{"id":38843,"date":"2023-10-26T16:39:47","date_gmt":"2023-10-26T16:39:47","guid":{"rendered":"https:\/\/skyplanner.ai\/%eb%b6%84%eb%a5%98%eb%90%98%ec%a7%80-%ec%95%8a%ec%9d%8c\/%ed%95%80%eb%9e%80%eb%93%9c-2023%eb%85%84-%ec%83%9d%ec%82%b0-%ea%b8%b0%ed%9a%8d%ec%9e%90-%ec%97%b0%eb%b4%89\/"},"modified":"2026-06-14T15:22:38","modified_gmt":"2026-06-14T15:22:38","slug":"%ed%95%80%eb%9e%80%eb%93%9c-2026%eb%85%84-%ec%83%9d%ec%82%b0-%ea%b8%b0%ed%9a%8d%ec%9e%90-%ec%97%b0%eb%b4%89","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ed%95%80%eb%9e%80%eb%93%9c-2026%eb%85%84-%ec%83%9d%ec%82%b0-%ea%b8%b0%ed%9a%8d%ec%9e%90-%ec%97%b0%eb%b4%89\/","title":{"rendered":"\ud540\ub780\ub4dc\uc758 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790 \uae09\uc5ec 2026"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\" id=\"h-production-planner-salary-in-finland-2026\">\ud540\ub780\ub4dc\uc758 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790 \uae09\uc5ec 2026<\/h1>\n\n\n<div class=\"gb-container gb-container-e8026af9\">\n\n<p><a href=\"\/ko\/\">\ud648<\/a>&nbsp;\u00bb&nbsp;<a href=\"\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/\">\uc790\ub8cc<\/a>&nbsp;\u00bb&nbsp;\ud540\ub780\ub4dc\uc758 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790 \uae09\uc5ec 2026<\/p>\n\n\n\n<\/div>\n\n<div class=\"gb-container gb-container-f0fd57d0\">\n<div class=\"gb-container gb-container-31dfeab3\"><div class=\"gb-inside-container\">\n\n<p><strong>2026\ub144 \ud540\ub780\ub4dc\uc758 \ud3c9\uade0 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790 \uae09\uc5ec\ub294 \uc5f0\uac04 \uc57d \u20ac48,783\uc774\uba70, \uc774\ub294 \uc138\uc804 \uc6d4 \uc57d \u20ac<strong>4,0<\/strong>65\uc5d0 \ud574\ub2f9\ud569\ub2c8\ub2e4. \uc774 \uc218\uce58\ub294 \uc804\uad6d \ud3c9\uade0\ubcf4\ub2e4 \uc57d\uac04 \ub192\uc73c\uba70, \uc774 \uc9c1\ubb34\uc758 \uc911\uc694\uc131\uacfc \uc218\uc694\ub97c \uc798 \ubcf4\uc5ec\uc90d\ub2c8\ub2e4.<\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p>2026\ub144, \ud540\ub780\ub4dc\uc758 \uc81c\uc870\uc5c5 \ubd80\ubb38\uc740 \ube44\ud560 \ub370 \uc5c6\ub294 \uc131\uc7a5\uc744 \ubc1c\uc0b0\ud558\uba70 \uae00\ub85c\ubc8c \uc2dc\uc7a5\uc5d0\uc11c \uad6d\uac00\uc758 \uc785\uc9c0\ub97c \uacf5\uace0\ud788 \ud558\uace0 \uc788\uc2b5\ub2c8\ub2e4. \uc774\ub7ec\ud55c \uc131\uc7a5\uc740 \ud6a8\uc728\uc801\uc778 \uc0dd\uc0b0 \uc6b4\uc601\uc758 \uc911\ucd94\uc778 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790\uc640 \uac19\uc740 \uc804\ubb38\uac00\uc758 \uac00\uce58\ub97c \ubd80\uac01\uc2dc\ud0b5\ub2c8\ub2e4. \uc9c0\uc18d \uac00\ub2a5\uc131\uc5d0 \ub300\ud55c \ud540\ub780\ub4dc\uc758 \uac15\uc870\uc640 \uc804\ub7b5\uc801 \uc9c0\ub9ac\uc801 \uc911\uc694\uc131\uc744 \uace0\ub824\ud560 \ub54c, \ud540\ub780\ub4dc\uc758 \uc81c\uc870 \uacbd\uc7c1\ub825\uc740 \ubd80\uc778\ud560 \uc218 \uc5c6\uc2b5\ub2c8\ub2e4. \ud658\uacbd\uc774 \uc9c4\ud654\ud568\uc5d0 \ub530\ub77c \uc774\ub7ec\ud55c \uc804\ubb38\uac00\ub4e4\uc740 \uc18c\ub4dd, \ubcf5\ub9ac\ud6c4\uc0dd \ub4f1\uacfc \uad00\ub828\ud558\uc5ec \ubb34\uc5c7\uc744 \uae30\ub300\ud560 \uc218 \uc788\uc744\uae4c\uc694? \uc790\uc138\ud788 \uc54c\uc544\ubcf4\uc138\uc694.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\ud540\ub780\ub4dc\uc758 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790 \uae09\uc5ec \uc774\ud574\ud558\uae30<\/h2>\n\n\n\n<p>2026\ub144 \ub3d9\uc548 \ud540\ub780\ub4dc \ub178\ub3d9 \uc778\uad6c\ub294 \ud569\ub9ac\uc801\uc778 \ubcf4\uc0c1 \ucd94\uc138\ub97c \uacbd\ud5d8\ud588\uc2b5\ub2c8\ub2e4. \ud540\ub780\ub4dc\uc5d0\uc11c \uc77c\ud558\ub294 \uac1c\uc778\uc740 \uc138\uc804 \uc5f0\uac04 \ud3c9\uade0 <strong>\u20ac48,384<\/strong>\uc758 \uae09\uc5ec\ub97c \uae30\ub300\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<p>2026\ub144 \ud540\ub780\ub4dc\uc758 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790\ub294 \uc5f0\ud3c9\uade0 <strong>\u20ac48,783<\/strong>\uc744 \ubc8c\uba70, \uc774\ub294 \uc138\uc804 \ub9e4\uc6d4 \uc57d <strong>\u20ac<strong><strong>4,0<\/strong>65<\/strong><\/strong>\uc5d0 \ud574\ub2f9\ud569\ub2c8\ub2e4. \uc774\ub7ec\ud55c \uc218\uce58\ub294 \ud574\ub2f9 \uad6d\uac00\uc758 \uc911\uc704 \uc18c\ub4dd\uc744 \ucd08\uacfc\ud558\uba70, \uc81c\uc870 \ubd84\uc57c\uc5d0\uc11c \uc774\ub7ec\ud55c \uc804\ubb38\uac00\ub4e4\uc758 \ud575\uc2ec\uc801\uc778 \uc5ed\ud560\uacfc \uc99d\uac00\ud558\ub294 \uc218\uc694\ub97c \uac15\uc870\ud569\ub2c8\ub2e4.<\/p>\n\n\n\n<p>\uadf8\ub7fc\uc5d0\ub3c4 \ubd88\uad6c\ud558\uace0 \ud540\ub780\ub4dc \ub0b4 \ub3c4\uc2dc, \uac1c\uc778\uc758 \uacbd\ub825, \ud2b9\uc815 \ud68c\uc0ac\uc640 \uac19\uc740 \uc694\uc778\ub4e4\uc774 \uc774 \uae09\uc5ec\uc5d0 \uc601\ud5a5\uc744 \ubbf8\uce60 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\uc778\uc811 \uad6d\uac00\uc640\uc758 \ube44\uad50 \ubd84\uc11d<\/h2>\n\n\n\n<p>\uc2a4\uce78\ub514\ub098\ube44\uc544 \uc9c0\uc5ed \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790\uc758 \ubcf4\uc218\ub97c \uc0b4\ud3b4\ubcf4\uba74, \ud540\ub780\ub4dc\ub294 \uacbd\uc7c1\ub825 \uc788\ub294 \uc704\uce58\uc5d0 \uc788\uc2b5\ub2c8\ub2e4. \uc608\ub97c \ub4e4\uc5b4, \ub192\uc740 \uc0dd\ud65c\ube44\ub85c \uc778\ud574 <a href=\"\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%eb%85%b8%eb%a5%b4%ec%9b%a8%ec%9d%b4-2026%eb%85%84-%ec%83%9d%ec%82%b0-%ea%b8%b0%ed%9a%8d%ec%9e%90-%ec%97%b0%eb%b4%89\/\">\ub178\ub974\uc6e8\uc774\uc758 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790 \uae09\uc5ec<\/a>\uc640 <a href=\"\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%8a%a4%ec%9b%a8%eb%8d%b4-2026%eb%85%84-%ec%83%9d%ec%82%b0-%ea%b8%b0%ed%9a%8d%ec%9e%90-%ec%97%b0%eb%b4%89\/\">\uc2a4\uc6e8\ub374\uc758 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790 \uae09\uc5ec<\/a>\ub294 \uc774 \uc9c1\ubb34\uc5d0 \ub300\ud574 \uc57d\uac04 \ub354 \ub192\uc2b5\ub2c8\ub2e4. <a href=\"\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%eb%8d%b4%eb%a7%88%ed%81%ac%ec%9d%98-%ec%83%9d%ec%82%b0-%ea%b8%b0%ed%9a%8d%ec%9e%90-%ec%97%b0%eb%b4%89-2026\/\">\ub374\ub9c8\ud06c\uc758 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790 \uae09\uc5ec<\/a>\ub294 \ud540\ub780\ub4dc\uc640 \ube44\uc2b7\ud55c \uc218\uc900\uc774\uba70, \uc5d0\uc2a4\ud1a0\ub2c8\uc544\uc640 \uac19\uc740 \ubc1c\ud2b8 \uad6d\uac00\ub4e4\uc740 \uc77c\ubc18\uc801\uc73c\ub85c \ub354 \ub0ae\uc740 \uc218\uce58\ub97c \ubcf4\uc785\ub2c8\ub2e4. \uc774\ub7ec\ud55c \uc591\uc0c1\uc740 \uc0dd\uc0b0 \uacc4\ud68d \ubd84\uc57c\uc5d0\uc11c \uacbd\ub825\uc744 \uc313\uace0\uc790 \ud558\ub294 \uc0ac\ub78c\ub4e4\uc5d0\uac8c \ud540\ub780\ub4dc\uc758 \ub9e4\ub825\uc744 \ub354\uc6b1 \uacac\uace0\ud558\uac8c \ub9cc\ub4ed\ub2c8\ub2e4.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f7e777f3\">\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Production planning and scheduling product image straight view\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Advanced production planning with AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Read more about our approach to production planning and optimization leveraging the power of AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"https:\/\/skyplanner.ai\/\" aria-label=\"Book a demo\">Production planning with AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div>\n\n<div class=\"gb-container gb-container-33d6b196\">\n\n<h2 class=\"gb-headline gb-headline-596b2be7 gb-headline-text\">\ud540\ub780\ub4dc\uc758 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790 \uae09\uc5ec\uc5d0 \uc601\ud5a5\uc744 \ubbf8\uce58\ub294 \uc694\uc778<\/h2>\n\n\n\n<h4 class=\"gb-headline gb-headline-8847af1b gb-headline-text\">\ud559\ub825<\/h4>\n\n\n\n<p>\uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790\uc758 \ud559\ub825\uc740 \ubcf4\uc218\ub97c \uacb0\uc815\ud558\ub294 \ub370 \uc885\uc885 \uc911\uc694\ud55c \uc5ed\ud560\uc744 \ud569\ub2c8\ub2e4. \ud2b9\ud788 \uc81c\uc870, \ubb3c\ub958 \ub610\ub294 \uacf5\uae09\ub9dd \uad00\ub9ac \uad00\ub828 \ubd84\uc57c\uc758 \uace0\uae09 \ud559\uc704\ub97c \ubcf4\uc720\ud55c \uc0ac\ub78c\uc740 \ub354 \ub192\uc740 \uae09\uc5ec\ub97c \ubc1b\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc790\uaca9\uc99d\uc774\ub098 \uc804\ubb38 \uad50\uc721 \ub610\ud55c \uc9c0\uc6d0\uc790\uc758 \uc2dc\uc7a5 \uac00\uce58\ub97c \ub192\uc77c \uc218 \uc788\ub294\ub370, \uace0\uc6a9\uc8fc\uac00 \uc774\ub97c \ud574\ub2f9 \ubd84\uc57c\uc5d0 \ub300\ud55c \uc804\ubb38\uc131\uacfc \ud5cc\uc2e0\uc758 \uc99d\uac70\ub85c \ubcf4\uae30 \ub54c\ubb38\uc785\ub2c8\ub2e4.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-94d55399 gb-headline-text\">\uacbd\ub825<\/h4>\n\n\n\n<p>\ub9ce\uc740 \uc9c1\uc885\uc5d0\uc11c \uadf8\ub7ec\ud558\ub4ef\uc774 \uacbd\ub825\uc740 \uc911\uc694\ud569\ub2c8\ub2e4. \uc5ec\ub7ec \ud574\uc758 \uc5c5\uacc4 \uacbd\ud5d8\uc744 \uc313\uc740 \ub178\ub828\ud55c \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790\ub294 \ub354 \ub192\uc740 \uae09\uc5ec\ub97c \ud655\ubcf4\ud560 \uac00\ub2a5\uc131\uc774 \ub192\uc2b5\ub2c8\ub2e4. \uadf8\ub4e4\uc758 \uc2e4\ubb34 \uc9c0\uc2dd, \ubcf5\uc7a1\ud55c \ubb38\uc81c\ub97c \ud574\uacb0\ud558\ub294 \ub2a5\ub825, \uadf8\ub9ac\uace0 \uc5ed\ud560\uc758 \ubbf8\ubb18\ud55c \ubd80\ubd84\uc5d0 \ub300\ud55c \uc775\uc219\ud568\uc740 \uace0\uc6a9\uc8fc\uc5d0\uac8c \ub9e4\uc6b0 \uadc0\uc911\ud55c \uc790\uc0b0\uc774 \ub418\uba70, \uc774\ub294 \ub354 \ub9ce\uc740 \ubcf4\uc218\ub97c \uc815\ub2f9\ud654\ud569\ub2c8\ub2e4.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-ca05dd1b gb-headline-text\">\uc5ed\ub7c9<\/h4>\n\n\n\n<p>\uc815\uaddc \uad50\uc721\uacfc \ud604\uc7a5 \uacbd\ub825 \uc5f0\uc218\ub97c \ub118\uc5b4, \ud2b9\uc815 \uc5ed\ub7c9\uc740 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790\uc758 \uae09\uc5ec\uc5d0 \uc0c1\ub2f9\ud55c \uc601\ud5a5\uc744 \ubbf8\uce60 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ucd5c\uc2e0 \uc5c5\uacc4 \uc18c\ud504\ud2b8\uc6e8\uc5b4\uc5d0 \ub300\ud55c \uc219\ub828\ub3c4, \ubd84\uc11d \ub2a5\ub825, \uadf8\ub9ac\uace0 \uc758\uc0ac\uc18c\ud1b5 \ubc0f \ud611\uc0c1 \ub2a5\ub825\uc740 \uc9c0\uc6d0\uc790\ub97c \ucc28\ubcc4\ud654\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc9c0\uc18d\uc801\uc73c\ub85c \uc5ed\ub7c9\uc744 \ud5a5\uc0c1\uc2dc\ud0a4\uace0 \uc5ed\ud560\uc758 \ubcc0\ud654\ud558\ub294 \uc694\uad6c\uc5d0 \uc801\uc751\ud558\ub294 \uc0ac\ub78c\ub4e4\uc740 \uc885\uc885 \uc7ac\uc815\uc801\uc73c\ub85c \uc720\ub9ac\ud55c \uc704\uce58\uc5d0 \uc11c\uac8c \ub429\ub2c8\ub2e4.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-3198e200 gb-headline-text\">\uadfc\ubb34\uc9c0<\/h4>\n\n\n\n<p>\uae09\uc5ec\ub294 \uc9c0\ub9ac\uc801 \uc9c0\uc5ed\uc5d0 \ub530\ub77c \ud06c\uac8c \ub2ec\ub77c\uc9c8 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ud5ec\uc2f1\ud0a4\ucc98\ub7fc \uc81c\uc870\uc5c5\uc774 \ubc00\uc9d1\ud55c \ub3c4\uc2dc \uc911\uc2ec\ubd80\ub294 \ub18d\ucd0c \uc9c0\uc5ed\ubcf4\ub2e4 \ub354 \uacbd\uc7c1\ub825 \uc788\ub294 \ud328\ud0a4\uc9c0\ub97c \uc81c\uacf5\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc0dd\ud65c\ube44, \uc0b0\uc5c5 \uc218\uc694, \uc9c0\uc5ed \uacbd\uc81c \uac74\uc804\uc131\uc740 \ubaa8\ub450 \uac01 \uc9c0\uc5ed \ub0b4 \uae09\uc5ec \uad6c\uc870\ub97c \ud615\uc131\ud569\ub2c8\ub2e4.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-f4aa40a7 gb-headline-text\">\ud68c\uc0ac\uc758 \uaddc\ubaa8<\/h4>\n\n\n\n<p>\uc77c\ubc18\uc801\uc73c\ub85c \uad11\ubc94\uc704\ud55c \uc6b4\uc601\uacfc \ub192\uc740 \ub9e4\ucd9c\uc744 \uac00\uc9c4 \ub354 \ud070 \ub300\uae30\uc5c5\uc740 \uc18c\uaddc\ubaa8 \uae30\uc5c5\ubcf4\ub2e4 \ub354 \ub098\uc740 \uae09\uc5ec\uc640 \ubcf5\ub9ac\ud6c4\uc0dd\uc744 \uc81c\uacf5\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc778\uc7ac\uc5d0 \ud22c\uc790\ud560 \uc218 \uc788\ub294 \uadf8\ub4e4\uc758 \uc5ed\ub7c9\uacfc \ub354\ubd88\uc5b4 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790\uac00 \uac10\ub3c5\ud558\uac8c \ub420 \uc5c5\ubb34\uc758 \uaddc\ubaa8\uc640 \ubcf5\uc7a1\uc131\uc740 \uadf8\ub4e4\uc774 \uc81c\uc2dc\ud558\ub294 \uae09\uc5ec \uad6c\uac04\uc5d0 \uc601\ud5a5\uc744 \ubbf8\uce60 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-6a3b42a6 gb-headline-text\">\ud68c\uc0ac\uc758 \uc720\ud615<\/h4>\n\n\n\n<p>\ud68c\uc0ac\uac00 \uc18d\ud55c \uc0b0\uc5c5 \ubd80\ubb38\uc774\ub098 \ud2c8\uc0c8 \uc2dc\uc7a5\uc740 \uae09\uc5ec \uc218\uc900\uc5d0 \uc601\ud5a5\uc744 \ubbf8\uce60 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc804\uc790\ub098 \uc81c\uc57d\ucc98\ub7fc \uc790\ubcf8 \uc9d1\uc57d\uc801 \uc0b0\uc5c5\uc774\ub098 \ub192\uc740 \uc774\uc775\ub960\uc744 \uac00\uc9c4 \uc0b0\uc5c5\uc758 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790\ub294 \ubcf4\ub2e4 \uc804\ud1b5\uc801\uc778 \uc81c\uc870 \ubd80\ubb38\uc758 \ub2f4\ub2f9\uc790\ubcf4\ub2e4 \ub354 \ub098\uc740 \ubcf4\uc0c1\uc744 \ubc1b\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc11c\ub85c \ub2e4\ub978 \uc0b0\uc5c5 \ub0b4\uc5d0\uc11c \uc0dd\uc0b0 \uacc4\ud68d \uc5ed\ud560\uc758 \uc804\ub7b5\uc801 \uc911\uc694\uc131\uacfc \uad6c\uccb4\uc801\uc778 \uacfc\uc81c \ub610\ud55c \uae09\uc5ec \ucc28\uc774\uc5d0 \uae30\uc5ec\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790\uc758 \uc5ed\ud560 \uc774\ud574\ud558\uae30<\/h2>\n\n\n\n<p>\uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790\ub294 \uc81c\uc870\uc640 \ud6a8\uc728\uc131\uc758 \uc811\uc810\uc5d0\uc11c \uc77c\ud569\ub2c8\ub2e4. \ud558\ub098 \ub610\ub294 \uc5ec\ub7ec \uc81c\ud488\uc758 \uc0dd\uc0b0 \uc6cc\ud06c\ud50c\ub85c\ub97c \uc870\uc728\ud558\ub294 \uc784\ubb34\ub97c \ub9e1\uc544, \uc6d0\uc790\uc7ac \uc870\ub2ec\ubd80\ud130 \ucd5c\uc885 \uc81c\ud488 \ucd9c\ud558\uc5d0 \uc774\ub974\uae30\uae4c\uc9c0 \uc0dd\uc0b0 \uacf5\uc815\uc758 \uac01 \ub2e8\uacc4\uac00 \uc9c0\uc5f0\uc774\ub098 \ucc28\uc9c8 \uc5c6\uc774 \uc9c4\ud589\ub418\ub3c4\ub85d \ubcf4\uc7a5\ud569\ub2c8\ub2e4.<\/p>\n\n\n\n<p><strong>\ud68c\uc0ac\uc5d0\uc11c \uadf8\ub4e4\uc774 \ub9e1\ub294<\/strong> <strong>\uc77c\ubd80 \uc5c5\ubb34\ub294 \ub2e4\uc74c\uacfc \uac19\uc2b5\ub2c8\ub2e4:<\/strong><\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>\uc218\uc694 \uc608\uce21:<\/strong>&nbsp;\uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790\uc758 \uc8fc\uc694 \ucc45\uc784 \uc911 \ud558\ub098\ub294 \uc81c\ud488 \uc218\uc694\ub97c \uc608\uce21\ud558\uc5ec \uc774\ub7ec\ud55c \uc608\uce21\uc744 \ucda9\uc871\ud560 \ucda9\ubd84\ud55c \uc790\uc6d0\uacfc \uc790\uc7ac\ub97c \ud655\ubcf4\ud558\ub294 \uac83\uc785\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\uc790\uc6d0 \ubc30\ubd84:<\/strong>&nbsp;\uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790\ub294 \uc790\uc6d0\uc758 \ucd5c\uc801 \ud65c\uc6a9\uc744 \ubcf4\uc7a5\ud569\ub2c8\ub2e4. \uc5b4\ub5a4 \uc791\uc5c5\uc744 \uc5b4\ub5a4 \uae30\uacc4\uc5d0\uc11c \uc5bc\ub9c8\ub098 \uc624\ub798 \uc2e4\ud589\ud560\uc9c0 \uacb0\uc815\ud558\uc5ec \ud6a8\uc728\uc131\uacfc \uc0b0\ucd9c\ub7c9\uc744 \uadf9\ub300\ud654\ud569\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\uc77c\uc815 \uacc4\ud68d:<\/strong>&nbsp;\uadf8\ub4e4\uc740 \uc0c1\uc138\ud55c \uc0dd\uc0b0 \uc77c\uc815\uc744 \uc218\ub9bd\ud558\uace0 \ud504\ub85c\uc81d\ud2b8\uc640 \uc8fc\ubb38\uc758 \uc801\uc2dc \uc644\ub8cc\ub97c \ubcf4\uc7a5\ud558\ub294 \ucc45\uc784\uc744 \ub9e1\uc2b5\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\uc7ac\uace0 \uad00\ub9ac:<\/strong>&nbsp;\uadf8\ub4e4\uc758 \uc5ed\ud560\uc5d0\uc11c \uc911\uc694\ud55c \ubd80\ubd84\uc740 \uc7ac\uace0 \uc218\uc900\uc744 \ubaa8\ub2c8\ud130\ub9c1\ud558\uc5ec, \ub0ad\ube44\ub85c \uc774\uc5b4\uc9c0\ub294 \uacfc\uc789\ub3c4 \uc0dd\uc0b0 \uc911\ub2e8\uc744 \ucd08\ub798\ud558\ub294 \ubd80\uc871\ub3c4 \uc5c6\ub3c4\ub85d \ubcf4\uc7a5\ud558\ub294 \uac83\uc785\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\ud0c0 \ubd80\uc11c\uc640\uc758 \ud611\ub825:<\/strong>&nbsp;\uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790\ub294 \uad6c\ub9e4, \ucc3d\uace0, \ubb3c\ub958\uc640 \uac19\uc740 \ubd80\uc11c\uc640 \uc815\uae30\uc801\uc73c\ub85c \uc18c\ud1b5\ud558\uc5ec \uc0dd\uc0b0 \uacf5\uc815\uc758 \uc6d0\ud65c\ud55c \ud750\ub984\uc744 \ubcf4\uc7a5\ud569\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\ud488\uc9c8 \ubcf4\uc99d:<\/strong>&nbsp;\ub610\ud55c \uc81c\ud488 \ud488\uc9c8 \uc720\uc9c0\uc5d0 \uc911\uc694\ud55c \uc5ed\ud560\uc744 \ud558\uba70, \uc0dd\uc0b0 \ubc29\uc2dd\uc774 \ud655\ub9bd\ub41c \ud45c\uc900\uacfc \uc9c0\uce68\uc744 \uc900\uc218\ud558\ub3c4\ub85d \ubcf4\uc7a5\ud569\ub2c8\ub2e4.<\/li>\n<\/ol>\n\n\n\n<h2 class=\"gb-headline gb-headline-fcf2aadc gb-headline-text\">\uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790\uc5d0\uac8c \ud544\uc694\ud55c \uc5ed\ub7c9<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>\ubd84\uc11d \ub2a5\ub825:<\/strong>&nbsp;\ubcf5\uc7a1\ud55c \ub370\uc774\ud130 \uc138\ud2b8\ub97c \ubd84\uc11d\ud558\uc5ec \uc218\uc694\ub97c \uc608\uce21\ud558\uace0 \uc0dd\uc0b0 \uc77c\uc815\uc744 \uacb0\uc815\ud558\ub294 \ub2a5\ub825\uc740 \ub9e4\uc6b0 \uc911\uc694\ud569\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\uc758\uc0ac\uc18c\ud1b5:<\/strong>&nbsp;\ud68c\uc0ac \ub0b4 \ub2e4\uc591\ud55c \ubd80\uc11c\uc640 \uc9c1\uae09\uc5d0 \uc790\uc2e0\uc758 \uacc4\ud68d\uc744 \uba85\ud655\ud558\uac8c \uc804\ub2ec\ud560 \uc218 \uc788\uc5b4\uc57c \ud569\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\ubb38\uc81c \ud574\uacb0:<\/strong>&nbsp;\uc0dd\uc0b0\uc0c1\uc758 \ucc28\uc9c8\uc740 \ubd88\uac00\ud53c\ud569\ub2c8\ub2e4. \uc2e0\uc18d\ud55c \ud310\ub2e8\uacfc \uc2e4\uc6a9\uc801\uc778 \ubb38\uc81c \ud574\uacb0 \ub2a5\ub825\uc740 \ud63c\ub780\uc744 \ucd5c\uc18c\ud654\ud569\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\uae30\uc220\uc801 \uc219\ub828\ub3c4:<\/strong>&nbsp;\uc5c5\uacc4 \ud2b9\ud654 \uc18c\ud504\ud2b8\uc6e8\uc5b4 \ubc0f \ub3c4\uad6c\uc5d0 \ub300\ud55c \uce5c\uc219\ud568\uc740 \uc0c1\ub2f9\ud55c \uac15\uc810\uc774 \ub420 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\uc138\ubd80 \uc0ac\ud56d\uc5d0 \ub300\ud55c \uc8fc\uc758:<\/strong>&nbsp;\uad11\ubc94\uc704\ud55c \uc0dd\uc0b0 \ud658\uacbd\uc744 \uac10\ub3c5\ud558\ub824\uba74 \uc544\ubb34\ub9ac \uc0ac\uc18c\ud55c \uc138\ubd80 \uc0ac\ud56d\uc774\ub77c\ub3c4 \ub193\uce58\uc9c0 \uc54a\ub3c4\ub85d \uaf3c\uaf3c\ud568\uc774 \ud544\uc694\ud569\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\uc801\uc751\ub825:<\/strong>&nbsp;\ub04a\uc784\uc5c6\uc774 \uc9c4\ud654\ud558\ub294 \uc81c\uc870 \ubd84\uc57c\uc5d0\uc11c \uc0c8\ub85c\uc6b4 \uae30\uc220\uacfc \ubc29\ubc95\ub860\uc744 \uc218\uc6a9\ud558\ub294 \uc790\uc138\ub294 \uc720\uc775\ud569\ub2c8\ub2e4.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"gb-headline gb-headline-fd024514 gb-headline-text\">AI\ub97c \uac16\ucd98 APS\uac00 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790\uc758 \uc5c5\ubb34\uc5d0 \ubbf8\uce58\ub294 \uc601\ud5a5<\/h2>\n\n\n\n<p><a href=\"\/ko\/\">SkyPlanner<\/a>\uc640 \uac19\uc774 \uc778\uacf5\uc9c0\ub2a5\uacfc \ud1b5\ud569\ub41c \uace0\uae09 \uc0dd\uc0b0 \uc2a4\ucf00\uc904\ub9c1 \uc2dc\uc2a4\ud15c(APS)\uc740 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790\uc5d0\uac8c \ud310\ub3c4\ub97c \ubc14\uafb8\ub294 \uc694\uc18c\uac00 \ub420 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uadf8 \ubc29\ubc95\uc740 \ub2e4\uc74c\uacfc \uac19\uc2b5\ub2c8\ub2e4:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>\uace0\uae09 \ud1b5\ud569:<\/strong>&nbsp;AI\ub85c \uac15\ud654\ub41c APS \uc2dc\uc2a4\ud15c\uc740 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790\uc5d0\uac8c \uc0c1\ub2f9\ud55c \uc774\uc810\uc744 \uc81c\uacf5\ud569\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\uc608\uce21 \ubd84\uc11d:<\/strong>&nbsp;APS \uc2dc\uc2a4\ud15c\uc758 AI\ub294 \uc218\uc694 \uc608\uce21\uc744 \ud5a5\uc0c1\uc2dc\ucf1c \ub354 \ub098\uc740 \uc790\uc6d0 \uacc4\ud68d\uc73c\ub85c \uc774\uc5b4\uc9d1\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\uc790\uc728 \uc801\uc751:<\/strong>&nbsp;\uc774 \uc2dc\uc2a4\ud15c\uc740 \uc7a5\ube44 \uace0\uc7a5\uacfc \uac19\uc740 \uc2e4\uc2dc\uac04 \ubcc0\ud654\uc5d0 \uc790\uc728\uc801\uc73c\ub85c \uc801\uc751\ud569\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\ud6a8\uc728\uc801\uc778 \ub370\uc774\ud130 \ubd84\uc11d:<\/strong>&nbsp;\ub300\uaddc\ubaa8 \ub370\uc774\ud130\uc14b\uc744 \ubd84\uc11d\ud558\ub294 AI\uc758 \uc5ed\ub7c9\uc740 \ud6a8\uc728\uc131 \uac1c\uc120\uc744 \uc704\ud55c \uc911\uc694\ud55c \ud1b5\ucc30\uc744 \uc81c\uacf5\ud569\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\uc791\uc5c5 \uc790\ub3d9\ud654:<\/strong>&nbsp;\uc774 \uc2dc\uc2a4\ud15c\uc740 \uc77c\uc0c1\uc801\uc778 \uc791\uc5c5\uc744 \uc790\ub3d9\ud654\ud558\uc5ec \uacc4\ud68d \ub2f4\ub2f9\uc790\uac00 \uc804\ub7b5\uc801 \uc758\uc0ac \uacb0\uc815\uc5d0 \uc9d1\uc911\ud560 \uc218 \uc788\ub3c4\ub85d \ud569\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\ucd5c\uc801\ud654\ub41c \ud504\ub85c\uc138\uc2a4:<\/strong>&nbsp;AI \uad8c\uc7a5 \uc0ac\ud56d\uc740 \uc790\uc6d0\uc758 \ucd5c\uc801 \uc0ac\uc6a9\uc744 \uc9c0\uc6d0\ud558\uc5ec \uc0dd\uc0b0\uc744 \uac04\uc18c\ud654\ud569\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\uc804\ub7b5\uc801 \uc758\uc0ac \uacb0\uc815:<\/strong>&nbsp;APS \uc2dc\uc2a4\ud15c\uc758 AI\ub294 \ub354 \ub098\uc740 \uacc4\ud68d \uc218\ub9bd\uc744 \uc704\ud55c \uc9c0\ub2a5\ud615 \uc81c\uc548\uc744 \uc81c\uacf5\ud569\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\ub354 \uc6d0\ud65c\ud55c \uc6b4\uc601:<\/strong>&nbsp;AI \ud1b5\ud569\uc740 \ub354 \uc6d0\ud65c\ud55c \uc0dd\uc0b0 \uc6cc\ud06c\ud50c\ub85c\uc6b0\uc640 \ubcd1\ubaa9 \ud604\uc0c1 \uac10\uc18c\ub97c \ubcf4\uc7a5\ud569\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\ud5a5\uc0c1\ub41c \uc0dd\uc0b0\uc131:<\/strong>&nbsp;AI\uc640 APS\ub97c \uacb0\ud569\ud558\uba74 \ub354\uc6b1 \ucd5c\uc801\ud654\ub418\uace0 \ud6a8\uc728\uc801\uc778 \uc0dd\uc0b0 \ud504\ub85c\uc138\uc2a4\ub97c \uc5bb\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"gb-headline gb-headline-8bba528d gb-headline-text\">\ud540\ub780\ub4dc\uc5d0\uc11c \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790\ub97c \ucc44\uc6a9\ud558\ub294 \uc0b0\uc5c5<\/h2>\n\n\n\n<p>\uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790\ub294 \ud540\ub780\ub4dc\uc758 \ub2e4\uc591\ud55c \uc0b0\uc5c5, \ud2b9\ud788 \uc774 \ub098\ub77c\uc758 \uacac\uace0\ud55c \uacbd\uc81c\ub97c \uc120\ub3c4\ud558\ub294 \uc0b0\uc5c5\uc5d0\uc11c \uc911\uc694\ud55c \uc5ed\ud560\uc744 \ud569\ub2c8\ub2e4. \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790\uc5d0 \ub300\ud55c \uc218\uc694\uac00 \ub192\uc740 \uc8fc\uc694 \ubd80\ubb38\uc740 \ub2e4\uc74c\uacfc \uac19\uc2b5\ub2c8\ub2e4:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>\uae30\uc220 \ubc0f \uc804\uc790:<\/strong>&nbsp;\ucca8\ub2e8 \uae30\uc220 \ubd80\ubb38\uc73c\ub85c \uc720\uba85\ud55c \ud540\ub780\ub4dc\ub294 \uc804\uc790, \ud1b5\uc2e0, \uc18c\ud504\ud2b8\uc6e8\uc5b4 \uac1c\ubc1c\uc744 \uc804\ubb38\uc73c\ub85c \ud558\ub294 \uae30\uc5c5\uc5d0\uc11c \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790\uc5d0\uac8c \ud48d\ubd80\ud55c \uae30\ud68c\ub97c \uc81c\uacf5\ud569\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\uc790\ub3d9\ucc28:<\/strong>&nbsp;\uc77c\ubd80 \ub2e4\ub978 \uad6d\uac00\uc5d0 \ube44\ud574 \uaddc\ubaa8\ub294 \uc791\uc9c0\ub9cc, \uc804\uae30\ucc28 \uc0dd\uc0b0\uc744 \ud3ec\ud568\ud55c \ud540\ub780\ub4dc\uc758 \uc790\ub3d9\ucc28 \ubd80\ubb38\uc740 \ud6a8\uc728\uc801\uc778 \uc81c\uc870 \uacf5\uc815\uc744 \uc704\ud574 \uc219\ub828\ub41c \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790\uc5d0 \uc758\uc874\ud569\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\uc784\uc0b0\ubb3c \ubc0f \uc81c\uc9c0 \uc81c\uc870:<\/strong>&nbsp;\uc81c\uc9c0 \ubc0f \ud384\ud504 \uc81c\uc870\ub97c \ud3ec\ud568\ud55c \ud540\ub780\ub4dc\uc758 \uc784\uc0b0\ubb3c \uc0b0\uc5c5\uc740 \uac00\uc7a5 \uc911\uc694\ud55c \uc0b0\uc5c5 \uc911 \ud558\ub098\uc785\ub2c8\ub2e4. \uc774 \ubd80\ubb38\uc758 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790\ub294 \ubaa9\uc7ac \uc218\ud655\ubd80\ud130 \ucd5c\uc885 \uc81c\ud488 \ub0a9\ud488\uae4c\uc9c0 \ubcf5\uc7a1\ud55c \uacfc\uc815\uc744 \uad00\ub9ac\ud569\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\uae30\uacc4 \ubc0f \uc7a5\ube44 \uc81c\uc870:<\/strong>&nbsp;\uc774 \uc0b0\uc5c5\uc740 \uc911\uc7a5\ube44 \ubc0f \uc0b0\uc5c5 \uc7a5\ube44\uc758 \uc0dd\uc0b0\uc744 \ud3ec\ud568\ud558\uba70, \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790\ub294 \uac04\uc18c\ud654\ub41c \uc81c\uc870 \uc6cc\ud06c\ud50c\ub85c\uc6b0\uc640 \uc801\uc2dc \ub0a9\ud488\uc744 \ubcf4\uc7a5\ud569\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\uc2dd\uc74c\ub8cc \uc0b0\uc5c5:<\/strong>&nbsp;\ud540\ub780\ub4dc \uc2dd\uc74c\ub8cc \ubd80\ubb38\uc758 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790\ub294 \uc9c0\uc18d \uac00\ub2a5\uc131\uacfc \ud601\uc2e0\uc5d0 \uc911\uc810\uc744 \ub450\ub294 \uac83\uc73c\ub85c \uc54c\ub824\uc9c4 \uc0b0\uc5c5\uc5d0\uc11c \uacf5\uae09\ub9dd, \uc0dd\uc0b0 \uc77c\uc815, \ud488\uc9c8 \uad00\ub9ac\ub97c \uad00\ub9ac\ud569\ub2c8\ub2e4.<\/li>\n<\/ol>\n\n\n\n<h2 class=\"gb-headline gb-headline-6308260c gb-headline-text\">\ud540\ub780\ub4dc \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790\uc758 \uae09\uc5ec \uc678 \ud61c\ud0dd<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>\ud3ec\uad04\uc801\uc778 \uc758\ub8cc \uc11c\ube44\uc2a4:<\/strong>&nbsp;\ud540\ub780\ub4dc\ub294 \uc138\uacc4 \ucd5c\uace0 \uc218\uc900\uc758 \uc758\ub8cc \uc2dc\uc2a4\ud15c\uc744 \uc790\ub791\ud569\ub2c8\ub2e4. \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790\ub3c4 \ub2e4\ub978 \uc9c1\uc6d0\ub4e4\uacfc \ub9c8\ucc2c\uac00\uc9c0\ub85c \ud3ed\ub113\uc740 \uc758\ub8cc \ubcf4\uc7a5 \ud61c\ud0dd\uc744 \ub204\ub9bd\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\ub109\ub109\ud55c \ud734\uac00 \uc77c\uc218:<\/strong>&nbsp;\ud540\ub780\ub4dc \uae30\uc5c5\ub4e4\uc740 \ucda9\ubd84\ud55c \uc5f0\ucc28 \ud734\uac00\ub97c \uc81c\uacf5\ud558\uc5ec \uc804\ubb38\uac00\ub4e4\uc774 \uac74\uac15\ud55c \uc77c\uacfc \uc0b6\uc758 \uade0\ud615\uc744 \uc720\uc9c0\ud560 \uc218 \uc788\ub3c4\ub85d \ud569\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\ud1f4\uc9c1 \ud61c\ud0dd:<\/strong>&nbsp;\ud0c4\ud0c4\ud55c \uc5f0\uae08 \uc2dc\uc2a4\ud15c\uc740 \uc9c1\uc6d0\ub4e4\uc774 \ud3b8\uc548\ud55c \ub178\ud6c4\ub97c \uae30\ub300\ud560 \uc218 \uc788\ub3c4\ub85d \ubcf4\uc7a5\ud569\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\uc804\ubb38\uc131 \uac1c\ubc1c \uae30\ud68c:<\/strong>&nbsp;\ud540\ub780\ub4dc\uc758 \ub9ce\uc740 \uae30\uc5c5\ub4e4\uc740 \uc9c1\uc6d0\ub4e4\uc758 \uc9c0\uc18d\uc801\uc778 \ud559\uc2b5\uc744 \uc6b0\uc120\uc2dc\ud558\uba70, \ub2e4\uc591\ud55c \uad50\uc721 \uacfc\uc815\uacfc \ud6c8\ub828\uc744 \uc81c\uacf5\ud569\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\uc77c\uacfc \uc0b6\uc758 \uade0\ud615:<\/strong>&nbsp;\ud540\ub780\ub4dc\uc758 \uc9c1\uc7a5\uc740 \uc720\uc5f0\ud55c \uadfc\ubb34 \uc2dc\uac04\uacfc \uc6d0\uaca9 \uadfc\ubb34 \uae30\ud68c\ub97c \ud1b5\ud574 \uade0\ud615 \uc7a1\ud78c \uc0dd\ud65c \ubc29\uc2dd\uc744 \uc7a5\ub824\ud558\ub294 \uacbd\uc6b0\uac00 \ub9ce\uc2b5\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\uace0\uc6a9 \uc548\uc815\uc131:<\/strong>&nbsp;\uc81c\uc870\uc5c5 \ubd80\ubb38\uc758 \uafb8\uc900\ud55c \uc131\uc7a5\uc740 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790\uc5d0\uac8c \uc548\uc815\uc801\uc778 \uace0\uc6a9 \ud658\uacbd\uc744 \uc81c\uacf5\ud569\ub2c8\ub2e4.<\/li>\n<\/ol>\n\n\n\n<h2 class=\"gb-headline gb-headline-a1c255a8 gb-headline-text\">\ud540\ub780\ub4dc\ub294 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790\uc5d0\uac8c \uc801\ud569\ud55c \uacf3\uc77c\uae4c\uc694?<\/h2>\n\n\n\n<p>\ud540\ub780\ub4dc \uc81c\uc870\uc5c5 \ubd80\ubb38\uc758 \ubc1c\uc804 \uada4\uc801\uc740 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790\uc5d0\uac8c \uc720\ub9dd\ud55c \uadf8\ub9bc\uc744 \uadf8\ub824 \ubcf4\uc785\ub2c8\ub2e4. \uad6d\uac00\uc758 \uc0b0\uc5c5\ub4e4\uc774 \ud601\uc2e0\uc5d0 \uae30\ub300\uba74\uc11c, \uacbd\ud5d8\uc774 \ud48d\ubd80\ud558\uace0 \uc219\ub828\ub41c \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790\uc5d0 \ub300\ud55c \uc218\uc694\ub294 \uad73\uac74\ud558\uac8c \uc720\uc9c0\ub429\ub2c8\ub2e4.&nbsp;<\/p>\n\n\n\n<p>APS \uc2dc\uc2a4\ud15c\uacfc \uac19\uc740 \ub3c4\uad6c\uc758 \ub3c4\uc785\uc740 \ucd5c\uace0 \uc218\uc900\uc758 \uc6b4\uc601 \ud6a8\uc728\uc131\uc744 \ub2ec\uc131\ud558\ub824\ub294 \uc5c5\uacc4\uc758 \ucd94\uc9c4\ub825\uc744 \uac15\uc870\ud569\ub2c8\ub2e4. SkyPlanner\uc640 \uac19\uc740 AI \ud50c\ub7ab\ud3fc\uacfc \uacb0\ud569\ub418\uba74, \uc774\ub7ec\ud55c \uc2dc\uc2a4\ud15c\uc740 \uc0dd\uc0b0 \ud658\uacbd\uc744 \ubcc0\ud654\uc2dc\ud0a4\uace0 \ud6a8\uc728\uc131\uacfc \uc0dd\uc0b0\uc131\uc744 \uba87 \ubc30\ub85c \uc99d\ud3ed\uc2dc\ud0b5\ub2c8\ub2e4. \uc774\ub7ec\ud55c \ubcc0\ud654\ub294 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790\uc5d0\uac8c \uace0\uc6a9 \uc548\uc815\uc131\uc744 \uc57d\uc18d\ud558\uba70, \uae30\uc220\uacfc \uc804\ub7b5\uc801 \uacc4\ud68d\uc744 \uc804\ub840 \uc5c6\ub294 \ubc29\uc2dd\uc73c\ub85c \ud1b5\ud569\ud558\uba74\uc11c \uadf8\ub4e4\uc758 \uc5ed\ud560\uc774 \uc9c4\ud654\ud558\ub294 \ubbf8\ub798\ub97c \uc2dc\uc0ac\ud569\ub2c8\ub2e4. \ud540\ub780\ub4dc \uc81c\uc870\uc5c5\uc774 \ud601\uc2e0\uc744 \ubc14\ud0d5\uc73c\ub85c \ubc88\ucc3d\ud558\ub294 \ud55c, \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790\ub294 \uadf8 \ucd5c\uc804\uc120\uc5d0 \ub0a8\uc544 \ubc1c\uc804\uc744 \ud615\uc131\ud558\uace0 \uc774\ub04c\uc5b4 \uac08 \uac83\uc785\ub2c8\ub2e4.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-92545123\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-0a61546f\">\n<div class=\"gb-grid-column gb-grid-column-e4183086\"><div class=\"gb-container gb-container-e4183086\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-84ccbb5d\"><div class=\"gb-container gb-container-84ccbb5d\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\ud540\ub780\ub4dc\uc758 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790 \uae09\uc5ec 2026 \ud648&nbsp;\u00bb&nbsp;\uc790\ub8cc&nbsp;\u00bb&nbsp;\ud540\ub780\ub4dc\uc758 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790 \uae09\uc5ec 2026 2026\ub144 \ud540\ub780\ub4dc\uc758 \ud3c9\uade0 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790 \uae09\uc5ec\ub294 \uc5f0\uac04 \uc57d \u20ac48,783\uc774\uba70, \uc774\ub294 \uc138\uc804 \uc6d4 \uc57d \u20ac4,065\uc5d0 \ud574\ub2f9\ud569\ub2c8\ub2e4. \uc774 \uc218\uce58\ub294 \uc804\uad6d \ud3c9\uade0\ubcf4\ub2e4 \uc57d\uac04 \ub192\uc73c\uba70, \uc774 \uc9c1\ubb34\uc758 \uc911\uc694\uc131\uacfc \uc218\uc694\ub97c \uc798 \ubcf4\uc5ec\uc90d\ub2c8\ub2e4. 2026\ub144, \ud540\ub780\ub4dc\uc758 \uc81c\uc870\uc5c5 \ubd80\ubb38\uc740 \ube44\ud560 \ub370 \uc5c6\ub294 \uc131\uc7a5\uc744 \ubc1c\uc0b0\ud558\uba70 \uae00\ub85c\ubc8c \uc2dc\uc7a5\uc5d0\uc11c \uad6d\uac00\uc758 \uc785\uc9c0\ub97c \uacf5\uace0\ud788 \ud558\uace0 &#8230; <a title=\"\ud540\ub780\ub4dc\uc758 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790 \uae09\uc5ec 2026\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ed%95%80%eb%9e%80%eb%93%9c-2026%eb%85%84-%ec%83%9d%ec%82%b0-%ea%b8%b0%ed%9a%8d%ec%9e%90-%ec%97%b0%eb%b4%89\/\" aria-label=\"Read more about \ud540\ub780\ub4dc\uc758 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790 \uae09\uc5ec 2026\">Read more<\/a><\/p>\n","protected":false},"author":6,"featured_media":38844,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[496,2735],"tags":[],"class_list":["post-38843","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-496","category-2735","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\ud540\ub780\ub4dc\uc758 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790 \uae09\uc5ec 2026<\/title>\n<meta name=\"description\" content=\"2026\ub144 \ud540\ub780\ub4dc\uc758 \ud3c9\uade0 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790 \uae09\uc5ec\ub294 \uc5f0\uac04 \uc57d \u20ac48,783\uc774\uba70, \uc774\ub294 \uc138\uc804 \uc6d4 \uc57d \u20ac4,065\uc5d0 \ud574\ub2f9\ud569\ub2c8\ub2e4.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ed%95%80%eb%9e%80%eb%93%9c-2026%eb%85%84-%ec%83%9d%ec%82%b0-%ea%b8%b0%ed%9a%8d%ec%9e%90-%ec%97%b0%eb%b4%89\/\" \/>\n<meta property=\"og:locale\" content=\"ko_KR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\ud540\ub780\ub4dc\uc758 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790 \uae09\uc5ec 2026\" \/>\n<meta property=\"og:description\" content=\"2026\ub144 \ud540\ub780\ub4dc\uc758 \ud3c9\uade0 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790 \uae09\uc5ec\ub294 \uc5f0\uac04 \uc57d \u20ac48,783\uc774\uba70, \uc774\ub294 \uc138\uc804 \uc6d4 \uc57d \u20ac4,065\uc5d0 \ud574\ub2f9\ud569\ub2c8\ub2e4.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ed%95%80%eb%9e%80%eb%93%9c-2026%eb%85%84-%ec%83%9d%ec%82%b0-%ea%b8%b0%ed%9a%8d%ec%9e%90-%ec%97%b0%eb%b4%89\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2023-10-26T16:39:47+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-14T15:22:38+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Finland-1024x683.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\uae00\uc4f4\uc774\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/%ed%95%80%eb%9e%80%eb%93%9c-2026%eb%85%84-%ec%83%9d%ec%82%b0-%ea%b8%b0%ed%9a%8d%ec%9e%90-%ec%97%b0%eb%b4%89\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/%ed%95%80%eb%9e%80%eb%93%9c-2026%eb%85%84-%ec%83%9d%ec%82%b0-%ea%b8%b0%ed%9a%8d%ec%9e%90-%ec%97%b0%eb%b4%89\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"\ud540\ub780\ub4dc\uc758 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790 \uae09\uc5ec 2026\",\"datePublished\":\"2023-10-26T16:39:47+00:00\",\"dateModified\":\"2026-06-14T15:22:38+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/%ed%95%80%eb%9e%80%eb%93%9c-2026%eb%85%84-%ec%83%9d%ec%82%b0-%ea%b8%b0%ed%9a%8d%ec%9e%90-%ec%97%b0%eb%b4%89\\\/\"},\"wordCount\":55,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/%ed%95%80%eb%9e%80%eb%93%9c-2026%eb%85%84-%ec%83%9d%ec%82%b0-%ea%b8%b0%ed%9a%8d%ec%9e%90-%ec%97%b0%eb%b4%89\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/Production-Planner-Finland.png\",\"articleSection\":[\"\ub9ac\uc18c\uc2a4\",\"\ucee4\ub9ac\uc5b4 \ubc0f \uc5f0\ubd09\"],\"inLanguage\":\"ko-KR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/%ed%95%80%eb%9e%80%eb%93%9c-2026%eb%85%84-%ec%83%9d%ec%82%b0-%ea%b8%b0%ed%9a%8d%ec%9e%90-%ec%97%b0%eb%b4%89\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/%ed%95%80%eb%9e%80%eb%93%9c-2026%eb%85%84-%ec%83%9d%ec%82%b0-%ea%b8%b0%ed%9a%8d%ec%9e%90-%ec%97%b0%eb%b4%89\\\/\",\"name\":\"\ud540\ub780\ub4dc\uc758 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790 \uae09\uc5ec 2026\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/%ed%95%80%eb%9e%80%eb%93%9c-2026%eb%85%84-%ec%83%9d%ec%82%b0-%ea%b8%b0%ed%9a%8d%ec%9e%90-%ec%97%b0%eb%b4%89\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/%ed%95%80%eb%9e%80%eb%93%9c-2026%eb%85%84-%ec%83%9d%ec%82%b0-%ea%b8%b0%ed%9a%8d%ec%9e%90-%ec%97%b0%eb%b4%89\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/Production-Planner-Finland.png\",\"datePublished\":\"2023-10-26T16:39:47+00:00\",\"dateModified\":\"2026-06-14T15:22:38+00:00\",\"description\":\"2026\ub144 \ud540\ub780\ub4dc\uc758 \ud3c9\uade0 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790 \uae09\uc5ec\ub294 \uc5f0\uac04 \uc57d \u20ac48,783\uc774\uba70, \uc774\ub294 \uc138\uc804 \uc6d4 \uc57d \u20ac4,065\uc5d0 \ud574\ub2f9\ud569\ub2c8\ub2e4.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/%ed%95%80%eb%9e%80%eb%93%9c-2026%eb%85%84-%ec%83%9d%ec%82%b0-%ea%b8%b0%ed%9a%8d%ec%9e%90-%ec%97%b0%eb%b4%89\\\/#breadcrumb\"},\"inLanguage\":\"ko-KR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/%ed%95%80%eb%9e%80%eb%93%9c-2026%eb%85%84-%ec%83%9d%ec%82%b0-%ea%b8%b0%ed%9a%8d%ec%9e%90-%ec%97%b0%eb%b4%89\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/%ed%95%80%eb%9e%80%eb%93%9c-2026%eb%85%84-%ec%83%9d%ec%82%b0-%ea%b8%b0%ed%9a%8d%ec%9e%90-%ec%97%b0%eb%b4%89\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/Production-Planner-Finland.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/10\\\/Production-Planner-Finland.png\",\"width\":4990,\"height\":3327,\"caption\":\"Production Planner Finland\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/%ed%95%80%eb%9e%80%eb%93%9c-2026%eb%85%84-%ec%83%9d%ec%82%b0-%ea%b8%b0%ed%9a%8d%ec%9e%90-%ec%97%b0%eb%b4%89\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\ud540\ub780\ub4dc\uc758 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790 \uae09\uc5ec 2026\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ko-KR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\ud540\ub780\ub4dc\uc758 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790 \uae09\uc5ec 2026","description":"2026\ub144 \ud540\ub780\ub4dc\uc758 \ud3c9\uade0 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790 \uae09\uc5ec\ub294 \uc5f0\uac04 \uc57d \u20ac48,783\uc774\uba70, \uc774\ub294 \uc138\uc804 \uc6d4 \uc57d \u20ac4,065\uc5d0 \ud574\ub2f9\ud569\ub2c8\ub2e4.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ed%95%80%eb%9e%80%eb%93%9c-2026%eb%85%84-%ec%83%9d%ec%82%b0-%ea%b8%b0%ed%9a%8d%ec%9e%90-%ec%97%b0%eb%b4%89\/","og_locale":"ko_KR","og_type":"article","og_title":"\ud540\ub780\ub4dc\uc758 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790 \uae09\uc5ec 2026","og_description":"2026\ub144 \ud540\ub780\ub4dc\uc758 \ud3c9\uade0 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790 \uae09\uc5ec\ub294 \uc5f0\uac04 \uc57d \u20ac48,783\uc774\uba70, \uc774\ub294 \uc138\uc804 \uc6d4 \uc57d \u20ac4,065\uc5d0 \ud574\ub2f9\ud569\ub2c8\ub2e4.","og_url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ed%95%80%eb%9e%80%eb%93%9c-2026%eb%85%84-%ec%83%9d%ec%82%b0-%ea%b8%b0%ed%9a%8d%ec%9e%90-%ec%97%b0%eb%b4%89\/","og_site_name":"SkyPlanner","article_published_time":"2023-10-26T16:39:47+00:00","article_modified_time":"2026-06-14T15:22:38+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Finland-1024x683.png","type":"image\/png"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"\uae00\uc4f4\uc774":"SkyPlanner"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ed%95%80%eb%9e%80%eb%93%9c-2026%eb%85%84-%ec%83%9d%ec%82%b0-%ea%b8%b0%ed%9a%8d%ec%9e%90-%ec%97%b0%eb%b4%89\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ed%95%80%eb%9e%80%eb%93%9c-2026%eb%85%84-%ec%83%9d%ec%82%b0-%ea%b8%b0%ed%9a%8d%ec%9e%90-%ec%97%b0%eb%b4%89\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"\ud540\ub780\ub4dc\uc758 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790 \uae09\uc5ec 2026","datePublished":"2023-10-26T16:39:47+00:00","dateModified":"2026-06-14T15:22:38+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ed%95%80%eb%9e%80%eb%93%9c-2026%eb%85%84-%ec%83%9d%ec%82%b0-%ea%b8%b0%ed%9a%8d%ec%9e%90-%ec%97%b0%eb%b4%89\/"},"wordCount":55,"publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ed%95%80%eb%9e%80%eb%93%9c-2026%eb%85%84-%ec%83%9d%ec%82%b0-%ea%b8%b0%ed%9a%8d%ec%9e%90-%ec%97%b0%eb%b4%89\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Finland.png","articleSection":["\ub9ac\uc18c\uc2a4","\ucee4\ub9ac\uc5b4 \ubc0f \uc5f0\ubd09"],"inLanguage":"ko-KR"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ed%95%80%eb%9e%80%eb%93%9c-2026%eb%85%84-%ec%83%9d%ec%82%b0-%ea%b8%b0%ed%9a%8d%ec%9e%90-%ec%97%b0%eb%b4%89\/","url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ed%95%80%eb%9e%80%eb%93%9c-2026%eb%85%84-%ec%83%9d%ec%82%b0-%ea%b8%b0%ed%9a%8d%ec%9e%90-%ec%97%b0%eb%b4%89\/","name":"\ud540\ub780\ub4dc\uc758 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790 \uae09\uc5ec 2026","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ed%95%80%eb%9e%80%eb%93%9c-2026%eb%85%84-%ec%83%9d%ec%82%b0-%ea%b8%b0%ed%9a%8d%ec%9e%90-%ec%97%b0%eb%b4%89\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ed%95%80%eb%9e%80%eb%93%9c-2026%eb%85%84-%ec%83%9d%ec%82%b0-%ea%b8%b0%ed%9a%8d%ec%9e%90-%ec%97%b0%eb%b4%89\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Finland.png","datePublished":"2023-10-26T16:39:47+00:00","dateModified":"2026-06-14T15:22:38+00:00","description":"2026\ub144 \ud540\ub780\ub4dc\uc758 \ud3c9\uade0 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790 \uae09\uc5ec\ub294 \uc5f0\uac04 \uc57d \u20ac48,783\uc774\uba70, \uc774\ub294 \uc138\uc804 \uc6d4 \uc57d \u20ac4,065\uc5d0 \ud574\ub2f9\ud569\ub2c8\ub2e4.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ed%95%80%eb%9e%80%eb%93%9c-2026%eb%85%84-%ec%83%9d%ec%82%b0-%ea%b8%b0%ed%9a%8d%ec%9e%90-%ec%97%b0%eb%b4%89\/#breadcrumb"},"inLanguage":"ko-KR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ed%95%80%eb%9e%80%eb%93%9c-2026%eb%85%84-%ec%83%9d%ec%82%b0-%ea%b8%b0%ed%9a%8d%ec%9e%90-%ec%97%b0%eb%b4%89\/"]}]},{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ed%95%80%eb%9e%80%eb%93%9c-2026%eb%85%84-%ec%83%9d%ec%82%b0-%ea%b8%b0%ed%9a%8d%ec%9e%90-%ec%97%b0%eb%b4%89\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Finland.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Finland.png","width":4990,"height":3327,"caption":"Production Planner Finland"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ed%95%80%eb%9e%80%eb%93%9c-2026%eb%85%84-%ec%83%9d%ec%82%b0-%ea%b8%b0%ed%9a%8d%ec%9e%90-%ec%97%b0%eb%b4%89\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ko\/"},{"@type":"ListItem","position":2,"name":"\ud540\ub780\ub4dc\uc758 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790 \uae09\uc5ec 2026"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ko\/#website","url":"https:\/\/skyplanner.ai\/ko\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ko\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ko-KR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ko\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ko\/","logo":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Finland.png",4990,3327,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Finland-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Finland-300x200.png",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Finland-768x512.png",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Finland-1024x683.png",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Finland-1536x1024.png",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Finland-2048x1365.png",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/10\/Production-Planner-Finland.png",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/ko\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"\ud540\ub780\ub4dc\uc758 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790 \uae09\uc5ec 2026 \ud648&nbsp;\u00bb&nbsp;\uc790\ub8cc&nbsp;\u00bb&nbsp;\ud540\ub780\ub4dc\uc758 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790 \uae09\uc5ec 2026 2026\ub144 \ud540\ub780\ub4dc\uc758 \ud3c9\uade0 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790 \uae09\uc5ec\ub294 \uc5f0\uac04 \uc57d \u20ac48,783\uc774\uba70, \uc774\ub294 \uc138\uc804 \uc6d4 \uc57d \u20ac4,065\uc5d0 \ud574\ub2f9\ud569\ub2c8\ub2e4. \uc774 \uc218\uce58\ub294 \uc804\uad6d \ud3c9\uade0\ubcf4\ub2e4 \uc57d\uac04 \ub192\uc73c\uba70, \uc774 \uc9c1\ubb34\uc758 \uc911\uc694\uc131\uacfc \uc218\uc694\ub97c \uc798 \ubcf4\uc5ec\uc90d\ub2c8\ub2e4. 2026\ub144, \ud540\ub780\ub4dc\uc758 \uc81c\uc870\uc5c5 \ubd80\ubb38\uc740 \ube44\ud560 \ub370 \uc5c6\ub294 \uc131\uc7a5\uc744 \ubc1c\uc0b0\ud558\uba70 \uae00\ub85c\ubc8c \uc2dc\uc7a5\uc5d0\uc11c \uad6d\uac00\uc758 \uc785\uc9c0\ub97c \uacf5\uace0\ud788 \ud558\uace0&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/38843","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/comments?post=38843"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/38843\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media\/38844"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media?parent=38843"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/categories?post=38843"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/tags?post=38843"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}