{"id":38752,"date":"2023-09-21T11:08:56","date_gmt":"2023-09-21T11:08:56","guid":{"rendered":"https:\/\/skyplanner.ai\/%eb%b6%84%eb%a5%98%eb%90%98%ec%a7%80-%ec%95%8a%ec%9d%8c\/2023%eb%85%84-%ed%94%84%eb%9e%91%ec%8a%a4-%ec%83%9d%ec%82%b0-%ea%b4%80%eb%a6%ac%ec%9e%90-%ec%97%b0%eb%b4%89\/"},"modified":"2026-10-03T09:51:01","modified_gmt":"2026-10-03T09:51:01","slug":"2026%eb%85%84-%ed%94%84%eb%9e%91%ec%8a%a4-%ec%83%9d%ec%82%b0-%ea%b4%80%eb%a6%ac%ec%9e%90-%ec%97%b0%eb%b4%89","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/2026%eb%85%84-%ed%94%84%eb%9e%91%ec%8a%a4-%ec%83%9d%ec%82%b0-%ea%b4%80%eb%a6%ac%ec%9e%90-%ec%97%b0%eb%b4%89\/","title":{"rendered":"2026\ub144 \ud504\ub791\uc2a4 \uacf5\uc7a5\uc7a5 \uc5f0\ubd09"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">2026\ub144 \ud504\ub791\uc2a4 \uacf5\uc7a5\uc7a5 \uc5f0\ubd09<\/h1>\n\n\n\n<p>\u20ac40,000\uc740 \ud504\ub791\uc2a4 \uacf5\uc7a5\uc7a5\uc758 \uacbd\ub825 \ucd08\ubc18 \uc5f0\uac04 \ucd1d\uae09\uc5ec\uc774\uba70, \uacbd\ub825\uc5d0 \ub530\ub77c \uc57d \u20ac90,000\uae4c\uc9c0 \uc624\ub97c \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc6d4\uae09\uacfc \ub3c5\uc77c \uae09\uc5ec\ub97c \ube44\uad50\ud558\uc138\uc694.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\ud504\ub791\uc2a4 \uacf5\uc7a5\uc7a5 \uc5f0\ubd09: \uc6d4\uae09 \ubc0f \uc5f0\ubd09<\/h2>\n\n\n\n<p>\ud504\ub791\uc2a4\uc758 responsable de production \uc9c1\ubb34\uc5d0 \ub300\ud574 <a href=\"https:\/\/www.randstad.fr\/metiers\/responsable-de-production\/\">Randstad<\/a>\ub294 (2026\ub144 10\uc6d4 3\uc77c \ud655\uc778) \uacbd\ub825 \ub2e8\uacc4\ubcc4 \ub300\ub7b5\uc801\uc778 \uc5f0\uac04 \ucd1d\uae09\uc5ec\ub97c \uc81c\uc2dc\ud569\ub2c8\ub2e4. \uacbd\ub825 \ucd08\ubc18\uc5d0\ub294 \uc57d \u20ac40,000, \uc218\ub144\uc758 \uacbd\ub825 \ud6c4\uc5d0\ub294 \u20ac70,000\uae4c\uc9c0 \uc624\ub97c \uc218 \uc788\uc73c\uba70, \uacbd\ub825 \ud6c4\ubc18\uc5d0\ub294 \uc57d \u20ac90,000\uae4c\uc9c0 \ubc1b\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\uacbd\ub825 \ub2e8\uacc4<\/th><th>\uc5f0\uac04 \ucd1d\uae09\uc5ec<\/th><th>\uacc4\uc0b0\ub41c \uc6d4\uac04 \ucd1d\uae09\uc5ec \ud658\uc0b0\uc561(\uc5f0\ubd09 \u00f7 12)<\/th><\/tr><\/thead><tbody><tr><td>\uacbd\ub825 \ucd08\ubc18<\/td><td>\uc57d \u20ac40,000<\/td><td>\uc57d \u20ac3,333<\/td><\/tr><tr><td>\uc218\ub144\uc758 \uacbd\ub825 \ud6c4<\/td><td>\uc57d \u20ac70,000\uae4c\uc9c0 \uc624\ub97c \uc218 \uc788\uc74c<\/td><td>\uc57d \u20ac5,833<\/td><\/tr><tr><td>\uacbd\ub825 \ud6c4\ubc18<\/td><td>\uc57d \u20ac90,000\uae4c\uc9c0 \ubc1b\uc744 \uc218 \uc788\uc74c<\/td><td>\uc57d \u20ac7,500<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>\uc6d4\uac04 \ud658\uc0b0\uc561\uc740 \uc5f0\uac04 \uae09\uc5ec\ub97c 12\ud68c \uade0\ub4f1 \uc9c0\uae09\uc73c\ub85c \uacc4\uc0b0\ud558\uace0 \uac00\uc7a5 \uac00\uae4c\uc6b4 \uc720\ub85c \ub2e8\uc704\ub85c \ubc18\uc62c\ub9bc\ud55c \uac12\uc785\ub2c8\ub2e4. \ucd1d\uae09\uc5ec\ub294 \uc9c1\uc6d0 \uacf5\uc81c \uc804 \uae08\uc561\uc774\uba70, \uc21c\uae09\uc5ec\ub294 \uacf5\uc81c \ud6c4 \uc2e4\uc218\ub839\uc561\uc785\ub2c8\ub2e4.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\ud504\ub791\uc2a4 \uacf5\uc7a5\uc7a5 \uc5f0\ubd09\uc5d0 \uc601\ud5a5\uc744 \ubbf8\uce58\ub294 \uc694\uc778\uc740 \ubb34\uc5c7\uc778\uac00\uc694?<\/h2>\n\n\n\n<p>\uacbd\ub825\uacfc \uc804\ubb38 \uc9c0\uc2dd\uc740 \uc18c\ub4dd \uc7a0\uc7ac\ub825\uc744 \ub192\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uadfc\ubb34 \uc9c0\uc5ed\uacfc \uc5c5\uc885\ub3c4 \ub2f4\ub2f9 \uc5c5\ubb34\uc758 \ubc94\uc704 \ubc0f \ubd80\uad00\ub9ac\uc790 \uc720\ubb34\uc640 \ud568\uaed8 \uae09\uc5ec\uc5d0 \uc601\ud5a5\uc744 \ubbf8\uce69\ub2c8\ub2e4. \uc0dd\uc0b0 \ubaa9\ud45c\ub97c \ub2ec\uc131\ud558\uba74 \uc131\uacfc \uc5f0\ub3d9 \ubcf4\ub108\uc2a4\ub85c \ucd1d\ubcf4\uc0c1 \uc218\uc900\uc774 \ub192\uc544\uc9c8 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<p>\uc774 \uc9c1\ubb34\ub294 <a href=\"\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%83%9d%ec%82%b0-%ea%b4%80%eb%a6%ac%ec%9e%90-%ec%a7%81%eb%ac%b4-%ec%84%a4%eb%aa%85\/\">\uacf5\uc7a5\uc7a5 \uc9c1\ubb34 \uc124\uba85<\/a>\uc5d0 \uc124\uba85\ub41c \ubc14\uc640 \uac19\uc774 \uc0dd\uc0b0 \uacc4\ud68d, \uc790\uc7ac, \ud488\uc9c8, \uc608\uc0b0 \ubc0f \ud300 \uad00\ub9ac \uc5c5\ubb34\ub97c \ud3ec\uad04\ud569\ub2c8\ub2e4.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\ud504\ub791\uc2a4\ub294 \ub3c5\uc77c\uacfc \uc5b4\ub5bb\uac8c \ube44\uad50\ub418\ub098\uc694?<\/h2>\n\n\n\n<p>\uc778\uc811\uad6d\uc778 \ub3c5\uc77c\uc5d0\uc11c\ub294 <a href=\"https:\/\/www.hays.de\/jobprofile\/produktionsleiter\">Hays<\/a>\uac00 (2026\ub144 10\uc6d4 3\uc77c \ud655\uc778) \uacf5\uc7a5\uc7a5\uc758 \ud3c9\uade0 \uc5f0\uac04 \ucd1d\uae09\uc5ec\ub97c \u20ac64,000\uc73c\ub85c \uc81c\uc2dc\ud558\uba70, \uc8fc\ub2c8\uc5b4 \uad00\ub9ac\uc790\ub294 \uc57d \u20ac46,000, \uc2dc\ub2c8\uc5b4 \uad00\ub9ac\uc790\ub294 \u20ac77,000\uc744 \ucd08\uacfc\ud55c\ub2e4\uace0 \ubcf4\uace0\ud569\ub2c8\ub2e4. \ud504\ub791\uc2a4\uc758 \uacbd\ub825 \ucd08\ubc18 \uc218\uce58\uc778 \uc57d \u20ac40,000\uc740 \ub3c5\uc77c \uc8fc\ub2c8\uc5b4 \uad00\ub9ac\uc790\uc758 \uc218\uce58\ubcf4\ub2e4 \ub0ae\uc9c0\ub9cc, \ud504\ub791\uc2a4\uc758 \uacbd\ub825 \ud6c4\ubc18 \uae09\uc5ec\ub294 \uc57d \u20ac90,000\uc5d0 \uc774\ub97c \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<p>\ub3c5\uc77c\uc758 \uc5f0\uac04 \ud3c9\uade0 \u20ac64,000\uc740 \uacc4\uc0b0\ub41c \uc6d4\uac04 \ud658\uc0b0\uc561\uc73c\ub85c \uc57d \u20ac5,333\uc785\ub2c8\ub2e4. \ub3c5\uc77c\uc758 \uacbd\ub825 \uc218\uc900\uacfc \uae09\uc5ec \uc601\ud5a5 \uc694\uc778\uc740 <a href=\"\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%eb%8f%85%ec%9d%bc-2026%eb%85%84-%ec%83%9d%ec%82%b0-%ea%b4%80%eb%a6%ac%ec%9e%90-%ea%b8%89%ec%97%ac\/\">\ub3c5\uc77c \uacf5\uc7a5\uc7a5 \uc5f0\ubd09<\/a>\uc5d0\uc11c \ud655\uc778\ud558\uc138\uc694.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">SkyPlanner APS\ub97c \ud65c\uc6a9\ud55c \uc0dd\uc0b0 \uc2a4\ucf00\uc904\ub9c1<\/h2>\n\n\n\n<p>SkyPlanner APS\ub294 \uc790\uc7ac \uac00\uc6a9\uc131, \uad50\ub300\uc870, \uc6b0\uc120\uc21c\uc704 \ubc0f \ub0a9\uae30\uc77c\uc744 \uace0\ub824\ud558\uc5ec \uc791\uc5c5\uc7a5 \uc804\ubc18\uc758 \uacf5\uc7a5 \uc791\uc5c5\uc744 \uc790\ub3d9\uc73c\ub85c \uc2a4\ucf00\uc904\ub9c1\ud558\ub294 \uace0\uae09 \uacc4\ud68d \ubc0f \uc2a4\ucf00\uc904\ub9c1 \uc18c\ud504\ud2b8\uc6e8\uc5b4\uc785\ub2c8\ub2e4. \ub300\ud654\ud615 Gantt \ud0c0\uc784\ub77c\uc778\uc73c\ub85c \ud300\uc774 \uc77c\uc815\uc744 \uc9c1\uc811 \uad00\ub9ac\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. SkyPlanner\ub294 \uac1c\ubc29\ud615 REST API\ub97c \ud1b5\ud574 \ubaa8\ub4e0 ERP \ub610\ub294 MES \uc2dc\uc2a4\ud15c\uacfc \uc5f0\ub3d9\ub429\ub2c8\ub2e4.<\/p>\n\n\n\n<p>\uc0dd\uc0b0 \ud300\uc744 \uc704\ud574 SkyPlanner\uc758 <a href=\"\/ko\/%ea%b8%b0%eb%8a%a5\/\">\uc0dd\uc0b0 \uc2a4\ucf00\uc904\ub9c1 \uae30\ub2a5<\/a>\uc744 \uc0b4\ud3b4\ubcf4\uac70\ub098 <a href=\"\/ko\/%ec%98%81%ec%97%85%ed%8c%80%ec%97%90-%eb%ac%b8%ec%9d%98\/\">\ub370\ubaa8\ub97c \uc608\uc57d<\/a>\ud558\uc138\uc694.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\uc790\uc8fc \ubb3b\ub294 \uc9c8\ubb38<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">\ud504\ub791\uc2a4 \uacf5\uc7a5\uc7a5\uc758 \uc6d4\uae09\uc740 \uc5bc\ub9c8\uc778\uac00\uc694?<\/h3>\n\n\n\n<p>\ud504\ub791\uc2a4 responsable de production \uc9c1\ubb34\uc758 \uc5f0\ubd09 \u00f7 12\ub85c \uacc4\uc0b0\ud55c \ub300\ub7b5\uc801\uc778 \uc6d4\uac04 \ucd1d\uae09\uc5ec \ud658\uc0b0\uc561\uc740 \uacbd\ub825 \ucd08\ubc18 \u20ac3,333(\uc5f0\uac04 \u20ac40,000), \uc218\ub144\uc758 \uacbd\ub825 \ud6c4 \u20ac5,833(\uc5f0\uac04 \u20ac70,000), \uacbd\ub825 \ud6c4\ubc18 \u20ac7,500(\uc5f0\uac04 \u20ac90,000)\uc785\ub2c8\ub2e4. \ub4a4\uc758 \ub450 \uc5f0\uac04 \uae09\uc5ec\ub294 \uacbd\ub825\uc744 \uc313\uc73c\uba74 \ubc1b\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">\ud504\ub791\uc2a4 \uacf5\uc7a5\uc7a5\uc758 \uc5f0\ubd09\uc740 \uc5bc\ub9c8\uc778\uac00\uc694?<\/h3>\n\n\n\n<p>\uc5f0\uac04 \ucd1d\uae09\uc5ec\ub294 \uacbd\ub825 \ucd08\ubc18 \uc57d \u20ac40,000\uc774\uba70, \uc218\ub144\uc758 \uacbd\ub825 \ud6c4 \uc57d \u20ac70,000\uae4c\uc9c0 \uc624\ub97c \uc218 \uc788\uace0, \uacbd\ub825 \ud6c4\ubc18\uc5d0\ub294 \uc57d \u20ac90,000\uae4c\uc9c0 \ubc1b\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">\uacf5\uc7a5\uc7a5 \uae09\uc5ec \uc218\uce58\ub294 \ucd1d\uae09\uc5ec\uc778\uac00\uc694, \uc21c\uae09\uc5ec\uc778\uac00\uc694?<\/h3>\n\n\n\n<p>\uc5f0\uac04 \uc218\uce58\uc640 \uacc4\uc0b0\ub41c \uc6d4\uac04 \ud658\uc0b0\uc561\uc740 \ubaa8\ub450 \uc9c1\uc6d0 \uacf5\uc81c \uc804 \ucd1d\uae09\uc5ec\uc785\ub2c8\ub2e4. \uc21c\uae09\uc5ec\ub294 \uacf5\uc81c \ud6c4 \uc2e4\uc218\ub839\uc561\uc785\ub2c8\ub2e4.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">\ud504\ub791\uc2a4 \uacf5\uc7a5\uc7a5 \uc5f0\ubd09\uc744 \ub192\uc77c \uc218 \uc788\ub294 \uc694\uc778\uc740 \ubb34\uc5c7\uc778\uac00\uc694?<\/h3>\n\n\n\n<p>\uacbd\ub825, \uc804\ubb38 \uc9c0\uc2dd, \uadfc\ubb34 \uc9c0\uc5ed, \uc5c5\uc885, \uc5c5\ubb34 \ubc94\uc704, \ubd80\uad00\ub9ac\uc790 \uc9c0\uc6d0 \ubc0f \uc131\uacfc \uc5f0\ub3d9 \ubcf4\ub108\uc2a4\uac00 \uae09\uc5ec\uc5d0 \uc601\ud5a5\uc744 \ubbf8\uce69\ub2c8\ub2e4.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">\ud504\ub791\uc2a4 \uacf5\uc7a5\uc7a5 \uc5f0\ubd09\uc740 \ub3c5\uc77c\uacfc \uc5b4\ub5bb\uac8c \ube44\uad50\ub418\ub098\uc694?<\/h3>\n\n\n\n<p>\ud504\ub791\uc2a4\uc758 \uacbd\ub825 \ub2e8\uacc4\ubcc4 \ub300\ub7b5\uc801\uc778 \uc5f0\uac04 \ucd1d\uae09\uc5ec\ub294 \uacbd\ub825 \ucd08\ubc18 \u20ac40,000\uc774\uba70, \uc218\ub144 \ud6c4\uc5d0\ub294 \u20ac70,000\uae4c\uc9c0 \uc624\ub97c \uc218 \uc788\uace0, \uacbd\ub825 \ud6c4\ubc18\uc5d0\ub294 \uc57d \u20ac90,000\uae4c\uc9c0 \ubc1b\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ub3c5\uc77c\uc758 \uc5f0\uac04 \ucd1d\uae09\uc5ec \ud3c9\uade0\uc740 \u20ac64,000\uc774\uba70, \uc8fc\ub2c8\uc5b4 \uad00\ub9ac\uc790\ub294 \uc57d \u20ac46,000, \uc2dc\ub2c8\uc5b4 \uad00\ub9ac\uc790\ub294 \u20ac77,000\uc744 \ucd08\uacfc\ud569\ub2c8\ub2e4.<\/p>\n\n<\/div>","protected":false},"excerpt":{"rendered":"<p>2026\ub144 \ud504\ub791\uc2a4 \uacf5\uc7a5\uc7a5 \uc5f0\ubd09 \u20ac40,000\uc740 \ud504\ub791\uc2a4 \uacf5\uc7a5\uc7a5\uc758 \uacbd\ub825 \ucd08\ubc18 \uc5f0\uac04 \ucd1d\uae09\uc5ec\uc774\uba70, \uacbd\ub825\uc5d0 \ub530\ub77c \uc57d \u20ac90,000\uae4c\uc9c0 \uc624\ub97c \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc6d4\uae09\uacfc \ub3c5\uc77c \uae09\uc5ec\ub97c \ube44\uad50\ud558\uc138\uc694. \ud504\ub791\uc2a4 \uacf5\uc7a5\uc7a5 \uc5f0\ubd09: \uc6d4\uae09 \ubc0f \uc5f0\ubd09 \ud504\ub791\uc2a4\uc758 responsable de production \uc9c1\ubb34\uc5d0 \ub300\ud574 Randstad\ub294 (2026\ub144 10\uc6d4 3\uc77c \ud655\uc778) \uacbd\ub825 \ub2e8\uacc4\ubcc4 \ub300\ub7b5\uc801\uc778 \uc5f0\uac04 \ucd1d\uae09\uc5ec\ub97c \uc81c\uc2dc\ud569\ub2c8\ub2e4. \uacbd\ub825 \ucd08\ubc18\uc5d0\ub294 \uc57d \u20ac40,000, \uc218\ub144\uc758 \uacbd\ub825 \ud6c4\uc5d0\ub294 \u20ac70,000\uae4c\uc9c0 \uc624\ub97c \uc218 &#8230; <a title=\"2026\ub144 \ud504\ub791\uc2a4 \uacf5\uc7a5\uc7a5 \uc5f0\ubd09\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/2026%eb%85%84-%ed%94%84%eb%9e%91%ec%8a%a4-%ec%83%9d%ec%82%b0-%ea%b4%80%eb%a6%ac%ec%9e%90-%ec%97%b0%eb%b4%89\/\" aria-label=\"Read more about 2026\ub144 \ud504\ub791\uc2a4 \uacf5\uc7a5\uc7a5 \uc5f0\ubd09\">Read more<\/a><\/p>\n","protected":false},"author":6,"featured_media":38753,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[496,2735],"tags":[],"class_list":["post-38752","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-496","category-2735","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>2026\ub144 \ud504\ub791\uc2a4 \uacf5\uc7a5\uc7a5 \uc5f0\ubd09 &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"\u20ac40,000\uc740 \ud504\ub791\uc2a4 \uacf5\uc7a5\uc7a5\uc758 \uacbd\ub825 \ucd08\ubc18 \uc5f0\uac04 \ucd1d\uae09\uc5ec\uc774\uba70, \uacbd\ub825\uc5d0 \ub530\ub77c \uc57d \u20ac90,000\uae4c\uc9c0 \uc624\ub97c \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc6d4\uae09\uacfc \ub3c5\uc77c \uae09\uc5ec\ub97c \ube44\uad50\ud558\uc138\uc694.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/2026%eb%85%84-%ed%94%84%eb%9e%91%ec%8a%a4-%ec%83%9d%ec%82%b0-%ea%b4%80%eb%a6%ac%ec%9e%90-%ec%97%b0%eb%b4%89\/\" \/>\n<meta property=\"og:locale\" content=\"ko_KR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"2026\ub144 \ud504\ub791\uc2a4 \uacf5\uc7a5\uc7a5 \uc5f0\ubd09\" \/>\n<meta property=\"og:description\" content=\"\u20ac40,000\uc740 \ud504\ub791\uc2a4 \uacf5\uc7a5\uc7a5\uc758 \uacbd\ub825 \ucd08\ubc18 \uc5f0\uac04 \ucd1d\uae09\uc5ec\uc774\uba70, \uacbd\ub825\uc5d0 \ub530\ub77c \uc57d \u20ac90,000\uae4c\uc9c0 \uc624\ub97c \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc6d4\uae09\uacfc \ub3c5\uc77c \uae09\uc5ec\ub97c \ube44\uad50\ud558\uc138\uc694.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/2026%eb%85%84-%ed%94%84%eb%9e%91%ec%8a%a4-%ec%83%9d%ec%82%b0-%ea%b4%80%eb%a6%ac%ec%9e%90-%ec%97%b0%eb%b4%89\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2023-09-21T11:08:56+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-03T09:51:01+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-France-1024x683.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\uae00\uc4f4\uc774\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/2026%eb%85%84-%ed%94%84%eb%9e%91%ec%8a%a4-%ec%83%9d%ec%82%b0-%ea%b4%80%eb%a6%ac%ec%9e%90-%ec%97%b0%eb%b4%89\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/2026%eb%85%84-%ed%94%84%eb%9e%91%ec%8a%a4-%ec%83%9d%ec%82%b0-%ea%b4%80%eb%a6%ac%ec%9e%90-%ec%97%b0%eb%b4%89\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"2026\ub144 \ud504\ub791\uc2a4 \uacf5\uc7a5\uc7a5 \uc5f0\ubd09\",\"datePublished\":\"2023-09-21T11:08:56+00:00\",\"dateModified\":\"2026-10-03T09:51:01+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/2026%eb%85%84-%ed%94%84%eb%9e%91%ec%8a%a4-%ec%83%9d%ec%82%b0-%ea%b4%80%eb%a6%ac%ec%9e%90-%ec%97%b0%eb%b4%89\\\/\"},\"wordCount\":19,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/2026%eb%85%84-%ed%94%84%eb%9e%91%ec%8a%a4-%ec%83%9d%ec%82%b0-%ea%b4%80%eb%a6%ac%ec%9e%90-%ec%97%b0%eb%b4%89\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Production-Manager-Salary-in-France.png\",\"articleSection\":[\"\ub9ac\uc18c\uc2a4\",\"\ucee4\ub9ac\uc5b4 \ubc0f \uc5f0\ubd09\"],\"inLanguage\":\"ko-KR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/2026%eb%85%84-%ed%94%84%eb%9e%91%ec%8a%a4-%ec%83%9d%ec%82%b0-%ea%b4%80%eb%a6%ac%ec%9e%90-%ec%97%b0%eb%b4%89\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/2026%eb%85%84-%ed%94%84%eb%9e%91%ec%8a%a4-%ec%83%9d%ec%82%b0-%ea%b4%80%eb%a6%ac%ec%9e%90-%ec%97%b0%eb%b4%89\\\/\",\"name\":\"2026\ub144 \ud504\ub791\uc2a4 \uacf5\uc7a5\uc7a5 \uc5f0\ubd09 &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/2026%eb%85%84-%ed%94%84%eb%9e%91%ec%8a%a4-%ec%83%9d%ec%82%b0-%ea%b4%80%eb%a6%ac%ec%9e%90-%ec%97%b0%eb%b4%89\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/2026%eb%85%84-%ed%94%84%eb%9e%91%ec%8a%a4-%ec%83%9d%ec%82%b0-%ea%b4%80%eb%a6%ac%ec%9e%90-%ec%97%b0%eb%b4%89\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Production-Manager-Salary-in-France.png\",\"datePublished\":\"2023-09-21T11:08:56+00:00\",\"dateModified\":\"2026-10-03T09:51:01+00:00\",\"description\":\"\u20ac40,000\uc740 \ud504\ub791\uc2a4 \uacf5\uc7a5\uc7a5\uc758 \uacbd\ub825 \ucd08\ubc18 \uc5f0\uac04 \ucd1d\uae09\uc5ec\uc774\uba70, \uacbd\ub825\uc5d0 \ub530\ub77c \uc57d \u20ac90,000\uae4c\uc9c0 \uc624\ub97c \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc6d4\uae09\uacfc \ub3c5\uc77c \uae09\uc5ec\ub97c \ube44\uad50\ud558\uc138\uc694.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/2026%eb%85%84-%ed%94%84%eb%9e%91%ec%8a%a4-%ec%83%9d%ec%82%b0-%ea%b4%80%eb%a6%ac%ec%9e%90-%ec%97%b0%eb%b4%89\\\/#breadcrumb\"},\"inLanguage\":\"ko-KR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/2026%eb%85%84-%ed%94%84%eb%9e%91%ec%8a%a4-%ec%83%9d%ec%82%b0-%ea%b4%80%eb%a6%ac%ec%9e%90-%ec%97%b0%eb%b4%89\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/2026%eb%85%84-%ed%94%84%eb%9e%91%ec%8a%a4-%ec%83%9d%ec%82%b0-%ea%b4%80%eb%a6%ac%ec%9e%90-%ec%97%b0%eb%b4%89\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Production-Manager-Salary-in-France.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Production-Manager-Salary-in-France.png\",\"width\":4990,\"height\":3327,\"caption\":\"Production Manager Salary in France\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/2026%eb%85%84-%ed%94%84%eb%9e%91%ec%8a%a4-%ec%83%9d%ec%82%b0-%ea%b4%80%eb%a6%ac%ec%9e%90-%ec%97%b0%eb%b4%89\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"2026\ub144 \ud504\ub791\uc2a4 \uacf5\uc7a5\uc7a5 \uc5f0\ubd09\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ko-KR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"2026\ub144 \ud504\ub791\uc2a4 \uacf5\uc7a5\uc7a5 \uc5f0\ubd09 &#8211; SkyPlanner","description":"\u20ac40,000\uc740 \ud504\ub791\uc2a4 \uacf5\uc7a5\uc7a5\uc758 \uacbd\ub825 \ucd08\ubc18 \uc5f0\uac04 \ucd1d\uae09\uc5ec\uc774\uba70, \uacbd\ub825\uc5d0 \ub530\ub77c \uc57d \u20ac90,000\uae4c\uc9c0 \uc624\ub97c \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc6d4\uae09\uacfc \ub3c5\uc77c \uae09\uc5ec\ub97c \ube44\uad50\ud558\uc138\uc694.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/2026%eb%85%84-%ed%94%84%eb%9e%91%ec%8a%a4-%ec%83%9d%ec%82%b0-%ea%b4%80%eb%a6%ac%ec%9e%90-%ec%97%b0%eb%b4%89\/","og_locale":"ko_KR","og_type":"article","og_title":"2026\ub144 \ud504\ub791\uc2a4 \uacf5\uc7a5\uc7a5 \uc5f0\ubd09","og_description":"\u20ac40,000\uc740 \ud504\ub791\uc2a4 \uacf5\uc7a5\uc7a5\uc758 \uacbd\ub825 \ucd08\ubc18 \uc5f0\uac04 \ucd1d\uae09\uc5ec\uc774\uba70, \uacbd\ub825\uc5d0 \ub530\ub77c \uc57d \u20ac90,000\uae4c\uc9c0 \uc624\ub97c \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc6d4\uae09\uacfc \ub3c5\uc77c \uae09\uc5ec\ub97c \ube44\uad50\ud558\uc138\uc694.","og_url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/2026%eb%85%84-%ed%94%84%eb%9e%91%ec%8a%a4-%ec%83%9d%ec%82%b0-%ea%b4%80%eb%a6%ac%ec%9e%90-%ec%97%b0%eb%b4%89\/","og_site_name":"SkyPlanner","article_published_time":"2023-09-21T11:08:56+00:00","article_modified_time":"2026-10-03T09:51:01+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-France-1024x683.png","type":"image\/png"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"\uae00\uc4f4\uc774":"SkyPlanner"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/2026%eb%85%84-%ed%94%84%eb%9e%91%ec%8a%a4-%ec%83%9d%ec%82%b0-%ea%b4%80%eb%a6%ac%ec%9e%90-%ec%97%b0%eb%b4%89\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/2026%eb%85%84-%ed%94%84%eb%9e%91%ec%8a%a4-%ec%83%9d%ec%82%b0-%ea%b4%80%eb%a6%ac%ec%9e%90-%ec%97%b0%eb%b4%89\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"2026\ub144 \ud504\ub791\uc2a4 \uacf5\uc7a5\uc7a5 \uc5f0\ubd09","datePublished":"2023-09-21T11:08:56+00:00","dateModified":"2026-10-03T09:51:01+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/2026%eb%85%84-%ed%94%84%eb%9e%91%ec%8a%a4-%ec%83%9d%ec%82%b0-%ea%b4%80%eb%a6%ac%ec%9e%90-%ec%97%b0%eb%b4%89\/"},"wordCount":19,"publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/2026%eb%85%84-%ed%94%84%eb%9e%91%ec%8a%a4-%ec%83%9d%ec%82%b0-%ea%b4%80%eb%a6%ac%ec%9e%90-%ec%97%b0%eb%b4%89\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-France.png","articleSection":["\ub9ac\uc18c\uc2a4","\ucee4\ub9ac\uc5b4 \ubc0f \uc5f0\ubd09"],"inLanguage":"ko-KR"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/2026%eb%85%84-%ed%94%84%eb%9e%91%ec%8a%a4-%ec%83%9d%ec%82%b0-%ea%b4%80%eb%a6%ac%ec%9e%90-%ec%97%b0%eb%b4%89\/","url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/2026%eb%85%84-%ed%94%84%eb%9e%91%ec%8a%a4-%ec%83%9d%ec%82%b0-%ea%b4%80%eb%a6%ac%ec%9e%90-%ec%97%b0%eb%b4%89\/","name":"2026\ub144 \ud504\ub791\uc2a4 \uacf5\uc7a5\uc7a5 \uc5f0\ubd09 &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/2026%eb%85%84-%ed%94%84%eb%9e%91%ec%8a%a4-%ec%83%9d%ec%82%b0-%ea%b4%80%eb%a6%ac%ec%9e%90-%ec%97%b0%eb%b4%89\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/2026%eb%85%84-%ed%94%84%eb%9e%91%ec%8a%a4-%ec%83%9d%ec%82%b0-%ea%b4%80%eb%a6%ac%ec%9e%90-%ec%97%b0%eb%b4%89\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-France.png","datePublished":"2023-09-21T11:08:56+00:00","dateModified":"2026-10-03T09:51:01+00:00","description":"\u20ac40,000\uc740 \ud504\ub791\uc2a4 \uacf5\uc7a5\uc7a5\uc758 \uacbd\ub825 \ucd08\ubc18 \uc5f0\uac04 \ucd1d\uae09\uc5ec\uc774\uba70, \uacbd\ub825\uc5d0 \ub530\ub77c \uc57d \u20ac90,000\uae4c\uc9c0 \uc624\ub97c \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc6d4\uae09\uacfc \ub3c5\uc77c \uae09\uc5ec\ub97c \ube44\uad50\ud558\uc138\uc694.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/2026%eb%85%84-%ed%94%84%eb%9e%91%ec%8a%a4-%ec%83%9d%ec%82%b0-%ea%b4%80%eb%a6%ac%ec%9e%90-%ec%97%b0%eb%b4%89\/#breadcrumb"},"inLanguage":"ko-KR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/2026%eb%85%84-%ed%94%84%eb%9e%91%ec%8a%a4-%ec%83%9d%ec%82%b0-%ea%b4%80%eb%a6%ac%ec%9e%90-%ec%97%b0%eb%b4%89\/"]}]},{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/2026%eb%85%84-%ed%94%84%eb%9e%91%ec%8a%a4-%ec%83%9d%ec%82%b0-%ea%b4%80%eb%a6%ac%ec%9e%90-%ec%97%b0%eb%b4%89\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-France.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-France.png","width":4990,"height":3327,"caption":"Production Manager Salary in France"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/2026%eb%85%84-%ed%94%84%eb%9e%91%ec%8a%a4-%ec%83%9d%ec%82%b0-%ea%b4%80%eb%a6%ac%ec%9e%90-%ec%97%b0%eb%b4%89\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ko\/"},{"@type":"ListItem","position":2,"name":"2026\ub144 \ud504\ub791\uc2a4 \uacf5\uc7a5\uc7a5 \uc5f0\ubd09"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ko\/#website","url":"https:\/\/skyplanner.ai\/ko\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ko\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ko-KR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ko\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ko\/","logo":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-France.png",4990,3327,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-France-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-France-300x200.png",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-France-768x512.png",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-France-1024x683.png",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-France-1536x1024.png",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-France-2048x1365.png",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-France.png",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/ko\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"2026\ub144 \ud504\ub791\uc2a4 \uacf5\uc7a5\uc7a5 \uc5f0\ubd09 \u20ac40,000\uc740 \ud504\ub791\uc2a4 \uacf5\uc7a5\uc7a5\uc758 \uacbd\ub825 \ucd08\ubc18 \uc5f0\uac04 \ucd1d\uae09\uc5ec\uc774\uba70, \uacbd\ub825\uc5d0 \ub530\ub77c \uc57d \u20ac90,000\uae4c\uc9c0 \uc624\ub97c \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc6d4\uae09\uacfc \ub3c5\uc77c \uae09\uc5ec\ub97c \ube44\uad50\ud558\uc138\uc694. \ud504\ub791\uc2a4 \uacf5\uc7a5\uc7a5 \uc5f0\ubd09: \uc6d4\uae09 \ubc0f \uc5f0\ubd09 \ud504\ub791\uc2a4\uc758 responsable de production \uc9c1\ubb34\uc5d0 \ub300\ud574 Randstad\ub294 (2026\ub144 10\uc6d4 3\uc77c \ud655\uc778) \uacbd\ub825 \ub2e8\uacc4\ubcc4 \ub300\ub7b5\uc801\uc778 \uc5f0\uac04 \ucd1d\uae09\uc5ec\ub97c \uc81c\uc2dc\ud569\ub2c8\ub2e4. \uacbd\ub825 \ucd08\ubc18\uc5d0\ub294 \uc57d \u20ac40,000, \uc218\ub144\uc758 \uacbd\ub825 \ud6c4\uc5d0\ub294 \u20ac70,000\uae4c\uc9c0 \uc624\ub97c \uc218&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/38752","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/comments?post=38752"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/38752\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media\/38753"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media?parent=38752"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/categories?post=38752"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/tags?post=38752"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}