{"id":38719,"date":"2023-09-17T17:16:11","date_gmt":"2023-09-17T17:16:11","guid":{"rendered":"https:\/\/skyplanner.ai\/%eb%b6%84%eb%a5%98%eb%90%98%ec%a7%80-%ec%95%8a%ec%9d%8c\/erp-%eb%b3%b4%ec%95%88\/"},"modified":"2024-08-09T07:06:27","modified_gmt":"2024-08-09T07:06:27","slug":"erp-%eb%b3%b4%ec%95%88","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/erp-%eb%b3%b4%ec%95%88\/","title":{"rendered":"ERP \ubcf4\uc548"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\" id=\"h-erp-security\">ERP \ubcf4\uc548<\/h1>\n\n\n<div class=\"gb-container gb-container-e8026af9\">\n\n<p><a href=\"https:\/\/skyplanner.ai\/ko\/\">\ud648<\/a> &#8221; <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/\">\ub9ac\uc18c\uc2a4<\/a> &#8221; ERP \ubcf4\uc548<\/p>\n\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" viewbox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">\uc608\uc0c1 \uc77d\uae30 \uc2dc\uac04: <\/span><span class=\"yoast-reading-time__reading-time\">18<\/span><span class=\"yoast-reading-time__time-unit\"> \ubd84<\/span><\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f0fd57d0\">\n\n<p>\uae30\uc5c5\uc774 \ub514\uc9c0\ud138 \ud50c\ub7ab\ud3fc\uc5d0 \uacc4\uc18d \uc758\uc874\ud558\ub294 \ud55c, \uac15\ub825\ud55c \ubcf4\uc548\uc758 \ud544\uc694\uc131\uc740 \ubb34\uc5c7\ubcf4\ub2e4 \uc911\uc694\ud574\uc9d1\ub2c8\ub2e4.\n\ube44\uc988\ub2c8\uc2a4 \ub3c4\uad6c\uac00 \uc9c4\ud654\ud558\ub294 \uacfc\uc815\uc5d0\uc11c ERP\ub77c\uace0\ub3c4 \ubd88\ub9ac\ub294 <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/what-is-erp\/\">\uc804\uc0ac\uc801 \uc790\uc6d0<\/a> \uad00\ub9ac\uac00 \uc804 \uc138\uacc4 \uae30\uc5c5\uc758 \uc911\uc694\ud55c \ub3c4\uad6c\ub85c \ubd80\uc0c1\ud588\uc2b5\ub2c8\ub2e4.\nERP\ub294 \ub2e4\uc591\ud55c \uae30\ub2a5\uc744 \uc9c0\uc6d0\ud558\ub294 \uac83 \uc678\uc5d0\ub3c4 \uc0dd\uc0b0 \uacc4\ud68d\uc5d0 \uc911\uc694\ud55c \uc5ed\ud560\uc744 \ud569\ub2c8\ub2e4.  <\/p>\n\n\n\n<p>\ubcf5\uc7a1\ud55c \uc81c\uc870\uc5c5\uacc4\uc5d0\uc11c \ud604\ub300 \uc0b0\uc5c5\uc740 \uc911\uc694\ud55c \ud68c\uc0ac \ub370\uc774\ud130\uc758 \uc7a0\uc7ac\uc801 \uc190\uc2e4\ubd80\ud130 \uae30\ubc00 \uc815\ubcf4 \uc720\ucd9c\uc758 \uc545\ubabd\uc5d0 \uc774\ub974\uae30\uae4c\uc9c0 \uae34\uae09\ud55c \ub514\uc9c0\ud138 \ubb38\uc81c\uc640 \uc528\ub984\ud558\uace0 \uc788\uc2b5\ub2c8\ub2e4.\n\uc774\ub7ec\ud55c \ubb38\uc81c\ub97c \uc815\uba74\uc73c\ub85c \ud574\uacb0\ud560 \uc900\ube44\uac00 \ub418\uc5b4 \uc788\ub294 \uc804\uc0ac\uc801 \uc790\uc6d0 \uad00\ub9ac \uc2dc\uc2a4\ud15c\uc758 \ud30c\uc218\uafbc\uc778 ERP \ubcf4\uc548\uc744 \ub9cc\ub098\ubcf4\uc138\uc694.\n\ub04a\uc784\uc5c6\uc774 \uc9c4\ud654\ud558\ub294 \uc81c\uc870 \ubd84\uc57c\ub97c \ud0d0\uc0c9\ud558\ub294 \uc0ac\ub78c\ub4e4\uc5d0\uac8c \uc774 \uc911\ucd94\uc801\uc778 <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/erp-%ea%b8%b0%eb%8a%a5\/\">ERP \uae30\ub2a5\uc740<\/a> \ubcf4\ud638\ubfd0\ub9cc \uc544\ub2c8\ub77c \ub9c8\uc74c\uc758 \ud3c9\uc548\uae4c\uc9c0 \uc57d\uc18d\ud569\ub2c8\ub2e4.\n\uad00\uc2ec\uc774 \uc788\uc73c\uc2e0\uac00\uc694?\n\uc624\ub298\ub0a0\uc758 \ub514\uc9c0\ud138 \uc2dc\ub300\uc5d0 ERP \ubcf4\uc548\uc774 \ubbf8\uce58\ub294 \uc601\ud5a5\uacfc \ud544\uc694\uc131\uc5d0 \ub300\ud574 \ub354 \uc790\uc138\ud788 \uc54c\uc544\ubcf4\uc138\uc694.    <\/p>\n\n\n\t\t\t\t<div class=\"wp-block-uagb-table-of-contents uagb-toc__align-left uagb-toc__columns-1  uagb-block-f3017ca9      \"\n\t\t\t\t\tdata-scroll= \"1\"\n\t\t\t\t\tdata-offset= \"30\"\n\t\t\t\t\tstyle=\"\"\n\t\t\t\t>\n\t\t\t\t<div class=\"uagb-toc__wrap\">\n\t\t\t\t\t\t<div class=\"uagb-toc__title\">\n\t\t\t\t\t\t\t\ubaa9\ucc28 \ud14c\uc774\ube14\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"uagb-toc__list-wrap \">\n\t\t\t\t\t\t<ol class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#tldr\" class=\"uagb-toc-link__trigger\">TL;DR<\/a><li class=\"uagb-toc__list\"><a href=\"#erp-\ubcf4\uc548\uc774\ub780-\ubb34\uc5c7\uc778\uac00\uc694\" class=\"uagb-toc-link__trigger\">ERP \ubcf4\uc548\uc774\ub780 \ubb34\uc5c7\uc778\uac00\uc694?<\/a><li class=\"uagb-toc__list\"><a href=\"#erp-\ubcf4\uc548\uc758-\uc911\uc694\uc131\" class=\"uagb-toc-link__trigger\">ERP \ubcf4\uc548\uc758 \uc911\uc694\uc131<\/a><li class=\"uagb-toc__list\"><a href=\"#\uae30\uc5c5\uc5d0-erp-\ubcf4\uc548\uc774-\ud544\uc694\ud55c-\uc774\uc720\" class=\"uagb-toc-link__trigger\">\uae30\uc5c5\uc5d0 ERP \ubcf4\uc548\uc774 \ud544\uc694\ud55c \uc774\uc720<\/a><li class=\"uagb-toc__list\"><a href=\"#erp-\ubcf4\uc548\uc758-\uae30\ub2a5\" class=\"uagb-toc-link__trigger\">ERP \ubcf4\uc548\uc758 \uae30\ub2a5<\/a><li class=\"uagb-toc__list\"><a href=\"#erp-\ubcf4\uc548\uc758-\uc774\uc810\" class=\"uagb-toc-link__trigger\">ERP \ubcf4\uc548\uc758 \uc774\uc810<\/a><li class=\"uagb-toc__list\"><a href=\"#\uc774-\uae30\ub2a5\uc758-\uc774\uc810\uc744-\ub204\ub9b4-\uc218-\uc788\ub294-\uc0b0\uc5c5\" class=\"uagb-toc-link__trigger\">\uc774 \uae30\ub2a5\uc758 \uc774\uc810\uc744 \ub204\ub9b4 \uc218 \uc788\ub294 \uc0b0\uc5c5<\/a><li class=\"uagb-toc__list\"><a href=\"#erp-\ubcf4\uc548\uc758-\ud6a8\uacfc\uc801\uc778-\uc0ac\uc6a9\" class=\"uagb-toc-link__trigger\">ERP \ubcf4\uc548\uc758 \ud6a8\uacfc\uc801\uc778 \uc0ac\uc6a9<\/a><li class=\"uagb-toc__list\"><a href=\"#\uc2a4\uce74\uc774\ud50c\ub798\ub108-aps-\ud55c-\ubc88\uc5d0-\uc0dd\uc0b0-\ud601\uc2e0-\ubc0f-\ubcf4\uc548-\uac15\ud654\" class=\"uagb-toc-link__trigger\">\uc2a4\uce74\uc774\ud50c\ub798\ub108 APS: \ud55c \ubc88\uc5d0 \uc0dd\uc0b0 \ud601\uc2e0 \ubc0f \ubcf4\uc548 \uac15\ud654<\/a><\/ol>\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\n\n\n<h2 class=\"gb-headline gb-headline-bed2deec gb-headline-text\">TL;DR<\/h2>\n\n\n\n<p><strong>ERP \ubcf4\uc548\uc740 ERP \uc2dc\uc2a4\ud15c\uc758 \ud575\uc2ec \uad6c\uc131 \uc694\uc18c\ub85c, \ub370\uc774\ud130 \ubcf4\ud638\uc640 \uad8c\ud55c\uc774 \ubd80\uc5ec\ub41c \uc561\uc138\uc2a4\ub9cc \ubcf4\uc7a5\ud558\ub294 \ub370 \uc911\uc810\uc744 \ub461\ub2c8\ub2e4.<\/strong>  \ubc29\ub300\ud558\uace0 \ubbfc\uac10\ud55c \ub370\uc774\ud130 \ud750\ub984\uc774 \uc788\ub294 \uc624\ub298\ub0a0\uc758 \ub514\uc9c0\ud138 \uc2dc\ub300\uc5d0 ERP \ubcf4\uc548\uc740 \ub370\uc774\ud130 \ubb34\uacb0\uc131 \uae30\ubc00\uc744 \uc720\uc9c0\ud558\uace0 \ube44\uc988\ub2c8\uc2a4\uc5d0 \ud574\ub97c \ub07c\uce60 \uc218 \uc788\ub294 \ubb34\ub2e8 \uce68\ud574\ub97c \ubc29\uc9c0\ud558\ub294 \ub370 \ud544\uc218\uc801\uc785\ub2c8\ub2e4.\n\uae30\uc5c5\uc774 \ub514\uc9c0\ud138 \ud1b5\ud569\uc744 \uac15\ud654\ud568\uc5d0 \ub530\ub77c \uc0ac\uc774\ubc84 \uacf5\uaca9\uacfc \ubb34\ub2e8 \uc561\uc138\uc2a4\uc758 \uc704\ud5d8\ub3c4 \ucee4\uc9c0\uace0 \uc788\uc73c\uba70, ERP \ubcf4\uc548\uc740 \ub514\uc9c0\ud138 \uc790\uc0b0\uc744 \ubcf4\ud638\ud558\uace0 \uc774\ud574\uad00\uacc4\uc790\uc758 \uc2e0\ub8b0\ub97c \uc720\uc9c0\ud558\uba70 \uc6d0\ud65c\ud55c \uc6b4\uc601\uc744 \ubcf4\uc7a5\ud558\ub294 \ub370 \uc720\uc6a9\ud558\uace0 \ud544\uc218\uc801\uc778 \uc694\uc18c\uc785\ub2c8\ub2e4. <\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-55817bd7 gb-headline-text\">ERP \ubcf4\uc548\uc774\ub780 \ubb34\uc5c7\uc778\uac00\uc694?<\/h2>\n\n\n<div class=\"gb-container gb-container-ce737323\"><div class=\"gb-inside-container\">\n\n<p><strong>ERP \ubcf4\uc548\uc740 \ub370\uc774\ud130\ub97c \ubcf4\ud638\ud558\uace0 \uc2b9\uc778\ub41c \uc561\uc138\uc2a4\ub97c \ubcf4\uc7a5\ud558\uae30 \uc704\ud55c ERP \uc2dc\uc2a4\ud15c \ub0b4\uc758 \ud2b9\uc218\ud55c \ud558\uc704 \uc9d1\ud569\uc785\ub2c8\ub2e4.  <\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p><strong>\uc804\uccb4\uc801\uc73c\ub85c ERP \ubcf4\uc548\uc740 ERP \uc2dc\uc2a4\ud15c \ub0b4\uc5d0\uc11c \uc870\uc9c1\uc758 \ub514\uc9c0\ud138 \uc790\uc0b0\uc744 \ubcf4\ud638\ud558\ub294 \uc694\uc0c8\ub97c \ud615\uc131\ud558\ub294 \ub3c4\uad6c, \ud504\ub85c\ud1a0\ucf5c, \uc815\ucc45\uc758 \uc885\ud569\uc801\uc778 \uc9d1\ud569\uccb4\uc785\ub2c8\ub2e4.<\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">ERP \ubcf4\uc548\uc758 \uc911\uc694\uc131<\/h2>\n\n\n\n<p>\ub514\uc9c0\ud138 \uc2dc\ub300\uc5d0\ub294 \uc870\uc9c1\uc744 \ud1b5\ud574 \uc720\uc785\ub418\ub294 \uc815\ubcf4\uc758 \uc591\uc774 \uc5c4\uccad\ub098\uac8c \uc99d\uac00\ud558\uace0 \uc788\uc2b5\ub2c8\ub2e4.\n\uc911\uc694\ud55c \uac83\uc740 \uc591\uc774 \uc544\ub2c8\ub77c \ub370\uc774\ud130\uc758 \ud488\uc9c8\uacfc \ubbfc\uac10\ub3c4\uc785\ub2c8\ub2e4. <strong>ERP \ubcf4\uc548\uc758 \uc8fc\uc694 \ubaa9\ud45c\ub294<\/strong> <strong>\uc774\ub7ec\ud55c \ub370\uc774\ud130\uc758 \ubb34\uacb0\uc131, \uae30\ubc00\uc131, \uac00\uc6a9\uc131\uc744 \ubcf4\uc7a5\ud558\uc5ec \ube44\uc988\ub2c8\uc2a4\uc5d0 \uce58\uba85\uc801\uc778 \uacb0\uacfc\ub97c \ucd08\ub798\ud560 \uc218 \uc788\ub294 \ubb34\ub2e8 \uc561\uc138\uc2a4\ub098 \uce68\ud574\ub97c \ubc29\uc9c0\ud558\ub294 <\/strong> <strong>\uac83\uc785\ub2c8\ub2e4<\/strong> <strong>. <\/strong>\ub514\uc9c0\ud138 \ud658\uacbd\uc758 \uc704\ud611\uc774 \uc99d\uac00\ud568\uc5d0 \ub530\ub77c ERP \ubcf4\uc548\uc740 \ub2e8\uc21c\ud55c \ucd94\uac00 \uae30\ub2a5\uc774 \uc544\ub2c8\ub77c \uc870\uc9c1\uc5d0 \ub300\ud55c \uc774\ud574\uad00\uacc4\uc790\uc758 \uc2e0\ub8b0\ub97c \ub4b7\ubc1b\uce68\ud558\ub294 \ud544\uc218 \uc694\uc18c\uc785\ub2c8\ub2e4. <\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\uae30\uc5c5\uc5d0 ERP \ubcf4\uc548\uc774 \ud544\uc694\ud55c \uc774\uc720<\/h2>\n\n\n\n<p>\ud604\ub300 \uae30\uc5c5\uc740 \ucd08\uc5f0\uacb0 \ud658\uacbd\uc5d0\uc11c \uc6b4\uc601\ub429\ub2c8\ub2e4.\n\ubaa8\ub4e0 \uac70\ub798, \ucee4\ubba4\ub2c8\ucf00\uc774\uc158, \uc758\uc0ac \uacb0\uc815\uc774 \ub514\uc9c0\ud138 \ub370\uc774\ud130\uc5d0 \uc758\uc874\ud558\ub294 \uacbd\uc6b0\uac00 \ub9ce\uc2b5\ub2c8\ub2e4.\n\ud558\uc9c0\ub9cc \uc774\ub7ec\ud55c \ub514\uc9c0\ud138\ud654\ub294 \ucde8\uc57d\uc131\uc744 \uc218\ubc18\ud569\ub2c8\ub2e4.\n\uc0ac\uc774\ubc84 \uacf5\uaca9, \ubb34\ub2e8 \uc561\uc138\uc2a4, \ub370\uc774\ud130 \uc720\ucd9c\uc740 \uae08\uc804\uc801 \uc190\uc2e4\ub85c \uc774\uc5b4\uc9c0\uace0 \uae30\uc5c5\uc758 \ud3c9\ud310\uc774 \uc190\uc0c1\ub418\uace0 \uc2e0\ub8b0\uac00 \uc57d\ud654\ub418\uba70 \ubc95\uc801 \ucc45\uc784\uc5d0 \ub178\ucd9c\ub420 \uc218 \uc788\uc2b5\ub2c8\ub2e4.\nERP \ubcf4\uc548\uc740 \ub370\uc774\ud130\ub97c \ubcf4\ud638\ud558\uace0 \ud504\ub85c\uc138\uc2a4\ub97c \ubc29\ud574\ud558\uc9c0 \uc54a\uc73c\uba70 \uae30\uc5c5\uc774 \ub514\uc9c0\ud138 \uc704\ud611\uc758 \uadf8\ub9bc\uc790 \uc5c6\uc774 \uc131\uc7a5\uc5d0 \uc9d1\uc911\ud560 \uc218 \uc788\ub3c4\ub85d \uc9c0\uc6d0\ud558\ub294 \uac8c\uc774\ud2b8\ud0a4\ud37c \uc5ed\ud560\uc744 \ud569\ub2c8\ub2e4.    <\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"536\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png\" alt=\"\" class=\"wp-image-6463\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-300x157.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-768x402.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1536x804.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-2048x1072.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-f68c7cb9 gb-headline-text\">ERP \ubcf4\uc548\uc758 \uae30\ub2a5<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>\uc0ac\uc6a9\uc790 \uc778\uc99d:<\/strong> ERP \uc2dc\uc2a4\ud15c\uc5d0 \ub300\ud55c \uc561\uc138\uc2a4 \uad8c\ud55c\uc744 \ubd80\uc5ec\ud558\uae30 \uc804\uc5d0 \uc0ac\uc6a9\uc790\uc758 \uc2e0\uc6d0\uc744 \ud655\uc778\ud569\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\uc561\uc138\uc2a4 \uc81c\uc5b4:<\/strong> \uc0ac\uc6a9\uc790 \uad8c\ud55c\uc744 \uacb0\uc815\ud558\uace0 \uad00\ub9ac\ud558\uc5ec \uc9c1\uc6d0\uc774 \uc790\uc2e0\uc758 \uc5ed\ud560\uacfc \uad00\ub828\ub41c \ub370\uc774\ud130\uc640 \ub3c4\uad6c\uc5d0\ub9cc \uc561\uc138\uc2a4\ud560 \uc218 \uc788\ub3c4\ub85d \ud569\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\ub370\uc774\ud130 \uc554\ud638\ud654:<\/strong> \uad8c\ud55c\uc774 \uc5c6\ub294 \uc0ac\uc6a9\uc790\uac00 \ub370\uc774\ud130\ub97c \uc77d\uc744 \uc218 \uc5c6\ub294 \ud615\uc2dd\uc73c\ub85c \ubcc0\ud658\ud558\uc5ec \uc800\uc7a5 \ubc0f \uc804\uc1a1 \uc911\uc5d0 \uc548\uc804\uc744 \ubcf4\uc7a5\ud569\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\uac10\uc0ac \ucd94\uc801:<\/strong> \uc0ac\uc6a9\uc790 \ud65c\ub3d9\uc744 \ubaa8\ub2c8\ud130\ub9c1\ud558\uace0 \uae30\ub85d\ud558\uc5ec \ub204\uac00 \uc5b8\uc81c \ubb34\uc5c7\uc744 \ud588\ub294\uc9c0\uc5d0 \ub300\ud55c \uc778\uc0ac\uc774\ud2b8\ub97c \uc81c\uacf5\ud569\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\uce68\uc785 \ud0d0\uc9c0:<\/strong> \uc758\uc2ec\uc2a4\ub7ec\uc6b4 \ud65c\ub3d9\uc774 \uc788\ub294\uc9c0 \uc2dc\uc2a4\ud15c\uc744 \ubaa8\ub2c8\ud130\ub9c1\ud558\uc5ec \uad00\ub9ac\uc790\uc5d0\uac8c \uc7a0\uc7ac\uc801\uc778 \uce68\uc785\uc744 \uacbd\uace0\ud569\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\ubc29\ud654\ubcbd \uad6c\ud604:<\/strong> ERP \uc2dc\uc2a4\ud15c\uacfc \uc778\ud130\ub137\uc758 \uc7a0\uc7ac\uc801 \uc704\ud611 \uc0ac\uc774\uc758 \uc7a5\ubcbd \uc5ed\ud560\uc744 \ud569\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\ubc31\uc5c5 \ubc0f \ubcf5\uad6c:<\/strong> \uc2dc\uc2a4\ud15c \uace0\uc7a5\uc774\ub098 \ub370\uc774\ud130 \ubd88\uc77c\uce58 \uc2dc \uc77c\uad00\ub41c \ub370\uc774\ud130 \ubc31\uc5c5\uacfc \uc2e0\uc18d\ud55c \ubcf5\uc6d0\uc744 \ubcf4\uc7a5\ud569\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\uc815\uae30 \uc5c5\ub370\uc774\ud2b8:<\/strong> \ucd5c\uc2e0 \uc704\ud611\uacfc \ucde8\uc57d\uc131\uc5d0 \ub300\uc751\ud560 \uc218 \uc788\ub3c4\ub85d ERP \uc2dc\uc2a4\ud15c\uc744 \uc5c5\ub370\uc774\ud2b8\ud569\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\uaddc\uc815 \uc900\uc218 \uad00\ub9ac:<\/strong> \uc870\uc9c1\uc758 ERP \uc2dc\uc2a4\ud15c\uc774 \ub370\uc774\ud130 \ubcf4\uc548\uc5d0 \uad00\ud55c \uc5c5\uacc4 \uaddc\uc815 \ubc0f \ud45c\uc900\uc744 \uc900\uc218\ud558\ub294\uc9c0 \ud655\uc778\ud569\ub2c8\ub2e4.<\/li>\n<\/ol>\n\n\n\n<h2 class=\"gb-headline gb-headline-3df7d9a2 gb-headline-text\">ERP \ubcf4\uc548\uc758 \uc774\uc810<\/h2>\n\n\n\n<p>\uc804\uc0ac\uc801 \uc790\uc6d0 \uad00\ub9ac \uc2dc\uc2a4\ud15c\uc740 \uc218\ub9ce\uc740 \ud604\ub300 \ube44\uc988\ub2c8\uc2a4\uc758 \uae30\ubc18\uc774\uba70, ERP \ubcf4\uc548\uc740 \ud544\uc218 \uad6c\uc131 \uc694\uc18c\uc785\ub2c8\ub2e4.\nERP \ubcf4\uc548\uc744 \uc6b0\uc120\uc21c\uc704\uc5d0 \ub450\uba74 \uc5bb\uc744 \uc218 \uc788\ub294 8\uac00\uc9c0 \uc774\uc810\uc744 \uc0b4\ud3b4\ubcf4\uc138\uc694: <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-d10f49c0 gb-headline-text\">\ubbfc\uac10\ud55c \ub370\uc774\ud130 \ubcf4\ud638:&nbsp;<\/h4>\n\n\n\n<p>ERP \ubcf4\uc548\uc758 \ud575\uc2ec\uc740 \uc7ac\ubb34 \ubcf4\uace0\uc11c, \uc601\uc5c5 \ube44\ubc00, \uc9c1\uc6d0 \uc815\ubcf4\uc640 \uac19\uc740 \ubbfc\uac10\ud55c \ud68c\uc0ac \ub370\uc774\ud130\ub97c \uae30\ubc00\ub85c \uc720\uc9c0\ud558\ub3c4\ub85d \ubcf4\uc7a5\ud558\ub294 \uac83\uc785\ub2c8\ub2e4.\n\uc774\ub97c \ud1b5\ud574 \ud68c\uc0ac\uc758 \uacbd\uc7c1 \uc6b0\uc704\ub97c \uc720\uc9c0\ud558\uace0 \uc774\ud574\uad00\uacc4\uc790\uc758 \uc2e0\ub8b0\ub97c \uc720\uc9c0\ud569\ub2c8\ub2e4. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-e5957489 gb-headline-text\">\uaddc\uc815 \uc900\uc218:&nbsp;<\/h4>\n\n\n\n<p>\ub9ce\uc740 \uc0b0\uc5c5\uc5d0\uc11c \ub370\uc774\ud130 \ubcf4\ud638\uc5d0 \uad00\ud55c \uc5c4\uaca9\ud55c \uaddc\uc81c \uc694\uac74\uc744 \uc900\uc218\ud574\uc57c \ud569\ub2c8\ub2e4.\nERP \ubcf4\uc548\uc740 \uae30\uc5c5\uc774 \uaddc\uc815\uc744 \uc900\uc218\ud558\uc5ec \uc7a0\uc7ac\uc801\uc778 \ubc95\uc801 \uc601\ud5a5\uacfc \ub9c9\ub300\ud55c \ubc8c\uae08\uc744 \ud53c\ud560 \uc218 \uc788\ub3c4\ub85d \uc9c0\uc6d0\ud569\ub2c8\ub2e4. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-680d3e13 gb-headline-text\">\ube44\uc988\ub2c8\uc2a4 \ud3c9\ud310 \ud5a5\uc0c1:&nbsp;<\/h4>\n\n\n\n<p>\uac15\ub825\ud55c \ubcf4\uc548 \ud504\ub85c\ud1a0\ucf5c\ub85c \uc720\uba85\ud55c \uae30\uc5c5\uc740 \uc885\uc885 \ub354 \ub192\uc740 \ud3c9\uac00\ub97c \ubc1b\uc2b5\ub2c8\ub2e4.\n\uac15\ud654\ub41c ERP \ubcf4\uc548 \ud504\ub808\uc784\uc6cc\ud06c\ub294 \ube44\uc988\ub2c8\uc2a4 \ud3c9\ud310\uc744 \ub192\uc774\uace0 \uace0\uac1d, \uacf5\uae09\uc5c5\uccb4, \ud30c\ud2b8\ub108 \uac04\uc758 \uc2e0\ub8b0\ub97c \uad6c\ucd95\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-7b0d8820 gb-headline-text\">\uc7ac\uc815\uc801 \uc190\uc2e4 \ubc29\uc9c0:&nbsp;<\/h4>\n\n\n\n<p>\uc0ac\uc774\ubc84 \uacf5\uaca9\uc740 \uc9c1\uc811\uc801\uc778 \uc790\uae08 \ub3c4\ub09c\ubd80\ud130 \uce68\ud574 \ubcf5\uad6c\uc640 \uad00\ub828\ub41c \ube44\uc6a9\uae4c\uc9c0 \uc0c1\ub2f9\ud55c \uc7ac\uc815\uc801 \uc601\ud5a5\uc744 \ucd08\ub798\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.\nERP \ubcf4\uc548\uc740 \uc774\ub7ec\ud55c \uc704\ud611\uc5d0 \ub300\ud55c \ubc29\uc5b4\ubcbd \uc5ed\ud560\uc744 \ud558\uc5ec \uae30\uc5c5\uc758 \uc7ac\ubb34 \uac74\uc804\uc131\uc744 \ubcf4\ud638\ud569\ub2c8\ub2e4. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-589d9705 gb-headline-text\">\uc6b4\uc601 \uc5f0\uc18d\uc131:&nbsp;<\/h4>\n\n\n\n<p>\ubcf4\uc548 \uce68\ud574\ub294 \uc6b4\uc601\uc744 \uc911\ub2e8\uc2dc\ucf1c \uc0dd\uc0b0, \uc11c\ube44\uc2a4 \uc81c\uacf5 \ub610\ub294 \uae30\ud0c0 \ud575\uc2ec \uae30\ub2a5\uc758 \uc9c0\uc5f0\uc744 \ucd08\ub798\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.\n\uac15\ub825\ud55c ERP \ubcf4\uc548\uc744 \ud1b5\ud574 \uae30\uc5c5\uc740 \ub514\uc9c0\ud138 \uc704\ud611\uc774 \uc99d\uac00\ud558\ub294 \uc0c1\ud669\uc5d0\uc11c\ub3c4 \uc911\ub2e8 \uc5c6\ub294 \uc6b4\uc601\uc744 \ubcf4\uc7a5\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-a8637974 gb-headline-text\">\uc2e4\uc2dc\uac04 \uc704\ud611 \ubaa8\ub2c8\ud130\ub9c1:&nbsp;<\/h4>\n\n\n\n<p>\ucd5c\uc2e0 ERP \ubcf4\uc548 \uae30\ub2a5\uc5d0\ub294 \uc2e4\uc2dc\uac04 \ubaa8\ub2c8\ud130\ub9c1 \uae30\ub2a5\uc774 \ud0d1\uc7ac\ub418\uc5b4 \uc788\uc5b4 \ubcf4\uc548 \uc774\uc0c1 \uc9d5\ud6c4\ub97c \uc989\uc2dc \uac10\uc9c0\ud558\uace0 \ub300\uc751\ud560 \uc218 \uc788\uc73c\ubbc0\ub85c \uc7a0\uc7ac\uc801\uc778 \ud53c\ud574\ub97c \uc904\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-4d60a9db gb-headline-text\">\uc561\uc138\uc2a4 \uc81c\uc5b4:&nbsp;<\/h4>\n\n\n\n<p>ERP \ubcf4\uc548\uc744 \ud1b5\ud574 \uae30\uc5c5\uc740 \uc2dc\uc2a4\ud15c \ub0b4\uc5d0\uc11c \ub204\uac00 \uc5b4\ub5a4 \uc815\ubcf4\uc5d0 \uc561\uc138\uc2a4\ud560 \uc218 \uc788\ub294\uc9c0 \uc815\uc758\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.\n\uc774\ub97c \ud1b5\ud574 \ubb34\ub2e8 \uc561\uc138\uc2a4\ub97c \ubc29\uc9c0\ud560 \ubfd0\ub9cc \uc544\ub2c8\ub77c \uc9c1\uc6d0\ub4e4\uc774 \uc790\uc2e0\uc758 \uc5ed\ud560\uacfc \uad00\ub828\ub41c \ub370\uc774\ud130\ub85c \ud6a8\uc728\uc801\uc73c\ub85c \uc5c5\ubb34\ub97c \uc218\ud589\ud560 \uc218 \uc788\ub3c4\ub85d \ubcf4\uc7a5\ud569\ub2c8\ub2e4. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-903a3af5 gb-headline-text\">\ub9c8\uc74c\uc758 \ud3c9\ud654:<\/h4>\n\n\n\n<p>\uac15\ub825\ud55c ERP \ubcf4\uc548\uc774 \uad6c\ucd95\ub418\uc5b4 \uc788\uc73c\uba74 \ube44\uc988\ub2c8\uc2a4 \ub9ac\ub354\ub294 \ub514\uc9c0\ud138 \uc790\uc0b0\uc774 \ubcf4\ud638\ub41c\ub2e4\ub294 \ud655\uc2e0\uc744 \uac16\uace0 \uc131\uc7a5\uacfc \uc804\ub7b5\uc5d0 \uc9d1\uc911\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.\n\uc624\ub298\ub0a0\uacfc \uac19\uc774 \uae09\ubcc0\ud558\ub294 \ube44\uc988\ub2c8\uc2a4 \ud658\uacbd\uc5d0\uc11c\ub294 \uc774\ub7ec\ud55c \ub9c8\uc74c\uc758 \ud3c9\ud654\uac00 \ub9e4\uc6b0 \uc911\uc694\ud569\ub2c8\ub2e4. <\/p>\n\n\n\n<p>\ub514\uc9c0\ud138 \uac70\ub798\uc640 \uc628\ub77c\uc778 \uc6b4\uc601\uc73c\ub85c \uc810\uc810 \ub354 \uc815\uc758\ub418\ub294 \uc138\uc0c1\uc5d0\uc11c ERP \ubcf4\uc548\uc740 \ub2e8\uc21c\ud55c \uae30\ub2a5\uc774 \uc544\ub2c8\ub77c \ube44\uc988\ub2c8\uc2a4 \ubb34\uacb0\uc131\uacfc \uc9c0\uc18d \uac00\ub2a5\uc131\uc744 \uc9c0\uc6d0\ud558\ub294 \ud544\uc218 \uc694\uc18c\ub85c \ubd80\uc0c1\ud558\uace0 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f7e777f3\">\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Production planning and scheduling product image straight view\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Advanced production planning with AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Read more about our approach to production planning and optimization leveraging the power of AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"https:\/\/skyplanner.ai\/\" aria-label=\"Book a demo\">Production planning with AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div>\n\n<div class=\"gb-container gb-container-33d6b196\">\n\n<h2 class=\"wp-block-heading\">\uc774 \uae30\ub2a5\uc758 \uc774\uc810\uc744 \ub204\ub9b4 \uc218 \uc788\ub294 \uc0b0\uc5c5<\/h2>\n\n\n\n<p><strong>\uc758\ub8cc \uc0b0\uc5c5:<\/strong> \uc758\ub8cc \uae30\uad00\uc5d0\uc11c\ub294 \ubbfc\uac10\ud55c \ud658\uc790 \uae30\ub85d, \uc758\ub8cc \uae30\ub85d, \uccad\uad6c \uc138\ubd80 \uc815\ubcf4\ub97c \ubcf4\ud638\ud574\uc57c \ud558\ub294 \uacfc\uc81c\ub97c \uc548\uace0 \uc788\uc2b5\ub2c8\ub2e4.\n\uc5c4\uaca9\ud55c \uc758\ub8cc \uaddc\uc815 \uc900\uc218 \ud45c\uc900\uc73c\ub85c \uc778\ud574 \ubb34\ub2e8 \uc561\uc138\uc2a4\ub294 \uc2ec\uac01\ud55c \uac1c\uc778\uc815\ubcf4 \uce68\ud574, \ud658\uc790 \uc2e0\ub8b0 \uc0c1\uc2e4, \uc2ec\uac01\ud55c \ubc95\uc801 \ubb38\uc81c\ub85c \uc774\uc5b4\uc9c8 \uc218 \uc788\uc2b5\ub2c8\ub2e4.\n\uc758\ub8cc \uae30\uad00\uc740 ERP \ubcf4\uc548\uc744 \ud65c\uc6a9\ud558\uc5ec \uad8c\ud55c\uc774 \uc788\ub294 \uc0ac\ub78c\ub9cc \ubbfc\uac10\ud55c \ub370\uc774\ud130\uc5d0 \uc561\uc138\uc2a4\ud560 \uc218 \uc788\ub3c4\ub85d \ud560 \ubfd0\ub9cc \uc544\ub2c8\ub77c \ud658\uc790 \uae30\ubc00\uc131\uc744 \uac15\ud654\ud558\uace0 \uaddc\uc81c \uc694\uac74\uc744 \ucda9\uc871\ud558\uba70 \uc2e0\ub8b0\ub97c \uad6c\ucd95\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.  <\/p>\n\n\n\n<p><strong>\uae08\uc735 \uc11c\ube44\uc2a4 \ubc0f \ubc45\ud0b9:<\/strong> \uc740\ud589\uacfc \uae08\uc735 \uae30\uad00\uc740 \ubc29\ub300\ud55c \uc591\uc758 \uae30\ubc00 \uae08\uc735 \ub370\uc774\ud130\ub97c \ubcf4\ud638\ud574\uc57c \ud558\ub294 \uc0ac\uc774\ubc84 \uc704\ud611\uc758 \ucd5c\uc804\uc120\uc5d0 \uc11c \uc788\uc2b5\ub2c8\ub2e4.\n\ubcf4\uc548 \uce68\ud574\uc758 \uc601\ud5a5\uc740 \uc2ec\uac01\ud55c \uacbd\uc81c\uc801 \uc190\uc2e4\ubd80\ud130 \uc2e0\uc6d0 \ub3c4\uc6a9, \uc0c1\ub2f9\ud55c \uaddc\uc81c \uc601\ud5a5\uc5d0 \uc774\ub974\uae30\uae4c\uc9c0 \ub2e4\uc591\ud569\ub2c8\ub2e4.\nERP \ubcf4\uc548\uc740 \uae08\uc735 \ub370\uc774\ud130\ub97c \ubcf4\ud638\ud558\uace0 \uae30\ubc00 \uac70\ub798\ub97c \ucd09\uc9c4\ud558\uba70 \uae08\uc735 \uc5c5\uacc4\uc758 \uc5c4\uaca9\ud55c \ud45c\uc900\uc744 \uc900\uc218\ud558\ub3c4\ub85d \uc9c0\uc6d0\ud558\uc5ec \uc774\ub7ec\ud55c \ubb38\uc81c\uc5d0 \ub300\ud55c \ubcf4\ub8e8 \uc5ed\ud560\uc744 \ud569\ub2c8\ub2e4.  <\/p>\n\n\n\n<p><strong>\uc81c\uc870 \uc0b0\uc5c5:<\/strong> \uc81c\uc870\uc5c5\uccb4\ub294 \uc9c0\uc801 \uc7ac\uc0b0\uc744 \ubcf4\ud638\ud558\uace0 \ud6a8\uc728\uc801\uc778 \uc0dd\uc0b0 \uccad\uc0ac\uc9c4\uacfc \uacf5\uae09\ub9dd \ubb3c\ub958\ub97c \uc720\uc9c0\ud574\uc57c \ud558\ub294 \uc774\uc911\uc758 \ucc45\uc784\uc744 \uc9c0\uace0 \uc788\uc2b5\ub2c8\ub2e4.\n\uc774\ub7ec\ud55c \uc815\ubcf4\uac00 \ubb34\ub2e8\uc73c\ub85c \uacf5\uac1c\ub418\uba74 \uc9c0\uc801 \uc7ac\uc0b0 \ub3c4\ub09c, \uc0dd\uc0b0 \ucc28\uc9c8, \uc2ec\uc9c0\uc5b4 \uc0b0\uc5c5 \uc2a4\ud30c\uc774 \ud589\uc704\ub85c \uc774\uc5b4\uc9c8 \uc218 \uc788\uc2b5\ub2c8\ub2e4.\nERP \ubcf4\uc548\uc744 \ud1b5\ud574 \uc81c\uc870 \uae30\uc5c5\uc740 \ub3c5\uc810 \uc124\uacc4\uc758 \uae30\ubc00\uc131\uc744 \ubcf4\uc7a5\ud558\uace0 \uc0dd\uc0b0 \ud504\ub85c\uc138\uc2a4\uc758 \uc6d0\ud65c\ud55c \ud750\ub984\uc744 \ubcf4\uc7a5\ud558\uba70 \uacf5\uae09\ub9dd \ubb34\uacb0\uc131\uc744 \uc720\uc9c0\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.  <\/p>\n\n\n\n<p><strong>\uc774\ucee4\uba38\uc2a4 \ubc0f \uc18c\ub9e4\uc5c5:<\/strong> \uc774\ucee4\uba38\uc2a4 \ud50c\ub7ab\ud3fc\uc758 \uacbd\uc6b0, \uc2e0\uc6a9\uce74\ub4dc \uc815\ubcf4\ubd80\ud130 \uad6c\ub9e4 \ub0b4\uc5ed\uc5d0 \uc774\ub974\uae30\uae4c\uc9c0 \ubc29\ub300\ud55c \uace0\uac1d \ub370\uc774\ud130\ub294 \uc790\uc0b0\uc778 \ub3d9\uc2dc\uc5d0 \ucc45\uc784\uc774\uae30\ub3c4 \ud569\ub2c8\ub2e4.\n\ub370\uc774\ud130 \uc720\ucd9c\uc740 \uae08\uc735 \uc0ac\uae30\ub97c \ucd09\ubc1c\ud558\uace0 \uc18c\ube44\uc790 \uc2e0\ub8b0\ub97c \uc57d\ud654\uc2dc\ud0a4\uba70 \ud310\ub9e4\ub97c \uc800\ud574\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.\n\uc628\ub77c\uc778 \ub9ac\ud14c\uc77c\ub7ec\ub294 ERP \ubcf4\uc548\uc744 \ud1b5\ud574 \uace0\uac1d \ub370\uc774\ud130\ub97c \uc548\uc804\ud558\uac8c \ubcf4\ud638\ud558\uc5ec \uc6d0\ud65c\ud55c \uac70\ub798\ub97c \ucd09\uc9c4\ud558\uace0 \uc18c\ube44\uc790 \uc2e0\ub8b0\uc640 \ucda9\uc131\ub3c4\ub97c \uac15\ud654\ud558\ub294 \uc1fc\ud551 \ud658\uacbd\uc744 \uc870\uc131\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.  <\/p>\n\n\n\n<p><strong>\uc5d0\ub108\uc9c0 \ubc0f \uc720\ud2f8\ub9ac\ud2f0:<\/strong> \uc5d0\ub108\uc9c0 \ubc0f \uc720\ud2f8\ub9ac\ud2f0 \ubd80\ubb38\uc758 \uae30\uc5c5\uc740 \uc804\ub825\ub9dd\uacfc \uc218\ub3c4 \uc2dc\uc2a4\ud15c\uacfc \uac19\uc740 \uc911\uc694 \uc778\ud504\ub77c\uc758 \uad00\ub9ac\uc790\uc785\ub2c8\ub2e4.\n\uc0ac\uc774\ubc84 \uce68\uc785\uc740 \ub300\uaddc\ubaa8 \uc11c\ube44\uc2a4 \uc911\ub2e8\uc744 \ucd08\ub798\ud558\uc5ec \uacf5\uacf5 \uc548\uc804\uc744 \uc704\ud611\ud558\uace0 \uacbd\uc81c\uc801 \ud63c\ub780\uc744 \uc57c\uae30\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.\n\uc774\ub7ec\ud55c \uae30\uc5c5\uc740 \uac15\ub825\ud55c \ubcf4\uc548 \uc870\uce58\ub85c ERP \uc2dc\uc2a4\ud15c\uc744 \uac15\ud654\ud568\uc73c\ub85c\uc368 \uc545\uc758\uc801\uc778 \uacf5\uaca9\uc744 \ucc28\ub2e8\ud558\uc5ec \uc9c0\uc18d\uc801\uc778 \uc11c\ube44\uc2a4 \uc81c\uacf5\uc744 \ubcf4\uc7a5\ud558\uace0 \ub300\uc911\uc758 \uc2e0\ub8b0\ub97c \uc720\uc9c0\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.  <\/p>\n\n\n\n<p>\uc774\ub7ec\ud55c \uac01 \uc0b0\uc5c5\uc740 ERP \ubcf4\uc548\uc758 \ubcf4\ud638 \uae30\ub2a5\uc744 \ud65c\uc6a9\ud558\uc5ec \ub514\uc9c0\ud138 \uc790\uc0b0\uc744 \ubcf4\ud638\ud560 \ubfd0\ub9cc \uc544\ub2c8\ub77c \uc6b4\uc601 \ubb34\uacb0\uc131\uacfc \uc774\ud574\uad00\uacc4\uc790\uc758 \uc2e0\ub8b0\ub97c \uac15\ud654\ud569\ub2c8\ub2e4.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-8302c3b5 gb-headline-text\">ERP \ubcf4\uc548\uc758 \ud6a8\uacfc\uc801\uc778 \uc0ac\uc6a9<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>\uc815\uae30 \uac10\uc0ac:<\/strong> ERP \uc2dc\uc2a4\ud15c\uc758 \ubcf4\uc548\uc744 \uc8fc\uae30\uc801\uc73c\ub85c \uac80\ud1a0\ud558\uc5ec \ucde8\uc57d\uc810\uc744 \ucc3e\uc544\ub0b4\uace0 \ucd5c\uc2e0 \ubcf4\uc548 \ud45c\uc900\uc744 \uc720\uc9c0\ud558\uc138\uc694.<\/li>\n\n\n\n<li><strong>\uc5ed\ud560 \uae30\ubc18 \uc561\uc138\uc2a4 \uc81c\uc5b4(RBAC):<\/strong> \uc9c1\uc6d0\ub4e4\uc774 \ud2b9\uc815 \uc5ed\ud560\uc5d0 \ud544\uc694\ud55c \ub370\uc774\ud130\uc5d0\ub9cc \uc561\uc138\uc2a4\ud560 \uc218 \uc788\ub3c4\ub85d RBAC\ub97c \uad6c\ud604\ud558\uc138\uc694.\n\uc774\ub807\uac8c \ud558\uba74 \ub0b4\ubd80 \uc704\ud611 \ubc0f \ub370\uc774\ud130 \uc720\ucd9c\uacfc \uad00\ub828\ub41c \uc704\ud5d8\uc744 \ucd5c\uc18c\ud654\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. <\/li>\n\n\n\n<li><strong>\uc815\uae30\uc801\uc73c\ub85c \uc5c5\ub370\uc774\ud2b8 \ubc0f \ud328\uce58\ud558\uae30:<\/strong> ERP \uc2dc\uc2a4\ud15c\uc744 \ud56d\uc0c1 \ucd5c\uc2e0 \uc0c1\ud0dc\ub85c \uc720\uc9c0\ud558\uc138\uc694.\n\uc81c\uc870\uc5c5\uccb4\ub294 \uc885\uc885 \uc54c\ub824\uc9c4 \ucde8\uc57d\uc810\uc5d0 \ub300\ud55c \ud328\uce58\ub97c \ucd9c\uc2dc\ud569\ub2c8\ub2e4.\n\uc815\uae30\uc801\uc778 \uc5c5\ub370\uc774\ud2b8\ub294 \uc54c\ub824\uc9c4 \uc704\ud611\uc73c\ub85c\ubd80\ud130 \uc2dc\uc2a4\ud15c\uc744 \uc548\uc804\ud558\uac8c \uc720\uc9c0\ud558\ub294 \ub370 \ub3c4\uc6c0\uc774 \ub429\ub2c8\ub2e4.  <\/li>\n\n\n\n<li><strong>2\ub2e8\uacc4 \uc778\uc99d(2FA):<\/strong> ERP \uc2dc\uc2a4\ud15c\uc5d0 \uc561\uc138\uc2a4\ud560 \ub54c 2FA\ub97c \ud1b5\ud569\ud558\uc138\uc694.\n\uc774\ub807\uac8c \ud558\uba74 \ucd94\uac00\uc801\uc778 \ubcf4\ud638 \uacc4\uce35\uc774 \ub3c4\uc785\ub418\uc5b4 \ube44\ubc00\ubc88\ud638 \uc720\ucd9c\uc774 \ubb34\ub2e8 \uce68\uc785\uc73c\ub85c \uc774\uc5b4\uc9c0\uc9c0 \uc54a\ub3c4\ub85d \ubc29\uc9c0\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. <\/li>\n\n\n\n<li><strong>\uc9c1\uc6d0 \uad50\uc721:<\/strong> \uc9c1\uc6d0\ub4e4\uc5d0\uac8c ERP \ubcf4\uc548 \ubaa8\ubc94 \uc0ac\ub840\uc5d0 \ub300\ud574 \uad50\uc721\ud558\uc138\uc694.\n\ud53c\uc2f1 \uc2dc\ub3c4, \ube44\ubc00\ubc88\ud638 \uad00\ub9ac \ubc0f \uae30\ud0c0 \ubcf4\uc548 \uc704\ud611\uc5d0 \ub300\ud574 \uc54c\ub824\uc8fc\uba74 \uc2dc\uc2a4\ud15c \ubcf4\uc548\uc744 \uc720\uc9c0\ud558\ub294 \ub370 \ud070 \ub3c4\uc6c0\uc774 \ub420 \uc218 \uc788\uc2b5\ub2c8\ub2e4. <\/li>\n\n\n\n<li><strong>\ub370\uc774\ud130 \ubc31\uc5c5\uc740 \ucca0\uc800\ud558\uac8c \ud558\uc138\uc694:<\/strong> \ud56d\uc0c1 \ubc31\uc5c5 \uc804\ub7b5\uc744 \ub9c8\ub828\ud558\uc138\uc694.\n\ubcf4\uc548 \uce68\ud574\ub098 \uc2dc\uc2a4\ud15c \uc7a5\uc560\uac00 \ubc1c\uc0dd\ud588\uc744 \ub54c \ubc31\uc5c5\uc774 \uc788\uc73c\uba74 \ub370\uc774\ud130\ub97c \ubcf5\uc6d0\ud558\uace0 \ube44\uc988\ub2c8\uc2a4 \uc5f0\uc18d\uc131\uc744 \uc720\uc9c0\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. <\/li>\n\n\n\n<li><strong>\uc2dc\uc2a4\ud15c \ud65c\ub3d9 \ubaa8\ub2c8\ud130\ub9c1:<\/strong> \ubaa8\ub2c8\ud130\ub9c1 \ub3c4\uad6c\ub97c \uc0ac\uc6a9\ud558\uc5ec \uc2dc\uc2a4\ud15c \ud65c\ub3d9\uc744 \uc8fc\uc2dc\ud558\uc138\uc694.\n\ube44\uc815\uc0c1\uc801\uc778 \ud65c\ub3d9\uc740 \uce68\ud574 \ub610\ub294 \uce68\ud574 \uc2dc\ub3c4\ub97c \ub098\ud0c0\ub0b4\ub294 \uc9c0\ud45c\uac00 \ub420 \uc218 \uc788\uc73c\ubbc0\ub85c \uc2e0\uc18d\ud558\uac8c \uac1c\uc785\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. <\/li>\n\n\n\n<li><strong>\uc6d0\uaca9 \uc561\uc138\uc2a4\ub97c \uc81c\ud55c\ud558\uc138\uc694:<\/strong> \uc9c1\uc6d0\uc774 ERP \uc2dc\uc2a4\ud15c\uc5d0 \uc6d0\uaca9\uc73c\ub85c \uc561\uc138\uc2a4\ud574\uc57c \ud558\ub294 \uacbd\uc6b0 VPN\uacfc \uac19\uc740 \uc548\uc804\ud55c \ucc44\ub110\uc744 \ud1b5\ud574 \uc561\uc138\uc2a4\ud558\ub3c4\ub85d \ud558\uc138\uc694.\n\uac00\ub2a5\ud558\uba74 \uc9c1\uc811 \uc6d0\uaca9 \uc561\uc138\uc2a4\ub294 \ud53c\ud558\uc138\uc694. <\/li>\n\n\n\n<li><strong>\uc804\ubb38\uac00\uc758 \uc870\uc5b8\uc744 \uad6c\ud558\uc138\uc694:<\/strong> ERP \ubcf4\uc548\uc5d0 \ub300\ud574 \ub354 \uc790\uc138\ud55c \uc124\uba85\uc774 \ud544\uc694\ud55c \uacbd\uc6b0 \uc804\ubb38\uac00\uc640 \uc0c1\ub2f4\ud558\uc138\uc694.\nERP \uacf5\uae09\uc5c5\uccb4 \ub610\ub294 ERP \ubcf4\uc548\uc744 \uc804\ubb38\uc73c\ub85c \ud558\ub294 \ud0c0\uc0ac \ubcf4\uc548 \ucee8\uc124\ud134\ud2b8\uc5d0\uac8c \ubb38\uc758\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. <\/li>\n\n\n\n<li><strong>\ub300\uc751 \uacc4\ud68d\uc744 \uc138\uc6b0\uc138\uc694:<\/strong> \ud56d\uc0c1 \uc0ac\uace0 \ub300\uc751 \uacc4\ud68d\uc744 \uc900\ube44\ud558\uc138\uc694.\n\uce68\ud574\uac00 \ubc1c\uc0dd\ud588\uc744 \ub54c \ucde8\ud574\uc57c \ud560 \uc989\uac01\uc801\uc778 \uc870\uce58\ub97c \uc54c\uace0 \uc788\uc73c\uba74 \uc7a0\uc7ac\uc801\uc778 \ud53c\ud574\ub97c \uc644\ud654\ud558\uace0 \ubcf5\uad6c \uc18d\ub3c4\ub97c \ub192\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4. <\/li>\n<\/ol>\n\n\n\n<p>ERP \uc2dc\uc2a4\ud15c\uc740 \uc911\uc694\ud55c \ube44\uc988\ub2c8\uc2a4 \ub370\uc774\ud130\uc640 \ud504\ub85c\uc138\uc2a4\ub97c \ud1b5\ud569\ud558\uc9c0\ub9cc, ERP \ubcf4\uc548\uc740 \uc774\ub7ec\ud55c \ud1b5\ud569\uc774 \ucde8\uc57d\uc810\uc774 \ub418\uc9c0 \uc54a\ub3c4\ub85d \ubcf4\uc7a5\ud569\ub2c8\ub2e4.\n\uc0ac\uc804 \uc608\ubc29\uc801 \uc811\uadfc \ubc29\uc2dd\uc744 \ucc44\ud0dd\ud558\uace0, \ucd5c\uc2e0 \uc0c1\ud0dc\ub97c \uc720\uc9c0\ud558\uace0, \uc778\uc801 \uc694\uc18c\ub97c \uad50\uc721\ud558\ub294 \uac83\uc740 \uc548\uc804\ud55c \ud658\uacbd\uc744 \uc720\uc9c0\ud558\uba74\uc11c ERP\uc758 \uc774\uc810\uc744 \ucd5c\ub300\ud55c \ud65c\uc6a9\ud558\uae30 \uc704\ud55c \ud575\uc2ec \uc694\uc18c\uc785\ub2c8\ub2e4. <\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"302\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1024x302.png\" alt=\"&#xC0DD;&#xC0B0; &#xBB38;&#xC81C;&#xC5D0; &#xB300;&#xD55C; SkyPlanner &#xACE0;&#xAE09; &#xACC4;&#xD68D; &#xBC0F; &#xC2A4;&#xCF00;&#xC904;&#xB9C1; &#xC194;&#xB8E8;&#xC158;\" class=\"wp-image-4232\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1024x302.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-300x88.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-768x226.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1536x452.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-2048x603.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-231df0c4 gb-headline-text\">\uc2a4\uce74\uc774\ud50c\ub798\ub108 APS: \ud55c \ubc88\uc5d0 \uc0dd\uc0b0 \ud601\uc2e0 \ubc0f \ubcf4\uc548 \uac15\ud654<\/h2>\n\n\n\n<p>\uc5c5\uacc4\uc5d0\uc11c \ucd5c\uc801\ud654\ub97c \ub04a\uc784\uc5c6\uc774 \ucd94\uad6c\ud568\uc5d0 \ub530\ub77c <a href=\"https:\/\/skyplanner.ai\/ko\/\">Skyplanner\uc640 \uac19\uc740 \uace0\uae09 \uacc4\ud68d \ubc0f \uc608\uc57d(APS) \uc2dc\uc2a4\ud15c\uacfc<\/a> \uac19\uc740 \ub3c4\uad6c\ub294 \ud544\uc218 \ubd88\uac00\uacb0\ud55c \uc694\uc18c\uac00 \ub418\uc5c8\uc2b5\ub2c8\ub2e4.\nAPS\ub294 ERP \ubcf4\uc548\uc5d0 \uc5b4\ub5a4 \uc5ed\ud560\uc744 \ud560\uae4c\uc694?\n\ud574\ub2f5\uc740 \uc790\ub3d9\ud654\uc640 \uc911\uc559 \uc9d1\uc911\uc2dd \ub370\uc774\ud130 \ucc98\ub9ac\uc758 \uc735\ud569\uc5d0 \uc788\uc2b5\ub2c8\ub2e4.    <\/p>\n\n\n\n<p>Arcturus\ub77c\ub294 AI\uac00 \ub0b4\uc7a5\ub41c Skyplanner APS\ub294 \uc0dd\uc0b0 \uc77c\uc815 \ubc0f \uacc4\ud68d\uc758 \ubcf5\uc7a1\ud55c \uacfc\uc815\uc744 \uac04\uc18c\ud654\ud560 \ubfd0\ub9cc \uc544\ub2c8\ub77c <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%a0%9c%ec%a1%b0-erp-%ec%a2%85%ed%95%a9-%ea%b0%80%ec%9d%b4%eb%93%9c\/\">ERP<\/a> \ub610\ub294 <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mes-%ec%8b%9c%ec%8a%a4%ed%85%9c-%ec%a0%95%ec%9d%98%ec%99%80-%ea%b8%b0%eb%8a%a5\/\">MES \uc2dc\uc2a4\ud15c\uacfc\ub3c4<\/a> \uc6d0\ud65c\ud558\uac8c \ud1b5\ud569\ub429\ub2c8\ub2e4.\n\uc774\ub97c \ud1b5\ud574 \ubcf4\uc548\uc758 \ucde8\uc57d\uc810\uc774 \ub418\ub294 \uc5ec\ub7ec \ud50c\ub7ab\ud3fc\uc5d0 \uac78\uce5c \ub370\uc774\ud130 \ud30c\ud3b8\ud654\ub97c \uc904\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4. <\/p>\n\n\n\n<p>\uc0dd\uc0b0 \uacc4\ud68d\uc5d0 \ub300\ud55c \ud0c1\uc6d4\ud55c \uae30\ub2a5 \uc678\uc5d0\ub3c4 Skyplanner\ub294 \ub370\uc774\ud130 \uc785\ub825\uacfc \ubcc0\uacbd \uc0ac\ud56d\uc744 \uc2e4\uc2dc\uac04\uc73c\ub85c \uaf3c\uaf3c\ud558\uac8c \ucd94\uc801\ud558\uace0 \ucd5c\uc801\ud654\ud558\ub294 \uc790\ub3d9\ud654\ub41c \ud1b5\ud569 \ud50c\ub7ab\ud3fc\uc744 \uc81c\uacf5\ud568\uc73c\ub85c\uc368 ERP \ubcf4\uc548\uc744 \uac15\ud654\ud569\ub2c8\ub2e4.\n\uc2a4\ud504\ub808\ub4dc\uc2dc\ud2b8 \ubc0f \uc218\ub3d9 \uc785\ub825\uacfc \uc791\ubcc4\ud568\uc73c\ub85c\uc368 \uae30\uc5c5\uc740 \ubcf4\uc548 \uce68\ud574\uc758 \uc8fc\uc694 \uc6d0\uc778 \uc911 \ud558\ub098\uc778 \uc778\uc801 \uc624\ub958\ub97c \ucd5c\uc18c\ud654\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.\n\ub610\ud55c \uacc4\ud68d\uacfc \ubcf4\uc548 \ubaa8\ub450\uc5d0 \ucd5c\uc801\ud654\ub41c \ub2e8\uc77c \ud50c\ub7ab\ud3fc\uc744 \uc0ac\uc6a9\ud568\uc73c\ub85c\uc368 \ubd88\uc77c\uce58\ub098 \uc7a0\uc7ac\uc801 \uc704\ud611\uc744 \uc2e0\uc18d\ud558\uac8c \uac10\uc9c0\ud558\uace0 \ud574\uacb0\ud560 \uc218 \uc788\uc73c\uba70, Arcturus\uc758 \ucca0\uc800\ud55c \uac10\ub3c5\uc744 \ubc1b\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4.  <\/p>\n\n\n\n<p>\uc81c\uc870 \ud504\ub85c\uc138\uc2a4\ub97c \uc5c5\uadf8\ub808\uc774\ub4dc\ud558\ub294 \ub3d9\uc2dc\uc5d0 \ubcf4\uc548\uc744 \uac15\ud654\ud558\ub824\ub294 \uacbd\uc6b0 <a href=\"https:\/\/skyplanner.ai\/ko\/%ea%b8%b0%eb%8a%a5\/\">Skyplanner APS\uac00 \uc194\ub8e8\uc158\uc774 \ub420 \uc218<\/a> \uc788\uc2b5\ub2c8\ub2e4.\n\uc804\ub2f4 \uc804\ubb38 \ud300\uc774 \uc900\ube44\ub41c \uc9c0\uc6d0\uc744 \ud1b5\ud574 \uc0dd\uc0b0 \uacc4\ud68d\uc774 \ud6a8\uc728\uc801\uc774\uace0 \uc548\uc804\ud558\uac8c \uc774\ub8e8\uc5b4\uc9c8 \uc218 \uc788\ub3c4\ub85d \ub3c4\uc640\ub4dc\ub9bd\ub2c8\ub2e4.\n\ucc28\uc138\ub300 \uc81c\uc870 \ucd5c\uc801\ud654\uc5d0 \ub300\ud574 \uc790\uc138\ud788 \uc54c\uc544\ubcf4\uace0, \uadf8 \uc5ec\uc815\uc744 \uc548\ub0b4\ud574 \ub4dc\ub9ac\uaca0\uc2b5\ub2c8\ub2e4.    <a href=\"https:\/\/skyplanner.ai\/ko\/%ec%98%81%ec%97%85%ed%8c%80%ec%97%90-%eb%ac%b8%ec%9d%98\/\"><\/a><a href=\"https:\/\/skyplanner.ai\/ko\/%ec%98%81%ec%97%85%ed%8c%80%ec%97%90-%eb%ac%b8%ec%9d%98\/\">\ubb38\uc758\ud558\uc138\uc694!<\/a>  \uc2a4\uce74\uc774\ud50c\ub798\ub108\ub9cc\uc774 \uc81c\uacf5\ud560 \uc218 \uc788\ub294 \ud6a8\uc728\uc131\uacfc \ubcf4\uc548\uc758 \uacb0\ud569\uc744 \uacbd\ud5d8\ud558\uc138\uc694.<\/p>\n\n\n\n<p><\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-92545123\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-0a61546f\">\n<div class=\"gb-grid-column gb-grid-column-e4183086\"><div class=\"gb-container gb-container-e4183086\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-84ccbb5d\"><div class=\"gb-container gb-container-84ccbb5d\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>ERP \ubcf4\uc548 \ud648 &#8221; \ub9ac\uc18c\uc2a4 &#8221; ERP \ubcf4\uc548 \uae30\uc5c5\uc774 \ub514\uc9c0\ud138 \ud50c\ub7ab\ud3fc\uc5d0 \uacc4\uc18d \uc758\uc874\ud558\ub294 \ud55c, \uac15\ub825\ud55c \ubcf4\uc548\uc758 \ud544\uc694\uc131\uc740 \ubb34\uc5c7\ubcf4\ub2e4 \uc911\uc694\ud574\uc9d1\ub2c8\ub2e4. \ube44\uc988\ub2c8\uc2a4 \ub3c4\uad6c\uac00 \uc9c4\ud654\ud558\ub294 \uacfc\uc815\uc5d0\uc11c ERP\ub77c\uace0\ub3c4 \ubd88\ub9ac\ub294 \uc804\uc0ac\uc801 \uc790\uc6d0 \uad00\ub9ac\uac00 \uc804 \uc138\uacc4 \uae30\uc5c5\uc758 \uc911\uc694\ud55c \ub3c4\uad6c\ub85c \ubd80\uc0c1\ud588\uc2b5\ub2c8\ub2e4. ERP\ub294 \ub2e4\uc591\ud55c \uae30\ub2a5\uc744 \uc9c0\uc6d0\ud558\ub294 \uac83 \uc678\uc5d0\ub3c4 \uc0dd\uc0b0 \uacc4\ud68d\uc5d0 \uc911\uc694\ud55c \uc5ed\ud560\uc744 \ud569\ub2c8\ub2e4. \ubcf5\uc7a1\ud55c \uc81c\uc870\uc5c5\uacc4\uc5d0\uc11c \ud604\ub300 \uc0b0\uc5c5\uc740 \uc911\uc694\ud55c \ud68c\uc0ac \ub370\uc774\ud130\uc758 \uc7a0\uc7ac\uc801 \uc190\uc2e4\ubd80\ud130 \uae30\ubc00 &#8230; <a title=\"ERP \ubcf4\uc548\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/erp-%eb%b3%b4%ec%95%88\/\" aria-label=\"Read more about ERP \ubcf4\uc548\">Read more<\/a><\/p>\n","protected":false},"author":6,"featured_media":38721,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2734,496],"tags":[],"class_list":["post-38719","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-erp-ko","category-496","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>ERP \ubcf4\uc548 &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"ERP \ubcf4\uc548\uc740 \ub370\uc774\ud130\ub97c \ubcf4\ud638\ud558\uace0 \uc2b9\uc778\ub41c \uc561\uc138\uc2a4\ub97c \ubcf4\uc7a5\ud558\uae30 \uc704\ud55c ERP \uc2dc\uc2a4\ud15c \ub0b4\uc758 \ud2b9\uc218\ud55c \ud558\uc704 \uc9d1\ud569\uc785\ub2c8\ub2e4.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/erp-%eb%b3%b4%ec%95%88\/\" \/>\n<meta property=\"og:locale\" content=\"ko_KR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ERP \ubcf4\uc548\" \/>\n<meta property=\"og:description\" content=\"ERP \ubcf4\uc548\uc740 \ub370\uc774\ud130\ub97c \ubcf4\ud638\ud558\uace0 \uc2b9\uc778\ub41c \uc561\uc138\uc2a4\ub97c \ubcf4\uc7a5\ud558\uae30 \uc704\ud55c ERP \uc2dc\uc2a4\ud15c \ub0b4\uc758 \ud2b9\uc218\ud55c \ud558\uc704 \uc9d1\ud569\uc785\ub2c8\ub2e4.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/erp-%eb%b3%b4%ec%95%88\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2023-09-17T17:16:11+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-08-09T07:06:27+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/ERP-Security-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1708\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\uae00\uc4f4\uc774\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/erp-%eb%b3%b4%ec%95%88\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/erp-%eb%b3%b4%ec%95%88\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"ERP \ubcf4\uc548\",\"datePublished\":\"2023-09-17T17:16:11+00:00\",\"dateModified\":\"2024-08-09T07:06:27+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/erp-%eb%b3%b4%ec%95%88\\\/\"},\"wordCount\":87,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/erp-%eb%b3%b4%ec%95%88\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/ERP-Security-scaled.jpg\",\"articleSection\":[\"ERP\",\"\ub9ac\uc18c\uc2a4\"],\"inLanguage\":\"ko-KR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/erp-%eb%b3%b4%ec%95%88\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/erp-%eb%b3%b4%ec%95%88\\\/\",\"name\":\"ERP \ubcf4\uc548 &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/erp-%eb%b3%b4%ec%95%88\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/erp-%eb%b3%b4%ec%95%88\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/ERP-Security-scaled.jpg\",\"datePublished\":\"2023-09-17T17:16:11+00:00\",\"dateModified\":\"2024-08-09T07:06:27+00:00\",\"description\":\"ERP \ubcf4\uc548\uc740 \ub370\uc774\ud130\ub97c \ubcf4\ud638\ud558\uace0 \uc2b9\uc778\ub41c \uc561\uc138\uc2a4\ub97c \ubcf4\uc7a5\ud558\uae30 \uc704\ud55c ERP \uc2dc\uc2a4\ud15c \ub0b4\uc758 \ud2b9\uc218\ud55c \ud558\uc704 \uc9d1\ud569\uc785\ub2c8\ub2e4.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/erp-%eb%b3%b4%ec%95%88\\\/#breadcrumb\"},\"inLanguage\":\"ko-KR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/erp-%eb%b3%b4%ec%95%88\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/erp-%eb%b3%b4%ec%95%88\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/ERP-Security-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/ERP-Security-scaled.jpg\",\"width\":2560,\"height\":1708,\"caption\":\"ERP Security\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/erp-%eb%b3%b4%ec%95%88\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP \ubcf4\uc548\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ko-KR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"ERP \ubcf4\uc548 &#8211; SkyPlanner","description":"ERP \ubcf4\uc548\uc740 \ub370\uc774\ud130\ub97c \ubcf4\ud638\ud558\uace0 \uc2b9\uc778\ub41c \uc561\uc138\uc2a4\ub97c \ubcf4\uc7a5\ud558\uae30 \uc704\ud55c ERP \uc2dc\uc2a4\ud15c \ub0b4\uc758 \ud2b9\uc218\ud55c \ud558\uc704 \uc9d1\ud569\uc785\ub2c8\ub2e4.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/erp-%eb%b3%b4%ec%95%88\/","og_locale":"ko_KR","og_type":"article","og_title":"ERP \ubcf4\uc548","og_description":"ERP \ubcf4\uc548\uc740 \ub370\uc774\ud130\ub97c \ubcf4\ud638\ud558\uace0 \uc2b9\uc778\ub41c \uc561\uc138\uc2a4\ub97c \ubcf4\uc7a5\ud558\uae30 \uc704\ud55c ERP \uc2dc\uc2a4\ud15c \ub0b4\uc758 \ud2b9\uc218\ud55c \ud558\uc704 \uc9d1\ud569\uc785\ub2c8\ub2e4.","og_url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/erp-%eb%b3%b4%ec%95%88\/","og_site_name":"SkyPlanner","article_published_time":"2023-09-17T17:16:11+00:00","article_modified_time":"2024-08-09T07:06:27+00:00","og_image":[{"width":2560,"height":1708,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/ERP-Security-scaled.jpg","type":"image\/jpeg"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"\uae00\uc4f4\uc774":"SkyPlanner"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/erp-%eb%b3%b4%ec%95%88\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/erp-%eb%b3%b4%ec%95%88\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"ERP \ubcf4\uc548","datePublished":"2023-09-17T17:16:11+00:00","dateModified":"2024-08-09T07:06:27+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/erp-%eb%b3%b4%ec%95%88\/"},"wordCount":87,"publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/erp-%eb%b3%b4%ec%95%88\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/ERP-Security-scaled.jpg","articleSection":["ERP","\ub9ac\uc18c\uc2a4"],"inLanguage":"ko-KR"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/erp-%eb%b3%b4%ec%95%88\/","url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/erp-%eb%b3%b4%ec%95%88\/","name":"ERP \ubcf4\uc548 &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/erp-%eb%b3%b4%ec%95%88\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/erp-%eb%b3%b4%ec%95%88\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/ERP-Security-scaled.jpg","datePublished":"2023-09-17T17:16:11+00:00","dateModified":"2024-08-09T07:06:27+00:00","description":"ERP \ubcf4\uc548\uc740 \ub370\uc774\ud130\ub97c \ubcf4\ud638\ud558\uace0 \uc2b9\uc778\ub41c \uc561\uc138\uc2a4\ub97c \ubcf4\uc7a5\ud558\uae30 \uc704\ud55c ERP \uc2dc\uc2a4\ud15c \ub0b4\uc758 \ud2b9\uc218\ud55c \ud558\uc704 \uc9d1\ud569\uc785\ub2c8\ub2e4.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/erp-%eb%b3%b4%ec%95%88\/#breadcrumb"},"inLanguage":"ko-KR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/erp-%eb%b3%b4%ec%95%88\/"]}]},{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/erp-%eb%b3%b4%ec%95%88\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/ERP-Security-scaled.jpg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/ERP-Security-scaled.jpg","width":2560,"height":1708,"caption":"ERP Security"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/erp-%eb%b3%b4%ec%95%88\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ko\/"},{"@type":"ListItem","position":2,"name":"ERP \ubcf4\uc548"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ko\/#website","url":"https:\/\/skyplanner.ai\/ko\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ko\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ko-KR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ko\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ko\/","logo":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/ERP-Security-scaled.jpg",2560,1708,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/ERP-Security-150x150.jpg",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/ERP-Security-300x200.jpg",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/ERP-Security-768x513.jpg",768,513,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/ERP-Security-1024x683.jpg",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/ERP-Security-1536x1025.jpg",1536,1025,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/ERP-Security-2048x1367.jpg",2048,1367,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/ERP-Security-scaled.jpg",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/ko\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"ERP \ubcf4\uc548 \ud648 &#8221; \ub9ac\uc18c\uc2a4 &#8221; ERP \ubcf4\uc548 \uae30\uc5c5\uc774 \ub514\uc9c0\ud138 \ud50c\ub7ab\ud3fc\uc5d0 \uacc4\uc18d \uc758\uc874\ud558\ub294 \ud55c, \uac15\ub825\ud55c \ubcf4\uc548\uc758 \ud544\uc694\uc131\uc740 \ubb34\uc5c7\ubcf4\ub2e4 \uc911\uc694\ud574\uc9d1\ub2c8\ub2e4. \ube44\uc988\ub2c8\uc2a4 \ub3c4\uad6c\uac00 \uc9c4\ud654\ud558\ub294 \uacfc\uc815\uc5d0\uc11c ERP\ub77c\uace0\ub3c4 \ubd88\ub9ac\ub294 \uc804\uc0ac\uc801 \uc790\uc6d0 \uad00\ub9ac\uac00 \uc804 \uc138\uacc4 \uae30\uc5c5\uc758 \uc911\uc694\ud55c \ub3c4\uad6c\ub85c \ubd80\uc0c1\ud588\uc2b5\ub2c8\ub2e4. ERP\ub294 \ub2e4\uc591\ud55c \uae30\ub2a5\uc744 \uc9c0\uc6d0\ud558\ub294 \uac83 \uc678\uc5d0\ub3c4 \uc0dd\uc0b0 \uacc4\ud68d\uc5d0 \uc911\uc694\ud55c \uc5ed\ud560\uc744 \ud569\ub2c8\ub2e4. \ubcf5\uc7a1\ud55c \uc81c\uc870\uc5c5\uacc4\uc5d0\uc11c \ud604\ub300 \uc0b0\uc5c5\uc740 \uc911\uc694\ud55c \ud68c\uc0ac \ub370\uc774\ud130\uc758 \uc7a0\uc7ac\uc801 \uc190\uc2e4\ubd80\ud130 \uae30\ubc00&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/38719","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/comments?post=38719"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/38719\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media\/38721"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media?parent=38719"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/categories?post=38719"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/tags?post=38719"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}