{"id":38663,"date":"2023-08-01T11:59:17","date_gmt":"2023-08-01T11:59:17","guid":{"rendered":"https:\/\/skyplanner.ai\/%eb%b6%84%eb%a5%98%eb%90%98%ec%a7%80-%ec%95%8a%ec%9d%8c\/mes-%ec%9e%ac%ea%b3%a0-%ec%b5%9c%ec%a0%81%ed%99%94\/"},"modified":"2026-10-15T12:49:05","modified_gmt":"2026-10-15T12:49:05","slug":"mes-%ec%9e%ac%ea%b3%a0-%ec%b5%9c%ec%a0%81%ed%99%94","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mes-%ec%9e%ac%ea%b3%a0-%ec%b5%9c%ec%a0%81%ed%99%94\/","title":{"rendered":"MES \uc7ac\uace0 \ucd5c\uc801\ud654"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89\">\n\n<h1 class=\"gb-headline gb-headline-af81cfc1 gb-headline-text\">MES \uc7ac\uace0 \ucd5c\uc801\ud654<\/h1>\n\n\n<div class=\"gb-container gb-container-e8026af9\">\n\n<p><a href=\"\/ko\/\">\ud648<\/a>&nbsp;\u00bb&nbsp;<a href=\"\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/\">\uc790\ub8cc\uc2e4<\/a>&nbsp;\u00bb&nbsp;MES \uc7ac\uace0 \ucd5c\uc801\ud654<\/p>\n\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">\uc608\uc0c1 \uc77d\uae30 \uc2dc\uac04: <\/span><span class=\"yoast-reading-time__reading-time\">0<\/span><span class=\"yoast-reading-time__time-unit\"> \ubd84<\/span><\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f0fd57d0\">\n\n<p>\ub2e4\uc74c\uacfc \uac19\uc740 \uc0c1\ud669\uc744 \ub5a0\uc62c\ub824 \ubcf4\uc138\uc694. \uc798\ub098\uac00\ub358 \uc81c\uacfc\uc5c5\uccb4\uac00 \uac11\uc790\uae30 \ub3c4\uc0b0 \uc704\uae30\uc5d0 \ubab0\ub9bd\ub2c8\ub2e4. \uc131\uc218\uae30\uc5d0\ub294 \ud488\uc808\uc774, \ube44\uc218\uae30\uc5d0\ub294 \uacfc\uc789 \uc7ac\uace0\uac00 \ubc18\ubcf5\ub418\uba74\uc11c \ud68c\uc0ac\uc758 \uc7ac\ubb34 \uc0c1\ud0dc\uac00 \uc545\ud654\ub418\uace0 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<p>\ucc3d\uace0\uac00 \uac00\ub4dd \ucc3c\ub2e4\uac00 \uc5bc\ub9c8 \uc9c0\ub098\uc9c0 \uc54a\uc544 \uac70\uc758 \ud145 \ube44\ub294 \uc77c\uc774 \ubc18\ubcf5\ub418\uba74\uc11c \uc6b4\uc601 \ud6a8\uc728\uacfc \uace0\uac1d \ub9cc\uc871\ub3c4 \ubaa8\ub450 \ud070 \ud0c0\uaca9\uc744 \uc785\uc2b5\ub2c8\ub2e4. \uc774\ub54c MES\uc758 \ud575\uc2ec \uae30\ub2a5\uc778 \uc7ac\uace0 \ucd5c\uc801\ud654\ub97c \ub3c4\uc785\ud558\uba74\uc11c \uc0ac\uc5c5\uc5d0 \ubcc0\ud654\uac00 \ucc3e\uc544\uc635\ub2c8\ub2e4. \uc774\uc81c \uc815\ud655\ud55c \uc218\uc694 \uc608\uce21\uacfc \ucd5c\uc801\uc758 \uc7ac\uace0 \uc218\uc900\uc744 \uc77c\uc0c1\uc801\uc73c\ub85c \uc720\uc9c0\ud558\uac8c \ub429\ub2c8\ub2e4.<\/p>\n\n\n\n<p>\uc7ac\uace0 \ucd5c\uc801\ud654 \ub3c4\uc785\uc740 \ud68c\uc0ac\ub97c \uc704\uae30\uc5d0\uc11c \uad6c\ud558\uace0 \uc131\uc7a5\uacfc \uc218\uc775\uc131 \ud5a5\uc0c1\uc73c\ub85c \uc774\uc5b4\uc9d1\ub2c8\ub2e4. \uc774 \ud6a8\uacfc\uc801\uc778 <a href=\"\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mes-%ec%8b%9c%ec%8a%a4%ed%85%9c-%ec%a0%95%ec%9d%98%ec%99%80-%ea%b8%b0%eb%8a%a5\/\">MES<\/a> \uae30\ub2a5\uc774 \uc5b4\ub5bb\uac8c \uc791\ub3d9\ud558\ub294\uc9c0 \uad81\uae08\ud558\uc2e0\uac00\uc694? \uc6b4\uc601\uc5d0 \ud65c\ub825\uc744 \ubd88\uc5b4\ub123\uace0 \uc218\uc775\uacfc \uace0\uac1d \ub9cc\uc871\ub3c4\ub97c \ub192\uc77c \uc218 \uc788\ub294 \uc7ac\uace0 \ucd5c\uc801\ud654\ub97c \uc790\uc138\ud788 \uc0b4\ud3b4\ubcf4\uaca0\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\t\t\t\t<div class=\"wp-block-uagb-table-of-contents uagb-toc__align-left uagb-toc__columns-1  uagb-block-636f2262      \"\n\t\t\t\t\tdata-scroll= \"1\"\n\t\t\t\t\tdata-offset= \"30\"\n\t\t\t\t\tstyle=\"\"\n\t\t\t\t>\n\t\t\t\t<div class=\"uagb-toc__wrap\">\n\t\t\t\t\t\t<div class=\"uagb-toc__title\">\n\t\t\t\t\t\t\t\ubaa9\ucc28 \ud14c\uc774\ube14\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"uagb-toc__list-wrap \">\n\t\t\t\t\t\t<ol class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#\ud575\uc2ec-\uc694\uc57d\" class=\"uagb-toc-link__trigger\">\ud575\uc2ec \uc694\uc57d<\/a><li class=\"uagb-toc__list\"><a href=\"#\uc7ac\uace0-\ucd5c\uc801\ud654\ub780\" class=\"uagb-toc-link__trigger\">\uc7ac\uace0 \ucd5c\uc801\ud654\ub780?<\/a><li class=\"uagb-toc__list\"><a href=\"#\uc7ac\uace0-\ucd5c\uc801\ud654\uc758-\uc5ed\ud560\" class=\"uagb-toc-link__trigger\">\uc7ac\uace0 \ucd5c\uc801\ud654\uc758 \uc5ed\ud560<\/a><li class=\"uagb-toc__list\"><a href=\"#\uc7ac\uace0-\ucd5c\uc801\ud654\uc640-mes-\uacf5\uae09\ub9dd-\uad00\ub9ac\uc758-\ud1b5\ud569\" class=\"uagb-toc-link__trigger\">\uc7ac\uace0 \ucd5c\uc801\ud654\uc640 MES, \uacf5\uae09\ub9dd \uad00\ub9ac\uc758 \ud1b5\ud569<\/a><li class=\"uagb-toc__list\"><a href=\"#mes\ub97c-\ud1b5\ud55c-\uc7ac\uace0-\ucd5c\uc801\ud654\uc758-8\uac00\uc9c0-\uc774\uc810\" class=\"uagb-toc-link__trigger\">MES\ub97c \ud1b5\ud55c \uc7ac\uace0 \ucd5c\uc801\ud654\uc758 8\uac00\uc9c0 \uc774\uc810<\/a><li class=\"uagb-toc__list\"><a href=\"#\uc7ac\uace0-\ucd5c\uc801\ud654\ub97c-\uc704\ud55c-mes-\ub3c4\uc785-\uac00\uc774\ub4dc\" class=\"uagb-toc-link__trigger\">\uc7ac\uace0 \ucd5c\uc801\ud654\ub97c \uc704\ud55c MES \ub3c4\uc785 \uac00\uc774\ub4dc<\/a><li class=\"uagb-toc__list\"><a href=\"#\uc7ac\uace0-\ucd5c\uc801\ud654\uc758-\ud6a8\uacfc\ub97c-\uc5bb\ub294-\ub2e4\uc12f-\uac00\uc9c0-\uc0b0\uc5c5\" class=\"uagb-toc-link__trigger\">\uc7ac\uace0 \ucd5c\uc801\ud654\uc758 \ud6a8\uacfc\ub97c \uc5bb\ub294 \ub2e4\uc12f \uac00\uc9c0 \uc0b0\uc5c5<\/a><li class=\"uagb-toc__list\"><a href=\"#mes\uc640-\uc7ac\uace0-\ucd5c\uc801\ud654\uc758-\ubbf8\ub798\" class=\"uagb-toc-link__trigger\">MES\uc640 \uc7ac\uace0 \ucd5c\uc801\ud654\uc758 \ubbf8\ub798<\/a><li class=\"uagb-toc__list\"><a href=\"#skyplanner-\uc7ac\uace0-\ucd5c\uc801\ud654\ub97c-\ud568\uaed8\ud558\ub294-\ud30c\ud2b8\ub108\" class=\"uagb-toc-link__trigger\">SkyPlanner: \uc7ac\uace0 \ucd5c\uc801\ud654\ub97c \ud568\uaed8\ud558\ub294 \ud30c\ud2b8\ub108<\/a><\/ol>\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\n\n\n<h2 class=\"gb-headline gb-headline-79f63b48 gb-headline-text\">\ud575\uc2ec \uc694\uc57d<\/h2>\n\n\n\n<p>\uc7ac\uace0 \ucd5c\uc801\ud654\ub294 \uc774\uc0c1\uc801\uc778 \uc7ac\uace0 \uade0\ud615\uc744 \uc720\uc9c0\ud558\uae30 \uc704\ud55c \uc81c\uc870 \uc2e4\ud589 \uc2dc\uc2a4\ud15c(MES)\uc758 \ud575\uc2ec \uae30\ub2a5\uc785\ub2c8\ub2e4. \uace0\uae09 \uc54c\uace0\ub9ac\uc998\uacfc \uc608\uce21 \uae30\ubc95, \uae30\uc220\uc744 \ud65c\uc6a9\ud574 \uacfc\uc789 \uc7ac\uace0\uc640 \ud488\uc808\uc744 \ubc29\uc9c0\ud558\uace0 \ube44\uc6a9\uc744 \uc904\uc774\uba70 \uace0\uac1d \ub9cc\uc871\ub3c4\ub97c \ub192\uc785\ub2c8\ub2e4. \uacf5\uae09\ub9dd \uad00\ub9ac(SCM)\uc640 \uc5f0\uacc4\ub41c MES\uc758 \uc7ac\uace0 \ucd5c\uc801\ud654\ub294 \uc2e4\uc2dc\uac04 \ub370\uc774\ud130\ub97c \uc81c\uacf5\ud558\uc5ec \ud6a8\uc728\uc801\uc778 \uc758\uc0ac\uacb0\uc815\uc744 \ub3d5\uc2b5\ub2c8\ub2e4. \uc8fc\uc694 \uc774\uc810\uc740 \ube44\uc6a9 \uc808\uac10, \uace0\uac1d \ub9cc\uc871\ub3c4 \ud5a5\uc0c1, \ucc3d\uace0 \uc6b4\uc601 \ud6a8\uc728\ud654, \uacf5\uae09\uc5c5\uccb4\uc640\uc758 \uad00\uacc4 \uac15\ud654, \ud604\uae08 \ud750\ub984 \uac1c\uc120, \uc11c\ube44\uc2a4 \uc218\uc900 \ud5a5\uc0c1, \uc2dc\uc7a5 \ubcc0\ud654 \ub300\uc751\ub825 \uac15\ud654, \ub9ac\ub4dc\ud0c0\uc784 \ub2e8\ucd95\uc758 \uc5ec\ub35f \uac00\uc9c0\uc785\ub2c8\ub2e4. \uc7ac\uace0 \ucd5c\uc801\ud654\ub97c \uc704\ud574 MES\ub97c \ub3c4\uc785\ud560 \ub54c\ub294 \uba85\ud655\ud55c \ubaa9\ud45c\uc640 \uc591\uc9c8\uc758 \ub370\uc774\ud130, \uc9c0\uc18d\uc801\uc778 \uac1c\uc120\uc774 \ud544\uc694\ud569\ub2c8\ub2e4. \uc774\ub97c \ud1b5\ud574 \uacfc\uc789 \uc7ac\uace0\uc640 \ud488\uc808 \uac19\uc740 \ubb38\uc81c\ub97c \ud574\uacb0\ud560 \uc218 \uc788\uc73c\uba70, \uc81c\uc870\uc5c5, \uc18c\ub9e4\uc5c5, \uc758\ub8cc, \uc790\ub3d9\ucc28, \uc2dd\uc74c\ub8cc \ub4f1\uc758 \uc0b0\uc5c5\uc5d0\uc11c \ud6a8\uacfc\ub97c \uc5bb\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc55e\uc73c\ub85c \uc778\uacf5\uc9c0\ub2a5, \uba38\uc2e0\ub7ec\ub2dd, \uc608\uce21 \ubd84\uc11d\uacfc \uac19\uc740 \ud601\uc2e0 \uae30\uc220\uc774 \uc7ac\uace0 \ucd5c\uc801\ud654\ub97c \ub354\uc6b1 \ubc1c\uc804\uc2dc\ud0ac \uac83\uc785\ub2c8\ub2e4. SkyPlanner\uc640 \uac19\uc740 \ub3c4\uad6c\ub294 MES\uc640 \uc5f0\ub3d9\ud558\uc5ec \ube44\uc988\ub2c8\uc2a4 \uc6b4\uc601\uc744 \ucd5c\uc801\ud654\ud558\ub294 \uc885\ud569\uc801\uc778 \uc194\ub8e8\uc158\uc744 \uc81c\uacf5\ud569\ub2c8\ub2e4.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-02d660ad gb-headline-text\">\uc7ac\uace0 \ucd5c\uc801\ud654\ub780?<\/h2>\n\n\n\n<p><strong>\uc7ac\uace0 \ucd5c\uc801\ud654\ub294 \uc81c\uc870 \uc2e4\ud589 \uc2dc\uc2a4\ud15c(MES)\uc5d0 \ub0b4\uc7a5\ub41c \uace0\ub3c4\ud654\ub41c \uae30\ub2a5\uc785\ub2c8\ub2e4.<\/strong> \ub2e8\uc21c\ud788 \uc801\uc815\ud55c \uc7ac\uace0\ub7c9\uc744 \uc720\uc9c0\ud558\ub294 \uac83 \uc774\uc0c1\uc758 \uc5ed\ud560\uc744 \ud569\ub2c8\ub2e4.<\/p>\n\n\n<div class=\"gb-container gb-container-ce737323\"><div class=\"gb-inside-container\">\n\n<p><strong>\uc7ac\uace0 \ucd5c\uc801\ud654\ub294 \uace0\uae09 \uc54c\uace0\ub9ac\uc998, \uc218\uc694 \uc608\uce21, \ucd5c\uc2e0 \uae30\uc220\uc744 \ud65c\uc6a9\ud558\uc5ec \uc774\uc0c1\uc801\uc778 \uc7ac\uace0 \uade0\ud615\uc744 \ub2ec\uc131\ud558\ub294 MES \uae30\ub2a5\uc785\ub2c8\ub2e4.<\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p>\uc774\ub7ec\ud55c \uade0\ud615\uc744 \uc720\uc9c0\ud558\uba74 \uacfc\uc789 \uc7ac\uace0\ub85c \ucc3d\uace0\uac00 \ud3ec\ud654\ub418\ub294 \uac83\uc744 \ubc29\uc9c0\ud558\uba74\uc11c\ub3c4 \uace0\uac1d \uc218\uc694\uc5d0 \ub300\uc751\ud560 \ubb3c\ub7c9\uc744 \ud56d\uc0c1 \ud655\ubcf4\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<p>\uc7ac\uace0 \ucd5c\uc801\ud654\ub294 \uace0\uac1d \uc218\uc694\ub97c \uc815\ud655\ud788 \uc608\uce21\ud558\uc5ec \uae30\uc5c5\uc5d0 \uc2ec\uac01\ud55c \uc7ac\uc815\uc801 \uc190\uc2e4\uc744 \ucd08\ub798\ud560 \uc218 \uc788\ub294 \ud488\uc808\uacfc \uacfc\uc789 \uc7ac\uace0\uc758 \uc704\ud5d8\uc744 \ucd5c\uc18c\ud654\ud569\ub2c8\ub2e4. \ud488\uc808\uc744 \ubc29\uc9c0\ud558\uba74 \ub192\uc740 \uace0\uac1d \ub9cc\uc871\ub3c4\ub97c \uc720\uc9c0\ud560 \uc218 \uc788\uace0, \uacfc\uc789 \uc7ac\uace0\ub97c \uc904\uc774\uba74 \ubcf4\uad00 \ube44\uc6a9\uacfc \uc7ac\uace0 \uc9c4\ubd80\ud654\uc5d0 \ub530\ub978 \ube44\uc6a9\uc744 \uc808\uac10\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-056a4b8a gb-headline-text\">\uc7ac\uace0 \ucd5c\uc801\ud654\uc758 \uc5ed\ud560<\/h2>\n\n\n\n<p><strong>\uc81c\uc870 \uc2e4\ud589 \uc2dc\uc2a4\ud15c(MES)\uc5d0\uc11c \uc7ac\uace0 \ucd5c\uc801\ud654\uc758 \uc8fc\ub41c \ubaa9\ud45c\ub294 \uc7ac\uace0 \ud22c\uc790\uc640 \uc11c\ube44\uc2a4 \uc218\uc900 \ubaa9\ud45c \uc0ac\uc774\uc5d0 \uc801\uc808\ud55c \uade0\ud615\uc744 \uc774\ub8e8\ub294 \uac83\uc785\ub2c8\ub2e4.<\/strong> \uace0\uac1d \uc218\uc694\uc5d0 \ub9de\ucdb0 \ud544\uc694\ud55c \uc7a5\uc18c\uc640 \uc2dc\uc810\uc5d0 \uc801\uc815 \ubb3c\ub7c9\uc744 \ud655\ubcf4\ud558\ub824\uba74 \uc774\ub7ec\ud55c \uade0\ud615\uc774 \ud544\uc218\uc801\uc785\ub2c8\ub2e4. \uc7ac\uace0 \ucd5c\uc801\ud654\ub294 \uc218\uc694\ub97c \uc815\ud655\ud788 \uc608\uce21\ud558\uace0 \uc7ac\uc8fc\ubb38 \uc2dc\uc810\uacfc \uc218\ub7c9\uc744 \uad00\ub9ac\ud558\uba70 \uacfc\uc789 \uc7ac\uace0\uc640 \uc7ac\uace0 \ubd80\uc871\uc758 \uc704\ud5d8\uc744 \ucd5c\uc18c\ud654\ud558\uc5ec \uc6b4\uc601 \ud6a8\uc728\uc744 \ub192\uc774\ub294 \ub370 \ubaa9\uc801\uc774 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<p>\uc7ac\uace0 \ucd5c\uc801\ud654\ub294 \uacf5\uae09\ub9dd \uc6b4\uc601\uc744 \ud6a8\uc728\ud654\ud558\ub3c4\ub85d \uc124\uacc4\ub418\uc5c8\uc2b5\ub2c8\ub2e4. \uacf5\uae09\ub9dd\uc758 \uc5ec\ub7ec \uc9c0\uc810\uc5d0 \uc788\ub294 \uc7ac\uace0 \uc218\uc900\uc744 \uc2e4\uc2dc\uac04\uc73c\ub85c \ud30c\uc545\ud560 \uc218 \uc788\ub3c4\ub85d \uc9c0\uc6d0\ud558\ub294 \ubc29\uc2dd\uc785\ub2c8\ub2e4. \uc774\ub97c \ubc14\ud0d5\uc73c\ub85c \uc870\ub2ec, \uc0dd\uc0b0, \uc720\ud1b5\uc5d0 \ub300\ud574 \uadfc\uac70 \uc788\ub294 \uacb0\uc815\uc744 \ub0b4\ub9ac\uace0 \uac01 \ud504\ub85c\uc138\uc2a4\ub97c \ucd5c\uc801\ud654\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ub610\ud55c \uc7ac\uace0 \ubcf4\uc720 \ube44\uc6a9\uc744 \ucd5c\uc18c\ud654\ud558\uace0 \ud488\uc808\uacfc \uacfc\uc789 \uc7ac\uace0\ub97c \uc904\uc774\uba70 \uc804\ubc18\uc801\uc778 \uace0\uac1d \ub9cc\uc871\ub3c4\ub97c \ub192\uc774\ub294 \ub370 \uc911\uc810\uc744 \ub461\ub2c8\ub2e4. \uc2dc\uc7a5 \ub3d9\ud5a5\uacfc \uace0\uac1d \uc218\uc694 \ubcc0\ud654\uc5d0 \uad00\ud55c \uc720\uc6a9\ud55c \uc778\uc0ac\uc774\ud2b8\ub97c \uc81c\uacf5\ud558\ubbc0\ub85c \uacbd\uc601 \uc804\ub7b5\uc744 \uacb0\uc815\ud558\uace0 \uc131\uc7a5\uc744 \uc774\ub044\ub294 \ub370 \uc911\uc694\ud55c \uc5ed\ud560\uc744 \ud569\ub2c8\ub2e4.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-ffb3cfe9 gb-headline-text\">\uc7ac\uace0 \ucd5c\uc801\ud654\uc640 MES, \uacf5\uae09\ub9dd \uad00\ub9ac\uc758 \ud1b5\ud569<\/h2>\n\n\n\n<p>\uc7ac\uace0 \ucd5c\uc801\ud654\uc758 \uc131\uacf5\uc744 \uc704\ud574\uc11c\ub294 \uc720\uae30\uc801\uc73c\ub85c \uc791\ub3d9\ud558\ub294 <a href=\"\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ea%b3%b5%ea%b8%89%eb%a7%9d-%ea%b4%80%eb%a6%acscm%eb%9e%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80%ec%9a%94\/\">\uacf5\uae09\ub9dd \uad00\ub9ac <\/a>(SCM) \uc2dc\uc2a4\ud15c\uc774 \ud544\uc218\uc801\uc785\ub2c8\ub2e4. MES \uc18c\ud504\ud2b8\uc6e8\uc5b4\ub294 \uc6d0\uc790\uc7ac \uc870\ub2ec\ubd80\ud130 \ucd5c\uc885 \uc81c\ud488 \ub0a9\ud488\uae4c\uc9c0 \uacf5\uae09\ub9dd\uc758 \ubaa8\ub4e0 \uc694\uc18c\ub97c \uc5f0\uacb0\ud558\ub294 \uad6c\uc2ec\uc810 \uc5ed\ud560\uc744 \ud569\ub2c8\ub2e4. MES\uc640 SCM\uc744 \ud1b5\ud569\ud558\uba74 \uc815\ubcf4\uac00 \uc6d0\ud65c\ud558\uac8c \uc804\ub2ec\ub418\uace0 \uc2e4\uc2dc\uac04 \ub370\uc774\ud130\uac00 \uc2e0\uc18d\ud558\uac8c \uad50\ud658\ub418\uc5b4 \ub370\uc774\ud130 \uae30\ubc18 \uc758\uc0ac\uacb0\uc815\uc5d0 \ub3c4\uc6c0\uc774 \ub429\ub2c8\ub2e4.<\/p>\n\n\n\n<p>\uc774\ucc98\ub7fc \uc815\ubcf4\uac00 \uc6d0\ud65c\ud558\uac8c \ub3d9\uae30\ud654\ub418\uba74 \uc81c\uc870 \uacf5\uc815\uc774 \uc21c\uc870\ub86d\uac8c \uc9c4\ud589\ub429\ub2c8\ub2e4. \uc815\ud655\ud55c \uc2e4\uc2dc\uac04 \ub370\uc774\ud130\ub97c \ubc14\ud0d5\uc73c\ub85c \uc218\uc694\ub098 \uacf5\uae09 \ubcc0\ud654\uc5d0 \uc2e0\uc18d\ud558\uac8c \ub300\uc751\ud558\uace0 \uc870\uc815\ud560 \uc218 \uc788\uc5b4 \uc0dd\uc0b0\uc744 \ud6a8\uc728\uc801\uc73c\ub85c \uc6b4\uc601\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<div class=\"wp-block-uagb-image uagb-block-9490676e wp-block-uagb-image--layout-default wp-block-uagb-image--effect-static wp-block-uagb-image--align-none\"><figure class=\"wp-block-uagb-image__figure\"><img decoding=\"async\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png\" alt=\"\" class=\"uag-image-6463\" width=\"1024\" height=\"536\" title=\"\" loading=\"lazy\" role=\"img\" \/><\/figure><\/div>\n\n\n\n<h2 class=\"gb-headline gb-headline-ee8059a3 gb-headline-text\">MES\ub97c \ud1b5\ud55c \uc7ac\uace0 \ucd5c\uc801\ud654\uc758 8\uac00\uc9c0 \uc774\uc810<\/h2>\n\n\n\n<p>MES \uc18c\ud504\ud2b8\uc6e8\uc5b4\ub85c \uc7ac\uace0 \ucd5c\uc801\ud654 \uae30\ub2a5\uc744 \uac15\ud654\ud558\uba74 \ub2e4\uc74c\uacfc \uac19\uc740 \ub2e4\uc591\ud55c \uc774\uc810\uc744 \uc5bb\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-0085edae gb-headline-text\">\ube44\uc6a9 \uc808\uac10<\/h4>\n\n\n\n<p>\uc7ac\uace0\ub97c \ucd5c\uc801\ud654\ud558\uba74 \uc0c1\ub2f9\ud55c \ube44\uc6a9\uc744 \uc808\uac10\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc801\uc815 \uc7ac\uace0\ub7c9\uc744 \uc720\uc9c0\ud568\uc73c\ub85c\uc368 \ubcf4\uad00 \ube44\uc6a9\uc744 \ucd5c\uc18c\ud654\ud558\uace0 \uacfc\uc789 \uc7ac\uace0\uc5d0 \ubb36\uc778 \uc790\uae08\uc744 \uc904\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc7ac\uace0 \uc218\uc900\uc774 \ucd5c\uc801\ud654\ub418\uba74 \uc774 \uc790\uae08\uc744 \uc218\uc775\uc131 \uc788\ub294 \ub2e4\ub978 \uc0ac\uc5c5\uc5d0 \ud22c\uc785\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-1cc114e4 gb-headline-text\">\uace0\uac1d \ub9cc\uc871\ub3c4 \uadf9\ub300\ud654<\/h4>\n\n\n\n<p>\uc7ac\uace0 \ucd5c\uc801\ud654\ub294 \uace0\uac1d \uc218\uc694\uc5d0 \ub300\uc751\ud560 \uc81c\ud488\uc744 \ud56d\uc0c1 \ud655\ubcf4\ud558\ub3c4\ub85d \ud574 \uc90d\ub2c8\ub2e4. \uc81c\ud488\uc744 \uafb8\uc900\ud788 \uacf5\uae09\ud558\uba74 \uace0\uac1d\uc758 \uc2e0\ub8b0\ub97c \uc5bb\uace0 \ucda9\uc131\ub3c4\uc640 \uc7ac\uad6c\ub9e4\uc728\uc744 \ub192\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ud544\uc694\ud55c \ud488\ubaa9\uc744 \ud56d\uc0c1 \uc7ac\uace0\ub85c \ubcf4\uc720\ud558\ubbc0\ub85c \ud488\uc808\ub85c \ud310\ub9e4 \uae30\ud68c\ub97c \ub193\uce60 \uac00\ub2a5\uc131\ub3c4 \ud06c\uac8c \uc904\uc5b4\ub4ed\ub2c8\ub2e4.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-d55b7d05 gb-headline-text\">\ucc3d\uace0 \uc6b4\uc601 \ud6a8\uc728\ud654<\/h4>\n\n\n\n<p>\uc7ac\uace0\ub97c \ucd5c\uc801\ud654\ud558\uba74 \ucc3d\uace0 \uc6b4\uc601\uc774 \ub354\uc6b1 \ud6a8\uc728\uc801\uc774 \ub429\ub2c8\ub2e4. \uc218\uc694 \uc608\uce21\uc5d0 \ub530\ub77c \ud488\ubaa9\uc744 \uccb4\uacc4\uc801\uc73c\ub85c \ubc30\uce58\ud558\uba74 \ucc3d\uace0 \ub2f4\ub2f9\uc790\uac00 \ub354 \uc27d\uac8c \ubb3c\ud488\uc744 \ucc3e\uace0 \uad00\ub9ac\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc774\ub7ec\ud55c \ud6a8\uc728 \ud5a5\uc0c1\uc740 \uc8fc\ubb38 \ucc98\ub9ac \uc18d\ub3c4\ub97c \ub192\uc774\uace0 \uc778\uac74\ube44\ub97c \uc904\uc774\ub294 \ub370 \ub3c4\uc6c0\uc774 \ub429\ub2c8\ub2e4. <a href=\"\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%b0%bd%ea%b3%a0-%ea%b4%80%eb%a6%ac-%ec%8b%9c%ec%8a%a4%ed%85%9cwms\/\">\ucc3d\uace0 \uad00\ub9ac \uc2dc\uc2a4\ud15c\uc758 \uc774\uc810\uc744 \uc54c\uc544\ubcf4\uc138\uc694.<\/a><\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-dcb6fd2b gb-headline-text\">\uacf5\uae09\uc5c5\uccb4\uc640\uc758 \uad00\uacc4 \uac15\ud654<\/h4>\n\n\n\n<p>\uc7ac\uace0 \ucd5c\uc801\ud654\ub294 \uacf5\uae09\uc5c5\uccb4\uc640\uc758 \uad00\uacc4 \uac1c\uc120\uc73c\ub85c\ub3c4 \uc774\uc5b4\uc9c8 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc218\uc694\ub97c \uc815\ud655\ud788 \uc608\uce21\ud558\uace0 \uc774 \uc815\ubcf4\ub97c \uacf5\uae09\uc5c5\uccb4\uc640 \uacf5\uc720\ud558\uba74 \uacf5\uae09\uc5c5\uccb4\uac00 \ub354 \ub098\uc740 \uacc4\ud68d\uc744 \uc138\uc6b8 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc774\ub97c \ud1b5\ud574 \uc548\uc815\uc801\uc778 \uc801\uae30 \ub0a9\ud488\uc774 \uac00\ub2a5\ud574\uc838 \ud611\ub825 \uad00\uacc4\uac00 \ub354\uc6b1 \uac15\ud654\ub420 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-0fd33ab2 gb-headline-text\">\ud604\uae08 \ud750\ub984 \uac1c\uc120<\/h4>\n\n\n\n<p>\uc7ac\uace0\ub97c \ucd5c\uc801\ud654\ud55c \uae30\uc5c5\uc740 \ud604\uae08 \ud750\ub984\uc774 \uac1c\uc120\ub418\ub294 \uacbd\uc6b0\uac00 \ub9ce\uc2b5\ub2c8\ub2e4. \uc7ac\uace0\uc5d0 \ubb36\uc778 \uc790\uae08\uc744 \uc904\uc774\uba74 \ub2e4\ub978 \uc0ac\uc5c5 \ud65c\ub3d9\uc5d0 \uc0ac\uc6a9\ud560 \uc218 \uc788\ub294 \ud604\uae08\uc774 \ub298\uc5b4\ub0a9\ub2c8\ub2e4. \uc774\ub807\uac8c \ud655\ubcf4\ud55c \ud604\uae08\uc740 \uc0ac\uc5c5 \uc131\uc7a5\uacfc \ud655\uc7a5\uc5d0 \uc911\uc694\ud55c \uc5ed\ud560\uc744 \ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-f6aaf910 gb-headline-text\">\uc11c\ube44\uc2a4 \uc218\uc900 \ud5a5\uc0c1<\/h4>\n\n\n\n<p>\uc7ac\uace0 \ucd5c\uc801\ud654\ub294 \uc11c\ube44\uc2a4 \uc218\uc900\uc744 \ud06c\uac8c \ub192\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ud544\uc694\ud55c \uc81c\ud488\uc744 \ud56d\uc0c1 \ud655\ubcf4\ud558\uba74 \uc9c0\uc5f0\uc744 \ucd5c\uc18c\ud654\ud558\uace0 \uace0\uac1d \uc218\uc694\uc5d0 \ub300\uc751\ud558\ub294 \uc5ed\ub7c9\uc744 \uadf9\ub300\ud654\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc774\ub7ec\ud55c \ub192\uc740 \uc11c\ube44\uc2a4 \uc218\uc900\uc740 \uacbd\uc7c1\uc774 \uce58\uc5f4\ud55c \uc2dc\uc7a5\uc5d0\uc11c \uc911\uc694\ud55c \ucc28\ubcc4\ud654 \uc694\uc18c\uac00 \ub420 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-01d099a3 gb-headline-text\">\uc2dc\uc7a5 \ubcc0\ud654 \ub300\uc751\ub825 \uac15\ud654<\/h4>\n\n\n\n<p>\uc7ac\uace0 \ucd5c\uc801\ud654\ub294 \uae30\uc5c5\uc774 \uc2dc\uc7a5 \ubcc0\ud654\uc5d0 \ub354\uc6b1 \ubbfc\ucca9\ud558\uac8c \ub300\uc751\ud558\ub3c4\ub85d \ud574 \uc90d\ub2c8\ub2e4. \ud310\ub9e4 \ub370\uc774\ud130\ub97c \uc815\uae30\uc801\uc73c\ub85c \ubd84\uc11d\ud558\uace0 \uc218\uc694\ub97c \uc608\uce21\ud558\uba74 \uc2dc\uc7a5 \ub3d9\ud5a5\uc774\ub098 \uace0\uac1d \uc120\ud638\ub3c4 \ubcc0\ud654\uc5d0 \ub9de\ucdb0 \uc7ac\uace0 \uc218\uc900\uc744 \ube60\ub974\uac8c \uc870\uc815\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-0b1bc6a2 gb-headline-text\">\ub9ac\ub4dc\ud0c0\uc784 \ub2e8\ucd95<\/h4>\n\n\n\n<p>\uc7ac\uace0 \ucd5c\uc801\ud654\ub294 \ub9ac\ub4dc\ud0c0\uc784 \ub2e8\ucd95\uc73c\ub85c\ub3c4 \uc774\uc5b4\uc9c8 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ucd5c\uc801\uc758 \uc7ac\uace0 \uc218\uc900\uc744 \uc720\uc9c0\ud558\uba74 \uace0\uac1d \uc8fc\ubb38\uc744 \ub354 \ube60\ub974\uac8c \ucc98\ub9ac\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ub9ac\ub4dc\ud0c0\uc784\uc774 \uc9e7\uc544\uc9c0\uba74 \uace0\uac1d \ub9cc\uc871\ub3c4\uac00 \ub192\uc544\uc9c0\uace0 \uacbd\uc7c1 \uc6b0\uc704\ub97c \ud655\ubcf4\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<p>\uc774\ub7ec\ud55c \uc774\uc810\uc740 \uae30\uc5c5\uc758 \uc804\ubc18\uc801\uc778 \uc218\uc775\uc131\uacfc \uacbd\uc7c1 \uc6b0\uc704\uc5d0 \uae30\uc5ec\ud569\ub2c8\ub2e4. \uc81c\uc870 \uc2e4\ud589 \uc2dc\uc2a4\ud15c(MES)\uc758 \uc77c\ubd80\ub85c \uc7ac\uace0 \ucd5c\uc801\ud654\ub97c \ub3c4\uc785\ud558\uba74 \uc6b4\uc601 \ud6a8\uc728\uacfc \uc0ac\uc5c5 \uc131\uacfc\ub97c \ud55c\uce35 \ub192\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4. <a href=\"\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%a0%9c%ec%a1%b0%ec%97%90%ec%84%9c-%eb%a6%ac%eb%93%9c-%ed%83%80%ec%9e%84%ec%9d%84-%ec%b5%9c%ec%a0%81%ed%99%94%ed%95%98%eb%8a%94-%eb%b0%a9%eb%b2%95%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80\/\">\ub9ac\ub4dc\ud0c0\uc784 \ucd5c\uc801\ud654\uc758 \uc774\uc810\uc744 \uc54c\uc544\ubcf4\uc138\uc694. <\/a><\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-f3756629 gb-headline-text\">\uc7ac\uace0 \ucd5c\uc801\ud654\ub97c \uc704\ud55c MES \ub3c4\uc785 \uac00\uc774\ub4dc<\/h2>\n\n\n\n<p>MES\ub97c \ud1b5\ud574 \uc7ac\uace0 \ucd5c\uc801\ud654\ub97c \uc131\uacf5\uc801\uc73c\ub85c \uad6c\ud604\ud558\ub824\uba74 \ub2e4\uc74c\uacfc \uac19\uc740 \ubaa8\ubc94 \uc0ac\ub840\ub97c \ub530\ub974\ub294 \uac83\uc774 \uc88b\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>\uba85\ud655\ud55c \ubaa9\ud45c \uc124\uc815:<\/strong>&nbsp;\uad6c\uccb4\uc801\uc778 \uc5c5\ubb34 \uc694\uad6c\uc0ac\ud56d\uc744 \ud30c\uc545\ud558\uace0 \uc774\ub97c \ucda9\uc871\ud558\ub3c4\ub85d MES \ub3c4\uc785\uc744 \ucd94\uc9c4\ud558\ub294 \uac83\uc774 \uc911\uc694\ud569\ub2c8\ub2e4. \uba85\ud655\ud558\uace0 \uce21\uc815 \uac00\ub2a5\ud55c \ubaa9\ud45c\ub294 \uc131\uacf5\uc801\uc778 \ub3c4\uc785\uc5d0 \ub3c4\uc6c0\uc774 \ub429\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\ub370\uc774\ud130 \ud488\uc9c8:<\/strong>&nbsp;\uc815\ud655\ud55c \ub370\uc774\ud130\ub294 \ud6a8\uacfc\uc801\uc778 MES \uc2dc\uc2a4\ud15c\uc758 \ud1a0\ub300\uc785\ub2c8\ub2e4. \uc758\uc0ac\uacb0\uc815\uc5d0 \ud65c\uc6a9\ud560 \uc2e0\ub8b0\ud560 \uc218 \uc788\ub294 \uacb0\uacfc\ub97c \uc5bb\uc73c\ub824\uba74 \uc785\ub825 \ub370\uc774\ud130\uc758 \ubb34\uacb0\uc131\uacfc \uc815\ud655\uc131\uc744 \ud655\ubcf4\ud558\ub294 \uac83\uc774 \ud544\uc218\uc801\uc785\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\uc9c0\uc18d\uc801\uc778 \uac1c\uc120:<\/strong>&nbsp;\ub370\uc774\ud130\uc5d0\uc11c \uc5bb\uc740 \uc778\uc0ac\uc774\ud2b8\uc640 \ubcc0\ud654\ud558\ub294 \uc2dc\uc7a5 \uc0c1\ud669\uc744 \ubc14\ud0d5\uc73c\ub85c \ud504\ub85c\uc138\uc2a4\ub97c \uc218\uc2dc\ub85c \uac80\ud1a0\ud558\uace0 \uc870\uc815\ud574\uc57c \ud569\ub2c8\ub2e4. \uc9c0\uc18d\uc801\uc73c\ub85c \uac1c\uc120\ud558\ub294 \ud658\uacbd\uc740 \uacbd\uc7c1 \uc6b0\uc704\ub97c \uc720\uc9c0\ud558\ub294 \ub370 \ub3c4\uc6c0\uc774 \ub429\ub2c8\ub2e4.<\/li>\n<\/ul>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f7e777f3\">\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Production planning and scheduling product image straight view\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Advanced production planning with AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Read more about our approach to production planning and optimization leveraging the power of AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"https:\/\/skyplanner.ai\/\" aria-label=\"Book a demo\">Production planning with AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div>\n\n<div class=\"gb-container gb-container-33d6b196\">\n\n<h3 class=\"gb-headline gb-headline-4cbdf7bb gb-headline-text\">\uc7ac\uace0 \ucd5c\uc801\ud654\uc758 \uacfc\uc81c\uc640 MES\ub97c \ud1b5\ud55c \ud574\uacb0<\/h3>\n\n\n\n<p>\uacfc\uc789 \uc7ac\uace0\ub294 \ubcf4\uad00 \ube44\uc6a9\uc758 \uae09\uc99d\uc73c\ub85c \uc774\uc5b4\uc9c0\uace0, \ud488\uc808\uc740 \ud310\ub9e4 \uae30\ud68c \uc0c1\uc2e4\uacfc \uace0\uac1d \uc2e4\ub9dd\uc744 \ucd08\ub798\ud569\ub2c8\ub2e4. MES \uc18c\ud504\ud2b8\uc6e8\uc5b4\ub294 \uc2e4\uc2dc\uac04 \ub370\uc774\ud130\uc640 \uc218\uc694 \uc608\uce21\uc744 \ubc14\ud0d5\uc73c\ub85c \ucd5c\uc801\uc758 \uc7ac\uace0 \uc218\uc900\uc744 \uc720\uc9c0\ud558\uc5ec \uc774\ub7ec\ud55c \ubb38\uc81c\ub97c \ud574\uacb0\ud569\ub2c8\ub2e4. \ub370\uc774\ud130\uc5d0 \uae30\ubc18\ud55c \uc774 \uc811\uadfc \ubc29\uc2dd\uc740 \ucd94\uce21\uc5d0 \uc758\uc874\ud558\uc9c0 \uc54a\uace0 \uc815\ud655\ud55c \uadfc\uac70\ub97c \ud1a0\ub300\ub85c \uc758\uc0ac\uacb0\uc815\uc744 \ub0b4\ub9b4 \uc218 \uc788\ub3c4\ub85d \ud569\ub2c8\ub2e4.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-8320f191 gb-headline-text\">\uc7ac\uace0 \ucd5c\uc801\ud654\uc758 \ud6a8\uacfc\ub97c \uc5bb\ub294 \ub2e4\uc12f \uac00\uc9c0 \uc0b0\uc5c5<\/h2>\n\n\n\n<h4 class=\"gb-headline gb-headline-8848aa5b gb-headline-text\">\uc81c\uc870\uc5c5<\/h4>\n\n\n\n<p>\uc7ac\uace0 \ucd5c\uc801\ud654\ub294 <a href=\"\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%a0%9c%ec%a1%b0%ec%97%85%ec%9d%b4%eb%9e%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80%ec%9a%94\/\">\uc81c\uc870\uc5c5<\/a>\uc5d0\uc11c \uc218\uc694\uc640 \uacf5\uae09 \uc0ac\uc774\uc758 \uc815\uad50\ud55c \uade0\ud615\uc744 \uc720\uc9c0\ud558\ub294 \uc911\uc694\ud55c \uc5ed\ud560\uc744 \ud569\ub2c8\ub2e4. \uc81c\uc870\uc5c5\uccb4\ub294 \uc774\ub97c \ud1b5\ud574 \uc6b4\uc601 \ud6a8\uc728\uc744 \ub192\uc774\uace0 \ub0ad\ube44\ub97c \uc904\uc774\uba70 \uace0\uac1d \uc218\uc694\uc5d0 \uc815\ud655\ud788 \ub300\uc751\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. MES\uc758 \uc7ac\uace0 \ucd5c\uc801\ud654\ub97c \ud65c\uc6a9\ud558\uba74 \uc0dd\uc0b0 \uacf5\uc815\uc744 \ucd5c\uc801\ud654\ud558\uace0 \uc804\ubc18\uc801\uc778 \uc218\uc775\uc131\uc744 \ub192\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-981bade8 gb-headline-text\">\uc18c\ub9e4\uc5c5<\/h4>\n\n\n\n<p>\uc18c\ub9e4\uc5c5\uc740 \uc81c\ud488\uc758 \uc7ac\uace0 \uc720\ubb34\uac00 \uace0\uac1d \ub9cc\uc871\ub3c4\uc640 \ubc00\uc811\ud558\uac8c \uc5f0\uacb0\ub418\ub294 \uae4c\ub2e4\ub85c\uc6b4 \ubd84\uc57c\uc785\ub2c8\ub2e4. \uc7ac\uace0 \ucd5c\uc801\ud654\ub294 \uc18c\ub9e4\uc5c5\uccb4\uac00 \ucd5c\uc801\uc758 \uc7ac\uace0 \uc218\uc900\uc744 \uc720\uc9c0\ud558\ub3c4\ub85d \ud558\uc5ec \uace0\uac1d\uc774 \uc6d0\ud558\ub294 \uc81c\ud488\uc744 \ud56d\uc0c1 \ud655\ubcf4\ud558\uace0 \ud488\uc808\uc774\ub098 \uacfc\uc789 \uc7ac\uace0\uc758 \uc704\ud5d8\uc744 \ucd5c\uc18c\ud654\ud569\ub2c8\ub2e4. \ub610\ud55c \ucc3d\uace0 \uad00\ub9ac\ub97c \uac1c\uc120\ud558\uace0 \uc870\ub2ec \ud504\ub85c\uc138\uc2a4\ub97c \ub354\uc6b1 \ud6a8\uc728\uc801\uc73c\ub85c \uc6b4\uc601\ud558\ub294 \ub370\ub3c4 \ub3c4\uc6c0\uc774 \ub429\ub2c8\ub2e4.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\" id=\"h-healthcare\">\uc758\ub8cc<\/h4>\n\n\n\n<p>\uc758\ub8cc \ubd84\uc57c\uc5d0\uc11c \uc7ac\uace0 \ucd5c\uc801\ud654\ub294 \uc0dd\uba85\uc744 \uc0b4\ub9ac\ub294 \uc5ed\ud560\uc744 \ud569\ub2c8\ub2e4. \ud6a8\uacfc\uc801\uc778 \ud658\uc790 \uc9c4\ub8cc\ub97c \uc704\ud574\uc11c\ub294 \uc758\ub8cc \uc18c\ubaa8\ud488, \uc758\uc57d\ud488, \uc7a5\ube44\uc758 \ud604\ud669\uc744 \ud30c\uc545\ud558\ub294 \uac83\uc774 \uc911\uc694\ud569\ub2c8\ub2e4. MES\uc758 \uc7ac\uace0 \ucd5c\uc801\ud654\ub294 \ud544\uc218 \uc758\ub8cc \ubb3c\ud488\uc744 \ud544\uc694\ud560 \ub54c \uc5b8\uc81c\ub098 \uc0ac\uc6a9\ud560 \uc218 \uc788\ub3c4\ub85d \ud574 \uc90d\ub2c8\ub2e4. \ub610\ud55c \ubcd1\uc6d0 \uc6b4\uc601\uc758 \ud6a8\uc728\uc744 \ub192\uc5ec \ube44\uc6a9\uc744 \uc808\uac10\ud558\uace0 \ud658\uc790\uc758 \uce58\ub8cc \uacb0\uacfc\ub97c \uac1c\uc120\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-737bc495 gb-headline-text\">\uc790\ub3d9\ucc28<\/h4>\n\n\n\n<p>\uc790\ub3d9\ucc28 \uc0b0\uc5c5\uc758 \uacf5\uae09\ub9dd\uc740 \ubcf5\uc7a1\ud558\uace0 \uc815\uad50\ud558\uac8c \uc5bd\ud600 \uc788\uc2b5\ub2c8\ub2e4. \uc7ac\uace0 \ucd5c\uc801\ud654\ub294 \uc790\ub3d9\ucc28 \uae30\uc5c5\uc774 \uc774\ub7ec\ud55c \ubcf5\uc7a1\uc131\uc744 \ud6a8\uacfc\uc801\uc73c\ub85c \uad00\ub9ac\ud558\ub3c4\ub85d \ub3d5\uc2b5\ub2c8\ub2e4. \ucc28\ub7c9 \uc870\ub9bd\uc5d0 \ud544\uc694\ud55c \uc218\ucc9c \uac1c\uc758 \ubd80\ud488 \ucd94\uc801\ubd80\ud130 \uc0ac\ud6c4 \uc11c\ube44\uc2a4\uc6a9 \ubd80\ud488 \uad00\ub9ac\uae4c\uc9c0, MES\uc758 \uc7ac\uace0 \ucd5c\uc801\ud654\ub294 \uc6b4\uc601\uc744 \ud6a8\uc728\ud654\ud558\uace0 \ub9ac\ub4dc\ud0c0\uc784\uc744 \ub2e8\ucd95\ud558\uba70 \ub192\uc740 \uc11c\ube44\uc2a4 \uc218\uc900\uc744 \uc720\uc9c0\ud558\ub294 \ub370 \ub3c4\uc6c0\uc774 \ub429\ub2c8\ub2e4.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-0000614c gb-headline-text\">\uc2dd\uc74c\ub8cc<\/h4>\n\n\n\n<p>\uc720\ud1b5\uae30\ud55c\uc774 \ud55c\uc815\ub41c \uc81c\ud488\uc774 \ub9ce\uc740 \uc2dd\uc74c\ub8cc \uc0b0\uc5c5\uc5d0\uc11c\ub294 \uc7ac\uace0 \ucd5c\uc801\ud654\uac00 \ud2b9\ud788 \uc911\uc694\ud569\ub2c8\ub2e4. \ubcc0\uc9c8\ub418\uae30 \uc26c\uc6b4 \uc7ac\uace0\ub97c \ud6a8\uacfc\uc801\uc73c\ub85c \uad00\ub9ac\ud558\uc5ec \ubd80\ud328\ub85c \uc778\ud55c \ud3d0\uae30\ub97c \uc904\uc774\ub294 \ub370 \ub3c4\uc6c0\uc774 \ub429\ub2c8\ub2e4. \uc2dd\uc74c\ub8cc \uae30\uc5c5\uc740 MES\uc758 \uc7ac\uace0 \ucd5c\uc801\ud654\ub97c \ud1b5\ud574 \uc218\uc694\ub97c \uc815\ud655\ud788 \uc608\uce21\ud558\uace0 \ud544\uc694\ud55c \uc81c\ud488\uc744 \uc801\uc2dc\uc5d0 \ud655\ubcf4\ud558\uc5ec \uad81\uadf9\uc801\uc73c\ub85c \uace0\uac1d \ub9cc\uc871\ub3c4\uc640 \uc218\uc775\uc131\uc744 \ub192\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-4236f72b gb-headline-text\">MES\uc640 \uc7ac\uace0 \ucd5c\uc801\ud654\uc758 \ubbf8\ub798<\/h2>\n\n\n\n<p>\uc55e\uc73c\ub85c \uc778\uacf5\uc9c0\ub2a5, \uba38\uc2e0\ub7ec\ub2dd, \uc608\uce21 \ubd84\uc11d, \uc0ac\ubb3c\uc778\ud130\ub137\uacfc \uac19\uc740 \ud601\uc2e0 \uae30\uc220\uc774 \uc7ac\uace0 \uad00\ub9ac\uc758 \ubcc0\ud654\ub97c \uc774\ub04c \uac83\uc785\ub2c8\ub2e4. \uc774\ub7ec\ud55c \uae30\uc220 \ubc1c\uc804\uc740 MES \uc18c\ud504\ud2b8\uc6e8\uc5b4\uc758 \uc5ed\ub7c9\uc744 \uac15\ud654\ud558\uc5ec \uc7ac\uace0 \ucd5c\uc801\ud654\uc758 \uc815\ud655\ub3c4\uc640 \ud6a8\uc728\uc744 \uc804\ub840 \uc5c6\ub294 \uc218\uc900\uc73c\ub85c \ub04c\uc5b4\uc62c\ub9b4 \uac83\uc785\ub2c8\ub2e4.<\/p>\n\n\n\n<p>\uc774\ub7ec\ud55c \uae30\uc220\uc740 \uc5ec\ub7ec \uac70\uc810\uc758 \uc7ac\uace0\ub97c \uc2e4\uc2dc\uac04\uc73c\ub85c \ucd94\uc801\ud558\uace0 \uace0\ub3c4\ud654\ub41c \uc608\uce21 \ubaa8\ub378\uc744 \ud65c\uc6a9\ud558\ub294 \ub370 \ub3c4\uc6c0\uc774 \ub420 \uac83\uc785\ub2c8\ub2e4. \ub610\ud55c \uc608\uce21 \ubd84\uc11d\uc744 \ud1b5\ud574 \uacc4\uc808\uc801 \ucd94\uc138\uc640 \uc2dc\uc7a5 \ubcc0\ub3d9\uc5d0 \ub530\ub978 \uc218\uc694 \ubcc0\ud654\ub97c \ubbf8\ub9ac \ud30c\uc545\ud560 \uc218 \uc788\uac8c \ub420 \uac83\uc785\ub2c8\ub2e4.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-bd532782 gb-headline-text\">SkyPlanner: \uc7ac\uace0 \ucd5c\uc801\ud654\ub97c \ud568\uaed8\ud558\ub294 \ud30c\ud2b8\ub108<\/h2>\n\n\n\n<p>\uc7ac\uace0 \ucd5c\uc801\ud654\ub97c \ucd94\uc9c4\ud558\ub294 \uc81c\uc870\uc5c5\uccb4\ub294 <a href=\"\/ko\/\">SkyPlanner<\/a>\ub97c \ud1b5\ud574 \uc790\uc7ac \uac00\uc6a9\uc131\uc744 \uc0dd\uc0b0 \uc2a4\ucf00\uc904\ub9c1\uc5d0 \ubc18\uc601\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc790\uc7ac\ub97c \uace0\ub824\ud558\ub294 \uc2a4\ucf00\uc904\ub9c1 \uc124\uc815\uc744 \ud65c\uc131\ud654\ud558\uba74 Arcturus\ub294 \uae30\ub85d\ub41c \uc7ac\uace0\uc640 \uc790\uc7ac \uc785\uace0 \uc608\uc815\uc77c\uc744 \uc0dd\uc0b0 \ub2a5\ub825, \uc6b0\uc120\uc21c\uc704\uc640 \ud568\uaed8 \uace0\ub824\ud558\uc5ec \uc0dd\uc0b0 \uc77c\uc815\uc744 \uacc4\uc0b0\ud569\ub2c8\ub2e4. \ub530\ub77c\uc11c \uc0dd\uc0b0\uacc4\ud68d \ub2f4\ub2f9\uc790\ub294 \uc124\ube44 \uac00\uc6a9\uc131\ub9cc\uc744 \uae30\uc900\uc73c\ub85c \uacc4\ud68d\ud558\ub294 \ub300\uc2e0, \ud544\uc694\ud55c \uc790\uc7ac\uac00 \uc900\ube44\ub418\ub294 \uc2dc\uc810\uc5d0 \ub9de\ucdb0 \uc791\uc5c5\uc744 \uacc4\ud68d\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<p>SkyPlanner <a href=\"\/ko\/%ea%b8%b0%eb%8a%a5\/\">APS<\/a>\ub294 \uac1c\ubc29\ud615 REST API\ub97c \ud1b5\ud574 \ubaa8\ub4e0 ERP \ub610\ub294 MES\uc640 \uc5f0\ub3d9\ud558\uc5ec \uae30\uc874 \uc2dc\uc2a4\ud15c\uc744 \uc0dd\uc0b0 \uc2a4\ucf00\uc904\ub9c1\uacfc \uc5f0\uacb0\ud569\ub2c8\ub2e4. \uacc4\uc0b0\ub41c \uc77c\uc815\uc740 Gantt \ud0c0\uc784\ub77c\uc778\uc5d0 \ud45c\uc2dc\ub418\ubbc0\ub85c, \uc624\ub354\uac00 \uc5b8\uc81c \uc0dd\uc0b0\ub420 \uc608\uc815\uc778\uc9c0, \uadf8 \uc2dc\uc810\uc5d0 \ud544\uc694\ud55c \uc790\uc7ac\ub97c \uc0ac\uc6a9\ud560 \uc218 \uc788\ub294\uc9c0 \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ubd80\ud488 \uc785\uace0\uc77c\uc774 \ub2a6\ucdb0\uc9c0\ub294 \uc0c1\ud669\uc744 \uc0dd\uac01\ud574 \ubcf4\uc138\uc694. \uc785\uace0 \uc608\uc815\uc77c\uc744 \uc218\uc815\ud558\uace0 \uc77c\uc815\uc744 \ub2e4\uc2dc \uacc4\uc0b0\ud558\uba74 \ub0a9\ud488\uc77c\uc744 \ud655\uc815\ud558\uae30 \uc804\uc5d0 \uc0dd\uc0b0\uc5d0 \ubbf8\uce58\ub294 \uc601\ud5a5\uc744 \uac80\ud1a0\ud558\ub294 \ub370 \ub3c4\uc6c0\uc774 \ub429\ub2c8\ub2e4.<\/p>\n\n\n\n<p>\uc7ac\uace0 \uc815\ubcf4\ub97c \uc0dd\uc0b0 \uc77c\uc815\uc5d0 \uc5b4\ub5bb\uac8c \ubc18\uc601\ud560 \uc218 \uc788\ub294\uc9c0 \ud655\uc778\ud558\uace0 \uc2f6\uc73c\uc2e0\uac00\uc694? <a href=\"\/ko\/%ec%98%81%ec%97%85%ed%8c%80%ec%97%90-%eb%ac%b8%ec%9d%98\/\">SkyPlanner \ud300\uacfc\uc758 \ub370\ubaa8\ub97c \uc608\uc57d\ud558\uace0<\/a> \uacf5\uc7a5\uc5d0\uc11c \uc790\uc7ac\ub97c \uace0\ub824\ud55c \uc2a4\ucf00\uc904\ub9c1\uc744 \uc5b4\ub5bb\uac8c \ud65c\uc6a9\ud560 \uc218 \uc788\ub294\uc9c0 \uc54c\uc544\ubcf4\uc138\uc694.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-92545123\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-0a61546f\">\n<div class=\"gb-grid-column gb-grid-column-e4183086\"><div class=\"gb-container gb-container-e4183086\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-84ccbb5d\"><div class=\"gb-container gb-container-84ccbb5d\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>MES \uc7ac\uace0 \ucd5c\uc801\ud654 \ud648&nbsp;\u00bb&nbsp;\uc790\ub8cc\uc2e4&nbsp;\u00bb&nbsp;MES \uc7ac\uace0 \ucd5c\uc801\ud654 \ub2e4\uc74c\uacfc \uac19\uc740 \uc0c1\ud669\uc744 \ub5a0\uc62c\ub824 \ubcf4\uc138\uc694. \uc798\ub098\uac00\ub358 \uc81c\uacfc\uc5c5\uccb4\uac00 \uac11\uc790\uae30 \ub3c4\uc0b0 \uc704\uae30\uc5d0 \ubab0\ub9bd\ub2c8\ub2e4. \uc131\uc218\uae30\uc5d0\ub294 \ud488\uc808\uc774, \ube44\uc218\uae30\uc5d0\ub294 \uacfc\uc789 \uc7ac\uace0\uac00 \ubc18\ubcf5\ub418\uba74\uc11c \ud68c\uc0ac\uc758 \uc7ac\ubb34 \uc0c1\ud0dc\uac00 \uc545\ud654\ub418\uace0 \uc788\uc2b5\ub2c8\ub2e4. \ucc3d\uace0\uac00 \uac00\ub4dd \ucc3c\ub2e4\uac00 \uc5bc\ub9c8 \uc9c0\ub098\uc9c0 \uc54a\uc544 \uac70\uc758 \ud145 \ube44\ub294 \uc77c\uc774 \ubc18\ubcf5\ub418\uba74\uc11c \uc6b4\uc601 \ud6a8\uc728\uacfc \uace0\uac1d \ub9cc\uc871\ub3c4 \ubaa8\ub450 \ud070 \ud0c0\uaca9\uc744 \uc785\uc2b5\ub2c8\ub2e4. \uc774\ub54c MES\uc758 \ud575\uc2ec \uae30\ub2a5\uc778 \uc7ac\uace0 \ucd5c\uc801\ud654\ub97c \ub3c4\uc785\ud558\uba74\uc11c \uc0ac\uc5c5\uc5d0 &#8230; <a title=\"MES \uc7ac\uace0 \ucd5c\uc801\ud654\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mes-%ec%9e%ac%ea%b3%a0-%ec%b5%9c%ec%a0%81%ed%99%94\/\" aria-label=\"Read more about MES \uc7ac\uace0 \ucd5c\uc801\ud654\">Read more<\/a><\/p>\n","protected":false},"author":6,"featured_media":38665,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2733,496],"tags":[],"class_list":["post-38663","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mes-","category-496","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>MES \uc7ac\uace0 \ucd5c\uc801\ud654 &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"\uc7ac\uace0 \ucd5c\uc801\ud654\ub294 \uace0\uae09 \uc54c\uace0\ub9ac\uc998, \uc218\uc694 \uc608\uce21, \ucd5c\uc2e0 \uae30\uc220\ub85c \uc774\uc0c1\uc801\uc778 \uc7ac\uace0 \uade0\ud615\uc744 \ub2ec\uc131\ud558\ub294 MES \uae30\ub2a5\uc785\ub2c8\ub2e4.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mes-%ec%9e%ac%ea%b3%a0-%ec%b5%9c%ec%a0%81%ed%99%94\/\" \/>\n<meta property=\"og:locale\" content=\"ko_KR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"MES \uc7ac\uace0 \ucd5c\uc801\ud654\" \/>\n<meta property=\"og:description\" content=\"\uc7ac\uace0 \ucd5c\uc801\ud654\ub294 \uace0\uae09 \uc54c\uace0\ub9ac\uc998, \uc218\uc694 \uc608\uce21, \ucd5c\uc2e0 \uae30\uc220\ub85c \uc774\uc0c1\uc801\uc778 \uc7ac\uace0 \uade0\ud615\uc744 \ub2ec\uc131\ud558\ub294 MES \uae30\ub2a5\uc785\ub2c8\ub2e4.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mes-%ec%9e%ac%ea%b3%a0-%ec%b5%9c%ec%a0%81%ed%99%94\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2023-08-01T11:59:17+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-15T12:49:05+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/INVENTORY-OPTIMIZATION-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\uae00\uc4f4\uc774\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/mes-%ec%9e%ac%ea%b3%a0-%ec%b5%9c%ec%a0%81%ed%99%94\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/mes-%ec%9e%ac%ea%b3%a0-%ec%b5%9c%ec%a0%81%ed%99%94\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"MES \uc7ac\uace0 \ucd5c\uc801\ud654\",\"datePublished\":\"2023-08-01T11:59:17+00:00\",\"dateModified\":\"2026-10-15T12:49:05+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/mes-%ec%9e%ac%ea%b3%a0-%ec%b5%9c%ec%a0%81%ed%99%94\\\/\"},\"wordCount\":52,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/mes-%ec%9e%ac%ea%b3%a0-%ec%b5%9c%ec%a0%81%ed%99%94\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/INVENTORY-OPTIMIZATION-scaled.jpg\",\"articleSection\":[\"MES \uc2dc\uc2a4\ud15c\",\"\ub9ac\uc18c\uc2a4\"],\"inLanguage\":\"ko-KR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/mes-%ec%9e%ac%ea%b3%a0-%ec%b5%9c%ec%a0%81%ed%99%94\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/mes-%ec%9e%ac%ea%b3%a0-%ec%b5%9c%ec%a0%81%ed%99%94\\\/\",\"name\":\"MES \uc7ac\uace0 \ucd5c\uc801\ud654 &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/mes-%ec%9e%ac%ea%b3%a0-%ec%b5%9c%ec%a0%81%ed%99%94\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/mes-%ec%9e%ac%ea%b3%a0-%ec%b5%9c%ec%a0%81%ed%99%94\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/INVENTORY-OPTIMIZATION-scaled.jpg\",\"datePublished\":\"2023-08-01T11:59:17+00:00\",\"dateModified\":\"2026-10-15T12:49:05+00:00\",\"description\":\"\uc7ac\uace0 \ucd5c\uc801\ud654\ub294 \uace0\uae09 \uc54c\uace0\ub9ac\uc998, \uc218\uc694 \uc608\uce21, \ucd5c\uc2e0 \uae30\uc220\ub85c \uc774\uc0c1\uc801\uc778 \uc7ac\uace0 \uade0\ud615\uc744 \ub2ec\uc131\ud558\ub294 MES \uae30\ub2a5\uc785\ub2c8\ub2e4.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/mes-%ec%9e%ac%ea%b3%a0-%ec%b5%9c%ec%a0%81%ed%99%94\\\/#breadcrumb\"},\"inLanguage\":\"ko-KR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/mes-%ec%9e%ac%ea%b3%a0-%ec%b5%9c%ec%a0%81%ed%99%94\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/mes-%ec%9e%ac%ea%b3%a0-%ec%b5%9c%ec%a0%81%ed%99%94\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/INVENTORY-OPTIMIZATION-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/INVENTORY-OPTIMIZATION-scaled.jpg\",\"width\":2560,\"height\":1707,\"caption\":\"INVENTORY OPTIMIZATION\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/mes-%ec%9e%ac%ea%b3%a0-%ec%b5%9c%ec%a0%81%ed%99%94\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"MES \uc7ac\uace0 \ucd5c\uc801\ud654\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ko-KR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"MES \uc7ac\uace0 \ucd5c\uc801\ud654 &#8211; SkyPlanner","description":"\uc7ac\uace0 \ucd5c\uc801\ud654\ub294 \uace0\uae09 \uc54c\uace0\ub9ac\uc998, \uc218\uc694 \uc608\uce21, \ucd5c\uc2e0 \uae30\uc220\ub85c \uc774\uc0c1\uc801\uc778 \uc7ac\uace0 \uade0\ud615\uc744 \ub2ec\uc131\ud558\ub294 MES \uae30\ub2a5\uc785\ub2c8\ub2e4.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mes-%ec%9e%ac%ea%b3%a0-%ec%b5%9c%ec%a0%81%ed%99%94\/","og_locale":"ko_KR","og_type":"article","og_title":"MES \uc7ac\uace0 \ucd5c\uc801\ud654","og_description":"\uc7ac\uace0 \ucd5c\uc801\ud654\ub294 \uace0\uae09 \uc54c\uace0\ub9ac\uc998, \uc218\uc694 \uc608\uce21, \ucd5c\uc2e0 \uae30\uc220\ub85c \uc774\uc0c1\uc801\uc778 \uc7ac\uace0 \uade0\ud615\uc744 \ub2ec\uc131\ud558\ub294 MES \uae30\ub2a5\uc785\ub2c8\ub2e4.","og_url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mes-%ec%9e%ac%ea%b3%a0-%ec%b5%9c%ec%a0%81%ed%99%94\/","og_site_name":"SkyPlanner","article_published_time":"2023-08-01T11:59:17+00:00","article_modified_time":"2026-10-15T12:49:05+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/INVENTORY-OPTIMIZATION-scaled.jpg","type":"image\/jpeg"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"\uae00\uc4f4\uc774":"SkyPlanner"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mes-%ec%9e%ac%ea%b3%a0-%ec%b5%9c%ec%a0%81%ed%99%94\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mes-%ec%9e%ac%ea%b3%a0-%ec%b5%9c%ec%a0%81%ed%99%94\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"MES \uc7ac\uace0 \ucd5c\uc801\ud654","datePublished":"2023-08-01T11:59:17+00:00","dateModified":"2026-10-15T12:49:05+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mes-%ec%9e%ac%ea%b3%a0-%ec%b5%9c%ec%a0%81%ed%99%94\/"},"wordCount":52,"publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mes-%ec%9e%ac%ea%b3%a0-%ec%b5%9c%ec%a0%81%ed%99%94\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/INVENTORY-OPTIMIZATION-scaled.jpg","articleSection":["MES \uc2dc\uc2a4\ud15c","\ub9ac\uc18c\uc2a4"],"inLanguage":"ko-KR"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mes-%ec%9e%ac%ea%b3%a0-%ec%b5%9c%ec%a0%81%ed%99%94\/","url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mes-%ec%9e%ac%ea%b3%a0-%ec%b5%9c%ec%a0%81%ed%99%94\/","name":"MES \uc7ac\uace0 \ucd5c\uc801\ud654 &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mes-%ec%9e%ac%ea%b3%a0-%ec%b5%9c%ec%a0%81%ed%99%94\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mes-%ec%9e%ac%ea%b3%a0-%ec%b5%9c%ec%a0%81%ed%99%94\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/INVENTORY-OPTIMIZATION-scaled.jpg","datePublished":"2023-08-01T11:59:17+00:00","dateModified":"2026-10-15T12:49:05+00:00","description":"\uc7ac\uace0 \ucd5c\uc801\ud654\ub294 \uace0\uae09 \uc54c\uace0\ub9ac\uc998, \uc218\uc694 \uc608\uce21, \ucd5c\uc2e0 \uae30\uc220\ub85c \uc774\uc0c1\uc801\uc778 \uc7ac\uace0 \uade0\ud615\uc744 \ub2ec\uc131\ud558\ub294 MES \uae30\ub2a5\uc785\ub2c8\ub2e4.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mes-%ec%9e%ac%ea%b3%a0-%ec%b5%9c%ec%a0%81%ed%99%94\/#breadcrumb"},"inLanguage":"ko-KR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mes-%ec%9e%ac%ea%b3%a0-%ec%b5%9c%ec%a0%81%ed%99%94\/"]}]},{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mes-%ec%9e%ac%ea%b3%a0-%ec%b5%9c%ec%a0%81%ed%99%94\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/INVENTORY-OPTIMIZATION-scaled.jpg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/INVENTORY-OPTIMIZATION-scaled.jpg","width":2560,"height":1707,"caption":"INVENTORY OPTIMIZATION"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mes-%ec%9e%ac%ea%b3%a0-%ec%b5%9c%ec%a0%81%ed%99%94\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ko\/"},{"@type":"ListItem","position":2,"name":"MES \uc7ac\uace0 \ucd5c\uc801\ud654"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ko\/#website","url":"https:\/\/skyplanner.ai\/ko\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ko\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ko-KR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ko\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ko\/","logo":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/INVENTORY-OPTIMIZATION-scaled.jpg",2560,1707,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/INVENTORY-OPTIMIZATION-150x150.jpg",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/INVENTORY-OPTIMIZATION-300x200.jpg",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/INVENTORY-OPTIMIZATION-768x512.jpg",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/INVENTORY-OPTIMIZATION-1024x683.jpg",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/INVENTORY-OPTIMIZATION-1536x1024.jpg",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/INVENTORY-OPTIMIZATION-2048x1365.jpg",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/INVENTORY-OPTIMIZATION-scaled.jpg",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/ko\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"MES \uc7ac\uace0 \ucd5c\uc801\ud654 \ud648&nbsp;\u00bb&nbsp;\uc790\ub8cc\uc2e4&nbsp;\u00bb&nbsp;MES \uc7ac\uace0 \ucd5c\uc801\ud654 \ub2e4\uc74c\uacfc \uac19\uc740 \uc0c1\ud669\uc744 \ub5a0\uc62c\ub824 \ubcf4\uc138\uc694. \uc798\ub098\uac00\ub358 \uc81c\uacfc\uc5c5\uccb4\uac00 \uac11\uc790\uae30 \ub3c4\uc0b0 \uc704\uae30\uc5d0 \ubab0\ub9bd\ub2c8\ub2e4. \uc131\uc218\uae30\uc5d0\ub294 \ud488\uc808\uc774, \ube44\uc218\uae30\uc5d0\ub294 \uacfc\uc789 \uc7ac\uace0\uac00 \ubc18\ubcf5\ub418\uba74\uc11c \ud68c\uc0ac\uc758 \uc7ac\ubb34 \uc0c1\ud0dc\uac00 \uc545\ud654\ub418\uace0 \uc788\uc2b5\ub2c8\ub2e4. \ucc3d\uace0\uac00 \uac00\ub4dd \ucc3c\ub2e4\uac00 \uc5bc\ub9c8 \uc9c0\ub098\uc9c0 \uc54a\uc544 \uac70\uc758 \ud145 \ube44\ub294 \uc77c\uc774 \ubc18\ubcf5\ub418\uba74\uc11c \uc6b4\uc601 \ud6a8\uc728\uacfc \uace0\uac1d \ub9cc\uc871\ub3c4 \ubaa8\ub450 \ud070 \ud0c0\uaca9\uc744 \uc785\uc2b5\ub2c8\ub2e4. \uc774\ub54c MES\uc758 \ud575\uc2ec \uae30\ub2a5\uc778 \uc7ac\uace0 \ucd5c\uc801\ud654\ub97c \ub3c4\uc785\ud558\uba74\uc11c \uc0ac\uc5c5\uc5d0&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/38663","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/comments?post=38663"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/38663\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media\/38665"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media?parent=38663"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/categories?post=38663"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/tags?post=38663"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}