{"id":38647,"date":"2023-08-01T11:08:26","date_gmt":"2023-08-01T11:08:26","guid":{"rendered":"https:\/\/skyplanner.ai\/%eb%b6%84%eb%a5%98%eb%90%98%ec%a7%80-%ec%95%8a%ec%9d%8c\/mes%ec%99%80-erp-%ec%b0%a8%ec%9d%b4%ec%a0%90%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%bc%ea%b9%8c%ec%9a%94\/"},"modified":"2026-10-08T14:20:25","modified_gmt":"2026-10-08T14:20:25","slug":"mes%ec%99%80-erp-%ec%b0%a8%ec%9d%b4%ec%a0%90%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%bc%ea%b9%8c%ec%9a%94","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mes%ec%99%80-erp-%ec%b0%a8%ec%9d%b4%ec%a0%90%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%bc%ea%b9%8c%ec%9a%94\/","title":{"rendered":"MES\uc640 ERP: \ucc28\uc774\uc810\uc740 \ubb34\uc5c7\uc77c\uae4c\uc694?"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89\">\n\n<h1 class=\"wp-block-heading\" id=\"h-mes-vs-erp-what-s-the-difference\">MES\uc640 ERP: \ucc28\uc774\uc810\uc740 \ubb34\uc5c7\uc77c\uae4c\uc694?<\/h1>\n\n\n<div class=\"gb-container gb-container-e8026af9\">\n\n<p><a href=\"\/ko\/\">\ud648<\/a> &#8221; <a href=\"\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/\">\ub9ac\uc18c\uc2a4<\/a> &#8221; MES\uc640 ERP: \ucc28\uc774\uc810\uc740 \ubb34\uc5c7\uc77c\uae4c\uc694?<\/p>\n\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">\uc608\uc0c1 \uc77d\uae30 \uc2dc\uac04: <\/span><span class=\"yoast-reading-time__reading-time\">16<\/span><span class=\"yoast-reading-time__time-unit\"> \ubd84<\/span><\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f0fd57d0\">\n\n<p>\ud65c\uae30\uac00 \ub118\uce58\uace0 \uae30\uacc4\uac00 \uc719\uc719\uac70\ub9ac\uba70 \uc0ac\ub78c\ub4e4\uc774 \uc870\ud654\ub86d\uac8c \uc77c\ud558\ub294 \ubd84\uc8fc\ud55c \uacf5\uc7a5\uc5d0 \ub4e4\uc5b4\uc130\ub2e4\uace0 \uc0c1\uc0c1\ud574 \ubcf4\uc138\uc694. \uc774 \uc6d0\ud65c\ud55c \uc6b4\uc601 \ub4a4\uc5d0\ub294 \ub450 \uba85\uc758 \uc870\uc6a9\ud55c \uc288\ud37c\ud788\uc5b4\ub85c\uac00 \uc788\uc2b5\ub2c8\ub2e4: \ubc14\ub85c <a href=\"\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mes-%ec%8b%9c%ec%8a%a4%ed%85%9c-%ec%a0%95%ec%9d%98%ec%99%80-%ea%b8%b0%eb%8a%a5\/\">MES(\uc81c\uc870 \uc2e4\ud589 \uc2dc\uc2a4\ud15c)<\/a> \uc640 ERP(\uc804\uc0ac\uc801 \uc790\uc6d0 \uad00\ub9ac)\uc785\ub2c8\ub2e4.<\/p>\n\n\n\n<p>\uc774\ub4e4\uc740 \uc0dd\uc0b0 \uacc4\ud68d\uc744 \ud604\uc2e4\ub85c \ub9cc\ub4dc\ub294 \uae30\uacc4\uc758 \ub9c8\ubc95\uacfc\ub3c4 \uac19\uc740 \uc874\uc7ac\uc785\ub2c8\ub2e4. \ud558\uc9c0\ub9cc \uc774\ub4e4\uc744 \ud604\ubbf8\uacbd\uc73c\ub85c \ub4e4\uc5ec\ub2e4\ubcf4\uba74 \uc5b4\ub5a4 \uc77c\uc774 \ubc8c\uc5b4\uc9c8\uae4c\uc694? \uc774\ub4e4\uc758 \uace0\uc720\ud55c \uae30\uc220\uc740 \ubb34\uc5c7\uc77c\uae4c\uc694? \uc81c\uc870 \ubd84\uc57c\uc758 \ud310\ub3c4\ub97c \ubc14\uafc0 \uc218 \uc788\ub294 \ucd5c\uace0\uc758 \uc778\uc7ac\ub294 \ub204\uad6c\uc77c\uae4c\uc694? <\/p>\n\n\n\n<p>MES\uc640 ERP\uc758 \uace0\uc720\ud55c \uae30\ub2a5, \uac15\uc810 \ubc0f \uc5ed\ud560\uc744 \uc0b4\ud3b4\ubcf4\uba74\uc11c \uc774 \ub450 \uac00\uc9c0\ub97c \uc774\ud574\ud558\ub294 \uacfc\uc815\uc744 \uc7a0\uc2dc \uba48\ucdb0 \ubcf4\uc138\uc694. \uace0\uae09 \uacc4\ud68d \ubc0f \uc77c\uc815 \uad00\ub9ac(APS) \uc2dc\uc2a4\ud15c\uc744 \uace0\ub824\ud558\uace0 \uc788\ub294 \ubd84\ub4e4\uc744 \uc704\ud574 \uc774 \ub450 \uac00\uc9c0 \uc911\uc694\ud55c \uc2dc\uc2a4\ud15c\uc744 \uc774\ud574\ud558\uae30 \uc704\ud55c \ube60\ub978 \uac00\uc774\ub4dc\ub97c \uc81c\uacf5\ud569\ub2c8\ub2e4. \uc9c0\uae08 \ubc14\ub85c \uc2dc\uc791\ud558\uc138\uc694!<\/p>\n\n\n\t\t\t\t<div class=\"wp-block-uagb-table-of-contents uagb-toc__align-left uagb-toc__columns-1  uagb-block-5df248d4      \"\n\t\t\t\t\tdata-scroll= \"1\"\n\t\t\t\t\tdata-offset= \"30\"\n\t\t\t\t\tstyle=\"\"\n\t\t\t\t>\n\t\t\t\t<div class=\"uagb-toc__wrap\">\n\t\t\t\t\t\t<div class=\"uagb-toc__title\">\n\t\t\t\t\t\t\t\ubaa9\ucc28 \ud14c\uc774\ube14\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"uagb-toc__list-wrap \">\n\t\t\t\t\t\t<ol class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#tldr\" class=\"uagb-toc-link__trigger\">TL;DR<\/a><li class=\"uagb-toc__list\"><a href=\"#mes\uc640-erp\uc758-\uc9c4\ud654\" class=\"uagb-toc-link__trigger\">MES\uc640 ERP\uc758 \uc9c4\ud654<\/a><li class=\"uagb-toc__list\"><a href=\"#mes-\ub300-erp-\uc8fc\uc694-\ucc28\uc774\uc810-\uc124\uba85\" class=\"uagb-toc-link__trigger\">MES \ub300 ERP: \uc8fc\uc694 \ucc28\uc774\uc810 \uc124\uba85<\/a><li class=\"uagb-toc__list\"><a href=\"#mes-erp\uc5d0\uc11c-\uc0ac\uc6a9\ud560-\uc218-\uc5c6\ub294-\uc8fc\uc694-\uae30\ub2a5\" class=\"uagb-toc-link__trigger\">MES: ERP\uc5d0\uc11c \uc0ac\uc6a9\ud560 \uc218 \uc5c6\ub294 \uc8fc\uc694 \uae30\ub2a5<\/a><li class=\"uagb-toc__list\"><a href=\"#erp-mes\uc5d0\uc11c-\uc0ac\uc6a9\ud560-\uc218-\uc5c6\ub294-\uc8fc\uc694-\uae30\ub2a5\" class=\"uagb-toc-link__trigger\">ERP: MES\uc5d0\uc11c \uc0ac\uc6a9\ud560 \uc218 \uc5c6\ub294 \uc8fc\uc694 \uae30\ub2a5<\/a><li class=\"uagb-toc__list\"><a href=\"#\uc120\ud0dd\ud558\uae30-mes-\ub610\ub294-erp\" class=\"uagb-toc-link__trigger\">\uc120\ud0dd\ud558\uae30: MES \ub610\ub294 ERP?<\/a><li class=\"uagb-toc__list\"><a href=\"#\uad6c\ud604-\ubbf8\ub85c-\ud0d0\uc0c9\ud558\uae30-mes-\ubc0f-erp\" class=\"uagb-toc-link__trigger\">\uad6c\ud604 \ubbf8\ub85c \ud0d0\uc0c9\ud558\uae30: MES \ubc0f ERP<\/a><li class=\"uagb-toc__list\"><a href=\"#\ub2e4\uc74c-\ub2e8\uacc4\ub85c-\ub118\uc5b4\uac00\uae30-\uc2a4\uce74\uc774\ud50c\ub798\ub108\uc640-\ud568\uaed8\ud558\ub294-\uc5ec\uc815-aps\" class=\"uagb-toc-link__trigger\">\ub2e4\uc74c \ub2e8\uacc4\ub85c \ub118\uc5b4\uac00\uae30: \uc2a4\uce74\uc774\ud50c\ub798\ub108\uc640 \ud568\uaed8\ud558\ub294 \uc5ec\uc815 APS<\/a><\/ol>\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\n\n\n<h2 class=\"gb-headline gb-headline-dc27138e gb-headline-text\">TL;DR<\/h2>\n\n\n\n<p>MES\uc640 ERP\ub294 \uac01\uac01 \uace0\uc720\ud55c \uc5ed\ud560\uc744 \ud558\ub294 \uc81c\uc870 \ubd84\uc57c\uc758 \ud575\uc2ec \uc2dc\uc2a4\ud15c\uc785\ub2c8\ub2e4. MES\ub294 \uc81c\uc870 \ud504\ub85c\uc138\uc2a4\uc758 \uc2e4\uc2dc\uac04 \uc81c\uc5b4 \ubc0f \ubaa8\ub2c8\ud130\ub9c1\uc5d0 \uc911\uc810\uc744 \ub450\ub294 \ubc18\uba74, ERP\ub294 \uc804\ub7b5\uc801 \uacc4\ud68d\uc744 \uc704\ud55c \uad11\ubc94\uc704\ud55c \ube44\uc988\ub2c8\uc2a4 \uae30\ub2a5\uc744 \ud1b5\ud569\ud569\ub2c8\ub2e4. \uac01 \uc2dc\uc2a4\ud15c\uc5d0\ub294 \uace0\uc720\ud55c \uac15\uc810\uacfc \ud55c\uacc4\uac00 \uc788\uc73c\uba70, \uac1c\ubcc4 \ube44\uc988\ub2c8\uc2a4 \uc694\uad6c \uc0ac\ud56d, \ube44\uc6a9 \ubc0f \ud5a5\ud6c4 \uc131\uc7a5\uc5d0 \ub530\ub77c \uc2dc\uc2a4\ud15c \uac04\uc758 \uc120\ud0dd\uc774 \ub2ec\ub77c\uc9d1\ub2c8\ub2e4. \ub450 \uac00\uc9c0\ub97c \uacb0\ud569\ud558\uba74 \uc885\ud569\uc801\uc778 \uc194\ub8e8\uc158\uc744 \uc81c\uacf5\ud560 \uc218 \uc788\uc73c\uba70, \uc120\ud0dd\uacfc \uad6c\ud604\uc5d0 \ub3c4\uc6c0\uc774 \ub418\ub294 \uc804\ubb38\uac00\uc758 \uc548\ub0b4\ub97c \ubc1b\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-f161feb6 gb-headline-text\">MES\uc640 ERP\uc758 \uc9c4\ud654<\/h2>\n\n\n\n<p>1970\ub144\ub300\uc640 1980\ub144\ub300\uc5d0 \uac01\uac01 \ub3c4\uc785\ub41c MES\uc640 ERP \uc2dc\uc2a4\ud15c\uc740 \uc81c\uc870 \uae30\uc5c5\uc758 \ubcf5\uc7a1\ud55c \uc694\uad6c \uc0ac\ud56d\uc744 \ud574\uacb0\ud558\ub294 \ud601\uc2e0\uc801\uc778 \uc194\ub8e8\uc158\uc73c\ub85c \ubd80\uc0c1\ud588\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<p>MES\ub294 \uacf5\uc815 \ubc0f \uac1c\ubcc4 \uc81c\uc870 \uc0b0\uc5c5\uc5d0\uc11c \uadf8 \ubfcc\ub9ac\ub97c \ucc3e\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ucc98\uc74c\uc5d0\ub294 \uacf5\uc7a5 \ud604\uc7a5 \uc7a5\ube44\uc640 \uc0c1\uc704 \uad00\ub9ac \uc2dc\uc2a4\ud15c \uac04\uc758 \uac04\uadf9\uc744 \uba54\uc6b0\uae30 \uc704\ud574 \uc124\uacc4\ub418\uc5c8\uc2b5\ub2c8\ub2e4. \uadf8 \ubaa9\uc801\uc740 \uc8fc\ubb38 \ucd9c\uace0\ubd80\ud130 \uc644\uc81c\ud488\uc5d0 \uc774\ub974\uae30\uae4c\uc9c0 \uc0dd\uc0b0 \ud65c\ub3d9\uc744 \ubaa8\ub2c8\ud130\ub9c1, \uc81c\uc5b4 \ubc0f \ucd5c\uc801\ud654\ud558\ub294 \uac83\uc774\uc5c8\uace0 \uc9c0\uae08\ub3c4 \ub9c8\ucc2c\uac00\uc9c0\uc785\ub2c8\ub2e4.<\/p>\n\n\n\n<p>\ubc18\uba74<a href=\"\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%a0%9c%ec%a1%b0-erp-%ec%a2%85%ed%95%a9-%ea%b0%80%ec%9d%b4%eb%93%9c\/\"> ERP\ub294<\/a> <a href=\"\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mrp-%ea%b0%84%eb%8b%a8%ed%95%9c-%ea%b0%80%ec%9d%b4%eb%93%9c\/\">\uc790\uc7ac \uc18c\uc694\ub7c9 \uacc4\ud68d(MRP)<\/a> \uc2dc\uc2a4\ud15c \uac1c\ub150\uc5d0\uc11c \ubc1c\uc804\ud588\uc2b5\ub2c8\ub2e4. \ucc98\uc74c\uc5d0\ub294 \uc7ac\uace0 \ubc0f \uc0dd\uc0b0 \uacc4\ud68d\uc744 \uc870\uc815\ud558\uae30 \uc704\ud574 \uc124\uacc4\ub41c ERP \uc2dc\uc2a4\ud15c\uc740 \uc774\ud6c4 \ube44\uc988\ub2c8\uc2a4\uc758 \uae30\ub2a5 \uc601\uc5ed\uc744 \ucea1\uc290\ud654\ud558\uc5ec \ud1b5\ud569\uc801\uc774\uace0 \ud3ec\uad04\uc801\uc778 \uc811\uadfc \ubc29\uc2dd\uc73c\ub85c \ud1b5\ud569\ud558\ub294 \uac83\uc73c\ub85c \ud655\uc7a5\ub418\uc5c8\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<h3 class=\"gb-headline gb-headline-92733ee7 gb-headline-text\">MES\ub780 \ubb34\uc5c7\uc778\uac00\uc694?<\/h3>\n\n\n\n<p>MES\ub294 \uacbd\uc601\uc9c4\uacfc \uc0dd\uc0b0 \ud604\uc7a5 \uc0ac\uc774\ub97c \uc774\uc5b4 \uc8fc\ub294 \uc911\uac04 \ub2e4\ub9ac \uc5ed\ud560\uc744 \ud558\uba70, \uaf2d \ud544\uc694\ud55c \uc2dc\uc2a4\ud15c\uc785\ub2c8\ub2e4. MES\uc758 \ud575\uc2ec \uae30\ub2a5\uc740 \ud488\uc9c8 \uad00\ub9ac, <a href=\"\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-scheduling\/\">\uc2a4\ucf00\uc904\ub9c1<\/a>, \uacf5\uc815 \uc2e4\ud589, \uc131\uacfc \ubd84\uc11d, \ubb38\uc11c \uad00\ub9ac, \uc778\ub825 \uad00\ub9ac \ub4f1 \uc5ec\ub7ec \uc601\uc5ed\uc5d0 \uac78\uccd0 \uc788\uace0, \ud604\uc7a5 \uc0c1\ud669\uc5d0 \ub530\ub77c \uacc4\uc18d \ub2ec\ub77c\uc9c0\ub294 \uc5ed\ub3d9\uc801\uc778 \uc131\uaca9\uc744 \ub771\ub2c8\ub2e4.<\/p>\n\n\n\n<p>\uc81c\ud488 \ud488\uc9c8 \uc720\uc9c0\ubd80\ud130 \uacf5\uc7a5 \ud65c\ub3d9 \uad00\ub9ac\uc5d0 \uc774\ub974\uae30\uae4c\uc9c0 MES\ub294 \uc81c\uc870 \ud504\ub85c\uc138\uc2a4\uc5d0 \ub300\ud55c \uc2e4\uc2dc\uac04 \uc81c\uc5b4 \ubc0f \uac00\uc2dc\uc131\uc744 \uc81c\uacf5\ud569\ub2c8\ub2e4. MES\ub294 \uc81c\uc870 \uc6b4\uc601\uc5d0 \ub300\ud55c \uc138\ubd80\uc801\uc778 \uc815\ubcf4\ub97c \uc81c\uacf5\ud558\uc5ec \uc815\ubcf4\uc5d0 \uc785\uac01\ud55c \uc758\uc0ac \uacb0\uc815\uacfc \uc120\uc81c\uc801\uc778 \ubb38\uc81c \ud574\uacb0\uc744 \uc9c0\uc6d0\ud569\ub2c8\ub2e4.<\/p>\n\n\n\n<p>\uc218\ubc31 \ub300\uc758 \uae30\uacc4\uc640 \uc218\ucc9c \uac1c\uc758 \ubd80\ud488\uc774 \uc788\ub294 \ub300\uaddc\ubaa8 \uc790\ub3d9\ucc28 \uc81c\uc870 \uacf5\uc7a5\uc744 \uc0c1\uc0c1\ud574 \ubcf4\uc138\uc694. \uc774\ub7ec\ud55c \ubcf5\uc7a1\ud55c \uc6b4\uc601 \uad00\ub9ac\ub294 MES\uc640 \uac19\uc740 \uc2dc\uc2a4\ud15c\uc744 \ud1b5\ud574\uc11c\ub9cc \uac00\ub2a5\ud569\ub2c8\ub2e4.<\/p>\n\n\n\n<p>\uc774\ub7ec\ud55c \ub9e5\ub77d\uc5d0\uc11c MES \uc2dc\uc2a4\ud15c\uc740 \uc2dc\uac04\ub2f9 \uc0dd\uc0b0\ub418\ub294 \ubd80\ud488 \uc218, \uac01 \uae30\uacc4\uc758 \ud6a8\uc728\uc131\uacfc \uac00\ub3d9 \uc2dc\uac04, \ucd9c\ub825 \ud488\uc9c8 \ub4f1 \uc0dd\uc0b0\uc758 \ubaa8\ub4e0 \ubbf8\ubb18\ud55c \ucc28\uc774\ub97c \ubaa8\ub2c8\ud130\ub9c1\ud569\ub2c8\ub2e4. \uc774\ub7ec\ud55c \uc2e4\uc2dc\uac04 \uc778\uc0ac\uc774\ud2b8\ub97c \ud1b5\ud574 \uacf5\uc7a5 \uacbd\uc601\uc9c4\uc740 \uc7a0\uc7ac\uc801\uc778 \ubcd1\ubaa9 \ud604\uc0c1\uc744 \uc989\uc2dc \ud574\uacb0\ud558\uace0 \ud504\ub85c\uc138\uc2a4\ub97c \uac04\uc18c\ud654\ud558\uba70 \uc0dd\uc0b0\uc131\uc744 \uac1c\uc120\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"536\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png\" alt=\"\" class=\"wp-image-6463\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-300x157.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-768x402.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1536x804.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-2048x1072.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<h3 class=\"gb-headline gb-headline-9a4bee74 gb-headline-text\">ERP\ub780 \ubb34\uc5c7\uc778\uac00\uc694?<\/h3>\n\n\n\n<p>\uae30\uc5c5 \uc6b4\uc601\uc774 \uc131\uacf5\ud558\ub824\uba74 \uadf8 \uc911\uc2ec\uc5d0 <a href=\"\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/what-is-erp\/\">ERP \uc2dc\uc2a4\ud15c<\/a>\uc774 \uc788\uc5b4\uc57c \ud569\ub2c8\ub2e4. ERP\ub294 \uc804\uc0ac \ucc28\uc6d0\uc758 \uc194\ub8e8\uc158\uc73c\ub85c, \uc5ec\ub7ec \uc5c5\ubb34 \ud504\ub85c\uc138\uc2a4\ub97c \uc9c0\uc6d0\ud558\uace0 \ud558\ub098\ub85c \uc5f0\uacb0\ud569\ub2c8\ub2e4.<\/p>\n\n\n\n<p>ERP \uae30\ub2a5\uc740 \ud68c\uacc4, \uc778\uc0ac, \uace0\uac1d \uad00\uacc4 \uad00\ub9ac, \uc601\uc5c5, \uad6c\ub9e4, \uc7ac\uace0 \uad00\ub9ac \ub4f1 \ub2e4\uc591\ud55c \uc601\uc5ed\uc5d0 \uac78\uccd0 \uc788\uc2b5\ub2c8\ub2e4. ERP \uc2dc\uc2a4\ud15c\uc740 \ube44\uc988\ub2c8\uc2a4 \uc6b4\uc601\uc5d0 \ub300\ud55c \uc804\uccb4\uc801\uc778 \uadf8\ub9bc\uc744 \uc81c\uc2dc\ud558\uace0 \uc870\uc9c1 \ub0b4 \ub370\uc774\ud130 \uc0ac\uc77c\ub85c\ub97c \ubb34\ub108\ub728\ub9ac\ub294 \ub370 \ub3c4\uc6c0\uc774 \ub429\ub2c8\ub2e4. \uc870\uc9c1 \uc6b4\uc601\uc5d0 \ub300\ud55c \ud1b5\ud569\ub41c \ubdf0\ub97c \uc81c\uacf5\ud568\uc73c\ub85c\uc368 \ub354 \ub098\uc740 \uacc4\ud68d, \uc608\uce21, \uc758\uc0ac\uacb0\uc815\uc744 \uac00\ub2a5\ud558\uac8c \ud569\ub2c8\ub2e4.<\/p>\n\n\n\n<p>\uc88b\uc740 \uc608\ub85c \uc5ec\ub7ec \uad6d\uac00\uc5d0 \ub9e4\uc7a5\uc744 \ubcf4\uc720\ud55c \uae00\ub85c\ubc8c \uc18c\ub9e4 \uccb4\uc778\uc744 \ub4e4 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc774\ub807\uac8c \ubc29\ub300\ud55c \ub124\ud2b8\uc6cc\ud06c\uc5d0\uc11c \uc7ac\uace0 \uc218\uc900\uc744 \uad00\ub9ac\ud558\uace0, \ud310\ub9e4 \ub370\uc774\ud130\ub97c \ucd94\uc801\ud558\uace0, \uad6c\ub9e4 \uc8fc\ubb38\uc744 \ucc98\ub9ac\ud558\uace0, \uc7ac\ubb34 \uc815\ubcf4\ub97c \ubaa8\ub2c8\ud130\ub9c1\ud558\ub294 \uac83\uc740 \uc5c4\uccad\ub09c \uc791\uc5c5\uc785\ub2c8\ub2e4.<\/p>\n\n\n\n<p>\uc774 \uc2dc\ub098\ub9ac\uc624\uc5d0\uc11c ERP \uc2dc\uc2a4\ud15c\uc740 \uc774\ub7ec\ud55c \ubaa8\ub4e0 \uc774\uc9c8\uc801\uc778 \uc694\uc18c\ub97c \ud1b5\ud569\ud558\ub294 \uc911\uc2ec \ud5c8\ube0c \uc5ed\ud560\uc744 \ud569\ub2c8\ub2e4. ERP\ub294 \ub2e4\uc591\ud55c \ube44\uc988\ub2c8\uc2a4 \uae30\ub2a5\uc744 \ud1b5\ud569\ud568\uc73c\ub85c\uc368 \uc774\ub4e4 \uac04\uc758 \ud6a8\uc728\uc801\uc778 \uc815\ubcf4 \ud750\ub984\uc744 \uac00\ub2a5\ud558\uac8c \ud558\uc5ec \ub354 \ub098\uc740 \uc870\uc815\uacfc \uc815\ubcf4\uc5d0 \uae30\ubc18\ud55c \uc758\uc0ac\uacb0\uc815\uc744 \uac00\ub2a5\ud558\uac8c \ud569\ub2c8\ub2e4.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-6d5566ee gb-headline-text\">MES \ub300 ERP: \uc8fc\uc694 \ucc28\uc774\uc810 \uc124\uba85<\/h2>\n\n\n\n<p>MES\uc640 ERP\uc758 \ub300\uacb0\uc5d0\uc11c \uac01 \uc2dc\uc2a4\ud15c\uc758 \uace0\uc720\ud55c \uac15\uc810\uacfc \uae30\ub2a5\uc744 \uc774\ud574\ud558\ub294 \uac83\uc740 \ub9e4\uc6b0 \uc911\uc694\ud569\ub2c8\ub2e4. \ud37c\uc990 \uc870\uac01\ucc98\ub7fc \uac01 \uc2dc\uc2a4\ud15c\uc740 \uc870\uc9c1\uc758 \uc6b4\uc601 \ud6a8\uc728\uc131\uc774\ub77c\ub294 \ud070 \uadf8\ub9bc\uc5d0\uc11c \uace0\uc720\ud55c \uc5ed\ud560\uc744 \ud569\ub2c8\ub2e4.<\/p>\n\n\n\n<p>\uc774\uc5d0 \ub300\ud574 \ub354 \uc790\uc138\ud788 \uc54c\uc544\ubcf4\uae30 \uc704\ud574 MES\uc640 ERP \uc2dc\uc2a4\ud15c\ub9cc\uc758 \uc8fc\uc694 \uae30\ub2a5\uc744 \uc0b4\ud3b4\ubcf4\uace0, \ub450 \uc2dc\uc2a4\ud15c\uc744 \uad6c\ubcc4\ud558\ub294 \uae30\ub2a5\uc5d0 \ucd08\uc810\uc744 \ub9de\ucdb0 \uc0b4\ud3b4\ubd05\uc2dc\ub2e4. \uc774\ub97c \ud1b5\ud574 \uac01 \uc2dc\uc2a4\ud15c\uc758 \uac15\uc810\uc744 \ud30c\uc545\ud558\uc5ec \ud2b9\uc815 \uc81c\uc870 \uc694\uad6c \uc0ac\ud56d\uc5d0 \uc801\ud569\ud55c \ub514\uc9c0\ud138 \ub3c4\uad6c\ub97c \uacb0\uc815\ud558\ub294 \ub370 \ub3c4\uc6c0\uc774 \ub420 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<h3 class=\"gb-headline gb-headline-6e519d87 gb-headline-text\">MES \ubc0f ERP: \ube44\uc988\ub2c8\uc2a4 \ud658\uacbd\uc5d0\uc11c\uc758 \uc704\uce58<\/h3>\n\n\n\n<p>MES\uc640 ERP\uc758 \uae30\ubcf8 \uc5ed\ud560\uc740 \uacb9\uce58\uc9c0\ub9cc \uace0\uc720\ud55c \ubaa9\uc801\uc744 \uac00\uc9c0\uace0 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<p>MES\ub294 \uc81c\uc870 \ud604\uc7a5\uc5d0\uc11c \uc911\uc694\ud55c \uc5ed\ud560\uc744 \ud569\ub2c8\ub2e4. \uc77c\uc815, \uc2e4\ud589 \ubc0f \ud504\ub85c\uc138\uc2a4 \uc81c\uc5b4\uc640 \uac19\uc740 \uce21\uba74\uc5d0 \uc9d1\uc911\ud558\uc5ec \uc2e4\uc2dc\uac04 \uc0dd\uc0b0 \ud65c\ub3d9\uc744 \uad00\ub9ac\ud569\ub2c8\ub2e4. \ubcf8\uc9c8\uc801\uc73c\ub85c MES\ub294 \uc81c\uc870 \uc6b4\uc601\uc758 &#8216;\uc9c0\uae08 \uc5ec\uae30&#8217;\ub97c \uad00\ub9ac\ud569\ub2c8\ub2e4.<\/p>\n\n\n\n<p>\ubc18\ub300\ub85c ERP\ub294 \uc870\uc9c1\uc744 \ucd1d\uccb4\uc801\uc778 \ucc28\uc6d0\uc5d0\uc11c \uc9c0\uc6d0\ud569\ub2c8\ub2e4. \uc7ac\ubb34, \uc778\uc0ac, \uacf5\uae09\ub9dd \uad00\ub9ac, \uace0\uac1d \uad00\uacc4 \uad00\ub9ac\uc640 \uac19\uc740 \ub2e4\uc591\ud55c \uae30\ub2a5 \uc601\uc5ed\uc744 \ud3ec\uad04\ud569\ub2c8\ub2e4. ERP\ub294 \ub2e4\uc591\ud55c \ube44\uc988\ub2c8\uc2a4 \uc6b4\uc601\uc744 \ud1b5\ud569\ud558\uace0 \uc804\ub7b5\uc801 \uacc4\ud68d\uacfc \uc758\uc0ac \uacb0\uc815\uc744 \uc6a9\uc774\ud558\uac8c \ud558\ub294 \uc2dc\uc2a4\ud15c\uc785\ub2c8\ub2e4.<\/p>\n\n\n\n<p><strong>MES\uc640 ERP \ube44\uad50: MES\ub294 \uc2e4\uc2dc\uac04 \uc81c\uc870 \ud504\ub85c\uc138\uc2a4\uc5d0 \uc911\uc810\uc744 \ub450\ub294 \ubc18\uba74, ERP\ub294 \uc804\ub7b5 \uacc4\ud68d\uc744 \uc704\ud55c \uad11\ubc94\uc704\ud55c \ube44\uc988\ub2c8\uc2a4 \uae30\ub2a5\uc744 \uac04\uc18c\ud654\ud569\ub2c8\ub2e4.<\/strong><\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f7e777f3\">\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Production planning and scheduling product image straight view\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Advanced production planning with AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Read more about our approach to production planning and optimization leveraging the power of AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"https:\/\/skyplanner.ai\/\" aria-label=\"Book a demo\">Production planning with AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div>\n\n<div class=\"gb-container gb-container-33d6b196\">\n\n<h2 class=\"gb-headline gb-headline-adbe5b90 gb-headline-text\">MES: ERP\uc5d0\uc11c \uc0ac\uc6a9\ud560 \uc218 \uc5c6\ub294 \uc8fc\uc694 \uae30\ub2a5<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>\uc2e4\uc2dc\uac04 \ud504\ub85c\uc138\uc2a4 \uc81c\uc5b4:<\/strong> MES\ub294 \uc81c\uc870 \uacf5\uc815\uc744 \uc9c1\uc811 \uc81c\uc5b4\ud560 \uc218 \uc788\uc5b4 \uc989\uc2dc \uc870\uc815\ud558\uc5ec \ud6a8\uc728\uc131\uc744 \uadf9\ub300\ud654\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\uae30\uacc4 \uc131\ub2a5 \ucd94\uc801:<\/strong> MES\ub294 \uc2e4\uc2dc\uac04 \uae30\uacc4 \uc131\ub2a5\uc744 \ubaa8\ub2c8\ud130\ub9c1\ud558\uc5ec \uac00\ub3d9 \uc2dc\uac04\uacfc \uc0dd\uc0b0\uc131\uc744 \ucd5c\uc801\ud654\ud569\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\ud488\uc9c8 \uad00\ub9ac:<\/strong> MES\uc5d0\ub294 \uc81c\uc870 \uacfc\uc815\uc5d0\uc11c \uc81c\ud488 \ud488\uc9c8\uc744 \uad00\ub9ac\ud558\uace0 \uc720\uc9c0\ud558\uae30 \uc704\ud55c \uc138\ubd80\uc801\uc778 \ud488\uc9c8 \uad00\ub9ac \ub3c4\uad6c\uac00 \uc788\uc2b5\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\uc2e4\uc2dc\uac04 \uc0dd\uc0b0 \ubaa8\ub2c8\ud130\ub9c1:<\/strong> MES\ub294 \uc791\uc5c5 \ud604\uc7a5\uc758 \ubaa8\ub4e0 \ud65c\ub3d9\uc5d0 \ub300\ud55c \uc2e4\uc2dc\uac04 \uac1c\uc694\ub97c \uc81c\uacf5\ud558\uc5ec \uc138\ubd84\ud654\ub41c \uc218\uc900\uc758 \uac00\uc2dc\uc131\uc744 \uc81c\uacf5\ud569\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\uc0c1\uc138\ud55c \uc0dd\uc0b0 \ubcf4\uace0:<\/strong> MES \uc2dc\uc2a4\ud15c\uc740 \uc0dd\uc0b0 \ub370\uc774\ud130\uc5d0 \ub300\ud55c \uc2ec\uce35\uc801\uc778 \ubcf4\uace0\uc11c\ub97c \uc0dd\uc131\ud558\uc5ec \ubcd1\ubaa9 \ud604\uc0c1\uc744 \ud30c\uc545\ud558\uace0 \uc81c\uac70\ud558\ub294 \ub370 \ub3c4\uc6c0\uc744 \uc904 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/li>\n<\/ol>\n\n\n\n<h3 class=\"gb-headline gb-headline-b4f060c1 gb-headline-text\">MES: ERP\uac00 \ud574\uacb0\ud55c \ub2e8\uc810<\/h3>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>\ube44\uc988\ub2c8\uc2a4 \uc804\ubc18\uc758 \ud1b5\ud569 \ubd80\uc871:<\/strong> MES\ub294 \uc791\uc5c5 \ud604\uc7a5 \uad00\ub9ac\uc5d0\ub294 \ud0c1\uc6d4\ud558\uc9c0\ub9cc ERP \uc2dc\uc2a4\ud15c\ucc98\ub7fc \ubaa8\ub4e0 \ube44\uc988\ub2c8\uc2a4 \uae30\ub2a5\uc744 \ud1b5\ud569\ud560 \uc218\ub294 \uc5c6\uc2b5\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\uc804\ub7b5 \uacc4\ud68d\uc744 \uc704\ud55c \uc81c\ud55c\ub41c \ubc94\uc704:<\/strong> \uc6b4\uc601 \ud6a8\uc728\uc131\uacfc \uc2e4\uc2dc\uac04 \uc81c\uc5b4\uc5d0 \uc911\uc810\uc744 \ub450\uae30 \ub54c\ubb38\uc5d0 MES\ub294 ERP \uc2dc\uc2a4\ud15c\uc758 \uac15\uc810\uc778 \uc7a5\uae30 \uc804\ub7b5 \uacc4\ud68d\uc5d0 \ub300\ud55c \uad11\ubc94\uc704\ud55c \ubc94\uc704\uac00 \ubd80\uc871\ud569\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\uc7ac\ubb34 \ub370\uc774\ud130\ub97c \uad00\ub9ac\ud560 \uc218 \uc5c6\uc74c:<\/strong> ERP\uc640 \ub2ec\ub9ac MES\ub294 \uc7ac\ubb34 \ub370\uc774\ud130\ub97c \ucc98\ub9ac\ud558\uac70\ub098 \uc7ac\ubb34 \ubd84\uc11d\uc744 \uc218\ud589\ud558\ub3c4\ub85d \uc124\uacc4\ub418\uc9c0 \uc54a\uc558\uae30 \ub54c\ubb38\uc5d0 \ube44\uc988\ub2c8\uc2a4\uc5d0 \ub300\ud55c \uc804\uccb4 \ubdf0\uac00 \ud544\uc694\ud55c \uad00\ub9ac\uc790\uc5d0\uac8c\ub294 \uc720\uc6a9\uc131\uc774 \uc81c\ud55c\ub420 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/li>\n<\/ol>\n\n\n\n<p>\uc774\uc81c ERP \uc2dc\uc2a4\ud15c\uc73c\ub85c \ucd08\uc810\uc744 \uc62e\uaca8 ERP \uc2dc\uc2a4\ud15c\uc758 \uace0\uc720\ud55c \uae30\ub2a5, \uc774\uc810 \ubc0f MES\uac00 \ud55c\uacc4\ub97c \uadf9\ubcf5\ud558\ub294 \ub370 \ub3c4\uc6c0\uc774 \ub420 \uc218 \uc788\ub294 \uc601\uc5ed\uc744 \uc0b4\ud3b4\ubcf4\uaca0\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-fcbba856 gb-headline-text\">ERP: MES\uc5d0\uc11c \uc0ac\uc6a9\ud560 \uc218 \uc5c6\ub294 \uc8fc\uc694 \uae30\ub2a5<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>\ube44\uc988\ub2c8\uc2a4 \uc804\ubc18\uc758 \ud1b5\ud569:<\/strong> ERP\ub294 \ub2e4\uc591\ud55c \ube44\uc988\ub2c8\uc2a4 \uae30\ub2a5\uc744 \ub2e8\uc77c \uc2dc\uc2a4\ud15c\uc5d0 \ud1b5\ud569\ud558\uc5ec \uc870\uc9c1\uc744 \uc885\ud569\uc801\uc73c\ub85c \ud30c\uc545\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\uc804\ub7b5 \uacc4\ud68d:<\/strong> ERP \uc2dc\uc2a4\ud15c\uc740 \ud68c\uc0ac \ub370\uc774\ud130\uc5d0 \ub300\ud55c \uad11\ubc94\uc704\ud55c \uac1c\uc694\ub97c \ud1b5\ud574 \uc7a5\uae30\uc801\uc778 \uc804\ub7b5 \uacc4\ud68d \ubc0f \uc758\uc0ac \uacb0\uc815\uc744 \uc9c0\uc6d0\ud569\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\uc7ac\ubb34 \uad00\ub9ac:<\/strong> ERP \uc2dc\uc2a4\ud15c\uc740 \uc608\uc0b0, \uc608\uce21, \uc7ac\ubb34 \ubcf4\uace0 \uc791\uc5c5\uc744 \ud3ec\ud568\ud55c \uc7ac\ubb34 \ub370\uc774\ud130\ub97c \uad00\ub9ac\ud560 \uc218 \uc788\ub294 \uae30\ub2a5\uc744 \uac16\ucd94\uace0 \uc788\uc2b5\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\uace0\uac1d \uad00\uacc4 \uad00\ub9ac(CRM):<\/strong> ERP\uc5d0\ub294 \uace0\uac1d \uad00\uacc4\ub97c \uad00\ub9ac\ud558\uace0 \uc601\uc5c5 \ud65c\ub3d9\uc744 \ucd94\uc801\ud558\ub294 \ub370 \ub3c4\uc6c0\uc774 \ub418\ub294 CRM \ub3c4\uad6c\uac00 \ud3ec\ud568\ub418\uc5b4 \uc788\ub294 \uacbd\uc6b0\uac00 \ub9ce\uc2b5\ub2c8\ub2e4. CRM \uc18c\ud504\ud2b8\uc6e8\uc5b4\uc5d0 \ub300\ud574 \uc790\uc138\ud788 \uc54c\uc544\ubcf4\uc138\uc694.<\/li>\n\n\n\n<li><strong>\uc778\uc801 \uc790\uc6d0 \uad00\ub9ac:<\/strong> ERP\ub294 \uae09\uc5ec, \ucd9c\ud1f4\uadfc \ucd94\uc801, \uc131\uacfc \ud3c9\uac00 \ub4f1\uacfc \uac19\uc740 HR \uad00\ub828 \uc5c5\ubb34\ub97c \ucc98\ub9ac\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/li>\n<\/ol>\n\n\n\n<p>\uc774\ub7ec\ud55c \uc778\uc0c1\uc801\uc778 \uae30\ub2a5\uacfc \uc774\uc810\uc5d0\ub3c4 \ubd88\uad6c\ud558\uace0 ERP\uac00 \ubd80\uc871\ud55c \uc601\uc5ed\uc774 \uc788\ub294\ub370, \ubc14\ub85c \uc774 \ubd80\ubd84\uc5d0\uc11c MES \uc2dc\uc2a4\ud15c\uc774 \uc720\uc6a9\ud55c \uc9c0\uc6d0\uc744 \uc81c\uacf5\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<h3 class=\"gb-headline gb-headline-a481e4a0 gb-headline-text\">ERP: MES\uac00 \ud574\uacb0\ud574\uc57c \ud560 \ub2e8\uc810<\/h3>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>\uc81c\ud55c\uc801\uc778 \uc2e4\uc2dc\uac04 \uc791\uc5c5 \ud604\uc7a5 \ub370\uc774\ud130:<\/strong> \ube44\uc988\ub2c8\uc2a4 \uae30\ub2a5\uc744 \ud1b5\ud569\ud558\ub294 \ub370\ub294 \ud0c1\uc6d4\ud558\uc9c0\ub9cc ERP \uc2dc\uc2a4\ud15c\uc740 \uc791\uc5c5 \ud604\uc7a5\uc5d0\uc11c MES \uc2dc\uc2a4\ud15c\uc774 \uc81c\uacf5\ud558\ub294 \uc2e4\uc2dc\uac04 \ub370\uc774\ud130 \uc218\uc9d1 \ubc0f \uc81c\uc5b4 \uae30\ub2a5\uc774 \ubd80\uc871\ud569\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\ubd88\ucda9\ubd84\ud55c \ud488\uc9c8 \uad00\ub9ac \uba54\ucee4\ub2c8\uc998:<\/strong> ERP \uc2dc\uc2a4\ud15c\uc740 MES\uc640 \ub2ec\ub9ac \uc138\ubd80\uc801\uc778 \ud488\uc9c8 \uad00\ub9ac \uba54\ucee4\ub2c8\uc998\uc744 \uc81c\uacf5\ud558\uc9c0 \uc54a\uc544 \uc81c\ud488 \ud488\uc9c8\uc744 \uc9c1\uc811\uc801\uc73c\ub85c \uc720\uc9c0 \ubc0f \uac1c\uc120\ud558\uae30\uac00 \uc5b4\ub835\uc2b5\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\ubd80\uc801\uc808\ud55c \ud504\ub85c\uc138\uc2a4 \uc81c\uc5b4:<\/strong> ERP \uc2dc\uc2a4\ud15c\uc5d0\ub294 MES\uc758 \uc9c1\uc811\uc801\uc778 \uacf5\uc815 \uc81c\uc5b4 \uae30\ub2a5\uc774 \ubd80\uc871\ud558\uc5ec \uc0dd\uc0b0 \ud6a8\uc728\uc131\uc744 \ucd5c\uc801\ud654\ud558\uae30 \uc704\ud55c \uc2e4\uc2dc\uac04 \uc870\uc815 \uae30\ub2a5\uc744 \uc81c\uacf5\ud558\uc9c0 \ubabb\ud569\ub2c8\ub2e4.<\/li>\n<\/ol>\n\n\n\n<p>MES\uc640 ERP \uc2dc\uc2a4\ud15c\uc758 \uace0\uc720\ud55c \uae30\ub2a5, \uc774\uc810 \ubc0f \ud55c\uacc4\ub97c \uc774\ud574\ud568\uc73c\ub85c\uc368 \uae30\uc5c5\uc740 \uc5b4\ub5a4 \uc2dc\uc2a4\ud15c \ub610\ub294 \uc811\uadfc \ubc29\uc2dd\uc758 \uc870\ud569\uc774 \uc790\uc0ac\uc758 \uc694\uad6c\uc5d0 \uac00\uc7a5 \uc801\ud569\ud55c\uc9c0 \uc815\ubcf4\uc5d0 \uc785\uac01\ud55c \uacb0\uc815\uc744 \ub0b4\ub9b4 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-d6bf2644 gb-headline-text\">\uc120\ud0dd\ud558\uae30: MES \ub610\ub294 ERP?<\/h2>\n\n\n\n<p>MES\uc640 ERP \uc911 \ud558\ub098\ub97c \uc120\ud0dd\ud558\ub824\uba74 \uba87 \uac00\uc9c0 \uc694\uc18c\ub97c \uc2e0\uc911\ud558\uac8c \uace0\ub824\ud574\uc57c \ud569\ub2c8\ub2e4. \uc5ec\uae30\uc5d0\ub294 \ud2b9\uc815 \ube44\uc988\ub2c8\uc2a4 \uc694\uad6c \uc0ac\ud56d, \uc6b4\uc601 \ubc94\uc704, \ub450 \uc2dc\uc2a4\ud15c \uad6c\ud604\uacfc \uad00\ub828\ub41c \ube44\uc6a9 \ubc0f \uc7a0\uc7ac\uc801 \ud22c\uc790 \uc218\uc775\ub960\uc5d0 \ub300\ud55c \uc774\ud574\uac00 \ud3ec\ud568\ub429\ub2c8\ub2e4. \uc774\ub7ec\ud55c \uc758\uc0ac \uacb0\uc815\uc758 \uc5ec\uc815\uc744 \uc548\ub0b4\ud558\uae30 \uc704\ud574 \uc5fc\ub450\uc5d0 \ub450\uc5b4\uc57c \ud560 \uc8fc\uc694 \uace0\ub824 \uc0ac\ud56d\uc740 \ub2e4\uc74c\uacfc \uac19\uc2b5\ub2c8\ub2e4:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>\ube44\uc988\ub2c8\uc2a4 \uc694\uad6c \uc0ac\ud56d\uc744 \ud3c9\uac00\ud558\uc138\uc694:<\/strong> \uc870\uc9c1\uc758 \uc694\uad6c \uc0ac\ud56d\uc744 \uba74\ubc00\ud788 \uc0b4\ud3b4\ubcf4\uc138\uc694. \uc791\uc5c5 \ud604\uc7a5 \uc81c\uc5b4, \ud488\uc9c8 \uad00\ub9ac, \uc2e4\uc2dc\uac04 \ud504\ub85c\uc138\uc2a4 \uc870\uc815\uc5d0 \uc911\uc810\uc744 \ub454\ub2e4\uba74 MES\uac00 \ucd5c\uc120\uc758 \uc120\ud0dd\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ubc18\ub300\ub85c \uc804\ub7b5 \uacc4\ud68d, \uc7ac\ubb34 \uad00\ub9ac \ubc0f CRM \uae30\ub2a5\uacfc \ud568\uaed8 \ube44\uc988\ub2c8\uc2a4\uc5d0 \ub300\ud55c \ud3ec\uad04\uc801\uc778 \uac1c\uc694\ub97c \ucc3e\uace0 \uc788\ub2e4\uba74 ERP\uac00 \ub354 \ub098\uc740 \uc120\ud0dd\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\uad6c\ud604 \ube44\uc6a9\uc744 \uace0\ub824\ud558\uc138\uc694:<\/strong> \uc774\ub7ec\ud55c \uc2dc\uc2a4\ud15c\uc744 \uad6c\ud604\ud558\ub824\uba74 \uc0c1\ub2f9\ud55c \ud22c\uc790\uac00 \ud544\uc694\ud569\ub2c8\ub2e4. \uc18c\ud504\ud2b8\uc6e8\uc5b4 \uad6c\uc785\uc5d0 \ub4dc\ub294 \uc9c1\uc811\uc801\uc778 \ube44\uc6a9\ubfd0\ub9cc \uc544\ub2c8\ub77c \uad50\uc721 \ube44\uc6a9, \uc2dc\uc2a4\ud15c \uc720\uc9c0\ubcf4\uc218, \uad6c\ud604 \ub2e8\uacc4\uc5d0\uc11c\uc758 \uc7a0\uc7ac\uc801 \uc911\ub2e8 \uac00\ub2a5\uc131\ub3c4 \uace0\ub824\ud574\uc57c \ud569\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\uae30\uc220 \uc5ed\ub7c9 \uc774\ud574<\/strong> MES \ubc0f ERP \uc2dc\uc2a4\ud15c\uc740 \uad6c\ud604 \ubc0f \uc720\uc9c0\ubcf4\uc218\ub97c \uc704\ud574 \ud2b9\uc815 \uae30\uc220 \uc804\ubb38 \uc9c0\uc2dd\uc774 \ud544\uc694\ud569\ub2c8\ub2e4. \ud300\uc758 \uae30\uc220\uc801 \uc5ed\ub7c9\uacfc \ud55c\uacc4\ub97c \uc774\ud574\ud558\uba74 \uc870\uc9c1\uc758 \uc5ed\ub7c9\uc5d0 \ub354 \uc798 \ub9de\ub294 \uc2dc\uc2a4\ud15c\uc744 \uc120\ud0dd\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\ud655\uc7a5\uc131\uc774 \uc911\uc694\ud569\ub2c8\ub2e4:<\/strong> \ube44\uc988\ub2c8\uc2a4\uc758 \uc131\uc7a5 \uada4\uc801\uc744 \uace0\ub824\ud558\uc138\uc694. \ube44\uc988\ub2c8\uc2a4\uac00 \ud655\uc7a5\ub428\uc5d0 \ub530\ub77c \uc99d\uac00\ud558\ub294 \ub370\uc774\ud130 \uc591\uacfc \ub354 \ubcf5\uc7a1\ud55c \ud504\ub85c\uc138\uc2a4\ub97c \uc218\uc6a9\ud558\uba74\uc11c \ud568\uaed8 \uc131\uc7a5\ud560 \uc218 \uc788\ub294 \uc2dc\uc2a4\ud15c\uc774 \ud544\uc694\ud569\ub2c8\ub2e4.<\/li>\n\n\n\n<li><strong>\uc804\ubb38\uac00\uc640 \uc0c1\ub2f4\ud558\uae30:<\/strong> \ub9c8\uc9c0\ub9c9\uc73c\ub85c, \uc804\ubb38\uac00\ub098 \ub3d9\uc885 \uc5c5\uacc4\uc758 \ub2e4\ub978 \ube44\uc988\ub2c8\uc2a4\uc640 \uc0c1\ub2f4\ud558\ub294 \uac83\ub3c4 \ub3c4\uc6c0\uc774 \ub420 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc804\ubb38\uac00\uac00 \uc790\uc2e0\uc758 \uacbd\ud5d8\uc744 \ubc14\ud0d5\uc73c\ub85c \uc778\uc0ac\uc774\ud2b8\ub97c \uacf5\uc720\ud558\uace0 \uc815\ubcf4\uc5d0 \uc785\uac01\ud55c \uacb0\uc815\uc744 \ub0b4\ub9ac\ub294 \ub370 \ub3c4\uc6c0\uc744 \uc904 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/li>\n<\/ol>\n\n\n\n<h3 class=\"gb-headline gb-headline-b4b4eaac gb-headline-text\">MES\uc640 ERP: \uacf5\uc0dd \uad00\uacc4 \ub2ec\uc131<\/h3>\n\n\n\n<p>MES\uc640 ERP\ub294 \uc11c\ub85c \ub2e4\ub978 \uc5ed\ud560\uc744 \uc218\ud589\ud558\uc9c0\ub9cc, \ubd84\ub9ac\ub418\uc5b4 \uc874\uc7ac\ud560 \ud544\uc694\ub294 \uc5c6\uc2b5\ub2c8\ub2e4. \ub300\ubd80\ubd84\uc758 \uacbd\uc6b0 \uc774\ub7ec\ud55c \uc2dc\uc2a4\ud15c\uc744 \ud1b5\ud569\ud558\uc5ec \uc2dc\ub108\uc9c0 \ud6a8\uacfc\ub97c \ub0bc \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc774\ub7ec\ud55c \ud1b5\ud569\uc744 \ud1b5\ud574 MES\uc640 ERP \uac04\uc5d0 \ub370\uc774\ud130\ub97c \uad50\ud658\ud560 \uc218 \uc788\uc73c\ubbc0\ub85c \uc81c\uc870 \ubc0f \ube44\uc988\ub2c8\uc2a4 \uc6b4\uc601\uc5d0 \ub300\ud55c \ubcf4\ub2e4 \ud3ec\uad04\uc801\uc778 \uc2dc\uac01\uc744 \ud655\ubcf4\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-feeebb08 gb-headline-text\">\uad6c\ud604 \ubbf8\ub85c \ud0d0\uc0c9\ud558\uae30: MES \ubc0f ERP<\/h2>\n\n\n\n<p>\uc870\uc9c1\uc5d0\uc11c MES \ubc0f ERP \uc2dc\uc2a4\ud15c\uc744 \uad6c\ud604\ud558\ub294 \uac83\uc740 \uc5b4\ub824\uc6b4 \uc791\uc5c5\uc785\ub2c8\ub2e4. \uc138\uc2ec\ud55c \uacc4\ud68d, \uc774\ud574\uad00\uacc4\uc790 \ucc38\uc5ec, \ub9ac\uc18c\uc2a4 \ud560\ub2f9 \ubc0f \uad50\uc721\uc774 \ud544\uc694\ud569\ub2c8\ub2e4. \uc131\uacf5\uc801\uc778 \uad6c\ud604\uc744 \uc704\ud574\uc11c\ub294 \ubcc0\uacbd \uad00\ub9ac \ubd80\uc871, \ubd80\uc801\uc808\ud55c \uad50\uc721, \ubc94\uc704 \ud655\ub300\uc640 \uac19\uc740 \uc77c\ubc18\uc801\uc778 \ud568\uc815\uc744 \ud53c\ud558\ub294 \uac83\uc774 \uc911\uc694\ud569\ub2c8\ub2e4.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-b9d3b483 gb-headline-text\">\ub2e4\uc74c \ub2e8\uacc4\ub85c \ub118\uc5b4\uac00\uae30: \uc2a4\uce74\uc774\ud50c\ub798\ub108\uc640 \ud568\uaed8\ud558\ub294 \uc5ec\uc815 APS<\/h2>\n\n\n\n<p>MES\uc640 ERP \uc2dc\uc2a4\ud15c \uc911 \ud558\ub098\ub97c \uacb0\uc815\ud558\ub294 \uac83\uc740 \ubd80\ub2f4\uc2a4\ub7ec\uc6b8 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ud558\uc9c0\ub9cc \ud63c\uc790\uc11c \uacb0\uc815\ud560 \ud544\uc694\ub294 \uc5c6\uc2b5\ub2c8\ub2e4. <a href=\"\/ko\/\">Skyplanner APS\uac00<\/a> \uc5ec\uc815\uc744 \ud0d0\uc0c9\ud558\ub294 \ub370 \ub3c4\uc6c0\uc744 \ub4dc\ub9bd\ub2c8\ub2e4.<\/p>\n\n\n<p>\ub2e4\uc74c\uc73c\ub85c \uad81\uae08\ud55c \uc810\uc774 \uac00\uc6a9\ud55c \uc0dd\uc0b0 \uc790\uc6d0\uc5d0 \uc791\uc5c5\uc744 \uc5b4\ub5a4 \uc21c\uc11c\ub85c \ubc30\uc815\ud560\uc9c0\ub77c\uba74, <a href=\"\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/advanced-planning-and-scheduling\/\">\uace0\uae09 \uacc4\ud68d \ubc0f \uc2a4\ucf00\uc904\ub9c1 \uac00\uc774\ub4dc<\/a>\uc5d0\uc11c ERP, MES\uc640 \ud568\uaed8 \uc4f0\uc774\ub294 \uc2a4\ucf00\uc904\ub9c1 \uacc4\uce35\uc744 \uc124\uba85\ud574 \ub4dc\ub9bd\ub2c8\ub2e4.<\/p>\n\n\n\n<p><a href=\"\/ko\/%ec%98%81%ec%97%85%ed%8c%80%ec%97%90-%eb%ac%b8%ec%9d%98\/\">\uc804\ubb38\uac00 \ud300\uc5d0 \ubb38\uc758\ud558\uc138\uc694<\/a>. \uadc0\uc0ac\uc758 \uc694\uad6c\uc5d0 \ub9de\ub294 \uc644\ubcbd\ud55c \uc2dc\uc2a4\ud15c\uc744 \ucc3e\ub294 \ub370 \ub3c4\uc6c0\uc774 \ub418\ub294 \uc0c1\ub2f4 \ubc0f \uac10\uc0ac \uc11c\ube44\uc2a4\ub97c \uc81c\uacf5\ud560 \uc900\ube44\uac00 \ub418\uc5b4 \uc788\uc2b5\ub2c8\ub2e4. \uae30\ub2e4\ub9b4 \uc774\uc720\uac00 \uc5c6\uc8e0? \uc9c0\uae08 \ubc14\ub85c \uc5f0\ub77d\ud558\uc5ec \ube44\uc988\ub2c8\uc2a4\uc758 \ub514\uc9c0\ud138 \ud2b8\ub79c\uc2a4\ud3ec\uba54\uc774\uc158\uc744 \uc704\ud55c \uacfc\uc815\uc744 \uacc4\ud68d\ud574 \ubcf4\uc138\uc694.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-92545123\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-0a61546f\">\n<div class=\"gb-grid-column gb-grid-column-e4183086\"><div class=\"gb-container gb-container-e4183086\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-84ccbb5d\"><div class=\"gb-container gb-container-84ccbb5d\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>MES\uc640 ERP: \ucc28\uc774\uc810\uc740 \ubb34\uc5c7\uc77c\uae4c\uc694? \ud648 &#8221; \ub9ac\uc18c\uc2a4 &#8221; MES\uc640 ERP: \ucc28\uc774\uc810\uc740 \ubb34\uc5c7\uc77c\uae4c\uc694? \ud65c\uae30\uac00 \ub118\uce58\uace0 \uae30\uacc4\uac00 \uc719\uc719\uac70\ub9ac\uba70 \uc0ac\ub78c\ub4e4\uc774 \uc870\ud654\ub86d\uac8c \uc77c\ud558\ub294 \ubd84\uc8fc\ud55c \uacf5\uc7a5\uc5d0 \ub4e4\uc5b4\uc130\ub2e4\uace0 \uc0c1\uc0c1\ud574 \ubcf4\uc138\uc694. \uc774 \uc6d0\ud65c\ud55c \uc6b4\uc601 \ub4a4\uc5d0\ub294 \ub450 \uba85\uc758 \uc870\uc6a9\ud55c \uc288\ud37c\ud788\uc5b4\ub85c\uac00 \uc788\uc2b5\ub2c8\ub2e4: \ubc14\ub85c MES(\uc81c\uc870 \uc2e4\ud589 \uc2dc\uc2a4\ud15c) \uc640 ERP(\uc804\uc0ac\uc801 \uc790\uc6d0 \uad00\ub9ac)\uc785\ub2c8\ub2e4. \uc774\ub4e4\uc740 \uc0dd\uc0b0 \uacc4\ud68d\uc744 \ud604\uc2e4\ub85c \ub9cc\ub4dc\ub294 \uae30\uacc4\uc758 \ub9c8\ubc95\uacfc\ub3c4 \uac19\uc740 \uc874\uc7ac\uc785\ub2c8\ub2e4. \ud558\uc9c0\ub9cc \uc774\ub4e4\uc744 \ud604\ubbf8\uacbd\uc73c\ub85c \ub4e4\uc5ec\ub2e4\ubcf4\uba74 \uc5b4\ub5a4 &#8230; <a title=\"MES\uc640 ERP: \ucc28\uc774\uc810\uc740 \ubb34\uc5c7\uc77c\uae4c\uc694?\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mes%ec%99%80-erp-%ec%b0%a8%ec%9d%b4%ec%a0%90%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%bc%ea%b9%8c%ec%9a%94\/\" aria-label=\"Read more about MES\uc640 ERP: \ucc28\uc774\uc810\uc740 \ubb34\uc5c7\uc77c\uae4c\uc694?\">Read more<\/a><\/p>\n","protected":false},"author":6,"featured_media":38648,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2733,496],"tags":[],"class_list":["post-38647","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mes-","category-496","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>MES\uc640 ERP: \ucc28\uc774\uc810\uc740 \ubb34\uc5c7\uc77c\uae4c\uc694?<\/title>\n<meta name=\"description\" content=\"MES\uc640 ERP \ube44\uad50: MES\ub294 \uc2e4\uc2dc\uac04 \uc81c\uc870 \ud504\ub85c\uc138\uc2a4\uc5d0 \uc911\uc810\uc744 \ub450\ub294 \ubc18\uba74, ERP\ub294 \uc804\ub7b5 \uacc4\ud68d\uc744 \uc704\ud55c \uad11\ubc94\uc704\ud55c \ube44\uc988\ub2c8\uc2a4 \uae30\ub2a5\uc744 \uac04\uc18c\ud654\ud569\ub2c8\ub2e4.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mes%ec%99%80-erp-%ec%b0%a8%ec%9d%b4%ec%a0%90%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%bc%ea%b9%8c%ec%9a%94\/\" \/>\n<meta property=\"og:locale\" content=\"ko_KR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"MES\uc640 ERP: \ucc28\uc774\uc810\uc740 \ubb34\uc5c7\uc77c\uae4c\uc694?\" \/>\n<meta property=\"og:description\" content=\"MES\uc640 ERP \ube44\uad50: MES\ub294 \uc2e4\uc2dc\uac04 \uc81c\uc870 \ud504\ub85c\uc138\uc2a4\uc5d0 \uc911\uc810\uc744 \ub450\ub294 \ubc18\uba74, ERP\ub294 \uc804\ub7b5 \uacc4\ud68d\uc744 \uc704\ud55c \uad11\ubc94\uc704\ud55c \ube44\uc988\ub2c8\uc2a4 \uae30\ub2a5\uc744 \uac04\uc18c\ud654\ud569\ub2c8\ub2e4.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mes%ec%99%80-erp-%ec%b0%a8%ec%9d%b4%ec%a0%90%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%bc%ea%b9%8c%ec%9a%94\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2023-08-01T11:08:26+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-08T14:20:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/MES-VS-ERP-1024x683.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\uae00\uc4f4\uc774\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n\t<meta name=\"twitter:label2\" content=\"\uc608\uc0c1 \ub418\ub294 \ud310\ub3c5 \uc2dc\uac04\" \/>\n\t<meta name=\"twitter:data2\" content=\"1\ubd84\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/mes%ec%99%80-erp-%ec%b0%a8%ec%9d%b4%ec%a0%90%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%bc%ea%b9%8c%ec%9a%94\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/mes%ec%99%80-erp-%ec%b0%a8%ec%9d%b4%ec%a0%90%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%bc%ea%b9%8c%ec%9a%94\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"MES\uc640 ERP: \ucc28\uc774\uc810\uc740 \ubb34\uc5c7\uc77c\uae4c\uc694?\",\"datePublished\":\"2023-08-01T11:08:26+00:00\",\"dateModified\":\"2026-10-08T14:20:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/mes%ec%99%80-erp-%ec%b0%a8%ec%9d%b4%ec%a0%90%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%bc%ea%b9%8c%ec%9a%94\\\/\"},\"wordCount\":124,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/mes%ec%99%80-erp-%ec%b0%a8%ec%9d%b4%ec%a0%90%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%bc%ea%b9%8c%ec%9a%94\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/MES-VS-ERP.png\",\"articleSection\":[\"MES \uc2dc\uc2a4\ud15c\",\"\ub9ac\uc18c\uc2a4\"],\"inLanguage\":\"ko-KR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/mes%ec%99%80-erp-%ec%b0%a8%ec%9d%b4%ec%a0%90%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%bc%ea%b9%8c%ec%9a%94\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/mes%ec%99%80-erp-%ec%b0%a8%ec%9d%b4%ec%a0%90%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%bc%ea%b9%8c%ec%9a%94\\\/\",\"name\":\"MES\uc640 ERP: \ucc28\uc774\uc810\uc740 \ubb34\uc5c7\uc77c\uae4c\uc694?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/mes%ec%99%80-erp-%ec%b0%a8%ec%9d%b4%ec%a0%90%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%bc%ea%b9%8c%ec%9a%94\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/mes%ec%99%80-erp-%ec%b0%a8%ec%9d%b4%ec%a0%90%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%bc%ea%b9%8c%ec%9a%94\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/MES-VS-ERP.png\",\"datePublished\":\"2023-08-01T11:08:26+00:00\",\"dateModified\":\"2026-10-08T14:20:25+00:00\",\"description\":\"MES\uc640 ERP \ube44\uad50: MES\ub294 \uc2e4\uc2dc\uac04 \uc81c\uc870 \ud504\ub85c\uc138\uc2a4\uc5d0 \uc911\uc810\uc744 \ub450\ub294 \ubc18\uba74, ERP\ub294 \uc804\ub7b5 \uacc4\ud68d\uc744 \uc704\ud55c \uad11\ubc94\uc704\ud55c \ube44\uc988\ub2c8\uc2a4 \uae30\ub2a5\uc744 \uac04\uc18c\ud654\ud569\ub2c8\ub2e4.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/mes%ec%99%80-erp-%ec%b0%a8%ec%9d%b4%ec%a0%90%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%bc%ea%b9%8c%ec%9a%94\\\/#breadcrumb\"},\"inLanguage\":\"ko-KR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/mes%ec%99%80-erp-%ec%b0%a8%ec%9d%b4%ec%a0%90%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%bc%ea%b9%8c%ec%9a%94\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/mes%ec%99%80-erp-%ec%b0%a8%ec%9d%b4%ec%a0%90%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%bc%ea%b9%8c%ec%9a%94\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/MES-VS-ERP.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/MES-VS-ERP.png\",\"width\":6000,\"height\":4000,\"caption\":\"MES VS ERP\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/mes%ec%99%80-erp-%ec%b0%a8%ec%9d%b4%ec%a0%90%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%bc%ea%b9%8c%ec%9a%94\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"MES\uc640 ERP: \ucc28\uc774\uc810\uc740 \ubb34\uc5c7\uc77c\uae4c\uc694?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ko-KR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"MES\uc640 ERP: \ucc28\uc774\uc810\uc740 \ubb34\uc5c7\uc77c\uae4c\uc694?","description":"MES\uc640 ERP \ube44\uad50: MES\ub294 \uc2e4\uc2dc\uac04 \uc81c\uc870 \ud504\ub85c\uc138\uc2a4\uc5d0 \uc911\uc810\uc744 \ub450\ub294 \ubc18\uba74, ERP\ub294 \uc804\ub7b5 \uacc4\ud68d\uc744 \uc704\ud55c \uad11\ubc94\uc704\ud55c \ube44\uc988\ub2c8\uc2a4 \uae30\ub2a5\uc744 \uac04\uc18c\ud654\ud569\ub2c8\ub2e4.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mes%ec%99%80-erp-%ec%b0%a8%ec%9d%b4%ec%a0%90%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%bc%ea%b9%8c%ec%9a%94\/","og_locale":"ko_KR","og_type":"article","og_title":"MES\uc640 ERP: \ucc28\uc774\uc810\uc740 \ubb34\uc5c7\uc77c\uae4c\uc694?","og_description":"MES\uc640 ERP \ube44\uad50: MES\ub294 \uc2e4\uc2dc\uac04 \uc81c\uc870 \ud504\ub85c\uc138\uc2a4\uc5d0 \uc911\uc810\uc744 \ub450\ub294 \ubc18\uba74, ERP\ub294 \uc804\ub7b5 \uacc4\ud68d\uc744 \uc704\ud55c \uad11\ubc94\uc704\ud55c \ube44\uc988\ub2c8\uc2a4 \uae30\ub2a5\uc744 \uac04\uc18c\ud654\ud569\ub2c8\ub2e4.","og_url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mes%ec%99%80-erp-%ec%b0%a8%ec%9d%b4%ec%a0%90%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%bc%ea%b9%8c%ec%9a%94\/","og_site_name":"SkyPlanner","article_published_time":"2023-08-01T11:08:26+00:00","article_modified_time":"2026-10-08T14:20:25+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/MES-VS-ERP-1024x683.png","type":"image\/png"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"\uae00\uc4f4\uc774":"SkyPlanner","\uc608\uc0c1 \ub418\ub294 \ud310\ub3c5 \uc2dc\uac04":"1\ubd84"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mes%ec%99%80-erp-%ec%b0%a8%ec%9d%b4%ec%a0%90%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%bc%ea%b9%8c%ec%9a%94\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mes%ec%99%80-erp-%ec%b0%a8%ec%9d%b4%ec%a0%90%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%bc%ea%b9%8c%ec%9a%94\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"MES\uc640 ERP: \ucc28\uc774\uc810\uc740 \ubb34\uc5c7\uc77c\uae4c\uc694?","datePublished":"2023-08-01T11:08:26+00:00","dateModified":"2026-10-08T14:20:25+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mes%ec%99%80-erp-%ec%b0%a8%ec%9d%b4%ec%a0%90%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%bc%ea%b9%8c%ec%9a%94\/"},"wordCount":124,"publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mes%ec%99%80-erp-%ec%b0%a8%ec%9d%b4%ec%a0%90%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%bc%ea%b9%8c%ec%9a%94\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/MES-VS-ERP.png","articleSection":["MES \uc2dc\uc2a4\ud15c","\ub9ac\uc18c\uc2a4"],"inLanguage":"ko-KR"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mes%ec%99%80-erp-%ec%b0%a8%ec%9d%b4%ec%a0%90%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%bc%ea%b9%8c%ec%9a%94\/","url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mes%ec%99%80-erp-%ec%b0%a8%ec%9d%b4%ec%a0%90%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%bc%ea%b9%8c%ec%9a%94\/","name":"MES\uc640 ERP: \ucc28\uc774\uc810\uc740 \ubb34\uc5c7\uc77c\uae4c\uc694?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mes%ec%99%80-erp-%ec%b0%a8%ec%9d%b4%ec%a0%90%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%bc%ea%b9%8c%ec%9a%94\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mes%ec%99%80-erp-%ec%b0%a8%ec%9d%b4%ec%a0%90%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%bc%ea%b9%8c%ec%9a%94\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/MES-VS-ERP.png","datePublished":"2023-08-01T11:08:26+00:00","dateModified":"2026-10-08T14:20:25+00:00","description":"MES\uc640 ERP \ube44\uad50: MES\ub294 \uc2e4\uc2dc\uac04 \uc81c\uc870 \ud504\ub85c\uc138\uc2a4\uc5d0 \uc911\uc810\uc744 \ub450\ub294 \ubc18\uba74, ERP\ub294 \uc804\ub7b5 \uacc4\ud68d\uc744 \uc704\ud55c \uad11\ubc94\uc704\ud55c \ube44\uc988\ub2c8\uc2a4 \uae30\ub2a5\uc744 \uac04\uc18c\ud654\ud569\ub2c8\ub2e4.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mes%ec%99%80-erp-%ec%b0%a8%ec%9d%b4%ec%a0%90%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%bc%ea%b9%8c%ec%9a%94\/#breadcrumb"},"inLanguage":"ko-KR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mes%ec%99%80-erp-%ec%b0%a8%ec%9d%b4%ec%a0%90%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%bc%ea%b9%8c%ec%9a%94\/"]}]},{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mes%ec%99%80-erp-%ec%b0%a8%ec%9d%b4%ec%a0%90%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%bc%ea%b9%8c%ec%9a%94\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/MES-VS-ERP.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/MES-VS-ERP.png","width":6000,"height":4000,"caption":"MES VS ERP"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mes%ec%99%80-erp-%ec%b0%a8%ec%9d%b4%ec%a0%90%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%bc%ea%b9%8c%ec%9a%94\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ko\/"},{"@type":"ListItem","position":2,"name":"MES\uc640 ERP: \ucc28\uc774\uc810\uc740 \ubb34\uc5c7\uc77c\uae4c\uc694?"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ko\/#website","url":"https:\/\/skyplanner.ai\/ko\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ko\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ko-KR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ko\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ko\/","logo":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/MES-VS-ERP.png",6000,4000,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/MES-VS-ERP-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/MES-VS-ERP-300x200.png",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/MES-VS-ERP-768x512.png",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/MES-VS-ERP-1024x683.png",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/MES-VS-ERP-1536x1024.png",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/MES-VS-ERP-2048x1365.png",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/MES-VS-ERP.png",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/ko\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"MES\uc640 ERP: \ucc28\uc774\uc810\uc740 \ubb34\uc5c7\uc77c\uae4c\uc694? \ud648 &#8221; \ub9ac\uc18c\uc2a4 &#8221; MES\uc640 ERP: \ucc28\uc774\uc810\uc740 \ubb34\uc5c7\uc77c\uae4c\uc694? \ud65c\uae30\uac00 \ub118\uce58\uace0 \uae30\uacc4\uac00 \uc719\uc719\uac70\ub9ac\uba70 \uc0ac\ub78c\ub4e4\uc774 \uc870\ud654\ub86d\uac8c \uc77c\ud558\ub294 \ubd84\uc8fc\ud55c \uacf5\uc7a5\uc5d0 \ub4e4\uc5b4\uc130\ub2e4\uace0 \uc0c1\uc0c1\ud574 \ubcf4\uc138\uc694. \uc774 \uc6d0\ud65c\ud55c \uc6b4\uc601 \ub4a4\uc5d0\ub294 \ub450 \uba85\uc758 \uc870\uc6a9\ud55c \uc288\ud37c\ud788\uc5b4\ub85c\uac00 \uc788\uc2b5\ub2c8\ub2e4: \ubc14\ub85c MES(\uc81c\uc870 \uc2e4\ud589 \uc2dc\uc2a4\ud15c) \uc640 ERP(\uc804\uc0ac\uc801 \uc790\uc6d0 \uad00\ub9ac)\uc785\ub2c8\ub2e4. \uc774\ub4e4\uc740 \uc0dd\uc0b0 \uacc4\ud68d\uc744 \ud604\uc2e4\ub85c \ub9cc\ub4dc\ub294 \uae30\uacc4\uc758 \ub9c8\ubc95\uacfc\ub3c4 \uac19\uc740 \uc874\uc7ac\uc785\ub2c8\ub2e4. \ud558\uc9c0\ub9cc \uc774\ub4e4\uc744 \ud604\ubbf8\uacbd\uc73c\ub85c \ub4e4\uc5ec\ub2e4\ubcf4\uba74 \uc5b4\ub5a4&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/38647","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/comments?post=38647"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/38647\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media\/38648"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media?parent=38647"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/categories?post=38647"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/tags?post=38647"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}