{"id":38617,"date":"2023-07-15T16:44:06","date_gmt":"2023-07-15T16:44:06","guid":{"rendered":"https:\/\/skyplanner.ai\/%eb%b6%84%eb%a5%98%eb%90%98%ec%a7%80-%ec%95%8a%ec%9d%8c\/%ec%84%9c%eb%b9%84%ec%8a%a4%ed%98%95-%ec%a0%9c%ec%a1%b0maas%eb%9e%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80%ec%9a%94\/"},"modified":"2024-08-09T06:58:33","modified_gmt":"2024-08-09T06:58:33","slug":"%ec%84%9c%eb%b9%84%ec%8a%a4%ed%98%95-%ec%a0%9c%ec%a1%b0maas%eb%9e%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80%ec%9a%94","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%84%9c%eb%b9%84%ec%8a%a4%ed%98%95-%ec%a0%9c%ec%a1%b0maas%eb%9e%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80%ec%9a%94\/","title":{"rendered":"\uc11c\ube44\uc2a4\ud615 \uc81c\uc870(MaaS)\ub780 \ubb34\uc5c7\uc778\uac00\uc694?"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89\">\n\n<h1 class=\"wp-block-heading\" id=\"h-what-is-manufacturing-as-a-service-maas\">\uc11c\ube44\uc2a4\ud615 \uc81c\uc870(MaaS)\ub780 \ubb34\uc5c7\uc778\uac00\uc694?<\/h1>\n\n\n<div class=\"gb-container gb-container-e8026af9\">\n\n<p><a href=\"https:\/\/skyplanner.ai\/ko\/\">\ud648<\/a> &#8221; <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/\">\ub9ac\uc18c\uc2a4<\/a> &#8221; \uc11c\ube44\uc2a4\ud615 \uc81c\uc870(MaaS)\ub780 \ubb34\uc5c7\uc778\uac00\uc694?<\/p>\n\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" viewbox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">\uc608\uc0c1 \uc77d\uae30 \uc2dc\uac04: <\/span><span class=\"yoast-reading-time__reading-time\">25<\/span><span class=\"yoast-reading-time__time-unit\"> \ubd84<\/span><\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f0fd57d0\">\n\n<p>\uc81c\uc870 \ud504\ub85c\uc138\uc2a4\uac00 \uc6d0\ud65c\ud558\uace0 \ud6a8\uc728\uc801\uc774\uba70 \uc801\uc751\ub825\uc774 \ub6f0\uc5b4\ub09c \uc138\uc0c1\uc744 \uc0c1\uc0c1\ud574 \ubcf4\uc138\uc694.\n\uae30\uc5c5\uc774 \uc778\ud504\ub77c\uc640 \uc7a5\ube44\uc5d0 \ub300\uaddc\ubaa8\ub85c \ud22c\uc790\ud560 \ud544\uc694 \uc5c6\uc774 \ud544\uc694\uc5d0 \ub530\ub77c \uc81c\uc870 \uae30\ub2a5\uc744 \uc774\uc6a9\ud560 \uc218 \uc788\ub294 \uc138\uc0c1.\n\uc774\uac83\uc774 \ubc14\ub85c \uc81c\uc870 \uc0b0\uc5c5\uc744 \ubcc0\ud654\uc2dc\ud0a4\uace0 \uc788\ub294 \ud601\uc2e0\uc801\uc778 \uac1c\ub150\uc778 \uc11c\ube44\uc2a4\ud615 \uc81c\uc870(MaaS)\uc758 \ud798\uc785\ub2c8\ub2e4.  <\/p>\n\n\n\n<p>\uc774 \uae00\uc5d0\uc11c\ub294 \uc11c\ube44\uc2a4\ub85c\uc11c\uc758 \uc81c\uc870\uc5d0 \ub300\ud55c \uc815\uc758\uc640 \uac1c\uc694\ub97c \uc0b4\ud3b4\ubcf4\uace0, \uae30\uc874 \uc81c\uc870 \ud504\ub85c\uc138\uc2a4\uc640 \ube44\uad50\ud558\uace0, MaaS\ub97c \uc9c0\uc6d0\ud558\ub294 \uc8fc\uc694 \uae30\uc220\uc5d0 \ub300\ud574 \ub17c\uc758\ud558\uace0, \uc774\uc810\uc744 \uac15\uc870\ud558\uace0, \uacfc\uc81c\ub97c \ud574\uacb0\ud558\uace0, \uc774 \ud68d\uae30\uc801\uc778 \uc811\uadfc \ubc29\uc2dd\uc758 \ud5a5\ud6c4 \ub3d9\ud5a5\uc5d0 \ub300\ud574 \uc0b4\ud3b4\ubd05\ub2c8\ub2e4.\n\uc0dd\uc0b0 \uae30\ud68d\uc790\ub4e0 \ube44\uc988\ub2c8\uc2a4 \uc18c\uc720\uc790\uc774\ub4e0 MaaS\uc640 \uadf8 \uad6c\ud604\uc744 \uc774\ud574\ud558\uba74 \ub04a\uc784\uc5c6\uc774 \ubcc0\ud654\ud558\ub294 \uc81c\uc870 \uc0b0\uc5c5\uc5d0\uc11c \uacbd\uc7c1\ub825\uc744 \ud655\ubcf4\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. <\/p>\n\n\n\t\t\t\t<div class=\"wp-block-uagb-table-of-contents uagb-toc__align-left uagb-toc__columns-1  uagb-block-1a4fa64d      \"\n\t\t\t\t\tdata-scroll= \"1\"\n\t\t\t\t\tdata-offset= \"30\"\n\t\t\t\t\tstyle=\"\"\n\t\t\t\t>\n\t\t\t\t<div class=\"uagb-toc__wrap\">\n\t\t\t\t\t\t<div class=\"uagb-toc__title\">\n\t\t\t\t\t\t\t\ubaa9\ucc28 \ud14c\uc774\ube14\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"uagb-toc__list-wrap \">\n\t\t\t\t\t\t<ol class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#tldr\" class=\"uagb-toc-link__trigger\">TL;DR<\/a><li class=\"uagb-toc__list\"><a href=\"#\uc11c\ube44\uc2a4\ud615-\uc81c\uc870maas\uc758-\uc815\uc758-\ubc0f-\uac1c\uc694\" class=\"uagb-toc-link__trigger\">\uc11c\ube44\uc2a4\ud615 \uc81c\uc870(MaaS)\uc758 \uc815\uc758 \ubc0f \uac1c\uc694<\/a><li class=\"uagb-toc__list\"><a href=\"#maas\ub97c-\uc9c0\uc6d0\ud558\ub294-\uc8fc\uc694-\uae30\uc220\" class=\"uagb-toc-link__trigger\">MaaS\ub97c \uc9c0\uc6d0\ud558\ub294 \uc8fc\uc694 \uae30\uc220<\/a><li class=\"uagb-toc__list\"><a href=\"#\uc11c\ube44\uc2a4\ud615-\uc81c\uc870\uc758-\uc774\uc810\" class=\"uagb-toc-link__trigger\">\uc11c\ube44\uc2a4\ud615 \uc81c\uc870\uc758 \uc774\uc810<\/a><li class=\"uagb-toc__list\"><a href=\"#maas\uc758-\uacfc\uc81c\uc640-\uc194\ub8e8\uc158\" class=\"uagb-toc-link__trigger\">MaaS\uc758 \uacfc\uc81c\uc640 \uc194\ub8e8\uc158<\/a><li class=\"uagb-toc__list\"><a href=\"#\uc11c\ube44\uc2a4\ud615-\uc81c\uc870\uc758-\ud61c\ud0dd\uc744-\ubc1b\ub294-\uc0b0\uc5c5\" class=\"uagb-toc-link__trigger\">\uc11c\ube44\uc2a4\ud615 \uc81c\uc870\uc758 \ud61c\ud0dd\uc744 \ubc1b\ub294 \uc0b0\uc5c5<\/a><li class=\"uagb-toc__list\"><a href=\"#maas\uc758-\ubbf8\ub798\" class=\"uagb-toc-link__trigger\">MaaS\uc758 \ubbf8\ub798<\/a><li class=\"uagb-toc__list\"><a href=\"#\ube44\uc988\ub2c8\uc2a4\uc5d0\uc11c-maas\ub97c-\uad6c\ud604\ud558\ub294-\ubc29\ubc95\" class=\"uagb-toc-link__trigger\">\ube44\uc988\ub2c8\uc2a4\uc5d0\uc11c MaaS\ub97c \uad6c\ud604\ud558\ub294 \ubc29\ubc95<\/a><li class=\"uagb-toc__list\"><a href=\"#aps-\uc2dc\uc2a4\ud15c\uc744-\ud1b5\ud55c-\uc81c\uc870-\ud6a8\uc728\uc131-\ud5a5\uc0c1\" class=\"uagb-toc-link__trigger\">APS \uc2dc\uc2a4\ud15c\uc744 \ud1b5\ud55c \uc81c\uc870 \ud6a8\uc728\uc131 \ud5a5\uc0c1<\/a><li class=\"uagb-toc__list\"><a href=\"#\uc790\uc8fc-\ubb3b\ub294-\uc9c8\ubb38\" class=\"uagb-toc-link__trigger\">\uc790\uc8fc \ubb3b\ub294 \uc9c8\ubb38<\/a><\/ol>\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\n\n\n<h2 class=\"gb-headline gb-headline-102dcdbf gb-headline-text\">TL;DR<\/h2>\n\n\n\n<p><strong>\uc11c\ube44\uc2a4\ud615 \uc81c\uc870(MaaS)\ub294 \uae30\uc5c5\uc774 \ub300\uaddc\ubaa8 \ud22c\uc790 \uc5c6\uc774\ub3c4 \uc628\ub514\ub9e8\ub4dc \ubc29\uc2dd\uc73c\ub85c \uc81c\uc870 \uae30\ub2a5\uc744 \uc774\uc6a9\ud560 \uc218 \uc788\ub294 \ud601\uc2e0\uc801\uc778 \uac1c\ub150\uc785\ub2c8\ub2e4.<\/strong>  \uc774 \ubb38\uc11c\uc5d0\uc11c\ub294 MaaS\uc758 \uc815\uc758\uc640 \uac1c\uc694\ub97c \uc0b4\ud3b4\ubcf4\uace0, \uae30\uc874 \uc81c\uc870\uc5c5\uacfc \ube44\uad50\ud558\uba70, MaaS\ub97c \uc774\ub044\ub294 \uc8fc\uc694 \uae30\uc220\uc744 \uac15\uc870\ud558\uace0, \uc774\uc810\uc744 \ub17c\uc758\ud558\uace0, \uacfc\uc81c\ub97c \ud574\uacb0\ud558\uba70, \ud5a5\ud6c4 \ud2b8\ub80c\ub4dc\ub97c \uc0b4\ud3b4\ubd05\ub2c8\ub2e4.\nMaaS\ub294 \ube44\uc6a9 \uc808\uac10, \uc0dd\uc0b0 \uc18d\ub3c4, \ud655\uc7a5\uc131, \uc804\ubb38 \uc9c0\uc2dd\uc5d0 \ub300\ud55c \uc561\uc138\uc2a4, \uc704\ud5d8 \uc644\ud654, \ud601\uc2e0, \uae00\ub85c\ubc8c \ubc94\uc704, \ud658\uacbd\uc801 \uc9c0\uc18d \uac00\ub2a5\uc131 \ub4f1\uc758 \uc774\uc810\uc744 \uc81c\uacf5\ud569\ub2c8\ub2e4.\n\ud488\uc9c8 \uad00\ub9ac, \uc9c0\uc801 \uc7ac\uc0b0\uad8c \ubcf4\ud638, \uacf5\uae09\ub9dd \uac00\uc2dc\uc131, \ucee4\ubba4\ub2c8\ucf00\uc774\uc158 \ub4f1\uc758 \uacfc\uc81c\uac00 \uc788\uc2b5\ub2c8\ub2e4.\nMaaS\uc758 \ubbf8\ub798\uc5d0\ub294 \ub354 \ub9ce\uc740 \ucc44\ud0dd, \ud5a5\uc0c1\ub41c \uae30\uc220 \ud1b5\ud569, \ubd84\uc0b0\ub41c \uc81c\uc870 \ub124\ud2b8\uc6cc\ud06c, \uc9c0\uc18d \uac00\ub2a5\ud55c \uad00\ud589\uc774 \ud3ec\ud568\ub429\ub2c8\ub2e4.\nMaaS\ub97c \uad6c\ud604\ud558\ub824\uba74 \uc694\uad6c \uc0ac\ud56d \ud3c9\uac00, \uc11c\ube44\uc2a4 \uc81c\uacf5\uc5c5\uccb4 \uc870\uc0ac, \uc804\ud658 \uacc4\ud68d \uac1c\ubc1c, \ud30c\uc77c\ub7ff \ud504\ub85c\uc81d\ud2b8, \ud655\uc7a5 \ubc0f \uc9c0\uc18d\uc801\uc778 \uac1c\uc120\uc774 \ud544\uc694\ud569\ub2c8\ub2e4.\nSkyplanner\uc640 \uac19\uc740 APS \uc2dc\uc2a4\ud15c\uc740 \uc0dd\uc0b0 \uacc4\ud68d \ubc0f \ub9ac\uc18c\uc2a4 \ud560\ub2f9\uc744 \ucd5c\uc801\ud654\ud558\uc5ec MaaS\uc758 \uc774\uc810\uc744 \ub354\uc6b1 \ud5a5\uc0c1\uc2dc\ud0b5\ub2c8\ub2e4.     <\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-7d316c01 gb-headline-text\">\uc11c\ube44\uc2a4\ud615 \uc81c\uc870(MaaS)\uc758 \uc815\uc758 \ubc0f \uac1c\uc694<\/h2>\n\n\n<div class=\"gb-container gb-container-ce737323\"><div class=\"gb-inside-container\">\n\n<p><strong>\uc11c\ube44\uc2a4\ub85c\uc11c\uc758 \uc81c\uc870\ub294 \uae30\uc5c5\uc774 \ub300\uaddc\ubaa8 \uc0ac\ub0b4 \uc0dd\uc0b0 \uc2dc\uc124\uc5d0 \ud22c\uc790\ud558\uc9c0 \uc54a\uace0 \ud544\uc694\uc5d0 \ub530\ub77c \uc81c\uc870 \ub9ac\uc18c\uc2a4\uc640 \uc5ed\ub7c9\uc744 \uc774\uc6a9\ud560 \uc218 \uc788\ub294 \ube44\uc988\ub2c8\uc2a4 \ubaa8\ub378\uc785\ub2c8\ub2e4.<\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p>\uc11c\ube44\uc2a4\ub85c\uc11c\uc758 \uc81c\uc870\ub294 \ub514\uc9c0\ud138 \uae30\uc220\uacfc \uc81c\uc870 \uc11c\ube44\uc2a4 \uc81c\uacf5\uc5c5\uccb4 \ub124\ud2b8\uc6cc\ud06c\ub97c \ud65c\uc6a9\ud558\uc5ec \ud655\uc7a5 \uac00\ub2a5\ud558\uace0 \ube44\uc6a9 \ud6a8\uc728\uc801\uc774\uba70 \ud6a8\uc728\uc801\uc778 \uc0dd\uc0b0 \uc194\ub8e8\uc158\uc744 \uc81c\uacf5\ud558\ub294 \uc81c\uc870 \uc0b0\uc5c5\uc758 \ud328\ub7ec\ub2e4\uc784 \uc804\ud658\uc785\ub2c8\ub2e4.<\/p>\n\n\n\n<p>\uacfc\uac70\uc5d0\ub294 \uae30\uc5c5\uc774 \uc81c\uc870\uc5c5\uc744 \uc124\ub9bd\ud558\uae30 \uc704\ud574 \uc0c1\ub2f9\ud55c \uc790\ubcf8 \ud22c\uc790\ub97c \ud574\uc57c \ud588\uc2b5\ub2c8\ub2e4.\n\ub530\ub77c\uc11c \uc790\uc6d0\uc774 \ubd80\uc871\ud55c \uc18c\uaddc\ubaa8 \uae30\uc5c5\uc740 \uc5c5\uacc4 \uc9c4\uc785 \uc7a5\ubcbd\uc5d0 \ubd80\ub52a\ud788\ub294 \uacbd\uc6b0\uac00 \ub9ce\uc558\uc2b5\ub2c8\ub2e4.\n\ud558\uc9c0\ub9cc MaaS\uc758 \ub4f1\uc7a5\uc73c\ub85c \uae30\uc5c5\uc740 \uc804\ubb38 \uc9c0\uc2dd, \uc7a5\ube44, \uc2dc\uc124\uc744 \uacc4\uc57d \uae30\ubc18\uc73c\ub85c \uc81c\uacf5\ud558\ub294 \uae00\ub85c\ubc8c \uc81c\uc870 \uc11c\ube44\uc2a4 \uc81c\uacf5\uc5c5\uccb4 \ub124\ud2b8\uc6cc\ud06c\ub97c \ud65c\uc6a9\ud560 \uc218 \uc788\uac8c \ub418\uc5c8\uc2b5\ub2c8\ub2e4.  <\/p>\n\n\n\n<p>\ucd5c\uadfc \uba87 \ub144 \ub3d9\uc548 MaaS\ub294 \uc0c1\ub2f9\ud55c \uc8fc\ubaa9\uc744 \ubc1b\uace0 \uc788\uc73c\uba70, \ub354 \ub9ce\uc740 \uae30\uc5c5\uc774 \uc0dd\uc0b0 \ud504\ub85c\uc138\uc2a4\ub97c \ucd5c\uc801\ud654\ud558\uae30 \uc704\ud574 \uc774 \ubaa8\ub378\uc744 \ucc44\ud0dd\ud558\uace0 \uc788\uc2b5\ub2c8\ub2e4.\n\uc804\ubb38 \uc81c\uc870\uc5c5\uccb4\uc758 \uc5ed\ub7c9\uc744 \ud65c\uc6a9\ud568\uc73c\ub85c\uc368 \uae30\uc5c5\uc740 \ud575\uc2ec \uac15\uc810\uc5d0 \uc6b0\uc120\uc21c\uc704\ub97c \ub450\uace0 \uc804\ubb38 \uc11c\ube44\uc2a4 \uc81c\uacf5\uc5c5\uccb4\uc5d0 \uc81c\uc870 \ucc45\uc784\uc744 \uc704\uc784\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.\n\uc774\ub97c \ud1b5\ud574 \ube44\uc6a9\uc744 \uc808\uac10\ud560 \ubfd0\ub9cc \uc544\ub2c8\ub77c \ubbfc\ucca9\uc131\uc744 \ud5a5\uc0c1\uc2dc\ud0a4\uace0 \uc2dc\uc7a5 \uc218\uc694\uc5d0 \ubcf4\ub2e4 \ud6a8\uacfc\uc801\uc73c\ub85c \ub300\uc751\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.  <\/p>\n\n\n\n<h3 class=\"gb-headline gb-headline-74ea7411 gb-headline-text\">MaaS\uc640 \uae30\uc874 \uc81c\uc870<\/h3>\n\n\n\n<p>\uc11c\ube44\uc2a4\ub85c\uc11c\uc758 \uc81c\uc870\uc758 \ub69c\ub837\ud55c \uc774\uc810\uc744 \uc774\ud574\ud558\uae30 \uc704\ud574 \uc804\ud1b5\uc801\uc778 \uc81c\uc870 \ud504\ub85c\uc138\uc2a4\uc640 \ube44\uad50\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4.\n\uc804\ud1b5\uc801\uc778 \uc81c\uc870\uc5c5\uc740 \uacf5\uc7a5, \uae30\uacc4, \uc219\ub828\ub41c \uc778\ub825\uc744 \ud3ec\ud568\ud55c \uc0ac\ub0b4 \uc0dd\uc0b0 \uc2dc\uc124\uc744 \uad6c\ucd95\ud558\uace0 \uc720\uc9c0\ud574\uc57c \ud569\ub2c8\ub2e4.\n\uc774 \uc811\uadfc \ubc29\uc2dd\uc740 \uc804\uccb4 \uc0dd\uc0b0 \ud504\ub85c\uc138\uc2a4\ub97c \uc81c\uc5b4\ud560 \uc218 \uc788\uc9c0\ub9cc \uba87 \uac00\uc9c0 \ud55c\uacc4\uc640 \uacfc\uc81c\ub97c \uc548\uace0 \uc788\uc2b5\ub2c8\ub2e4.  <\/p>\n\n\n\n<p>\ubc18\uba74\uc5d0 MaaS\ub294 \uc720\uc5f0\ud558\uace0 \ud655\uc7a5 \uac00\ub2a5\ud55c \ub300\uc548\uc744 \uc81c\uacf5\ud569\ub2c8\ub2e4.\n\uc804\ubb38 \uc11c\ube44\uc2a4 \uc81c\uacf5\uc5c5\uccb4\uc5d0 \uc81c\uc870 \uc791\uc5c5\uc744 \uc544\uc6c3\uc18c\uc2f1\ud568\uc73c\ub85c\uc368 \uae30\uc5c5\uc740 \ub300\uaddc\ubaa8 \uc790\ubcf8 \ud22c\uc790 \uc5c6\uc774\ub3c4 \ub2e4\uc591\ud55c \uae30\ub2a5\uc744 \uc774\uc6a9\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.\nMaaS\ub294 \uc778\ud504\ub77c \uc720\uc9c0 \uad00\ub9ac, \uae30\uacc4 \uc5c5\uadf8\ub808\uc774\ub4dc, \uc9c1\uc6d0 \uad50\uc721\uc5d0 \ub300\ud55c \ubd80\ub2f4\uc744 \uc5c6\uc560\uc8fc\ubbc0\ub85c \uae30\uc5c5\uc740 \ud575\uc2ec \uc5ed\ub7c9\uc5d0 \uc9d1\uc911\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.  <\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-6b8368e6 gb-headline-text\">MaaS\ub97c \uc9c0\uc6d0\ud558\ub294 \uc8fc\uc694 \uae30\uc220<\/h2>\n\n\n\n<p>\uc11c\ube44\uc2a4\ub85c\uc11c\uc758 \uc81c\uc870\ub294 \uc5c5\uacc4\uc5d0 \ud601\uc2e0\uc744 \uac00\uc838\uc628 \uba87 \uac00\uc9c0 \ud575\uc2ec \uae30\uc220\uc744 \ud65c\uc6a9\ud569\ub2c8\ub2e4.\n\uc774\ub7ec\ud55c \uae30\uc220\uc740 \uc2dc\ub108\uc9c0 \ud6a8\uacfc\ub97c \ubc1c\ud718\ud558\uc5ec \ud6a8\uc728\uc801\uc774\uace0 \ubbfc\ucca9\ud55c \uc0dd\uc0b0 \ud504\ub85c\uc138\uc2a4\ub97c \uac00\ub2a5\ud558\uac8c \ud569\ub2c8\ub2e4.\nMaaS\ub97c \uc9c0\uc6d0\ud558\ub294 \uba87 \uac00\uc9c0 \uc911\uc694\ud55c \uad6c\uc131 \uc694\uc18c\ub97c \uc0b4\ud3b4\ubcf4\uaca0\uc2b5\ub2c8\ub2e4:  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-cc1506b8 gb-headline-text\">\uc778\uacf5 \uc9c0\ub2a5(AI)<\/h4>\n\n\n\n<p>AI\ub294 \uc0dd\uc0b0 \uacc4\ud68d, \uc608\uce21 \uc720\uc9c0\ubcf4\uc218, \ud488\uc9c8 \uad00\ub9ac, \uacf5\uae09\ub9dd \uad00\ub9ac\ub97c \ucd5c\uc801\ud654\ud558\ub294 \ub370 \ud575\uc2ec\uc801\uc778 \uc5ed\ud560\uc744 \ud569\ub2c8\ub2e4.\nAI \uae30\ubc18 \uc54c\uace0\ub9ac\uc998\uc740 \ubc29\ub300\ud55c \uc591\uc758 \ub370\uc774\ud130\ub97c \ubd84\uc11d\ud558\uace0 \ud328\ud134\uc744 \ud30c\uc545\ud558\uba70 \ub370\uc774\ud130 \uae30\ubc18 \uc758\uc0ac\uacb0\uc815\uc744 \ub0b4\ub824 \ud6a8\uc728\uc131\uacfc \uc0dd\uc0b0\uc131\uc744 \ud5a5\uc0c1\uc2dc\ud0b5\ub2c8\ub2e4. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-1a537c78 gb-headline-text\">\uc0ac\ubb3c \uc778\ud130\ub137(IoT)<\/h4>\n\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%82%ac%eb%ac%bc-%ec%9d%b8%ed%84%b0%eb%84%b7-%ec%a0%9c%ec%a1%b0-%ec%97%ad%eb%9f%89-%ea%b0%95%ed%99%94\/\">IoT<\/a> \ub514\ubc14\uc774\uc2a4\ub294 \uc0dd\uc0b0 \uacf5\uc815\uc758 \ub2e4\uc591\ud55c \ub2e8\uacc4\uc5d0\uc11c \uc2e4\uc2dc\uac04 \ub370\uc774\ud130\ub97c \uc218\uc9d1\ud558\uc5ec \uc0ac\uc804 \ubaa8\ub2c8\ud130\ub9c1, \uc608\ubc29\uc801 \uc720\uc9c0\ubcf4\uc218, \uc790\uc0b0 \ud65c\uc6a9\ub3c4 \ud5a5\uc0c1\uc744 \uac00\ub2a5\ud558\uac8c \ud569\ub2c8\ub2e4.\nIoT \uc13c\uc11c\uc640 \uc5f0\uacb0\uc131\uc744 \ud1b5\ud574 \uae30\uacc4, \uc2dc\uc2a4\ud15c, \uc774\ud574\uad00\uacc4\uc790 \uac04\uc758 \uc6d0\ud65c\ud55c \ud1b5\ud569\uc744 \uc9c0\uc6d0\ud558\uc5ec \uc5f0\uacb0\ub41c \uc9c0\ub2a5\ud615 \uc81c\uc870 \uc5d0\ucf54\uc2dc\uc2a4\ud15c\uc744 \uad6c\ucd95\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-9f3b6280 gb-headline-text\">3D \ud504\ub9b0\ud305<\/h4>\n\n\n\n<p>\uc801\uce35 \uc81c\uc870\ub85c \uc54c\ub824\uc9c4 3D \ud504\ub9b0\ud305\uc740 \ubcf5\uc7a1\ud55c \ud504\ub85c\ud1a0\ud0c0\uc785\uacfc \ucd5c\uc885 \uc0ac\uc6a9 \ubd80\ud488\uc744 \uc815\ubc00\ud558\uace0 \ube60\ub974\uac8c \uc81c\uc791\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.\n\uc774 \uae30\uc220\uc740 \ub9ac\ub4dc \ud0c0\uc784\uc744 \ub2e8\ucd95\ud558\uace0 \ud234\ub9c1 \ube44\uc6a9\uc744 \uc5c6\uc560\uba70 \uc8fc\ubb38\ud615 \uc0dd\uc0b0\uc744 \uac00\ub2a5\ucf00 \ud558\ubbc0\ub85c MaaS\uc5d0 \uc774\uc0c1\uc801\uc785\ub2c8\ub2e4. <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%a0%9c%ec%a1%b0%ec%97%90%ec%84%9c-%eb%a6%ac%eb%93%9c-%ed%83%80%ec%9e%84%ec%9d%84-%ec%b5%9c%ec%a0%81%ed%99%94%ed%95%98%eb%8a%94-%eb%b0%a9%eb%b2%95%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80\/\"> <\/a><a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%a0%9c%ec%a1%b0%ec%97%90%ec%84%9c-%eb%a6%ac%eb%93%9c-%ed%83%80%ec%9e%84%ec%9d%84-%ec%b5%9c%ec%a0%81%ed%99%94%ed%95%98%eb%8a%94-%eb%b0%a9%eb%b2%95%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80\/\"> \ub9ac\ub4dc \ud0c0\uc784\uc744 \ucd5c\uc801\ud654\ud558\ub294 \ubc29\ubc95\uc744 \uc54c\uc544\ubcf4\uc138\uc694. <\/a> <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-65e00346 gb-headline-text\">\ub85c\ubd07 \uacf5\ud559<\/h4>\n\n\n\n<p>\ub85c\ubd07\uc740 \ubc18\ubcf5\uc801\uc778 \uc791\uc5c5\uc744 \uc790\ub3d9\ud654\ud558\uace0, \uc0dd\uc0b0 \uc18d\ub3c4\ub97c \ub192\uc774\uba70, \uc815\ud655\uc131\uc744 \ud5a5\uc0c1\uc2dc\ud0a4\uae30 \uc704\ud574 MaaS\uc5d0\uc11c \ub110\ub9ac \uc0ac\uc6a9\ub429\ub2c8\ub2e4.\n\ud611\ub3d9 \ub85c\ubd07 \ub610\ub294 <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%bd%94%eb%b4%87-%ec%a0%9c%ec%a1%b0%ec%97%85%ec%9d%98-%eb%a5%b4%eb%84%a4%ec%83%81%ec%8a%a4\/\">\ucf54\ubd07\uc740<\/a> \uc778\uac04 \uc791\uc5c5\uc790\uc640 \ud568\uaed8 \uc791\uc5c5\ud558\uc5ec \uc791\uc5c5\uc790\uc758 \uc5ed\ub7c9\uc744 \uac15\ud654\ud558\uace0 \uc804\ubc18\uc801\uc778 \ud6a8\uc728\uc131\uc744 \ud5a5\uc0c1\uc2dc\ud0b5\ub2c8\ub2e4. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-b87ebda0 gb-headline-text\">\ud074\ub77c\uc6b0\ub4dc \ucef4\ud4e8\ud305<\/h4>\n\n\n\n<p>\ud074\ub77c\uc6b0\ub4dc \uae30\ubc18 \ud50c\ub7ab\ud3fc\uc740 \ud655\uc7a5 \uac00\ub2a5\ud558\uace0 \uc548\uc804\ud55c \ub370\uc774\ud130 \uc2a4\ud1a0\ub9ac\uc9c0, \ubd84\uc11d \ubc0f \ud611\uc5c5 \uc778\ud504\ub77c\ub97c \uc81c\uacf5\ud569\ub2c8\ub2e4.\n\uc81c\uc870\uc5c5\uccb4\ub294 \uc2e4\uc2dc\uac04 \uc815\ubcf4\uc5d0 \uc561\uc138\uc2a4\ud558\uace0, \uc0dd\uc0b0 \ud504\ub85c\uc138\uc2a4\ub97c \uc6d0\uaca9\uc73c\ub85c \ubaa8\ub2c8\ud130\ub9c1\ud558\uace0, \ub2e4\ub978 \uc2dc\uc2a4\ud15c \ubc0f \ud30c\ud2b8\ub108\uc640 \uc6d0\ud65c\ud558\uac8c \ud1b5\ud569\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. <\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"536\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png\" alt=\"\" class=\"wp-image-6463\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-300x157.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-768x402.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1536x804.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-2048x1072.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-edbab0a7 gb-headline-text\">\uc11c\ube44\uc2a4\ud615 \uc81c\uc870\uc758 \uc774\uc810<\/h2>\n\n\n\n<p>\uc11c\ube44\uc2a4\ud615 \uc81c\uc870\ub294 \uc81c\uc870 \uc5c5\uacc4\uc758 \ube44\uc988\ub2c8\uc2a4\uc5d0 \ub2e4\uc591\ud55c \uc774\uc810\uc744 \uc81c\uacf5\ud569\ub2c8\ub2e4.\nMaaS\ub97c \ub3c4\uc785\ud558\uba74 \uc5bb\uc744 \uc218 \uc788\ub294 8\uac00\uc9c0 \uc8fc\uc694 \uc774\uc810\uc744 \uc0b4\ud3b4\ubcf4\uc138\uc694: <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-8dc1ce04 gb-headline-text\">\ube44\uc6a9 \uc808\uac10<\/h4>\n\n\n\n<p>\uc778\ud504\ub77c \ubc0f \uc7a5\ube44\uc5d0 \ub300\ud55c \ub300\uaddc\ubaa8 \uc790\ubcf8 \ud22c\uc790\uac00 \ud544\uc694 \uc5c6\uae30 \ub54c\ubb38\uc5d0 MaaS\ub294 \ucd08\uae30 \ube44\uc6a9\uc744 \ud06c\uac8c \uc808\uac10\ud569\ub2c8\ub2e4.\n\uae30\uc5c5\uc740 \ud544\uc694\ud55c \uc11c\ube44\uc2a4\uc5d0 \ub300\ud574\uc11c\ub9cc \ube44\uc6a9\uc744 \uc9c0\ubd88\ud558\uace0 \uae30\uc874 \uc81c\uc870 \uc5ed\ub7c9\uc744 \uc628\ub514\ub9e8\ub4dc \ubc29\uc2dd\uc73c\ub85c \ud65c\uc6a9\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.\n\uc774\ub97c \ud1b5\ud574 \uc7ac\ubb34 \uad00\ub9ac\uac00 \uac1c\uc120\ub418\uace0 \uc218\uc775\uc131\uc774 \ud5a5\uc0c1\ub429\ub2c8\ub2e4.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-20e8d6fb gb-headline-text\">\uc0dd\uc0b0 \uc18d\ub3c4<\/h4>\n\n\n\n<p>MaaS\ub294 \uc2dc\uc7a5 \uc218\uc694\uc5d0 \uc2e0\uc18d\ud558\uac8c \ub300\uc751\ud560 \uc218 \uc788\ub3c4\ub85d \uc9c0\uc6d0\ud569\ub2c8\ub2e4.\n\uc804\ubb38 \uc11c\ube44\uc2a4 \uc81c\uacf5\uc5c5\uccb4\uc758 \uc804\ubb38 \uc9c0\uc2dd\uacfc \ub9ac\uc18c\uc2a4\ub97c \ud65c\uc6a9\ud558\uc5ec \uae30\uc5c5\uc740 \uc0dd\uc0b0 \ud504\ub85c\uc138\uc2a4\ub97c \uc2e0\uc18d\ud558\uac8c \uc870\uc815\ud558\uace0 \uc2dc\uc7a5 \ucd9c\uc2dc \uae30\uac04\uc744 \ub2e8\ucd95\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.\n\uc774\ub7ec\ud55c \ubbfc\ucca9\uc131\uc740 \uae30\uc5c5\uc774 \uacbd\uc7c1\uc5d0\uc11c \uc55e\uc11c \ub098\uac00\uace0 \uc0c8\ub85c\uc6b4 \uae30\ud68c\ub97c \ud3ec\ucc29\ud558\ub294 \ub370 \ub3c4\uc6c0\uc774 \ub429\ub2c8\ub2e4.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-7f7ccfb7 gb-headline-text\">\ud655\uc7a5\uc131<\/h4>\n\n\n\n<p>MaaS\ub294 \ud0c1\uc6d4\ud55c \ud655\uc7a5\uc131\uc744 \uc81c\uacf5\ud558\uc5ec \uae30\uc5c5\uc774 \ud544\uc694\uc5d0 \ub530\ub77c \uc0dd\uc0b0\ub7c9\uc744 \uc870\uc815\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.\n\uc218\uc694\uac00 \uae09\uc99d\ud560 \ub54c \ud655\uc7a5\ud558\ub4e0, \ube44\uc6a9\uc744 \ucd5c\uc801\ud654\ud558\uae30 \uc704\ud574 \ucd95\uc18c\ud558\ub4e0, MaaS\ub294 \ubcc0\ud654\ud558\ub294 \uc2dc\uc7a5 \uc0c1\ud669\uc5d0 \uc720\uc5f0\ud558\uac8c \ub300\uc751\ud560 \uc218 \uc788\ub294 \uc720\uc5f0\uc131\uc744 \uc81c\uacf5\ud569\ub2c8\ub2e4. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-4e9098ce gb-headline-text\">\uc804\ubb38 \uc9c0\uc2dd\uc5d0 \uc561\uc138\uc2a4<\/h4>\n\n\n\n<p>MaaS\ub294 \uc2ec\uce35\uc801\uc778 \ub3c4\uba54\uc778 \uc9c0\uc2dd\uacfc \uc804\ubb38\uc131\uc744 \ubcf4\uc720\ud55c \uc804\ubb38 \uc81c\uc870\uc5c5\uccb4\uc640 \uae30\uc5c5\uc744 \uc5f0\uacb0\ud569\ub2c8\ub2e4.\n\uc81c\uc870 \uc804\ubb38\uac00\ub85c \uad6c\uc131\ub41c \uae00\ub85c\ubc8c \ub124\ud2b8\uc6cc\ud06c\ub97c \ud1b5\ud574 \uae30\uc5c5\uc740 \ucd5c\uc2e0 \uc5c5\uacc4 \ubaa8\ubc94 \uc0ac\ub840, \ud601\uc2e0\uc801\uc778 \uae30\uc220 \ubc0f \uc0c8\ub85c\uc6b4 \ud2b8\ub80c\ub4dc\ub97c \ud65c\uc6a9\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-88e2374e gb-headline-text\">\uc704\ud5d8 \uc644\ud654<\/h4>\n\n\n\n<p>MaaS\ub294 \uc7a5\ube44 \ub178\ud6c4\ud654, \uc0dd\uc0b0 \ubcd1\ubaa9 \ud604\uc0c1, \ud488\uc9c8 \ubb38\uc81c \ub4f1 \uae30\uc874 \uc81c\uc870\uc640 \uad00\ub828\ub41c \uc704\ud5d8\uc744 \uc904\uc5ec\uc90d\ub2c8\ub2e4.\n\uc219\ub828\ub41c \uc11c\ube44\uc2a4 \uc81c\uacf5\uc5c5\uccb4\uc758 \uc5ed\ub7c9\uc744 \ud65c\uc6a9\ud568\uc73c\ub85c\uc368 \uae30\uc5c5\uc740 \uc774\ub7ec\ud55c \uc704\ud5d8\uc744 \uc644\ud654\ud558\uace0 \uc77c\uad00\ub41c \ud488\uc9c8\uacfc \uc548\uc815\uc131\uc744 \ubcf4\uc7a5\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-e9898522 gb-headline-text\">\ud601\uc2e0 \ubc0f \uc0ac\uc6a9\uc790 \uc9c0\uc815<\/h4>\n\n\n\n<p>MaaS\ub294 \ucd5c\ucca8\ub2e8 \uae30\uc220\uacfc \uc81c\uc870 \ud504\ub85c\uc138\uc2a4\uc5d0 \ub300\ud55c \uc561\uc138\uc2a4\ub97c \uc81c\uacf5\ud568\uc73c\ub85c\uc368 \ud601\uc2e0\uc744 \uc7a5\ub824\ud569\ub2c8\ub2e4.\n\uae30\uc5c5\uc740 \uc0c8\ub85c\uc6b4 \uc81c\ud488 \ub514\uc790\uc778\uc744 \uc2e4\ud5d8\ud558\uace0, \ud504\ub85c\ud1a0\ud0c0\uc785\uc744 \ud14c\uc2a4\ud2b8\ud558\uace0, \ub9de\ucda4\ud615 \uc194\ub8e8\uc158\uc744 \ub354 \ube60\ub974\uac8c \uc2dc\uc7a5\uc5d0 \ucd9c\uc2dc\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-40d772a0 gb-headline-text\">\uae00\ub85c\ubc8c \ub3c4\ub2ec \ubc94\uc704<\/h4>\n\n\n\n<p>MaaS\ub97c \uc0ac\uc6a9\ud558\uba74 \uc9c0\ub9ac\uc801 \uacbd\uacc4\ub294 \ub354 \uc774\uc0c1 \uc81c\uc57d\uc774 \ub418\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4.\n\uae30\uc5c5\uc740 \uc804 \uc138\uacc4 \uc81c\uc870\uc5c5\uccb4 \ub124\ud2b8\uc6cc\ud06c\ub97c \ud65c\uc6a9\ud558\uc5ec \ud574\uc678 \uc2dc\uc7a5\uc5d0 \ud6a8\uc728\uc801\uc73c\ub85c \uc11c\ube44\uc2a4\ub97c \uc81c\uacf5\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.\n\uc774\ub97c \ud1b5\ud574 \uc2dc\uc7a5 \ubc94\uc704\ub97c \ud655\uc7a5\ud558\uace0 \uc0c8\ub85c\uc6b4 \uc131\uc7a5 \uae30\ud68c\ub97c \ucc3d\ucd9c\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-902c2dfe gb-headline-text\">\ud658\uacbd \uc9c0\uc18d \uac00\ub2a5\uc131<\/h4>\n\n\n\n<p>MaaS\ub294 \uc9c0\uc18d \uac00\ub2a5\ud55c \uc81c\uc870 \uad00\ud589\uc744 \ucd09\uc9c4\ud569\ub2c8\ub2e4.\nMaaS\ub294 \ub9ac\uc18c\uc2a4\ub97c \uacf5\uc720\ud558\uace0 \uc0dd\uc0b0 \ud504\ub85c\uc138\uc2a4\ub97c \ucd5c\uc801\ud654\ud558\uc5ec \ud3d0\uae30\ubb3c, \uc5d0\ub108\uc9c0 \uc18c\ube44, \ud0c4\uc18c \ubc30\ucd9c\uc744 \uc904\uc785\ub2c8\ub2e4.\n\uc774\ub294 \ubcf4\ub2e4 \uce5c\ud658\uacbd\uc801\uc774\uace0 \ud658\uacbd\uc744 \uc0dd\uac01\ud558\ub294 \uc81c\uc870 \uc0b0\uc5c5\uc5d0 \uae30\uc5ec\ud569\ub2c8\ub2e4.  <\/p>\n\n\n\n<p>\uc758\ub958 \uc0dd\uc0b0\uc744 \uc544\uc6c3\uc18c\uc2f1\ud558\ub294 \uc758\ub958 \ube0c\ub79c\ub4dc\ub098 \ud68c\ub85c \uae30\ud310 \uc870\ub9bd\uc744 \uc704\ud574 \uacc4\uc57d \uc81c\uc870\uc5c5\uccb4\ub97c \ud65c\uc6a9\ud558\ub294 \uc804\uc790 \ud68c\uc0ac\uc640 \uac19\uc740 \uc2e4\uc81c MaaS \uad6c\ud604 \uc0ac\ub840\ub294 \uc774\ub7ec\ud55c \uc774\uc810\uc744 \ub354\uc6b1 \uac15\uc870\ud569\ub2c8\ub2e4.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f7e777f3\">\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Production planning and scheduling product image straight view\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Advanced production planning with AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Read more about our approach to production planning and optimization leveraging the power of AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"https:\/\/skyplanner.ai\/\" aria-label=\"Book a demo\">Production planning with AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div>\n\n<div class=\"gb-container gb-container-33d6b196\">\n\n<h2 class=\"gb-headline gb-headline-51e65f04 gb-headline-text\">MaaS\uc758 \uacfc\uc81c\uc640 \uc194\ub8e8\uc158<\/h2>\n\n\n\n<p>MaaS\ub294 \uc0c1\ub2f9\ud55c \uc774\uc810\uc744 \uc81c\uacf5\ud558\uc9c0\ub9cc \uad6c\ud604\uacfc \uad00\ub828\ub41c \ubb38\uc81c\ub3c4 \uc788\uc2b5\ub2c8\ub2e4.\n\uba87 \uac00\uc9c0 \uc77c\ubc18\uc801\uc778 \uc7a5\uc560\ubb3c\uc744 \ud574\uacb0\ud558\uace0 \uc2e4\uc6a9\uc801\uc778 \uc194\ub8e8\uc158\uc744 \uc81c\uacf5\ud558\uaca0\uc2b5\ub2c8\ub2e4: <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-232542e8 gb-headline-text\">\ud488\uc9c8 \uad00\ub9ac<\/h4>\n\n\n\n<p>\uc5ec\ub7ec \uc81c\uc870 \uc11c\ube44\uc2a4 \uc81c\uacf5\uc5c5\uccb4\uc5d0\uc11c \uc77c\uad00\ub41c \ud488\uc9c8\uc744 \uc720\uc9c0\ud558\ub294 \uac83\uc740 \uc5b4\ub824\uc6b4 \uc77c\uc774 \ub420 \uc218 \uc788\uc2b5\ub2c8\ub2e4.\n\ud45c\uc900\ud654\ub41c \ud488\uc9c8 \uad00\ub9ac \ud504\ub85c\uc138\uc2a4\ub97c \uad6c\ud604\ud558\uace0, \uc815\uae30\uc801\uc778 \uac10\uc0ac\ub97c \uc2e4\uc2dc\ud558\uace0, \uba85\ud655\ud55c \ucee4\ubba4\ub2c8\ucf00\uc774\uc158 \ucc44\ub110\uc744 \uad6c\ucd95\ud558\ub294 \uac83\uc774 \ud488\uc9c8 \ud45c\uc900\uc744 \ucda9\uc871\ud558\ub294 \ub370 \ud575\uc2ec\uc785\ub2c8\ub2e4. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-12ce109f gb-headline-text\">\uc9c0\uc801 \uc7ac\uc0b0\uad8c \ubcf4\ud638<\/h4>\n\n\n\n<p>\ub3c5\uc810 \ub514\uc790\uc778\uacfc \ubbfc\uac10\ud55c \uc815\ubcf4\ub97c \uc678\ubd80 \ud30c\ud2b8\ub108\uc640 \uacf5\uc720\ud558\ub824\uba74 \uac15\ub825\ud55c \uc9c0\uc801 \uc7ac\uc0b0\uad8c \ubcf4\ud638 \uc870\uce58\uac00 \ud544\uc694\ud569\ub2c8\ub2e4.\n\uae30\ubc00 \uc720\uc9c0 \uacc4\uc57d, \uc548\uc804\ud55c \ub370\uc774\ud130 \uacf5\uc720 \ud50c\ub7ab\ud3fc, \uc5c4\uaca9\ud55c \uacc4\uc57d \uacc4\uc57d\uc740 \uc9c0\uc801 \uc7ac\uc0b0\uc744 \ubcf4\ud638\ud558\ub294 \ub370 \ub3c4\uc6c0\uc774 \ub420 \uc218 \uc788\uc2b5\ub2c8\ub2e4.   <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%a0%9c%ed%92%88-%eb%8d%b0%ec%9d%b4%ed%84%b0-%ea%b4%80%eb%a6%acpdm\/\"><\/a><a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%a0%9c%ed%92%88-%eb%8d%b0%ec%9d%b4%ed%84%b0-%ea%b4%80%eb%a6%acpdm\/\">\uc81c\ud488 \ub370\uc774\ud130 \uad00\ub9ac(PDM)\ub85c \uc11c\ube44\uc2a4\ud615 \uc81c\uc870(MaaS)\uc5d0\uc11c \ubbfc\uac10\ud55c \uc815\ubcf4\ub97c \ubcf4\ud638\ud558\ub294 \ubc29\ubc95\uc744 \uc54c\uc544\ubcf4\uc138\uc694.<\/a><\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-d85c00e0 gb-headline-text\">\uacf5\uae09\ub9dd \uac00\uc2dc\uc131<\/h4>\n\n\n\n<p>\uc5ec\ub7ec \uc11c\ube44\uc2a4 \uc81c\uacf5\uc5c5\uccb4\uc640 \ud611\ub825\ud560 \uacbd\uc6b0 \uacf5\uae09\ub9dd\uc744 \uc870\uc815\ud558\uace0 \ubaa8\ub2c8\ud130\ub9c1\ud558\ub294 \uc77c\uc740 \ubcf5\uc7a1\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.\n\uace0\uae09 \uacf5\uae09\ub9dd \uad00\ub9ac \uc2dc\uc2a4\ud15c\uc744 \uad6c\ud604\ud558\uace0 IoT \uc13c\uc11c\ub97c \ud65c\uc6a9\ud558\uba74 \uc804\uccb4 \uc0dd\uc0b0 \ud504\ub85c\uc138\uc2a4\uc5d0 \ub300\ud55c \uc2e4\uc2dc\uac04 \uac00\uc2dc\uc131\uc744 \uc81c\uacf5\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-4727e1a2 gb-headline-text\">\ucee4\ubba4\ub2c8\ucf00\uc774\uc158 \ubc0f \ud611\uc5c5<\/h4>\n\n\n\n<p>\uae30\uc5c5\uacfc \uc81c\uc870 \uc11c\ube44\uc2a4 \uc81c\uacf5\uc5c5\uccb4 \uac04\uc758 \ud6a8\uacfc\uc801\uc778 \ud611\uc5c5\uacfc \ucee4\ubba4\ub2c8\ucf00\uc774\uc158\uc740 \uc131\uacf5\uc801\uc778 MaaS \uad6c\ud604\uc744 \uc704\ud574 \ud544\uc218\uc801\uc785\ub2c8\ub2e4.\n\uba85\ud655\ud55c \uae30\ub300\uce58\ub97c \uc124\uc815\ud558\uace0, \ud611\uc5c5 \ud504\ub85c\uc81d\ud2b8 \uad00\ub9ac \ub3c4\uad6c\ub97c \ud65c\uc6a9\ud558\uace0, \uac15\ub825\ud55c \ud30c\ud2b8\ub108\uc2ed\uc744 \uad6c\ucd95\ud558\uba74 \uc6d0\ud65c\ud55c \ud611\ub825\uc774 \uac00\ub2a5\ud569\ub2c8\ub2e4. <\/p>\n\n\n\n<p>\uc774\ub7ec\ud55c \ubb38\uc81c\ub97c \uc120\uc81c\uc801\uc73c\ub85c \ud574\uacb0\ud568\uc73c\ub85c\uc368 \uae30\uc5c5\uc740 MaaS\ub85c\uc758 \uc6d0\ud65c\ud55c \uc804\ud658\uc744 \ubcf4\uc7a5\ud558\uace0 \uc774\uc810\uc744 \uadf9\ub300\ud654\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-9a24ad69 gb-headline-text\">\uc11c\ube44\uc2a4\ud615 \uc81c\uc870\uc758 \ud61c\ud0dd\uc744 \ubc1b\ub294 \uc0b0\uc5c5<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>\ud328\uc158 \ubc0f \uc758\ub958 \uc0b0\uc5c5: <\/strong>\ud328\uc158 \ubc0f \uc758\ub958 \uc0b0\uc5c5\uc740 \uc758\ub958 \uc0dd\uc0b0\uc744 \uc544\uc6c3\uc18c\uc2f1\ud568\uc73c\ub85c\uc368 \uc11c\ube44\uc2a4\ud615 \uc81c\uc870\uc758 \uc774\uc810\uc744 \ub204\ub9b4 \uc218 \uc788\uc2b5\ub2c8\ub2e4.\nMaaS\ub97c \ud1b5\ud574 \uae30\uc5c5\uc740 \ud544\uc694\uc5d0 \ub530\ub77c \uc804\ubb38 \uc81c\uc870\uc5c5\uccb4 \ubc0f \uc0dd\uc0b0 \uae30\ub2a5\uc744 \uc774\uc6a9\ud560 \uc218 \uc788\uc73c\ubbc0\ub85c \uc2dc\uc7a5 \ucd9c\uc2dc \uae30\uac04\uc744 \ub2e8\ucd95\ud558\uace0 \ud655\uc7a5\uc131 \ubc0f \ube44\uc6a9 \ud6a8\uc728\uc131\uc744 \ub192\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4. <\/li>\n\n\n\n<li><strong>\uc804\uc790 \uc0b0\uc5c5:<\/strong> \uc804\uc790 \uc0b0\uc5c5\uc5d0\uc11c \uc11c\ube44\uc2a4\ud615 \uc81c\uc870\ub294 \ud68c\ub85c \uae30\ud310 \uc870\ub9bd \ubc0f \uae30\ud0c0 \uc804\uc790 \ubd80\ud488 \uc0dd\uc0b0\uc744 \uc704\ud574 \uacc4\uc57d \uc81c\uc870\uc5c5\uccb4\ub97c \ud65c\uc6a9\ud560 \uc218 \uc788\ub294 \uae30\ud68c\ub97c \uc81c\uacf5\ud569\ub2c8\ub2e4.\nMaaS\ub294 \ucca8\ub2e8 \uae30\uc220, \uc804\uc790 \uc81c\ud488 \uc81c\uc870\uc5d0 \ub300\ud55c \uc804\ubb38 \uc9c0\uc2dd, \ubcc0\ud654\ud558\ub294 \uc2dc\uc7a5 \uc218\uc694\ub97c \ud6a8\uacfc\uc801\uc73c\ub85c \ucda9\uc871\ud560 \uc218 \uc788\ub294 \ub2a5\ub825\uc744 \uc81c\uacf5\ud569\ub2c8\ub2e4. <\/li>\n\n\n\n<li><strong>\uc790\ub3d9\ucc28 \uc0b0\uc5c5: <\/strong>\uc790\ub3d9\ucc28 \uc5c5\uacc4\ub294 \ubd80\ud488 \uc0dd\uc0b0, \uc870\ub9bd, \ub9de\ucda4\ud654 \ub4f1 \ub2e4\uc591\ud55c \uc81c\uc870 \uacf5\uc815\uc5d0 \uc11c\ube44\uc2a4\ud615 \uc81c\uc870\ub97c \ud65c\uc6a9\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.\n\uc790\ub3d9\ucc28 \uc81c\uc870\uc5c5\uccb4\ub294 MaaS\ub97c \ud1b5\ud574 \uc804\ubb38 \uc81c\uc870\uc5c5\uccb4\uc758 \uae00\ub85c\ubc8c \ub124\ud2b8\uc6cc\ud06c\ub97c \ud65c\uc6a9\ud558\uc5ec \ud6a8\uc728\uc801\uc778 \uc0dd\uc0b0, \ub9de\ucda4\ud654 \uc635\uc158 \ubc0f \ube60\ub978 \uc751\ub2f5 \uc2dc\uac04\uc744 \ucd09\uc9c4\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. <\/li>\n\n\n\n<li><strong>\uc758\ub8cc \uae30\uae30 \uc0b0\uc5c5: <\/strong>\uc11c\ube44\uc2a4\ud615 \uc81c\uc870\ub294 \ud2b9\ud788 \uc758\ub8cc \uae30\uae30 \uc0b0\uc5c5\uc5d0 \uc720\uc6a9\ud569\ub2c8\ub2e4.\n\uc758\ub8cc \uae30\uae30 \uc81c\uc870\uc5c5\uccb4\ub294 \uc815\ubc00 \uc81c\uc870, \uba78\uade0 \ud504\ub85c\uc138\uc2a4, \uc5c4\uaca9\ud55c \uaddc\uc81c \ud45c\uc900 \uc900\uc218\uc5d0 \ud544\uc694\ud55c \uc804\ubb38 \uc2dc\uc124\uacfc \uc804\ubb38 \uc9c0\uc2dd\uc744 \uc774\uc6a9\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.\nMaaS\ub294 \ub192\uc740 \ud488\uc9c8\uacfc \uaddc\uc815 \uc900\uc218\ub97c \uc720\uc9c0\ud558\uba74\uc11c \ube44\uc6a9 \ud6a8\uc728\uc801\uc778 \uc0dd\uc0b0\uc744 \uac00\ub2a5\ud558\uac8c \ud569\ub2c8\ub2e4.  <\/li>\n<\/ol>\n\n\n\n<h2 class=\"gb-headline gb-headline-4a545cbd gb-headline-text\">MaaS\uc758 \ubbf8\ub798<\/h2>\n\n\n\n<p>\uc11c\ube44\uc2a4\ub85c\uc11c\uc758 \uc81c\uc870\ub294 \ud5a5\ud6c4 \uba87 \ub144 \ub3d9\uc548 \uc81c\uc870 \uc0b0\uc5c5\uc744 \uc7ac\ud3b8\ud560 \uac83\uc785\ub2c8\ub2e4.\n\uba87 \uac00\uc9c0 \ud2b8\ub80c\ub4dc\ub294 MaaS\uac00 \ub098\uc544\uac08 \ubc29\ud5a5\uc744 \ubcf4\uc5ec\uc90d\ub2c8\ub2e4: <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-f527714e gb-headline-text\">\ucc44\ud0dd\ub960 \uc99d\uac00<\/h4>\n\n\n\n<p>\uae30\uc5c5\ub4e4\uc774 MaaS\uc758 \uc774\uc810\uc744 \uc778\uc2dd\ud568\uc5d0 \ub530\ub77c \ub3c4\uc785\ub960\uc774 \uc99d\uac00\ud560 \uac83\uc73c\ub85c \uc608\uc0c1\ub429\ub2c8\ub2e4.\n\ud2b9\ud788 \uc911\uc18c\uae30\uc5c5\uc740 \ub300\uae30\uc5c5\uacfc \uacbd\uc7c1\ud558\uace0 \uc2dc\uc7a5\uc5d0\uc11c \ubc1c\ud310\uc744 \ub9c8\ub828\ud558\uae30 \uc704\ud574 MaaS\ub97c \ub3c4\uc785\ud560 \uac83\uc785\ub2c8\ub2e4. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-b53bc335 gb-headline-text\">\ud5a5\uc0c1\ub41c \uae30\uc220 \ud1b5\ud569<\/h4>\n\n\n\n<p>AI, IoT, 3D \ud504\ub9b0\ud305, \ub85c\ubd07\uacf5\ud559\uc758 \uc735\ud569\uc740 MaaS\uc758 \uae30\ub2a5\uc744 \ub354\uc6b1 \ud5a5\uc0c1\uc2dc\ud0ac \uac83\uc785\ub2c8\ub2e4.\n\uc774\ub7ec\ud55c \uae30\uc220\uc744 \ud1b5\ud569\ud558\uba74 \uc790\ub3d9\ud654\ub97c \ucd09\uc9c4\ud558\uace0 \uc0dd\uc0b0 \ud504\ub85c\uc138\uc2a4\ub97c \ucd5c\uc801\ud654\ud558\uba70 \uc0c8\ub85c\uc6b4 \uc218\uc900\uc758 \ud6a8\uc728\uc131\uacfc \ub9de\ucda4\ud654\ub97c \uc2e4\ud604\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-f84583c9 gb-headline-text\">\ubd84\uc0b0 \uc81c\uc870 \ub124\ud2b8\uc6cc\ud06c<\/h4>\n\n\n\n<p>MaaS\ub294 \ubd84\uc0b0\ud615 \uc81c\uc870 \ub124\ud2b8\uc6cc\ud06c\uc758 \uac1c\ubc1c\uc744 \ucd09\uc9c4\ud558\uc5ec \uc804 \uc138\uacc4\uc758 \uc81c\uc870 \uc5ed\ub7c9\uc744 \uac16\ucd98 \uae30\uc5c5\uc744 \uc5f0\uacb0\ud560 \uac83\uc785\ub2c8\ub2e4.\n\uc774\ub7ec\ud55c \ub124\ud2b8\uc6cc\ud06c \uc811\uadfc \ubc29\uc2dd\uc744 \ud1b5\ud574 \uae30\uc5c5\uc740 \uc9c0\ub9ac\uc801 \uc704\uce58\uc5d0 \uad00\uacc4\uc5c6\uc774 \uc804\ubb38\ud654\ub41c \uc804\ubb38 \uc9c0\uc2dd\uacfc \ub9ac\uc18c\uc2a4\ub97c \ud65c\uc6a9\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-cfb02197 gb-headline-text\">\uc9c0\uc18d \uac00\ub2a5\ud55c \uc81c\uc870<\/h4>\n\n\n\n<p>\ud658\uacbd\uc801 \uc9c0\uc18d \uac00\ub2a5\uc131\uc740 MaaS\uc758 \ubbf8\ub798\uc5d0\uc11c \ud575\uc2ec\uc801\uc778 \ucd08\uc810\uc774 \ub420 \uac83\uc785\ub2c8\ub2e4.\n\uc81c\uc870\uc5c5\uccb4\ub294 \uc810\uc810 \ub354 \uce5c\ud658\uacbd\uc801\uc778 \uad00\ud589\uc744 \ucc44\ud0dd\ud558\uace0, \ud3d0\uae30\ubb3c\uc744 \uc904\uc774\uace0, \uc5d0\ub108\uc9c0 \uc18c\ube44\ub97c \ucd5c\uc801\ud654\ud558\uc5ec \ubcf4\ub2e4 \uc9c0\uc18d \uac00\ub2a5\ud558\uace0 \ucc45\uc784\uac10 \uc788\ub294 \uc81c\uc870 \uc0dd\ud0dc\uacc4\ub97c \uc870\uc131\ud560 \uac83\uc785\ub2c8\ub2e4. <\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-c6394760 gb-headline-text\">\ube44\uc988\ub2c8\uc2a4\uc5d0\uc11c MaaS\ub97c \uad6c\ud604\ud558\ub294 \ubc29\ubc95<\/h2>\n\n\n\n<p>\ube44\uc988\ub2c8\uc2a4\uc5d0 \uc11c\ube44\uc2a4\ub85c\uc11c\uc758 \uc81c\uc870 \uad6c\ud604\uc744 \uace0\ub824\ud558\uace0 \uc788\ub2e4\uba74 \uc2dc\uc791\ud558\uae30 \uc704\ud55c \ub2e8\uacc4\ubcc4 \uac00\uc774\ub4dc\ub97c \ucc38\uc870\ud558\uc138\uc694:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>\uc694\uad6c \uc0ac\ud56d \ud3c9\uac00<\/strong>: \ud604\uc7ac \uc81c\uc870 \uc5ed\ub7c9\uc744 \ud3c9\uac00\ud558\uace0, MaaS\uac00 \uac00\uce58\ub97c \ub354\ud560 \uc218 \uc788\ub294 \uc601\uc5ed\uc744 \ud30c\uc545\ud558\uace0, \ubaa8\ub378 \ub3c4\uc785\uc5d0 \ub300\ud55c \uba85\ud655\ud55c \ubaa9\ud45c\ub97c \uc124\uc815\ud558\uc138\uc694.<\/li>\n\n\n\n<li><strong>\ub9ac\uc11c\uce58 \uc11c\ube44\uc2a4 \uc81c\uacf5\uc5c5\uccb4<\/strong>: \ube44\uc988\ub2c8\uc2a4 \uc694\uad6c\uc0ac\ud56d\uc5d0 \ubd80\ud569\ud558\ub294 \uc81c\uc870 \uc11c\ube44\uc2a4 \uc81c\uacf5\uc5c5\uccb4 \uc2dc\uc7a5\uc744 \uc0b4\ud3b4\ubcf4\uc138\uc694.\n\uc804\ubb38\uc131, \uc5ed\ub7c9, \ud488\uc9c8 \ud45c\uc900, \uc9c0\ub9ac\uc801 \uc704\uce58 \ub4f1\uc758 \uc694\uc18c\ub97c \uace0\ub824\ud558\uc138\uc694. <\/li>\n\n\n\n<li><strong>\uc804\ud658 \uacc4\ud68d\uc744 \uc218\ub9bd\ud558\uc138\uc694<\/strong>: \uc77c\uc815, \ub9ac\uc18c\uc2a4 \ud560\ub2f9, \ucee4\ubba4\ub2c8\ucf00\uc774\uc158 \uc804\ub7b5 \ub4f1 MaaS\ub85c\uc758 \uc804\ud658\uc744 \uc704\ud55c \ub85c\ub4dc\ub9f5\uc744 \uc791\uc131\ud558\uc138\uc694.\n\uc8fc\uc694 \uc774\ud574\uad00\uacc4\uc790\uc758 \ub3d9\uc758\ub97c \uc5bb\uace0 \ud300\uc6d0\ub4e4\uc744 \ud504\ub85c\uc138\uc2a4\uc5d0 \ucc38\uc5ec\uc2dc\ud0a4\uc138\uc694. <\/li>\n\n\n\n<li><strong>\ud30c\uc77c\ub7ff \ud504\ub85c\uc81d\ud2b8<\/strong>: \uc18c\uaddc\ubaa8 \ud30c\uc77c\ub7ff \ud504\ub85c\uc81d\ud2b8\ub85c \uc2dc\uc791\ud558\uc5ec MaaS\uc758 \uc2e4\ud604 \uac00\ub2a5\uc131\uacfc \uc774\uc810\uc744 \ud14c\uc2a4\ud2b8\ud558\uc138\uc694.\n\ud575\uc2ec \uc131\uacfc \uc9c0\ud45c\ub97c \ubaa8\ub2c8\ud130\ub9c1\ud558\uace0 \ud53c\ub4dc\ubc31\uc744 \uc218\uc9d1\ud558\uc5ec \uad6c\ud604 \uc804\ub7b5\uc744 \uad6c\uccb4\ud654\ud558\uc138\uc694. <\/li>\n\n\n\n<li><strong>\ud655\uc7a5<\/strong>: MaaS\uc758 \uc774\uc810\uc744 \ud655\uc778\ud588\ub2e4\uba74 \uc81c\uc870 \uc11c\ube44\uc2a4 \uc81c\uacf5\uc5c5\uccb4\uc640\uc758 \uad00\uacc4\ub97c \ud655\uc7a5\ud558\uc138\uc694.\n\uc0c1\ud638 \uc2e0\ub8b0, \ud22c\uba85\uc131, \uacf5\uc720 \ubaa9\ud45c\ub97c \ubc14\ud0d5\uc73c\ub85c \uc7a5\uae30\uc801\uc778 \ud30c\ud2b8\ub108\uc2ed\uc744 \uad6c\ucd95\ud558\uc138\uc694. <\/li>\n\n\n\n<li><strong>\uc9c0\uc18d\uc801\uc778 \uac1c\uc120<\/strong>: MaaS \uad6c\ud604\uc744 \uc815\uae30\uc801\uc73c\ub85c \uac80\ud1a0\ud558\uace0 \ucd5c\uc801\ud654\ud558\uc138\uc694.\n\ub370\uc774\ud130 \ubd84\uc11d\uacfc \ud53c\ub4dc\ubc31 \ub8e8\ud504\ub97c \ud65c\uc6a9\ud558\uc5ec \uac1c\uc120\uc774 \ud544\uc694\ud55c \ubd80\ubd84\uc744 \ud30c\uc545\ud558\uace0 \uc9c0\uc18d\uc801\uc778 \ud601\uc2e0\uc744 \ucd94\uc9c4\ud558\uc138\uc694. <\/li>\n<\/ol>\n\n\n\n<p>\ub2e4\uc74c \ub2e8\uacc4\ub97c \ub530\ub974\uba74 MaaS\uc758 \uc7a0\uc7ac\ub825\uc744 \uc2e4\ud604\ud558\uace0 \uc5ed\ub3d9\uc801\uc778 \uc81c\uc870 \ud658\uacbd\uc5d0\uc11c \ube44\uc988\ub2c8\uc2a4\uc758 \uc131\uacf5 \uac00\ub2a5\uc131\uc744 \ub192\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-6bab3fe2 gb-headline-text\">APS \uc2dc\uc2a4\ud15c\uc744 \ud1b5\ud55c \uc81c\uc870 \ud6a8\uc728\uc131 \ud5a5\uc0c1<\/h2>\n\n\n\n<p>\uace0\uae09 \uacc4\ud68d \ubc0f \uc2a4\ucf00\uc904\ub9c1 \uc2dc\uc2a4\ud15c\uc744 \uad6c\ud604\ud558\uba74 \uc11c\ube44\uc2a4\ub85c\uc11c\uc758 \uc81c\uc870\uc758 \uc774\uc810\uc744 \ub354\uc6b1 \ud5a5\uc0c1\uc2dc\ud0ac \uc218 \uc788\uc2b5\ub2c8\ub2e4. <a href=\"https:\/\/skyplanner.ai\/ko\/\">Skyplanner\uc758 APS\ub97c <\/a>\ud1b5\ud574 \uae30\uc5c5\uc740 \uc0dd\uc0b0 \uacc4\ud68d, \ub9ac\uc18c\uc2a4 \ud560\ub2f9 \ubc0f \uc77c\uc815\uc744 \ucd5c\uc801\ud654\ud558\uc5ec \ud6a8\uc728\uc131\uacfc \uc0dd\uc0b0\uc131\uc744 \ud5a5\uc0c1\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n\n<p>AI\uac00 \ud0d1\uc7ac\ub41c \uace0\uae09 \uacc4\ud68d \ubc0f \uc2a4\ucf00\uc904\ub9c1 \uc18c\ud504\ud2b8\uc6e8\uc5b4\ub294 MaaS \uc194\ub8e8\uc158\uacfc \uc6d0\ud65c\ud558\uac8c \ud1b5\ud569\ub418\uc5b4 \uc0dd\uc0b0 \ud504\ub85c\uc138\uc2a4, \uc218\uc694 \uc608\uce21, \uc6a9\ub7c9 \uacc4\ud68d\uc5d0 \ub300\ud55c \uc2e4\uc2dc\uac04 \uac00\uc2dc\uc131\uc744 \uc81c\uacf5\ud569\ub2c8\ub2e4.\n\uc774\ub97c \ud1b5\ud574 \uae30\uc5c5\uc740 \ub370\uc774\ud130 \uae30\ubc18 \uc758\uc0ac \uacb0\uc815\uc744 \ub0b4\ub9ac\uace0, \uc7ac\uace0 \uc218\uc900\uc744 \ucd5c\uc801\ud654\ud558\uace0, \ub9ac\ub4dc \ud0c0\uc784\uc744 \ub2e8\ucd95\ud558\uace0, \uace0\uac1d\uc758 \uc694\uad6c\ub97c \ud6a8\uacfc\uc801\uc73c\ub85c \ucda9\uc871\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. <\/p>\n\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/ko\/%ea%b8%b0%eb%8a%a5\/\">Skyplanner\ub294<\/a> \uae30\uc5c5\uc774 \uc11c\ube44\uc2a4\ub85c\uc11c\uc758 \uc81c\uc870\uc758 \uc7a0\uc7ac\ub825\uc744 \ucd5c\ub300\ud55c \ud65c\uc6a9\ud560 \uc218 \uc788\ub3c4\ub85d \uc9c0\uc6d0\ud558\ub294 <a href=\"https:\/\/skyplanner.ai\/ko\/%ea%b8%b0%eb%8a%a5\/\">\ucd5c\ucca8\ub2e8 APS \uc18c\ud504\ud2b8\uc6e8\uc5b4\ub97c \uc804\ubb38\uc801\uc73c\ub85c \uc81c\uacf5\ud569\ub2c8\ub2e4<\/a>.\nSkyplanner\uc758 \uace0\uae09 \uae30\ub2a5\uc744 \ud1b5\ud574 \uae30\uc5c5\uc740 \uc6b4\uc601 \ud6a8\uc728\uc131\uc744 \ub192\uc774\uace0 \ube44\uc6a9\uc744 \ucd5c\uc18c\ud654\ud558\uba70 \uc81c\uc870 \uc0b0\uc5c5\uc5d0\uc11c \uacbd\uc7c1 \uc6b0\uc704\ub97c \ud655\ubcf4\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. <\/p>\n\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/ko\/%ec%98%81%ec%97%85%ed%8c%80%ec%97%90-%eb%ac%b8%ec%9d%98\/\">\uc9c0\uae08 \ubc14\ub85c<\/a> \uc2a4\uce74\uc774\ud50c\ub798\ub108 <a href=\"https:\/\/skyplanner.ai\/ko\/%ec%98%81%ec%97%85%ed%8c%80%ec%97%90-%eb%ac%b8%ec%9d%98\/\">\ud300\uc5d0 \ubb38\uc758\ud558\uc5ec<\/a> \uadc0\uc0ac\uac00 \uc11c\ube44\uc2a4\ub85c\uc11c\uc758 \uc81c\uc870\ub97c \uad6c\ud604\ud558\uace0 \uc0dd\uc0b0\uc131\uacfc \ub9e4\ucd9c\uc744 \ub192\uc77c \uc218 \uc788\ub294 \ubc29\ubc95\uc744 \uc54c\uc544\ubcf4\uc138\uc694.<\/p>\n\n\n\n<p>\uc11c\ube44\uc2a4\ub85c\uc11c\uc758 \uc81c\uc870\ub294 \uc81c\uc870 \uc0b0\uc5c5\uc5d0 \ud601\uc2e0\uc744 \uc77c\uc73c\ud0a4\uba70 \uae30\uc5c5\uc5d0 \ud0c1\uc6d4\ud55c \uc720\uc5f0\uc131, \ud655\uc7a5\uc131, \ube44\uc6a9 \ud6a8\uc728\uc131\uc744 \uc81c\uacf5\ud569\ub2c8\ub2e4.\n\ub514\uc9c0\ud138 \uae30\uc220, \uc804\ubb38 \uc9c0\uc2dd, \uc81c\uc870 \uc11c\ube44\uc2a4 \uc81c\uacf5\uc5c5\uccb4 \ub124\ud2b8\uc6cc\ud06c\ub97c \ud65c\uc6a9\ud558\uc5ec \uae30\uc5c5\uc740 \uc0dd\uc0b0 \ud504\ub85c\uc138\uc2a4\ub97c \ucd5c\uc801\ud654\ud558\uace0 \ube44\uc6a9\uc744 \uc808\uac10\ud558\uba70 \uacbd\uc7c1\uc5d0\uc11c \uc55e\uc11c \ub098\uac08 \uc218 \uc788\uc2b5\ub2c8\ub2e4.\n\uc624\ub298\ub0a0\uc758 \uc5ed\ub3d9\uc801\uc778 \ube44\uc988\ub2c8\uc2a4 \ud658\uacbd\uc5d0\uc11c \uc81c\uc870 \ud6a8\uc728\uc131\uc744 \uadf9\ub300\ud654\ud558\ub824\uba74 Skyplanner\uc640 \uac19\uc740 APS \uc2dc\uc2a4\ud15c\uacfc \uacb0\ud569\ub41c MaaS\ub97c \ub3c4\uc785\ud558\ub294 \uac83\uc774 \ud575\uc2ec\uc785\ub2c8\ub2e4.  <\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"302\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1024x302.png\" alt=\"&#xC0DD;&#xC0B0; &#xBB38;&#xC81C;&#xC5D0; &#xB300;&#xD55C; SkyPlanner &#xACE0;&#xAE09; &#xACC4;&#xD68D; &#xBC0F; &#xC2A4;&#xCF00;&#xC904;&#xB9C1; &#xC194;&#xB8E8;&#xC158;\" class=\"wp-image-4232\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1024x302.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-300x88.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-768x226.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1536x452.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-2048x603.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-509a8a4d gb-headline-text\">\uc790\uc8fc \ubb3b\ub294 \uc9c8\ubb38<\/h2>\n\n\n\n<p>\ub2e4\uc74c\uc740 \uc774 \ud601\uc2e0\uc801\uc778 \uac1c\ub150\uacfc \uc81c\uc870 \uc0b0\uc5c5\uc5d0 \ubbf8\uce58\ub294 \uc601\ud5a5\uc744 \uc774\ud574\ud558\ub294 \ub370 \ub3c4\uc6c0\uc774 \ub418\ub294 \uc11c\ube44\uc2a4\ud615 \uc81c\uc870(MaaS)\uc5d0 \ub300\ud574 \uc790\uc8fc \ubb3b\ub294 \uba87 \uac00\uc9c0 \uc9c8\ubb38\uc785\ub2c8\ub2e4.\n\uc774 \uc790\uc8fc \ubb3b\ub294 \uc9c8\ubb38\uc740 MaaS\uc758 \uc815\uc758\uc640 \uc774\uc810\ubd80\ud130 \ub3c4\uc804 \uacfc\uc81c\uc640 \ud5a5\ud6c4 \ud2b8\ub80c\ub4dc\uc5d0 \uc774\ub974\uae30\uae4c\uc9c0 \uc774 \ud601\uc2e0\uc801\uc778 \uc811\uadfc \ubc29\uc2dd\uc5d0 \ub300\ud55c \uadc0\uc911\ud55c \uc778\uc0ac\uc774\ud2b8\ub97c \uc81c\uacf5\ud569\ub2c8\ub2e4.\nMaaS \uad6c\ud604\uc5d0 \ub300\ud574 \uad81\uae08\ud55c \uc810\uc774 \uc788\uac70\ub098 \uc774\ub97c \ub4b7\ubc1b\uce68\ud558\ub294 \uc8fc\uc694 \uae30\uc220\uc744 \uc0b4\ud3b4\ubcf4\uace0 \uc2f6\uc73c\uc2dc\ub2e4\uba74 \uc774 FAQ \uc139\uc158\uc744 \ucc38\uc870\ud558\uc138\uc694.\n\uc11c\ube44\uc2a4\ub85c\uc11c\uc758 \uc81c\uc870\uc5d0 \ub300\ud574 \ub354 \uae4a\uc774 \uc774\ud574\ud558\uace0 \uae30\uc5c5\uc758 \uc0dd\uc0b0 \ubc29\uc2dd\uc744 \ud601\uc2e0\ud560 \uc218 \uc788\ub294 \uc7a0\uc7ac\ub825\uc5d0 \ub300\ud574 \uc54c\uc544\ubcf4\uc138\uc694.   <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-c2a2d786 gb-headline-text\">\uc11c\ube44\uc2a4\ud615 \uc81c\uc870(MaaS)\ub780 \ubb34\uc5c7\uc778\uac00\uc694?<\/h4>\n\n\n\n<p>\uc11c\ube44\uc2a4\ub85c\uc11c\uc758 \uc81c\uc870\ub294 \uae30\uc5c5\uc774 \ub300\uaddc\ubaa8 \uc0ac\ub0b4 \uc0dd\uc0b0 \uc2dc\uc124\uc5d0 \ud22c\uc790\ud558\ub294 \ub300\uc2e0 \ud544\uc694\uc5d0 \ub530\ub77c \uc81c\uc870 \ub9ac\uc18c\uc2a4\uc640 \uc5ed\ub7c9\uc744 \uc774\uc6a9\ud560 \uc218 \uc788\ub294 \ube44\uc988\ub2c8\uc2a4 \ubaa8\ub378\uc785\ub2c8\ub2e4.\n\ub514\uc9c0\ud138 \uae30\uc220\uacfc \uc81c\uc870 \uc11c\ube44\uc2a4 \uc81c\uacf5\uc5c5\uccb4 \ub124\ud2b8\uc6cc\ud06c\ub97c \ud65c\uc6a9\ud558\uc5ec \ud655\uc7a5 \uac00\ub2a5\ud558\uace0 \ube44\uc6a9 \ud6a8\uc728\uc801\uc774\uba70 \ud6a8\uc728\uc801\uc778 \uc0dd\uc0b0 \uc194\ub8e8\uc158\uc744 \uc81c\uacf5\ud569\ub2c8\ub2e4. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-bc2ed937 gb-headline-text\">MaaS\ub294 \uae30\uc874 \uc81c\uc870\uc5c5\uacfc \uc5b4\ub5bb\uac8c \ub2e4\ub978\uac00\uc694?<\/h4>\n\n\n\n<p>\uc804\ud1b5\uc801\uc778 \uc81c\uc870\uc5c5\uc740 \uc0ac\ub0b4 \uc0dd\uc0b0 \uc2dc\uc124\uc744 \uad6c\ucd95\ud558\uace0 \uc720\uc9c0\ud574\uc57c \ud558\ub294 \ubc18\uba74, MaaS\ub294 \uc720\uc5f0\ud558\uace0 \ud655\uc7a5 \uac00\ub2a5\ud55c \ub300\uc548\uc744 \uc81c\uacf5\ud569\ub2c8\ub2e4.\nMaaS\ub97c \ud1b5\ud574 \uae30\uc5c5\uc740 \uc81c\uc870 \uc791\uc5c5\uc744 \uc804\ubb38 \uc11c\ube44\uc2a4 \uc81c\uacf5\uc5c5\uccb4\uc5d0 \uc544\uc6c3\uc18c\uc2f1\ud558\uc5ec \uc778\ud504\ub77c\uc640 \uc7a5\ube44\uc5d0 \ub300\ud55c \uc790\ubcf8 \ud22c\uc790\ub97c \uc904\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4.\n\uc774\ub97c \ud1b5\ud574 \uae30\uc5c5\uc740 \ud575\uc2ec \ubd84\uc57c\uc5d0 \uc6b0\uc120\uc21c\uc704\ub97c \ub450\uace0 \uc11c\ube44\uc2a4 \uc81c\uacf5\uc5c5\uccb4\uc758 \uc804\ubb38\uc131\uc744 \ud65c\uc6a9\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-8dfbc30e gb-headline-text\">MaaS\ub97c \uc9c0\uc6d0\ud558\ub294 \ud575\uc2ec \uae30\uc220\uc5d0\ub294 \uc5b4\ub5a4 \uac83\uc774 \uc788\ub098\uc694?<\/h4>\n\n\n\n<p>MaaS\ub294 \uc0ac\ubb3c\uc778\ud130\ub137(IoT), 3D \ud504\ub9b0\ud305, \uc778\uacf5\uc9c0\ub2a5(AI), \ub85c\ubd07\uacf5\ud559, \ud074\ub77c\uc6b0\ub4dc \ucef4\ud4e8\ud305 \ub4f1 \uc5ec\ub7ec \uac00\uc9c0 \ud575\uc2ec \uae30\uc220\uc744 \ud65c\uc6a9\ud569\ub2c8\ub2e4.\n\uc774\ub7ec\ud55c \uae30\uc220\uc740 \ud568\uaed8 \uc791\ub3d9\ud558\uc5ec \uc0dd\uc0b0 \uacc4\ud68d\uc744 \ucd5c\uc801\ud654\ud558\uace0, \uc790\uc0b0 \ud65c\uc6a9\ub3c4\ub97c \uac1c\uc120\ud558\uba70, \ub9de\ucda4\ud654\ub97c \uac00\ub2a5\ud558\uac8c \ud558\uace0, \uc81c\uc870 \ud504\ub85c\uc138\uc2a4\uc5d0\uc11c \ud611\uc5c5\uc744 \uac15\ud654\ud569\ub2c8\ub2e4. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-431a9d0c gb-headline-text\">\uc11c\ube44\uc2a4\ub85c\uc11c\uc758 \uc81c\uc870\ub97c \ub3c4\uc785\ud558\uba74 \uc5b4\ub5a4 \uc774\uc810\uc774 \uc788\ub098\uc694?<\/h4>\n\n\n\n<p>MaaS\ub97c \ub3c4\uc785\ud558\uba74 \uae30\uc5c5\uc740 \ube44\uc6a9 \uc808\uac10, \uc0dd\uc0b0 \uc18d\ub3c4, \ud655\uc7a5\uc131, \uc804\ubb38 \uc9c0\uc2dd \ud65c\uc6a9, \uc704\ud5d8 \uc644\ud654, \ud601\uc2e0, \uae00\ub85c\ubc8c \uc9c4\ucd9c, \ud658\uacbd\uc801 \uc9c0\uc18d \uac00\ub2a5\uc131 \ub4f1\uc758 \uc774\uc810\uc744 \ub204\ub9b4 \uc218 \uc788\uc2b5\ub2c8\ub2e4.\nMaaS\ub97c \ud1b5\ud574 \uae30\uc5c5\uc740 \uc804\ubb38 \uc81c\uc870\uc5c5\uccb4 \ub124\ud2b8\uc6cc\ud06c\ub97c \ud65c\uc6a9\ud558\uace0, \uc0dd\uc0b0 \ud504\ub85c\uc138\uc2a4\ub97c \ucd5c\uc801\ud654\ud558\uba70, \uc9c4\ud654\ud558\ub294 \uc81c\uc870 \uc0b0\uc5c5\uc5d0\uc11c \uacbd\uc7c1\ub825\uc744 \uc720\uc9c0\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-f66f175d gb-headline-text\">MaaS\ub97c \uad6c\ud604\ud560 \ub54c \uc5b4\ub5a4 \uc5b4\ub824\uc6c0\uc774 \uc788\ub098\uc694?<\/h4>\n\n\n\n<p>\uc5ec\ub7ec \uc11c\ube44\uc2a4 \uc81c\uacf5\uc5c5\uccb4\uc5d0\uc11c \uc77c\uad00\ub41c \ud488\uc9c8 \uc720\uc9c0, \uc9c0\uc801 \uc7ac\uc0b0\uad8c \ubcf4\ud638, \uacf5\uae09\ub9dd \uac00\uc2dc\uc131 \ud655\ubcf4, \ud6a8\uacfc\uc801\uc778 \ucee4\ubba4\ub2c8\ucf00\uc774\uc158 \ubc0f \ud611\uc5c5 \uad6c\ucd95 \ub4f1 MaaS\ub97c \uad6c\ud604\ud560 \ub54c \ud754\ud788 \ubc1c\uc0dd\ud558\ub294 \uba87 \uac00\uc9c0 \uacfc\uc81c\uac00 \uc788\uc2b5\ub2c8\ub2e4.\n\ud558\uc9c0\ub9cc \ud45c\uc900\ud654\ub41c \ud488\uc9c8 \uad00\ub9ac \ud504\ub85c\uc138\uc2a4\ub97c \uad6c\ud604\ud558\uace0, \uc548\uc804\ud55c \ub370\uc774\ud130 \uacf5\uc720 \ud50c\ub7ab\ud3fc\uc744 \ud65c\uc6a9\ud558\uace0, \uac15\ub825\ud55c \ud30c\ud2b8\ub108\uc2ed\uc744 \uad6c\ucd95\ud558\uba74 \uc774\ub7ec\ud55c \uacfc\uc81c\ub97c \ud574\uacb0\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-ea9c933e gb-headline-text\">MaaS\uc758 \ubbf8\ub798\ub294 \uc5b4\ub5bb\uac8c \ub420\uae4c\uc694?<\/h4>\n\n\n\n<p>MaaS\uc758 \ubbf8\ub798\uc5d0\ub294 \ucc44\ud0dd \uc99d\uac00, \uae30\uc220 \ud1b5\ud569 \uac15\ud654, \ubd84\uc0b0\ub41c \uc81c\uc870 \ub124\ud2b8\uc6cc\ud06c\uc758 \uac1c\ubc1c, \uc9c0\uc18d \uac00\ub2a5\ud55c \uc81c\uc870 \uad00\ud589\uc5d0 \ub300\ud55c \uc9d1\uc911\uc774 \ud3ec\ud568\ub429\ub2c8\ub2e4.\n\ub354 \ub9ce\uc740 \uae30\uc5c5\uc774 MaaS\uc758 \uc774\uc810\uc744 \uc778\uc2dd\ud568\uc5d0 \ub530\ub77c MaaS\ub294 \uacc4\uc18d\ud574\uc11c \uc81c\uc870 \uc0b0\uc5c5\uc744 \uc7ac\ud3b8\ud558\uc5ec \uc131\uc7a5\uacfc \ud601\uc2e0\uc758 \uae30\ud68c\ub97c \uc81c\uacf5\ud560 \uac83\uc785\ub2c8\ub2e4. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-d073317f gb-headline-text\">\uae30\uc5c5\uc774 \uc6b4\uc601\uc5d0\uc11c MaaS\ub97c \uad6c\ud604\ud558\ub824\uba74 \uc5b4\ub5bb\uac8c \ud574\uc57c \ud560\uae4c\uc694?<\/h4>\n\n\n\n<p>MaaS\ub97c \uad6c\ud604\ud558\ub824\uba74 \uae30\uc5c5\uc740 \uc694\uad6c \uc0ac\ud56d\uc744 \ud3c9\uac00\ud558\uace0, \uc801\ud569\ud55c \uc11c\ube44\uc2a4 \uc81c\uacf5\uc5c5\uccb4\ub97c \uc870\uc0ac\ud558\uace0, \uc804\ud658 \uacc4\ud68d\uc744 \uac1c\ubc1c\ud558\uace0, \ud30c\uc77c\ub7ff \ud504\ub85c\uc81d\ud2b8\ubd80\ud130 \uc2dc\uc791\ud558\uc5ec \uad00\ucc30\ub41c \uc774\uc810\uc5d0 \ub530\ub77c \ud655\uc7a5\ud558\uace0, \uc9c0\uc18d\uc801\uc73c\ub85c \uad6c\ud604\uc744 \uac80\ud1a0\ud558\uace0 \ucd5c\uc801\ud654\ud574\uc57c \ud569\ub2c8\ub2e4.\n\uc774\ub7ec\ud55c \ub2e8\uacc4\ub97c \ub530\ub974\uba74 \uae30\uc5c5\uc740 MaaS\ub97c \uc81c\uc870 \uc6b4\uc601\uc5d0 \uc131\uacf5\uc801\uc73c\ub85c \ud1b5\ud569\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-1a5eb120 gb-headline-text\">\uc5b4\ub5bb\uac8c APS \uc2dc\uc2a4\ud15c\uc73c\ub85c MaaS \uad6c\ud604\uc744 \ud5a5\uc0c1\uc2dc\ud0ac \uc218 \uc788\ub098\uc694?<\/h4>\n\n\n\n<p>Skyplanner\uc758 APS\uc640 \uac19\uc740 APS \uc2dc\uc2a4\ud15c\uc744 \uad6c\ud604\ud558\uba74 \uc11c\ube44\uc2a4\ub85c\uc11c\uc758 \uc81c\uc870\uc758 \uc774\uc810\uc744 \ub354\uc6b1 \ud5a5\uc0c1\uc2dc\ud0ac \uc218 \uc788\uc2b5\ub2c8\ub2e4.\nAPS\ub294 \uc0dd\uc0b0 \uacc4\ud68d, \ub9ac\uc18c\uc2a4 \ud560\ub2f9 \ubc0f \uc77c\uc815\uc744 \ucd5c\uc801\ud654\ud558\uc5ec \ud6a8\uc728\uc131\uacfc \uc0dd\uc0b0\uc131\uc744 \uac1c\uc120\ud569\ub2c8\ub2e4.\nMaaS \uc194\ub8e8\uc158\uacfc \uc6d0\ud65c\ud558\uac8c \ud1b5\ud569\ub418\uc5b4 \uc0dd\uc0b0 \ud504\ub85c\uc138\uc2a4\uc5d0 \ub300\ud55c \uc2e4\uc2dc\uac04 \uac00\uc2dc\uc131\uc744 \uc81c\uacf5\ud558\uace0 \ub370\uc774\ud130 \uae30\ubc18 \uc758\uc0ac\uacb0\uc815\uc744 \ud1b5\ud574 \uc7ac\uace0 \uad00\ub9ac\ub97c \uac1c\uc120\ud558\uace0 \uace0\uac1d \uc694\uad6c\ub97c \ud6a8\uacfc\uc801\uc73c\ub85c \ucda9\uc871\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.  <\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-92545123\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-0a61546f\">\n<div class=\"gb-grid-column gb-grid-column-e4183086\"><div class=\"gb-container gb-container-e4183086\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-84ccbb5d\"><div class=\"gb-container gb-container-84ccbb5d\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\uc11c\ube44\uc2a4\ud615 \uc81c\uc870(MaaS)\ub780 \ubb34\uc5c7\uc778\uac00\uc694? \ud648 &#8221; \ub9ac\uc18c\uc2a4 &#8221; \uc11c\ube44\uc2a4\ud615 \uc81c\uc870(MaaS)\ub780 \ubb34\uc5c7\uc778\uac00\uc694? \uc81c\uc870 \ud504\ub85c\uc138\uc2a4\uac00 \uc6d0\ud65c\ud558\uace0 \ud6a8\uc728\uc801\uc774\uba70 \uc801\uc751\ub825\uc774 \ub6f0\uc5b4\ub09c \uc138\uc0c1\uc744 \uc0c1\uc0c1\ud574 \ubcf4\uc138\uc694. \uae30\uc5c5\uc774 \uc778\ud504\ub77c\uc640 \uc7a5\ube44\uc5d0 \ub300\uaddc\ubaa8\ub85c \ud22c\uc790\ud560 \ud544\uc694 \uc5c6\uc774 \ud544\uc694\uc5d0 \ub530\ub77c \uc81c\uc870 \uae30\ub2a5\uc744 \uc774\uc6a9\ud560 \uc218 \uc788\ub294 \uc138\uc0c1. \uc774\uac83\uc774 \ubc14\ub85c \uc81c\uc870 \uc0b0\uc5c5\uc744 \ubcc0\ud654\uc2dc\ud0a4\uace0 \uc788\ub294 \ud601\uc2e0\uc801\uc778 \uac1c\ub150\uc778 \uc11c\ube44\uc2a4\ud615 \uc81c\uc870(MaaS)\uc758 \ud798\uc785\ub2c8\ub2e4. \uc774 \uae00\uc5d0\uc11c\ub294 \uc11c\ube44\uc2a4\ub85c\uc11c\uc758 \uc81c\uc870\uc5d0 \ub300\ud55c \uc815\uc758\uc640 \uac1c\uc694\ub97c \uc0b4\ud3b4\ubcf4\uace0, \uae30\uc874 \uc81c\uc870 &#8230; <a title=\"\uc11c\ube44\uc2a4\ud615 \uc81c\uc870(MaaS)\ub780 \ubb34\uc5c7\uc778\uac00\uc694?\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%84%9c%eb%b9%84%ec%8a%a4%ed%98%95-%ec%a0%9c%ec%a1%b0maas%eb%9e%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80%ec%9a%94\/\" aria-label=\"Read more about \uc11c\ube44\uc2a4\ud615 \uc81c\uc870(MaaS)\ub780 \ubb34\uc5c7\uc778\uac00\uc694?\">Read more<\/a><\/p>\n","protected":false},"author":6,"featured_media":38619,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[496,2558],"tags":[],"class_list":["post-38617","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-496","category-2558","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\uc11c\ube44\uc2a4\ud615 \uc81c\uc870(MaaS)\ub780 \ubb34\uc5c7\uc778\uac00\uc694? &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"\uc11c\ube44\uc2a4\ub85c\uc11c\uc758 \uc81c\uc870\ub294 \uae30\uc5c5\uc774 \ub300\uaddc\ubaa8 \uc0ac\ub0b4 \uc0dd\uc0b0 \uc2dc\uc124\uc5d0 \ud22c\uc790\ud558\uc9c0 \uc54a\uace0 \ud544\uc694\uc5d0 \ub530\ub77c \uc81c\uc870 \ub9ac\uc18c\uc2a4\uc640 \uc5ed\ub7c9\uc744 \uc774\uc6a9\ud560 \uc218 \uc788\ub294 \ube44\uc988\ub2c8\uc2a4 \ubaa8\ub378\uc785\ub2c8\ub2e4.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%84%9c%eb%b9%84%ec%8a%a4%ed%98%95-%ec%a0%9c%ec%a1%b0maas%eb%9e%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80%ec%9a%94\/\" \/>\n<meta property=\"og:locale\" content=\"ko_KR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\uc11c\ube44\uc2a4\ud615 \uc81c\uc870(MaaS)\ub780 \ubb34\uc5c7\uc778\uac00\uc694?\" \/>\n<meta property=\"og:description\" content=\"\uc11c\ube44\uc2a4\ub85c\uc11c\uc758 \uc81c\uc870\ub294 \uae30\uc5c5\uc774 \ub300\uaddc\ubaa8 \uc0ac\ub0b4 \uc0dd\uc0b0 \uc2dc\uc124\uc5d0 \ud22c\uc790\ud558\uc9c0 \uc54a\uace0 \ud544\uc694\uc5d0 \ub530\ub77c \uc81c\uc870 \ub9ac\uc18c\uc2a4\uc640 \uc5ed\ub7c9\uc744 \uc774\uc6a9\ud560 \uc218 \uc788\ub294 \ube44\uc988\ub2c8\uc2a4 \ubaa8\ub378\uc785\ub2c8\ub2e4.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%84%9c%eb%b9%84%ec%8a%a4%ed%98%95-%ec%a0%9c%ec%a1%b0maas%eb%9e%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80%ec%9a%94\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2023-07-15T16:44:06+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-08-09T06:58:33+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/Manufacturing-as-a-Service-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\uae00\uc4f4\uc774\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n\t<meta name=\"twitter:label2\" content=\"\uc608\uc0c1 \ub418\ub294 \ud310\ub3c5 \uc2dc\uac04\" \/>\n\t<meta name=\"twitter:data2\" content=\"1\ubd84\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/%ec%84%9c%eb%b9%84%ec%8a%a4%ed%98%95-%ec%a0%9c%ec%a1%b0maas%eb%9e%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80%ec%9a%94\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/%ec%84%9c%eb%b9%84%ec%8a%a4%ed%98%95-%ec%a0%9c%ec%a1%b0maas%eb%9e%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80%ec%9a%94\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"\uc11c\ube44\uc2a4\ud615 \uc81c\uc870(MaaS)\ub780 \ubb34\uc5c7\uc778\uac00\uc694?\",\"datePublished\":\"2023-07-15T16:44:06+00:00\",\"dateModified\":\"2024-08-09T06:58:33+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/%ec%84%9c%eb%b9%84%ec%8a%a4%ed%98%95-%ec%a0%9c%ec%a1%b0maas%eb%9e%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80%ec%9a%94\\\/\"},\"wordCount\":117,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/%ec%84%9c%eb%b9%84%ec%8a%a4%ed%98%95-%ec%a0%9c%ec%a1%b0maas%eb%9e%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80%ec%9a%94\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/Manufacturing-as-a-Service-scaled.jpg\",\"articleSection\":[\"\ub9ac\uc18c\uc2a4\",\"\uc81c\uc870 \ud6a8\uc728\"],\"inLanguage\":\"ko-KR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/%ec%84%9c%eb%b9%84%ec%8a%a4%ed%98%95-%ec%a0%9c%ec%a1%b0maas%eb%9e%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80%ec%9a%94\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/%ec%84%9c%eb%b9%84%ec%8a%a4%ed%98%95-%ec%a0%9c%ec%a1%b0maas%eb%9e%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80%ec%9a%94\\\/\",\"name\":\"\uc11c\ube44\uc2a4\ud615 \uc81c\uc870(MaaS)\ub780 \ubb34\uc5c7\uc778\uac00\uc694? &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/%ec%84%9c%eb%b9%84%ec%8a%a4%ed%98%95-%ec%a0%9c%ec%a1%b0maas%eb%9e%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80%ec%9a%94\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/%ec%84%9c%eb%b9%84%ec%8a%a4%ed%98%95-%ec%a0%9c%ec%a1%b0maas%eb%9e%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80%ec%9a%94\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/Manufacturing-as-a-Service-scaled.jpg\",\"datePublished\":\"2023-07-15T16:44:06+00:00\",\"dateModified\":\"2024-08-09T06:58:33+00:00\",\"description\":\"\uc11c\ube44\uc2a4\ub85c\uc11c\uc758 \uc81c\uc870\ub294 \uae30\uc5c5\uc774 \ub300\uaddc\ubaa8 \uc0ac\ub0b4 \uc0dd\uc0b0 \uc2dc\uc124\uc5d0 \ud22c\uc790\ud558\uc9c0 \uc54a\uace0 \ud544\uc694\uc5d0 \ub530\ub77c \uc81c\uc870 \ub9ac\uc18c\uc2a4\uc640 \uc5ed\ub7c9\uc744 \uc774\uc6a9\ud560 \uc218 \uc788\ub294 \ube44\uc988\ub2c8\uc2a4 \ubaa8\ub378\uc785\ub2c8\ub2e4.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/%ec%84%9c%eb%b9%84%ec%8a%a4%ed%98%95-%ec%a0%9c%ec%a1%b0maas%eb%9e%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80%ec%9a%94\\\/#breadcrumb\"},\"inLanguage\":\"ko-KR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/%ec%84%9c%eb%b9%84%ec%8a%a4%ed%98%95-%ec%a0%9c%ec%a1%b0maas%eb%9e%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80%ec%9a%94\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/%ec%84%9c%eb%b9%84%ec%8a%a4%ed%98%95-%ec%a0%9c%ec%a1%b0maas%eb%9e%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80%ec%9a%94\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/Manufacturing-as-a-Service-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/Manufacturing-as-a-Service-scaled.jpg\",\"width\":2560,\"height\":1707,\"caption\":\"Manufacturing as a Service\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/%ec%84%9c%eb%b9%84%ec%8a%a4%ed%98%95-%ec%a0%9c%ec%a1%b0maas%eb%9e%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80%ec%9a%94\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\uc11c\ube44\uc2a4\ud615 \uc81c\uc870(MaaS)\ub780 \ubb34\uc5c7\uc778\uac00\uc694?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ko-KR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\uc11c\ube44\uc2a4\ud615 \uc81c\uc870(MaaS)\ub780 \ubb34\uc5c7\uc778\uac00\uc694? &#8211; SkyPlanner","description":"\uc11c\ube44\uc2a4\ub85c\uc11c\uc758 \uc81c\uc870\ub294 \uae30\uc5c5\uc774 \ub300\uaddc\ubaa8 \uc0ac\ub0b4 \uc0dd\uc0b0 \uc2dc\uc124\uc5d0 \ud22c\uc790\ud558\uc9c0 \uc54a\uace0 \ud544\uc694\uc5d0 \ub530\ub77c \uc81c\uc870 \ub9ac\uc18c\uc2a4\uc640 \uc5ed\ub7c9\uc744 \uc774\uc6a9\ud560 \uc218 \uc788\ub294 \ube44\uc988\ub2c8\uc2a4 \ubaa8\ub378\uc785\ub2c8\ub2e4.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%84%9c%eb%b9%84%ec%8a%a4%ed%98%95-%ec%a0%9c%ec%a1%b0maas%eb%9e%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80%ec%9a%94\/","og_locale":"ko_KR","og_type":"article","og_title":"\uc11c\ube44\uc2a4\ud615 \uc81c\uc870(MaaS)\ub780 \ubb34\uc5c7\uc778\uac00\uc694?","og_description":"\uc11c\ube44\uc2a4\ub85c\uc11c\uc758 \uc81c\uc870\ub294 \uae30\uc5c5\uc774 \ub300\uaddc\ubaa8 \uc0ac\ub0b4 \uc0dd\uc0b0 \uc2dc\uc124\uc5d0 \ud22c\uc790\ud558\uc9c0 \uc54a\uace0 \ud544\uc694\uc5d0 \ub530\ub77c \uc81c\uc870 \ub9ac\uc18c\uc2a4\uc640 \uc5ed\ub7c9\uc744 \uc774\uc6a9\ud560 \uc218 \uc788\ub294 \ube44\uc988\ub2c8\uc2a4 \ubaa8\ub378\uc785\ub2c8\ub2e4.","og_url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%84%9c%eb%b9%84%ec%8a%a4%ed%98%95-%ec%a0%9c%ec%a1%b0maas%eb%9e%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80%ec%9a%94\/","og_site_name":"SkyPlanner","article_published_time":"2023-07-15T16:44:06+00:00","article_modified_time":"2024-08-09T06:58:33+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/Manufacturing-as-a-Service-scaled.jpg","type":"image\/jpeg"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"\uae00\uc4f4\uc774":"SkyPlanner","\uc608\uc0c1 \ub418\ub294 \ud310\ub3c5 \uc2dc\uac04":"1\ubd84"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%84%9c%eb%b9%84%ec%8a%a4%ed%98%95-%ec%a0%9c%ec%a1%b0maas%eb%9e%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80%ec%9a%94\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%84%9c%eb%b9%84%ec%8a%a4%ed%98%95-%ec%a0%9c%ec%a1%b0maas%eb%9e%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80%ec%9a%94\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"\uc11c\ube44\uc2a4\ud615 \uc81c\uc870(MaaS)\ub780 \ubb34\uc5c7\uc778\uac00\uc694?","datePublished":"2023-07-15T16:44:06+00:00","dateModified":"2024-08-09T06:58:33+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%84%9c%eb%b9%84%ec%8a%a4%ed%98%95-%ec%a0%9c%ec%a1%b0maas%eb%9e%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80%ec%9a%94\/"},"wordCount":117,"publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%84%9c%eb%b9%84%ec%8a%a4%ed%98%95-%ec%a0%9c%ec%a1%b0maas%eb%9e%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80%ec%9a%94\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/Manufacturing-as-a-Service-scaled.jpg","articleSection":["\ub9ac\uc18c\uc2a4","\uc81c\uc870 \ud6a8\uc728"],"inLanguage":"ko-KR"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%84%9c%eb%b9%84%ec%8a%a4%ed%98%95-%ec%a0%9c%ec%a1%b0maas%eb%9e%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80%ec%9a%94\/","url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%84%9c%eb%b9%84%ec%8a%a4%ed%98%95-%ec%a0%9c%ec%a1%b0maas%eb%9e%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80%ec%9a%94\/","name":"\uc11c\ube44\uc2a4\ud615 \uc81c\uc870(MaaS)\ub780 \ubb34\uc5c7\uc778\uac00\uc694? &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%84%9c%eb%b9%84%ec%8a%a4%ed%98%95-%ec%a0%9c%ec%a1%b0maas%eb%9e%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80%ec%9a%94\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%84%9c%eb%b9%84%ec%8a%a4%ed%98%95-%ec%a0%9c%ec%a1%b0maas%eb%9e%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80%ec%9a%94\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/Manufacturing-as-a-Service-scaled.jpg","datePublished":"2023-07-15T16:44:06+00:00","dateModified":"2024-08-09T06:58:33+00:00","description":"\uc11c\ube44\uc2a4\ub85c\uc11c\uc758 \uc81c\uc870\ub294 \uae30\uc5c5\uc774 \ub300\uaddc\ubaa8 \uc0ac\ub0b4 \uc0dd\uc0b0 \uc2dc\uc124\uc5d0 \ud22c\uc790\ud558\uc9c0 \uc54a\uace0 \ud544\uc694\uc5d0 \ub530\ub77c \uc81c\uc870 \ub9ac\uc18c\uc2a4\uc640 \uc5ed\ub7c9\uc744 \uc774\uc6a9\ud560 \uc218 \uc788\ub294 \ube44\uc988\ub2c8\uc2a4 \ubaa8\ub378\uc785\ub2c8\ub2e4.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%84%9c%eb%b9%84%ec%8a%a4%ed%98%95-%ec%a0%9c%ec%a1%b0maas%eb%9e%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80%ec%9a%94\/#breadcrumb"},"inLanguage":"ko-KR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%84%9c%eb%b9%84%ec%8a%a4%ed%98%95-%ec%a0%9c%ec%a1%b0maas%eb%9e%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80%ec%9a%94\/"]}]},{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%84%9c%eb%b9%84%ec%8a%a4%ed%98%95-%ec%a0%9c%ec%a1%b0maas%eb%9e%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80%ec%9a%94\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/Manufacturing-as-a-Service-scaled.jpg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/Manufacturing-as-a-Service-scaled.jpg","width":2560,"height":1707,"caption":"Manufacturing as a Service"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%84%9c%eb%b9%84%ec%8a%a4%ed%98%95-%ec%a0%9c%ec%a1%b0maas%eb%9e%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80%ec%9a%94\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ko\/"},{"@type":"ListItem","position":2,"name":"\uc11c\ube44\uc2a4\ud615 \uc81c\uc870(MaaS)\ub780 \ubb34\uc5c7\uc778\uac00\uc694?"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ko\/#website","url":"https:\/\/skyplanner.ai\/ko\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ko\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ko-KR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ko\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ko\/","logo":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/Manufacturing-as-a-Service-scaled.jpg",2560,1707,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/Manufacturing-as-a-Service-150x150.jpg",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/Manufacturing-as-a-Service-300x200.jpg",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/Manufacturing-as-a-Service-768x512.jpg",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/Manufacturing-as-a-Service-1024x683.jpg",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/Manufacturing-as-a-Service-1536x1024.jpg",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/Manufacturing-as-a-Service-2048x1365.jpg",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/07\/Manufacturing-as-a-Service-scaled.jpg",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/ko\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"\uc11c\ube44\uc2a4\ud615 \uc81c\uc870(MaaS)\ub780 \ubb34\uc5c7\uc778\uac00\uc694? \ud648 &#8221; \ub9ac\uc18c\uc2a4 &#8221; \uc11c\ube44\uc2a4\ud615 \uc81c\uc870(MaaS)\ub780 \ubb34\uc5c7\uc778\uac00\uc694? \uc81c\uc870 \ud504\ub85c\uc138\uc2a4\uac00 \uc6d0\ud65c\ud558\uace0 \ud6a8\uc728\uc801\uc774\uba70 \uc801\uc751\ub825\uc774 \ub6f0\uc5b4\ub09c \uc138\uc0c1\uc744 \uc0c1\uc0c1\ud574 \ubcf4\uc138\uc694. \uae30\uc5c5\uc774 \uc778\ud504\ub77c\uc640 \uc7a5\ube44\uc5d0 \ub300\uaddc\ubaa8\ub85c \ud22c\uc790\ud560 \ud544\uc694 \uc5c6\uc774 \ud544\uc694\uc5d0 \ub530\ub77c \uc81c\uc870 \uae30\ub2a5\uc744 \uc774\uc6a9\ud560 \uc218 \uc788\ub294 \uc138\uc0c1. \uc774\uac83\uc774 \ubc14\ub85c \uc81c\uc870 \uc0b0\uc5c5\uc744 \ubcc0\ud654\uc2dc\ud0a4\uace0 \uc788\ub294 \ud601\uc2e0\uc801\uc778 \uac1c\ub150\uc778 \uc11c\ube44\uc2a4\ud615 \uc81c\uc870(MaaS)\uc758 \ud798\uc785\ub2c8\ub2e4. \uc774 \uae00\uc5d0\uc11c\ub294 \uc11c\ube44\uc2a4\ub85c\uc11c\uc758 \uc81c\uc870\uc5d0 \ub300\ud55c \uc815\uc758\uc640 \uac1c\uc694\ub97c \uc0b4\ud3b4\ubcf4\uace0, \uae30\uc874 \uc81c\uc870&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/38617","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/comments?post=38617"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/38617\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media\/38619"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media?parent=38617"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/categories?post=38617"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/tags?post=38617"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}