{"id":38594,"date":"2022-10-28T07:54:22","date_gmt":"2022-10-28T07:54:22","guid":{"rendered":""},"modified":"2026-10-19T14:41:33","modified_gmt":"2026-10-19T14:41:33","slug":"%ec%a0%9c%ec%a1%b0%ec%97%90%ec%84%9c-%eb%a6%ac%eb%93%9c-%ed%83%80%ec%9e%84%ec%9d%84-%ec%b5%9c%ec%a0%81%ed%99%94%ed%95%98%eb%8a%94-%eb%b0%a9%eb%b2%95%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%a0%9c%ec%a1%b0%ec%97%90%ec%84%9c-%eb%a6%ac%eb%93%9c-%ed%83%80%ec%9e%84%ec%9d%84-%ec%b5%9c%ec%a0%81%ed%99%94%ed%95%98%eb%8a%94-%eb%b0%a9%eb%b2%95%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80\/","title":{"rendered":"\uc81c\uc870 \ud604\uc7a5\uc758 \ub9ac\ub4dc\ud0c0\uc784: \uc791\uc5c5 \uc0ac\uc774\uc758 \ub300\uae30 \uc2dc\uac04\uc744 \ud30c\uc545\ud558\uc138\uc694"},"content":{"rendered":"<div class=\"gb-container gb-container-leadtime01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">\uc81c\uc870 \ud604\uc7a5\uc758 \ub9ac\ub4dc\ud0c0\uc784: \uc791\uc5c5 \uc0ac\uc774\uc758 \ub300\uae30 \uc2dc\uac04\uc744 \ud30c\uc545\ud558\uc138\uc694<\/h1>\n\n\n<p>\uacf5\uc815\ud45c\uc0c1 \uc18c\uc694 \uc2dc\uac04\uc740 \uc5f4\ub450 \uc2dc\uac04\uc778\ub370, \uace0\uac1d\uc5d0\uac8c \uc548\ub0b4\ud55c \uae30\uac04\uc740 8\uc77c\uc785\ub2c8\ub2e4. \uccab \uacf5\uc815\ubd80\ud130 \uc8fc\ubb38\uc774 \uc644\uc131\ub418\uae30\uae4c\uc9c0, \uc2e4\uc81c \uc791\uc5c5 \uc2dc\uac04\ubcf4\ub2e4 \ub300\uae30 \uc2dc\uac04\uc774 \ud6e8\uc52c \ub354 \uae34 \uc148\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790\uc5d0\uac8c\ub294 \uc774 \ucc28\uc774\ub97c \uc774\ud574\ud558\ub294 \uac83\uc774 \uc0dd\uc0b0 \ub9ac\ub4dc\ud0c0\uc784 \uac1c\uc120\uc758 \ucd9c\ubc1c\uc810\uc785\ub2c8\ub2e4. \uac00\uacf5 \uc18d\ub3c4\ub97c \ub192\uc774\uba74 \ub3c4\uc6c0\uc774 \ub420 \uc218\ub294 \uc788\uc9c0\ub9cc, \ub2e4\uc74c \uc791\uc5c5 \uc2dc\uac04\uc744 \ubc30\uc815\ubc1b\uae30\uae4c\uc9c0 \uc774\ud2c0\uc744 \uae30\ub2e4\ub9ac\ub294 \ubb38\uc81c\ub294 \ud574\uacb0\ub418\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774\ub54c \ub358\uc838\uc57c \ud560 \uc9c8\ubb38\uc740 \ub2e4\uc74c\uacfc \uac19\uc2b5\ub2c8\ub2e4. <strong>\uc774 \uc8fc\ubb38\uc744 \uc644\uc131\ud558\ub824\uba74 \uc5b4\ub5a4 \uc791\uc5c5\uc744 \uc5b4\ub5a4 \uc21c\uc11c\ub85c \uc9c4\ud589\ud574\uc57c \ud560\uae4c\uc694?<\/strong> SkyPlanner\ub294 \uac01 \uacf5\uc815\uc5d0 \ud544\uc694\ud55c \uc0dd\uc0b0 \ub2a5\ub825\uacfc \uc6b0\uc120\uc21c\uc704\ub97c \ubc18\uc601\ud574 \uc791\uc5c5\uc744 \uc5f0\uacb0\ud569\ub2c8\ub2e4. \uc774\ub807\uac8c \uc218\ub9bd\ud55c \uc77c\uc815\uc740 \uc904\uc77c \uc218 \uc788\ub294 \ub300\uae30\ub97c \ub2e8\ucd95\ud558\uace0, \uc55e\uc73c\ub85c \ucc98\ub9ac\ud560 \uc791\uc5c5\uc744 \uadfc\uac70\ub85c \uace0\uac1d\uc5d0\uac8c \ub0a9\uae30\ub97c \uc548\ub0b4\ud558\ub294 \ub370 \ub3c4\uc6c0\uc774 \ub429\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc0dd\uc0b0 \ub9ac\ub4dc\ud0c0\uc784\uc774\ub780?<\/h2>\n\n\n<p>\uc0dd\uc0b0 \ub9ac\ub4dc\ud0c0\uc784\uc740 \uc81c\ud488\uc774\ub098 \uc8fc\ubb38\uc774 \uc815\ud574\uc9c4 \uc81c\uc870 \uacfc\uc815\uc744 \uac70\uce58\ub294 \ub370 \uac78\ub9ac\ub294 \uc804\uccb4 \uacbd\uacfc \uc2dc\uac04\uc785\ub2c8\ub2e4. \uac00\uacf5\uacfc \uc791\uc5c5 \uc900\ube44\ubfd0 \uc544\ub2c8\ub77c \ud574\ub2f9 \uacfc\uc815\uc5d0\uc11c \ubc1c\uc0dd\ud558\ub294 \uc791\uc5c5 \ub300\uae30, \uc774\ub3d9, \uac80\uc0ac \ubc0f \uae30\ud0c0 \ub300\uae30 \uc2dc\uac04\ub3c4 \ud3ec\ud568\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774 \uae00\uc5d0\uc11c\ub294 <strong>\uc0dd\uc0b0\uc5d0 \ud22c\uc785\ub41c \uc2dc\uc810\ubd80\ud130 \uc8fc\ubb38\uc774 \uc644\uc131\ub418\uc5b4 \ucd9c\ud558 \uc900\ube44\uac00 \ub05d\ub09c \uc2dc\uc810\uae4c\uc9c0<\/strong>\ub97c \uce21\uc815\ud569\ub2c8\ub2e4. \ud22c\uc785 \ud6c4 \uccab \uacf5\uc815\uc744 \uc2dc\uc791\ud558\uae30 \uc804\uae4c\uc9c0\uc758 \ub300\uae30\ub3c4 \ud3ec\ud568\ud569\ub2c8\ub2e4. \ub2e4\ub9cc \ud22c\uc785 \uc804 \uc790\uc7ac \uad6c\ub9e4 \uae30\uac04\uc774\ub098 \uc644\uc81c\ud488\uc744 \uace0\uac1d\uc5d0\uac8c \uc6b4\uc1a1\ud558\ub294 \uae30\uac04\uae4c\uc9c0 \uc790\ub3d9\uc73c\ub85c \ud3ec\ud568\ub418\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p>\ub9ac\ub4dc\ud0c0\uc784\uc758 \uc815\uc758\ub294 \ud68c\uc0ac\ub098 \uacc4\ud68d \uc2dc\uc2a4\ud15c\ub9c8\ub2e4 \ub2e4\ub985\ub2c8\ub2e4. \uc218\uce58\ub97c \ube44\uad50\ud558\uae30 \uc804\uc5d0 \uc2dc\uc791\uacfc \uc885\ub8cc\ub97c \uc5b4\ub5a4 \uc2dc\uc810\uc73c\ub85c \uc7a1\uc744\uc9c0 \uba85\ud655\ud788 \uc815\ud558\uc138\uc694.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\uce21\uc815 \uc9c0\ud45c<\/th><th>\uc2dc\uc791 \ubc0f \uc885\ub8cc \uc2dc\uc810<\/th><th>\uc774 \uc9c0\ud45c\ub85c \uc54c \uc218 \uc788\ub294 \uac83<\/th><\/tr><\/thead><tbody><tr><td>\uc774 \uae00\uc5d0\uc11c \uc815\uc758\ud55c \uc0dd\uc0b0 \ub9ac\ub4dc\ud0c0\uc784<\/td><td>\uc0dd\uc0b0 \ud22c\uc785\ubd80\ud130 \ucd9c\ud558 \uc900\ube44 \uc644\ub8cc\uae4c\uc9c0<\/td><td>\uc8fc\ubb38\uc774 \uc6b0\ub9ac \uc0dd\uc0b0 \uacfc\uc815\uc744 \uac70\uce58\ub294 \ub370 \uc5bc\ub9c8\ub098 \uac78\ub9ac\ub294\uac00?<\/td><\/tr><tr><td>\uace0\uac1d \uc8fc\ubb38 \ub9ac\ub4dc\ud0c0\uc784<\/td><td>\uc8fc\ubb38 \uc811\uc218\ubd80\ud130 \uace0\uac1d \uc218\ub839\uae4c\uc9c0<\/td><td>\uace0\uac1d\uc740 \uc5bc\ub9c8\ub098 \uae30\ub2e4\ub824\uc57c \ud558\ub294\uac00?<\/td><\/tr><tr><td>\uacf5\uae09\uc5c5\uccb4 \ub9ac\ub4dc\ud0c0\uc784<\/td><td>\uad6c\ub9e4 \ubc1c\uc8fc\ubd80\ud130 \uc790\uc7ac \uc785\uace0\uae4c\uc9c0<\/td><td>\uad6c\ub9e4\ud55c \uc790\uc7ac\ub294 \uc5b8\uc81c \uc785\uace0\ub420 \uac83\uc73c\ub85c \uc608\uc0c1\ub418\ub294\uac00?<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\uc774 \uae30\uac04\ub4e4\uc740 \uc11c\ub85c \uacb9\uce60 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uae30\uc220 \ubd80\uc11c\uc5d0\uc11c \ud574\ub2f9 \uc8fc\ubb38\uc758 \uc0dd\uc0b0 \uc900\ube44\ub97c \ud558\ub294 \ub3d9\uc548 \uc790\uc7ac\ub97c \ubc1c\uc8fc\ud588\ub2e4\uba74, \ub450 \uae30\uac04\uc744 \uadf8\ub300\ub85c \ub354\ud560 \uacbd\uc6b0 \ub300\uae30 \uc2dc\uac04 \uc77c\ubd80\uac00 \uc911\ubcf5 \uacc4\uc0b0\ub429\ub2c8\ub2e4. \ubd80\uc11c\ubcc4 \ub9ac\ub4dc\ud0c0\uc784 \ucd94\uc815\uce58\ub97c \ubaa8\ub450 \ub354\ud558\uae30\ubcf4\ub2e4 \uc2e4\uc81c \uc2dc\uac04 \ud750\ub984\uc744 \ub530\ub77c\uac00\uc138\uc694.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\ub9ac\ub4dc\ud0c0\uc784\uc740 \uc0ac\uc774\ud074 \ud0c0\uc784\uc774\ub098 \ub2e8\uc704 \uc2dc\uac04\ub2f9 \uc0dd\uc0b0\ub7c9\uacfc \ub2e4\ub985\ub2c8\ub2e4<\/h3>\n\n\n<p><a href=\"\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/manufacturing-cycle-time\/\">\uc81c\uc870 \uc0ac\uc774\ud074 \ud0c0\uc784<\/a>\uc740 \uc81c\ud488 \ud55c \uac1c\ub97c \uc0dd\uc0b0\ud558\uac70\ub098 \ud2b9\uc815 \uacf5\uc815\uc744 \uc644\ub8cc\ud558\ub294 \ub370 \uac78\ub9ac\ub294 \uc2dc\uac04\uc785\ub2c8\ub2e4. \ubc18\uba74 \uc0dd\uc0b0 \ub9ac\ub4dc\ud0c0\uc784\uc740 \uacf5\uc815 \uc0ac\uc774\uc758 \ub300\uae30\uae4c\uc9c0 \ud3ec\ud568\ud574 \uc81c\ud488\uc774 \ub354 \ub113\uc740 \uc0dd\uc0b0 \uacfc\uc815\uc744 \uac70\uce58\ub294 \uc2dc\uac04\uc744 \ub098\ud0c0\ub0c5\ub2c8\ub2e4.<\/p>\n\n\n<p><a href=\"\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/manufacturing-throughput\/\">\ub2e8\uc704 \uc2dc\uac04\ub2f9 \uc0dd\uc0b0\ub7c9<\/a>\uc740 \uad50\ub300 \uadfc\ubb34 \ud55c \ud68c\ub2f9 \uc591\ud488 \uc870\ub9bd\ud488 \uc218\ucc98\ub7fc \uc77c\uc815 \uc2dc\uac04 \ub3d9\uc548 \ub098\uc628 \uc0b0\ucd9c\ub7c9\uc744 \ub098\ud0c0\ub0c5\ub2c8\ub2e4. \uc18c\uc694 \uae30\uac04\uc774 \uc544\ub2c8\ub77c \uc0dd\uc0b0 \uc18d\ub3c4\ub97c \ub098\ud0c0\ub0b4\ub294 \uc9c0\ud45c\uc785\ub2c8\ub2e4. \uc124\ube44\uc758 \uc0ac\uc774\ud074 \ud0c0\uc784\uc740 \uc9e7\ub354\ub77c\ub3c4 \uadf8 \ubd80\ud488\uc774 \ud3ec\ud568\ub41c \uc8fc\ubb38\uc758 \ub9ac\ub4dc\ud0c0\uc784\uc740 \uc5ec\uc804\ud788 \uae38 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc0dd\uc0b0 \ub9ac\ub4dc\ud0c0\uc784 \uacc4\uc0b0 \ubc29\ubc95<\/h2>\n\n\n<p>\uc644\ub8cc\ub41c \uc8fc\ubb38\uc740 \uae30\ub85d\ub41c \uc2dc\uc810\uc744 \uae30\uc900\uc73c\ub85c \uacc4\uc0b0\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>\uc0dd\uc0b0 \ub9ac\ub4dc\ud0c0\uc784 = \ucd9c\ud558 \uc900\ube44 \uc644\ub8cc \uc77c\uc2dc \u2212 \uc0dd\uc0b0 \ud22c\uc785 \uc77c\uc2dc<\/strong><\/p>\n\n\n<p>\uc6d4\uc694\uc77c 08:00\uc5d0 \uc0dd\uc0b0\uc5d0 \ud22c\uc785\ub418\uc5b4 \ubaa9\uc694\uc77c 08:00\uc5d0 \ucd9c\ud558 \uc900\ube44\uac00 \ub05d\ub09c \uc8fc\ubb38\uc744 \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \uc791\uc5c5 \uc900\ube44\uc640 \uac00\uacf5\uc5d0 \uc5f4\ub450 \uc2dc\uac04\ub9cc \ud544\uc694\ud558\ub354\ub77c\ub3c4, \uc774 \uc8fc\ubb38\uc758 \uc0dd\uc0b0 \ub9ac\ub4dc\ud0c0\uc784\uc740 <strong>\ub2ec\ub825 \uae30\uc900 72\uc2dc\uac04<\/strong>\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>\ub098\uba38\uc9c0 <strong>60\uc2dc\uac04<\/strong>\uc740 \uc791\uc5c5 \uc900\ube44\uc640 \uac00\uacf5 \uc678\uc5d0 \uc18c\uc694\ub41c \uc2dc\uac04\uc785\ub2c8\ub2e4. \uc791\uc5c5 \ub300\uae30, \uc774\ub3d9, \uac80\uc0ac, \uc57c\uac04 \ube44\uac00\ub3d9 \uc2dc\uac04, \ud544\uc218 \ub0c9\uac01 \uc2dc\uac04 \ub4f1\uc774 \uc5ec\uae30\uc5d0 \ud3ec\ud568\ub420 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc774 \uc2dc\uac04\uc744 \uc804\ubd80 \ud53c\ud560 \uc218 \uc788\ub294 \ub0ad\ube44\ub85c \ub2e8\uc815\ud558\uc9c0 \ub9d0\uace0, \uac01 \uad6c\uac04\uc5d0 \ubb34\uc5c7\uc774 \uc788\uc5c8\ub294\uc9c0 \ud655\uc778\ud558\uc138\uc694.<\/p>\n\n\n<p>\uc804\uccb4 \uc2dc\uac04\uc774 \uc5b4\ub5bb\uac8c \uad6c\uc131\ub418\ub294\uc9c0 \ud30c\uc545\ud558\ub824\uba74, \uc804\uccb4 \uacbd\uacfc \uc2dc\uac04\uc744 \uc11c\ub85c \uacb9\uce58\uc9c0 \uc54a\ub294 \ud56d\ubaa9\uc73c\ub85c \ub098\ub204\uc138\uc694.<\/p>\n\n\n<ul class=\"wp-block-list\">\n<li><strong>\uc791\uc5c5 \uc900\ube44 \ubc0f \uac00\uacf5:<\/strong> \uc124\ube44\ub97c \uc900\ube44\ud558\uace0 \uac01 \uacf5\uc815\uc744 \uc218\ud589\ud558\ub294 \uc2dc\uac04.<\/li>\n\n<li><strong>\uc791\uc5c5 \ub300\uae30:<\/strong> \uc124\ube44\ub97c \uc0ac\uc6a9\ud560 \uc218 \uc788\uac70\ub098 \uc791\uc5c5\uc790\uac00 \uc791\uc5c5\ud560 \uc218 \uc788\uc744 \ub54c\uae4c\uc9c0, \ub610\ub294 \uac80\uc0ac\uac00 \uac00\ub2a5\ud55c \uc2dc\uac04\uae4c\uc9c0 \uae30\ub2e4\ub9ac\ub294 \uc2dc\uac04.<\/li>\n\n<li><strong>\uc774\ub3d9 \ubc0f \uac80\uc0ac:<\/strong> \uce21\uc815 \ubc94\uc704 \uc548\uc5d0\uc11c \uc774\ub8e8\uc5b4\uc9c0\ub294 \uc774\uc1a1\uacfc \ud488\uc9c8 \uad00\ub828 \ud65c\ub3d9\uc5d0 \ub4dc\ub294 \uc2dc\uac04.<\/li>\n\n<li><strong>\uae30\ud0c0 \uacbd\uacfc \uc2dc\uac04:<\/strong> \ud544\uc218 \ub300\uae30, \uad50\ub300 \uadfc\ubb34\uac00 \uc5c6\ub294 \uc2dc\uac04, \ub2e4\ub978 \ud56d\ubaa9\uc5d0 \ud3ec\ud568\ub418\uc9c0 \uc54a\uc740 \uc791\uc5c5 \uc911\ub2e8 \uc2dc\uac04.<\/li>\n<\/ul>\n\n\n<p>\uc804\uccb4 \ub9ac\ub4dc\ud0c0\uc784\uc740 \uae30\ub85d\ub41c \uc2dc\uc791\u00b7\uc885\ub8cc \uc77c\uc2dc\ub85c \uacc4\uc0b0\ud558\uace0, \uc6d0\uc778\uc740 \ud56d\ubaa9\ubcc4 \uc2dc\uac04\uc744 \uc0b4\ud3b4\ubcf4\uba70 \uc9c4\ub2e8\ud558\uc138\uc694. \ub450 \uacf5\uc815\uc774 \ubcd1\ub82c\ub85c \uc9c4\ud589\ub41c\ub2e4\uba74 \uac01 \uc18c\uc694 \uc2dc\uac04\uc744 \ub2e8\uc21c\ud788 \ub354\ud574\uc11c \uacbd\uacfc \ub9ac\ub4dc\ud0c0\uc784\uc744 \uad6c\ud560 \uc218\ub294 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc2dc\uac04 \uae30\uc900\ub3c4 \uc77c\uad00\ub418\uac8c \uc801\uc6a9\ud574\uc57c \ud569\ub2c8\ub2e4. \ub2ec\ub825 \uae30\uc900 \uc2dc\uac04\uc740 \uc2e4\uc81c\ub85c \uacbd\uacfc\ud55c \uc804\uccb4 \uc2dc\uac04\uc744, \uadfc\ubb34 \uc2dc\uac04\uc740 \uc815\ud574\uc9c4 \uad50\ub300 \uadfc\ubb34 \uc77c\uc815 \uc548\uc758 \uc2dc\uac04\uc744 \ub73b\ud569\ub2c8\ub2e4. \ub458 \ub2e4 \uc720\uc6a9\ud558\uc9c0\ub9cc \uadfc\ubb34 \uc2dc\uac04 \uae30\uc900 \uc5f4\ub450 \uc2dc\uac04\uacfc \ub2ec\ub825 \uae30\uc900 \uc77c\ud754\ub450 \uc2dc\uac04\uc740 \uc11c\ub85c \ubc14\uafd4 \uc4f8 \uc218 \uc5c6\uc2b5\ub2c8\ub2e4. \uace0\uac1d\uc5d0\uac8c \uc548\ub0b4\ud558\ub294 \ub0a9\uae30\uac00 \uc5b4\ub5a4 \uc2dc\uac04 \uae30\uc900\uc73c\ub85c \uc0b0\uc815\ub410\ub294\uc9c0 \uc601\uc5c5\ud300\uc5d0\ub3c4 \uc54c\ub824\uc8fc\uc138\uc694.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uacf5\uc815 \uc18c\uc694 \uc2dc\uac04\uc740 \uc9e7\uc740\ub370 \ub9ac\ub4dc\ud0c0\uc784\uc740 \uc65c \uae38\uc5b4\uc9c8\uae4c\uc694?<\/h2>\n\n\n<p>\uacf5\uc815 \uc21c\uc11c\ub294 \uc8fc\ubb38\uc744 \uc644\uc131\ud558\ub294 \ub370 \ud544\uc694\ud55c \uc791\uc5c5\uc744 \uc54c\ub824\uc90d\ub2c8\ub2e4. \uadf8 \uc791\uc5c5\uc744 \uc5b8\uc81c \ud560 \uc218 \uc788\ub294\uc9c0\ub294 \ub300\uae30\uc5f4\uc5d0 \ub530\ub77c \uacb0\uc815\ub429\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud654\uc694\uc77c \uc624\uc804\uc5d0 \uac00\uacf5\uc774 \ub05d\ub098\uc9c0\ub9cc, \ub9c8\ubb34\ub9ac \uc791\uc5c5\uc7a5\uc5d0\ub294 \ubaa9\uc694\uc77c\uae4c\uc9c0 \ud574\ub2f9 \uc791\uc5c5\uc744 \ucc98\ub9ac\ud560 \uc5ec\ub825\uc774 \uc5c6\ub2e4\uace0 \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \ub9c8\ubb34\ub9ac \uc791\uc5c5\uc5d0 \ubc30\uc815\ub41c \uc2dc\uac04\ub300\uac00 \uadf8\ub300\ub85c\ub77c\uba74 \uac00\uacf5\uc744 \ud55c \uc2dc\uac04 \ube68\ub9ac \ub05d\ub0b4\ub3c4 \uc644\ub8cc \uc2dc\uc810\uc740 \uc55e\ub2f9\uaca8\uc9c0\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4. \uc77c\uc815 \uac1c\uc120\uc758 \ud575\uc2ec\uc740 \uccab \uacf5\uc815\uc744 \ubb34\uc870\uac74 \uc77c\ucc0d \uc2dc\uc791\ud558\ub294 \uac83\uc774 \uc544\ub2c8\ub77c \ub450 \uacf5\uc815\uc744 \uc870\uc728\ud558\ub294 \ub370 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774\ub7f0 \ub300\uae30 \uad6c\uac04\uc740 \uc77c\uc0c1\uc801\uc778 \uc758\uc0ac\uacb0\uc815\uc5d0\uc11c\ub3c4 \uc0dd\uae41\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>\ud6c4\uc18d \uacf5\uc815\uc5d0\uc11c \ucc98\ub9ac\ud560 \uc5ec\ub825\uc774 \uc0dd\uae30\uae30 \uc804\uc5d0 \uc791\uc5c5\uc744 \uc2dc\uc791\ud569\ub2c8\ub2e4.<\/strong> \uccab \uc791\uc5c5\uc7a5\uc740 \uacc4\uc18d \ubc14\uc058\uc9c0\ub9cc, \ud6c4\uc18d \uacf5\uc815\uc5d0\ub294 \ubbf8\uc644\ub8cc \uc791\uc5c5\uc774 \uc313\uc785\ub2c8\ub2e4. \uc55e\uc73c\ub85c \uac70\uccd0\uc57c \ud560 \uacf5\uc815\uc744 \uc0b4\ud3b4\ubcf4\uace0 \uc0dd\uc0b0\uc5d0 \ud22c\uc785\ud558\uc138\uc694. \uc774 \uc6d0\uce59\uc740 <a href=\"\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%a0%81%ec%8b%9c-%ec%a0%9c%ec%a1%b0\/\">\uc801\uc2dc \uc0dd\uc0b0<\/a>\uc5d0\ub3c4 \uc801\uc6a9\ub429\ub2c8\ub2e4. \uc791\uc5c5\uc774 \uacc4\uc18d \uc9c4\ud589\ub41c\ub2e4\ub294 \uc0ac\uc2e4\ub9cc\uc73c\ub85c \uc0dd\uc0b0 \ud750\ub984\uc774 \uc6d0\ud65c\ud558\ub2e4\uace0 \ubcfc \uc218\ub294 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>\uc2e4\uc81c\ub85c \uc4f8 \uc218 \uc5c6\ub294 \uc0dd\uc0b0 \ub2a5\ub825\uc744 \uae30\uc900\uc73c\ub85c \uacc4\ud68d\ud569\ub2c8\ub2e4.<\/strong> \uac89\uc73c\ub85c\ub294 \ube44\uc5b4 \uc788\ub294 \uc124\ube44\ub77c\ub3c4 \ud544\uc694\ud55c \uc791\uc5c5\uc790\uac00 \ub2e4\ub978 \uacf3\uc5d0\uc11c \uc77c\ud558\uace0 \uc788\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ud544\uc218 \uacf5\uad6c\ub098 \uc790\uc7ac\uac00 \uc5c6\uc744 \uc218\ub3c4 \uc788\uc2b5\ub2c8\ub2e4. \uacc4\ud68d \uc2dc\uc791 \uc2dc\uc810\uc5d0\ub294 \ud574\ub2f9 \uacf5\uc815\uc5d0 \uc2e4\uc81c\ub85c \ud544\uc694\ud55c \uc790\uc6d0\uc758 \uac00\uc6a9 \uc5ec\ubd80\uac00 \ubc18\uc601\ub418\uc5b4\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>\ub300\uae30\uc5f4\ubcc4\ub85c \ub530\ub85c \uc6b0\uc120\uc21c\uc704\ub97c \ubc14\uafc9\ub2c8\ub2e4.<\/strong> \uae34\uae09 \uc791\uc5c5\uc758 \uc21c\uc11c\ub294 \uc55e\ub2f9\uacbc\uc9c0\ub9cc \ub2e4\uc74c \uacf5\uc815\uc758 \uc21c\uc11c\ub294 \uadf8\ub300\ub85c\uc785\ub2c8\ub2e4. \uadf8 \uc5ec\ud30c\ub85c \ub2e4\ub978 \uc8fc\ubb38\uc758 \uc791\uc5c5 \uc2dc\uac04\uc774 \ubc00\ub824\ub098\ub3c4, \uc644\ub8cc\uc77c\uc5d0 \ubbf8\uce58\ub294 \uc601\ud5a5\uc740 \uc544\ubb34\ub3c4 \uac80\ud1a0\ud558\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>\uaf2d \ud544\uc694\ud55c \ub300\uae30 \uc2dc\uac04\uc744 \uc5ec\uc720 \uc2dc\uac04\uc73c\ub85c \ucde8\uae09\ud569\ub2c8\ub2e4.<\/strong> \uac74\uc870\ub098 \ub0c9\uac01, \ud488\uc9c8 \uc2b9\uc778 \ub300\uae30\uac00 \ud544\uc694\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc81c\ud488\uc774 \uc900\ube44\ub418\uae30 \uc804\uc5d0 \ub2e4\uc74c \uacf5\uc815\uc774 \uc7a1\ud788\uc9c0 \uc54a\ub3c4\ub85d \uc774\ub7f0 \uc2dc\uac04\uc744 \uacf5\uc815 \uc21c\uc11c\uc5d0 \uae30\ub85d\ud558\uc138\uc694.<\/p>\n\n\n<p><a href=\"\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%eb%a6%b0-%ec%a0%9c%ec%a1%b0-%ed%9a%a8%ec%9c%a8%ec%84%b1-%ea%b7%b9%eb%8c%80%ed%99%94\/\">\ub9b0 \uc0dd\uc0b0<\/a>\uc740 \ubd88\ud544\uc694\ud55c \ub300\uae30\uc640 \uc774\ub3d9\uc744 \ub4dc\ub7ec\ub0b4\ub294 \ub370 \ub3c4\uc6c0\uc774 \ub429\ub2c8\ub2e4. \uacf5\uc815 \uac04\uc5d0 \uc870\uc728\ub41c \uc77c\uc815\uc740 \uc774\ub7f0 \uac1c\uc120\uc744 \ub9e4\uc77c\uc758 \uc8fc\ubb38 \ucc98\ub9ac\uc5d0 \uc801\uc6a9\ud560 \uc218 \uc788\uac8c \ud574 \uc90d\ub2c8\ub2e4. \ub354 \ub2e4\uc591\ud55c \uac1c\uc120 \ubc29\ubc95\uc740 <a href=\"\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%eb%a6%ac%eb%93%9c-%ed%83%80%ec%9e%84-%eb%8b%a8%ec%b6%95-%eb%8d%94-%ec%8a%a4%eb%a7%88%ed%8a%b8%ed%95%9c-%eb%b9%84%ec%a6%88%eb%8b%88%ec%8a%a4%ec%9d%98-%eb%b9%84%ea%b2%b0\/\">\ub9ac\ub4dc\ud0c0\uc784 \ub2e8\ucd95 \uac00\uc774\ub4dc<\/a>\uc5d0\uc11c \ud655\uc778\ud558\uc138\uc694.<\/p>\n\n\n<h2 class=\"wp-block-heading\">SkyPlanner\ub85c \uacf5\uc815 \uc0ac\uc774\uc758 \uac04\uaca9\uc744 \uc904\uc774\uc138\uc694<\/h2>\n\n\n<p>SkyPlanner APS\ub294 \uc8fc\ubb38\ubcc4 \uacf5\uc815\uc744 \uc2e4\uc81c \uc0dd\uc0b0 \ub2a5\ub825 \ub0b4\uc5d0\uc11c \uc2e4\ud589\ud560 \uc218 \uc788\ub294 \uc77c\uc815\uc73c\ub85c \ud3b8\uc131\ud569\ub2c8\ub2e4. \uc2a4\ucf00\uc904\ub9c1 \uc778\uacf5\uc9c0\ub2a5\uc778 Arcturus\ub294 \uc124\uc815\ub41c \uc791\uc5c5\uc7a5 \uc0dd\uc0b0 \ub2a5\ub825, \uad50\ub300 \uadfc\ubb34, \uc120\ud6c4\ud589 \uad00\uacc4\uc640 \uc6b0\uc120\uc21c\uc704\ub97c \uace0\ub824\ud569\ub2c8\ub2e4. \uc790\uc7ac\ub97c \uace0\ub824\ud55c \uc2a4\ucf00\uc904\ub9c1\uc744 \ud65c\uc131\ud654\ud558\uba74 \uc790\uc7ac \uac00\uc6a9 \uc5ec\ubd80\ub3c4 \uc791\uc5c5 \uac00\ub2a5 \uc2dc\uc810\uc5d0 \ubc18\uc601\ub429\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790\uc5d0\uac8c\ub294 \uc774\ub807\uac8c \uc218\ub9bd\ud55c \uc77c\uc815\uc774 \u201c\ubaa8\ub4e0 \uc8fc\ubb38\uc740 8\uc77c \uac78\ub9bd\ub2c8\ub2e4\u201d\ub77c\ub294 \uace0\uc815\ub41c \uc57d\uc18d\ubcf4\ub2e4 \uc720\uc6a9\ud55c \ucd9c\ubc1c\uc810\uc774 \ub429\ub2c8\ub2e4. Gantt \ud0c0\uc784\ub77c\uc778\uc5d0\uc11c\ub294 \uc5ec\ub7ec \uc791\uc5c5\uc7a5\uc5d0\uc11c \uc9c4\ud589\ub418\ub294 \uacf5\uc815\uc758 \uc21c\uc11c\ub97c \ubcfc \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc774\ub97c \ud1b5\ud574 \uc8fc\ubb38\uc758 \uc791\uc5c5\uc774 \uc5b8\uc81c \uc5b4\ub514\uc11c \uc2dc\uc791\ub420 \uc608\uc815\uc778\uc9c0, \uc5b4\ub290 \uad6c\uac04\uc5d0 \ub300\uae30\uac00 \ub0a8\uc544 \uc788\ub294\uc9c0, \ub9c8\uc9c0\ub9c9 \uacf5\uc815\uc740 \uc5b8\uc81c \ub05d\ub0a0 \uc608\uc815\uc778\uc9c0 \uc0b4\ud3b4\ubcfc \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\ub9ac\ub4dc\ud0c0\uc784 \ub2e8\ucd95\ub3c4 \uc6b0\uc120\uc21c\uc704\uc5d0 \ubc18\uc601\ud558\uc138\uc694<\/h3>\n\n\n<p>SkyPlanner\uc5d0\ub294 <strong>\ub9ac\ub4dc\ud0c0\uc784 \uc6b0\uc120\uc21c\uc704<\/strong> \uc124\uc815\uc774 \uc788\uc2b5\ub2c8\ub2e4. \uc774 \uc124\uc815\uc5d0 \ub530\ub77c Arcturus\ub294 \uc8fc\ubb38\uc758 \uac01 \ud488\ubaa9\uc5d0\uc11c \uccab \uacf5\uc815\uacfc \ub9c8\uc9c0\ub9c9 \uacf5\uc815 \uc0ac\uc774\uc758 \uae30\uac04\uc744 \ucd5c\uc18c\ud654\ud558\ub3c4\ub85d \uc77c\uc815\uc744 \uc218\ub9bd\ud569\ub2c8\ub2e4. \uc2e4\uc81c \uc791\uc5c5 \uc2dc\uac04\uc740 \ube44\uad50\uc801 \uc9e7\uc9c0\ub9cc \uacf5\uc815\ub4e4\uc774 \uc2dc\uac04\uc0c1 \uba40\ub9ac \ub5a8\uc5b4\uc838 \uc788\uc744 \ub54c \uc720\uc6a9\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774 \ucd5c\uc801\ud654\uc758 \ub300\uc0c1 \uad6c\uac04\uc740 \uc55e\uc11c \uc124\uba85\ud55c \uc0dd\uc0b0 \ud22c\uc785\ubd80\ud130 \ucd9c\ud558 \uc900\ube44 \uc644\ub8cc\uae4c\uc9c0\uc758 \uce21\uc815 \ubc94\uc704\ubcf4\ub2e4 \uc881\uc2b5\ub2c8\ub2e4. \uccab \uacf5\uc815 \uc774\uc804\uc758 \ubaa8\ub4e0 \ub300\uae30\ub97c \ud3ec\ud568\ud558\ub294 \uac83\uc740 \uc544\ub2c8\uba70, \uad6c\ub9e4 \uae30\uac04\uc774\ub098 \uace0\uac1d\uc5d0\uac8c \uc6b4\uc1a1\ud558\ub294 \uae30\uac04\uc758 \ub2e8\ucd95\uc744 \uc57d\uc18d\ud558\ub294 \uac83\ub3c4 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc644\ub8cc\uc77c, \uace0\uac1d, \uc791\uc5c5 \uc6b0\uc120\uc21c\uc704\uc640 \ud568\uaed8 \uc774 \uc124\uc815\uc744 \uc870\uc815\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ud55c \ud488\ubaa9\uc758 \uc0dd\uc0b0 \uae30\uac04\uc744 \uc904\uc774\ub354\ub77c\ub3c4 \ub2e4\ub978 \uc8fc\ubb38\uc758 \ub0a9\uae30 \uc57d\uc18d\uacfc \uade0\ud615\uc744 \ub9de\ucdb0\uc57c \ud569\ub2c8\ub2e4. \ubaa8\ub4e0 \ud56d\ubaa9\uc774 \ub611\uac19\uc774 \uae34\uae09\ud558\ub2e4\uace0 \uc124\uc815\ud558\uae30\ubcf4\ub2e4, \uc2e4\uc81c \uc5c5\ubb34\uc5d0\uc11c \ub530\ub77c\uc57c \ud560 \uc6b0\uc120\uc21c\uc704\ub97c \uc2a4\ucf00\uc904\ub7ec\uc5d0 \uc9c0\uc815\ud558\uc138\uc694.<\/p>\n\n\n<p>\uc774 \uc2a4\ucf00\uc904\ub9c1 \uae30\ub2a5\uc5d0 \ub300\ud55c \uc790\uc138\ud55c \ub0b4\uc6a9\uc740 <a href=\"\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%eb%a6%ac%eb%93%9c-%ed%83%80%ec%9e%84-%ea%b4%80%eb%a6%ac-%ea%b8%b0%eb%8a%a5-%eb%a7%a4-%ec%88%9c%ea%b0%84-%ec%b5%9c%ec%a0%81%ed%99%94\/\">SkyPlanner\uc758 \ub9ac\ub4dc\ud0c0\uc784 \uad00\ub9ac \uae30\ub2a5<\/a>\uc5d0\uc11c \ud655\uc778\ud558\uc138\uc694.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uc0c1\ud669\uc774 \ubc14\ub00c\uba74 \uc77c\uc815\uc744 \ub2e4\uc2dc \uacc4\uc0b0\ud558\uc138\uc694<\/h3>\n\n\n<p>\uae34\uae09 \uc8fc\ubb38\uc774 \ub4e4\uc5b4\uc624\uac70\ub098 \uad50\ub300 \uadfc\ubb34\uac00 \ubc14\ub00c\uba74 Arcturus\ub294 \ubcc0\uacbd\ub41c \uc0c1\ud669\uc5d0 \ub9de\ucdb0 \uc77c\uc815\uc744 \ub2e4\uc2dc \uacc4\uc0b0\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc62e\uae34 \uacf5\uc815\ub9cc \ubcf4\uc9c0 \ub9d0\uace0, \uadf8 \uacb0\uacfc\ub85c \ub2ec\ub77c\uc9c4 \uc644\ub8cc\uc77c\ub3c4 \uac80\ud1a0\ud558\uc138\uc694. \uc7a0\uae08 \uae30\ub2a5\uc744 \uc0ac\uc6a9\ud558\uba74 \uc774\ubbf8 \uc815\ud55c \uc77c\uc815 \uc911 \ubcc0\uacbd\ub418\uc5b4\uc11c\ub294 \uc548 \ub418\ub294 \ubd80\ubd84\uc744 \uace0\uc815\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ub300\uae30\uc5f4\uc744 \uc77c\uc77c\uc774 \ub2e4\uc2dc \ud3b8\uc131\ud558\ub294 \uc2dc\uac04\uc744 \uc904\uc774\uace0, \ubcc0\uacbd\uc758 \uc601\ud5a5\uc744 \ub354 \uba85\ud655\ud788 \ud30c\uc545\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc8fc\ubb38\uc758 \ucd9c\ud558 \uc608\uc815\uc77c\uc774 \ub2e4\uac00\uc624\uae30 \uc804\uc5d0 \uc0dd\uc0b0 \ub2a5\ub825\uc744 \uc870\uc815\ud560\uc9c0, \uc6b0\uc120\uc21c\uc704\ub97c \ubc14\uafc0\uc9c0, \ub0a9\uae30 \ubcc0\uacbd\uc744 \ud611\uc758\ud560\uc9c0 \uacb0\uc815\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uae30\uc874 \uc2dc\uc2a4\ud15c\ub3c4 \uacc4\uc18d \ud65c\uc6a9\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. <a href=\"\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%a0%9c%ec%a1%b0-erp-%ec%a2%85%ed%95%a9-%ea%b0%80%ec%9d%b4%eb%93%9c\/\">ERP \uc2dc\uc2a4\ud15c<\/a>\uc740 \uc8fc\ubb38 \uad00\ub828 \uc815\ubcf4\ub97c \uc81c\uacf5\ud558\uace0, <a href=\"\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mes-%ec%8b%9c%ec%8a%a4%ed%85%9c-%ec%a0%95%ec%9d%98%ec%99%80-%ea%b8%b0%eb%8a%a5\/\">MES<\/a>\ub294 \uc0dd\uc0b0 \uc2e4\ud589 \uc815\ubcf4\ub97c \uc81c\uacf5\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. <strong>SkyPlanner\ub294 \uac1c\ubc29\ud615 REST API\ub97c \ud1b5\ud574 \uc5b4\ub5a4 ERP \ub610\ub294 MES\uc640\ub3c4 \uc5f0\ub3d9\ud560 \uc218 \uc788\uc73c\uba70<\/strong>, \uc774 \uc815\ubcf4\ub97c \uc0dd\uc0b0 \uc2a4\ucf00\uc904\ub9c1\uc5d0 \uc5f0\uacb0\ud569\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc0dd\uc0b0 \ud604\ud669\uc744 \ub354 \uc798 \ud30c\uc545\ud558\uac8c \ub41c Eskomatic\uc758 \ubcc0\ud654<\/h2>\n\n\n<p>\ud540\ub780\ub4dc\uc758 \uc704\ud0c1 \uac00\uacf5 \uc5c5\uccb4 Eskomatic\uc740 \uacfc\uac70 \uad6c\ud615 ERP\uc640 \uc0dd\uc0b0 \uad00\ub9ac \uc2dc\uc2a4\ud15c\uc5d0\uc11c \uc791\uc5c5 \ub300\uae30\uc5f4\uc744 \ub300\ubd80\ubd84 \uc218\uc791\uc5c5\uc73c\ub85c \ud3b8\uc131\ud588\uc2b5\ub2c8\ub2e4. \uc804\uccb4 \ud604\ud669\uc744 \ud30c\uc545\ud558\ub294 \ub370 \uc218\uace0\uac00 \ub9ce\uc774 \ub4e4\uc5c8\uace0, \uc791\uc5c5 \uc2dc\uc791 \uc608\uc815 \uc2dc\uc810\uc774 \uc784\ubc15\ud574\uc11c\uc57c \uc790\uc7ac \ubd80\uc871\uc774 \ub4dc\ub7ec\ub098\uae30\ub3c4 \ud588\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>SkyPlanner \ub3c4\uc785 \ud6c4 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790\ub4e4\uc740 \uc791\uc5c5 \ub300\uae30\uc5f4\uc744 \ub354 \uba85\ud655\ud558\uac8c \uc2dc\uac01\uc801\uc73c\ub85c \ud30c\uc545\ud558\uace0, \uc778\uacf5\uc9c0\ub2a5\uc774 \ud3b8\uc131\ud55c \uc77c\uc815\uc5d0\uc11c \uc55e\uc73c\ub85c\uc758 \uc791\uc5c5 \ubd80\ud558\ub97c \ud655\uc778\ud560 \uc218 \uc788\uac8c \ub418\uc5c8\uc2b5\ub2c8\ub2e4. Eskomatic\uc758 \uad6c\ucd95 \ud658\uacbd\uc5d0\uc11c\ub294 \uc0dd\uc0b0 \uacc4\ud68d \ub2e8\uacc4\uc5d0\uc11c \ubd80\uc871\ud55c \uc790\uc7ac\uac00 \ub4dc\ub7ec\ub098\ubbc0\ub85c, \uc790\uc7ac \ubd80\uc871\uc73c\ub85c \uc778\ud55c \uc791\uc5c5 \uc911\ub2e8\uc744 \ud53c\ud558\ub294 \ub370 \ub3c4\uc6c0\uc774 \ub429\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc791\uc5c5 \ubd80\ud558\ub97c \ubc18\uc601\ud55c \uc790\ub3d9 \uc2a4\ucf00\uc904\ub9c1\uc740 Eskomatic\uc774 \ud604\uc2e4\uc801\uc778 \uc644\ub8cc \uc2dc\uc810\uc744 \ud30c\uc545\ud558\uace0 \uace0\uac1d \ub0a9\uae30\ub97c \ub354 \uc815\ud655\ud558\uac8c \uc815\ud558\ub294 \ub370\ub3c4 \ub3c4\uc6c0\uc774 \ub429\ub2c8\ub2e4. \ub9ac\ub4dc\ud0c0\uc784\uacfc \uc2a4\ucf00\uc904\ub9c1\uc740 \ubc14\ub85c \uc774\ub807\uac8c \uc5f0\uacb0\ub429\ub2c8\ub2e4. \ubaa8\ub4e0 \uc8fc\ubb38\uc5d0 \uc77c\uc815\ud55c \uc5ec\uc720 \uae30\uac04\uc744 \uc77c\uad04\uc801\uc73c\ub85c \ub354\ud558\ub294 \ub300\uc2e0, \uc2e4\uc81c \uc791\uc5c5\uacfc \uc81c\uc57d \uc870\uac74\uc744 \uc0b4\ud3b4\ubcf4\uace0 \ub0a9\uae30\ub97c \uc815\ud558\ub294 \uac83\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc804\uccb4 \uace0\uac1d \uc0ac\ub840\ub294 <a href=\"\/ko\/%ea%b3%a0%ea%b0%9d-%ec%82%ac%eb%a1%80\/eskomatic\/\">Eskomatic\uc758 SkyPlanner \ub3c4\uc785 \uacbd\ud5d8<\/a>\uc5d0\uc11c \ud655\uc778\ud558\uc138\uc694.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc218\uce58\ub9cc \ubc14\uafb8\uc9c0 \ub9d0\uace0 \uc2e4\uc81c \uc18c\uc694 \uc2dc\uac04\uc744 \uac1c\uc120\ud558\uc138\uc694<\/h2>\n\n\n<p>\uc608\uc0c1\ubcf4\ub2e4 \uc644\ub8cc\uac00 \ub2a6\uc5b4\uc9c0\ub294 \uc8fc\ubb38\uc774 \ubc18\ubcf5\ub418\ub294 \uc81c\ud488\uad70 \ud558\ub098\ubd80\ud130 \uc0b4\ud3b4\ubcf4\uc138\uc694. \uc0dd\uc0b0 \ud22c\uc785 \uc2dc\uc810, \uac01 \uacf5\uc815\uc758 \uc2dc\uc791\u00b7\uc885\ub8cc \uc2dc\uc810, \ucd9c\ud558 \uc900\ube44 \uc644\ub8cc \uc2dc\uc810\uc744 \ube44\uad50\ud558\uc138\uc694. \uc644\ub8cc\ub97c \uac00\uc7a5 \uc790\uc8fc \uc9c0\uc5f0\uc2dc\ud0a4\ub294 \ubc18\ubcf5\uc801\uc778 \ub300\uae30 \uad6c\uac04\uc744 \ucc3e\uace0, \uc77c\uc815\uc774\ub098 \uacf5\uc815\uc744 \ubc14\uafd4 \uadf8 \uad6c\uac04\uc744 \uac1c\uc120\ud560 \uc218 \uc788\ub294\uc9c0 \uc2dc\ud5d8\ud574 \ubcf4\uc138\uc694.<\/p>\n\n\n<p>\ub9ac\ub4dc\ud0c0\uc784\uacfc \ud568\uaed8 \ub0a9\uae30 \uc900\uc218 \uc2e4\uc801\ub3c4 \ud655\uc778\ud558\uc138\uc694. \uc0dd\uc0b0\uc5d0 \uac78\ub9ac\ub294 \uc2dc\uac04\uc774 \uc904\uc5b4\ub3c4 \ub2e4\ub978 \uc8fc\ubb38\uc758 \uc57d\uc18d\ub41c \ub0a9\uae30\ub97c \uc9c0\ud0a4\uc9c0 \ubabb\ud558\uac8c \ub41c\ub2e4\uba74 \uac1c\uc120\uc774\ub77c\uace0 \ud560 \uc218 \uc5c6\uc2b5\ub2c8\ub2e4. \ub9c8\ucc2c\uac00\uc9c0\ub85c \uc0dd\uc0b0 \ud22c\uc785 \uc2dc\uc810\uc744 \ub4a4\ub85c \ubbf8\ub8e8\uba74 \ud22c\uc785\ubd80\ud130 \ucd9c\ud558 \uc900\ube44 \uc644\ub8cc\uae4c\uc9c0\uc758 \ub9ac\ub4dc\ud0c0\uc784\uc740 \uc9e7\uc544 \ubcf4\uc77c \uc218 \uc788\uc9c0\ub9cc, \uace0\uac1d\uc758 \uc804\uccb4 \ub300\uae30 \uc2dc\uac04\uc740 \uadf8\ub300\ub85c\uc785\ub2c8\ub2e4. \ud22c\uc785 \uc804 \ub300\uae30 \uc2dc\uac04\uc744 \uc9c0\ud45c\uc5d0\uc11c \uc9c0\uc6cc \ubc84\ub9ac\uc9c0 \ub9d0\uace0 \ubcc4\ub3c4\ub85c \ucd94\uc801\ud558\uc138\uc694.<\/p>\n\n\n<p>\uc5ec\ub7ec \uc8fc\ubb38\uc774 \uac19\uc740 \uc0dd\uc0b0 \uc790\uc6d0\uc744 \uc0ac\uc6a9\ud574 \uc77c\uc815 \uc870\uc728\uc774 \uc5b4\ub835\ub2e4\uba74 SkyPlanner\uac00 \uc801\ud569\ud569\ub2c8\ub2e4. Arcturus\uac00 \uc2a4\ucf00\uc904\ub9c1 \uacc4\uc0b0\uc744 \ub9e1\uace0, \uc6b0\uc120\uc21c\uc704\uc640 \ubcc0\uacbd\ub418\uc9c0 \uc54a\ub3c4\ub85d \uace0\uc815\ud560 \uc0ac\ud56d\uc740 \ub2f4\ub2f9\uc790\uac00 \uacc4\uc18d \uacb0\uc815\ud569\ub2c8\ub2e4. \ubaa8\ub4e0 \ub300\uae30\uc5f4\uc744 \uc218\uc791\uc5c5\uc73c\ub85c \uad00\ub9ac\ud558\uc9c0 \uc54a\uace0\ub3c4 \uacf5\uc815 \uc0ac\uc774\uc758 \uacf5\ubc31\uc744 \uc904\uc774\uace0 \uc644\ub8cc \uc608\uc815\uc77c\uc758 \uc2e0\ub8b0\ub3c4\ub97c \ub192\uc5ec \ub098\uac08 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p><a href=\"\/ko\/%ec%98%81%ec%97%85%ed%8c%80%ec%97%90-%eb%ac%b8%ec%9d%98\/\">SkyPlanner \ub370\ubaa8\ub97c \uc608\uc57d\ud558\uace0<\/a>, \uc2e4\uc81c \uc791\uc5c5\uc740 \uba87 \uc2dc\uac04\uc774\uba74 \ub418\ub294\ub370 \uc644\ub8cc\uae4c\uc9c0 \uba70\uce60\uc774 \uac78\ub838\ub358 \uc8fc\ubb38\uc744 \uc900\ube44\ud574 \uc8fc\uc138\uc694. \uadf8 \uc8fc\ubb38\uc758 \uacf5\uc815 \uc21c\uc11c\uc640 \ub300\uae30 \uc2dc\uac04, \uac00\uc7a5 \ubd80\ud558\uac00 \ub192\uc740 \uc0dd\uc0b0 \uc790\uc6d0\uc744 \uc0b4\ud3b4\ubcf4\uba74 \uc77c\uc815\uc744 \uc870\uc728\ud574 \ubb34\uc5c7\uc744 \ubc14\uafc0 \uc218 \uc788\uc744\uc9c0 \uac00\ub2a0\ud558\uae30 \uc88b\uc2b5\ub2c8\ub2e4. \uba3c\uc800 \uc9c1\uc811 \uc0b4\ud3b4\ubcf4\uace0 \uc2f6\ub2e4\uba74 <a href=\"\/ko\/%ed%8f%89%ea%b0%80%ed%8c%90\/\">\ub370\ubaa8 \ub370\uc774\ud130\ub85c SkyPlanner\ub97c \uccb4\ud5d8\ud574 \ubcf4\uc138\uc694<\/a>.<\/p>\n\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>\uc81c\uc870 \ud604\uc7a5\uc758 \ub9ac\ub4dc\ud0c0\uc784: \uc791\uc5c5 \uc0ac\uc774\uc758 \ub300\uae30 \uc2dc\uac04\uc744 \ud30c\uc545\ud558\uc138\uc694 \uacf5\uc815\ud45c\uc0c1 \uc18c\uc694 \uc2dc\uac04\uc740 \uc5f4\ub450 \uc2dc\uac04\uc778\ub370, \uace0\uac1d\uc5d0\uac8c \uc548\ub0b4\ud55c \uae30\uac04\uc740 8\uc77c\uc785\ub2c8\ub2e4. \uccab \uacf5\uc815\ubd80\ud130 \uc8fc\ubb38\uc774 \uc644\uc131\ub418\uae30\uae4c\uc9c0, \uc2e4\uc81c \uc791\uc5c5 \uc2dc\uac04\ubcf4\ub2e4 \ub300\uae30 \uc2dc\uac04\uc774 \ud6e8\uc52c \ub354 \uae34 \uc148\uc785\ub2c8\ub2e4. \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790\uc5d0\uac8c\ub294 \uc774 \ucc28\uc774\ub97c \uc774\ud574\ud558\ub294 \uac83\uc774 \uc0dd\uc0b0 \ub9ac\ub4dc\ud0c0\uc784 \uac1c\uc120\uc758 \ucd9c\ubc1c\uc810\uc785\ub2c8\ub2e4. \uac00\uacf5 \uc18d\ub3c4\ub97c \ub192\uc774\uba74 \ub3c4\uc6c0\uc774 \ub420 \uc218\ub294 \uc788\uc9c0\ub9cc, \ub2e4\uc74c \uc791\uc5c5 \uc2dc\uac04\uc744 \ubc30\uc815\ubc1b\uae30\uae4c\uc9c0 \uc774\ud2c0\uc744 \uae30\ub2e4\ub9ac\ub294 \ubb38\uc81c\ub294 &#8230; <a title=\"\uc81c\uc870 \ud604\uc7a5\uc758 \ub9ac\ub4dc\ud0c0\uc784: \uc791\uc5c5 \uc0ac\uc774\uc758 \ub300\uae30 \uc2dc\uac04\uc744 \ud30c\uc545\ud558\uc138\uc694\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%a0%9c%ec%a1%b0%ec%97%90%ec%84%9c-%eb%a6%ac%eb%93%9c-%ed%83%80%ec%9e%84%ec%9d%84-%ec%b5%9c%ec%a0%81%ed%99%94%ed%95%98%eb%8a%94-%eb%b0%a9%eb%b2%95%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80\/\" aria-label=\"Read more about \uc81c\uc870 \ud604\uc7a5\uc758 \ub9ac\ub4dc\ud0c0\uc784: \uc791\uc5c5 \uc0ac\uc774\uc758 \ub300\uae30 \uc2dc\uac04\uc744 \ud30c\uc545\ud558\uc138\uc694\">Read more<\/a><\/p>\n","protected":false},"author":2,"featured_media":98259,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2530,496],"tags":[],"class_list":["post-38594","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps--","category-496","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\uc81c\uc870 \ud604\uc7a5\uc758 \ub9ac\ub4dc\ud0c0\uc784: \uc791\uc5c5 \uc0ac\uc774\uc758 \ub300\uae30 \uc2dc\uac04\uc744 \ud30c\uc545\ud558\uc138\uc694<\/title>\n<meta name=\"description\" content=\"\uba87 \uc2dc\uac04\uc758 \uc791\uc5c5\uc774 \uc65c \uba70\uce60\uc529 \uac78\ub9b4\uae4c\uc694? \uc0dd\uc0b0 \ub9ac\ub4dc\ud0c0\uc784\uacfc \uacf5\uc815 \uc0ac\uc774 \ub300\uae30\ub97c \ud30c\uc545\ud558\uace0 SkyPlanner\ub85c \ub354 \uc2e0\ub8b0\ud560 \uc218 \uc788\ub294 \uc77c\uc815\uc744 \uc138\uc6b0\uc138\uc694.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%a0%9c%ec%a1%b0%ec%97%90%ec%84%9c-%eb%a6%ac%eb%93%9c-%ed%83%80%ec%9e%84%ec%9d%84-%ec%b5%9c%ec%a0%81%ed%99%94%ed%95%98%eb%8a%94-%eb%b0%a9%eb%b2%95%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80\/\" \/>\n<meta property=\"og:locale\" content=\"ko_KR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\uc81c\uc870 \ud604\uc7a5\uc758 \ub9ac\ub4dc\ud0c0\uc784: \uc791\uc5c5 \uc0ac\uc774\uc758 \ub300\uae30 \uc2dc\uac04\uc744 \ud30c\uc545\ud558\uc138\uc694\" \/>\n<meta property=\"og:description\" content=\"\uba87 \uc2dc\uac04\uc758 \uc791\uc5c5\uc774 \uc65c \uba70\uce60\uc529 \uac78\ub9b4\uae4c\uc694? \uc0dd\uc0b0 \ub9ac\ub4dc\ud0c0\uc784\uacfc \uacf5\uc815 \uc0ac\uc774 \ub300\uae30\ub97c \ud30c\uc545\ud558\uace0 SkyPlanner\ub85c \ub354 \uc2e0\ub8b0\ud560 \uc218 \uc788\ub294 \uc77c\uc815\uc744 \uc138\uc6b0\uc138\uc694.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%a0%9c%ec%a1%b0%ec%97%90%ec%84%9c-%eb%a6%ac%eb%93%9c-%ed%83%80%ec%9e%84%ec%9d%84-%ec%b5%9c%ec%a0%81%ed%99%94%ed%95%98%eb%8a%94-%eb%b0%a9%eb%b2%95%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2022-10-28T07:54:22+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-19T14:41:33+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"720\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jesse Sinisalo\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\uae00\uc4f4\uc774\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jesse Sinisalo\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/%ec%a0%9c%ec%a1%b0%ec%97%90%ec%84%9c-%eb%a6%ac%eb%93%9c-%ed%83%80%ec%9e%84%ec%9d%84-%ec%b5%9c%ec%a0%81%ed%99%94%ed%95%98%eb%8a%94-%eb%b0%a9%eb%b2%95%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/%ec%a0%9c%ec%a1%b0%ec%97%90%ec%84%9c-%eb%a6%ac%eb%93%9c-%ed%83%80%ec%9e%84%ec%9d%84-%ec%b5%9c%ec%a0%81%ed%99%94%ed%95%98%eb%8a%94-%eb%b0%a9%eb%b2%95%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80\\\/\"},\"author\":{\"name\":\"Jesse Sinisalo\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/eb1bfd6abe95a50b4a9ba1a081cce2dd\"},\"headline\":\"\uc81c\uc870 \ud604\uc7a5\uc758 \ub9ac\ub4dc\ud0c0\uc784: \uc791\uc5c5 \uc0ac\uc774\uc758 \ub300\uae30 \uc2dc\uac04\uc744 \ud30c\uc545\ud558\uc138\uc694\",\"datePublished\":\"2022-10-28T07:54:22+00:00\",\"dateModified\":\"2026-10-19T14:41:33+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/%ec%a0%9c%ec%a1%b0%ec%97%90%ec%84%9c-%eb%a6%ac%eb%93%9c-%ed%83%80%ec%9e%84%ec%9d%84-%ec%b5%9c%ec%a0%81%ed%99%94%ed%95%98%eb%8a%94-%eb%b0%a9%eb%b2%95%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80\\\/\"},\"wordCount\":29,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/%ec%a0%9c%ec%a1%b0%ec%97%90%ec%84%9c-%eb%a6%ac%eb%93%9c-%ed%83%80%ec%9e%84%ec%9d%84-%ec%b5%9c%ec%a0%81%ed%99%94%ed%95%98%eb%8a%94-%eb%b0%a9%eb%b2%95%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-lead-time-hero.png\",\"articleSection\":[\"APS \ubc0f \uc2a4\ucf00\uc904\ub9c1\",\"\ub9ac\uc18c\uc2a4\"],\"inLanguage\":\"ko-KR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/%ec%a0%9c%ec%a1%b0%ec%97%90%ec%84%9c-%eb%a6%ac%eb%93%9c-%ed%83%80%ec%9e%84%ec%9d%84-%ec%b5%9c%ec%a0%81%ed%99%94%ed%95%98%eb%8a%94-%eb%b0%a9%eb%b2%95%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/%ec%a0%9c%ec%a1%b0%ec%97%90%ec%84%9c-%eb%a6%ac%eb%93%9c-%ed%83%80%ec%9e%84%ec%9d%84-%ec%b5%9c%ec%a0%81%ed%99%94%ed%95%98%eb%8a%94-%eb%b0%a9%eb%b2%95%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80\\\/\",\"name\":\"\uc81c\uc870 \ud604\uc7a5\uc758 \ub9ac\ub4dc\ud0c0\uc784: \uc791\uc5c5 \uc0ac\uc774\uc758 \ub300\uae30 \uc2dc\uac04\uc744 \ud30c\uc545\ud558\uc138\uc694\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/%ec%a0%9c%ec%a1%b0%ec%97%90%ec%84%9c-%eb%a6%ac%eb%93%9c-%ed%83%80%ec%9e%84%ec%9d%84-%ec%b5%9c%ec%a0%81%ed%99%94%ed%95%98%eb%8a%94-%eb%b0%a9%eb%b2%95%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/%ec%a0%9c%ec%a1%b0%ec%97%90%ec%84%9c-%eb%a6%ac%eb%93%9c-%ed%83%80%ec%9e%84%ec%9d%84-%ec%b5%9c%ec%a0%81%ed%99%94%ed%95%98%eb%8a%94-%eb%b0%a9%eb%b2%95%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-lead-time-hero.png\",\"datePublished\":\"2022-10-28T07:54:22+00:00\",\"dateModified\":\"2026-10-19T14:41:33+00:00\",\"description\":\"\uba87 \uc2dc\uac04\uc758 \uc791\uc5c5\uc774 \uc65c \uba70\uce60\uc529 \uac78\ub9b4\uae4c\uc694? \uc0dd\uc0b0 \ub9ac\ub4dc\ud0c0\uc784\uacfc \uacf5\uc815 \uc0ac\uc774 \ub300\uae30\ub97c \ud30c\uc545\ud558\uace0 SkyPlanner\ub85c \ub354 \uc2e0\ub8b0\ud560 \uc218 \uc788\ub294 \uc77c\uc815\uc744 \uc138\uc6b0\uc138\uc694.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/%ec%a0%9c%ec%a1%b0%ec%97%90%ec%84%9c-%eb%a6%ac%eb%93%9c-%ed%83%80%ec%9e%84%ec%9d%84-%ec%b5%9c%ec%a0%81%ed%99%94%ed%95%98%eb%8a%94-%eb%b0%a9%eb%b2%95%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80\\\/#breadcrumb\"},\"inLanguage\":\"ko-KR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/%ec%a0%9c%ec%a1%b0%ec%97%90%ec%84%9c-%eb%a6%ac%eb%93%9c-%ed%83%80%ec%9e%84%ec%9d%84-%ec%b5%9c%ec%a0%81%ed%99%94%ed%95%98%eb%8a%94-%eb%b0%a9%eb%b2%95%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/%ec%a0%9c%ec%a1%b0%ec%97%90%ec%84%9c-%eb%a6%ac%eb%93%9c-%ed%83%80%ec%9e%84%ec%9d%84-%ec%b5%9c%ec%a0%81%ed%99%94%ed%95%98%eb%8a%94-%eb%b0%a9%eb%b2%95%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-lead-time-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-lead-time-hero.png\",\"width\":1280,\"height\":720,\"caption\":\"Parts waiting between manufacturing stations illustrate the gaps within manufacturing lead time\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/%ec%a0%9c%ec%a1%b0%ec%97%90%ec%84%9c-%eb%a6%ac%eb%93%9c-%ed%83%80%ec%9e%84%ec%9d%84-%ec%b5%9c%ec%a0%81%ed%99%94%ed%95%98%eb%8a%94-%eb%b0%a9%eb%b2%95%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\uc544\ud2f0\ud074\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"\uc81c\uc870 \ud604\uc7a5\uc758 \ub9ac\ub4dc\ud0c0\uc784: \uc791\uc5c5 \uc0ac\uc774\uc758 \ub300\uae30 \uc2dc\uac04\uc744 \ud30c\uc545\ud558\uc138\uc694\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ko-KR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/eb1bfd6abe95a50b4a9ba1a081cce2dd\",\"name\":\"Jesse Sinisalo\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g\",\"caption\":\"Jesse Sinisalo\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\uc81c\uc870 \ud604\uc7a5\uc758 \ub9ac\ub4dc\ud0c0\uc784: \uc791\uc5c5 \uc0ac\uc774\uc758 \ub300\uae30 \uc2dc\uac04\uc744 \ud30c\uc545\ud558\uc138\uc694","description":"\uba87 \uc2dc\uac04\uc758 \uc791\uc5c5\uc774 \uc65c \uba70\uce60\uc529 \uac78\ub9b4\uae4c\uc694? \uc0dd\uc0b0 \ub9ac\ub4dc\ud0c0\uc784\uacfc \uacf5\uc815 \uc0ac\uc774 \ub300\uae30\ub97c \ud30c\uc545\ud558\uace0 SkyPlanner\ub85c \ub354 \uc2e0\ub8b0\ud560 \uc218 \uc788\ub294 \uc77c\uc815\uc744 \uc138\uc6b0\uc138\uc694.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%a0%9c%ec%a1%b0%ec%97%90%ec%84%9c-%eb%a6%ac%eb%93%9c-%ed%83%80%ec%9e%84%ec%9d%84-%ec%b5%9c%ec%a0%81%ed%99%94%ed%95%98%eb%8a%94-%eb%b0%a9%eb%b2%95%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80\/","og_locale":"ko_KR","og_type":"article","og_title":"\uc81c\uc870 \ud604\uc7a5\uc758 \ub9ac\ub4dc\ud0c0\uc784: \uc791\uc5c5 \uc0ac\uc774\uc758 \ub300\uae30 \uc2dc\uac04\uc744 \ud30c\uc545\ud558\uc138\uc694","og_description":"\uba87 \uc2dc\uac04\uc758 \uc791\uc5c5\uc774 \uc65c \uba70\uce60\uc529 \uac78\ub9b4\uae4c\uc694? \uc0dd\uc0b0 \ub9ac\ub4dc\ud0c0\uc784\uacfc \uacf5\uc815 \uc0ac\uc774 \ub300\uae30\ub97c \ud30c\uc545\ud558\uace0 SkyPlanner\ub85c \ub354 \uc2e0\ub8b0\ud560 \uc218 \uc788\ub294 \uc77c\uc815\uc744 \uc138\uc6b0\uc138\uc694.","og_url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%a0%9c%ec%a1%b0%ec%97%90%ec%84%9c-%eb%a6%ac%eb%93%9c-%ed%83%80%ec%9e%84%ec%9d%84-%ec%b5%9c%ec%a0%81%ed%99%94%ed%95%98%eb%8a%94-%eb%b0%a9%eb%b2%95%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80\/","og_site_name":"SkyPlanner","article_published_time":"2022-10-28T07:54:22+00:00","article_modified_time":"2026-10-19T14:41:33+00:00","og_image":[{"width":1280,"height":720,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png","type":"image\/png"}],"author":"Jesse Sinisalo","twitter_card":"summary_large_image","twitter_misc":{"\uae00\uc4f4\uc774":"Jesse Sinisalo"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%a0%9c%ec%a1%b0%ec%97%90%ec%84%9c-%eb%a6%ac%eb%93%9c-%ed%83%80%ec%9e%84%ec%9d%84-%ec%b5%9c%ec%a0%81%ed%99%94%ed%95%98%eb%8a%94-%eb%b0%a9%eb%b2%95%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%a0%9c%ec%a1%b0%ec%97%90%ec%84%9c-%eb%a6%ac%eb%93%9c-%ed%83%80%ec%9e%84%ec%9d%84-%ec%b5%9c%ec%a0%81%ed%99%94%ed%95%98%eb%8a%94-%eb%b0%a9%eb%b2%95%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80\/"},"author":{"name":"Jesse Sinisalo","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/eb1bfd6abe95a50b4a9ba1a081cce2dd"},"headline":"\uc81c\uc870 \ud604\uc7a5\uc758 \ub9ac\ub4dc\ud0c0\uc784: \uc791\uc5c5 \uc0ac\uc774\uc758 \ub300\uae30 \uc2dc\uac04\uc744 \ud30c\uc545\ud558\uc138\uc694","datePublished":"2022-10-28T07:54:22+00:00","dateModified":"2026-10-19T14:41:33+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%a0%9c%ec%a1%b0%ec%97%90%ec%84%9c-%eb%a6%ac%eb%93%9c-%ed%83%80%ec%9e%84%ec%9d%84-%ec%b5%9c%ec%a0%81%ed%99%94%ed%95%98%eb%8a%94-%eb%b0%a9%eb%b2%95%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80\/"},"wordCount":29,"publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%a0%9c%ec%a1%b0%ec%97%90%ec%84%9c-%eb%a6%ac%eb%93%9c-%ed%83%80%ec%9e%84%ec%9d%84-%ec%b5%9c%ec%a0%81%ed%99%94%ed%95%98%eb%8a%94-%eb%b0%a9%eb%b2%95%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png","articleSection":["APS \ubc0f \uc2a4\ucf00\uc904\ub9c1","\ub9ac\uc18c\uc2a4"],"inLanguage":"ko-KR"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%a0%9c%ec%a1%b0%ec%97%90%ec%84%9c-%eb%a6%ac%eb%93%9c-%ed%83%80%ec%9e%84%ec%9d%84-%ec%b5%9c%ec%a0%81%ed%99%94%ed%95%98%eb%8a%94-%eb%b0%a9%eb%b2%95%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80\/","url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%a0%9c%ec%a1%b0%ec%97%90%ec%84%9c-%eb%a6%ac%eb%93%9c-%ed%83%80%ec%9e%84%ec%9d%84-%ec%b5%9c%ec%a0%81%ed%99%94%ed%95%98%eb%8a%94-%eb%b0%a9%eb%b2%95%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80\/","name":"\uc81c\uc870 \ud604\uc7a5\uc758 \ub9ac\ub4dc\ud0c0\uc784: \uc791\uc5c5 \uc0ac\uc774\uc758 \ub300\uae30 \uc2dc\uac04\uc744 \ud30c\uc545\ud558\uc138\uc694","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%a0%9c%ec%a1%b0%ec%97%90%ec%84%9c-%eb%a6%ac%eb%93%9c-%ed%83%80%ec%9e%84%ec%9d%84-%ec%b5%9c%ec%a0%81%ed%99%94%ed%95%98%eb%8a%94-%eb%b0%a9%eb%b2%95%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%a0%9c%ec%a1%b0%ec%97%90%ec%84%9c-%eb%a6%ac%eb%93%9c-%ed%83%80%ec%9e%84%ec%9d%84-%ec%b5%9c%ec%a0%81%ed%99%94%ed%95%98%eb%8a%94-%eb%b0%a9%eb%b2%95%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png","datePublished":"2022-10-28T07:54:22+00:00","dateModified":"2026-10-19T14:41:33+00:00","description":"\uba87 \uc2dc\uac04\uc758 \uc791\uc5c5\uc774 \uc65c \uba70\uce60\uc529 \uac78\ub9b4\uae4c\uc694? \uc0dd\uc0b0 \ub9ac\ub4dc\ud0c0\uc784\uacfc \uacf5\uc815 \uc0ac\uc774 \ub300\uae30\ub97c \ud30c\uc545\ud558\uace0 SkyPlanner\ub85c \ub354 \uc2e0\ub8b0\ud560 \uc218 \uc788\ub294 \uc77c\uc815\uc744 \uc138\uc6b0\uc138\uc694.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%a0%9c%ec%a1%b0%ec%97%90%ec%84%9c-%eb%a6%ac%eb%93%9c-%ed%83%80%ec%9e%84%ec%9d%84-%ec%b5%9c%ec%a0%81%ed%99%94%ed%95%98%eb%8a%94-%eb%b0%a9%eb%b2%95%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80\/#breadcrumb"},"inLanguage":"ko-KR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%a0%9c%ec%a1%b0%ec%97%90%ec%84%9c-%eb%a6%ac%eb%93%9c-%ed%83%80%ec%9e%84%ec%9d%84-%ec%b5%9c%ec%a0%81%ed%99%94%ed%95%98%eb%8a%94-%eb%b0%a9%eb%b2%95%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80\/"]}]},{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%a0%9c%ec%a1%b0%ec%97%90%ec%84%9c-%eb%a6%ac%eb%93%9c-%ed%83%80%ec%9e%84%ec%9d%84-%ec%b5%9c%ec%a0%81%ed%99%94%ed%95%98%eb%8a%94-%eb%b0%a9%eb%b2%95%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png","width":1280,"height":720,"caption":"Parts waiting between manufacturing stations illustrate the gaps within manufacturing lead time"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%a0%9c%ec%a1%b0%ec%97%90%ec%84%9c-%eb%a6%ac%eb%93%9c-%ed%83%80%ec%9e%84%ec%9d%84-%ec%b5%9c%ec%a0%81%ed%99%94%ed%95%98%eb%8a%94-%eb%b0%a9%eb%b2%95%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ko\/"},{"@type":"ListItem","position":2,"name":"\uc544\ud2f0\ud074","item":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/"},{"@type":"ListItem","position":3,"name":"\uc81c\uc870 \ud604\uc7a5\uc758 \ub9ac\ub4dc\ud0c0\uc784: \uc791\uc5c5 \uc0ac\uc774\uc758 \ub300\uae30 \uc2dc\uac04\uc744 \ud30c\uc545\ud558\uc138\uc694"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ko\/#website","url":"https:\/\/skyplanner.ai\/ko\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ko\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ko-KR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ko\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ko\/","logo":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/eb1bfd6abe95a50b4a9ba1a081cce2dd","name":"Jesse Sinisalo","image":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/secure.gravatar.com\/avatar\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g","caption":"Jesse Sinisalo"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png",1280,720,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png",1280,720,false],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png",1280,720,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jesse Sinisalo","author_link":"https:\/\/skyplanner.ai\/ko\/author\/jesse\/"},"uagb_comment_info":0,"uagb_excerpt":"\uc81c\uc870 \ud604\uc7a5\uc758 \ub9ac\ub4dc\ud0c0\uc784: \uc791\uc5c5 \uc0ac\uc774\uc758 \ub300\uae30 \uc2dc\uac04\uc744 \ud30c\uc545\ud558\uc138\uc694 \uacf5\uc815\ud45c\uc0c1 \uc18c\uc694 \uc2dc\uac04\uc740 \uc5f4\ub450 \uc2dc\uac04\uc778\ub370, \uace0\uac1d\uc5d0\uac8c \uc548\ub0b4\ud55c \uae30\uac04\uc740 8\uc77c\uc785\ub2c8\ub2e4. \uccab \uacf5\uc815\ubd80\ud130 \uc8fc\ubb38\uc774 \uc644\uc131\ub418\uae30\uae4c\uc9c0, \uc2e4\uc81c \uc791\uc5c5 \uc2dc\uac04\ubcf4\ub2e4 \ub300\uae30 \uc2dc\uac04\uc774 \ud6e8\uc52c \ub354 \uae34 \uc148\uc785\ub2c8\ub2e4. \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790\uc5d0\uac8c\ub294 \uc774 \ucc28\uc774\ub97c \uc774\ud574\ud558\ub294 \uac83\uc774 \uc0dd\uc0b0 \ub9ac\ub4dc\ud0c0\uc784 \uac1c\uc120\uc758 \ucd9c\ubc1c\uc810\uc785\ub2c8\ub2e4. \uac00\uacf5 \uc18d\ub3c4\ub97c \ub192\uc774\uba74 \ub3c4\uc6c0\uc774 \ub420 \uc218\ub294 \uc788\uc9c0\ub9cc, \ub2e4\uc74c \uc791\uc5c5 \uc2dc\uac04\uc744 \ubc30\uc815\ubc1b\uae30\uae4c\uc9c0 \uc774\ud2c0\uc744 \uae30\ub2e4\ub9ac\ub294 \ubb38\uc81c\ub294&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/38594","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/comments?post=38594"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/38594\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media\/98259"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media?parent=38594"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/categories?post=38594"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/tags?post=38594"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}