{"id":113181,"date":"2026-10-30T04:08:00","date_gmt":"2026-10-30T04:08:00","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=113181"},"modified":"2026-10-30T04:10:14","modified_gmt":"2026-10-30T04:10:14","slug":"vendor-managed-inventory","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/vendor-managed-inventory\/","title":{"rendered":"\uacf5\uae09\uc5c5\uccb4 \uad00\ub9ac \uc7ac\uace0: \uc0dd\uc0b0\uc5d0 \uc2e4\uc9c8\uc801\uc73c\ub85c \ub3c4\uc6c0\uc774 \ub418\ub294 VMI \uc6b4\uc601\ubc95"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">\uacf5\uae09\uc5c5\uccb4 \uad00\ub9ac \uc7ac\uace0: \uc0dd\uc0b0\uc5d0 \uc2e4\uc9c8\uc801\uc73c\ub85c \ub3c4\uc6c0\uc774 \ub418\ub294 VMI \uc6b4\uc601\ubc95<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/ko\/\">\ud648<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/\">\ub9ac\uc18c\uc2a4<\/a> &raquo; \uacf5\uae09\uc5c5\uccb4 \uad00\ub9ac \uc7ac\uace0: \uc0dd\uc0b0\uc5d0 \uc2e4\uc9c8\uc801\uc73c\ub85c \ub3c4\uc6c0\uc774 \ub418\ub294 VMI \uc6b4\uc601\ubc95<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">\uc608\uc0c1 \uc77d\uae30 \uc2dc\uac04: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> \ubd84<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p><strong>\uacf5\uae09\uc5c5\uccb4 \uad00\ub9ac \uc7ac\uace0(VMI)<\/strong>\ub294 \uacf5\uae09\uc5c5\uccb4\uac00 \uc0ac\uc804\uc5d0 \uc815\ud55c \uc7ac\uace0 \uc815\ubcf4\ub97c \ud655\uc778\ud558\uace0, \uad6c\ub9e4\uc0ac\uc640 \ud569\uc758\ud55c \uaddc\uce59 \uc548\uc5d0\uc11c \ubcf4\ucda9 \uc2dc\uc810\uacfc \uc218\ub7c9\uc744 \uacb0\uc815\ud560 \ucc45\uc784\uc744 \ub9e1\ub294 \ubc29\uc2dd\uc785\ub2c8\ub2e4. \uad6c\ub9e4\ud300\uc774 \uc77c\uc0c1\uc801\uc778 \ubcf4\ucda9\uc744 \ub9e4\ubc88 \uc694\uccad\ud558\ub294 \ub300\uc2e0, \uacf5\uae09\uc5c5\uccb4\uac00 \uad6c\ub9e4\uc0ac\uc5d0\uc11c \uacf5\uc720\ud55c \uc7ac\uace0 \ubc0f \uc218\uc694 \uc815\ubcf4\ub97c \ubc14\ud0d5\uc73c\ub85c \ubcf4\ucda9\uc744 \uc9c4\ud589\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc81c\uc870\uc5c5\uccb4\uac00 \uae30\ub300\ud558\ub294 \uc774\uc810\uc740 \ubd84\uba85\ud569\ub2c8\ub2e4. \ubc18\ubcf5 \ubc1c\uc8fc\ub97c \ucc59\uae30\ub294 \uc2dc\uac04\uc774 \uc904\uace0, \uacf5\uae09\uc5c5\uccb4\ub294 \uc0c1\ud669\uc744 \ub354 \uc798 \ud30c\uc545\ud558\uba70, \uc790\uc8fc \uc4f0\ub294 \uc790\uc7ac\uc5d0\uc11c \uc608\uc0c1\uce58 \ubabb\ud55c \ubb38\uc81c\uac00 \uc0dd\uae30\ub294 \uc77c\ub3c4 \uc904\uc5b4\ub4ed\ub2c8\ub2e4. \ud558\uc9c0\ub9cc \ubcf4\ucda9 \uc5c5\ubb34\ub97c \ub118\uae34\ub2e4\uace0 \ud574\uc11c \uc0dd\uc0b0 \uc57d\uc18d\uc744 \uc9c0\ud0ac \ucc45\uc784\uae4c\uc9c0 \ub118\uc5b4\uac00\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4. \ubd80\ud488\uc774 \uc6b4\uc1a1 \uc911\uc774\ub354\ub77c\ub3c4 \uc57d\uc18d\ud55c \uc791\uc5c5\uc5d0 \uc4f0\uae30\uc5d0\ub294 \ub108\ubb34 \ub2a6\uac8c \ub3c4\ucc29\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>VMI\ub97c \uc81c\ub300\ub85c \uc6b4\uc601\ud558\ub824\uba74 \ub450 \uac00\uc9c0 \ud310\ub2e8\uc774 \uc5f0\uacb0\ub418\uc5b4\uc57c \ud569\ub2c8\ub2e4. \uacf5\uae09\uc5c5\uccb4\uac00 \ubb34\uc5c7\uc744 \ubcf4\ucda9\ud574\uc57c \ud558\ub294\uc9c0, \uadf8\ub9ac\uace0 \uacf5\uc7a5\uc774 \uadf8 \ubb3c\ub7c9\uc73c\ub85c \uc2e4\uc81c \ubb34\uc5c7\uc744 \uc0dd\uc0b0\ud560 \uc218 \uc788\ub294\uc9c0\uc785\ub2c8\ub2e4. SkyPlanner APS\ub294 \ub450 \ubc88\uc9f8 \ud310\ub2e8\uc744 \ub3d5\uc2b5\ub2c8\ub2e4. \uc790\uc7ac \uac00\uc6a9\uc131\uacfc \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ud558\ub098\uc758 \uc77c\uc815\uc5d0 \ubc18\uc601\ud558\ubbc0\ub85c, \uacf5\uae09\uc5c5\uccb4\uc758 \uc815\ubcf4\uac00 \uac31\uc2e0\ub420 \ub54c\ub9c8\ub2e4 \uc791\uc5c5 \uc21c\uc11c\ub97c \ub2e4\uc2dc \uc218\ub3d9\uc73c\ub85c \ubc14\uafb8\ub294 \ub300\uc2e0 \uc2e4\ud589 \uac00\ub2a5\ud55c \uacc4\ud68d\uc744 \uc138\uc6b8 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">VMI, \uc704\ud0c1\uc7ac\uace0, \ucd5c\uc18c\u00b7\ucd5c\ub300 \uc7ac\uace0 \uc815\ucc45\uc740 \uac01\uac01 \uacb0\uc815\ud558\ub294 \uc0ac\ud56d\uc774 \ub2e4\ub985\ub2c8\ub2e4<\/h2>\n\n\n<p>VMI\ub294 <strong>\ub204\uac00 \ubcf4\ucda9\uc744 \uad00\ub9ac\ud558\ub294\uac00<\/strong>\uc5d0 \uad00\ud55c \uac83\uc785\ub2c8\ub2e4. \uc704\ud0c1\uc7ac\uace0\ub294 <strong>\ub204\uac00 \uc7ac\uace0\ub97c \uc18c\uc720\ud558\ub294\uac00<\/strong>\uc5d0 \uad00\ud55c \uac83\uc785\ub2c8\ub2e4. \ucd5c\uc18c\u00b7\ucd5c\ub300 \uc7ac\uace0 \uc815\ucc45\uc740 <strong>\ubcf4\ucda9 \uc218\ub7c9\uc744 \uc5b4\ub5bb\uac8c \uc870\uc808\ud558\ub294\uac00<\/strong>\ub97c \uc815\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc704\ud0c1\uc7ac\uace0 \ubc29\uc2dd\uc5d0\uc11c\ub294 \uad6c\ub9e4\uc0ac \uc0ac\uc5c5\uc7a5\uc5d0 \uc788\ub294 \uc7ac\uace0\ub3c4 \ud569\uc758\ub41c \uc18c\uc720\uad8c \uc774\uc804 \uc870\uac74\uc774 \ucda9\uc871\ub420 \ub54c\uae4c\uc9c0 \uacf5\uae09\uc5c5\uccb4 \uc18c\uc720\ub85c \ub0a8\uc2b5\ub2c8\ub2e4. \uc774 \uc870\uac74\uc740 \ubcf4\ud1b5 \uc790\uc7ac\uc758 \uc18c\ube44\ub098 \ucd9c\uace0\uc785\ub2c8\ub2e4. VMI\ub294 \uc704\ud0c1\uc7ac\uace0\uc5d0\ub3c4, \uad6c\ub9e4\uc0ac \uc18c\uc720 \uc7ac\uace0\uc5d0\ub3c4 \uc801\uc6a9\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ubcf4\ucda9 \ubc29\uc2dd\uc744 \uc815\ud558\ub294 \uac83\ub9cc\uc73c\ub85c \uacb0\uc81c \uc870\uac74\uc774\ub098 \uc18c\uc720\uad8c, \uccad\uad6c \ub300\uae08\uc758 \uc9c0\uae09 \uae30\uc77c\uae4c\uc9c0 \uc815\ud574\uc9c0\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p>\ub9c8\ucc2c\uac00\uc9c0\ub85c \uacf5\uae09\uc5c5\uccb4\uac00 <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/min-max-inventory-manufacturing\/\">\ud569\uc758\ub41c \ucd5c\uc18c\u00b7\ucd5c\ub300 \uc7ac\uace0 \uc218\uc900<\/a>\uc744 \uae30\uc900\uc73c\ub85c VMI\ub97c \uc6b4\uc601\ud560 \uc218\ub294 \uc788\uc9c0\ub9cc, \uc774 \uae30\uc900\uc740 VMI \uc6b4\uc601\uc5d0 \uc801\uc6a9\ud558\ub294 \ud558\ub098\uc758 \uc815\ucc45\uc785\ub2c8\ub2e4. VMI \uc5c6\uc774 \uad6c\ub9e4\uc0ac\uac00 \uc9c1\uc811 \ucd5c\uc18c\u00b7\ucd5c\ub300 \uc7ac\uace0 \uae30\uc900\uc5d0 \ub530\ub77c \ubcf4\ucda9\ud560 \uc218\ub3c4 \uc788\uc2b5\ub2c8\ub2e4. \ucc45\uc784 \ubc94\uc704, \uc7ac\uace0 \uc815\ucc45, \uac70\ub798 \uc870\uac74\uc740 \uac01\uac01 \ubcc4\ub3c4\ub85c \ud569\uc758\ud558\uc138\uc694. \uc774 \uc6a9\uc5b4\ub4e4\uc744 \uac19\uc740 \ub73b\uc73c\ub85c \ucde8\uae09\ud558\uba74 \uc911\uc694\ud55c \uacb0\uc815\uc774 \ubbf8\ud574\uacb0 \uc0c1\ud0dc\ub85c \ub0a8\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uacf5\uae09\uc5c5\uccb4 \uad00\ub9ac \uc7ac\uace0\uc758 \uc6b4\uc601 \ubc29\uc2dd<\/h2>\n\n\n<p>\uc6b4\uc601\uc740 \uc815\ubcf4\ub97c \uacf5\uc720\ud558\ub294 \ub370\uc11c \uc2dc\uc791\ub429\ub2c8\ub2e4. \uad6c\ub9e4\uc0ac\ub294 \ud569\uc758\ub41c \ubc94\uc704\uc758 \uc7ac\uace0 \ud604\ud669, \uc18c\ube44\ub7c9, \uad00\ub828 \ubbf8\ub798 \uc218\uc694\ub97c \uacf5\uc720\ud569\ub2c8\ub2e4. \uacf5\uae09\uc5c5\uccb4\ub294 \uc774 \uc815\ubcf4\ub97c \uac80\ud1a0\ud574 \ud544\uc694\ud55c \ubcf4\ucda9\ub7c9\uc744 \uacb0\uc815\ud558\uace0, \ud569\uc758\ub41c \uc808\ucc28\uc5d0 \ub530\ub77c \uc81c\uc548\ud558\ub294 \ub0a9\ud488 \uc77c\uc815\uc774\ub098 \ud655\uc815\ub41c \ub0a9\ud488 \uc77c\uc815\uc744 \uc54c\ub9bd\ub2c8\ub2e4.<\/p>\n\n\n<p>\uad6c\ub9e4\uc0ac\ub294 \ubb3c\ud488\uc744 \uc785\uace0\ud558\uace0 \ucc28\uc774\uac00 \uc788\uc73c\uba74 \uae30\ub85d\ud55c \ub4a4 \uc7ac\uace0 \uc815\ubcf4\ub97c \uac31\uc2e0\ud569\ub2c8\ub2e4. \uc0dd\uc0b0\uc5d0\uc11c \uc18c\ube44\ud55c \uc218\ub7c9\uc740 \ub2e4\uc74c \ubcf4\ucda9 \uacb0\uc815\uc5d0 \ubc18\uc601\ub429\ub2c8\ub2e4. \ud569\uc758\ub41c \uc808\ucc28\uc5d0 \ub530\ub77c \uacf5\uae09\uc5c5\uccb4\ub294 \uc774\ubbf8 \uc2b9\uc778\ubc1b\uc740 \ubc94\uc704 \uc548\uc5d0\uc11c \ubcf4\ucda9\ud558\uac70\ub098 \uc2b9\uc778\uc744 \uc694\uccad\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. VMI\ub77c\uace0 \ud574\uc11c \ubc1c\uc8fc\uc11c\ub098 \uc2b9\uc778 \uc808\ucc28\uac00 \uc5c6\uc5b4\uc9c0\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774 \uacfc\uc815\uc774 \uc6d0\ud65c\ud558\uac8c \ub3cc\uc544\uac00\ub824\uba74 \uc591\uce21\uc774 \ub370\uc774\ud130\uc758 \uc758\ubbf8\ub97c \uc774\ud574\ud574\uc57c \ud569\ub2c8\ub2e4. \uac80\uc0ac \ub300\uae30 \uc911\uc778 \uc790\uc7ac\uae4c\uc9c0 \ud3ec\ud568\ud55c \uc7ac\uace0 \uc218\ub7c9\uc740 \uc870\ub9bd\uc5d0 \ubc14\ub85c \uc4f8 \uc218 \uc788\ub294 \uc7ac\uace0 \uc218\ub7c9\uacfc \ub2e4\ub985\ub2c8\ub2e4. \uc608\uce21 \uc218\uc694\uc640 \ud655\uc815 \uc18c\uc694\ub3c4 \ub2e4\ub985\ub2c8\ub2e4. \uacf5\uae09\uc5c5\uccb4\uc5d0\uc11c \ucd9c\ud558\ub41c \ubb3c\ub7c9\uacfc \uc0ac\uc6a9 \uc9c0\uc810\uc5d0\uc11c \ud22c\uc785\ud560 \uc218 \uc788\ub294 \uc790\uc7ac \uc5ed\uc2dc \ub2e4\ub985\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774\ub7f0 \ucc28\uc774\ub97c \uba85\ud655\ud788 \uad6c\ubd84\ud558\uba74 \uacf5\uae09\uc5c5\uccb4\ub294 \ub354 \uc77c\ucc0d \ub300\uc751\ud560 \uc218 \uc788\uace0, \uc0dd\uc0b0\uacc4\ud68d \ub2f4\ub2f9\uc790\ub294 \uc2e4\uc81c\ub85c \ubb34\uc5c7\uc774 \ud655\uc57d\ub418\uc5c8\ub294\uc9c0 \ucd94\uce21\ud560 \ud544\uc694\uac00 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc81c\uc870\uc5c5\uccb4\uc5d0 VMI\uac00 \uc801\ud569\ud55c \uacbd\uc6b0\ub294?<\/h2>\n\n\n<p>\ubc18\ubcf5\uc801\uc73c\ub85c \uc18c\ube44\ub418\ub294 \ud488\ubaa9\uacfc \uc6b4\uc601 \uc5ed\ub7c9\uc744 \uac16\ucd98 \uacf5\uae09\uc5c5\uccb4\ubd80\ud130 \uac80\ud1a0\ud558\uc138\uc694. \ud45c\uc900 \uccb4\uacb0\ubd80\ud488, \ud3ec\uc7a5\uc7ac, \uacf5\uc6a9 \ubd80\ud488, \uc0c1\uc2dc \uc0ac\uc6a9\ud558\ub294 \uc6d0\uc790\uc7ac\ub294 \uc218\uc694\uc640 \ub9ac\ub4dc\ud0c0\uc784, \uc7ac\uace0 \ud604\ud669\uc744 \uacf5\uc720\ud560 \uc218 \uc788\ub2e4\uba74 \uc88b\uc740 \ud6c4\ubcf4\uc785\ub2c8\ub2e4. \ud2b9\ud788 \ubcf4\ucda9 \ubc29\uc2dd\uc740 \ubc18\ubcf5\uc801\uc778\ub370\ub3c4 \uad6c\ub9e4\ud300\uc774 \ub9ce\uc740 \uc2dc\uac04\uc744 \ub4e4\uc5ec \ucc59\uaca8\uc57c \ud558\ub294 \ud488\ubaa9\uad70\uc5d0\uc11c \ud6a8\uacfc\ub97c \uae30\ub300\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774\ub7ec\ud55c \uc77c\uc0c1 \uc5c5\ubb34\ub97c \ubc14\uafb8\uba74 \ub2e4\uc74c\uacfc \uac19\uc740 \uc774\uc810\uc744 \uae30\ub300\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>\uc77c\uc0c1\uc801\uc778 \uad6c\ub9e4 \uc5c5\ubb34 \ubd80\ub2f4 \uc644\ud654.<\/strong> \uac19\uc740 \ud488\ubaa9\uc758 \uc7ac\uace0\ub97c \ud655\uc778\ud558\uace0 \ubcf4\ucda9 \uc694\uccad\uc744 \ubc18\ubcf5\ud574\uc11c \uc791\uc131\ud558\ub294 \uc2dc\uac04\uc744 \uc904\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/li><li><strong>\uacf5\uae09\uc5c5\uccb4\uc758 \uc870\uae30 \uacc4\ud68d \uc218\ub9bd.<\/strong> \ubd80\uc871\uc774 \ubc1c\uc0dd\ud55c \ub4a4\uc5d0\uc57c \ubc1c\uc8fc\uc11c\ub97c \ubcf4\ub0b4\ub294 \ubc29\uc2dd\ubcf4\ub2e4 \uc18c\ube44\ub7c9\uacfc \uc218\uc694\ub97c \uacf5\uc720\ud558\ub294 \ubc29\uc2dd\uc774 \uacf5\uae09\uc5c5\uccb4\uc5d0 \ub354 \uc77c\ucc0d \ub300\ube44\ud560 \uae30\ud68c\ub97c \uc90d\ub2c8\ub2e4.<\/li><li><strong>\uc7ac\uace0 \uc218\uc900\uc758 \uade0\ud615 \uac1c\uc120.<\/strong> \uc7ac\uace0 \ubaa9\ud45c\ub97c \ud568\uaed8 \uac80\ud1a0\ud558\uba74 \uc0dd\uc0b0\uc5d0 \ud544\uc694\ud55c \ubb3c\ub7c9\uc744 \ud655\ubcf4\ud558\uba74\uc11c \ubd88\ud544\uc694\ud55c \uc7ac\uace0 \ucd95\uc801\uc744 \uc904\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/li><li><strong>\uc2e0\uc18d\ud55c \uc608\uc678 \uc0c1\ud669 \ub300\uc751.<\/strong> \uacbd\uace0 \ubc0f \ub300\uc751 \uc808\ucc28\ub97c \ud569\uc758\ud574 \ub450\uba74 \ubcf4\ucda9 \uc9c0\uc5f0\uc744 \uc124\ube44 \uc55e\uc5d0\uc11c \ub4a4\ub2a6\uac8c \ubc1c\uacac\ud558\ub294 \ub300\uc2e0 \uc591\uce21\uc774 \ud568\uaed8 \ub300\uc751\uc744 \uacb0\uc815\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/li><\/ul>\n\n\n<p>\uace0\ub824\ud574\uc57c \ud560 \ubd80\ub2f4\ub3c4 \uc788\uc2b5\ub2c8\ub2e4. \uacf5\uae09\uc5c5\uccb4\ub294 \ubaa8\ub2c8\ud130\ub9c1\uacfc \uacc4\ud68d \uc5c5\ubb34\ub97c \ub9e1\ub294 \ub9cc\ud07c \uc774\ub97c \uac10\ub2f9\ud560 \ub9cc\ud55c \uac70\ub798 \uaddc\ubaa8\uac00 \ud544\uc694\ud569\ub2c8\ub2e4. \uad6c\ub9e4\uc0ac\ub294 \uc6b4\uc601 \uc815\ubcf4\ub97c \uacf5\uc720\ud558\uba70, \uc774\ub97c \ud574\uc11d\ud558\uace0 \ub300\uc751\ud558\ub294 \ud611\ub825\uc0ac\uc758 \uc5ed\ub7c9\uc5d0 \ub354 \uc758\uc874\ud558\uac8c \ub429\ub2c8\ub2e4. \uacf5\uae09\uc5c5\uccb4\uac00 \uc18c\ube44\ub7c9\ub9cc \ubcf4\uace0 \uc81c\ud488 \ub2e8\uc885\uc774\ub098 \uc124\uacc4 \uac1c\uc815 \uc0ac\uc2e4\uc744 \ub193\uce58\uba74 \uc5ec\uc804\ud788 \uacfc\uc789 \uc7ac\uace0\uac00 \uc313\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc77c\ud68c\uc131 \ud504\ub85c\uc81d\ud2b8 \uad6c\ub9e4, \uc0ac\uc591\uc774 \ube60\ub974\uac8c \ubc14\ub00c\ub294 \ud488\ubaa9, \uc7ac\uace0 \uae30\ub85d\uc774 \ubd80\uc815\ud655\ud55c \ud488\ubaa9\uc740 VMI\ub97c \ucc98\uc74c \ub3c4\uc785\ud560 \ub300\uc0c1\uc73c\ub85c\ub294 \uc801\ud569\uc131\uc774 \ub5a8\uc5b4\uc9d1\ub2c8\ub2e4. \uc218\uc694 \ubcc0\ub3d9\uc774 \uc788\ub2e4\uace0 \ud574\uc11c VMI\ub97c \uc801\uc6a9\ud560 \uc218 \uc5c6\ub294 \uac83\uc740 \uc544\ub2c8\uc9c0\ub9cc, \ubbf8\ub798 \uc815\ubcf4\uc758 \uacf5\uc720\uc640 \uc608\uc678 \uc0c1\ud669 \ub300\uc751\uc774 \ub354 \uc911\uc694\ud574\uc9d1\ub2c8\ub2e4. \uad6c\ub9e4\uc0ac\uac00 \uc0dd\uc0b0 \uae09\uc99d\uc744 \uc54c\ub9ac\uc9c0 \uc54a\uc73c\uba74 \uacf5\uae09\uc5c5\uccb4\ub3c4 \ub300\ube44\ud560 \uc218 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>VMI\ub97c \ub3c4\uc785\ud574\ub3c4 \uc548\uc804 \uc7ac\uace0\ub294 \uc5ec\uc804\ud788 \ud544\uc694\ud569\ub2c8\ub2e4. \uc18c\ube44\ub7c9 \ubcc0\ub3d9, \ubcf4\ucda9 \ub9ac\ub4dc\ud0c0\uc784, \uacf5\uae09 \uc2e0\ub8b0\uc131, \uc790\uc7ac \ubd80\uc871\uc5d0 \ub530\ub978 \ube44\uc6a9\uc744 \uace0\ub824\ud574 \uc644\ucda9 \uc7ac\uace0\ub97c \uac80\ud1a0\ud558\uc138\uc694. \ud488\ubaa9\uc758 \ubcf4\ucda9 \uc8fc\uccb4\uac00 \ubc14\ub010\ub2e4\uace0 \ud574\uc11c \uc774\ub7f0 \uc704\ud5d8\uc774 \uc0ac\ub77c\uc9c0\uc9c0\ub294 \uc54a\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uccab \ubcf4\ucda9 \uc804\uc5d0 \uac01\uc790\uc758 \uad8c\ud55c\uacfc \uc5ed\ud560\uc744 \uc815\ud558\uc138\uc694<\/h2>\n\n\n<p>\uc2e4\ubb34\uc5d0\uc11c \uc911\uc694\ud55c \uc9c8\ubb38\uc740 \ub2e8\uc21c\ud788 \uacf5\uae09\uc5c5\uccb4\uac00 \u2018\uc7ac\uace0\ub97c \uad00\ub9ac\ud560 \uac83\uc778\uac00\u2019\uac00 \uc544\ub2d9\ub2c8\ub2e4. \uacf5\uae09\uc5c5\uccb4\uac00 \uc5b4\ub5a4 \uacb0\uc815\uc744 \ub3c5\uc790\uc801\uc73c\ub85c \ub0b4\ub9b4 \uc218 \uc788\uace0, \uc5b8\uc81c \uad6c\ub9e4\uc0ac\uac00 \uad00\uc5ec\ud574\uc57c \ud558\ub294\uc9c0\ub97c \uc815\ud558\ub294 \uac83\uc774 \ud575\uc2ec\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>\uacf5\uae09\uc5c5\uccb4\uc758 \ubcf4\ucda9 \ucc45\uc784 \ubc94\uc704\ub97c \uba85\ud655\ud788 \uc815\ud558\uc138\uc694.<\/strong> \ub300\uc0c1 \ud488\ubaa9 \ucf54\ub4dc, \uac1c\uc815 \ubc88\ud638, \uc704\uce58, \uc7ac\uace0 \ubaa9\ud45c \ub610\ub294 \ubcc4\ub3c4\ub85c \ud569\uc758\ud55c \ubcf4\ucda9 \uc815\ucc45, \uac80\ud1a0 \uc8fc\uae30, \ub0a9\ud488 \ub9ac\ub4dc\ud0c0\uc784, \ud3ec\uc7a5 \ub2e8\uc704, \ub0a9\ud488 \uac00\ub2a5 \uc2dc\uac04\ub300\ub97c \uba85\uc2dc\ud558\uc138\uc694. \uacf5\uae09\uc5c5\uccb4\uac00 \uc7ac\uace0 \ubaa9\ud45c\ub97c \uc870\uc815\ud560 \uc218 \uc788\ub294\uc9c0, \uad6c\ub9e4 \ub2f4\ub2f9\uc790\uc5d0\uac8c \uba3c\uc800 \uc2b9\uc778\uc744 \ubc1b\uc544\uc57c \ud558\ub294\uc9c0\ub3c4 \uc815\ud574\uc57c \ud569\ub2c8\ub2e4. \ubcf4\ucda9 \uac74\uc774 \uc5b4\ub5a4 \uc808\ucc28\ub97c \uac70\uccd0 \uc2b9\uc778\ub41c \uac70\ub798\ub85c \ud655\uc815\ub418\ub294\uc9c0\ub3c4 \uba85\uc2dc\ud558\uc138\uc694.<\/p>\n\n\n<p><strong>\uc81c\uc870\uc5c5\uccb4\uc758 \ucc45\uc784\ub3c4 \uba85\ud655\ud788 \ud558\uc138\uc694.<\/strong> \uad6c\ub9e4\uc0ac\ub294 \uc815\ud655\ud55c \uc18c\ube44\ub7c9\uacfc \uc7ac\uace0 \uc815\ubcf4\ub97c \uc81c\uacf5\ud558\uace0, \uc0dd\uc0b0 \uc218\uc694\uc758 \ubcc0\ud654\ub97c \uc54c\ub9ac\uba70, \ud1b5\uc0c1\uc801\uc778 \uc778\uc218 \uc808\ucc28\uc5d0 \ub530\ub77c \ubb3c\ud488\uc744 \ubc1b\uc2b5\ub2c8\ub2e4. \uc7ac\uace0 \ubd88\uc77c\uce58, \uc815\ubcf4 \uac31\uc2e0 \ub204\ub77d, \uc0ac\uc591 \ubcc0\uacbd\uc744 \ub2f4\ub2f9\ud560 \ucc45\uc784\uc790\ub97c \uc9c0\uc815\ud558\uc138\uc694. \uad6c\ub9e4\ud300\uacfc \uc0dd\uc0b0\ud300\uc740 \uc11c\ub85c \uc0c1\ub300 \ud300\uc774 \uacf5\uae09\uc5c5\uccb4\uc5d0 \uc54c\ub838\uc744 \uac83\uc774\ub77c\uace0 \uac00\uc815\ud574\uc11c\ub294 \uc548 \ub429\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>\uc608\uc678 \uc0c1\ud669\uc758 \ucc98\ub9ac \ubc29\ubc95\uc744 \ud568\uaed8 \ud569\uc758\ud558\uc138\uc694.<\/strong> \uc790\uc7ac \ubd80\uc871\uc774 \uc608\uc0c1\ub420 \ub54c, \ucd9c\ud558\uac00 \uc9c0\uc5f0\ub420 \ub54c, \ub0a9\ud488 \ubb3c\ud488\uc758 \uc778\uc218\uac00 \uac70\ubd80\ub420 \ub54c, \uacfc\uc789 \uc7ac\uace0\ub098 \ub354 \uc774\uc0c1 \uc0ac\uc6a9\ud558\uc9c0 \uc54a\ub294 \uac1c\uc815 \uc0ac\uc591\uc758 \ubd80\ud488\uc774 \uc0dd\uacbc\uc744 \ub54c \ub204\uac00 \ub300\uc751\ud560\uc9c0 \uc815\ud558\uc138\uc694. \ubb38\uc81c\ub97c \uc811\uc218\ud588\uc74c\uc744 \uc5bc\ub9c8 \uc548\uc5d0 \uc54c\ub824\uc57c \ud558\ub294\uc9c0, \uae34\uae09 \uc870\ub2ec\uc774\ub098 \ub300\uccb4 \uacf5\uae09\ucc98 \uc774\uc6a9, \uc218\ub7c9 \ubcc0\uacbd\uc744 \ub204\uac00 \uc2b9\uc778\ud560 \uc218 \uc788\ub294\uc9c0\ub3c4 \ud3ec\ud568\ud558\uc138\uc694. \ub300\uccb4 \ubd80\ud488\uc5d0\ub294 \uc5ec\uc804\ud788 \uc801\uc808\ud55c \uae30\uc220 \uc2b9\uc778\uc774 \ud544\uc694\ud569\ub2c8\ub2e4. \ubcf4\ucda9\uc5d0 \uad00\ud55c \ud569\uc758\uac00 \uc81c\ud488\uc744 \ubcc0\uacbd\ud574\ub3c4 \ub41c\ub2e4\ub294 \ud5c8\uac00\ub294 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc18c\uc720\uad8c, \uacb0\uc81c, \ub370\uc774\ud130 \uc811\uadfc \uad8c\ud55c, \uacc4\uc57d \uc885\ub8cc \uc2dc \uc794\uc5ec \uc7ac\uace0\uc758 \ucc98\ub9ac \ubc29\ubc95\ub3c4 \uc815\ud558\uc138\uc694. \uc774\ub7ec\ud55c \uac70\ub798 \uc870\uac74\uc740 VMI\ub77c\ub294 \uc774\ub984\ub9cc\uc73c\ub85c \ub2f9\uc5f0\uc2dc\ud560 \uac83\uc774 \uc544\ub2c8\ub77c \ubcc4\ub3c4\ub85c \ud569\uc758\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\ubcf4\ucda9 \uacb0\uc815\uc5d0 \uc2e4\uc81c\ub85c \ub3c4\uc6c0\uc774 \ub418\ub294 \uc815\ubcf4\ub97c \uacf5\uc720\ud558\uc138\uc694<\/h2>\n\n\n<p>\uacf5\uae09\uc5c5\uccb4\uac00 \uc2e4\ud589\uc5d0 \uc62e\uae38 \uc218 \uc788\uc744 \ub9cc\ud07c \ucda9\ubd84\ud55c \uc815\ubcf4\ub97c \uc81c\uacf5\ud558\uc138\uc694. \ub370\uc774\ud130\uc758 \uc815\uc758\ub97c \ud569\uc758\ud558\uace0 \uc790\uc7ac \uad00\ub828 \uc704\ud5d8\uc5d0 \ub9de\uac8c \uac31\uc2e0 \uc8fc\uae30\ub97c \uc815\ud574\uc57c \ud569\ub2c8\ub2e4. \uc77c\ubc18\uc801\uc73c\ub85c \ub2e4\uc74c \uc815\ubcf4\uac00 \uc720\uc6a9\ud569\ub2c8\ub2e4.<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>\ud488\ubaa9 \ubc0f \uc704\uce58 \uc2dd\ubcc4 \uc815\ubcf4:<\/strong> \uc591\uce21\uc5d0\uc11c \uc77c\uce58\ud558\ub294 \ubd80\ud488 \ucf54\ub4dc, \uac1c\uc815 \ubc88\ud638, \uc218\ub7c9 \ub2e8\uc704, \ub0a9\ud488 \ub610\ub294 \ubcf4\uad00 \uc704\uce58.<\/li><li><strong>\uc0ac\uc6a9 \uac00\ub2a5\ud55c \uc7ac\uace0\uc640 \uc18c\ube44\ub7c9:<\/strong> \uac00\uc6a9 \uc218\ub7c9, \uae30\ub85d\ub41c \uc0ac\uc6a9\ub7c9 \ubc0f \uc870\uc815 \ub0b4\uc5ed. \ubcf4\ub958\ub418\uac70\ub098 \ubd88\ud569\uaca9 \ud310\uc815\uc744 \ubc1b\uc740 \uc790\uc7ac\ub97c \uc0ac\uc6a9 \uac00\ub2a5\ud55c \ubb3c\ub7c9\uacfc \uad6c\ubd84\ud560 \uc218 \uc788\uc5b4\uc57c \ud569\ub2c8\ub2e4.<\/li><li><strong>\ud5a5\ud6c4 \uc218\uc694:<\/strong> \uad00\ub828 \uc0dd\uc0b0 \uc18c\uc694, \uc218\uc694 \uc608\uce21, \uacc4\ud68d\ub41c \uac00\ub3d9 \uc911\ub2e8, \ud310\ucd09 \ud589\uc0ac \ub4f1 \uc774\ubbf8 \uc54c\ub824\uc9c4 \ubcc0\ud654. \ud655\uc815 \uc218\uc694\uc640 \ucd94\uc815\uce58\ub294 \uba85\ud655\ud788 \uad6c\ubd84\ud574\uc57c \ud569\ub2c8\ub2e4.<\/li><li><strong>\uc774\ubbf8 \uc9c4\ud589 \uc911\uc778 \uacf5\uae09:<\/strong> \ubbf8\uc785\uace0 \ubcf4\ucda9 \uac74, \ud655\uc815 \uc218\ub7c9\uacfc \uc77c\uc815, \uc6b4\uc1a1 \uc911\uc778 \ubb3c\ub7c9, \uc2e4\uc81c \uc785\uace0 \ub0b4\uc5ed. \ub3d9\uc77c\ud55c \ubb3c\ub7c9\uc744 \uc911\ubcf5 \uacc4\uc0b0\ud558\uc9c0 \uc54a\ub3c4\ub85d \ud574\uc57c \ud569\ub2c8\ub2e4.<\/li><li><strong>\uc6b4\uc601 \ud55c\uacc4\uc640 \uacbd\uace0 \uae30\uc900:<\/strong> \ud569\uc758\ub41c \uc7ac\uace0 \ubaa9\ud45c, \ud574\ub2f9\ub418\ub294 \uacbd\uc6b0 \uc720\ud6a8\uae30\uac04\uc774\ub098 \ubcf4\uad00 \uc81c\uc57d, \uc608\uc678 \uc0c1\ud669 \ud310\ub2e8 \uae30\uc900, \uc9c0\uc815 \ub2f4\ub2f9\uc790.<\/li><\/ul>\n\n\n<p>\uc6b4\uc601\uc0c1\uc758 \ud544\uc694\uc5d0 \ub9de\ucdb0 \uc815\ubcf4 \uad50\ud658 \ubc29\uc2dd\uc744 \uc120\ud0dd\ud558\uc138\uc694. \ud569\uc758\ub41c \uc2dc\uc2a4\ud15c \uc5f0\ub3d9 \ubc29\uc2dd\uc774\ub098 \uacf5\uae09\uc5c5\uccb4 \uc2dc\uc2a4\ud15c\uc73c\ub85c \ub370\uc774\ud130\ub97c \uc804\ub2ec\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc911\uc694\ud55c \uac83\uc740 \uc591\uce21\uc774 \uc801\uc2dc\uc5d0 \uc77c\uad00\ub41c \uc815\ubcf4\ub97c \ubc1b\uace0, \uac31\uc2e0 \uc2e4\ud328\ub97c \uac10\uc9c0\ud560 \uc218 \uc788\uc5b4\uc57c \ud55c\ub2e4\ub294 \uc810\uc785\ub2c8\ub2e4. \ubcf4\ucda9 \uc5c5\ubb34\uc5d0 \ud544\uc694\ud55c \ubc94\uc704\ub97c \ub118\uc5b4 \uacf5\uae09\uc5c5\uccb4\uc5d0 \uc2dc\uc2a4\ud15c \uc811\uadfc \uad8c\ud55c\uc744 \uc8fc\uc9c0 \ub9c8\uc138\uc694.<\/p>\n\n\n<p>\uc5f0\uacb0\ubfd0 \uc544\ub2c8\ub77c \ub370\uc774\ud130\uc758 \uc758\ubbf8\ub3c4 \uac80\uc99d\ud558\uc138\uc694. \uad6c\ub9e4\uc0ac \uc2dc\uc2a4\ud15c\uc740 \uc0c1\uc790 \ub2e8\uc704\ub85c \uae30\ub85d\ud558\uace0 \uacf5\uae09\uc5c5\uccb4\ub294 \ub0b1\uac1c \ub2e8\uc704\ub85c \uacc4\ud68d\ud55c\ub2e4\uba74, \ub370\uc774\ud130 \uc804\uc1a1\uc5d0 \uc131\uacf5\ud574\ub3c4 \ubcf4\ucda9 \uc218\ub7c9\uc774 \uc798\ubabb\ub420 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc774 \uc815\ubcf4 \ud750\ub984\uc5d0 \uc758\uc874\ud558\uae30 \uc804\uc5d0 \uc2e4\uc81c \ud488\ubaa9 \ud558\ub098\ub97c \uace8\ub77c \uc7ac\uace0, \uc0ac\uc6a9\ub7c9, \uc785\uace0 \uc608\uc815 \uc218\ub7c9\uc744 \uc591\uce21\uc774 \ud568\uaed8 \ub300\uc870\ud558\uc138\uc694.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uacf5\uae09 \uc0c1\ud669\uc774 \ubc14\ub00c\uba74 \uc0dd\uc0b0 \uacb0\uc815\ub3c4 \uc870\uc815\ud558\uc138\uc694<\/h2>\n\n\n<p>\uc5ec\ub7ec \uc81c\ud488\uc5d0 \ub3d9\uc77c\ud55c \uc678\ubd80 \uad6c\ub9e4 \ud53c\ud305\uc744 \uc0ac\uc6a9\ud558\ub294 \uc870\ub9bd \uacf5\uc7a5\uc744 \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. VMI \uacf5\uae09\uc5c5\uccb4\ub294 \ubcf4\ud1b5 \ub9e4\uc8fc \uc815\uae30 \ubc30\uc1a1 \uacbd\ub85c\ub97c \ub530\ub77c \uc7ac\uace0\ub97c \ubcf4\ucda9\ud569\ub2c8\ub2e4. \uadf8\ub7f0\ub370 \uace0\uac1d\uc774 \uc8fc\ubb38 \uc77c\uc815\uc744 \uc55e\ub2f9\uae30\uba74\uc11c \ud5a5\ud6c4 \uc774\ud2c0 \ub3d9\uc548 \ub354 \ub9ce\uc740 \ud53c\ud305\uc774 \ud544\uc694\ud574\uc84c\uc2b5\ub2c8\ub2e4. \uc7ac\uace0 \uc794\ub7c9\uc740 \ud3c9\uc18c\uc758 \ucd5c\uc18c \uae30\uc900\uc5d0 \ube44\ud558\uba74 \uc5ec\uc720 \uc788\uc5b4 \ubcf4\uc774\uc9c0\ub9cc, \ubcc0\uacbd\ub41c \uc870\ub9bd \uc21c\uc11c\ub300\ub85c \uc791\uc5c5\ud558\uba74 \ub2e4\uc74c \ub0a9\ud488 \uc804\uc5d0 \ubaa8\ub450 \uc18c\uc9c4\ub429\ub2c8\ub2e4.<\/p>\n\n\n<p>\uad6c\ub9e4\uc790\uc640 \uacf5\uae09\uc5c5\uccb4\ub294 \ubcf4\ucda9 \uc77c\uc815\uc744 \uc55e\ub2f9\uae38 \uc218 \uc788\ub294\uc9c0 \ud611\uc758\ud558\uace0, \uc218\ub7c9\uacfc \ub3c4\ucc29 \uc2dc\uc810\uc744 \ud655\uc815\ud574\uc57c \ud569\ub2c8\ub2e4. \uc0dd\uc0b0\uacc4\ud68d \ub2f4\ub2f9\uc790\ub294 \ub610 \ub2e4\ub978 \uacb0\uc815\uc744 \ub0b4\ub824\uc57c \ud569\ub2c8\ub2e4. \uc790\uc7ac\uac00 \ub3c4\ucc29\ud558\uae30 \uc804\uc5d0 \uc5b4\ub5a4 \uc870\ub9bd \uc791\uc5c5\uc744 \uc9c4\ud589\ud560 \uc218 \uc788\uc73c\uba70, \ud6c4\uc18d \uacf5\uc815\uacfc \uace0\uac1d \ucd9c\ud558\uc5d0\ub294 \uc5b4\ub5a4 \uc601\ud5a5\uc774 \uc788\uc744\uae4c\uc694?<\/p>\n\n\n<p>\uacf5\uae09\uc5c5\uccb4\uc758 \ubaa9\ud45c \uc7ac\uace0\ub7c9\ub9cc \ud655\uc778\ud574\uc11c\ub294 \uc774 \uc9c8\ubb38\uc5d0 \ub2f5\ud560 \uc218 \uc5c6\uc2b5\ub2c8\ub2e4. \ub0a9\ud488\uc744 \uc55e\ub2f9\uaca8\ub3c4 \uc870\ub9bd\ub77c\uc778\uc758 \uad50\ub300\uc870\uac00 \ud558\ub098 \ub354 \uc0dd\uae30\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4. \uc790\uc7ac\uc640 \uac00\uc6a9 \uc0dd\uc0b0 \ub2a5\ub825\uc774 \uc11c\ub85c \ub9de\uc544\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\ub0a9\ud488\uc774 \uc9c0\uc5f0\ub418\uac70\ub098 \uc218\ub7c9\uc774 \ubd80\uc871\ud560 \ub54c\ub3c4 \uac19\uc740 \uc808\ucc28\ub85c \ub300\uc751\ud558\uc138\uc694. \uc0ac\uc6a9 \uac00\ub2a5\ud55c \uc218\ub7c9\uacfc \uc2e0\ub8b0\ud560 \uc218 \uc788\ub294 \uc0ac\uc6a9 \uac00\ub2a5 \uc2dc\uc810\uc744 \ud655\uc778\ud558\uace0, \uacf5\uc720 \uc815\ubcf4\ub97c \uac31\uc2e0\ud55c \ub2e4\uc74c, \uc601\ud5a5\uc744 \ubc1b\ub294 \uc0dd\uc0b0 \uc57d\uc18d\uc744 \uac80\ud1a0\ud569\ub2c8\ub2e4. \uc608\uc678 \uc0c1\ud669\uc774 \ud574\uacb0\ub420 \ub54c\uae4c\uc9c0 \ub2f4\ub2f9\uc790\ub97c \uba85\ud655\ud788 \uc9c0\uc815\ud574 \ub450\uc138\uc694. \uadf8\ub807\uc9c0 \uc54a\uc73c\uba74 \uacf5\uae09\uc5c5\uccb4\uac00 \uc774\uba54\uc77c\ub85c \ubcc0\uacbd \uc0ac\ud56d\uc744 \uc54c\ub824\ub3c4 \uc124\ube44\uc758 \uc791\uc5c5 \ub300\uae30\uc5f4\uc740 \uadf8\ub300\ub85c \ub0a8\uc544 \uc788\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">SkyPlanner\ub85c VMI \uacf5\uae09 \uc815\ubcf4\ub97c \uc2e4\ud589 \uac00\ub2a5\ud55c \uc0dd\uc0b0 \uc77c\uc815\uc5d0 \ubc18\uc601\ud558\uc138\uc694<\/h2>\n\n\n<p>SkyPlanner APS\ub294 \uc790\uc7ac \ud604\ud669\uc744 \ud574\ub2f9 \uc790\uc7ac\uac00 \ud544\uc694\ud55c \uc791\uc5c5\uacfc \uc5f0\uacb0\ud569\ub2c8\ub2e4. \uc790\uc7ac\ub97c \uace0\ub824\ud558\ub294 \uc2a4\ucf00\uc904\ub9c1 \uae30\ub2a5\uc744 \ud65c\uc131\ud654\ud558\uba74 \uc778\uacf5\uc9c0\ub2a5 \uc2a4\ucf00\uc904\ub9c1 \uc5d4\uc9c4\uc778 Arcturus\uac00 \uad00\ub9ac \uc911\uc778 \uc790\uc7ac \uc7ac\uace0\ub7c9\uacfc \ud568\uaed8 \uc791\uc5c5\uc7a5\uc758 \uc0dd\uc0b0 \ub2a5\ub825, \uad50\ub300\uc870, \uacf5\uc815 \ub2e8\uacc4 \uac04 \uc120\ud6c4\uad00\uacc4, \uc124\uc815\ub41c \uc6b0\uc120\uc21c\uc704\ub97c \ubc18\uc601\ud569\ub2c8\ub2e4. \uc774\ub807\uac8c \uc0dd\uc131\ub41c \uac04\ud2b8 \uc77c\uc815\uc5d0\uc11c\ub294 \uac01 \uc624\ub354\uac00 \uc0dd\uc0b0 \uacfc\uc815\uc744 \uc5b4\ub5bb\uac8c \uac70\uce58\ub294\uc9c0 \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc81c\ud488\uc5d0 \uc5f0\uacb0\ub41c \uc790\uc7ac \uc815\ubcf4\ub294 \uc8fc\ubb38 \ud488\ubaa9\uc5d0\ub3c4 \ubc18\uc601\ub429\ub2c8\ub2e4. \uc7ac\uace0\ub7c9\uc740 \uc2dc\uc2a4\ud15c \uc5f0\ub3d9\uc73c\ub85c \ucd5c\uc2e0 \uc0c1\ud0dc\ub97c \uc720\uc9c0\ud558\uac70\ub098 SkyPlanner\uc758 \ucc3d\uace0 \ubaa8\ub4c8\uc5d0\uc11c \uad00\ub9ac\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uad6c\ub9e4 \ubc1c\uc8fc\uc11c\uc758 \ub0a9\ud488\uc77c\uc740 \uc790\uc7ac\ub97c \uc0ac\uc6a9\ud560 \uc218 \uc788\uc744 \uac83\uc73c\ub85c \uc608\uc0c1\ub418\ub294 \uc2dc\uc810\uc744 \uc81c\uacf5\ud558\uba70, \ub0a9\ud488 \uc644\ub8cc\ub85c \ud655\uc778 \ucc98\ub9ac\ud558\uba74 \uc7ac\uace0\ub7c9\uc774 \uac31\uc2e0\ub429\ub2c8\ub2e4. \ud544\uc694\ud55c \uc785\uace0 \uac80\uc0ac\uae4c\uc9c0 \uace0\ub824\ud574, \uc774 \uc815\ubcf4\uac00 \uacf5\uc7a5\uc5d0\uc11c \uc2e4\uc81c\ub85c \uc0ac\uc6a9\ud560 \uc218 \uc788\ub294 \uc218\ub7c9\uacfc \uc2dc\uc810\uc5d0 \ub9de\ub3c4\ub85d \uad00\ub9ac\ud558\uc138\uc694.<\/p>\n\n\n<p>\uc0dd\uc0b0\uacc4\ud68d \ub2f4\ub2f9\uc790\ub294 \ubcf4\ucda9 \ubaa9\ub85d\uacfc \uac1c\ubcc4 \uc124\ube44\uc758 \uc791\uc5c5 \ub300\uae30\uc5f4\uc744 \ub300\uc870\ud558\uace0 \uc870\uc815\ud558\ub294 \uc218\uace0\ub97c \uc904\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ud569\uc758\ub41c \ub0a9\ud488 \uc77c\uc815\uc774 \ubc14\ub00c\uba74 \uacc4\ud68d \uc815\ubcf4\ub97c \uac31\uc2e0\ud558\uace0, SkyPlanner\uac00 \ubcc0\uacbd\ub41c \uacf5\uae09 \uc0c1\ud669\uacfc \uc0dd\uc0b0 \ub2a5\ub825\uc5d0 \ub9de\ucdb0 \uc791\uc5c5 \uc77c\uc815\uc744 \ub2e4\uc2dc \uacc4\uc0b0\ud558\ub3c4\ub85d \ud558\uc138\uc694. \uadf8\ub7f0 \ub2e4\uc74c \uc624\ub354 \uc644\ub8cc \uc2dc\uc810\uc5d0 \ubbf8\uce58\ub294 \uc601\ud5a5\uc744 \uac80\ud1a0\ud558\uace0, \ud544\uc694\uc5d0 \ub530\ub77c \uc6b0\uc120\uc21c\uc704\ub97c \uc870\uc815\ud558\uba70, \ub3d9\ub8cc\ub4e4\uc5d0\uac8c \ub0a9\uae30 \uc57d\uc18d\uc5d0 \uad00\ud574 \ub354 \uba85\ud655\ud55c \ub2f5\uc744 \uc904 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>SkyPlanner\ub294 \uac1c\ubc29\ud615 REST API\ub97c \ud1b5\ud574 \ubaa8\ub4e0 ERP \ub610\ub294 MES\uc640 \uc5f0\ub3d9\ub429\ub2c8\ub2e4.<\/strong> \uacf5\uae09\uc5c5\uccb4\uc640 \ud569\uc758\ud55c \ubcf4\ucda9 \uc808\ucc28\ub294 \uae30\uc874 \ub2f4\ub2f9 \uc2dc\uc2a4\ud15c\uc5d0\uc11c \uacc4\uc18d \uc6b4\uc601\ud558\uba74\uc11c, \ucd5c\uc2e0 \uc7ac\uace0\u00b7\uad6c\ub9e4\u00b7\uc0dd\uc0b0 \ub370\uc774\ud130\ub97c <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-scheduling\/\">\uacf5\ud1b5 \uc0dd\uc0b0 \uc77c\uc815<\/a>\uc5d0 \ubc18\uc601\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc0dd\uc0b0 \uc21c\uc11c\ub97c \ub9e4\ubc88 \uc218\uc791\uc5c5\uc73c\ub85c \ub2e4\uc2dc \uc9dc\ub294 \uc77c\uc744 \uc904\uc774\uae30 \uc704\ud574 \uc798 \uc791\ub3d9\ud558\ub294 ERP\ub97c \uad50\uccb4\ud560 \ud544\uc694\ub294 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uc0ac\uc6a9 \uc911\uc778 \uc778\uacf5\uc9c0\ub2a5 \uc5b4\uc2dc\uc2a4\ud134\ud2b8\ub85c \uc791\uc5c5\ud558\uc138\uc694<\/h3>\n\n\n<p>MCP\ub85c \uc5f0\uacb0\ud55c \uc778\uacf5\uc9c0\ub2a5 \uc5b4\uc2dc\uc2a4\ud134\ud2b8\ub97c \ud1b5\ud574\uc11c\ub3c4 \uc791\uc5c5\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. Claude, ChatGPT, Microsoft Copilot\uc740 \uc774\ubbf8 \uc0ac\uc6a9\ud558\uace0 \uacc4\uc2e4 \ub9cc\ud55c \uc5b4\uc2dc\uc2a4\ud134\ud2b8\uc758 \uc608\uc785\ub2c8\ub2e4. MCP\ub294 \uc774\ub7ec\ud55c \uc5b4\uc2dc\uc2a4\ud134\ud2b8\ub97c SkyPlanner\uc758 \ub370\uc774\ud130 \ubc0f \uae30\ub2a5\uacfc \uc5f0\uacb0\ud558\ub294 \uc218\ub2e8\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>\uad00\ub828 \uc624\ub354\uc640 \uc791\uc5c5 \ub300\uae30\uc5f4\uc744 \uc77c\uc77c\uc774 \ucc3e\ub294 \ub300\uc2e0 \uc774\ub807\uac8c \uc9c8\ubb38\ud574 \ubcf4\uc138\uc694. \u201c\uc774 \ud53c\ud305\uc774 \ud544\uc694\ud55c \uc624\ub354\ub294 \ubb34\uc5c7\uc774\uace0, \uc785\uace0 \uc608\uc815 \ubb3c\ub7c9\uc740 \uc5b4\ub5bb\uac8c \ub4f1\ub85d\ub418\uc5b4 \uc788\uc73c\uba70, \ud574\ub2f9 \uc624\ub354\uc758 \uc0dd\uc0b0 \ub2e8\uacc4\ub294 \uc5b4\ub5bb\uac8c \uc7a1\ud600 \uc788\ub098\uc694?\u201d \uc5b4\uc2dc\uc2a4\ud134\ud2b8\ub294 SkyPlanner \ub370\uc774\ud130\uc640 \uc81c\ud488 \uc9c0\uc2dd\uc744 \uacb0\ud569\ud574 \uc0c1\ud669\uc744 \ud30c\uc545\ud558\ub3c4\ub85d \ub3c4\uc6b8 \uc218 \uc788\uc73c\uba70, \uc801\uc808\ud55c \uad8c\ud55c\uc774 \uc788\uc73c\uba74 SkyPlanner\uc758 \uae30\ub2a5\ub3c4 \uc0ac\uc6a9\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc6b0\uc120\uc21c\uc704\ub294 \uc0ac\uc6a9\uc790\uac00 \uc815\ud558\uace0, \uc2a4\ucf00\uc904\ub9c1 \uacc4\uc0b0\uc740 Arcturus\uac00 \uc218\ud589\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uacf5\uae09\uc5c5\uccb4\uc758 \ubcc0\uacbd \uc18c\uc2dd\uc744 \ubc1b\uace0 \ub2e8\uc21c\ud55c \ud604\ud669 \ubcf4\uace0\uac00 \uc544\ub2c8\ub77c \uc0dd\uc0b0 \uce21\uba74\uc758 \ub300\uc751 \ubc29\uc548\uc744 \ub9c8\ub828\ud574\uc57c \ud560 \ub54c, \uc774\ucc98\ub7fc \uc815\ubcf4\ub97c \ub354 \uc27d\uac8c \ud65c\uc6a9\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uc790\uc7ac \uac00\uc6a9\uc131 \ud30c\uc545\uc774 Eskomatic\uc5d0 \uac00\uc838\uc628 \ubcc0\ud654<\/h3>\n\n\n<p>\uc704\ud0c1 \uae30\uacc4\uac00\uacf5 \uc5c5\uccb4\uc778 Eskomatic\uc740 \uacfc\uac70\uc5d0 \uc791\uc5c5 \ub300\uae30\uc5f4\uc744 \uc8fc\ub85c \uc218\uc791\uc5c5\uc73c\ub85c \uad00\ub9ac\ud588\uc73c\uba70, \uc790\uc7ac \uac00\uc6a9\uc131\uc744 \ucda9\ubd84\ud788 \ud30c\uc545\ud558\uae30 \uc5b4\ub824\uc6e0\uc2b5\ub2c8\ub2e4. \uc791\uc5c5 \uc2dc\uc791 \uc608\uc815 \uc2dc\uc810\uc774 \uc784\ubc15\ud574\uc11c\uc57c \uc790\uc7ac \ubd80\uc871\uc744 \uc54c\uac8c \ub418\ub294 \uacbd\uc6b0\ub3c4 \uc788\uc5c8\uc2b5\ub2c8\ub2e4. SkyPlanner \ub3c4\uc785\uc73c\ub85c \uae30\uc874 ERP \ub370\uc774\ud130\ub97c \uc2dc\uac01\uc801\uc778 \uc791\uc5c5 \ub300\uae30\uc5f4 \ubc0f \uc790\ub3d9 \ubd80\ud558 \uc2a4\ucf00\uc904\ub9c1\uacfc \uc5f0\uacb0\ud588\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p><a href=\"\/ko\/%ea%b3%a0%ea%b0%9d-%ec%82%ac%eb%a1%80\/eskomatic\/\">Eskomatic\uc5d0 \ub530\ub974\uba74<\/a> \uc790\uc7ac \ubd80\uc871\uc73c\ub85c \uc778\ud55c \uc0dd\uc0b0 \uc911\ub2e8\uc774 \uc904\uace0 \ub0a9\uae30\uc77c \uc124\uc815\uc774 \ub354 \uc815\ud655\ud574\uc84c\uc2b5\ub2c8\ub2e4. \uc774 \uc0ac\ub840\ub294 \uc790\uc7ac \ud604\ud669\uc744 \uc77c\uc0c1\uc801\uc778 \uc0dd\uc0b0 \uc2a4\ucf00\uc904\ub9c1\uacfc \uc5f0\uacb0\ud558\ub294 \uac00\uce58\ub97c \ubcf4\uc5ec\uc90d\ub2c8\ub2e4. \uc0dd\uc0b0\uacc4\ud68d \ub2f4\ub2f9\uc790\ub294 \uc55e\uc73c\ub85c \uc9c4\ud589\ud560 \uc791\uc5c5\uc744 \ub354 \uba85\ud655\ud788 \ud30c\uc545\ud558\uace0 \ub354 \uc77c\ucc0d \ub300\uc751\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc790\uccb4 VMI \uc6b4\uc601\uacfc \ud568\uaed8 \uae30\ub300\ud574\uc57c \ud560 \uc2a4\ucf00\uc904\ub9c1\uc758 \uc774\uc810\ub3c4 \ubc14\ub85c \uc774\uac83\uc785\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc804\uccb4 \uc6b4\uc601 \uacfc\uc815\uc744 \uac80\uc99d\ud558\ub294 \uc2dc\ubc94 \uc6b4\uc601\ubd80\ud130 \uc2dc\uc791\ud558\uc138\uc694<\/h2>\n\n\n<p>\uad00\ub9ac \uac00\ub2a5\ud55c \ubc94\uc704\uc758 \ud488\ubaa9\uad70\uacfc \uc6b4\uc601 \ubc29\uc2dd\uc744 \ud568\uaed8 \uac80\ud1a0\ud560 \uc758\ud5a5\uc774 \uc788\ub294 \uacf5\uae09\uc5c5\uccb4\ub97c \uc120\uc815\ud558\uc138\uc694. \ucc45\uc784\uc744 \ubcc0\uacbd\ud558\uae30 \uc804\uc5d0 \ud604\uc7ac \uc808\ucc28\uc758 \uc131\uacfc\ub97c \uae30\ub85d\ud569\ub2c8\ub2e4. \uc7ac\uace0 \uac00\uc6a9\uc131, \ubcf4\uc720 \uc7ac\uace0\ub7c9, \uae34\uae09 \ubcf4\ucda9, \uad6c\ub9e4 \uc5c5\ubb34\uc5d0 \ub4dc\ub294 \ub178\ub825\uc744 \uc0b4\ud3b4\ubcf4\uc138\uc694. \uc591\uce21\uc774 \uac19\uc740 \uae30\uc900\uc73c\ub85c \uc2e4\uc801\uc744 \uc9d1\uacc4\ud558\ub3c4\ub85d \uac01 \uc9c0\ud45c\ub97c \uc815\uc758\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uadf8\ub7f0 \ub2e4\uc74c \uc6b4\uc601 \uacfc\uc815\uc744 \ucc98\uc74c\ubd80\ud130 \ub05d\uae4c\uc9c0 \uac80\uc99d\ud558\uc138\uc694. \uc2dc\uc791 \uc2dc\uc810\uc758 \uc7ac\uace0\ub97c \ud655\uc778\ud558\uace0, \uc0ac\uc6a9\ub7c9 \uac31\uc2e0\uc774 \uc815\ud655\ud55c\uc9c0 \uac80\uc99d\ud558\uba70, \ubcf4\ucda9 \uad8c\ud55c\uc5d0 \ud569\uc758\ud558\uace0, \ub0a9\ud488\ub41c \uc790\uc7ac\uac00 \uc785\uace0\ub418\uc5b4 \uc0dd\uc0b0 \uacc4\ud68d\uc5d0 \ubc18\uc601\ub418\uae30\uae4c\uc9c0 \ucd94\uc801\ud569\ub2c8\ub2e4. \uc218\uc694 \ubcc0\uacbd\uc774\ub098 \ub0a9\ud488 \uc9c0\uc5f0 \uac19\uc740 \uc608\uc678 \uc0c1\ud669\ub3c4 \ud3ec\ud568\ud558\uc138\uc694. \uc815\uc0c1\uc801\uc778 \uc0ac\uc6a9 \ud328\ud134\ub9cc \ub530\ub77c\uac00\ub294 \uc2dc\ubc94 \uc6b4\uc601\uc73c\ub85c\ub294 \ubb38\uc81c\uac00 \uc0dd\uacbc\uc744 \ub54c \uc774 \ubc29\uc2dd\uc774 \uc5bc\ub9c8\ub098 \uc798 \ub300\uc751\ud558\ub294\uc9c0 \ud30c\uc545\ud558\uae30 \uc5b4\ub835\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc790\uc7ac \uac00\uc6a9\uc131\uacfc \uc7ac\uace0\ub7c9\uc744 \ud568\uaed8 \uac80\ud1a0\ud558\uc138\uc694. \ubaa8\ub4e0 \uc120\ubc18\uc744 \ucc44\uc6cc \ud488\uc808\uc744 \uc904\uc600\ub2e4\uba74 \uc758\ubbf8 \uc788\ub294 \uac1c\uc120\uc774\ub77c\uace0 \ubcf4\uae30 \uc5b4\ub824\uc6b8 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ub9c8\ucc2c\uac00\uc9c0\ub85c \ud3c9\uade0 \uc7ac\uace0\ub7c9\uc774 \uc904\uc5c8\ub354\ub77c\ub3c4 \uc0dd\uc0b0\uacc4\ud68d \ub2f4\ub2f9\uc790\uac00 \ubd80\ud488 \ub0a9\ud488\uc744 \ub3c5\ucd09\ud558\uace0 \uc791\uc5c5 \uc77c\uc815\uc744 \uc62e\uae30\ub294 \ub370 \ub354 \ub9ce\uc740 \uc2dc\uac04\uc744 \uc4f4\ub2e4\uba74 \uc131\uacf5\uc774\ub77c\uace0 \ud560 \uc218 \uc5c6\uc2b5\ub2c8\ub2e4. \uac80\ud1a0 \uacb0\uacfc\ub97c \ubc14\ud0d5\uc73c\ub85c \ub300\uc0c1 \ud488\ubaa9, \ubaa9\ud45c, \uc815\ubcf4 \uac31\uc2e0 \uc8fc\uae30\uc640 \ucc45\uc784\uc744 \uc870\uc815\ud55c \ub4a4 \uc801\uc6a9 \ubc94\uc704\ub97c \ud655\ub300\ud558\uc138\uc694.<\/p>\n\n\n<p>\ubaa9\ud45c\ub294 \ubcf4\ucda9 \uc808\ucc28\ub97c \uac04\uc18c\ud654\ud558\uace0, \uadf8 \uacb0\uacfc\uc5d0 \ub9de\ucdb0 \uacf5\uc7a5\uc774 \uc6c0\uc9c1\uc77c \uc218 \uc788\ub3c4\ub85d \ud558\ub294 \uac83\uc785\ub2c8\ub2e4. \uacf5\uc7a5\uc774 \uc5b4\ub5bb\uac8c \ub300\uc751\ud560 \uc218 \uc788\ub294\uc9c0 \ud655\uc778\ud558\ub824\uba74 \ubc18\ubcf5\uc801\uc73c\ub85c \uc0ac\uc6a9\ud558\ub294 \ubd80\ud488 \ud558\ub098\uc640 \ud655\uc815\ub41c \ubcf4\ucda9 \ubb3c\ub7c9, \uadf8 \ubd80\ud488\uc744 \ub450\uace0 \uacbd\ud569\ud558\ub294 \uc624\ub354\ub97c \uc900\ube44\ud574 <a href=\"https:\/\/skyplanner.ai\/ko\/%ec%98%81%ec%97%85%ed%8c%80%ec%97%90-%eb%ac%b8%ec%9d%98\/\">SkyPlanner \ub370\ubaa8\ub97c \uc608\uc57d\ud558\uc138\uc694<\/a>. \uc790\uc7ac \uac00\uc6a9\uc131\uacfc \uc0dd\uc0b0 \ub2a5\ub825\uc774 \ud574\ub2f9 \uc624\ub354\uc758 \uc77c\uc815\uc5d0 \uc5b4\ub5bb\uac8c \ubc18\uc601\ub418\ub294\uc9c0 \uc0b4\ud3b4\ubcfc \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uba3c\uc800 \uc9c1\uc811 \uc0b4\ud3b4\ubcf4\uace0 \uc2f6\ub2e4\uba74 <a href=\"https:\/\/skyplanner.ai\/ko\/%ed%8f%89%ea%b0%80%ed%8c%90\/\">\ub370\ubaa8 \ub370\uc774\ud130\ub85c SkyPlanner\ub97c \uccb4\ud5d8\ud558\uac70\ub098<\/a> SkyPlanner Assistant\uc5d0\uc11c \uc778\uacf5\uc9c0\ub2a5\uc758 \ub3c4\uc6c0\uc744 \ubc1b\uc73c\uba70 Getting Started \uae30\ub2a5\uc744 \uc774\uc6a9\ud558\uc138\uc694.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\uacf5\uae09\uc5c5\uccb4 \uad00\ub9ac \uc7ac\uace0: \uc0dd\uc0b0\uc5d0 \uc2e4\uc9c8\uc801\uc73c\ub85c \ub3c4\uc6c0\uc774 \ub418\ub294 VMI \uc6b4\uc601\ubc95 \ud648 &raquo; \ub9ac\uc18c\uc2a4 &raquo; \uacf5\uae09\uc5c5\uccb4 \uad00\ub9ac \uc7ac\uace0: \uc0dd\uc0b0\uc5d0 \uc2e4\uc9c8\uc801\uc73c\ub85c \ub3c4\uc6c0\uc774 \ub418\ub294 VMI \uc6b4\uc601\ubc95 \uacf5\uae09\uc5c5\uccb4 \uad00\ub9ac \uc7ac\uace0(VMI)\ub294 \uacf5\uae09\uc5c5\uccb4\uac00 \uc0ac\uc804\uc5d0 \uc815\ud55c \uc7ac\uace0 \uc815\ubcf4\ub97c \ud655\uc778\ud558\uace0, \uad6c\ub9e4\uc0ac\uc640 \ud569\uc758\ud55c \uaddc\uce59 \uc548\uc5d0\uc11c \ubcf4\ucda9 \uc2dc\uc810\uacfc \uc218\ub7c9\uc744 \uacb0\uc815\ud560 \ucc45\uc784\uc744 \ub9e1\ub294 \ubc29\uc2dd\uc785\ub2c8\ub2e4. \uad6c\ub9e4\ud300\uc774 \uc77c\uc0c1\uc801\uc778 \ubcf4\ucda9\uc744 \ub9e4\ubc88 \uc694\uccad\ud558\ub294 \ub300\uc2e0, \uacf5\uae09\uc5c5\uccb4\uac00 \uad6c\ub9e4\uc0ac\uc5d0\uc11c \uacf5\uc720\ud55c \uc7ac\uace0 \ubc0f \uc218\uc694 \uc815\ubcf4\ub97c &#8230; <a title=\"\uacf5\uae09\uc5c5\uccb4 \uad00\ub9ac \uc7ac\uace0: \uc0dd\uc0b0\uc5d0 \uc2e4\uc9c8\uc801\uc73c\ub85c \ub3c4\uc6c0\uc774 \ub418\ub294 VMI \uc6b4\uc601\ubc95\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/vendor-managed-inventory\/\" aria-label=\"Read more about \uacf5\uae09\uc5c5\uccb4 \uad00\ub9ac \uc7ac\uace0: \uc0dd\uc0b0\uc5d0 \uc2e4\uc9c8\uc801\uc73c\ub85c \ub3c4\uc6c0\uc774 \ub418\ub294 VMI \uc6b4\uc601\ubc95\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":113190,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2530,496],"tags":[],"class_list":["post-113181","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps--","category-496","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\uacf5\uae09\uc5c5\uccb4 \uad00\ub9ac \uc7ac\uace0: \uc0dd\uc0b0\uc5d0 \uc2e4\uc9c8\uc801\uc73c\ub85c \ub3c4\uc6c0\uc774 \ub418\ub294 VMI \uc6b4\uc601\ubc95<\/title>\n<meta name=\"description\" content=\"\uc0dd\uc0b0 \uc18c\uc694\ub97c \ub193\uce58\uc9c0 \uc54a\uc73c\uba74\uc11c \ubcf4\ucda9\uc740 \uacf5\uae09\uc5c5\uccb4\uc5d0 \ub9e1\uae30\uc138\uc694. VMI \ucc45\uc784\uc744 \uc815\ud558\uace0 \uc785\uace0 \uc608\uc815 \ubb3c\ub7c9\uc744 \uc2e4\ud589 \uac00\ub2a5\ud55c \uc0dd\uc0b0 \uc77c\uc815\uc5d0 \ubc18\uc601\ud558\uc138\uc694.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/vendor-managed-inventory\/\" \/>\n<meta property=\"og:locale\" content=\"ko_KR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\uacf5\uae09\uc5c5\uccb4 \uad00\ub9ac \uc7ac\uace0: \uc0dd\uc0b0\uc5d0 \uc2e4\uc9c8\uc801\uc73c\ub85c \ub3c4\uc6c0\uc774 \ub418\ub294 VMI \uc6b4\uc601\ubc95\" \/>\n<meta property=\"og:description\" content=\"\uc0dd\uc0b0 \uc18c\uc694\ub97c \ub193\uce58\uc9c0 \uc54a\uc73c\uba74\uc11c \ubcf4\ucda9\uc740 \uacf5\uae09\uc5c5\uccb4\uc5d0 \ub9e1\uae30\uc138\uc694. VMI \ucc45\uc784\uc744 \uc815\ud558\uace0 \uc785\uace0 \uc608\uc815 \ubb3c\ub7c9\uc744 \uc2e4\ud589 \uac00\ub2a5\ud55c \uc0dd\uc0b0 \uc77c\uc815\uc5d0 \ubc18\uc601\ud558\uc138\uc694.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/vendor-managed-inventory\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-30T04:08:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-30T04:10:14+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/vendor-managed-inventory-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1984\" \/>\n\t<meta property=\"og:image:height\" content=\"1116\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\uae00\uc4f4\uc774\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/vendor-managed-inventory\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/vendor-managed-inventory\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"\uacf5\uae09\uc5c5\uccb4 \uad00\ub9ac \uc7ac\uace0: \uc0dd\uc0b0\uc5d0 \uc2e4\uc9c8\uc801\uc73c\ub85c \ub3c4\uc6c0\uc774 \ub418\ub294 VMI \uc6b4\uc601\ubc95\",\"datePublished\":\"2026-10-30T04:08:00+00:00\",\"dateModified\":\"2026-10-30T04:10:14+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/vendor-managed-inventory\\\/\"},\"wordCount\":57,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/vendor-managed-inventory\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/vendor-managed-inventory-hero.png\",\"articleSection\":[\"APS \ubc0f \uc2a4\ucf00\uc904\ub9c1\",\"\ub9ac\uc18c\uc2a4\"],\"inLanguage\":\"ko-KR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/vendor-managed-inventory\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/vendor-managed-inventory\\\/\",\"name\":\"\uacf5\uae09\uc5c5\uccb4 \uad00\ub9ac \uc7ac\uace0: \uc0dd\uc0b0\uc5d0 \uc2e4\uc9c8\uc801\uc73c\ub85c \ub3c4\uc6c0\uc774 \ub418\ub294 VMI \uc6b4\uc601\ubc95\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/vendor-managed-inventory\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/vendor-managed-inventory\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/vendor-managed-inventory-hero.png\",\"datePublished\":\"2026-10-30T04:08:00+00:00\",\"dateModified\":\"2026-10-30T04:10:14+00:00\",\"description\":\"\uc0dd\uc0b0 \uc18c\uc694\ub97c \ub193\uce58\uc9c0 \uc54a\uc73c\uba74\uc11c \ubcf4\ucda9\uc740 \uacf5\uae09\uc5c5\uccb4\uc5d0 \ub9e1\uae30\uc138\uc694. VMI \ucc45\uc784\uc744 \uc815\ud558\uace0 \uc785\uace0 \uc608\uc815 \ubb3c\ub7c9\uc744 \uc2e4\ud589 \uac00\ub2a5\ud55c \uc0dd\uc0b0 \uc77c\uc815\uc5d0 \ubc18\uc601\ud558\uc138\uc694.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/vendor-managed-inventory\\\/#breadcrumb\"},\"inLanguage\":\"ko-KR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/vendor-managed-inventory\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/vendor-managed-inventory\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/vendor-managed-inventory-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/vendor-managed-inventory-hero.png\",\"width\":1984,\"height\":1116,\"caption\":\"Supplier cart, shared stock of blue fittings and two assembly benches connected by outgoing and return arrows.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/vendor-managed-inventory\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\uacf5\uae09\uc5c5\uccb4 \uad00\ub9ac \uc7ac\uace0: \uc0dd\uc0b0\uc5d0 \uc2e4\uc9c8\uc801\uc73c\ub85c \ub3c4\uc6c0\uc774 \ub418\ub294 VMI \uc6b4\uc601\ubc95\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ko-KR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\uacf5\uae09\uc5c5\uccb4 \uad00\ub9ac \uc7ac\uace0: \uc0dd\uc0b0\uc5d0 \uc2e4\uc9c8\uc801\uc73c\ub85c \ub3c4\uc6c0\uc774 \ub418\ub294 VMI \uc6b4\uc601\ubc95","description":"\uc0dd\uc0b0 \uc18c\uc694\ub97c \ub193\uce58\uc9c0 \uc54a\uc73c\uba74\uc11c \ubcf4\ucda9\uc740 \uacf5\uae09\uc5c5\uccb4\uc5d0 \ub9e1\uae30\uc138\uc694. VMI \ucc45\uc784\uc744 \uc815\ud558\uace0 \uc785\uace0 \uc608\uc815 \ubb3c\ub7c9\uc744 \uc2e4\ud589 \uac00\ub2a5\ud55c \uc0dd\uc0b0 \uc77c\uc815\uc5d0 \ubc18\uc601\ud558\uc138\uc694.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/vendor-managed-inventory\/","og_locale":"ko_KR","og_type":"article","og_title":"\uacf5\uae09\uc5c5\uccb4 \uad00\ub9ac \uc7ac\uace0: \uc0dd\uc0b0\uc5d0 \uc2e4\uc9c8\uc801\uc73c\ub85c \ub3c4\uc6c0\uc774 \ub418\ub294 VMI \uc6b4\uc601\ubc95","og_description":"\uc0dd\uc0b0 \uc18c\uc694\ub97c \ub193\uce58\uc9c0 \uc54a\uc73c\uba74\uc11c \ubcf4\ucda9\uc740 \uacf5\uae09\uc5c5\uccb4\uc5d0 \ub9e1\uae30\uc138\uc694. VMI \ucc45\uc784\uc744 \uc815\ud558\uace0 \uc785\uace0 \uc608\uc815 \ubb3c\ub7c9\uc744 \uc2e4\ud589 \uac00\ub2a5\ud55c \uc0dd\uc0b0 \uc77c\uc815\uc5d0 \ubc18\uc601\ud558\uc138\uc694.","og_url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/vendor-managed-inventory\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-30T04:08:00+00:00","article_modified_time":"2026-10-30T04:10:14+00:00","og_image":[{"width":1984,"height":1116,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/vendor-managed-inventory-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"\uae00\uc4f4\uc774":"Jussi M\u00e4ntyl\u00e4"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/vendor-managed-inventory\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/vendor-managed-inventory\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"\uacf5\uae09\uc5c5\uccb4 \uad00\ub9ac \uc7ac\uace0: \uc0dd\uc0b0\uc5d0 \uc2e4\uc9c8\uc801\uc73c\ub85c \ub3c4\uc6c0\uc774 \ub418\ub294 VMI \uc6b4\uc601\ubc95","datePublished":"2026-10-30T04:08:00+00:00","dateModified":"2026-10-30T04:10:14+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/vendor-managed-inventory\/"},"wordCount":57,"publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/vendor-managed-inventory\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/vendor-managed-inventory-hero.png","articleSection":["APS \ubc0f \uc2a4\ucf00\uc904\ub9c1","\ub9ac\uc18c\uc2a4"],"inLanguage":"ko-KR"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/vendor-managed-inventory\/","url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/vendor-managed-inventory\/","name":"\uacf5\uae09\uc5c5\uccb4 \uad00\ub9ac \uc7ac\uace0: \uc0dd\uc0b0\uc5d0 \uc2e4\uc9c8\uc801\uc73c\ub85c \ub3c4\uc6c0\uc774 \ub418\ub294 VMI \uc6b4\uc601\ubc95","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/vendor-managed-inventory\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/vendor-managed-inventory\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/vendor-managed-inventory-hero.png","datePublished":"2026-10-30T04:08:00+00:00","dateModified":"2026-10-30T04:10:14+00:00","description":"\uc0dd\uc0b0 \uc18c\uc694\ub97c \ub193\uce58\uc9c0 \uc54a\uc73c\uba74\uc11c \ubcf4\ucda9\uc740 \uacf5\uae09\uc5c5\uccb4\uc5d0 \ub9e1\uae30\uc138\uc694. VMI \ucc45\uc784\uc744 \uc815\ud558\uace0 \uc785\uace0 \uc608\uc815 \ubb3c\ub7c9\uc744 \uc2e4\ud589 \uac00\ub2a5\ud55c \uc0dd\uc0b0 \uc77c\uc815\uc5d0 \ubc18\uc601\ud558\uc138\uc694.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/vendor-managed-inventory\/#breadcrumb"},"inLanguage":"ko-KR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/vendor-managed-inventory\/"]}]},{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/vendor-managed-inventory\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/vendor-managed-inventory-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/vendor-managed-inventory-hero.png","width":1984,"height":1116,"caption":"Supplier cart, shared stock of blue fittings and two assembly benches connected by outgoing and return arrows."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/vendor-managed-inventory\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ko\/"},{"@type":"ListItem","position":2,"name":"\uacf5\uae09\uc5c5\uccb4 \uad00\ub9ac \uc7ac\uace0: \uc0dd\uc0b0\uc5d0 \uc2e4\uc9c8\uc801\uc73c\ub85c \ub3c4\uc6c0\uc774 \ub418\ub294 VMI \uc6b4\uc601\ubc95"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ko\/#website","url":"https:\/\/skyplanner.ai\/ko\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ko\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ko-KR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ko\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ko\/","logo":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/vendor-managed-inventory-hero.png",1984,1116,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/vendor-managed-inventory-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/vendor-managed-inventory-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/vendor-managed-inventory-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/vendor-managed-inventory-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/vendor-managed-inventory-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/vendor-managed-inventory-hero.png",1984,1116,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/vendor-managed-inventory-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ko\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\uacf5\uae09\uc5c5\uccb4 \uad00\ub9ac \uc7ac\uace0: \uc0dd\uc0b0\uc5d0 \uc2e4\uc9c8\uc801\uc73c\ub85c \ub3c4\uc6c0\uc774 \ub418\ub294 VMI \uc6b4\uc601\ubc95 \ud648 &raquo; \ub9ac\uc18c\uc2a4 &raquo; \uacf5\uae09\uc5c5\uccb4 \uad00\ub9ac \uc7ac\uace0: \uc0dd\uc0b0\uc5d0 \uc2e4\uc9c8\uc801\uc73c\ub85c \ub3c4\uc6c0\uc774 \ub418\ub294 VMI \uc6b4\uc601\ubc95 \uacf5\uae09\uc5c5\uccb4 \uad00\ub9ac \uc7ac\uace0(VMI)\ub294 \uacf5\uae09\uc5c5\uccb4\uac00 \uc0ac\uc804\uc5d0 \uc815\ud55c \uc7ac\uace0 \uc815\ubcf4\ub97c \ud655\uc778\ud558\uace0, \uad6c\ub9e4\uc0ac\uc640 \ud569\uc758\ud55c \uaddc\uce59 \uc548\uc5d0\uc11c \ubcf4\ucda9 \uc2dc\uc810\uacfc \uc218\ub7c9\uc744 \uacb0\uc815\ud560 \ucc45\uc784\uc744 \ub9e1\ub294 \ubc29\uc2dd\uc785\ub2c8\ub2e4. \uad6c\ub9e4\ud300\uc774 \uc77c\uc0c1\uc801\uc778 \ubcf4\ucda9\uc744 \ub9e4\ubc88 \uc694\uccad\ud558\ub294 \ub300\uc2e0, \uacf5\uae09\uc5c5\uccb4\uac00 \uad6c\ub9e4\uc0ac\uc5d0\uc11c \uacf5\uc720\ud55c \uc7ac\uace0 \ubc0f \uc218\uc694 \uc815\ubcf4\ub97c&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/113181","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/comments?post=113181"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/113181\/revisions"}],"predecessor-version":[{"id":113243,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/113181\/revisions\/113243"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media\/113190"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media?parent=113181"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/categories?post=113181"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/tags?post=113181"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}