{"id":112998,"date":"2026-10-29T23:03:54","date_gmt":"2026-10-29T23:03:54","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=112998"},"modified":"2026-10-29T23:06:06","modified_gmt":"2026-10-29T23:06:06","slug":"process-capability","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/process-capability\/","title":{"rendered":"\uacf5\uc815\ub2a5\ub825: Cp\uc640 Cpk \uacc4\uc0b0\uc5d0\uc11c \uac1c\uc120 \uc870\uce58\uae4c\uc9c0"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">\uacf5\uc815\ub2a5\ub825: Cp\uc640 Cpk \uacc4\uc0b0\uc5d0\uc11c \uac1c\uc120 \uc870\uce58\uae4c\uc9c0<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/ko\/\">\ud648<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/\">\ub9ac\uc18c\uc2a4<\/a> &raquo; \uacf5\uc815\ub2a5\ub825: Cp\uc640 Cpk \uacc4\uc0b0\uc5d0\uc11c \uac1c\uc120 \uc870\uce58\uae4c\uc9c0<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">\uc608\uc0c1 \uc77d\uae30 \uc2dc\uac04: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> \ubd84<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p><strong>\uacf5\uc815\ub2a5\ub825<\/strong>\uc740 \uc548\uc815\ub41c \uc81c\uc870 \uacf5\uc815\uc774 \uad6c\uba4d \uc9c0\ub984\uc774\ub098 \ucda9\uc804 \uc911\ub7c9\uacfc \uac19\uc740 \uaddc\uc815\ub41c \uc694\uad6c\uc0ac\ud56d\uc744 \uc5bc\ub9c8\ub098 \uc798 \ucda9\uc871\ud560 \uc218 \uc788\ub294\uc9c0\ub97c \ub098\ud0c0\ub0c5\ub2c8\ub2e4. \uacf5\uc815\uc758 \uc790\uc5f0 \ubcc0\ub3d9\uc744 \uaddc\uaca9 \ud55c\uacc4\uc640 \ube44\uad50\ud558\ub294 \uac1c\ub150\uc785\ub2c8\ub2e4. Cp\ub294 \uacf5\uc815\uc758 \uc0b0\ud3ec\uac00 \uacf5\ucc28 \ubc94\uc704 \uc548\uc5d0 \uc5bc\ub9c8\ub098 \uc5ec\uc720 \uc788\uac8c \ub4e4\uc5b4\uac00\ub294\uc9c0\ub97c \ub098\ud0c0\ub0b4\uba70, Cpk\ub294 \uacf5\uc815 \ud3c9\uade0\uc758 \uc704\uce58\uae4c\uc9c0 \ubc18\uc601\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774 \ucc28\uc774\ub294 \uc911\uc694\ud569\ub2c8\ub2e4. \uce21\uc815\uac12\ub4e4\uc774 \uc881\uc740 \ubc94\uc704\uc5d0 \ubaa8\uc5ec \uc788\uc5b4\ub3c4 \uacf5\uc815\uc774 \uacf5\ucc28 \ud55c\uacc4\uc5d0 \uc9c0\ub098\uce58\uac8c \uac00\uae4c\uc6b8 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ub9c8\ucc2c\uac00\uc9c0\ub85c, \ub0b4\uc77c \uac00\uc6a9 \uc2dc\uac04\uc774 \ub0a8\ub294 \uae30\uacc4\ub77c\uace0 \ud574\uc11c \uae4c\ub2e4\ub85c\uc6b4 \ud615\uc0c1\uc744 \uac00\uacf5\ud558\ub3c4\ub85d \uc2b9\uc778\ub41c \uc124\ube44\uc778 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p>\ub530\ub77c\uc11c \uc2e4\ud6a8\uc131 \uc788\ub294 \uacf5\uc815\ub2a5\ub825 \ud3c9\uac00\ub77c\uba74 \ub9c8\uc9c0\ub9c9\uc5d0 \ub450 \uac00\uc9c0\ub97c \uacb0\uc815\ud574\uc57c \ud569\ub2c8\ub2e4. \uacf5\uc815\uc5d0\uc11c \ubb34\uc5c7\uc744 \ubc14\uafd4\uc57c \ud558\ub294\uc9c0, \uadf8\ub9ac\uace0 \ud574\ub2f9 \uc791\uc5c5\uc5d0 \uc5b4\ub5a4 \uacf5\uc815 \uc21c\uc11c\ub97c \uc0ac\uc6a9\ud560 \uc218 \uc788\ub294\uc9c0\uc785\ub2c8\ub2e4. SkyPlanner APS\ub294 \ub450 \ubc88\uc9f8 \uacfc\uc81c\ub97c \ub3d5\uc2b5\ub2c8\ub2e4. \uc2b9\uc778\ub41c \uacf5\uc815 \uc21c\uc11c\uc640 \uc791\uc5c5 \uac00\ub2a5\ud55c \uc791\uc5c5\uc7a5 \uc815\ubcf4\ub97c \uad00\ub9ac\ud574 \ub450\uba74, \ud574\ub2f9 \uc790\uc6d0\uc744 \uc0ac\uc6a9\ud558\ub294 \uc624\ub354\uc758 \uc0dd\uc0b0 \uc77c\uc815\uc744 \uc218\ub9bd\ud558\uace0 \ud55c\uc815\ub41c \uc0dd\uc0b0 \ub2a5\ub825\uc774 \ub0a9\uae30\uc5d0 \ubbf8\uce58\ub294 \uc601\ud5a5\uc744 \ubcf4\uc5ec\uc90d\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Cp\uc640 Cpk \uacc4\uc0b0 \ubc29\ubc95<\/h2>\n\n\n<p>\uba3c\uc800 \ud558\ub098\uc758 \uce21\uc815 \ud2b9\uc131\uacfc \uadf8 \ud2b9\uc131\uc5d0 \uc801\uc6a9\ub418\ub294 \uaddc\uaca9\uc744 \uc815\ud569\ub2c8\ub2e4. \uc11c\ub85c \uad00\ub828 \uc5c6\ub294 \uce58\uc218\ub97c \ud558\ub098\uc758 \uc9c0\uc218\ub85c \ud569\uce58\uc9c0 \ub9c8\uc138\uc694. \uc77c\ubc18\uc801\uc778 \uc815\uaddc\ubd84\ud3ec \uae30\ubc18 \uacc4\uc0b0\uc5d0\ub294 \ub2e4\uc74c \uac12\uc774 \ud544\uc694\ud569\ub2c8\ub2e4.<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>USL:<\/strong> \uaddc\uaca9 \uc0c1\ud55c\uc73c\ub85c, \ud5c8\uc6a9\ub418\ub294 \ucd5c\ub313\uac12\uc785\ub2c8\ub2e4.<\/li><li><strong>LSL:<\/strong> \uaddc\uaca9 \ud558\ud55c\uc73c\ub85c, \ud5c8\uc6a9\ub418\ub294 \ucd5c\uc19f\uac12\uc785\ub2c8\ub2e4.<\/li><li><strong>\ud3c9\uade0:<\/strong> \ud3c9\uac00 \ub300\uc0c1 \uacf5\uc815\uc5d0\uc11c \uc5bb\uc740 \uce21\uc815\uac12\uc758 \ud3c9\uade0\uc785\ub2c8\ub2e4.<\/li><li><strong>\uc2dc\uadf8\ub9c8:<\/strong> \uac1c\ubcc4 \uce21\uc815\uac12\uc758 \uc0b0\ud3ec\ub97c \ub098\ud0c0\ub0b4\ub294 \uacf5\uc815 \ud45c\uc900\ud3b8\ucc28\uc758 \ucd94\uc815\uac12\uc785\ub2c8\ub2e4.<\/li><\/ul>\n\n\n<p>\ubaa8\ub4e0 \uac12\uc5d0\ub294 \ub3d9\uc77c\ud55c \ub2e8\uc704\ub97c \uc0ac\uc6a9\ud558\uc138\uc694. \uaddc\uaca9 \ud55c\uacc4\ub294 \ud574\ub2f9 \uc81c\ud488\uc758 \uc694\uad6c\uc0ac\ud56d\uc5d0\uc11c \uc815\ud558\ub294 \uac83\uc774\uc9c0, \ud45c\ubcf8 \uce21\uc815\uac12\uc758 \ucd5c\ub313\uac12\uacfc \ucd5c\uc19f\uac12\uc73c\ub85c \uc815\ud558\ub294 \uac83\uc774 \uc544\ub2d9\ub2c8\ub2e4. \uacf5\uc815\uc758 \uac70\ub3d9\uc744 \ub098\ud0c0\ub0b4\ub294 \uad00\ub9ac\ub3c4\uc758 \uad00\ub9ac \ud55c\uacc4\uc640\ub3c4 \uad6c\ubd84\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Cp: \uacf5\ucc28 \ud3ed\uacfc \uacf5\uc815 \uc0b0\ud3ec \ube44\uad50<\/h3>\n\n\n<p><strong>Cp = (USL \u2212 LSL) \/ (6 \u00d7 sigma)<\/strong><\/p>\n\n\n<p>\ubd84\uc790\ub294 \uacf5\ucc28 \ud3ed\uc785\ub2c8\ub2e4. \ubd84\ubaa8\ub294 \uc815\uaddc\ubd84\ud3ec \ubaa8\ud615\uc5d0\uc11c \ud1b5\uc0c1 \uc0ac\uc6a9\ud558\ub294 \uacf5\uc815 \uc0b0\ud3ec\uc758 \ud3ed\uc73c\ub85c, \ud3c9\uade0\uc744 \uae30\uc900\uc73c\ub85c \uc591\ucabd\uc73c\ub85c \uac01\uac01 \ud45c\uc900\ud3b8\ucc28\uc758 3\ubc30\ub9cc\ud07c \ubed7\uc740 \ubc94\uc704\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>Cp\ub294 \uacf5\uc815 \ud3c9\uade0\uc774 \ub450 \uaddc\uaca9 \ud55c\uacc4\uc758 \uc911\uc559\uc5d0 \uc788\ub2e4\uba74 \uc774 \uc0b0\ud3ec\uac00 \uacf5\ucc28 \uc548\uc5d0 \ub4e4\uc5b4\uac08 \uc218 \uc788\ub294\uc9c0\uc5d0 \ub2f5\ud569\ub2c8\ub2e4. \uc2e4\uc81c\ub85c \uacf5\uc815 \ud3c9\uade0\uc774 \uadf8 \uc911\uc559\uc5d0 \uc788\ub294\uc9c0\ub294 \uc54c\ub824\uc8fc\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Cpk: \ub354 \uac00\uae4c\uc6b4 \uaddc\uaca9 \ud55c\uacc4\uae4c\uc9c0\uc758 \uac70\ub9ac \ud655\uc778<\/h3>\n\n\n<p><strong>Cpk = min[(USL \u2212 mean) \/ (3 \u00d7 sigma), (mean \u2212 LSL) \/ (3 \u00d7 sigma)]<\/strong><\/p>\n\n\n<p>\uc591\ucabd \uac12\uc744 \ubaa8\ub450 \uacc4\uc0b0\ud55c \ub4a4 \ub354 \uc791\uc740 \uac12\uc744 \ud0dd\ud569\ub2c8\ub2e4. \uadf8\ucabd\uc774 \uaddc\uaca9 \ud55c\uacc4\uae4c\uc9c0\uc758 \uc5ec\uc720\uac00 \ub354 \uc801\uc740 \ucabd\uc785\ub2c8\ub2e4. \ub530\ub77c\uc11c Cpk\ub294 \uacf5\uc815\uc758 \uc0b0\ud3ec\uc640 \ud3c9\uade0 \uc704\uce58\ub97c \ubaa8\ub450 \ubc18\uc601\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uac19\uc740 \ub370\uc774\ud130\uc640 \uc2dc\uadf8\ub9c8 \ucd94\uc815\uac12\uc744 \uc0ac\uc6a9\ud558\uba74 Cpk\ub294 Cp\ubcf4\ub2e4 \ud074 \uc218 \uc5c6\uc2b5\ub2c8\ub2e4. \ud3c9\uade0\uc774 \uaddc\uaca9 \uc0c1\ud55c\uacfc \ud558\ud55c\uc758 \uc911\uc559\uc5d0 \uc788\uc744 \ub54c \ub450 \uac12\uc774 \uac19\uc544\uc9d1\ub2c8\ub2e4. \ub450 \uac12\uc5d0 \ucc28\uc774\uac00 \uc788\ub2e4\uba74 \uacf5\uc815 \ud3c9\uade0\uc774 \uc911\uc559\uc5d0\uc11c \ubc97\uc5b4\ub098 \uc788\ub2e4\ub294 \ub73b\uc774\uc9c0, \uacf5\uc815\uc774 \uc548\uc815\uc801\uc774\ub77c\ub294 \uc99d\uac70\ub294 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc2e4\ubb34\uc5d0\uc11c \uc774 \uac12\ub4e4\uc740 \ud45c\ubcf8\uc73c\ub85c \uacc4\uc0b0\ud55c \ucd94\uc815\uac12\uc774\uba70, \uc815\ud655\ud788 \uc54c\ub824\uc9c4 \ubaa8\uc9d1\ub2e8\uc758 \uac12\uc774 \uc544\ub2d9\ub2c8\ub2e4. \uc2dc\uadf8\ub9c8\ub97c \uc5b4\ub5a4 \ubc29\ubc95\uc73c\ub85c \ucd94\uc815\ud588\ub294\uc9c0 \uba85\uc2dc\ud558\uc138\uc694. \uad70\ub0b4 \ubcc0\ub3d9\uacfc \uc804\uccb4 \ubcc0\ub3d9\uc744 \uad6c\ubd84\ud574 \ubcf4\uace0\ud558\ub294 \uc77c\ubc18\uc801\uc778 \uad00\ub840\uc5d0\uc11c\ub294 Cp\uc640 Cpk\uc5d0 \uad70\ub0b4 \ubcc0\ub3d9 \ucd94\uc815\uac12\uc744 \uc0ac\uc6a9\ud558\uace0, Pp\uc640 Ppk\uc5d0\ub294 \uc804\uccb4 \ubcc0\ub3d9\uc744 \uc0ac\uc6a9\ud569\ub2c8\ub2e4. \uaddc\uaca9\uc774 \uadf8\ub300\ub85c\uc5ec\ub3c4 \ucd94\uc815 \ubc29\ubc95\uc744 \ubc14\uafb8\uba74 \uacb0\uacfc\uac00 \ub2ec\ub77c\uc9c8 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uaddc\uaca9 \ud55c\uacc4\uac00 \ud55c\ucabd\uc5d0\ub9cc \uc788\ub2e4\uba74?<\/h3>\n\n\n<p>\ud574\ub2f9\ud558\ub294 \ub2e8\uce21 \uc9c0\uc218\ub97c \uc0ac\uc6a9\ud558\uc138\uc694. \uc0c1\ud55c\ub9cc \uc788\uc73c\uba74 <strong>Cpu = (USL \u2212 mean) \/ (3 \u00d7 sigma)<\/strong>, \ud558\ud55c\ub9cc \uc788\uc73c\uba74 <strong>Cpl = (mean \u2212 LSL) \/ (3 \u00d7 sigma)<\/strong>\ub97c \uc0ac\uc6a9\ud569\ub2c8\ub2e4. \uc591\uce21 \uc9c0\uc218\uc778 Cp\ub97c \uacc4\uc0b0\ud558\ub824\uba74 \uaddc\uaca9 \uc0c1\ud55c\uacfc \ud558\ud55c\uc774 \ubaa8\ub450 \ud544\uc694\ud569\ub2c8\ub2e4. \uacf5\uc2dd\uc744 \uc801\uc6a9\ud558\uae30 \uc704\ud574 \uc874\uc7ac\ud558\uc9c0 \uc54a\ub294 \uc694\uad6c\uc0ac\ud56d\uc744 \ub9cc\ub4e4\uc5b4 \ub123\uc9c0 \ub9c8\uc138\uc694.<\/p>\n\n\n<p>\ud2b9\uc131\uc5d0 \uc790\uc5f0\uc801\uc73c\ub85c \uc874\uc7ac\ud558\ub294 \uacbd\uacc4\uac00 \uace7 \uaddc\uaca9 \ud55c\uacc4\uc778 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4. \uc74c\uc218\uac00 \ub420 \uc218 \uc5c6\ub294 \ud2b9\uc131\uc774\ub77c\uba74 \uc704\uc758 \uc815\uaddc\ubd84\ud3ec \ubaa8\ud615 \uacc4\uc0b0 \ub300\uc2e0 \ube44\uc815\uaddc\ubd84\ud3ec \ubd84\uc11d\uc774 \ud544\uc694\ud560 \uc218\ub3c4 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uacc4\uc0b0 \uc608\uc2dc: Cp\ub294 \ub192\uc9c0\ub9cc Cpk\ub294 \ub0ae\uc740 \uacbd\uc6b0<\/h2>\n\n\n<p>\uac00\uacf5 \uad6c\uba4d \uc9c0\ub984\uc758 \uaddc\uaca9 \ud558\ud55c\uacfc \uc0c1\ud55c\uc774 \uac01\uac01 <strong>19.90 mm\uc640 20.10 mm<\/strong>\ub77c\uace0 \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \uc801\uc808\ud55c \ud3c9\uac00\ub97c \ud1b5\ud574 \ud3c9\uade0\uc740 <strong>20.04 mm<\/strong>, \uad70\ub0b4 \ud45c\uc900\ud3b8\ucc28 \ucd94\uc815\uac12\uc740 <strong>0.020 mm<\/strong>\ub85c \ub098\uc654\uc2b5\ub2c8\ub2e4. \uc774\ub294 \uc124\uba85\uc744 \uc704\ud55c \uac00\uc0c1\uc758 \uac12\uc774\uba70, \uace0\uac1d\uc758 \uc2e4\uc81c \uce21\uc815\uac12\uc774 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p>\uacf5\ucc28 \ud3ed\uc740 0.20 mm\uc774\uace0, \uc2dc\uadf8\ub9c8\uc758 6\ubc30\uc5d0 \ud574\ub2f9\ud558\ub294 \uc0b0\ud3ec \ud3ed\uc740 0.120 mm\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>Cp = (20.10 \u2212 19.90) \/ (6 \u00d7 0.020) = 1.67<\/strong>\uc785\ub2c8\ub2e4. \uacb0\uacfc\ub294 \ubc18\uc62c\ub9bc\ud55c \uac12\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774\uc81c \ud3c9\uade0\uc744 \uae30\uc900\uc73c\ub85c \uc591\ucabd\uc744 \uac01\uac01 \ud655\uc778\ud569\ub2c8\ub2e4.<\/p>\n\n\n<ul class=\"wp-block-list\"><li>\uc0c1\ud55c \uce21 \uc9c0\uc218: (20.10 \u2212 20.04) \/ (3 \u00d7 0.020) = <strong>1.00<\/strong>.<\/li><li>\ud558\ud55c \uce21 \uc9c0\uc218: (20.04 \u2212 19.90) \/ (3 \u00d7 0.020) = <strong>2.33<\/strong>. \uacb0\uacfc\ub294 \ubc18\uc62c\ub9bc\ud55c \uac12\uc785\ub2c8\ub2e4.<\/li><li>Cpk\ub294 \ub450 \uac12 \uc911 \uc791\uc740 \uac12\uc778 <strong>1.00<\/strong>\uc785\ub2c8\ub2e4.<\/li><\/ul>\n\n\n<p>\uc0b0\ud3ec\ub294 \ube44\uad50\uc801 \uc881\uc9c0\ub9cc \uacf5\uc815 \ud3c9\uade0\uc774 \uc0c1\ud55c\uc5d0 \ub108\ubb34 \uac00\uae4c\uc6cc \uacf5\ucc28 \ubc94\uc704\ub97c \ucda9\ubd84\ud788 \ud65c\uc6a9\ud558\uc9c0 \ubabb\ud558\uace0 \uc788\uc2b5\ub2c8\ub2e4. Cp\ub9cc \ubcf4\uace0\ud558\uba74 \uc774 \ubb38\uc81c\uac00 \ub4dc\ub7ec\ub098\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud45c\uc900\ud3b8\ucc28\uac00 \uadf8\ub300\ub85c\uc778 \uc0c1\ud0dc\uc5d0\uc11c \ud3c9\uade0\uc774 20.00 mm\ub85c \uc774\ub3d9\ud55c\ub2e4\uba74, \ubc18\uc62c\ub9bc\ud55c \uac12\uc73c\ub85c Cp\ub294 1.67\uc744 \uc720\uc9c0\ud558\uace0 Cpk\ub294 1.67\ub85c \ub192\uc544\uc9d1\ub2c8\ub2e4. \ub530\ub77c\uc11c \ud3c9\uade0\uc744 \uacf5\ucc28 \uc911\uc559\uc5d0 \ub9de\ucd94\ub294 \ubc29\uc548\uc744 \uac1c\uc120\ucc45\uc73c\ub85c \uac80\ud1a0\ud560 \ub9cc\ud569\ub2c8\ub2e4. \ub2e4\ub9cc \uc624\ud504\uc14b\uc744 \ubc14\uafd4\ub3c4 \ubcc0\ub3d9\uc774 \uadf8\ub300\ub85c \uc720\uc9c0\ub41c\ub2e4\ub294 \ubcf4\uc7a5\uc740 \uc544\ub2d9\ub2c8\ub2e4. \uc870\uc815\ud55c \uacf5\uc815\uc740 \uc0c8\ub85c\uc6b4 \ub370\uc774\ud130\ub85c \uac80\uc99d\ud558\uc138\uc694.<\/p>\n\n\n<p>Cp \uc790\uccb4\uac00 \ud569\uc758\ub41c \uc694\uad6c \uc218\uc900\uc5d0 \ubabb \ubbf8\uce5c\ub2e4\uba74 \ud3c9\uade0\uc744 \uc911\uc559\uc5d0 \ub9de\ucd94\ub294 \uac83\ub9cc\uc73c\ub85c\ub294 \ud574\uacb0\ub418\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4. \uacf5\uad6c, \uc790\uc7ac, \uc14b\uc5c5 \ub610\ub294 \ud658\uacbd\uc5d0\uc11c \ud655\uc778\ub41c \ubcc0\ub3d9 \uc6d0\uc778\uc744 \ud574\uc18c\ud558\ub294 \ub4f1\uc758 \ubc29\ubc95\uc73c\ub85c \uc0b0\ud3ec\ub3c4 \uc904\uc5ec\uc57c \ud569\ub2c8\ub2e4. \uacf5\uc815\uc744 \ubc14\uafb8\uae30 \uc804\uc5d0 \uc6d0\uc778\ubd80\ud130 \uc870\uc0ac\ud558\uc138\uc694.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Cpk\ub294 \uc5b4\ub290 \uc815\ub3c4\uc5ec\uc57c \uc88b\uc740\uac00?<\/h2>\n\n\n<p><strong>Cpk\uac00 1.00<\/strong>\uc774\uba74 \ud3c9\uade0\uc5d0\uc11c \ub354 \uac00\uae4c\uc6b4 \uaddc\uaca9 \ud55c\uacc4\uae4c\uc9c0\uc758 \uac70\ub9ac\uac00 \ucd94\uc815 \ud45c\uc900\ud3b8\ucc28\uc758 3\ubc30\ub77c\ub294 \ub73b\uc785\ub2c8\ub2e4. <strong>1.33<\/strong>\uc740 \ud754\ud788 \uc4f0\uc774\ub294 \uae30\uc900\uac12\uc774\uc9c0\ub9cc \ubaa8\ub4e0 \uacbd\uc6b0\uc5d0 \uc801\uc6a9\ub418\ub294 \uc2b9\uc778 \uae30\uc900\uc740 \uc544\ub2d9\ub2c8\ub2e4. \uc694\uad6c\ub418\ub294 \uac12\uc740 \uace0\uac1d, \ud2b9\uc131, \uc704\ud5d8\ub3c4, \uc801\uc6a9\ub418\ub294 \ud488\uc9c8 \uc694\uad6c\uc0ac\ud56d\uc5d0 \ub530\ub77c \ub2ec\ub77c\uc9d1\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc18c\ud504\ud2b8\uc6e8\uc5b4\uc5d0 \ud45c\uc2dc\ub418\ub294 \uc0c9\uc0c1\ub9cc \ubcf4\uc9c0 \ub9d0\uace0, \ud569\uc758\ub41c \uae30\uc900\uc5d0 \ub530\ub77c \uacb0\uacfc\ub97c \ud574\uc11d\ud558\uc138\uc694.<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Cpk\uac00 \uc694\uad6c\uac12 \ubbf8\ub9cc\uc778 \uacbd\uc6b0:<\/strong> \ud3c9\uac00\uc5d0\uc11c \ud655\uc778\ub41c \uc5ec\uc720\uac00 \ubd80\uc871\ud569\ub2c8\ub2e4. \ud3c9\uac00\uc758 \ud0c0\ub2f9\uc131\uc744 \ud655\uc778\ud55c \ub4a4 \ud3c9\uade0 \uc704\uce58, \ubcc0\ub3d9 \ub610\ub294 \ub458 \ubaa8\ub450\ub97c \uac1c\uc120\ud558\uc138\uc694.<\/li><li><strong>Cpk\uac00 \uc694\uad6c\uac12 \uc774\uc0c1\uc778 \uacbd\uc6b0:<\/strong> \uacb0\uacfc\ub97c \uc0dd\uc0b0\uc758 \uadfc\uac70\ub85c \uc778\uc815\ud558\uae30 \uc804\uc5d0 \ud3c9\uac00 \uc870\uac74\uacfc \ud1b5\uacc4\uc801 \ubd88\ud655\uc2e4\uc131\uc744 \uac80\ud1a0\ud558\uc138\uc694.<\/li><li><strong>Cpk\uac00 0\uc778 \uacbd\uc6b0:<\/strong> \ud3c9\uade0\uc774 \uaddc\uaca9 \ud55c\uacc4\uc5d0 \uc788\uc2b5\ub2c8\ub2e4.<\/li><li><strong>Cpk\uac00 \uc74c\uc218\uc778 \uacbd\uc6b0:<\/strong> \ud3c9\uade0\uc774 \uaddc\uaca9 \ud55c\uacc4\ub97c \ubc97\uc5b4\ub098 \uc788\uc5b4, \ub354 \uac00\uae4c\uc6b4 \ud55c\uacc4 \ucabd\uc758 \uacc4\uc0b0\uac12\uc774 \uc74c\uc218\uac00 \ub429\ub2c8\ub2e4.<\/li><\/ul>\n\n\n<p>Cpk\ub97c \uc591\ud488 \ube44\uc728\uc774\ub098 \ubcf4\uc7a5\ub41c \ubd88\ub7c9\ub960\ub85c \ud574\uc11d\ud558\uc9c0 \ub9c8\uc138\uc694. \uc9c0\uc218\ub85c \uc608\uc0c1 \ubd88\ub7c9\ub960\uc744 \uad6c\ud558\ub824\uba74 \ubd84\ud3ec\uc640 \uc548\uc815\uc131\uc5d0 \ub300\ud55c \uac00\uc815\ubfd0 \uc544\ub2c8\ub77c \uc591\ucabd \uaddc\uaca9 \ud55c\uacc4\uc758 \uc704\uce58\ub3c4 \ud544\uc694\ud569\ub2c8\ub2e4. Cpk \uac12 \ud558\ub098\ub9cc\uc73c\ub85c\ub294 \uc804\uccb4 \uc0c1\ud669\uc744 \uc54c \uc218 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ub610\ud55c Cpk\ub294 \ubcc4\ub3c4\ub85c \uc815\ud574\uc9c4 \uc124\uacc4 \ubaa9\ud45c\uac12\uc5d0 \uc5bc\ub9c8\ub098 \uac00\uae4c\uc6b4\uc9c0\ub97c \uc9c1\uc811 \uce21\uc815\ud558\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4. \uc0b0\ud3ec\uc640 \uc591\ucabd \uaddc\uaca9 \ud55c\uacc4\uac00 \uace0\uc815\ub418\uc5b4 \uc788\ub2e4\uba74 \ud3c9\uade0\uc774 \uacf5\ucc28 \uc911\uc559\uc5d0 \uc788\uc744 \ub54c Cpk\uac00 \ucd5c\ub300\uac00 \ub429\ub2c8\ub2e4. \uc124\uacc4 \ubaa9\ud45c\uac12\uc774 \uacf5\ucc28 \uc911\uc559\uacfc \ub2e4\ub974\ub2e4\uba74 Cpk\ub97c \ucd5c\ub300\ud654\ud558\ub824\uace0 \uacf5\uc815 \ud3c9\uade0\uc744 \uc62e\uae30\uae30\ubcf4\ub2e4, \ubaa9\ud45c\uac12\uc744 \uc5bc\ub9c8\ub098 \uc798 \ub2ec\uc131\ud558\ub294\uc9c0\ub3c4 \ud568\uaed8 \ud3c9\uac00\ud558\uc138\uc694.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc218\uce58\ub97c \uc2e0\ub8b0\ud558\uae30 \uc804\uc5d0 \ud3c9\uac00\ubd80\ud130 \uc810\uac80\ud558\uc138\uc694<\/h2>\n\n\n<p>\uacc4\uc0b0 \uc790\uccb4\ub294 \ub300\uac1c \uc5b4\ub835\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4. \ub354 \uc5b4\ub824\uc6b4 \ubb38\uc81c\ub294 \uce21\uc815\uac12\uc774 \uc55e\uc73c\ub85c \uc6b4\uc601\ud558\ub824\ub294 \uacf5\uc815\uc744 \uc81c\ub300\ub85c \ub098\ud0c0\ub0b4\ub294\uc9c0 \ud310\ub2e8\ud558\ub294 \uac83\uc785\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uc6a9\ub3c4\uc5d0 \ub9de\ub294 \uce21\uc815 \uc2dc\uc2a4\ud15c \uc0ac\uc6a9<\/h3>\n\n\n<p>\uce21\uc815 \ubc29\ubc95\uc774 \ud574\ub2f9 \ud2b9\uc131\uc744 \ucda9\ubd84\ud788 \uad6c\ubd84\ud574 \ub0bc \uc218 \uc788\ub294\uc9c0, \uce21\uc815 \uc624\ucc28\uac00 \ud310\ub2e8\uc5d0 \ud5c8\uc6a9\ub418\ub294 \uc218\uc900\uc778\uc9c0 \ud655\uc778\ud558\uc138\uc694. \uad50\uc815\ub3c4 \uc911\uc694\ud558\uc9c0\ub9cc \ud3b8\uc758, \ubc18\ubcf5\uc131, \uc791\uc5c5\uc790\ub098 \uce21\uc815 \ubc29\ubc95\uc5d0 \ub530\ub978 \ucc28\uc774\ub3c4 \uc911\uc694\ud569\ub2c8\ub2e4. \uce21\uc815 \uc2dc\uc2a4\ud15c \ubd84\uc11d\uc740 \uce21\uc815\uc5d0 \uc758\ud55c \ubcc0\ub3d9\uacfc \uc81c\uc870 \uacf5\uc815\uc758 \ubcc0\ub3d9\uc744 \uad6c\ubd84\ud558\ub294 \ub370 \ub3c4\uc6c0\uc774 \ub429\ub2c8\ub2e4.<\/p>\n\n\n<p>\uacc4\ub7c9\ud615 \ub370\uc774\ud130\ub85c Cp\/Cpk\ub97c \ud3c9\uac00\ud560 \ub54c\ub294 \uc2e4\uc81c \uce21\uc815\uac12\uc744 \uc0ac\uc6a9\ud558\uc138\uc694. \uc591\ud488\uacfc \ubd88\ub7c9\ud488\uc758 \uac1c\uc218\ub85c\ub294 \uad6c\uba4d \uc9c0\ub984, \uc911\ub7c9 \ub4f1 \uce21\uc815 \ud2b9\uc131\uc758 \ubd84\ud3ec\ub97c \ub300\uc2e0\ud560 \uc218 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\ud310\ub2e8\uc774 \uc801\uc6a9\ub420 \uc870\uac74\uc744 \ubc18\uc601\ud574 \ud45c\ubcf8 \uc218\uc9d1<\/h3>\n\n\n<p>\uc81c\ud488 \ub9ac\ube44\uc804, \ud2b9\uc131, \uacf5\uc815 \uc21c\uc11c, \uc124\ube44, \uc14b\uc5c5 \ubc0f \uad00\ub828 \uc0dd\uc0b0 \uc870\uac74\uc744 \uc815\uc758\ud558\uc138\uc694. \uc5b8\uc81c \uc5b4\ub514\uc11c \uce21\uc815\ud588\ub294\uc9c0\ub3c4 \uae30\ub85d\ud569\ub2c8\ub2e4. \uacf5\uad6c \ud558\ub098, \uc791\uc5c5\uc790 \ud55c \uba85, \uc790\uc7ac \ud55c \ub85c\ud2b8\ub85c \ub2e8\uae30\uac04 \uc0dd\uc0b0\ud55c \uacb0\uacfc\ub9cc\uc73c\ub85c \ub2e4\ub978 \uc870\uac74\uc5d0\uc11c\uc758 \uacf5\uc815\ub2a5\ub825\uae4c\uc9c0 \uc785\uc99d\ub418\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p>\ub370\uc774\ud130\ub294 \uc2dc\uac04 \uc21c\uc11c\ub300\ub85c \uc218\uc9d1\ud558\uc138\uc694. \ud569\ub9ac\uc801 \ubd80\ubd84\uad70\uc744 \uc0ac\uc6a9\ud558\ub294 \uacbd\uc6b0, \ubd80\ubd84\uad70 \ub0b4 \ubcc0\ub3d9\uc774 \ud30c\uc545\ud558\ub824\ub294 \ub2e8\uae30 \uacf5\uc815 \ubcc0\ub3d9\uc744 \ub098\ud0c0\ub0b4\ub3c4\ub85d \uce21\uc815\uac12\uc744 \ubb36\uace0, \ubd84\uc11d\uc744 \ud1b5\ud574 \ubd80\ubd84\uad70 \uac04 \ubcc0\ud654\ub3c4 \ub4dc\ub7ec\ub098\ub3c4\ub85d \ud574\uc57c \ud569\ub2c8\ub2e4. \uc9c0\uc218\ub97c \ub192\uc774\ub824\uace0 \ub370\uc774\ud130\ub97c \ub2e4\uc2dc \ubb36\uac70\ub098 \ubd88\ub9ac\ud55c \uce21\uc815\uac12\uc744 \uc54c\ub9ac\uc9c0 \uc54a\uace0 \uc81c\uc678\ud574\uc11c\ub294 \uc548 \ub429\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc11c\ub85c \ub2e4\ub978 \uae30\uacc4, \uce90\ube44\ud2f0 \ub610\ub294 \uc14b\uc5c5\uc5d0\uc11c \uc5bb\uc740 \ub370\uc774\ud130\ub97c \ud569\uce58\uae30 \uc804\uc5d0\ub294 \uc774\ub4e4\uc774 \ud558\ub098\uc758 \uacf5\uc815\uc744 \ub098\ud0c0\ub0b4\ub294\uc9c0 \ud655\uc778\ud558\uc138\uc694. \ub370\uc774\ud130\ub97c \ud569\uce5c \ud788\uc2a4\ud1a0\uadf8\ub7a8\uc740 \ubcc4\ub3c4\ub85c \uc870\uc0ac\ud574\uc57c \ud560 \uc218\uc900 \ubcc0\ud654\ub098 \uc11c\ub85c \ub2e4\ub978 \ubd84\ud3ec\uc758 \ud63c\uc7ac\ub97c \uac00\ub9b4 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uc608\uce21\uc5d0 \uc55e\uc11c \uc548\uc815\uc131 \ud655\uc778\ud558\uae30<\/h3>\n\n\n<p>\uc801\uc808\ud55c \uad00\ub9ac\ub3c4\uc640 \uacf5\uc815\uc5d0 \ub300\ud55c \uc9c0\uc2dd\uc744 \ubc14\ud0d5\uc73c\ub85c \ubcc0\ud654, \ucd94\uc138, \ud2b9\ubcc4\uc6d0\uc778\uc744 \uc870\uc0ac\ud558\uc138\uc694. \ud788\uc2a4\ud1a0\uadf8\ub7a8\uc740 \uacb0\uacfc\uc758 \ubd84\ud3ec\ub97c \ubcf4\uc5ec \uc8fc\uc9c0\ub9cc \uc2dc\uac04 \uc21c\uc11c\ub294 \ubcf4\uc5ec \uc8fc\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4. \ud788\uc2a4\ud1a0\uadf8\ub7a8\ub9cc\uc73c\ub85c\ub294 \uc548\uc815\uc131\uc744 \ud655\uc778\ud560 \uc218 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uacf5\uc815\uc774 \uc548\uc815\uc801\uc774\uc5b4\ub3c4 \uacf5\ucc28\ub97c \ucda9\uc871\ud560 \ub2a5\ub825\uc740 \ubd80\uc871\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ubc18\ub300\ub85c \ubd88\uc548\uc815\ud55c \uacf5\uc815\uc5d0\uc11c \uacf5\uc815\ub2a5\ub825 \ucd94\uc815\uce58\uac00 \uc88b\uac8c \ub098\uc654\ub2e4\uace0 \ud574\uc11c \ud5a5\ud6c4 \uc0dd\uc0b0 \uacb0\uacfc\ub97c \uc2e0\ub8b0\ud560 \ub9cc\ud558\uac8c \uc608\uce21\ud560 \uc218 \uc788\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4. \uc9c0\uc218\ub97c \uadfc\uac70\ub85c \ud604\uc7ac \uc0c1\ud0dc\ub97c \uadf8\ub300\ub85c \uc720\uc9c0\ud574\ub3c4 \ub41c\ub2e4\uace0 \ud310\ub2e8\ud558\uc9c0 \ub9d0\uace0, \uacf5\uc815\uc744 \uc548\uc815\uc2dc\ud0a8 \ub4a4 \ub2e4\uc2dc \ud3c9\uac00\ud558\uc138\uc694.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\ubd84\ud3ec\uc640 \ubd88\ud655\uc2e4\uc131 \ud655\uc778\ud558\uae30<\/h3>\n\n\n<p>\uc77c\ubc18\uc801\uc778 \uacf5\uc2dd\uc740 \uc815\uaddc\ubd84\ud3ec \ubaa8\ud615\uc744 \uc0ac\uc6a9\ud569\ub2c8\ub2e4. \ub370\uc774\ud130\uc640 \ubd84\ud3ec\uc758 \uc801\ud569\uc131\uc744 \uac80\ud1a0\ud558\uace0, \ud2b9\uc131 \uc790\uccb4\uac00 \ube44\uc815\uaddc\ubd84\ud3ec\ub97c \ub530\ub978\ub2e4\uba74 \ud0c0\ub2f9\ud55c \uadfc\uac70\uac00 \uc788\ub294 \ubcc0\ud658\uc774\ub098 \uc801\uc808\ud55c \ube44\uc815\uaddc \uacf5\uc815\ub2a5\ub825 \ubd84\uc11d \ubc29\ubc95\uc744 \uc0ac\uc6a9\ud558\uc138\uc694. \uc815\uaddc\uc131 \uac80\uc815\uc744 \ud1b5\uacfc\ud560 \ub54c\uae4c\uc9c0 \uad00\uce21\uac12\uc744 \uc81c\uac70\ud558\ub294 \uac83\uc740 \ud574\uacb0\ucc45\uc774 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p>\ubd84\uc11d \ubaa9\uc801\uacfc \uc801\uc6a9 \uc694\uac74\uc5d0 \ub9de\ucdb0 \ud45c\ubcf8 \ud06c\uae30\uc640 \ub370\uc774\ud130 \uc218\uc9d1 \uae30\uac04\uc744 \uacc4\ud68d\ud558\uc138\uc694. \uc720\ub09c\ud788 \uc720\ub9ac\ud55c \uc870\uac74\uc5d0\uc11c \ud55c \ucc28\ub840 \uc0dd\uc0b0\ud55c \ub370\uc774\ud130\ub77c\uba74 \uad00\uce21\uac12\uc774 \ucda9\ubd84\ud574\ub3c4 \uc911\uc694\ud55c \ubcc0\ub3d9\uc744 \ub193\uce60 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ud45c\ubcf8\uc774 \uc791\uc73c\uba74 \uc9c0\uc218 \ucd94\uc815\uce58\uc758 \ubd88\ud655\uc2e4\uc131\ub3c4 \ucee4\uc9c0\ubbc0\ub85c, \ud569\uaca9 \ud310\uc815\uc5d0 \ud544\uc694\ud55c \uacbd\uc6b0 \uc2e0\ub8b0\uad6c\uac04\uc774\ub098 \uc2e0\ub8b0\ud558\ud55c\uc744 \uac80\ud1a0\ud558\uc138\uc694.<\/p>\n\n\n<p>\ubcf4\uace0\uc11c\ub97c \uc77d\ub294 \uc0ac\ub78c\uc774 \uacb0\uacfc\ub97c \uc62c\ubc14\ub974\uac8c \ud574\uc11d\ud560 \uc218 \uc788\ub3c4\ub85d \uaddc\uaca9\uc758 \uac1c\uc815 \ubc84\uc804, \ubd84\uc11d \uc870\uac74, \uc0d8\ud50c\ub9c1 \uacc4\ud68d, \uc2dc\uadf8\ub9c8 \ucd94\uc815 \ubc29\ubc95, \uc548\uc815\uc131 \uadfc\uac70, \ubd84\ud3ec \ubd84\uc11d \ubc29\ubc95, \uc9c0\uc218 \ucd94\uc815\uce58, \ud569\uc758\ub41c \ud569\uaca9 \uae30\uc900\uc744 \uba85\uc2dc\ud558\uc138\uc694. \uc774\ub7f0 \uc138\ubd80 \uc815\ubcf4\uac00 \uc788\uc5b4\uc57c \ub2e4\uc74c \ub2f4\ub2f9\uc790\uac00 \uadf8 \uc218\uce58\ub85c \uc2e4\uc81c\ub85c \ubb34\uc5c7\uc744 \ud310\ub2e8\ud560 \uc218 \uc788\ub294\uc9c0 \uc774\ud574\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Cp\/Cpk, Pp\/Ppk, Cm\/Cmk\ub294 \uc11c\ub85c \ub300\uccb4\ud560 \uc218 \uc5c6\uc2b5\ub2c8\ub2e4<\/h2>\n\n\n<p>\uad70\ub0b4 \ubcc0\ub3d9\uacfc \uc804\uccb4 \ubcc0\ub3d9\uc744 \uad6c\ubd84\ud558\ub294 \uc77c\ubc18\uc801\uc778 \uad00\ub840\uc5d0\uc11c <strong>Cp\uc640 Cpk<\/strong>\ub294 \ucd94\uc815\ub41c \uacf5\uc815 \ub0b4 \ubcc0\ub3d9\uc744 \uc0ac\uc6a9\ud574 \uacf5\uc815\ub2a5\ub825\uc744 \ub098\ud0c0\ub0c5\ub2c8\ub2e4. <strong>Pp\uc640 Ppk<\/strong>\ub294 \ubd84\uc11d \ub370\uc774\ud130 \uc804\uccb4\uc758 \ud45c\uc900\ud3b8\ucc28\ub97c \uc0ac\uc6a9\ud569\ub2c8\ub2e4. \ub450 \uc9c0\uc218 \uc30d \ubaa8\ub450 \uc0b0\ud3ec\ub97c \uaddc\uaca9\uacfc \ube44\uad50\ud558\uba70, Cpk\uc640 Ppk\ub294 \ud3c9\uade0\uc758 \uc704\uce58\ub3c4 \ubc18\uc601\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>Ppk\uac00 Cpk\ubcf4\ub2e4 \ub208\uc5d0 \ub744\uac8c \ub0ae\ub2e4\uba74 \uad70\ub0b4 \ubcc0\ub3d9 \ucd94\uc815\uce58\uc5d0 \uc7a1\ud788\uc9c0 \uc54a\uc740 \ubd80\ubd84\uad70 \uac04 \ubcc0\ub3d9\uc774 \uc788\ub2e4\ub294 \uc2e0\ud638\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc2dc\uac04 \uc21c\uc11c\uc5d0 \ub530\ub978 \uc591\uc0c1\uacfc \ubcc0\ub3d9 \uc6d0\uc778\uc744 \uc870\uc0ac\ud558\uc138\uc694. \uc5b4\ub5a4 \uc9c0\uc218\ub97c \uc0ac\uc6a9\ud558\ub4e0 \ubd88\uc548\uc815\ud55c \ub370\uc774\ud130\uac00 \uc2e0\ub8b0\ud560 \ub9cc\ud55c \uc608\uce21\uc73c\ub85c \ubc14\ub00c\uc9c0\ub294 \uc54a\uc2b5\ub2c8\ub2e4. \uc804\uccb4 \ubcc0\ub3d9\uc744 \uc0ac\uc6a9\ud558\ub294 \uc9c0\uc218\ub3c4 \uc2e4\uc81c\ub85c \ud45c\ubcf8\uc744 \uc218\uc9d1\ud55c \uc870\uac74\ub9cc \ub300\ud45c\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>Cm\uacfc Cmk<\/strong>\ub294 \uae30\uacc4\ub2a5\ub825 \ubd84\uc11d\uc5d0 \uc0ac\uc6a9\ud558\ub294 \uc9c0\uc218\uc785\ub2c8\ub2e4. \uc774 \ubd84\uc11d\uc740 \ubcf4\ud1b5 \uae30\uacc4 \uc790\uccb4\uc758 \uc601\ud5a5\uc744 \ubd84\ub9ac\ud574 \ud30c\uc545\ud560 \uc218 \uc788\ub3c4\ub85d \ud1b5\uc81c\ub41c \uc870\uac74\uc5d0\uc11c \uc218\ud589\ud569\ub2c8\ub2e4. \ub530\ub77c\uc11c \uc77c\uc0c1\uc801\uc778 \uc5ec\ub7ec \uc694\uc778\uc758 \uc601\ud5a5\uc744 \ubc1b\ub294 \uc0dd\uc0b0 \uacf5\uc815\uc744 \ubd84\uc11d\ud558\ub294 \uac83\uacfc\ub294 \ubc94\uc704\uac00 \ub2e4\ub985\ub2c8\ub2e4.<\/p>\n\n\n<p>\uba85\uce6d\uacfc \uacc4\uc0b0 \uad00\ub840\ub294 \ud45c\uc900, \uc0b0\uc5c5, \ubd84\uc11d \uc18c\ud504\ud2b8\uc6e8\uc5b4\uc5d0 \ub530\ub77c \ub2e4\ub97c \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ubcf4\uace0\uc11c\ub97c \ube44\uad50\ud560 \ub54c\ub294 \uacf5\uc2dd\uc774 \ube44\uc2b7\ud55c\uc9c0\ub9cc \ubcf4\uc9c0 \ub9d0\uace0 \ubd84\uc11d \ubaa9\uc801, \ub370\uc774\ud130, \ubcc0\ub3d9 \ucd94\uc815\uce58\uc640 \ucd94\uc815 \ubc29\ubc95\uc744 \ud655\uc778\ud558\uc138\uc694. \uae30\uacc4\ub2a5\ub825 \ubd84\uc11d \uacb0\uacfc\uc5d0 \uc774\ub984\ub9cc \ubc14\uafd4 \ubd99\uc5ec \uc804\uccb4 \uc0dd\uc0b0 \uacf5\uc815\uc758 \uadfc\uac70\ub85c \uc0ac\uc6a9\ud560 \uc218\ub294 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc2b9\uc778\ub41c \uacf5\uc815\uc744 \uc0dd\uc0b0 \uacc4\ud68d\uc5d0 \ubc18\uc601\ud558\uae30<\/h2>\n\n\n<p>\ud488\uc9c8 \ubd80\uc11c\uac00 \ubd84\uc11d\uc744 \ud3c9\uac00\ud55c \ub4a4\uc5d0\ub294 \uc2e4\ubb34\uc5d0 \uc801\uc6a9\ud560 \uacb0\ub860\uc774 \uba85\ud655\ud574\uc57c \ud569\ub2c8\ub2e4. \uc5b4\ub5a4 \uc81c\uc870 \ubc29\ubc95\uc744 \uc5b4\ub5a4 \uc870\uac74\uc5d0\uc11c \uc0ac\uc6a9\ud560 \uc218 \uc788\ub294\uc9c0, \uc5b4\ub5a4 \ubaa8\ub2c8\ud130\ub9c1\uc774\ub098 \uc2dc\uc815\uc870\uce58\uac00 \ud544\uc694\ud55c\uc9c0\uac00 \ubd84\uba85\ud574\uc57c \ud569\ub2c8\ub2e4. \ud488\uc9c8 \uad00\ub9ac \uc808\ucc28\uc5d0 \ub530\ub77c \uc2b9\uc778 \ub0b4\uc6a9\uacfc \uadf8 \ubc94\uc704\ub97c \uae30\ub85d\ud558\uc138\uc694.<\/p>\n\n\n<p>\uadf8\ub2e4\uc74c \ud574\ub2f9 \uacb0\uc815\uc5d0 \ub530\ub77c \ud5c8\uc6a9\ub41c <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-routing\/\">\uacf5\uc815 \uc21c\uc11c\uc640 \uc790\uc6d0<\/a>\uc744 \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790\uc5d0\uac8c \uc804\ub2ec\ud558\uc138\uc694. \uc2b9\uc778\ub41c \ubc29\ubc95\uc740 \uae30\uacc4\ub9cc\uc73c\ub85c \uacb0\uc815\ub418\uc9c0 \uc54a\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uacf5\uad6c, \ud504\ub85c\uadf8\ub7a8, \uc790\uc7ac, \uc14b\uc5c5, \uc6b4\uc804 \uc870\uac74\ub3c4 \uc911\uc694\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc791\uc5c5\uc7a5\ubcc4 \uc791\uc5c5 \uac00\ub2a5 \uc5ec\ubd80\ub97c \uc124\uc815\ud558\ub294 \uac83\uc740 \uadf8 \uacb0\uc815\uc744 \uc2e4\ud589\ud558\ub294 \ud55c \ubd80\ubd84\uc77c \ubfd0, \uad00\ub828\ub41c \ubaa8\ub4e0 \uc0dd\uc0b0 \uad00\ub9ac\ub97c \ub300\uc2e0\ud558\uc9c0\ub294 \uc54a\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ubcf4\uc5b4 \uac00\uacf5\uc5d0 \uc0ac\uc6a9\ud560 \uc218 \uc788\ub3c4\ub85d \uc2b9\uc778\ub41c \uc124\ube44\uac00 \ud2b9\uc815 \uba38\uc2dc\ub2dd\uc13c\ud130 \ud55c \ub300\ubfd0\uc774\ub77c\uace0 \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \ub2e4\ub978 \uba38\uc2dc\ub2dd\uc13c\ud130\uc5d0\ub294 \uc5ec\uc720 \uc2dc\uac04\uc774 \uc788\uc9c0\ub9cc \uc774 \uacf5\uc815\uc5d0 \ub300\ud55c \uc801\uaca9\uc131\uc740 \ud655\uc778\ub418\uc9c0 \uc54a\uc558\uc2b5\ub2c8\ub2e4. \uadf8\ucabd\uc73c\ub85c \uc624\ub354\ub97c \uc62e\uae30\ub294 \uac83\uc740 \uc2b9\uc778\ub41c \uc870\uac74\uc744 \uc9c0\ud0a4\uba74\uc11c \uc0dd\uc0b0 \ub2a5\ub825 \ubb38\uc81c\ub97c \ud574\uacb0\ud558\ub294 \ubc29\ubc95\uc774 \uc544\ub2d9\ub2c8\ub2e4. \uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790\ub294 \uc774\ubbf8 \ub0a9\uae30\ub97c \uc57d\uc18d\ud55c \ub2e4\ub978 \uc791\uc5c5\uacfc \ud568\uaed8, \ud574\ub2f9 \uc791\uc5c5\uc744 \uc801\uaca9\ud55c \uba38\uc2dc\ub2dd\uc13c\ud130\uc5d0\uc11c \ucc98\ub9ac\ud560 \uc218 \uc788\ub294\uc9c0 \ud655\uc778\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">SkyPlanner\ub85c \uc801\uaca9 \uc790\uc6d0\uc5d0 \uc791\uc5c5 \uc77c\uc815 \ubc30\uc815\ud558\uae30<\/h3>\n\n\n<p>SkyPlanner APS\ub294 \uc774\ub807\uac8c \uad00\ub9ac\ud558\ub294 \uacf5\uc815 \uc21c\uc11c\ub97c \ubc14\ud0d5\uc73c\ub85c <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-scheduling\/\">\uc720\ud55c \uc6a9\ub7c9\uc744 \ubc18\uc601\ud55c \uc0dd\uc0b0 \uc77c\uc815<\/a>\uc744 \uc218\ub9bd\ud569\ub2c8\ub2e4. \uacf5\uc815 \ub2e8\uacc4, \uc18c\uc694 \uc2dc\uac04, \uc791\uc5c5 \uac00\ub2a5\ud55c \uc791\uc5c5\uc7a5\uacfc \ud568\uaed8 \uad50\ub300\uc870, \uc0dd\uc0b0 \ub2a5\ub825, \uc120\ud6c4\ud589 \uad00\uacc4, \uc6b0\uc120\uc21c\uc704\ub97c \uc815\uc758\ud558\uc138\uc694. \uc2a4\ucf00\uc904\ub9c1 \uc778\uacf5\uc9c0\ub2a5 Arcturus\uac00 \uc124\uc815\ub41c \uc790\uc6d0\uc5d0 \uacf5\uc815\uc744 \ubc30\uc815\ud569\ub2c8\ub2e4. \uac04\ud2b8 \ud0c0\uc784\ub77c\uc778\uc5d0\uc11c\ub294 \uc791\uc5c5\uc774 \uc5b8\uc81c \uc608\uc815\ub418\uc5b4 \uc788\uace0 \ub2e4\ub978 \uc624\ub354\uc640 \uc5b4\ub5bb\uac8c \ub9de\ubb3c\ub9ac\ub294\uc9c0 \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc0dd\uc0b0 \uacc4\ud68d \ub2f4\ub2f9\uc790\ub294 \uacf5\uc815 \uc21c\uc11c\uc758 \uc81c\uc57d\uc744 \uc77c\uc77c\uc774 \uae30\uc5b5\ud558\uace0 \uae30\uacc4\ubcc4 \ub300\uae30 \uc791\uc5c5\uc744 \uc218\uc791\uc5c5\uc73c\ub85c \uc870\uc815\ud558\ub294 \ub370 \uc4f0\ub294 \uc2dc\uac04\uc744 \uc904\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc2b9\uc778\ub41c \uc790\uc6d0\uc5d0 \ubd80\ud558\uac00 \ubab0\ub9ac\uba74 \ub0a9\uae30\uc5d0 \ubbf8\uce58\ub294 \uc601\ud5a5\uc774 \uc77c\uc815\uc5d0 \ub4dc\ub7ec\ub0a9\ub2c8\ub2e4. \ube48 \uae30\uacc4\ub77c\uba74 \uc5b4\ub514\ub4e0 \uc791\uc5c5\uc744 \ub9e1\uae38 \uc218 \uc788\ub2e4\uace0 \uac00\uc815\ud558\ub294 \ub300\uc2e0, \uc6b0\uc120\uc21c\uc704\ub97c \ubc14\uafb8\uac70\ub098 \uc801\uaca9 \uc790\uc6d0\uc758 \uc791\uc5c5 \uc2dc\uac04\uc744 \ub298\ub9ac\ub294 \ubc29\uc548\uc744 \uac80\ud1a0\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud1b5\uacc4\uc801 \ud3c9\uac00\ub294 \ud488\uc9c8 \uad00\ub9ac \uc808\ucc28 \uc548\uc5d0\uc11c \uc218\ud589\ud558\uc138\uc694. \uc5ec\uae30\uc11c SkyPlanner\uc758 \uc5ed\ud560\uc740 \uc0ac\uc6a9\uc790\uac00 \uad00\ub9ac\ud558\ub294 \uc2b9\uc778\ub41c \uacf5\uc815 \uc21c\uc11c \uc815\ubcf4\ub97c \ud65c\uc6a9\ud574 \uc77c\uc815\uc744 \uc218\ub9bd\ud558\ub294 \uac83\uc785\ub2c8\ub2e4. Cpk \uac12\uc73c\ub85c \uc801\uaca9\uc131\uc744 \ucd94\ub860\ud558\uac70\ub098 \uc2b9\uc778 \uc0c1\ud0dc\ub97c \uc790\ub3d9\uc73c\ub85c \uac31\uc2e0\ud558\ub294 \uac83\uc774 \uc544\ub2d9\ub2c8\ub2e4. \ud488\uc9c8 \ubd80\uc11c\uac00 \ub2e4\ub978 \uc790\uc6d0\uc744 \uc2b9\uc778\ud558\uba74 \uc0ac\uc6a9 \uac00\ub2a5\ud55c \uc790\uc6d0\uc774 \uacf5\uc815 \uc21c\uc11c\uc5d0 \ubc18\uc601\ub418\ub3c4\ub85d \uc815\ubcf4\ub97c \uac31\uc2e0\ud558\uace0, \ucd94\uac00\ub41c \uc0dd\uc0b0 \ub2a5\ub825\uc744 \uc77c\uc815\uc5d0 \ubc18\uc601\ud558\uc138\uc694.<\/p>\n\n\n<p><strong>Claude, ChatGPT \ub610\ub294 Microsoft Copilot<\/strong>\ucc98\ub7fc \uc0ac\uc6a9 \uc911\uc778 \uc778\uacf5\uc9c0\ub2a5 \uc5b4\uc2dc\uc2a4\ud134\ud2b8\ub97c \ud1b5\ud574\uc11c\ub3c4 \uc791\uc5c5\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc5b4\uc2dc\uc2a4\ud134\ud2b8\uc640 SkyPlanner\ub97c \uc787\ub294 MCP\ub85c \uc5f0\uacb0\ud558\uba74 \ub429\ub2c8\ub2e4. \uc774\ubc88 \uc8fc\uc5d0 \ud2b9\uc815 \uc2b9\uc778 \uc791\uc5c5\uc7a5\uc744 \ub450\uace0 \uc5b4\ub5a4 \uc624\ub354\ub4e4\uc774 \uacbd\ud569\ud558\ub294\uc9c0 \ub4f1 \ud30c\uc545\ud558\uace0 \uc2f6\uc740 \ub0b4\uc6a9\uc744 \uc694\uccad\ud558\uc138\uc694. \uc5b4\uc2dc\uc2a4\ud134\ud2b8\ub294 SkyPlanner \ub370\uc774\ud130\uc640 \uc81c\ud488 \uc9c0\uc2dd\uc744 \uacb0\ud569\ud574 \ub300\uae30 \uc791\uc5c5\uc744 \uc0b4\ud3b4\ubcf4\uace0 \ud5c8\uc6a9\ub41c \uc2a4\ucf00\uc904\ub9c1 \uae30\ub2a5\uc744 \uc0ac\uc6a9\ud558\ub3c4\ub85d \ub3c4\uc6b8 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc0dd\uc0b0 \uc6b0\uc120\uc21c\uc704\uc5d0 \ub300\ud55c \ud1b5\uc81c\uad8c\uc740 \uc720\uc9c0\ud558\uba74\uc11c \ud544\uc694\ud55c \uc815\ubcf4\ub97c \ucc3e\ub294 \uc218\uace0\ub97c \uc904\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>SkyPlanner\ub294 \uac1c\ubc29\ud615 REST API\ub97c \ud1b5\ud574 \ubaa8\ub4e0 ERP \ub610\ub294 MES\uc640 \uc5f0\ub3d9\ub429\ub2c8\ub2e4. \uae30\uc874 \uc2dc\uc2a4\ud15c\uc744 \uadf8\ub300\ub85c \uc720\uc9c0\ud558\uba74\uc11c \uc2a4\ucf00\uc904\ub9c1\uc5d0 \ud544\uc694\ud55c \uc624\ub354 \ubc0f \uc0dd\uc0b0 \ub370\uc774\ud130\ub97c \uc5f0\uacb0\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uc790\uc6d0 \ubc30\uc815\uc744 \uac1c\uc120\ud55c \uc2e4\uc81c \uc0ac\ub840<\/h3>\n\n\n<p><a href=\"\/ko\/%ea%b3%a0%ea%b0%9d-%ec%82%ac%eb%a1%80\/kjh-comp\/\">\ud310\uae08 \uc704\ud0c1 \uc81c\uc870\uc5c5\uccb4 KJH-Comp<\/a>\ub294 ERP\uc640 \uc2a4\ud504\ub808\ub4dc\uc2dc\ud2b8\ub85c \ub300\ub7b5\uc801\uc778 \uc8fc\uac04 \ubd80\ud558\ub294 \ud30c\uc545\ud588\uc9c0\ub9cc, \uc77c \ub2e8\uc704\ub85c \uae30\uacc4\uc5d0 \uc791\uc5c5\uc744 \ubc30\uc815\ud558\ub294 \uc77c\uc740 \uc5ec\uc804\ud788 \uc218\uc791\uc5c5\uc73c\ub85c \ucc98\ub9ac\ud588\uc2b5\ub2c8\ub2e4. \uc774 \ud68c\uc0ac\ub294 C9000 ERP\ub97c \uc720\uc9c0\ud558\uba74\uc11c \uc720\ud55c \uc6a9\ub7c9 \uc2a4\ucf00\uc904\ub9c1\uc744 \uc704\ud574 SkyPlanner\ub97c \ub3c4\uc785\ud588\uc2b5\ub2c8\ub2e4. \ud574\ub2f9 \uace0\uac1d \uc0ac\ub840\uc5d0\uc11c\ub294 \uae30\uacc4 \uc790\ub3d9 \ubc30\uc815\uacfc \ud568\uaed8, \ud2b9\uc815 \uc808\uace1\uae30\uc758 \uc0dd\uc0b0 \ub2a5\ub825\uc744 \uc791\uc5c5\ub7c9\uc774 \ucd08\uacfc\ud558\ub294 \uc0c1\ud669\uc744 \ub354 \uc77c\ucc0d \ud30c\uc545\ud558\uac8c \ub41c \uacbd\ud5d8\uc744 \uc18c\uac1c\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774 \uc0ac\ub840\ub294 \uc2a4\ucf00\uc904\ub9c1\uc758 \uc774\uc810\uc744 \ubcf4\uc5ec \uc90d\ub2c8\ub2e4. \uc8fc\uac04 \ud569\uacc4\uc5d0 \ubb3b\ud788\ub358 \uac1c\ubcc4 \uc790\uc6d0\uacfc \ub0a9\ud488 \uac00\ub2a5 \uc2dc\uc810\uc744 \ud655\uc778\ud560 \uc218 \uc788\uac8c \ub41c \uac83\uc785\ub2c8\ub2e4. KJH-Comp\uc758 Cp\/Cpk \uacb0\uacfc\uc5d0 \uad00\ud55c \uc8fc\uc7a5\uc740 \uc544\ub2d9\ub2c8\ub2e4. \uacf5\uc815\ub2a5\ub825\uc5d0 \ub530\ub77c \uc0ac\uc6a9\ud560 \uc218 \uc788\ub294 \uc790\uc6d0\uc774 \uc81c\ud55c\ub41c \uacf5\uc815 \uc21c\uc11c\uc5d0\uc11c\ub3c4 \ud575\uc2ec \uc9c8\ubb38\uc740 \uac19\uc2b5\ub2c8\ub2e4. \ud5c8\uc6a9\ub41c \uc790\uc6d0\uc5d0\uc11c \uc791\uc5c5\uc744 \uc5b8\uc81c \uc644\ub8cc\ud560 \uc218 \uc788\uc744\uae4c\uc694?<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc2b9\uc778\ub41c \uacf5\uc815 \uc21c\uc11c\ub85c \uacc4\ud68d \uac80\uc99d\ud558\uae30<\/h2>\n\n\n<p>Cp\uc640 Cpk\ub85c \uacf5\ucc28, \uc0b0\ud3ec, \ud3c9\uade0 \uc704\uce58\uc758 \uad00\uacc4\ub97c \ud30c\uc545\ud558\uc138\uc694. \uc801\uc808\ud558\uac8c \uc124\uacc4\ub41c \ubd84\uc11d\uc744 \ud1b5\ud574 \uadf8 \uadfc\uac70\uac00 \uc0dd\uc0b0\uc5d0 \uc5b4\ub5a4 \uc758\ubbf8\ub97c \uac16\ub294\uc9c0 \ud310\ub2e8\ud558\uc138\uc694. \uadf8\ub7f0 \ub2e4\uc74c \uc2b9\uc778\ub41c \uacf5\uc815 \uc21c\uc11c\ub97c \ub2f4\ub2f9\uc790\uac00 \uae30\uc5b5\ud574\uc57c \ud558\ub294 \uba54\ubaa8\ub85c \ub0a8\uaca8 \ub450\uc9c0 \ub9d0\uace0, \uc77c\uc815 \uc218\ub9bd \uc2dc \uc2e4\uc81c\ub85c \uc801\uc6a9\ub418\ub294 \uc81c\uc57d\uc73c\ub85c \ubc18\uc601\ud558\uc138\uc694.<\/p>\n\n\n<p>\uc2b9\uc778\ub41c \uacf5\uc815 \uc21c\uc11c \ud558\ub098\uc640 \ud574\ub2f9 \uc791\uc5c5\uc774 \uac00\ub2a5\ud55c \uc791\uc5c5\uc7a5, \ud604\uc7ac \uc624\ub354 \ubd80\ud558\ub97c \uc900\ube44\ud574 <a href=\"https:\/\/skyplanner.ai\/ko\/%ec%98%81%ec%97%85%ed%8c%80%ec%97%90-%eb%ac%b8%ec%9d%98\/\">SkyPlanner \ub370\ubaa8\ub97c \uc608\uc57d\ud558\uc138\uc694<\/a>. \uc791\uc5c5\uc744 \uc77c\uc815\uc5d0 \uc5b4\ub5bb\uac8c \ubc30\uce58\ud560 \uc218 \uc788\ub294\uc9c0, \uc57d\uc18d\ud55c \ub0a9\uae30 \uc911 \uc8fc\uc758\uac00 \ud544\uc694\ud55c \uac83\uc740 \ubb34\uc5c7\uc778\uc9c0 \ud655\uc778\ud574 \ubcf4\uc138\uc694. \uba3c\uc800 \uc9c1\uc811 \uc0b4\ud3b4\ubcf4\uace0 \uc2f6\ub2e4\uba74 <a href=\"https:\/\/skyplanner.ai\/ko\/%ed%8f%89%ea%b0%80%ed%8c%90\/\">\ub370\ubaa8 \ub370\uc774\ud130\ub85c SkyPlanner\ub97c \uccb4\ud5d8\ud558\uac70\ub098<\/a> SkyPlanner \uc5b4\uc2dc\uc2a4\ud134\ud2b8\uc5d0\uc11c \uc778\uacf5\uc9c0\ub2a5\uc774 \uc9c0\uc6d0\ud558\ub294 \u2018\uc2dc\uc791\ud558\uae30\u2019 \uae30\ub2a5\uc744 \uc774\uc6a9\ud574 \ubcf4\uc138\uc694.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\uacf5\uc815\ub2a5\ub825: Cp\uc640 Cpk \uacc4\uc0b0\uc5d0\uc11c \uac1c\uc120 \uc870\uce58\uae4c\uc9c0 \ud648 &raquo; \ub9ac\uc18c\uc2a4 &raquo; \uacf5\uc815\ub2a5\ub825: Cp\uc640 Cpk \uacc4\uc0b0\uc5d0\uc11c \uac1c\uc120 \uc870\uce58\uae4c\uc9c0 \uacf5\uc815\ub2a5\ub825\uc740 \uc548\uc815\ub41c \uc81c\uc870 \uacf5\uc815\uc774 \uad6c\uba4d \uc9c0\ub984\uc774\ub098 \ucda9\uc804 \uc911\ub7c9\uacfc \uac19\uc740 \uaddc\uc815\ub41c \uc694\uad6c\uc0ac\ud56d\uc744 \uc5bc\ub9c8\ub098 \uc798 \ucda9\uc871\ud560 \uc218 \uc788\ub294\uc9c0\ub97c \ub098\ud0c0\ub0c5\ub2c8\ub2e4. \uacf5\uc815\uc758 \uc790\uc5f0 \ubcc0\ub3d9\uc744 \uaddc\uaca9 \ud55c\uacc4\uc640 \ube44\uad50\ud558\ub294 \uac1c\ub150\uc785\ub2c8\ub2e4. Cp\ub294 \uacf5\uc815\uc758 \uc0b0\ud3ec\uac00 \uacf5\ucc28 \ubc94\uc704 \uc548\uc5d0 \uc5bc\ub9c8\ub098 \uc5ec\uc720 \uc788\uac8c \ub4e4\uc5b4\uac00\ub294\uc9c0\ub97c \ub098\ud0c0\ub0b4\uba70, Cpk\ub294 \uacf5\uc815 \ud3c9\uade0\uc758 \uc704\uce58\uae4c\uc9c0 &#8230; <a title=\"\uacf5\uc815\ub2a5\ub825: Cp\uc640 Cpk \uacc4\uc0b0\uc5d0\uc11c \uac1c\uc120 \uc870\uce58\uae4c\uc9c0\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/process-capability\/\" aria-label=\"Read more about \uacf5\uc815\ub2a5\ub825: Cp\uc640 Cpk \uacc4\uc0b0\uc5d0\uc11c \uac1c\uc120 \uc870\uce58\uae4c\uc9c0\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":113007,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2530,496],"tags":[],"class_list":["post-112998","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps--","category-496","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\uacf5\uc815\ub2a5\ub825: Cp\uc640 Cpk \uacc4\uc0b0\uc5d0\uc11c \uac1c\uc120 \uc870\uce58\uae4c\uc9c0<\/title>\n<meta name=\"description\" content=\"\ub192\uc740 Cp\ub3c4 \uacf5\uc815 \uce58\uc6b0\uce68\uc744 \uac00\ub9b4 \uc218 \uc788\uc2b5\ub2c8\ub2e4. Cp\u00b7Cpk \uacc4\uc0b0\uacfc \ud3c9\uac00 \ud0c0\ub2f9\uc131 \ud655\uc778 \ud6c4, \ud574\ub2f9 \uc791\uc5c5\uc5d0 \uc2b9\uc778\ub41c \uc790\uc6d0\uc73c\ub85c \uc0dd\uc0b0\uc744 \uacc4\ud68d\ud558\uc138\uc694.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/process-capability\/\" \/>\n<meta property=\"og:locale\" content=\"ko_KR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\uacf5\uc815\ub2a5\ub825: Cp\uc640 Cpk \uacc4\uc0b0\uc5d0\uc11c \uac1c\uc120 \uc870\uce58\uae4c\uc9c0\" \/>\n<meta property=\"og:description\" content=\"\ub192\uc740 Cp\ub3c4 \uacf5\uc815 \uce58\uc6b0\uce68\uc744 \uac00\ub9b4 \uc218 \uc788\uc2b5\ub2c8\ub2e4. Cp\u00b7Cpk \uacc4\uc0b0\uacfc \ud3c9\uac00 \ud0c0\ub2f9\uc131 \ud655\uc778 \ud6c4, \ud574\ub2f9 \uc791\uc5c5\uc5d0 \uc2b9\uc778\ub41c \uc790\uc6d0\uc73c\ub85c \uc0dd\uc0b0\uc744 \uacc4\ud68d\ud558\uc138\uc694.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/process-capability\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-29T23:03:54+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-29T23:06:06+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/process-capability-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\uae00\uc4f4\uc774\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"\uc608\uc0c1 \ub418\ub294 \ud310\ub3c5 \uc2dc\uac04\" \/>\n\t<meta name=\"twitter:data2\" content=\"1\ubd84\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/process-capability\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/process-capability\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"\uacf5\uc815\ub2a5\ub825: Cp\uc640 Cpk \uacc4\uc0b0\uc5d0\uc11c \uac1c\uc120 \uc870\uce58\uae4c\uc9c0\",\"datePublished\":\"2026-10-29T23:03:54+00:00\",\"dateModified\":\"2026-10-29T23:06:06+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/process-capability\\\/\"},\"wordCount\":122,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/process-capability\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/process-capability-hero.png\",\"articleSection\":[\"APS \ubc0f \uc2a4\ucf00\uc904\ub9c1\",\"\ub9ac\uc18c\uc2a4\"],\"inLanguage\":\"ko-KR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/process-capability\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/process-capability\\\/\",\"name\":\"\uacf5\uc815\ub2a5\ub825: Cp\uc640 Cpk \uacc4\uc0b0\uc5d0\uc11c \uac1c\uc120 \uc870\uce58\uae4c\uc9c0\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/process-capability\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/process-capability\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/process-capability-hero.png\",\"datePublished\":\"2026-10-29T23:03:54+00:00\",\"dateModified\":\"2026-10-29T23:06:06+00:00\",\"description\":\"\ub192\uc740 Cp\ub3c4 \uacf5\uc815 \uce58\uc6b0\uce68\uc744 \uac00\ub9b4 \uc218 \uc788\uc2b5\ub2c8\ub2e4. Cp\u00b7Cpk \uacc4\uc0b0\uacfc \ud3c9\uac00 \ud0c0\ub2f9\uc131 \ud655\uc778 \ud6c4, \ud574\ub2f9 \uc791\uc5c5\uc5d0 \uc2b9\uc778\ub41c \uc790\uc6d0\uc73c\ub85c \uc0dd\uc0b0\uc744 \uacc4\ud68d\ud558\uc138\uc694.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/process-capability\\\/#breadcrumb\"},\"inLanguage\":\"ko-KR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/process-capability\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/process-capability\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/process-capability-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/process-capability-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Bored sleeve in a fixture, with parts routed to one machining centre and a separate alternative machine.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/process-capability\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\uacf5\uc815\ub2a5\ub825: Cp\uc640 Cpk \uacc4\uc0b0\uc5d0\uc11c \uac1c\uc120 \uc870\uce58\uae4c\uc9c0\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ko-KR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\uacf5\uc815\ub2a5\ub825: Cp\uc640 Cpk \uacc4\uc0b0\uc5d0\uc11c \uac1c\uc120 \uc870\uce58\uae4c\uc9c0","description":"\ub192\uc740 Cp\ub3c4 \uacf5\uc815 \uce58\uc6b0\uce68\uc744 \uac00\ub9b4 \uc218 \uc788\uc2b5\ub2c8\ub2e4. Cp\u00b7Cpk \uacc4\uc0b0\uacfc \ud3c9\uac00 \ud0c0\ub2f9\uc131 \ud655\uc778 \ud6c4, \ud574\ub2f9 \uc791\uc5c5\uc5d0 \uc2b9\uc778\ub41c \uc790\uc6d0\uc73c\ub85c \uc0dd\uc0b0\uc744 \uacc4\ud68d\ud558\uc138\uc694.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/process-capability\/","og_locale":"ko_KR","og_type":"article","og_title":"\uacf5\uc815\ub2a5\ub825: Cp\uc640 Cpk \uacc4\uc0b0\uc5d0\uc11c \uac1c\uc120 \uc870\uce58\uae4c\uc9c0","og_description":"\ub192\uc740 Cp\ub3c4 \uacf5\uc815 \uce58\uc6b0\uce68\uc744 \uac00\ub9b4 \uc218 \uc788\uc2b5\ub2c8\ub2e4. Cp\u00b7Cpk \uacc4\uc0b0\uacfc \ud3c9\uac00 \ud0c0\ub2f9\uc131 \ud655\uc778 \ud6c4, \ud574\ub2f9 \uc791\uc5c5\uc5d0 \uc2b9\uc778\ub41c \uc790\uc6d0\uc73c\ub85c \uc0dd\uc0b0\uc744 \uacc4\ud68d\ud558\uc138\uc694.","og_url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/process-capability\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-29T23:03:54+00:00","article_modified_time":"2026-10-29T23:06:06+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/process-capability-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"\uae00\uc4f4\uc774":"Jussi M\u00e4ntyl\u00e4","\uc608\uc0c1 \ub418\ub294 \ud310\ub3c5 \uc2dc\uac04":"1\ubd84"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/process-capability\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/process-capability\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"\uacf5\uc815\ub2a5\ub825: Cp\uc640 Cpk \uacc4\uc0b0\uc5d0\uc11c \uac1c\uc120 \uc870\uce58\uae4c\uc9c0","datePublished":"2026-10-29T23:03:54+00:00","dateModified":"2026-10-29T23:06:06+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/process-capability\/"},"wordCount":122,"publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/process-capability\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/process-capability-hero.png","articleSection":["APS \ubc0f \uc2a4\ucf00\uc904\ub9c1","\ub9ac\uc18c\uc2a4"],"inLanguage":"ko-KR"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/process-capability\/","url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/process-capability\/","name":"\uacf5\uc815\ub2a5\ub825: Cp\uc640 Cpk \uacc4\uc0b0\uc5d0\uc11c \uac1c\uc120 \uc870\uce58\uae4c\uc9c0","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/process-capability\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/process-capability\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/process-capability-hero.png","datePublished":"2026-10-29T23:03:54+00:00","dateModified":"2026-10-29T23:06:06+00:00","description":"\ub192\uc740 Cp\ub3c4 \uacf5\uc815 \uce58\uc6b0\uce68\uc744 \uac00\ub9b4 \uc218 \uc788\uc2b5\ub2c8\ub2e4. Cp\u00b7Cpk \uacc4\uc0b0\uacfc \ud3c9\uac00 \ud0c0\ub2f9\uc131 \ud655\uc778 \ud6c4, \ud574\ub2f9 \uc791\uc5c5\uc5d0 \uc2b9\uc778\ub41c \uc790\uc6d0\uc73c\ub85c \uc0dd\uc0b0\uc744 \uacc4\ud68d\ud558\uc138\uc694.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/process-capability\/#breadcrumb"},"inLanguage":"ko-KR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/process-capability\/"]}]},{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/process-capability\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/process-capability-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/process-capability-hero.png","width":1672,"height":941,"caption":"Bored sleeve in a fixture, with parts routed to one machining centre and a separate alternative machine."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/process-capability\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ko\/"},{"@type":"ListItem","position":2,"name":"\uacf5\uc815\ub2a5\ub825: Cp\uc640 Cpk \uacc4\uc0b0\uc5d0\uc11c \uac1c\uc120 \uc870\uce58\uae4c\uc9c0"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ko\/#website","url":"https:\/\/skyplanner.ai\/ko\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ko\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ko-KR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ko\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ko\/","logo":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/process-capability-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/process-capability-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/process-capability-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/process-capability-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/process-capability-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/process-capability-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/process-capability-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/process-capability-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ko\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\uacf5\uc815\ub2a5\ub825: Cp\uc640 Cpk \uacc4\uc0b0\uc5d0\uc11c \uac1c\uc120 \uc870\uce58\uae4c\uc9c0 \ud648 &raquo; \ub9ac\uc18c\uc2a4 &raquo; \uacf5\uc815\ub2a5\ub825: Cp\uc640 Cpk \uacc4\uc0b0\uc5d0\uc11c \uac1c\uc120 \uc870\uce58\uae4c\uc9c0 \uacf5\uc815\ub2a5\ub825\uc740 \uc548\uc815\ub41c \uc81c\uc870 \uacf5\uc815\uc774 \uad6c\uba4d \uc9c0\ub984\uc774\ub098 \ucda9\uc804 \uc911\ub7c9\uacfc \uac19\uc740 \uaddc\uc815\ub41c \uc694\uad6c\uc0ac\ud56d\uc744 \uc5bc\ub9c8\ub098 \uc798 \ucda9\uc871\ud560 \uc218 \uc788\ub294\uc9c0\ub97c \ub098\ud0c0\ub0c5\ub2c8\ub2e4. \uacf5\uc815\uc758 \uc790\uc5f0 \ubcc0\ub3d9\uc744 \uaddc\uaca9 \ud55c\uacc4\uc640 \ube44\uad50\ud558\ub294 \uac1c\ub150\uc785\ub2c8\ub2e4. Cp\ub294 \uacf5\uc815\uc758 \uc0b0\ud3ec\uac00 \uacf5\ucc28 \ubc94\uc704 \uc548\uc5d0 \uc5bc\ub9c8\ub098 \uc5ec\uc720 \uc788\uac8c \ub4e4\uc5b4\uac00\ub294\uc9c0\ub97c \ub098\ud0c0\ub0b4\uba70, Cpk\ub294 \uacf5\uc815 \ud3c9\uade0\uc758 \uc704\uce58\uae4c\uc9c0&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/112998","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/comments?post=112998"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/112998\/revisions"}],"predecessor-version":[{"id":113060,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/112998\/revisions\/113060"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media\/113007"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media?parent=112998"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/categories?post=112998"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/tags?post=112998"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}