{"id":111838,"date":"2026-10-28T17:16:38","date_gmt":"2026-10-28T17:16:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=111838"},"modified":"2026-10-28T17:18:53","modified_gmt":"2026-10-28T17:18:53","slug":"inventory-aging-manufacturing","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/inventory-aging-manufacturing\/","title":{"rendered":"\uc7ac\uace0 \uc5f0\ub839 \ubd84\uc11d: \uc624\ub798\ub41c \uc7ac\uace0\ub97c \uc0dd\uc0b0 \uacc4\ud68d\uc5d0 \ubc18\uc601\ud558\ub294 \ubc29\ubc95"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">\uc7ac\uace0 \uc5f0\ub839 \ubd84\uc11d: \uc624\ub798\ub41c \uc7ac\uace0\ub97c \uc0dd\uc0b0 \uacc4\ud68d\uc5d0 \ubc18\uc601\ud558\ub294 \ubc29\ubc95<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/ko\/\">\ud648<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/\">\ub9ac\uc18c\uc2a4<\/a> &raquo; \uc7ac\uace0 \uc5f0\ub839 \ubd84\uc11d: \uc624\ub798\ub41c \uc7ac\uace0\ub97c \uc0dd\uc0b0 \uacc4\ud68d\uc5d0 \ubc18\uc601\ud558\ub294 \ubc29\ubc95<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">\uc608\uc0c1 \uc77d\uae30 \uc2dc\uac04: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> \ubd84<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>\uba87 \ub2ec\uc9f8 \ucc3d\uace0\uc5d0 \ub193\uc778 \ud314\ub808\ud2b8\uac00 \uc788\uc2b5\ub2c8\ub2e4. \uad6c\ub9e4 \ubd80\uc11c\uc5d0\ub294 \uc790\uae08\uc774 \ubb36\uc5ec \uc788\ub294 \uc790\uc7ac\ub85c, \uc0dd\uc0b0 \ubd80\uc11c\uc5d0\ub294 \ucd94\uac00 \uad6c\ub9e4\ub97c \ud53c\ud560 \uae30\ud68c\ub85c \ubcf4\uc785\ub2c8\ub2e4. \ud488\uc9c8 \ubd80\uc11c\ub294 \uc544\uc9c1 \uc774 \uc790\uc7ac\ub97c \uc0ac\uc6a9\ud560 \uc218 \uc788\ub294\uc9c0 \ud655\uc778\ud574\uc57c \ud569\ub2c8\ub2e4. \uc815\uc791 \uc774 \uc790\uc7ac\ub97c \ud22c\uc785\ud560 \uc124\ube44\ub294 \uace0\uac1d \uc8fc\ubb38\uc744 \ucc98\ub9ac\ud558\ub290\ub77c \ubc14\uc069\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc7ac\uace0 \uc5f0\ub839 \ubd84\uc11d \ubcf4\uace0\uc11c\ub294 \uc774\ub7f0 \ud314\ub808\ud2b8\ub97c \ucc3e\uc544\ub0b4\ub294 \ub370 \ub3c4\uc6c0\uc774 \ub429\ub2c8\ub2e4. \ud558\uc9c0\ub9cc \uc2e4\uc81c \uac00\uce58\ub294 \ucc98\ub9ac \ubc29\uc548\uc744 \uc815\ud558\uace0 \uc2e4\ud589\uc5d0 \uc62e\uae38 \ub54c \uc0dd\uae41\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc81c\uc870\uc5c5\uc758 \ubaa9\ud45c\ub294 \ub2e8\uc21c\ud788 \uac00\uc7a5 \uc624\ub798\ub41c \uc7ac\uace0\ub97c \uc5c6\uc560\ub294 \uac83\uc774 \uc544\ub2d9\ub2c8\ub2e4. \uc801\ud569\ud55c \uc790\uc7ac\ub97c \uc2e4\uc81c \uc218\uc694\uc5d0 \ub9de\ucdb0 \uc0ac\uc6a9\ud558\uba74\uc11c \ub0a9\uae30\ub97c \uc9c0\ud0a4\uace0, \uac19\uc740 \uc789\uc5ec \uc7ac\uace0\uac00 \ub2e4\uc2dc \uc0dd\uae30\uc9c0 \uc54a\ub3c4\ub85d \ud558\ub294 \uac83\uc785\ub2c8\ub2e4. SkyPlanner APS\ub294 \uadf8 \uc2e4\ud589\uc744 \ub3d5\uc2b5\ub2c8\ub2e4. \uc0ac\uc6a9\uc774 \uc2b9\uc778\ub41c \uc790\uc7ac\ub97c \ud22c\uc785\ud558\ub294 \uc791\uc5c5\uc744, \ud55c\uc815\ub41c \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ud568\uaed8 \uc0ac\uc6a9\ud558\ub294 \ub2e4\ub978 \uc8fc\ubb38\ub4e4\uacfc \ub098\ub780\ud788 \uc0dd\uc0b0 \uc77c\uc815\uc5d0 \ubc18\uc601\ud569\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc7ac\uace0 \uc5f0\ub839 \ubd84\uc11d\uc774\ub780?<\/h2>\n\n\n<p><strong>\uc7ac\uace0 \uc5f0\ub839 \ubd84\uc11d\uc740 \ud604\uc7ac \ub0a8\uc544 \uc788\ub294 \uc7ac\uace0\uac00 \uc5bc\ub9c8\ub098 \uc624\ub798 \ubcf4\uc720\ub418\uc5c8\ub294\uc9c0, \ud569\uc758\ub41c \uae30\uc0b0\uc77c\uacfc \uacbd\uacfc \uae30\uac04 \uad6c\uac04\uc5d0 \ub530\ub77c \ub098\ub204\uc5b4 \uc0b4\ud3b4\ubcf4\ub294 \uac83\uc785\ub2c8\ub2e4.<\/strong> \uc785\uace0\uc77c \uae30\uc900 \ubd84\uc11d\uc5d0\uc11c\ub294 \ud604\uc7ac \uc7ac\uace0\ub85c \ub0a8\uc544 \uc788\ub294 \uc218\ub7c9\uc5d0 \ub300\ud574 \uc790\uc7ac \uc785\uace0\uc77c\ubd80\ud130 \ubcf4\uace0\uc11c \uae30\uc900\uc77c\uae4c\uc9c0\uc758 \uae30\uac04\uc744 \uacc4\uc0b0\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc7ac\uace0 \uc5f0\ub839 \ubd84\uc11d \ubcf4\uace0\uc11c\ub294 \uc774\ub7ec\ud55c \ubd84\ud3ec\ub97c \ubcf4\uc5ec \uc90d\ub2c8\ub2e4. \ubd80\ud488 \uc7ac\uace0\uac00 600\uac1c\ub77c\ub294 \ucd1d\ub7c9\ub9cc \ud45c\uc2dc\ud558\ub294 \uac83\uc774 \uc544\ub2c8\ub77c, \uadf8\uc911 \uc5bc\ub9c8\uac00 \uacfc\uac70 \uc785\uace0\ubd84\uc774\uace0 \uc5bc\ub9c8\uac00 \ucd5c\uadfc \uc785\uace0\ubd84\uc778\uc9c0 \ubcf4\uc5ec \uc90d\ub2c8\ub2e4. \ub530\ub77c\uc11c \ucd94\uac00 \uad6c\ub9e4\ub098 \uc0dd\uc0b0\uc5d0 \uc55e\uc11c \uac80\ud1a0\ud574\uc57c \ud560 \uc790\uc7ac\ub97c \ucc3e\uc544\ub0bc \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ubcf4\uace0\uc11c\ub97c \ud574\uc11d\ud558\uae30 \uc804\uc5d0 \uae30\uac04\uc744 \uacc4\uc0b0\ud558\ub294 \uae30\uc900\ubd80\ud130 \ud569\uc758\ud574\uc57c \ud569\ub2c8\ub2e4. \uc77c\ubd80 \ubcf4\uace0\uc11c\ub294 \uc785\uace0\ubd84\ubcc4 \uc794\uc5ec \uc218\ub7c9\uc758 \ubcf4\uc720 \uae30\uac04\uc774 \uc544\ub2c8\ub77c \ub9c8\uc9c0\ub9c9 \uc7ac\uace0 \uc774\ub3d9 \uc774\ud6c4\uc758 \uae30\uac04\uc744 \uce21\uc815\ud569\ub2c8\ub2e4. \ub458 \ub2e4 \uc720\uc6a9\ud560 \uc218 \uc788\uc9c0\ub9cc, \ub2f5\ud558\ub294 \uc9c8\ubb38\uc740 \ub2e4\ub985\ub2c8\ub2e4. \ub9e4\uc8fc \uc0ac\uc6a9\ud558\ub294 \ubd80\ud488\uc774\ub77c\ub3c4 \uacfc\uac70 \uc785\uace0\ubd84\uc758 \uc77c\ubd80\ub294 \uc190\ub300\uc9c0 \uc54a\uc740 \ucc44 \ub0a8\uc544 \uc788\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc7ac\uace0 \uc5f0\ub839\uc740 \ub2e4\uc74c \uac1c\ub150\uacfc\ub3c4 \ub2e4\ub985\ub2c8\ub2e4.<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>\uc0ac\uc6a9 \uac00\ub2a5 \uae30\uac04:<\/strong> \uc9c0\uc815\ub41c \uc870\uac74\uc5d0\uc11c \uc790\uc7ac\uac00 \uc801\ud569\ud55c \uc0c1\ud0dc\ub97c \uc720\uc9c0\ud558\ub294 \uae30\uac04\uc785\ub2c8\ub2e4. \uc720\ud6a8\uae30\ud55c\uc740 \uc785\uace0\uc77c\uc774 \uc544\ub2c8\ub77c \uc81c\uc870\uc77c, \uac1c\ubd09\uc77c \ub610\ub294 \ub2e4\ub978 \uc2dc\uc810\uc744 \uae30\uc900\uc73c\ub85c \uc815\ud574\uc9c8 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/li><li><strong>\uc800\ud68c\uc804:<\/strong> \uc77c\uc815 \uae30\uac04 \ub3d9\uc548 \uc0ac\uc6a9\uc774\ub098 \ucd9c\uace0\uac00 \uc801\uc740 \uc0c1\ud0dc\uc785\ub2c8\ub2e4. \ucd5c\uadfc \uc785\uace0\ub41c \uc790\uc7ac\ub3c4 \uc774\ubbf8 \uacc4\ud68d\ubcf4\ub2e4 \ub354\ub514\uac8c \uc0ac\uc6a9\ub418\uace0 \uc788\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/li><li><strong>\uacfc\uc789 \uc7ac\uace0:<\/strong> \uc218\uc694\uc640 \ubcf4\ucda9 \uc815\ucc45\uc5d0 \ub530\ub978 \ud544\uc694\ub7c9\ubcf4\ub2e4 \ub9ce\uc740 \uc7ac\uace0\uc785\ub2c8\ub2e4. \ucd5c\uadfc \uc785\uace0\ubd84\uc77c \uc218\ub3c4, \uc624\ub798\ub41c \uc785\uace0\ubd84\uc77c \uc218\ub3c4 \uc788\uc2b5\ub2c8\ub2e4.<\/li><li><strong>\uc9c4\ubd80\ud654:<\/strong> \uc124\uacc4 \ubcc0\uacbd \ub4f1\uc758 \uc774\uc720\ub85c \ub354 \uc774\uc0c1 \ub2f9\ucd08 \uc6a9\ub3c4\uc5d0 \uc801\ud569\ud558\uac8c \uc0ac\uc6a9\ud560 \uc218 \uc5c6\uac8c \ub41c \uc7ac\uace0\ub97c \ub73b\ud569\ub2c8\ub2e4. \uc624\ub798\ub418\uc5c8\ub2e4\ub294 \uc0ac\uc2e4\ub9cc\uc73c\ub85c \uc9c4\ubd80\ud654\ub418\uc5c8\ub2e4\uace0 \ud310\ub2e8\ud560 \uc218\ub294 \uc5c6\uc2b5\ub2c8\ub2e4.<\/li><\/ul>\n\n\n<p>\ub530\ub77c\uc11c \ud544\uc694\ud55c \uc9c8\ubb38\uc740 \u201c\uc624\ub798\ub41c \uc7ac\uace0\uc778\uac00?\u201d\uac00 \uc544\ub2c8\ub77c \u201c\uc774 \uc790\uc7ac\uc758 \ud2b9\uc131\uacfc \uc0c1\ud0dc, \ub2e4\uc74c \uc18c\uc694\ub97c \uace0\ub824\ud560 \ub54c \uc774 \ubcf4\uc720 \uae30\uac04\uc740 \ubb34\uc5c7\uc744 \uc758\ubbf8\ud558\ub294\uac00?\u201d\uc785\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc7ac\uace0 \uc5f0\ub839 \uacc4\uc0b0 \ubc29\ubc95<\/h2>\n\n\n<p>\uc785\uace0\uc77c\uc744 \uae30\uc900\uc73c\ub85c \uac80\ud1a0\ud560 \ub54c\ub294 \ub2e4\uc74c\uacfc \uac19\uc774 \uacc4\uc0b0\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>\uc7ac\uace0 \uc5f0\ub839(\uc77c) = \ubcf4\uace0\uc11c \uae30\uc900\uc77c \u2212 \ucd5c\ucd08 \uc785\uace0\uc77c<\/strong><\/p>\n\n\n<p>\uc774 \uae30\uac04\uc740 \ucd5c\ucd08 \uc785\uace0 \uc218\ub7c9\uc774 \uc544\ub2c8\ub77c <strong>\ud574\ub2f9 \uc785\uace0\ubd84\uc5d0\uc11c \ud604\uc7ac \ub0a8\uc544 \uc788\ub294 \uc218\ub7c9<\/strong>\uc5d0 \uc801\uc6a9\ud569\ub2c8\ub2e4. \uc785\uace0\ubd84 \ub300\ubd80\ubd84\uc744 \uc774\ubbf8 \uc0ac\uc6a9\ud588\ub2e4\uba74, \uc0ac\uc6a9\ub41c \uc218\ub7c9\uc740 \uc624\ub298 \uae30\uc900\uc758 \uc7ac\uace0 \uc5f0\ub839 \ubd84\uc11d\uc5d0 \ud3ec\ud568\ud558\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uba3c\uc800 \uae30\uc900\uc77c\uc744 \ud558\ub098\ub85c \uace0\uc815\ud558\uace0 \uc0ac\uc5c5\uc7a5, \ucc3d\uace0, \ud488\ubaa9, \ud544\uc694\uc2dc \ub85c\ud2b8\ub098 \ub9ac\ube44\uc804\uae4c\uc9c0 \ubd84\uc11d \ubc94\uc704\ub97c \uc815\ud569\ub2c8\ub2e4. \uc794\uc5ec \uc218\ub7c9\uc774 \ub3d9\uc77c\ud55c \ubc94\uc704\uc640 \uae30\uc900\uc77c\uc758 \uc7ac\uace0 \uc794\ub7c9\uacfc \uc77c\uce58\ud558\ub294\uc9c0 \ud655\uc778\ud558\uc138\uc694. \uc774\ubbf8 \ucc3d\uace0\uc5d0\uc11c \ucd9c\uace0\ub41c \uc218\ub7c9\uc774 \ud3ec\ud568\ub418\uc5b4 \uc788\ub2e4\uba74, \uc544\ubb34\ub9ac \uc815\ubc00\ud574 \ubcf4\uc774\ub294 \uc7ac\uace0 \uc5f0\ub839 \uacc4\uc0b0\ub3c4 \uc4f8\ubaa8\uac00 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uc77c\ubd80 \uc0ac\uc6a9\ud558\uac70\ub098 \uc774\ub3d9\ud574\ub3c4 \ucd5c\ucd08 \uae30\uc900\uc77c \uc720\uc9c0\ud558\uae30<\/h3>\n\n\n<p>\ub85c\ud2b8\uc758 \uc77c\ubd80\ub97c \ucd9c\uace0\ud588\ub2e4\uace0 \ud574\uc11c \ub098\uba38\uc9c0 \uc7ac\uace0\uc758 \ubcf4\uc720 \uae30\uac04\uc774 \uc9e7\uc544\uc9c0\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4. \ucd5c\ucd08 \uc785\uace0 \uc774\ud6c4\uc758 \ubcf4\uc720 \uae30\uac04\uc744 \ubd84\uc11d\ud558\ub824\ub294 \ubaa9\uc801\uc774\ub77c\uba74, \uc624\ub798\ub41c \ud314\ub808\ud2b8\ub97c \ubcf4\uad00 \uc704\uce58 \uac04\uc5d0 \uc774\ub3d9\ud55c \uac83\uc744 \uc0c8\ub85c\uc6b4 \uc678\ubd80 \uc785\uace0\ub85c \ucc98\ub9ac\ud574\uc11c\ub3c4 \uc548 \ub429\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774\ub7ec\ud55c \uc774\ub3d9 \ud6c4\uc5d0\ub3c4 \ucd5c\ucd08 \uae30\uc900\uc77c\uc744 \ucd94\uc801\ud560 \uc218 \uc788\uc5b4\uc57c \ud569\ub2c8\ub2e4. \ubc18\ud488, \uc7ac\uace0 \uc870\uc815, \uae30\ucd08 \uc7ac\uace0\ub294 \uba85\ud655\ud55c \uc815\ucc45\uc5d0 \ub530\ub77c \ucc98\ub9ac\ud558\uc138\uc694. \ucd5c\ucd08 \uae30\uc900\uc77c\uc744 \uc54c \uc218 \uc5c6\ub2e4\uba74 \ud3b8\uc758\uc0c1 \ucd5c\uadfc \ub0a0\uc9dc\ub97c \ubd80\uc5ec\ud558\uc9c0 \ub9d0\uace0, \ub0a0\uc9dc\uac00 \ubd88\ud655\uc2e4\ud558\ub2e4\ub294 \uc0ac\uc2e4\uc744 \ud45c\uc2dc\ud574\uc57c \ud569\ub2c8\ub2e4. \uc790\uccb4 \uc0dd\uc0b0 \ud488\ubaa9\uc740 \uc7ac\uace0 \uc5f0\ub839\uc758 \uae30\uc900\uc73c\ub85c \uc0bc\ub294 \uc0dd\uc0b0 \uc785\uace0 \ub610\ub294 \uc0dd\uc0b0 \uc644\ub8cc \uc2dc\uc810\uc744 \uba85\uc2dc\ud558\uc138\uc694. \uc7ac\uacf5\ud488\uc758 \uacbd\uc6b0\uc5d0\ub294 \uc791\uc5c5 \ud22c\uc785 \uc774\ud6c4\uc758 \uc804\uccb4 \uacbd\uacfc \uc2dc\uac04\uc744 \uce21\uc815\ud558\ub294\uc9c0, \ud2b9\uc815 \ub2e8\uacc4\uc758 \ub300\uae30 \uc2dc\uac04\uc744 \uce21\uc815\ud558\ub294\uc9c0 \ubc1d\ud600\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\ubaa8\ub4e0 \uc2dc\uc2a4\ud15c\uc774 \uc785\uace0 \uac74\ubcc4\ub85c \uc2e4\uc81c \ub0a8\uc544 \uc788\ub294 \ubb3c\ub7c9\uc744 \uc2dd\ubcc4\ud558\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4. \uc77c\ubd80 \ubcf4\uace0\uc11c\ub294 \uc77c\uc815\ud55c \ucc28\uac10 \uac00\uc815\uc744 \uc801\uc6a9\ud574 \uc7ac\uace0 \uc794\ub7c9\uacfc \uc218\ubd88 \uc774\ub825\uc73c\ub85c \uc785\uace0 \uc2dc\uae30\ubcc4 \uc794\uc5ec \uc218\ub7c9\uc744 \uc7ac\uad6c\uc131\ud569\ub2c8\ub2e4. \uc774\ub294 \uc7ac\uace0 \uc5f0\ub839 \uac80\ud1a0\uc5d0 \ub3c4\uc6c0\uc774 \ub420 \uc218 \uc788\uc9c0\ub9cc, \ud574\ub2f9 \uc2e4\ubb3c \ub85c\ud2b8\ub97c \ud53c\ud0b9\ud560 \uc218 \uc788\ub2e4\ub294 \uc99d\uac70\ub294 \uc544\ub2d9\ub2c8\ub2e4. \ubcf4\uace0\uc11c\ub97c \uadfc\uac70\ub85c \ucc3d\uace0\uc5d0 \uc791\uc5c5\uc744 \uc9c0\uc2dc\ud558\uae30 \uc804\uc5d0 \uc0b0\ucd9c \ub85c\uc9c1\uc744 \ud655\uc778\ud558\uc138\uc694.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\ub85c\ud2b8\uc758 \uc7ac\uace0 \uc5f0\ub839\uc744 \uc7ac\uace0\ud68c\uc804\uc728\ub85c \ub300\uc2e0\ud558\uc9c0 \uc54a\uae30<\/h3>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/inventory-turnover-manufacturing\/\">\uc7ac\uace0\ud68c\uc804\uc728<\/a>\uacfc \uc7ac\uace0\uc790\uc0b0 \ud68c\uc804\uc77c\uc218\ub294 \uc77c\uc815 \uae30\uac04\uc758 \uc7ac\uace0 \uc6b4\uc601 \uc131\uacfc\ub97c \ub098\ud0c0\ub0c5\ub2c8\ub2e4. \ud604\uc7ac \ub0a8\uc544 \uc788\ub294 \ud2b9\uc815 \ubc30\uce58\uac00 \uc5b8\uc81c \uc785\uace0\ub418\uc5c8\ub294\uc9c0\ub294 \uc54c\ub824 \uc8fc\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud604\uc7a5 \uc6b4\uc601\uc744 \uc704\ud574 \ub3d9\uc77c \ud488\ubaa9\uacfc \ub3d9\uc77c \ub2e8\uc704 \ub0b4\uc5d0\uc11c \ud3c9\uade0\uc744 \uad6c\ud558\ub824\uba74 \ub2e4\uc74c\uacfc \uac19\uc774 \uacc4\uc0b0\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>\uc218\ub7c9 \uac00\uc911\ud3c9\uade0 \uc7ac\uace0 \uc5f0\ub839 = (\uc794\uc5ec \uc218\ub7c9 \u00d7 \uc7ac\uace0 \uc5f0\ub839(\uc77c))\uc758 \ud569 \u00f7 \ucd1d \uc794\uc5ec \uc218\ub7c9<\/strong><\/p>\n\n\n<p>\ud3c9\uade0\uc740 \uc694\uc57d \uc9c0\ud45c\ub85c \ud65c\uc6a9\ud558\ub418, \uc5f0\ub839 \uad6c\uac04\ubcc4 \ubd84\ud3ec\ub97c \ub300\uc2e0\ud574\uc11c\ub294 \uc548 \ub429\ub2c8\ub2e4. \uc790\uc7ac \uac04 \ub2e8\uc704\uac00 \ub2e4\ub974\uba74 \uc218\ub7c9\uc744 \ud569\uc0b0\ud558\uc9c0 \ub9c8\uc138\uc694. \uae08\uc561 \uac00\uc911\ud3c9\uade0\uc740 \ubcc4\uac1c\uc758 \uc9c0\ud45c\uc774\ubbc0\ub85c \uadf8\uc5d0 \ub9de\uac8c \ud45c\uc2dc\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc2e4\ud589\uc73c\ub85c \uc774\uc5b4\uc9c0\ub294 \uc7ac\uace0 \uc5f0\ub839 \ubd84\uc11d \ubcf4\uace0\uc11c\uc758 \ud544\uc218 \ud56d\ubaa9<\/h2>\n\n\n<p>\uc81c\uc870 \ud604\uc7a5\uc5d0\uc11c \uc720\uc6a9\ud55c \ubcf4\uace0\uc11c\ub294 \uc7ac\uace0 \uc5f0\ub839\uc744 \uc758\uc0ac\uacb0\uc815\uc73c\ub85c \uc5f0\uacb0\ud569\ub2c8\ub2e4. \ud488\ubaa9 \uc2dd\ubcc4\uc790, \uaddc\uaca9 \ub610\ub294 \ub9ac\ube44\uc804, \ubcf4\uad00 \uc704\uce58, \ub85c\ud2b8 \ub610\ub294 \uc785\uace0 \ucc38\uc870\ubc88\ud638, \uc5f0\ub839 \uae30\uc0b0\uc77c, \uc794\uc5ec \uc218\ub7c9\uc744 \ud568\uaed8 \ud45c\uc2dc\ud558\uc138\uc694. \uc5ec\uae30\uc5d0 \uc2e4\uc81c \uc870\uce58\uc5d0 \ud544\uc694\ud55c \ud488\uc9c8 \uc0c1\ud0dc, \uae30\uc874 \uc608\uc57d \ub0b4\uc5ed, \ud574\ub2f9\ub418\ub294 \uacbd\uc6b0 \uc720\ud6a8\uae30\ud55c\uc774\ub098 \uc7ac\uac80\ud1a0\uc77c, \ub2e4\uc74c \uc2e4\uc81c \uc18c\uc694\ub97c \ucd94\uac00\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uae08\uc561\uc0c1 \uc911\uc694\ud55c \uc7ac\uace0\ubd80\ud130 \uac80\ud1a0\ud574\uc57c \ud55c\ub2e4\uba74 \ud3c9\uac00 \uae30\uc900\uc744 \uba85\ud655\ud788 \ubc1d\ud788\uace0 \uc7ac\uace0 \uae08\uc561\uc744 \ud45c\uc2dc\ud558\uc138\uc694. \uc7ac\uace0 \uae08\uc561\uc740 \uc2e4\ubb3c \uc218\ub7c9 \ubc0f \uc608\uc0c1 \ud310\ub9e4 \ub300\uae08\uacfc \uad6c\ubd84\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc790\uc7ac \ud2b9\uc131\uc5d0 \ub9de\uac8c \uc11c\ub85c \uacb9\uce58\uc9c0 \uc54a\ub294 \uc5f0\ub839 \uad6c\uac04\uc744 \uc815\ud558\uc138\uc694. \uc608\ub97c \ub4e4\uc5b4 <strong>0\u201330\uc77c, 31\u201360\uc77c, 61\u201390\uc77c, 91\u2013180\uc77c, 180\uc77c \ucd08\uacfc<\/strong>\ub85c \ub098\ub20c \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc774\ub294 \ubcf4\uace0\ub97c \uc704\ud55c \uad6c\uac04\uc77c \ubfd0, \uc815\uc0c1 \uc7ac\uace0\uc640 \ud3d0\uae30 \uc7ac\uace0\ub97c \uac00\ub974\ub294 \ubcf4\ud3b8\uc801\uc778 \uae30\uc900\uc740 \uc544\ub2d9\ub2c8\ub2e4. \uc0ac\uc6a9 \uac00\ub2a5 \uae30\uac04\uc774 \uc9e7\uc740 \uc790\uc7ac\ub294 \uae34 \ub9ac\ub4dc\ud0c0\uc784\uc758 \uc18c\uc694\uc5d0 \ub300\ube44\ud574 \uc758\ub3c4\uc801\uc73c\ub85c \ubcf4\uc720\ud558\ub294 \ub0b4\uad6c\uc131 \ub192\uc740 \ubd80\ud488\ubcf4\ub2e4 \ub354 \uc77c\ucc0d \uc0b4\ud3b4\ubd10\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uac01 \uc608\uc678 \ud56d\ubaa9\uc5d0 \ub2f4\ub2f9\uc790, \uc2e4\ud589\ud560 \uc870\uce58, \uc644\ub8cc \uae30\ud55c\uc744 \uc9c0\uc815\ud574 \uc2e4\uc81c \ud589\ub3d9\uc73c\ub85c \uc774\uc5b4\uc9c0\uac8c \ud558\uc138\uc694. \u201c90\uc77c \ucd08\uacfc\u201d\ub294 \ud574\ub2f9 \uc7ac\uace0\ub97c \ucc3e\uc544 \uc904 \ubfd0\uc785\ub2c8\ub2e4. \u201c\uc0ac\uc6a9 \uc2b9\uc778 \uc5ec\ubd80\ub97c \ud655\uc778\ud558\uace0 \uc8fc\ubb38 X\uc5d0 \ud22c\uc785\ud560 \uc77c\uc815\uc744 \uc218\ub9bd\u201d\ud574\uc57c \ub2f4\ub2f9\uc790\uac00 \uc644\ub8cc\ud560 \uc77c\uc774 \uba85\ud655\ud574\uc9d1\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uc608\uc2dc: \uc808\ubc18\uc774 \uc624\ub798\ub41c \uc7ac\uace0\ub77c\ub3c4 \uc790\uc720\ub86d\uac8c \uc4f8 \uc218 \uc788\ub294 \ubb3c\ub7c9\uc740 \uc77c\ubd80<\/h3>\n\n\n<p>\ud55c \uc81c\uc870\uc5c5\uccb4\uac00 \uac19\uc740 \ubd80\ud488\uc758 \uc785\uace0 \uac74 \uc138 \uac1c\ub97c \ub3d9\uc77c\ud55c \ub2e8\uc704\ub85c \uac80\ud1a0\ud55c\ub2e4\uace0 \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \uc544\ub798 \uc218\ub7c9\uc740 \ucd5c\ucd08 \uc785\uace0 \uc218\ub7c9\uc774 \uc544\ub2c8\ub77c \ubcf4\uace0\uc11c \uae30\uc900\uc77c\uc5d0 \ub0a8\uc544 \uc788\ub294 \uc218\ub7c9\uc785\ub2c8\ub2e4.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\uc785\uace0 \uac74<\/th><th>\uc794\uc5ec \uc218\ub7c9<\/th><th>\uc785\uace0 \ud6c4 \uacbd\uacfc\uc77c<\/th><th>\uc5f0\ub839 \uad6c\uac04<\/th><\/tr><\/thead><tbody><tr><td>A<\/td><td>300\uac1c<\/td><td>120\uc77c<\/td><td>91\u2013180\uc77c<\/td><\/tr><tr><td>B<\/td><td>100\uac1c<\/td><td>60\uc77c<\/td><td>31\u201360\uc77c<\/td><\/tr><tr><td>C<\/td><td>200\uac1c<\/td><td>10\uc77c<\/td><td>0\u201330\uc77c<\/td><\/tr><tr><td>\ud569\uacc4<\/td><td>600\uac1c<\/td><td><\/td><td><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\uc218\ub7c9 \uac00\uc911\ud3c9\uade0 \uc7ac\uace0 \uc5f0\ub839\uc740 44,000\uac1c\u00b7\uc77c\uc744 600\uac1c\ub85c \ub098\ub208 <strong>73.3\uc77c<\/strong>\uc785\ub2c8\ub2e4. \ud558\uc9c0\ub9cc <strong>\uc804\uccb4 \uc218\ub7c9\uc758 50%\ub294 \uc785\uace0\ub41c \uc9c0 90\uc77c\uc774 \ub118\uc5c8\uc2b5\ub2c8\ub2e4<\/strong>. \ud3c9\uade0\ub9cc\uc73c\ub85c\ub294 \uc624\ub798\ub41c \uc7ac\uace0\uac00 \uc5bc\ub9c8\ub098 \ubab0\ub824 \uc788\ub294\uc9c0 \uc54c\uae30 \uc5b4\ub835\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774\uc81c \uc785\uace0 \uac74 A\ub97c \uc0b4\ud3b4\ubcf4\uaca0\uc2b5\ub2c8\ub2e4. 300\uac1c \uc911 100\uac1c\ub294 \uc774\ubbf8 \ub2e4\ub978 \uc8fc\ubb38\uc5d0 \uc608\uc57d\ub418\uc5b4 \uc788\uace0, 50\uac1c\ub294 \ud488\uc9c8 \ubcf4\ub958 \uc0c1\ud0dc\uc785\ub2c8\ub2e4. \uc0ac\uc6a9 \uc2b9\uc778\uc744 \ubc1b\uc558\uace0 \uc544\uc9c1 \ubc30\uc815\ub418\uc9c0 \uc54a\uc544 \uc0c8 \uc6a9\ub3c4\ub97c \uacb0\uc815\ud560 \uc218 \uc788\ub294 \ubb3c\ub7c9\uc740 150\uac1c\ubfd0\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>\uace0\uac1d \uc8fc\ubb38\uc5d0 \uc774 \uc801\ud569\ud55c \uc790\uc7ac 150\uac1c\ub97c \uc0ac\uc6a9\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc774\ub294 \uc88b\uc740 \ud65c\uc6a9 \uae30\ud68c\uc774\uc9c0\ub9cc, 300\uac1c \uc804\ub7c9\uc744 \ucd9c\uace0\ud558\uac70\ub098 \ud488\uc9c8 \ubcf4\ub958\ub97c \ubb34\uc2dc\ud558\uac70\ub098 \ub2e4\ub978 \uc8fc\ubb38\uc5d0 \uc57d\uc18d\ub41c \uc790\uc7ac\ub97c \uac00\uc838\ub2e4 \uc368\ub3c4 \ub41c\ub2e4\ub294 \ub73b\uc740 \uc544\ub2d9\ub2c8\ub2e4. \ucc3d\uace0\uc5d0\uc11c\ub294 \uc815\ud655\ud55c \uc7ac\uace0\ub97c \uc2dd\ubcc4\ud574\uc57c \ud558\uace0, \uc0dd\uc0b0\uacc4\ud68d \ub2f4\ub2f9\uc790\ub294 \uc774\ub97c \ud22c\uc785\ud558\ub294 \uacf5\uc815\uc5d0 \ud544\uc694\ud55c \uc2dc\uac04\uc744 \ud655\ubcf4\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\ubc14\ub85c \uc774 \uc9c0\uc810\uc5d0\uc11c \uc7ac\uace0 \uc5f0\ub839 \ubd84\uc11d \ubcf4\uace0\uc11c\ub294 \uc0dd\uc0b0 \uacc4\ud68d \uacfc\uc81c\ub85c \uc774\uc5b4\uc9d1\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc0ac\uc6a9\u00b7\ubcf4\ub958\u00b7\ubc18\ud488\u00b7\ucc98\ubd84 \uc911 \uc870\uce58 \uacb0\uc815\ud558\uae30<\/h2>\n\n\n<p>\uc790\uc7ac\uc758 \uc0c1\ud0dc, \uc218\uc694, \ucc98\ub9ac \ubc29\uc548\uc744 \uacb0\uc815\ud560 \uc218 \uc788\ub294 \ub2f4\ub2f9\uc790\ub4e4\uacfc \uc624\ub798\ub41c \uc7ac\uace0\ub97c \uac80\ud1a0\ud558\uc138\uc694. \uac00\uc7a5 \uc624\ub798\ub41c \ud488\ubaa9\uc774 \ud56d\uc0c1 \uac00\uc7a5 \uc2dc\uae09\ud55c \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4. \uc720\ud6a8\uae30\ud55c\uc774 \ub354 \uc784\ubc15\ud55c \uc790\uc7ac, \uc0dd\uc0b0\uc774 \ucde8\uc18c\ub41c \uc81c\ud488, \uc55e\uc73c\ub85c \uc18c\uc694\uac00 \uc5c6\ub294 \uace0\uc561 \uc7ac\uace0\ub97c \uba3c\uc800 \uc0b4\ud3b4\ubd10\uc57c \ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc790\uc7ac\uac00 \uc694\uad6c \uaddc\uaca9\uc744 \ucda9\uc871\ud558\uace0 \uc0ac\uc6a9 \uc2b9\uc778\uc744 \ubc1b\uc558\uc73c\uba70 \ub2e4\ub978 \uc6a9\ub3c4\ub85c \ud560\ub2f9\ub418\uc5b4 \uc788\uc9c0 \uc54a\ub2e4\uba74 <strong>\uc2e4\uc81c \uc18c\uc694\uc5d0 \ub9de\ucdb0 \uc0ac\uc6a9\ud558\uc138\uc694<\/strong>. \uc624\ub354\uc640 \ud22c\uc785 \uc218\ub7c9\uc744 \ud655\uc778\ud558\uc138\uc694. \ub300\uccb4 \uc0ac\uc6a9\uc774\ub098 \uc7ac\uc791\uc5c5\uc774 \ud544\uc694\ud558\ub2e4\uba74 \ud574\ub2f9 \uacbd\ub85c\uc758 \uc77c\uc815\uc744 \uc7a1\uae30 \uc804\uc5d0 \uad00\ub828 \uc2b9\uc778\uc744 \ubc1b\uc73c\uc138\uc694. \uc801\uc808\ud55c \uacbd\uc6b0\uc5d0\ub294 \uc120\uc785\uc120\ucd9c(FIFO)\ub85c \uc0ac\uc6a9 \uac00\ub2a5\ud55c \uc785\uace0\ubd84 \uc911 \uc624\ub798\ub41c \uac83\uc744 \uc6b0\uc120 \uc0ac\uc6a9\ud558\uac70\ub098, \uc120\uae30\ud55c\uc120\ucd9c(FEFO)\ub85c \uc0ac\uc6a9 \uac00\ub2a5\ud55c \uc7ac\uace0 \uc911 \uc720\ud6a8\uae30\uac04\uc774 \uac00\uc7a5 \uba3c\uc800 \ub3c4\ub798\ud558\ub294 \uac83\uc744 \uc6b0\uc120 \uc0ac\uc6a9\ud558\uc138\uc694. \ucc3d\uace0\uc758 \ub85c\ud2b8 \ucd9c\uace0 \uc9c0\uc2dc\uc5d0\ub3c4 \uc774 \uacb0\uc815\uc774 \uadf8\ub300\ub85c \ubc18\uc601\ub418\uc5b4\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uac80\uc0ac, \uae30\uc220 \ubd80\uc11c\uc758 \uc2b9\uc778 \ub610\ub294 \ud5a5\ud6c4 \uc18c\uc694 \ub54c\ubb38\uc5d0 \ubcf4\uad00\ud560 \ud544\uc694\uac00 \uc788\ub2e4\uba74 <strong>\uba85\ud655\ud55c \uc0ac\uc720\ub97c \uc815\ud574 \ubcf4\ub958\ud558\uc138\uc694<\/strong>. \ubcf4\ub958 \uac74\ub9c8\ub2e4 \ub2f4\ub2f9\uc790\uc640 \uc7ac\uac80\ud1a0\uc77c\uc744 \uc9c0\uc815\ud558\uc138\uc694. \u201c\uc5b8\uc820\uac00 \ud544\uc694\ud560 \uc218\ub3c4 \uc788\ub2e4\u201d\ub294 \ub9d0\uc774 \ub098\uc624\uba74 \ubcf4\ub958 \uae30\uac04\uc744 \ub610\ub2e4\uc2dc \ubb34\uae30\ud55c \uc5f0\uc7a5\ud560 \uac83\uc774 \uc544\ub2c8\ub77c \uc218\uc694\ub97c \ub17c\uc758\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uacf5\uae09\uc5c5\uccb4\uc640\uc758 \uacc4\uc57d, \ub2e4\ub978 \uc0ac\uc5c5\uc7a5 \ub610\ub294 \ub2e4\ub978 \uc720\ud6a8\ud55c \uc18c\uc694\ub97c \ud1b5\ud574 \ub354 \ub098\uc740 \uacb0\uacfc\ub97c \uc5bb\uc744 \uc218 \uc788\ub2e4\uba74 <strong>\ubc18\ud488\ud558\uac70\ub098 \uc774\uad00\ud558\uac70\ub098 \ub2e4\ub978 \uc2b9\uc778\ub41c \uc6a9\ub3c4\ub97c \ucc3e\uc73c\uc138\uc694<\/strong>. \ud574\ub2f9 \uc7ac\uace0\uac00 \ud574\uacb0\ub418\uc5c8\ub2e4\uace0 \ud310\ub2e8\ud558\uae30 \uc804\uc5d0 \uc0c1\ub300\ubc29\uc758 \uc218\ub77d \uc5ec\ubd80\uc640 \uc2e4\uc81c \ucc98\ub9ac \ubc29\ubc95\uc744 \ud655\uc778\ud558\uc138\uc694. \ub0b4\ubd80 \uc774\uad00\uc73c\ub85c \uc7ac\uace0 \uc704\uce58\uc640 \uc18c\uc694 \uc704\uce58\uac00 \ub9de\uc9c0 \uc54a\ub294 \ubb38\uc81c\ub97c \ud574\uacb0\ud560 \uc218\ub294 \uc788\uc9c0\ub9cc, \uc790\uc7ac\uc758 \uc6d0\ub798 \uc7ac\uace0 \uc5f0\ub839\uc774 \uc0ac\ub77c\uc9c0\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud5c8\uc6a9\ub418\ub294 \uc6a9\ub3c4\uac00 \ub354 \uc774\uc0c1 \uc5c6\ub2e4\uba74 <strong>\uc2b9\uc778\ub41c \ud3d0\uae30 \uc808\ucc28\uc5d0 \ub530\ub77c \ucc98\ub9ac\ud558\uc138\uc694<\/strong>. \uc7ac\uace0 \ud3c9\uac00\uac10\uc774\ub098 \uc7a5\ubd80\uac00\uc561 \uc81c\uac01 \uc5ec\ubd80\ub294 \uc7ac\ubb34 \ubd80\uc11c\uac00 \ud68c\uc0ac\uc758 \ud68c\uacc4 \uc815\ucc45\uc5d0 \ub530\ub77c \ubcc4\ub3c4\ub85c \uac80\ud1a0\ud574\uc57c \ud569\ub2c8\ub2e4. \uc6b4\uc601 \uad00\ub9ac\ub97c \uc704\ud55c \uc7ac\uace0 \uc5f0\ub839 \uad6c\uac04\ub9cc\uc73c\ub85c \ud3c9\uac00\uc561\uc774 \uc790\ub3d9 \uacb0\uc815\ub418\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc624\ub798\ub41c \uc6d0\uc790\uc7ac\ub97c \uc18c\uc9c4\ud560 \ubaa9\uc801\uc73c\ub85c\ub9cc \uc644\uc81c\ud488\uc744 \uc0dd\uc0b0\ud558\uc9c0 \ub9c8\uc138\uc694. \uc2e4\uc81c \uc218\uc694\uac00 \uc5c6\ub2e4\uba74 \uc7ac\uace0 \uc7a5\uae30\ud654 \ubb38\uc81c\ub97c \ub354 \ube44\uc2fc \ud615\ud0dc\uc758 \uc7ac\uace0\ub85c \uc62e\uae30\ub294 \ub370 \uadf8\uce60 \uc218 \uc788\uc73c\uba70, \uace0\uac1d \ub0a9\ud488\uc5d0 \ud544\uc694\ud55c \uc0dd\uc0b0 \ub2a5\ub825\uae4c\uc9c0 \ucc28\uc9c0\ud558\uac8c \ub429\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">SkyPlanner\ub85c \uc2b9\uc778\ub41c \uc790\uc7ac \uc0ac\uc6a9 \uacc4\ud68d\uc744 \uc0dd\uc0b0 \uc77c\uc815\uc5d0 \ubc18\uc601\ud558\uc138\uc694<\/h2>\n\n\n<p>\uc0ac\uc6a9 \uc5ec\ubd80\uac00 \uacb0\uc815\ub418\uba74 \ub2e4\uc74c\uacfc \uac19\uc740 \uad6c\uccb4\uc801\uc778 \uc9c8\ubb38\uc5d0 \ub2f5\ud574\uc57c \ud569\ub2c8\ub2e4. <strong>\uc774\ubbf8 \uc57d\uc18d\ud55c \ub2e4\ub978 \uc791\uc5c5\ub4e4\uc744 \ud568\uaed8 \uc218\ud589\ud558\uba74\uc11c \uc774 \uc790\uc7ac\ub97c \ud22c\uc785\ud558\ub294 \uc791\uc5c5\uc744 \uc5b8\uc81c \uc9c4\ud589\ud560 \uc218 \uc788\uc744\uae4c\uc694?<\/strong><\/p>\n\n\n<p>\uc7a5\uae30 \ubcf4\uc720 \uc7ac\uace0\uc5d0 \ub300\ud55c \ubcc4\ub3c4 \uc870\uce58 \ubaa9\ub85d\ub9cc\uc73c\ub85c\ub294 \uc774 \uc9c8\ubb38\uc5d0 \ub2f5\ud560 \uc218 \uc5c6\uc2b5\ub2c8\ub2e4. \ubaa9\ub85d\uc5d0\ub294 \uc774\ubc88 \uc8fc\uc5d0 \uc785\uace0\ubd84 A\uc758 150\uac1c\ub97c \uc0ac\uc6a9\ud558\ub77c\uace0 \ub418\uc5b4 \uc788\uc5b4\ub3c4, \ud544\uc694\ud55c \uc124\ube44\uc640 \ud6c4\uc18d \uacf5\uc815\uc740 \uc774\ubbf8 \ub2e4\ub978 \uc791\uc5c5\uc5d0 \ubc30\uc815\ub418\uc5b4 \uc788\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc870\uce58\ubcc4\ub85c \uacc4\ud68d\uc744 \ub530\ub85c \uc138\uc6b0\uba74 \uacb0\uad6d \ub204\uad70\uac00\uac00 \uc11c\ub85c \uc790\uc6d0\uc744 \ub2e4\ud22c\ub294 \uc791\uc5c5 \ub300\uae30\uc5f4\uc744 \uc218\uc791\uc5c5\uc73c\ub85c \uc870\uc815\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>SkyPlanner APS\ub294 \uc624\ub354\ubcc4 \uacf5\uc815\uc5d0 \uc791\uc5c5 \uc790\uc6d0, \uad50\ub300\uc870, \uc0dd\uc0b0 \ub2a5\ub825, \uc120\ud6c4\ud589 \uad00\uacc4, \uc6b0\uc120\uc21c\uc704\ub97c \ud568\uaed8 \ubc18\uc601\ud569\ub2c8\ub2e4. \uc2a4\ucf00\uc904\ub9c1 \uc778\uacf5\uc9c0\ub2a5\uc778 Arcturus\uac00 <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-scheduling\/\">\uc0dd\uc0b0 \uc77c\uc815<\/a>\uc744 \uacc4\uc0b0\ud558\uace0, \uac04\ud2b8 \ud654\uba74\uc5d0\uc11c \uc791\uc5c5 \uc21c\uc11c\uc640 \uc2dc\uc810\uc744 \uc2dc\uac01\uc801\uc73c\ub85c \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc790\uc7ac \uac00\uc6a9\uc131\uc744 \uace0\ub824\ud558\ub294 \uc2a4\ucf00\uc904\ub9c1 \uae30\ub2a5\uc744 \ud65c\uc131\ud654\ud558\uba74, \uc790\uc7ac\uac00 \ud22c\uc785\ub418\ub294 \uacf5\uc815\uc5d0\uc11c \uad00\ub9ac \uc911\uc778 \uc790\uc7ac \uac00\uc6a9 \uc815\ubcf4\ub3c4 \ud568\uaed8 \uace0\ub824\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc608\uc2dc\uc758 \uc624\ub354\uc5d0\uc11c\ub294 \uc2b9\uc778\ub41c \uc218\ub7c9\uacfc \uc815\ud655\ud55c \uc790\uc7ac \uc18c\uc694\ub7c9\uc744 \ucd5c\uc2e0 \uc0c1\ud0dc\ub85c \uc720\uc9c0\ud558\uace0, \ucc3d\uace0\uc758 \ub85c\ud2b8 \uc120\ud0dd \uc9c0\uc2dc\ub97c \uadf8\ub300\ub85c \uc720\uc9c0\ud558\uba74\uc11c \uc790\uc7ac \ud22c\uc785 \uc791\uc5c5\uc744 \ud1b5\ud569 \uc0dd\uc0b0 \uc77c\uc815\uc5d0 \ud3ec\ud568\ud558\uc138\uc694. \uc0dd\uc0b0\uacc4\ud68d \ub2f4\ub2f9\uc790\uac00 \uc6b0\uc120\uc21c\uc704\ub97c \uc124\uc815\ud558\uba74 Arcturus\uac00 \ub2e4\ub978 \uc791\uc5c5\uacfc \ud568\uaed8 \ud574\ub2f9 \uc791\uc5c5\uc758 \ubc30\uce58\ub97c \uacc4\uc0b0\ud569\ub2c8\ub2e4. \uacc4\uc0b0\ub41c \uc791\uc5c5 \uc2dc\uc810\uacfc \ub0a9\ud488\uc5d0 \ubbf8\uce58\ub294 \uc601\ud5a5\uc744 \uac80\ud1a0\ud55c \ub4a4, \uc6b0\uc120\uc21c\uc704\ub97c \ubc14\uafc0\uc9c0 \ub610\ub294 \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ucd94\uac00\ub85c \ud655\ubcf4\ud560\uc9c0 \uacb0\uc815\ud558\uc138\uc694.<\/p>\n\n\n<p>\uc774\ub807\uac8c \ud558\uba74 \uc791\uc5c5 \ub300\uae30\uc5f4\uc744 \uc218\uc791\uc5c5\uc73c\ub85c \ub2e4\uc2dc \uc9dc\ub294 \ubd80\ub2f4\uc774 \uc904\uace0, \uc7ac\uace0 \uc0ac\uc6a9 \uacb0\uc815\uc774 \ub2e4\ub978 \uc624\ub354\uc5d0 \ubbf8\uce58\ub294 \uc601\ud5a5\uc744 \ub354 \uba85\ud655\ud788 \ud30c\uc545\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc7ac\uace0 \uc5f0\ub839\uc774 \uae30\uc900\uc744 \ub118\uc5c8\ub2e4\ub294 \uc774\uc720\ub85c \ubaa8\ub4e0 \uace0\uac1d \uc791\uc5c5\uc744 \ub4a4\ub85c \ubbf8\ub8e8\uc9c0 \uc54a\uace0\ub3c4 \ud569\ub9ac\uc801\uc778 \uc790\uc7ac \uc0ac\uc6a9 \uae30\ud68c\ub97c \uc0b4\ub9b4 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc624\ub798\ub41c \uc790\uc7ac\uc758 \uc0ac\uc6a9 \ubcf4\ub958\ub97c \ud574\uc81c\ud560 \uc218 \uc5c6\ub2e4\uba74 \ub300\uccb4 \uc790\uc7ac\uc758 \uacf5\uae09\ub3c4 \uac19\uc740 \uacc4\ud68d \uc548\uc5d0\uc11c \uace0\ub824\ud574\uc57c \ud569\ub2c8\ub2e4. SkyPlanner\ub294 \uad00\ub9ac \uc911\uc778 \uad6c\ub9e4\ud488 \uc785\uace0 \uc608\uc815\uc77c\uc744 \uc2a4\ucf00\uc904\ub9c1\uc5d0 \uc0ac\uc6a9\ud569\ub2c8\ub2e4. \uc785\uace0 \uc608\uc815\uc77c\uc744 \uac31\uc2e0\ud558\uace0 \uc77c\uc815\uc744 \ub2e4\uc2dc \uacc4\uc0b0\ud574 \uad00\ub828 \uc791\uc5c5\uc774 \uc5b4\ub5bb\uac8c \ubc30\uce58\ub418\ub294\uc9c0 \ud655\uc778\ud558\uc138\uc694. \uadf8\ub7ec\uba74 \uc544\uc9c1 \uc900\ube44\ub418\uc9c0 \uc54a\uc740 \uc790\uc7ac\ub97c \uc804\uc81c\ub85c \uc791\uc5c5 \uc77c\uc815\uc744 \ub0a8\uaca8 \ub450\ub294 \ub300\uc2e0, \ud604\uc2e4\uc801\uc778 \uc0dd\uc0b0 \ub300\uc751 \ubc29\uc548\uc744 \ub17c\uc758\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>SkyPlanner\ub294 \uc2dc\uc2a4\ud15c \uc5f0\ub3d9\uc744 \ud1b5\ud574 \ucd5c\uc2e0 \uc0c1\ud0dc\ub85c \uc720\uc9c0\ub418\ub294 \uc7ac\uace0 \uc218\ub7c9\uc774\ub098 \ucc3d\uace0 \ubaa8\ub4c8\uc5d0\uc11c \uad00\ub9ac\ud558\ub294 \uc7ac\uace0 \uc218\ub7c9\uc744 \uc0ac\uc6a9\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. <strong><a href=\"https:\/\/skyplanner.ai\/ko\/%ed%86%b5%ed%95%a9\/\">\uac1c\ubc29\ud615 REST API\ub97c \ud1b5\ud574 \uc5b4\ub5a4 ERP \ub610\ub294 MES\uc640\ub3c4 \uc5f0\ub3d9\ud560 \uc218 \uc788\uc73c\ubbc0\ub85c<\/a><\/strong>, \uacc4\ud68d\uc744 \uac1c\uc120\ud558\uae30 \uc704\ud574 \uc798 \uc791\ub3d9\ud558\ub294 ERP\ub97c \uad50\uccb4\ud560 \ud544\uc694 \uc5c6\uc774 \uae30\uc874 \uc624\ub354 \ubc0f \uc790\uc7ac \ub370\uc774\ud130\ub97c \uc0dd\uc0b0 \uc2a4\ucf00\uc904\ub9c1\uc5d0 \uc5f0\uacb0\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uc790\uc7ac \ud604\ud669\uc744 \uba85\ud655\ud788 \ud30c\uc545\ud558\uba74\uc11c \ub2ec\ub77c\uc9c4 Eskomatic\uc758 \uc0dd\uc0b0 \uad00\ub9ac<\/h3>\n\n\n<p><a href=\"\/ko\/%ea%b3%a0%ea%b0%9d-%ec%82%ac%eb%a1%80\/eskomatic\/\">\ud540\ub780\ub4dc\uc758 \uc704\ud0c1 \uae30\uacc4\uac00\uacf5 \uc5c5\uccb4 Eskomatic<\/a>\uc740 \uc774\uc804\uc5d0 \uc791\uc5c5 \ub300\uae30\uc5f4\uc744 \ub300\ubd80\ubd84 \uc218\uc791\uc5c5\uc73c\ub85c \uad00\ub9ac\ud588\uace0, \uc790\uc7ac \ud604\ud669\uc744 \ud30c\uc545\ud558\ub294 \ub370\ub3c4 \ud55c\uacc4\uac00 \uc788\uc5c8\uc2b5\ub2c8\ub2e4. \uc791\uc5c5 \uc2dc\uc791 \uc608\uc815\uc77c\uc774 \uc784\ubc15\ud574\uc11c\uc57c \uc790\uc7ac \ubd80\uc871\uc774 \ub4dc\ub7ec\ub098\ub294 \uacbd\uc6b0\ub3c4 \uc788\uc5c8\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>ERP \ub370\uc774\ud130\ub97c SkyPlanner\uc5d0 \uc5f0\uacb0\ud55c \ub4a4, Eskomatic\uc740 \uc791\uc5c5 \ub300\uae30\uc5f4\uc744 \uc2dc\uac01\uc801\uc73c\ub85c \ud655\uc778\ud558\uace0 \uc790\uc7ac \ubd80\uc871 \ud604\ud669\ub3c4 \ub354 \uba85\ud655\ud558\uac8c \ud30c\uc545\ud560 \uc218 \uc788\uac8c \ub418\uc5c8\uc2b5\ub2c8\ub2e4. Eskomatic\uc5d0 \ub530\ub974\uba74 \uc790\uc7ac \ubd80\uc871\uc73c\ub85c \uc778\ud55c \uc0dd\uc0b0 \uc911\ub2e8\uc774 \uc904\uace0 \ub0a9\uae30 \uc124\uc815\uc758 \uc815\ud655\ub3c4\uac00 \ub192\uc544\uc84c\uc2b5\ub2c8\ub2e4. \uc7ac\uace0 \uc5f0\ub839\uc744 \uac80\ud1a0\ud560 \ub54c\ub3c4 \ud544\uc694\ud55c \uc5f0\uacb0\uc740 \uac19\uc2b5\ub2c8\ub2e4. \uc790\uc7ac \uc815\ubcf4\ub294 \uc2e4\uc81c\ub85c \uc218\ud589\ud560 \uc218 \uc788\ub294 \uc791\uc5c5\uc744 \ud310\ub2e8\ud558\ub294 \ub370 \ubc18\uc601\ub420 \ub54c \uc720\uc6a9\ud574\uc9d1\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uac19\uc740 \uc7ac\uace0\uac00 \ub2e4\uc2dc \uc7a5\uae30\ud654\ub418\uc9c0 \uc54a\ub3c4\ub85d \ud558\uc138\uc694<\/h2>\n\n\n<p>\ub2e4\uc74c \uac80\ud1a0\uc5d0\uc11c\ub294 \ud569\uc758\ud55c \uc870\uce58\uac00 \uc2e4\uc81c\ub85c \uc774\ud589\ub418\uc5c8\ub294\uc9c0 \ud655\uc778\ud558\uc138\uc694. \uc791\uc5c5 \uc77c\uc815\uc774 \uc7a1\ud614\ub2e4\uace0 \uc790\uc7ac\uac00 \uc774\ubbf8 \uc0ac\uc6a9\ub41c \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4. \ucd9c\uace0 \ub610\ub294 \uc0ac\uc6a9 \uae30\ub85d\uacfc \uc794\uc5ec \uc7ac\uace0\ub97c \ud655\uc778\ud558\uc138\uc694. \ubc18\ud488\ub3c4 \uc694\uccad\ud588\ub2e4\ub294 \uc774\uc720\ub9cc\uc73c\ub85c \uc644\ub8cc\ub41c \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p>\uadf8\ub2e4\uc74c\uc5d0\ub294 \uc794\uc5ec \uc7ac\uace0\uac00 \uc313\uc778 \uc6d0\uc778\uc744 \ud574\uacb0\ud558\uc138\uc694. \uc624\ub354\uac00 \ucde8\uc18c\ub418\uc5c8\ub2e4\uba74 \uad6c\ub9e4 \uacc4\ud68d\uc744 \ubcc0\uacbd\ud574\uc57c \ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ub3c4\uba74\uc774 \uac1c\uc815\ub418\uba74 \uc774\uc804 \uaddc\uaca9\uc758 \uc790\uc7ac\ub294 \uc218\uc694\uac00 \uc5c6\uc5b4\uc9c8 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uad6c\ub9e4 \ub610\ub294 \uc0dd\uc0b0 \ubc30\uce58\uac00 \ud06c\uba74 \uc2e4\uc81c \uc0ac\uc6a9\ub7c9\uc744 \ubc18\ubcf5\uc801\uc73c\ub85c \ucd08\uacfc\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc624\ub7ab\ub3d9\uc548 \ubcf4\ub958\ub41c \uc7ac\uace0\uc5d0\ub294 \ub610 \ud55c \ubc88\uc758 \uacc4\ud68d \uc870\uc815\ubcf4\ub2e4 \ud488\uc9c8 \ub610\ub294 \uae30\uc220 \ubd80\uc11c\uc758 \uacb0\uc815\uc774 \ud544\uc694\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ubbf8\uc785\uace0 \uad6c\ub9e4 \uac74\uacfc \uc608\uc815\ub41c \uc0dd\uc0b0 \ubb3c\ub7c9\uc744 \uc0ac\uc6a9 \uac00\ub2a5\ud55c \uc794\uc5ec \uc218\ub7c9\uacfc \ud568\uaed8 \uac80\ud1a0\ud558\uc138\uc694. \uadf8\ub798\uc57c \ubc29\uae08 \ud574\uc18c\ud55c \uacfc\uc789 \uc7ac\uace0\uac00 \uc2e0\uaddc \uacf5\uae09\uc73c\ub85c \ub2e4\uc2dc \uc0dd\uae30\ub294 \uc77c\uc744 \ub9c9\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ubbf8\uc644\ub8cc \uc870\uce58\uc640 \uc624\ub798\ub41c \uc7ac\uace0\ub294 \uc77c\uad00\ub41c \ubc94\uc704\uc640 \uc7ac\uace0 \uc5f0\ub839 \uc0b0\uc815 \uae30\uc900\uc73c\ub85c \ucd94\uc801\ud558\uc138\uc694. \uadf8\ub807\uc9c0 \uc54a\uc73c\uba74 \uadfc\ubcf8\uc801\uc778 \ubb38\uc81c\ub294 \uc904\uc9c0 \uc54a\uc558\ub294\ub370\ub3c4 \uc774\uad00\uc774\ub098 \ubcf4\uace0 \ubc29\uc2dd\uc758 \ubcc0\uacbd\uc774 \uac1c\uc120\ucc98\ub7fc \ubcf4\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc7ac\uace0 \uad00\ub9ac\uc758 \uc911\uc694\uc131\uc774 \ud06c\uace0 \uacb0\uc815\ud55c \uc870\uce58\ub97c \ub05d\uae4c\uc9c0 \uc2e4\ud589\ud560 \uc218 \uc788\ub294 \uc790\uc7ac\uad70\ubd80\ud130 \uc2dc\uc791\ud558\uc138\uc694. \ubaa9\ud45c\ub294 \uc624\ub798\ub41c \uc794\uc5ec \uc7ac\uace0\ub97c \ud30c\uc545\ud558\uace0, \uc801\uc808\ud55c \uc870\uce58\ub97c \uc2b9\uc778\ud558\uace0, \ud544\uc694\ud55c \uc791\uc5c5\uc758 \uc77c\uc815\uc744 \uc7a1\uace0, \uacb0\uacfc\ub97c \ud655\uc778\ud558\ub294 \uacfc\uc815\uc744 \ubc18\ubcf5 \uac00\ub2a5\ud55c \uad00\ub9ac \uc808\ucc28\ub85c \ub9cc\ub4dc\ub294 \uac83\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774 \uacfc\uc815\uc774 \uc0dd\uc0b0\uc5d0\uc11c \uc5b4\ub5bb\uac8c \uc774\uc5b4\uc9c0\ub294\uc9c0 \ud655\uc778\ud558\ub824\uba74 <strong><a href=\"https:\/\/skyplanner.ai\/ko\/%ec%98%81%ec%97%85%ed%8c%80%ec%97%90-%eb%ac%b8%ec%9d%98\/\">SkyPlanner \ub370\ubaa8\ub97c \uc608\uc57d\ud558\uc138\uc694<\/a><\/strong>. \uc624\ub798\ub41c \uc790\uc7ac\uc758 \uc794\uc5ec \uc218\ub7c9, \uadf8 \uc790\uc7ac\ub97c \uc0ac\uc6a9\ud560 \uc218 \uc788\ub294 \uc2b9\uc778\ub41c \uc624\ub354, \uac19\uc740 \uc790\uc6d0\uc744 \uc0ac\uc6a9\ud558\ub294 \ub2e4\ub978 \uc791\uc5c5 \uc815\ubcf4\ub97c \uc900\ube44\ud574 \uc8fc\uc138\uc694. SkyPlanner\uac00 \uc790\uc7ac \uc0ac\uc6a9 \uae30\ud68c\ub97c \uc0dd\uc0b0 \uc77c\uc815\uc5d0 \ubc18\uc601\ud558\uace0 \uc57d\uc18d\ud55c \ub0a9\uae30\uc5d0 \ubbf8\uce58\ub294 \uc601\ud5a5\uc744 \uc5b4\ub5bb\uac8c \ubcf4\uc5ec \uc8fc\ub294\uc9c0 \ud655\uc778\ud574 \ubcf4\uc138\uc694. \uba3c\uc800 \uc9c1\uc811 \uc0b4\ud3b4\ubcf4\uace0 \uc2f6\ub2e4\uba74 <a href=\"https:\/\/skyplanner.ai\/ko\/%ed%8f%89%ea%b0%80%ed%8c%90\/\">\ub370\ubaa8 \ub370\uc774\ud130\ub85c SkyPlanner\ub97c \uccb4\ud5d8\ud574 \ubcf4\uc138\uc694<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\uc7ac\uace0 \uc5f0\ub839 \ubd84\uc11d: \uc624\ub798\ub41c \uc7ac\uace0\ub97c \uc0dd\uc0b0 \uacc4\ud68d\uc5d0 \ubc18\uc601\ud558\ub294 \ubc29\ubc95 \ud648 &raquo; \ub9ac\uc18c\uc2a4 &raquo; \uc7ac\uace0 \uc5f0\ub839 \ubd84\uc11d: \uc624\ub798\ub41c \uc7ac\uace0\ub97c \uc0dd\uc0b0 \uacc4\ud68d\uc5d0 \ubc18\uc601\ud558\ub294 \ubc29\ubc95 \uba87 \ub2ec\uc9f8 \ucc3d\uace0\uc5d0 \ub193\uc778 \ud314\ub808\ud2b8\uac00 \uc788\uc2b5\ub2c8\ub2e4. \uad6c\ub9e4 \ubd80\uc11c\uc5d0\ub294 \uc790\uae08\uc774 \ubb36\uc5ec \uc788\ub294 \uc790\uc7ac\ub85c, \uc0dd\uc0b0 \ubd80\uc11c\uc5d0\ub294 \ucd94\uac00 \uad6c\ub9e4\ub97c \ud53c\ud560 \uae30\ud68c\ub85c \ubcf4\uc785\ub2c8\ub2e4. \ud488\uc9c8 \ubd80\uc11c\ub294 \uc544\uc9c1 \uc774 \uc790\uc7ac\ub97c \uc0ac\uc6a9\ud560 \uc218 \uc788\ub294\uc9c0 \ud655\uc778\ud574\uc57c \ud569\ub2c8\ub2e4. \uc815\uc791 \uc774 \uc790\uc7ac\ub97c \ud22c\uc785\ud560 &#8230; <a title=\"\uc7ac\uace0 \uc5f0\ub839 \ubd84\uc11d: \uc624\ub798\ub41c \uc7ac\uace0\ub97c \uc0dd\uc0b0 \uacc4\ud68d\uc5d0 \ubc18\uc601\ud558\ub294 \ubc29\ubc95\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/inventory-aging-manufacturing\/\" aria-label=\"Read more about \uc7ac\uace0 \uc5f0\ub839 \ubd84\uc11d: \uc624\ub798\ub41c \uc7ac\uace0\ub97c \uc0dd\uc0b0 \uacc4\ud68d\uc5d0 \ubc18\uc601\ud558\ub294 \ubc29\ubc95\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":111842,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[496,2558],"tags":[],"class_list":["post-111838","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-496","category-2558","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\uc7ac\uace0 \uc5f0\ub839 \ubd84\uc11d: \uc624\ub798\ub41c \uc7ac\uace0\ub97c \uc0dd\uc0b0 \uacc4\ud68d\uc5d0 \ubc18\uc601\ud558\ub294 \ubc29\ubc95<\/title>\n<meta name=\"description\" content=\"\uc624\ub798\ub41c \uc790\uc7ac\uac00 \uaf2d \ud3d0\uae30 \ub300\uc0c1\uc774\uac70\ub098 \ubc14\ub85c \uc4f8 \uc218 \uc788\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4. \uc7ac\uace0 \uc5f0\ub839 \ubd84\uc11d \ubcf4\uace0\uc11c\ub85c \uc870\uce58\ub97c \uc815\ud558\uace0 SkyPlanner\ub85c \uc2b9\uc778\ub41c \uc0ac\uc6a9 \uc77c\uc815\uc744 \uc7a1\uc73c\uc138\uc694.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/inventory-aging-manufacturing\/\" \/>\n<meta property=\"og:locale\" content=\"ko_KR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\uc7ac\uace0 \uc5f0\ub839 \ubd84\uc11d: \uc624\ub798\ub41c \uc7ac\uace0\ub97c \uc0dd\uc0b0 \uacc4\ud68d\uc5d0 \ubc18\uc601\ud558\ub294 \ubc29\ubc95\" \/>\n<meta property=\"og:description\" content=\"\uc624\ub798\ub41c \uc790\uc7ac\uac00 \uaf2d \ud3d0\uae30 \ub300\uc0c1\uc774\uac70\ub098 \ubc14\ub85c \uc4f8 \uc218 \uc788\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4. \uc7ac\uace0 \uc5f0\ub839 \ubd84\uc11d \ubcf4\uace0\uc11c\ub85c \uc870\uce58\ub97c \uc815\ud558\uace0 SkyPlanner\ub85c \uc2b9\uc778\ub41c \uc0ac\uc6a9 \uc77c\uc815\uc744 \uc7a1\uc73c\uc138\uc694.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/inventory-aging-manufacturing\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-28T17:16:38+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-28T17:18:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-aging-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t<meta property=\"og:image:height\" content=\"864\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\uae00\uc4f4\uc774\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/inventory-aging-manufacturing\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/inventory-aging-manufacturing\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"\uc7ac\uace0 \uc5f0\ub839 \ubd84\uc11d: \uc624\ub798\ub41c \uc7ac\uace0\ub97c \uc0dd\uc0b0 \uacc4\ud68d\uc5d0 \ubc18\uc601\ud558\ub294 \ubc29\ubc95\",\"datePublished\":\"2026-10-28T17:16:38+00:00\",\"dateModified\":\"2026-10-28T17:18:53+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/inventory-aging-manufacturing\\\/\"},\"wordCount\":33,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/inventory-aging-manufacturing\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-aging-manufacturing-hero.png\",\"articleSection\":[\"\ub9ac\uc18c\uc2a4\",\"\uc81c\uc870 \ud6a8\uc728\"],\"inLanguage\":\"ko-KR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/inventory-aging-manufacturing\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/inventory-aging-manufacturing\\\/\",\"name\":\"\uc7ac\uace0 \uc5f0\ub839 \ubd84\uc11d: \uc624\ub798\ub41c \uc7ac\uace0\ub97c \uc0dd\uc0b0 \uacc4\ud68d\uc5d0 \ubc18\uc601\ud558\ub294 \ubc29\ubc95\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/inventory-aging-manufacturing\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/inventory-aging-manufacturing\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-aging-manufacturing-hero.png\",\"datePublished\":\"2026-10-28T17:16:38+00:00\",\"dateModified\":\"2026-10-28T17:18:53+00:00\",\"description\":\"\uc624\ub798\ub41c \uc790\uc7ac\uac00 \uaf2d \ud3d0\uae30 \ub300\uc0c1\uc774\uac70\ub098 \ubc14\ub85c \uc4f8 \uc218 \uc788\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4. \uc7ac\uace0 \uc5f0\ub839 \ubd84\uc11d \ubcf4\uace0\uc11c\ub85c \uc870\uce58\ub97c \uc815\ud558\uace0 SkyPlanner\ub85c \uc2b9\uc778\ub41c \uc0ac\uc6a9 \uc77c\uc815\uc744 \uc7a1\uc73c\uc138\uc694.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/inventory-aging-manufacturing\\\/#breadcrumb\"},\"inLanguage\":\"ko-KR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/inventory-aging-manufacturing\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/inventory-aging-manufacturing\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-aging-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/inventory-aging-manufacturing-hero.png\",\"width\":1536,\"height\":864,\"caption\":\"Stored metal rings beside an hourglass, with a selected portion at an assembly fixture for production use.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/inventory-aging-manufacturing\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\uc7ac\uace0 \uc5f0\ub839 \ubd84\uc11d: \uc624\ub798\ub41c \uc7ac\uace0\ub97c \uc0dd\uc0b0 \uacc4\ud68d\uc5d0 \ubc18\uc601\ud558\ub294 \ubc29\ubc95\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ko-KR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\uc7ac\uace0 \uc5f0\ub839 \ubd84\uc11d: \uc624\ub798\ub41c \uc7ac\uace0\ub97c \uc0dd\uc0b0 \uacc4\ud68d\uc5d0 \ubc18\uc601\ud558\ub294 \ubc29\ubc95","description":"\uc624\ub798\ub41c \uc790\uc7ac\uac00 \uaf2d \ud3d0\uae30 \ub300\uc0c1\uc774\uac70\ub098 \ubc14\ub85c \uc4f8 \uc218 \uc788\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4. \uc7ac\uace0 \uc5f0\ub839 \ubd84\uc11d \ubcf4\uace0\uc11c\ub85c \uc870\uce58\ub97c \uc815\ud558\uace0 SkyPlanner\ub85c \uc2b9\uc778\ub41c \uc0ac\uc6a9 \uc77c\uc815\uc744 \uc7a1\uc73c\uc138\uc694.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/inventory-aging-manufacturing\/","og_locale":"ko_KR","og_type":"article","og_title":"\uc7ac\uace0 \uc5f0\ub839 \ubd84\uc11d: \uc624\ub798\ub41c \uc7ac\uace0\ub97c \uc0dd\uc0b0 \uacc4\ud68d\uc5d0 \ubc18\uc601\ud558\ub294 \ubc29\ubc95","og_description":"\uc624\ub798\ub41c \uc790\uc7ac\uac00 \uaf2d \ud3d0\uae30 \ub300\uc0c1\uc774\uac70\ub098 \ubc14\ub85c \uc4f8 \uc218 \uc788\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4. \uc7ac\uace0 \uc5f0\ub839 \ubd84\uc11d \ubcf4\uace0\uc11c\ub85c \uc870\uce58\ub97c \uc815\ud558\uace0 SkyPlanner\ub85c \uc2b9\uc778\ub41c \uc0ac\uc6a9 \uc77c\uc815\uc744 \uc7a1\uc73c\uc138\uc694.","og_url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/inventory-aging-manufacturing\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-28T17:16:38+00:00","article_modified_time":"2026-10-28T17:18:53+00:00","og_image":[{"width":1536,"height":864,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-aging-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"\uae00\uc4f4\uc774":"Jussi M\u00e4ntyl\u00e4"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/inventory-aging-manufacturing\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/inventory-aging-manufacturing\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"\uc7ac\uace0 \uc5f0\ub839 \ubd84\uc11d: \uc624\ub798\ub41c \uc7ac\uace0\ub97c \uc0dd\uc0b0 \uacc4\ud68d\uc5d0 \ubc18\uc601\ud558\ub294 \ubc29\ubc95","datePublished":"2026-10-28T17:16:38+00:00","dateModified":"2026-10-28T17:18:53+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/inventory-aging-manufacturing\/"},"wordCount":33,"publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/inventory-aging-manufacturing\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-aging-manufacturing-hero.png","articleSection":["\ub9ac\uc18c\uc2a4","\uc81c\uc870 \ud6a8\uc728"],"inLanguage":"ko-KR"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/inventory-aging-manufacturing\/","url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/inventory-aging-manufacturing\/","name":"\uc7ac\uace0 \uc5f0\ub839 \ubd84\uc11d: \uc624\ub798\ub41c \uc7ac\uace0\ub97c \uc0dd\uc0b0 \uacc4\ud68d\uc5d0 \ubc18\uc601\ud558\ub294 \ubc29\ubc95","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/inventory-aging-manufacturing\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/inventory-aging-manufacturing\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-aging-manufacturing-hero.png","datePublished":"2026-10-28T17:16:38+00:00","dateModified":"2026-10-28T17:18:53+00:00","description":"\uc624\ub798\ub41c \uc790\uc7ac\uac00 \uaf2d \ud3d0\uae30 \ub300\uc0c1\uc774\uac70\ub098 \ubc14\ub85c \uc4f8 \uc218 \uc788\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4. \uc7ac\uace0 \uc5f0\ub839 \ubd84\uc11d \ubcf4\uace0\uc11c\ub85c \uc870\uce58\ub97c \uc815\ud558\uace0 SkyPlanner\ub85c \uc2b9\uc778\ub41c \uc0ac\uc6a9 \uc77c\uc815\uc744 \uc7a1\uc73c\uc138\uc694.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/inventory-aging-manufacturing\/#breadcrumb"},"inLanguage":"ko-KR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/inventory-aging-manufacturing\/"]}]},{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/inventory-aging-manufacturing\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-aging-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-aging-manufacturing-hero.png","width":1536,"height":864,"caption":"Stored metal rings beside an hourglass, with a selected portion at an assembly fixture for production use."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/inventory-aging-manufacturing\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ko\/"},{"@type":"ListItem","position":2,"name":"\uc7ac\uace0 \uc5f0\ub839 \ubd84\uc11d: \uc624\ub798\ub41c \uc7ac\uace0\ub97c \uc0dd\uc0b0 \uacc4\ud68d\uc5d0 \ubc18\uc601\ud558\ub294 \ubc29\ubc95"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ko\/#website","url":"https:\/\/skyplanner.ai\/ko\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ko\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ko-KR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ko\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ko\/","logo":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-aging-manufacturing-hero.png",1536,864,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-aging-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-aging-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-aging-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-aging-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-aging-manufacturing-hero.png",1536,864,false],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-aging-manufacturing-hero.png",1536,864,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/inventory-aging-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ko\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\uc7ac\uace0 \uc5f0\ub839 \ubd84\uc11d: \uc624\ub798\ub41c \uc7ac\uace0\ub97c \uc0dd\uc0b0 \uacc4\ud68d\uc5d0 \ubc18\uc601\ud558\ub294 \ubc29\ubc95 \ud648 &raquo; \ub9ac\uc18c\uc2a4 &raquo; \uc7ac\uace0 \uc5f0\ub839 \ubd84\uc11d: \uc624\ub798\ub41c \uc7ac\uace0\ub97c \uc0dd\uc0b0 \uacc4\ud68d\uc5d0 \ubc18\uc601\ud558\ub294 \ubc29\ubc95 \uba87 \ub2ec\uc9f8 \ucc3d\uace0\uc5d0 \ub193\uc778 \ud314\ub808\ud2b8\uac00 \uc788\uc2b5\ub2c8\ub2e4. \uad6c\ub9e4 \ubd80\uc11c\uc5d0\ub294 \uc790\uae08\uc774 \ubb36\uc5ec \uc788\ub294 \uc790\uc7ac\ub85c, \uc0dd\uc0b0 \ubd80\uc11c\uc5d0\ub294 \ucd94\uac00 \uad6c\ub9e4\ub97c \ud53c\ud560 \uae30\ud68c\ub85c \ubcf4\uc785\ub2c8\ub2e4. \ud488\uc9c8 \ubd80\uc11c\ub294 \uc544\uc9c1 \uc774 \uc790\uc7ac\ub97c \uc0ac\uc6a9\ud560 \uc218 \uc788\ub294\uc9c0 \ud655\uc778\ud574\uc57c \ud569\ub2c8\ub2e4. \uc815\uc791 \uc774 \uc790\uc7ac\ub97c \ud22c\uc785\ud560&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/111838","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/comments?post=111838"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/111838\/revisions"}],"predecessor-version":[{"id":111901,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/111838\/revisions\/111901"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media\/111842"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media?parent=111838"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/categories?post=111838"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/tags?post=111838"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}