{"id":111619,"date":"2026-10-28T00:43:16","date_gmt":"2026-10-28T00:43:16","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=111619"},"modified":"2026-10-28T00:45:22","modified_gmt":"2026-10-28T00:45:22","slug":"methods-time-measurement","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/methods-time-measurement\/","title":{"rendered":"MTM \uae30\ubc95: \uc0dd\uc0b0 \uc804\uc5d0 \uc791\uc5c5\uc744 \uc124\uacc4\ud558\uace0 \uc2dc\uac04\uc744 \uc0b0\uc815\ud558\ub294 \ubc29\ubc95"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">MTM \uae30\ubc95: \uc0dd\uc0b0 \uc804\uc5d0 \uc791\uc5c5\uc744 \uc124\uacc4\ud558\uace0 \uc2dc\uac04\uc744 \uc0b0\uc815\ud558\ub294 \ubc29\ubc95<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/ko\/\">\ud648<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/\">\ub9ac\uc18c\uc2a4<\/a> &raquo; MTM \uae30\ubc95: \uc0dd\uc0b0 \uc804\uc5d0 \uc791\uc5c5\uc744 \uc124\uacc4\ud558\uace0 \uc2dc\uac04\uc744 \uc0b0\uc815\ud558\ub294 \ubc29\ubc95<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">\uc608\uc0c1 \uc77d\uae30 \uc2dc\uac04: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> \ubd84<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>\uc0c8 \uc870\ub9bd\ud488\uc758 \uc0dd\uc0b0 \uacc4\ud68d\uc744 \uc138\uc6b8 \ub2e8\uacc4\uc778\ub370, \uc544\uc9c1 \uc0dd\uc0b0 \uacbd\ud5d8\uc774 \ucda9\ubd84\ud558\uc9c0 \uc54a\uc544 \uc2e0\ub8b0\ud560 \ub9cc\ud55c \ud3c9\uade0 \uc791\uc5c5\uc2dc\uac04\uc774 \uc5c6\uc2b5\ub2c8\ub2e4. \uadf8\ub798\ub3c4 \uc791\uc5c5\uc7a5 \ubc30\uce58\ub97c \ube44\uad50\ud558\uace0, \uc791\uc5c5 \ubd80\ud558\ub97c \ucd94\uc0b0\ud558\uace0, \ucd08\uae30 \uc8fc\ubb38 \ubb3c\ub7c9\uc744 \ucc98\ub9ac\ud560 \uc218 \uc788\uc744\uc9c0 \ud310\ub2e8\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>MTM \uae30\ubc95(Methods-Time Measurement)\uc744 \ud65c\uc6a9\ud558\uba74 \uc815\uaddc \uc0dd\uc0b0\uc744 \uc2dc\uc791\ud558\uae30 \uc804\uc5d0 \uc218\uc791\uc5c5 \ubc29\ubc95\uc744 \ubd84\uc11d\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc644\ub8cc\ub41c \uc791\uc5c5 \uc774\ub825\uc774 \uc313\uc774\uae30\ub97c \uae30\ub2e4\ub9ac\ub294 \ub300\uc2e0, \uba85\ud655\ud788 \uc815\uc758\ub41c \ub3d9\uc791\uacfc \uc815\ud574\uc9c4 \uc2dc\uac04 \ub370\uc774\ud130\ub97c \ubc14\ud0d5\uc73c\ub85c \uc18c\uc694\uc2dc\uac04\uc744 \uc0b0\uc815\ud569\ub2c8\ub2e4. \uc6b0\uc120\ud574\uc57c \ud560 \uac83\uc740 \uc791\uc5c5 \ubc29\ubc95\uc785\ub2c8\ub2e4. \uc2dc\uac04\uc774 \uc9e7\uc544\uc84c\ub2e4\ub294 \uc218\uce58\ub294 \uc791\uc5c5\uc790\uac00 \uc2e4\uc81c\ub85c \uc548\uc804\ud558\uace0 \uc815\ud655\ud558\uac8c \uc218\ud589\ud560 \uc218 \uc788\ub294 \ubc29\ubc95\uc744 \ub098\ud0c0\ub0bc \ub54c\ub9cc \uc758\ubbf8\uac00 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc0b0\uc815\ud55c \uc2dc\uac04\uc744 \uacc4\ud68d\uc5d0 \uc0ac\uc6a9\ud558\ub3c4\ub85d \uc2b9\uc778\ud55c \ub4a4\uc5d0\ub294 SkyPlanner APS\ub97c \ud1b5\ud574 \uc2e4\uc81c \uc77c\uc815\uc5d0 \ud65c\uc6a9\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc2a4\ucf00\uc904\ub9c1 \uc778\uacf5\uc9c0\ub2a5\uc778 Arcturus\uac00 \uacf5\uc815\ubcc4 \uc18c\uc694\uc2dc\uac04\uc744 \uc804\uccb4 \uc0dd\uc0b0 \uc77c\uc815\uc5d0 \ubc30\uce58\ud569\ub2c8\ub2e4. \uc774\ub807\uac8c \ud558\uba74 \uac1c\uc120\ub41c \uc791\uc5c5 \ubc29\ubc95\uc774 \uae30\uc220 \ubb38\uc11c \uc18d \uc218\uce58\ub85c\ub9cc \ub0a8\uc9c0 \uc54a\uace0, \ub354 \ud0c4\ud0c4\ud55c \uadfc\uac70\ub97c \uac16\ucd98 \uacc4\ud68d\uc73c\ub85c \uc774\uc5b4\uc9d1\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">MTM \uae30\ubc95\uc774\ub780?<\/h2>\n\n\n<p>MTM \uae30\ubc95\uc740 \uc218\uc791\uc5c5\uc744 \uae30\uc220\ud558\uace0 \ubd84\uc11d\u00b7\ud3c9\uac00\ud558\ub294 \ub370 \uc0ac\uc6a9\ud558\ub294 \uc608\uc815\ub3d9\uc791\uc2dc\uac04\ubc95\uc785\ub2c8\ub2e4. \ubd84\uc11d\uc790\ub294 \uc815\ud574\uc9c4 \uc791\uc5c5 \ubc29\ubc95\uc744 \ub3d9\uc791\uc774\ub098 \uacf5\uc815 \uad6c\uc131\uc694\uc18c\ub85c \ub098\ub204\uace0, \ud574\ub2f9 \uc2dc\uac04 \ub370\uc774\ud130\uc640 \uc801\uc6a9 \uaddc\uce59\uc744 \uc0ac\uc6a9\ud574 \uae30\uc900 \uc791\uc5c5\uc218\ud589 \uc218\uc900\uc5d0\uc11c \uadf8 \ubc29\ubc95\uc5d0 \ud544\uc694\ud55c \uc2dc\uac04\uc744 \uc0b0\uc815\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>MTM-1\uc758 \uc0c1\uc138 \ubd84\uc11d\uc5d0\uc11c\ub294 \uc190 \ubed7\uae30, \uc7a1\uae30, \uc774\ub3d9\ud558\uae30, \uc704\uce58 \ub9de\ucd94\uae30, \ub193\uae30 \ub4f1\uc758 \ub3d9\uc791\uc744 \ub2e4\ub8f9\ub2c8\ub2e4. \uc5ec\uae30\uc11c\ub294 \ub3d9\uc791 \uc870\uac74\uc774 \uc911\uc694\ud569\ub2c8\ub2e4. \uc27d\uac8c \uc9d1\uc744 \uc218 \uc788\ub294 \ubd80\ud488\uc744 \ub4e4\uc5b4 \uc62c\ub9ac\ub294 \uc77c\uacfc \ucde8\uae09\ud558\uae30 \uae4c\ub2e4\ub85c\uc6b4 \ubd80\ud488\uc744 \uace8\ub77c \uc704\uce58\ub97c \ub9de\ucd94\ub294 \uc77c\uc740 \uac19\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4. MTM\uc740 \uc774\ub7f0 \ucc28\uc774\ub97c \ud558\ub098\uc758 \ucd1d\uad04 \ucd94\uc815\uce58\uc5d0 \ubb3b\uc5b4 \ub450\uc9c0 \uc54a\uace0 \uba85\ud655\ud788 \ub4dc\ub7ec\ub0c5\ub2c8\ub2e4.<\/p>\n\n\n<p>MTM\uc758 \uc2dc\uac04\uac12\uc740 TMU\ub77c\ub294 \uc2dc\uac04 \uce21\uc815 \ub2e8\uc704\ub85c \ud45c\uc2dc\ud569\ub2c8\ub2e4. 1 TMU\ub294 0.036\ucd08\uc774\ubbc0\ub85c 1,000 TMU\ub294 36\ucd08\uc785\ub2c8\ub2e4. TMU\ub294 \uc2dc\uac04 \ub2e8\uc704\uc774\uc9c0 \ud6a8\uc728\uc744 \ub098\ud0c0\ub0b4\ub294 \ubc31\ubd84\uc728\uc774 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p>\uae30\uc900 \uc791\uc5c5\uc218\ud589 \uc218\uc900\ub3c4 \uc911\uc694\ud569\ub2c8\ub2e4. MTM\uc740 \uac00\uc7a5 \ube60\ub978 \uc791\uc5c5\uc790\uc758 \uc2dc\uac04\uc744 \uce21\uc815\ud574 \uc774\ub97c \ud45c\uc900\uc73c\ub85c \uc0bc\ub294 \ubc29\uc2dd\uc774 \uc544\ub2d9\ub2c8\ub2e4. \uc2dc\uac04 \ub370\uc774\ud130 \uc790\uccb4\uc5d0 \uc774\ubbf8 \uc815\ud574\uc9c4 \uc791\uc5c5\uc218\ud589 \uae30\uc900\uc774 \ubc18\uc601\ub418\uc5b4 \uc788\uc2b5\ub2c8\ub2e4. \ub2e4\ub978 \uc2dc\uac04 \uc5f0\uad6c\uc5d0\uc11c \uc791\uc5c5\uc18d\ub3c4 \ud3c9\uac00\ub97c \uc801\uc6a9\ud588\ub2e4\ub294 \uc774\uc720\ub9cc\uc73c\ub85c \uc2a4\ud1b1\uc6cc\uce58 \uc2dc\uac04 \uc5f0\uad6c\uc758 \uc791\uc5c5\uc18d\ub3c4 \ud3c9\uac00\ub97c \ub2e4\uc2dc \uc801\uc6a9\ud574\uc11c\ub294 \uc548 \ub429\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\ub2e4\ub978 \uc2dc\uac04 \uc0b0\uc815 \ubc29\ubc95\ubcf4\ub2e4 MTM\uc774 \uc801\ud569\ud55c \ub54c\ub294?<\/h2>\n\n\n<p>MTM\uc740 \uc218\uc791\uc5c5 \ubc29\ubc95\uc744 \uc124\uacc4\ud560 \ub54c \ud2b9\ud788 \uc720\uc6a9\ud569\ub2c8\ub2e4. \uc2e0\uc81c\ud488\uc744 \ub3c4\uc785\ud558\uac70\ub098, \uce58\uad6c\ub97c \ubcc0\uacbd\ud558\uac70\ub098, \uc790\uc7ac \uacf5\uae09\u00b7\ubc30\uce58 \ubc29\uc2dd\uc744 \ubc14\uafb8\uac70\ub098, \ub450 \uac00\uc9c0 \uc870\ub9bd \uc21c\uc11c \uc911 \ud558\ub098\ub97c \uc120\ud0dd\ud558\ub294 \uacbd\uc6b0\uac00 \uc5ec\uae30\uc5d0 \ud574\ub2f9\ud569\ub2c8\ub2e4. \uc791\uc5c5 \ubc29\ubc95\uc744 \ud655\uc815\ud558\uae30 \uc804\uc5d0 \ud544\uc694\ud55c \uc791\uc5c5\ub7c9\uc744 \ube44\uad50\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uadf8\ub807\ub2e4\uace0 \uc2dc\uac04\uacfc \uad00\ub828\ub41c \ubaa8\ub4e0 \uc9c8\ubb38\uc5d0 MTM\uc774 \uc815\ub2f5\uc778 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4. \uc5b4\ub5a4 \uacb0\uc815\uc744 \ub0b4\ub9ac\ub824\ub294\uc9c0\uc5d0 \ub9de\ucdb0 \uadfc\uac70 \uc790\ub8cc\ub97c \uc120\ud0dd\ud558\uc138\uc694.<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>MTM:<\/strong> \uc815\ud574\uc9c4 \uc218\uc791\uc5c5 \ubc29\ubc95\uc744 \uc218\ud589\ud558\ub294 \ub370 \uc5b4\ub290 \uc815\ub3c4 \uc2dc\uac04\uc774 \ud544\uc694\ud55c\uac00? \uc0dd\uc0b0 \uc774\ub825\uc774 \ucda9\ubd84\ud788 \uc313\uc774\uae30 \uc804\uc5d0 \uc791\uc5c5\uc744 \uc124\uacc4\ud558\uace0 \ube44\uad50\ud560 \ub54c \uc720\uc6a9\ud569\ub2c8\ub2e4.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/manufacturing-time-study\/\">\uc2a4\ud1b1\uc6cc\uce58 \uc2dc\uac04 \uc5f0\uad6c<\/a>:<\/strong> \uba85\uc2dc\ub41c \uc870\uac74\uc5d0\uc11c \uad00\uce21\ud55c \uc791\uc5c5 \uc694\uc18c\ubcc4 \uc18c\uc694\uc2dc\uac04\uc740 \uc5bc\ub9c8\uc774\uba70, \uc774\ub97c \uadfc\uac70\ub85c \uc5b4\ub5a4 \ud45c\uc900\uc2dc\uac04\uc744 \uc815\ud560 \uc218 \uc788\ub294\uac00? \uacf5\uc815\uc774 \uc774\ubbf8 \uc874\uc7ac\ud558\uace0 \uad00\uce21\u00b7\ubd84\uc11d\ud560 \uc218 \uc788\uc744 \ub54c \uc720\uc6a9\ud569\ub2c8\ub2e4.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/work-sampling-manufacturing\/\">\uc6cc\ud06c \uc0d8\ud50c\ub9c1<\/a>:<\/strong> \uc870\ub9bd, \uc900\ube44, \ub300\uae30 \ub4f1 \uac01 \ud65c\ub3d9\uc5d0 \uc4f0\uc774\ub294 \uc2dc\uac04\uc758 \ube44\uc911\uc740 \uc5bc\ub9c8\uc778\uac00? \uc9e7\uc740 \ub3d9\uc791 \ud558\ub098\ud558\ub098\uc758 \uc2dc\uac04\uc744 \uc7ac\uae30\ubcf4\ub2e4 \uadfc\ubb34\uc2dc\uac04\uc774 \uc5b4\ub5bb\uac8c \ubc30\ubd84\ub418\ub294\uc9c0 \ud30c\uc545\ud560 \ub54c \uc720\uc6a9\ud569\ub2c8\ub2e4.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/manufacturing-time-tracking\/\">\uc791\uc5c5\ubcc4 \uc2dc\uac04 \uae30\ub85d<\/a>:<\/strong> \uc2e4\uc81c \uc8fc\ubb38\uc774\ub098 \uacf5\uc815\uc744 \uc218\ud589\ud558\ub294 \ub3d9\uc548 \uc5b4\ub5a4 \uc77c\uc774 \uc788\uc5c8\ub294\uac00? \uc0dd\uc0b0 \uc2e4\uc801\uc744 \uac80\ud1a0\ud558\uace0 \uacc4\ud68d\uacfc \ucc28\uc774\uac00 \ub09c \uc774\uc720\ub97c \uc124\uba85\ud560 \ub54c \uc720\uc6a9\ud569\ub2c8\ub2e4.<\/li><\/ul>\n\n\n<p>\uc774 \ubc29\ubc95\ub4e4\uc740 \uc11c\ub85c \ubcf4\uc644\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. MTM \ubd84\uc11d\uc73c\ub85c \uc81c\uc548\ub41c \uc791\uc5c5 \ubc29\ubc95\uc758 \uc18c\uc694\uc2dc\uac04\uc744 \uc0b0\uc815\ud558\uace0, \uc774\ud6c4 \uc0dd\uc0b0\uc744 \uad00\uce21\ud558\uba74\uc11c \ube60\ub728\ub9b0 \uc791\uc5c5 \uc694\uc18c\ub098 \ub2ec\ub77c\uc9c4 \uc870\uac74\uc744 \ubc1c\uacac\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ub2e4\ub9cc \uc790\uc7ac \ub300\uae30\uc2dc\uac04\uae4c\uc9c0 \ud3ec\ud568\ub41c \uae30\ub85d \uc2dc\uac04\uc758 \ud3c9\uade0\uc740 \ubbf8\ub9ac \uc0b0\uc815\ud55c \uc218\uc791\uc5c5\ub7c9\uacfc \uac19\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc790\ub3d9 \uc124\ube44\uc758 \uc0ac\uc774\ud074\uc5d0\uc11c\ub294 \uacf5\uc815 \uc870\uac74\uc5d0 \ub530\ub77c \uacb0\uc815\ub418\ub294 \uc2dc\uac04\uc744 \ubcc4\ub3c4\ub85c \uc0b0\uc815\ud574\uc57c \ud569\ub2c8\ub2e4. MTM\uc73c\ub85c \uc791\uc5c5\uc790\uc758 \ud22c\uc785, \ubc30\ucd9c, \ucde8\uae09 \uc791\uc5c5\uc744 \ubd84\uc11d\ud560 \uc218\ub294 \uc788\uc9c0\ub9cc, \uc124\ube44\uc758 \uc808\uc0ad \ud504\ub85c\uadf8\ub7a8\uc774\ub098 \uacbd\ud654\uc5d0 \ud544\uc694\ud55c \uc2dc\uac04\uc744 \uc190\ub3d9\uc791\uc73c\ub85c \ud658\uc0b0\ud558\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">MTM-1, MTM-2, MTM-UAS: \uc801\uc808\ud55c \ubd84\uc11d \uc218\uc900 \uc120\ud0dd\ud558\uae30<\/h2>\n\n\n<p>MTM\uc5d0\ub294 \uc0c1\uc138 \uc218\uc900\uc774 \uc11c\ub85c \ub2e4\ub978 \uc5ec\ub7ec \uc2dc\uc2a4\ud15c\uc774 \uc788\uc2b5\ub2c8\ub2e4. \uc5b4\ub5a4 \uc2dc\uc2a4\ud15c\uc744 \uc120\ud0dd\ud558\ub290\ub0d0\uc5d0 \ub530\ub77c \ubd84\uc11d\uc73c\ub85c \ub2e4\ub8e8\ub294 \ub0b4\uc6a9\uacfc \ubd84\uc11d\uc5d0 \ub4dc\ub294 \ub178\ub825\uc774 \ub2ec\ub77c\uc9d1\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>MTM-1<\/strong>\uc740 \uae30\ubcf8 \ub3d9\uc791 \ub2e8\uc704\ub85c \ubd84\uc11d\ud569\ub2c8\ub2e4. \uac1c\ubcc4 \ub3d9\uc791\uc758 \uc870\uac74\uc774 \uc791\uc5c5 \uc124\uacc4\uc5d0 \uc911\uc694\ud55c \uc601\ud5a5\uc744 \ubbf8\uce58\ub294, \uc9e7\uace0 \ubc18\ubcf5\uc801\uc778 \uc218\uc791\uc5c5\uc744 \uc0c1\uc138\ud788 \uac80\ud1a0\ud558\ub294 \ub370 \uc801\ud569\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>MTM-2<\/strong>\ub294 \uae30\ubcf8 \ub3d9\uc791\uc744 \ub354 \ud070 \ubb36\uc74c\uc73c\ub85c \uacb0\ud569\ud569\ub2c8\ub2e4. MTM-1\uc758 \ubaa8\ub4e0 \ub3d9\uc791\uc744 \uac1c\ubcc4\uc801\uc73c\ub85c \uae30\ub85d\ud558\uc9c0 \uc54a\uace0\ub3c4, \uc801\uc6a9\uc5d0 \uc801\ud569\ud55c \uc791\uc5c5\uc744 \ub35c \uc138\ubd84\ud654\ub41c \uc218\uc900\uc5d0\uc11c \ubd84\uc11d\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>MTM-UAS<\/strong>(Universal Analyzing System)\ub294 \ub354 \ud070 \ub2e8\uc704\uc758 \uacf5\uc815 \uad6c\uc131\uc694\uc18c\ub97c \uc0ac\uc6a9\ud558\uba70 \ubc30\uce58 \uc0dd\uc0b0 \uc791\uc5c5\uc5d0 \ud65c\uc6a9\ub429\ub2c8\ub2e4. \ub2e8\uc21c\ud788 MTM-1\uc744 \ub2e4\ub974\uac8c \ubd80\ub974\ub294 \uc774\ub984\uc774 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p>\uad50\uc721\uc744 \uc774\uc218\ud55c \ubd84\uc11d\uc790\uc640 \ud568\uaed8 \uacf5\uc815\uc758 \ud2b9\uc131, \ubc18\ubcf5\uc131\uacfc \ubcc0\ub3d9\uc131, \ubd84\uc11d \uacb0\uacfc\ub97c \ud65c\uc6a9\ud560 \uc758\uc0ac\uacb0\uc815\uc744 \uace0\ub824\ud574 \uc2dc\uc2a4\ud15c\uc744 \uc120\ud0dd\ud558\uc138\uc694. \ub354 \uc0c1\uc138\ud55c \ubd84\uc11d\uc774 \uacb0\uc815\uc5d0 \uc601\ud5a5\uc744 \uc904 \uc218 \uc788\uc744 \ub54c\ub294 \uadf8\ub9cc\ud07c\uc758 \ub178\ub825\uc744 \ub4e4\uc77c \uac00\uce58\uac00 \uc788\uc2b5\ub2c8\ub2e4. \uc62c\ubc14\ub974\uac8c \uc801\uc6a9\ud558\ub824\uba74 \uc120\ud0dd\ud55c \uc2dc\uc2a4\ud15c\uc5d0 \ub300\ud55c \uad50\uc721\uacfc \ucd5c\uc2e0 \ub370\uc774\ud130, \uc801\uc6a9 \uaddc\uce59\uc774 \ud544\uc694\ud569\ub2c8\ub2e4. \uc77c\ubc18\uc801\uc778 \uc548\ub0b4\uc11c\uac00 \uc774\ub97c \ub300\uc2e0\ud560 \uc218\ub294 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">MTM \ubd84\uc11d \uacb0\uacfc\ub97c \uacc4\ud68d\uc5d0 \uc4f8 \uc218 \uc788\ub294 \uc2dc\uac04\uc73c\ub85c \uc815\ub9ac\ud558\ub294 \ubc29\ubc95<\/h2>\n\n\n<p>\uc720\uc6a9\ud55c \ubd84\uc11d \uacb0\uacfc\ub294 \ub2e8\uc21c\ud55c \uc18c\uc694\uc2dc\uac04 \uc218\uce58\uc5d0 \uadf8\uce58\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4. \uc791\uc5c5 \ubc29\ubc95\uc774 \ubb38\uc11c\ud654\ub418\uc5b4 \uc788\uace0, \ub2e4\uc74c \ub2f4\ub2f9\uc790\ub3c4 \uadf8 \uc2dc\uac04\uc774 \ubb34\uc5c7\uc744 \uc758\ubbf8\ud558\ub294\uc9c0 \uc774\ud574\ud560 \uc218 \uc788\uc5b4\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. \uc791\uc5c5\uacfc \uc870\uac74 \uc815\uc758\ud558\uae30<\/h3>\n\n\n<p>\ub300\uc0c1 \uc81c\ud488 \uc0ac\uc591, \uacf5\uc815, \uc791\uc5c5 \ubc29\ubc95\uc758 \uac1c\uc815 \ubc84\uc804\uc744 \uc815\ud558\uc138\uc694. \uacf5\uad6c, \uce58\uad6c, \ubd80\ud488 \uacf5\uae09\u00b7\ubc30\uce58 \ubc29\uc2dd, \uc791\uc5c5 \uc21c\uc11c, \ud488\uc9c8 \uc810\uac80, \uc2dc\uc791 \ubc0f \uc885\ub8cc \uae30\uc900\uc744 \uae30\uc220\ud569\ub2c8\ub2e4. \ubd84\uc11d \ubc94\uc704\uac00 \uc81c\ud488 \ud55c \uac1c\uc778\uc9c0, \ud55c \uc0ac\uc774\ud074\uc778\uc9c0, \ud55c \ubc30\uce58\uc778\uc9c0\ub3c4 \uba85\uc2dc\ud558\uc138\uc694.<\/p>\n\n\n<p>\ud604\uc7ac \uc791\uc5c5\uc744 \uc218\ud589\ud558\uac70\ub098 \uc55e\uc73c\ub85c \uc218\ud589\ud560 \uc791\uc5c5\uc790\ub97c \ucc38\uc5ec\uc2dc\ud0a4\uc138\uc694. \uae54\ub054\ud55c \ub3c4\uba74\ub9cc\uc73c\ub85c\ub294 \ub193\uce58\uae30 \uc26c\uc6b4 \ubb34\ub9ac\ud55c \ubed7\uae30 \ub3d9\uc791, \ud544\uc694\ud55c \uc810\uac80, \uc6a9\uae30 \uad50\uccb4 \ub4f1\uc744 \uc9da\uc5b4\ub0bc \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc548\uc804\ud55c \ucde8\uae09\uacfc \uc81c\ud488 \ud488\uc9c8 \ud655\ubcf4\uc5d0 \ud544\uc694\ud55c \uc808\ucc28\ub294 \uc791\uc5c5 \ubc29\ubc95\uc5d0 \uadf8\ub300\ub85c \ud3ec\ud568\ud574\uc57c \ud569\ub2c8\ub2e4. \ud544\uc218 \uc791\uc5c5\uc744 \ube7c\ub294 \uac83\uc740 \uac1c\uc120\uc774 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. \uc120\ud0dd\ud55c \uc2dc\uc2a4\ud15c\uc73c\ub85c \uc791\uc5c5 \uc21c\uc11c \ubd84\uc11d\ud558\uae30<\/h3>\n\n\n<p>\uad50\uc721\uc744 \uc774\uc218\ud55c \ubd84\uc11d\uc790\uac00 \uc801\uc808\ud55c \uad6c\uc131\uc694\uc18c\ub85c \uc791\uc5c5\uc744 \ub098\ub204\uace0, \uc791\uc5c5\uc5d0 \uc601\ud5a5\uc744 \ubbf8\uce58\ub294 \uc870\uac74\uc744 \uace0\ub824\ud574 \uadf8 \ub0b4\uc6a9\uc744 \uae30\uc220\ud569\ub2c8\ub2e4. \uc815\ud574\uc9c4 \uac04\uaca9\uc73c\ub85c\ub9cc \uc218\ud589\ud558\ub294 \uc791\uc5c5\uae4c\uc9c0 \ud3ec\ud568\ud558\uc5ec, \uc2e4\uc81c\ub85c \uc774\ub8e8\uc5b4\uc9c0\ub294 \uc77c\uc744 \ubd84\uc11d\uc5d0 \ubc18\uc601\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc791\uc5c5 \uc21c\uc11c\uc640 \ub3d9\uc2dc \uc218\ud589\uc5d0 \uad00\ud55c \ud574\ub2f9 \uc2dc\uc2a4\ud15c\uc758 \uaddc\uce59\uc744 \ub530\ub974\uc138\uc694. \ub450 \uc190\uc774 \ub3d9\uc2dc\uc5d0 \uc6c0\uc9c1\uc778\ub2e4\uace0 \ud574\uc11c \ub450 \ub3d9\uc791\uc758 \uc2dc\uac04\uc774 \ubc18\ub4dc\uc2dc \uc5f0\uc18d\ud574\uc11c \ub354\ud574\uc9c0\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4. \uc791\uc5c5 \ubc29\ubc95 \uc124\uba85\uc774 \ubd88\uc644\uc804\ud558\ub2e4\uace0 \ud574\uc11c \ube48 \ubd80\ubd84\uc744 \ucc44\uc6b0\uae30 \uc704\ud574 \ub3d9\uc791\uc2dc\uac04\uc744 \uc784\uc758\ub85c \ub9cc\ub4e4\uc5b4\uc11c\ub3c4 \uc548 \ub429\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc900\ube44 \uc791\uc5c5\uacfc \ubc18\ubcf5 \uc791\uc5c5\uc744 \uad6c\ubd84\ud558\uc138\uc694. \ubc30\uce58\ub2f9 \ud55c \ubc88\ub9cc \uc218\ud589\ud558\ub294 \uce58\uad6c \uc900\ube44\uc2dc\uac04\uc744 \uc81c\ud488\ub9c8\ub2e4 \ubc18\ubcf5\ud574\uc11c \uc0b0\uc815\ud574\uc11c\ub294 \uc548 \ub429\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. \ucd1d\uc2dc\uac04\ubfd0 \uc544\ub2c8\ub77c \uc791\uc5c5 \ubc29\ubc95 \ube44\uad50\ud558\uae30<\/h3>\n\n\n<p>\ubd84\uc11d\uc744 \ud1b5\ud574 \uc5b4\ub5a4 \ubc29\ubc95\uc774 \uc65c \ub354 \uc801\uc740 \uc791\uc5c5\uc744 \uc694\uad6c\ud558\ub294\uc9c0 \uc0b4\ud3b4\ubcf4\uc138\uc694. \ubd80\ud488\uc744 \ud56d\uc0c1 \uac19\uc740 \ubc29\ud5a5\uc73c\ub85c \uacf5\uae09\ud560 \uc218 \uc788\uc744\uae4c\uc694? \uce58\uad6c\ub97c \uc0ac\uc6a9\ud574 \ubc18\ubcf5\uc801\uc778 \uc704\uce58 \uc870\uc815\uc744 \uc5c6\uc568 \uc218 \uc788\uc744\uae4c\uc694? \uc791\uc5c5 \uc21c\uc11c\ub97c \ubc14\uafb8\uba74 \uac80\uc0ac\ub294 \uc720\uc9c0\ud558\uba74\uc11c \ubd88\ud544\uc694\ud55c \ucde8\uae09\uc744 \uc904\uc77c \uc218 \uc788\uc744\uae4c\uc694?<\/p>\n\n\n<p>\ubd84\uc11d \ubc94\uc704\uc640 \ud488\uc9c8 \uc694\uad6c\uc0ac\ud56d\uc744 \ub3d9\uc77c\ud558\uac8c \ub9de\ucdb0 \ub300\uc548\uc744 \ube44\uad50\ud558\uc138\uc694. \uc790\uc7ac \ubcf4\ucda9\uc774\ub098 \uac80\uc0ac\ub97c \ubd84\uc11d \ubc94\uc704 \ubc16\uc73c\ub85c \uc62e\uaca8\uc11c \ub354 \ube68\ub77c \ubcf4\uc774\ub294 \ubc29\ubc95\uc774 \uc2e4\uc81c\ub85c \uc791\uc5c5\uc744 \uc904\uc778 \uac83\uc740 \uc544\ub2d0 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc774\ub807\uac8c \ube44\uad50\ud560 \ub54c MTM\uc740 \uadf8\ub7f4\ub4ef\ud55c \ucd94\uc815\uce58\ub97c \ub9cc\ub4dc\ub294 \ub370 \uadf8\uce58\uc9c0 \uc54a\uace0 \uc791\uc5c5 \uc124\uacc4 \ub3c4\uad6c\ub85c \uae30\ub2a5\ud569\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. \uacf5\uc2dd \uc801\uc6a9\ud560 \uc2dc\uac04\uc5d0 \ud3ec\ud568\ub41c \ud56d\ubaa9 \uba85\ud655\ud788 \ud558\uae30<\/h3>\n\n\n<p>\uacb0\uacfc\ub97c \uc0dd\uc0b0 \ud45c\uc900\uc2dc\uac04\uc73c\ub85c \uc0bc\uae30 \uc804\uc5d0 \uc2dc\uac04 \uc0b0\uc815 \uae30\uc900\uc744 \ud655\uc778\ud558\uc138\uc694. \ubc18\ubcf5\uc801\uc73c\ub85c \ud544\uc694\ud55c \uc9c0\uc6d0 \uc791\uc5c5\uc744 \ud30c\uc545\ud558\uace0, \uac1c\uc778 \uc6a9\ubb34, \ud53c\ub85c \ud68c\ubcf5, \ubd88\uac00\ud53c\ud55c \uc9c0\uc5f0\uc744 \uc5b4\ub5bb\uac8c \ubc18\uc601\ud560\uc9c0 \uc815\ud569\ub2c8\ub2e4. \uc5b4\ub5a4 \uc5ec\uc720\uc2dc\uac04\uc744 \ud3ec\ud568\ud588\uc73c\uba70 \uc5b4\ub5bb\uac8c \uacc4\uc0b0\ud588\ub294\uc9c0 \uae30\ub85d\ud558\uc138\uc694. \ubaa8\ub4e0 \uacbd\uc6b0\uc5d0 \ud1b5\uc6a9\ub418\ub294 \uc77c\uc815 \ube44\uc728\uc774 \uc788\ub2e4\uace0 \uac00\uc815\ud574\uc11c\ub294 \uc548 \ub429\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc608\ubc29\ud560 \uc218 \uc788\ub294 \uc791\uc5c5 \uc911\ub2e8\uc740 \ud574\uacb0\ud574\uc57c \ud560 \ubb38\uc81c\ub85c \ub4dc\ub7ec\ub0b4 \ub450\uc138\uc694. \ubd80\ud488 \ubd80\uc871\uc73c\ub85c \uc778\ud55c \ub300\uae30\uac00 \ubaa8\ub4e0 \uc190 \ubed7\uae30\u00b7\uc7a1\uae30 \ub3d9\uc791\uc5d0 \uc2ac\uadf8\uba38\ub2c8 \ud3ec\ud568\ub418\uc5b4\uc11c\ub294 \uc548 \ub429\ub2c8\ub2e4. \ubc18\ub300\ub85c \ubc18\ub4dc\uc2dc \ud544\uc694\ud55c \ubc18\ubcf5 \uc791\uc5c5\uc744 \uacc4\ud68d\uc6a9 \uc18c\uc694\uc2dc\uac04\uc5d0\uc11c \ube7c\uba74, \uc0c8 \uc791\uc5c5 \ubc29\ubc95\uc744 \uc2e4\uc81c\ubcf4\ub2e4 \uc77c\uc815\uc5d0 \ubc30\uce58\ud558\uae30 \uc26c\uc6b4 \uac83\uc73c\ub85c \ud310\ub2e8\ud558\uac8c \ub429\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. \uc791\uc5c5 \ubc29\ubc95 \uac80\uc99d \ubc0f \uc0ac\uc6a9 \uc2b9\uc778\ud558\uae30<\/h3>\n\n\n<p>\uacf5\uc2dd \uc801\uc6a9 \uc804\uc5d0 \uc608\uc815\ub41c \uc124\ube44, \uc790\uc7ac \uacf5\uae09\u00b7\ubc30\uce58 \ubc29\uc2dd, \ud488\uc9c8 \uc694\uad6c\uc0ac\ud56d\uc744 \uac16\ucd98 \uc870\uac74\uc5d0\uc11c \uc81c\uc548\ub41c \uc791\uc5c5 \ubc29\ubc95\uc744 \uc218\ud589\ud560 \uc218 \uc788\ub294\uc9c0 \ud655\uc778\ud558\uc138\uc694. \uc2dc\ud5d8 \uc0dd\uc0b0\uc774\ub098 \ucd08\uae30 \uc0dd\uc0b0 \uacb0\uacfc\ub97c \ud655\ubcf4\ud558\uba74 \ube44\uad50 \uac00\ub2a5\ud55c \uc791\uc5c5\uc744 \uae30\uc900\uc73c\ub85c \ucc28\uc774\ub97c \uc870\uc0ac\ud569\ub2c8\ub2e4. \uc219\ub828 \uacfc\uc815, \uce58\uad6c \ubcc0\uacbd, \ubd84\uc11d \uc694\uc18c \ub204\ub77d\uc740 \uac01\uac01 \ub2e4\ub978 \ub300\uc751\uc774 \ud544\uc694\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\ubd84\uc11d \ub0b4\uc6a9, \uc0ac\uc6a9\ud55c \uc2dc\uc2a4\ud15c, \uc791\uc5c5 \ubc29\ubc95\uc758 \uac1c\uc815 \ubc84\uc804, \uc804\uc81c \uc870\uac74, \ud3ec\ud568\ub41c \uc5ec\uc720\uc2dc\uac04, \uc2b9\uc778 \ub0b4\uc5ed\uacfc \uc801\uc6a9\uc77c\uc744 \ubcf4\uad00\ud558\uc138\uc694. \uc791\uc5c5 \ubc29\ubc95\uc774\ub098 \uc870\uac74\uc774 \ubc14\ub00c\uba74 \uc18c\uc694\uc2dc\uac04\ub3c4 \ub2e4\uc2dc \uac80\ud1a0\ud574\uc57c \ud569\ub2c8\ub2e4. \ubaa9\uc801\uc740 \ubcf4\uae30 \uc88b\uc740 \uc218\uce58\ub97c \ubb34\uae30\ud55c \uc720\uc9c0\ud558\ub294 \uac83\uc774 \uc544\ub2c8\ub77c, \uc2e4\uc81c \uc791\uc5c5\uacfc \uacc4\ud68d \uc0ac\uc774\uc758 \uc2e0\ub8b0\ud560 \uc218 \uc788\ub294 \uc5f0\uacb0\uc744 \uc720\uc9c0\ud558\ub294 \uac83\uc785\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc608\uc2dc: \uc870\ub9bd \ubc29\ubc95\uc744 \uac1c\uc120\ud574\ub3c4 \uc0dd\uc0b0 \uc77c\uc815\uc774 \uc800\uc808\ub85c \ubc14\ub00c\uc9c0\ub294 \uc54a\uc2b5\ub2c8\ub2e4<\/h2>\n\n\n<p>\ubd80\ud488\uc774 \uc81c\uac01\uac01 \ub2e4\ub978 \ubc29\ud5a5\uc73c\ub85c \uacf5\uae09\ub418\ub294 \uc218\uc791\uc5c5 \uc870\ub9bd \uc791\uc5c5\uc7a5\uc744 \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \uac1c\uc120\uc548\uc740 \ubd80\ud488 \uacf5\uae09 \ud2b8\ub808\uc774\uc640 \uc704\uce58 \uacb0\uc815 \uc9c0\uadf8\ub97c \uc0ac\uc6a9\ud574 \ubd80\ud488\uc744 \uace8\ub77c\ub0b4\uac70\ub098 \ubc29\ud5a5\uc744 \ub2e4\uc2dc \ub9de\ucd94\ub294 \ub3d9\uc791\uc744 \uc904\uc774\ub294 \uac83\uc785\ub2c8\ub2e4. \ud300\uc740 \uc774 \uc791\uc5c5 \ubc29\ubc95\uc744 \uac80\ud1a0\ud558\uace0 \uc0ac\uc6a9\uc744 \uc2b9\uc778\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uadf8 \uacb0\uacfc \uacc4\ud68d\uc5d0 \uc0ac\uc6a9\ud558\ub294 \uac1c\ub2f9 \uc2dc\uac04\uc774 \uc774 \ubd84\uc5d0\uc11c \uc77c \ubd84 \uc0bc\uc2ed \ucd08\ub85c \uc904\uc5c8\ub2e4\uace0 \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \uc774\ub294 \uc608\uc2dc\ub97c \uc704\ud574 \uc2b9\uc778\ub41c \uacc4\ud68d \uc785\ub825\uac12\uc744 \uac00\uc815\ud55c \uac83\uc774\uba70, MTM \ub370\uc774\ud130 \uce74\ub4dc\uc5d0\uc11c \uac00\uc838\uc628 \uac12\uc774 \uc544\ub2d9\ub2c8\ub2e4. \uc791\uc5c5\uc790 \ud55c \uba85\uc774 \ud55c \uc791\uc5c5\uc7a5\uc5d0\uc11c \uc21c\ucc28\uc801\uc73c\ub85c \uc791\uc5c5\ud558\uace0, \ub3d9\uc2dc\uc5d0 \uc9c4\ud589\ub418\ub294 \uae30\uacc4 \uc0ac\uc774\ud074\uc740 \uc5c6\uc73c\uba70, \uc5ec\uc720\uc2dc\uac04\uc774 \uc911\ubcf5 \ubc18\uc601\ub418\uc9c0 \uc54a\ub3c4\ub85d \uc18c\uc694\uc2dc\uac04\uacfc \uac00\uc6a9 \uc791\uc5c5 \uce98\ub9b0\ub354\ub97c \uc870\uc815\ud588\ub2e4\uace0 \uac00\uc815\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc8fc\ubb38 \uc218\ub7c9\uc774 120\uac1c\uc774\uace0 \uc900\ube44\uc2dc\uac04\uc740 \uae30\uc874\uacfc \ub3d9\uc77c\ud558\uac8c 30\ubd84\uc774\ub77c\uba74 \uacc4\uc0b0\uc740 \ub2e4\uc74c\uacfc \uac19\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>\uae30\uc874 \ubc29\ubc95:<\/strong> 120 \u00d7 2\ubd84 + 30\ubd84 = 270\ubd84, \uc989 \ub124 \uc2dc\uac04 \ubc18\uc785\ub2c8\ub2e4.<\/li><li><strong>\uc0c8 \ubc29\ubc95:<\/strong> 120 \u00d7 1.5\ubd84 + 30\ubd84 = 210\ubd84, \uc989 \uc138 \uc2dc\uac04 \ubc18\uc785\ub2c8\ub2e4.<\/li><\/ul>\n\n\n<p>\uc774 \uc8fc\ubb38\uc774 \ud574\ub2f9 \uc791\uc5c5\uc7a5\uc5d0\uc11c \ucc28\uc9c0\ud558\ub294 \uc2dc\uac04\uc774 \ud55c \uc2dc\uac04 \uc904\uc5b4\ub4ed\ub2c8\ub2e4. \uadf8\ub9cc\ud07c \uc0dd\uc0b0 \uc5ec\ub825\uc774 \uc0dd\uae30\uc9c0\ub9cc, \ucd9c\ud558\uac00 \uc790\ub3d9\uc73c\ub85c \ud55c \uc2dc\uac04 \ube68\ub77c\uc9c0\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4. \uc870\ub9bd\ud488\uc774 \uc2dc\ud5d8 \uc124\ube44\ub97c \uae30\ub2e4\ub824\uc57c \ud560 \uc218\ub3c4 \uc788\uace0, \ub2e4\uc74c \uacf5\uc815\uc5d0 \ub2e4\ub978 \uc8fc\ubb38\uc774 \uc9c4\ud589 \uc911\uc77c \uc218\ub3c4 \uc788\uc2b5\ub2c8\ub2e4. \ud655\ubcf4\ub41c \ud55c \uc2dc\uac04\uc774 \ub2e4\ub978 \uc791\uc5c5\uc5d0 \ud544\uc694\ud55c \uc2dc\uac04\ub300\uc640 \ub9de\uc9c0 \uc54a\uc744 \uc218\ub3c4 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ub530\ub77c\uc11c \ub2e4\uc74c \ub2e8\uacc4\ub294 \ub0a9\uae30\ub97c 1\uc2dc\uac04 \uc55e\ub2f9\uae30\ub294 \uac83\uc774 \uc544\ub2d9\ub2c8\ub2e4. \uac00\uc6a9 \uc790\uc6d0 \uc548\uc5d0\uc11c \uc774 \uc8fc\ubb38\uacfc \ub2e4\ub978 \uc791\uc5c5\uc744 \uc5b4\ub5bb\uac8c \ubc30\uce58\ud560\uc9c0 \ub2e4\uc2dc \uacc4\uc0b0\ud574\uc57c \ud569\ub2c8\ub2e4. SkyPlanner\uac00 \ubc14\ub85c \uc774 \uacc4\uc0b0\uc744 \uc218\ud589\ud569\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc2b9\uc778\ub41c \uc791\uc5c5 \ubc29\ubc95\uc758 \uc18c\uc694\uc2dc\uac04\uc744 SkyPlanner \uacc4\ud68d\uc5d0 \ubc18\uc601\ud558\uc138\uc694<\/h2>\n\n\n<p>SkyPlanner\uc5d0\uc11c\ub294 \uacf5\uc815 \uc18c\uc694\uc2dc\uac04\uc744 \uac1c\ub2f9 \uc2dc\uac04, \uc0dd\uc0b0 \uc18d\ub3c4 \ub610\ub294 \uace0\uc815 \uc2dc\uac04\uc73c\ub85c \uc124\uc815\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc900\ube44\uc2dc\uac04\uacfc \uc791\uc5c5 \ud6c4 \uc815\ub9ac\uc2dc\uac04\uc740 \ubcc4\ub3c4\ub85c \uc785\ub825\ud569\ub2c8\ub2e4. \ub530\ub77c\uc11c \uc55e\uc11c \uc0b4\ud3b4\ubcf8 \uc804\ub7c9 \uc218\uc791\uc5c5 \uc608\uc2dc\uc5d0\uc11c\ub294 \uc8fc\ubb38 \uc218\ub7c9\uc774 \ub2ec\ub77c\uc838\ub3c4 \uc2b9\uc778\ub41c \uac1c\ub2f9 \uacc4\ud68d\uc2dc\uac04\uacfc \ubc30\uce58 \uc900\ube44\uc2dc\uac04\uc744 \uad6c\ubd84\ud574 \uad00\ub9ac\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uba3c\uc800 \ud574\ub2f9 \uc18c\uc694\uc2dc\uac04 \ub3d9\uc548 \uc5b4\ub5a4 \uc790\uc6d0\uc744 \ud655\ubcf4\ud574\uc57c \ud558\ub294\uc9c0 \ud655\uc778\ud558\uc138\uc694. \uc791\uc5c5\uc790\uac00 \uc9c1\uc811 \uc77c\ud558\ub294 \uc2dc\uac04, \uae30\uacc4 \uc810\uc720\uc2dc\uac04, \uacf5\uc815 \uc2dc\uc791\ubd80\ud130 \uc885\ub8cc\uae4c\uc9c0\uc758 \uacbd\uacfc\uc2dc\uac04\uc740 \uc11c\ub85c \ub2e4\ub978 \uc9c0\ud45c\uc785\ub2c8\ub2e4. \uc791\uc5c5\uc790\uac00 \ub2e4\uc74c \ubd80\ud488\uc744 \uc900\ube44\ud558\ub294 \ub3d9\uc548 \uae30\uacc4\uac00 \uac00\ub3d9\ub41c\ub2e4\uba74, \ubaa8\ub4e0 \ud65c\ub3d9\uc758 \uc2dc\uac04\uc744 \ub2e8\uc21c\ud788 \ub354\ud560 \uacbd\uc6b0 \uae30\uacc4 \uc810\uc720\uc2dc\uac04\uc744 \uacfc\ub2e4\ud558\uac8c \uc7a1\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ubc18\ub300\ub85c \uc218\uc791\uc5c5 \uc2dc\uac04\ub9cc \ubc18\uc601\ud558\uba74 \uc124\ube44\ub97c \ub2e4\ub978 \uc791\uc5c5\uc5d0 \uc0ac\uc6a9\ud560 \uc218 \uc5c6\ub294 \uc2dc\uac04\uc774 \ub204\ub77d\ub420 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ud574\ub2f9 \uc791\uc5c5 \ubc29\ubc95\uc744 \uc218\ud589\ud558\ub294 \ub370 \uc2e4\uc81c\ub85c \ud544\uc694\ud55c \uc790\uc6d0\uc744 \uacf5\uc815\uc5d0 \ubc18\uc601\ud558\uc138\uc694.<\/p>\n\n\n<p>\uc18c\uc694\uc2dc\uac04\uc5d0 \ud3ec\ud568\ub41c \uc5ec\uc720\uc2dc\uac04\ub3c4 \uc791\uc5c5 \uce98\ub9b0\ub354\uc640 \ub9de\ucdb0 \ud655\uc778\ud574\uc57c \ud569\ub2c8\ub2e4. \uac00\uc6a9 \uc0dd\uc0b0 \ub2a5\ub825\uc5d0\uc11c \uc774\ubbf8 \uc81c\uc678\ud55c \ud734\uc2dd\uc2dc\uac04\uc744 \uac19\uc740 \ud734\uc2dd\uc5d0 \ub300\ud55c \uc5ec\uc720\uc2dc\uac04\uc73c\ub85c \ub2e4\uc2dc \ucc28\uac10\ud574\uc11c\ub294 \uc548 \ub429\ub2c8\ub2e4. \uc2b9\uc778\ub41c \ubd84\uc11d \uae30\ub85d\uc740 \ubcf4\uc874\ud558\uace0, \uac01 \uad6c\uc131 \uc694\uc18c\ub97c \uacc4\ud68d \uc785\ub825\uac12\uc5d0 \uc5b4\ub5bb\uac8c \ubc18\uc601\ud588\ub294\uc9c0 \ubb38\uc11c\ud654\ud558\uc138\uc694.<\/p>\n\n\n<p>Arcturus\ub294 \uc124\uc815\ub41c \uc791\uc5c5\uc7a5, \uad50\ub300\uadfc\ubb34, \uc120\ud6c4\ud589 \uad00\uacc4, \uc6b0\uc120\uc21c\uc704\ub97c \uae30\uc900\uc73c\ub85c \uacf5\uc815\ubcc4 \uc18c\uc694\uc2dc\uac04\uc744 \uc77c\uc815\uc5d0 \ubc30\uce58\ud569\ub2c8\ub2e4. \uac04\ud2b8 \ud0c0\uc784\ub77c\uc778\uc5d0\uc11c\ub294 \uc791\uc5c5\ub4e4\uc774 \uc5b4\ub5bb\uac8c \uc5f0\uacb0\ub418\uace0 \ubc30\uce58\ub418\ub294\uc9c0 \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc2b9\uc778\ub41c \uc791\uc5c5 \ubc29\ubc95 \ubcc0\uacbd\uc744 \uc801\uc6a9\ud560 \ub54c\ub294 \uad00\ub828 \uacc4\ud68d \uc785\ub825\uac12\uc744 \uac31\uc2e0\ud558\uace0 <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-scheduling\/\">\uc0dd\uc0b0 \uc77c\uc815\uc744 \ub2e4\uc2dc \uacc4\uc0b0\ud574<\/a> \ud6c4\uc18d \uacf5\uc815\uacfc \uac19\uc740 \uc790\uc6d0\uc744 \ub450\uace0 \uacbd\ud569\ud558\ub294 \uc8fc\ubb38\uc5d0 \ubbf8\uce58\ub294 \uc601\ud5a5\uc744 \ud655\uc778\ud558\uc138\uc694.<\/p>\n\n\n<p>\ubcc0\uacbd\ud560 \ub54c\ub9c8\ub2e4 \uac1c\ubcc4 \uc791\uc5c5 \ub300\uae30\uc5f4\uc744 \uc218\uc791\uc5c5\uc73c\ub85c \ub2e4\uc2dc \uad6c\uc131\ud558\ub294 \uc218\uace0\ub97c \uc904\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ub354 \uc911\uc694\ud55c \uc810\uc740 \uc644\ub8cc\ub41c \uc791\uc5c5 \uc774\ub825\uc774 \ucda9\ubd84\ud788 \uc313\uc774\uae30 \uc804\uc5d0\ub3c4 \uc0c8 \uc791\uc5c5 \ubc29\ubc95\uc5d0 \ub300\ud574 \uadfc\uac70 \uc788\ub294 \uc18c\uc694\uc2dc\uac04\uc744 \uc0ac\uc6a9\ud574 \ud5a5\ud6c4 \uc0dd\uc0b0 \uacc4\ud68d\uc744 \uc138\uc6b8 \uc218 \uc788\ub2e4\ub294 \uac83\uc785\ub2c8\ub2e4. \uc5b4\ub5a4 \uc791\uc5c5 \ubc29\ubc95\uc744 \uc2b9\uc778\ud558\uace0 \uc5b4\ub5a4 \ub0a9\ud488 \uc57d\uc18d\uc744 \uc6b0\uc120\ud560\uc9c0\ub294 \ub2f4\ub2f9\uc790\uac00 \uacb0\uc815\ud558\uace0, SkyPlanner\ub294 \uc11c\ub85c \uc5f0\uacb0\ub41c \uc0dd\uc0b0 \uc77c\uc815\uc744 \uacc4\uc0b0\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774\ud6c4 \uc2e4\uc81c \uc0dd\uc0b0\uc774 \uc9c4\ud589\ub418\uba74 \ucd94\uac00 \uadfc\uac70\ub97c \ud655\ubcf4\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. SkyPlanner\ub294 \uacfc\uac70 \uc791\uc5c5\uc2dc\uac04 \uae30\ub85d\uc744 \ubc14\ud0d5\uc73c\ub85c \uacf5\uc815 \uc18c\uc694\uc2dc\uac04\uc744 \ucd94\uc815\ud558\ub294 \uae30\ub2a5\ub3c4 \uc9c0\uc6d0\ud569\ub2c8\ub2e4. \ub2e4\ub9cc \uc774 \ubc29\uc2dd\uc740 MTM\uacfc \uad6c\ubd84\ud574\uc57c \ud569\ub2c8\ub2e4. \uacfc\uac70 \uae30\ub85d \uae30\ubc18 \ucd94\uc815\uc740 \uc2e4\uc81c \uc0dd\uc0b0 \uae30\ub85d\uc744 \uc774\uc6a9\ud558\uace0, MTM\uc740 \ubbf8\ub9ac \uc815\ud574\uc9c4 \ub370\uc774\ud130\ub97c \uc774\uc6a9\ud574 \uc815\uc758\ub41c \uc218\uc791\uc5c5 \ubc29\ubc95\uc744 \ud3c9\uac00\ud569\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uacf5\uc720\ub41c \uc0dd\uc0b0 \uc77c\uc815\uc774 \uc911\uc694\ud55c \uc774\uc720<\/h3>\n\n\n<p><a href=\"\/ko\/%ea%b3%a0%ea%b0%9d-%ec%82%ac%eb%a1%80\/utu\/\">\ud540\ub780\ub4dc\uc758 \ubc30\uc804\ubc18 \ubc0f \uac1c\ud3d0\uc7a5\uce58 \uc81c\uc870\uc5c5\uccb4 UTU<\/a>\ub294 \uacfc\uac70\uc5d0 \ubd80\uc11c\ubcc4 \uc2a4\ud504\ub808\ub4dc\uc2dc\ud2b8\ub85c \uacc4\ud68d\uc744 \uc218\ub9bd\ud588\uc2b5\ub2c8\ub2e4. ERP\uc5d0\uc11c \uc791\uc5c5 \uc21c\uc11c\uac00 \ubc14\ub00c\uc5b4\ub3c4 \uc0dd\uc0b0 \ud604\uc7a5\uc5d0 \uc804\ub2ec\ub418\uc9c0 \uc54a\ub294 \uacbd\uc6b0\uac00 \uc788\uc5c8\uace0, \uc2e4\uc81c \uac00\uc6a9 \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ud30c\uc545\ud558\uae30\ub3c4 \uc5b4\ub824\uc6e0\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>UTU\ub294 SkyPlanner\ub97c Oracle NetSuite\uc640 \uc5f0\ub3d9\ud574 Ulvila \uacf5\uc7a5\uc758 \uc0dd\uc0b0 \ub77c\uc778\uacfc \ubd80\uc11c\ub97c \ud558\ub098\uc758 \uc2dc\uc2a4\ud15c\uc73c\ub85c \ud1b5\ud569\ud588\uc2b5\ub2c8\ub2e4. UTU \ud300\uc5d0 \ub530\ub974\uba74 \uac31\uc2e0\ub41c \uc791\uc5c5 \ub300\uae30\uc5f4\uc774 \uc218\ucd08 \uc548\uc5d0 \uc124\uce58 \uc791\uc5c5\uc790\uc5d0\uac8c \uc804\ub2ec\ub418\uba70, \ud504\ub85c\uc81d\ud2b8 \ub0a9\ud488 \uc77c\uc815\ub3c4 \ub354 \uc815\ubc00\ud558\uac8c \uc218\ub9bd\ud560 \uc218 \uc788\uac8c \ub418\uc5c8\uc2b5\ub2c8\ub2e4. \uc774 \uc0ac\ub840\ub294 \ubd80\uc11c\ub9c8\ub2e4 \uc790\uccb4 \ub300\uae30\uc5f4\uc744 \uc870\uc815\ud558\uac8c \ub450\ub294 \ub300\uc2e0 \uc804\uccb4 \uc791\uc5c5\ub7c9\uc744 \ud558\ub098\uc758 \uacf5\uc720 \uacc4\ud68d\uc5d0 \ubc18\uc601\ud558\ub294 \uac83\uc774 \uc65c \uc911\uc694\ud55c\uc9c0 \ubcf4\uc5ec\uc90d\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc2e0\ub8b0\ud560 \uc218 \uc788\ub294 \uc791\uc5c5 \ubc29\ubc95\ubcc4 \uc18c\uc694\uc2dc\uac04\uc5d0\uc11c \uc2e0\ub8b0\ud560 \uc218 \uc788\ub294 \uc0dd\uc0b0 \uacc4\ud68d\uc73c\ub85c<\/h2>\n\n\n<p>\uc0dd\uc0b0 \uc774\ub825\ub9cc\uc73c\ub85c \ud310\ub2e8\ud558\uae30 \uc5b4\ub824\uc6b4 \ub2e8\uacc4\uc5d0\uc11c \uc218\uc791\uc5c5\uc744 \uc124\uacc4\ud558\uace0 \uadf8 \ud0c0\ub2f9\uc131\uc744 \uc785\uc99d\ud574\uc57c \ud55c\ub2e4\uba74 MTM \uae30\ubc95\uc744 \ud65c\uc6a9\ud558\uc138\uc694. \uadf8\ub807\uac8c \uc2b9\uc778\ub41c \uc18c\uc694\uc2dc\uac04\uc744 \uc2e4\uc81c \uc218\uc8fc \ubb3c\ub7c9\uc758 \uc0dd\uc0b0 \uc77c\uc815\uc5d0 \ubc18\uc601\ud574\uc57c \ud560 \ub54c\ub294 SkyPlanner\ub97c \uc120\ud0dd\ud558\uc138\uc694. \uc62c\ubc14\ub978 \uc791\uc5c5 \ubc29\ubc95\uc740 \uc791\uc5c5\uc5d0 \ubb34\uc5c7\uc774 \ud544\uc694\ud55c\uc9c0 \uc54c\ub824\uc8fc\uace0, \uc720\ud55c \uc6a9\ub7c9 \uc2a4\ucf00\uc904\ub9c1\uc740 \uadf8 \uc791\uc5c5\uc744 \uc5b4\ub514\uc5d0, \uc5b8\uc81c \ubc30\uce58\ud560 \uc218 \uc788\ub294\uc9c0 \ubcf4\uc5ec\uc90d\ub2c8\ub2e4.<\/p>\n\n\n<p>SkyPlanner\ub294 \uac1c\ubc29\ud615 REST API\ub97c \ud1b5\ud574 \ubaa8\ub4e0 ERP \ub610\ub294 MES\uc640 \uc5f0\ub3d9\ub418\ubbc0\ub85c, \uae30\uc874 \uc0dd\uc0b0 \uc815\ubcf4\ub97c \ud65c\uc6a9\ud574 \ub354 \ub098\uc740 \uc0dd\uc0b0 \uc77c\uc815\uc744 \uc218\ub9bd\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc2b9\uc778\ub41c \uc791\uc5c5 \ubc29\ubc95\uc758 \uc18c\uc694\uc2dc\uac04 \ud55c \uac00\uc9c0\uc640 \ud574\ub2f9 \uacf5\uc815 \uacbd\ub85c, \uac19\uc740 \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ub450\uace0 \uacbd\ud569\ud558\ub294 \ub2e4\ub978 \uc8fc\ubb38\uc744 \uc900\ube44\ud574 <a href=\"https:\/\/skyplanner.ai\/ko\/%ec%98%81%ec%97%85%ed%8c%80%ec%97%90-%eb%ac%b8%ec%9d%98\/\">SkyPlanner \ub370\ubaa8\ub97c \uc608\uc57d\ud558\uc138\uc694<\/a>. \uc791\uc5c5 \ubc29\ubc95 \ubcc0\uacbd\uc774 \ub2e8\uc77c \uacf5\uc815\uc758 \uc18c\uc694\uc2dc\uac04\ubfd0 \uc544\ub2c8\ub77c \uc0dd\uc0b0 \uacc4\ud68d\uacfc \ub0a9\uae30\uc5d0 \uc5b4\ub5a4 \uc601\ud5a5\uc744 \ubbf8\uce58\ub294\uc9c0 \ud655\uc778\ud574 \ubcf4\uc138\uc694. \uba3c\uc800 \uc9c1\uc811 \uc0b4\ud3b4\ubcf4\uace0 \uc2f6\ub2e4\uba74 <a href=\"https:\/\/skyplanner.ai\/ko\/%ed%8f%89%ea%b0%80%ed%8c%90\/\">\ub370\ubaa8 \ub370\uc774\ud130\ub85c SkyPlanner\ub97c \uccb4\ud5d8\ud558\uac70\ub098<\/a> \uc5b4\uc2dc\uc2a4\ud134\ud2b8\uc758 \uc778\uacf5\uc9c0\ub2a5 \uae30\ubc18 \uc2dc\uc791 \uc548\ub0b4\ub97c \uc774\uc6a9\ud574 \ubcf4\uc138\uc694.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>MTM \uae30\ubc95: \uc0dd\uc0b0 \uc804\uc5d0 \uc791\uc5c5\uc744 \uc124\uacc4\ud558\uace0 \uc2dc\uac04\uc744 \uc0b0\uc815\ud558\ub294 \ubc29\ubc95 \ud648 &raquo; \ub9ac\uc18c\uc2a4 &raquo; MTM \uae30\ubc95: \uc0dd\uc0b0 \uc804\uc5d0 \uc791\uc5c5\uc744 \uc124\uacc4\ud558\uace0 \uc2dc\uac04\uc744 \uc0b0\uc815\ud558\ub294 \ubc29\ubc95 \uc0c8 \uc870\ub9bd\ud488\uc758 \uc0dd\uc0b0 \uacc4\ud68d\uc744 \uc138\uc6b8 \ub2e8\uacc4\uc778\ub370, \uc544\uc9c1 \uc0dd\uc0b0 \uacbd\ud5d8\uc774 \ucda9\ubd84\ud558\uc9c0 \uc54a\uc544 \uc2e0\ub8b0\ud560 \ub9cc\ud55c \ud3c9\uade0 \uc791\uc5c5\uc2dc\uac04\uc774 \uc5c6\uc2b5\ub2c8\ub2e4. \uadf8\ub798\ub3c4 \uc791\uc5c5\uc7a5 \ubc30\uce58\ub97c \ube44\uad50\ud558\uace0, \uc791\uc5c5 \ubd80\ud558\ub97c \ucd94\uc0b0\ud558\uace0, \ucd08\uae30 \uc8fc\ubb38 \ubb3c\ub7c9\uc744 \ucc98\ub9ac\ud560 \uc218 \uc788\uc744\uc9c0 \ud310\ub2e8\ud574\uc57c \ud569\ub2c8\ub2e4. MTM \uae30\ubc95(Methods-Time &#8230; <a title=\"MTM \uae30\ubc95: \uc0dd\uc0b0 \uc804\uc5d0 \uc791\uc5c5\uc744 \uc124\uacc4\ud558\uace0 \uc2dc\uac04\uc744 \uc0b0\uc815\ud558\ub294 \ubc29\ubc95\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/methods-time-measurement\/\" aria-label=\"Read more about MTM \uae30\ubc95: \uc0dd\uc0b0 \uc804\uc5d0 \uc791\uc5c5\uc744 \uc124\uacc4\ud558\uace0 \uc2dc\uac04\uc744 \uc0b0\uc815\ud558\ub294 \ubc29\ubc95\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":111623,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[496,2558],"tags":[],"class_list":["post-111619","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-496","category-2558","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>MTM \uae30\ubc95: \uc0dd\uc0b0 \uc804\uc5d0 \uc791\uc5c5\uc744 \uc124\uacc4\ud558\uace0 \uc2dc\uac04\uc744 \uc0b0\uc815\ud558\ub294 \ubc29\ubc95<\/title>\n<meta name=\"description\" content=\"\uc0c8 \uc218\uc791\uc5c5 \uc2dc\uac04\uc740? MTM \uae30\ubc95\uc73c\ub85c \uc0dd\uc0b0 \uc804\uc5d0 \uc0b0\uc815\ud558\ub294 \ubc95\uc744 \uc54c\uc544\ubcf4\uace0, \uc2b9\uc778\ub41c \uc2dc\uac04\uc744 SkyPlanner\ub85c \uc2e4\ud589 \uac00\ub2a5\ud55c \uc77c\uc815\uc5d0 \ubc18\uc601\ud558\uc138\uc694.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/methods-time-measurement\/\" \/>\n<meta property=\"og:locale\" content=\"ko_KR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"MTM \uae30\ubc95: \uc0dd\uc0b0 \uc804\uc5d0 \uc791\uc5c5\uc744 \uc124\uacc4\ud558\uace0 \uc2dc\uac04\uc744 \uc0b0\uc815\ud558\ub294 \ubc29\ubc95\" \/>\n<meta property=\"og:description\" content=\"\uc0c8 \uc218\uc791\uc5c5 \uc2dc\uac04\uc740? MTM \uae30\ubc95\uc73c\ub85c \uc0dd\uc0b0 \uc804\uc5d0 \uc0b0\uc815\ud558\ub294 \ubc95\uc744 \uc54c\uc544\ubcf4\uace0, \uc2b9\uc778\ub41c \uc2dc\uac04\uc744 SkyPlanner\ub85c \uc2e4\ud589 \uac00\ub2a5\ud55c \uc77c\uc815\uc5d0 \ubc18\uc601\ud558\uc138\uc694.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/methods-time-measurement\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-28T00:43:16+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-28T00:45:22+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1774\" \/>\n\t<meta property=\"og:image:height\" content=\"887\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\uae00\uc4f4\uc774\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/methods-time-measurement\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/methods-time-measurement\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"MTM \uae30\ubc95: \uc0dd\uc0b0 \uc804\uc5d0 \uc791\uc5c5\uc744 \uc124\uacc4\ud558\uace0 \uc2dc\uac04\uc744 \uc0b0\uc815\ud558\ub294 \ubc29\ubc95\",\"datePublished\":\"2026-10-28T00:43:16+00:00\",\"dateModified\":\"2026-10-28T00:45:22+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/methods-time-measurement\\\/\"},\"wordCount\":67,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/methods-time-measurement\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/methods-time-measurement-hero.png\",\"articleSection\":[\"\ub9ac\uc18c\uc2a4\",\"\uc81c\uc870 \ud6a8\uc728\"],\"inLanguage\":\"ko-KR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/methods-time-measurement\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/methods-time-measurement\\\/\",\"name\":\"MTM \uae30\ubc95: \uc0dd\uc0b0 \uc804\uc5d0 \uc791\uc5c5\uc744 \uc124\uacc4\ud558\uace0 \uc2dc\uac04\uc744 \uc0b0\uc815\ud558\ub294 \ubc29\ubc95\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/methods-time-measurement\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/methods-time-measurement\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/methods-time-measurement-hero.png\",\"datePublished\":\"2026-10-28T00:43:16+00:00\",\"dateModified\":\"2026-10-28T00:45:22+00:00\",\"description\":\"\uc0c8 \uc218\uc791\uc5c5 \uc2dc\uac04\uc740? MTM \uae30\ubc95\uc73c\ub85c \uc0dd\uc0b0 \uc804\uc5d0 \uc0b0\uc815\ud558\ub294 \ubc95\uc744 \uc54c\uc544\ubcf4\uace0, \uc2b9\uc778\ub41c \uc2dc\uac04\uc744 SkyPlanner\ub85c \uc2e4\ud589 \uac00\ub2a5\ud55c \uc77c\uc815\uc5d0 \ubc18\uc601\ud558\uc138\uc694.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/methods-time-measurement\\\/#breadcrumb\"},\"inLanguage\":\"ko-KR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/methods-time-measurement\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/methods-time-measurement\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/methods-time-measurement-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/methods-time-measurement-hero.png\",\"width\":1774,\"height\":887,\"caption\":\"Loose assembly parts contrast with oriented parts and a locating fixture in an MTM method comparison.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/methods-time-measurement\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"MTM \uae30\ubc95: \uc0dd\uc0b0 \uc804\uc5d0 \uc791\uc5c5\uc744 \uc124\uacc4\ud558\uace0 \uc2dc\uac04\uc744 \uc0b0\uc815\ud558\ub294 \ubc29\ubc95\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ko-KR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"MTM \uae30\ubc95: \uc0dd\uc0b0 \uc804\uc5d0 \uc791\uc5c5\uc744 \uc124\uacc4\ud558\uace0 \uc2dc\uac04\uc744 \uc0b0\uc815\ud558\ub294 \ubc29\ubc95","description":"\uc0c8 \uc218\uc791\uc5c5 \uc2dc\uac04\uc740? MTM \uae30\ubc95\uc73c\ub85c \uc0dd\uc0b0 \uc804\uc5d0 \uc0b0\uc815\ud558\ub294 \ubc95\uc744 \uc54c\uc544\ubcf4\uace0, \uc2b9\uc778\ub41c \uc2dc\uac04\uc744 SkyPlanner\ub85c \uc2e4\ud589 \uac00\ub2a5\ud55c \uc77c\uc815\uc5d0 \ubc18\uc601\ud558\uc138\uc694.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/methods-time-measurement\/","og_locale":"ko_KR","og_type":"article","og_title":"MTM \uae30\ubc95: \uc0dd\uc0b0 \uc804\uc5d0 \uc791\uc5c5\uc744 \uc124\uacc4\ud558\uace0 \uc2dc\uac04\uc744 \uc0b0\uc815\ud558\ub294 \ubc29\ubc95","og_description":"\uc0c8 \uc218\uc791\uc5c5 \uc2dc\uac04\uc740? MTM \uae30\ubc95\uc73c\ub85c \uc0dd\uc0b0 \uc804\uc5d0 \uc0b0\uc815\ud558\ub294 \ubc95\uc744 \uc54c\uc544\ubcf4\uace0, \uc2b9\uc778\ub41c \uc2dc\uac04\uc744 SkyPlanner\ub85c \uc2e4\ud589 \uac00\ub2a5\ud55c \uc77c\uc815\uc5d0 \ubc18\uc601\ud558\uc138\uc694.","og_url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/methods-time-measurement\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-28T00:43:16+00:00","article_modified_time":"2026-10-28T00:45:22+00:00","og_image":[{"width":1774,"height":887,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"\uae00\uc4f4\uc774":"Jussi M\u00e4ntyl\u00e4"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/methods-time-measurement\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/methods-time-measurement\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"MTM \uae30\ubc95: \uc0dd\uc0b0 \uc804\uc5d0 \uc791\uc5c5\uc744 \uc124\uacc4\ud558\uace0 \uc2dc\uac04\uc744 \uc0b0\uc815\ud558\ub294 \ubc29\ubc95","datePublished":"2026-10-28T00:43:16+00:00","dateModified":"2026-10-28T00:45:22+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/methods-time-measurement\/"},"wordCount":67,"publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/methods-time-measurement\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","articleSection":["\ub9ac\uc18c\uc2a4","\uc81c\uc870 \ud6a8\uc728"],"inLanguage":"ko-KR"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/methods-time-measurement\/","url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/methods-time-measurement\/","name":"MTM \uae30\ubc95: \uc0dd\uc0b0 \uc804\uc5d0 \uc791\uc5c5\uc744 \uc124\uacc4\ud558\uace0 \uc2dc\uac04\uc744 \uc0b0\uc815\ud558\ub294 \ubc29\ubc95","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/methods-time-measurement\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/methods-time-measurement\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","datePublished":"2026-10-28T00:43:16+00:00","dateModified":"2026-10-28T00:45:22+00:00","description":"\uc0c8 \uc218\uc791\uc5c5 \uc2dc\uac04\uc740? MTM \uae30\ubc95\uc73c\ub85c \uc0dd\uc0b0 \uc804\uc5d0 \uc0b0\uc815\ud558\ub294 \ubc95\uc744 \uc54c\uc544\ubcf4\uace0, \uc2b9\uc778\ub41c \uc2dc\uac04\uc744 SkyPlanner\ub85c \uc2e4\ud589 \uac00\ub2a5\ud55c \uc77c\uc815\uc5d0 \ubc18\uc601\ud558\uc138\uc694.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/methods-time-measurement\/#breadcrumb"},"inLanguage":"ko-KR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/methods-time-measurement\/"]}]},{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/methods-time-measurement\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png","width":1774,"height":887,"caption":"Loose assembly parts contrast with oriented parts and a locating fixture in an MTM method comparison."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/methods-time-measurement\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ko\/"},{"@type":"ListItem","position":2,"name":"MTM \uae30\ubc95: \uc0dd\uc0b0 \uc804\uc5d0 \uc791\uc5c5\uc744 \uc124\uacc4\ud558\uace0 \uc2dc\uac04\uc744 \uc0b0\uc815\ud558\ub294 \ubc29\ubc95"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ko\/#website","url":"https:\/\/skyplanner.ai\/ko\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ko\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ko-KR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ko\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ko\/","logo":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png",1774,887,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-300x150.png",300,150,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-768x384.png",768,384,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-1024x512.png",1024,512,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-1536x768.png",1536,768,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero.png",1774,887,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/methods-time-measurement-hero-360x180.png",360,180,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ko\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"MTM \uae30\ubc95: \uc0dd\uc0b0 \uc804\uc5d0 \uc791\uc5c5\uc744 \uc124\uacc4\ud558\uace0 \uc2dc\uac04\uc744 \uc0b0\uc815\ud558\ub294 \ubc29\ubc95 \ud648 &raquo; \ub9ac\uc18c\uc2a4 &raquo; MTM \uae30\ubc95: \uc0dd\uc0b0 \uc804\uc5d0 \uc791\uc5c5\uc744 \uc124\uacc4\ud558\uace0 \uc2dc\uac04\uc744 \uc0b0\uc815\ud558\ub294 \ubc29\ubc95 \uc0c8 \uc870\ub9bd\ud488\uc758 \uc0dd\uc0b0 \uacc4\ud68d\uc744 \uc138\uc6b8 \ub2e8\uacc4\uc778\ub370, \uc544\uc9c1 \uc0dd\uc0b0 \uacbd\ud5d8\uc774 \ucda9\ubd84\ud558\uc9c0 \uc54a\uc544 \uc2e0\ub8b0\ud560 \ub9cc\ud55c \ud3c9\uade0 \uc791\uc5c5\uc2dc\uac04\uc774 \uc5c6\uc2b5\ub2c8\ub2e4. \uadf8\ub798\ub3c4 \uc791\uc5c5\uc7a5 \ubc30\uce58\ub97c \ube44\uad50\ud558\uace0, \uc791\uc5c5 \ubd80\ud558\ub97c \ucd94\uc0b0\ud558\uace0, \ucd08\uae30 \uc8fc\ubb38 \ubb3c\ub7c9\uc744 \ucc98\ub9ac\ud560 \uc218 \uc788\uc744\uc9c0 \ud310\ub2e8\ud574\uc57c \ud569\ub2c8\ub2e4. MTM \uae30\ubc95(Methods-Time&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/111619","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/comments?post=111619"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/111619\/revisions"}],"predecessor-version":[{"id":111683,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/111619\/revisions\/111683"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media\/111623"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media?parent=111619"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/categories?post=111619"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/tags?post=111619"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}