{"id":111340,"date":"2026-10-27T18:49:22","date_gmt":"2026-10-27T18:49:22","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=111340"},"modified":"2026-10-27T18:51:34","modified_gmt":"2026-10-27T18:51:34","slug":"min-max-inventory-manufacturing","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/min-max-inventory-manufacturing\/","title":{"rendered":"\ucd5c\uc18c \ucd5c\ub300 \uc7ac\uace0 \uad00\ub9ac: \uc5b8\uc81c, \uc5bc\ub9c8\ub098 \uc7ac\uc8fc\ubb38\ud574\uc57c \ud560\uae4c"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">\ucd5c\uc18c \ucd5c\ub300 \uc7ac\uace0 \uad00\ub9ac: \uc5b8\uc81c, \uc5bc\ub9c8\ub098 \uc7ac\uc8fc\ubb38\ud574\uc57c \ud560\uae4c<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/ko\/\">\ud648<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/\">\ub9ac\uc18c\uc2a4<\/a> &raquo; \ucd5c\uc18c \ucd5c\ub300 \uc7ac\uace0 \uad00\ub9ac: \uc5b8\uc81c, \uc5bc\ub9c8\ub098 \uc7ac\uc8fc\ubb38\ud574\uc57c \ud560\uae4c<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">\uc608\uc0c1 \uc77d\uae30 \uc2dc\uac04: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> \ubd84<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>\ubcf4\uad00\ud568\uc758 \uc7ac\uace0\uac00 \uc904\uc5b4\ub4e4\uc790 \uad6c\ub9e4 \ub2f4\ub2f9\uc790\uac00 \ucd94\uac00 \ubb3c\ub7c9\uc744 \ubc1c\uc8fc\ud569\ub2c8\ub2e4. \uadf8\ub7f0\ub370 \uc0dd\uc0b0 \ud604\uc7a5\uc5d0\uc11c\ub294 \uc774\ubbf8 \uac19\uc740 \ud488\ubaa9\uc758 \uc7ac\uace0\ub97c \ubcf4\ucda9\ud558\uae30 \uc704\ud55c \uc0dd\uc0b0\uc774 \uc9c4\ud589 \uc911\uc785\ub2c8\ub2e4. \uac01\uac01\ub9cc \ubcf4\uba74 \ud569\ub9ac\uc801\uc778 \ud310\ub2e8\uc774\uc9c0\ub9cc, \ub450 \uacb0\uc815\uc774 \uacb9\uce58\uba74 \uacf5\uc7a5\uc5d0 \ud544\uc694 \uc774\uc0c1\uc758 \uc7ac\uace0\uac00 \uc313\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>\ucd5c\uc18c \ucd5c\ub300 \uc7ac\uace0 \uad00\ub9ac\ub294 \uc77c\uad00\ub418\uac8c \uc801\uc6a9\ud560 \uc218 \uc788\ub294 \ubcf4\ucda9 \uae30\uc900\uc744 \uc81c\uc2dc\ud569\ub2c8\ub2e4. \ucd5c\uc18c \uc218\uc900\uc740 \ubcf4\ucda9\uc5d0 \ub098\uc124 \uc2dc\uc810\uc744, \ucd5c\ub300 \ubaa9\ud45c\ub294 \uc5bc\ub9c8\ub098 \ucc44\uc6b8\uc9c0\ub97c \uc815\ud569\ub2c8\ub2e4. \uc81c\uc870 \ud604\uc7a5\uc5d0\uc11c \uc774 \ubc29\uc2dd\uc744 \uc81c\ub300\ub85c \ud65c\uc6a9\ud558\ub824\uba74 \uc120\ubc18\uc5d0 \ub193\uc778 \uc218\ub7c9\ubfd0 \uc544\ub2c8\ub77c \uc774\ubbf8 \uc785\uace0 \uc608\uc815\uc778 \ubb3c\ub7c9\uacfc \ud655\uc815\ub41c \uc218\uc694\ub3c4 \ud568\uaed8 \uacc4\uc0b0\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uadf8\ub2e4\uc74c\uc5d0\ub294 \uc0dd\uc0b0\uc744 \uc5b4\ub5bb\uac8c \uc9c4\ud589\ud560\uc9c0 \uacb0\uc815\ud574\uc57c \ud569\ub2c8\ub2e4. \ubcf4\ucda9 \ubb3c\ub7c9\uc744 \uc790\uccb4 \uc0dd\uc0b0\ud55c\ub2e4\uba74 \uace0\uac1d \uc8fc\ubb38 \uc791\uc5c5\uacfc \ud568\uaed8 \uc2e4\uc81c \uc124\ube44\uc758 \uac00\ub3d9 \uc2dc\uac04\uc744 \ud655\ubcf4\ud574\uc57c \ud569\ub2c8\ub2e4. SkyPlanner APS\ub294 \uc2b9\uc778\ub41c \ubcf4\ucda9 \uc0dd\uc0b0\uc744 \uc0dd\uc0b0 \ub2a5\ub825\uacfc \uc790\uc7ac\ub97c \uace0\ub824\ud55c \ub3d9\uc77c\ud55c \uc77c\uc815\uc5d0 \ubc18\uc601\ud569\ub2c8\ub2e4. \ub530\ub77c\uc11c \ubcc4\ub3c4\uc758 \uc791\uc5c5 \ub300\uae30\uc5f4\uc744 \uc218\uc791\uc5c5\uc73c\ub85c \ub9cc\ub4e4\uc9c0 \uc54a\uace0\ub3c4 \uc644\ub8cc \uc2dc\uc810\uc744 \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\ucd5c\uc18c \ucd5c\ub300 \uc7ac\uace0 \uad00\ub9ac\ub780?<\/h2>\n\n\n<p>\ucd5c\uc18c \ucd5c\ub300 \uc7ac\uace0 \uad00\ub9ac\ub294 \uc7ac\uace0\ub85c \ubcf4\uc720\ud558\ub294 \uac01 \ud488\ubaa9\uc5d0 \ub2e4\uc74c \ub450 \uac00\uc9c0 \uae30\uc900\uc744 \uc124\uc815\ud558\ub294 \ubcf4\ucda9 \uc815\ucc45\uc785\ub2c8\ub2e4.<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>\ucd5c\uc18c \uc218\uc900:<\/strong> \ubcf4\ucda9 \uc5ec\ubd80\ub97c \ud310\ub2e8\ud558\ub294 \uae30\uc900\uac12\uc785\ub2c8\ub2e4.<\/li><li><strong>\ucd5c\ub300 \uc218\uc900:<\/strong> \ubcf4\ucda9 \ud6c4 \ub3c4\ub2ec\ud558\uace0\uc790 \ud558\ub294 \uc21c\uc7ac\uace0 \ud3ec\uc9c0\uc158\uc758 \ubaa9\ud45c\uac12\uc785\ub2c8\ub2e4.<\/li><\/ul>\n\n\n<p>\ucd5c\uc18c \uc218\uc900\uc740 \uc7ac\uace0\ub97c \ubaa8\ub450 \uc18c\uc9c4\ud574\ub3c4 \ub418\ub294 \uc9c0\uc810\uc774 \uc544\ub2d9\ub2c8\ub2e4. \uc218\uc694\uac00 \uacc4\uc18d \ubc1c\uc0dd\ud558\ub294 \ub3d9\uc548\uc5d0\ub3c4 \ubcf4\ucda9 \ubb3c\ub7c9\uc774 \ub3c4\ucc29\ud560 \uc2dc\uac04\uc744 \ud655\ubcf4\ud560 \uc218 \uc788\uc5b4\uc57c \ud569\ub2c8\ub2e4. \ucd5c\ub300 \uc218\uc900 \uc5ed\uc2dc \ub9e4\ubc88 \uc8fc\ubb38\ud558\ub294 \uc218\ub7c9\uc774 \uc544\ub2c8\uba70, \uc2e4\uc81c \ubcf4\uc720 \uc7ac\uace0\uac00 \uc808\ub300\ub85c \uadf8 \uc218\uc900\uc744 \ub118\uc9c0 \uc54a\ub294\ub2e4\ub294 \ub73b\ub3c4 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p>\ucd5c\uc18c \ucd5c\ub300 \uc7ac\uace0 \uad00\ub9ac\uc5d0\uc11c\ub294 \ubaa9\ud45c\uae4c\uc9c0 \uc5bc\ub9c8\ub098 \ubd80\uc871\ud55c\uc9c0\uc5d0 \ub530\ub77c \uc8fc\ubb38\ub7c9\uc774 \ub2ec\ub77c\uc9d1\ub2c8\ub2e4. \ubaa9\ud45c\uac00 600\uac1c\uc774\uace0 \ud574\ub2f9 \uae30\uc900\uc73c\ub85c \uacc4\uc0b0\ud55c \uc21c\uc7ac\uace0 \ud3ec\uc9c0\uc158\uc774 230\uac1c\ub77c\uba74, \uc6b0\uc120 \uc0b0\ucd9c\ub418\ub294 \ubcf4\ucda9\ub7c9\uc740 370\uac1c\uc785\ub2c8\ub2e4. \uc21c\uc7ac\uace0 \ud3ec\uc9c0\uc158\uc774 280\uac1c\ub77c\uba74 \ubcf4\ucda9\ub7c9\uc740 320\uac1c\uac00 \ub429\ub2c8\ub2e4.<\/p>\n\n\n<p>\ubcf4\ucda9 \uae30\uc900\uc774 \u2018\ucd5c\uc18c \uc218\uc900 \ubbf8\ub9cc\u2019\uc778\uc9c0 \u2018\ucd5c\uc18c \uc218\uc900 \uc774\ud558\u2019\uc778\uc9c0 \uba85\uc2dc\ud558\uc138\uc694. \uacbd\uacc4\uac12\uc744 \ucc98\ub9ac\ud558\ub294 \ubc29\uc2dd\uc740 \uc2dc\uc2a4\ud15c\uacfc \ud68c\uc0ac \uc815\ucc45\uc5d0 \ub530\ub77c \ub2e4\ub97c \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc544\ub798 \uc608\uc2dc\uc5d0\uc11c\ub294 \uc21c\uc7ac\uace0 \ud3ec\uc9c0\uc158\uc774 \ucd5c\uc18c \uc218\uc900 <strong>\ubbf8\ub9cc<\/strong>\uc77c \ub54c \ubcf4\ucda9\ud558\ub294 \uac83\uc73c\ub85c \uc815\ud569\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\ud604\uc7ac\uace0\ub9cc \ubcf4\uc9c0 \ub9d0\uace0 \uc21c\uc7ac\uace0 \ud3ec\uc9c0\uc158\uc744 \uacc4\uc0b0\ud558\uc138\uc694<\/h2>\n\n\n<p>\ud604\uc7ac\uace0\ub294 \uc9c0\uae08 \uc2e4\uc81c\ub85c \ubcf4\uc720\ud55c \uc218\ub7c9\uc744 \ub098\ud0c0\ub0c5\ub2c8\ub2e4. \ubc18\uba74 \uc21c\uc7ac\uace0 \ud3ec\uc9c0\uc158\uc740 \uae30\uc874 \uacf5\uae09 \ubb3c\ub7c9\uacfc \ucda9\uc871\ud574\uc57c \ud560 \uc218\uc694\ub97c \ubc18\uc601\ud558\uc5ec \ucd94\uac00 \ubcf4\ucda9 \uc8fc\ubb38\uc774 \ud544\uc694\ud55c\uc9c0 \ud310\ub2e8\ud558\ub294 \ub370 \uc4f0\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud655\uc815 \uc218\uc694\ub97c \ucc28\uac10\ud558\ub294 \uc815\ucc45\uc774\ub77c\uba74 \ub2e4\uc74c \uc2dd\uc744 \uc0ac\uc6a9\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>\uc21c\uc7ac\uace0 \ud3ec\uc9c0\uc158 = \uc0ac\uc6a9 \uac00\ub2a5\ud55c \ud604\uc7ac\uace0 + \ubbf8\uc785\uace0 \ubcf4\ucda9 \ubb3c\ub7c9 \u2212 \uacc4\uc0b0 \ubc94\uc704\uc5d0 \ud3ec\ud568\ub41c \ud655\uc815 \uc218\uc694<\/strong><\/p>\n\n\n<p>\ubbf8\uc785\uace0 \ubcf4\ucda9 \ubb3c\ub7c9\uc5d0\ub294 \uc544\uc9c1 \uc785\uace0\ub418\uc9c0 \uc54a\uc740 \uad6c\ub9e4 \ubc1c\uc8fc \ubb3c\ub7c9, \uc7ac\uace0 \uc774\ub3d9 \ubb3c\ub7c9, \uc790\uccb4 \ubcf4\ucda9 \uc0dd\uc0b0 \ubb3c\ub7c9 \ub4f1\uc774 \ud3ec\ud568\ub420 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uac01 \ubb3c\ub7c9\uc740 \ud55c \ubc88\ub9cc \ubc18\uc601\ud558\uc138\uc694. \uc77c\ubd80\uac00 \uc785\uace0\ub41c \uacbd\uc6b0\uc5d0\ub294 \uc6d0\ub798 \uc8fc\ubb38\ub7c9\uc774 \uc544\ub2c8\ub77c \uc55e\uc73c\ub85c \uc785\uace0\ub420 \uc794\ub7c9\uc744 \uacc4\uc0b0\uc5d0 \ub123\uc5b4\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uacc4\uc0b0\ud558\uae30 \uc804\uc5d0 \ubc94\uc704\ub97c \uc815\ud558\uc138\uc694. \ub300\uc0c1 \ud488\ubaa9 \ud558\ub098, \ub2e8\uc77c \uc7ac\uace0 \uc704\uce58 \ub610\ub294 \ud569\uc758\ub41c \uc7ac\uace0 \uc704\uce58 \uadf8\ub8f9, \ub3d9\uc77c\ud55c \uc218\ub7c9 \ub2e8\uc704\ub97c \uae30\uc900\uc73c\ub85c \uc0bc\uace0 \uacf5\uae09\uacfc \uc218\uc694\ub97c \ubc18\uc601\ud558\ub294 \ub9c8\uac10 \uae30\uc900\ub3c4 \uc77c\uad00\ub418\uac8c \uc801\uc6a9\ud574\uc57c \ud569\ub2c8\ub2e4. \uaca9\ub9ac \uc7ac\uace0 \ub4f1 \uc0ac\uc6a9\ud560 \uc218 \uc5c6\ub294 \uc7ac\uace0\ub294 \uc81c\uc678\ud558\uc138\uc694. \uac19\uc740 \ud655\uc815 \uc218\uc694\ub97c \ub450 \ubc88 \ucc28\uac10\ud574\uc11c\ub294 \uc548 \ub429\ub2c8\ub2e4. \uacc4\uc0b0\uc744 \uc2dc\uc791\ud558\ub294 \uc7ac\uace0 \uc794\ub7c9\uc5d0\uc11c \uc774\ubbf8 \uc608\uc57d \ubb3c\ub7c9\uc744 \ucc28\uac10\ud588\ub2e4\uba74 \ub2e4\uc2dc \ube7c\uc9c0 \ub9c8\uc138\uc694.<\/p>\n\n\n<p>\ubaa8\ub4e0 \uc6b4\uc601 \ubc29\uc2dd\uc5d0\uc11c \ub3d9\uc77c\ud55c \uc218\uc694 \ud56d\ubaa9\uc744 \ucc28\uac10\ud558\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4. \uc911\uc694\ud55c \uac83\uc740 \uacc4\uc0b0\ud55c \uc218\uce58\uc5d0 \ubb34\uc5c7\uc774 \ud3ec\ud568\ub418\uc5b4 \uc788\ub294\uc9c0 \ud30c\uc545\ud558\uace0, \uadf8 \uae30\uc900\uc5d0 \ub9de\ucdb0 \uc124\uc815\ud55c \uae30\uc900\uac12\uc744 \uc0ac\uc6a9\ud558\ub294 \uac83\uc785\ub2c8\ub2e4. \ud55c \uac00\uc9c0 \uc815\uc758\uc5d0 \ub530\ub77c \uc0b0\ucd9c\ud55c \ucd5c\uc18c \uc218\uc900\uc744 \uac80\ud1a0 \uc5c6\uc774 \ub2e4\ub978 \uc815\uc758\uc5d0 \uc801\uc6a9\ud558\ub294 \uac83\uc740 \uc704\ud5d8\ud569\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uc81c\uc870 \ud604\uc7a5\uc758 \ucd5c\uc18c \ucd5c\ub300 \uc7ac\uace0 \uad00\ub9ac \uc608\uc2dc<\/h3>\n\n\n<p>\ubc18\ubcf5 \uc8fc\ubb38\uc5d0 \ub300\uc751\ud558\uae30 \uc704\ud574 \ud45c\uc900 \ube0c\ub798\ud0b7\uc744 \uc7ac\uace0\ub85c \ubcf4\uc720\ud558\ub294 \uc81c\uc870\uc5c5\uccb4\ub97c \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \ucd5c\uc18c \uc218\uc900\uc740 300\uac1c, \ucd5c\ub300 \ubaa9\ud45c\ub294 600\uac1c\uc785\ub2c8\ub2e4. \uc774 \uc5c5\uccb4\ub294 \ud569\uc758\ub41c \uacc4\ud68d \uae30\uac04 \ub0b4 \ud655\uc815 \uc218\uc694\ub97c \ucc28\uac10\ud558\ub294 \uc815\ucc45\uc744 \uc0ac\uc6a9\ud569\ub2c8\ub2e4.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\uacc4\uc0b0 \ud56d\ubaa9<\/th><th>\uc218\ub7c9<\/th><th>\ubc18\uc601 \ubc29\ubc95<\/th><\/tr><\/thead><tbody><tr><td>\uc0ac\uc6a9 \uac00\ub2a5\ud55c \ube0c\ub798\ud0b7 \ud604\uc7ac\uace0<\/td><td>180<\/td><td>\ud604\uc7ac\uace0\ub85c \ubc18\uc601<\/td><\/tr><tr><td>\uc774\ubbf8 \uc2b9\uc778\ub418\uc5c8\uc73c\ub098 \uc544\uc9c1 \uc785\uace0\ub418\uc9c0 \uc54a\uc740 \ubcf4\ucda9 \ubb3c\ub7c9<\/td><td>200<\/td><td>\ubbf8\uc785\uace0 \ubcf4\ucda9 \ubb3c\ub7c9\uc73c\ub85c \ud55c \ubc88\ub9cc \uac00\uc0b0<\/td><\/tr><tr><td>\uc774\ubc88 \uac80\ud1a0\uc5d0 \ud3ec\ud568\ub41c \ud655\uc815 \uc218\uc694<\/td><td>150<\/td><td>\ud55c \ubc88\ub9cc \ucc28\uac10<\/td><\/tr><tr><td>\uc21c\uc7ac\uace0 \ud3ec\uc9c0\uc158<\/td><td>230<\/td><td>\ucd5c\uc18c \uc218\uc900\uc778 300\uac1c\uc640 \ube44\uad50<\/td><\/tr><tr><td>\uc2e0\uaddc \ubcf4\ucda9\ub7c9<\/td><td>370<\/td><td>\uc21c\uc7ac\uace0 \ud3ec\uc9c0\uc158\uc744 230\uac1c\uc5d0\uc11c 600\uac1c\ub85c \ubcf4\ucda9<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\uacc4\uc0b0\uc2dd\uc740 <strong>180 + 200 \u2212 150 = 230<\/strong>\uc785\ub2c8\ub2e4. 230\uac1c\ub294 300\uac1c \ubbf8\ub9cc\uc774\ubbc0\ub85c \uc815\ucc45\uc5d0 \ub530\ub77c \ubcf4\ucda9\uc774 \ud544\uc694\ud569\ub2c8\ub2e4. \uc6b0\uc120 \uc0b0\ucd9c\ub418\ub294 \uc8fc\ubb38\ub7c9\uc740 <strong>600 \u2212 230 = 370\uac1c<\/strong>\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>\uae30\uc874\uc5d0 \uc8fc\ubb38\ud55c 200\uac1c\ub97c \uc81c\uc678\ud558\uba74 \ubcf4\ucda9 \uc81c\uc548\ub7c9\uc774 570\uac1c\ub85c \uacc4\uc0b0\ub429\ub2c8\ub2e4. \uac19\uc740 \uc18c\uc694\ub7c9\uc5d0 \ub300\ud574 200\uac1c\ub97c \uc911\ubcf5 \uc8fc\ubb38\ud558\uac8c \ub418\ub294 \uc148\uc785\ub2c8\ub2e4. \ubc18\ub300\ub85c \ud655\uc815 \uc218\uc694\ub97c \ubc18\uc601\ud558\uc9c0 \uc54a\uc73c\uba74 \uc21c\uc7ac\uace0 \ud3ec\uc9c0\uc158\uc774 380\uac1c\ub85c \ub098\ud0c0\ub098 \ubcf4\ucda9\uc774 \ud544\uc694\ud55c \uc2dc\uc810\uc744 \uc544\uc608 \ub193\uce58\uac8c \ub429\ub2c8\ub2e4.<\/p>\n\n\n<p>\ubaa9\ud45c\uac12\uc740 \uc2e0\uaddc \uc8fc\ubb38\uc744 \ub354\ud55c \ub4a4\uc758 \uc21c\uc7ac\uace0 \ud3ec\uc9c0\uc158\uc744 \ub73b\ud558\uba70, \ubc18\ub4dc\uc2dc \ud574\ub2f9 \ubb3c\ub7c9\uc774 \ub3c4\ucc29\ud588\uc744 \ub54c\uc758 \uc2e4\uc81c \uc7ac\uace0\ub7c9\uc744 \ub098\ud0c0\ub0b4\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4. \ubb3c\ub7c9\uc744 \uad6c\ub9e4\ud558\uac70\ub098 \uc0dd\uc0b0\ud558\ub294 \ub3d9\uc548\uc5d0\ub3c4 \uc7ac\uace0\ub294 \uacc4\uc18d \uc18c\ube44\ub418\uae30 \ub54c\ubb38\uc785\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uc785\uace0 \uc608\uc815 \ubb3c\ub7c9\ub3c4 \ud544\uc694\ud55c \uc2dc\uc810\ubcf4\ub2e4 \ub2a6\uac8c \ub3c4\ucc29\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4<\/h3>\n\n\n<p>\uc21c\uc7ac\uace0 \ud3ec\uc9c0\uc158\uc740 \uc218\ub7c9\uc744 \ud310\ub2e8\ud558\ub294 \uc9c0\ud45c\uc785\ub2c8\ub2e4. \uc774 \uc218\uce58\ub9cc\uc73c\ub85c \ubaa8\ub4e0 \uc18c\uc694\ub7c9\uc744 \ud544\uc694\ud55c \ub0a0\uc9dc\uc5d0 \ub9de\ucdb0 \ucda9\uc871\ud560 \uc218 \uc788\ub2e4\uace0 \ud655\uc778\ud560 \uc218\ub294 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc55e\uc758 \ube0c\ub798\ud0b7 \uc608\uc2dc\uc5d0\uc11c \ud654\uc694\uc77c\uc5d0 120\uac1c, \uc218\uc694\uc77c\uc5d0 \ucd94\uac00\ub85c 30\uac1c\uac00 \ud544\uc694\ud558\ub2e4\uace0 \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \uc0ac\uc6a9 \uac00\ub2a5\ud55c 180\uac1c\ub85c \ub450 \uc18c\uc694\ub7c9\uc744 \ubaa8\ub450 \ucda9\uc871\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ud558\uc9c0\ub9cc \uae30\uc874 \ubcf4\ucda9 \ubb3c\ub7c9 200\uac1c \uc804\ubd80\uac00 \uc9c0\uc5f0\ub418\uc5b4 \uc774\ud6c4 \uc0c8\ub85c \ubc1c\uc0dd\ud55c \uc218\uc694\uc758 \ud544\uc694\uc77c\ubcf4\ub2e4 \ub2a6\uac8c \ub3c4\ucc29\ud55c\ub2e4\uba74, \ud574\ub2f9 \ubb3c\ub7c9\uc744 \uc804\uccb4 \uc21c\uc7ac\uace0 \ud3ec\uc9c0\uc158\uc5d0 \ud3ec\ud568\ud588\ub354\ub77c\ub3c4 \uadf8 \uc0c8\ub85c\uc6b4 \uc218\uc694\ub294 \ucda9\uc871\ud558\uc9c0 \ubabb\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud569\uacc4 \uc218\ub7c9\ubfd0 \uc544\ub2c8\ub77c \ub0a0\uc9dc\ub3c4 \ud655\uc778\ud558\uc138\uc694. \ubcf4\ucda9 \uc8fc\ubb38\uc744 \uc0c8\ub85c \ud55c \uac74 \ub354 \ub0b4\ub294 \uac83\ubcf4\ub2e4 \uae30\uc874 \uc8fc\ubb38\uc758 \uc785\uace0\ub97c \uc55e\ub2f9\uae30\uac70\ub098 \uc77c\uc815\uc744 \uc870\uc815\ud558\ub294 \ud3b8\uc774 \ub354 \ud569\ub9ac\uc801\uc778 \ud574\uacb0\ucc45\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ub0a0\uc9dc\ubcc4 <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/inventory-coverage-manufacturing\/\">\uc7ac\uace0 \ucee4\ubc84\ub9ac\uc9c0 \uc810\uac80<\/a>\uc740 \ucd5c\uc18c \ucd5c\ub300 \uc7ac\uace0 \uad00\ub9ac\ub97c \ubcf4\uc644\ud558\ub294 \uc218\ub2e8\uc774\uc9c0, \uc815\ucc45\uc5d0\uc11c \uc815\ud55c \ubcf4\ucda9 \uae30\uc900\uacfc \ubaa9\ud45c\ub97c \ub300\uccb4\ud558\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\ucd5c\uc18c\u00b7\ucd5c\ub300 \uc7ac\uace0 \uc218\uc900\uc744 \uc124\uc815\ud558\ub294 \ubc29\ubc95<\/h2>\n\n\n<p>\ubc18\ubcf5\uc801\uc73c\ub85c \uc18c\ube44\ub418\uba70 \uc0ac\uc6a9\ub7c9\uacfc \ubcf4\ucda9 \uc774\ub825\uc744 \uc2e0\ub8b0\ud560 \uc218 \uc788\ub294 \ud488\ubaa9\ubd80\ud130 \uc2dc\uc791\ud558\uc138\uc694. \ucd5c\uc18c \uc218\uc900\uacfc \ucd5c\ub300 \uc218\uc900\uc740 \ud568\uaed8 \uc815\ud558\ub418, \uac01\uac01\uc758 \uc5ed\ud560\uc740 \uba85\ud655\ud788 \uad6c\ubd84\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\ubcf4\ucda9 \ubb3c\ub7c9\uc744 \uae30\ub2e4\ub9ac\ub294 \ub3d9\uc548 \uc218\uc694\ub97c \ucda9\uc871\ud558\ub3c4\ub85d \ucd5c\uc18c \uc218\uc900 \uc124\uc815\ud558\uae30<\/h3>\n\n\n<p>\uc218\uc694\uac00 \ube44\uad50\uc801 \uc77c\uc815\ud558\ub2e4\uba74 \ub2e4\uc74c \uc2dd\uc744 \uc2e4\ubb34\uc801\uc778 \ucd9c\ubc1c\uc810\uc73c\ub85c \uc0bc\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>\ucd5c\uc18c \uc218\uc900 = \ubcf4\ucda9 \ub9ac\ub4dc\ud0c0\uc784 \ub3d9\uc548\uc758 \uc608\uc0c1 \uc218\uc694 + \uc548\uc804 \uc7ac\uace0<\/strong><\/p>\n\n\n<p>\uacf5\uae09\uc5c5\uccb4\uc758 \uc6b4\uc1a1 \uc2dc\uac04\uc774\ub098 \uc124\ube44\uc758 \uac00\uacf5 \uc2dc\uac04\ub9cc\uc774 \uc544\ub2c8\ub77c, \uc7ac\uace0\ub97c \uc2e4\uc81c\ub85c \uc0ac\uc6a9\ud560 \uc218 \uc788\uac8c \ub420 \ub54c\uae4c\uc9c0 \uac78\ub9ac\ub294 \uc2dc\uac04\uc744 \uc801\uc6a9\ud558\uc138\uc694. \uc2b9\uc778, \uad6c\ub9e4, \uc0dd\uc0b0 \uc5ec\ub825 \ud655\ubcf4\ub97c \uc704\ud55c \ub300\uae30, \uc785\uace0 \ucc98\ub9ac \uc2dc\uac04\ub3c4 \ubaa8\ub450 \uc5ec\uae30\uc5d0 \ud3ec\ud568\ub420 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc791\uc5c5\uc77c\ub9c8\ub2e4 40\uac1c\uc529 \uc0ac\uc6a9\ud558\ub294 \ud488\ubaa9\uc744 \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \ubcf4\ucda9\uc5d0\ub294 5\uc791\uc5c5\uc77c\uc774 \uac78\ub9ac\uace0, \ud68c\uc0ac\uc5d0\uc11c \uc548\uc804 \uc7ac\uace0\ub97c 80\uac1c\ub85c \uc815\ud588\uc2b5\ub2c8\ub2e4. \ub9ac\ub4dc\ud0c0\uc784 \ub3d9\uc548\uc758 \uc608\uc0c1 \uc218\uc694\ub294 200\uac1c\uc774\ubbc0\ub85c \uc6b0\uc120 \uc0b0\ucd9c\ub418\ub294 \ucd5c\uc18c \uc218\uc900\uc740 <strong>280\uac1c<\/strong>\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc548\uc804 \uc7ac\uace0 80\uac1c\ub294 \uc774 \uc608\uc2dc\ub97c \uc704\ud55c \uac00\uc815\uc77c \ubfd0, \uad8c\uc7a5 \uc11c\ube44\uc2a4 \uc218\uc900\uc744 \ub73b\ud558\uc9c0\ub294 \uc54a\uc2b5\ub2c8\ub2e4. \uc548\uc804 \uc7ac\uace0\ub294 \ubcc0\ub3d9\uc131\uacfc \uc7ac\uace0 \ubd80\uc871\uc774 \ubbf8\uce58\ub294 \uc601\ud5a5\uc744 \uace0\ub824\ud574 \uc815\ud558\uc138\uc694. \uac00\uaca9\uc774 \uc800\ub834\ud55c \ubd80\ud488\uc774\ub77c\ub3c4 \ubd80\uc871 \uc2dc \ucd5c\uc885 \uc870\ub9bd\uc744 \uba48\ucd94\uac8c \ud55c\ub2e4\uba74 \uad6c\ub9e4 \uae08\uc561\ub9cc\uc73c\ub85c \ud310\ub2e8\ud560 \ub54c\ubcf4\ub2e4 \ub354 \uc138\uc2ec\ud55c \uad00\ub9ac\uac00 \ud544\uc694\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uac80\ud1a0 \uc8fc\uae30\ub3c4 \uc911\uc694\ud569\ub2c8\ub2e4. \uc0c1\uc2dc \ubaa8\ub2c8\ud130\ub9c1\ud558\ub294 \ubc29\uc2dd\uacfc \uc8fc 1\ud68c \ubcf4\uace0\uc11c\ub97c \ud655\uc778\ud558\ub294 \ubc29\uc2dd\uc740 \uac19\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4. \uac80\ud1a0 \uc9c1\ud6c4 \uc7ac\uace0\uac00 \uae30\uc900\uac12 \uc544\ub798\ub85c \ub0b4\ub824\uac08 \uc218 \uc788\ub2e4\uba74, \uc2e4\uc81c\ub85c \ub204\uad70\uac00 \uc8fc\ubb38\uc744 \ub123\uc744 \ub54c\uae4c\uc9c0 \ucd94\uac00\ub85c \uae30\ub2e4\ub9ac\ub294 \uc2dc\uac04\ub3c4 \uace0\ub824\ud558\uc138\uc694. \uadf8\ub807\uc9c0 \uc54a\uc73c\uba74 \ucda9\ubd84\ud574 \ubcf4\uc774\ub294 \ucd5c\uc18c \uc218\uc900\uc744 \uc124\uc815\ud558\uace0\ub3c4 \ubcf4\ucda9 \uc870\uce58\uac00 \ub2a6\uc5b4\uc9c8 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uc758\ub3c4\ud55c \ubcf4\ucda9 \uc8fc\uae30\uc5d0 \ub9de\ucdb0 \ucd5c\ub300 \uc218\uc900 \uc124\uc815\ud558\uae30<\/h3>\n\n\n<p>\ucd5c\ub300 \uc218\uc900\uc740 \uc7ac\uace0\uac00 \ubcf4\ucda9 \uae30\uc900 \uc544\ub798\ub85c \ub0b4\ub824\uac14\uc744 \ub54c \uc21c\uc7ac\uace0 \ud3ec\uc9c0\uc158\uc744 \uc5b4\ub514\uae4c\uc9c0 \ud68c\ubcf5\ud560\uc9c0 \uc815\ud569\ub2c8\ub2e4. \uc77c\ubc18\uc801\uc73c\ub85c \ucd5c\ub300 \uc218\uc900\uc744 \ub192\uc774\uba74 \ud55c \ubc88\uc5d0 \ubcf4\ucda9\ud558\ub294 \uc591\uacfc \uc7ac\uace0 \ubd80\ub2f4\uc774 \ucee4\uc9d1\ub2c8\ub2e4. \ubc18\ub300\ub85c \ub0ae\ucd94\uba74 \ubcf4\ucda9 \ube48\ub3c4\uac00 \ub192\uc544\uc838 \uc8fc\ubb38\uc774\ub098 \uc0dd\uc0b0 \uc900\ube44 \uc791\uc5c5\uc774 \ub354 \uc790\uc8fc \ud544\uc694\ud574\uc9d1\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc55e\uc11c \ud558\ub8e8\uc5d0 40\uac1c\uc529 \uc0ac\uc6a9\ud558\ub294 \uc608\uc2dc\uc5d0\uc11c \ucd5c\ub300 \uc218\uc900\uc744 600\uac1c\ub85c \uc815\ud588\ub2e4\uace0 \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \ucd5c\uc18c \uc218\uc900\uc778 280\uac1c\uc640\uc758 \ucc28\uc774\ub294 320\uac1c\ub85c, \ud3c9\uade0 \uc0ac\uc6a9\ub7c9 \uae30\uc900 8\uc791\uc5c5\uc77c\ubd84\uc5d0 \ud574\ub2f9\ud569\ub2c8\ub2e4. \uc774\ub294 \uc81c\uc548\ub41c \ubcf4\ucda9 \uc8fc\uae30\ub97c \uc774\ud574\ud558\ub294 \ubc29\ubc95\uc774\uc9c0, 600\uac1c\uac00 \ube44\uc6a9\uc774 \uac00\uc7a5 \uc801\uac8c \ub4e4\uac70\ub098 \uac00\uc7a5 \uc88b\uc740 \ubaa9\ud45c\ub77c\ub294 \uc99d\uac70\ub294 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p>\ubcf4\uad00 \uacf5\uac04, \ubcf4\uad00 \uac00\ub2a5 \uae30\uac04, \uc9c4\ubd80\ud654 \uc704\ud5d8, \uc6b4\uc804 \uc790\uae08, \uc790\uccb4 \uc0dd\uc0b0 \ub610\ub294 \uacf5\uae09\uc5c5\uccb4\uc758 \ubc30\uce58 \ud06c\uae30\ub97c \uace0\ub824\ud574 \ubaa9\ud45c\uac00 \uc801\uc808\ud55c\uc9c0 \uac80\ud1a0\ud558\uc138\uc694. \uc18c\uc9c4 \uc18d\ub3c4\uac00 \ub290\ub9ac\uace0 \ubcf4\uad00 \uac00\ub2a5 \uae30\uac04\uc774 \uc9e7\uc740 \ud488\ubaa9\uc774\ub77c\uba74, \ucd5c\uc18c\u00b7\ucd5c\ub300 \ubc94\uc704\uac00 \uac89\ubcf4\uae30\uc5d0\ub294 \uc801\uc808\ud574\ub3c4 \ud3d0\uae30\ub85c \ud070 \ube44\uc6a9\uc774 \ubc1c\uc0dd\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uc8fc\ubb38\uc744 \ud655\uc815\ud558\uae30 \uc804\uc5d0 \uc8fc\ubb38 \uc81c\uc57d \uc870\uac74 \ubc18\uc601\ud558\uae30<\/h3>\n\n\n<p>\uacc4\uc0b0\ub41c \ubd80\uc871\ubd84\uc740 \uc8fc\ubb38 \uc218\ub7c9\uc744 \uc815\ud558\ub294 \ucd9c\ubc1c\uc810\uc785\ub2c8\ub2e4. \uacf5\uae09\uc5c5\uccb4\uc758 \ucd5c\uc18c \uc8fc\ubb38\ub7c9, \ud3ec\uc7a5 \ub2e8\uc704, \uc0dd\uc0b0 \ubc30\uce58 \uc81c\uc57d\uc5d0 \ub530\ub77c \uc2e4\uc81c \uc8fc\ubb38\ud560 \uc218 \uc788\ub294 \uc218\ub7c9\uc740 \ub2ec\ub77c\uc9c8 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ube0c\ub798\ud0b7\uc758 \uad8c\uc7a5 \ubcf4\ucda9 \uc218\ub7c9\uc774 370\uac1c\uc778\ub370 50\uac1c \ub2e8\uc704\ub85c\ub9cc \uacf5\uae09\ub41c\ub2e4\uba74, \uc62c\ub9bc\ud55c \uc8fc\ubb38 \uc218\ub7c9\uc740 400\uac1c\uac00 \ub429\ub2c8\ub2e4. \uc870\uc815 \uc804 \ubaa9\ud45c\ubcf4\ub2e4 30\uac1c\uac00 \ub9ce\uc544\uc9c0\ub294 \uc148\uc785\ub2c8\ub2e4. \uc774 \ucc28\uc774\ub97c \uc218\uc6a9\ud560\uc9c0, \uacf5\uae09 \ubc29\uc2dd\uc744 \ubc14\uafc0\uc9c0, \uc7ac\uace0 \uc815\ucc45\uc744 \uc218\uc815\ud560\uc9c0 \uacb0\uc815\ud574\uc57c \ud569\ub2c8\ub2e4. \uc774\ub54c \u2018\ucd5c\ub300 \uc7ac\uace0 \ubaa9\ud45c\u2019\uc640 \u2018\ucd5c\ub300 \uc8fc\ubb38 \uc218\ub7c9\u2019\uc744 \uac19\uc740 \uc124\uc815\uc73c\ub85c \uac04\uc8fc\ud574\uc11c\ub294 \uc548 \ub429\ub2c8\ub2e4. \uc804\uc790\ub294 \ud655\ubcf4\ud558\uace0\uc790 \ud558\ub294 \uc21c\uc7ac\uace0 \uc218\uc900\uc744 \ub098\ud0c0\ub0b4\uace0, \ud6c4\uc790\ub294 \uac1c\ubcc4 \uc8fc\ubb38\uc758 \uc218\ub7c9\uc744 \uc81c\ud55c\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc2b9\uc778\ub41c \ubcf4\ucda9 \uc8fc\ubb38\uc740 \uc989\uc2dc \ubbf8\uc785\uace0 \uacf5\uae09 \ubb3c\ub7c9\uc73c\ub85c \ub4f1\ub85d\ud558\uc138\uc694. \uadf8\ub798\uc57c \ub2e4\uc74c \uac80\ud1a0 \ub54c\ub098 \ub2e4\ub978 \uad6c\ub9e4 \ub2f4\ub2f9\uc790\uac00 \uac19\uc740 \ubd80\uc871\ubd84\uc744 \ub2e4\uc2dc \uc8fc\ubb38\ud558\ub294 \uc77c\uc744 \ub9c9\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\ucd5c\uc18c \ucd5c\ub300 \uc7ac\uace0 \uad00\ub9ac\uac00 \ud6a8\uacfc\uc801\uc778 \uacbd\uc6b0\uc640 \uae30\uc900\uac12\ub9cc\uc73c\ub85c \ubd80\uc871\ud55c \uacbd\uc6b0<\/h2>\n\n\n<p>\ucd5c\uc18c \ucd5c\ub300 \uc7ac\uace0 \uad00\ub9ac\ub294 \ubc18\ubcf5\uc801\uc73c\ub85c \uc18c\ube44\ub418\uace0 \ubcf4\ucda9 \uacfc\uc815\uc744 \ubaa8\ub2c8\ud130\ub9c1\ud560 \uc218 \uc788\ub294 \uc7ac\uace0 \ud488\ubaa9\uc5d0 \uc720\uc6a9\ud569\ub2c8\ub2e4. \uacf5\uc6a9 \ubd80\ud488, \ud45c\uc900 \ubc18\uc870\ub9bd\ud488, \uc790\uc8fc \uc4f0\ub294 \uc18c\ubaa8\ud488\uc774 \uc5ec\uae30\uc5d0 \ud574\ub2f9\ud569\ub2c8\ub2e4. \uc774 \ubc29\uc2dd\uc758 \uc7a5\uc810\uc740 \uc77c\uad00\uc131\uc785\ub2c8\ub2e4. \ubcf4\ucda9\uc774 \ud544\uc694\ud55c \uc774\uc720\uc640 \uc218\ub7c9\uc744 \uc815\ud55c \uadfc\uac70\ub97c \ub204\uad6c\ub098 \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud2b9\uc815 \ub0a0\uc9dc\uc5d0 \ud544\uc694\ud55c \ub300\ub7c9 \uc18c\uc694\uac00 \ud3c9\uade0\uac12\uc5d0 \uac00\ub824\uc9c4\ub2e4\uba74 \uc774 \ubc29\uc2dd\uc758 \uc2e0\ub8b0\uc131\uc740 \ub5a8\uc5b4\uc9d1\ub2c8\ub2e4. \uac04\ud5d0\uc801\uc778 \uace0\uac1d \uc8fc\ubb38 \ubc30\uce58\uc5d0\ub9cc \uc4f0\uc774\ub294 \ubd80\ud488\uc740 \uc77c\uc815\ud55c \uc7ac\uace0 \ubc94\uc704\ub97c \uc720\uc9c0\ud558\uae30\ubcf4\ub2e4 \uc2dc\uc810\ubcc4 \uc790\uc7ac \uacc4\ud68d\uc73c\ub85c \uad00\ub9ac\ud574\uc57c \ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uac00\ub054 \uc4f0\uc774\ub294 \uc608\ube44 \ubd80\ud488\ub3c4 \uc911\uc694\ub3c4\uc5d0 \ub530\ub77c \ube44\ucd95 \uc5ec\ubd80\ub97c \uacb0\uc815\ud574\uc57c \ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ud3c9\uade0 \uc0ac\uc6a9\ub7c9\uc774 \uc801\ub2e4\ub294 \uc0ac\uc2e4\ub9cc\uc73c\ub85c\ub294 \ud574\ub2f9 \ubd80\ud488\uc774 \uc5c6\uc744 \ub54c \ubc1c\uc0dd\ud560 \ube44\uc6a9\uc744 \uc54c \uc218 \uc5c6\uae30 \ub54c\ubb38\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>\uad00\ub828 \uac1c\ub150 \ubc0f \ubc29\uc2dd\uacfc\ub3c4 \uba85\ud655\ud788 \uad6c\ubd84\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong><a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/safety-stock-in-manufacturing\/\">\uc548\uc804 \uc7ac\uace0<\/a><\/strong>\ub294 \ubd88\ud655\uc2e4\uc131\uc5d0 \ub300\ube44\ud55c \uc644\ucda9 \uc7ac\uace0\uc785\ub2c8\ub2e4. \ucd5c\uc18c \uae30\uc900\uc744 \uc815\ud558\ub294 \ub370 \ud65c\uc6a9\ud560 \uc218 \uc788\uc9c0\ub9cc, \uc774\uac83\ub9cc\uc73c\ub85c \ucd5c\uc18c \ucd5c\ub300 \uc7ac\uace0 \uad00\ub9ac \uc815\ucc45 \uc804\uccb4\uac00 \uc815\ud574\uc9c0\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/economic-order-quantity\/\">\uacbd\uc81c\uc801 \uc8fc\ubb38\ub7c9(EOQ)<\/a><\/strong>\uc740 \uc8fc\ubb38 \ube44\uc6a9\uacfc \uc7ac\uace0 \ubcf4\uc720 \ube44\uc6a9\uc5d0 \ub300\ud55c \uac00\uc815\uc744 \ubc14\ud0d5\uc73c\ub85c 1\ud68c \uc8fc\ubb38\ub7c9\uc744 \uacc4\uc0b0\ud569\ub2c8\ub2e4. \ubc18\uba74 \ucd5c\uc18c \ucd5c\ub300 \uc7ac\uace0 \uad00\ub9ac\ub294 \ucd5c\ub300 \ubaa9\ud45c\uae4c\uc9c0\uc758 \ubd80\uc871\ubd84\uc744 \ubcf4\ucda9\ud558\ubbc0\ub85c \ubcf4\ucda9 \uc218\ub7c9\uc774 \uadf8\ub54c\uadf8\ub54c \ub2ec\ub77c\uc9d1\ub2c8\ub2e4.<\/li><li><strong>\uc7ac\uace0\uc0dd\uc0b0<\/strong>\uc740 \uace0\uac1d \uc8fc\ubb38\uc5d0 \uc55e\uc11c \ubbf8\ub9ac \uc0dd\uc0b0\ud558\ub294 \ubc29\uc2dd\uc785\ub2c8\ub2e4. \ucd5c\uc18c \ucd5c\ub300 \uc7ac\uace0 \uad00\ub9ac\ub294 \uc774 \uc804\ub7b5 \uc548\uc5d0\uc11c \ubcf4\ucda9\uc744 \uad00\ub9ac\ud558\ub294 \ubc29\ubc95 \uc911 \ud558\ub098\uc785\ub2c8\ub2e4.<\/li><\/ul>\n\n\n<p>\uc0ac\uc6a9\ub7c9, \uacf5\uae09\uc5c5\uccb4 \uc131\uacfc, \uc0dd\uc0b0 \ub9ac\ub4dc\ud0c0\uc784 \ub610\ub294 \uc81c\ud488 \uc218\uba85\uc5d0 \ubcc0\ud654\uac00 \uc0dd\uae30\uba74 \ucd5c\uc18c\u00b7\ucd5c\ub300 \uc218\uc900\uc744 \uac80\ud1a0\ud558\uc138\uc694. \ud488\uc808\uc774\ub098 \uacfc\uc789 \uc7ac\uace0\uac00 \ubc18\ubcf5\ub41c\ub2e4\uba74 \ub2e8\uc21c\ud788 \ubc94\uc704\ub97c \ub113\ud788\uae30 \uc804\uc5d0 \uc6d0\uc778\uc744 \uc870\uc0ac\ud574\uc57c \ud569\ub2c8\ub2e4. \uc785\uace0 \uc9c0\uc5f0, \ubd80\uc815\ud655\ud55c \uc7ac\uace0 \uc218\ub7c9, \uc911\ubcf5 \uc8fc\ubb38\uc740 \uac01\uac01 \ud574\uacb0 \ubc29\ubc95\uc774 \ub2e4\ub985\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc2b9\uc778\ub41c \ubcf4\ucda9 \uc791\uc5c5\uc744 \uc0dd\uc0b0 \uc77c\uc815\uc5d0 \ubc18\uc601\ud558\uae30<\/h2>\n\n\n<p>\uc790\uccb4 \uc0dd\uc0b0 \ubd80\ud488\uc774\ub77c\uba74 \u2018370\uac1c \uc8fc\ubb38\u2019\uc774\ub77c\ub294 \uacb0\uc815\ub9cc\uc73c\ub85c\ub294 \ucda9\ubd84\ud558\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4. \uc7ac\uace0\uac00 \ubd80\uc871\ud574\uc9c0\uae30 \uc804\uc5d0 \ube0c\ub798\ud0b7 \uc0dd\uc0b0\uc744 \ub9c8\uce60 \uc218 \uc788\ub294\uc9c0, \uc0dd\uc0b0 \uc2dc\uac04\uc744 \ud655\ubcf4\ud558\ub824\uba74 \uc5b4\ub5a4 \uace0\uac1d \uc791\uc5c5\uc758 \uc77c\uc815\uc744 \uc62e\uaca8\uc57c \ud558\ub294\uc9c0\uae4c\uc9c0\ub294 \uc54c \uc218 \uc5c6\uae30 \ub54c\ubb38\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc2b9\uc778\ub41c \ubcf4\ucda9 \uc791\uc5c5\uc5d0 \uc774\ubc88 \uc8fc \ub0a9\uae30\uc778 \uace0\uac1d \uc8fc\ubb38\uacfc \ub3d9\uc77c\ud55c \uba38\uc2dc\ub2dd\uc13c\ud130\uac00 \ud544\uc694\ud558\ub2e4\uace0 \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \ubcc4\ub3c4\uc758 \uc7ac\uace0 \ubcf4\ucda9 \ubaa9\ub85d\uc5d0\uc11c \uc774 \uc791\uc5c5\uc744 \ub9e8 \uc704\uc5d0 \uc62c\ub824\ub193\uc73c\uba74 \uc790\uc6d0 \uacbd\ud569\uc774 \ub4dc\ub7ec\ub098\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4. \ud1b5\ud569 \uc77c\uc815\uc5d0 \ubc30\uce58\ud558\uba74 \uc544\uc9c1 \uacb0\uc815\uc744 \ub0b4\ub9b4 \uc2dc\uac04\uc774 \uc788\uc744 \ub54c \ubb34\uc5c7\uc744 \uc870\uc815\ud574\uc57c \ud558\ub294\uc9c0 \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>SkyPlanner APS<\/strong>\ub97c \uc120\ud0dd\ud558\uba74 \uc774\ub7ec\ud55c <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-scheduling\/\">\ud1b5\ud569 \uc77c\uc815\uc744 \ub354 \uc27d\uac8c \uad00\ub9ac<\/a>\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc2a4\ucf00\uc904\ub9c1 \uc778\uacf5\uc9c0\ub2a5 Arcturus\ub294 \uc124\uc815\ub41c \uc791\uc5c5 \uc790\uc6d0, \uad50\ub300\uc870, \uc6b0\uc120\uc21c\uc704, \uacf5\uc815 \uac04 \uc120\ud6c4 \uad00\uacc4, \uc790\uc7ac\ub97c \uae30\uc900\uc73c\ub85c \uc791\uc5c5 \uc77c\uc815\uc744 \uacc4\uc0b0\ud569\ub2c8\ub2e4. \uac04\ud2b8 \ucc28\ud2b8\uc5d0\uc11c\ub294 \ub2e4\ub978 \uc8fc\ubb38\uacfc \ud568\uaed8 \ubcf4\ucda9 \uc791\uc5c5\uc774 \uc5b4\ub514\uc5d0 \ubc30\uce58\ub418\uace0 \uc5b8\uc81c \uc644\ub8cc\ub420 \uc608\uc815\uc778\uc9c0 \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc7ac\uace0 \ubaa9\ub85d\uacfc \uac1c\ubcc4 \uc124\ube44\uc758 \ub300\uae30 \uc791\uc5c5\uc744 \ub300\uc870\ud558\ub294 \uc2dc\uac04\uc744 \uc904\uc774\uace0, \ub0a9\uae30\ub97c \uc9c0\ud0a4\uae30 \uc704\ud55c \ud310\ub2e8 \uadfc\uac70\ub97c \ub354 \uba85\ud655\ud788 \ud655\ubcf4\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>SkyPlanner\ub294 \uc0ac\uc6a9\uc790\uac00 \ubcf4\ucda9 \uc8fc\ubb38\uc744 \uc0dd\uc131\ud558\ub3c4\ub85d \uc548\ub0b4\ud558\ub294 \uc7ac\uace0 \ubd80\uc871 \uc54c\ub9bc\uc744 \uc9c0\uc6d0\ud569\ub2c8\ub2e4. \ucd5c\uc18c\u00b7\ucd5c\ub300 \ubaa9\ud45c, \ubcf4\ucda9 \uc218\ub7c9, \uc2b9\uc778 \ubc29\uc2dd\uc740 \ub2f4\ub2f9 \uc0dd\uc0b0\uacc4\ud68d \ub2f4\ub2f9\uc790\uc640 \ud611\uc758\ud558\uac70\ub098 ERP\/MRP\uc758 \uad00\ub9ac \uae30\uc900\uc5d0 \ub530\ub77c \uc815\ud558\uc138\uc694. \uadf8\ub7f0 \ub2e4\uc74c SkyPlanner\uc5d0\uc11c \uc2b9\uc778\ub41c \uc791\uc5c5\uc744 \uace0\uac1d \uc8fc\ubb38\uacfc \ud568\uaed8 \uc77c\uc815\uc5d0 \ubc30\uce58\ud558\uba74, \uc7ac\uace0 \uad00\ub828 \uacb0\uc815\ub3c4 \uacf5\uc7a5\uc758 \ud1b5\ud569 \uc0dd\uc0b0 \uacc4\ud68d\uc5d0 \ubc18\uc601\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc790\uc7ac\ub97c \uace0\ub824\ud558\ub294 \uc2a4\ucf00\uc904\ub9c1 \uae30\ub2a5\uc744 \ud65c\uc131\ud654\ud558\uace0 \uad00\ub828 \uc790\uc7ac \uc815\ubcf4\ub97c \uad00\ub9ac\ud558\uba74, \ud574\ub2f9 \uc790\uc7ac\ub97c \uc0ac\uc6a9\ud558\ub294 \uc791\uc5c5\uc774 \uc2e4\ud589\ub420 \ub54c \uc790\uc7ac\ub97c \uc0ac\uc6a9\ud560 \uc218 \uc788\ub294\uc9c0\ub3c4 \uacc4\uc0b0\uc5d0 \ubc18\uc601\ub429\ub2c8\ub2e4. \uad6c\ub9e4 \uc790\uc7ac\uc758 \uc77c\uc815\uc740 \uad6c\ub9e4 \uc8fc\ubb38\uc758 \uc785\uace0 \uc608\uc815\uc77c\uc744 \uae30\uc900\uc73c\ub85c \uc218\ub9bd\ud569\ub2c8\ub2e4. \uc785\uace0 \uc608\uc815\uc77c\uc774\ub098 \uc6b0\uc120\uc21c\uc704\uac00 \ubc14\ub00c\uba74 \uc601\ud5a5\uc744 \ubc1b\ub294 \ubaa8\ub4e0 \uc791\uc5c5\uc744 \uc218\ub3d9\uc73c\ub85c \uc62e\uae30\ub294 \ub300\uc2e0 \ud1b5\ud569 \uacc4\ud68d\uc744 \ub2e4\uc2dc \uacc4\uc0b0\ud574 \uacb0\uacfc\ub97c \ud655\uc778\ud558\uc138\uc694.<\/p>\n\n\n<p><strong>SkyPlanner\ub294 \uac1c\ubc29\ud615 REST API\ub97c \ud1b5\ud574 \ubaa8\ub4e0 ERP \ub610\ub294 MES\uc640 \uc5f0\ub3d9\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/strong> \ubcf4\ucda9 \uc815\ucc45\uc744 \uad00\ub9ac\ud558\ub294 \uae30\uc874 \uc2dc\uc2a4\ud15c\uc740 \uadf8\ub300\ub85c \uc720\uc9c0\ud558\uba74\uc11c, \uadf8 \uc2dc\uc2a4\ud15c\uc5d0\uc11c \uc2b9\uc778\ud55c \uc8fc\ubb38\uc744 \uc2e4\uc81c \uc0dd\uc0b0 \ub2a5\ub825\uc744 \uace0\ub824\ud55c \uc0dd\uc0b0 \uc77c\uc815\uc5d0 \uc5f0\uacb0\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uc7ac\uace0\uc0dd\uc0b0 \ud604\uc7a5\uc5d0\uc11c\uc758 \ud65c\uc6a9 \uc0ac\ub840<\/h3>\n\n\n<p><a href=\"\/ko\/%ea%b3%a0%ea%b0%9d-%ec%82%ac%eb%a1%80\/opes-corporation\/\">Opes Corporation<\/a>\uc740 \uc608\uce21 \uac00\ub2a5\ud55c \uace0\uac1d \ud655\uc815 \uc218\uc694\uc5d0 \ub9de\ucdb0 \uc7ac\uace0\uc0dd\uc0b0\uc744 \ud569\ub2c8\ub2e4. SkyPlanner \ub3c4\uc785 \uc804\uc5d0\ub294 Excel\uacfc \ubcc4\ub3c4\uc758 \ucc3d\uace0 \uad00\ub9ac \uc560\ud50c\ub9ac\ucf00\uc774\uc158\uc744 \uc0ac\uc6a9\ud574 \ub370\uc774\ud130\uac00 \uc5ec\ub7ec \uacf3\uc5d0 \ud769\uc5b4\uc838 \uc788\uc5c8\uc2b5\ub2c8\ub2e4. Visma Nova \uc5f0\ub3d9\uc744 \ub2e8\uacc4\uc801\uc73c\ub85c \uc9c4\ud589\ud558\uba74\uc11c \uc774 \uc815\ubcf4\ub97c \uc0dd\uc0b0 \uacc4\ud68d\uacfc \uc5f0\uacb0\ud588\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud68c\uc0ac \uce21\uc5d0 \ub530\ub974\uba74 SkyPlanner\ub97c \ud1b5\ud574 \ud300\uc774 \uc0dd\uc0b0 \ub2a5\ub825\uc744 \uba85\ud655\ud788 \ud30c\uc545\ud560 \uc218 \uc788\uac8c \ub418\uc5c8\uc2b5\ub2c8\ub2e4. \uae34\uae09 \uc18c\ub7c9 \uc8fc\ubb38\uc774\ub098 \uc81c\ud488 \uac1c\ubc1c\uc6a9 \uc0dd\uc0b0\uc774 \ub4e4\uc5b4\uc624\uba74, \uac31\uc2e0\ub41c \uc0dd\uc0b0 \uacc4\ud68d\uc5d0\uc11c \ub0a9\uae30\uc5d0 \ubbf8\uce58\ub294 \uc601\ud5a5\uc744 \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ubcc0\uacbd \uc0ac\ud56d\uc744 \ub354 \ube60\ub974\uac8c \ubc18\uc601\ud560 \uc218 \uc788\uace0, \uc0dd\uc0b0\uacc4\ud68d \ub2f4\ub2f9\uc790\ub294 \uc791\uc5c5\ub4e4\uc774 \uc804\uccb4 \uc77c\uc815 \uc548\uc5d0\uc11c \uc5b4\ub5bb\uac8c \ub9de\ubb3c\ub9ac\ub294\uc9c0 \ubcfc \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774 \uc0ac\ub840\uac00 \uc7ac\uace0 \ubcf4\ucda9\uc5d0 \uc8fc\ub294 \uc2dc\uc0ac\uc810\uc740 \ubd84\uba85\ud569\ub2c8\ub2e4. \uc7ac\uace0 \uc218\uc694\uac00 \uc548\uc815\uc801\uc774\uc5b4\ub3c4 \uc608\uc678 \uc0c1\ud669\uc744 \uad00\ub9ac\ud560 \ud544\uc694\ub294 \uc0ac\ub77c\uc9c0\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4. \ud1b5\ud569 \uc77c\uc815\uc774 \uc788\uc73c\uba74 \uac01 \ub300\uae30 \uc791\uc5c5 \ubaa9\ub85d\uc744 \ub530\ub85c \uad00\ub9ac\ud558\ub294 \ub300\uc2e0, \uae30\uc874\uc5d0 \uc57d\uc18d\ud55c \ub0a9\uae30\uc640 \ubb3c\ub7c9\uc744 \uae30\uc900\uc73c\ub85c \ucd94\uac00 \uc791\uc5c5\uc744 \ud310\ub2e8\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc2e4\uc81c \ubcf4\ucda9 \uc0ac\ub840 \ud558\ub098\ub85c \uc815\ucc45 \uac80\uc99d\ud558\uae30<\/h2>\n\n\n<p>\ubc18\ubcf5\uc801\uc73c\ub85c \uc0ac\uc6a9\ud558\ub294 \ud488\ubaa9 \ud558\ub098\ub97c \uc120\ud0dd\ud558\uc138\uc694. \uc0ac\uc6a9 \uac00\ub2a5\ud55c \ud604\uc7ac\uace0, \ubbf8\uc785\uace0 \uacf5\uae09 \ubb3c\ub7c9, \uacc4\uc0b0\uc5d0 \ud3ec\ud568\ud560 \ud655\uc815 \uc218\uc694, \ub9ac\ub4dc\ud0c0\uc784\uc744 \ud655\uc778\ud558\uc138\uc694. \uc774\ub97c \ubc14\ud0d5\uc73c\ub85c \ubcf4\ucda9 \uae30\uc900\uacfc \ubaa9\ud45c\ub97c \uc815\ud558\uace0 \ubd80\uc871\ubd84\uc744 \uacc4\uc0b0\ud55c \ub4a4, \ud574\ub2f9 \uc218\ub7c9\uc774 \uc2e4\uc81c\ub85c \uc5b8\uc81c \ud544\uc694\ud55c\uc9c0 \ud655\uc778\ud558\uc138\uc694.<\/p>\n\n\n<p>\uadf8\ub2e4\uc74c \uc2b9\uc778\ub41c \ubcf4\ucda9 \uc8fc\ubb38\uacfc \ub3d9\uc77c\ud55c \uc790\uc6d0\uc744 \ub450\uace0 \uacbd\ud569\ud558\ub294 \uace0\uac1d \uc8fc\ubb38\uc744 \uc900\ube44\ud574 SkyPlanner \ub370\ubaa8\uc5d0 \ucc38\uc5ec\ud558\uc138\uc694. \ub450 \uc8fc\ubb38\uc758 \uc0dd\uc0b0 \uacbd\ub85c\uac00 \uc0dd\uc0b0 \ub2a5\ub825\uc744 \uc5b4\ub5bb\uac8c \ub098\ub220 \uc4f0\ub294\uc9c0, \ubcf4\ucda9 \uc791\uc5c5\uc740 \uc5b8\uc81c \ub05d\ub098\ub294\uc9c0, \uc790\uc7ac \uc785\uace0\uac00 \uc9c0\uc5f0\ub418\uba74 \uc5b4\ub5a4 \uc77c\uc774 \uc0dd\uae30\ub294\uc9c0 \ud655\uc778\ud574 \ubcf4\uc138\uc694. \uc774\ub97c \ud1b5\ud574 \ub2e8\uc21c\ud55c \uc7ac\uace0 \uacc4\uc0b0\uc744 \ub118\uc5b4 \uc2e4\uc81c \uc0dd\uc0b0\uc5d0 \uc62e\uae38 \uc218 \uc788\ub294 \ubcf4\ucda9 \uacb0\uc815\uc744 \uc5b4\ub5bb\uac8c \ub0b4\ub9ac\ub294\uc9c0 \uc54c \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/ko\/%ec%98%81%ec%97%85%ed%8c%80%ec%97%90-%eb%ac%b8%ec%9d%98\/\">SkyPlanner \ub370\ubaa8\ub97c \uc608\uc57d<\/a>\ud574 \uacf5\uc7a5 \uc0c1\ud669\uc744 \ud568\uaed8 \uc0b4\ud3b4\ubcf4\uac70\ub098, \uba3c\uc800 <a href=\"https:\/\/skyplanner.ai\/ko\/%ed%8f%89%ea%b0%80%ed%8c%90\/\">\ub370\ubaa8 \ub370\uc774\ud130\ub85c SkyPlanner\ub97c \uccb4\ud5d8<\/a>\ud574 \ubcf4\uc138\uc694. \ubaa9\ud45c\ub294 \uac04\ub2e8\ud569\ub2c8\ub2e4. \ud544\uc694\ud55c \ub9cc\ud07c \ubcf4\ucda9\ud558\uace0, \uc911\ubcf5 \uc8fc\ubb38\uc744 \ud53c\ud558\uba70, \uacf5\uc7a5\uc5d0\uc11c \uc2e4\ud589\ud560 \uc218 \uc788\ub294 \uc791\uc5c5 \uc77c\uc815\uc744 \ub9c8\ub828\ud558\ub294 \uac83\uc785\ub2c8\ub2e4.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\ucd5c\uc18c \ucd5c\ub300 \uc7ac\uace0 \uad00\ub9ac: \uc5b8\uc81c, \uc5bc\ub9c8\ub098 \uc7ac\uc8fc\ubb38\ud574\uc57c \ud560\uae4c \ud648 &raquo; \ub9ac\uc18c\uc2a4 &raquo; \ucd5c\uc18c \ucd5c\ub300 \uc7ac\uace0 \uad00\ub9ac: \uc5b8\uc81c, \uc5bc\ub9c8\ub098 \uc7ac\uc8fc\ubb38\ud574\uc57c \ud560\uae4c \ubcf4\uad00\ud568\uc758 \uc7ac\uace0\uac00 \uc904\uc5b4\ub4e4\uc790 \uad6c\ub9e4 \ub2f4\ub2f9\uc790\uac00 \ucd94\uac00 \ubb3c\ub7c9\uc744 \ubc1c\uc8fc\ud569\ub2c8\ub2e4. \uadf8\ub7f0\ub370 \uc0dd\uc0b0 \ud604\uc7a5\uc5d0\uc11c\ub294 \uc774\ubbf8 \uac19\uc740 \ud488\ubaa9\uc758 \uc7ac\uace0\ub97c \ubcf4\ucda9\ud558\uae30 \uc704\ud55c \uc0dd\uc0b0\uc774 \uc9c4\ud589 \uc911\uc785\ub2c8\ub2e4. \uac01\uac01\ub9cc \ubcf4\uba74 \ud569\ub9ac\uc801\uc778 \ud310\ub2e8\uc774\uc9c0\ub9cc, \ub450 \uacb0\uc815\uc774 \uacb9\uce58\uba74 \uacf5\uc7a5\uc5d0 \ud544\uc694 \uc774\uc0c1\uc758 \uc7ac\uace0\uac00 \uc313\uc785\ub2c8\ub2e4. \ucd5c\uc18c \ucd5c\ub300 \uc7ac\uace0 &#8230; <a title=\"\ucd5c\uc18c \ucd5c\ub300 \uc7ac\uace0 \uad00\ub9ac: \uc5b8\uc81c, \uc5bc\ub9c8\ub098 \uc7ac\uc8fc\ubb38\ud574\uc57c \ud560\uae4c\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/min-max-inventory-manufacturing\/\" aria-label=\"Read more about \ucd5c\uc18c \ucd5c\ub300 \uc7ac\uace0 \uad00\ub9ac: \uc5b8\uc81c, \uc5bc\ub9c8\ub098 \uc7ac\uc8fc\ubb38\ud574\uc57c \ud560\uae4c\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":111344,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2530,496],"tags":[],"class_list":["post-111340","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps--","category-496","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\ucd5c\uc18c \ucd5c\ub300 \uc7ac\uace0 \uad00\ub9ac: \uc5b8\uc81c, \uc5bc\ub9c8\ub098 \uc7ac\uc8fc\ubb38\ud574\uc57c \ud560\uae4c<\/title>\n<meta name=\"description\" content=\"\uc911\ubcf5 \uc8fc\ubb38 \uc5c6\uc774 \ucd5c\uc18c\u00b7\ucd5c\ub300 \uc7ac\uace0 \uc218\uc900\uc744 \uc124\uc815\ud558\uc138\uc694. \uacc4\uc0b0 \ud56d\ubaa9\uacfc \ubcf4\ucda9\ub7c9, SkyPlanner\uac00 \uc2b9\uc778\ub41c \uc791\uc5c5\uc758 \uc77c\uc815\uc744 \uc7a1\ub294 \ubc29\uc2dd\uc744 \uc54c\uc544\ubcf4\uc138\uc694.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/min-max-inventory-manufacturing\/\" \/>\n<meta property=\"og:locale\" content=\"ko_KR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\ucd5c\uc18c \ucd5c\ub300 \uc7ac\uace0 \uad00\ub9ac: \uc5b8\uc81c, \uc5bc\ub9c8\ub098 \uc7ac\uc8fc\ubb38\ud574\uc57c \ud560\uae4c\" \/>\n<meta property=\"og:description\" content=\"\uc911\ubcf5 \uc8fc\ubb38 \uc5c6\uc774 \ucd5c\uc18c\u00b7\ucd5c\ub300 \uc7ac\uace0 \uc218\uc900\uc744 \uc124\uc815\ud558\uc138\uc694. \uacc4\uc0b0 \ud56d\ubaa9\uacfc \ubcf4\ucda9\ub7c9, SkyPlanner\uac00 \uc2b9\uc778\ub41c \uc791\uc5c5\uc758 \uc77c\uc815\uc744 \uc7a1\ub294 \ubc29\uc2dd\uc744 \uc54c\uc544\ubcf4\uc138\uc694.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/min-max-inventory-manufacturing\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-27T18:49:22+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-27T18:51:34+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\uae00\uc4f4\uc774\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/min-max-inventory-manufacturing\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/min-max-inventory-manufacturing\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"\ucd5c\uc18c \ucd5c\ub300 \uc7ac\uace0 \uad00\ub9ac: \uc5b8\uc81c, \uc5bc\ub9c8\ub098 \uc7ac\uc8fc\ubb38\ud574\uc57c \ud560\uae4c\",\"datePublished\":\"2026-10-27T18:49:22+00:00\",\"dateModified\":\"2026-10-27T18:51:34+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/min-max-inventory-manufacturing\\\/\"},\"wordCount\":27,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/min-max-inventory-manufacturing\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/min-max-inventory-manufacturing-hero.png\",\"articleSection\":[\"APS \ubc0f \uc2a4\ucf00\uc904\ub9c1\",\"\ub9ac\uc18c\uc2a4\"],\"inLanguage\":\"ko-KR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/min-max-inventory-manufacturing\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/min-max-inventory-manufacturing\\\/\",\"name\":\"\ucd5c\uc18c \ucd5c\ub300 \uc7ac\uace0 \uad00\ub9ac: \uc5b8\uc81c, \uc5bc\ub9c8\ub098 \uc7ac\uc8fc\ubb38\ud574\uc57c \ud560\uae4c\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/min-max-inventory-manufacturing\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/min-max-inventory-manufacturing\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/min-max-inventory-manufacturing-hero.png\",\"datePublished\":\"2026-10-27T18:49:22+00:00\",\"dateModified\":\"2026-10-27T18:51:34+00:00\",\"description\":\"\uc911\ubcf5 \uc8fc\ubb38 \uc5c6\uc774 \ucd5c\uc18c\u00b7\ucd5c\ub300 \uc7ac\uace0 \uc218\uc900\uc744 \uc124\uc815\ud558\uc138\uc694. \uacc4\uc0b0 \ud56d\ubaa9\uacfc \ubcf4\ucda9\ub7c9, SkyPlanner\uac00 \uc2b9\uc778\ub41c \uc791\uc5c5\uc758 \uc77c\uc815\uc744 \uc7a1\ub294 \ubc29\uc2dd\uc744 \uc54c\uc544\ubcf4\uc138\uc694.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/min-max-inventory-manufacturing\\\/#breadcrumb\"},\"inLanguage\":\"ko-KR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/min-max-inventory-manufacturing\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/min-max-inventory-manufacturing\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/min-max-inventory-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/min-max-inventory-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"A low bracket bin with lower and upper reference marks beside incoming parts illustrates min\u2013max replenishment.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/min-max-inventory-manufacturing\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\ucd5c\uc18c \ucd5c\ub300 \uc7ac\uace0 \uad00\ub9ac: \uc5b8\uc81c, \uc5bc\ub9c8\ub098 \uc7ac\uc8fc\ubb38\ud574\uc57c \ud560\uae4c\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ko-KR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\ucd5c\uc18c \ucd5c\ub300 \uc7ac\uace0 \uad00\ub9ac: \uc5b8\uc81c, \uc5bc\ub9c8\ub098 \uc7ac\uc8fc\ubb38\ud574\uc57c \ud560\uae4c","description":"\uc911\ubcf5 \uc8fc\ubb38 \uc5c6\uc774 \ucd5c\uc18c\u00b7\ucd5c\ub300 \uc7ac\uace0 \uc218\uc900\uc744 \uc124\uc815\ud558\uc138\uc694. \uacc4\uc0b0 \ud56d\ubaa9\uacfc \ubcf4\ucda9\ub7c9, SkyPlanner\uac00 \uc2b9\uc778\ub41c \uc791\uc5c5\uc758 \uc77c\uc815\uc744 \uc7a1\ub294 \ubc29\uc2dd\uc744 \uc54c\uc544\ubcf4\uc138\uc694.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/min-max-inventory-manufacturing\/","og_locale":"ko_KR","og_type":"article","og_title":"\ucd5c\uc18c \ucd5c\ub300 \uc7ac\uace0 \uad00\ub9ac: \uc5b8\uc81c, \uc5bc\ub9c8\ub098 \uc7ac\uc8fc\ubb38\ud574\uc57c \ud560\uae4c","og_description":"\uc911\ubcf5 \uc8fc\ubb38 \uc5c6\uc774 \ucd5c\uc18c\u00b7\ucd5c\ub300 \uc7ac\uace0 \uc218\uc900\uc744 \uc124\uc815\ud558\uc138\uc694. \uacc4\uc0b0 \ud56d\ubaa9\uacfc \ubcf4\ucda9\ub7c9, SkyPlanner\uac00 \uc2b9\uc778\ub41c \uc791\uc5c5\uc758 \uc77c\uc815\uc744 \uc7a1\ub294 \ubc29\uc2dd\uc744 \uc54c\uc544\ubcf4\uc138\uc694.","og_url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/min-max-inventory-manufacturing\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-27T18:49:22+00:00","article_modified_time":"2026-10-27T18:51:34+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"\uae00\uc4f4\uc774":"Jussi M\u00e4ntyl\u00e4"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/min-max-inventory-manufacturing\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/min-max-inventory-manufacturing\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"\ucd5c\uc18c \ucd5c\ub300 \uc7ac\uace0 \uad00\ub9ac: \uc5b8\uc81c, \uc5bc\ub9c8\ub098 \uc7ac\uc8fc\ubb38\ud574\uc57c \ud560\uae4c","datePublished":"2026-10-27T18:49:22+00:00","dateModified":"2026-10-27T18:51:34+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/min-max-inventory-manufacturing\/"},"wordCount":27,"publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/min-max-inventory-manufacturing\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero.png","articleSection":["APS \ubc0f \uc2a4\ucf00\uc904\ub9c1","\ub9ac\uc18c\uc2a4"],"inLanguage":"ko-KR"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/min-max-inventory-manufacturing\/","url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/min-max-inventory-manufacturing\/","name":"\ucd5c\uc18c \ucd5c\ub300 \uc7ac\uace0 \uad00\ub9ac: \uc5b8\uc81c, \uc5bc\ub9c8\ub098 \uc7ac\uc8fc\ubb38\ud574\uc57c \ud560\uae4c","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/min-max-inventory-manufacturing\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/min-max-inventory-manufacturing\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero.png","datePublished":"2026-10-27T18:49:22+00:00","dateModified":"2026-10-27T18:51:34+00:00","description":"\uc911\ubcf5 \uc8fc\ubb38 \uc5c6\uc774 \ucd5c\uc18c\u00b7\ucd5c\ub300 \uc7ac\uace0 \uc218\uc900\uc744 \uc124\uc815\ud558\uc138\uc694. \uacc4\uc0b0 \ud56d\ubaa9\uacfc \ubcf4\ucda9\ub7c9, SkyPlanner\uac00 \uc2b9\uc778\ub41c \uc791\uc5c5\uc758 \uc77c\uc815\uc744 \uc7a1\ub294 \ubc29\uc2dd\uc744 \uc54c\uc544\ubcf4\uc138\uc694.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/min-max-inventory-manufacturing\/#breadcrumb"},"inLanguage":"ko-KR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/min-max-inventory-manufacturing\/"]}]},{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/min-max-inventory-manufacturing\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero.png","width":1672,"height":941,"caption":"A low bracket bin with lower and upper reference marks beside incoming parts illustrates min\u2013max replenishment."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/min-max-inventory-manufacturing\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ko\/"},{"@type":"ListItem","position":2,"name":"\ucd5c\uc18c \ucd5c\ub300 \uc7ac\uace0 \uad00\ub9ac: \uc5b8\uc81c, \uc5bc\ub9c8\ub098 \uc7ac\uc8fc\ubb38\ud574\uc57c \ud560\uae4c"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ko\/#website","url":"https:\/\/skyplanner.ai\/ko\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ko\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ko-KR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ko\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ko\/","logo":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/min-max-inventory-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ko\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\ucd5c\uc18c \ucd5c\ub300 \uc7ac\uace0 \uad00\ub9ac: \uc5b8\uc81c, \uc5bc\ub9c8\ub098 \uc7ac\uc8fc\ubb38\ud574\uc57c \ud560\uae4c \ud648 &raquo; \ub9ac\uc18c\uc2a4 &raquo; \ucd5c\uc18c \ucd5c\ub300 \uc7ac\uace0 \uad00\ub9ac: \uc5b8\uc81c, \uc5bc\ub9c8\ub098 \uc7ac\uc8fc\ubb38\ud574\uc57c \ud560\uae4c \ubcf4\uad00\ud568\uc758 \uc7ac\uace0\uac00 \uc904\uc5b4\ub4e4\uc790 \uad6c\ub9e4 \ub2f4\ub2f9\uc790\uac00 \ucd94\uac00 \ubb3c\ub7c9\uc744 \ubc1c\uc8fc\ud569\ub2c8\ub2e4. \uadf8\ub7f0\ub370 \uc0dd\uc0b0 \ud604\uc7a5\uc5d0\uc11c\ub294 \uc774\ubbf8 \uac19\uc740 \ud488\ubaa9\uc758 \uc7ac\uace0\ub97c \ubcf4\ucda9\ud558\uae30 \uc704\ud55c \uc0dd\uc0b0\uc774 \uc9c4\ud589 \uc911\uc785\ub2c8\ub2e4. \uac01\uac01\ub9cc \ubcf4\uba74 \ud569\ub9ac\uc801\uc778 \ud310\ub2e8\uc774\uc9c0\ub9cc, \ub450 \uacb0\uc815\uc774 \uacb9\uce58\uba74 \uacf5\uc7a5\uc5d0 \ud544\uc694 \uc774\uc0c1\uc758 \uc7ac\uace0\uac00 \uc313\uc785\ub2c8\ub2e4. \ucd5c\uc18c \ucd5c\ub300 \uc7ac\uace0&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/111340","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/comments?post=111340"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/111340\/revisions"}],"predecessor-version":[{"id":111405,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/111340\/revisions\/111405"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media\/111344"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media?parent=111340"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/categories?post=111340"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/tags?post=111340"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}