{"id":111063,"date":"2026-10-27T12:48:18","date_gmt":"2026-10-27T12:48:18","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=111063"},"modified":"2026-10-27T12:50:35","modified_gmt":"2026-10-27T12:50:35","slug":"sku-rationalization-manufacturing","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/sku-rationalization-manufacturing\/","title":{"rendered":"\uc81c\uc870\uc5c5 SKU \ud569\ub9ac\ud654: \uc5b4\ub5a4 \ud488\ubaa9\uc744 \uc720\uc9c0\ud560 \uac83\uc778\uac00"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">\uc81c\uc870\uc5c5 SKU \ud569\ub9ac\ud654: \uc5b4\ub5a4 \ud488\ubaa9\uc744 \uc720\uc9c0\ud560 \uac83\uc778\uac00<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/ko\/\">\ud648<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/\">\ub9ac\uc18c\uc2a4<\/a> &raquo; \uc81c\uc870\uc5c5 SKU \ud569\ub9ac\ud654: \uc5b4\ub5a4 \ud488\ubaa9\uc744 \uc720\uc9c0\ud560 \uac83\uc778\uac00<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">\uc608\uc0c1 \uc77d\uae30 \uc2dc\uac04: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> \ubd84<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>\ud310\ub9e4\ub7c9\uc774 \uac00\uc7a5 \uc801\uc740 \uc0ac\uc591\uc774 \uc624\ud788\ub824 \ub9cc\ub4e4\uae30\ub294 \uc26c\uc6b8 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc8fc\ub825 \uc81c\ud488\uacfc \uac19\uc740 \uc790\uc7ac\ub97c \uc4f0\uace0, \uc900\ube44 \uc791\uc5c5\ub3c4 \uac70\uc758 \ucd94\uac00\ud558\uc9c0 \uc54a\uc740 \ucc44 \ud568\uaed8 \uc0dd\uc0b0\ud560 \uc218 \uc788\uae30 \ub54c\ubb38\uc785\ub2c8\ub2e4. \ubc18\uba74 \ud310\ub9e4\ub7c9\uc740 \ub354 \ub9ce\uc544\ub3c4 \uac00\uc7a5 \ubc14\uc05c \uc124\ube44\uc758 \uc791\uc5c5\uc744 \uc218\uc2dc\ub85c \ub04a\uace0, \uc804\uc6a9 \ubd80\ud488\uc774 \ud544\uc694\ud558\uba70, \ubc30\uce58\ub97c \uc0dd\uc0b0\ud560 \ub54c\ub9c8\ub2e4 \uc790\uc7ac\uac00 \ub0a8\ub294 \uc0ac\uc591\ub3c4 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud310\ub9e4 \uc21c\uc704\ub9cc\uc73c\ub85c\ub294 \uc5b4\ub290 \uc0ac\uc591\uc744 \uc81c\ud488\uad70\uc5d0 \ub0a8\uaca8\uc57c \ud560\uc9c0 \uc54c \uc218 \uc5c6\uc2b5\ub2c8\ub2e4. \uc81c\ub300\ub85c \ub41c SKU \ud569\ub9ac\ud654\ub294 \uace0\uac1d\uc774 \uc911\uc694\ud558\uac8c \uc5ec\uae30\ub294 \uac00\uce58\uc640 \uc774\ub97c \uacf5\uae09\ud558\uae30 \uc704\ud574 \uacf5\uc7a5\uc5d0\uc11c \ud574\uc57c \ud558\ub294 \uc77c\uc744 \ud568\uaed8 \uc0b4\ud54d\ub2c8\ub2e4. \ubaa9\ud45c\ub294 \ub2e8\uc21c\ud788 \uce74\ud0c8\ub85c\uadf8\uc758 \ud488\ubaa9 \uc218\ub97c \uc904\uc774\ub294 \uac83\uc774 \uc544\ub2c8\ub77c, \uc218\uc775\uc131\uc774 \ub192\uace0 \uad00\ub9ac\ud558\uae30 \uc26c\uc6b4 \uc81c\ud488 \uad6c\uc131\uc744 \ub9cc\ub4dc\ub294 \uac83\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc720\uc9c0\ud560 \ud488\ubaa9\uc5d0 \ub300\ud55c \ud569\uc758\uac00 \uc774\ub8e8\uc5b4\uc9c0\uba74 SkyPlanner APS\ub294 \uc2b9\uc778\ub41c \uc8fc\ubb38\uc744 \ubc14\ud0d5\uc73c\ub85c \uc790\uc7ac, \uc900\ube44 \uc2dc\uac04, \uac00\uc6a9 \uc0dd\uc0b0 \ub2a5\ub825\uc744 \uace0\ub824\ud55c \uc0dd\uc0b0 \uc77c\uc815\uc744 \ub9cc\ub4ed\ub2c8\ub2e4. \uc124\ube44\ubcc4 \uc791\uc5c5 \ub300\uae30\uc5f4\uc744 \uc77c\uc77c\uc774 \ub2e4\uc2dc \uc9dc\uc9c0 \uc54a\uc544\ub3c4 \ub0a8\uc740 \uc791\uc5c5\uacfc \ub0a9\uae30\uc5d0 \ubbf8\uce58\ub294 \uc601\ud5a5\uc744 \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">SKU \ud569\ub9ac\ud654\ub780?<\/h2>\n\n\n<p>SKU \ud569\ub9ac\ud654\ub294 \uac1c\ubcc4 \uc7ac\uace0 \uad00\ub9ac \ud488\ubaa9\uc744 \uac80\ud1a0\ud558\uace0, \uc218\uc694\uc640 \uacbd\uc81c\uc131, \uc81c\ud488\uad70 \ub0b4 \uc5ed\ud560\uc744 \ubc14\ud0d5\uc73c\ub85c \uc720\uc9c0\u00b7\ubcc0\uacbd\u00b7\ud1b5\ud569\u00b7\ub2e8\uc885 \uc5ec\ubd80\ub97c \uacb0\uc815\ud558\ub294 \uacfc\uc815\uc785\ub2c8\ub2e4. SKU\ub294 \ud2b9\uc815 \ud06c\uae30, \ub9c8\uac10, \ud3ec\uc7a5 \uad6c\uc131 \ub4f1\uc73c\ub85c \uad6c\ubd84\ub418\ub294 \uac1c\ubcc4 \ud488\ubaa9\uc744 \uc2dd\ubcc4\ud558\ub294 \ub2e8\uc704\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc81c\uc870\uc5c5\uc5d0\uc11c \uc774 \uacb0\uc815\uc740 \uc644\uc81c\ud488 \uc7ac\uace0\uc5d0\ub9cc \uc601\ud5a5\uc744 \uc8fc\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4. \uc0ac\uc591\ub9c8\ub2e4 \ubcc4\ub3c4\uc758 \ubd80\ud488, \uacf5\uad6c, \uac80\uc0ac, \uc900\ube44 \uc791\uc5c5, \uacf5\uc815 \uc21c\uc11c\uac00 \ud544\uc694\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc911\ubcf5 \ud488\ubaa9\uc744 \uc5c6\uc560\uba74 \uc774 \ubaa8\ub4e0 \uac83\uc774 \ub2e8\uc21c\ud574\uc9c8 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uadf8\ub7ec\ub098 \uace0\uac1d\uc5d0\uac8c \uc911\uc694\ud55c \uc120\ud0dd\uc9c0\ub97c \uc5c6\uc560\uba74 \ud574\ub2f9 \ud488\ubaa9\uc758 \ub9e4\ucd9c\ub9cc\uc73c\ub85c \uc608\uc0c1\ud55c \uac83\ubcf4\ub2e4 \ud6e8\uc52c \ud070 \uac70\ub798\ub97c \uc783\uc744 \uc218\ub3c4 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud310\ub2e8\uc5d0 \ub3c4\uc6c0\uc774 \ub418\ub294 \uc9c8\ubb38\uc740 \ub2e4\uc74c\uacfc \uac19\uc2b5\ub2c8\ub2e4. <strong>\uc774 \uc0ac\uc591\uc740 \ucd94\uac00\ub85c \ud544\uc694\ud55c \uc791\uc5c5\uacfc \uc790\uc6d0\uc744 \uac10\uc218\ud560 \ub9cc\ud07c \ucda9\ubd84\ud55c \uac00\uce58\ub97c \ub9cc\ub4dc\ub294\uac00?<\/strong><\/p>\n\n\n<p>\uc774 \uc810\uc5d0\uc11c \ud569\ub9ac\ud654\ub294 \uc7ac\uace0 \ubd84\ub958\uc640 \ub2e4\ub985\ub2c8\ub2e4. <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/abc-inventory-analysis\/\">ABC \ubd84\uc11d<\/a>\uc740 \uc120\ud0dd\ud55c \uac00\uce58 \uc9c0\ud45c\uc5d0 \ub530\ub77c \ud488\ubaa9\uc758 \uc21c\uc704\ub97c \uc815\ud558\ub294 \ub370 \ub3c4\uc6c0\uc774 \ub418\uace0, XYZ \ubd84\uc11d\uc740 \uc218\uc694\uc758 \ubcc0\ub3d9\uc131\uc744 \ubcf4\uc5ec\uc90d\ub2c8\ub2e4. \ub450 \ubd84\uc11d \ubaa8\ub450 \uac80\ud1a0 \ub300\uc0c1\uc744 \uace0\ub974\ub294 \ub370 \ud65c\uc6a9\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ud558\uc9c0\ub9cc \ud310\ub9e4\ub7c9\uc774 \uc801\uc740 \uc608\ube44 \ubd80\ud488\uc774\ub098 \uace0\uac1d \uc804\uc6a9 \uc0ac\uc591, \uacf5\uc6a9 \ubd80\ud488\uc744 \uc5c6\uc560\uc57c \ud558\ub294\uc9c0\uae4c\uc9c0 \uacb0\uc815\ud574 \uc8fc\uc9c0\ub294 \uc54a\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc904\uc774\ub824\ub294 \ubcf5\uc7a1\uc131\ubd80\ud130 \uba85\ud655\ud788 \ud558\uc138\uc694<\/h2>\n\n\n<p>\ubb38\uc81c\uac00 \ub69c\ub837\ud55c \uc81c\ud488\uad70\uc744 \uc120\ud0dd\ud558\uc138\uc694. \uc0dd\uc0b0 \ub2a5\ub825\uc774 \ubd80\uc871\ud55c \ub77c\uc778\uc5d0\uc11c \uc18c\ub7c9 \uc0dd\uc0b0\uc774 \uc9c0\ub098\uce58\uac8c \uc790\uc8fc \ubc1c\uc0dd\ud558\uac70\ub098, \uc804\uc6a9 \uc790\uc7ac\uac00 \ubd88\uc6a9\ud654\ub418\uac70\ub098, \uac70\uc758 \uac19\uc740 \uc120\ud0dd\uc9c0\ub85c \uc218\uc694\uac00 \ubd84\uc0b0\ub418\uac70\ub098, \uace0\uac1d\uc758 \ud544\uc694 \uc774\uc0c1\uc73c\ub85c \uc81c\ud488 \uc885\ub958\uac00 \ub298\uc5b4\ub09c \uacbd\uc6b0\uac00 \uc5ec\uae30\uc5d0 \ud574\ub2f9\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\ubaa9\ud45c SKU \uc218\ub97c \ub17c\uc758\ud558\uae30 \uc804\uc5d0 \uc5b4\ub5a4 \uc131\uacfc\ub97c \uc5bb\uc73c\ub824\ub294\uc9c0 \uc815\ud558\uc138\uc694. \ub3c4\uc7a5 \ub77c\uc778\uc758 \uc791\uc5c5 \uc804\ud658\uc774 \ubb38\uc81c\ub77c\uba74 \uc774\ubbf8 \ud568\uaed8 \ub3c4\uc7a5\ud558\ub294 \ud488\ubaa9\uc744 \ub2e8\uc885\ud574\ub3c4 \ud6a8\uacfc\uac00 \uc791\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uad6c\ub9e4 \ubd80\ud488\uc758 \ubd88\uc6a9\ud654\uac00 \ubb38\uc81c\ub77c\uba74 \uc644\uc81c\ud488 \ucf54\ub4dc\ub97c \uc5c6\uc560\ub294 \uac83\ubcf4\ub2e4 \uc720\uc9c0\ud560 \uc81c\ud488\ub4e4\uc758 \ubd80\ud488\uc744 \uacf5\uc6a9\ud654\ud558\ub294 \ud3b8\uc774 \ub354 \ub3c4\uc6c0\uc774 \ub420 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ub2e4\uc591\uc131\uc740 \ub450 \uac00\uc9c0\ub85c \ub098\ub204\uc5b4 \uc0b4\ud3b4\ubd10\uc57c \ud569\ub2c8\ub2e4. \uc678\ubd80 \ub2e4\uc591\uc131\uc740 \uace0\uac1d\uc5d0\uac8c \ubcf4\uc774\ub294 \uc120\ud0dd\uc9c0\uc774\uace0, \ub0b4\ubd80 \ub2e4\uc591\uc131\uc740 \uadf8 \uc120\ud0dd\uc9c0\ub97c \uc81c\uacf5\ud558\ub294 \ub370 \ud544\uc694\ud55c \ubd80\ud488, \uc790\uc7ac, \uacf5\uc815\uc758 \uc885\ub958\uc785\ub2c8\ub2e4. \uc124\uacc4 \ubd80\uc11c\uc5d0\uc11c\ub294 \uc5ec\ub7ec \uc81c\ud488\uc5d0 \uacf5\ud1b5 \ube14\ub7ad\ud06c(\uac00\uacf5 \uc804 \uc18c\uc7ac)\ub098 \uccb4\uacb0 \ubc29\uc2dd\uc744 \uc801\uc6a9\ud558\ub294 \ub4f1\uc758 \ubc29\ubc95\uc73c\ub85c \uace0\uac1d\uc758 \uc120\ud0dd\uc9c0\ub294 \uadf8\ub300\ub85c \ub450\uba74\uc11c \ub0b4\ubd80 \ub2e4\uc591\uc131\ub9cc \uc904\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uac80\ud1a0\uc5d0\ub294 \uc601\uc5c5, \uc81c\ud488 \uad00\ub9ac \ub610\ub294 \uc124\uacc4, \uc7ac\ubb34, \uad6c\ub9e4, \uc0dd\uc0b0 \ubd80\uc11c\uac00 \ud568\uaed8 \ucc38\uc5ec\ud574\uc57c \ud569\ub2c8\ub2e4. \ubd80\uc11c\ub9c8\ub2e4 \ud310\ub2e8\uc5d0 \ud544\uc694\ud55c \uc11c\ub85c \ub2e4\ub978 \uc815\ubcf4\ub97c \uc81c\uacf5\ud569\ub2c8\ub2e4. \uc601\uc5c5\uc740 \uace0\uac1d\uc758 \ud544\uc694\ub97c \uc124\uba85\ud558\uace0, \uc124\uacc4\ub294 \ub300\uccb4 \uac00\ub2a5\uc131\uc744 \ud655\uc778\ud558\uba70, \uc7ac\ubb34\ub294 \uacbd\uc81c\uc131\uc744 \uac80\uc99d\ud569\ub2c8\ub2e4. \uad6c\ub9e4\uc640 \uc0dd\uc0b0\uc740 \uc2e4\uc81c\ub85c \uc5b4\ub5a4 \ubd80\ub2f4\uc774 \ub2ec\ub77c\uc9c0\ub294\uc9c0 \ud30c\uc545\ud569\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uac80\ud1a0 \ub300\uc0c1\ubcc4\ub85c \ud310\ub2e8\uc5d0 \ud544\uc694\ud55c \uc815\ubcf4\ub97c \ubaa8\uc73c\uc138\uc694<\/h2>\n\n\n<p>\uc81c\ud488\uad70\uc758 \ud1b5\uc0c1\uc801\uc778 \uc218\uc694 \uc8fc\uae30\ub97c \ud3ec\uad04\ud558\ub3c4\ub85d \uac80\ud1a0 \uae30\uac04\uc744 \uc77c\uad00\ub418\uac8c \uc124\uc815\ud558\uc138\uc694. \uc2e4\uc81c\ub85c \uc218\uc694\uac00 \uc904\uc5b4\ub4dc\ub294 \uc81c\ud488\uc740 \uacc4\uc808\uc131 \uc81c\ud488, \ucd9c\uc2dc \ucd08\uae30 \uc81c\ud488, \uacf5\uae09\ub418\uc9c0 \ubabb\ud574 \ud310\ub9e4\ub7c9\uc774 \uc801\uc5c8\ub358 \ud488\ubaa9\uacfc \uad6c\ubd84\ud574\uc57c \ud569\ub2c8\ub2e4. \ud488\uc808\uc740 \uace0\uac1d\uc774 \ub354 \uc774\uc0c1 \uc81c\ud488\uc744 \uc6d0\ud558\uc9c0 \uc54a\ub294\ub2e4\ub294 \uc99d\uac70\uac00 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p>\uac80\ud1a0 \ub300\uc0c1\ub9c8\ub2e4 \uc601\uc5c5 \uce21\uba74\uc758 \uadfc\uac70\uc640 \uc0dd\uc0b0 \uce21\uba74\uc758 \uadfc\uac70\ub97c \uc5f0\uacb0\ud574 \uc0b4\ud3b4\ubcf4\uc138\uc694.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\uac80\ud1a0 \ud56d\ubaa9<\/th><th>\uacb0\uc815 \uc804\uc5d0 \ud655\uc778\ud560 \ub0b4\uc6a9<\/th><\/tr><\/thead><tbody><tr><td>\uc218\uc694\uc640 \uc81c\ud488 \uc218\uba85\uc8fc\uae30<\/td><td>\ud310\ub9e4 \uc218\ub7c9\uacfc \uae08\uc561, \uc8fc\ubb38 \ube48\ub3c4, \ucd94\uc138, \uacc4\uc808\uc131, \uc2e0\uaddc\u00b7\uc131\uc219\u00b7\ub2e8\uc885 \uc608\uc815 \ud488\ubaa9 \uc5ec\ubd80<\/td><\/tr><tr><td>\uace0\uac1d\uc5d0\uac8c \ud544\uc694\ud55c \uc5ed\ud560<\/td><td>\uad6c\ub9e4 \uace0\uac1d, \ucda9\uc871\ud558\ub294 \uc694\uad6c, \uace0\uac1d\uc774 \uc218\uc6a9\ud55c \ub300\uccb4\ud488\uc758 \uc720\ubb34, \ud574\ub2f9 \ud488\ubaa9\uc758 \uacf5\uae09\uc5d0 \uc758\uc874\ud558\ub294 \ub2e4\ub978 \uac70\ub798<\/td><\/tr><tr><td>\uacbd\uc81c\uc131<\/td><td>\ud604\uc7ac \uc790\uc7ac\ube44\uc640 \uac00\uacf5\ube44, \uc900\ube44 \uc791\uc5c5 \ubc0f \uc9c0\uc6d0 \uc5c5\ubb34\uc758 \ubd80\ub2f4, \ud310\ub9e4 \uac00\uaca9, \ub2e8\uc885 \uc2dc \uc2e4\uc81c\ub85c \uc5c6\uc5b4\uc9c0\ub294 \ube44\uc6a9<\/td><\/tr><tr><td>\uc790\uc7ac\uc640 \uc7ac\uace0<\/td><td>\uacf5\uc6a9 \ubd80\ud488\uacfc \uc804\uc6a9 \ubd80\ud488, \uacf5\uae09\uc5c5\uccb4\uc758 \ucd5c\uc18c \uc8fc\ubb38 \uc218\ub7c9, \uc794\uc5ec \uc7ac\uace0, \uc7ac\uacf5\ud488, \ubbf8\uc785\uace0 \uad6c\ub9e4 \ubb3c\ub7c9<\/td><\/tr><tr><td>\uc0dd\uc0b0 \ubd80\ub2f4<\/td><td>\uacf5\uc815 \uc21c\uc11c, \ubc30\uce58 \uc0dd\uc0b0 \ube48\ub3c4, \ud544\uc694\ud55c \uc900\ube44 \uc791\uc5c5, \uc0ac\uc6a9 \uac00\ub2a5\ud55c \uc790\uc6d0, \ubcd1\ubaa9 \uacf5\uc815\uc5d0\uc11c \uc18c\uc694\ub418\ub294 \uc2dc\uac04<\/td><\/tr><tr><td>\uc774\ud589 \uc758\ubb34\uc640 \uc804\ud658<\/td><td>\uc218\ub77d\ud55c \uc8fc\ubb38, \uc11c\ube44\uc2a4 \uc774\ud589 \uc57d\uc18d, \uc2b9\uc778 \uc694\uac74, \ub300\uccb4\ud488 \uc804\ud658 \uc791\uc5c5, \uc2e4\ud589 \uac00\ub2a5\ud55c \uacf5\uae09 \uc885\ub8cc\uc77c<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\ubd88\ud655\uc2e4\ud55c \uc6d0\uac00 \ucd94\uc815\uce58\ub97c \uc815\ubc00\ud55c \ud310\ub2e8\uc778 \uac83\ucc98\ub7fc \ubc1b\uc544\ub4e4\uc774\uc9c0 \ub9c8\uc138\uc694. \uc790\uc7ac\uba85\uc138\uc11c\uc640 \uacf5\uc815 \uc21c\uc11c\uac00 \ud604\uc7ac\uc758 \uc2e4\uc81c \uc81c\uc870 \ubc29\uc2dd\uc744 \ubc18\uc601\ud558\ub294\uc9c0 \ud655\uc778\ud574\uc57c \ud569\ub2c8\ub2e4. \uc7a5\uc2dc\uac04 \uc5f0\uc18d \uc0dd\uc0b0\uc744 \uae30\uc900\uc73c\ub85c \uc0b0\uc815\ud55c \ud45c\uc900\uc6d0\uac00\ub294 \ud604\uc7ac\uc758 \uc18c\ub7c9 \ubc30\uce58 \uc0dd\uc0b0\uc5d0 \ub530\ub974\ub294 \ubd80\ub2f4\uc744 \uac00\ub9b4 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc2e4\uc81c \ube44\uc6a9\uc774 \uc5c6\uc5b4\uc9c0\ub294 \uac83\uacfc \uc0dd\uc0b0 \ub2a5\ub825\uc5d0 \uc5ec\uc720\uac00 \uc0dd\uae30\ub294 \uac83\ub3c4 \uad6c\ubd84\ud574\uc57c \ud569\ub2c8\ub2e4. \ud2b9\uc815 \uc0ac\uc591\uc744 \ub2e8\uc885\ud55c\ub2e4\uace0 \ud574\uc11c \uadf8 \ud488\ubaa9\uc5d0 \ubc30\ubd80\ub41c \uc784\ucc28\ub8cc, \uad00\ub9ac\u00b7\uac10\ub3c5 \uc778\ub825\uc758 \uace0\uc815 \uae09\uc5ec, \uc124\ube44 \ube44\uc6a9\uc774 \uc790\ub3d9\uc73c\ub85c \uc0ac\ub77c\uc9c0\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4. \ub300\uc2e0 \ub2e4\ub978 \uc218\uc775\uc131 \uc788\ub294 \uc791\uc5c5\uc5d0 \uc4f8 \uc2dc\uac04\uc774 \ud655\ubcf4\ub420 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc774\uac83\ub3c4 \uac00\uce58 \uc788\ub294 \ud6a8\uacfc\uc774\uc9c0\ub9cc, \ud604\uae08 \uc9c0\ucd9c\uc774 \uc5c6\uc5b4\uc9c0\ub294 \uac83\uacfc\ub294 \ub2e4\ub978 \uc774\uc810\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>\uadf8 \uc2dc\uac04\uc774 \uc5b4\ub290 \uc790\uc6d0\uc5d0\uc11c \uc5b8\uc81c \ud655\ubcf4\ub418\ub294\uc9c0\ub3c4 \uc911\uc694\ud569\ub2c8\ub2e4. \uc774\ubbf8 \ubd80\ud558\uac00 \ub0ae\uc740 \uc791\uc5c5\uc7a5\uc5d0\uc11c \ud55c \uc2dc\uac04\uc744 \ud655\ubcf4\ud558\ub294 \uac83\uacfc \uace0\uac1d \uc8fc\ubb38\uc744 \uc9c0\uc5f0\uc2dc\ud0a4\ub294 \uc790\uc6d0\uc5d0\uc11c \ud55c \uc2dc\uac04\uc744 \ud655\ubcf4\ud558\ub294 \uac83\uc740 \ub2e4\ub985\ub2c8\ub2e4. \uac80\ud1a0 \ub300\uc0c1\uc758 \ub2e8\uc704\uc6d0\uac00\ub9cc \ub530\ub85c \ubcf4\uc9c0 \ub9d0\uace0, \uac19\uc740 \uc790\uc6d0\uc744 \ub193\uace0 \uacbd\uc7c1\ud558\ub294 \ub2e4\ub978 \uc791\uc5c5\uacfc \ud568\uaed8 \ud3c9\uac00\ud558\uc138\uc694.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc720\uc9c0\u00b7\ubcc0\uacbd\u00b7\ub2e8\uc885\uc744 \uacb0\uc815\ud558\uc138\uc694<\/h2>\n\n\n<p>\uc2e4\ud589\uc5d0 \ub3c4\uc6c0\uc774 \ub418\ub294 \uacb0\uc815\uc5d0\ub294 \uc870\uce58 \ub0b4\uc6a9, \uc774\uc720, \ucc45\uc784\uc790, \uc7ac\uac80\ud1a0 \uc870\uac74\uc774 \uae30\ub85d\ub418\uc5b4 \uc788\uc5b4\uc57c \ud569\ub2c8\ub2e4. \uc774\ub7ec\ud55c \ud310\ub2e8\uc744 \ub300\uc2e0\ud560 \uc218 \uc788\ub294 \ubcf4\ud3b8\uc801\uc778 \ub9e4\ucd9c \uae30\uc900\uc120\uc740 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\ubd80\ub2f4\uc744 \uac10\uc218\ud560 \ub9cc\ud55c \uc5ed\ud560\uc774 \uc788\ub2e4\uba74 \uc720\uc9c0\ud558\uc138\uc694<\/h3>\n\n\n<p>\ud310\ub9e4\ub7c9\uc774 \uc801\uc740 \ud488\ubaa9\ub3c4 \uc8fc\uc694 \uace0\uac1d\uc5d0\uac8c \ud544\uc694\ud55c \uc81c\ud488 \uad6c\uc131\uc744 \uc644\uc131\ud558\uac70\ub098, \uc774\ubbf8 \uc0ac\uc6a9 \uc911\uc778 \uc124\ube44\ub97c \uc9c0\uc6d0\ud558\uac70\ub098, \ud45c\uc900 \uc0ac\uc591\uc73c\ub85c\ub294 \ucda9\uc871\ud560 \uc218 \uc5c6\ub294 \uc694\uad6c\uc5d0 \ub300\uc751\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ub2e4\ub978 \ud488\ubaa9\uacfc \uc790\uc7ac \ubc0f \uc900\ube44 \uc791\uc5c5\uc744 \ub300\ubd80\ubd84 \uacf5\uc720\ud574 \ucd94\uac00 \uc0dd\uc0b0 \ubd80\ub2f4\uc774 \ud06c\uc9c0 \uc54a\uc744 \uc218\ub3c4 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc608\uc678\ub85c \uc720\uc9c0\ud558\ub294 \uc774\uc720\ub97c \uad6c\uccb4\uc801\uc73c\ub85c \ub0a8\uae30\uc138\uc694. \uc5b4\ub5a4 \uace0\uac1d \uc694\uad6c\ub098 \uc11c\ube44\uc2a4 \uc774\ud589 \uc57d\uc18d \ub54c\ubb38\uc778\uc9c0 \uba85\uc2dc\ud558\uace0 \uacf5\uae09 \ubc29\uc2dd\uc5d0\ub3c4 \ud569\uc758\ud574\uc57c \ud569\ub2c8\ub2e4. \u201c\uc601\uc5c5\uc5d0\uc11c \uc720\uc9c0\ud558\uc790\uace0 \ud55c\ub2e4\u201d\ub294 \uac83\ub9cc\uc73c\ub85c\ub294 \uadfc\uac70\uac00 \ucda9\ubd84\ud558\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4. \ub9c8\ucc2c\uac00\uc9c0\ub85c \u201c\ud310\ub9e4 \uc21c\uc704\uac00 \ud558\uc704\uad8c\uc774\ub2e4\u201d\ub77c\ub294 \uc774\uc720\ub9cc\uc73c\ub85c \ub2e8\uc885\ud574\uc11c\ub3c4 \uc548 \ub429\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uc720\uc6a9\ud55c \uc81c\ud488\uc744 \uc5c6\uc560\uae30 \uc804\uc5d0 \uacf5\uae09 \ubc29\uc2dd\uc744 \ubc14\uafd4 \ubcf4\uc138\uc694<\/h3>\n\n\n<p>\uc720\uc6a9\ud55c \uc81c\ud488\uc774\ub77c\ub3c4 \uacf5\uae09 \ubc29\uc2dd \ub54c\ubb38\uc5d0 \ubd88\ud544\uc694\ud55c \ube44\uc6a9\uc774 \ub4e4 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ud45c\uc900 \ubd80\ud488\uc774\ub098 \uacf5\ud1b5 \ub9c8\uac10\uc758 \uc801\uc6a9, \uc8fc\ubb38 \uc811\uc218 \uae30\uac04 \ud569\uc758, \ucd5c\uc18c \uc8fc\ubb38 \uc218\ub7c9 \uc870\uc815, \uc644\uc81c\ud488 \uc7ac\uace0\ub97c \ubcf4\uc720\ud558\ub294 \ub300\uc2e0 \uc218\uc8fc\uc0dd\uc0b0\uc73c\ub85c \uacf5\uae09\ud558\ub294 \ubc29\uc548\uc744 \uac80\ud1a0\ud558\uc138\uc694.<\/p>\n\n\n<p>\uc774\ub7ec\ud55c \ubcc0\uacbd\uc5d0\ub294 \uc0c1\ucda9\ud558\ub294 \ud6a8\uacfc\uac00 \uc788\uc2b5\ub2c8\ub2e4. \ubc30\uce58\ub97c \ud0a4\uc6b0\uba74 \uc900\ube44 \uc791\uc5c5\uc758 \ube48\ub3c4\ub294 \uc904\uc5b4\ub3c4 \uc7ac\uace0\uac00 \ub298 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ub9ac\ub4dc\ud0c0\uc784\uc744 \ub298\ub9ac\uba74 \uc0dd\uc0b0\uc740 \uc218\uc6d4\ud574\uc838\ub3c4 \uace0\uac1d\uc774 \ubc1b\uc544\ub4e4\uc774\uc9c0 \ubabb\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ube44\uc6a9\uc774\ub098 \ubd88\ud3b8\uc744 \ub2e4\ub978 \uacf3\uc73c\ub85c \ub5a0\ub118\uae30\ub294 \ub370 \uadf8\uce58\uc9c0 \uc54a\ub3c4\ub85d \uc804\uccb4 \uc601\ud5a5\uc744 \ud655\uc778\ud558\uace0 \uc0c8\ub85c\uc6b4 \uc870\uac74\uc5d0 \ud569\uc758\ud558\uc138\uc694.<\/p>\n\n\n<p>\ub450 \uc0ac\uc591\uc774 \uc11c\ub85c \ub300\uccb4 \uac00\ub2a5\ud574 \ubcf4\uc774\ub354\ub77c\ub3c4 \uc124\uacc4 \ubd80\uc11c\uc640 \uace0\uac1d\uc774 \uc7a5\ucc29 \uc801\ud569\uc131, \uae30\ub2a5, \uc2b9\uc778 \uc694\uac74\uc744 \ud655\uc778\ud558\ub3c4\ub85d \ud558\uc138\uc694. \ud488\ubaa9 \uc124\uba85\uc774 \ube44\uc2b7\ud558\ub2e4\uace0 \ud574\uc11c \uc548\uc804\ud558\uac8c \ub300\uccb4\ud560 \uc218 \uc788\ub2e4\ub294 \ub73b\uc740 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\ub354 \uc774\uc0c1 \uc720\uc9c0\ud560 \uc774\uc720\uac00 \uc5c6\ub294 \uc911\ubcf5 \ud488\ubaa9\uc740 \ub2e8\uc885\ud558\uc138\uc694<\/h3>\n\n\n<p>\uc218\uc694\uac00 \uc801\uace0 \uaf2d \ud544\uc694\ud55c \uc5ed\ud560\ub3c4 \uc5c6\uc73c\uba70, \uc720\uc9c0\uc5d0 \ub4dc\ub294 \ube44\uc6a9\uc774\ub098 \ubcf5\uc7a1\uc131\uc744 \uac10\uc218\ud560 \uc774\uc720\uac00 \uc5c6\ub2e4\uba74 \ub2e8\uc885\uc744 \uc801\uadf9\uc801\uc73c\ub85c \uace0\ub824\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uacc4\uc18d \uacf5\uae09\ub418\ub294 \ub300\uccb4\ud488\uc744 \uace0\uac1d\uc774 \uc218\uc6a9\ud558\uace0, \uad00\ub828 \uc790\uc7ac\ub098 \uacf5\uc815\uc744 \uc2e4\uc81c\ub85c \uc5c6\uc568 \uc218 \uc788\ub2e4\uba74 \ub2e8\uc885 \uacb0\uc815\uc758 \uadfc\uac70\ub294 \ub354 \ud655\uc2e4\ud574\uc9d1\ub2c8\ub2e4.<\/p>\n\n\n<p>\uacf5\uae09\uc744 \uc911\ub2e8\ud558\uae30 \uc804\uc5d0 \uc794\uc5ec \uc7ac\uace0\uc640 \uc774\ud589\ud574\uc57c \ud560 \uc57d\uc18d\uc744 \uc5b4\ub5bb\uac8c \ucc98\ub9ac\ud560\uc9c0 \uacb0\uc815\ud558\uc138\uc694. \uc2b9\uc778\ub41c \ub2e8\uc885 \ubaa9\ub85d\uc740 \uacc4\ud68d\uc5d0 \ub530\ub978 \ub2e8\uacc4\uc801 \uacf5\uae09 \uc885\ub8cc\ub85c \uc774\uc5b4\uc838\uc57c \ud569\ub2c8\ub2e4. \uace0\uac1d\uc774 \uc5ec\uc804\ud788 \uae30\ub2e4\ub9ac\ub294 \uc791\uc5c5\uc744 \uac11\uc790\uae30 \ucde8\uc18c\ud558\ub294 \uadfc\uac70\uac00 \ub418\uc5b4\uc11c\ub294 \uc548 \ub429\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc608\uc2dc: \uc778\ud074\ub85c\uc800\uc758 \uc138 \uac00\uc9c0 \uc0ac\uc591, \uc11c\ub85c \ub2e4\ub978 \uacb0\uc815<\/h2>\n\n\n<p>\ud55c \uc81c\uc870\uc5c5\uccb4\uac00 \uc0b0\uc5c5\uc6a9 \uc778\ud074\ub85c\uc800 \uc81c\ud488\uad70\uc744 \uac80\ud1a0\ud55c\ub2e4\uace0 \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \ud45c\uc900 \ud68c\uc0c9 \uc778\ud074\ub85c\uc800\ub294 \uafb8\uc900\ud788 \ud310\ub9e4\ub429\ub2c8\ub2e4. \uc7a5\ucc29 \ubc29\uc2dd\uc774 \ub2e4\ub978 \ud68c\uc0c9 \uc0ac\uc591\uc740 \uc8fc\ubb38\uc774 \ub4dc\ubb3c\uace0, \ud2b9\uc218 \ub9c8\uac10 \uc0ac\uc591\ub3c4 \uc218\uc694\uac00 \uc801\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc7a5\ucc29 \ubc29\uc2dd\uc774 \ub2e4\ub978 \uc0ac\uc591\ub3c4 \ud45c\uc900 \uc81c\ud488\uacfc \ub3d9\uc77c\ud55c \ud310\uc7ac\uc640 \ub3c4\ub8cc\ub97c \uc0ac\uc6a9\ud569\ub2c8\ub2e4. \ubcc4\ub3c4\uc758 \uac00\uacf5 \uc791\uc5c5\uc774 \ud544\uc694\ud558\uc9c0\ub9cc, \uc8fc\uc694 \uc7a5\ube44 \uace0\uac1d\uc774 \ub2e4\ub978 \uc81c\ud488\ub4e4\uacfc \ud568\uaed8 \ud328\ud0a4\uc9c0\ub85c \uc8fc\ubb38\ud558\ub294 \ud488\ubaa9\uc785\ub2c8\ub2e4. \uc774 \uc0ac\uc591\uc744 \ub2e8\uc885\ud574\ub3c4 \ub3c4\uc7a5 \uc791\uc5c5 \uc804\ud658\uc774 \uc904\uc5b4\ub4e4\uc9c0\ub294 \uc54a\uc73c\uba70, \uc624\ud788\ub824 \ud574\ub2f9 \uace0\uac1d\uacfc\uc758 \uc804\ubc18\uc801\uc778 \uac70\ub798 \uad00\uacc4\uac00 \uc704\ud0dc\ub85c\uc6cc\uc9c8 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ub2f4\ub2f9 \ud300\uc740 \uc774 \uc0ac\uc591\uc744 \uc720\uc9c0\ud558\uace0 \uace0\uac1d\uc5d0\uac8c \uc5b4\ub5a4 \uc5ed\ud560\uc744 \ud558\ub294\uc9c0 \ubb38\uc11c\ud654\ud569\ub2c8\ub2e4. \ub610\ud55c \ud568\uaed8 \uc0dd\uc0b0\ud560 \uc218 \uc788\ub294 \uc791\uc5c5\uc744 \ubb36\uae30 \uc27d\ub3c4\ub85d \uc8fc\ubb38 \uc811\uc218 \uae30\uac04\uc744 \ud569\uc758\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud2b9\uc218 \ub9c8\uac10 \uc0ac\uc591\uc5d0\ub294 \uc804\uc6a9 \ub3c4\ub8cc\uac00 \ud544\uc694\ud558\uace0, \uacf5\uc6a9 \ub3c4\uc7a5 \ub77c\uc778\uc5d0\uc11c \ubcc4\ub3c4\ub85c \uc14b\uc5c5\ud574\uc57c \ud569\ub2c8\ub2e4. \uc601\uc5c5\ud300\uc740 \uace0\uac1d\uc5d0\uac8c \uadf8 \ub9c8\uac10\uc774 \uc2e4\uc81c\ub85c \ud544\uc694\ud55c\uc9c0 \ud655\uc778\ud569\ub2c8\ub2e4. \uc77c\ubd80 \uace0\uac1d\uc740 \ud45c\uc900 \ud68c\uc0c9 \uc81c\ud488\uc73c\ub85c \ub300\uccb4\ud558\ub294 \ub370 \ub3d9\uc758\ud569\ub2c8\ub2e4. \ub2e4\ub978 \ud55c \uace0\uac1d\uc740 \uc5ec\uc804\ud788 \ud2b9\uc218 \ub9c8\uac10\uc774 \ud544\uc694\ud558\uba70, \uc870\uc815\ub41c \uc8fc\ubb38 \uc218\ub7c9\uacfc \ub9ac\ub4dc\ud0c0\uc784\uc5d0 \ub3d9\uc758\ud569\ub2c8\ub2e4. \ub2f4\ub2f9 \ud300\uc740 \ub300\uccb4 \uac00\ub2a5\ud55c \uc218\uc694\ub97c \ud45c\uc900 \uc81c\ud488\uc73c\ub85c \ud1b5\ud569\ud558\uace0, \ub0a8\uc740 \ud2b9\uc218 \ub9c8\uac10 \uc218\uc694\uc5d0 \ub300\ud574\uc11c\ub294 \uacf5\uae09 \uc870\uac74\uc744 \ubcc0\uacbd\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud2b9\uc218 \ub9c8\uac10\uc774 \ud544\uc694\ud55c \uace0\uac1d\uc774 \uc5c6\uace0 \uc774\ud589\ud574\uc57c \ud560 \uc758\ubb34\ub3c4 \ub0a8\uc544 \uc788\uc9c0 \uc54a\ub2e4\uba74, \ub2e8\uc885\uc774 \ub354 \ub098\uc740 \uacb0\uc815\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ud558\uc9c0\ub9cc \ud310\ub9e4\ub7c9\uc774 \uc801\ub2e4\ub294 \uc774\uc720\ub9cc\uc73c\ub85c \uadf8\ub807\uac8c \ud310\ub2e8\ud560 \uc218\ub294 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774\uc81c \uacf5\uc7a5\uc740 \uc81c\uc870 \uce21\uba74\uc758 \uadfc\uac70\ub97c \ubc14\ud0d5\uc73c\ub85c \uc0ac\uc5c5\uc801 \uacb0\uc815\uc744 \ub0b4\ub838\uc2b5\ub2c8\ub2e4. \ub2e4\uc74c\uc73c\ub85c \ud655\uc778\ud560 \uac83\uc740 \ud569\uc758\ub41c \ud2b9\uc218 \ub9c8\uac10 \ubc30\uce58\ub97c \ud3ec\ud568\ud574 \uc720\uc9c0\ud558\uae30\ub85c \ud55c \uc8fc\ubb38\uc744 \ub2e4\ub978 \uc791\uc5c5\uacfc \ud568\uaed8 \ucc98\ub9ac\ud558\uba74\uc11c \uac01\uac01\uc758 \ub0a9\uae30\ub97c \ub9de\ucd9c \uc218 \uc788\ub294\uc9c0\uc785\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc2b9\uc778\ub41c \uc81c\ud488 \uad6c\uc131\uc744 \uc2e4\ud589 \uac00\ub2a5\ud55c \uc0dd\uc0b0 \uc77c\uc815\uc73c\ub85c \uc804\ud658\ud558\uae30<\/h2>\n\n\n<p>\ubc14\ub85c \uc774 \ub2e8\uacc4\uc5d0\uc11c SkyPlanner\uac00 \ud2b9\ud788 \uc720\uc6a9\ud569\ub2c8\ub2e4. \uc81c\ud488\uad70\uc744 \ub2e8\uc21c\ud654\ud558\ub294 \uac83\ub9cc\uc73c\ub85c \ub3c4\uc7a5 \ub77c\uc778\uc758 \uc791\uc5c5 \uc21c\uc11c\uac00 \uc815\ud574\uc9c0\uac70\ub098, \uc790\uc7ac \ubd80\uc871\uc774 \ud574\uacb0\ub418\uac70\ub098, \ub0b4\uc77c \ub0a9\ud488\ud560 \ubb3c\ub7c9\uc758 \ub0a9\uae30\uac00 \ubcf4\uc7a5\ub418\uc9c0\ub294 \uc54a\uc2b5\ub2c8\ub2e4. \ub0a8\uaca8 \ub454 \uc81c\ud488\ub4e4\ub3c4 \uc5ec\uc804\ud788 \uac19\uc740 \uc0dd\uc0b0 \uc790\uc6d0\uc744 \uc0ac\uc6a9\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>SkyPlanner\ub294 \uc81c\ud488\uc758 \uc790\uc7ac \ubc0f \uacf5\uc815 \ub2e8\uacc4 \uc815\ubcf4\ub97c \uc2e4\uc81c\ub85c \uc77c\uc815\uc744 \uc7a1\uc544\uc57c \ud560 \uc791\uc5c5\uacfc \uc5f0\uacb0\ud569\ub2c8\ub2e4. \uac01 \uacf5\uc815 \ub2e8\uacc4\uc5d0\ub294 \uac00\uacf5 \uc2dc\uac04\uacfc \uc14b\uc5c5 \uc2dc\uac04, \uc791\uc5c5 \uac00\ub2a5\ud55c \uc791\uc5c5\uc7a5, \uc120\ud6c4\ud589 \uad00\uacc4\ub97c \uc124\uc815\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. SkyPlanner\uc758 \uc2a4\ucf00\uc904\ub9c1 \uc778\uacf5\uc9c0\ub2a5\uc778 Arcturus\ub294 \uc124\uc815\ub41c \uc0dd\uc0b0 \ub2a5\ub825, \uad50\ub300\uadfc\ubb34, \uc6b0\uc120\uc21c\uc704, \uc790\uc7ac \uac00\uc6a9\uc131\uc744 \ubc14\ud0d5\uc73c\ub85c <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-scheduling\/\">\uc0dd\uc0b0 \uc77c\uc815\uc744 \uacc4\uc0b0\ud569\ub2c8\ub2e4<\/a>. \uacc4\uc0b0\ub41c \uc791\uc5c5 \uc21c\uc11c\uc640 \uc2dc\uac04\uc740 Gantt \ud654\uba74\uc5d0\uc11c \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc55e\uc11c \uc0b4\ud3b4\ubcf8 \uc778\ud074\ub85c\uc800 \uc81c\ud488\uad70\uc758 \uacbd\uc6b0, \uc81c\ud488 \uc18d\uc131\uacfc \uc791\uc5c5\uc7a5 \uaddc\uce59\uc744 \ud65c\uc6a9\ud558\uba74 \ud568\uaed8 \ucc98\ub9ac\ud560 \uc218 \uc788\ub294 \ub3c4\uc7a5 \uc791\uc5c5\uc744 \uc0c9\uc0c1\ubcc4\ub85c \ubb36\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc14b\uc5c5 \uc694\uac74\ub3c4 \uacc4\ud68d\uc5d0 \ubc18\uc601\ub418\uba70, \ub0a9\ud488 \uc6b0\uc120\uc21c\uc704\ub294 \uc791\uc5c5 \uc21c\uc11c\ub97c \uc815\ud558\ub294 \uae30\uc900\uc774 \ub429\ub2c8\ub2e4. \uc774\ub807\uac8c \ud558\uba74 \uc0dd\uc0b0\uacc4\ud68d \ub2f4\ub2f9\uc790\ub294 \uc0ac\uc591\ubcc4 \uc791\uc5c5\uc744 \uc11c\ub85c \ubb34\uad00\ud55c \ub300\uae30 \uc791\uc5c5\uc73c\ub85c \ucde8\uae09\ud558\ub294 \ub300\uc2e0, \ud68c\uc0ac\uac00 \uc720\uc9c0\ud558\uae30\ub85c \ud55c \uc81c\ud488\uc758 \ub2e4\uc591\uc131\uc744 \uc2e4\ubb34\uc801\uc73c\ub85c \uad00\ub9ac\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc2b9\uc778\ub41c \uc81c\ud488 \uad6c\uc131\uc774 \uc0dd\uc0b0\uc5d0 \ubbf8\uce58\ub294 \uc601\ud5a5\uc744 \uad00\ub9ac\ud558\ub294 \ub370 SkyPlanner\ub97c \ud65c\uc6a9\ud558\uc138\uc694. \uc5b4\ub5a4 \uc791\uc5c5\uc744 \uc5b4\ub514\uc5d0\uc11c \uc218\ud589\ud560\uc9c0, \uc0dd\uc0b0 \ub2a5\ub825\uc744 \uc5b4\ub5bb\uac8c \ub098\ub220 \uc4f8\uc9c0, \uc5b4\ub5a4 \ub0a9\ud488 \uac74\uc5d0 \uc8fc\uc758\uac00 \ud544\uc694\ud55c\uc9c0 \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uace0\uac1d\uacfc \uc81c\ud488\uc5d0 \uad00\ud55c \uacb0\uc815\uc740 \ud574\ub2f9 \ucc45\uc784\uc790\uac00 \ub0b4\ub9ac\ub3c4\ub85d \ud558\uc138\uc694. \ub2f4\ub2f9 \ud300\uc774 \uc81c\ud488\uad70\uacfc \uc2a4\ucf00\uc904\ub9c1 \uc6b0\uc120\uc21c\uc704\ub97c \uacb0\uc815\ud558\uba74, Arcturus\uac00 \uc77c\uc815 \uacc4\uc0b0\uc744 \ub9e1\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uae30\uc874 \uc81c\ud488\uc5d0\uc11c \uc0c8 \uc81c\ud488\uc73c\ub85c\uc758 \uc804\ud658 \uad00\ub9ac\ud558\uae30<\/h3>\n\n\n<p>\uc77c\uc815\uc744 \ub2e4\uc2dc \uacc4\uc0b0\ud558\uae30 \uc804\uc5d0 \ub2e4\uc74c \uc804\ud658 \uc138\ubd80 \uc0ac\ud56d\uc5d0 \ud569\uc758\ud558\uc138\uc694.<\/p>\n\n\n<ul class=\"wp-block-list\"><li>\ub2e8\uc885\ud560 \uc0ac\uc591\uc758 \ucd5c\uc885 \uc8fc\ubb38 \uc811\uc218\uc77c\uacfc \uc544\uc9c1 \uc774\ud589\ud574\uc57c \ud560 \uc57d\uc18d<\/li><li>\uc2b9\uc778\ub41c \ub300\uccb4 \ud488\ubaa9 \ub610\ub294 \ubcc0\uacbd\ub41c \uaddc\uaca9\uacfc \uba85\ud655\ud55c \uc801\uc6a9\uc77c<\/li><li>\uae30\uc874 \uc7ac\uace0, \uc7ac\uacf5\ud488, \uc804\uc6a9 \ubd80\ud488, \ubbf8\uc785\uace0 \uad6c\ub9e4 \uac74\uc758 \ucc98\ub9ac \ubc29\uc548<\/li><li>\uc9c4\ud589 \uc911\uc778 \uc8fc\ubb38 \uc911 \uc790\uc7ac, \uacf5\uc815 \ub2e8\uacc4 \ub610\ub294 \uc218\ub7c9\uc744 \ubcc0\uacbd\ud574\uc57c \ud560 \uc8fc\ubb38\uacfc \uae30\uc874 \ub0b4\uc6a9\ub300\ub85c \uc9c4\ud589\ud574\uc57c \ud560 \uc8fc\ubb38<\/li><li>\ud310\ub9e4 \uc870\uac74, \uc0dd\uc0b0 \ub370\uc774\ud130, \uad6c\ub9e4 \uc9c0\uce68\uc744 \uac31\uc2e0\ud560 \ub2f4\ub2f9\uc790<\/li><\/ul>\n\n\n<p>\uc81c\ud488 \ub9c8\uc2a4\ud130\ub97c \uc218\uc815\ud558\ub294 \uac83\uc740 \uc774\ubbf8 \uc9c4\ud589 \uc911\uc778 \uc791\uc5c5\uc758 \ubcc0\uacbd\uc744 \uc2b9\uc778\ud558\ub294 \uac83\uacfc \ub2e4\ub985\ub2c8\ub2e4. \uc601\ud5a5\uc744 \ubc1b\ub294 \uc8fc\ubb38\uc744 \uba85\uc2dc\uc801\uc73c\ub85c \ub300\uc870\ud558\uace0 \uc870\uc815\ud574\uc57c \ud569\ub2c8\ub2e4. \uadf8\ub798\uc57c \ud604\uc7a5\uc5d0\uc11c \ub354 \uc774\uc0c1 \uc720\ud6a8\ud558\uc9c0 \uc54a\uc740 \uac1c\uc815 \uc0ac\uc591\uc73c\ub85c \uc0dd\uc0b0\ud558\uac70\ub098 \uace0\uac1d\uc774 \uc2b9\uc778\ud558\uc9c0 \uc54a\uc740 \uc81c\ud488\uc73c\ub85c \uc784\uc758 \ub300\uccb4\ud558\ub294 \uc77c\uc744 \ub9c9\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uadf8\ub7f0 \ub2e4\uc74c SkyPlanner\uc5d0\uc11c \uc2b9\uc778\ub41c \uc791\uc5c5\ub7c9\uc744 \uacf5\uc7a5\uc758 \ub2e4\ub978 \uc8fc\ubb38\uacfc \ud568\uaed8 \ubc18\uc601\ud574 \uc77c\uc815\uc744 \uacc4\uc0b0\ud558\uc138\uc694. \uc0c8 \ub0a9\uae30\ub97c \uc57d\uc18d\ud558\uae30 \uc804\uc5d0 \uc81c\uc57d\uc774 \ub418\ub294 \uc790\uc6d0\uacfc \uacc4\uc0b0\ub41c \uc644\ub8cc\uc77c\uc744 \uac80\ud1a0\ud558\uc138\uc694. \uc774\ub807\uac8c \ud558\uba74 \uac01 \ud604\uc7a5 \uad00\ub9ac\uc790\uac00 \ud569\ub9ac\ud654 \ubaa9\ub85d\uc744 \uc81c\uac01\uac01 \ud574\uc11d\ud558\ub3c4\ub85d \ub450\ub294 \ub300\uc2e0, \ubaa8\ub450\uac00 \uacf5\uc720\ud558\ub294 \uc0dd\uc0b0 \uacc4\ud68d\uc744 \ub9c8\ub828\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>SkyPlanner\ub294 \uac1c\ubc29\ud615 REST API\ub97c \ud1b5\ud574 <a href=\"https:\/\/skyplanner.ai\/ko\/%ed%86%b5%ed%95%a9\/\">\ubaa8\ub4e0 ERP \ub610\ub294 MES\uc640 \uc5f0\ub3d9\ub429\ub2c8\ub2e4<\/a>. \ub530\ub77c\uc11c \uae30\uc874 \uc2dc\uc2a4\ud15c\uc758 \uc8fc\ubb38 \ubc0f \uc0dd\uc0b0 \ub370\uc774\ud130\ub97c \uc720\ud55c \uc6a9\ub7c9 \uc2a4\ucf00\uc904\ub9c1\uc5d0 \uc5f0\uacb0\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Mamec\uc758 \uacbd\ud5d8\uc5d0\uc11c \ud655\uc778\ud558\ub294 \uc2e4\ud589 \ub2e8\uacc4\uc758 \ud6a8\uacfc<\/h3>\n\n\n<p><a href=\"\/ko\/%ea%b3%a0%ea%b0%9d-%ec%82%ac%eb%a1%80\/mamec\/\">\ud63c\ud569 \uae30\uc220 \ubd84\uc57c \uc81c\uc870\uc5c5\uccb4 Mamec<\/a>\uc740 \ucca8\ub2e8 \uc81c\ud488\uc758 \uc704\ud0c1\uc0dd\uc0b0\ub3c4 \uc218\ud589\ud569\ub2c8\ub2e4. \uc774 \ud68c\uc0ac\ub294 \uc11c\ub85c \uc758\uc874\ud558\ub294 \uc218\ucc9c \uac74\uc758 \uc791\uc5c5\uc9c0\uc2dc\ub97c \ucc98\ub9ac\ud558\uba74\uc11c\ub3c4 \uc885\uc774 \uc791\uc5c5\uc9c0\uc2dc\uc11c\uc640 \uc8fc\uad00\uc801\uc778 \ubd80\ud558 \ucd94\uc815\uc5d0 \uc758\uc874\ud574 \uc0dd\uc0b0 \ud604\ud669\uc744 \ud30c\uc545\ud558\uace0 \uc788\uc5c8\uc2b5\ub2c8\ub2e4. \uace0\uac1d \uc694\uad6c\uc5d0 \ub530\ub978 \uc81c\ud488 \uac1c\ubc1c\ub85c \uacf5\uc815 \uc21c\uc11c\ub3c4 \uc790\uc8fc \ubcc0\uacbd\ub418\uc5c8\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>Mamec\uc740 SkyPlanner\ub97c Oscar ERP\uc640 \uc5f0\ub3d9\ud558\uba74\uc11c \uc0dd\uc0b0 \ud604\ud669\uc744 \ud568\uaed8 \ud655\uc778\ud560 \uc218 \uc788\uac8c \ub418\uc5c8\uace0, \uc720\ud55c \uc6a9\ub7c9 \uc2a4\ucf00\uc904\ub9c1\ub3c4 \uc790\ub3d9\ud654\ud588\uc2b5\ub2c8\ub2e4. \ud68c\uc0ac\uc5d0 \ub530\ub974\uba74 \uacc4\ud68d \uc5c5\ubb34 \ubd80\ub2f4\uc774 \ud655\uc5f0\ud788 \uc904\uace0 \ubcc0\uacbd \uad00\ub9ac\ub3c4 \uc26c\uc6cc\uc84c\uc2b5\ub2c8\ub2e4. \uc791\uc5c5 \uc21c\uc11c \ubcc0\uacbd\uc758 \uc601\ud5a5\uc744 \ub354 \uc801\uc740 \ub178\ub825\uc73c\ub85c \ud30c\uc545\ud560 \uc218 \uc788\uc5b4, \uace0\uac1d\uc5d0\uac8c \ubb34\uc5c7\uc744 \uc57d\uc18d\ud560 \uc218 \uc788\ub294\uc9c0 \uc124\uba85\ud558\ub294 \ub370 \ub3c4\uc6c0\uc774 \ub429\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774 \uacbd\ud5d8\uc740 \uc2e4\ud589 \ub2e8\uacc4\uc5d0\uc11c \uc5bb\ub294 \uc774\uc810\uc744 \ubcf4\uc5ec \uc90d\ub2c8\ub2e4. \uc81c\ud488\uacfc \uc81c\uc870 \uc694\uac74\uc774 \ubc14\ub014 \ub54c \uacf5\uc7a5\uc5d0 \ud544\uc694\ud55c \uac83\uc740 \uac31\uc2e0\ub41c \uacc4\ud68d\uc774\uc9c0, \uc791\uc5c5 \ub300\uae30\uc5f4\uc744 \ub2e4\uc2dc \uc218\uc791\uc5c5\uc73c\ub85c \uc9dc\ub294 \uc77c\uc774 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">SKU \uc218\ub9cc\uc774 \uc544\ub2c8\ub77c \uacb0\uacfc\ub97c \uac80\ud1a0\ud558\uae30<\/h2>\n\n\n<p>\uc804\ud658\uc774 \ub05d\ub098\uba74 \ucc98\uc74c \ud574\uacb0\ud558\ub824\ub358 \ubb38\uc81c\uac00 \uac1c\uc120\ub418\uc5c8\ub294\uc9c0 \ud655\uc778\ud558\uc138\uc694. \ud574\ub2f9 \uc790\uc6d0\uc758 \uc14b\uc5c5 \ube48\ub3c4\uc640 \uc18c\uc694 \uc2dc\uac04, \ub0a8\uc544 \uc788\ub294 \uc804\uc6a9 \uc7ac\uace0, \uc7ac\uacf5\ud488, \ub0a9\uae30 \uc900\uc218 \uc2e4\uc801, \uace0\uac1d \uc720\uc9c0 \uc5ec\ubd80\ub97c \uc0b4\ud3b4\ubcf4\uc138\uc694. \uacf5\ud5cc\uc774\uc775\uacfc \uc2e4\uc81c \uc9c0\ucd9c\uc758 \ubcc0\ud654\ub294 \ub2e4\ub978 \uc791\uc5c5\uc5d0 \uc4f8 \uc218 \uc788\ub3c4\ub85d \ud655\ubcf4\ud55c \uc5ec\uc720 \uc0dd\uc0b0 \ub2a5\ub825\uacfc \uad6c\ubd84\ud574 \uac80\ud1a0\ud558\uc138\uc694.<\/p>\n\n\n<p>SKU \uc218\uac00 \uc904\uc5b4\ub3c4 \uc791\uc5c5 \uc804\ud658 \ubd80\ub2f4\uc774 \uadf8\ub300\ub85c\ub77c\uba74 \uc6b4\uc601 \uce21\uba74\uc5d0\uc11c \ud070 \uc131\uacfc\ub77c\uace0 \ubcf4\uae30 \uc5b4\ub835\uc2b5\ub2c8\ub2e4. \uc81c\ud488\uad70\uc744 \uc904\uc778 \ud0d3\uc5d0 \uc8fc\uc694 \uace0\uac1d\uc774 \ub2e4\ub978 \uacf5\uae09\uc5c5\uccb4\ub85c \ub5a0\ub098\ub294 \uacbd\uc6b0\ub3c4 \ub9c8\ucc2c\uac00\uc9c0\uc785\ub2c8\ub2e4. \uac00\uc7a5 \uc88b\uc740 \uacb0\uacfc\ub294 \ubcf5\uc7a1\uc131\uc744 \uac10\uc218\ud560 \ub9cc\ud55c \uac00\uce58\uac00 \uc788\ub294 \uc81c\ud488\uad70\uc744 \uac16\ucd94\uace0, \uacf5\uc7a5\uc774 \uc774\ub97c \ud6a8\uc728\uc801\uc73c\ub85c \uacf5\uae09\ud560 \uc218 \uc788\ub294 \uc0c1\ud0dc\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc0c8\ub85c\uc6b4 \uc0ac\uc591\uc744 \uc2b9\uc778\ud560 \ub54c\ub3c4 \uac19\uc740 \uc6d0\uce59\uc744 \uc9c0\ud0a4\uc138\uc694. \uace0\uac1d \uce21\uba74\uc758 \ud544\uc694\uc131, \uc81c\uc870 \uce21\uba74\uc758 \ud3c9\uac00, \ud5a5\ud6c4 \uc7ac\uac80\ud1a0 \uc2dc\uc810\uc744 \ubc18\ub4dc\uc2dc \uc815\ud558\ub3c4\ub85d \ud558\uc138\uc694. \uadf8\ub798\uc57c \uc608\uc678\uac00 \ubaa8\ub974\ub294 \uc0ac\uc774\uc5d0 \uc313\uc774\uc9c0 \uc54a\uace0, \uc758\ub3c4\uc801\uc73c\ub85c \uad00\ub9ac\ub429\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc2b9\uc778\ub41c \uc81c\ud488 \uad6c\uc131\uc744 \uc2e4\uc81c \uc0dd\uc0b0\uc5d0 \uc801\uc6a9\ud558\ub824\uba74 <a href=\"https:\/\/skyplanner.ai\/ko\/%ec%98%81%ec%97%85%ed%8c%80%ec%97%90-%eb%ac%b8%ec%9d%98\/\">SkyPlanner \ub370\ubaa8\ub97c \uc608\uc57d\ud558\uc138\uc694<\/a>. \uc720\uc9c0\ud558\uae30\ub85c \ud55c \uc0ac\uc591 \uba87 \uac00\uc9c0\uc640 \ud574\ub2f9 \uc8fc\ubb38, \uc774\ub4e4\uc774 \ud568\uaed8 \uc0ac\uc6a9\ud558\ub294 \uc790\uc6d0 \uc815\ubcf4\ub97c \uc900\ube44\ud574 \uc8fc\uc138\uc694. \uc790\uc7ac, \uc14b\uc5c5 \uc694\uac74, \ub0a9\ud488 \uc6b0\uc120\uc21c\uc704\uac00 \uc5b4\ub5bb\uac8c \ud558\ub098\uc758 \uc2e4\ud589 \uac00\ub2a5\ud55c \uc0dd\uc0b0 \uc77c\uc815\uc5d0 \ubc18\uc601\ub418\ub294\uc9c0 \ud655\uc778\ud574 \ubcf4\uc138\uc694. \uba3c\uc800 \uc9c1\uc811 \uc0b4\ud3b4\ubcf4\uace0 \uc2f6\ub2e4\uba74 <a href=\"https:\/\/skyplanner.ai\/ko\/%ed%8f%89%ea%b0%80%ed%8c%90\/\">\ub370\ubaa8 \ub370\uc774\ud130\ub85c SkyPlanner\ub97c \uccb4\ud5d8\ud574 \ubcf4\uc138\uc694<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\uc81c\uc870\uc5c5 SKU \ud569\ub9ac\ud654: \uc5b4\ub5a4 \ud488\ubaa9\uc744 \uc720\uc9c0\ud560 \uac83\uc778\uac00 \ud648 &raquo; \ub9ac\uc18c\uc2a4 &raquo; \uc81c\uc870\uc5c5 SKU \ud569\ub9ac\ud654: \uc5b4\ub5a4 \ud488\ubaa9\uc744 \uc720\uc9c0\ud560 \uac83\uc778\uac00 \ud310\ub9e4\ub7c9\uc774 \uac00\uc7a5 \uc801\uc740 \uc0ac\uc591\uc774 \uc624\ud788\ub824 \ub9cc\ub4e4\uae30\ub294 \uc26c\uc6b8 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc8fc\ub825 \uc81c\ud488\uacfc \uac19\uc740 \uc790\uc7ac\ub97c \uc4f0\uace0, \uc900\ube44 \uc791\uc5c5\ub3c4 \uac70\uc758 \ucd94\uac00\ud558\uc9c0 \uc54a\uc740 \ucc44 \ud568\uaed8 \uc0dd\uc0b0\ud560 \uc218 \uc788\uae30 \ub54c\ubb38\uc785\ub2c8\ub2e4. \ubc18\uba74 \ud310\ub9e4\ub7c9\uc740 \ub354 \ub9ce\uc544\ub3c4 \uac00\uc7a5 \ubc14\uc05c \uc124\ube44\uc758 \uc791\uc5c5\uc744 \uc218\uc2dc\ub85c \ub04a\uace0, \uc804\uc6a9 \ubd80\ud488\uc774 &#8230; <a title=\"\uc81c\uc870\uc5c5 SKU \ud569\ub9ac\ud654: \uc5b4\ub5a4 \ud488\ubaa9\uc744 \uc720\uc9c0\ud560 \uac83\uc778\uac00\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/sku-rationalization-manufacturing\/\" aria-label=\"Read more about \uc81c\uc870\uc5c5 SKU \ud569\ub9ac\ud654: \uc5b4\ub5a4 \ud488\ubaa9\uc744 \uc720\uc9c0\ud560 \uac83\uc778\uac00\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":111067,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[496,2558],"tags":[],"class_list":["post-111063","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-496","category-2558","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\uc81c\uc870\uc5c5 SKU \ud569\ub9ac\ud654: \uc5b4\ub5a4 \ud488\ubaa9\uc744 \uc720\uc9c0\ud560 \uac83\uc778\uac00<\/title>\n<meta name=\"description\" content=\"\uace0\uac1d \uc120\ud0dd\uad8c\uc740 \uc9c0\ud0a4\uace0 \uc0dd\uc0b0 \ubcf5\uc7a1\uc131\uc740 \uc904\uc774\ub294 SKU \ud569\ub9ac\ud654. \uc720\uc9c0\u00b7\ubcc0\uacbd\u00b7\ub2e8\uc885\uc744 \uacb0\uc815\ud558\uace0 SkyPlanner\ub85c \uc2b9\uc778\ub41c \ud488\ubaa9\uc758 \uc0dd\uc0b0 \uc77c\uc815\uc744 \uc138\uc6b0\uc138\uc694.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/sku-rationalization-manufacturing\/\" \/>\n<meta property=\"og:locale\" content=\"ko_KR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\uc81c\uc870\uc5c5 SKU \ud569\ub9ac\ud654: \uc5b4\ub5a4 \ud488\ubaa9\uc744 \uc720\uc9c0\ud560 \uac83\uc778\uac00\" \/>\n<meta property=\"og:description\" content=\"\uace0\uac1d \uc120\ud0dd\uad8c\uc740 \uc9c0\ud0a4\uace0 \uc0dd\uc0b0 \ubcf5\uc7a1\uc131\uc740 \uc904\uc774\ub294 SKU \ud569\ub9ac\ud654. \uc720\uc9c0\u00b7\ubcc0\uacbd\u00b7\ub2e8\uc885\uc744 \uacb0\uc815\ud558\uace0 SkyPlanner\ub85c \uc2b9\uc778\ub41c \ud488\ubaa9\uc758 \uc0dd\uc0b0 \uc77c\uc815\uc744 \uc138\uc6b0\uc138\uc694.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/sku-rationalization-manufacturing\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-27T12:48:18+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-27T12:50:35+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/sku-rationalization-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\uae00\uc4f4\uc774\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/sku-rationalization-manufacturing\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/sku-rationalization-manufacturing\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"\uc81c\uc870\uc5c5 SKU \ud569\ub9ac\ud654: \uc5b4\ub5a4 \ud488\ubaa9\uc744 \uc720\uc9c0\ud560 \uac83\uc778\uac00\",\"datePublished\":\"2026-10-27T12:48:18+00:00\",\"dateModified\":\"2026-10-27T12:50:35+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/sku-rationalization-manufacturing\\\/\"},\"wordCount\":37,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/sku-rationalization-manufacturing\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/sku-rationalization-manufacturing-hero.png\",\"articleSection\":[\"\ub9ac\uc18c\uc2a4\",\"\uc81c\uc870 \ud6a8\uc728\"],\"inLanguage\":\"ko-KR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/sku-rationalization-manufacturing\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/sku-rationalization-manufacturing\\\/\",\"name\":\"\uc81c\uc870\uc5c5 SKU \ud569\ub9ac\ud654: \uc5b4\ub5a4 \ud488\ubaa9\uc744 \uc720\uc9c0\ud560 \uac83\uc778\uac00\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/sku-rationalization-manufacturing\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/sku-rationalization-manufacturing\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/sku-rationalization-manufacturing-hero.png\",\"datePublished\":\"2026-10-27T12:48:18+00:00\",\"dateModified\":\"2026-10-27T12:50:35+00:00\",\"description\":\"\uace0\uac1d \uc120\ud0dd\uad8c\uc740 \uc9c0\ud0a4\uace0 \uc0dd\uc0b0 \ubcf5\uc7a1\uc131\uc740 \uc904\uc774\ub294 SKU \ud569\ub9ac\ud654. \uc720\uc9c0\u00b7\ubcc0\uacbd\u00b7\ub2e8\uc885\uc744 \uacb0\uc815\ud558\uace0 SkyPlanner\ub85c \uc2b9\uc778\ub41c \ud488\ubaa9\uc758 \uc0dd\uc0b0 \uc77c\uc815\uc744 \uc138\uc6b0\uc138\uc694.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/sku-rationalization-manufacturing\\\/#breadcrumb\"},\"inLanguage\":\"ko-KR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/sku-rationalization-manufacturing\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/sku-rationalization-manufacturing\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/sku-rationalization-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/sku-rationalization-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Two grey enclosure variants share a coating rack while an amber variant sits on a separate setup.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/sku-rationalization-manufacturing\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\uc81c\uc870\uc5c5 SKU \ud569\ub9ac\ud654: \uc5b4\ub5a4 \ud488\ubaa9\uc744 \uc720\uc9c0\ud560 \uac83\uc778\uac00\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ko-KR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\uc81c\uc870\uc5c5 SKU \ud569\ub9ac\ud654: \uc5b4\ub5a4 \ud488\ubaa9\uc744 \uc720\uc9c0\ud560 \uac83\uc778\uac00","description":"\uace0\uac1d \uc120\ud0dd\uad8c\uc740 \uc9c0\ud0a4\uace0 \uc0dd\uc0b0 \ubcf5\uc7a1\uc131\uc740 \uc904\uc774\ub294 SKU \ud569\ub9ac\ud654. \uc720\uc9c0\u00b7\ubcc0\uacbd\u00b7\ub2e8\uc885\uc744 \uacb0\uc815\ud558\uace0 SkyPlanner\ub85c \uc2b9\uc778\ub41c \ud488\ubaa9\uc758 \uc0dd\uc0b0 \uc77c\uc815\uc744 \uc138\uc6b0\uc138\uc694.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/sku-rationalization-manufacturing\/","og_locale":"ko_KR","og_type":"article","og_title":"\uc81c\uc870\uc5c5 SKU \ud569\ub9ac\ud654: \uc5b4\ub5a4 \ud488\ubaa9\uc744 \uc720\uc9c0\ud560 \uac83\uc778\uac00","og_description":"\uace0\uac1d \uc120\ud0dd\uad8c\uc740 \uc9c0\ud0a4\uace0 \uc0dd\uc0b0 \ubcf5\uc7a1\uc131\uc740 \uc904\uc774\ub294 SKU \ud569\ub9ac\ud654. \uc720\uc9c0\u00b7\ubcc0\uacbd\u00b7\ub2e8\uc885\uc744 \uacb0\uc815\ud558\uace0 SkyPlanner\ub85c \uc2b9\uc778\ub41c \ud488\ubaa9\uc758 \uc0dd\uc0b0 \uc77c\uc815\uc744 \uc138\uc6b0\uc138\uc694.","og_url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/sku-rationalization-manufacturing\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-27T12:48:18+00:00","article_modified_time":"2026-10-27T12:50:35+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/sku-rationalization-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"\uae00\uc4f4\uc774":"Jussi M\u00e4ntyl\u00e4"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/sku-rationalization-manufacturing\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/sku-rationalization-manufacturing\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"\uc81c\uc870\uc5c5 SKU \ud569\ub9ac\ud654: \uc5b4\ub5a4 \ud488\ubaa9\uc744 \uc720\uc9c0\ud560 \uac83\uc778\uac00","datePublished":"2026-10-27T12:48:18+00:00","dateModified":"2026-10-27T12:50:35+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/sku-rationalization-manufacturing\/"},"wordCount":37,"publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/sku-rationalization-manufacturing\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/sku-rationalization-manufacturing-hero.png","articleSection":["\ub9ac\uc18c\uc2a4","\uc81c\uc870 \ud6a8\uc728"],"inLanguage":"ko-KR"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/sku-rationalization-manufacturing\/","url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/sku-rationalization-manufacturing\/","name":"\uc81c\uc870\uc5c5 SKU \ud569\ub9ac\ud654: \uc5b4\ub5a4 \ud488\ubaa9\uc744 \uc720\uc9c0\ud560 \uac83\uc778\uac00","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/sku-rationalization-manufacturing\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/sku-rationalization-manufacturing\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/sku-rationalization-manufacturing-hero.png","datePublished":"2026-10-27T12:48:18+00:00","dateModified":"2026-10-27T12:50:35+00:00","description":"\uace0\uac1d \uc120\ud0dd\uad8c\uc740 \uc9c0\ud0a4\uace0 \uc0dd\uc0b0 \ubcf5\uc7a1\uc131\uc740 \uc904\uc774\ub294 SKU \ud569\ub9ac\ud654. \uc720\uc9c0\u00b7\ubcc0\uacbd\u00b7\ub2e8\uc885\uc744 \uacb0\uc815\ud558\uace0 SkyPlanner\ub85c \uc2b9\uc778\ub41c \ud488\ubaa9\uc758 \uc0dd\uc0b0 \uc77c\uc815\uc744 \uc138\uc6b0\uc138\uc694.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/sku-rationalization-manufacturing\/#breadcrumb"},"inLanguage":"ko-KR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/sku-rationalization-manufacturing\/"]}]},{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/sku-rationalization-manufacturing\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/sku-rationalization-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/sku-rationalization-manufacturing-hero.png","width":1672,"height":941,"caption":"Two grey enclosure variants share a coating rack while an amber variant sits on a separate setup."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/sku-rationalization-manufacturing\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ko\/"},{"@type":"ListItem","position":2,"name":"\uc81c\uc870\uc5c5 SKU \ud569\ub9ac\ud654: \uc5b4\ub5a4 \ud488\ubaa9\uc744 \uc720\uc9c0\ud560 \uac83\uc778\uac00"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ko\/#website","url":"https:\/\/skyplanner.ai\/ko\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ko\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ko-KR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ko\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ko\/","logo":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/sku-rationalization-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/sku-rationalization-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/sku-rationalization-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/sku-rationalization-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/sku-rationalization-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/sku-rationalization-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/sku-rationalization-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/sku-rationalization-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ko\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\uc81c\uc870\uc5c5 SKU \ud569\ub9ac\ud654: \uc5b4\ub5a4 \ud488\ubaa9\uc744 \uc720\uc9c0\ud560 \uac83\uc778\uac00 \ud648 &raquo; \ub9ac\uc18c\uc2a4 &raquo; \uc81c\uc870\uc5c5 SKU \ud569\ub9ac\ud654: \uc5b4\ub5a4 \ud488\ubaa9\uc744 \uc720\uc9c0\ud560 \uac83\uc778\uac00 \ud310\ub9e4\ub7c9\uc774 \uac00\uc7a5 \uc801\uc740 \uc0ac\uc591\uc774 \uc624\ud788\ub824 \ub9cc\ub4e4\uae30\ub294 \uc26c\uc6b8 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc8fc\ub825 \uc81c\ud488\uacfc \uac19\uc740 \uc790\uc7ac\ub97c \uc4f0\uace0, \uc900\ube44 \uc791\uc5c5\ub3c4 \uac70\uc758 \ucd94\uac00\ud558\uc9c0 \uc54a\uc740 \ucc44 \ud568\uaed8 \uc0dd\uc0b0\ud560 \uc218 \uc788\uae30 \ub54c\ubb38\uc785\ub2c8\ub2e4. \ubc18\uba74 \ud310\ub9e4\ub7c9\uc740 \ub354 \ub9ce\uc544\ub3c4 \uac00\uc7a5 \ubc14\uc05c \uc124\ube44\uc758 \uc791\uc5c5\uc744 \uc218\uc2dc\ub85c \ub04a\uace0, \uc804\uc6a9 \ubd80\ud488\uc774&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/111063","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/comments?post=111063"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/111063\/revisions"}],"predecessor-version":[{"id":111126,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/111063\/revisions\/111126"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media\/111067"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media?parent=111063"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/categories?post=111063"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/tags?post=111063"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}