{"id":110420,"date":"2026-10-26T00:03:20","date_gmt":"2026-10-26T00:03:20","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=110420"},"modified":"2026-10-26T00:05:26","modified_gmt":"2026-10-26T00:05:26","slug":"plan-for-every-part","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/plan-for-every-part\/","title":{"rendered":"\ud488\ubaa9\ubcc4 \uacf5\uae09\u00b7\uc6b4\uc6a9 \uacc4\ud68d(PFEP): \uc791\uc5c5\uc5d0 \ud544\uc694\ud55c \ubd80\ud488 \uc900\ube44\ud558\uae30"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">\ud488\ubaa9\ubcc4 \uacf5\uae09\u00b7\uc6b4\uc6a9 \uacc4\ud68d(PFEP): \uc791\uc5c5\uc5d0 \ud544\uc694\ud55c \ubd80\ud488 \uc900\ube44\ud558\uae30<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/ko\/\">\ud648<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/\">\ub9ac\uc18c\uc2a4<\/a> &raquo; \ud488\ubaa9\ubcc4 \uacf5\uae09\u00b7\uc6b4\uc6a9 \uacc4\ud68d(PFEP): \uc791\uc5c5\uc5d0 \ud544\uc694\ud55c \ubd80\ud488 \uc900\ube44\ud558\uae30<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">\uc608\uc0c1 \uc77d\uae30 \uc2dc\uac04: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> \ubd84<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>\ubd80\ud488\uc740 \uacf5\uc7a5 \uc548\uc5d0 \uc788\uc2b5\ub2c8\ub2e4. \uad6c\ub9e4 \ub2f4\ub2f9\uc790\ub3c4 \uc7ac\uace0 \ubcf4\uace0\uc11c\uc5d0\uc11c \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uadf8\ub7f0\ub370 \uc791\uc5c5\uc790\ub294 \uc5ec\uc804\ud788 \uae30\ub2e4\ub9bd\ub2c8\ub2e4. \uc774 \uc791\uc5c5\uc7a5\uae4c\uc9c0 \uc5b4\ub5a4 \uc6a9\uae30\uc5d0 \ub2f4\uc544 \uc5b4\ub5bb\uac8c \uc804\ub2ec\ud560\uc9c0, \uc6a9\uae30\uac00 \ube44\uba74 \ub204\uac00 \ubcf4\ucda9\ud560\uc9c0 \uc815\ud574 \ub193\uc9c0 \uc54a\uc558\uae30 \ub54c\ubb38\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>PFEP(Plan for Every Part), \uc989 \ud488\ubaa9\ubcc4 \uacf5\uae09\u00b7\uc6b4\uc6a9 \uacc4\ud68d\uc740 \uc774\ub7f0 \ube48\ud2c8\uc744 \uba54\uc6c1\ub2c8\ub2e4. \uac01 \ubd80\ud488\uc758 \uacf5\uae09, \ubcf4\uad00, \ucde8\uae09, \uc0ac\uc6a9 \uc9c0\uc810\uc5d0 \uad00\ud55c \uc9c0\uce68\uc744 \ud55c\uacf3\uc5d0 \ubaa8\uc544 \uc9c0\uc18d\uc801\uc73c\ub85c \uad00\ub9ac\ud558\ub294 \ubc29\uc2dd\uc785\ub2c8\ub2e4. \ubd80\ud488\uc744 \ucc3e\uc544\ub2e4\ub2c8\uac70\ub098 \uadf8\ub54c\uadf8\ub54c \uc784\uc2dc\ub85c \uc6b4\ubc18\ud558\ub294 \uc77c\uc774 \uc904\uace0, \ub204\uad70\uac00\uc758 \uae30\uc5b5\uc5d0\ub9cc \uc758\uc874\ud558\ub358 \uc778\uacc4 \uacfc\uc815\uc5d0\uc11c \uc0dd\uae30\ub294 \uc791\uc5c5 \uc911\ub2e8\ub3c4 \uc904\uc5b4\ub4ed\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud558\uc9c0\ub9cc \uc2e0\ub8b0\ud560 \uc218 \uc788\ub294 \ubd80\ud488 \uacf5\uae09 \uacc4\ud68d\uc744 \uc6b4\uc601\ud558\ub824\uba74 \uc0dd\uc0b0 \uacc4\ud68d\ub3c4 \uc2e0\ub8b0\ud560 \uc218 \uc788\uc5b4\uc57c \ud569\ub2c8\ub2e4. PFEP\ub85c \uc790\uc7ac\ub97c \uc791\uc5c5 \ud604\uc7a5\uae4c\uc9c0 \uacf5\uae09\ud558\ub294 \ubc29\ubc95\uc744 \uc815\ud558\uace0, SkyPlanner APS\ub85c \uc790\uc7ac \uac00\uc6a9\uc131\uc744 \ud574\ub2f9 \uc790\uc7ac\uac00 \ud544\uc694\ud55c \uc624\ub354, \uacf5\uc815, \uc0dd\uc0b0 \ub2a5\ub825\uacfc \uc5f0\uacb0\ud558\uc138\uc694. \uc5ec\ub7ec \ubaa9\ub85d\uc744 \ub300\uc870\ud558\ub294 \ub370 \uc4f0\ub294 \uc2dc\uac04\uc744 \uc904\uc774\uace0 \uc0dd\uc0b0 \ud750\ub984\uc744 \uc720\uc9c0\ud558\ub294 \ub370 \ub354 \uc9d1\uc911\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\ud488\ubaa9\ubcc4 \uacf5\uae09\u00b7\uc6b4\uc6a9 \uacc4\ud68d\uc774\ub780?<\/h2>\n\n\n<p>\ud488\ubaa9\ubcc4 \uacf5\uae09\u00b7\uc6b4\uc6a9 \uacc4\ud68d\uc740 \uc0dd\uc0b0\uc5d0 \uc4f0\uc774\ub294 \uac01 \ubd80\ud488\uc744 \uc5b4\ub5bb\uac8c \uacf5\uae09\ud558\uace0 \ubcf4\uad00\ud558\uba70 \ucde8\uae09\ud558\uace0 \uc0ac\uc6a9 \uc9c0\uc810\uae4c\uc9c0 \uc804\ub2ec\ud560\uc9c0 \uc0c1\uc138\ud788 \uae30\ub85d\ud55c \uac83\uc785\ub2c8\ub2e4. \uc77c\ubc18\uc801\uc73c\ub85c PFEP\ub77c\ub294 \uc57d\uc5b4\ub97c \uc501\ub2c8\ub2e4. \uc5b4\ub5a4 \ubd80\ud488\uc774 \uc5bc\ub9c8\ub098 \ud544\uc694\ud55c\uc9c0, \uc5b4\ub514\ub85c \uc5b4\ub5a4 \ubc29\ubc95\uc73c\ub85c \ubcf4\ub0b4\ub294\uc9c0, \ubb34\uc5c7\uc744 \uae30\uc900\uc73c\ub85c \ubcf4\ucda9\ud558\ub294\uc9c0 \ub4f1 \ud604\uc7a5\uc758 \uc2e4\ud589 \uc694\uac74\uc744 \uba85\ud655\ud788 \ud558\uc5ec \ub9b0 \uc0dd\uc0b0\uc758 \uc790\uc7ac \ud750\ub984\uc744 \ub4b7\ubc1b\uce68\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud488\ubc88\uacfc \uc7ac\uace0 \uc218\ub7c9\ub9cc\uc73c\ub85c\ub294 \ucda9\ubd84\ud558\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4. \uc774 \uc815\ubcf4\ub85c \ud488\ubaa9\uacfc \uc7a5\ubd80\uc0c1 \uc218\ub7c9\uc740 \uc54c \uc218 \uc788\uc9c0\ub9cc, \uacf5\uae09\uc5c5\uccb4\uc5d0\uc11c \ubc1b\uc740 \uc0c1\uc790\ub97c \uadf8\ub300\ub85c \ub77c\uc778\uc5d0 \ubcf4\ub0bc \uc218 \uc788\ub294\uc9c0, \ubd80\ud488 \uc190\uc0c1\uc744 \ub9c9\uae30 \uc704\ud574 \ud2b9\ubcc4\ud788 \ucde8\uae09\ud574\uc57c \ud558\ub294\uc9c0, \uc57c\uac04 \uadfc\ubb34\uc870\uac00 \ubcf4\ucda9\uc6a9 \uc6a9\uae30\ub97c \uc5b4\ub5bb\uac8c \ubc1b\ub294\uc9c0\ub294 \uc54c \uc218 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>PFEP\ub294 \uc774\ub7f0 \uae30\ubcf8 \uc815\ubcf4\uc5d0 \uc6b4\uc601 \ubc29\uc2dd\uacfc \ub2f4\ub2f9 \ucc45\uc784\uc744 \ub354\ud569\ub2c8\ub2e4. \ud574\ub2f9 \ubd80\ud488\uc744 \uc798 \ubaa8\ub974\ub294 \uc0ac\ub78c\ub3c4 \ud3c9\uc18c \uc5b4\ub5bb\uac8c \ucc98\ub9ac\ud558\ub294\uc9c0 \uac70\ub4ed \ubb3b\uc9c0 \uc54a\uace0 \uc815\ud574\uc9c4 \uacf5\uae09 \uacbd\ub85c\ub97c \ub530\ub77c \uc5c5\ubb34\ub97c \uc218\ud589\ud560 \uc218 \uc788\ub294\uc9c0 \ud655\uc778\ud574 \ubcf4\uba74, \uacc4\ud68d\uc774 \uc81c\ub300\ub85c \ub9c8\ub828\ub418\uc5c8\ub294\uc9c0 \ud310\ub2e8\ud558\ub294 \ub370 \ub3c4\uc6c0\uc774 \ub429\ub2c8\ub2e4.<\/p>\n\n\n<p>\uad00\ub828 \ub3c4\uad6c\uc640 PFEP\uc758 \uc5ed\ud560\uc744 \uad6c\ubd84\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<ul class=\"wp-block-list\"><li>\uc790\uc7ac\uba85\uc138\uc11c\ub294 \uc81c\ud488\uc744 \ub9cc\ub4dc\ub294 \ub370 \ud544\uc694\ud55c \uad6c\uc131 \ubd80\ud488\uacfc \uc218\ub7c9\uc744 \uc815\uc758\ud569\ub2c8\ub2e4. PFEP\ub294 \uadf8 \ubd80\ud488\uc744 \uc5b4\ub5bb\uac8c \uacf5\uae09\ud558\uace0 \ucde8\uae09\ud560\uc9c0 \uc815\ud569\ub2c8\ub2e4.<\/li><li>\uc7ac\uace0 \uae30\ub85d\uc740 \uc7ac\uace0\ub7c9\uacfc \uc774\ub3d9 \ub0b4\uc5ed\uc744 \ubcf4\uc5ec \uc90d\ub2c8\ub2e4. PFEP\ub294 \uadf8 \ud750\ub984\uc744 \ub4b7\ubc1b\uce68\ud558\ub294 \uc6b4\uc601 \uae30\uc900\uacfc \uc2e4\uc81c \ubcf4\uad00\u00b7\uc6b4\ubc18 \ubc29\uc2dd\uc744 \uaddc\uc815\ud569\ub2c8\ub2e4.<\/li><li><a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/kitting-in-manufacturing\/\">\ud0a4\ud305<\/a>\uc740 \ud2b9\uc815 \uc791\uc5c5\uc5d0 \ud544\uc694\ud55c \ubd80\ud488\uc744 \ubaa8\uc73c\uace0 \ud655\uc778\ud558\ub294 \ud65c\ub3d9\uc785\ub2c8\ub2e4. PFEP\uc5d0\uc11c\ub294 \ubd80\ud488\uc744 \ub77c\uc778 \uc606 \uc6a9\uae30\uc5d0 \ubcf4\uad00\ud558\uba70 \ubcf4\ucda9\ud558\ub294 \ub300\uc2e0 \ud0a4\ud2b8\uc5d0 \ub2f4\uc544 \uacf5\uae09\ud558\ub3c4\ub85d \uc815\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/li><li>ABC \ubd84\uc11d\uc740 \uc18c\ube44 \uae08\uc561\uc744 \uae30\uc900\uc73c\ub85c \uc7ac\uace0 \uad00\ub9ac\uc758 \uc6b0\uc120\uc21c\uc704\ub97c \uc815\ud558\ub294 \ub370 \ub3c4\uc6c0\uc774 \ub429\ub2c8\ub2e4. \uc774 \ubd84\ub958\ub97c PFEP \uc218\ub9bd\uc5d0 \ucc38\uace0\ud560 \uc218\ub294 \uc788\uc9c0\ub9cc, \ubd80\ud488\uc774 \uc791\uc5c5\uc790\uc5d0\uac8c \ub3c4\ub2ec\ud558\ub294 \uacbd\ub85c\uae4c\uc9c0 \uc815\ud574 \uc8fc\uc9c0\ub294 \uc54a\uc2b5\ub2c8\ub2e4.<\/li><\/ul>\n\n\n<p>\uc774 \ub3c4\uad6c\ub4e4\uc740 \uc77c\uad00\ub41c \uc2dd\ubcc4 \ucf54\ub4dc\ub97c \uacf5\uc720\ud574\uc57c \ud569\ub2c8\ub2e4. \uac19\uc740 \ubaa9\ub85d\uc744 \uc11c\ub85c \ub2e4\ub978 \ubc84\uc804\uc73c\ub85c \uad00\ub9ac\ud558\uba70 \uc5b4\ub290 \ucabd\uc774 \ub9de\ub294\uc9c0 \ub2e4\ud22c\ub294 \uc0c1\ud669\uc774 \ub418\uc5b4\uc11c\ub294 \uc548 \ub429\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">PFEP\uc5d0\ub294 \uc5b4\ub5a4 \uc815\ubcf4\ub97c \ub2f4\uc544\uc57c \ud560\uae4c\uc694?<\/h2>\n\n\n<p>\uacf5\uae09 \ubc29\uc2dd\uc744 \uacb0\uc815\ud558\uace0 \uc720\uc9c0\ud558\ub294 \ub370 \ud544\uc694\ud55c \uc815\ubcf4\ub97c \ub2f4\uc73c\uc138\uc694. \uc544\ub798 \ud45c\ub294 \uc2e4\ubb34\uc5d0\uc11c \uc2dc\uc791\uc810\uc73c\ub85c \uc0bc\uc744 \uc218 \uc788\ub294 \uad6c\uc131 \uc608\uc2dc\uc774\uba70, \uc5f4\uc758 \uc218\uac00 \uc815\ud574\uc838 \uc788\ub2e4\ub294 \ub73b\uc740 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\uc815\ubcf4 \uad6c\ubd84<\/th><th>\uc815\ud574\uc57c \ud560 \uc138\ubd80 \uc0ac\ud56d<\/th><th>\ud310\ub2e8\uc5d0 \ub3c4\uc6c0\uc774 \ub418\ub294 \uc810<\/th><\/tr><\/thead><tbody><tr><td>\ubd80\ud488 \uc2dd\ubcc4 \uc815\ubcf4<\/td><td>\uace0\uc720 \ucf54\ub4dc, \ud488\ubaa9 \uc124\uba85, \ud574\ub2f9 \uac1c\uc815 \ubc84\uc804, \uc7ac\uace0 \uad00\ub9ac \ub2e8\uc704 \ubc0f \uad6c\ub9e4 \ub2e8\uc704 \ud658\uc0b0 \uae30\uc900<\/td><td>\uc785\uace0, \ucc3d\uace0, \uc0dd\uc0b0 \ub2f4\ub2f9\uc790\uac00 \uc0ac\uc6a9 \uac00\ub2a5\ud55c \ud488\ubaa9\uacfc \uc218\ub7c9\uc744 \ub3d9\uc77c\ud558\uac8c \ud30c\uc545\ud569\ub2c8\ub2e4.<\/td><\/tr><tr><td>\uc218\uc694 \ubc0f \uc0ac\uc6a9<\/td><td>\ubd80\ud488\uc744 \uc0ac\uc6a9\ud558\ub294 \uc81c\ud488 \ub610\ub294 \uacf5\uc815, \uc0ac\uc6a9 \ud328\ud134, \uc0ac\uc6a9 \uc9c0\uc810<\/td><td>\uc2e4\uc81c\ub85c \ubd80\ud488\uc774 \uc18c\ube44\ub418\ub294 \uc7a5\uc18c\uc640 \uc2dc\uc810\uc744 \ubc18\uc601\ud574 \uacf5\uae09 \ubc29\uc2dd\uc744 \uc815\ud569\ub2c8\ub2e4.<\/td><\/tr><tr><td>\uacf5\uae09\ucc98 \ubc0f \ubcf4\ucda9<\/td><td>\uacf5\uae09\uc5c5\uccb4 \ub610\ub294 \ub0b4\ubd80 \uacf5\uae09\ucc98, \ubcf4\ucda9 \uc18c\uc694 \uc2dc\uac04, \ubc1c\uc8fc \uc8fc\uae30, \ubc1c\uc8fc \uc81c\uc57d \uc870\uac74<\/td><td>\uc5b4\ub5a4 \uc870\uac74\uc5d0\uc11c \ubcf4\ucda9\uc744 \uc2dc\uc791\ud558\uace0 \uc5bc\ub9c8\ub098 \uac78\ub9ac\ub294\uc9c0 \ub2f4\ub2f9\uc790\ub4e4\uc774 \uc54c \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/td><\/tr><tr><td>\ud3ec\uc7a5 \ubc0f \ucde8\uae09<\/td><td>\uacf5\uae09\uc5c5\uccb4 \ud3ec\uc7a5\ub2f9 \uc218\ub7c9, \ub0b4\ubd80 \uc6b4\ubc18 \uc6a9\uae30\ub2f9 \uc218\ub7c9, \uce58\uc218, \uc911\ub7c9, \ubcf4\ud638 \uc694\uac74<\/td><td>\ubcf4\uad00 \uacf5\uac04, \ucde8\uae09 \ubc29\ubc95, \uc791\uc5c5 \ud604\uc7a5\uc5d0 \ub9de\ub294 \uc6a9\uae30\ub97c \uc0ac\uc6a9\ud569\ub2c8\ub2e4.<\/td><\/tr><tr><td>\ubcf4\uad00 \ubc0f \uc6b4\ubc18<\/td><td>\ubcf4\uad00 \uc704\uce58 \ucf54\ub4dc, \ub77c\uc778 \uc606 \ubc30\uce58 \uc704\uce58, \uc6b4\ubc18 \ubc29\ubc95, \uc6b4\ubc18 \uc8fc\uae30, \ub2f4\ub2f9 \uc5ed\ud560<\/td><td>\uc785\uace0\ubd80\ud130 \uc0ac\uc6a9\uae4c\uc9c0 \ubd80\ud488\uc774 \uc2e4\uc81c\ub85c \uc774\ub3d9\ud558\ub294 \uacbd\ub85c\uac00 \uc815\ud574\uc9d1\ub2c8\ub2e4.<\/td><\/tr><tr><td>\uad00\ub9ac \ubc0f \uac31\uc2e0<\/td><td>\ubcf4\ucda9 \uc2e0\ud638, \ubc84\ud37c \uc7ac\uace0 \uae30\uc900, \uc608\uc678 \uc0c1\ud669 \uc5f0\ub77d \ub2f4\ub2f9\uc790, \ub370\uc774\ud130 \uad00\ub9ac \ucc45\uc784\uc790, \ucd5c\uc885 \uac80\uc99d \ub0b4\uc5ed<\/td><td>\uacf5\uae09\uc5d0 \ucc28\uc9c8\uc774 \uc0dd\uae30\uae30 \uc804\uc5d0 \ub2f4\ub2f9\uc790\uac00 \uc870\uce58\ud558\uace0 \uc9c0\uce68\uc744 \ucd5c\uc2e0 \uc0c1\ud0dc\ub85c \uc720\uc9c0\ud569\ub2c8\ub2e4.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\ubd80\ud488 \uacf5\ud1b5 \uc815\ubcf4\uc640 \uc704\uce58\ubcc4 \uacf5\uae09 \ubc29\uc2dd\uc740 \ubd84\ub9ac\ud574\uc11c \uad00\ub9ac\ud558\uc138\uc694. \uac19\uc740 \uc530\uc744 \uc5ec\ub7ec \uc140\uc5d0 \uacf5\uae09\ud55c\ub2e4\uba74 \uc140\ub9c8\ub2e4 \uc6a9\uae30\ub2f9 \uc218\ub7c9, \uc6b4\ubc18 \uc8fc\uae30, \ubcf4\ucda9 \uc2e0\ud638\ub97c \ub530\ub85c \uc815\ud574\uc57c \ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ub530\ub77c\uc11c \ud558\ub098\uc758 \ud488\ubaa9 \ucf54\ub4dc\uc5d0 \uc5ec\ub7ec \uc0ac\uc6a9 \uc9c0\uc810\uc758 \uae30\ub85d\uc744 \uc5f0\uacb0\ud558\uba74 \ub429\ub2c8\ub2e4. \uac19\uc740 \ubd80\ud488\uc744 \uc11c\ub85c \ub2e4\ub974\uac8c \uc815\uc758\ud558\ub294 \ubaa8\uc21c\uc740 \uc0dd\uae30\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc6b4\uc601 \uae30\uc900\uacfc \ud604\uc7ac \uc0c1\ud669\ub3c4 \uad6c\ubd84\ud574\uc57c \ud569\ub2c8\ub2e4. \uacf5\uae09\uc5c5\uccb4\uc758 \ud45c\uc900 \ub9ac\ub4dc\ud0c0\uc784\uc740 \uacc4\ud68d\uc758 \uae30\ucd08 \ub370\uc774\ud130\uc774\uace0, \uc9c0\uc5f0\ub41c \ubb3c\ub7c9\uc758 \ubcc0\uacbd \ub3c4\ucc29 \uc608\uc815\uc77c\uc740 \ud604\uc7ac\uc758 \uc608\uc678 \uc815\ubcf4\uc785\ub2c8\ub2e4. \ub77c\uc778 \uc606 \ubaa9\ud45c \uc7ac\uace0\ub7c9\uc740 \uc6b4\uc601 \uae30\uc900\uc774\uace0, \uc9c0\uae08 \uadf8\uacf3\uc5d0\uc11c \uc0ac\uc6a9\ud560 \uc218 \uc788\ub294 \uc218\ub7c9\uc740 \ud604\uc7a5 \uc6b4\uc601 \uc815\ubcf4\uc785\ub2c8\ub2e4. \ub458 \ub2e4 \uc911\uc694\ud558\uc9c0\ub9cc \ud558\ub098\ub97c \uac31\uc2e0\ud55c\ub2e4\uace0 \ub2e4\ub978 \ud558\ub098\uac00 \uc790\ub3d9\uc73c\ub85c \ubc14\ub85c\uc7a1\ud788\uc9c0\ub294 \uc54a\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc2e4\uc81c \uc790\uc7ac \ud750\ub984\uc744 \ubc14\ud0d5\uc73c\ub85c \uccab PFEP \uc218\ub9bd\ud558\uae30<\/h2>\n\n\n<p>\ubd80\ud488 \ubd80\uc871\uc774\ub098 \ubd80\ud488\uc744 \ucc3e\ub294 \uc77c, \ubd88\ud544\uc694\ud55c \ucde8\uae09\uc774 \ubc18\ubcf5\ub418\uc5b4 \ubb38\uc81c\uac00 \ub4dc\ub7ec\ub098\ub294 \uc0dd\uc0b0 \uad6c\uc5ed \ub610\ub294 \uc81c\ud488\uad70\uc744 \uc815\ud574 \uc2dc\uc791\ud558\uc138\uc694. \uad81\uadf9\uc801\uc778 \ubaa9\ud45c\ub294 \ubaa8\ub4e0 \ubd80\ud488\uc744 \ub2e4\ub8e8\ub294 \uac83\uc774\uaca0\uc9c0\ub9cc, \ubc94\uc704\ub97c \ud55c\uc815\ud55c \uc2dc\ubc94 \uc6b4\uc601\uc744 \uac70\uce58\uba74 \uac80\uc99d\ub418\uc9c0 \uc54a\uc740 \uac00\uc815\uc774 \uacf5\uc7a5 \uc804\uccb4\ub85c \ud37c\uc9c0\uae30 \uc804\uc5d0 \ubc29\ubc95\uc744 \uc2dc\ud5d8\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uae30\ub85d\ub9cc \ubcf4\uc9c0 \ub9d0\uace0 \ubd80\ud488\uc758 \uc774\ub3d9\uc744 \ub530\ub77c\uac00\uc138\uc694<\/h3>\n\n\n<p>\ub300\uc0c1 \ubd80\ud488\uc744 \uace8\ub77c \uc785\uace0\ubd80\ud130 \ubcf4\uad00, \uc2e4\uc81c \uc0ac\uc6a9\uae4c\uc9c0 \ud604\uc7a5\uc5d0\uc11c \uc774\ub3d9 \uacbd\ub85c\ub97c \ub530\ub77c\uac00 \ubcf4\uc138\uc694. \uad6c\ub9e4 \ub2f4\ub2f9\uc790, \ucc3d\uace0 \uc9c1\uc6d0, \uc790\uc7ac \uc6b4\ubc18 \ub2f4\ub2f9\uc790, \ubd80\ud488\uc744 \uc0ac\uc6a9\ud558\ub294 \uc791\uc5c5\uc790\uac00 \ud568\uaed8 \ucc38\uc5ec\ud574\uc57c \ud569\ub2c8\ub2e4. \uc2e4\uc81c \uc5c5\ubb34\uac00 ERP \uae30\ub85d, \ud604\uc7a5\uc5d0\uc11c \uc4f0\ub294 \ubaa9\ub85d, \uc9c0\uce68\uacfc \uc77c\uce58\ud558\ub294\uc9c0 \ube44\uad50\ud558\uc138\uc694.<\/p>\n\n\n<p>\ud2b9\ud788 \ube44\uacf5\uc2dd\uc801\uc778 \ucc98\ub9ac \ubc29\uc2dd\uc744 \uc0b4\ud3b4\ubcf4\uc138\uc694. \ubcc4\ub3c4\ub85c \uc4f0\ub294 \ub450 \ubc88\uc9f8 \ubcf4\uad00 \uc7a5\uc18c, \ud2b9\uc815 \uadfc\ubb34\uc870\uc5d0\uc11c\ub9cc \uc0ac\uc6a9\ud558\ub294 \uc791\uc740 \uc6a9\uae30, \ub204\uad70\uac00 \uc694\uccad\ud558\uba74 \ubc1c\uc8fc\ub97c \ub123\ub294 \ud604\uc7a5 \uad00\ub9ac\uc790 \ub4f1\uc774 \uadf8 \uc608\uc785\ub2c8\ub2e4. \uae54\ub054\ud558\uac8c \ucd94\ucd9c\ud55c \ud488\ubaa9 \ub370\uc774\ud130\ub9cc\uc73c\ub85c\ub294 \ub4dc\ub7ec\ub098\uc9c0 \uc54a\ub294 \uc5f0\uacb0 \uace0\ub9ac\uac00 \uc774\ub7f0 \uacf3\uc5d0 \uc788\ub294 \uacbd\uc6b0\uac00 \ub9ce\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uacf5\uae09 \uacb0\uc815\uc5d0 \uc601\ud5a5\uc744 \uc8fc\ub294 \uc138\ubd80 \uc0ac\ud56d\uc744 \uac80\uc99d\ud558\uc138\uc694<\/h3>\n\n\n<p>\ubcf4\ucda9 \uc218\ub7c9\uc744 \uc815\ud558\uae30 \uc804\uc5d0 \ucf54\ub4dc, \uac1c\uc815 \ubc84\uc804, \ub2e8\uc704, \uc704\uce58\ub97c \ud655\uc778\ud558\uc138\uc694. \uad6c\ub9e4 \uc2dc \ud3ec\uc7a5 \ub2e8\uc704\uc640 \ub0b4\ubd80 \uc6b4\ubc18 \uc6a9\uae30\ub97c \uba85\ud655\ud788 \uad6c\ubd84\ud574\uc57c \ud569\ub2c8\ub2e4. \uc9c0\uac8c\ucc28\uac00 \uc774\ub3d9\ud558\ub294 \uc2dc\uac04\ub9cc\uc774 \uc544\ub2c8\ub77c, \ub0b4\ubd80 \ubcf4\ucda9 \uc2e0\ud638\uac00 \ubc1c\uc0dd\ud55c \ub54c\ubd80\ud130 \uc791\uc5c5\uc7a5\uc5d0\uc11c \uc7ac\uace0\ub97c \uc0ac\uc6a9\ud560 \uc218 \uc788\uac8c \ub420 \ub54c\uae4c\uc9c0\uc758 \uc2dc\uac04\uc744 \uae30\ub85d\ud558\uc138\uc694.<\/p>\n\n\n<p>\uacf5\uae09\uc5c5\uccb4\uc758 \ubcf4\ucda9 \ub9ac\ub4dc\ud0c0\uc784\uacfc \ub0b4\ubd80 \uc6b4\ubc18 \uc18c\uc694 \uc2dc\uac04\uc740 \uc11c\ub85c \ub2e4\ub985\ub2c8\ub2e4. \ub0b4\ubd80 \uc6b4\ubc18\uc744 \uc544\ubb34\ub9ac \uc790\uc8fc \ud574\ub3c4 \uacf5\uae09\uc5c5\uccb4\uc5d0 \ubc1c\uc8fc\ud558\uc9c0 \uc54a\uc740 \ubb38\uc81c\ub97c \ud574\uacb0\ud560 \uc218\ub294 \uc5c6\uc2b5\ub2c8\ub2e4. \ub9c8\ucc2c\uac00\uc9c0\ub85c \uc790\uc7ac\uac00 \ud558\uc5ed\uc7a5\uc5d0 \ub3c4\ucc29\ud588\ub354\ub77c\ub3c4 \uac80\uc0ac\ub098 \uc7ac\ud3ec\uc7a5\uc774 \ub0a8\uc544 \uc788\ub2e4\uba74 \uc124\ube44\uc5d0\uc11c \ubc14\ub85c \uc0ac\uc6a9\ud560 \uc218 \uc788\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc544\uc9c1 \ubaa8\ub974\ub294 \uc815\ubcf4\ub294 \ud655\uc778\uc774 \ud544\uc694\ud558\ub2e4\uace0 \ud45c\uc2dc\ud558\uace0 \ub2f4\ub2f9\uc790\ub97c \uc9c0\uc815\ud558\uc138\uc694. \ub9ac\ub4dc\ud0c0\uc784\uc774 \ube44\uc5b4 \uc788\uc73c\uba74 \ubb38\uc81c\uac00 \ub208\uc5d0 \ubcf4\uc774\uc9c0\ub9cc, \uc784\uc758\ub85c \ub123\uc740 \uac12\uc740 \uc798\ubabb\ub41c \uacf5\uae09 \uaddc\uce59\uc758 \uadfc\uac70\uac00 \ub418\uc5b4\ub3c4 \ub4dc\ub7ec\ub098\uc9c0 \uc54a\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uacf5\uae09 \ubc29\uc2dd\uc744 \uc815\ud55c \ub4a4 \uc2dc\ud5d8\ud558\uc138\uc694<\/h3>\n\n\n<p>\ubd80\ud488\uc744 \uc0ac\uc6a9 \uc9c0\uc810\uc5d0 \ube44\uce58\ud560\uc9c0, \uc288\ud37c\ub9c8\ucf13(\uc77c\uc815\ud55c \uae30\uc900\uc73c\ub85c \uad00\ub9ac\ud558\ub294 \uc911\uac04 \uc7ac\uace0 \uad6c\uc5ed)\uc744 \ud1b5\ud574 \ubcf4\ucda9\ud560\uc9c0, \ud0a4\ud2b8\ub85c \uc804\ub2ec\ud560\uc9c0, \ud2b9\uc815 \uc624\ub354\uc5d0 \ub9de\ucdb0 \uacf5\uae09\ud560\uc9c0 \uacb0\uc815\ud558\uc138\uc694. \ubaa8\ub4e0 \ud488\ubaa9\uc744 \ub611\uac19\uc774 \ucde8\uae09\ud558\uae30\ubcf4\ub2e4 \uc0ac\uc6a9\ub7c9, \uacf5\uac04, \ucde8\uae09\uc5d0 \ub4dc\ub294 \uc218\uace0, \ubd80\uc871 \uc704\ud5d8\uc5d0 \ub9de\ucdb0 \uacf5\uae09 \ubc29\uc2dd\uc744 \uc815\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud574\ub2f9 \ubcf4\ucda9 \uc18c\uc694 \uc2dc\uac04 \ub3d9\uc548\uc758 \uc18c\ube44\ub7c9\uc744 \uae30\uc900\uc73c\ub85c \uc6a9\uae30\ub2f9 \uc218\ub7c9\uacfc \ubcf4\ucda9 \uc2dc\uc810\uc744 \uc815\ud558\uace0, \ubd88\ud655\uc2e4\uc131\uc5d0 \ub300\ube44\ud560 \uc5ec\uc720\ub3c4 \uc801\uc808\ud788 \ud655\ubcf4\ud558\uc138\uc694. \uc2e4\uc81c \uacf5\uac04\uacfc \ucde8\uae09\uc0c1\uc758 \uc81c\uc57d\ub3c4 \ud655\uc778\ud574\uc57c \ud569\ub2c8\ub2e4. \uc6a9\uae30\ub97c \ud0a4\uc6e0\ub354\ub77c\ub3c4 \ud1b5\ud589\uc744 \ub9c9\uac70\ub098 \ubd80\ud488 \uc190\uc0c1 \uc704\ud5d8\uc744 \ub192\uc778\ub2e4\uba74 \uc720\uc6a9\ud55c \ubc84\ud37c\uac00 \ub420 \uc218 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc2e4\uc81c \uc791\uc5c5 \uc911\uc5d0 \uc815\ud574 \ub193\uc740 \ubc29\uc2dd\uc774 \uc81c\ub300\ub85c \uc791\ub3d9\ud558\ub294\uc9c0 \uc2dc\ud5d8\ud558\uc138\uc694. \uc6b4\ubc18 \ub2f4\ub2f9\uc790\uac00 \ubcf4\ucda9 \uc2e0\ud638\ub97c \ubcfc \uc218 \uc788\ub098\uc694? \ub0a8\uc544 \uc788\ub294 \ubd80\ud488\uc744 \ub2e4 \uc4f0\uae30 \uc804\uc5d0 \ubcf4\ucda9 \ubb3c\ub7c9\uc774 \ub3c4\ucc29\ud560 \uc218 \uc788\ub098\uc694? \uc0dd\uc0b0 \ud488\ubaa9 \uad6c\uc131\uc774 \ubc14\ub00c\uac70\ub098 \ud3c9\uc18c \ub2f4\ub2f9\uc790\uac00 \uc790\ub9ac\ub97c \ube44\uc6b0\uba74 \uc5b4\ub5bb\uac8c \ub418\ub098\uc694? \uc801\uc6a9 \ubc94\uc704\ub97c \ub113\ud788\uae30 \uc804\uc5d0 \uacf5\uae09 \ubc29\uc2dd\uc744 \ubcf4\uc644\ud558\uc138\uc694.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc608\uc2dc: \uc0c1\uc790\uc9f8 \uc7ac\uace0\uac00 \uc788\uc5b4\ub3c4 \uc140\uc5d0\uc11c\ub294 \ubd80\ud488\uc774 \ubd80\uc871\ud55c \uc774\uc720<\/h2>\n\n\n<p>\ud55c \uc81c\uc870\uc5c5\uccb4\uac00 \ub450 \uc870\ub9bd \uc140\uc5d0\uc11c \uac19\uc740 \uc530\uc744 \uc0ac\uc6a9\ud55c\ub2e4\uace0 \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \uad6c\ub9e4 \ubd80\uc11c\ub294 \uc0c1\uc790 \ub2e8\uc704\ub85c \ubc1c\uc8fc\ud558\uace0, \ucc3d\uace0\ub294 \ub0b1\uac1c \ub2e8\uc704\ub85c \uc7ac\uace0\ub97c \uae30\ub85d\ud558\uba70, \uc790\uc7ac \uc6b4\ubc18 \ub2f4\ub2f9\uc790\ub294 \uc791\uc5c5\ub300\uc5d0 \uacf5\uae09\ud558\uae30 \uc704\ud574 \uc791\uc740 \ubcf4\ud638 \uc6a9\uae30\uc5d0 \ub098\ub204\uc5b4 \ub2f4\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uccab PFEP \ucd08\uc548\uc5d0\ub294 \uacf5\uae09\uc5c5\uccb4, \uc0c1\uc790\ub2f9 \uc218\ub7c9, \uc8fc \ubcf4\uad00 \uc704\uce58\uac00 \uae30\ub85d\ub418\uc5b4 \uc788\uc2b5\ub2c8\ub2e4. \uc0dd\uc0b0 \ud488\ubaa9 \uad6c\uc131\uc774 \ubc14\ub00c\uae30 \uc804\uae4c\uc9c0\ub294 \ube60\uc9d0\uc5c6\uc774 \uac16\ucdb0\uc9c4 \uac83\ucc98\ub7fc \ubcf4\uc785\ub2c8\ub2e4. \uadf8\ub7f0\ub370 \ud55c \uc140\uc5d0\uc11c \uc530\uc744 \ud6e8\uc52c \ube60\ub974\uac8c \uc18c\ube44\ud558\uae30 \uc2dc\uc791\ud574\ub3c4 \uc21c\ud68c \ubcf4\ucda9\uc740 \uae30\uc874 \ubc29\uc2dd\ub300\ub85c \uc774\ub8e8\uc5b4\uc9d1\ub2c8\ub2e4. \ucc3d\uace0\uc5d0\ub294 \uc7ac\uace0\uac00 \uc788\uc9c0\ub9cc \uc140\uc740 \ubd80\ud488\uc744 \uae30\ub2e4\ub9ac\uac8c \ub429\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774\ub54c \ud544\uc694\ud55c \uac1c\uc120\uc740 \ub2e8\uc21c\ud788 \u2018\uc530\uc744 \ub354 \uad6c\ub9e4\ud558\ub294 \uac83\u2019\uc774 \uc544\ub2d9\ub2c8\ub2e4. \ub2f4\ub2f9\uc790\ub4e4\uc740 \uac01 \uc0ac\uc6a9 \uc9c0\uc810\uacfc \uadf8\uacf3\uc758 \ub0b4\ubd80 \uc6a9\uae30\ub2f9 \uc218\ub7c9, \ubcf4\ucda9 \uc2e0\ud638, \uc6b4\ubc18 \ucc45\uc784\uc744 \ucd94\uac00\ud569\ub2c8\ub2e4. \ub2e8\uc704 \ud658\uc0b0\uc774 \ub9de\ub294\uc9c0 \uac80\uc99d\ud558\uace0, \uc0dd\uc0b0 \ud488\ubaa9 \uad6c\uc131\uc774 \ubc14\ub014 \ub54c \ub204\uac00 \uacf5\uae09 \ubc29\uc2dd\uc744 \uc870\uc815\ud560\uc9c0\ub3c4 \ud655\uc778\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774\uc81c \uc530\uc5d0\ub294 \ub2e8\uc21c\ud55c \uad6c\ub9e4 \uc815\ubcf4\uac00 \uc544\ub2c8\ub77c \ud604\uc7a5\uc5d0\uc11c \uc2e4\ud589\ud560 \uc6b4\uc601 \uacc4\ud68d\uc774 \ub9c8\ub828\ub418\uc5c8\uc2b5\ub2c8\ub2e4. \ub2e4\uc74c \ub2e8\uacc4\ub294 \uc774 \uc530\uc744 \uc0ac\uc6a9\ud558\ub294 \uc624\ub354\ub97c \uac00\uc6a9 \uc790\uc7ac \ubc0f \uc0dd\uc0b0 \ub2a5\ub825\uacfc \uc5f0\uacb0\ud558\ub294 \uac83\uc785\ub2c8\ub2e4. \uadf8\ub807\uc9c0 \uc54a\uc73c\uba74 \uc0dd\uc0b0\uacc4\ud68d \ub2f4\ub2f9\uc790\uac00 \uc5ec\uc804\ud788 \ub3d9\uc77c\ud55c \uacf5\uae09 \ubb3c\ub7c9\uc744 \ub450 \uc140\uc5d0 \uc911\ubcf5\uc73c\ub85c \uc57d\uc18d\ud558\uac70\ub098, \ud6c4\uc18d \uc791\uc5c5\uc5d0 \ubbf8\uce60 \uc601\ud5a5\uc744 \ubaa8\ub978 \ucc44 \uc624\ub354 \uc77c\uc815\uc744 \uc62e\uae38 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc911\uc694\ud55c \ubcc0\uacbd \uc0ac\ud56d\uc774 \ube60\uc9d0\uc5c6\uc774 \uacc4\ud68d\uc5d0 \ubc18\uc601\ub418\ub3c4\ub85d \ud558\uc138\uc694<\/h2>\n\n\n<p>PFEP \uad00\ub9ac\ub97c \uae09\ud55c \uc77c\uc744 \ub9c8\uce5c \ub4a4 \uc5ec\uc720\uac00 \uc788\uc744 \ub54c \ud558\ub294 \uc5c5\ubb34\ub85c \ub450\uba74 \uacc4\ud68d\uc740 \uc810\ucc28 \ud604\uc2e4\uacfc \uc5b4\uae0b\ub0a9\ub2c8\ub2e4. \uacf5\uae09\uc5d0 \uc601\ud5a5\uc744 \uc8fc\ub294 \ubcc0\uacbd\uc774 \uc788\uc744 \ub54c\ub294 PFEP \uac31\uc2e0\ub3c4 \ud568\uaed8 \uc774\ub8e8\uc5b4\uc9c0\ub3c4\ub85d \ud558\uc138\uc694.<\/p>\n\n\n<p>\uad6c\ub9e4 \ubd80\uc11c\ub294 \uacf5\uae09\uc5c5\uccb4\uc640\uc758 \uac70\ub798 \uc870\uac74, \ubc1c\uc8fc \uc81c\uc57d, \ud655\uc815\ub41c \ubcf4\ucda9 \ub9ac\ub4dc\ud0c0\uc784 \ubcc0\uacbd\uc744 \ub2f4\ub2f9\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ubb3c\ub958 \ubd80\uc11c\ub294 \ubcf4\uad00 \uc704\uce58, \uc6a9\uae30, \ub0b4\ubd80 \ubc30\uc1a1 \ubc29\uc2dd\uc744 \ub9e1\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uae30\uc220 \ubc0f \ud488\uc9c8 \ubd80\uc11c\ub294 \uad00\ub828 \uc0ac\uc591 \ubcc0\uacbd\uacfc \uc2b9\uc778\ub41c \ucde8\uae09 \uc694\uac74\uc744 \uad00\ub9ac\ud558\uace0, \uc0dd\uc0b0 \ubd80\uc11c\ub294 \uc0ac\uc6a9 \uc9c0\uc810\uacfc \uc18c\ube44 \ud328\ud134\uc758 \ubcc0\ud654\ub97c \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. PFEP \ucd1d\uad04 \ub2f4\ub2f9\uc790 \ud55c \uba85\uc740 \uc804\uccb4 \uccb4\uacc4\uc640 \ubbf8\ud574\uacb0 \uc608\uc678 \uc0ac\ud56d\uc744 \uad00\ub9ac\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\ucd1d\uad04 \ub2f4\ub2f9\uc790\uac00 \ubaa8\ub4e0 \ubcc0\uacbd \uc0ac\ud56d\uc744 \uc9c1\uc811 \ucc3e\uc544\ub0b4\uc57c \ud574\uc11c\ub294 \uc548 \ub429\ub2c8\ub2e4. \ud56d\ubaa9\uad70\ubcc4\ub85c \ucc45\uc784\uc790\ub97c \uc9c0\uc815\ud558\uace0, \ub2e4\uc74c\uacfc \uac19\uc740 \uc77c\uc774 \ubc1c\uc0dd\ud558\uba74 \uad00\ub828 \uc815\ubcf4\ub97c \uac31\uc2e0\ud558\ub3c4\ub85d \ud558\uc138\uc694.<\/p>\n\n\n<ul class=\"wp-block-list\"><li>\uc2e0\uaddc \ubd80\ud488\uc774\ub098 \uacf5\uae09\uc5c5\uccb4 \ub4f1\ub85d, \uac1c\uc815 \ub610\ub294 \uc2b9\uc778\ub41c \ub300\uccb4\ud488 \uc801\uc6a9<\/li><li>\ud3ec\uc7a5, \uad6c\ub9e4 \ub2e8\uc704 \ub610\ub294 \ub0b4\ubd80 \uc6a9\uae30\ub2f9 \uc218\ub7c9 \ubcc0\uacbd<\/li><li>\uc0dd\uc0b0 \uc140 \uc774\uc804, \uc0ac\uc6a9 \uc9c0\uc810 \ucd94\uac00, \uad50\ub300 \uadfc\ubb34 \ud615\ud0dc \ub610\ub294 \uc0dd\uc0b0 \ud488\ubaa9 \uad6c\uc131 \ubcc0\uacbd<\/li><li>\ubc18\ubcf5\uc801\uc778 \ubd80\ud488 \ubd80\uc871\uc774\ub098 \uc190\uc0c1, \uc6d0\uc778\uc744 \uc54c \uc218 \uc5c6\ub294 \uc7ac\uace0 \ucc28\uc774 \ubc1c\uc0dd<\/li><\/ul>\n\n\n<p>\ubcc0\uacbd \uac74\ub9c8\ub2e4 \uc2b9\uc778\uc790, \uc801\uc6a9 \uc2dc\uc810, \uadf8\uc5d0 \ub530\ub77c \uac31\uc2e0\ud574\uc57c \ud560 \ud6c4\uc18d \uc9c0\uce68\uc774\ub098 \uc2dc\uc2a4\ud15c\uc744 \uae30\ub85d\ud558\uc138\uc694. \ubcf4\uad00 \ub799\uc758 \ub77c\ubca8\ub9cc \uad50\uccb4\ud558\uace0 \ubc30\uc1a1 \uc9c0\uce68\uc744 \uadf8\ub300\ub85c \ub450\uc5c8\ub2e4\uba74 \uac31\uc2e0\uc774 \uc644\ub8cc\ub41c \uac83\uc774 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p>\ubaa8\ub4e0 \ud56d\ubaa9\uc744 \uc0c8 \ub370\uc774\ud130\ubca0\uc774\uc2a4\uc5d0 \ubcf5\uc0ac\ud560 \ud544\uc694\ub294 \uc5c6\uc2b5\ub2c8\ub2e4. \uc815\ubcf4 \uc720\ud615\ubcc4\ub85c \uacf5\uc2dd \uae30\uc900\uc774 \ub418\ub294 \uc6d0\ucc9c\uc744 \uc815\ud558\uace0, PFEP\uc640\uc758 \uad00\uacc4\ub97c \uba85\ud655\ud788 \ud558\uc138\uc694. \uad6c\ub9e4 \uc870\uac74\uc740 ERP\uc5d0\uc11c, \uc2e4\uc81c \ubcf4\uad00 \uc704\uce58\ub294 WMS\uc5d0\uc11c \uad00\ub9ac\ud55c\ub2e4\uba74 \ub3d9\uae30\ud654 \ucc45\uc784\ub3c4 \uc815\ud558\uc9c0 \uc54a\uc740 \ucc44 \ubcc4\ub3c4\ub85c \uc218\uc815\ud560 \uc218 \uc788\ub294 \uc0ac\ubcf8\uc744 \ub9cc\ub4e4\uc9c0 \ub9c8\uc138\uc694. \uc5ec\ub7ec \uc2dc\uc2a4\ud15c\uc5d0\uc11c \uc815\ubcf4\ub97c \uac00\uc838\uc624\ub354\ub77c\ub3c4 \ud558\ub098\uc758 \uc77c\uad00\ub418\uace0 \uc2e0\ub8b0\ud560 \uc218 \uc788\ub294 \uae30\uc900\uc73c\ub85c \ud65c\uc6a9\ud560 \uc218 \uc788\uc5b4\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc608\uc678 \uc0ac\ud56d\uc740 \uc81c\ub54c \uc870\uce58\ud560 \uc218 \uc788\uc744 \ub9cc\ud07c \uc790\uc8fc \uac80\ud1a0\ud558\uace0, \ud604\uc7a5\uc758 \uc2e4\uc81c \ubcf4\uad00\u00b7\ubc30\uc1a1 \ubc29\uc2dd\ub3c4 \uc8fc\uae30\uc801\uc73c\ub85c \ud655\uc778\ud558\uc138\uc694. \ucd5c\uadfc\uc5d0 \uae30\ub85d\uc744 \uc218\uc815\ud588\ub2e4\ub294 \uc0ac\uc2e4\ub9cc\uc73c\ub85c \uc6a9\uae30\uac00 \uc5ec\uc804\ud788 \uc801\ud569\ud558\uac70\ub098 \ubc30\uc1a1 \uacbd\ub85c\uac00 \uc81c\ub300\ub85c \uc791\ub3d9\ud55c\ub2e4\uace0 \ubcfc \uc218\ub294 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">SkyPlanner\ub85c \uc790\uc7ac \uac00\uc6a9\uc131\uc744 \uc0dd\uc0b0 \uacc4\ud68d\uc5d0 \uc5f0\uacb0\ud558\uc138\uc694<\/h2>\n\n\n<p>PFEP\ub294 \uc790\uc7ac\uac00 \ub354 \uc548\uc815\uc801\uc73c\ub85c \ud750\ub974\ub3c4\ub85d \ud569\ub2c8\ub2e4. SkyPlanner\ub294 \uc790\uc7ac \uac00\uc6a9\uc131\uc774 \uc0dd\uc0b0\uc5d0 \ubbf8\uce58\ub294 \uc601\ud5a5\uc744 \ub354 \uc27d\uac8c \uad00\ub9ac\ud558\ub3c4\ub85d \ub3d5\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>SkyPlanner\uc5d0\uc11c\ub294 \uc81c\ud488\uc5d0 \uc5f0\uacb0\ud55c \uc790\uc7ac\uac00 \ud574\ub2f9 \uc81c\ud488\uc758 \uc624\ub354 \ud56d\ubaa9\uc5d0\ub3c4 \ubc18\uc601\ub429\ub2c8\ub2e4. \uc7ac\uace0 \uc815\ubcf4\ub294 \uc2dc\uc2a4\ud15c \uc5f0\ub3d9\uc744 \ud1b5\ud574 \uad00\ub9ac\ud558\uac70\ub098 SkyPlanner\uc758 Warehouse \ubaa8\ub4c8\uc5d0\uc11c \uc9c1\uc811 \uad00\ub9ac\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc790\uc7ac\ub97c \uace0\ub824\ud55c \uc2a4\ucf00\uc904\ub9c1 \uae30\ub2a5\uc744 \ud65c\uc131\ud654\ud558\uba74 SkyPlanner\uc758 \uc2a4\ucf00\uc904\ub9c1 \uc778\uacf5\uc9c0\ub2a5\uc778 Arcturus\uac00 \uc790\uc7ac \uac00\uc6a9\uc131, \uc791\uc5c5\uc7a5 \uc0dd\uc0b0 \ub2a5\ub825, \uad50\ub300 \uadfc\ubb34, \uacf5\uc815 \uac04 \uc120\ud6c4 \uad00\uacc4, \uc0ac\uc6a9\uc790\uac00 \uc124\uc815\ud55c \uaddc\uce59\uc744 \ud568\uaed8 \ubc18\uc601\ud574 \uacc4\uc0b0\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774\ub7ec\ud55c \uc5f0\uacb0\uc740 \uc5ec\ub7ec \uc624\ub354\uac00 \uac19\uc740 \uc790\uc7ac\ub97c \uc0ac\uc6a9\ud558\uac70\ub098 \uac19\uc740 \uc124\ube44\ub97c \ub450\uace0 \uacbd\ud569\ud560 \ub54c \uc720\uc6a9\ud569\ub2c8\ub2e4. \uc790\uc7ac \ubaa9\ub85d\uc744 \ud655\uc778\ud55c \ub4a4 \uc124\ube44\ubcc4 \uc791\uc5c5 \uc21c\uc11c\ub97c \ub530\ub85c \ub2e4\uc2dc \uc9dc\ub294 \ub300\uc2e0, \uac04\ud2b8 \ud0c0\uc784\ub77c\uc778\uc5d0\uc11c \uc11c\ub85c \uc5f0\uacb0\ub41c \uc77c\uc815\uc744 \uac80\ud1a0\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc785\ub825 \uc815\ubcf4\uac00 \ubc14\ub00c\uba74 \uc77c\uc815\uc744 \ub2e4\uc2dc \uacc4\uc0b0\ud574 \uc791\uc5c5\uc744 \uc5b4\ub5bb\uac8c \ubc30\uce58\ud560 \uc218 \uc788\ub294\uc9c0, \uc5b4\ub5a4 \ub0a9\uae30 \uc57d\uc18d\uc744 \uc810\uac80\ud574\uc57c \ud558\ub294\uc9c0 \ud655\uc778\ud558\uc138\uc694. \uc6b0\uc120\uc21c\uc704\ub294 \uc0ac\uc6a9\uc790\uac00 \uc815\ud558\uace0, <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-scheduling\/\">\uc0dd\uc0b0 \uc2a4\ucf00\uc904\ub9c1 \uacc4\uc0b0<\/a>\uc740 Arcturus\uac00 \ucc98\ub9ac\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>SkyPlanner\ub294 \uac1c\ubc29\ud615 REST API\ub97c \ud1b5\ud574 \ubaa8\ub4e0 ERP \ub610\ub294 MES\uc640 \uc5f0\ub3d9\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uad6c\ub9e4 \ubc0f \ud488\ubaa9 \ub370\uc774\ud130\ub97c \uad00\ub9ac\ud558\ub294 \uae30\uc874 \uc2dc\uc2a4\ud15c\uc740 \uc720\uc9c0\ud558\uba74\uc11c, \uad00\ub828 \uc2dd\ubcc4\uc790\uc640 \uc790\uc7ac \uc18c\uc694\ub7c9, \uac00\uc6a9\uc131 \uc815\ubcf4\ub97c \uc138\ubd80 \uc0dd\uc0b0 \uc2a4\ucf00\uc904\ub9c1\uc5d0 \uc5f0\uacb0\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ud604\uc7a5\uc758 \uc2e4\uc81c \uc791\uc5c5\uc740 \uc5ec\uc804\ud788 PFEP\uc758 \ucde8\uae09 \ubc0f \ubc30\uc1a1 \uc9c0\uce68\uc5d0 \ub530\ub77c \uc774\ub8e8\uc5b4\uc838\uc57c \ud569\ub2c8\ub2e4. \uc2dc\uc2a4\ud15c\uc5d0 \uc7ac\uace0 \uc218\ub7c9\uc774 \uae30\ub85d\ub418\uc5b4 \uc788\ub2e4\uace0 \ud574\uc11c \uc190\uc0c1\ub418\uc9c0 \uc54a\uc740 \uc6a9\uae30\uac00 \uc62c\ubc14\ub978 \uc791\uc5c5\ub300\uc5d0 \ub3c4\ucc29\ud588\ub2e4\ub294 \ub73b\uc740 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p><a href=\"\/ko\/%ea%b3%a0%ea%b0%9d-%ec%82%ac%eb%a1%80\/eskomatic\/\">\uc218\ud0c1 \uae30\uacc4\uac00\uacf5\uc5c5\uccb4 Eskomatic<\/a>\uc740 \uc624\ub798\ub41c ERP\uc640 \ub300\ubd80\ubd84 \uc218\uc791\uc5c5\uc73c\ub85c \uad00\ub9ac\ud558\ub358 \uc791\uc5c5 \ub300\uae30 \ubaa9\ub85d \ub54c\ubb38\uc5d0 \uc804\ubc18\uc801\uc778 \uc0c1\ud669, \ud2b9\ud788 \uc790\uc7ac \uac00\uc6a9\uc131\uc744 \ud30c\uc545\ud558\uae30 \uc5b4\ub824\uc6e0\uc2b5\ub2c8\ub2e4. \uae30\uc874 ERP\uc5d0 SkyPlanner\ub97c \uc5f0\uacb0\ud55c \ub4a4\uc5d0\ub294 \uc790\uc7ac \ud604\ud669\uc744 \ub354 \uba85\ud655\ud788 \ud30c\uc545\ud558\uace0, \ubd80\ud558\ub97c \uc790\ub3d9\uc73c\ub85c \ubc30\ubd84\ud574 \uc77c\uc815\uc744 \uc218\ub9bd\ud558\uba70, \uc791\uc5c5 \uc21c\uc11c\ub97c \uc2dc\uac01\uc801\uc73c\ub85c \ud655\uc778\ud560 \uc218 \uc788\uac8c \ub418\uc5c8\uc2b5\ub2c8\ub2e4. Eskomatic\uc740 \uc790\uc7ac \ubd80\uc871\uc73c\ub85c \uc778\ud55c \uc0dd\uc0b0 \uc911\ub2e8\uc774 \uc904\uace0 \ub0a9\uae30\uc77c\uc744 \ub354 \uc815\ud655\ud558\uac8c \uc124\uc815\ud558\uac8c \ub418\uc5c8\ub2e4\uace0 \uc804\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc2e0\ub8b0\ud560 \uc218 \uc788\ub294 \ubd80\ud488 \uc815\ubcf4\ub97c \uc0dd\uc0b0 \uc2a4\ucf00\uc904\ub9c1\uacfc \uc5f0\uacb0\ud574\uc57c \ud558\ub294 \uc2e4\uc9c8\uc801\uc778 \uc774\uc720\uac00 \uc5ec\uae30\uc5d0 \uc788\uc2b5\ub2c8\ub2e4. \uacc4\ud68d\ub41c \uc791\uc5c5 \uc2dc\uc791 \uc2dc\uc810\uc5d0 \uc608\uc0c1\uce58 \ubabb\ud55c \ubb38\uc81c\uac00 \uc904\uace0, \uadf8 \uc5ec\ud30c\ub97c \uc218\uc791\uc5c5\uc73c\ub85c \ud574\uacb0\ud558\ub294 \ub370 \ub4dc\ub294 \uc2dc\uac04\ub3c4 \uc904\uc5b4\ub4ed\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uacc4\ud68d\uc774 \uc791\uc5c5\uc744 \uacc4\uc18d \uc9c4\ud589\ud558\ub294 \ub370 \ub3c4\uc6c0\uc774 \ub418\ub294\uc9c0 \uce21\uc815\ud558\uc138\uc694<\/h2>\n\n\n<p>\uc2dc\ubc94 \uc801\uc6a9\uc758 \uc131\uacfc\ub294 \uc785\ub825\ud55c \ud56d\ubaa9 \uc218\ub9cc\uc774 \uc544\ub2c8\ub77c \uc2e4\uc81c \uc0ac\uc6a9 \uc9c0\uc810\uc5d0\uc11c \ubb34\uc5c7\uc774 \ub2ec\ub77c\uc84c\ub294\uc9c0\ub85c \ud310\ub2e8\ud558\uc138\uc694. \ubd80\ud488\uc774 \uc5c6\uac70\ub098 \uc798\ubabb\ub41c \ubd80\ud488\uc774 \uacf5\uae09\ub418\uc5b4 \ubc1c\uc0dd\ud55c \uc791\uc5c5 \uc911\ub2e8, \uae34\uae09 \ubc30\uc1a1, \ubd80\ud488\uc744 \ucc3e\ub294 \ub370 \uac78\ub9b0 \uc2dc\uac04, \ud574\ub2f9 \uad6c\uc5ed\uc758 \uc790\uc7ac\ub97c \ubcf4\ucda9\ud558\ub294 \ub370 \ub4dc\ub294 \ub178\ub825\uc744 \ucd94\uc801\ud558\uc138\uc694. \uc774 \uacb0\uacfc\uc640 \ud568\uaed8 \uc7ac\uace0\ub7c9\uacfc \uacf5\uac04 \uc0ac\uc6a9\ub3c4 \uac80\ud1a0\ud574\uc57c \ud569\ub2c8\ub2e4. \ube48 \uacf3\ub9c8\ub2e4 \uc7ac\uace0\ub97c \uc313\uc544 \ub193\uc740 \ub355\ubd84\uc5d0 \uac89\uc73c\ub85c\ub9cc \uac1c\uc120\ub41c \uac83\uc740 \uc544\ub2cc\uc9c0 \ud655\uc778\ud558\uc138\uc694.<\/p>\n\n\n<p>\ubd80\ud488 \ubd80\uc871\uc774 \ubc18\ubcf5\ub418\uba74 \uc5b4\ub514\uc11c \ubb38\uc81c\uac00 \uc0dd\uacbc\ub294\uc9c0 \ucd94\uc801\ud558\uc138\uc694. \uae30\ub85d\uc774 \uc798\ubabb\ub418\uc5c8\ub294\uc9c0, \ubcf4\ucda9 \uc2e0\ud638\ub97c \ub193\ucce4\ub294\uc9c0, \uacf5\uae09\uc5c5\uccb4\uac00 \ub0a9\ud488\uc744 \uc9c0\uc5f0\ud588\ub294\uc9c0, \uc624\ub798\ub41c \uac00\uc6a9\uc131 \uc815\ubcf4\ub85c \uc77c\uc815\uc744 \uc7a1\uc558\ub294\uc9c0 \ud655\uc778\ud574\uc57c \ud569\ub2c8\ub2e4. \uc6d0\uc778\ub9c8\ub2e4 \ud544\uc694\ud55c \uc870\uce58\uac00 \ub2e4\ub985\ub2c8\ub2e4. \uc2e4\uc81c\ub85c \ubb38\uc81c\ub97c \uc77c\uc73c\ud0a8 \uad00\ub9ac \uae30\uc900\uc774\ub098 \uc6b4\uc601 \uc815\ubcf4\ub97c \uc218\uc815\ud558\uc138\uc694.<\/p>\n\n\n<p>\ubd80\ud488 \uc815\ubcf4\uac00 \uc815\ud655\ud55c\ub370\ub3c4 \uc0dd\uc0b0\uacc4\ud68d \ub2f4\ub2f9\uc790\uac00 \uacbd\ud569\ud558\ub294 \uc624\ub354\uc640 \uc124\ube44\ubcc4 \uc791\uc5c5 \uc21c\uc11c\uc5d0 \ub9de\ucdb0 \uc790\uc7ac\ub97c \uc77c\uc77c\uc774 \ubc30\uc815\ud558\uace0 \uc788\ub2e4\uba74 SkyPlanner\ub97c \uc120\ud0dd\ud558\uc138\uc694. \ubc18\ubcf5\uc801\uc73c\ub85c \ubd80\uc871\ud574\uc9c0\ub294 \ubd80\ud488 \ud558\ub098, \uadf8 \ubd80\ud488\uc744 \uc0ac\uc6a9\ud558\ub294 \uc624\ub354, \uac19\uc740 \uc790\uc6d0\uc744 \ub450\uace0 \uacbd\ud569\ud558\ub294 \ub2e4\ub978 \uc624\ub354\ub97c \uc900\ube44\ud574 <a href=\"https:\/\/skyplanner.ai\/ko\/%ec%98%81%ec%97%85%ed%8c%80%ec%97%90-%eb%ac%b8%ec%9d%98\/\">SkyPlanner \ub370\ubaa8\ub97c \uc608\uc57d\ud558\uc138\uc694<\/a>. \uc774 \uc0c1\ud669\uc744 \ubc14\ud0d5\uc73c\ub85c \uc790\uc7ac\ub97c \uace0\ub824\ud55c \uc2a4\ucf00\uc904\ub9c1\uc774 \ub2e4\uc74c \uc0dd\uc0b0 \uc758\uc0ac\uacb0\uc815\uc744 \uc5b4\ub5bb\uac8c \ub354 \uc27d\uac8c \ud560 \uc218 \uc788\ub294\uc9c0 \uc0b4\ud3b4\ubcf4\uc138\uc694. \uba3c\uc800 \uc9c1\uc811 \uc0b4\ud3b4\ubcf4\uace0 \uc2f6\ub2e4\uba74 <a href=\"https:\/\/skyplanner.ai\/ko\/%ed%8f%89%ea%b0%80%ed%8c%90\/\">\ub370\ubaa8 \ub370\uc774\ud130\ub85c SkyPlanner\ub97c \uccb4\ud5d8\ud574 \ubcf4\uc138\uc694<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\ud488\ubaa9\ubcc4 \uacf5\uae09\u00b7\uc6b4\uc6a9 \uacc4\ud68d(PFEP): \uc791\uc5c5\uc5d0 \ud544\uc694\ud55c \ubd80\ud488 \uc900\ube44\ud558\uae30 \ud648 &raquo; \ub9ac\uc18c\uc2a4 &raquo; \ud488\ubaa9\ubcc4 \uacf5\uae09\u00b7\uc6b4\uc6a9 \uacc4\ud68d(PFEP): \uc791\uc5c5\uc5d0 \ud544\uc694\ud55c \ubd80\ud488 \uc900\ube44\ud558\uae30 \ubd80\ud488\uc740 \uacf5\uc7a5 \uc548\uc5d0 \uc788\uc2b5\ub2c8\ub2e4. \uad6c\ub9e4 \ub2f4\ub2f9\uc790\ub3c4 \uc7ac\uace0 \ubcf4\uace0\uc11c\uc5d0\uc11c \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uadf8\ub7f0\ub370 \uc791\uc5c5\uc790\ub294 \uc5ec\uc804\ud788 \uae30\ub2e4\ub9bd\ub2c8\ub2e4. \uc774 \uc791\uc5c5\uc7a5\uae4c\uc9c0 \uc5b4\ub5a4 \uc6a9\uae30\uc5d0 \ub2f4\uc544 \uc5b4\ub5bb\uac8c \uc804\ub2ec\ud560\uc9c0, \uc6a9\uae30\uac00 \ube44\uba74 \ub204\uac00 \ubcf4\ucda9\ud560\uc9c0 \uc815\ud574 \ub193\uc9c0 \uc54a\uc558\uae30 \ub54c\ubb38\uc785\ub2c8\ub2e4. PFEP(Plan for Every Part), \uc989 \ud488\ubaa9\ubcc4 \uacf5\uae09\u00b7\uc6b4\uc6a9 &#8230; <a title=\"\ud488\ubaa9\ubcc4 \uacf5\uae09\u00b7\uc6b4\uc6a9 \uacc4\ud68d(PFEP): \uc791\uc5c5\uc5d0 \ud544\uc694\ud55c \ubd80\ud488 \uc900\ube44\ud558\uae30\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/plan-for-every-part\/\" aria-label=\"Read more about \ud488\ubaa9\ubcc4 \uacf5\uae09\u00b7\uc6b4\uc6a9 \uacc4\ud68d(PFEP): \uc791\uc5c5\uc5d0 \ud544\uc694\ud55c \ubd80\ud488 \uc900\ube44\ud558\uae30\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":110424,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2530,496],"tags":[],"class_list":["post-110420","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps--","category-496","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\ud488\ubaa9\ubcc4 \uacf5\uae09\u00b7\uc6b4\uc6a9 \uacc4\ud68d(PFEP): \uc791\uc5c5\uc5d0 \ud544\uc694\ud55c \ubd80\ud488 \uc900\ube44\ud558\uae30<\/title>\n<meta name=\"description\" content=\"\uc7ac\uace0\ub294 \uc788\ub294\ub370 \ud604\uc7a5\uc5d0\ub294 \ubd80\ud488\uc774 \uc5c6\ub098\uc694? \uacf5\uae09 \uaddc\uce59\uacfc \ucc45\uc784\uc774 \uba85\ud655\ud55c PFEP\ub97c \uc218\ub9bd\ud558\uace0 \uc790\uc7ac \uac00\uc6a9\uc131\uc744 \uc0dd\uc0b0 \uc2a4\ucf00\uc904\ub9c1\uc5d0 \uc5f0\uacb0\ud558\uc138\uc694.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/plan-for-every-part\/\" \/>\n<meta property=\"og:locale\" content=\"ko_KR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\ud488\ubaa9\ubcc4 \uacf5\uae09\u00b7\uc6b4\uc6a9 \uacc4\ud68d(PFEP): \uc791\uc5c5\uc5d0 \ud544\uc694\ud55c \ubd80\ud488 \uc900\ube44\ud558\uae30\" \/>\n<meta property=\"og:description\" content=\"\uc7ac\uace0\ub294 \uc788\ub294\ub370 \ud604\uc7a5\uc5d0\ub294 \ubd80\ud488\uc774 \uc5c6\ub098\uc694? \uacf5\uae09 \uaddc\uce59\uacfc \ucc45\uc784\uc774 \uba85\ud655\ud55c PFEP\ub97c \uc218\ub9bd\ud558\uace0 \uc790\uc7ac \uac00\uc6a9\uc131\uc744 \uc0dd\uc0b0 \uc2a4\ucf00\uc904\ub9c1\uc5d0 \uc5f0\uacb0\ud558\uc138\uc694.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/plan-for-every-part\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-26T00:03:20+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-26T00:05:26+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/plan-for-every-part-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\uae00\uc4f4\uc774\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/plan-for-every-part\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/plan-for-every-part\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"\ud488\ubaa9\ubcc4 \uacf5\uae09\u00b7\uc6b4\uc6a9 \uacc4\ud68d(PFEP): \uc791\uc5c5\uc5d0 \ud544\uc694\ud55c \ubd80\ud488 \uc900\ube44\ud558\uae30\",\"datePublished\":\"2026-10-26T00:03:20+00:00\",\"dateModified\":\"2026-10-26T00:05:26+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/plan-for-every-part\\\/\"},\"wordCount\":54,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/plan-for-every-part\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/plan-for-every-part-hero.png\",\"articleSection\":[\"APS \ubc0f \uc2a4\ucf00\uc904\ub9c1\",\"\ub9ac\uc18c\uc2a4\"],\"inLanguage\":\"ko-KR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/plan-for-every-part\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/plan-for-every-part\\\/\",\"name\":\"\ud488\ubaa9\ubcc4 \uacf5\uae09\u00b7\uc6b4\uc6a9 \uacc4\ud68d(PFEP): \uc791\uc5c5\uc5d0 \ud544\uc694\ud55c \ubd80\ud488 \uc900\ube44\ud558\uae30\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/plan-for-every-part\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/plan-for-every-part\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/plan-for-every-part-hero.png\",\"datePublished\":\"2026-10-26T00:03:20+00:00\",\"dateModified\":\"2026-10-26T00:05:26+00:00\",\"description\":\"\uc7ac\uace0\ub294 \uc788\ub294\ub370 \ud604\uc7a5\uc5d0\ub294 \ubd80\ud488\uc774 \uc5c6\ub098\uc694? \uacf5\uae09 \uaddc\uce59\uacfc \ucc45\uc784\uc774 \uba85\ud655\ud55c PFEP\ub97c \uc218\ub9bd\ud558\uace0 \uc790\uc7ac \uac00\uc6a9\uc131\uc744 \uc0dd\uc0b0 \uc2a4\ucf00\uc904\ub9c1\uc5d0 \uc5f0\uacb0\ud558\uc138\uc694.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/plan-for-every-part\\\/#breadcrumb\"},\"inLanguage\":\"ko-KR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/plan-for-every-part\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/plan-for-every-part\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/plan-for-every-part-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/plan-for-every-part-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Seals move from a supplier carton through storage to separate containers at two assembly benches\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/plan-for-every-part\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\ud488\ubaa9\ubcc4 \uacf5\uae09\u00b7\uc6b4\uc6a9 \uacc4\ud68d(PFEP): \uc791\uc5c5\uc5d0 \ud544\uc694\ud55c \ubd80\ud488 \uc900\ube44\ud558\uae30\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ko-KR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\ud488\ubaa9\ubcc4 \uacf5\uae09\u00b7\uc6b4\uc6a9 \uacc4\ud68d(PFEP): \uc791\uc5c5\uc5d0 \ud544\uc694\ud55c \ubd80\ud488 \uc900\ube44\ud558\uae30","description":"\uc7ac\uace0\ub294 \uc788\ub294\ub370 \ud604\uc7a5\uc5d0\ub294 \ubd80\ud488\uc774 \uc5c6\ub098\uc694? \uacf5\uae09 \uaddc\uce59\uacfc \ucc45\uc784\uc774 \uba85\ud655\ud55c PFEP\ub97c \uc218\ub9bd\ud558\uace0 \uc790\uc7ac \uac00\uc6a9\uc131\uc744 \uc0dd\uc0b0 \uc2a4\ucf00\uc904\ub9c1\uc5d0 \uc5f0\uacb0\ud558\uc138\uc694.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/plan-for-every-part\/","og_locale":"ko_KR","og_type":"article","og_title":"\ud488\ubaa9\ubcc4 \uacf5\uae09\u00b7\uc6b4\uc6a9 \uacc4\ud68d(PFEP): \uc791\uc5c5\uc5d0 \ud544\uc694\ud55c \ubd80\ud488 \uc900\ube44\ud558\uae30","og_description":"\uc7ac\uace0\ub294 \uc788\ub294\ub370 \ud604\uc7a5\uc5d0\ub294 \ubd80\ud488\uc774 \uc5c6\ub098\uc694? \uacf5\uae09 \uaddc\uce59\uacfc \ucc45\uc784\uc774 \uba85\ud655\ud55c PFEP\ub97c \uc218\ub9bd\ud558\uace0 \uc790\uc7ac \uac00\uc6a9\uc131\uc744 \uc0dd\uc0b0 \uc2a4\ucf00\uc904\ub9c1\uc5d0 \uc5f0\uacb0\ud558\uc138\uc694.","og_url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/plan-for-every-part\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-26T00:03:20+00:00","article_modified_time":"2026-10-26T00:05:26+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/plan-for-every-part-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"\uae00\uc4f4\uc774":"Jussi M\u00e4ntyl\u00e4"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/plan-for-every-part\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/plan-for-every-part\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"\ud488\ubaa9\ubcc4 \uacf5\uae09\u00b7\uc6b4\uc6a9 \uacc4\ud68d(PFEP): \uc791\uc5c5\uc5d0 \ud544\uc694\ud55c \ubd80\ud488 \uc900\ube44\ud558\uae30","datePublished":"2026-10-26T00:03:20+00:00","dateModified":"2026-10-26T00:05:26+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/plan-for-every-part\/"},"wordCount":54,"publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/plan-for-every-part\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/plan-for-every-part-hero.png","articleSection":["APS \ubc0f \uc2a4\ucf00\uc904\ub9c1","\ub9ac\uc18c\uc2a4"],"inLanguage":"ko-KR"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/plan-for-every-part\/","url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/plan-for-every-part\/","name":"\ud488\ubaa9\ubcc4 \uacf5\uae09\u00b7\uc6b4\uc6a9 \uacc4\ud68d(PFEP): \uc791\uc5c5\uc5d0 \ud544\uc694\ud55c \ubd80\ud488 \uc900\ube44\ud558\uae30","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/plan-for-every-part\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/plan-for-every-part\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/plan-for-every-part-hero.png","datePublished":"2026-10-26T00:03:20+00:00","dateModified":"2026-10-26T00:05:26+00:00","description":"\uc7ac\uace0\ub294 \uc788\ub294\ub370 \ud604\uc7a5\uc5d0\ub294 \ubd80\ud488\uc774 \uc5c6\ub098\uc694? \uacf5\uae09 \uaddc\uce59\uacfc \ucc45\uc784\uc774 \uba85\ud655\ud55c PFEP\ub97c \uc218\ub9bd\ud558\uace0 \uc790\uc7ac \uac00\uc6a9\uc131\uc744 \uc0dd\uc0b0 \uc2a4\ucf00\uc904\ub9c1\uc5d0 \uc5f0\uacb0\ud558\uc138\uc694.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/plan-for-every-part\/#breadcrumb"},"inLanguage":"ko-KR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/plan-for-every-part\/"]}]},{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/plan-for-every-part\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/plan-for-every-part-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/plan-for-every-part-hero.png","width":1672,"height":941,"caption":"Seals move from a supplier carton through storage to separate containers at two assembly benches"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/plan-for-every-part\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ko\/"},{"@type":"ListItem","position":2,"name":"\ud488\ubaa9\ubcc4 \uacf5\uae09\u00b7\uc6b4\uc6a9 \uacc4\ud68d(PFEP): \uc791\uc5c5\uc5d0 \ud544\uc694\ud55c \ubd80\ud488 \uc900\ube44\ud558\uae30"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ko\/#website","url":"https:\/\/skyplanner.ai\/ko\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ko\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ko-KR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ko\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ko\/","logo":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/plan-for-every-part-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/plan-for-every-part-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/plan-for-every-part-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/plan-for-every-part-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/plan-for-every-part-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/plan-for-every-part-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/plan-for-every-part-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/plan-for-every-part-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ko\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\ud488\ubaa9\ubcc4 \uacf5\uae09\u00b7\uc6b4\uc6a9 \uacc4\ud68d(PFEP): \uc791\uc5c5\uc5d0 \ud544\uc694\ud55c \ubd80\ud488 \uc900\ube44\ud558\uae30 \ud648 &raquo; \ub9ac\uc18c\uc2a4 &raquo; \ud488\ubaa9\ubcc4 \uacf5\uae09\u00b7\uc6b4\uc6a9 \uacc4\ud68d(PFEP): \uc791\uc5c5\uc5d0 \ud544\uc694\ud55c \ubd80\ud488 \uc900\ube44\ud558\uae30 \ubd80\ud488\uc740 \uacf5\uc7a5 \uc548\uc5d0 \uc788\uc2b5\ub2c8\ub2e4. \uad6c\ub9e4 \ub2f4\ub2f9\uc790\ub3c4 \uc7ac\uace0 \ubcf4\uace0\uc11c\uc5d0\uc11c \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uadf8\ub7f0\ub370 \uc791\uc5c5\uc790\ub294 \uc5ec\uc804\ud788 \uae30\ub2e4\ub9bd\ub2c8\ub2e4. \uc774 \uc791\uc5c5\uc7a5\uae4c\uc9c0 \uc5b4\ub5a4 \uc6a9\uae30\uc5d0 \ub2f4\uc544 \uc5b4\ub5bb\uac8c \uc804\ub2ec\ud560\uc9c0, \uc6a9\uae30\uac00 \ube44\uba74 \ub204\uac00 \ubcf4\ucda9\ud560\uc9c0 \uc815\ud574 \ub193\uc9c0 \uc54a\uc558\uae30 \ub54c\ubb38\uc785\ub2c8\ub2e4. PFEP(Plan for Every Part), \uc989 \ud488\ubaa9\ubcc4 \uacf5\uae09\u00b7\uc6b4\uc6a9&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/110420","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/comments?post=110420"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/110420\/revisions"}],"predecessor-version":[{"id":110482,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/110420\/revisions\/110482"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media\/110424"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media?parent=110420"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/categories?post=110420"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/tags?post=110420"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}