{"id":108949,"date":"2026-10-24T16:49:56","date_gmt":"2026-10-24T16:49:56","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=108949"},"modified":"2026-10-24T16:52:14","modified_gmt":"2026-10-24T16:52:14","slug":"mean-time-to-repair","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mean-time-to-repair\/","title":{"rendered":"\ud3c9\uade0 \uc218\ub9ac \uc2dc\uac04: MTTR \uacc4\uc0b0\uc73c\ub85c \uc190\uc2e4 \uc2dc\uac04 \uc904\uc774\uae30"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">\ud3c9\uade0 \uc218\ub9ac \uc2dc\uac04: MTTR \uacc4\uc0b0\uc73c\ub85c \uc190\uc2e4 \uc2dc\uac04 \uc904\uc774\uae30<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/ko\/\">\ud648<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/\">\ub9ac\uc18c\uc2a4<\/a> &raquo; \ud3c9\uade0 \uc218\ub9ac \uc2dc\uac04: MTTR \uacc4\uc0b0\uc73c\ub85c \uc190\uc2e4 \uc2dc\uac04 \uc904\uc774\uae30<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">\uc608\uc0c1 \uc77d\uae30 \uc2dc\uac04: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> \ubd84<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p><strong>\ud3c9\uade0 \uc218\ub9ac \uc2dc\uac04(MTTR)\uc740 \uc124\ube44 \uace0\uc7a5 \ud6c4 \uc815\ud574\uc9c4 \uc218\ub9ac \ub610\ub294 \ubcf5\uad6c \uacfc\uc815\uc5d0 \uac78\ub9ac\ub294 \uc2dc\uac04\uc758 \ud3c9\uade0\uc785\ub2c8\ub2e4.<\/strong> \ube44\uad50 \uac00\ub2a5\ud55c \uc644\ub8cc \uac74\ub4e4\uc758 \uc18c\uc694 \uc2dc\uac04\uc744 \ubaa8\ub450 \ub354\ud55c \ub4a4, \ud574\ub2f9 \uac74\uc218\ub85c \ub098\ub204\uc5b4 \uacc4\uc0b0\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>MTTR = \ucd1d \uc218\ub9ac \ub610\ub294 \ubcf5\uad6c \uc2dc\uac04 \u00f7 \uc644\ub8cc \uac74\uc218<\/strong><\/p>\n\n\n<p>\ub098\ub217\uc148\ub9cc\ud07c \uc911\uc694\ud55c \uac83\uc774 \u2018\uc2dc\uac04\u2019\uc758 \uc815\uc758\uc785\ub2c8\ub2e4. \ubd80\ud488 \uad50\uccb4\uc5d0\ub294 40\ubd84\uc774 \uac78\ub824\ub3c4 \uc124\ube44\ub294 \uc138 \uc2dc\uac04 \ub3d9\uc548 \uc0ac\uc6a9\ud560 \uc218 \uc5c6\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc720\uc6a9\ud55c \ubcf4\uace0\uc11c\ub294 \uc774 \ucc28\uc774\ub97c \uba85\ud655\ud788 \ubcf4\uc5ec\uc90d\ub2c8\ub2e4. \uadf8\ub798\uc57c \ubcf4\uc804 \ubd80\uc11c\ub294 \uac1c\uc120\uc774 \ud544\uc694\ud55c \ub2e8\uacc4\ub97c \ucc3e\uc544\ub0b4\uace0, \uc0dd\uc0b0 \ubd80\uc11c\ub294 \uc2e4\uc81c\ub85c \uac00\uc6a9\ud55c \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ubc14\ud0d5\uc73c\ub85c \uacc4\ud68d\uc744 \uc138\uc6b8 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>MTTR\uc740 \uacfc\uac70\uc758 \uace0\uc7a5\uc744 \uc774\ud574\ud558\ub294 \ub370 \ub3c4\uc6c0\uc774 \ub429\ub2c8\ub2e4. \ud558\uc9c0\ub9cc \ud604\uc7ac \ubc1c\uc0dd\ud55c \uace0\uc7a5\uc774 \uc5b8\uc81c \ud574\uacb0\ub420\uc9c0\ub294 \uc54c\ub824\uc8fc\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4. \ud604\uc7ac \uace0\uc7a5\uc758 \uac00\ub3d9 \uc7ac\uac1c \uc608\uc0c1 \uc2dc\uc810\uc740 \ubcf4\uc804 \ubd80\uc11c\uc758 \ucd5c\uc2e0 \ud310\ub2e8\uc744 \ubc14\ud0d5\uc73c\ub85c \uc815\ud574\uc57c \ud558\uba70, \uc608\uc0c1\uc774 \ub2ec\ub77c\uc9c0\uba74 \uc0dd\uc0b0 \uc77c\uc815\uc5d0\ub3c4 \ubc18\uc601\ud574\uc57c \ud569\ub2c8\ub2e4. SkyPlanner\ub294 \ubcc0\uacbd\ub41c \uc124\ube44 \uac00\uc6a9 \uc2dc\uac04\uc744 \uacf5\uc720 \uc77c\uc815\uc5d0 \ubc18\uc601\ud569\ub2c8\ub2e4. \ub530\ub77c\uc11c \uc5f0\uacb0\ub41c \ubaa8\ub4e0 \uc791\uc5c5 \ub300\uae30\uc5f4\uc744 \uc77c\uc77c\uc774 \ub2e4\uc2dc \uc9dc\uc9c0 \uc54a\uace0\ub3c4 \uace0\uac1d \uc8fc\ubb38\uc5d0 \ubbf8\uce58\ub294 \uc601\ud5a5\uc744 \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uba3c\uc800 MTTR\ub85c \uce21\uc815\ud560 \uc2dc\uac04 \uad6c\uac04\uc744 \uc815\ud558\uc138\uc694<\/h2>\n\n\n<p>MTTR\uc740 \ud3c9\uade0 \uc218\ub9ac \uc2dc\uac04\uc774\ub098 \ud3c9\uade0 \ud68c\ubcf5 \uc2dc\uac04, \ud3c9\uade0 \ubcf5\uad6c \uc2dc\uac04\uc744 \ub73b\ud558\ub294 \ub370 \uc4f0\uc774\uc9c0\ub9cc, \uc774 \uba85\uce6d\ub4e4\uc774 \ud56d\uc0c1 \uac19\uc740 \uc2dc\uac04 \uad6c\uac04\uc744 \uac00\ub9ac\ud0a4\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4. IEC\uc758 \uc2e0\ub8b0\uc131 \uc6a9\uc5b4\uc5d0\uc11c\ub294 MTTR\uc744 <strong>\ud3c9\uade0 \ubcf5\uad6c \uc2dc\uac04(mean time to restoration)<\/strong>\uc73c\ub85c \uc815\uc758\ud569\ub2c8\ub2e4. \uc2e4\uc81c \uc218\ub9ac \uc791\uc5c5 \uc2dc\uac04\ub9cc \uc9d1\uacc4\ud558\ub294 \ubcf4\uace0\uc11c\ub294 \uae30\uc220\uc790\ub098 \uc608\ube44 \ubd80\ud488\uc744 \uae30\ub2e4\ub9ac\ub294 \uc2dc\uac04\uae4c\uc9c0 \ud3ec\ud568\ud558\ub294 \ubcf4\uace0\uc11c\ubcf4\ub2e4 \ub354 \uc881\uc740 \ubc94\uc704\ub97c \ub2e4\ub8f9\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774 \uac00\uc774\ub4dc\uc758 \uc81c\uc870 \ud604\uc7a5 \ubcf4\uace0\uc11c \uacc4\uc0b0 \uc608\uc81c\uc5d0\uc11c <strong>MTTR\uc740 \uc124\ube44 \uace0\uc7a5 \ubc1c\uc0dd\ubd80\ud130 \uc0dd\uc0b0\uc5d0 \uc0ac\uc6a9\ud560 \uc218 \uc788\ub294 \uc0c1\ud0dc\uc784\uc774 \ud655\uc778\ub420 \ub54c\uae4c\uc9c0\uc758 \uacbd\uacfc \uc2dc\uac04<\/strong>\uc744 \uce21\uc815\ud569\ub2c8\ub2e4. \uc124\ube44\ub97c \ub2e4\uc2dc \uc0ac\uc6a9\ud560 \uc218 \uc788\uc744 \ub54c\uae4c\uc9c0 \ub300\uc751 \uc9c0\uc5f0, \uc9c4\ub2e8, \ub300\uae30, \uc218\ub9ac, \uc2dc\ud5d8, \ud544\uc694\ud55c \uac00\ub3d9 \uc2b9\uc778\uc5d0 \uac78\ub9ac\ub294 \uc2dc\uac04\uc744 \ubaa8\ub450 \ud3ec\ud568\ud569\ub2c8\ub2e4. \uc2e4\uc81c \uc218\ub9ac \uc791\uc5c5 \uc2dc\uac04\uc740 \ubcc4\ub3c4\ub85c \uae30\ub85d\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\ubcf4\uace0\uc11c \uc0c1\ub2e8\uc5d0 \uc774 \uae30\uc900\uc744 \uce21\uc815 \ub300\uc0c1 \uc124\ube44\uc758 \ubc94\uc704 \ubc0f \ubcf4\uace0 \uae30\uac04\uacfc \ud568\uaed8 \uba85\uc2dc\ud558\uc138\uc694. \ud68c\uc0ac\ub098 \uacc4\uc57d, \ubcf4\uace0 \ud45c\uc900\uc5d0\uc11c \ub2e4\ub978 \uc2dc\uac04 \uad6c\uac04\uc744 \uc815\ud558\uace0 \uc788\ub2e4\uba74 \uadf8 \uc815\uc758\ub97c \ub530\ub974\uace0 \uba85\ud655\ud558\uac8c \ud45c\uc2dc\ud558\uc138\uc694. \uce21\uc815 \ubc94\uc704\uac00 \uc77c\uce58\ud558\uae30 \uc804\uc5d0\ub294 \uadf8 \uc218\uce58\ub97c \uc774 \uc608\uc81c\uc758 \uc218\uce58\uc640 \ube44\uad50\ud558\uc9c0 \ub9c8\uc138\uc694.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uc138 \uc2dc\uac04 \uc815\uc9c0\ud574\ub3c4 \uc2e4\uc81c \uc218\ub9ac \uc791\uc5c5 \uc2dc\uac04\uc740 \ud6e8\uc52c \uc9e7\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4<\/h3>\n\n\n<p>\uba38\uc2dc\ub2dd\uc13c\ud130\uac00 08:00\uc5d0 \uace0\uc7a5 \ub098\uace0 11:00\uc5d0 \uc0dd\uc0b0\uc5d0 \uc0ac\uc6a9\ud560 \uc218 \uc788\ub3c4\ub85d \uac00\ub3d9 \uc2b9\uc778\uc744 \ubc1b\uc740 \uc0c1\ud669\uc744 \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \uc774 \uace0\uc7a5 \uac74\uc758 \uae30\ub85d\uc740 \ub2e4\uc74c \ub2e8\uacc4\ub85c \ub098\ub269\ub2c8\ub2e4.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\ub2e8\uacc4<\/th><th>\uc2dc\uac04\ub300<\/th><th>\uc18c\uc694 \uc2dc\uac04<\/th><\/tr><\/thead><tbody><tr><td>\ubcf4\uc804 \ub300\uc751 \ub300\uae30<\/td><td>08:00\u201308:30<\/td><td>30\ubd84<\/td><\/tr><tr><td>\uc9c4\ub2e8<\/td><td>08:30\u201308:50<\/td><td>20\ubd84<\/td><\/tr><tr><td>\ud544\uc694 \ubd80\ud488 \ub300\uae30<\/td><td>08:50\u201309:50<\/td><td>60\ubd84<\/td><\/tr><tr><td>\uc124\ube44 \uc218\ub9ac \uc791\uc5c5<\/td><td>09:50\u201310:30<\/td><td>40\ubd84<\/td><\/tr><tr><td>\uae30\ub2a5 \uc2dc\ud5d8<\/td><td>10:30\u201310:40<\/td><td>10\ubd84<\/td><\/tr><tr><td>\uc0dd\uc0b0 \uc7ac\uac1c \uc2b9\uc778\uc5d0 \ud544\uc694\ud55c \uc810\uac80<\/td><td>10:40\u201311:00<\/td><td>20\ubd84<\/td><\/tr><tr><td>\ubcf5\uad6c\uae4c\uc9c0\uc758 \ucd1d \uacbd\uacfc \uc2dc\uac04<\/td><td>08:00\u201311:00<\/td><td>180\ubd84<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\uc774 \uc608\uc81c\uc5d0\uc11c \ubcc4\ub3c4\ub85c \uce21\uc815\ud558\ub294 \uc2e4\uc81c \uc218\ub9ac \uc791\uc5c5 \uc2dc\uac04\uc740 \uc9c4\ub2e8, \uc124\ube44 \uc218\ub9ac \uc791\uc5c5, \uae30\ub2a5 \uc2dc\ud5d8\uc744 \ud3ec\ud568\ud558\ubbc0\ub85c <strong>20 + 40 + 10 = 70\ubd84<\/strong>\uc785\ub2c8\ub2e4. \ubcf5\uad6c\uae4c\uc9c0\uc758 \uacbd\uacfc \uc2dc\uac04\uc740 <strong>180\ubd84<\/strong>\uc785\ub2c8\ub2e4. \uc5b4\ub290 \ucabd\ub3c4 \ud2c0\ub9b0 \uc218\uce58\uac00 \uc544\ub2d9\ub2c8\ub2e4. \uc11c\ub85c \ub2e4\ub978 \uc9c8\ubb38\uc5d0 \ub2f5\ud558\ub294 \uc218\uce58\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774 \ub458\uc744 \uad6c\ubd84\ud558\uba74 \uc5b4\ub514\ub97c \uac1c\uc120\ud574\uc57c \ud560\uc9c0 \uc54c \uc218 \uc788\uc2b5\ub2c8\ub2e4. 40\ubd84\uc774 \uac78\ub9ac\ub294 \ubd80\ud488 \uad50\uccb4 \uc791\uc5c5\uc744 \uac1c\uc120\ud574\ub3c4 \ubd80\ud488\uc744 \uae30\ub2e4\ub9ac\ub294 \ud55c \uc2dc\uac04\uc774 \uc5c6\uc5b4\uc9c0\uc9c0\ub294 \uc54a\uc2b5\ub2c8\ub2e4. \ubc18\ub300\ub85c \ubd80\ud488 \uc218\uae09\uc744 \uac1c\uc120\ud574\ub3c4 \uc9c4\ub2e8\uc758 \uc5b4\ub824\uc6c0\uc774 \ud574\uacb0\ub418\uc9c0\ub294 \uc54a\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774 \uc608\uc81c\uc5d0\uc11c\ub294 \uac01 \ub2e8\uacc4\uac00 \uc21c\uc11c\ub300\ub85c \uc9c4\ud589\ub418\uc9c0\ub9cc, \uc2e4\uc81c \uace0\uc7a5\uc5d0\uc11c\ub294 \uc77c\ubd80 \uc791\uc5c5\uc774 \uacb9\uce60 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uacbd\uacfc \uc2dc\uac04\uc740 \uc911\ubcf5\ud574\uc11c \uacc4\uc0b0\ud558\uc9c0 \ub9c8\uc138\uc694. \uae30\uc220\uc790 \ub450 \uba85\uc774 40\ubd84 \ub3d9\uc548 \ud568\uaed8 \uc791\uc5c5\ud588\ub2e4\uace0 \ud574\uc11c \uc815\uc9c0 \uc2dc\uac04\uc774 80\ubd84\uc774 \ub418\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4. \ud22c\uc785 \uacf5\uc218\ub294 \ubcf4\uc804 \ube44\uc6a9 \ubd84\uc11d\uc5d0 \uc720\uc6a9\ud560 \uc218 \uc788\uc9c0\ub9cc, \uc124\ube44\uc758 \uacbd\uacfc \uc2dc\uac04\uacfc \uac19\uc740 \uac12\uc73c\ub85c \ucde8\uae09\ud560 \uc218\ub294 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uace0\uc7a5\uacfc \ubb34\uad00\ud55c \uc190\uc2e4\uc740 \ud574\ub2f9 \uac74\uc5d0\uc11c \uc81c\uc678\ud558\uc138\uc694<\/h3>\n\n\n<p>\ud574\ub2f9 \uace0\uc7a5 \uac74\uc758 \uc885\ub8cc \uc2dc\uc810\uc740 \uc124\ube44\uac00 \ud569\uc758\ub41c \uac00\ub3d9 \uc7ac\uac1c \uc870\uac74\uc744 \ucda9\uc871\ud55c \ub54c\uc785\ub2c8\ub2e4. \ub098\uc911\uc5d0 \uc791\uc5c5\uc9c0\uc2dc\ub97c \ub9c8\uac10 \ucc98\ub9ac\ud55c \uc2dc\uc810\uc774 \uc544\ub2d9\ub2c8\ub2e4. 11:00\uc5d0 \uc124\ube44\ub97c \uc0ac\uc6a9\ud560 \uc218 \uc788\uac8c \ub418\uc5c8\uc9c0\ub9cc \ub2e4\uc74c \uc8fc\ubb38\uc5d0 \ud544\uc694\ud55c \uc790\uc7ac\uac00 \uc815\uc624\uae4c\uc9c0 \uc900\ube44\ub418\uc9c0 \uc54a\uc558\ub2e4\uba74, \ucd94\uac00\ub41c \ud55c \uc2dc\uac04\uc740 \ubcf5\uad6c \uc2dc\uac04\uc774 \uc544\ub2c8\ub77c \uc790\uc7ac \uc9c0\uc5f0 \uc2dc\uac04\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>\ub9c8\ucc2c\uac00\uc9c0\ub85c \uacc4\ud68d\ub41c \uc815\ube44, \ud1b5\uc0c1\uc801\uc778 \uc791\uc5c5 \uc804\ud658, \uc791\uc5c5\uc790 \ub300\uae30\ub97c \ubaa8\ub450 \uace0\uc7a5 \uc218\ub9ac\ub85c \ubcfc \uc218\ub294 \uc5c6\uc2b5\ub2c8\ub2e4. \ubaa8\ub4e0 \uc815\uc9c0 \uc2dc\uac04\uc744 MTTR\uc5d0 \ub123\uc9c0 \ub9d0\uace0, \uac01 \uc190\uc2e4\uc744 \uc801\uc808\ud55c \ud56d\ubaa9\uc5d0 \uae30\ub85d\ud558\uc138\uc694. \uc774 \ubcf4\uace0\uc11c\uac00 \uce21\uc815\ud558\ub294 \uac83\uc740 \uc815\ud574\uc9c4 \uc124\ube44 \uace0\uc7a5 \uc774\ud6c4\uc758 \ubcf5\uad6c \uc2dc\uac04\uc774\uc9c0 \uacf5\uc7a5 \ub0b4 \ubaa8\ub4e0 \uc815\uc9c0 \uc2dc\uac04\uc774 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\ube44\uad50 \uac00\ub2a5\ud55c \ubcf5\uad6c \uc644\ub8cc \uac74\uc744 \uc120\uc815\ud558\uc138\uc694<\/h2>\n\n\n<p>\uc124\ube44 \ud55c \ub300\ubd80\ud130 \uc2dc\uc791\ud558\uac70\ub098, \uc124\ube44\uc640 \uace0\uc7a5 \uc720\ud615\uc774 \uc2e4\uc81c\ub85c \ube44\uad50 \uac00\ub2a5\ud55c \uadf8\ub8f9\uc744 \uc120\uc815\ud558\uc138\uc694. \uc18c\ud615 \uc13c\uc11c \uad50\uccb4\uc640 \ub300\uaddc\ubaa8 \ubd84\ud574 \uc815\ube44 \ubaa8\ub450 \uc720\ud6a8\ud55c \uc9d1\uacc4 \ub300\uc0c1\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ud558\uc9c0\ub9cc \uc5b4\ub5a4 \uac74\ub4e4\uc774 \uc11e\uc5ec \uc788\ub294\uc9c0 \ubcf4\uc5ec\uc8fc\uc9c0 \uc54a\uace0 \ud3c9\uade0\ub9cc \ub0b4\uba74 \ud574\uacb0\ud574\uc57c \ud560 \ubb38\uc81c\uac00 \uac00\ub824\uc9c8 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc6d4\uac04 \ubcf4\uace0\uc11c\uc5d0 \uc801\uc6a9\ud560 \uc218 \uc788\ub294 \ud55c \uac00\uc9c0 \uae30\uc900\uc740 <strong>\ud574\ub2f9 \uc6d4\uc5d0 \ubcf5\uad6c\uac00 \uc644\ub8cc\ub41c \uac74<\/strong>\uc744 \uc9d1\uacc4\ud558\ub294 \uac83\uc785\ub2c8\ub2e4. \uc774\uc804 \ub2ec\uc5d0 \uc2dc\uc791\ub41c \uace0\uc7a5\uc774\ub77c\ub3c4 \uac01 \uac74\uc758 \uc804\uccb4 \uc18c\uc694 \uc2dc\uac04\uc744 \uc0ac\uc6a9\ud569\ub2c8\ub2e4. \ubd84\ubaa8\ub294 \uc774\ub807\uac8c \ubcf5\uad6c\uac00 \uc644\ub8cc\ub41c \uac74\uc218\uc785\ub2c8\ub2e4. \ud574\ub2f9 \uc6d4\uc5d0 \uc811\uc218\ub41c \ubaa8\ub4e0 \uace0\uc7a5 \uac74\uc218\ub098 \ubcf4\uc804 \uc791\uc5c5\uc9c0\uc2dc\uc758 \uc804\uccb4 \ud56d\ubaa9 \uc218\uac00 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p>\ub9e4\uc6d4 \uac19\uc740 \uae30\uc900\uc744 \uc801\uc6a9\ud558\uace0 \uadfc\uac70 \uae30\ub85d\uc744 \ubcf4\uad00\ud558\uc138\uc694. \ud2b9\ud788 \ub2e4\uc74c \uc0ac\ud56d\uc744 \uc9c0\ucf1c\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>\uc544\uc9c1 \ud574\uacb0\ub418\uc9c0 \uc54a\uc740 \ud558\ub098\uc758 \uace0\uc7a5\uc5d0\ub294 \ud558\ub098\uc758 \uc2dd\ubcc4\uc790\ub97c \uc0ac\uc6a9\ud558\uc138\uc694.<\/strong> \uc54c\ub78c\uc774\ub098 \ud22c\uc785 \uae30\uc220\uc790, \uc791\uc5c5\uc9c0\uc2dc \ub0b4 \uc791\uc5c5\uc774 \uc5ec\ub7ec \uac1c\ub77c\uace0 \ud574\uc11c \ubcf5\uad6c \uac74\uc218\ub3c4 \uc5ec\ub7ec \uac74\uc778 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4.<\/li><li><strong>\ubbf8\uc644\ub8cc \uac74\ub3c4 \uacc4\uc18d \ud655\uc778\ud560 \uc218 \uc788\uac8c \ud45c\uc2dc\ud558\uc138\uc694.<\/strong> \uc6d4\ub9d0\uc5d0\ub3c4 \uc218\ub9ac\uac00 \uc9c4\ud589 \uc911\uc778 \uac74\uc740 \ucd5c\uc885 \ubcf5\uad6c \uc18c\uc694 \uc2dc\uac04\uc774 \uc544\uc9c1 \uc815\ud574\uc9c0\uc9c0 \uc54a\uc558\uc2b5\ub2c8\ub2e4. \ud604\uc7ac\uae4c\uc9c0\uc758 \uacbd\uacfc \uc2dc\uac04\uacfc \uc0c1\ud0dc\ub97c \ubcc4\ub3c4\ub85c \ud45c\uc2dc\ud558\uace0, \uc218\ub9ac \uc2dc\uac04\uc774 0\uc2dc\uac04\uc778 \uc644\ub8cc \uac74\uc73c\ub85c \ucc98\ub9ac\ud558\uc9c0 \ub9c8\uc138\uc694.<\/li><li><strong>\uae30\ub85d\ub41c \uc2dc\uac01\uc744 \ud655\uc778\ud558\uc138\uc694.<\/strong> \ud589\uc815\uc0c1 \uc785\ub825 \uc2dc\uac01\uc774 \ubc18\ub4dc\uc2dc \uace0\uc7a5 \ubc1c\uc0dd, \ub300\uc751 \ub610\ub294 \ubcf5\uad6c \uc2dc\uac01\uacfc \uc77c\uce58\ud558\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4. \uace0\uc7a5 \ubc1c\uc0dd \uc2dc\uac01\uc744 \ubaa8\ub978\ub2e4\uba74 \uadf8\ubcf4\ub2e4 \uc774\ub978 \uc2dc\uac01\uc744 \uc784\uc758\ub85c \ub9cc\ub4e4\uc5b4 \ub123\uc9c0 \ub9d0\uace0, \uc2e4\uc81c\ub85c \ud655\ubcf4\ud55c \uace0\uc7a5 \uac10\uc9c0 \uc2dc\uac01\uc784\uc744 \uba85\uc2dc\ud558\uc138\uc694.<\/li><li><strong>\uc81c\uc678 \ub0b4\uc5ed\uc744 \uba85\ud655\ud788 \ubc1d\ud788\uc138\uc694.<\/strong> \uc2dc\uac01 \uc815\ubcf4 \ub204\ub77d, \uae30\ub85d \ucde8\uc18c, \uacc4\uc0b0\uc5d0\uc11c \uc81c\uc678\ud55c \uace0\uc7a5 \uc720\ud615\uc774 \uc788\ub2e4\uba74 \uc124\uba85\ud558\uc138\uc694. \ud3c9\uade0\uc774 \ub098\ube60 \ubcf4\uc778\ub2e4\ub294 \uc774\uc720\ub9cc\uc73c\ub85c \uc9d1\uacc4 \uae30\uc900\uc5d0 \ub9de\ub294 \uc7a5\uc2dc\uac04 \uc218\ub9ac \uac74\uc744 \ube7c\uc11c\ub294 \uc548 \ub429\ub2c8\ub2e4.<\/li><\/ul>\n\n\n<p>\uc7a5\uae30 \uace0\uc7a5\uc774 \uc544\uc9c1 \ubcf5\uad6c\ub418\uc9c0 \uc54a\uc740 \uc0c1\ud0dc\uc5d0\uc11c\ub294 \uc644\ub8cc \uac74\ub9cc \uc9d1\uacc4\ud55c \ubcf4\uace0\uc11c\uc758 \uc218\uce58\uac00 \uc720\ub09c\ud788 \uc88b\uc544 \ubcf4\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ub530\ub77c\uc11c \ud3c9\uade0\uacfc \ud568\uaed8 \ubbf8\uc644\ub8cc \uac74 \ubaa9\ub85d\ub3c4 \uc81c\uc2dc\ud574\uc57c \ud569\ub2c8\ub2e4. \ub300\uc2e0 \ud574\ub2f9 \uae30\uac04\uc5d0 \ubc1c\uc0dd\ud55c \uace0\uc7a5\ub4e4\uc744 \uc9d1\uacc4 \ub300\uc0c1\uc73c\ub85c \uc0bc\ub294\ub2e4\uba74, \uadf8 \uace0\uc7a5\ub4e4\uc774 \ubcf5\uad6c\ub420 \ub54c\uae4c\uc9c0 \ucd94\uc801\ud558\uace0 \ubbf8\uc644\ub8cc \uac74\uc744 \uc5b4\ub5bb\uac8c \ucc98\ub9ac\ud558\ub294\uc9c0 \uc124\uba85\ud558\uc138\uc694. \uc124\uba85 \uc5c6\uc774 \ub450 \ubc29\uc2dd\uc744 \ubc14\uafb8\uc5b4 \uc801\uc6a9\ud558\uc9c0 \ub9c8\uc138\uc694.<\/p>\n\n\n<h2 class=\"wp-block-heading\">MTTR \uacc4\uc0b0 \uc608\uc81c<\/h2>\n\n\n<p>\ubcf4\uace0 \ub300\uc0c1 \uc6d4\uc5d0 \uac19\uc740 \uc124\ube44\uc5d0\uc11c \ub124 \uac74\uc758 \ubcf5\uad6c\uac00 \uc644\ub8cc\ub418\uc5c8\ub2e4\uace0 \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \uac01 \uac74\uc5d0\ub294 \uc55e\uc11c \uc815\ud55c \uacbd\uacfc \uc2dc\uac04 \uae30\uc900\uc744 \uc801\uc6a9\ud569\ub2c8\ub2e4. \uc2e4\uc81c \uc218\ub9ac \uc791\uc5c5 \uc2dc\uac04 \uc5f4\uc740 \ub450 \uc2dc\uac04\uc758 \ucc28\uc774\ub97c \uc124\uba85\ud558\uae30 \uc704\ud55c \uac83\uc774\uba70, \uacbd\uacfc \uc2dc\uac04\uc5d0 \ub354\ud558\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\ubcf5\uad6c \uc644\ub8cc \uac74<\/th><th>\uace0\uc7a5 \ubc1c\uc0dd\ubd80\ud130 \uc0dd\uc0b0 \uac00\ub2a5 \uc0c1\ud0dc\uae4c\uc9c0\uc758 \uacbd\uacfc \uc2dc\uac04<\/th><th>\uc2e4\uc81c \uc218\ub9ac \uc791\uc5c5 \uc2dc\uac04<\/th><\/tr><\/thead><tbody><tr><td>A<\/td><td>90\ubd84<\/td><td>60\ubd84<\/td><\/tr><tr><td>B: \uc55e\uc11c \uc0b4\ud3b4\ubcf8 08:00\u201311:00 \uc608\uc81c<\/td><td>180\ubd84<\/td><td>70\ubd84<\/td><\/tr><tr><td>C<\/td><td>150\ubd84<\/td><td>110\ubd84<\/td><\/tr><tr><td>D<\/td><td>420\ubd84<\/td><td>240\ubd84<\/td><\/tr><tr><td>\ud569\uacc4<\/td><td>840\ubd84<\/td><td>480\ubd84<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\uc774 \ubcf4\uace0\uc11c\uc758 \uc8fc \uc9c0\ud45c\ub294 \ub2e4\uc74c\uacfc \uac19\uc774 \uacc4\uc0b0\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>\ubcf5\uad6c \uacbd\uacfc \uc2dc\uac04 \uae30\uc900 MTTR = 840\ubd84 \u00f7 4\uac74 = 210\ubd84, \uc989 3.5\uc2dc\uac04\uc785\ub2c8\ub2e4.<\/strong><\/p>\n\n\n<p>\ubcc4\ub3c4\ub85c \uc9d1\uacc4\ud55c \uc2e4\uc81c \uc218\ub9ac \uc791\uc5c5 \uc2dc\uac04\uc758 \ud3c9\uade0\uc740 \ub2e4\uc74c\uacfc \uac19\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>480\ubd84 \u00f7 4\uac74 = 120\ubd84, \uc989 2\uc2dc\uac04\uc785\ub2c8\ub2e4.<\/strong><\/p>\n\n\n<p>\uc2e4\uc81c \uc218\ub9ac \uc791\uc5c5 \uc2dc\uac04\ub9cc \uc9d1\uacc4\ud55c \uac12\uc784\uc744 \uba85\uc2dc\ud558\uc9c0 \uc54a\uace0 \u201cMTTR: 2\uc2dc\uac04\u201d\uc73c\ub85c \ubcf4\uace0\ud558\uba74, \uc774 \uc608\uc2dc\uc5d0\uc11c \uce21\uc815\ud55c \ubcf5\uad6c \uacbd\uacfc \uc2dc\uac04\uc744 \uc2e4\uc81c\ubcf4\ub2e4 \uc9e7\uac8c \uc804\ub2ec\ud558\uac8c \ub429\ub2c8\ub2e4. \ubc18\ub300\ub85c \uc815\uc758 \uc5c6\uc774 3.5\uc2dc\uac04\uc774\ub77c\uace0\ub9cc \ubcf4\uace0\ud558\uba74, \uc77d\ub294 \uc0ac\ub78c\uc740 \uc5b4\ub5a4 \uc2dc\uac04\uc744 \ud3ec\ud568\ud588\ub294\uc9c0 \uc54c \uc218 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc2dc\uac04\uc744 \ud569\uc0b0\ud558\uae30 \uc804\uc5d0 \ub2e8\uc704\ub97c \ud1b5\uc77c\ud558\uc138\uc694. \uad6c\uc2ed \ubd84\uc740 0.90\uc2dc\uac04\uc774 \uc544\ub2c8\ub77c 1.5\uc2dc\uac04\uc785\ub2c8\ub2e4. \uc9d1\uacc4 \uc870\uac74\uc5d0 \ub9de\ub294 \ubcf5\uad6c \uc644\ub8cc \uac74\uc774 \uc5c6\ub2e4\uba74 \ud574\ub2f9 \uc9d1\uacc4 \ub300\uc0c1\uc758 \uad00\uce21 \ud3c9\uade0\ub3c4 \uc5c6\uc2b5\ub2c8\ub2e4. \uc774\ub54c\ub294 \ubd84 \ub2e8\uc704 MTTR\uc744 \uc601\uc73c\ub85c \ud45c\uc2dc\ud558\uc9c0 \ub9d0\uace0, \uc644\ub8cc \uac74\uc218\ub294 \uc5c6\uace0 \ud3c9\uade0\uc740 \uc0b0\ucd9c \ubd88\uac00\ud558\ub2e4\uace0 \ubcf4\uace0\ud558\uc138\uc694.<\/p>\n\n\n<p>\uc5ec\ub7ec \uc124\ube44\ub97c \ubb36\uc5b4 \uc0b0\ucd9c\ud560 \ub54c\ub294 \uc9d1\uacc4 \ub300\uc0c1\uc778 \uac01 \uac74\uc758 \uc18c\uc694 \uc2dc\uac04\uc744 \ubaa8\ub450 \ub354\ud55c \ub4a4 \uc804\uccb4 \uac74\uc218\ub85c \ub098\ub204\uc138\uc694. \uc124\ube44\ub9c8\ub2e4 \uc218\ub9ac \uac74\uc218\uac00 \ub2e4\ub974\ub2e4\uba74 \uc124\ube44\ubcc4 \ud3c9\uade0\uc744 \ub2e8\uc21c \ud3c9\uade0\ud574\uc11c\ub294 \uc548 \ub429\ub2c8\ub2e4. \uc804\uccb4 \uc218\uce58\uc5d0 \ud2b9\uc815 \uc124\ube44\ub098 \uace0\uc7a5 \uc720\ud615\uc758 \uc2ec\uac01\ud55c \ubb38\uc81c\uac00 \uac00\ub824\uc9c0\uc9c0 \uc54a\ub3c4\ub85d \uc124\ube44\ubcc4\u00b7\uace0\uc7a5 \uc720\ud615\ubcc4 \ub0b4\uc5ed\ub3c4 \ud655\uc778\ud560 \uc218 \uc788\uac8c \uc720\uc9c0\ud558\uc138\uc694.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc5b4\ub290 \uc815\ub3c4\uc758 MTTR\uc774 \uc801\uc808\ud560\uae4c\uc694?<\/h2>\n\n\n<p>\uc88b\uc740 \uc131\uacfc\ub780 \ud544\uc694\ud55c \ubcf5\uad6c \uacb0\uacfc\ub97c \ud6fc\uc190\ud558\uc9c0 \uc54a\uc73c\uba74\uc11c, \uc758\ubbf8 \uc788\ub294 \ubc94\uc704\ub97c \uc77c\uad00\ub418\uac8c \uce21\uc815\ud558\uace0 \uadf8 \ubcf5\uad6c \uacfc\uc815\uc744 \uac1c\uc120\ud558\ub294 \uac83\uc785\ub2c8\ub2e4. \ubaa8\ub4e0 \uc0dd\uc0b0 \uc124\ube44\uc640 \uace0\uc7a5 \uc720\ud615\uc5d0 \uacf5\ud1b5\uc73c\ub85c \uc801\uc6a9\ud560 \uc218 \uc788\ub294 \ub2e8\uc77c \ubaa9\ud45c \uc2dc\uac04\uc740 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ube44\uc2b7\ud55c \uc870\uac74\uc5d0\uc11c \ud574\ub2f9 \uc124\ube44\uc758 \uae30\uc874 \uae30\uc900\uac12\uacfc \ube44\uad50\ud558\uc138\uc694. \ud3c9\uade0\uc774 \ub0ae\uc544\uc9c4 \uc774\uc720\ub97c \uc218\ub9ac \uc131\uacfc\uc758 \uac1c\uc120\uc73c\ub85c \ud310\ub2e8\ud558\uae30 \uc804\uc5d0, \ubc1c\uc0dd\ud55c \uace0\uc7a5\uc758 \uc720\ud615\ubcc4 \uad6c\uc131, \uad50\ub300\uc870\ubcc4 \ub300\uc751 \uc778\ub825, \ubcf4\uc804 \ubc29\uc2dd \ub610\ub294 \ubcf4\uace0 \uae30\uc900\uc774 \ub2ec\ub77c\uc84c\ub294\uc9c0 \ud655\uc778\ud574\uc57c \ud569\ub2c8\ub2e4. \ud300\uc774 \ub611\uac19\uc774 \uc798 \ub300\uc751\ud588\ub354\ub77c\ub3c4 \ub2e8\uc21c \uace0\uc7a5\uc774 \uc5ec\ub7ec \uac74 \ubc1c\uc0dd\ud55c \ub2ec\uc740 \ubcf5\uc7a1\ud55c \uace0\uc7a5 \ud55c \uac74\uc774 \ubc1c\uc0dd\ud55c \ub2ec\ubcf4\ub2e4 \uc218\uce58\uac00 \uc88b\uc544 \ubcf4\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud3c9\uade0\uc740 \uac74\uc218, \ucd1d \uc190\uc2e4 \uc2dc\uac04, \uac74\ubcc4 \uc18c\uc694 \uc2dc\uac04, \uc9c0\uc5f0\uc774 \ubc1c\uc0dd\ud55c \ub2e8\uacc4\uc640 \ud568\uaed8 \uc0b4\ud3b4\ubcf4\uc138\uc694. \uc55e\uc11c \uc0b4\ud3b4\ubcf8 4\uac74\uc758 \uc608\uc2dc\uc5d0\uc11c \ubcf5\uad6c \uacbd\uacfc \uc2dc\uac04\uc744 \uc9e7\uc740 \uc21c\uc11c\ub85c \ub098\uc5f4\ud558\uba74 90\ubd84, 150\ubd84, 180\ubd84, 420\ubd84\uc785\ub2c8\ub2e4. \uc911\uc559\uac12\uc740 <strong>165\ubd84<\/strong>\uc774\uace0 \ud3c9\uade0\uc740 210\ubd84\uc785\ub2c8\ub2e4. \uac00\uc7a5 \uc624\ub798 \uac78\ub9b0 \ub9c8\uc9c0\ub9c9 \uac74\uc740 \uc870\uc0ac\ud560 \ub300\uc0c1\uc774\uc9c0, \ub450 \uc218\uce58\ub97c \ub9de\ucd94\uae30 \uc704\ud574 \uc81c\uc678\ud560 \ub300\uc0c1\uc774 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p>\ub610\ud55c MTTR\ub9cc\uc73c\ub85c\ub294 \uc124\ube44\uac00 \uc5bc\ub9c8\ub098 \uc790\uc8fc \uace0\uc7a5 \ub098\ub294\uc9c0 \uc54c \uc218 \uc5c6\uc2b5\ub2c8\ub2e4. <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mean-time-between-failures\/\">\ud3c9\uade0 \uace0\uc7a5 \uac04\uaca9<\/a>\uc778 MTBF\ub294 \uc218\ub9ac \uac00\ub2a5\ud55c \uc124\ube44\uc758 \uace0\uc7a5 1\uac74\ub2f9 \uac00\ub3d9 \uc2dc\uac04\uc744 \ub098\ud0c0\ub0c5\ub2c8\ub2e4. \uc9e7\uc740 \uace0\uc7a5\uc774 \uc790\uc8fc \ubc1c\uc0dd\ud558\ub294 \uacbd\uc6b0\uc640 \uae34 \uace0\uc7a5\uc774 \ub4dc\ubb3c\uac8c \ubc1c\uc0dd\ud558\ub294 \uacbd\uc6b0\ub294 \ucd1d \uc190\uc2e4 \uc2dc\uac04\uc774 \ube44\uc2b7\ud558\ub354\ub77c\ub3c4 \uc11c\ub85c \ub2e4\ub978 \uac1c\uc120 \ubc29\uc548\uc774 \ud544\uc694\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\ubb34\uc5c7\ubcf4\ub2e4 <strong>3.5\uc2dc\uac04\uc740 \ub2e4\uc74c \uc218\ub9ac\uc758 \uc644\ub8cc \uc2dc\ud55c\uc744 \ub73b\ud558\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4<\/strong>. \ud604\uc7ac \uace0\uc7a5\uc5d0\ub294 \ub2e4\ub978 \ubd80\ud488\uc774\ub098 \uc804\ubb38\uac00, \uac80\uc99d \uc808\ucc28\uac00 \ud544\uc694\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ube44\uad50 \uac00\ub2a5\ud55c \uacfc\uac70 \uc774\ub825\uc744 \ub17c\uc758\uc758 \ucc38\uace0 \uc790\ub8cc\ub85c \ud65c\uc6a9\ud558\ub418, \ubcf4\uc804 \ub2f4\ub2f9\uc790\uc5d0\uac8c \ud604\uc7ac \uc0c1\ud669\uc5d0 \ub300\ud55c \ud310\ub2e8\uacfc \ub2e4\uc74c \uc810\uac80 \uc2dc\uc810\uc744 \ud655\uc778\ud558\uc138\uc694.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc0dd\uc0b0 \uc7ac\uac1c\ub97c \uc2e4\uc81c\ub85c \uac00\ub85c\ub9c9\ub294 \uc9c0\uc5f0\uc744 \uc904\uc774\uc138\uc694<\/h2>\n\n\n<p>\uc870\uce58\ub97c \uc815\ud558\uae30 \uc804\uc5d0 \uc624\ub798 \uac78\ub9b0 \ubcf5\uad6c \uac74\uc744 \ub2e8\uacc4\ubcc4\ub85c \ub098\ub204\uc5b4 \uc0b4\ud3b4\ubcf4\uc138\uc694. \uac00\uc7a5 \ud6a8\uacfc\uc801\uc778 \uac1c\uc120\uc774 \ubc18\ub4dc\uc2dc \uc218\ub9ac \uc791\uc5c5 \uc790\uccb4\ub97c \ub354 \ube68\ub9ac \ub05d\ub0b4\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4. \uc791\uc5c5\uc744 \uc2dc\uc791\ud558\uae30 \uc804\uc758 \uc9c0\uc5f0\uc744 \uc5c6\uc560\ub294 \uac83\uc774 \ub354 \ud6a8\uacfc\uc801\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ucd08\uae30 \ub300\uc751\uc774 \ub2a6\ub2e4\uba74 \uace0\uc7a5 \uc815\ubcf4\uac00 \ub2f4\ub2f9\uc790\uc5d0\uac8c \uc5b4\ub5bb\uac8c \uc804\ub2ec\ub418\ub294\uc9c0, \uad50\ub300 \uc2dc \ucc45\uc784\uc774 \uc5b4\ub5bb\uac8c \uc778\uacc4\ub418\ub294\uc9c0 \uc810\uac80\ud558\uc138\uc694. \ub2e8\uc21c\ud788 \uc0dd\uc0b0\uc774 \uba48\ucdc4\ub2e4\ub294 \ubaa8\ud638\ud55c \uba54\uc2dc\uc9c0\ubcf4\ub2e4 \uc124\ube44 \uc2dd\ubcc4 \uc815\ubcf4, \uad00\ucc30\ub41c \uc99d\uc0c1, \uba85\ud655\ud55c \uc0c1\uc704 \ubcf4\uace0 \uacbd\ub85c\uac00 \uc788\uc5b4\uc57c \ubcf4\uc804 \ub2f4\ub2f9\uc790\uac00 \ub354 \ud6a8\uacfc\uc801\uc73c\ub85c \ub300\uc751\uc744 \uc2dc\uc791\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc9c4\ub2e8\uc5d0 \uac00\uc7a5 \ub9ce\uc740 \uc2dc\uac04\uc774 \uac78\ub9b0\ub2e4\uba74 \uad00\ub828 \uc124\ube44 \uc815\ubcf4\uc640 \uace0\uc7a5 \uc774\ub825, \uc804\ubb38\uac00\uc758 \uc9c0\uc2dd\uc744 \ub354 \uc27d\uac8c \ud65c\uc6a9\ud560 \uc218 \uc788\ub3c4\ub85d \ud558\uc138\uc694. \ubc18\ubcf5\ub418\ub294 \uace0\uc7a5\uc740 \ubcf4\uc804 \ubc0f \uc5d4\uc9c0\ub2c8\uc5b4\ub9c1 \ub2f4\ub2f9\uc790\uc640 \ud568\uaed8 \uac80\ud1a0\ud558\uc138\uc694. \uc124\ube44\ub97c \ubc18\ubcf5\ud574\uc11c \ub9ac\uc14b\ud558\uba74 \uae30\ub85d\uc0c1 \uac1c\ubcc4 \uc815\uc9c0 \uc2dc\uac04\uc740 \uc9e7\uc544\uc9c8 \uc218 \uc788\uc9c0\ub9cc \uc6d0\uc778\uc740 \ud574\uacb0\ub418\uc9c0 \uc54a\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ubd80\ud488 \ub300\uae30\uac00 \uac00\uc7a5 \ud070 \ube44\uc911\uc744 \ucc28\uc9c0\ud55c\ub2e4\uba74 \uc5b4\ub5a4 \ubd80\ud488\uc774 \ud544\uc694\ud588\ub294\uc9c0, \ud544\uc694\ud55c \ubd80\ud488\uc744 \uc5b4\ub5bb\uac8c \uc2dd\ubcc4\ud588\ub294\uc9c0, \uc65c \uc0ac\uc6a9\ud560 \uc218 \uc5c6\uc5c8\ub294\uc9c0 \uc870\uc0ac\ud558\uc138\uc694. \ubaa8\ub4e0 \ubd80\ud488\uc744 \uc7ac\uace0\ub85c \ubcf4\uc720\ud558\uae30\ubcf4\ub2e4 \ud575\uc2ec \uc608\ube44\ud488\uc758 \ud655\ubcf4\ub098 \uc2dd\ubcc4 \ubc29\uc2dd\uc744 \uc120\ubcc4\uc801\uc73c\ub85c \uac1c\uc120\ud558\ub294 \ud3b8\uc774 \ub354 \ud6a8\uacfc\uc801\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ubcf5\uad6c\uc5d0 3\uc2dc\uac04\uc774 \uac78\ub9b0 \uc608\uc2dc\uc5d0\uc11c 60\ubd84\uc758 \ubd80\ud488 \ub300\uae30\ub294 \ubd84\uba85 \uc870\uc0ac\ud560 \uc0ac\ud56d\uc774\uc9c0\ub9cc, \uadf8\uac83\ub9cc\uc73c\ub85c \ud2b9\uc815 \uc7ac\uace0 \uc815\ucc45\uc774 \ud0c0\ub2f9\ud558\ub2e4\uace0 \ub2e8\uc815\ud560 \uc218\ub294 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc2e4\uc81c \uc218\ub9ac \uc791\uc5c5\uc774 \uac00\uc7a5 \uc624\ub798 \uac78\ub9b0\ub2e4\uba74 \uc900\ube44 \uc0c1\ud0dc, \uc791\uc5c5 \ubd80\uc704\uc5d0 \ub300\ud55c \uc811\uadfc\uc131, \uacf5\uad6c, \uc9c0\uce68, \ud574\ub2f9 \uc791\uc5c5\uc5d0 \ud544\uc694\ud55c \uc219\ub828\ub3c4\ub97c \uc810\uac80\ud558\uc138\uc694. \uc2dc\ud5d8\uc774\ub098 \uac00\ub3d9 \uc2b9\uc778 \ub2e8\uacc4\uac00 \ubcd1\ubaa9 \uacf5\uc815\uc774\ub77c\uba74 \ud544\uc694\ud55c \uc778\ub825\uacfc \uc810\uac80\uc744 \uc81c\ub54c \uc900\ube44\ud560 \ubc29\ubc95\uc744 \ud611\uc758\ud558\uc138\uc694. \uac1c\uc120\uc758 \ubaa9\uc801\uc740 \uac00\ub3d9 \ubcf5\uadc0\ub97c \ub354 \ucca0\uc800\ud788 \uc900\ube44\ud558\ub294 \uac83\uc774\uc9c0, \uae30\ub85d \uc2dc\uac04\uc744 \uc904\uc774\ub824\uace0 \uac80\uc99d\uc744 \uc0dd\ub7b5\ud558\ub294 \uac83\uc774 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc120\ud0dd\ud55c \uc870\uce58\uc758 \ub2f4\ub2f9\uc790\ub97c \uc9c0\uc815\ud558\uace0 \uc774\ud6c4 \ubc1c\uc0dd\ud558\ub294 \uc720\uc0ac\ud55c \ubcf5\uad6c \uac74\uc744 \uac80\ud1a0\ud558\uc138\uc694. \ub2e8\uacc4\ubcc4 \uc18c\uc694 \uc2dc\uac04\uacfc \uc804\uccb4 \ubcf5\uad6c \uc2dc\uac04\uc744 \ubaa8\ub450 \ud655\uc778\ud560 \uc218 \uc788\uac8c \uc720\uc9c0\ud558\uc138\uc694. \uc218\ub9ac \ub2e8\uacc4\uac00 \uc9e7\uc544\uc838\ub3c4 \uadf8\ub9cc\ud07c \ub2e4\ub978 \ub300\uae30 \uc2dc\uac04\uc774 \ub298\uc5b4\ub098\uac70\ub098 \ubd88\uc644\uc804\ud55c \uc791\uc5c5\uc73c\ub85c \uace7 \ub2e4\uc2dc \uc815\uc9c0\uac00 \ubc1c\uc0dd\ud55c\ub2e4\uba74 \uc0dd\uc0b0 \uce21\uba74\uc758 \ud6a8\uacfc\ub294 \uc81c\ud55c\uc801\uc785\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc218\ub9ac \uc0c1\ud669\uc774 \ub2ec\ub77c\uc9c0\uba74 \uc0dd\uc0b0 \uacc4\ud68d\ub3c4 \ucd5c\uc2e0 \uc0c1\ud0dc\ub85c \uc720\uc9c0\ud558\uc138\uc694<\/h2>\n\n\n<p>\uc55e\uc73c\ub85c\uc758 \ubcf5\uad6c \uacfc\uc815\uc744 \uac1c\uc120\ud558\ub294 \uc77c\uacfc <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-rescheduling-after-machine-breakdown\/\">\ub2f9\uc7a5 \uace0\uac1d\uacfc\uc758 \ub0a9\uae30 \uc57d\uc18d\uc744 \uc9c0\ud0a4\ub294 \uc77c<\/a>\uc740 \ubcc4\uac1c\uc785\ub2c8\ub2e4. \ub2e4\uc74c\uc5d0 \ubb34\uc5c7\uc744 \uc0dd\uc0b0\ud560\uc9c0 \uacb0\uc815\ud558\uae30 \uc704\ud574 \uc6d4\ub9d0 \ud3c9\uade0\uc774 \ub098\uc62c \ub54c\uae4c\uc9c0 \uae30\ub2e4\ub9b4 \uc218\ub294 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ubcf4\uc804 \ub2f4\ub2f9\uc790\uac00 \ucc98\uc74c\uc5d0\ub294 \uba38\uc2dc\ub2dd\uc13c\ud130\uc758 \uac00\ub3d9 \ubcf5\uadc0 \uc2dc\uc810\uc744 11:00\ub85c \uc608\uc0c1\ud588\ub2e4\uace0 \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \uc774\ud6c4 \uc810\uac80 \uacb0\uacfc \uc608\uc0c1 \uc2dc\uc810\uc774 14:00\ub85c \ub2a6\ucdb0\uc84c\uc2b5\ub2c8\ub2e4. \uacfc\uac70 MTTR\uc740 \uadf8\ub300\ub85c\uc9c0\ub9cc, \ub300\uae30 \uc911\uc778 \uc624\ub354\uc5d0 \uc0ac\uc6a9\ud560 \uc218 \uc788\ub294 \uc0dd\uc0b0 \ub2a5\ub825\uc740 \ub2ec\ub77c\uc84c\uc2b5\ub2c8\ub2e4. \ud55c \uc624\ub354\ub294 \uac00\uacf5 \ud6c4 \uac80\uc0ac\uae4c\uc9c0 \ud544\uc694\ud558\uace0, \ub300\uccb4 \uba38\uc2dc\ub2dd\uc13c\ud130\uc5d0\ub294 \uc774\ubbf8 \ub2e4\ub978 \uace0\uac1d\uc758 \uc791\uc5c5\uc774 \uc7a1\ud600 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>SkyPlanner APS\ub294 \uc774\ub7ec\ud55c \uc0dd\uc0b0 \ub2a5\ub825\uc758 \ubcc0\ud654\ub97c <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-scheduling\/\">\uc11c\ub85c \uc5f0\uacc4\ub41c \uc0dd\uc0b0 \uc77c\uc815<\/a>\uc5d0 \ubc18\uc601\ud569\ub2c8\ub2e4.<\/strong> \ubcf4\uc804 \ub2f4\ub2f9\uc790\uac00 \uac80\ud1a0\ud55c \uac00\ub3d9 \ubd88\uac00 \uae30\uac04\uc744 \uc791\uc5c5\uc7a5 \uc608\uc678\ub85c \ub4f1\ub85d\ud558\uc138\uc694. \uc608\uc0c1 \ubcf5\uadc0 \uc2dc\uc810\uc774 \ubc14\ub00c\uba74 \ud574\ub2f9 \uc2dc\uac04 \ubc94\uc704\ub97c \uc218\uc815\ud558\uace0 \uc77c\uc815\uc744 \ub2e4\uc2dc \uacc4\uc0b0\ud558\uc138\uc694. SkyPlanner\uc758 \uc2a4\ucf00\uc904\ub9c1 \uc778\uacf5\uc9c0\ub2a5 Arcturus\ub294 \uc124\uc815\ub41c \uc790\uc6d0, \uacf5\uc815 \uac04 \uc120\ud6c4 \uad00\uacc4, \uc6b0\uc120\uc21c\uc704, \uc7a0\uae08 \uc870\uac74\uc744 \uc801\uc6a9\ud574, \uc601\ud5a5\uc744 \ubc1b\ub294 \uacf5\uc815 \uc911 \uc77c\uc815 \ud3b8\uc131\uc774 \uac00\ub2a5\ud55c \uacf5\uc815\uc744 \uae30\ub85d\ub41c \uc0dd\uc0b0 \ub2a5\ub825\uc5d0 \ub9de\ucdb0 \ubc30\uce58\ud569\ub2c8\ub2e4. \uadf8 \uacb0\uacfc\uc5d0 \ub530\ub978 \uc791\uc5c5 \uc21c\uc11c\ub294 \uac04\ud2b8 \ucc28\ud2b8\uc5d0\uc11c \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>14:00\uc5d0 \uc124\ube44\uac00 \ub2e4\uc2dc \uac00\ub3d9\ub41c\ub2e4\uba74 \ub300\uae30 \uc911\uc778 \uac00\uacf5 \uc791\uc5c5\uc744 \ub9c8\uce5c \ub4a4\uc5d0\ub3c4 \uac80\uc0ac\uc640 \ub0a9\ud488\uc5d0 \ucda9\ubd84\ud55c \uc2dc\uac04\uc774 \ub0a8\ub294\uc9c0 \uac80\ud1a0\ud558\uc138\uc694. \uc801\ud569\ud55c \ub300\uccb4 \uc124\ube44\uc5d0\uc11c \uacf5\uc815\uc744 \uc218\ud589\ud560 \uc218 \uc788\ub2e4\uba74 \uadf8 \uc790\uc6d0\uc5d0 \uc774\ubbf8 \ubc30\uc815\ub41c \ub0a9\uae30 \uc57d\uc18d\ub3c4 \ud568\uaed8 \ud655\uc778\ud558\uc138\uc694. \uc774\ubbf8 \uc2dc\uc791\ud55c \uc791\uc5c5\uc740 \ubcc4\ub3c4\ub85c \uc7ac\uc2dc\uc791 \uc5ec\ubd80\ub97c \ud310\ub2e8\ud574\uc57c \ud569\ub2c8\ub2e4. \ub300\uae30 \uc791\uc5c5\uc758 \uc77c\uc815\uc744 \ub2e4\uc2dc \uacc4\uc0b0\ud558\ub294 \uac83\ub9cc\uc73c\ub85c \uc911\ub2e8\ub41c \uc791\uc5c5\uc758 \uc0c1\ud0dc \ud655\uc778\uc744 \ub300\uc2e0\ud560 \uc218\ub294 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774\ub807\uac8c \ud558\uba74 \uc11c\ub85c \uc601\ud5a5\uc744 \uc8fc\ub294 \ub300\uae30 \uc791\uc5c5\uc758 \uc21c\uc11c\ub97c \uc218\uc791\uc5c5\uc73c\ub85c \ub2e4\uc2dc \uc9dc\ub294 \ubd80\ub2f4\uc774 \uc904\uace0, \ub0a9\uae30 \ud310\ub2e8\uc758 \uadfc\uac70\ub3c4 \ub354 \uba85\ud655\ud574\uc9d1\ub2c8\ub2e4. \ud604\uc7ac \ubcf5\uad6c \uc0c1\ud669\uc5d0 \ub300\ud55c \ud310\ub2e8\uc740 \ubcf4\uc804 \ub2f4\ub2f9\uc790\uac00 \ub9e1\uace0, \uc0dd\uc0b0 \uc6b0\uc120\uc21c\uc704\ub294 \uc0dd\uc0b0\uacc4\ud68d \ub2f4\ub2f9\uc790\uac00 \uacb0\uc815\ud569\ub2c8\ub2e4. \uc124\ube44\ubcc4 \uc791\uc5c5 \ubaa9\ub85d\uc744 \uc77c\uc77c\uc774 \uc218\uc815\ud560 \ud544\uc694 \uc5c6\uc774 Arcturus\uac00 \uc11c\ub85c \uc5f0\uacb0\ub41c \uc791\uc5c5 \uc804\ubc18\uc758 \uc77c\uc815\uc744 \uacc4\uc0b0\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc218\ub9ac \uac1c\uc120 \ud65c\ub3d9\uacfc \ud568\uaed8 SkyPlanner\ub97c \ud65c\uc6a9\ud560 \uc774\uc720\uac00 \uc5ec\uae30\uc5d0 \uc788\uc2b5\ub2c8\ub2e4. <strong>\uc124\ube44 \uac00\uc6a9 \uc2dc\uc810\uc5d0 \ub300\ud55c \uc608\uc0c1\uc774 \ubc14\ub00c\uba74, \uadf8 \uc601\ud5a5\uc744 \ubc1b\ub294 \uc624\ub354\uc640 \ud6c4\uc18d \uacf5\uc815\uc758 \uc77c\uc815\uc5d0\ub3c4 \ubc18\uc601\ub429\ub2c8\ub2e4<\/strong>. \ubd88\ud655\uc2e4\uc131\uc774 \ub0a8\uc544 \uc788\ub2e4\uba74 \ud574\ub2f9 \uc608\uc0c1\uc744 \ub2e4\uc2dc \uac80\ud1a0\ud560 \uc2dc\uc810\uc744 \uc815\ud558\uace0, \ub354 \uc815\ud655\ud55c \uc815\ubcf4\uac00 \ub4e4\uc5b4\uc62c \ub54c\ub9c8\ub2e4 \uc77c\uc815\uc744 \ucd5c\uc2e0 \uc0c1\ud0dc\ub85c \uc720\uc9c0\ud558\uc138\uc694.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uace0\uc7a5 \ud55c \uac74\uc758 \uc7a5\uae30\ud654\uac00 \ub0a9\uae30\uc5d0 \ubbf8\uce58\ub294 \uc601\ud5a5\uc744 \ud655\uc778\ud558\uc138\uc694<\/h2>\n\n\n<p>\uc720\uc6a9\ud55c MTTR \ubcf4\uace0\uc11c\ub294 \ubb34\uc5c7\uc744 \uce21\uc815\ud588\ub294\uc9c0, \uc5b4\ub5a4 \ubcf5\uad6c \uac74\uc73c\ub85c \ud3c9\uade0\uc744 \uc0b0\ucd9c\ud588\ub294\uc9c0, \uc5b4\ub514\uc11c\ubd80\ud130 \uac1c\uc120\ud574\uc57c \ud558\ub294\uc9c0\ub97c \ubcf4\uc5ec\uc90d\ub2c8\ub2e4. \uc720\uc6a9\ud55c \uc0dd\uc0b0 \uacc4\ud68d\uc740 \ud604\uc7ac \uc218\ub9ac\uac00 \uc9c4\ud589\ub418\ub294 \ub3d9\uc548 \ubb34\uc5c7\uc744 \ud574\uc57c \ud560\uc9c0 \uc54c\ub824\uc90d\ub2c8\ub2e4. \uc774 \ub450 \uac00\uc9c0 \ud310\ub2e8\uc744 \uc5f0\uacb0\ud574\uc57c \ucda9\uc2e4\ud55c \ubcf4\uc804 \ubd84\uc11d\uc774 \ubcc4\ub3c4\ub85c \uc9d1\uacc4\ud558\ub294 \uc6d4\ubcc4 \uc218\uce58\uc5d0 \uadf8\uce58\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>SkyPlanner\ub294 \uac1c\ubc29\ud615 REST API\ub97c \ud1b5\ud574 \uc5b4\ub5a4 ERP \ub610\ub294 MES\uc640\ub3c4 \uc5f0\ub3d9\ub418\ubbc0\ub85c, \uae30\uc874 \uc624\ub354 \ubc0f \uc0dd\uc0b0 \uc815\ubcf4\ub97c \ubc14\ud0d5\uc73c\ub85c \uc5f0\uacc4\ub41c \uc0dd\uc0b0 \uc77c\uc815\uc744 \uc218\ub9bd\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ucd5c\uadfc \ubc1c\uc0dd\ud55c \uace0\uc7a5 \ud55c \uac74\uacfc \uc218\uc815\ub41c \uac00\ub3d9 \ubcf5\uadc0 \uc608\uc0c1 \uc2dc\uc810, \ud574\ub2f9 \uc790\uc6d0\uc744 \uac70\uce58\ub294 \uace0\uac1d \uc624\ub354\ub97c \uc900\ube44\ud574 <a href=\"https:\/\/skyplanner.ai\/ko\/%ec%98%81%ec%97%85%ed%8c%80%ec%97%90-%eb%ac%b8%ec%9d%98\/\">SkyPlanner \ub370\ubaa8\ub97c \uc608\uc57d\ud558\uc138\uc694<\/a>. \ub300\uae30 \uc911\uc778 \uc5b4\ub5a4 \uacf5\uc815\uc758 \uc77c\uc815\uc774 \ubc14\ub00c\ub294\uc9c0, \ud6c4\uc18d \uacf5\uc815\uc5d0\ub294 \uc5b4\ub5a4 \uc601\ud5a5\uc774 \uc0dd\uae30\ub294\uc9c0, \uc5b4\ub5a4 \ub0a9\uae30 \uc57d\uc18d\uc744 \uc8fc\uc758 \uae4a\uac8c \uc0b4\ud3b4\ubd10\uc57c \ud558\ub294\uc9c0 \ud655\uc778\ud574 \ubcf4\uc138\uc694. \uba3c\uc800 \uc9c1\uc811 \uc0b4\ud3b4\ubcf4\uace0 \uc2f6\ub2e4\uba74 <a href=\"https:\/\/skyplanner.ai\/ko\/%ed%8f%89%ea%b0%80%ed%8c%90\/\">\ub370\ubaa8 \ub370\uc774\ud130\ub85c SkyPlanner\ub97c \uccb4\ud5d8\ud558\uace0<\/a> \uc0dd\uc0b0 \ub2a5\ub825\uc758 \ubcc0\ud654\uc5d0 \ub530\ub77c \uc77c\uc815\uc774 \uc5b4\ub5bb\uac8c \ub2ec\ub77c\uc9c0\ub294\uc9c0 \ud655\uc778\ud558\uc138\uc694.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\ud3c9\uade0 \uc218\ub9ac \uc2dc\uac04: MTTR \uacc4\uc0b0\uc73c\ub85c \uc190\uc2e4 \uc2dc\uac04 \uc904\uc774\uae30 \ud648 &raquo; \ub9ac\uc18c\uc2a4 &raquo; \ud3c9\uade0 \uc218\ub9ac \uc2dc\uac04: MTTR \uacc4\uc0b0\uc73c\ub85c \uc190\uc2e4 \uc2dc\uac04 \uc904\uc774\uae30 \ud3c9\uade0 \uc218\ub9ac \uc2dc\uac04(MTTR)\uc740 \uc124\ube44 \uace0\uc7a5 \ud6c4 \uc815\ud574\uc9c4 \uc218\ub9ac \ub610\ub294 \ubcf5\uad6c \uacfc\uc815\uc5d0 \uac78\ub9ac\ub294 \uc2dc\uac04\uc758 \ud3c9\uade0\uc785\ub2c8\ub2e4. \ube44\uad50 \uac00\ub2a5\ud55c \uc644\ub8cc \uac74\ub4e4\uc758 \uc18c\uc694 \uc2dc\uac04\uc744 \ubaa8\ub450 \ub354\ud55c \ub4a4, \ud574\ub2f9 \uac74\uc218\ub85c \ub098\ub204\uc5b4 \uacc4\uc0b0\ud569\ub2c8\ub2e4. MTTR = \ucd1d \uc218\ub9ac \ub610\ub294 \ubcf5\uad6c \uc2dc\uac04 \u00f7 &#8230; <a title=\"\ud3c9\uade0 \uc218\ub9ac \uc2dc\uac04: MTTR \uacc4\uc0b0\uc73c\ub85c \uc190\uc2e4 \uc2dc\uac04 \uc904\uc774\uae30\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mean-time-to-repair\/\" aria-label=\"Read more about \ud3c9\uade0 \uc218\ub9ac \uc2dc\uac04: MTTR \uacc4\uc0b0\uc73c\ub85c \uc190\uc2e4 \uc2dc\uac04 \uc904\uc774\uae30\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":108953,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2530,496],"tags":[],"class_list":["post-108949","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps--","category-496","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\ud3c9\uade0 \uc218\ub9ac \uc2dc\uac04: MTTR \uacc4\uc0b0\uc73c\ub85c \uc190\uc2e4 \uc2dc\uac04 \uc904\uc774\uae30<\/title>\n<meta name=\"description\" content=\"\uc758\ubbf8 \uc788\ub294 MTTR\uc744 \uacc4\uc0b0\ud558\uace0 \uc124\ube44 \ubcf5\uad6c \uc9c0\uc5f0 \uc6d0\uc778\uc744 \ud30c\uc545\ud558\uc138\uc694. \uc218\ub9ac\uac00 \uae38\uc5b4\uc838\ub3c4 \uc601\ud5a5\ubc1b\ub294 \uace0\uac1d \uc8fc\ubb38\uc758 \uc0dd\uc0b0\uc744 \uc774\uc5b4\uac00\ub294 \ubc29\ubc95\uc744 \uc54c\uc544\ubcf4\uc138\uc694.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mean-time-to-repair\/\" \/>\n<meta property=\"og:locale\" content=\"ko_KR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\ud3c9\uade0 \uc218\ub9ac \uc2dc\uac04: MTTR \uacc4\uc0b0\uc73c\ub85c \uc190\uc2e4 \uc2dc\uac04 \uc904\uc774\uae30\" \/>\n<meta property=\"og:description\" content=\"\uc758\ubbf8 \uc788\ub294 MTTR\uc744 \uacc4\uc0b0\ud558\uace0 \uc124\ube44 \ubcf5\uad6c \uc9c0\uc5f0 \uc6d0\uc778\uc744 \ud30c\uc545\ud558\uc138\uc694. \uc218\ub9ac\uac00 \uae38\uc5b4\uc838\ub3c4 \uc601\ud5a5\ubc1b\ub294 \uace0\uac1d \uc8fc\ubb38\uc758 \uc0dd\uc0b0\uc744 \uc774\uc5b4\uac00\ub294 \ubc29\ubc95\uc744 \uc54c\uc544\ubcf4\uc138\uc694.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mean-time-to-repair\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-24T16:49:56+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-24T16:52:14+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-to-repair-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\uae00\uc4f4\uc774\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/mean-time-to-repair\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/mean-time-to-repair\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"\ud3c9\uade0 \uc218\ub9ac \uc2dc\uac04: MTTR \uacc4\uc0b0\uc73c\ub85c \uc190\uc2e4 \uc2dc\uac04 \uc904\uc774\uae30\",\"datePublished\":\"2026-10-24T16:49:56+00:00\",\"dateModified\":\"2026-10-24T16:52:14+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/mean-time-to-repair\\\/\"},\"wordCount\":45,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/mean-time-to-repair\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/mean-time-to-repair-hero.png\",\"articleSection\":[\"APS \ubc0f \uc2a4\ucf00\uc904\ub9c1\",\"\ub9ac\uc18c\uc2a4\"],\"inLanguage\":\"ko-KR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/mean-time-to-repair\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/mean-time-to-repair\\\/\",\"name\":\"\ud3c9\uade0 \uc218\ub9ac \uc2dc\uac04: MTTR \uacc4\uc0b0\uc73c\ub85c \uc190\uc2e4 \uc2dc\uac04 \uc904\uc774\uae30\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/mean-time-to-repair\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/mean-time-to-repair\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/mean-time-to-repair-hero.png\",\"datePublished\":\"2026-10-24T16:49:56+00:00\",\"dateModified\":\"2026-10-24T16:52:14+00:00\",\"description\":\"\uc758\ubbf8 \uc788\ub294 MTTR\uc744 \uacc4\uc0b0\ud558\uace0 \uc124\ube44 \ubcf5\uad6c \uc9c0\uc5f0 \uc6d0\uc778\uc744 \ud30c\uc545\ud558\uc138\uc694. \uc218\ub9ac\uac00 \uae38\uc5b4\uc838\ub3c4 \uc601\ud5a5\ubc1b\ub294 \uace0\uac1d \uc8fc\ubb38\uc758 \uc0dd\uc0b0\uc744 \uc774\uc5b4\uac00\ub294 \ubc29\ubc95\uc744 \uc54c\uc544\ubcf4\uc138\uc694.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/mean-time-to-repair\\\/#breadcrumb\"},\"inLanguage\":\"ko-KR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/mean-time-to-repair\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/mean-time-to-repair\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/mean-time-to-repair-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/mean-time-to-repair-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Restoration stages from maintenance response and parts waiting through repair, testing and production release.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/mean-time-to-repair\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\ud3c9\uade0 \uc218\ub9ac \uc2dc\uac04: MTTR \uacc4\uc0b0\uc73c\ub85c \uc190\uc2e4 \uc2dc\uac04 \uc904\uc774\uae30\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ko-KR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\ud3c9\uade0 \uc218\ub9ac \uc2dc\uac04: MTTR \uacc4\uc0b0\uc73c\ub85c \uc190\uc2e4 \uc2dc\uac04 \uc904\uc774\uae30","description":"\uc758\ubbf8 \uc788\ub294 MTTR\uc744 \uacc4\uc0b0\ud558\uace0 \uc124\ube44 \ubcf5\uad6c \uc9c0\uc5f0 \uc6d0\uc778\uc744 \ud30c\uc545\ud558\uc138\uc694. \uc218\ub9ac\uac00 \uae38\uc5b4\uc838\ub3c4 \uc601\ud5a5\ubc1b\ub294 \uace0\uac1d \uc8fc\ubb38\uc758 \uc0dd\uc0b0\uc744 \uc774\uc5b4\uac00\ub294 \ubc29\ubc95\uc744 \uc54c\uc544\ubcf4\uc138\uc694.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mean-time-to-repair\/","og_locale":"ko_KR","og_type":"article","og_title":"\ud3c9\uade0 \uc218\ub9ac \uc2dc\uac04: MTTR \uacc4\uc0b0\uc73c\ub85c \uc190\uc2e4 \uc2dc\uac04 \uc904\uc774\uae30","og_description":"\uc758\ubbf8 \uc788\ub294 MTTR\uc744 \uacc4\uc0b0\ud558\uace0 \uc124\ube44 \ubcf5\uad6c \uc9c0\uc5f0 \uc6d0\uc778\uc744 \ud30c\uc545\ud558\uc138\uc694. \uc218\ub9ac\uac00 \uae38\uc5b4\uc838\ub3c4 \uc601\ud5a5\ubc1b\ub294 \uace0\uac1d \uc8fc\ubb38\uc758 \uc0dd\uc0b0\uc744 \uc774\uc5b4\uac00\ub294 \ubc29\ubc95\uc744 \uc54c\uc544\ubcf4\uc138\uc694.","og_url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mean-time-to-repair\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-24T16:49:56+00:00","article_modified_time":"2026-10-24T16:52:14+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-to-repair-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"\uae00\uc4f4\uc774":"Jussi M\u00e4ntyl\u00e4"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mean-time-to-repair\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mean-time-to-repair\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"\ud3c9\uade0 \uc218\ub9ac \uc2dc\uac04: MTTR \uacc4\uc0b0\uc73c\ub85c \uc190\uc2e4 \uc2dc\uac04 \uc904\uc774\uae30","datePublished":"2026-10-24T16:49:56+00:00","dateModified":"2026-10-24T16:52:14+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mean-time-to-repair\/"},"wordCount":45,"publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mean-time-to-repair\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-to-repair-hero.png","articleSection":["APS \ubc0f \uc2a4\ucf00\uc904\ub9c1","\ub9ac\uc18c\uc2a4"],"inLanguage":"ko-KR"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mean-time-to-repair\/","url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mean-time-to-repair\/","name":"\ud3c9\uade0 \uc218\ub9ac \uc2dc\uac04: MTTR \uacc4\uc0b0\uc73c\ub85c \uc190\uc2e4 \uc2dc\uac04 \uc904\uc774\uae30","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mean-time-to-repair\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mean-time-to-repair\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-to-repair-hero.png","datePublished":"2026-10-24T16:49:56+00:00","dateModified":"2026-10-24T16:52:14+00:00","description":"\uc758\ubbf8 \uc788\ub294 MTTR\uc744 \uacc4\uc0b0\ud558\uace0 \uc124\ube44 \ubcf5\uad6c \uc9c0\uc5f0 \uc6d0\uc778\uc744 \ud30c\uc545\ud558\uc138\uc694. \uc218\ub9ac\uac00 \uae38\uc5b4\uc838\ub3c4 \uc601\ud5a5\ubc1b\ub294 \uace0\uac1d \uc8fc\ubb38\uc758 \uc0dd\uc0b0\uc744 \uc774\uc5b4\uac00\ub294 \ubc29\ubc95\uc744 \uc54c\uc544\ubcf4\uc138\uc694.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mean-time-to-repair\/#breadcrumb"},"inLanguage":"ko-KR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mean-time-to-repair\/"]}]},{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mean-time-to-repair\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-to-repair-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-to-repair-hero.png","width":1672,"height":941,"caption":"Restoration stages from maintenance response and parts waiting through repair, testing and production release."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mean-time-to-repair\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ko\/"},{"@type":"ListItem","position":2,"name":"\ud3c9\uade0 \uc218\ub9ac \uc2dc\uac04: MTTR \uacc4\uc0b0\uc73c\ub85c \uc190\uc2e4 \uc2dc\uac04 \uc904\uc774\uae30"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ko\/#website","url":"https:\/\/skyplanner.ai\/ko\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ko\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ko-KR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ko\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ko\/","logo":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-to-repair-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-to-repair-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-to-repair-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-to-repair-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-to-repair-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-to-repair-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-to-repair-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/mean-time-to-repair-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ko\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\ud3c9\uade0 \uc218\ub9ac \uc2dc\uac04: MTTR \uacc4\uc0b0\uc73c\ub85c \uc190\uc2e4 \uc2dc\uac04 \uc904\uc774\uae30 \ud648 &raquo; \ub9ac\uc18c\uc2a4 &raquo; \ud3c9\uade0 \uc218\ub9ac \uc2dc\uac04: MTTR \uacc4\uc0b0\uc73c\ub85c \uc190\uc2e4 \uc2dc\uac04 \uc904\uc774\uae30 \ud3c9\uade0 \uc218\ub9ac \uc2dc\uac04(MTTR)\uc740 \uc124\ube44 \uace0\uc7a5 \ud6c4 \uc815\ud574\uc9c4 \uc218\ub9ac \ub610\ub294 \ubcf5\uad6c \uacfc\uc815\uc5d0 \uac78\ub9ac\ub294 \uc2dc\uac04\uc758 \ud3c9\uade0\uc785\ub2c8\ub2e4. \ube44\uad50 \uac00\ub2a5\ud55c \uc644\ub8cc \uac74\ub4e4\uc758 \uc18c\uc694 \uc2dc\uac04\uc744 \ubaa8\ub450 \ub354\ud55c \ub4a4, \ud574\ub2f9 \uac74\uc218\ub85c \ub098\ub204\uc5b4 \uacc4\uc0b0\ud569\ub2c8\ub2e4. MTTR = \ucd1d \uc218\ub9ac \ub610\ub294 \ubcf5\uad6c \uc2dc\uac04 \u00f7&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/108949","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/comments?post=108949"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/108949\/revisions"}],"predecessor-version":[{"id":109011,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/108949\/revisions\/109011"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media\/108953"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media?parent=108949"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/categories?post=108949"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/tags?post=108949"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}