{"id":108857,"date":"2026-10-24T14:53:53","date_gmt":"2026-10-24T14:53:53","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=108857"},"modified":"2026-10-24T14:56:06","modified_gmt":"2026-10-24T14:56:06","slug":"demand-forecasting-manufacturing","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/demand-forecasting-manufacturing\/","title":{"rendered":"\uc81c\uc870\uc5c5 \uc218\uc694 \uc608\uce21: \uc2e4\ubb34 \uac00\uc774\ub4dc"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">\uc81c\uc870\uc5c5 \uc218\uc694 \uc608\uce21: \uc2e4\ubb34 \uac00\uc774\ub4dc<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/ko\/\">\ud648<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/\">\ub9ac\uc18c\uc2a4<\/a> &raquo; \uc81c\uc870\uc5c5 \uc218\uc694 \uc608\uce21: \uc2e4\ubb34 \uac00\uc774\ub4dc<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">\uc608\uc0c1 \uc77d\uae30 \uc2dc\uac04: <\/span><span class=\"yoast-reading-time__reading-time\">14<\/span><span class=\"yoast-reading-time__time-unit\"> \ubd84<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p><strong>\uc81c\uc870\uc5c5\uc758 \uc218\uc694 \uc608\uce21\uc740 \uace0\uac1d\uc5d0\uac8c \uc5b4\ub5a4 \uc81c\ud488\uc774 \uc5b8\uc81c, \uc5bc\ub9c8\ub098 \ud544\uc694\ud560\uc9c0 \ucd94\uc815\ud558\ub294 \uc77c\uc785\ub2c8\ub2e4.<\/strong> \uacfc\uac70 \uc218\uc694\uc640 \uc55e\uc73c\ub85c \uc608\uc0c1\ub418\ub294 \ubcc0\ud654\uc5d0 \uad00\ud55c \uc815\ubcf4\ub97c \ud568\uaed8 \ud65c\uc6a9\ud574 \uad6c\ub9e4 \ubd80\uc11c\uc640 \uc0dd\uc0b0 \ubd80\uc11c\uac00 \uacf5\ud1b5\ub41c \uadfc\uac70\ub85c \uc758\uc0ac\uacb0\uc815\uc744 \ub0b4\ub9ac\ub3c4\ub85d \ub3d5\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc720\uc6a9\ud55c \uc608\uce21\uc740 \ud310\ub9e4 \uac00\ub2a5\uc131\uc774 \uc788\ub2e4\ub294 \uc774\uc720\ub9cc\uc73c\ub85c \ubaa8\ub450 \uc7ac\uace0\ub85c \uc313\uc9c0 \uc54a\uc73c\uba74\uc11c\ub3c4 \ud544\uc694\ud55c \uc900\ube44\ub97c \ud558\ub3c4\ub85d \ub3d5\uc2b5\ub2c8\ub2e4. \uc608\uce21\uc758 \uc624\ucc28\uc640 \uac00\uc815\uc744 \uac80\ud1a0\ud558\uba74 \uc9c0\uae08 \ud655\uc815\ud574\uc57c \ud560 \uc77c\uacfc \ub098\uc911\uc5d0 \uacb0\uc815\ud574\ub3c4 \ub418\ub294 \uc77c\uc744 \uad6c\ubd84\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc218\uc694 \uc608\uce21\uc740 \uc218\uc694 \uacc4\ud68d\uc758 \ud55c \ubd80\ubd84\uc785\ub2c8\ub2e4. \uc218\uc694 \uacc4\ud68d\uc740 \uc2dc\uc7a5 \uc815\ubcf4\ub97c \uac80\ud1a0\ud558\uace0 \uc218\uc694 \uacc4\ud68d\uc548\uc5d0 \ud569\uc758\ud558\ub294 \ub354 \ub113\uc740 \uacfc\uc815\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc2e4\ubb34\uc5d0\uc11c\ub294 \ub450 \uac00\uc9c0 \uacfc\uc81c\ub97c \ud574\uacb0\ud574\uc57c \ud569\ub2c8\ub2e4. \uba3c\uc800 \uc758\uc0ac\uacb0\uc815\uc5d0 \ucda9\ubd84\ud788 \ud65c\uc6a9\ud560 \uc218 \uc788\uc744 \ub9cc\ud07c \uc218\uc694\ub97c \ucd94\uc815\ud558\uace0, \uadf8\uc5d0 \ub530\ub978 \ub300\uc751\uc744 \uc2e4\ud589\ud560 \uc218 \uc788\ub294 \uc0dd\uc0b0 \uacc4\ud68d\uc744 \uc138\uc6cc\uc57c \ud569\ub2c8\ub2e4. SkyPlanner APS\ub294 \uc0dd\uc0b0 \uad00\ub828 \uacb0\uc815\uc744 \uc2e4\ud589\ud558\ub294 \ub370 \ud544\uc694\ud55c \uc138\ubd80 \uc77c\uc815\uc744 \uc218\ub9bd\ud569\ub2c8\ub2e4. \ub530\ub77c\uc11c \uacb0\uc815\uc774 \ubc14\ub014 \ub54c\ub9c8\ub2e4 \uae30\uacc4\ubcc4 \uc791\uc5c5 \ub300\uae30\uc5f4\uc744 \ub530\ub85c \ub2e4\uc2dc \uc9dc\ub294 \uc218\uace0\ub97c \ub35c \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774\uc81c \uc218\uc694\ub97c \uc608\uce21\ud558\uace0, \uc624\ucc28\ub97c \ud3c9\uac00\ud558\uace0, \uc608\uce21\uc744 \uc2e4\ubb34\uc5d0 \ud65c\uc6a9\ud558\ub294 \ubc29\ubc95\uc744 \uc0b4\ud3b4\ubcf4\uaca0\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">1. \uc608\uce21\uc73c\ub85c \uc5b4\ub5a4 \uacb0\uc815\uc744 \ub0b4\ub9b4\uc9c0 \uc815\ud558\uae30<\/h2>\n\n\n<p>\uc608\uce21 \ubaa8\ub378\ubcf4\ub2e4 \uba3c\uc800 \uc5b4\ub5a4 \uacb0\uc815\uc744 \ub0b4\ub824\uc57c \ud558\ub294\uc9c0\ubd80\ud130 \uc815\ud558\uc138\uc694. \ub9ac\ub4dc\ud0c0\uc784\uc774 \uae34 \uc81c\ud488\uc758 \uc790\uc7ac\ub97c \ud655\ubcf4\ud560 \ub54c, \ub2e4\uc74c \ub2ec \uc7ac\uace0\uc0dd\uc0b0 \ubb3c\ub7c9\uc744 \uc815\ud560 \ub54c, \uc0dd\uc0b0 \uad50\ub300\uc870 \ucd94\uac00\ub97c \uac80\ud1a0\ud560 \ub54c \ud544\uc694\ud55c \uc815\ubcf4\uc758 \uc0c1\uc138 \uc218\uc900\uc740 \uc11c\ub85c \ub2e4\ub985\ub2c8\ub2e4.<\/p>\n\n\n<p>\ub370\uc774\ud130\ub97c \ubaa8\uc73c\uae30 \uc804\uc5d0 \ub2e4\uc74c \ub124 \uac00\uc9c0\ub97c \uc801\uc5b4 \ub450\uc138\uc694.<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>\uc218\uc694 \uc608\uce21 \ub300\uc0c1:<\/strong> \uc644\uc81c\ud488, \uc81c\ud488\uad70 \ub610\ub294 \ubc94\uc704\uac00 \uba85\ud655\ud788 \uc815\uc758\ub41c \ub2e4\ub978 \uacc4\ud68d \ud488\ubaa9.<\/li><li><strong>\ub2e8\uc704:<\/strong> \uac1c, \ud329, \ud0ac\ub85c\uadf8\ub7a8 \ub4f1 \uc77c\uad00\ub418\uac8c \uc0ac\uc6a9\ud560 \uc218 \uc788\ub294 \ubb3c\ub9ac\uc801 \uc218\ub7c9 \ub2e8\uc704. \ub9e4\ucd9c\uc561\ub9cc \ubcf4\uba74 \uac00\uaca9\uc774\ub098 \uc81c\ud488 \uad6c\uc131\uc758 \ubcc0\ud654\uac00 \ub4dc\ub7ec\ub098\uc9c0 \uc54a\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/li><li><strong>\uc81c\ud488\uc774 \ud544\uc694\ud55c \uc2dc\uae30:<\/strong> \uace0\uac1d\uc5d0\uac8c \uc81c\ud488\uc774 \ud544\uc694\ud55c \uc2dc\uc810. \ub370\uc774\ud130\uac00 \ub4b7\ubc1b\uce68\ub41c\ub2e4\uba74 \uace0\uac1d \uc694\uccad\uc77c\uc744 \uc77c\uad00\ub41c \uae30\uc900\uc73c\ub85c \uc0ac\uc6a9\ud569\ub2c8\ub2e4.<\/li><li><strong>\uc608\uce21 \uae30\uac04:<\/strong> \uad6c\ub9e4 \ubc0f \uc0dd\uc0b0 \ub9ac\ub4dc\ud0c0\uc784\uc744 \uace0\ub824\ud560 \ub54c \uc5bc\ub9c8\ub098 \uc55e\uc11c \uacb0\uc815\uc744 \ub0b4\ub824\uc57c \ud558\ub294\uc9c0.<\/li><\/ul>\n\n\n<p>\uc790\uc7ac\uac00 \ud544\uc694\ud55c \uc2dc\uc810\ubcf4\ub2e4 4\uc8fc \uc55e\uc11c \uad6c\ub9e4\ub97c \ud655\uc815\ud574\uc57c \ud55c\ub2e4\uba74, 1\uc8fc \uc804 \uc608\uce21\ub9cc \uc815\ud655\ud574\uc11c\ub294 \ucda9\ubd84\ud558\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4. \uad6c\ub9e4 \ubd80\uc11c\uac00 \uc2e4\uc81c\ub85c \uc0ac\uc6a9\ud574\uc57c \ud558\ub294 4\uc8fc \uc804 \uc608\uce21\uce58\ub97c \ud3c9\uac00\ud558\uc138\uc694.<\/p>\n\n\n<p>\uc5b4\ub5a4 \uacb0\uc815\uc744 \ub0b4\ub9b4\uc9c0\uc5d0 \ub9de\ucdb0 \uacc4\ud68d\uc758 \uc0c1\uc138 \uc218\uc900\uc744 \uc815\ud558\uc138\uc694. \uc81c\ud488\uad70\ubcc4 \uc608\uce21\uc740 \ud5a5\ud6c4 \uad50\ub300\uc870 \uc6b4\uc601\uc744 \uac80\ud1a0\ud558\ub294 \ub370 \ub3c4\uc6c0\uc774 \ub420 \uc218 \uc788\uc9c0\ub9cc, \uad6c\ub9e4 \ubd80\uc11c\uac00 \uc5b4\ub5a4 \uc0ac\uc591\ubcc4 \ubd80\ud488\uc744 \uc0ac\uc57c \ud558\ub294\uc9c0\uae4c\uc9c0 \uc54c\ub824\uc8fc\uc9c0\ub294 \ubabb\ud569\ub2c8\ub2e4. \ubc18\ub300\ub85c \uc8fc\ubb38\uc774 \ub4dc\ubb38 \uc0ac\uc591\uae4c\uc9c0 \ud558\ub098\uc529 \uc608\uce21\ud558\uba74 \uc720\uc6a9\ud55c \uc815\ubcf4\ubcf4\ub2e4 \uc7a1\uc74c\uc774 \ub354 \ub9ce\uc544\uc9c8 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc81c\ud488\uad70 \ud569\uacc4\uc640 \ud488\ubaa9\ubcc4 \ubc30\ubd84 \uc218\ub7c9\uc774 \uc77c\uce58\ud558\ub3c4\ub85d \uc720\uc9c0\ud558\uace0, \uc81c\ud488 \uad6c\uc131\uc758 \ubcc0\ud654\uac00 \uc790\uc7ac\ub098 \uc0dd\uc0b0 \ub2a5\ub825\uc5d0 \uc601\ud5a5\uc744 \uc8fc\ub294\uc9c0 \uac80\ud1a0\ud558\uc138\uc694.<\/p>\n\n\n<p>\uc7ac\uace0\uc0dd\uc0b0\uc5d0\uc11c\ub294 \uc608\uce21\uc774 \uc7ac\uace0 \ubcf4\ucda9 \uacb0\uc815\uc744 \ub3d5\uc2b5\ub2c8\ub2e4. \uc218\uc8fc\uc0dd\uc0b0\uc5d0\uc11c\ub294 \ud655\uc815 \uc8fc\ubb38\uc5d0 \ub530\ub77c \uc2e4\uc81c \uc0dd\uc0b0 \ucc29\uc218\ub97c \uacb0\uc815\ud558\uba74\uc11c, \uc608\uce21\uc73c\ub85c\ub294 \uacf5\uc6a9 \uc0dd\uc0b0 \uc790\uc6d0\uc774\ub098 \ub9ac\ub4dc\ud0c0\uc784\uc774 \uae34 \ud22c\uc785 \uc790\uc7ac\ub97c \ubbf8\ub9ac \uc900\ube44\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc608\uce21\uc774 \uc788\ub2e4\ub294 \uc774\uc720\ub9cc\uc73c\ub85c \uc8fc\ubb38\uc774 \ubd88\ud655\uc2e4\ud55c \uc644\uc81c\ud488\uc744 \ubbf8\ub9ac \uc0dd\uc0b0\ud574 \uc313\uc544 \ub458 \ud544\uc694\ub294 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud310\ub9e4 \ubaa9\ud45c\ub294 \uc608\uce21\uacfc \uad6c\ubd84\ud558\uc138\uc694. \ubaa9\ud45c\ub294 \ud68c\uc0ac\uac00 \uc5bc\ub9c8\ub098 \ud314\uace0 \uc2f6\uc740\uc9c0\ub97c \ub098\ud0c0\ub0b4\uace0, \uc608\uce21\uc740 \ud604\uc7ac \ud310\ub2e8\uc73c\ub85c \uace0\uac1d\uc5d0\uac8c \uc5bc\ub9c8\ub098 \ud544\uc694\ud560\uc9c0\ub97c \ub098\ud0c0\ub0c5\ub2c8\ub2e4. \ud604\uc7ac \uacf5\uc7a5\uc758 \uc0dd\uc0b0 \ub2a5\ub825\uc5d0 \ub9de\ucdb0 \uc608\uce21\uce58\ub97c \ub0ae\ucd94\uba74 \ucda9\uc871\ud558\uc9c0 \ubabb\ud560 \uc218\uc694\uac00 \uac00\ub824\uc9c8 \ubfd0, \ubb38\uc81c\uac00 \ud574\uacb0\ub418\uc9c0\ub294 \uc54a\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">2. \uc2e4\uc81c \uace0\uac1d \uc218\uc694\ub97c \ubc18\uc601\ud558\ub294 \uacfc\uac70 \ub370\uc774\ud130 \uc900\ube44\ud558\uae30<\/h2>\n\n\n<p>\ud488\ubaa9\ubcc4\u00b7\uae30\uac04\ubcc4 \uc218\uc694 \uc218\ub7c9\uc744 \uc77c\uad00\ub41c \uae30\uc900\uc73c\ub85c \uc815\ub9ac\ud55c \uc2dc\uacc4\uc5f4 \ub370\uc774\ud130\ub97c \uc0ac\uc6a9\ud558\uc138\uc694. ERP\uc758 \ucd9c\ud558 \ubcf4\uace0\uc11c\uc5d0\uc11c \uc2dc\uc791\ud560 \uc218 \uc788\uc9c0\ub9cc, \uadf8 \ub0a0\uc9dc\uc640 \uc218\ub7c9\uc774 \uc2e4\uc81c\ub85c \ubb34\uc5c7\uc744 \ub73b\ud558\ub294\uc9c0 \ud655\uc778\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\ub0a9\ud488 \uc9c0\uc5f0\uc740 \ud754\ud788 \ub193\uce58\ub294 \ud568\uc815\uc785\ub2c8\ub2e4. \uace0\uac1d\uc774 \uc774\ubc88 \uc8fc\uc5d0 \uc694\uccad\ud55c \ubb3c\ub7c9\uc744 \ub2e4\uc74c \uc8fc\uc5d0 \ucd9c\ud558\ud558\uba74, \uc774\ubc88 \uc8fc \uc218\uc694\ub294 \uc801\uace0 \ub2e4\uc74c \uc8fc \uc218\uc694\ub294 \uc720\ub09c\ud788 \ub9ce\uc740 \uac83\ucc98\ub7fc \ubcf4\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc81c\ud488\uc744 \uc5b8\uc81c \uacf5\uae09\ud560 \uc218 \uc788\ub3c4\ub85d \uc900\ube44\ud574\uc57c \ud558\ub294\uc9c0 \uc608\uce21\ud558\ub824\ub294 \ubaa9\uc801\uc774\ub77c\uba74, \uac00\ub2a5\ud560 \uacbd\uc6b0 \uace0\uac1d\uc774 \uc694\uccad\ud55c \uae30\uac04\uc744 \uae30\uc900\uc73c\ub85c \uc0bc\uc73c\uc138\uc694. \uc790\uc0ac\uc758 \ub0a9\ud488 \uc9c0\uc5f0\uc744 \uc218\uc694 \ud328\ud134\uc73c\ub85c \ud559\uc2b5\ud574\uc11c\ub294 \uc548 \ub429\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc601\uc5c5 \ubc0f \uc6b4\uc601 \ubd80\uc11c\uc640 \ud568\uaed8 \uacfc\uac70 \ub370\uc774\ud130\ub97c \uc810\uac80\ud558\uc138\uc694.<\/p>\n\n\n<ul class=\"wp-block-list\"><li>\uc911\ubcf5 \uae30\ub85d, \ub2e8\uc704 \ud658\uc0b0 \uc624\ub958, \uc81c\ud488 \ucf54\ub4dc \ubcc0\uacbd \ub0b4\uc5ed\uc744 \ubc14\ub85c\uc7a1\uc73c\uc138\uc694. \ubc18\ud488\uacfc \ucde8\uc18c\ub294 \ubaa8\ub4e0 \uc870\uc815\uc744 \uc0c8\ub85c\uc6b4 \uc74c\uc218 \uc218\uc694\ub85c \ucc98\ub9ac\ud558\uc9c0 \ub9d0\uace0 \uc6d0\uc778\uc5d0 \ub9de\uac8c \ubc18\uc601\ud558\uc138\uc694.<\/li><li>\uc2e4\uc81c\ub85c \uc218\uc694\uac00 0\uc774\uc5c8\ub358 \uae30\uac04\uc740 \uadf8\ub300\ub85c \uc720\uc9c0\ud558\uc138\uc694. \uae30\ub85d\uc774 \uc5c6\ub2e4\uace0 \uc790\ub3d9\uc73c\ub85c 0\uc774 \ub418\ub294 \uac83\uc740 \uc544\ub2c8\uba70, \uc8fc\ubb38\uc774 \ub738\ud588\ub358 \uc8fc\ub97c \uc0ad\uc81c\ud558\uba74 \uc608\uce21\uce58\uac00 \ubd80\ud480\ub824\uc9c8 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/li><li>\ud488\uc808, \ubb3c\ub7c9 \ubc30\uc815 \uc81c\ud55c, \uc0dd\uc0b0 \ub2a5\ub825 \uc81c\uc57d\uc744 \ud45c\uc2dc\ud558\uc138\uc694. \uace0\uac1d\uc774 100\uac1c\ub97c \uc6d0\ud588\ub294\ub370 60\uac1c\ub9cc \ucd9c\ud558\ud588\ub2e4\uace0 \ud574\uc11c \uc218\uc694\uac00 60\uac1c\ubfd0\uc774\uc5c8\ub2e4\uace0 \ubcfc \uc218\ub294 \uc5c6\uc2b5\ub2c8\ub2e4. \ubbf8\ucda9\uc871 \uc694\uccad \uae30\ub85d\uc774 \uc788\ub2e4\uba74 \ud65c\uc6a9\ud558\uace0, \ucd94\uc815\ud55c \uc218\uc694 \uc190\uc2e4\ubd84\uc740 \ubc18\ub4dc\uc2dc \ucd94\uc815\uce58\ub77c\uace0 \ud45c\uc2dc\ud558\uc138\uc694.<\/li><li>\ud310\ucd09 \ud589\uc0ac, \uc77c\ud68c\uc131 \uacc4\uc57d, \uc2e0\uc81c\ud488 \ucd9c\uc2dc, \ub2e8\uc885 \uc81c\ud488\uc744 \uad6c\ubd84\ud574 \ud45c\uc2dc\ud558\uc138\uc694. \uc6d0\ubcf8 \uc774\ub825\uc740 \ubcf4\uc874\ud558\uace0, \ubaa8\ub378\ub9c1\uc6a9 \ub370\uc774\ud130\ub97c \uc870\uc815\ud55c \uc774\uc720\ub97c \uae30\ub85d\ud558\uc138\uc694.<\/li><\/ul>\n\n\n<p>\uc815\ub9ac\ud55c \uc218\ub7c9\uc744 \uc2dc\uac04 \uc21c\uc11c\ub300\ub85c \uadf8\ub798\ud504\uc5d0 \ud45c\uc2dc\ud558\uc138\uc694. \uc218\uc694 \uc218\uc900\uc774 \uc548\uc815\uc801\uc778\uc9c0, \uc9c0\uc18d\uc801\uc73c\ub85c \ub298\uac70\ub098 \uc904\uc5b4\ub4dc\ub294\uc9c0, \uacc4\uc808\uc801 \uace0\uc810\uc774 \ubc18\ubcf5\ub418\ub294\uc9c0, \uc8fc\ubb38 \uc0ac\uc774\uc5d0 \uae34 \uacf5\ubc31\uc774 \uc788\ub294\uc9c0 \uc0b4\ud3b4\ubcf4\uc138\uc694. \uc774\ub7f0 \ud328\ud134\uc744 \ubcf4\uba74 \uc5b4\ub5a4 \ubc29\ubc95\uc744 \uc2dc\ud5d8\ud560\uc9c0 \uc815\ud558\ub294 \ub370 \ub3c4\uc6c0\uc774 \ub429\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc0c1\uc704 \uc81c\ud488\uc758 \uc0dd\uc0b0 \uacc4\ud68d\uc5d0 \ub530\ub77c \ubd80\ud488 \uc18c\uc694\ub7c9\uc774 \uacb0\uc815\ub41c\ub2e4\uba74 \ubd80\ud488\ub9c8\ub2e4 \uc218\uc694\ub97c \ubcc4\ub3c4\ub85c \uc608\uce21\ud558\uc9c0 \ub9c8\uc138\uc694. \uc774\ub7ec\ud55c \uc885\uc18d \uc218\uc694\ub294 BOM(\uc790\uc7ac\uba85\uc138\uc11c)\uacfc \uc790\uc7ac \uc18c\uc694\ub7c9 \uacc4\uc0b0\uc744 \ud1b5\ud574 \uc0b0\ucd9c\ud574\uc57c \ud569\ub2c8\ub2e4. \uadf8\ub807\uc9c0 \uc54a\uc73c\uba74 \uac19\uc740 \uad6c\ub9e4 \uacb0\uc815\uc5d0 \uc11c\ub85c \ub2e4\ub978 \uc218\ub7c9\uc774 \uc81c\uc2dc\ub420 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">3. \uc218\uc694 \ud328\ud134\uc5d0 \ub9de\ub294 \uc608\uce21 \ubc29\ubc95 \uc120\ud0dd\ud558\uae30<\/h2>\n\n\n<p>\ubaa8\ub4e0 \uc81c\uc870 \uc81c\ud488\uc5d0 \uac00\uc7a5 \uc798 \ub9de\ub294 \uc608\uce21 \ubc29\ubc95\uc740 \uc5c6\uc2b5\ub2c8\ub2e4. \uac04\ub2e8\ud55c \uae30\uc900 \uc608\uce21\ubd80\ud130 \uc2dc\uc791\ud558\uace0, \ub2e4\ub978 \ubc29\ubc95\uc744 \uc4f0\uba74 \ud544\uc694\ud55c \uc758\uc0ac\uacb0\uc815\uc774 \ub354 \ub098\uc544\uc9c0\ub294\uc9c0 \ud655\uc778\ud558\uc138\uc694.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\uc218\uc694 \ud2b9\uc131<\/th><th>\uc6b0\uc120 \uac80\ud1a0\ud560 \ubc29\ubc95<\/th><th>\ud655\uc778\ud560 \uc0ac\ud56d<\/th><\/tr><\/thead><tbody><tr><td>\ube44\uad50\uc801 \uc548\uc815\uc801\uc778 \uc218\uc694<\/td><td>\ucd5c\uadfc \uae30\uac04\uc758 \uc774\ub3d9\ud3c9\uade0 \ub610\ub294 \ub2e8\uc21c \uc9c0\uc218\ud3c9\ud65c\ubc95<\/td><td>\ud3c9\uade0 \uc0b0\ucd9c \uae30\uac04\uc774 \uc2e4\uc81c \ubcc0\ud654\ub97c \uac00\ub9ac\uc9c0 \uc54a\uc73c\uba74\uc11c \uc7a1\uc74c\uc744 \uc644\ud654\ud558\ub294\uc9c0<\/td><\/tr><tr><td>\ubc18\ubcf5\ub418\ub294 \uacc4\uc808\uc801 \uc218\uc694<\/td><td>\uc9c1\uc804\uc758 \ube44\uad50 \uac00\ub2a5\ud55c \uacc4\uc808 \uc2e4\uc801\uc744 \uae30\uc900\uc73c\ub85c \ud65c\uc6a9\ud558\uace0, \uacc4\uc808\uc131\uc744 \ubc18\uc601\ud558\ub294 \uc608\uce21 \ubaa8\ub378 \uac80\ud1a0<\/td><td>\ud734\uc77c \uc2dc\uc810, \uc870\uc5c5\uc77c \uc218 \ub610\ub294 \uc81c\ud488 \uad6c\uc131\uc774 \ubc14\ub00c\uc5c8\ub294\uc9c0<\/td><\/tr><tr><td>\uc9c0\uc18d\uc801\uc778 \ucd94\uc138<\/td><td>\ucd94\uc138 \uc9c0\uc218\ud3c9\ud65c\ubc95 \ub4f1 \ucd94\uc138\ub97c \ubc18\uc601\ud560 \uc218 \uc788\ub294 \ubaa8\ub378<\/td><td>\uc131\uc7a5\uc774 \uc774\uc5b4\uc9c0\uace0 \uc788\ub294\uc9c0, \uc81c\ud488\uc774 \uc131\uc219\uae30\uc5d0 \uc811\uc5b4\ub4e4\uace0 \uc788\ub294\uc9c0<\/td><\/tr><tr><td>\uce21\uc815 \uac00\ub2a5\ud55c \uc694\uc778\uacfc \uc5f0\uad00\ub41c \uc218\uc694<\/td><td>\ud68c\uadc0\ubd84\uc11d \ub610\ub294 \uc801\ud569\ud55c \uba38\uc2e0\ub7ec\ub2dd \ubaa8\ub378<\/td><td>\uc608\uce21\uc744 \uc791\uc131\ud558\ub294 \uc2dc\uc810\uc5d0 \ud574\ub2f9 \uc694\uc778\uc758 \uc815\ubcf4\ub97c \uc2e4\uc81c\ub85c \ud655\ubcf4\ud560 \uc218 \uc788\ub294\uc9c0<\/td><\/tr><tr><td>\uc218\uc694\uac00 0\uc778 \uae30\uac04\uc774 \ub9ce\uace0 \uac04\ud5d0\uc801\uc73c\ub85c \ubc1c\uc0dd\ud558\ub294 \uc8fc\ubb38<\/td><td>\ud06c\ub85c\uc2a4\ud134 \uacc4\uc5f4 \ubc29\ubc95 \ub4f1 \uac04\ud5d0\uc801 \uc218\uc694\uc5d0 \ub9de\ub294 \uc811\uadfc\ubc95<\/td><td>\uc8fc\ubb38\uc774 \uc5c6\ub294 \uac1c\ubcc4 \uc8fc\ub97c \ub9de\ud788\ub294\uc9c0\ubfd0 \uc544\ub2c8\ub77c \uc7ac\uace0 \ubcf4\ucda9 \uae30\uac04 \uc804\uccb4\uc5d0\uc11c\uc758 \uc608\uce21 \uc131\ub2a5<\/td><\/tr><tr><td>\uacfc\uac70 \ub370\uc774\ud130\uac00 \ubd80\uc871\ud55c \uc2e0\uc81c\ud488<\/td><td>\uc720\uc0ac \uc81c\ud488\uc758 \uc2e4\uc801\uacfc \uccb4\uacc4\uc801\uc73c\ub85c \uc218\uc9d1\u00b7\uc815\ub9ac\ud55c \uc601\uc5c5 \ubc0f \uace0\uac1d\uc758 \ud310\ub2e8<\/td><td>\ucd9c\uc2dc \uad00\ub828 \uac00\uc815, \uae30\uc874 \uc81c\ud488 \uc218\uc694\uc758 \ub300\uccb4 \uc5ec\ubd80, \uc2e4\uc81c \uc218\uc694\ub97c \uc5bc\ub9c8\ub098 \ube60\ub974\uac8c \ubc18\uc601\ud558\ub294\uc9c0<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\ub2e8\uc21c \uc9c0\uc218\ud3c9\ud65c\ubc95\uc740 \ucd5c\uadfc \uad00\uce21\uac12\uc5d0 \ub354 \ud070 \uac00\uc911\uce58\ub97c \uc8fc\uc9c0\ub9cc, \uae30\ubcf8 \ud615\ud0dc\ub85c\ub294 \ucd94\uc138\ub098 \uacc4\uc808\uc131\uc744 \ubc18\uc601\ud558\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4. \ud06c\ub85c\uc2a4\ud134 \uacc4\uc5f4 \ubc29\ubc95\uc740 \uc218\uc694\uac00 \ubc1c\uc0dd\ud588\uc744 \ub54c\uc758 \uc218\ub7c9\uacfc \ubc1c\uc0dd \uac04\uaca9\uc744 \uace0\ub824\ud574 \uac04\ud5d0\uc801 \uc218\uc694\ub97c \ub2e4\ub8f9\ub2c8\ub2e4. \ub2e4\ub9cc \ub2e4\uc74c \uc8fc\ubb38\uc5d0 \ub300\ud55c \ubd88\ud655\uc2e4\uc131\uae4c\uc9c0 \uc5c6\uc560 \uc8fc\uc9c0\ub294 \uc54a\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774\ub3d9\ud3c9\uade0\uc744 \uac04\ub2e8\ud55c \uc608\ub85c \uc0b4\ud3b4\ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \ucd5c\uadfc 3\uc8fc\uac04 \uc218\uc694\uac00 \uac01\uac01 80\uac1c, 100\uac1c, 120\uac1c\uc600\ub2e4\uace0 \uac00\uc815\ud558\uba74, 3\uc8fc \uc774\ub3d9\ud3c9\uade0\uc73c\ub85c \uacc4\uc0b0\ud55c \ub2e4\uc74c \uc8fc \uc608\uce21\uce58\ub294 \ub2e4\uc74c\uacfc \uac19\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>\uc608\uce21\uce58 = (80 + 100 + 120) \u00f7 3 = 100\uac1c.<\/strong><\/p>\n\n\n<p>\uacc4\uc0b0 \ubc29\uc2dd\uc740 \uc27d\uac8c \uc124\uba85\ud560 \uc218 \uc788\uc9c0\ub9cc, \uc2e4\uc81c \uc0c1\uc2b9 \ucd94\uc138\ub97c \ub4a4\ub2a6\uac8c \ubc18\uc601\ud560 \uc218\ub3c4 \uc788\uc2b5\ub2c8\ub2e4. \uad00\uce21\uac12 3\uac1c\ub85c \uacc4\uc0b0\ubc95\uc744 \ubcf4\uc5ec \uc904 \uc218\ub294 \uc788\uc5b4\ub3c4, \uc774 \ubc29\ubc95\uc774 \ud574\ub2f9 \uc81c\ud488\uc5d0 \uc801\ud569\ud558\ub2e4\ub294 \uac83\uae4c\uc9c0 \uc785\uc99d\ud560 \uc218\ub294 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud6c4\ubcf4 \ubc29\ubc95\uc744 \ub2e8\uc21c\ud55c \uae30\uc900 \uc608\uce21\uacfc \ube44\uad50\ud558\uc138\uc694. \uac00\uc7a5 \ucd5c\uadfc\uc758 \uc2e4\uc81c \uc218\uc694\ub97c \uae30\uc900\uc73c\ub85c \uc0bc\uace0, \uacc4\uc808\uc131\uc774 \uc788\ub294 \ud488\ubaa9\uc740 \uc9c1\uc804\uc758 \ube44\uad50 \uac00\ub2a5\ud55c \uacc4\uc808 \uc2e4\uc801\ub3c4 \ud65c\uc6a9\ud558\uc138\uc694. \ubcf5\uc7a1\ud55c \ubaa8\ub378\uc740 \uc774\ub984\uc774 \uc815\uad50\ud574 \ubcf4\uc5ec\uc11c\uac00 \uc544\ub2c8\ub77c, \ud559\uc2b5\uc5d0 \uc4f0\uc9c0 \uc54a\uc740 \ub370\uc774\ud130\uc5d0\uc11c \ub354 \ub098\uc740 \uc608\uce21 \uc131\ub2a5\uc744 \ubcf4\uc774\uac70\ub098 \ud604\uc7a5 \uc758\uc0ac\uacb0\uc815\uc744 \uac1c\uc120\ud560 \ub54c \uc120\ud0dd\ud560 \uac00\uce58\uac00 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud310\ucd09\uc774\ub098 \uacbd\uc81c\uc9c0\ud45c\ub97c \uc0ac\uc6a9\ud558\ub294 \ubaa8\ub378\ub3c4 \ubbf8\ub798\uc5d0 \ub300\ud55c \ud604\uc2e4\uc801\uc778 \uc785\ub825\uac12\uc774 \ud544\uc694\ud569\ub2c8\ub2e4. \uc608\uce21 \ub2f9\uc2dc\uc5d0\ub294 \uc54c \uc218 \uc5c6\uc5c8\ub358 \uc815\ubcf4\ub85c \ubaa8\ub378\uc744 \uc2dc\ud5d8\ud558\uba74 \uc2e4\uc81c\ub85c \uac00\ub2a5\ud588\ub358 \uac83\ubcf4\ub2e4 \uc131\ub2a5\uc774 \uc88b\uc544 \ubcf4\uc785\ub2c8\ub2e4. \uc608\uce21\uc5d0 \uc720\uc6a9\ud55c \uad00\uacc4\uac00 \uc788\ub2e4\ub294 \uc0ac\uc2e4\ub9cc\uc73c\ub85c \ud574\ub2f9 \uc694\uc778\uc744 \ubc14\uafb8\uba74 \ud2b9\uc815\ud55c \ud310\ub9e4 \uc99d\uac00\uac00 \uc77c\uc5b4\ub09c\ub2e4\ub294 \uc778\uacfc\uad00\uacc4\uae4c\uc9c0 \uc785\uc99d\ub418\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">4. \uae30\uc900 \uc608\uce21\uc740 \uc720\uc9c0\ud558\uba74\uc11c \ud604\uc5c5 \uc815\ubcf4 \ubc18\uc601\ud558\uae30<\/h2>\n\n\n<p>\uacfc\uac70 \ub370\uc774\ud130\uac00 \ubaa8\ub4e0 \uac83\uc744 \uc54c\ub824 \uc8fc\uc9c0\ub294 \uc54a\uc2b5\ub2c8\ub2e4. \uace0\uac1d\uc774 \uc870\uc5c5 \uc911\ub2e8\uc744 \uc608\uace0\ud588\uac70\ub098, \uc720\ud1b5\uc5c5\uccb4\uac00 \uac70\uc810\uc744 \ucd94\uac00\ud558\uac70\ub098, \uc2e0\uc81c\ud488\uc774 \uae30\uc874 \ubaa8\ub378\uc744 \ub300\uccb4\ud560 \uc218\ub3c4 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud1b5\uacc4\uc801\uc73c\ub85c \uc0b0\ucd9c\ud55c \uae30\uc900 \uc608\uce21\uc744 \uacc4\uc18d \ud655\uc778\ud560 \uc218 \uc788\ub3c4\ub85d \uc720\uc9c0\ud558\uace0, \ud604\uc5c5 \uc815\ubcf4\ub97c \ubc18\uc601\ud55c \uc870\uc815 \ub0b4\uc5ed\uc740 \uac01\uac01 \ubcc4\ub3c4\ub85c \uae30\ub85d\ud558\uc138\uc694. \uc218\ub7c9, \ud574\ub2f9 \uae30\uac04, \uc870\uc815 \uc774\uc720, \ub2f4\ub2f9\uc790, \uac80\ud1a0\uc77c\uc744 \ud568\uaed8 \ub0a8\uae30\uc138\uc694. \ud6a8\uacfc\ub97c \ucd94\uac00\ub85c \ubc18\uc601\ud558\uae30 \uc804\uc5d0 \ubaa8\ub378\uc774\ub098 \ub2e4\ub978 \uc870\uc815\uc5d0 \uc774\ubbf8 \ud3ec\ud568\ub418\uc5b4 \uc788\ub294\uc9c0 \ud655\uc778\ud558\uc138\uc694.<\/p>\n\n\n<p>\ub2e4\uac00\uc624\ub294 \uc5b4\ub290 \uc8fc\uc758 \uae30\ubcf8 \uc608\uce21\uac12\uc774 100\uac1c\ub77c\uace0 \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \uc601\uc5c5\ud300\uc774 \uae30\uc874 \uc608\uce21\uc5d0 \uc804\ud600 \ubc18\uc601\ub418\uc9c0 \uc54a\uc740 \uc2e0\uaddc \uace0\uac1d\uc758 \ucd94\uac00 \uc218\uc694 20\uac1c\uc5d0 \ub300\ud55c \uadfc\uac70\ub97c \uc81c\uc2dc\ud569\ub2c8\ub2e4. \uac80\ud1a0\ub97c \uac70\uce5c \uc608\uce21\uac12\uc740 120\uac1c\uac00 \ub429\ub2c8\ub2e4. \uace0\uac1d\uc774 \ub2e4\ub978 \uc81c\ud488\uc758 \uc218\uc694\ub97c \uc774 \uc81c\ud488\uc73c\ub85c \uc62e\uae30\ub294 \uac83\uc774\ub77c\uba74, \uc774\ub97c \uc21c\uc218\ud55c \uc218\uc694 \uc99d\uac00\ub85c \uae30\ub85d\ud558\uc9c0 \ub9d0\uace0 \ud574\ub2f9 \uc81c\ud488\uc758 \uc608\uce21\ub3c4 \ud568\uaed8 \uc870\uc815\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774\ub807\uac8c \ud558\uba74 \ucd94\uac00 \uc218\uc694\uac00 \uc2e4\uc81c\ub85c \ubc1c\uc0dd\ud588\ub294\uc9c0, \uc5b4\ub290 \uae30\uac04\uc5d0 \ubc1c\uc0dd\ud588\ub294\uc9c0, \uc218\ub3d9 \uc870\uc815\uc774 \uc608\uce21\uc744 \uac1c\uc120\ud588\ub294\uc9c0 \uad6c\uccb4\uc801\uc73c\ub85c \uac80\ud1a0\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc2dc\uac04\uc774 \uc9c0\ub098\uba74\uc11c \uae30\ubcf8 \uc608\uce21\uc758 \uc624\ucc28\uc640 \uc870\uc815 \ud6c4 \uc608\uce21\uc758 \uc624\ucc28\ub97c \ube44\uad50\ud558\uc138\uc694. \uc0c8\ub85c\uc6b4 \uc815\ubcf4\ub97c \ubc18\uc601\ud558\ub294 \uc870\uc815\uc740 \uc720\uc9c0\ud558\uace0, \ubc18\ubcf5\uc801\uc73c\ub85c \ub099\uad00\uc801\uc778 \uc804\ub9dd\ub9cc \ub354\ud558\ub294 \uc870\uc815\uc740 \uc6d0\uc778\uc744 \uc0b4\ud3b4\ubcf4\uc138\uc694.<\/p>\n\n\n<p>\ubd88\ud655\uc2e4\uc131\uc774 \ud070 \uc2e0\uc81c\ud488 \ucd9c\uc2dc\ub098 \ub300\ud615 \uacc4\uc57d\uc758 \uacbd\uc6b0, \uae30\ubcf8 \uc2dc\ub098\ub9ac\uc624\uc640 \ud568\uaed8 \ud604\uc2e4\uc131 \uc788\ub294 \uc0c1\ud5a5\u00b7\ud558\ud5a5 \uc2dc\ub098\ub9ac\uc624\ub97c \uac01\uac01\uc758 \uac00\uc815\uacfc \ud568\uaed8 \ubcf4\uad00\ud558\uc138\uc694. \uc774\ub294 \uacc4\ud68d \uc218\ub9bd\uc744 \uc704\ud55c \uc2dc\ub098\ub9ac\uc624\uc774\uc9c0, \ud1b5\uacc4\uc801\uc73c\ub85c \ubcf4\uc815\ub41c \uc608\uce21 \uad6c\uac04\uc774 \uc544\ub2d9\ub2c8\ub2e4. \uc2dc\ub098\ub9ac\uc624\ubcc4\ub85c \uc790\uc7ac \ud655\ubcf4, \uad50\ub300\uc870 \ucd94\uac00, \uc644\uc81c\ud488 \uc7ac\uace0 \ud655\ubcf4 \uacb0\uc815\uc758 \uc5f0\uae30 \ub4f1 \uc5b4\ub5a4 \uc758\uc0ac\uacb0\uc815\uc774 \ub2ec\ub77c\uc9c0\ub294\uc9c0 \ud30c\uc545\ud558\uc138\uc694.<\/p>\n\n\n<h2 class=\"wp-block-heading\">5. \uc2e4\uc81c \uc758\uc0ac\uacb0\uc815\uc5d0 \ud544\uc694\ud55c \ub9ac\ub4dc\ud0c0\uc784\uc744 \uae30\uc900\uc73c\ub85c \uc608\uce21 \uc624\ucc28 \uce21\uc815\ud558\uae30<\/h2>\n\n\n<p>\uc608\uce21\uc744 \ubc1c\ud589\ud560 \ub54c\ub9c8\ub2e4 \ubc1c\ud589\uc77c, \ub300\uc0c1 \uae30\uac04, \ud488\ubaa9, \ubc84\uc804\uc744 \ud568\uaed8 \uc800\uc7a5\ud558\uc138\uc694. \uc2e4\uc81c \uc218\uc694\uac00 \ud655\uc778\ub418\uba74 \ub0a9\ud488 \uc9c1\uc804\uc5d0 \uc218\uc815\ud55c \ucd5c\uc2e0 \uc608\uce21\uc774 \uc544\ub2c8\ub77c, \uc2e4\uc81c\ub85c \uc758\uc0ac\uacb0\uc815\uc744 \ub0b4\ub824\uc57c \ud588\ub358 \uc2dc\uc810\uc5d0 \uc774\uc6a9\ud560 \uc218 \uc788\uc5c8\ub358 \ubc84\uc804\uacfc \ube44\uad50\ud558\uc138\uc694.<\/p>\n\n\n<p>\uc608\uce21 \ubc29\ubc95\uc744 \uc120\ud0dd\ud560 \ub54c\ub294 \uacfc\uac70 \ub370\uc774\ud130\ub85c \ubc31\ud14c\uc2a4\ud2b8\ub97c \uc218\ud589\ud558\uc138\uc694. \uacfc\uac70\uc758 \ud2b9\uc815 \uc2dc\uc810\uc5d0 \uc774\uc6a9\ud560 \uc218 \uc788\uc5c8\ub358 \uc815\ubcf4\ub9cc\uc73c\ub85c \ubaa8\ub378\uc744 \uc801\ud569\ud558\uace0, \ud544\uc694\ud55c \uae30\uac04\uc744 \uc608\uce21\ud55c \ub4a4 \uae30\uc900 \uc2dc\uc810\uc744 \uc55e\uc73c\ub85c \uc62e\uaca8 \uac19\uc740 \uacfc\uc815\uc744 \ubc18\ubcf5\ud569\ub2c8\ub2e4. \uc774\ucc98\ub7fc \uc608\uce21 \uae30\uc900 \uc2dc\uc810\uc744 \uc21c\ucc28\uc801\uc73c\ub85c \uc62e\uae30\ub294 \ubc29\uc2dd\uc740 \ubbf8\ub798 \uad00\uce21\uac12\uc774 \uacfc\uac70 \uc608\uce21\uc5d0 \uc720\uc785\ub418\uc9c0 \uc54a\ub3c4\ub85d \ud558\uba74\uc11c \uc2e4\uc81c\ub85c \uc218\ud589\ud574\uc57c \ud558\ub294 \uc608\uce21 \uc5c5\ubb34\ub97c \uac80\uc99d\ud569\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uc608\uce21 \uc624\ucc28 \uacc4\uc0b0 \uc608\uc2dc<\/h3>\n\n\n<p>\ud55c \uc81c\ud488\uc5d0 \ub300\ud574 4\uac1c \uc8fc\uc758 \uc608\uce21\uc744 \ud3c9\uac00\ud55c\ub2e4\uace0 \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \uc544\ub798 \ud45c\uc758 \uac01 \ud589\uc5d0 \uc800\uc7a5\ub41c \uc608\uce21\uc740 \ubaa8\ub450 <strong>\ud574\ub2f9 \ub300\uc0c1 \uc8fc\uc758 4\uc8fc \uc804<\/strong>\uc5d0 \ubc1c\ud589\ud55c \uac12\uc785\ub2c8\ub2e4. \uc5ec\uae30\uc11c \ubd80\ud638 \uc788\ub294 \uc624\ucc28\ub294 \uc608\uce21 \uc218\uc694\uc5d0\uc11c \uc2e4\uc81c \uc218\uc694\ub97c \ube80 \uac12\uc774\ubbc0\ub85c, \uc591\uc218\uc774\uba74 \uacfc\ub300 \uc608\uce21\uc744 \ub73b\ud569\ub2c8\ub2e4.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\ub300\uc0c1 \uc8fc<\/th><th>\uc800\uc7a5\ub41c \uc608\uce21\uac12<\/th><th>\uc2e4\uc81c \uc218\uc694<\/th><th>\ubd80\ud638 \uc788\ub294 \uc624\ucc28<\/th><th>\uc808\ub300 \uc624\ucc28<\/th><\/tr><\/thead><tbody><tr><td>1\uc8fc\ucc28<\/td><td>110<\/td><td>100<\/td><td>+10<\/td><td>10<\/td><\/tr><tr><td>2\uc8fc\ucc28<\/td><td>110<\/td><td>120<\/td><td>\u221210<\/td><td>10<\/td><\/tr><tr><td>3\uc8fc\ucc28<\/td><td>110<\/td><td>80<\/td><td>+30<\/td><td>30<\/td><\/tr><tr><td>4\uc8fc\ucc28<\/td><td>110<\/td><td>100<\/td><td>+10<\/td><td>10<\/td><\/tr><tr><td>\ud569\uacc4<\/td><td>440<\/td><td>400<\/td><td>+40<\/td><td>60<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\ub2e4\uc74c 3\uac00\uc9c0 \uc9c0\ud45c\ub294 \uc774 \uacb0\uacfc\ub97c \uc11c\ub85c \ub2e4\ub978 \uce21\uba74\uc5d0\uc11c \uc124\uba85\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>\ud3c9\uade0 \uc808\ub300 \uc624\ucc28(MAE) = \uc808\ub300 \uc624\ucc28\uc758 \ud569 \u00f7 \uae30\uac04 \uc218 = 60 \u00f7 4 = \uc8fc\ub2f9 15\uac1c.<\/strong><\/p>\n\n\n<p>MAE\ub294 \ud3c9\uade0\uc801\uc778 \uc624\ucc28\uc758 \ud06c\uae30\ub97c \uc81c\ud488\uc758 \uc218\ub7c9 \ub2e8\uc704\ub85c \ub098\ud0c0\ub0b4\ubbc0\ub85c \uc774\ud574\ud558\uae30 \uc27d\uc2b5\ub2c8\ub2e4. \ub2e4\ub9cc \uc608\uce21\uc774 \uc2e4\uc81c \uc218\uc694\ubcf4\ub2e4 \ub192\uac70\ub098 \ub0ae\uc740 \ucabd\uc73c\ub85c \uce58\uc6b0\uce58\ub294\uc9c0\ub294 \ubcf4\uc5ec\uc8fc\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>\uac00\uc911 \uc808\ub300 \ubc31\ubd84\uc728 \uc624\ucc28(WAPE) = \uc808\ub300 \uc624\ucc28\uc758 \ud569 \u00f7 \uc2e4\uc81c \uc218\uc694\uc758 \ud569 \u00d7 100 = 60 \u00f7 400 \u00d7 100 = 15%.<\/strong><\/p>\n\n\n<p>\uc774 \uc608\uc2dc\ucc98\ub7fc \uc218\uc694\ub7c9\uc774 \uc74c\uc218\uac00 \uc544\ub2cc \uacbd\uc6b0, WAPE\ub294 \ucd1d\uc218\uc694 \ub300\ube44 \uc808\ub300 \uc624\ucc28\uc758 \ube44\uc728\uc744 \ub098\ud0c0\ub0c5\ub2c8\ub2e4. \ub9e4\uc8fc \uc608\uce21 \uc624\ucc28\uac00 15% \uc774\ub0b4\uc600\ub2e4\ub294 \ub73b\ub3c4, \uc218\uc694\ub97c \ucda9\uc871\ud560 \ud655\ub960\uc774 85%\ub77c\ub294 \ub73b\ub3c4 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>\ud3c9\uade0 \ubd80\ud638 \uc624\ucc28, \uc989 \ud3b8\ud5a5 = \ubd80\ud638 \uc788\ub294 \uc624\ucc28\uc758 \ud569 \u00f7 \uae30\uac04 \uc218 = 40 \u00f7 4 = \uc8fc\ub2f9 +10\uac1c.<\/strong><\/p>\n\n\n<p>\uc55e\uc11c \uc815\ud55c \ubd80\ud638 \uae30\uc900\uc5d0 \ub530\ub974\uba74 \uc608\uce21\uc740 \ud3c9\uade0\uc801\uc73c\ub85c \uc2e4\uc81c \uc218\uc694\ubcf4\ub2e4 \ub192\uc558\uc2b5\ub2c8\ub2e4. 4\uc8fc \uc804\uccb4\ub85c\ub294 \uc2e4\uc81c \uc218\uc694\ubcf4\ub2e4 40\uac1c \ub9ce\uc558\uc73c\uba70, \uc774\ub294 \uc2e4\uc81c \ucd1d\uc218\uc694\uc758 10%\uc785\ub2c8\ub2e4. \uacfc\ub300 \uc608\uce21\uacfc \uacfc\uc18c \uc608\uce21\uc740 \ud569\uc0b0 \uacfc\uc815\uc5d0\uc11c \uc11c\ub85c \uc0c1\uc1c4\ub420 \uc218 \uc788\uc73c\ubbc0\ub85c, \ud3b8\ud5a5\ub9cc\uc73c\ub85c\ub294 \uc624\ucc28\uc758 \ud06c\uae30\ub97c \uc124\uba85\ud560 \uc218 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774 4\uac1c \ud589\uc740 \uc9c0\ud45c\ub97c \uc124\uba85\ud558\uae30 \uc704\ud55c \uc608\uc2dc\uc77c \ubfd0, \uac80\uc99d\uc5d0 \ucda9\ubd84\ud55c \uc774\ub825\uc740 \uc544\ub2d9\ub2c8\ub2e4. \ud574\ub2f9 \uc81c\ud488\uc758 \uacc4\uc808\uc131, \uc8fc\ubb38 \ud328\ud134, \uad00\ub828 \ubcc0\ud654\ub97c \ubc18\uc601\ud560 \uc218 \uc788\ub3c4\ub85d \uae30\uc900 \uc2dc\uc810\uc744 \uc62e\uaca8 \uac00\uba70 \ucda9\ubd84\ud788 \ubc18\ubcf5 \uac80\uc99d\ud558\uc138\uc694.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uc815\ud655\ub3c4 \uc9c0\ud45c\uac00 \uc624\ud574\ub97c \ubd80\ub974\uc9c0 \uc54a\ub3c4\ub85d \ud558\uae30<\/h3>\n\n\n<p>\ud3c9\uade0 \uc808\ub300 \ubc31\ubd84\uc728 \uc624\ucc28(MAPE)\ub294 \uac01 \uae30\uac04\uc758 \uc808\ub300 \uc624\ucc28\ub97c \ud574\ub2f9 \uae30\uac04\uc758 \uc2e4\uc81c \uc218\uc694\ub85c \ub098\ub215\ub2c8\ub2e4. \uc2e4\uc81c \uc218\uc694\uac00 0\uc774\uba74 \uc815\uc758\ub418\uc9c0 \uc54a\uace0, 0\uc5d0 \uac00\uae4c\uc6b0\uba74 \uac12\uc774 \ubd88\uc548\uc815\ud574\uc9d1\ub2c8\ub2e4. \ub530\ub77c\uc11c \uc218\uc694\uac00 \ub4dc\ubb38\ub4dc\ubb38 \ubc1c\uc0dd\ud558\ub294 \uc81c\uc870\uc5c5\uc5d0\uc11c\ub294 \uae30\ubcf8 \uc9c0\ud45c\ub85c \uc801\ud569\ud558\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>WAPE\ub294 \uc218\uc694\uac00 0\uc778 \uae30\uac04\uc774 \uc77c\ubd80 \ud3ec\ud568\ub418\uc5b4\ub3c4 \uacc4\uc0b0\ud560 \uc218 \uc788\uc9c0\ub9cc, \uc2e4\uc81c \ucd1d\uc218\uc694\uac00 0\uc774\uba74 \uc815\uc758\ub418\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4. \ub610\ud55c \uc218\uc694\ub7c9\uc5d0 \ub530\ub77c \ubd84\ubaa8\uac00 \ub2ec\ub77c\uc9c0\ubbc0\ub85c, \uc218\ub7c9 \uae30\uc900 \uc624\ucc28\uac00 \uadf8\ub300\ub85c\uc5ec\ub3c4 \uc218\uc694\uac00 \ub298\uba74 \ube44\uc728\uc774 \uac1c\uc120\ub420 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ub3d9\uc77c\ud55c \uac80\uc99d \uae30\uac04\uc744 \uae30\uc900\uc73c\ub85c MAE, \ud3b8\ud5a5, \ub2e8\uc21c\ud55c \uae30\ubcf8 \uc608\uce21\uc758 \uacb0\uacfc\uc640 \ud568\uaed8 \uc0b4\ud3b4\ubcf4\uc138\uc694.<\/p>\n\n\n<p>\uc81c\ud488\uad70 \ud569\uacc4\ub9cc \ubcf4\uba74 \ud55c \uc0ac\uc591\uc740 \uc9c0\uc18d\uc801\uc73c\ub85c \uacfc\ub300 \uc608\uce21\ub418\uace0 \ub2e4\ub978 \uc0ac\uc591\uc740 \uacfc\uc18c \uc608\uce21\ub418\ub294 \ubb38\uc81c\uac00 \uac00\ub824\uc9c8 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc804\uccb4 \ud3c9\uade0\ub9cc \ubcf4\uc9c0 \ub9d0\uace0, \uace0\uac1d \uc218\uc694 \ucda9\uc871\uc5d0 \uc704\ud5d8\uc744 \ucd08\ub798\ud558\uac70\ub098 \uace0\uac00 \uc7ac\uace0 \ub610\ub294 \ud575\uc2ec \uc790\uc6d0\uc758 \ubd80\ud558\ub97c \uc720\ubc1c\ud558\ub294 \uc81c\ud488\uc744 \uac80\ud1a0\ud558\uc138\uc694.<\/p>\n\n\n<p>\uc5b4\ub514\uc5d0\ub098 \uc801\uc6a9\ud560 \uc218 \uc788\ub294 \ud5c8\uc6a9 \uc608\uce21 \uc624\ucc28\uc728\uc740 \uc5c6\uc2b5\ub2c8\ub2e4. 15\uac1c\uc758 \uc624\ucc28\ub77c\ub3c4 \uc800\ub834\ud55c \uacf5\uc6a9 \ubd80\ud488\uacfc \uc218\uc694\uac00 \uc801\uc740 \uc644\uc81c\ud488 \uc870\ub9bd\ud488\uc5d0 \ubbf8\uce58\ub294 \uc601\ud5a5\uc740 \ub2e4\ub985\ub2c8\ub2e4. \ubd80\uc871 \ubc0f \uacfc\uc789\uc5d0 \ub530\ub978 \ube44\uc6a9, \ubcf4\ucda9 \ub9ac\ub4dc\ud0c0\uc784, \uac00\ub2a5\ud55c \ub300\uc751 \ubc29\uc548\uc744 \uae30\uc900\uc73c\ub85c \uc608\uce21\uc744 \ud3c9\uac00\ud558\uc138\uc694. \ubd88\ud655\uc2e4\uc131\uacfc \uc11c\ube44\uc2a4 \uc815\ucc45\uc5d0 \ub530\ub77c \uc5ec\uc720\ubd84\uc744 \uacb0\uc815\ud574\uc57c \ud558\uba70, \ubaa8\ub4e0 \uc0dd\uc0b0 \uc218\ub7c9\uc5d0 MAE\ub97c \ub2e8\uc21c\ud788 \ub354\ud574\uc11c\ub294 \uc548 \ub429\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">6. \uc608\uce21\uc744 \ubc14\ud0d5\uc73c\ub85c \uc0dd\uc0b0 \uc758\uc0ac\uacb0\uc815 \ub0b4\ub9ac\uae30<\/h2>\n\n\n<p>\uac80\ud1a0\ub97c \ub9c8\uce5c \uc608\uce21\uc740 \uace0\uac1d \uc218\uc694\uc758 \ucd94\uc815\uce58\uc785\ub2c8\ub2e4. \uc0dd\uc0b0 \uc218\ub7c9\uc740 \ud655\uc815 \uc8fc\ubb38, \uc0ac\uc6a9 \uac00\ub2a5\ud55c \uc7ac\uace0, \uae30\uc874 \uc0dd\uc0b0\ubd84\uc758 \uc785\uace0 \uc608\uc815\ub7c9, \uc720\uc9c0\ud558\ub824\ub294 \uc7ac\uace0 \uc218\uc900\uc744 \uace0\ub824\ud574 \ubcc4\ub3c4\ub85c \uacb0\uc815\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uac19\uc740 \uc218\uc694\ub97c \uc911\ubcf5 \uacc4\uc0b0\ud558\uc9c0 \ub9c8\uc138\uc694. \uc608\uce21 \uc218\uc694\uac00 120\uac1c\uc774\uace0 \uadf8\uc911 70\uac1c\uac00 \ud655\uc815 \uc8fc\ubb38\uc73c\ub85c \ub4e4\uc5b4\uc654\ub2e4\uba74, \uac19\uc740 \uae30\uac04\uc758 \uc8fc\ubb38\uc774 \uc608\uce21\uc744 \ub300\uccb4\ud558\ub294 \ub2e8\uc21c\ud55c \uc608\uce21 \uc18c\uc9c4 \uc815\ucc45\uc5d0\uc11c\ub294 \uc544\uc9c1 \uc8fc\ubb38\uc73c\ub85c \ub300\uccb4\ub418\uc9c0 \uc54a\uc740 \uc608\uce21 \uc218\uc694\uac00 50\uac1c \ub0a8\uc2b5\ub2c8\ub2e4. \ucd1d\uc218\uc694\ub294 190\uac1c\uac00 \uc544\ub2c8\ub77c \uc5ec\uc804\ud788 120\uac1c\uc785\ub2c8\ub2e4. \uc2e4\uc81c \uc6b4\uc601 \uc815\ucc45\uc5d0 \ub530\ub77c\uc11c\ub294 \uc11c\ub85c \ub2e4\ub978 \ub0a0\uc9dc\ub098 \uc218\uc694 \uc720\ud615\uc5d0 \uac78\uccd0 \uc608\uce21\uc744 \uc18c\uc9c4\ud560 \uc218\ub3c4 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774\uc81c \uc0ac\uc6a9 \uac00\ub2a5\ud55c \uc644\uc81c\ud488\uc774 30\uac1c \uc788\uace0, \uae30\uac04 \ub9d0\uc5d0 10\uac1c\ub97c \ub0a8\uae30\ub824 \ud558\uba70, \uc0dd\uc0b0\ubd84\uc758 \uc785\uace0 \uc608\uc815\ub7c9\uc740 \uc5c6\ub2e4\uace0 \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \uc218\uc694 120\uac1c\ub97c \ucda9\uc871\ud558\uae30 \uc704\ud55c \uc0dd\uc0b0 \uc81c\uc548 \uc218\ub7c9\uc740 <strong>100\uac1c: 120 + 10 \u2212 30<\/strong>\uc785\ub2c8\ub2e4. \uc774\ub294 \uc7ac\uace0\uc640 \uc0dd\uc0b0 \uc644\ub8cc\ud488\uc744 \ud574\ub2f9 \uc218\uc694\uc5d0 \ud544\uc694\ud55c \uc2dc\uc810\ubcf4\ub2e4 \uba3c\uc800 \uc0ac\uc6a9\ud560 \uc218 \uc788\ub2e4\ub294 \uc804\uc81c\uc5d0 \ub530\ub978 \uacc4\uc0b0\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/master-production-schedule\/\">\uae30\uc900\uc0dd\uc0b0\uacc4\ud68d<\/a>\uc740 \uc774\ub7ec\ud55c \ud488\ubaa9\ubcc4 \uc218\ub7c9\uacfc \uacf5\uae09 \uac00\ub2a5 \uc77c\uc815\uc744 \uad6c\uccb4\ud654\ud569\ub2c8\ub2e4. <a href=\"\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/mrp-%ea%b0%84%eb%8b%a8%ed%95%9c-%ea%b0%80%ec%9d%b4%eb%93%9c\/\">MRP<\/a>\ub294 \uc2b9\uc778\ub41c \uc0dd\uc0b0 \uc218\ub7c9\uc5d0 \ud544\uc694\ud55c \uc790\uc7ac\uc640 \ubd80\ud488\uc744 \uacc4\uc0b0\ud569\ub2c8\ub2e4. \uadf8\ub7ec\ub098 \uc608\uce21\uc774\ub098 \uc7ac\uace0 \uc794\ub7c9\ub9cc\uc73c\ub85c\ub294 \uacf5\uc7a5\uc774 \uc81c\ub54c \uc0dd\uc0b0\ud560 \uc5ec\ub825\uc774 \uc788\ub294\uc9c0 \ud655\uc778\ud560 \uc218 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc608\ub97c \ub4e4\uc5b4 100\uac1c\ub97c \uc0dd\uc0b0\ud558\ub294 \ub370 \uac1c\ub2f9 \uc124\ube44 \uac00\ub3d9\uc2dc\uac04 0.2\uc2dc\uac04\uacfc \uc900\ube44 \uc2dc\uac04 2\uc2dc\uac04\uc774 \ud544\uc694\ud558\ub2e4\uba74, \ud575\uc2ec \uc124\ube44\uc5d0\uc11c \ucd1d <strong>22\uc2dc\uac04<\/strong>\uc774 \uc18c\uc694\ub429\ub2c8\ub2e4. \uc774 \uc124\ube44\uc5d0\ub294 \uc774\ubbf8 \ub2e4\ub978 \ud655\uc815 \uc791\uc5c5\uc5d0 20\uc2dc\uac04\uc774 \ud544\uc694\ud558\uc9c0\ub9cc, \uc694\uad6c \uc644\ub8cc\uc77c\uae4c\uc9c0 \uc0ac\uc6a9\ud560 \uc218 \uc788\ub294 \uc2dc\uac04\uc740 40\uc2dc\uac04\ubfd0\uc785\ub2c8\ub2e4. \uc81c\uc548\ub41c \ucd1d\ubd80\ud558\ub294 42\uc2dc\uac04\uc785\ub2c8\ub2e4. \ubd80\uc871\ud55c 2\uc2dc\uac04\uc744 \ud655\ubcf4\ud558\uac70\ub098, \uc791\uc5c5 \uc870\uac74\uc5d0 \ub9de\ub294 \ub300\uccb4 \uc124\ube44\ub97c \uc0ac\uc6a9\ud558\uac70\ub098, \uae30\uc874\uc5d0 \ud655\uc815\ud55c \uc0dd\uc0b0 \uc77c\uc815\uc744 \uc870\uc815\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc124\ube44 \ubd80\ud558\ub97c \uac00\uc6a9 \uc2dc\uac04\uc5d0 \ub9de\ucd94\uae30 \uc704\ud574 \uace0\uac1d \uc218\uc694 \uc608\uce21\uc744 110\uac1c\ub85c \ub0ae\ucd94\uc9c0 \ub9c8\uc138\uc694. \uc218\uc694 \ucd94\uc815\uce58\ub294 \uadf8\ub300\ub85c \ud655\uc778\ud560 \uc218 \uc788\uac8c \ub450\uace0, \uacf5\uae09 \ubd80\uc871\uc744 \uc5b4\ub5bb\uac8c \ud574\uacb0\ud560\uc9c0 \uacb0\uc815\ud558\uc138\uc694.<\/p>\n\n\n<h2 class=\"wp-block-heading\">SkyPlanner\ub85c \uc218\uc694 \ub300\uc751\uc5d0 \ud544\uc694\ud55c \uc791\uc5c5 \uc77c\uc815 \uc218\ub9bd\ud558\uae30<\/h2>\n\n\n<p>\uc608\uce21\uc774 \ub2ec\ub77c\uc838 \ud655\uc815\ud55c \uc0dd\uc0b0 \uacc4\ud68d\uc744 \ubcc0\uacbd\ud558\uba74, \uc77c\uc815 \uc870\uc815\uc774 \uc5ec\ub7ec \uc124\ube44\uc640 \uc8fc\ubb38\uc5d0 \uac78\uccd0 \ud544\uc694\ud574\uc9c8 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ubc30\uce58 \ud558\ub098\ub97c \ucd94\uac00\ud558\uba74 \ub4a4\ub530\ub974\ub294 \uacf5\uc815, \ud574\ub2f9 \uc124\ube44\uc5d0 \uc774\ubbf8 \ub300\uae30 \uc911\uc778 \uc791\uc5c5, \uadf8\ub9ac\uace0 \uc774 \uc791\uc5c5\ub4e4\uc5d0 \ub2ec\ub9b0 \ub0a9\ud488 \uc77c\uc815\uae4c\uc9c0 \uc601\ud5a5\uc744 \ubc1b\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>SkyPlanner APS\ub294 \uc774\ub7ec\ud55c \uc791\uc5c5\uc744 <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-scheduling\/\">\uc790\uc6d0\ubcc4 \uc791\uc5c5 \uc77c\uc815\uc744 \ud568\uaed8 \ubcfc \uc218 \uc788\ub294 \ud558\ub098\uc758 \uc77c\uc815\ud45c<\/a>\ub85c \ud1b5\ud569\ud569\ub2c8\ub2e4.<\/strong> \uc791\uc5c5\uc7a5, \uad50\ub300\uc870, \uc791\uc5c5\uc790, \uacf5\uc815 \ub2e8\uacc4\uc640 \uc18c\uc694 \uc2dc\uac04\uc744 \uc124\uc815\ud55c \ub4a4 \uc6b0\uc120\uc21c\uc704\uc640 \uc7a0\uae08 \uae30\ub2a5\uc73c\ub85c \uacc4\ud68d\uc744 \uc870\uc815\ud558\uc138\uc694. SkyPlanner\uc758 \uc2a4\ucf00\uc904\ub9c1 \uc778\uacf5\uc9c0\ub2a5\uc778 Arcturus\ub294 \uc124\uc815\ub41c \uc0dd\uc0b0 \ub2a5\ub825, \uc791\uc5c5 \uac00\ub2a5\ud55c \uc790\uc6d0, \uacf5\uc815 \uac04 \uc120\ud6c4 \uad00\uacc4\ub97c \uace0\ub824\ud574 \uc791\uc5c5 \ubc30\uce58\ub97c \uacc4\uc0b0\ud569\ub2c8\ub2e4. \uac04\ud2b8 \ud654\uba74\uc5d0\uc11c \uacc4\uc0b0\ub41c \uc791\uc5c5 \uc21c\uc11c\uc640 \uc644\ub8cc\uc77c\uc744 \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc55e\uc11c \uc81c\uc548\ud55c 100\uac1c \uc0dd\uc0b0\uc758 \uacbd\uc6b0, \uac00\uacf5\uc5d0 \ud544\uc694\ud55c \uc791\uc5c5\uc744 \ub098\uba38\uc9c0 \uacf5\uc815 \ubc0f \uac19\uc740 \uc790\uc6d0\uc744 \uc0ac\uc6a9\ud558\ub294 \ub2e4\ub978 \uc791\uc5c5\uacfc \uc5f0\uacb0\ud574 \uac80\ud1a0\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc601\ud5a5\uc744 \ubc1b\ub294 \uc124\ube44\uc758 \uc791\uc5c5 \ub300\uae30\uc5f4\uc744 \uc77c\uc77c\uc774 \uc218\uc791\uc5c5\uc73c\ub85c \ub9de\ucd94\uc9c0 \uc54a\uace0\ub3c4, \uc2b9\uc778\ub41c \uad50\ub300\uc870 \ubcc0\uacbd\uc774\ub098 \uc6b0\uc120\uc21c\uc704 \uc870\uc815\uc73c\ub85c \ud544\uc694\ud55c \uc2dc\uc810\uc5d0 \uc791\uc5c5\uc744 \uc644\ub8cc\ud560 \uc218 \uc788\ub294\uc9c0 \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc790\uc7ac\ub97c \uace0\ub824\ud558\ub294 \uc2a4\ucf00\uc904\ub9c1 \uae30\ub2a5\uc744 \ud65c\uc131\ud654\ud558\uba74, Arcturus\ub294 \uc2dc\uc791 \uc2dc\uac04\uc744 \uacc4\uc0b0\ud560 \ub54c \uc7ac\uace0\uc640 \uc785\uace0 \uc608\uc815 \uc790\uc7ac\uc758 \uac00\uc6a9 \uc2dc\uc810\uc744 \uace0\ub824\ud569\ub2c8\ub2e4. \uad6c\ub9e4 \uc790\uc7ac\uc758 \ub0a9\ud488 \uc608\uc815\uc77c\uc740 \uc0ac\uc6a9 \uac00\ub2a5\ud560 \uac83\uc73c\ub85c \uc608\uc0c1\ub418\ub294 \uc2dc\uc810\uc744 \ub098\ud0c0\ub0b4\uba70, \uc7ac\uace0\ub294 \uc785\uace0\uac00 \ud655\uc778\ub418\uba74 \uac31\uc2e0\ub429\ub2c8\ub2e4. \uc790\uc7ac\ub098 \uc120\ud589 \uacf5\uc815\uc774 \uc900\ube44\ub418\uc9c0 \uc54a\uc558\ub2e4\uba74 \uc124\ube44\uc5d0 \ube48 \uc2dc\uac04\ub9cc \uc788\ub2e4\uace0 \ud574\uc11c \uc791\uc5c5\uc744 \uc2dc\uc791\ud560 \uc218\ub294 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc608\uce21\uacfc \ubcf4\ucda9\uc5d0 \uad00\ud55c \uc758\uc0ac\uacb0\uc815\uc740 \uae30\uc874 \uc218\uc694 \uacc4\ud68d \ud504\ub85c\uc138\uc2a4\ub098 ERP\uc5d0\uc11c \uacc4\uc18d \uad00\ub9ac\ud558\uc138\uc694. SkyPlanner\ub294 \uc608\uce21\uc744 \ubc14\ud0d5\uc73c\ub85c \uc0dd\uc0b0 \uc791\uc5c5\uc744 \uc790\ub3d9 \uc0dd\uc131\ud558\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4. \uc0ac\uc6a9\uc790\uac00 \uc0dd\uc131\ud558\uac70\ub098 \uc5f0\ub3d9\uc744 \ud1b5\ud574 \uc804\ub2ec\ud55c \uc0dd\uc0b0 \uc791\uc5c5\uc758 \uc77c\uc815\uc744 \uc218\ub9bd\ud569\ub2c8\ub2e4. <strong>SkyPlanner\ub294 \uac1c\ubc29\ud615 REST API\ub97c \ud1b5\ud574 \ubaa8\ub4e0 ERP \ub610\ub294 MES\uc640 \uc5f0\ub3d9\ub429\ub2c8\ub2e4.<\/strong> \ub530\ub77c\uc11c \uc774\ub7ec\ud55c \uc758\uc0ac\uacb0\uc815\uc744 \uad00\ub9ac\ud558\ub294 \uae30\uc874 \uc2dc\uc2a4\ud15c\uc744 \uc720\uc9c0\ud558\uba74\uc11c \uc138\ubd80 \uc2e4\ud589 \uacc4\ud68d\uc744 \uac1c\uc120\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc218\uc694\uac00 \ubc14\ub014 \ub54c\ub9c8\ub2e4 \uc218\uc791\uc5c5\uc73c\ub85c \uc77c\uc815\uc744 \uc870\uc815\ud574\uc57c \ud55c\ub2e4\uba74 SkyPlanner\ub97c \uc120\ud0dd\ud560 \uc774\uc720\uac00 \uc5ec\uae30\uc5d0 \uc788\uc2b5\ub2c8\ub2e4. \uc0dd\uc0b0\uacc4\ud68d \ub2f4\ub2f9\uc790\uac00 \ubb34\uc5c7\uc774 \uc911\uc694\ud55c\uc9c0 \uacb0\uc815\ud558\uba74, Arcturus\uac00 \uadf8 \uacb0\uc815\uc744 \uc2e4\ud589\ud560 \uc218 \uc788\ub3c4\ub85d \uc790\uc6d0\ubcc4 \uc791\uc5c5 \uc21c\uc11c\ub97c \uacc4\uc0b0\ud569\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\ube60\ub978 \uc77c\uc815 \uc7ac\uc870\uc815\uc774 Fredman Operations\uc5d0 \uac00\uc838\uc628 \ubcc0\ud654<\/h3>\n\n\n<p>\ud540\ub780\ub4dc\uc5d0\uc11c \uc2dd\ud488\uc6a9 \uc8fc\ubc29\u00b7\ud3ec\uc7a5 \uc81c\ud488\uc744 \uc81c\uc870\ud558\ub294 <a href=\"\/ko\/%ea%b3%a0%ea%b0%9d-%ec%82%ac%eb%a1%80\/fredman-operations\/\">Fredman Operations<\/a>\ub294 \uacfc\uac70\uc5d0 \uc124\ube44\uac00 \uc5b8\uc81c \ube44\ub294\uc9c0, \uad50\ub300\uc870\ubcc4 \uc0dd\uc0b0 \ub2a5\ub825\uc774 \uc5bc\ub9c8\ub098 \ub418\ub294\uc9c0 \uc815\ud655\ud788 \ud30c\uc545\ud558\uc9c0 \ubabb\ud55c \ucc44 \uc218\uc791\uc5c5\uc73c\ub85c \uc791\uc5c5 \uc6b0\uc120\uc21c\uc704\ub97c \uc815\ud588\uc2b5\ub2c8\ub2e4. \uae34\uae09\ud558\uac8c \uc77c\uc815\uc744 \uc7ac\uc870\uc815\ud558\ub294 \ub370 1\uc2dc\uac04 \uc774\uc0c1 \uac78\ub9ac\uae30\ub3c4 \ud588\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>SkyPlanner\ub97c \ub3c4\uc785\ud558\uba74\uc11c L7 \ubc0f LTR \uc2dc\uc2a4\ud15c\uc744 \uc5f0\ub3d9\ud558\uace0, \uc0dd\uc0b0 \ub2a5\ub825\uacfc \uc791\uc5c5\uc744 \ud558\ub098\uc758 \uac04\ud2b8 \ucc28\ud2b8\uc5d0\uc11c \ud568\uaed8 \ubcfc \uc218 \uc788\uac8c \ub418\uc5c8\uc2b5\ub2c8\ub2e4. \uace0\uac1d \uc0ac\ub840\uc5d0 \ub530\ub974\uba74, \uc804\uccb4 \uc218\uc8fc\uc794\uace0\uc758 \ub0a9\uae30\ub97c \uc55e\ub2f9\uaca8 \ub2ec\ub77c\ub294 \uc694\uccad\uc744 \uac80\ud1a0\ud558\ub294 \ub370 \uc218\uc791\uc5c5 \uacc4\uc0b0\uc73c\ub85c \uba87 \uc2dc\uac04\uc529 \uac78\ub9ac\ub358 \uac83\uc774 \uc774\uc81c\ub294 \uba87 \ucd08\uba74 \ub429\ub2c8\ub2e4. \ub2f4\ub2f9 \ud300\uc740 \ucd08\uacfc\uadfc\ubb34\uac00 \uc904\uace0 \uc77c\uc815 \ubcc0\uacbd\uc5d0\ub3c4 \ub354 \ube60\ub974\uac8c \ub300\uc751\ud558\uac8c \ub418\uc5c8\ub2e4\uace0 \uc804\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774 \uc0ac\ub840\uc5d0\uc11c \uc8fc\ubaa9\ud560 \ud6a8\uacfc\ub294 \uc694\uad6c\uc0ac\ud56d\uc758 \ubcc0\uacbd\uc774 \uc791\uc5c5\uacfc \ub0a9\uae30\uc5d0 \uc5b4\ub5a4 \uc601\ud5a5\uc744 \ubbf8\uce58\ub294\uc9c0, \uc544\uc9c1 \ub300\uc751\ud560 \uc2dc\uac04\uc774 \uc788\uc744 \ub54c \ud30c\uc545\ud560 \uc218 \uc788\ub2e4\ub294 \uc810\uc785\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc218\uc694 \uc608\uce21\uacfc \uc0dd\uc0b0 \ub300\uc751\uc744 \uc5f0\uacc4\ud558\uc138\uc694<\/h2>\n\n\n<p>\uc758\uc0ac\uacb0\uc815 \uc8fc\uae30\uc5d0 \ub9de\ucdb0 \uac80\ud1a0 \uc8fc\uae30\ub97c \uc815\ud558\uc138\uc694. \uc0c8\ub85c\uc6b4 \uc218\uc694\uac00 \ub4e4\uc5b4\uc624\uba74 \uae30\uc900 \uc608\uce21\uc744 \uac31\uc2e0\ud558\uace0, \uc911\uc694\ud55c \uc608\uc678 \uc0ac\ud56d\uc740 \uc601\uc5c5 \ubd80\uc11c\uc640 \ud568\uaed8 \uac80\ud1a0\ud558\uc138\uc694. \uac01 \uc758\uc0ac\uacb0\uc815\uc5d0 \ud544\uc694\ud55c \ub9ac\ub4dc\ud0c0\uc784\uc744 \uae30\uc900\uc73c\ub85c \ub2f9\uc2dc \uc800\uc7a5\ud574 \ub454 \uc608\uce21\uc758 \uc624\ucc28\ub3c4 \ucd94\uc801\ud574\uc57c \ud569\ub2c8\ub2e4. \uc815\uae30\uc801\uc778 \uc608\uce21 \uc218\uc815\uc73c\ub85c \uc778\ud574 \uc0dd\uc0b0 \ubd80\uc11c\uac00 \uc774\ubbf8 \uc774\ud589\uc744 \uc900\ube44 \uc911\uc778 \ud655\uc815 \uc0ac\ud56d\uc774 \uc544\ubb34\ub7f0 \ud655\uc778 \uc5c6\uc774 \ubc14\ub00c\uc9c0 \uc54a\ub3c4\ub85d \ud558\uc138\uc694.<\/p>\n\n\n<p>\ud569\uc758\ub41c \ubcc0\uacbd\uc73c\ub85c \uc0dd\uc0b0 \uc218\ub7c9\uc774\ub098 \uc81c\ud488\uc744 \uacf5\uae09\ud560 \uc218 \uc788\ub294 \ub0a0\uc9dc\uac00 \ub2ec\ub77c\uc9c0\uba74, \uc0dd\uc0b0 \uc791\uc5c5\uc744 \uac31\uc2e0\ud558\uace0 \ud574\ub2f9 \uc791\uc5c5\uc5d0 \ubc30\uc815\ub41c \uc790\uc6d0\uc758 \uc77c\uc815\uc744 \uac80\ud1a0\ud558\uc138\uc694. \uadf8\ub7ec\uba74 \uad6c\ub9e4\u00b7\uc0dd\uc0b0\u00b7\uc601\uc5c5 \ubd80\uc11c\uac00 \ubb34\uc5c7\uc774 \ubc14\ub00c\uc5c8\uace0 \uc774\uc81c \ubb34\uc5c7\uc744 \ub0a9\ud488\ud560 \uc218 \uc788\ub294\uc9c0 \ub3d9\uc77c\ud55c \uae30\uc900\uc73c\ub85c \ud30c\uc545\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc218\uc791\uc5c5 \uacc4\ud68d\uc744 \uc904\uc774\uba74\uc11c \uc774\ub7ec\ud55c \uc0dd\uc0b0 \ub300\uc751\uc744 \uad00\ub9ac\ud558\ub294 \ubc29\ubc95\uc744 \uc54c\uc544\ubcf4\ub824\uba74 <a href=\"https:\/\/skyplanner.ai\/ko\/%ec%98%81%ec%97%85%ed%8c%80%ec%97%90-%eb%ac%b8%ec%9d%98\/\">SkyPlanner \ub370\ubaa8\ub97c \uc608\uc57d\ud558\uc138\uc694<\/a>. \uc608\uce21 \ubcc0\uacbd \ud6c4 \uacb0\uc815\ud55c \uc0dd\uc0b0 \uc218\ub7c9 \ud55c \uac74\uacfc \ud574\ub2f9 \uc81c\ud488\uc758 \uacf5\uc815 \uacbd\ub85c, \uc81c\ud488\uc774 \uc900\ube44\ub418\uc5b4\uc57c \ud558\ub294 \ub0a0\uc9dc\ub97c \uac00\uc838\uc624\uc138\uc694. \uc774 \uc815\ubcf4\ub294 \uc5ec\ub7ec \uc791\uc5c5\uc774 \ud568\uaed8 \uc0ac\uc6a9\ud558\ub294 \uc0dd\uc0b0 \ub2a5\ub825\uacfc \ub2e4\ub978 \ud655\uc815 \uc0ac\ud56d\uc5d0 \ubbf8\uce58\ub294 \uc601\ud5a5\uc744 \uc0b4\ud3b4\ubcf4\ub294 \uc2e4\uc9c8\uc801\uc778 \ucd9c\ubc1c\uc810\uc774 \ub429\ub2c8\ub2e4. \uba3c\uc800 \uc9c1\uc811 \uc0b4\ud3b4\ubcf4\uace0 \uc2f6\ub2e4\uba74 <a href=\"https:\/\/skyplanner.ai\/ko\/%ed%8f%89%ea%b0%80%ed%8c%90\/\">\ub370\ubaa8 \ub370\uc774\ud130\ub85c SkyPlanner\ub97c \uccb4\ud5d8\ud574 \ubcf4\uc138\uc694<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\uc81c\uc870\uc5c5 \uc218\uc694 \uc608\uce21: \uc2e4\ubb34 \uac00\uc774\ub4dc \ud648 &raquo; \ub9ac\uc18c\uc2a4 &raquo; \uc81c\uc870\uc5c5 \uc218\uc694 \uc608\uce21: \uc2e4\ubb34 \uac00\uc774\ub4dc \uc81c\uc870\uc5c5\uc758 \uc218\uc694 \uc608\uce21\uc740 \uace0\uac1d\uc5d0\uac8c \uc5b4\ub5a4 \uc81c\ud488\uc774 \uc5b8\uc81c, \uc5bc\ub9c8\ub098 \ud544\uc694\ud560\uc9c0 \ucd94\uc815\ud558\ub294 \uc77c\uc785\ub2c8\ub2e4. \uacfc\uac70 \uc218\uc694\uc640 \uc55e\uc73c\ub85c \uc608\uc0c1\ub418\ub294 \ubcc0\ud654\uc5d0 \uad00\ud55c \uc815\ubcf4\ub97c \ud568\uaed8 \ud65c\uc6a9\ud574 \uad6c\ub9e4 \ubd80\uc11c\uc640 \uc0dd\uc0b0 \ubd80\uc11c\uac00 \uacf5\ud1b5\ub41c \uadfc\uac70\ub85c \uc758\uc0ac\uacb0\uc815\uc744 \ub0b4\ub9ac\ub3c4\ub85d \ub3d5\uc2b5\ub2c8\ub2e4. \uc720\uc6a9\ud55c \uc608\uce21\uc740 \ud310\ub9e4 \uac00\ub2a5\uc131\uc774 \uc788\ub2e4\ub294 \uc774\uc720\ub9cc\uc73c\ub85c \ubaa8\ub450 \uc7ac\uace0\ub85c \uc313\uc9c0 \uc54a\uc73c\uba74\uc11c\ub3c4 \ud544\uc694\ud55c \uc900\ube44\ub97c &#8230; <a title=\"\uc81c\uc870\uc5c5 \uc218\uc694 \uc608\uce21: \uc2e4\ubb34 \uac00\uc774\ub4dc\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/demand-forecasting-manufacturing\/\" aria-label=\"Read more about \uc81c\uc870\uc5c5 \uc218\uc694 \uc608\uce21: \uc2e4\ubb34 \uac00\uc774\ub4dc\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":108861,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2530,496],"tags":[],"class_list":["post-108857","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps--","category-496","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\uc81c\uc870\uc5c5 \uc218\uc694 \uc608\uce21: \uc2e4\ubb34 \uac00\uc774\ub4dc<\/title>\n<meta name=\"description\" content=\"\uc81c\uc870\uc5c5 \uc218\uc694 \uc608\uce21\uc744 \uc2e4\ubb34\uc5d0 \ud65c\uc6a9\ud558\uc138\uc694. \uc608\uce21 \ubc29\ubc95\uc744 \uace0\ub974\uace0 \uc624\ucc28\ub97c \uce21\uc815\ud574 \uc218\uc694 \ubcc0\ud654\uc5d0 \ub9de\ucdb0 \uc774\ud589 \uac00\ub2a5\ud55c \uc0dd\uc0b0 \uacc4\ud68d\uc744 \ud655\uc815\ud558\uc138\uc694.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/demand-forecasting-manufacturing\/\" \/>\n<meta property=\"og:locale\" content=\"ko_KR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\uc81c\uc870\uc5c5 \uc218\uc694 \uc608\uce21: \uc2e4\ubb34 \uac00\uc774\ub4dc\" \/>\n<meta property=\"og:description\" content=\"\uc81c\uc870\uc5c5 \uc218\uc694 \uc608\uce21\uc744 \uc2e4\ubb34\uc5d0 \ud65c\uc6a9\ud558\uc138\uc694. \uc608\uce21 \ubc29\ubc95\uc744 \uace0\ub974\uace0 \uc624\ucc28\ub97c \uce21\uc815\ud574 \uc218\uc694 \ubcc0\ud654\uc5d0 \ub9de\ucdb0 \uc774\ud589 \uac00\ub2a5\ud55c \uc0dd\uc0b0 \uacc4\ud68d\uc744 \ud655\uc815\ud558\uc138\uc694.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/demand-forecasting-manufacturing\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-24T14:53:53+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-24T14:56:06+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/demand-forecasting-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\uae00\uc4f4\uc774\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/demand-forecasting-manufacturing\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/demand-forecasting-manufacturing\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"\uc81c\uc870\uc5c5 \uc218\uc694 \uc608\uce21: \uc2e4\ubb34 \uac00\uc774\ub4dc\",\"datePublished\":\"2026-10-24T14:53:53+00:00\",\"dateModified\":\"2026-10-24T14:56:06+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/demand-forecasting-manufacturing\\\/\"},\"wordCount\":39,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/demand-forecasting-manufacturing\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/demand-forecasting-manufacturing-hero.png\",\"articleSection\":[\"APS \ubc0f \uc2a4\ucf00\uc904\ub9c1\",\"\ub9ac\uc18c\uc2a4\"],\"inLanguage\":\"ko-KR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/demand-forecasting-manufacturing\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/demand-forecasting-manufacturing\\\/\",\"name\":\"\uc81c\uc870\uc5c5 \uc218\uc694 \uc608\uce21: \uc2e4\ubb34 \uac00\uc774\ub4dc\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/demand-forecasting-manufacturing\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/demand-forecasting-manufacturing\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/demand-forecasting-manufacturing-hero.png\",\"datePublished\":\"2026-10-24T14:53:53+00:00\",\"dateModified\":\"2026-10-24T14:56:06+00:00\",\"description\":\"\uc81c\uc870\uc5c5 \uc218\uc694 \uc608\uce21\uc744 \uc2e4\ubb34\uc5d0 \ud65c\uc6a9\ud558\uc138\uc694. \uc608\uce21 \ubc29\ubc95\uc744 \uace0\ub974\uace0 \uc624\ucc28\ub97c \uce21\uc815\ud574 \uc218\uc694 \ubcc0\ud654\uc5d0 \ub9de\ucdb0 \uc774\ud589 \uac00\ub2a5\ud55c \uc0dd\uc0b0 \uacc4\ud68d\uc744 \ud655\uc815\ud558\uc138\uc694.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/demand-forecasting-manufacturing\\\/#breadcrumb\"},\"inLanguage\":\"ko-KR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/demand-forecasting-manufacturing\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/demand-forecasting-manufacturing\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/demand-forecasting-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/demand-forecasting-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"A magnifying glass examines groups of machined rings beside pale outlines representing future demand.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/demand-forecasting-manufacturing\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\uc81c\uc870\uc5c5 \uc218\uc694 \uc608\uce21: \uc2e4\ubb34 \uac00\uc774\ub4dc\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ko-KR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\uc81c\uc870\uc5c5 \uc218\uc694 \uc608\uce21: \uc2e4\ubb34 \uac00\uc774\ub4dc","description":"\uc81c\uc870\uc5c5 \uc218\uc694 \uc608\uce21\uc744 \uc2e4\ubb34\uc5d0 \ud65c\uc6a9\ud558\uc138\uc694. \uc608\uce21 \ubc29\ubc95\uc744 \uace0\ub974\uace0 \uc624\ucc28\ub97c \uce21\uc815\ud574 \uc218\uc694 \ubcc0\ud654\uc5d0 \ub9de\ucdb0 \uc774\ud589 \uac00\ub2a5\ud55c \uc0dd\uc0b0 \uacc4\ud68d\uc744 \ud655\uc815\ud558\uc138\uc694.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/demand-forecasting-manufacturing\/","og_locale":"ko_KR","og_type":"article","og_title":"\uc81c\uc870\uc5c5 \uc218\uc694 \uc608\uce21: \uc2e4\ubb34 \uac00\uc774\ub4dc","og_description":"\uc81c\uc870\uc5c5 \uc218\uc694 \uc608\uce21\uc744 \uc2e4\ubb34\uc5d0 \ud65c\uc6a9\ud558\uc138\uc694. \uc608\uce21 \ubc29\ubc95\uc744 \uace0\ub974\uace0 \uc624\ucc28\ub97c \uce21\uc815\ud574 \uc218\uc694 \ubcc0\ud654\uc5d0 \ub9de\ucdb0 \uc774\ud589 \uac00\ub2a5\ud55c \uc0dd\uc0b0 \uacc4\ud68d\uc744 \ud655\uc815\ud558\uc138\uc694.","og_url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/demand-forecasting-manufacturing\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-24T14:53:53+00:00","article_modified_time":"2026-10-24T14:56:06+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/demand-forecasting-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"\uae00\uc4f4\uc774":"Jussi M\u00e4ntyl\u00e4"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/demand-forecasting-manufacturing\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/demand-forecasting-manufacturing\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"\uc81c\uc870\uc5c5 \uc218\uc694 \uc608\uce21: \uc2e4\ubb34 \uac00\uc774\ub4dc","datePublished":"2026-10-24T14:53:53+00:00","dateModified":"2026-10-24T14:56:06+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/demand-forecasting-manufacturing\/"},"wordCount":39,"publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/demand-forecasting-manufacturing\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/demand-forecasting-manufacturing-hero.png","articleSection":["APS \ubc0f \uc2a4\ucf00\uc904\ub9c1","\ub9ac\uc18c\uc2a4"],"inLanguage":"ko-KR"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/demand-forecasting-manufacturing\/","url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/demand-forecasting-manufacturing\/","name":"\uc81c\uc870\uc5c5 \uc218\uc694 \uc608\uce21: \uc2e4\ubb34 \uac00\uc774\ub4dc","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/demand-forecasting-manufacturing\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/demand-forecasting-manufacturing\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/demand-forecasting-manufacturing-hero.png","datePublished":"2026-10-24T14:53:53+00:00","dateModified":"2026-10-24T14:56:06+00:00","description":"\uc81c\uc870\uc5c5 \uc218\uc694 \uc608\uce21\uc744 \uc2e4\ubb34\uc5d0 \ud65c\uc6a9\ud558\uc138\uc694. \uc608\uce21 \ubc29\ubc95\uc744 \uace0\ub974\uace0 \uc624\ucc28\ub97c \uce21\uc815\ud574 \uc218\uc694 \ubcc0\ud654\uc5d0 \ub9de\ucdb0 \uc774\ud589 \uac00\ub2a5\ud55c \uc0dd\uc0b0 \uacc4\ud68d\uc744 \ud655\uc815\ud558\uc138\uc694.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/demand-forecasting-manufacturing\/#breadcrumb"},"inLanguage":"ko-KR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/demand-forecasting-manufacturing\/"]}]},{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/demand-forecasting-manufacturing\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/demand-forecasting-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/demand-forecasting-manufacturing-hero.png","width":1672,"height":941,"caption":"A magnifying glass examines groups of machined rings beside pale outlines representing future demand."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/demand-forecasting-manufacturing\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ko\/"},{"@type":"ListItem","position":2,"name":"\uc81c\uc870\uc5c5 \uc218\uc694 \uc608\uce21: \uc2e4\ubb34 \uac00\uc774\ub4dc"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ko\/#website","url":"https:\/\/skyplanner.ai\/ko\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ko\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ko-KR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ko\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ko\/","logo":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/demand-forecasting-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/demand-forecasting-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/demand-forecasting-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/demand-forecasting-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/demand-forecasting-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/demand-forecasting-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/demand-forecasting-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/demand-forecasting-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ko\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\uc81c\uc870\uc5c5 \uc218\uc694 \uc608\uce21: \uc2e4\ubb34 \uac00\uc774\ub4dc \ud648 &raquo; \ub9ac\uc18c\uc2a4 &raquo; \uc81c\uc870\uc5c5 \uc218\uc694 \uc608\uce21: \uc2e4\ubb34 \uac00\uc774\ub4dc \uc81c\uc870\uc5c5\uc758 \uc218\uc694 \uc608\uce21\uc740 \uace0\uac1d\uc5d0\uac8c \uc5b4\ub5a4 \uc81c\ud488\uc774 \uc5b8\uc81c, \uc5bc\ub9c8\ub098 \ud544\uc694\ud560\uc9c0 \ucd94\uc815\ud558\ub294 \uc77c\uc785\ub2c8\ub2e4. \uacfc\uac70 \uc218\uc694\uc640 \uc55e\uc73c\ub85c \uc608\uc0c1\ub418\ub294 \ubcc0\ud654\uc5d0 \uad00\ud55c \uc815\ubcf4\ub97c \ud568\uaed8 \ud65c\uc6a9\ud574 \uad6c\ub9e4 \ubd80\uc11c\uc640 \uc0dd\uc0b0 \ubd80\uc11c\uac00 \uacf5\ud1b5\ub41c \uadfc\uac70\ub85c \uc758\uc0ac\uacb0\uc815\uc744 \ub0b4\ub9ac\ub3c4\ub85d \ub3d5\uc2b5\ub2c8\ub2e4. \uc720\uc6a9\ud55c \uc608\uce21\uc740 \ud310\ub9e4 \uac00\ub2a5\uc131\uc774 \uc788\ub2e4\ub294 \uc774\uc720\ub9cc\uc73c\ub85c \ubaa8\ub450 \uc7ac\uace0\ub85c \uc313\uc9c0 \uc54a\uc73c\uba74\uc11c\ub3c4 \ud544\uc694\ud55c \uc900\ube44\ub97c&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/108857","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/comments?post=108857"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/108857\/revisions"}],"predecessor-version":[{"id":108920,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/108857\/revisions\/108920"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media\/108861"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media?parent=108857"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/categories?post=108857"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/tags?post=108857"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}