{"id":105720,"date":"2026-10-22T05:45:06","date_gmt":"2026-10-22T05:45:06","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=105720"},"modified":"2026-10-22T05:47:34","modified_gmt":"2026-10-22T05:47:34","slug":"scrap-rate-in-manufacturing","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/scrap-rate-in-manufacturing\/","title":{"rendered":"\uc81c\uc870\uc5c5 \ud3d0\uae30 \ubd88\ub7c9\ub960: \uc2e4\uc81c \uc190\uc2e4 \uacc4\uc0b0\ud558\uae30"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">\uc81c\uc870\uc5c5 \ud3d0\uae30 \ubd88\ub7c9\ub960: \uc2e4\uc81c \uc190\uc2e4 \uacc4\uc0b0\ud558\uae30<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/ko\/\">\ud648<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/\">\ub9ac\uc18c\uc2a4<\/a> &raquo; \uc81c\uc870\uc5c5 \ud3d0\uae30 \ubd88\ub7c9\ub960: \uc2e4\uc81c \uc190\uc2e4 \uacc4\uc0b0\ud558\uae30<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">\uc608\uc0c1 \uc77d\uae30 \uc2dc\uac04: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> \ubd84<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>\ubc30\uce58 \uc0dd\uc0b0\uc740 \ub05d\ub0ac\uc9c0\ub9cc \uc8fc\ubb38 \uc218\ub7c9\uc740 \uc544\uc9c1 \ucc44\uc6b0\uc9c0 \ubabb\ud588\uc2b5\ub2c8\ub2e4. \uac80\uc0ac\uc5d0\uc11c \ubcf5\uad6c\ud560 \uc218 \uc5c6\ub294 \ubd88\ub7c9\ud488\uc774 \ub098\uc654\uace0, \uc790\uc7ac\ub294 \uc774\ubbf8 \uc18c\ubaa8\ub41c \uc0c1\ud0dc\uc785\ub2c8\ub2e4. \uadf8\ub798\ub3c4 \uace0\uac1d\uc740 \uae08\uc694\uc77c\uc5d0 \uc8fc\ubb38\ud55c \uc804\ub7c9\uc744 \ubc1b\uae30\ub97c \uae30\ub300\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>\uc81c\uc870\uc5c5 \ud3d0\uae30 \ubd88\ub7c9\ub960\uc740 \uc815\ud574\uc9c4 \uc0dd\uc0b0 \uc218\ub7c9 \uc911 \ubcf8\ub798 \uc6a9\ub3c4\ub85c \uc0ac\uc6a9\ud560 \uc218 \uc5c6\uc5b4 \ucd5c\uc885 \ud3d0\uae30\ub41c \uc218\ub7c9\uc758 \ube44\uc728\uc785\ub2c8\ub2e4.<\/strong> \uc11c\ub85c \ube44\uad50\ud560 \uc218 \uc788\ub294 \uc81c\ud488\uad70\uc758 \uc0dd\uc0b0\uacfc \ucd5c\uc885 \ud310\uc815\uc774 \ubaa8\ub450 \ub05d\ub0ac\ub2e4\uba74 \ub2e4\uc74c\uacfc \uac19\uc774 \uacc4\uc0b0\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>\ud3d0\uae30 \ubd88\ub7c9\ub960 (%) = \ucd5c\uc885 \ud3d0\uae30 \uc218\ub7c9 \u00f7 \ub3d9\uc77c \uc0dd\uc0b0 \uc9d1\ub2e8\uc758 \ucd1d\uc218\ub7c9 \u00d7 100<\/strong><\/p>\n\n\n<p>\ubd84\ubaa8\uc5d0\ub294 \ud569\uaca9\ud488\uacfc \ud3d0\uae30\ud488\uc774 \ubaa8\ub450 \ud3ec\ud568\ub429\ub2c8\ub2e4. \uc7ac\uc791\uc5c5\uc744 \uac70\uccd0 \ud569\uaca9\ud55c \ubd80\ud488\uc740 \uc591\ud488 \uc0dd\uc0b0\ub7c9\uc5d0 \ud3ec\ud568\ud558\uba70, \ucd5c\uc885 \ud3d0\uae30\ud488\uc73c\ub85c \uacc4\uc0b0\ud558\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc2e0\ub8b0\ud560 \uc218 \uc788\ub294 \ube44\uc728\uc744 \uc0b0\ucd9c\ud558\uba74 \ubc18\ubcf5\ub418\ub294 \uc190\uc2e4\uc744 \ud30c\uc545\ud558\ub294 \ub370 \ub3c4\uc6c0\uc774 \ub429\ub2c8\ub2e4. \uadf8 \uc190\uc2e4\uc5d0 \ub300\uc751\ud558\ub824\uba74 \uc790\uc7ac \ud604\ud669\ub3c4 \ubc14\ub85c\uc7a1\uace0 \ub300\uccb4 \uc0dd\uc0b0\uc5d0 \ud544\uc694\ud55c \uc2dc\uac04\ub3c4 \ud655\ubcf4\ud574\uc57c \ud569\ub2c8\ub2e4. SkyPlanner\ub294 \ubd88\ub7c9 \uc218\ub7c9 \uae30\ub85d\uc744 \ud1b5\ud574 \ud3d0\uae30 \ubcf4\uace0\ub97c \uc9c0\uc6d0\ud558\uba70, \uc790\uc7ac \ucd94\uc801\uc774 \uc124\uc815\ub418\uc5b4 \uc788\uc73c\uba74 \ud574\ub2f9 \ubd88\ub7c9\ud488\uc758 \uc790\uc7ac \uc18c\ubaa8\ub7c9\ub3c4 \ubc18\uc601\ud569\ub2c8\ub2e4. \uc774\uc5b4\uc11c \uc778\uacf5\uc9c0\ub2a5 \uae30\ubc18 \uc2a4\ucf00\uc904\ub9c1\uc744 \ud1b5\ud574 \uc2b9\uc778\ub41c \ub300\uccb4 \uc0dd\uc0b0 \uacf5\uc815\uc744 \uc774\ubbf8 \ub0a9\uae30\ub97c \uc57d\uc18d\ud55c \uc8fc\ubb38\ub4e4\uacfc \uac19\uc740 \uacc4\ud68d\uc5d0 \ubc30\uce58\ud560 \uc218 \uc788\ub3c4\ub85d \ub3d5\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uac80\uc0ac \ubd88\ud569\uaca9 \uac74\uc218\uac00 \uc544\ub2cc \ucd5c\uc885 \ud310\uc815 \uacb0\uacfc\ub85c \ud3d0\uae30 \ubd88\ub7c9\ub960 \uacc4\uc0b0\ud558\uae30<\/h2>\n\n\n<p>\uae30\uacc4 \uac00\uacf5 \ubd80\ud488 1,000\uac1c\ub97c \uc0dd\uc0b0\ud55c \ubc30\uce58\ub97c \uc608\ub85c \ub4e4\uc5b4 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \ucc98\uc74c \uc0dd\uc0b0\ud55c \ubd80\ud488\uc744 \ub300\uc0c1\uc73c\ub85c \uac80\uc0ac\uc640 \ud5c8\uc6a9\ub41c \uc7ac\uc791\uc5c5\uc744 \uac70\uccd0 \ubaa8\ub4e0 \ubd80\ud488\uc758 \ucd5c\uc885 \ud310\uc815\uc774 \ub098\uc62c \ub54c\uae4c\uc9c0 \ucd94\uc801\ud569\ub2c8\ub2e4.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\ucd5c\ucd08 \ubc30\uce58\uc758 \ucd5c\uc885 \ud310\uc815 \uacb0\uacfc<\/th><th>\ubd80\ud488 \uc218\ub7c9<\/th><th>\ucd5c\uc885 \ud3d0\uae30 \ubd88\ub7c9\ub960 \uacc4\uc0b0 \uc2dc \ubc18\uc601 \ubc29\uc2dd<\/th><\/tr><\/thead><tbody><tr><td>\uccab \uac80\uc0ac\uc5d0\uc11c \ud569\uaca9<\/td><td>920<\/td><td>\uc591\ud488 \uc0dd\uc0b0\ub7c9<\/td><\/tr><tr><td>\uc7ac\uc791\uc5c5 \ud6c4 \ud569\uaca9<\/td><td>30<\/td><td>\uc591\ud488 \uc0dd\uc0b0\ub7c9\uc5d0 \ud3ec\ud568\ud558\ub418 \ucd94\uac00 \uc791\uc5c5\uc740 \ubcc4\ub3c4 \uae30\ub85d<\/td><\/tr><tr><td>\ucd5c\uc885 \ud3d0\uae30<\/td><td>50<\/td><td>\ud3d0\uae30 \ubd88\ub7c9\ub960\uc758 \ubd84\uc790<\/td><\/tr><tr><td>\ucd5c\ucd08 \uc0dd\uc0b0 \ucd1d\uc218\ub7c9<\/td><td>1,000<\/td><td>\ubd84\ubaa8<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\ucd5c\uc885 \ud3d0\uae30 \ubd88\ub7c9\ub960\uc740 <strong>50 \u00f7 1,000 \u00d7 100 = 5%<\/strong>\uc785\ub2c8\ub2e4. \ud569\uaca9\ud55c \ubd80\ud488\uc774 950\uac1c\uc774\ubbc0\ub85c \ucd5c\uc885 \uc218\uc728\uc740 95%\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/first-pass-yield\/\">\uc9c1\ud589\ub960<\/a>\uc740 \ub2e4\ub978 \uad00\uc810\uc758 \uc9c0\ud45c\uc785\ub2c8\ub2e4. \uc218\uc815 \uc791\uc5c5 \uc5c6\uc774 \ud55c \ubc88\uc5d0 \ud569\uaca9\ud55c \ubd80\ud488\uc740 920\uac1c\ubfd0\uc774\ubbc0\ub85c <strong>\uc9c1\ud589\ub960(FPY)\uc740 92%<\/strong>\uc785\ub2c8\ub2e4. \ub098\uba38\uc9c0 8%\uac00 \ubaa8\ub450 \ud3d0\uae30\ub41c \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4. \uadf8\uc911 30\uac1c\ub294 \uc7ac\uc791\uc5c5\uc73c\ub85c \uc591\ud488\uc774 \ub418\uc5c8\uc2b5\ub2c8\ub2e4. \uc7ac\uc791\uc5c5\uc5d0\ub294 \uc2dc\uac04\uc774 \ub4e4\uc9c0\ub9cc, \ubc18\ub4dc\uc2dc \uc0c8 \uc18c\uc7ac \ud55c \uac1c\ub97c \ud1b5\uc9f8\ub85c \uc4f0\uac70\ub098 \uae30\uc874 \ubd80\ud488\uc744 \ud3d0\uae30\ud574\uc57c \ud558\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p>\ub9c8\ucc2c\uac00\uc9c0\ub85c \ud3d0\uae30\ud488 50\uac1c\ub97c \ud569\uaca9\ud488 950\uac1c\ub85c \ub098\ub204\uba74 \uc57d 5.26%\uac00 \ub098\uc635\ub2c8\ub2e4. \uc774\ub294 \ucd5c\ucd08 \uc0dd\uc0b0\ub7c9 \uc911 \uc190\uc2e4\ub41c \ube44\uc728\uc778 5%\uc640\ub294 \ub2e4\ub985\ub2c8\ub2e4. \uc591\ud488 \uc0dd\uc0b0\ub7c9 \ub300\ube44 \ud3d0\uae30\ud488 \ube44\uc728\uc740 \ubcc4\ub3c4\uc758 \uc6d0\uac00 \uacc4\uc0b0\uc5d0 \uc720\uc6a9\ud560 \uc218 \uc788\uc9c0\ub9cc, \uc5b4\ub5a4 \ube44\uc728\uc778\uc9c0 \uba85\ud655\ud788 \ud45c\uc2dc\ud574\uc57c \ud569\ub2c8\ub2e4. \uc774\ub97c \ucd1d\uc0dd\uc0b0\ub7c9 \ub300\ube44 \ud3d0\uae30\ud488 \ube44\uc728\uacfc \ube44\uad50\ud574\uc11c\ub294 \uc548 \ub429\ub2c8\ub2e4.<\/p>\n\n\n<p>\ub300\uccb4\ud488\uc744 \uc0dd\uc0b0\ud55c \ub4a4\uc5d0\ub294 \ud574\ub2f9 \uc0dd\uc0b0 \uc2e4\uc801\uc744 \ubcc4\ub3c4\ub85c \uc2dd\ubcc4\ud560 \uc218 \uc788\uac8c \uad00\ub9ac\ud558\uc138\uc694. \ub300\uccb4\ud488\uc740 \uc0c8\ub85c \uc0dd\uc0b0\ud55c \uc81c\ud488\uc774\uc9c0, \uae30\uc874 \ubc30\uce58\uc5d0 \uac80\uc0ac\ub97c \ucd94\uac00\ub85c \uc2e4\uc2dc\ud55c \uac83\uc774 \uc544\ub2d9\ub2c8\ub2e4. \ub300\uccb4\ud488\uae4c\uc9c0 \ud3ec\ud568\ud55c \ud1b5\ud569 \uc2e4\uc801\uc744 \ubcf4\uace0\ud55c\ub2e4\uba74, \ub300\uccb4\ud488 \uc911 \ud569\uaca9\ud55c \uc218\ub7c9\uacfc \ucd94\uac00\ub85c \ubc1c\uc0dd\ud55c \ud3d0\uae30 \uc218\ub7c9\uc744 \ubaa8\ub450 \uac19\uc740 \uc9d1\uacc4 \ub300\uc0c1\uc5d0 \ud3ec\ud568\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\ud300 \uc804\uccb4\uac00 \uc77c\uad00\ub418\uac8c \uc801\uc6a9\ud560 \uc9d1\uacc4 \uae30\uc900 \uc815\ud558\uae30<\/h2>\n\n\n<p>\uce21\uc815 \uae30\uc900\uc744 \uba85\ud655\ud788 \uc815\uc758\ud558\uba74 \uad50\ub300\uc870\ub9c8\ub2e4 \ubd88\ub7c9\uc744 \ub2e4\ub974\uac8c \uae30\ub85d\ud55c\ub2e4\ub294 \uc774\uc720\ub9cc\uc73c\ub85c \uc218\uce58\uac00 \ub2ec\ub77c\uc9c0\ub294 \uc77c\uc744 \ub9c9\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ucd94\uc138\ub97c \ud574\uc11d\ud558\uae30 \uc804\uc5d0 \uc81c\ud488\uad70, \uc9d1\uacc4\ud560 \uacf5\uc815 \ubc94\uc704, \ubcf4\uace0 \uae30\uc900, \ucd5c\uc885 \ucc98\ubd84 \ud310\uc815 \uae30\uc900\uc744 \ud569\uc758\ud558\uc138\uc694.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\ubd88\ub7c9\ud488\uc740 \uc6d0\ub798 \uc0dd\uc0b0 \uc9d1\ub2e8\uc5d0 \ub9de\ucdb0 \uc9d1\uacc4\ud558\uae30<\/h3>\n\n\n<p>\ucd94\uc801\uc774 \uac00\ub2a5\ud558\uace0 \ucd5c\uc885 \ucc98\ub9ac \uacb0\uacfc\ubcc4 \uc218\ub7c9\uc758 \ud569\uacc4\uac00 \uc6d0\ub798 \uc218\ub7c9\uacfc \ub9de\ub294\uc9c0 \ud655\uc778\ud560 \uc218 \uc788\ub294 \ubc30\uce58\ub098 \uc624\ub354\ubd80\ud130 \uc2dc\uc791\ud558\uc138\uc694. \uac80\uc0ac\ub098 \uc7ac\uc791\uc5c5\uc5d0 \uba70\uce60\uc774 \uac78\ub9ac\ub294 \uacbd\uc6b0, \uc624\ub298 \ud3d0\uae30\uac00 \ud655\uc815\ub41c \uc218\ub7c9\uc744 \uc624\ub298 \uc0c8\ub85c \ud22c\uc785\ud55c \uc218\ub7c9\uc73c\ub85c \ub098\ub204\uba74 \uc11c\ub85c \ub2e4\ub978 \uc0dd\uc0b0 \uc9d1\ub2e8\uc744 \uc11e\uc5b4 \uacc4\uc0b0\ud558\uac8c \ub420 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc815\uae30 \ubcf4\uace0\uc5d0\uc11c\ub294 \ub2a6\uac8c \ub0b4\ub824\uc9c4 \ud310\uc815\uc744 \uc5b4\ub290 \uae30\uac04\uc5d0 \ubc18\uc601\ud560\uc9c0, \ubbf8\uacb0 \uc218\ub7c9\uc740 \uc5b4\ub5bb\uac8c \ud45c\uc2dc\ud560\uc9c0 \uc815\ud574 \ub450\uc138\uc694. \uc544\uc9c1 \ucc98\ubd84 \ud310\uc815\uc744 \uae30\ub2e4\ub9ac\ub294 \ubd80\ud488\uc774 20\uac1c\ub77c\uba74, \uc774 \uc218\ub7c9\uc740 \ud655\uc815\ub41c \uc591\ud488\ub3c4 \ucd5c\uc885 \ud3d0\uae30\ud488\ub3c4 \uc544\ub2d9\ub2c8\ub2e4. \ubbf8\uacb0 \uc0c1\ud0dc\ub85c \ud45c\uc2dc\ud558\uace0, \ud574\ub2f9 \uc9d1\ub2e8\uc758 \ubaa8\ub4e0 \ud310\uc815\uc774 \ub05d\ub098\uba74 \uacb0\uacfc\ub97c \ud655\uc815\ud558\uc138\uc694. \ube44\uc728\uc744 \uc88b\uc544 \ubcf4\uc774\uac8c \ud558\ub824\uace0 \uc774 \uc218\ub7c9\uc744 \uc2ac\uca4d \uc81c\uc678\ud574\uc11c\ub294 \uc548 \ub429\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc815\ud574\uc9c4 \uc9d1\uacc4 \ubc94\uc704\uc5d0\uc11c \ucd5c\ucd08 \ud22c\uc785\ud55c \uc81c\ud488\uc740 \uac01\uac01 \ud55c \ubc88\ub9cc \uc138\uc138\uc694. \uac00\uacf5 \ub2e8\uacc4\uc5d0\uc11c \ubd88\ud569\uaca9 \ud310\uc815\uc744 \ubc1b\uc740 \ubd80\ud488\uc774 \ucd5c\uc885 \uac80\uc0ac \ubcf4\uace0\uc11c\uc5d0 \ub2e4\uc2dc \ub4f1\uc7a5\ud558\ub354\ub77c\ub3c4 \ud3d0\uae30\ud488\uc774 2\uac1c\uac00 \ub418\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4. \ud55c \ubd80\ud488\uc5d0 \uacb0\ud568\uc774 \uc5ec\ub7ec \uac1c \uc788\uc5b4\ub3c4 \uc190\uc2e4 \uc218\ub7c9\uc740 1\uac1c\uc785\ub2c8\ub2e4. \ub2e4\ub9cc \uc6d0\uc778 \uc870\uc0ac\uc5d0\uc11c\ub294 \uac01 \uacb0\ud568\uc774 \uc911\uc694\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uac1c\ubcc4 \uacf5\uc815\uc758 \uc2e4\uc801\uacfc \uc804\uccb4 \uacf5\uc815 \uacbd\ub85c\uc758 \uc2e4\uc801\uc740 \uac01\uac01 \ub530\ub85c \uc815\uc758\ud574\uc57c \ud569\ub2c8\ub2e4. \uac00\uacf5 \uacf5\uc815\uc758 \ud3d0\uae30 \ubd88\ub7c9\ub960\uc740 \ud574\ub2f9 \uacf5\uc815\uc5d0 \ud22c\uc785\ub41c \uc218\ub7c9\uc744 \uae30\uc900\uc73c\ub85c \uacc4\uc0b0\ud558\uace0, \uc804 \uacf5\uc815 \uae30\uc900 \ud3d0\uae30 \ubd88\ub7c9\ub960\uc740 \ucd5c\ucd08 \uc0dd\uc0b0 \uc9d1\ub2e8\uc774 \uc804\uccb4 \uacf5\uc815 \uacbd\ub85c\ub97c \uac70\uce58\ub294 \ub3d9\uc548\uc758 \uacb0\uacfc\ub97c \ucd94\uc801\ud569\ub2c8\ub2e4. \uacf5\uc815\ubcc4 \ube44\uc728\uc744 \ub354\ud558\ub294 \uac83\ub9cc\uc73c\ub85c\ub294 \uc2e0\ub8b0\ud560 \uc218 \uc788\ub294 \uacf5\uc7a5 \uc804\uccb4 \ud3d0\uae30 \ubd88\ub7c9\ub960\uc744 \uad6c\ud560 \uc218 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\ucd5c\uc885 \ud3d0\uae30\ud488, \uc7ac\uc791\uc5c5\ud488, \uc790\uc7ac \ud3d0\uae30\ubb3c \uad6c\ubd84\ud558\uae30<\/h3>\n\n\n<p>\uac80\uc0ac\uc5d0\uc11c \ubd88\ud569\uaca9\ud558\uba74 \ub2e4\uc74c \ucc98\ub9ac \ubc29\uc2dd\uc744 \uacb0\uc815\ud574\uc57c \ud569\ub2c8\ub2e4. \ud574\ub2f9 \ubd80\ud488\uc740 \uc7ac\uc791\uc5c5\ud558\uac70\ub098, \uc870\uc0ac\ub97c \uc704\ud574 \ubcf4\ub958\ud558\uac70\ub098, \ucd5c\uc885 \ud3d0\uae30\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. KPI \uc0b0\ucd9c\uc5d0 \uc4f0\uc774\ub294 \uae30\ub85d\uc5d0\uc11c\ub3c4 \uc774 \uad6c\ubd84\uc744 \uc720\uc9c0\ud558\uc138\uc694.<\/p>\n\n\n<p>\ubd88\ud569\uaca9 \uc81c\ud488\uacfc \uacf5\uc815\uc0c1 \uc608\uc0c1\ub418\ub294 \ud3d0\uae30\ubb3c\ub3c4 \uad6c\ubd84\ud574\uc57c \ud569\ub2c8\ub2e4. \uc644\uc131\ub41c \ubd80\ud488\uc774 \ubaa8\ub450 \uac80\uc0ac\uc5d0 \ud569\uaca9\ud558\ub354\ub77c\ub3c4 \uac00\uacf5 \uce69, \uc808\ub2e8 \uc790\ud22c\ub9ac, \uac00\ub3d9 \ucd08\uae30 \uc18c\ubaa8 \uc790\uc7ac\ub294 \uc790\uc7ac \uc190\uc2e4 \uc9c0\ud45c\uc5d0 \ud3ec\ud568\ub420 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc774\ub97c \uac1c\uc218 \uae30\uc900 \ubd88\ub7c9 \uc218\ub7c9\uc5d0 \uc11e\uc73c\uba74 \uacb0\uacfc\ub97c \ud574\uc11d\ud558\uae30 \uc5b4\ub824\uc6cc\uc9d1\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc790\uc7ac \ud3d0\uae30\uc728\uc744 \uc911\ub7c9\uc73c\ub85c \uce21\uc815\ud55c\ub2e4\uba74 \ubd84\uc790\uc640 \ubd84\ubaa8\uc5d0 \ubaa8\ub450 \uc911\ub7c9\uc744 \uc0ac\uc6a9\ud558\uc138\uc694. \uc608\ub97c \ub4e4\uc5b4, \uc9d1\uacc4\uac00 \ub9c8\uac10\ub41c \uc808\ub2e8 \uc791\uc5c5\uc5d0\uc11c \uc790\uc7ac 500 kg\uc744 \ud22c\uc785\ud588\uace0, 40 kg\uc740 \ud3d0\uae30\ubb3c\ub85c \ubd84\ub958\ub418\uc5c8\uc73c\uba70 \ub098\uba38\uc9c0 460 kg\uc740 \uc0ac\uc6a9\ud560 \uc218 \uc788\ub294 \uc0dd\uc0b0\ubb3c\ub85c \ud655\uc778\ub418\uc5c8\ub2e4\uace0 \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \uc790\uc7ac \ud3d0\uae30\uc728\uc740 <strong>40 \u00f7 500 \u00d7 100 = 8%<\/strong>\uc785\ub2c8\ub2e4. \uc774 \ud3d0\uae30\ubb3c\uc5d0 \uc815\uc0c1\uc801\uc778 \uc808\ub2e8 \uc790\ud22c\ub9ac\uac00 \ud3ec\ud568\ub418\ub294\uc9c0, \ube44\uc815\uc0c1 \ubd88\ub7c9\ud488\uc774 \ud3ec\ud568\ub418\ub294\uc9c0, \uc544\ub2c8\uba74 \ub458 \ub2e4 \ud3ec\ud568\ub418\ub294\uc9c0 \uba85\uc2dc\ud558\uc138\uc694. \uc7ac\uc0ac\uc6a9 \uac00\ub2a5\ud55c \uc794\uc7ac\ub098 \uc544\uc9c1 \uacf5\uc815 \uc911\uc5d0 \uc788\ub294 \uc790\uc7ac\ub294 \ubcc4\ub3c4\ub85c \uc9d1\uacc4\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774 8%\ub294 \ud574\ub2f9 \ubc30\uce58\uc758 \uac1c\uc218 \uae30\uc900 \ud3d0\uae30 \ubd88\ub7c9\ub960 5%\uc640 \uc9c1\uc811 \ube44\uad50\ud560 \uc218 \uc5c6\uc2b5\ub2c8\ub2e4. \ub450 \uc218\uce58\ub294 \uc11c\ub85c \ub2e4\ub978 \uc190\uc2e4\uc744 \ub098\ud0c0\ub0c5\ub2c8\ub2e4. \ubb34\uac70\uc6b4 \uc8fc\ubb3c \ubd88\ub7c9\ud488 \ud558\ub098\uac00 \uc791\uc740 \ud53c\ud305 \ubd88\ub7c9\ud488 \ud558\ub098\ubcf4\ub2e4 \uc790\uc7ac \uc18c\ubaa8\uc5d0 \ud6e8\uc52c \ud070 \uc601\ud5a5\uc744 \uc904 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uc11c\ub85c \ub2e4\ub978 \ube44\uc728\uc744 \ud3c9\uade0 \ub0b4\uc9c0 \ub9d0\uace0 \uc218\ub7c9\uc744 \ud569\uc0b0\ud558\uae30<\/h3>\n\n\n<p>\ub3d9\uc77c\ud55c \uae30\uc900\uc73c\ub85c \uce21\uc815\ud55c \ube44\uad50 \uac00\ub2a5\ud55c \uc81c\ud488\uc774\ub77c\uba74, \ud3d0\uae30 \uc218\ub7c9\ub07c\ub9ac \ud569\uc0b0\ud558\uace0 \uc804\uccb4 \uc218\ub7c9\ub07c\ub9ac \ud569\uc0b0\ud55c \ub2e4\uc74c \ub098\ub204\uc138\uc694. \ubc30\uce58 \ud06c\uae30\uac00 \ub2e4\ub97c \ub54c \ubc30\uce58\ubcc4 \ube44\uc728\uc744 \ub2e8\uc21c \ud3c9\uade0\ud574\uc11c\ub294 \uc548 \ub429\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc790\uc7ac \uac00\uce58, \uacf5\uc815 \uacbd\ub85c \ub610\ub294 \ubd88\ub7c9\uc758 \uc601\ud5a5\uc774 \ub2e4\ub978 \uc81c\ud488\uc740 \uad6c\ubd84\ud574\uc11c \ubcfc \uc218 \uc788\ub3c4\ub85d \uc720\uc9c0\ud558\uc138\uc694. \uc0dd\uc0b0\ud558\uae30 \uc26c\uc6b4 \uc81c\ud488\uc758 \ube44\uc911\uc774 \ub298\uc5c8\ub2e4\ub294 \uc774\uc720\ub9cc\uc73c\ub85c\ub3c4 \uacf5\uc7a5 \ud3c9\uade0\uc740 \ub0ae\uc544\uc9c8 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uacf5\uc815\uc774 \uac1c\uc120\ub418\uc5c8\ub2e4\uace0 \uacb0\ub860 \ub0b4\ub9ac\uae30 \uc804\uc5d0 \ube44\uc728\ubfd0 \uc544\ub2c8\ub77c \uc0b0\ucd9c \uadfc\uac70\uac00 \ub41c \uc218\ub7c9, \uc81c\ud488 \uad6c\uc131, \uc190\uc2e4 \ube44\uc6a9\uc744 \ud568\uaed8 \uc0b4\ud3b4\ubcf4\uc138\uc694.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc190\uc2e4\uc744 \uae08\uc561\uc73c\ub85c \ud658\uc0b0\ud558\uae30<\/h2>\n\n\n<p>\ud3d0\uae30 \ubd88\ub7c9\ub960\uc740 \uc218\ub7c9\uc744 \ub098\ud0c0\ub0b4\ub294 \uc9c0\ud45c\uc774\uc9c0 \uc7ac\ubb34\uc801 \uc601\ud5a5 \uc804\uccb4\ub97c \ub098\ud0c0\ub0b4\uc9c0\ub294 \uc54a\uc2b5\ub2c8\ub2e4. \uc5ec\ub7ec \uacf5\uc815\uc744 \uac70\uce5c \ub4a4 \ubd88\ud569\uaca9\ud55c \ubd80\ud488\uc5d0\ub294 \uac00\uacf5 \uc2dc\uc791 \uc804\uc5d0 \ubd88\ud569\uaca9\ud55c \ubd80\ud488\ubcf4\ub2e4 \ub354 \ub9ce\uc740 \uc791\uc5c5\uc774 \ud22c\uc785\ub418\uc5b4 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc55e\uc11c \uc608\ub85c \ub4e0 \ud3d0\uae30 \ubd80\ud488 50\uac1c\ub85c \ub3cc\uc544\uac00 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \ubd80\ud488\ub2f9 \uc7ac\ub8cc\ube44\uac00 $12\uc774\uace0, \ubd88\ud569\uaca9 \ud310\uc815 \uc2dc\uc810\uae4c\uc9c0 \ubc1c\uc0dd\ud55c \uac00\uacf5\ube44\uac00 $8\uc774\ub77c\uace0 \uac00\uc815\ud574 \ubcf4\uc138\uc694. \uc7ac\ub8cc\ube44 \uc190\uc2e4\uc740 <strong>$600<\/strong>\uc774\uace0 \ub204\uc801 \uac00\uacf5\ube44\ub294 <strong>$400<\/strong>\uc785\ub2c8\ub2e4. \ud3d0\uc790\uc7ac\ub97c \ud68c\uc218\ud574 \ubd88\ud569\uaca9 \ubd80\ud488\ub2f9 $2\ub97c \ud68c\uc218\ud560 \uc218 \uc788\ub2e4\uba74, \uc774 \ub2e8\uc21c\ud654\ub41c \uae30\uc900\uc73c\ub85c \uae30\ub85d\ub418\ub294 \uc21c\uc190\uc2e4\uc740 \ub2e4\uc74c\uacfc \uac19\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>50 \u00d7 ($12 + $8 \u2212 $2) = $900<\/strong><\/p>\n\n\n<p>\ubd88\ud569\uaca9 \ud310\uc815 \uc2dc\uc810\uae4c\uc9c0 \ubc1c\uc0dd\ud55c \ube44\uc6a9\uc740 \uc790\uc0ac\uc758 \uc6d0\uac00 \uacc4\uc0b0 \uae30\uc900\uc5d0 \ub530\ub77c \uc0b0\uc815\ud558\uc138\uc694. \uc7ac\ud65c\uc6a9\uc744 \ud1b5\ud574 \ud68c\uc218\ud55c \uae08\uc561\uc740 \uc21c\uc190\uc2e4\uc744 \uc904\uc77c \uc218 \uc788\uc9c0\ub9cc, \ubd88\ud569\uaca9 \ubd80\ud488\uc744 \ub0a9\ud488 \uac00\ub2a5\ud55c \uc81c\ud488\uc73c\ub85c \ub418\ub3cc\ub9ac\uac70\ub098 \uc774\ubbf8 \uc18c\ubaa8\ud55c \uc0dd\uc0b0 \uc2dc\uac04\uc744 \ub418\ucc3e\uc544 \uc8fc\uc9c0\ub294 \uc54a\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774\ubbf8 \ubc1c\uc0dd\ud55c \uc190\uc2e4\uacfc \uc55e\uc73c\ub85c \ubd80\uc871\ubd84\uc744 \ubcf4\ucda9\ud558\ub294 \ub370 \ub4dc\ub294 \ube44\uc6a9\uc740 \uad6c\ubd84\ud558\uc138\uc694. \ub300\uccb4\ud488\uc744 \uc0dd\uc0b0\ud558\ub824\uba74 \uc790\uc7ac\uc640 \uacf5\uc815\uc774 \ucd94\uac00\ub85c \ud544\uc694\ud569\ub2c8\ub2e4. \ud5a5\ud6c4 \uc791\uc5c5 \ube44\uc6a9\uc744 \uc804\uccb4 \ube44\uc6a9\uc774 \ubc18\uc601\ub41c \uc190\uc2e4\uc561\uc5d0\ub3c4 \ub123\uace0 \ubcc4\ub3c4\uc758 \ubcf4\ucda9 \uc0dd\uc0b0 \ube44\uc6a9 \ucd94\uc815\uce58\uc5d0\ub3c4 \ub123\uc73c\uba74 \uc774\uc911 \uacc4\uc0b0\uc774 \ub420 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ub450 \uae08\uc561\uc5d0 \ubaa8\ub450 \ud3ec\ud568\ud55c\ub2e4\uba74 \uac01\uac01\uc758 \uc0b0\uc815 \ubc94\uc704\ub97c \uc124\uba85\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\ub2f9\uc7a5\uc758 \uc758\uc0ac\uacb0\uc815\uc5d0\uc11c\ub294 \ubb34\uc5c7\uc774 \ub2ec\ub77c\uc9c0\ub294\uc9c0 \ud30c\uc545\ud558\uc138\uc694. \uc608\ub97c \ub4e4\uc5b4 \ucd94\uac00 \uc790\uc7ac \uad6c\ub9e4, \uc794\uc5c5, \uc678\uc8fc \uac00\uacf5, \uae34\uae09 \uc6b4\uc1a1 \ub4f1\uc774 \uc788\uc2b5\ub2c8\ub2e4. \ud655\ubcf4\ub41c \uc124\ube44 \uc2dc\uac04\uc774 \ub2f9\uc7a5 \uc784\uae08\uc774\ub098 \uc124\ube44 \ub300\uae08 \uc9c0\ucd9c\uc744 \uc904\uc5ec \uc8fc\uc9c0 \uc54a\ub354\ub77c\ub3c4 \uadf8 \uc2dc\uac04\uc5d0\ub294 \uac00\uce58\uac00 \uc788\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ud3d0\uae30\ub97c \uc904\uc5ec \ubc29\uc9c0\ud55c \uc190\uc2e4\uc561 \uc804\ubd80\ub97c \uc989\uac01\uc801\uc778 \ud604\uae08 \uc808\uac10\uc73c\ub85c \uac04\uc8fc\ud558\uba74 \uc131\uacfc\ub97c \uacfc\uc7a5\ud558\uac8c \ub429\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\ubd80\uc871\ubd84\uc744 \ubcf4\ucda9\ud574 \ub0a9\ud488\ud560 \uc218 \uc788\ub294 \uc0dd\uc0b0 \uacc4\ud68d \uc138\uc6b0\uae30<\/h2>\n\n\n<p>\uc774 \uc608\uc5d0\uc11c\ub294 \ucd5c\ucd08 \ud22c\uc785 \uc218\ub7c9 1,000\uac1c \uc911 \ud569\uaca9\ud488\uc774 950\uac1c\ub9cc \ub098\uc654\uc2b5\ub2c8\ub2e4. \uace0\uac1d\uc774 1,000\uac1c\ub97c \ud544\uc694\ub85c \ud558\uace0 \uc0ac\uc6a9\ud560 \uc218 \uc788\ub294 \uc801\ud569\ud55c \uc7ac\uace0\uac00 \uc5c6\ub2e4\uba74, \uc591\ud488 50\uac1c\ub97c \ub354 \ud655\ubcf4\ud574\uc57c \ud569\ub2c8\ub2e4. \uc774\ub294 \ud488\uc9c8 \uc2e4\uc801\uc758 \ubb38\uc81c\uc778 \ub3d9\uc2dc\uc5d0 \ub0a9\ud488\uc744 \uc704\ud55c \uc758\uc0ac\uacb0\uc815\uc758 \ubb38\uc81c\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>\uba3c\uc800 \uc774 \uc791\uc5c5\uc5d0 \uc2e4\uc81c\ub85c \uc0ac\uc6a9\ud560 \uc218 \uc788\ub294 \uc790\uc7ac\ub97c \ud655\uc778\ud558\uc138\uc694. \uadf8\ub7f0 \ub2e4\uc74c \ub300\uccb4\ud488\uc758 \uacf5\uc815 \uacbd\ub85c, \uc0dd\uc0b0 \uc218\ub7c9, \ud544\uc694\ud55c \uac80\uc0ac\ub97c \uc2b9\uc778\ud558\uc138\uc694. \ud604\uc2e4\uc801\uc778 \uacf5\uc815 \uc18c\uc694 \uc2dc\uac04\uc744 \uc801\uc6a9\ud558\uace0 \uc900\ube44 \uc2dc\uac04\ub3c4 \ubc18\uc601\ud574\uc57c \ud569\ub2c8\ub2e4. \ucd94\uac00 \uc218\uc728 \uc190\uc2e4\uc774 \uc608\uc0c1\ub41c\ub2e4\uba74 \ub300\uccb4\ud488\uc774 \ubaa8\ub450 \ud569\uaca9\ud560 \uac83\uc774\ub77c\uace0 \uac00\uc815\ud558\uc9c0 \ub9d0\uace0, \uc190\uc2e4\uc5d0 \ub300\ube44\ud55c \ucd94\uac00 \uc0dd\uc0b0 \uc218\ub7c9\uc744 \uba85\uc2dc\ud558\uc138\uc694.<\/p>\n\n\n<p>\uc2b9\uc778\ub41c \ub300\uccb4\ud488 \uc0dd\uc0b0\uc5d0 \ubd80\ud488\ub2f9 \uac00\uacf5 \uc2dc\uac04 6\ubd84\uc774 \ud544\uc694\ud558\ub2e4\uace0 \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \uc774 \uc608\uc5d0\uc11c\ub294 \uc124\uba85\uc744 \uc704\ud574 \ucd94\uac00 \ubd88\ub7c9\uc774 \ubc1c\uc0dd\ud558\uc9c0 \uc54a\ub294\ub2e4\uace0 \uac00\uc815\ud569\ub2c8\ub2e4. \ubd80\ud488 50\uac1c\uc5d0\ub294 \ucd94\uac00 \uc900\ube44 \uc2dc\uac04\uacfc \uac80\uc0ac \uc2dc\uac04\uc744 \uc81c\uc678\ud558\uace0\ub3c4 <strong>\uac00\uacf5 \uc2dc\uac04 300\ubd84, \uc989 5\uc2dc\uac04<\/strong>\uc774 \ud544\uc694\ud569\ub2c8\ub2e4. \ub2e4\uc74c \uacf5\uc815\uc744 \uc2dc\uc791\ud574\uc57c \ud558\ub294 \uc2dc\uc810\uae4c\uc9c0 \ud574\ub2f9 \uc124\ube44\uc5d0 \uc5ec\uc720 \uc2dc\uac04\uc774 3\uc2dc\uac04\ubfd0\uc774\ub77c\uba74, \uacc4\ud68d\ud55c \ub300\ub85c \uadf8 \uc124\ube44\uc5d0\uc11c \ub300\uccb4\ud488\uc744 \uc0dd\uc0b0\ud560 \uc218 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774 \uc791\uc5c5\uc744 \uacf5\uc2dd \uc77c\uc815 \ubc16\uc758 \uae34\uae09 \uc791\uc5c5 \ub300\uae30 \ubaa9\ub85d\uc5d0 \ub123\ub294 \uac83\uc740 \ucda9\ub3cc\uc744 \uac10\ucd9c \ubfd0, \ubd80\uc871\ud55c \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ub9cc\ub4e4\uc5b4 \uc8fc\uc9c0\ub294 \uc54a\uc2b5\ub2c8\ub2e4. \uc791\uc5c5 \uac00\ub2a5\ud55c \ub2e4\ub978 \uc124\ube44\ub97c \ud65c\uc6a9\ud560\uc9c0, \ucd94\uac00 \uc0dd\uc0b0 \ub2a5\ub825 \ud655\ubcf4\uac00 \ud0c0\ub2f9\ud55c\uc9c0, \ub2e4\ub978 \uc624\ub354\uc758 \uc77c\uc815\uc744 \uc62e\uae38 \uc218 \uc788\ub294\uc9c0, \ub610\ub294 \uc57d\uc18d\ud55c \ub0a9\uae30\ub97c \ubcc0\uacbd\ud574\uc57c \ud558\ub294\uc9c0 \uacb0\uc815\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">SkyPlanner\uc5d0\uc11c \uc790\uc7ac \uc18c\ubaa8\uc640 \ub300\uccb4\ud488 \uc0dd\uc0b0\uc744 \uc5f0\uacc4\ud574 \uad00\ub9ac\ud558\uae30<\/h3>\n\n\n<p>SkyPlanner\uc5d0\uc11c\ub294 \uc791\uc5c5\uc790\uac00 <strong>\uc791\uc5c5 \ud0c0\uc774\uba38\ub97c \uc815\uc9c0\ud560 \ub54c \ubd88\ub7c9 \uc218\ub7c9\uc744 \uc785\ub825\ud558\ub294 \ubc29\uc2dd\uc73c\ub85c<\/strong> \ud3d0\uae30 \uc218\ub7c9\uc744 \ubcf4\uace0\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc790\uc7ac \ucd94\uc801\uc744 \uc124\uc815\ud574 \ub450\uba74 \ubd88\ub7c9\ud488\uc5d0 \uc0ac\uc6a9\ub41c \uc790\uc7ac\ub3c4 \uc18c\ubaa8\ub7c9\uc5d0 \ud3ec\ud568\ub418\uc5b4 \uc7ac\uace0 \uc794\ub7c9\uc5d0 \ubc18\uc601\ub429\ub2c8\ub2e4. \uc774\ub807\uac8c \ud558\uba74 \uc774\ubbf8 \ubd88\ub7c9\ud488 \uc0dd\uc0b0\uc5d0 \uc0ac\uc6a9\ud55c \uc18c\uc7ac\uac00 \ub2e4\uc74c \uc791\uc5c5\uc5d0 \uc4f8 \uc218 \uc788\ub294 \uc7ac\uace0\ub85c \uc7a1\ud788\ub294 \uc77c\uc744 \ubc29\uc9c0\ud558\ub294 \ub370 \ub3c4\uc6c0\uc774 \ub429\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc608\ub97c \ub4e4\uc5b4 \uc18c\uc7ac 10\uac1c\ub97c \ud22c\uc785\ud588\uc73c\ub098 2\uac1c\uac00 \ud3d0\uae30\ub418\uc5b4 \uc591\ud488 8\uac1c\ub97c \uc5bb\uc5c8\ub2e4\uba74, \uc790\uc7ac \uae30\ub85d\uc5d0\ub294 8\uac1c\uac00 \uc544\ub2c8\ub77c 10\uac1c\uac00 \ubc18\uc601\ub418\uc5b4\uc57c \ud569\ub2c8\ub2e4. \uc774 \uacbd\uc6b0 \ubd88\ub7c9\ud488 2\uac1c\ub294 \ucd5c\uc885 \ud3d0\uae30\uac00 \ud655\uc815\ub41c \uc218\ub7c9\uc785\ub2c8\ub2e4. \ucd5c\uc885 \ud3d0\uae30 \ubd88\ub7c9\ub960 KPI\ub97c \ub300\uc870\u00b7\ud655\uc778\ud560 \ub54c\ub294 \uc218\ub9ac \uac00\ub2a5\ud55c \ubd80\ud488\uacfc \ud488\uc9c8 \ud310\uc815\uc774 \ub05d\ub098\uc9c0 \uc54a\uc740 \ubcf4\ub958\ud488\uc744 \uad6c\ubd84\ud560 \uc218 \uc788\uc5b4\uc57c \ud569\ub2c8\ub2e4. \ub2e8\uc21c\ud788 \ud488\uc9c8 \ubd88\ud569\uaca9 \uc218\ub7c9\ub9cc \uae30\ub85d\ub418\uc5b4 \uc788\ub2e4\uace0 \ud574\uc11c \ubaa8\ub4e0 \ubd80\ud488\uc758 \ucd5c\uc885 \ucc98\ub9ac \uacb0\uacfc\uac00 \ud655\uc778\ub418\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p>\uadf8\ub2e4\uc74c \uc2b9\uc778\ub41c \ub300\uccb4 \uc0dd\uc0b0 \uacf5\uc815\uc744 SkyPlanner\uc758 <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-scheduling\/\">\ud1b5\ud569 \uc0dd\uc0b0 \uc77c\uc815<\/a>\uc5d0 \ubc18\uc601\ud569\ub2c8\ub2e4. <strong>SkyPlanner\uc758 \uc2a4\ucf00\uc904\ub9c1 \uc778\uacf5\uc9c0\ub2a5 Arcturus\ub294 \uc124\uc815\ub41c \uc0dd\uc0b0 \ub2a5\ub825, \uacf5\uc815 \uac04 \uc120\ud6c4 \uad00\uacc4, \uc6b0\uc120\uc21c\uc704\ub97c \ubc14\ud0d5\uc73c\ub85c \ud574\ub2f9 \uacf5\uc815\uc744 \uc77c\uc815\uc5d0 \ubc30\uce58\ud569\ub2c8\ub2e4.<\/strong> Gantt \ud0c0\uc784\ub77c\uc778\uc5d0\uc11c\ub294 \uac19\uc740 \uc790\uc6d0\uc744 \uc0ac\uc6a9\ud558\ub294 \ub2e4\ub978 \uc624\ub354\uc640 \ud568\uaed8 \ubc30\uce58 \uacb0\uacfc\uc5d0 \ub530\ub978 \uc791\uc5c5 \uc21c\uc11c\uc640 \uc644\ub8cc\uc77c\uc744 \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc790\uc7ac\ub97c \uace0\ub824\ud55c \uc2a4\ucf00\uc904\ub9c1\uc744 \ud65c\uc131\ud654\ud558\uba74 \uc790\uc7ac \uac00\uc6a9\uc131\ub3c4 \uc774 \uacc4\uc0b0\uc5d0 \ubc18\uc601\ub429\ub2c8\ub2e4.<\/p>\n\n\n<p>5\uc2dc\uac04\uc774 \uac78\ub9ac\ub294 \ub300\uccb4 \uc0dd\uc0b0\uc758 \uacbd\uc6b0, \ubcf5\uad6c \uc644\ub8cc\uc77c\uc744 \ud655\uc815\ud558\uae30 \uc804\uc5d0 \ub0a8\uc740 \uacf5\uc815\uacfc \ub2e4\ub978 \uace0\uac1d \uc8fc\ubb38\uc5d0 \ubbf8\uce58\ub294 \uc601\ud5a5\uc744 \uac80\ud1a0\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc6b0\uc120\uc21c\uc704\uc640 \ubcc0\uacbd\ud558\uc9c0 \uc54a\ub3c4\ub85d \ubcf4\ud638\ud560 \uc77c\uc815\uc740 \ub2f4\ub2f9\uc790\uac00 \uacb0\uc815\ud569\ub2c8\ub2e4. Arcturus\uac00 \uc5f0\uad00\ub41c \uc77c\uc815\uc744 \uacc4\uc0b0\ud558\ubbc0\ub85c, \uc601\ud5a5\uc744 \ubc1b\ub294 \uac01 \uc124\ube44\uc758 \uc791\uc5c5 \ub300\uae30\uc5f4\uc744 \uc77c\uc77c\uc774 \uc218\uc791\uc5c5\uc73c\ub85c \ub2e4\uc2dc \uad6c\uc131\ud560 \ud544\uc694\uac00 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud3d0\uae30 \ubd88\ub7c9\uc73c\ub85c \uc0dd\uc0b0\uc5d0 \ucc28\uc9c8\uc774 \ubc18\ubcf5\ub41c\ub2e4\uba74 SkyPlanner\uac00 \ub2e4\uc74c \ub300\uc751\uc5d0 \ub3c4\uc6c0\uc774 \ub418\ub294 \uc774\uc720\uac00 \uc5ec\uae30\uc5d0 \uc788\uc2b5\ub2c8\ub2e4. \uae30\ub85d\ub41c \uc190\uc2e4, \uc18c\ubaa8\ub41c \uc790\uc7ac, \uc544\uc9c1 \ud544\uc694\ud55c \uc791\uc5c5\uc744 \uacc4\ud68d \uc218\ub9bd\uc5d0 \ud568\uaed8 \ubc18\uc601\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ud488\uc9c8 \ubd80\uc11c, \ucc3d\uace0 \ub2f4\ub2f9\uc790, \ud604\uc7a5 \uad00\ub9ac\uc790\uac00 \ub098\uc911\uc5d0 \uac01\uac01\uc758 \uc218\uce58\ub97c \ub9de\ucdb0 \ubcfc \ud544\uc694\uac00 \uc5c6\uc2b5\ub2c8\ub2e4. SkyPlanner\ub294 \uac1c\ubc29\ud615 REST API\ub97c \ud1b5\ud574 \ubaa8\ub4e0 ERP \ub610\ub294 MES\uc640 \uc5f0\ub3d9\ub418\ubbc0\ub85c, \uae30\uc874 \uc624\ub354 \ubc0f \ud488\uc9c8 \uae30\ub85d\ub3c4 \uc774\ub807\uac8c \uc5f0\uacb0\ub41c \uc5c5\ubb34 \ud750\ub984 \uc548\uc5d0\uc11c \uacc4\uc18d \ud65c\uc6a9\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uc790\uc7ac \ud604\ud669 \ud30c\uc545\uc774 Eskomatic\uc5d0 \uac00\uc838\uc628 \ubcc0\ud654<\/h3>\n\n\n<p><a href=\"\/ko\/%ea%b3%a0%ea%b0%9d-%ec%82%ac%eb%a1%80\/eskomatic\/\">\uc704\ud0c1 \uae30\uacc4\uac00\uacf5 \uc5c5\uccb4 Eskomatic<\/a>\uc740 \uc774\uc804\uc5d0 \uad6c\ud615 ERP\uc640 \uc0dd\uc0b0 \uad00\ub9ac \uc2dc\uc2a4\ud15c\uc5d0\uc11c \uc791\uc5c5 \ub300\uae30\uc5f4\uc744 \ub300\ubd80\ubd84 \uc218\uc791\uc5c5\uc73c\ub85c \uad6c\uc131\ud588\uc2b5\ub2c8\ub2e4. \uc790\uc7ac \ud604\ud669\uc744 \ucda9\ubd84\ud788 \ud30c\uc545\ud558\uae30 \uc5b4\ub824\uc6cc \uc791\uc5c5 \uc2dc\uc791 \uc608\uc815\uc77c\uc774 \uc784\ubc15\ud574\uc11c\uc57c \uc790\uc7ac \ubd80\uc871\uc774 \ub4dc\ub7ec\ub098\uae30\ub3c4 \ud588\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uae30\uc874 ERP\uc5d0 SkyPlanner\ub97c \uc5f0\ub3d9\ud55c \ub4a4\uc5d0\ub294 Gantt\uc5d0\uc11c \uc791\uc5c5 \ub300\uae30\uc5f4\uc744 \ub354 \uba85\ud655\ud558\uac8c \ud655\uc778\ud558\uace0, \uc790\uc7ac \ubd80\uc871\uc744 \ud30c\uc545\ud558\uba70, \uc0dd\uc0b0 \ubd80\ud558\ub97c \uace0\ub824\ud574 \uc77c\uc815\uc744 \uc790\ub3d9\uc73c\ub85c \uc218\ub9bd\ud560 \uc218 \uc788\uac8c \ub418\uc5c8\uc2b5\ub2c8\ub2e4. Eskomatic\uc5d0 \ub530\ub974\uba74 \ub0a9\uae30\uc77c\uc744 \ub354 \uc815\ud655\ud558\uac8c \uc124\uc815\ud560 \uc218 \uc788\uac8c \ub418\uc5c8\uace0, \uc790\uc7ac \ubd80\uc871\uc73c\ub85c \uc778\ud55c \uc0dd\uc0b0 \uc911\ub2e8\ub3c4 \uc904\uc5c8\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774 \uc0ac\ub840\ub294 \uc790\uc7ac \uc900\ube44 \uc0c1\ud0dc\uc640 \uc791\uc5c5 \uc21c\uc11c\ub97c \ub9de\ucd94\ub294 \uac83\uc774 \ud604\uc7a5\uc5d0\uc11c \uc5b4\ub5a4 \uac00\uce58\ub97c \uac16\ub294\uc9c0 \ubcf4\uc5ec \uc90d\ub2c8\ub2e4. \uc0dd\uc0b0 \uc2dc\uc791 \uc9c1\uc804\uc5d0 \uc608\uc0c1\uce58 \ubabb\ud55c \ubb38\uc81c\uac00 \ubc1c\uc0dd\ud558\ub294 \uc77c\uc774 \uc904\uace0, \uace0\uac1d\uc5d0\uac8c \uc548\ub0b4\ud558\ub294 \ub0a9\uae30\uc77c\uc5d0\ub3c4 \ub354 \ud655\uc2e4\ud55c \uadfc\uac70\uac00 \uc0dd\uae41\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\ud655\uc778\ub41c \uc6d0\uc778\uc744 \ud574\uacb0\ud574 \ud3d0\uae30 \ubd88\ub7c9 \uc904\uc774\uae30<\/h2>\n\n\n<p>\ubaa8\ub4e0 \uc81c\uc870 \uacf5\uc815\uc5d0 \uacf5\ud1b5\uc73c\ub85c \uc801\uc6a9\ud560 \uc218 \uc788\ub294 \ud3d0\uae30 \ubd88\ub7c9\ub960 \ud5c8\uc6a9 \uae30\uc900\uc740 \uc5c6\uc2b5\ub2c8\ub2e4. \uc804\uc6a9 \ubc18\ubcf5 \uc0dd\uc0b0 \uacf5\uc815, \uc2e0\uc81c\ud488 \uc591\uc0b0 \ucd08\uae30, \uace0\ubd80\uac00\uac00\uce58 \uae30\uacc4\uac00\uacf5 \uacf5\uc815\uc740 \uc190\uc2e4\uc774 \ubc1c\uc0dd\ud558\ub294 \uc591\uc0c1\uc774 \uc11c\ub85c \ub2e4\ub985\ub2c8\ub2e4. 5% \uac19\uc740 \uc77c\ub960\uc801\uc778 \ud569\uaca9\uc120\uc744 \uc801\uc6a9\ud558\uc9c0 \ub9d0\uace0, \ube44\uad50 \uac00\ub2a5\ud55c \uc0dd\uc0b0 \uc2e4\uc801\uacfc \uace0\uac1d \uc694\uad6c\uc0ac\ud56d, \ubd88\ub7c9 \ubc1c\uc0dd \uc2dc \ud30c\uae09 \uc601\ud5a5\uc744 \uae30\uc900\uc73c\ub85c \ubaa9\ud45c\ub97c \uc124\uc815\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud3d0\uae30 \ubd88\ub7c9\ub960\uc758 \uadfc\uac70\uac00 \ub41c \uae30\ub85d\uc744 \uc0b4\ud3b4\ubcf4\uace0 \ubb34\uc5c7\uc744 \uc870\uc0ac\ud560\uc9c0 \uc815\ud569\ub2c8\ub2e4. \uc815\ubcf4\uac00 \ud655\ubcf4\ub418\uc5b4 \uc788\ub2e4\uba74 \uc81c\ud488, \uacf5\uc815, \uc790\uc7ac \ub85c\ud2b8, \ud655\uc778\ub41c \uc6d0\uc778\ubcc4\ub85c \uc190\uc2e4\uc744 \ubd84\ub958\ud569\ub2c8\ub2e4. \uc190\uc2e4 \uc218\ub7c9\uacfc \ube44\uc6a9, \ub0a9\uae30\uc5d0 \ubbf8\uce58\ub294 \uc601\ud5a5\uc744 \uae30\uc900\uc73c\ub85c \ubb38\uc81c\uc758 \uc6b0\uc120\uc21c\uc704\ub97c \uc815\ud558\uc138\uc694. \ud3d0\uae30\ub7c9\uc774 \uac00\uc7a5 \ub9ce\ub2e4\uace0 \ud574\uc11c \ubc18\ub4dc\uc2dc \uac00\uc7a5 \uc2dc\uae09\ud55c \uc0dd\uc0b0 \ubb38\uc81c\uc778 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc2e4\uc81c \ub300\uc751\uc740 \ud655\uc778\ub41c \uadfc\uac70\ub97c \ubc14\ud0d5\uc73c\ub85c \uc9c4\ud589\ud569\ub2c8\ub2e4.<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>\uce58\uc218 \ubd88\ub7c9\uc774 \ubc18\ubcf5\ub418\ub294 \uacbd\uc6b0:<\/strong> \uc2e4\uc81c\ub85c \ucda9\uc871\ud558\uc9c0 \ubabb\ud55c \uc694\uad6c\uc0ac\ud56d\uc744 \uae30\uc900\uc73c\ub85c \uacf5\uad6c \uc0c1\ud0dc, \uce58\uad6c, \ubcf4\uc815\uac12, \uacf5\uc815 \uc124\uc815\uc744 \uc810\uac80\ud569\ub2c8\ub2e4.<\/li><li><strong>\ud2b9\uc815 \uc790\uc7ac \ub85c\ud2b8\uc5d0 \uc190\uc2e4\uc774 \uc9d1\uc911\ub41c \uacbd\uc6b0:<\/strong> \uc124\ube44\ub098 \uc791\uc5c5\uc790\ub97c \uc6d0\uc778\uc73c\ub85c \uc9c0\ubaa9\ud558\uae30 \uc804\uc5d0 \uc785\uace0 \uc790\uc7ac\uc640 \uacf5\uae09\uc5c5\uccb4 \uad00\ub828 \uc99d\ube59\uc744 \uc870\uc0ac\ud569\ub2c8\ub2e4.<\/li><li><strong>\uac00\ub3d9 \ucd08\uae30\ub098 \uc791\uc5c5 \uc804\ud658 \uc2dc \ubd88\ub7c9\uc774 \ubc1c\uc0dd\ud558\ub294 \uacbd\uc6b0:<\/strong> \uc804\uccb4 \ubb3c\ub7c9\uc744 \uc0dd\uc0b0\ud558\uae30 \uc804\uc5d0 \uc14b\uc5c5 \uc0c1\ud0dc\uc640 \ucd08\ub3c4\ud488 \uc2b9\uc778\uc744 \ud655\uc778\ud569\ub2c8\ub2e4.<\/li><li><strong>\uacf5\uc815 \uc0ac\uc774\uc5d0\uc11c \uc190\uc0c1\uc774 \ubc1c\uc0dd\ud558\ub294 \uacbd\uc6b0:<\/strong> \uc190\uc0c1\uc774 \ubc1c\uc0dd\ud55c \uc9c0\uc810\uc758 \ucde8\uae09, \ubcf4\uad00, \ubcf4\ud638 \uc870\uce58\ub97c \uc810\uac80\ud569\ub2c8\ub2e4.<\/li><\/ul>\n\n\n<p>\uc2dc\uc815\uc870\uce58 \ub2f4\ub2f9\uc790\ub97c \uc9c0\uc815\ud558\uace0, \uc774\ud6c4 \uc0dd\uc0b0\ub418\ub294 \ube44\uad50 \uac00\ub2a5\ud55c \ubc30\uce58\ub97c \ub3d9\uc77c\ud55c \ud569\uaca9 \uae30\uc900\uc73c\ub85c \ud655\uc778\ud569\ub2c8\ub2e4. \uac80\uc0ac \uc2dc\uc810\uc744 \uc55e\ub2f9\uae30\uba74 \ubd88\ub7c9 \uc6d0\uc778\uc744 \uc81c\uac70\ud558\uae30 \uc804\uc774\ub77c\ub3c4 \uc774\ubbf8 \ubd88\ub7c9\uc778 \ubd80\ud488\uc5d0 \ucd94\uac00 \uac00\uacf5\ube44\uac00 \ud22c\uc785\ub418\ub294 \uac83\uc744 \ub9c9\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uac80\uc0ac \uae30\uc900\uc744 \uc644\ud654\ud558\uac70\ub098 \ubd88\ud569\uaca9\ud488 \uae30\ub85d\uc774 \ub204\ub77d\ub418\uc5b4 \uc218\uce58\ub9cc \ub0ae\uc544\uc9c4 \uac83\uc774\ub77c\uba74 \uac1c\uc120\uc774\ub77c\uace0 \ud560 \uc218 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud488\uc9c8 \uac1c\uc120\uc740 \ub2e4\uc74c \uc190\uc2e4\uc744 \uc608\ubc29\ud569\ub2c8\ub2e4. \ud604\uc2e4\uc801\uc778 \uc790\uc7ac \ubc0f \uc0dd\uc0b0 \ub2a5\ub825 \uacc4\ud68d\uc740 \uc774\ubbf8 \ubc1c\uc0dd\ud55c \uc190\uc2e4\uc5d0 \ub300\uc751\ud558\ub294 \ub370 \ub3c4\uc6c0\uc774 \ub429\ub2c8\ub2e4. \uc774 \ub450 \uac00\uc9c0 \ub300\uc751\uc744 \ud568\uaed8 \ucd94\uc9c4\ud574\uc57c \ud3d0\uae30 \ubd88\ub7c9\ub960\uc774\ub77c\ub294 \uc218\uce58\ub97c \uc2e4\uc81c \uc0dd\uc0b0 \uad00\ub9ac \uac1c\uc120\uc73c\ub85c \uc774\uc5b4 \uac08 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\ubd88\ud569\uaca9 \ubc30\uce58\uac00 \ub2e4\uc74c \ub0a9\ud488\uc5d0 \ubbf8\uce58\ub294 \uc601\ud5a5 \ud655\uc778\ud558\uae30<\/h2>\n\n\n<p>\ucd5c\uadfc \ucd5c\uc885 \ud3d0\uae30\uac00 \ud655\uc815\ub41c \uc0ac\ub840 \ud558\ub098\ub97c \uc900\ube44\ud574 SkyPlanner \ub370\ubaa8\uc5d0\uc11c \ud568\uaed8 \uc0b4\ud3b4\ubcf4\uc138\uc694. \ucd5c\ucd08 \ud22c\uc785 \uc218\ub7c9\uacfc \ud569\uaca9 \uc218\ub7c9, \uc18c\ubaa8\ub41c \uc790\uc7ac, \uc2b9\uc778\ub41c \ub300\uccb4 \uc0dd\uc0b0 \uacf5\uc815, \uc601\ud5a5\uc744 \ubc1b\uc740 \uace0\uac1d \uc8fc\ubb38\uc744 \uc900\ube44\ud558\uba74 \ub429\ub2c8\ub2e4.<\/p>\n\n\n<p>\uadf8 \uc0ac\ub840\ub97c \ubc14\ud0d5\uc73c\ub85c \uad6c\uccb4\uc801\uc778 \ubcf5\uad6c \uacc4\ud68d\uc744 \uac80\ud1a0\ud574 \ubcf4\uc138\uc694. \ubd80\uc871\ud55c \uc790\uc7ac\ub97c \ubc18\uc601\ud558\uace0, \uae30\uc874\uc5d0 \uc57d\uc18d\ud55c \uc77c\uc815\uc744 \uace0\ub824\ud574 \uc791\uc5c5\uc744 \ubc30\uce58\ud558\uba70, \uace0\uac1d\uc774 \ubb38\uc758\ud558\uae30 \uc804\uc5d0 \uc5b4\ub5a4 \ub0a9\uae30 \uad00\ub828 \uacb0\uc815\uc774 \ud544\uc694\ud55c\uc9c0 \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p><strong><a href=\"https:\/\/skyplanner.ai\/ko\/%ec%98%81%ec%97%85%ed%8c%80%ec%97%90-%eb%ac%b8%ec%9d%98\/\">SkyPlanner \ub370\ubaa8\ub97c \uc608\uc57d<\/a><\/strong>\ud574 \uc0dd\uc0b0 \ud604\uc7a5\uc758 \uc0c1\ud669\uc744 \uc0c1\ub2f4\ud558\uac70\ub098, \uba3c\uc800 <strong><a href=\"https:\/\/skyplanner.ai\/ko\/%ed%8f%89%ea%b0%80%ed%8c%90\/\">\ub370\ubaa8 \ub370\uc774\ud130\ub85c SkyPlanner\ub97c \uccb4\ud5d8<\/a><\/strong>\ud574 \ubcf4\uc138\uc694.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\uc81c\uc870\uc5c5 \ud3d0\uae30 \ubd88\ub7c9\ub960: \uc2e4\uc81c \uc190\uc2e4 \uacc4\uc0b0\ud558\uae30 \ud648 &raquo; \ub9ac\uc18c\uc2a4 &raquo; \uc81c\uc870\uc5c5 \ud3d0\uae30 \ubd88\ub7c9\ub960: \uc2e4\uc81c \uc190\uc2e4 \uacc4\uc0b0\ud558\uae30 \ubc30\uce58 \uc0dd\uc0b0\uc740 \ub05d\ub0ac\uc9c0\ub9cc \uc8fc\ubb38 \uc218\ub7c9\uc740 \uc544\uc9c1 \ucc44\uc6b0\uc9c0 \ubabb\ud588\uc2b5\ub2c8\ub2e4. \uac80\uc0ac\uc5d0\uc11c \ubcf5\uad6c\ud560 \uc218 \uc5c6\ub294 \ubd88\ub7c9\ud488\uc774 \ub098\uc654\uace0, \uc790\uc7ac\ub294 \uc774\ubbf8 \uc18c\ubaa8\ub41c \uc0c1\ud0dc\uc785\ub2c8\ub2e4. \uadf8\ub798\ub3c4 \uace0\uac1d\uc740 \uae08\uc694\uc77c\uc5d0 \uc8fc\ubb38\ud55c \uc804\ub7c9\uc744 \ubc1b\uae30\ub97c \uae30\ub300\ud569\ub2c8\ub2e4. \uc81c\uc870\uc5c5 \ud3d0\uae30 \ubd88\ub7c9\ub960\uc740 \uc815\ud574\uc9c4 \uc0dd\uc0b0 \uc218\ub7c9 \uc911 \ubcf8\ub798 \uc6a9\ub3c4\ub85c \uc0ac\uc6a9\ud560 \uc218 \uc5c6\uc5b4 \ucd5c\uc885 \ud3d0\uae30\ub41c &#8230; <a title=\"\uc81c\uc870\uc5c5 \ud3d0\uae30 \ubd88\ub7c9\ub960: \uc2e4\uc81c \uc190\uc2e4 \uacc4\uc0b0\ud558\uae30\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/scrap-rate-in-manufacturing\/\" aria-label=\"Read more about \uc81c\uc870\uc5c5 \ud3d0\uae30 \ubd88\ub7c9\ub960: \uc2e4\uc81c \uc190\uc2e4 \uacc4\uc0b0\ud558\uae30\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":105729,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[496,2558],"tags":[],"class_list":["post-105720","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-496","category-2558","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\uc81c\uc870\uc5c5 \ud3d0\uae30 \ubd88\ub7c9\ub960: \uc2e4\uc81c \uc190\uc2e4 \uacc4\uc0b0\ud558\uae30<\/title>\n<meta name=\"description\" content=\"\ud3d0\uae30 \uc190\uc2e4\uc740 \uc790\uc7ac\ube44\ub9cc\uc774 \uc544\ub2d9\ub2c8\ub2e4. \uc81c\uc870\uc5c5 \ud3d0\uae30 \ubd88\ub7c9\ub960\uc744 \uc815\ud655\ud788 \uacc4\uc0b0\ud558\uace0 \uc7ac\uace0 \uc190\uc2e4\uc744 \ubc18\uc601\ud574 \ub300\uccb4 \uc0dd\uc0b0\uc744 \ud604\uc2e4\uc801\uc778 \ub0a9\uae30 \uacc4\ud68d\uc5d0 \ub123\uc73c\uc138\uc694.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/scrap-rate-in-manufacturing\/\" \/>\n<meta property=\"og:locale\" content=\"ko_KR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\uc81c\uc870\uc5c5 \ud3d0\uae30 \ubd88\ub7c9\ub960: \uc2e4\uc81c \uc190\uc2e4 \uacc4\uc0b0\ud558\uae30\" \/>\n<meta property=\"og:description\" content=\"\ud3d0\uae30 \uc190\uc2e4\uc740 \uc790\uc7ac\ube44\ub9cc\uc774 \uc544\ub2d9\ub2c8\ub2e4. \uc81c\uc870\uc5c5 \ud3d0\uae30 \ubd88\ub7c9\ub960\uc744 \uc815\ud655\ud788 \uacc4\uc0b0\ud558\uace0 \uc7ac\uace0 \uc190\uc2e4\uc744 \ubc18\uc601\ud574 \ub300\uccb4 \uc0dd\uc0b0\uc744 \ud604\uc2e4\uc801\uc778 \ub0a9\uae30 \uacc4\ud68d\uc5d0 \ub123\uc73c\uc138\uc694.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/scrap-rate-in-manufacturing\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-22T05:45:06+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-22T05:47:34+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1776\" \/>\n\t<meta property=\"og:image:height\" content=\"999\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\uae00\uc4f4\uc774\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/scrap-rate-in-manufacturing\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/scrap-rate-in-manufacturing\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"\uc81c\uc870\uc5c5 \ud3d0\uae30 \ubd88\ub7c9\ub960: \uc2e4\uc81c \uc190\uc2e4 \uacc4\uc0b0\ud558\uae30\",\"datePublished\":\"2026-10-22T05:45:06+00:00\",\"dateModified\":\"2026-10-22T05:47:34+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/scrap-rate-in-manufacturing\\\/\"},\"wordCount\":32,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/scrap-rate-in-manufacturing\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/scrap-rate-in-manufacturing-hero.png\",\"articleSection\":[\"\ub9ac\uc18c\uc2a4\",\"\uc81c\uc870 \ud6a8\uc728\"],\"inLanguage\":\"ko-KR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/scrap-rate-in-manufacturing\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/scrap-rate-in-manufacturing\\\/\",\"name\":\"\uc81c\uc870\uc5c5 \ud3d0\uae30 \ubd88\ub7c9\ub960: \uc2e4\uc81c \uc190\uc2e4 \uacc4\uc0b0\ud558\uae30\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/scrap-rate-in-manufacturing\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/scrap-rate-in-manufacturing\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/scrap-rate-in-manufacturing-hero.png\",\"datePublished\":\"2026-10-22T05:45:06+00:00\",\"dateModified\":\"2026-10-22T05:47:34+00:00\",\"description\":\"\ud3d0\uae30 \uc190\uc2e4\uc740 \uc790\uc7ac\ube44\ub9cc\uc774 \uc544\ub2d9\ub2c8\ub2e4. \uc81c\uc870\uc5c5 \ud3d0\uae30 \ubd88\ub7c9\ub960\uc744 \uc815\ud655\ud788 \uacc4\uc0b0\ud558\uace0 \uc7ac\uace0 \uc190\uc2e4\uc744 \ubc18\uc601\ud574 \ub300\uccb4 \uc0dd\uc0b0\uc744 \ud604\uc2e4\uc801\uc778 \ub0a9\uae30 \uacc4\ud68d\uc5d0 \ub123\uc73c\uc138\uc694.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/scrap-rate-in-manufacturing\\\/#breadcrumb\"},\"inLanguage\":\"ko-KR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/scrap-rate-in-manufacturing\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/scrap-rate-in-manufacturing\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/scrap-rate-in-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/scrap-rate-in-manufacturing-hero.png\",\"width\":1776,\"height\":999,\"caption\":\"Accepted machined rings sit beside broken scrap components, with an empty delivery-tray slot showing the shortfall.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/scrap-rate-in-manufacturing\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\uc81c\uc870\uc5c5 \ud3d0\uae30 \ubd88\ub7c9\ub960: \uc2e4\uc81c \uc190\uc2e4 \uacc4\uc0b0\ud558\uae30\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ko-KR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\uc81c\uc870\uc5c5 \ud3d0\uae30 \ubd88\ub7c9\ub960: \uc2e4\uc81c \uc190\uc2e4 \uacc4\uc0b0\ud558\uae30","description":"\ud3d0\uae30 \uc190\uc2e4\uc740 \uc790\uc7ac\ube44\ub9cc\uc774 \uc544\ub2d9\ub2c8\ub2e4. \uc81c\uc870\uc5c5 \ud3d0\uae30 \ubd88\ub7c9\ub960\uc744 \uc815\ud655\ud788 \uacc4\uc0b0\ud558\uace0 \uc7ac\uace0 \uc190\uc2e4\uc744 \ubc18\uc601\ud574 \ub300\uccb4 \uc0dd\uc0b0\uc744 \ud604\uc2e4\uc801\uc778 \ub0a9\uae30 \uacc4\ud68d\uc5d0 \ub123\uc73c\uc138\uc694.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/scrap-rate-in-manufacturing\/","og_locale":"ko_KR","og_type":"article","og_title":"\uc81c\uc870\uc5c5 \ud3d0\uae30 \ubd88\ub7c9\ub960: \uc2e4\uc81c \uc190\uc2e4 \uacc4\uc0b0\ud558\uae30","og_description":"\ud3d0\uae30 \uc190\uc2e4\uc740 \uc790\uc7ac\ube44\ub9cc\uc774 \uc544\ub2d9\ub2c8\ub2e4. \uc81c\uc870\uc5c5 \ud3d0\uae30 \ubd88\ub7c9\ub960\uc744 \uc815\ud655\ud788 \uacc4\uc0b0\ud558\uace0 \uc7ac\uace0 \uc190\uc2e4\uc744 \ubc18\uc601\ud574 \ub300\uccb4 \uc0dd\uc0b0\uc744 \ud604\uc2e4\uc801\uc778 \ub0a9\uae30 \uacc4\ud68d\uc5d0 \ub123\uc73c\uc138\uc694.","og_url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/scrap-rate-in-manufacturing\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-22T05:45:06+00:00","article_modified_time":"2026-10-22T05:47:34+00:00","og_image":[{"width":1776,"height":999,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"\uae00\uc4f4\uc774":"Jussi M\u00e4ntyl\u00e4"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/scrap-rate-in-manufacturing\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/scrap-rate-in-manufacturing\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"\uc81c\uc870\uc5c5 \ud3d0\uae30 \ubd88\ub7c9\ub960: \uc2e4\uc81c \uc190\uc2e4 \uacc4\uc0b0\ud558\uae30","datePublished":"2026-10-22T05:45:06+00:00","dateModified":"2026-10-22T05:47:34+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/scrap-rate-in-manufacturing\/"},"wordCount":32,"publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/scrap-rate-in-manufacturing\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero.png","articleSection":["\ub9ac\uc18c\uc2a4","\uc81c\uc870 \ud6a8\uc728"],"inLanguage":"ko-KR"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/scrap-rate-in-manufacturing\/","url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/scrap-rate-in-manufacturing\/","name":"\uc81c\uc870\uc5c5 \ud3d0\uae30 \ubd88\ub7c9\ub960: \uc2e4\uc81c \uc190\uc2e4 \uacc4\uc0b0\ud558\uae30","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/scrap-rate-in-manufacturing\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/scrap-rate-in-manufacturing\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero.png","datePublished":"2026-10-22T05:45:06+00:00","dateModified":"2026-10-22T05:47:34+00:00","description":"\ud3d0\uae30 \uc190\uc2e4\uc740 \uc790\uc7ac\ube44\ub9cc\uc774 \uc544\ub2d9\ub2c8\ub2e4. \uc81c\uc870\uc5c5 \ud3d0\uae30 \ubd88\ub7c9\ub960\uc744 \uc815\ud655\ud788 \uacc4\uc0b0\ud558\uace0 \uc7ac\uace0 \uc190\uc2e4\uc744 \ubc18\uc601\ud574 \ub300\uccb4 \uc0dd\uc0b0\uc744 \ud604\uc2e4\uc801\uc778 \ub0a9\uae30 \uacc4\ud68d\uc5d0 \ub123\uc73c\uc138\uc694.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/scrap-rate-in-manufacturing\/#breadcrumb"},"inLanguage":"ko-KR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/scrap-rate-in-manufacturing\/"]}]},{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/scrap-rate-in-manufacturing\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero.png","width":1776,"height":999,"caption":"Accepted machined rings sit beside broken scrap components, with an empty delivery-tray slot showing the shortfall."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/scrap-rate-in-manufacturing\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ko\/"},{"@type":"ListItem","position":2,"name":"\uc81c\uc870\uc5c5 \ud3d0\uae30 \ubd88\ub7c9\ub960: \uc2e4\uc81c \uc190\uc2e4 \uacc4\uc0b0\ud558\uae30"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ko\/#website","url":"https:\/\/skyplanner.ai\/ko\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ko\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ko-KR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ko\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ko\/","logo":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero.png",1776,999,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero.png",1776,999,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/scrap-rate-in-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ko\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\uc81c\uc870\uc5c5 \ud3d0\uae30 \ubd88\ub7c9\ub960: \uc2e4\uc81c \uc190\uc2e4 \uacc4\uc0b0\ud558\uae30 \ud648 &raquo; \ub9ac\uc18c\uc2a4 &raquo; \uc81c\uc870\uc5c5 \ud3d0\uae30 \ubd88\ub7c9\ub960: \uc2e4\uc81c \uc190\uc2e4 \uacc4\uc0b0\ud558\uae30 \ubc30\uce58 \uc0dd\uc0b0\uc740 \ub05d\ub0ac\uc9c0\ub9cc \uc8fc\ubb38 \uc218\ub7c9\uc740 \uc544\uc9c1 \ucc44\uc6b0\uc9c0 \ubabb\ud588\uc2b5\ub2c8\ub2e4. \uac80\uc0ac\uc5d0\uc11c \ubcf5\uad6c\ud560 \uc218 \uc5c6\ub294 \ubd88\ub7c9\ud488\uc774 \ub098\uc654\uace0, \uc790\uc7ac\ub294 \uc774\ubbf8 \uc18c\ubaa8\ub41c \uc0c1\ud0dc\uc785\ub2c8\ub2e4. \uadf8\ub798\ub3c4 \uace0\uac1d\uc740 \uae08\uc694\uc77c\uc5d0 \uc8fc\ubb38\ud55c \uc804\ub7c9\uc744 \ubc1b\uae30\ub97c \uae30\ub300\ud569\ub2c8\ub2e4. \uc81c\uc870\uc5c5 \ud3d0\uae30 \ubd88\ub7c9\ub960\uc740 \uc815\ud574\uc9c4 \uc0dd\uc0b0 \uc218\ub7c9 \uc911 \ubcf8\ub798 \uc6a9\ub3c4\ub85c \uc0ac\uc6a9\ud560 \uc218 \uc5c6\uc5b4 \ucd5c\uc885 \ud3d0\uae30\ub41c&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/105720","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/comments?post=105720"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/105720\/revisions"}],"predecessor-version":[{"id":105782,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/105720\/revisions\/105782"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media\/105729"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media?parent=105720"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/categories?post=105720"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/tags?post=105720"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}