{"id":105534,"date":"2026-10-22T01:38:15","date_gmt":"2026-10-22T01:38:15","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=105534"},"modified":"2026-10-22T01:41:00","modified_gmt":"2026-10-22T01:41:00","slug":"value-stream-mapping","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/value-stream-mapping\/","title":{"rendered":"\uac00\uce58 \ud750\ub984\ub3c4: \ud604\uc7a5\uc758 \ud750\ub984\uc744 \ud30c\uc545\ud558\uace0 \uac1c\uc120\ud558\ub294 \ubc29\ubc95"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">\uac00\uce58 \ud750\ub984\ub3c4: \ud604\uc7a5\uc758 \ud750\ub984\uc744 \ud30c\uc545\ud558\uace0 \uac1c\uc120\ud558\ub294 \ubc29\ubc95<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/ko\/\">\ud648<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/\">\ub9ac\uc18c\uc2a4<\/a> &raquo; \uac00\uce58 \ud750\ub984\ub3c4: \ud604\uc7a5\uc758 \ud750\ub984\uc744 \ud30c\uc545\ud558\uace0 \uac1c\uc120\ud558\ub294 \ubc29\ubc95<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">\uc608\uc0c1 \uc77d\uae30 \uc2dc\uac04: <\/span><span class=\"yoast-reading-time__reading-time\">12<\/span><span class=\"yoast-reading-time__time-unit\"> \ubd84<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>\ubd80\ud488\uc744 \uac00\uacf5\ud558\ub294 \ub370\ub294 \uba87 \ubd84\ubc16\uc5d0 \uac78\ub9ac\uc9c0 \uc54a\uc544\ub3c4 \ub2e4\uc74c \uacf5\uc815\uc73c\ub85c \uc774\ub3d9\ud558\uae30\uae4c\uc9c0 \uba70\uce60\uc744 \uae30\ub2e4\ub9b4 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uacf5\uc815\uc744 \uc21c\uc11c\ub300\ub85c \uadf8\ub9ac\uba74 \ubd80\ud488\uc774 \uc5b4\ub514\ub85c \uac00\ub294\uc9c0 \uc54c \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uac00\uce58 \ud750\ub984\ub3c4\ub294 \uadf8\uacf3\uc5d0 \ub3c4\ub2ec\ud558\uae30\uae4c\uc9c0 \uc65c \uadf8\ub807\uac8c \uc624\ub798 \uac78\ub9ac\ub294\uc9c0 \uc774\ud574\ud558\ub294 \ub370 \ub3c4\uc6c0\uc774 \ub429\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>\uac00\uce58 \ud750\ub984\ub3c4(VSM)\ub294 \uc81c\ud488\uc744 \uace0\uac1d\uc5d0\uac8c \uacf5\uae09\ud558\ub294 \ub370 \ud544\uc694\ud55c \uc790\uc7ac\uc640 \uc815\ubcf4\uc758 \ud750\ub984\uc744 \uc791\uc5c5, \uc7ac\uace0, \uc9c0\uc5f0\uae4c\uc9c0 \ud3ec\ud568\ud574 \ub098\ud0c0\ub0b4\ub294 \ub9b0 \uae30\ubc95\uc785\ub2c8\ub2e4.<\/strong> \ud604\uc7ac \uc0c1\ud0dc\ub97c \uadf8\ub9b0 \ub4a4 \ub354 \ub098\uc740 \ubbf8\ub798 \uc0c1\ud0dc\ub97c \uc124\uacc4\ud558\uace0, \uc774\ub97c \uc2e4\ud604\ud558\ub294 \ub370 \ud544\uc694\ud55c \ubcc0\uacbd \uc0ac\ud56d\uc5d0 \ud569\uc758\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc81c\uc870\ud300\uc5d0 \uc2e4\uc9c8\uc801\uc73c\ub85c \ud544\uc694\ud55c \uacb0\uacfc\ub294 \u2018\ubb34\uc5c7\uc744 \ubc14\uafd4\uc57c \uace0\uac1d\uc5d0\uac8c \uc774\ub974\ub294 \ud750\ub984\uc774 \uac1c\uc120\ub418\ub294\uac00\u2019\uc5d0 \ub300\ud55c \uacb0\uc815\uc785\ub2c8\ub2e4. \uc14b\uc5c5 \uc2dc\uac04\uc744 \uc904\uc774\ub294 \ub4f1 \ud604\uc7a5\uc758 \ubb3c\ub9ac\uc801\uc778 \ubcc0\ud654\uac00 \ud544\uc694\ud560 \uc218\ub3c4 \uc788\uc2b5\ub2c8\ub2e4. \ud22c\uc785\ud574 \ubd10\uc57c \ub300\uae30 \ubb3c\ub7c9\ub9cc \ub298\uc5b4\ub098\ub294 \uc791\uc5c5\uc758 \ud22c\uc785\uc744 \uc911\ub2e8\ud574\uc57c \ud560 \ub54c\ub3c4 \uc788\uc2b5\ub2c8\ub2e4. \uc5ec\ub7ec \uc8fc\ubb38\uc774 \uacf5\uc6a9 \uc790\uc6d0\uc744 \ub193\uace0 \uacbd\ud569\ud558\ub294 \uac83\uc774 \ubb38\uc81c\ub77c\uba74, SkyPlanner APS\ub294 \ud569\uc758\ub41c \uacf5\uc815\uacfc \uc6b0\uc120\uc21c\uc704\ub97c \ubc14\ud0d5\uc73c\ub85c <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-scheduling\/\">\uc804\uccb4 \uc791\uc5c5\uc774 \uc870\uc728\ub41c \uc0dd\uc0b0 \uc77c\uc815<\/a>\uc744 \uc218\ub9bd\ud574 \ub300\uae30 \uc791\uc5c5\uc758 \uc21c\uc11c\ub97c \uc218\uc791\uc5c5\uc73c\ub85c \ub2e4\uc2dc \uc9dc\uc57c \ud558\ub294 \ubd80\ub2f4\uc744 \uc904\uc785\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uacf5\uc815 \ud750\ub984\ub3c4\uc5d0\uc11c\ub294 \ub193\uce58\uace0 \uac00\uce58 \ud750\ub984\ub3c4\uc5d0\uc11c\ub294 \ubcfc \uc218 \uc788\ub294 \uac83<\/h2>\n\n\n<p>\uacf5\uc815 \ud750\ub984\ub3c4\ub294 \uc808\ub2e8, \uc131\ud615, \uc870\ub9bd, \ucd9c\ud558\uc758 \uc21c\uc11c\ub97c \ubcf4\uc5ec \uc904 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uac00\uce58 \ud750\ub984\ub3c4\ub294 \uc774 \uc21c\uc11c\uc5d0 \ud750\ub984\uc744 \uc88c\uc6b0\ud558\ub294 \uc870\uac74\uae4c\uc9c0 \uc5f0\uacb0\ud569\ub2c8\ub2e4. \ub300\uae30 \uc911\uc778 \uc791\uc5c5\uc740 \uc5bc\ub9c8\ub098 \ub420\uae4c\uc694? \uacc4\ud68d \ubd80\uc11c\ub294 \uc5bc\ub9c8\ub098 \uc790\uc8fc \uc9c0\uc2dc\ub97c \ub0b4\ub9b4\uae4c\uc694? \ud604\uc7a5 \uad00\ub9ac\uc790\ub294 \uc0dd\uc0b0 \uc77c\uc815\uc744 \ub530\ub97c\uae4c\uc694, \uc544\ub2c8\uba74 \ubcc4\ub3c4\uc758 \uae34\uae09 \uc791\uc5c5 \ubaa9\ub85d\uc744 \ub530\ub97c\uae4c\uc694?<\/p>\n\n\n<p>\uac00\uce58 \ud750\ub984\ub3c4\ub294 \ub2e4\uc74c \uc138 \uac00\uc9c0 \uad00\uc810\uc744 \ud558\ub098\ub85c \ubaa8\uc74d\ub2c8\ub2e4.<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>\uc790\uc7ac \ud750\ub984:<\/strong> \uc815\ud574\uc9c4 \uc2dc\uc791\uc810\ubd80\ud130 \uace0\uac1d\uc5d0\uac8c \uacf5\uae09\ud558\ub294 \ucd5c\uc885 \uc9c0\uc810\uae4c\uc9c0\uc758 \uacf5\uc815, \uc7ac\uace0 \uc704\uce58, \uc774\ub3d9 \uacbd\ub85c\uc785\ub2c8\ub2e4.<\/li><li><strong>\uc815\ubcf4 \ud750\ub984:<\/strong> \uac01 \uacf5\uc815\uc5d0\uc11c \ubb34\uc5c7\uc744 \ud574\uc57c \ud558\ub294\uc9c0 \uc54c\ub824 \uc8fc\ub294 \uc8fc\ubb38, \uc77c\uc815, \ubcf4\ucda9 \uc2e0\ud638, \uae30\ud0c0 \uc9c0\uc2dc\uc785\ub2c8\ub2e4.<\/li><li><strong>\uc2dc\uac04 \ubc0f \uc6b4\uc601 \ub370\uc774\ud130:<\/strong> \ud750\ub984\uc744 \uc124\uba85\ud558\ub294 \uac00\uacf5 \uc2dc\uac04, \ud488\uc885 \uad50\uccb4, \uac00\uc6a9 \uc2dc\uac04, \ud488\uc9c8, \uc7ac\uace0, \uc9c0\uc5f0\uc5d0 \uad00\ud55c \ub370\uc774\ud130\uc785\ub2c8\ub2e4.<\/li><\/ul>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-routing\/\">\uacf5\uc815 \uc21c\uc11c<\/a>\ub294 \uc81c\ud488\uc744 \uc5b4\ub5bb\uac8c \uc81c\uc870\ud558\ub294\uc9c0 \uc124\uba85\ud569\ub2c8\ub2e4. \uac00\uce58 \ud750\ub984\ub3c4\ub294 \uc804\uccb4 \ud750\ub984\uc774 \ud604\uc7ac \uc5b4\ub5a4 \uc131\uacfc\ub97c \ub0b4\uace0 \uc788\uc73c\uba70 \uc55e\uc73c\ub85c\ub294 \uc5b4\ub5bb\uac8c \uc6b4\uc601\ub418\uc5b4\uc57c \ud558\ub294\uc9c0 \uc0b4\ud3b4\ubd05\ub2c8\ub2e4. \uace0\uac1d \uac00\uce58\ub97c \ub354\ud558\uc9c0 \uc54a\ub294 \ud65c\ub3d9\ub3c4 \ud3ec\ud568\ud558\uc138\uc694. \uc774\ub97c \ube7c\uba74 \uc815\uc791 \ucc3e\uc544\uc57c \ud560 \uac1c\uc120 \uae30\ud68c\ub97c \ub193\uce58\uac8c \ub429\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">1. \ud558\ub098\uc758 \uc81c\ud488\uad70\uc744 \uc120\ud0dd\ud558\uace0 \ubc94\uc704\ub97c \uba85\ud655\ud788 \uc815\ud558\uc138\uc694<\/h2>\n\n\n<p>\ube44\uc2b7\ud55c \uac00\uacf5 \ub2e8\uacc4\ub97c \uac70\uce58\uace0 \uc720\uc0ac\ud55c \uc790\uc6d0\uc744 \uc0ac\uc6a9\ud558\ub294 \uc81c\ud488\ubd80\ud130 \uc2dc\uc791\ud558\uc138\uc694. \uac04\ub2e8\ud55c \uc81c\ud488\ubcc4 \uacf5\uc815 \ub9e4\ud2b8\ub9ad\uc2a4\ub97c \ub9cc\ub4e4\uba74 \uc5b4\ub5a4 \uc81c\ud488\uc744 \ud55c \uc81c\ud488\uad70\uc73c\ub85c \ubb36\uc744 \uc218 \uc788\ub294\uc9c0 \uc54c \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ubaa8\ub450 \ucd9c\ud558 \uacf5\uc815\uc744 \uac70\uce5c\ub2e4\ub294 \uc774\uc720\ub9cc\uc73c\ub85c \uacf5\uc7a5\uc758 \ubaa8\ub4e0 \uc81c\ud488\uc744 \uccab \ubc88\uc9f8 \uac00\uce58 \ud750\ub984\ub3c4\uc5d0 \ub123\uc9c0\ub294 \ub9c8\uc138\uc694.<\/p>\n\n\n<p>\uae34 \ub0a9\ud488 \ub9ac\ub4dc\ud0c0\uc784, \uacfc\ub3c4\ud55c \uc7ac\uacf5\ud488, \uc870\ub9bd \uacf5\uc815\uc758 \ubc18\ubcf5\uc801\uc778 \uc790\uc7ac \ubd80\uc871, \uc7a6\uc740 \ub0a9\uae30 \ub3c5\ucd09 \ub4f1 \ud574\uacb0\ud560 \uac00\uce58\uac00 \uc788\ub294 \ubb38\uc81c\uac00 \uc788\ub294 \uc81c\ud488\uad70\uc744 \uc120\ud0dd\ud558\uc138\uc694. \uc0dd\uc0b0, \uacc4\ud68d, \uc790\uc7ac, \ud488\uc9c8 \uc5c5\ubb34\ub97c \uc798 \uc544\ub294 \uc0ac\ub78c\ub4e4\uc744 \ubaa8\uc73c\uc138\uc694. \uc11c\ub85c \ub2e4\ub978 \uad00\uc810\uc744 \ubaa8\uc73c\uba74 \ubd80\uc11c \uc0ac\uc774\uc5d0\uc11c \uc791\uc5c5\uc774 \uba48\ucd94\ub294 \uc774\uc720\ub97c \uc774\ud574\ud558\ub294 \ub370 \ub3c4\uc6c0\uc774 \ub429\ub2c8\ub2e4.<\/p>\n\n\n<p>\uac00\uce58 \ud750\ub984\ub3c4\uc5d0 \ubd84\uc11d \ubc94\uc704\ub97c \uc801\uc73c\uc138\uc694. \uc608\ub97c \ub4e4\uba74 \u2018\ubc18\ubcf5 \uc0dd\uc0b0\ud558\ub294 \uc778\ud074\ub85c\uc800 \uc81c\ud488\uad70, \ube14\ub7ad\ud06c \uc785\uace0\ubd80\ud130 \ucd9c\ud558 \uc900\ube44\uac00 \ub05d\ub09c \uc644\uc81c\ud488\uae4c\uc9c0\u2019\ub77c\uace0 \uba85\uc2dc\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uace0\uac1d \uc218\uc694, \uc81c\ud488 \uad6c\uc131, \uad00\ucc30 \uae30\uac04\ub3c4 \uae30\ub85d\ud558\uc138\uc694. \ubc94\uc704 \ubc16\uc758 \uc8fc\ubb38 \uc811\uc218\ub098 \uc678\uc8fc \ucc98\ub9ac\uc5d0\uc11c \uc0c1\ub2f9\ud55c \uc9c0\uc5f0\uc774 \ubc1c\uc0dd\ud55c\ub2e4\uba74, \uadf8 \uc2dc\uac04\uc744 \uc544\ubb34 \uc124\uba85 \uc5c6\uc774 0\uc73c\ub85c \uac04\uc8fc\ud558\uc9c0 \ub9d0\uace0 \uc5f0\uacb0 \uc9c0\uc810\uc744 \ud45c\uc2dc\ud558\uace0 \uc870\uc0ac\ud558\uc138\uc694.<\/p>\n\n\n<p>\uc5ec\ub7ec \uc81c\ud488\uc744 \uc0dd\uc0b0\ud558\ub294 \uc7a1\uc0f5\uc5d0\uc11c\ub3c4 VSM\uc744 \ud65c\uc6a9\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ub300\ud45c\uc801\uc778 \uc81c\ud488\uad70\uc774\ub098 \uacf5\uc815 \uc21c\uc11c \uc720\ud615\uc744 \uc120\ud0dd\ud558\uace0, \uc758\ubbf8 \uc788\ub294 \ud3b8\ucc28\ub97c \uae30\ub85d\ud558\uba70, \ub2e4\ub978 \uc81c\ud488\uad70\uacfc \uacf5\uc720\ud558\ub294 \uc124\ube44\ub97c \ud30c\uc545\ud558\uc138\uc694. 2\ubd84\uc9dc\ub9ac \uc791\uc5c5\uacfc 8\uc2dc\uac04\uc9dc\ub9ac \uc791\uc5c5\uc744 \ud569\uccd0 \ud3c9\uade0\uc744 \ub0b4\uba74 \uc5b4\ub290 \ucabd\ub3c4 \ucda9\ubd84\ud788 \uc124\uba85\ud558\uc9c0 \ubabb\ud574 \uac1c\uc120 \ubc29\ud5a5\uc744 \uc815\ud558\uae30 \uc5b4\ub824\uc6b8 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">2. \ud604\uc7a5\uc758 \ud750\ub984\uc744 \uc9c1\uc811 \ub530\ub77c\uac00\uba70 \uc2e4\uc81c \ub370\uc774\ud130\ub97c \uc218\uc9d1\ud558\uc138\uc694<\/h2>\n\n\n<p>\uc2e4\uc81c\ub85c \uc791\uc5c5\ud558\ub294 \uc0ac\ub78c\ub4e4\uacfc \ud568\uaed8 \uc0dd\uc0b0 \ud604\uc7a5\uc5d0\uc11c \uc790\uc7ac\uc758 \ud750\ub984\uc744 \ub530\ub77c\uac00\uc138\uc694. \ucd9c\ud558 \uc9c0\uc810\uc5d0\uc11c \uc55e \uacf5\uc815\uc73c\ub85c \uac70\uc2ac\ub7ec \uc62c\ub77c\uac00\uba74 \uac01 \uacf5\uc815\uc774 \uc774\uc804 \uacf5\uc815\uc5d0\uc11c \ubb34\uc5c7\uc744 \ud544\uc694\ub85c \ud558\ub294\uc9c0 \ud30c\uc545\ud558\ub294 \ub370 \ub3c4\uc6c0\uc774 \ub429\ub2c8\ub2e4. \ud574\ub2f9\ud558\ub294 \uacbd\uc6b0 \uc678\uc8fc \uacf5\uc815, \uc7ac\uc791\uc5c5 \uacbd\ub85c, \uc7ac\uace0 \uc704\uce58\ub3c4 \ud3ec\ud568\ud574 \uc2e4\uc81c \uc21c\uc11c\ub97c \uadf8\ub9ac\uc138\uc694. ERP \uae30\ub85d\uc740 \ubcf4\uc870 \uc790\ub8cc\ub85c \ud65c\uc6a9\ud558\ub418, \ud604\uc7a5\uc774 \ubb38\uc11c\uc5d0 \uc801\ud78c \uadf8\ub300\ub85c \uc6b4\uc601\ub41c\ub2e4\ub294 \uc99d\uac70\ub85c \ubcf4\uc9c0\ub294 \ub9c8\uc138\uc694.<\/p>\n\n\n<p>\uac01 \uacf5\uc815\uacfc \uacf5\uc815 \uc0ac\uc774\uc758 \uad6c\uac04\uc5d0\uc11c \uc131\uacfc\ub97c \uc124\uba85\ud560 \uc218 \uc788\uc744 \ub9cc\ud07c \ucda9\ubd84\ud55c \uc815\ubcf4\ub97c \uc218\uc9d1\ud558\uc138\uc694.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\uae30\ub85d\ud560 \ud56d\ubaa9<\/th><th>\uc911\uc694\ud55c \uc774\uc720<\/th><\/tr><\/thead><tbody><tr><td>\uc2e4\uce21 \uc0ac\uc774\ud074 \ud0c0\uc784 \ub610\ub294 \uac00\uacf5 \uc2dc\uac04\uacfc \uadf8 \ub2e8\uc704 \ubc0f \uae30\uc900 \uc218\ub7c9<\/td><td>\uc2e4\uc81c \uc791\uc5c5\uc5d0 \uac78\ub9ac\ub294 \uc2dc\uac04\uacfc \ub300\uae30 \uc2dc\uac04\uc744 \uad6c\ubd84\ud569\ub2c8\ub2e4.<\/td><\/tr><tr><td>\uc14b\uc5c5 \uc2dc\uac04\uacfc \uc2e4\uc81c \uc0dd\uc0b0\u00b7\uc774\uc1a1 \ubc30\uce58 \ud06c\uae30<\/td><td>\ud488\uc885 \uad50\uccb4\ub098 \ubc30\uce58 \uc644\ub8cc\ub97c \uae30\ub2e4\ub9ac\ub294 \uc2dc\uac04\uc774 \ud750\ub984\uc5d0 \uc601\ud5a5\uc744 \uc8fc\ub294\uc9c0 \ubcf4\uc5ec \uc90d\ub2c8\ub2e4.<\/td><\/tr><tr><td>\uac00\uc6a9 \uc791\uc5c5 \uc2dc\uac04, \uad50\ub300\uc870, \uc778\uc6d0, \uc790\uc6d0 \uacf5\uc720 \ud604\ud669<\/td><td>\uc791\uc5c5 \uc790\uccb4\ub294 \ube68\ub9ac \ub05d\ub098\ub294 \uacf5\uc815\uc5d0\ub3c4 \ub300\uae30 \ubb3c\ub7c9\uc774 \uae38\uac8c \ub298\uc5b4\uc124 \uc218 \uc788\ub294 \uc774\uc720\ub97c \uc124\uba85\ud558\ub294 \ub370 \ub3c4\uc6c0\uc774 \ub429\ub2c8\ub2e4.<\/td><\/tr><tr><td>\uc7ac\uace0 \uc218\ub7c9\uacfc \uc0c1\ud0dc<\/td><td>\uc0ac\uc6a9 \uac00\ub2a5\ud55c \uc7ac\uace0\ub97c \ubbf8\uc644\uc131\ud488, \ubd88\ud569\uaca9\ud488, \uaca9\ub9ac\ub41c \uc790\uc7ac\uc640 \uad6c\ubd84\ud569\ub2c8\ub2e4.<\/td><\/tr><tr><td>\ud488\uc9c8 \uc190\uc2e4\uacfc \uc7ac\uc791\uc5c5<\/td><td>\ubc18\ubcf5\ub418\ub294 \uc791\uc5c5\uacfc \ud750\ub984\uc774 \ub04a\uae30\ub294 \uc9c0\uc810\uc744 \ub4dc\ub7ec\ub0c5\ub2c8\ub2e4.<\/td><\/tr><tr><td>\ub300\ud45c \uc8fc\ubb38\uc758 \ub3c4\ucc29\u00b7\uc791\uc5c5 \uc2dc\uc791\u00b7\uc644\ub8cc \uc2dc\uac01<\/td><td>\uc815\ud574\uc9c4 \ubc94\uc704 \uc548\uc5d0\uc11c \uc791\uc5c5\uc774 \uc2e4\uc81c\ub85c \ub300\uae30\ud558\ub294 \uc2dc\uac04\uacfc \ud574\ub2f9 \ubc94\uc704\ub97c \ud1b5\uacfc\ud558\ub294 \ub370 \uac78\ub9ac\ub294 \uc2dc\uac04\uc744 \ud655\uc778\ud569\ub2c8\ub2e4.<\/td><\/tr><tr><td>\uc0dd\uc0b0 \uc9c0\uc2dc\uc758 \ubc1c\uc2e0 \uc8fc\uccb4, \ube48\ub3c4, \uc218\uc2e0 \ub300\uc0c1<\/td><td>\uc791\uc5c5\uc774 \uc5b4\ub5bb\uac8c \ud22c\uc785\ub418\uace0 \uc6b0\uc120\uc21c\uc704\uac00 \uc5b4\ub5bb\uac8c \ubc14\ub00c\ub294\uc9c0 \ubcf4\uc5ec \uc90d\ub2c8\ub2e4.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\ub370\uc774\ud130\uc758 \ub0a0\uc9dc, \ucd9c\ucc98, \uc0b0\uc815 \uae30\uc900\uc744 \ud45c\uc2dc\ud558\uc138\uc694. \uc5b4\ub290 \ub0a0 \uc544\uce68 \ud55c \ubc88 \uc13c \uc7ac\uace0\ub294 \uadf8 \uc2dc\uc810\uc758 \ubaa8\uc2b5\uc77c \ubfd0\uc785\ub2c8\ub2e4. \ubc18\ubcf5 \uad00\ucc30\uc744 \ud1b5\ud574 \uc5bb\uc740 \ub300\ud45c\uc131 \uc788\ub294 \ud3c9\uade0\uac12\uc774 \uc9c0\uc18d\uc801\uc73c\ub85c \ub098\ud0c0\ub098\ub294 \uc0c1\ud0dc\ub97c \ub354 \uc798 \ub4b7\ubc1b\uce68\ud569\ub2c8\ub2e4. \uc81c\ud488 \uac04 \ucc28\uc774\uac00 \ud06c\ub2e4\uba74 \ud558\ub098\uc758 \uc22b\uc790\ub85c \ud3b8\ucc28\ub97c \uac10\ucd94\uc9c0 \ub9d0\uace0 \ubc94\uc704\ub97c \ub0a8\uae30\uac70\ub098 \uc81c\ud488\uad70\uc744 \ub098\ub204\uc138\uc694.<\/p>\n\n\n<p>\uc791\uc5c5\uc790\uc5d0\uac8c \ub2e4\uc74c \uc791\uc5c5\uc740 \ubb34\uc5c7\uc744 \uae30\uc900\uc73c\ub85c \uc815\ud558\ub294\uc9c0 \ubb3c\uc5b4\ubcf4\uc138\uc694. \uc804\ud654\ub85c \uc9c0\uc2dc\ubc1b\ub294\ub2e4\ub294 \ub2f5\uc774 \ub098\uc628\ub2e4\uba74 \uacf5\uc2dd \uc808\ucc28\uc5d0 \u2018ERP \uc77c\uc77c \uc77c\uc815\u2019\uc774\ub77c\uace0 \ub418\uc5b4 \uc788\uc5b4\ub3c4 \uadf8 \uc9c0\uc2dc \uacbd\ub85c\ub97c \ud45c\uc2dc\ud558\uc138\uc694. \ubc14\ub85c \uc774\ub7f0 \uc9c0\uc810\uc5d0\uc11c \uac00\uce58 \ud750\ub984\ub3c4\ub294 \uc9c0\uc5f0\uc744 \ub2e8\uc21c\ud788 \ubcf4\uc5ec \uc8fc\ub294 \ub370 \uadf8\uce58\uc9c0 \uc54a\uace0 \uadf8 \uc774\uc720\ub97c \uc124\uba85\ud558\uae30 \uc2dc\uc791\ud569\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">3. \uc790\uc7ac \ud750\ub984, \uc9c0\uc2dc, \uc2dc\uac04\ucd95\uc744 \ud568\uaed8 \uadf8\ub9ac\uc138\uc694<\/h2>\n\n\n<p>\uc591\ucabd \ub05d\uc5d0 \uace0\uac1d\uacfc \uacf5\uae09\uc5c5\uccb4\ub97c \ubc30\uce58\ud558\uace0, \uadf8 \uc0ac\uc774\uc5d0 \uc8fc\uc694 \uacf5\uc815\uc744 \uc21c\uc11c\ub300\ub85c \ub193\uc73c\uc138\uc694. \uc7ac\uace0 \uc704\uce58\uc640 \uc218\ub7c9, \uc774\ub3d9 \uacbd\ub85c\ub97c \ucd94\uac00\ud558\uc138\uc694. \uacf5\uc815 \ud750\ub984 \uc704\ucabd\uc5d0\ub294 \uace0\uac1d \uc694\uad6c\uc0ac\ud56d\uc774 \uacc4\ud68d \ubd80\uc11c\uc5d0 \uc804\ub2ec\ub418\uace0 \uc9c0\uc2dc\uac00 \uc0dd\uc0b0 \ubd80\uc11c\uc5d0 \uc804\ub2ec\ub418\ub294 \ubc29\uc2dd\uc744 \ud45c\uc2dc\ud558\uc138\uc694. \uac01 \uacf5\uc815 \uc544\ub798\uc5d0\ub294 \uad00\ub828 \uacf5\uc815 \ub370\uc774\ud130\ub97c, \ub9e8 \uc544\ub798\uc5d0\ub294 \uacc4\ub2e8\ud615 \uc2dc\uac04\uc120\uc744 \ubc30\uce58\ud558\uc138\uc694.<\/p>\n\n\n<p>\ub110\ub9ac \uc4f0\uc774\ub294 VSM \uae30\ud638\ub97c \uc0ac\uc6a9\ud558\uace0, \ubaa8\ub450\uac00 \uac19\uc740 \ub73b\uc73c\ub85c \uc77d\uc744 \uc218 \uc788\ub3c4\ub85d \uac04\ub2e8\ud55c \ubc94\ub840\ub97c \ub123\uc73c\uc138\uc694. \uacf5\uc815 \uc0c1\uc790\ub294 \uacf5\uc815\uc744 \ub098\ud0c0\ub0b4\uace0, \uc7ac\uace0 \uc0bc\uac01\ud615\uc740 \ubcf4\uad00 \uc911\uc778 \uc790\uc7ac\ub098 \uc7ac\uacf5\ud488\uc744 \ud45c\uc2dc\ud569\ub2c8\ub2e4. \uc790\uc7ac \ud654\uc0b4\ud45c\ub294 \uc774\ub3d9\uc744, \uc815\ubcf4 \ud654\uc0b4\ud45c\ub294 \uc9c0\uc2dc\ub97c \ub098\ud0c0\ub0c5\ub2c8\ub2e4. \uc218\ub3d9 \uc804\ub2ec\uacfc \uc804\uc790\uc801 \uc804\ub2ec\uc744 \uad6c\ubd84\ud574\uc57c \ud560 \ub54c\ub294 \uc120 \ubaa8\uc591\uc744 \ub2e4\ub974\uac8c \ud558\uc138\uc694. \ub370\uc774\ud130 \uc0c1\uc790\uc5d0\ub294 \uc6b4\uc601 \uc218\uce58\ub97c \ub123\uace0, \uac1c\uc120 \uc81c\uc548\uc740 \uce74\uc774\uc820 \ubc84\uc2a4\ud2b8 \uae30\ud638\ub85c \ud45c\uc2dc\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\ubbf8\ub798 \uc0c1\ud0dc\uc758 \uac00\uce58 \ud750\ub984\ub3c4\uc5d0\uc11c \uc288\ud37c\ub9c8\ucf13 \uae30\ud638\ub294 \uc815\ud574\uc9c4 \ubcf4\ucda9 \uaddc\uce59\uc5d0 \ub530\ub77c \uad00\ub9ac\ud558\ub294 \uc7ac\uace0\ub97c \ub73b\ud558\uba70, FIFO \ub808\uc778\uc740 \uc120\uc785\uc120\ucd9c \uaddc\uce59\uc774 \uc815\ud574\uc9c4 \uc5f0\uacb0 \uad6c\uac04\uc744 \ub73b\ud569\ub2c8\ub2e4. \uc774 \uae30\ud638\ub4e4\uc740 \uc0c1\uc790\ub97c \ubcf4\uae30 \uc88b\uac8c \uc5f0\uacb0\ud558\ub294 \uc7a5\uc2dd\uc774 \uc544\ub2c8\ub77c \ud569\uc758\ub41c \uc6b4\uc601 \uaddc\uce59\uc744 \ub098\ud0c0\ub0b4\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uac04\ub2e8\ud55c \uc81c\uc870 \uc0ac\ub840<\/h3>\n\n\n<p>\uace0\uac1d\uc758 \ud3c9\uade0 \uc218\uc694\uac00 <strong>\uc0dd\uc0b0\uc77c\ub2f9 \uc591\ud488 \uc778\ud074\ub85c\uc800 100\uac1c<\/strong>\uc778 \ubc18\ubcf5 \uc0dd\uc0b0 \uc81c\ud488\uad70\uc744 \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \ud604\uc7ac \uc0c1\ud0dc\uc758 \uc790\uc7ac \ud750\ub984\uc740 \ub2e4\uc74c\uacfc \uac19\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>\ube14\ub7ad\ud06c \uc785\uace0 \u2192 \uc808\ub2e8 \u2192 \uc131\ud615 \u2192 \uc870\ub9bd \u2192 \ucd9c\ud558 \uc900\ube44\uac00 \ub05d\ub09c \uc644\uc81c\ud488<\/strong><\/p>\n\n\n<p>\uac00\uce58 \ud750\ub984\ub3c4\uc5d0\ub294 \ub300\uae30 \uc7ac\uace0\uc640 \uc2e4\uce21 \uac00\uacf5 \uc2dc\uac04\ub3c4 \uae30\ub85d\ud569\ub2c8\ub2e4.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\ud750\ub984\ub3c4\uc0c1\uc758 \uc704\uce58<\/th><th>\ub300\uae30 \uc7ac\uace0<\/th><th>\uc778\ud074\ub85c\uc800 1\uac1c\ub2f9 \uac00\uacf5 \uc2dc\uac04<\/th><\/tr><\/thead><tbody><tr><td>\uc808\ub2e8 \uc804<\/td><td>100\uac1c<\/td><td>\uc808\ub2e8: 20\ucd08<\/td><\/tr><tr><td>\uc808\ub2e8\uacfc \uc131\ud615 \uc0ac\uc774<\/td><td>300\uac1c<\/td><td>\uc131\ud615: 40\ucd08<\/td><\/tr><tr><td>\uc131\ud615\uacfc \uc870\ub9bd \uc0ac\uc774<\/td><td>100\uac1c<\/td><td>\uc870\ub9bd: 60\ucd08<\/td><\/tr><tr><td>\ucd9c\ud558 \ub300\uae30 \uc911\uc778 \uc644\uc81c\ud488<\/td><td>100\uac1c<\/td><td>\uc774 \uc608\uc2dc\uc758 \ucd1d \uac00\uacf5 \uc2dc\uac04\uc5d0\ub294 \ud3ec\ud568\ud558\uc9c0 \uc54a\uc74c<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\uc774 \uc790\uc7ac \ud750\ub984 \uc704\uc5d0 \uc2e4\uc81c \uc815\ubcf4 \ud750\ub984\uc744 \uadf8\ub9ac\uc138\uc694. \uace0\uac1d \uc694\uad6c\uc0ac\ud56d\uc740 \ub9e4\uc77c \uacc4\ud68d \ubd80\uc11c\uc5d0 \uc804\ub2ec\ub418\uace0, \uacc4\ud68d \ubd80\uc11c\ub294 \uc808\ub2e8\uacfc \uc131\ud615\uc5d0 \uac01\uac01 \ubcc4\ub3c4\uc758 \ubaa9\ub85d\uc744 \ubcf4\ub0c5\ub2c8\ub2e4. \uc870\ub9bd\uc5d0\uc11c\ub294 \uc804\ud654\ub85c \uae34\uae09 \ubd80\ud488\uc744 \uc694\uccad\ud569\ub2c8\ub2e4. \uc808\ub2e8 \uacf5\uc815\uc740 \uc5ec\uc720 \uc2dc\uac04\uc774 \uc0dd\uae38 \ub54c\ub9c8\ub2e4 \ub300\ub7c9 \ubc30\uce58 \uc791\uc5c5\uc744 \uc2dc\uc791\ud558\uba70, \uc131\ud615 \uacf5\uc815\uc740 \ub2e4\ub978 \uc81c\ud488\uad70\uacfc \uc124\ube44\ub97c \uacf5\uc720\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774\uc81c \uac00\uce58 \ud750\ub984\ub3c4\ub85c \uc6d0\uc778\uc744 \uc0b4\ud3b4\ubcfc \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc2e4\uce21 \uc791\uc5c5 \uc2dc\uac04\uc774 \uac00\uc7a5 \uae34 \uacf5\uc815\uc5d0 \ub300\uae30 \ubb3c\ub7c9\uc774 \uac00\uc7a5 \ub9ce\uc774 \uc313\uc774\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4. \uc791\uc5c5\uc744 \uc77c\ucc0d \ud22c\uc785\ud55c \uc9c0\uc810\uc5d0\uc11c \uacf5\uc6a9 \uc124\ube44\uc758 \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ub193\uace0 \uacbd\ud569\uc774 \ubc1c\uc0dd\ud574 \ub300\uae30 \ubb3c\ub7c9\uc774 \uc313\uc77c \uc218\ub3c4 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">4. \uc2dc\uac04 \uc9c0\ud45c\ub97c \uad6c\ubd84\ud574 \ub300\uae30 \uc0c1\ud0dc\ub97c \ud574\uc11d\ud558\uc138\uc694<\/h2>\n\n\n<p>\uc11c\ub85c \ube44\uad50\ud560 \uc218 \uc788\ub294 \uc81c\ud488\ub4e4\uc774 \uc548\uc815\uc801\uc73c\ub85c \ud750\ub974\ub294 \uacbd\uc6b0, \uc7ac\uace0\uac00 \uba70\uce60 \uce58 \uc218\uc694\uc5d0 \ud574\ub2f9\ud558\ub294\uc9c0 \uc77c\ucc28\uc801\uc73c\ub85c \ucd94\uc815\ud560 \ub54c \ub2e4\uc74c \uc2dd\uc774 \uc720\uc6a9\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>\uc7ac\uace0 \ubcf4\uc720\uc77c\uc218(\uc0dd\uc0b0\uc77c \uae30\uc900) = \uc7ac\uace0 \uc218\ub7c9 \u00f7 \uc77c\ud3c9\uade0 \uc218\uc694<\/strong><\/p>\n\n\n<p>\uc774 \uc608\uc5d0\uc11c \uc131\ud615 \uc804 \ub300\uae30 \uc7ac\uace0\ub294 <strong>300 \u00f7 100 = 3\uc0dd\uc0b0\uc77c<\/strong>\uce58 \uc218\uc694\uc5d0 \ud574\ub2f9\ud569\ub2c8\ub2e4. \ub124 \uacf3\uc758 \ub300\uae30 \uc7ac\uace0\ub97c \ud569\ud558\uba74 600\uac1c\ub85c, \uac19\uc740 \uc218\uc694 \uae30\uc900\uc73c\ub85c <strong>6\uc0dd\uc0b0\uc77c<\/strong>\uce58\uc5d0 \ud574\ub2f9\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc138 \uacf5\uc815\uc758 \uac00\uacf5 \uc2dc\uac04\uc744 \ud569\ud558\uba74 <strong>20 + 40 + 60 = 120\ucd08<\/strong>, \uc989 <strong>\uc778\ud074\ub85c\uc800 \uac1c\ub2f9 2\ubd84<\/strong>\uc785\ub2c8\ub2e4. \uac00\uacf5 \uc2dc\uac04\uacfc \ub300\uae30 \uc7ac\uace0\uc758 \uc774\ub7ec\ud55c \ucc28\uc774\ub294 \uc124\ube44 \uc0ac\uc774\ud074 \ub2e8\ucd95\uc5d0\ub9cc \uc9d1\uc911\ud558\uae30\uc5d0 \uc55e\uc11c \ub300\uae30 \uc6d0\uc778\uc744 \uc0b4\ud3b4\ubd10\uc57c \ud55c\ub2e4\ub294 \uc810\uc744 \ubcf4\uc5ec\uc90d\ub2c8\ub2e4.<\/p>\n\n\n<p>\ub2e4\ub9cc \uc7ac\uace0\uac00 6\uc0dd\uc0b0\uc77c\uce58 \uc218\uc694\uc5d0 \ud574\ub2f9\ud55c\ub2e4\ub294 \uac83\uc774 \uac01 \uc8fc\ubb38\uc758 <a href=\"\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%a0%9c%ec%a1%b0%ec%97%90%ec%84%9c-%eb%a6%ac%eb%93%9c-%ed%83%80%ec%9e%84%ec%9d%84-%ec%b5%9c%ec%a0%81%ed%99%94%ed%95%98%eb%8a%94-%eb%b0%a9%eb%b2%95%ec%9d%80-%eb%ac%b4%ec%97%87%ec%9d%b8%ea%b0%80\/\">\ub9ac\ub4dc\ud0c0\uc784<\/a>\uc744 \uc9c1\uc811 \uce21\uc815\ud55c \uacb0\uacfc\ub294 \uc544\ub2d9\ub2c8\ub2e4. \uc81c\ud488 \uad6c\uc131, \uc218\uc694 \ubcc0\ub3d9, \ubc30\uce58 \ub2e8\uc704 \uc774\ub3d9, \uc870\uc5c5 \uc77c\uc815, \uc6b0\uc120\uc21c\uc704\uc5d0 \ub530\ub978 \uc791\uc5c5 \uc21c\uc11c \ubcc0\uacbd\uc740 \ubaa8\ub450 \uc2e4\uc81c \uacbd\uacfc \uc2dc\uac04\uc5d0 \uc601\ud5a5\uc744 \uc904 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ub300\ud45c\uc801\uc778 \uc8fc\ubb38\uc758 \uc2dc\uac01 \uae30\ub85d\uacfc \ube44\uad50\ud574 \uac00\uce58 \ud750\ub984\ub3c4\uac00 \uc2e4\uc81c\ub97c \ubc18\uc601\ud558\ub294\uc9c0 \ud655\uc778\ud558\ub418, \uce21\uc815 \uc2dc\uc791\uc810\uacfc \uc885\ub8cc\uc810\uc740 \uc77c\uad00\ub418\uac8c \uc720\uc9c0\ud558\uc138\uc694. \uc0dd\uc0b0\uc77c\uc744 \ub2ec\ub825\uc77c\ub85c \ubc14\uafd4 \ud574\uc11d\ud574\uc11c\ub294 \uc548 \ub429\ub2c8\ub2e4.<\/p>\n\n\n<p>\uac00\uacf5\uc5d0 2\ubd84\uc774 \uac78\ub9b0\ub2e4\uace0 \ud574\uc11c \uadf8 2\ubd84\uc774 \ubaa8\ub450 \ubd80\uac00\uac00\uce58\ub97c \ucc3d\ucd9c\ud558\ub294 \uc2dc\uac04\uc778 \uac83\ub3c4 \uc544\ub2d9\ub2c8\ub2e4. \ub9b0 \uc0dd\uc0b0\uc5d0\uc11c \uac00\uce58\ub97c \ucc3d\ucd9c\ud558\ub294 \uc791\uc5c5\uc774\ub780 \uace0\uac1d\uc774 \uac00\uce58\ub97c \uc778\uc815\ud558\ub294 \ubc29\uc2dd\uc73c\ub85c \uc81c\ud488\uc744 \ubcc0\ud654\uc2dc\ud0a4\ub294 \uc791\uc5c5\uc785\ub2c8\ub2e4. \uac80\uc0ac\ub098 \uc7ac\uc791\uc5c5\uc740 \uc2dc\uac04\uc774 \ub4e4\ub354\ub77c\ub3c4 \uc774 \uc815\uc758\uc5d0 \ubd80\ud569\ud558\uc9c0 \uc54a\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ubd80\uac00\uac00\uce58 \uc2dc\uac04 \ube44\uc728\uc744 \uacc4\uc0b0\ud558\ub824\uba74 \uba3c\uc800 \ud65c\ub3d9\uc744 \ubd84\ub958\ud558\uace0, \ubd84\uc790\uc640 \ubd84\ubaa8\uc5d0 \ub3d9\uc77c\ud55c \uc2dc\uac04 \uae30\uc900\uc744 \uc801\uc6a9\ud558\uc138\uc694.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uc778\uc811 \uacf5\uc815\ubfd0 \uc544\ub2c8\ub77c \uc218\uc694\ub97c \uae30\uc900\uc73c\ub85c \uacf5\uc815\uc744 \ube44\uad50\ud558\uc138\uc694<\/h3>\n\n\n<p>\ud574\ub2f9 \uc81c\ud488\uad70\uc5d0 \ud558\ub8e8 420\ubd84\uc758 \uc0dd\uc0b0 \uac00\ub2a5 \uc2dc\uac04\uc774 \uc8fc\uc5b4\uc9c4\ub2e4\uba74, \uc218\uc694 \uae30\uc900 <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/takt-time\/\">\ud0dd\ud2b8 \ud0c0\uc784<\/a>\uc740 <strong>420 \u00f7 100 = \uc778\ud074\ub85c\uc800 \uac1c\ub2f9 4.2\ubd84<\/strong>\uc785\ub2c8\ub2e4. \ud0dd\ud2b8 \ud0c0\uc784\uc740 \uace0\uac1d \uc218\uc694\ub97c \ucda9\uc871\ud558\ub294 \ub370 \ud544\uc694\ud55c \uc0dd\uc0b0 \uac04\uaca9\uc774\uc9c0, \uc124\ube44\uc5d0\uc11c \uce21\uc815\ud55c \uc791\uc5c5 \uc18d\ub3c4\uac00 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774 \uc608\uc5d0\uc11c\ub294 \uac01 \uacf5\uc815\uc758 \uac00\uacf5 \uc2dc\uac04\uc774 \ud0dd\ud2b8 \ud0c0\uc784\ubcf4\ub2e4 \uc9e7\uc9c0\ub9cc, \uac00\uce58 \ud750\ub984\ub3c4\uc5d0\ub294 \uc5ec\uc804\ud788 \ub9ce\uc740 \ub300\uae30 \uc7ac\uace0\uac00 \ub098\ud0c0\ub0a9\ub2c8\ub2e4. \uadf8\ub807\ub2e4\uace0 \uc790\uc6d0\uc5d0 \uc5ec\uc720 \ub2a5\ub825\uc774 \uc788\ub2e4\uace0 \ub2e8\uc815\ud560 \uc218\ub294 \uc5c6\uc2b5\ub2c8\ub2e4. \uc131\ud615 \uc124\ube44\ub294 \ub2e4\ub978 \uc81c\ud488\uad70\ub3c4 \ucc98\ub9ac\ud558\uba70, \uc14b\uc5c5, \uac00\ub3d9 \uac00\ub2a5 \uc2dc\uac04, \uc778\ub825 \ubc30\uce58\ub3c4 \uc2e4\uc81c \uc0ac\uc6a9\ud560 \uc218 \uc788\ub294 \uc2dc\uac04\uc5d0 \uc601\ud5a5\uc744 \uc8fc\uae30 \ub54c\ubb38\uc785\ub2c8\ub2e4. \ubcd1\ubaa9 \uacf5\uc815\uc744 \ud310\ub2e8\ud558\uac70\ub098 \uc124\ube44\ub97c \ucd94\uac00 \uad6c\ub9e4\ud558\uae30 \uc804\uc5d0 \uc804\uccb4 \ubd80\ud558\ub97c \ud655\uc778\ud558\uc138\uc694.<\/p>\n\n\n<p>\uc808\ub2e8 \uc2dc\uac04\uc744 4\ucd08 \uc904\uc774\ub294 \uac83\ub9cc\uc73c\ub85c\ub294 \uc131\ud615 \uc804\uc5d0 3\uc0dd\uc0b0\uc77c\uce58 \uc7ac\uace0\uac00 \uc313\uc778 \uc774\uc720\ub97c \uc124\uba85\ud558\uac70\ub098 \uadf8 \uc7ac\uace0\ub97c \uc5c6\uc568 \uc218 \uc5c6\uc2b5\ub2c8\ub2e4. \ub354 \uc911\uc694\ud55c \uc9c8\ubb38\uc740 \uc65c 300\uac1c\uac00 \uc0dd\uc0b0\uc5d0 \ud22c\uc785\ub418\uc5c8\uace0, \ubb34\uc5c7\uc774 \ub2e4\uc74c \uacf5\uc815\uc73c\ub85c\uc758 \uc774\ub3d9\uc744 \ub9c9\uace0 \uc788\ub294\uac00\uc785\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">5. \uc9c0\uc5f0 \uc6d0\uc778\uc744 \uc911\uc2ec\uc73c\ub85c \ubbf8\ub798 \uc0c1\ud0dc \uc124\uacc4\ud558\uae30<\/h2>\n\n\n<p>\ud604\uc7ac \uc0c1\ud0dc\uc758 \uac00\uce58 \ud750\ub984\ub3c4\ub97c \ubc14\ud0d5\uc73c\ub85c \uc790\uc7ac\uc640 \uc815\ubcf4\ub97c \uc5b4\ub5bb\uac8c \ud750\ub974\uac8c \ud560\uc9c0 \ud569\uc758\ud558\uc138\uc694. \ub2e8\uc21c\ud788 \ub3c4\uba74\uc758 \uc7ac\uace0 \uc218\uce58\ub97c \uc904\uc5ec \uc801\ub294 \ub370 \uadf8\uccd0\uc11c\ub294 \uc548 \ub429\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc778\ud074\ub85c\uc800 \uc81c\ud488\uad70\uc758 \uacbd\uc6b0, \uc0dd\uc0b0\uacc4\ud68d \ub2f4\ub2f9\uc790 \ubc0f \uc791\uc5c5\uc790\uc640 \ud568\uaed8 \uc131\ud615 \uc804 \ub300\uae30 \uc6d0\uc778\uc744 \uc870\uc0ac\ud558\uc138\uc694. \uac00\uacf5 \uac00\ub2a5\ud55c \ubd80\ud488\uc774 \uc124\ube44 \uc5ec\ub825\uc744 \uae30\ub2e4\ub9ac\uace0 \uc788\ub098\uc694? \uc790\uc7ac \ubd80\uc871\uc774\ub098 \ud488\uc9c8 \uc2b9\uc778 \ub300\uae30\ub85c \uc791\uc5c5\uc774 \ub9c9\ud600 \uc788\ub098\uc694? \uc77c\uc77c \uc791\uc5c5 \ubaa9\ub85d\uc774 \uacc4\uc18d \ubc14\ub00c\ub098\uc694? \uc808\ub2e8 \uacf5\uc815\uc758 \uc131\uacfc\ub97c \ud574\ub2f9 \uc124\ube44\uc758 \uac00\ub3d9\ub960\ub85c \ud3c9\uac00\ud558\uae30 \ub54c\ubb38\uc5d0 \ubbf8\ub9ac \uc0dd\uc0b0\ud558\uace0 \uc788\ub098\uc694?<\/p>\n\n\n<p>\uc6d0\uc778\uc774 \ub2e4\ub974\uba74 \uac1c\uc120 \ubc29\ubc95\ub3c4 \ub2ec\ub77c\uc57c \ud569\ub2c8\ub2e4. \uc14b\uc5c5 \uc2dc\uac04\uc744 \uc904\uc774\uba74 \uc18c\uaddc\ubaa8 \ubc30\uce58 \uc0dd\uc0b0\uc744 \ud604\uc2e4\uc801\uc73c\ub85c \uc6b4\uc601\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc801\ud569\ud55c \uacf5\uc815\ub4e4\uc744 \uc5f0\uc18d \ud750\ub984\uc73c\ub85c \uc5f0\uacb0\ud558\uba74 \uc911\uac04 \ub300\uae30\ub97c \uc5c6\uc568 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc774\uac83\uc774 \uc5b4\ub835\ub2e4\uba74 \uad00\ub9ac \uae30\uc900\uc744 \uac16\ucd98 \uc120\uc785\uc120\ucd9c(FIFO) \ubc29\uc2dd\uc758 \uacf5\uc815 \uac04 \uc5f0\uacb0\uc774\ub098 \uc288\ud37c\ub9c8\ucf13 \uc7ac\uace0 \ubcf4\ucda9 \ubc29\uc2dd\uc73c\ub85c \ub2e4\uc74c\uc5d0 \uc774\ub3d9\ud560 \ubb3c\ub7c9\uc744 \uc81c\uc5b4\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ud544\uc694\ud55c \uacbd\ud654, \ub0c9\uac01 \ub610\ub294 \ud488\uc9c8 \ud655\uc778\uc744 \uc704\ud55c \ubcf4\ub958\ub294 \uc2b9\uc778\ub41c \uacf5\uc815 \ubcc0\uacbd\uc73c\ub85c \uadf8 \ud544\uc694\uc131\uc774 \uc5c6\uc5b4\uc9c8 \ub54c\uae4c\uc9c0 \uac00\uce58 \ud750\ub984\ub3c4\uc5d0 \uacc4\uc18d \ud45c\uc2dc\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\ubc18\ubcf5 \uc0dd\uc0b0 \ud750\ub984\uc744 \uc124\uacc4\ud560 \ub54c\ub294 \uace0\uac1d \uc218\uc694\uc5d0 \ub530\ub978 \uc0dd\uc0b0 \uc77c\uc815\uc744 \ud750\ub984\uc758 \uc5b4\ub290 \uc9c0\uc810\uc5d0 \uc801\uc6a9\ud560\uc9c0 \uc815\ud558\uc138\uc694. \uc774 \uc9c0\uc810\uc740 \ud754\ud788 <strong>\ud398\uc774\uc2a4\uba54\uc774\ucee4 \uacf5\uc815<\/strong>\uc73c\ub85c, \uadf8 \uc0dd\uc0b0 \ub9ac\ub4ec\uc774 \uc804\uccb4 \ud750\ub984\uc744 \uc88c\uc6b0\ud569\ub2c8\ub2e4. \uc0c1\ub958 \uacf5\uc815\uc758 \uc791\uc5c5 \ucc29\uc218\ub97c \ubb34\uc5c7\uc73c\ub85c \uc2b9\uc778\ud558\uace0, \ud558\ub958 \uacf5\uc815\uc740 \uc774\ub97c \uc5b4\ub5bb\uac8c \ub530\ub97c\uc9c0 \uc815\ud574\uc57c \ud569\ub2c8\ub2e4. \uac01 \uacf5\uc815\uc5d0 \uc11c\ub85c \ub3c5\ub9bd\uc801\uc774\uace0 \ucda9\ub3cc\ud558\ub294 \uc77c\uc815\uc744 \ub0b4\ub9ac\uba74 \ubbf8\ub798 \uc0c1\ud0dc\uc5d0\uc11c \uc5c6\uc560\ub824\ub358 \ub300\uae30\uac00 \ub2e4\uc2dc \uc0dd\uae38 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud300\uc774 \uc2dc\ubc94 \uc6b4\uc601 \ubaa9\ud45c\ub85c \uc131\ud615 \uc804 \ub300\uae30 \uc7ac\uace0\ub97c 300\uac1c\uc5d0\uc11c 100\uac1c\ub85c \uc904\uc774\uae30\ub85c \ud588\ub2e4\uace0 \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \uc218\uc694\uac00 \uac19\ub2e4\uba74 \uc774\ub294 2\uc0dd\uc0b0\uc77c\uce58 \uc7ac\uace0\ub97c \uc904\uc774\ub294 \uac83\uc785\ub2c8\ub2e4. \uac80\uc99d\ud574\uc57c \ud560 \ubaa9\ud45c\uc774\uc9c0, \ub0a9\ud488\uc774 \uc790\ub3d9\uc73c\ub85c 2\uc77c \ube68\ub77c\uc9c4\ub2e4\ub294 \ub73b\uc740 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc6b4\uc601 \ubc29\uc2dd\uc744 \uc5b4\ub5bb\uac8c \ubc14\uafc0\uc9c0 \uba85\ud655\ud788 \uc815\ud558\uc138\uc694. \uc5b4\ub5a4 \uc870\uac74\uc5d0\uc11c \uc808\ub2e8\uc5d0 \ucc29\uc218\ud560\uc9c0, \uc131\ud615 \uc804 \ub300\uae30 \uc7ac\uace0\ub294 \uc5bc\ub9c8\uae4c\uc9c0 \ud5c8\uc6a9\ud560\uc9c0, \uae34\uae09 \uc608\uc678\ub294 \ub204\uac00 \ucc98\ub9ac\ud560\uc9c0, \uc131\ud615 \uc124\ube44\uc758 \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ub2e4\ub978 \uc81c\ud488\uacfc \uc5b4\ub5bb\uac8c \ubc30\ubd84\ud560\uc9c0 \uc815\ud574\uc57c \ud569\ub2c8\ub2e4. \ub3c4\uba74\uc758 \uc7ac\uace0 \uc0bc\uac01\ud615\uc744 \uc791\uac8c \uadf8\ub9b0\ub2e4\uace0 \uc774\ub7f0 \uacb0\uc815\uc774 \uc2e4\ud589\ub418\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">SkyPlanner\ub85c \uc0dd\uc0b0 \uc77c\uc815 \uac1c\uc120\uc744 \uc2e4\ud589\uc5d0 \uc62e\uae30\uc138\uc694<\/h2>\n\n\n<p>\ubbf8\ub798 \uc0c1\ud0dc\uc758 \uac00\uce58 \ud750\ub984\ub3c4\ub294 \ubaa9\ud45c\ub85c \ud558\ub294 \ud750\ub984\uc744 \uc815\uc758\ud569\ub2c8\ub2e4. SkyPlanner\ub294 \ub3c4\uc2dd\ud654\ud55c \uc81c\ud488\uad70 \uc548\uc5d0\uc11c\ub9cc\uc774 \uc544\ub2c8\ub77c \uc2e4\uc81c \uc804\uccb4 \uc218\uc8fc\ub97c \ub300\uc0c1\uc73c\ub85c \uadf8 \ud750\ub984\uc5d0 \ub9de\ub294 \uc0dd\uc0b0 \uc77c\uc815\uc744 \uc6b4\uc601\ud558\ub3c4\ub85d \ub3d5\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud569\uc758\ud55c \uacf5\uc815\uc744 \uc81c\ud488\ubcc4 \uacf5\uc815 \ub2e8\uacc4\ub85c \ub4f1\ub85d\ud558\uace0, \uac01 \ub2e8\uacc4\uc5d0 \uc791\uc5c5 \uac00\ub2a5\ud55c \uc791\uc5c5\uc7a5, \uac00\uacf5 \uc2dc\uac04, \uc14b\uc5c5 \uc2dc\uac04\uc744 \uc9c0\uc815\ud558\uc138\uc694. \uad50\ub300 \uc77c\uc815\uacfc \uc790\uc6d0\uc758 \uac00\uc6a9 \uc2dc\uac04\uc744 \uc785\ub825\ud55c \ub2e4\uc74c, \uc57d\uc18d\ud55c \ub0a9\uae30\ub97c \ubc18\uc601\ud574 \uc6b0\uc120\uc21c\uc704\ub97c \uc124\uc815\ud558\uc138\uc694. SkyPlanner\uc758 \uc0dd\uc0b0 \uc2a4\ucf00\uc904\ub9c1 \uc778\uacf5\uc9c0\ub2a5\uc778 Arcturus\ub294 \uc0dd\uc0b0 \ub2a5\ub825, \uacf5\uc815 \uac04 \uc120\ud6c4 \uad00\uacc4, \uc124\uc815\ub41c \uc6b0\uc120\uc21c\uc704\ub97c \ubc18\uc601\ud574 \uc77c\uc815\uc744 \uacc4\uc0b0\ud569\ub2c8\ub2e4. \uc790\uc7ac \uac00\uc6a9\uc131\uc744 \uace0\ub824\ud558\ub294 \uc2a4\ucf00\uc904\ub9c1\uc744 \ud65c\uc131\ud654\ud558\uba74 \uc790\uc7ac \ud655\ubcf4 \uc5ec\ubd80\ub3c4 \uc791\uc5c5 \uac00\ub2a5 \uc2dc\uc810\uc5d0 \ubc18\uc601\ub429\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc778\ud074\ub85c\uc800 \uc81c\ud488\uad70\uc758 \uacbd\uc6b0, \uac19\uc740 \uc131\ud615 \uc124\ube44\ub97c \uc0ac\uc6a9\ud574\uc57c \ud558\ub294 \ub2e4\ub978 \uc8fc\ubb38\uacfc \ud568\uaed8 \uc131\ud615 \uc791\uc5c5\uc758 \uc77c\uc815\uc774 \uc218\ub9bd\ub429\ub2c8\ub2e4. \uc124\ube44\ub97c \uc5b8\uc81c\ub098 \uc0ac\uc6a9\ud560 \uc218 \uc788\ub2e4\uace0 \uac00\uc815\ud55c \uc81c\ud488\uad70\ubcc4 \uacc4\ud68d\uc744 \ub530\ub85c \uad00\ub9ac\ud558\ub294 \ub300\uc2e0, Gantt \ud654\uba74\uc5d0\uc11c \uacc4\uc0b0\ub41c \uc791\uc5c5 \uc21c\uc11c\ub97c \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uadf8 \uacb0\uacfc \ub300\uae30 \uc791\uc5c5\uc758 \uc21c\uc11c\ub97c \uc218\uc791\uc5c5\uc73c\ub85c \uc870\uc815\ud558\ub294 \ubd80\ub2f4\uc774 \uc904\uace0, \ubd80\ud488\uc744 \ub300\uae30\ud558\uac8c \ub9cc\ub4e4 \uc77c\uc815 \ucda9\ub3cc\ub3c4 \ub354 \uc77c\ucc0d \ud30c\uc545\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud569\uc758\ud55c \ud750\ub984 \uc81c\uc5b4 \uc6d0\uce59\uc740 \uadf8\ub300\ub85c \uc720\uc9c0\ud558\uc138\uc694. \ubbf8\ub798 \uc0c1\ud0dc\uc5d0 \ud480 \ubc29\uc2dd\uc758 \ubcf4\ucda9\uc744 \uc801\uc6a9\ud588\ub2e4\uba74, \ubcf4\ucda9 \uc2e0\ud638\uac00 \uc791\uc5c5 \ucc29\uc218\ub97c \uc2b9\uc778\ud558\uace0 \uc2a4\ucf00\uc904\ub9c1\uc740 \uc2b9\uc778\ub41c \uc791\uc5c5\uc744 \uac00\uc6a9 \uc790\uc6d0\uc5d0 \ub9de\ucdb0 \ubc30\uce58\ud558\ub294 \uc5ed\ud560\uc744 \ud569\ub2c8\ub2e4. \uc0dd\uc0b0 \ub2a5\ub825 \uacc4\uc0b0 \uacb0\uacfc\ub97c \ubd88\ud544\uc694\ud55c \uc7ac\uace0\ub97c \uc0dd\uc0b0\ud574\ub3c4 \ub41c\ub2e4\ub294 \uc2b9\uc778\uc73c\ub85c \ubc1b\uc544\ub4e4\uc5ec\uc11c\ub294 \uc548 \ub429\ub2c8\ub2e4.<\/p>\n\n\n<p>\uae34\uae09 \uc8fc\ubb38\uc774\ub098 \uad50\ub300 \uc77c\uc815 \ubcc0\uacbd\uc73c\ub85c \uc0c1\ud669\uc774 \ub2ec\ub77c\uc9c0\uba74 Arcturus\uac00 \uc77c\uc815\uc744 \ub2e4\uc2dc \uacc4\uc0b0\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc124\uc815\ud55c \uaddc\uce59\uacfc \uc7a0\uae08\uc740 \uc720\uc9c0\ud574\uc57c \ud560 \uacb0\uc815\uc744 \ubcf4\ud638\ud569\ub2c8\ub2e4. <strong>SkyPlanner\ub294 \uac1c\ubc29\ud615 REST API\ub97c \ud1b5\ud574 \ubaa8\ub4e0 ERP \ub610\ub294 MES\uc640 \uc5f0\ub3d9\ub429\ub2c8\ub2e4.<\/strong> \ub530\ub77c\uc11c \uc8fc\ubb38 \ubc0f \uc0dd\uc0b0 \ub370\uc774\ud130\ub97c \ubcf4\uad00\ud558\ub294 \uae30\uc874 \uc2dc\uc2a4\ud15c\uc744 \uc720\uc9c0\ud558\uba74\uc11c \uc0dd\uc0b0 \uc2a4\ucf00\uc904\ub9c1\uc744 \uac1c\uc120\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\ud1b5\ud569\ub41c \uc0dd\uc0b0 \uc2a4\ucf00\uc904\ub9c1\uc774 Mamec\uc5d0 \uac00\uc838\uc628 \ubcc0\ud654<\/h3>\n\n\n<p>\ud63c\ud569 \uae30\uc220 \uc81c\ud488\uc744 \uc81c\uc870\ud558\uace0 \ucca8\ub2e8 \uc81c\ud488\uc744 \uc218\ud0c1 \uc0dd\uc0b0\ud558\ub294 <a href=\"\/ko\/%ea%b3%a0%ea%b0%9d-%ec%82%ac%eb%a1%80\/mamec\/\">\ud540\ub780\ub4dc \uc81c\uc870\uc5c5\uccb4 Mamec<\/a>\uc5d0\ub294 \uc11c\ub85c \uc5f0\uad00\ub41c \uc791\uc5c5\uc9c0\uc2dc\uac00 \uc218\ucc9c \uac74 \uc788\uc5c8\uc2b5\ub2c8\ub2e4. \ud604\uc7a5 \uad00\ub9ac\uc790\ub294 \uc885\uc774 \uc791\uc5c5\uc9c0\uc2dc\uc11c\uc758 \ub0a9\uae30\ub97c \ubcf4\uace0 \uc791\uc5c5 \uc6b0\uc120\uc21c\uc704\ub97c \uc815\ud588\uace0, \uacbd\uc601\uc9c4\uc740 \uc804\uccb4 \ubd80\ud558\ub97c \uc2e0\ub8b0\ud560 \ub9cc\ud558\uac8c \ud30c\uc545\ud558\uae30 \uc5b4\ub824\uc6e0\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>Mamec\uc740 SkyPlanner\ub97c Oscar ERP\uc640 \uc5f0\ub3d9\ud588\uc2b5\ub2c8\ub2e4. \uc774\uc81c \uc778\uacf5\uc9c0\ub2a5 \uae30\ubc18 \uc720\ud55c \uc6a9\ub7c9 \uc2a4\ucf00\uc904\ub9c1\uc774 \uc77c\uc815 \uc218\ub9bd\uc758 \uae30\ucd08 \uc791\uc5c5\uc744 \ucc98\ub9ac\ud558\uba70, \uc791\uc5c5 \ub300\uae30\uc5f4\uc744 1\uc8fc \ub2e8\uc704\ub85c \uace0\uc815\ud574 \uae30\uacc4 \uac00\uacf5 \uc791\uc5c5\uc790\uac00 \ub2e4\uc74c \uc791\uc5c5\uc744 \ubbf8\ub9ac \ud30c\uc545\ud558\uace0 \uc900\ube44\ud560 \uc218 \uc788\ub3c4\ub85d \ub3d5\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>Mamec\uc740 SkyPlanner\ub97c \uc0ac\uc6a9\ud558\uba74\uc11c \uc791\uc5c5 \uc21c\uc11c\uac00 \uac1c\uc120\ub418\uc5b4 \uc791\uc5c5\uc7a5 \ube44\uac00\ub3d9 \uc2dc\uac04\uc774 \uc904\uc5c8\uace0, \uacc4\ud68d \uc218\ub9bd \ubd80\ub2f4\uacfc \uc7ac\uacf5\ud488\uc5d0 \ubd88\ud544\uc694\ud558\uac8c \ubb36\uc774\ub294 \uc6b4\uc804\uc790\ubcf8\ub3c4 \uc904\uc5c8\ub2e4\uace0 \uc124\uba85\ud569\ub2c8\ub2e4. \uc774 \uacbd\ud5d8\uc740 \uc11c\ub85c \uc5f0\uad00\ub41c \uc791\uc5c5\uc744 \uc870\uc728\ud558\ub294 \uac83\uc774 \ud604\uc7a5\uc5d0\uc11c \uc5b4\ub5a4 \uac00\uce58\ub97c \uac16\ub294\uc9c0 \ubcf4\uc5ec\uc90d\ub2c8\ub2e4. \uac1c\uc120\ub41c \ud750\ub984\uc744 \uc720\uc9c0\ud558\ub824\uba74 \uc0dd\uc0b0 \uc0c1\ud669\uc774 \ubc14\ub00c\uc5b4\ub3c4 \uad6c\uc131\uc6d0\ub4e4\uc774 \uacc4\uc18d \ud65c\uc6a9\ud560 \uc218 \uc788\ub294 \uacf5\ub3d9\uc758 \uacc4\ud68d\uc774 \ud544\uc694\ud569\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uac80\uc99d\ud560 \uc218 \uc788\ub294 \uac1c\uc120 \ud55c \uac00\uc9c0\ubd80\ud130 \uc2dc\uc791\ud558\uc138\uc694<\/h2>\n\n\n<p>\ubbf8\ub798 \uc0c1\ud0dc\ub97c \uc2e4\ud604\ud558\uae30 \uc704\ud55c \uccab \uc2e4\ud589 \uacfc\uc81c\uc5d0 \ub2f4\ub2f9\uc790, \uc644\ub8cc\uc77c, \uce21\uc815 \uac00\ub2a5\ud55c \uc131\uacfc\ub97c \uc815\ud558\uc138\uc694. \uc131\ud615 \uacf5\uc815\uc758 \ub300\uae30\uc5f4\uc5d0 \ub300\ud574\uc11c\ub294 \ub300\uae30 \uc7ac\uace0\uc640 \ub3c4\ucc29\ubd80\ud130 \uc791\uc5c5 \uc2dc\uc791\uae4c\uc9c0 \uc2e4\uc81c\ub85c \uac78\ub9b0 \uc2dc\uac04\uc744 \uc0dd\uc0b0 \ucc98\ub9ac\ub7c9, \ub0a9\uae30 \uc2e4\uc801, \uae34\uae09 \ub300\uc751\uc774 \ud544\uc694\ud55c \uc608\uc678 \uc0c1\ud669\uacfc \ud568\uaed8 \ucd94\uc801\ud558\uc138\uc694. \ub300\uae30\uc5f4\uc774 \uc904\uc5b4\ub4e0 \uac83\uc774 \ub2e8\uc9c0 \uc9c0\uc5f0\uc744 \uc808\ub2e8\uc774\ub098 \uc870\ub9bd \uacf5\uc815 \ub610\ub294 \uace0\uac1d \ucabd\uc73c\ub85c \uc62e\uae34 \uacb0\uacfc\ub294 \uc544\ub2cc\uc9c0 \ud655\uc778\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud574\ub2f9 \uc0dd\uc0b0 \ud750\ub984\uc744 \uc6b4\uc601\ud558\ub294 \uc0ac\ub78c\ub4e4\uacfc \uacb0\uacfc\ub97c \uac80\ud1a0\ud558\uc138\uc694. \ud750\ub984\uc744 \uac1c\uc120\ud55c \ubc29\ubc95\uc740 \uc720\uc9c0\ud558\uace0, \ud6a8\uacfc\uac00 \uc5c6\uc5c8\ub358 \ubc29\ubc95\uc740 \uc6d0\uc778\uc744 \uc870\uc0ac\ud558\uc138\uc694. \ub2e4\uc74c \uac1c\uc120 \uacfc\uc81c\ub97c \uc120\ud0dd\ud558\uae30 \uc804\uc5d0 \ud604\uc7ac \uc0c1\ud0dc\uc758 \uac00\uce58 \ud750\ub984\ub3c4\ub3c4 \uac31\uc2e0\ud558\uc138\uc694.<\/p>\n\n\n<p>\uadc0\uc0ac \uacf5\uc7a5\uc5d0\uc11c \uc0dd\uc0b0 \uc2a4\ucf00\uc904\ub9c1\uc774 \uc5b4\ub5bb\uac8c \uc791\ub3d9\ud560\uc9c0 \uc54c\uc544\ubcf4\ub824\uba74 <a href=\"https:\/\/skyplanner.ai\/ko\/%ec%98%81%ec%97%85%ed%8c%80%ec%97%90-%eb%ac%b8%ec%9d%98\/\">SkyPlanner \ub370\ubaa8\ub97c \uc608\uc57d\ud558\uc138\uc694<\/a>. \uac00\uce58 \ud750\ub984\ub3c4\ub97c \uc791\uc131\ud55c \uc81c\ud488\uad70, \ub300\uae30\uac00 \uac00\uc7a5 \ub9ce\uc774 \uc313\uc778 \uc9c0\uc810, \uac19\uc740 \uc790\uc6d0\uc744 \uc0ac\uc6a9\ud558\ub294 \ub2e4\ub978 \uc791\uc5c5\uc5d0 \uad00\ud55c \uc790\ub8cc\ub97c \uc900\ube44\ud574 \uc8fc\uc138\uc694. \uc774\ub97c \uad6c\uccb4\uc801\uc778 \ucd9c\ubc1c\uc810\uc73c\ub85c \uc0bc\uc544 \uac00\uce58 \ud750\ub984\ub3c4\ub97c \ub300\uae30 \uac10\uc18c\uc640 \ud300\uc774 \uc2e4\ud589\ud560 \uc218 \uc788\ub294 \uc0dd\uc0b0 \uacc4\ud68d\uc73c\ub85c \uc5f0\uacb0\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uba3c\uc800 \uc9c1\uc811 \uc0b4\ud3b4\ubcf4\uace0 \uc2f6\ub2e4\uba74 <a href=\"https:\/\/skyplanner.ai\/ko\/%ed%8f%89%ea%b0%80%ed%8c%90\/\">\ub370\ubaa8 \ub370\uc774\ud130\ub85c SkyPlanner\ub97c \uccb4\ud5d8\ud574 \ubcf4\uc138\uc694<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\uac00\uce58 \ud750\ub984\ub3c4: \ud604\uc7a5\uc758 \ud750\ub984\uc744 \ud30c\uc545\ud558\uace0 \uac1c\uc120\ud558\ub294 \ubc29\ubc95 \ud648 &raquo; \ub9ac\uc18c\uc2a4 &raquo; \uac00\uce58 \ud750\ub984\ub3c4: \ud604\uc7a5\uc758 \ud750\ub984\uc744 \ud30c\uc545\ud558\uace0 \uac1c\uc120\ud558\ub294 \ubc29\ubc95 \ubd80\ud488\uc744 \uac00\uacf5\ud558\ub294 \ub370\ub294 \uba87 \ubd84\ubc16\uc5d0 \uac78\ub9ac\uc9c0 \uc54a\uc544\ub3c4 \ub2e4\uc74c \uacf5\uc815\uc73c\ub85c \uc774\ub3d9\ud558\uae30\uae4c\uc9c0 \uba70\uce60\uc744 \uae30\ub2e4\ub9b4 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uacf5\uc815\uc744 \uc21c\uc11c\ub300\ub85c \uadf8\ub9ac\uba74 \ubd80\ud488\uc774 \uc5b4\ub514\ub85c \uac00\ub294\uc9c0 \uc54c \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uac00\uce58 \ud750\ub984\ub3c4\ub294 \uadf8\uacf3\uc5d0 \ub3c4\ub2ec\ud558\uae30\uae4c\uc9c0 \uc65c \uadf8\ub807\uac8c \uc624\ub798 \uac78\ub9ac\ub294\uc9c0 \uc774\ud574\ud558\ub294 \ub370 \ub3c4\uc6c0\uc774 \ub429\ub2c8\ub2e4. \uac00\uce58 \ud750\ub984\ub3c4(VSM)\ub294 &#8230; <a title=\"\uac00\uce58 \ud750\ub984\ub3c4: \ud604\uc7a5\uc758 \ud750\ub984\uc744 \ud30c\uc545\ud558\uace0 \uac1c\uc120\ud558\ub294 \ubc29\ubc95\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/value-stream-mapping\/\" aria-label=\"Read more about \uac00\uce58 \ud750\ub984\ub3c4: \ud604\uc7a5\uc758 \ud750\ub984\uc744 \ud30c\uc545\ud558\uace0 \uac1c\uc120\ud558\ub294 \ubc29\ubc95\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":105538,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[496,2558],"tags":[],"class_list":["post-105534","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-496","category-2558","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\uac00\uce58 \ud750\ub984\ub3c4: \ud604\uc7a5\uc758 \ud750\ub984\uc744 \ud30c\uc545\ud558\uace0 \uac1c\uc120\ud558\ub294 \ubc29\ubc95<\/title>\n<meta name=\"description\" content=\"\uc81c\ud488\uc740 \uc65c \ub300\uae30\ud560\uae4c\uc694? \ud55c \uc81c\ud488\uad70\uc758 \uc790\uc7ac\u00b7\uc815\ubcf4 \ud750\ub984\uc744 \uac00\uce58 \ud750\ub984\ub3c4\ub85c \uc815\ub9ac\ud558\uace0, \ub300\uae30 \uc6d0\uc778\uc744 \ubd84\uc11d\ud574 \ud604\uc7a5\uc5d0\uc11c \uc2e4\ud589\ud560 \uac1c\uc120\uc548\uc744 \uc120\ud0dd\ud558\uc138\uc694.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/value-stream-mapping\/\" \/>\n<meta property=\"og:locale\" content=\"ko_KR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\uac00\uce58 \ud750\ub984\ub3c4: \ud604\uc7a5\uc758 \ud750\ub984\uc744 \ud30c\uc545\ud558\uace0 \uac1c\uc120\ud558\ub294 \ubc29\ubc95\" \/>\n<meta property=\"og:description\" content=\"\uc81c\ud488\uc740 \uc65c \ub300\uae30\ud560\uae4c\uc694? \ud55c \uc81c\ud488\uad70\uc758 \uc790\uc7ac\u00b7\uc815\ubcf4 \ud750\ub984\uc744 \uac00\uce58 \ud750\ub984\ub3c4\ub85c \uc815\ub9ac\ud558\uace0, \ub300\uae30 \uc6d0\uc778\uc744 \ubd84\uc11d\ud574 \ud604\uc7a5\uc5d0\uc11c \uc2e4\ud589\ud560 \uac1c\uc120\uc548\uc744 \uc120\ud0dd\ud558\uc138\uc694.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/value-stream-mapping\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-22T01:38:15+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-22T01:41:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/value-stream-mapping-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\uae00\uc4f4\uc774\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/value-stream-mapping\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/value-stream-mapping\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"\uac00\uce58 \ud750\ub984\ub3c4: \ud604\uc7a5\uc758 \ud750\ub984\uc744 \ud30c\uc545\ud558\uace0 \uac1c\uc120\ud558\ub294 \ubc29\ubc95\",\"datePublished\":\"2026-10-22T01:38:15+00:00\",\"dateModified\":\"2026-10-22T01:41:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/value-stream-mapping\\\/\"},\"wordCount\":32,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/value-stream-mapping\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/value-stream-mapping-hero.png\",\"articleSection\":[\"\ub9ac\uc18c\uc2a4\",\"\uc81c\uc870 \ud6a8\uc728\"],\"inLanguage\":\"ko-KR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/value-stream-mapping\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/value-stream-mapping\\\/\",\"name\":\"\uac00\uce58 \ud750\ub984\ub3c4: \ud604\uc7a5\uc758 \ud750\ub984\uc744 \ud30c\uc545\ud558\uace0 \uac1c\uc120\ud558\ub294 \ubc29\ubc95\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/value-stream-mapping\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/value-stream-mapping\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/value-stream-mapping-hero.png\",\"datePublished\":\"2026-10-22T01:38:15+00:00\",\"dateModified\":\"2026-10-22T01:41:00+00:00\",\"description\":\"\uc81c\ud488\uc740 \uc65c \ub300\uae30\ud560\uae4c\uc694? \ud55c \uc81c\ud488\uad70\uc758 \uc790\uc7ac\u00b7\uc815\ubcf4 \ud750\ub984\uc744 \uac00\uce58 \ud750\ub984\ub3c4\ub85c \uc815\ub9ac\ud558\uace0, \ub300\uae30 \uc6d0\uc778\uc744 \ubd84\uc11d\ud574 \ud604\uc7a5\uc5d0\uc11c \uc2e4\ud589\ud560 \uac1c\uc120\uc548\uc744 \uc120\ud0dd\ud558\uc138\uc694.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/value-stream-mapping\\\/#breadcrumb\"},\"inLanguage\":\"ko-KR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/value-stream-mapping\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/value-stream-mapping\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/value-stream-mapping-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/value-stream-mapping-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Material and information paths connect three manufacturing stations, with parts waiting before the middle machine.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/value-stream-mapping\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\uac00\uce58 \ud750\ub984\ub3c4: \ud604\uc7a5\uc758 \ud750\ub984\uc744 \ud30c\uc545\ud558\uace0 \uac1c\uc120\ud558\ub294 \ubc29\ubc95\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ko-KR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\uac00\uce58 \ud750\ub984\ub3c4: \ud604\uc7a5\uc758 \ud750\ub984\uc744 \ud30c\uc545\ud558\uace0 \uac1c\uc120\ud558\ub294 \ubc29\ubc95","description":"\uc81c\ud488\uc740 \uc65c \ub300\uae30\ud560\uae4c\uc694? \ud55c \uc81c\ud488\uad70\uc758 \uc790\uc7ac\u00b7\uc815\ubcf4 \ud750\ub984\uc744 \uac00\uce58 \ud750\ub984\ub3c4\ub85c \uc815\ub9ac\ud558\uace0, \ub300\uae30 \uc6d0\uc778\uc744 \ubd84\uc11d\ud574 \ud604\uc7a5\uc5d0\uc11c \uc2e4\ud589\ud560 \uac1c\uc120\uc548\uc744 \uc120\ud0dd\ud558\uc138\uc694.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/value-stream-mapping\/","og_locale":"ko_KR","og_type":"article","og_title":"\uac00\uce58 \ud750\ub984\ub3c4: \ud604\uc7a5\uc758 \ud750\ub984\uc744 \ud30c\uc545\ud558\uace0 \uac1c\uc120\ud558\ub294 \ubc29\ubc95","og_description":"\uc81c\ud488\uc740 \uc65c \ub300\uae30\ud560\uae4c\uc694? \ud55c \uc81c\ud488\uad70\uc758 \uc790\uc7ac\u00b7\uc815\ubcf4 \ud750\ub984\uc744 \uac00\uce58 \ud750\ub984\ub3c4\ub85c \uc815\ub9ac\ud558\uace0, \ub300\uae30 \uc6d0\uc778\uc744 \ubd84\uc11d\ud574 \ud604\uc7a5\uc5d0\uc11c \uc2e4\ud589\ud560 \uac1c\uc120\uc548\uc744 \uc120\ud0dd\ud558\uc138\uc694.","og_url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/value-stream-mapping\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-22T01:38:15+00:00","article_modified_time":"2026-10-22T01:41:00+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/value-stream-mapping-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"\uae00\uc4f4\uc774":"Jussi M\u00e4ntyl\u00e4"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/value-stream-mapping\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/value-stream-mapping\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"\uac00\uce58 \ud750\ub984\ub3c4: \ud604\uc7a5\uc758 \ud750\ub984\uc744 \ud30c\uc545\ud558\uace0 \uac1c\uc120\ud558\ub294 \ubc29\ubc95","datePublished":"2026-10-22T01:38:15+00:00","dateModified":"2026-10-22T01:41:00+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/value-stream-mapping\/"},"wordCount":32,"publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/value-stream-mapping\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/value-stream-mapping-hero.png","articleSection":["\ub9ac\uc18c\uc2a4","\uc81c\uc870 \ud6a8\uc728"],"inLanguage":"ko-KR"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/value-stream-mapping\/","url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/value-stream-mapping\/","name":"\uac00\uce58 \ud750\ub984\ub3c4: \ud604\uc7a5\uc758 \ud750\ub984\uc744 \ud30c\uc545\ud558\uace0 \uac1c\uc120\ud558\ub294 \ubc29\ubc95","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/value-stream-mapping\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/value-stream-mapping\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/value-stream-mapping-hero.png","datePublished":"2026-10-22T01:38:15+00:00","dateModified":"2026-10-22T01:41:00+00:00","description":"\uc81c\ud488\uc740 \uc65c \ub300\uae30\ud560\uae4c\uc694? \ud55c \uc81c\ud488\uad70\uc758 \uc790\uc7ac\u00b7\uc815\ubcf4 \ud750\ub984\uc744 \uac00\uce58 \ud750\ub984\ub3c4\ub85c \uc815\ub9ac\ud558\uace0, \ub300\uae30 \uc6d0\uc778\uc744 \ubd84\uc11d\ud574 \ud604\uc7a5\uc5d0\uc11c \uc2e4\ud589\ud560 \uac1c\uc120\uc548\uc744 \uc120\ud0dd\ud558\uc138\uc694.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/value-stream-mapping\/#breadcrumb"},"inLanguage":"ko-KR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/value-stream-mapping\/"]}]},{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/value-stream-mapping\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/value-stream-mapping-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/value-stream-mapping-hero.png","width":1672,"height":941,"caption":"Material and information paths connect three manufacturing stations, with parts waiting before the middle machine."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/value-stream-mapping\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ko\/"},{"@type":"ListItem","position":2,"name":"\uac00\uce58 \ud750\ub984\ub3c4: \ud604\uc7a5\uc758 \ud750\ub984\uc744 \ud30c\uc545\ud558\uace0 \uac1c\uc120\ud558\ub294 \ubc29\ubc95"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ko\/#website","url":"https:\/\/skyplanner.ai\/ko\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ko\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ko-KR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ko\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ko\/","logo":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/value-stream-mapping-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/value-stream-mapping-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/value-stream-mapping-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/value-stream-mapping-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/value-stream-mapping-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/value-stream-mapping-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/value-stream-mapping-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/value-stream-mapping-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ko\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\uac00\uce58 \ud750\ub984\ub3c4: \ud604\uc7a5\uc758 \ud750\ub984\uc744 \ud30c\uc545\ud558\uace0 \uac1c\uc120\ud558\ub294 \ubc29\ubc95 \ud648 &raquo; \ub9ac\uc18c\uc2a4 &raquo; \uac00\uce58 \ud750\ub984\ub3c4: \ud604\uc7a5\uc758 \ud750\ub984\uc744 \ud30c\uc545\ud558\uace0 \uac1c\uc120\ud558\ub294 \ubc29\ubc95 \ubd80\ud488\uc744 \uac00\uacf5\ud558\ub294 \ub370\ub294 \uba87 \ubd84\ubc16\uc5d0 \uac78\ub9ac\uc9c0 \uc54a\uc544\ub3c4 \ub2e4\uc74c \uacf5\uc815\uc73c\ub85c \uc774\ub3d9\ud558\uae30\uae4c\uc9c0 \uba70\uce60\uc744 \uae30\ub2e4\ub9b4 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uacf5\uc815\uc744 \uc21c\uc11c\ub300\ub85c \uadf8\ub9ac\uba74 \ubd80\ud488\uc774 \uc5b4\ub514\ub85c \uac00\ub294\uc9c0 \uc54c \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uac00\uce58 \ud750\ub984\ub3c4\ub294 \uadf8\uacf3\uc5d0 \ub3c4\ub2ec\ud558\uae30\uae4c\uc9c0 \uc65c \uadf8\ub807\uac8c \uc624\ub798 \uac78\ub9ac\ub294\uc9c0 \uc774\ud574\ud558\ub294 \ub370 \ub3c4\uc6c0\uc774 \ub429\ub2c8\ub2e4. \uac00\uce58 \ud750\ub984\ub3c4(VSM)\ub294&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/105534","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/comments?post=105534"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/105534\/revisions"}],"predecessor-version":[{"id":105598,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/105534\/revisions\/105598"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media\/105538"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media?parent=105534"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/categories?post=105534"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/tags?post=105534"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}