{"id":105443,"date":"2026-10-21T23:26:46","date_gmt":"2026-10-21T23:26:46","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=105443"},"modified":"2026-10-21T23:30:00","modified_gmt":"2026-10-21T23:30:00","slug":"kanban-in-manufacturing","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/kanban-in-manufacturing\/","title":{"rendered":"\uce78\ubc18 \uc0dd\uc0b0 \ubc29\uc2dd: \uc2e0\ud638, \uc21c\ud658 \uccb4\uacc4\uc640 \uc801\uc815 \uc218\ub7c9 \uc0b0\uc815"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">\uce78\ubc18 \uc0dd\uc0b0 \ubc29\uc2dd: \uc2e0\ud638, \uc21c\ud658 \uccb4\uacc4\uc640 \uc801\uc815 \uc218\ub7c9 \uc0b0\uc815<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/ko\/\">\ud648<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/\">\ub9ac\uc18c\uc2a4<\/a> &raquo; \uce78\ubc18 \uc0dd\uc0b0 \ubc29\uc2dd: \uc2e0\ud638, \uc21c\ud658 \uccb4\uacc4\uc640 \uc801\uc815 \uc218\ub7c9 \uc0b0\uc815<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">\uc608\uc0c1 \uc77d\uae30 \uc2dc\uac04: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> \ubd84<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>\uc81c\uc870\uc5c5\uc758 \uce78\ubc18\uc740 \uc2e0\ud638\ub97c \ud1b5\ud574 \uc815\ud574\uc9c4 \uc218\ub7c9\uc758 \ubd80\ud488\uc744 \uc0dd\uc0b0\ud558\uac70\ub098 \uc6b4\ubc18\ud558\ub3c4\ub85d \uc2b9\uc778\ud558\ub294 <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/push-vs-pull-manufacturing\/\">\ud480 \ubc29\uc2dd\uc758 \uc0dd\uc0b0 \uad00\ub9ac \uae30\ubc95<\/a>\uc785\ub2c8\ub2e4. \ud6c4\uacf5\uc815\uc5d0\uc11c \ubd80\ud488\uc744 \uc0ac\uc6a9\ud558\uba74 \ubcf4\ucda9 \uc218\uc694\uac00 \uc0dd\uae30\uace0, \uc2e0\ud638\ub294 \uacf5\uae09 \uacf5\uc815\uc5d0 \ubb34\uc5c7\uc744 \ubcf4\ucda9\ud574\uc57c \ud558\ub294\uc9c0 \uc54c\ub824\uc90d\ub2c8\ub2e4. \uc774 \uc9c0\uc2dc\ub294 \uce74\ub4dc, \ube48 \uc6a9\uae30 \ub610\ub294 \uc804\uc790 \uba54\uc2dc\uc9c0\ub85c \uc804\ub2ec\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uce78\ubc18\uc758 \uc7a5\uc810\uc740 \ubcf4\ucda9 \uc218\ub7c9\uc5d0 \uba85\ud655\ud55c \ud55c\ub3c4\ub97c \ub454\ub2e4\ub294 \ub370 \uc788\uc2b5\ub2c8\ub2e4. \uc124\ube44\uac00 \ube44\uc5b4 \uc788\ub2e4\ub294 \uc774\uc720\ub85c \ud55c \ubc30\uce58\ub97c \ub354 \ub9cc\ub4dc\ub294 \ub300\uc2e0, \ub2e4\uc74c \uacf5\uc815\uc5d0\uc11c \uc2e4\uc81c\ub85c \uc778\uc218\ud574 \uac04 \uc218\ub7c9\ub9cc \ubcf4\ucda9\ud569\ub2c8\ub2e4. \ub530\ub77c\uc11c \ubd88\ud544\uc694\ud55c \uc7ac\uace0\uac00 \uc904\uace0 \ubcf4\ucda9 \ub204\ub77d\ub3c4 \ub354 \uc27d\uac8c \ubc1c\uacac\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud558\uc9c0\ub9cc \uc2e0\ud638\ub9cc\uc73c\ub85c \uc124\ube44 \uc2dc\uac04\uc774 \ud655\ubcf4\ub418\uc9c0\ub294 \uc54a\uc2b5\ub2c8\ub2e4. \ubc18\ubcf5 \uc0dd\uc0b0 \ubd80\ud488\uc774 \uace0\uac1d \uc8fc\ubb38\ud488\uacfc \ud504\ub808\uc2a4, \uba38\uc2dc\ub2dd\uc13c\ud130 \ub610\ub294 \uc808\uace1\uae30\ub97c \ud568\uaed8 \uc0ac\uc6a9\ud55c\ub2e4\uba74, \ubcf4\ucda9 \uc791\uc5c5\ub3c4 \uc0dd\uc0b0 \uc77c\uc815\uc5d0 \ubc30\uc815\ud574\uc57c \ud569\ub2c8\ub2e4. \uce78\ubc18\uc73c\ub85c \uc218\ub7c9\uc744 \uc2b9\uc778\ud558\uace0, SkyPlanner APS\ub85c \ud655\uc815\ub41c \uc791\uc5c5\uc744 \uacf5\uc7a5\uc758 \uac00\uc6a9 \uc0dd\uc0b0 \ub2a5\ub825\uacfc \uc790\uc7ac \uc5ec\uac74\uc5d0 \ub9de\ucdb0 \ubc30\uce58\ud558\uc138\uc694. \ub530\ub85c \uad00\ub9ac\ud558\ub358 \uc791\uc5c5 \ub300\uae30\uc5f4\uc744 \uc870\uc728\ud558\ub294 \uc2dc\uac04\uc744 \uc904\uc774\uace0, \uc77c\uc815 \ucda9\ub3cc\uc774 \uc870\ub9bd \uacf5\uc815\uc758 \ubd80\ud488 \ubd80\uc871\uc73c\ub85c \uc774\uc5b4\uc9c0\uae30 \uc804\uc5d0 \ud30c\uc545\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc0dd\uc0b0 \uce78\ubc18\uacfc \uc778\uc218 \uce78\ubc18\uc740 \uc11c\ub85c \ub2e4\ub978 \uc791\uc5c5\uc744 \uc2b9\uc778\ud569\ub2c8\ub2e4<\/h2>\n\n\n<p>\uc81c\uc870\uc5c5\uc758 \uce78\ubc18\uc740 \ub2e8\uc21c\ud788 \ubcf4\ub4dc\uc758 \u2018\ud560 \uc77c\u2019, \u2018\uc9c4\ud589 \uc911\u2019, \u2018\uc644\ub8cc\u2019 \uce78 \uc0ac\uc774\ub85c \uce74\ub4dc\ub97c \uc62e\uae30\ub294 \uac83\uc774 \uc544\ub2d9\ub2c8\ub2e4. \ud2b9\uc815 \ubcf4\ucda9 \uc791\uc5c5\uc744 \uc218\ud589\ud558\ub3c4\ub85d \uc2b9\uc778\ud558\ub294 \uc218\ub2e8\uc785\ub2c8\ub2e4. \uc77c\ubc18\uc801\uc73c\ub85c \ub2e4\uc74c \ub450 \uac00\uc9c0 \uc2e0\ud638\ub97c \ud568\uaed8 \uc0ac\uc6a9\ud569\ub2c8\ub2e4.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\uc2e0\ud638<\/th><th>\uc2b9\uc778\ud558\ub294 \uc791\uc5c5<\/th><th>\uc2b9\uc778\ud558\uc9c0 \uc54a\ub294 \uc791\uc5c5<\/th><\/tr><\/thead><tbody><tr><td>\uc0dd\uc0b0 \uce78\ubc18<\/td><td>\uacf5\uae09 \uacf5\uc815\uc740 \uc778\uc218\ub418\uc5b4 \ub098\uac04 \uc218\ub7c9\uc744 \ubcf4\ucda9\ud558\uae30 \uc704\ud574 \uc9c0\uc815\ub41c \ubd80\ud488\uc744 \uc815\ud574\uc9c4 \uc218\ub7c9\ub9cc\ud07c \uc0dd\uc0b0\ud569\ub2c8\ub2e4.<\/td><td>\uc124\ube44\ub97c \uacc4\uc18d \uac00\ub3d9\ud558\uae30 \uc704\ud574 \uc6a9\uae30 \uba87 \uac1c \ubd84\ub7c9\uc744 \ucd94\uac00\ub85c \uc0dd\uc0b0\ud558\ub294 \uac83.<\/td><\/tr><tr><td>\uc778\uc218 \uce78\ubc18(\uc6b4\ubc18 \uce78\ubc18 \ub610\ub294 \uc774\uc1a1 \uce78\ubc18\uc774\ub77c\uace0\ub3c4 \ud568)<\/td><td>\uc790\uc7ac \uc6b4\ubc18 \ub2f4\ub2f9\uc790\uac00 \uacf5\uae09 \uc704\uce58\uc5d0\uc11c \uc0ac\uc6a9 \uc704\uce58\ub85c \uc9c0\uc815\ub41c \uc218\ub7c9\uc744 \uc6b4\ubc18\ud569\ub2c8\ub2e4.<\/td><td>\uc6b4\ubc18 \uc694\uccad\uc774 \ub4e4\uc5b4\uc654\ub2e4\ub294 \uc774\uc720\ub9cc\uc73c\ub85c \ud55c \ubc30\uce58\ub97c \ub354 \uc0dd\uc0b0\ud558\ub294 \uac83.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p><strong>\uc288\ud37c\ub9c8\ucf13<\/strong>\uc740 \uacf5\uc815 \uc0ac\uc774\uc5d0\uc11c \uc7ac\uace0\ub97c \ud1b5\uc81c\ud558\uba70 \ubcf4\uad00\ud558\ub294 \uc7a5\uc18c\uc785\ub2c8\ub2e4. \ubd80\ud488\ubcc4\ub85c \ubcf4\uad00 \uc704\uce58\uc640 \ubcf4\ucda9 \uc218\ub7c9\uc774 \uc815\ud574\uc838 \uc788\uc2b5\ub2c8\ub2e4. \ud6c4\uacf5\uc815\uc774 \ud544\uc694\ud55c \ub9cc\ud07c \uac00\uc838\uac00\uba74 \uc804\uacf5\uc815\uc774 \uadf8 \uc218\ub7c9\uc744 \ubcf4\ucda9\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\ub530\ub77c\uc11c \uce78\ubc18\uc774 \uc7ac\uace0\ub97c \uc5c6\uc560\uc57c \ud55c\ub2e4\ub294 \ub73b\uc740 \uc544\ub2d9\ub2c8\ub2e4. \uc288\ud37c\ub9c8\ucf13\uc758 \uc7ac\uace0\ub294 \ubcf4\ucda9\uc774 \uc9c4\ud589\ub418\ub294 \ub3d9\uc548\uc5d0\ub3c4 \ubd80\ud488\uc744 \uc0ac\uc6a9\ud560 \uc218 \uc788\uac8c \ud574 \uc90d\ub2c8\ub2e4. \uc911\uc694\ud55c \uc6d0\uce59\uc740 \uc7ac\uace0\ub97c \uacc4\uc18d \uc313\ub294 \uac83\uc774 \uc544\ub2c8\ub77c \uc815\ud574\uc9c4 \ubc94\uc704 \uc548\uc5d0\uc11c \uad00\ub9ac\ud558\ub294 \uac83\uc785\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc6a9\uae30 \ud558\ub098\ub85c \uc0b4\ud3b4\ubcf4\ub294 2\uce74\ub4dc \uc21c\ud658 \uccb4\uacc4<\/h2>\n\n\n<p>\uc5ec\ub7ec \uc791\uc5c5\uc774 \uacf5\uc720\ud558\ub294 \uc808\uace1\uae30\uc5d0\uc11c \ubc18\ubcf5 \uc0dd\uc0b0\ud55c \ube0c\ub798\ud0b7\uc744 \uc870\ub9bd \ub77c\uc778\uc5d0 \uacf5\uae09\ud55c\ub2e4\uace0 \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \ube0c\ub798\ud0b7\uc740 \uc6a9\uae30\ub2f9 20\uac1c\uc529 \uacf5\uae09\ub429\ub2c8\ub2e4. \uac00\uacf5\uc774 \uc644\ub8cc\ub41c \ube0c\ub798\ud0b7 \uc6a9\uae30\ub294 \uc808\uace1 \uacf5\uc815 \uadfc\ucc98\uc758 \uc288\ud37c\ub9c8\ucf13\uc5d0\uc11c \ub300\uae30\ud558\uace0, \uc870\ub9bd \uacf5\uc815\uc740 \uc0ac\uc6a9 \uc9c0\uc810\uc5d0 \ubcc4\ub3c4\uc758 \uc7ac\uace0\ub97c \ubcf4\uc720\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774 \uc608\uc2dc\uc5d0\uc11c\ub294 \uc870\ub9bd \uacf5\uc815\uc5d0\uc11c \uc0c8 \uc6a9\uae30\ub97c \uac1c\ubd09\ud560 \ub54c \uc778\uc218 \uc2e0\ud638\ub97c \ubcf4\ub0c5\ub2c8\ub2e4. \ub9c8\uc9c0\ub9c9 \ube0c\ub798\ud0b7\uc744 \ub2e4 \uc37c\uc744 \ub54c\uac00 \uc544\ub2d9\ub2c8\ub2e4. \uc774\ub807\uac8c \ud558\uba74 \uac1c\ubd09\ud55c \uc6a9\uae30\uc758 \ubd80\ud488\uc744 \uc0ac\uc6a9\ud558\ub294 \ub3d9\uc548 \uc790\uc7ac \uc6b4\ubc18 \ub2f4\ub2f9\uc790\uac00 \ub2e4\uc74c \uc6a9\uae30\ub97c \uac00\uc838\uc62c \uc2dc\uac04\uc744 \ud655\ubcf4\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>1. <strong>\uc870\ub9bd \uacf5\uc815\uc5d0\uc11c \uc6a9\uae30\uc758 \ubd80\ud488\uc744 \uc0ac\uc6a9\ud558\uae30 \uc2dc\uc791\ud569\ub2c8\ub2e4.<\/strong> \uc791\uc5c5\uc790\ub294 \uc6a9\uae30\uc5d0 \ubd99\uc740 \uc778\uc218 \uce74\ub4dc\ub97c \ub5bc\uc5b4 \uc218\uac70\ud568\uc5d0 \ub123\uc2b5\ub2c8\ub2e4. \uc774 \uce74\ub4dc\ub294 \uc288\ud37c\ub9c8\ucf13\uc5d0 \ube0c\ub798\ud0b7 20\uac1c\uac00 \ub2f4\uae34 \uc6a9\uae30 \ud558\ub098\ub97c \ucd94\uac00\ub85c \uc694\uccad\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>2. <strong>\uc790\uc7ac \uc6b4\ubc18 \ub2f4\ub2f9\uc790\uac00 \uc694\uccad\uc744 \uc218\uac70\ud569\ub2c8\ub2e4.<\/strong> \ub2f4\ub2f9\uc790\ub294 \uc288\ud37c\ub9c8\ucf13\uc5d0\uc11c \ud574\ub2f9 \ube0c\ub798\ud0b7\uc774 \uac00\ub4dd \ub2f4\uae34 \uc6a9\uae30\ub97c \uac00\uc838\uc635\ub2c8\ub2e4. \uc6a9\uae30\uc5d0 \ubd99\uc5b4 \uc788\ub358 \uc0dd\uc0b0 \uce74\ub4dc\ub97c \ub5bc\uc5b4 \uc0dd\uc0b0 \uce74\ub4dc \uc218\uac70\ud568\uc5d0 \ub123\uace0, \uc870\ub9bd \uacf5\uc815\uc73c\ub85c \uc6b4\ubc18\ud560 \uc6a9\uae30\uc5d0\ub294 \uc778\uc218 \uce74\ub4dc\ub97c \ubd80\ucc29\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>3. <strong>\uc808\uace1 \uacf5\uc815\uc774 \uc0dd\uc0b0 \uc2e0\ud638\ub97c \ubc1b\uc2b5\ub2c8\ub2e4.<\/strong> \ud68c\uc218\ub41c \uc0dd\uc0b0 \uce74\ub4dc\ub294 \ubcf4\ucda9\uc6a9 \ube0c\ub798\ud0b7 20\uac1c, \uc989 \uc6a9\uae30 \ud558\ub098 \ubd84\ub7c9\uc758 \uc0dd\uc0b0\uc744 \uc2b9\uc778\ud569\ub2c8\ub2e4. \uc218\ub7c9 \uc81c\ud55c \uc5c6\uc774 \uacc4\uc18d \uc0dd\uc0b0\ud574\ub3c4 \ub41c\ub2e4\ub294 \ub73b\uc740 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p>4. <strong>\ubcf4\ucda9\ud560 \ubd80\ud488\uc744 \uc0dd\uc0b0\ud558\uace0 \uac80\uc0ac\ud569\ub2c8\ub2e4.<\/strong> \uc0ac\uc6a9 \uac00\ub2a5\ud55c \ube0c\ub798\ud0b7\uc774 \uc815\ud574\uc9c4 \uc218\ub7c9\ub9cc\ud07c \uc900\ube44\ub418\uba74 \uc0dd\uc0b0 \uce74\ub4dc\ub97c \uc6a9\uae30\uc640 \ud568\uaed8 \uc288\ud37c\ub9c8\ucf13\uc758 \uc9c0\uc815 \uc704\uce58\ub85c \ub3cc\ub824\ubcf4\ub0c5\ub2c8\ub2e4.<\/p>\n\n\n<p>5. <strong>\uc870\ub9bd \uacf5\uc815\uc774 \ubd80\ud488\uc744 \uc18c\ube44\ud558\uba74\uc11c \uc774 \uc21c\ud658\uc774 \ubc18\ubcf5\ub429\ub2c8\ub2e4.<\/strong> \uc0dd\uc0b0 \uce74\ub4dc\uac00 \ub354 \uc774\uc0c1 \ub3cc\uc544\uc624\uc9c0 \uc54a\uc73c\uba74 \uc774 \uc21c\ud658 \uccb4\uacc4\uc5d0\uc11c \ucd94\uac00\ub85c \uc0dd\uc0b0\ud560 \uc2b9\uc778\uc774 \uc5c6\ub294 \uac83\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>\uce74\ub4dc\uc5d0\ub294 \ud488\ubc88, \uc218\ub7c9, \uacf5\uae09 \uc704\uce58\uc640 \uc0ac\uc6a9 \uc704\uce58, \uac01 \uc2b9\uc778\uc744 \uad6c\ubcc4\ud558\ub294 \uc2dd\ubcc4\uc790\uac00 \uae30\uc7ac\ub429\ub2c8\ub2e4. \uc804\uc790 \uc2e0\ud638\ub3c4 \ub611\uac19\uc774 \uba85\ud655\ud574\uc57c \ud569\ub2c8\ub2e4. \ubaa8\ud638\ud55c \uc9c0\uc2dc\ub97c \ub514\uc9c0\ud138\ud654\ud55c\ub2e4\uace0 \ud574\uc11c \uc2e0\ub8b0\ud560 \uc218 \uc788\ub294 \ubcf4\ucda9 \uaddc\uce59\uc774 \ub418\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc6a9\uae30\uac00 \ube44\uc5c8\uc744 \ub54c \uc2e0\ud638\ub97c \ubcf4\ub0b4\ub3c4\ub85d \uc124\uacc4\ud558\ub294 \ubc29\uc2dd\ub3c4 \uc788\uc2b5\ub2c8\ub2e4. \ub0a8\uc740 \uc7ac\uace0\ub85c \uc804\uccb4 \ub300\uc751 \uc2dc\uac04\uc744 \ubc84\ud2f8 \uc218 \uc788\ub2e4\uba74 \uc774 \ubc29\uc2dd\ub3c4 \uac00\ub2a5\ud569\ub2c8\ub2e4. \uc5b4\ub5a4 \uc2dc\uc810\uc5d0 \uc2e0\ud638\ub97c \ubcf4\ub0bc\uc9c0 \uc815\ud558\uace0 \ubaa8\ub450\uac00 \uc77c\uad00\ub418\uac8c \ub530\ub974\ub3c4\ub85d \uad50\uc721\ud558\uc138\uc694. \u2018\uc6a9\uae30 \uac1c\ubd09\u2019\uacfc \u2018\uc6a9\uae30 \uc18c\uc9c4\u2019\uc744 \ud63c\uc6a9\ud558\uba74 \ubcf4\ucda9 \uc21c\ud658\uc5d0 \ud5c8\uc6a9\ub418\ub294 \ub300\uc751 \uc2dc\uac04\uc774 \ub2ec\ub77c\uc9d1\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc548\uc815\uc801\uc73c\ub85c \ubcf4\ucda9\ud560 \uc218 \uc788\ub294 \ubd80\ud488\ubd80\ud130 \uc120\ud0dd\ud558\uc138\uc694<\/h2>\n\n\n<p>\uc18c\ube44\uac00 \uaddc\uce59\uc801\uc774\uace0 \uc0ac\uc591 \ubcc0\ub3d9\uc774 \uc801\uc73c\uba70 \ubcf4\ucda9 \uacbd\ub85c\ub97c \uc5b4\ub290 \uc815\ub3c4 \uc608\uce21\ud560 \uc218 \uc788\ub294 \ubc18\ubcf5 \uc0dd\uc0b0 \ubd80\ud488\ubd80\ud130 \uc2dc\uc791\ud558\ub294 \uac83\uc774 \uc88b\uc2b5\ub2c8\ub2e4. \uc5f0 1\ud68c \uc8fc\ubb38\ud558\ub294 \uace0\uac1d \uc804\uc6a9 \ubd80\ud488\ubcf4\ub2e4\ub294 \uc5ec\ub7ec \uc870\ub9bd\ud488\uc5d0 \uacf5\ud1b5\uc73c\ub85c \uc4f0\uc774\ub294 \ube0c\ub798\ud0b7\uc774 \ub354 \uc801\ud569\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uce74\ub4dc\ub97c \ub3c4\uc785\ud558\uae30 \uc804\uc5d0 \uacf5\uae09 \uacf5\uc815\uc774 \ud3c9\uade0 \uc218\uc694\ub97c \uac10\ub2f9\ud560 \uc218 \uc788\ub294\uc9c0 \ud655\uc778\ud558\uc138\uc694. \uc870\ub9bd \uacf5\uc815\uc758 \uc18c\ube44 \uc18d\ub3c4\uac00 \uc808\uace1 \uacf5\uc815\uc758 \uc0dd\uc0b0 \uc18d\ub3c4\ubcf4\ub2e4 \uacc4\uc18d \ube60\ub974\ub2e4\uba74, \uce74\ub4dc\ub97c \ub298\ub824\ub3c4 \ubd80\ud488 \ubd80\uc871\uc774 \ubc1c\uc0dd\ud558\ub294 \uc2dc\uc810\ub9cc \ub2a6\ucd9c \ubfd0\uc785\ub2c8\ub2e4. \ud544\uc694\ud55c \uac83\uc740 \uc2b9\uc778 \uc218\ub7c9\uc744 \ub354 \uc313\ub294 \uc77c\uc774 \uc544\ub2c8\ub77c \uc0dd\uc0b0 \ub2a5\ub825\uc774\ub098 \uc218\uc694\ub97c \uc5b4\ub5bb\uac8c \uc870\uc815\ud560\uc9c0 \uacb0\uc815\ud558\ub294 \uc77c\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc14b\uc5c5 \uc2dc\uac04\ub3c4 \uc911\uc694\ud569\ub2c8\ub2e4. \uce74\ub4dc \ud55c \uc7a5\uc774 \uc6a9\uae30 \ud558\ub098\uc5d0 \ud574\ub2f9\ud558\ub354\ub77c\ub3c4 \uc6a9\uae30\ub9c8\ub2e4 \uc124\ube44\ub97c \uc0c8\ub85c \uc14b\uc5c5\ud560 \ud544\uc694\ub294 \uc5c6\uc2b5\ub2c8\ub2e4. \ud68c\uc218\ub41c \uce74\ub4dc \uc5ec\ub7ec \uc7a5\uc744 \ud558\ub098\uc758 \uc0dd\uc0b0 \ubc30\uce58\ub85c \ubb36\ub294\ub2e4\uba74, \uc5b4\ub5a4 \uc870\uac74\uc5d0\uc11c \ubc30\uce58 \uc0dd\uc0b0\uc744 \uc2dc\uc791\ud560\uc9c0 \uc815\ud558\uace0 \uadf8 \ub300\uae30 \uc2dc\uac04\ub3c4 \ubcf4\ucda9 \ub9ac\ub4dc\ud0c0\uc784\uc5d0 \ud3ec\ud568\ud558\uc138\uc694. \uc694\uccad\ud558\uc9c0 \uc54a\uc740 \uc7ac\uace0\ub97c \uc2ac\uadf8\uba38\ub2c8 \ucd94\uac00\ud574 \ubc30\uce58 \uc218\ub7c9\uc744 \ucc44\uc6cc\uc11c\ub294 \uc548 \ub429\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc2dc\ubc94 \uc6b4\uc601\uc5d0 \uc55e\uc11c \ub2e4\uc74c \uc6b4\uc601 \uaddc\uce59\uc5d0 \ud569\uc758\ud558\uc138\uc694.<\/p>\n\n\n<ul class=\"wp-block-list\"><li>\ud574\ub2f9 \uc791\uc5c5\uc5d0 \ub9de\ub294 \uc720\ud6a8\ud55c \uc2e0\ud638\uac00 \uc788\uc744 \ub54c\ub9cc, \uc2e0\ud638\uc5d0 \uba85\uc2dc\ub41c \uc218\ub7c9\ub9cc\ud07c \uc0dd\uc0b0\ud558\uac70\ub098 \uc6b4\ubc18\ud569\ub2c8\ub2e4.<\/li><li>\ub300\uae30 \uc911\uc774\ub4e0, \ucc98\ub9ac \uc911\uc774\ub4e0, \uc644\uc131\ub41c \ubd80\ud488\uacfc \ud568\uaed8 \uc774\ub3d9 \uc911\uc774\ub4e0 \uc2b9\uc778 \ub0b4\uc5ed\uc744 \ucd94\uc801\ud560 \uc218 \uc788\ub3c4\ub85d \uc720\uc9c0\ud569\ub2c8\ub2e4.<\/li><li>\ubd88\ub7c9\ud488\uc744 \ud6c4\uacf5\uc815\uc73c\ub85c \ub118\uae30\uac70\ub098 \uaca9\ub9ac\ub41c \uc7ac\uace0\ub97c \uc0ac\uc6a9 \uac00\ub2a5\ud55c \ubcf4\ucda9 \uc218\ub7c9\uc73c\ub85c \uacc4\uc0b0\ud558\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4.<\/li><li>\ubd80\ud488 \ubd80\uc871, \uce74\ub4dc \ubd84\uc2e4, \uae34\uae09 \uc608\uc678 \uc0c1\ud669\uc744 \ucc98\ub9ac\ud560 \ub2f4\ub2f9\uc790\ub97c \uba85\ud655\ud788 \uc9c0\uc815\ud569\ub2c8\ub2e4. \ub300\uccb4 \uc2b9\uc778\uc744 \ubc1c\ud589\ud558\uae30 \uc804\uc5d0 \uc6d0\ub798 \uc2b9\uc778 \ub0b4\uc5ed\uc744 \ud655\uc778\ud558\uace0 \uc815\ub9ac\ud558\uc5ec, \ud558\ub098\uc758 \uc218\uc694\uc5d0 \uc624\ub354\uac00 \ub450 \uac1c \uc0dd\uae30\uc9c0 \uc54a\ub3c4\ub85d \ud569\ub2c8\ub2e4.<\/li><li>\ubcf4\ucda9 \uc21c\ud658\uc5d0 \ubb38\uc81c\uac00 \uc0dd\uae38 \ub54c\ub9c8\ub2e4 \ube44\uacf5\uc2dd \uce74\ub4dc\ub97c \ucd94\uac00\ud558\uc9c0 \ub9d0\uace0, \uac80\ud1a0\ub97c \uac70\uccd0 \uce74\ub4dc \uc218\ub97c \ubcc0\uacbd\ud569\ub2c8\ub2e4.<\/li><\/ul>\n\n\n<p>\uc774\ub7ec\ud55c \uaddc\uce59\uc774 \uc788\uc5b4\uc57c \uc218\ub7c9 \ud55c\ub3c4\uac00 \uc81c \uc5ed\ud560\uc744 \ud569\ub2c8\ub2e4. \uaddc\uce59\uc774 \uc5c6\uc73c\uba74 \uce78\ubc18\uc740 \uae30\uc874 \uc0dd\uc0b0 \uacc4\ud68d \uc704\uc5d0 \ub367\ubd99\uc778 \ub610 \ud558\ub098\uc758 \ud604\uc7a5\ubcc4 \uad00\ub9ac \ubaa9\ub85d\uc5d0 \uadf8\uce69\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\ubcf4\ucda9 \uc2dc\uac04 \ub3d9\uc548\uc758 \uc218\uc694\ub97c \uae30\uc900\uc73c\ub85c \uc21c\ud658 \uc218\ub7c9\uc744 \uc0b0\uc815\ud558\uc138\uc694<\/h2>\n\n\n<p>\uc6a9\uae30\ub2f9 \uc218\ub7c9\uc774 \uace0\uc815\ub41c \uc0dd\uc0b0 \uc21c\ud658 \uccb4\uacc4\uc5d0\uc11c\ub294 \ub2e4\uc74c \uc2dd\uc744 \ucd08\uae30 \uc0b0\uc815\uc5d0 \ud65c\uc6a9\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>\uc0dd\uc0b0 \uce74\ub4dc \uc218 = [(D \u00d7 L + S) \u00f7 C]\uc758 \uc18c\uc218\uc810 \uc774\ud558 \uc62c\ub9bc<\/strong><\/p>\n\n\n<p>\uac01 \ubcc0\uc218\uc758 \uc758\ubbf8\ub294 \ub2e4\uc74c\uacfc \uac19\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>D<\/strong>\ub294 \ud574\ub2f9 \uc21c\ud658 \uccb4\uacc4\uc758 \uc778\uc218 \uc9c0\uc810\uc5d0\uc11c \ubc1c\uc0dd\ud558\ub294 \ud3c9\uade0 \uc218\uc694\uc728\ub85c, \ub2e8\uc704 \uc2dc\uac04\ub2f9 \ubd80\ud488 \uc218\ub85c \ud45c\uc2dc\ud569\ub2c8\ub2e4.<\/li><li><strong>L<\/strong>\uc740 D\uc640 \ub3d9\uc77c\ud55c \uc2dc\uac04 \ub2e8\uc704\ub85c \ud45c\uc2dc\ud55c \ubcf4\ucda9 \ub9ac\ub4dc\ud0c0\uc784\uc785\ub2c8\ub2e4. \ubd80\ud488 \uc778\uc218\ub85c \uc0dd\uc0b0 \uc2e0\ud638\uac00 \ubc1c\uc0dd\ud55c \uc2dc\uc810\ubd80\ud130, \ubcf4\ucda9\ub41c \ubd80\ud488\uc744 \ud574\ub2f9 \uc288\ud37c\ub9c8\ucf13\uc5d0\uc11c \uc0ac\uc6a9\ud560 \uc218 \uc788\uac8c \ub418\ub294 \uc2dc\uc810\uae4c\uc9c0\uc758 \uc2dc\uac04\uc785\ub2c8\ub2e4.<\/li><li><strong>S<\/strong>\ub294 \ub300\ube44\ud558\ub824\ub294 \ubcc0\ub3d9\uc5d0 \ub300\uc751\ud558\uae30 \uc704\ud574 \ucd94\uac00\ub85c \ud655\ubcf4\ud558\ub294 \uc548\uc804 \uc5ec\uc720\ubd84\uc774\uba70, \ubd80\ud488 \uc218\ub85c \ud45c\uc2dc\ud569\ub2c8\ub2e4.<\/li><li><strong>C<\/strong>\ub294 \uce74\ub4dc \ud55c \uc7a5 \ub610\ub294 \uc6a9\uae30 \ud558\ub098\uc5d0 \ud574\ub2f9\ud558\ub294 \uc0ac\uc6a9 \uac00\ub2a5\ud55c \ubd80\ud488 \uc218\uc785\ub2c8\ub2e4.<\/li><\/ul>\n\n\n<p>\uacc4\uc0b0 \uc6d0\ub9ac\ub294 \uac04\ub2e8\ud569\ub2c8\ub2e4. \ubcf4\ucda9\uc774 \uc9c4\ud589\ub418\ub294 \ub3d9\uc548\uc758 \uc608\uc0c1 \uc18c\ube44\ub7c9\uc5d0 \uc815\ud574 \ub454 \uc548\uc804 \uc5ec\uc720\ubd84\uc744 \ub354\ud55c \ub4a4, \uc774\ub97c \uc6a9\uae30 \uc218\ub85c \ud658\uc0b0\ud569\ub2c8\ub2e4. \uce74\ub4dc \uc218\uc5d0 \uc18c\uc218\uac00 \ub0a8\uc73c\uba74 \uc6a9\uae30 \ud558\ub098 \uc804\uccb4\ub97c \uc2b9\uc778\ud560 \uc218 \uc5c6\uc73c\ubbc0\ub85c \uc18c\uc218\uc810 \uc774\ud558\ub294 \uc62c\ub9bc\ud569\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uc0dd\uc0b0 \uce74\ub4dc \uc218 \uacc4\uc0b0 \uc608\uc2dc<\/h3>\n\n\n<p>\ube0c\ub798\ud0b7 \uc0dd\uc0b0 \uc21c\ud658\uc758 \uacc4\ud68d \uc785\ub825\uac12\uc744 \ub2e4\uc74c\uacfc \uac19\uc774 \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\uc785\ub825 \ud56d\ubaa9<\/th><th>\uc608\uc2dc \uac12<\/th><\/tr><\/thead><tbody><tr><td>\uc808\uace1 \uacf5\uc815 \uc288\ud37c\ub9c8\ucf13\uc5d0\uc11c\uc758 \uc2dc\uac04\ub2f9 \ud3c9\uade0 \uc778\uc218\ub7c9<\/td><td>\uac00\ub3d9 \uc2dc\uac04\ub2f9 \ube0c\ub798\ud0b7 40\uac1c<\/td><\/tr><tr><td>\uc778\uc218 \uc2dc\uc810\ubd80\ud130 \ubcf4\ucda9 \ubd80\ud488\uc744 \uc0ac\uc6a9\ud560 \uc218 \uc788\uc744 \ub54c\uae4c\uc9c0\uc758 \ub9ac\ub4dc\ud0c0\uc784<\/td><td>\uac00\ub3d9 \uc2dc\uac04 \uae30\uc900 3\uc2dc\uac04<\/td><\/tr><tr><td>\ucd94\uac00 \uc548\uc804 \uc5ec\uc720\ubd84<\/td><td>\ube0c\ub798\ud0b7 30\uac1c<\/td><\/tr><tr><td>\uc6a9\uae30\ub2f9 \uc218\ub7c9<\/td><td>\ube0c\ub798\ud0b7 20\uac1c<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\ubcf4\ucda9 \uc2dc\uac04 \ub3d9\uc548\uc758 \uc608\uc0c1 \uc218\uc694\ub294 <strong>40 \u00d7 3 = \ube0c\ub798\ud0b7 120\uac1c<\/strong>\uc785\ub2c8\ub2e4. \uc5ec\uc720\ubd84 30\uac1c\ub97c \ub354\ud558\uba74 150\uac1c\uac00 \ub429\ub2c8\ub2e4. \uc774\ub97c 20\uc73c\ub85c \ub098\ub208 <strong>7.5\ub97c \uc62c\ub9bc\ud558\uba74 \ud544\uc694\ud55c \uc0dd\uc0b0 \uce74\ub4dc\ub294 8\uc7a5<\/strong>\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774 \uce74\ub4dc 8\uc7a5\uc740 <strong>\uc0dd\uc0b0 \uc21c\ud658 \ub0b4\uc5d0\uc11c \uc2b9\uc778\ub41c \ucd1d\uc218\ub7c9\uc778 \ube0c\ub798\ud0b7 160\uac1c<\/strong>\ub97c \ub098\ud0c0\ub0c5\ub2c8\ub2e4. \uc774 \uc218\ub7c9\uc740 \uc288\ud37c\ub9c8\ucf13\uc758 \uc644\uc131\ud488 \uc7ac\uace0\uc640 \ubcf4\ucda9 \ub300\uae30 \uc911\uc774\uac70\ub098 \ubcf4\ucda9 \uc791\uc5c5 \uc911\uc778 \uc218\ub7c9\uc73c\ub85c \ub098\ub269\ub2c8\ub2e4. \uc120\ubc18\uc5d0 \uc788\ub294 \ube0c\ub798\ud0b7 160\uac1c\uc5d0 \uc0dd\uc0b0 \uc911\uc778 160\uac1c\ub97c \ub354\ud55c\ub2e4\ub294 \ub73b\uc774 \uc544\ub2d9\ub2c8\ub2e4. \uac00\ub4dd \ucc2c \uc6a9\uae30\uac00 \ubc18\ucd9c\ub418\uba74 \uadf8 \uc6a9\uae30\uc758 \uc0dd\uc0b0 \uce74\ub4dc\uac00 \ub3cc\uc544\uc640 \ubcf4\ucda9 \uc0dd\uc0b0\uc744 \uc2b9\uc778\ud569\ub2c8\ub2e4. \uacc4\uc18d \uc0ac\uc6a9\ud560 \uce74\ub4dc\ub97c \uc0c8\ub85c \ub9cc\ub4dc\ub294 \uac83\uc774 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774 \uacc4\uc0b0\uc740 \uc808\uace1 \uacf5\uc815\uc758 \uc0dd\uc0b0 \uc21c\ud658\uc5d0\ub9cc \uc801\uc6a9\ub429\ub2c8\ub2e4. \uc870\ub9bd \uacf5\uc815\uc5d0 \uacf5\uae09\ud558\ub294 \uc778\uc218 \uc21c\ud658\uc740 \ubcc4\ub3c4\uc758 \uc6b4\ubc18 \uc2dc\uac04\uacfc \uc0ac\uc6a9 \uc9c0\uc810 \uc7ac\uace0 \uc18c\uc694\ub7c9\uc744 \uac16\uc2b5\ub2c8\ub2e4. \uac19\uc740 \uce74\ub4dc 8\uc7a5\uc73c\ub85c \ubaa8\ub4e0 \ud6c4\uacf5\uc815 \uc704\uce58\uc758 \uc7ac\uace0\ub098 \uacf5\uc7a5 \uc804\uccb4\uc758 \uc7ac\uacf5\ud488 \uc218\ub7c9\uae4c\uc9c0 \uc815\ud560 \uc218 \uc788\ub2e4\uace0 \uac00\uc815\ud574\uc11c\ub294 \uc548 \ub429\ub2c8\ub2e4.<\/p>\n\n\n<p>\ube0c\ub798\ud0b7 30\uac1c\uc758 \uc5ec\uc720\ubd84\uc740 \uc6b4\uc601 \uc815\ucc45\uc758 \uc608\uc2dc\uc77c \ubfd0, \ubcf4\ud3b8\uc801\uc73c\ub85c \uc801\uc6a9\ud560 \ube44\uc728\uc774\ub098 \uc11c\ube44\uc2a4 \uc218\uc900\uc744 \ubcf4\uc7a5\ud558\ub294 \uc218\ub7c9\uc774 \uc544\ub2d9\ub2c8\ub2e4. \uc2e4\uc81c \uc218\uc694\uc640 \ubcf4\ucda9 \uc2dc\uac04\uc758 \ubcc0\ub3d9, \ubd80\ud488 \ubd80\uc871\uc758 \uc601\ud5a5, \ud544\uc694\ud55c \uc11c\ube44\uc2a4 \uc218\uc900\uc744 \ubc14\ud0d5\uc73c\ub85c \uc548\uc804 \uc5ec\uc720\ubd84\uc744 \uc815\ud558\uc138\uc694. \uacf5\uc815\uc758 \uc2e0\ub8b0\uc131\uc774 \ub192\uc544\uc9c0\uba74 \uc5ec\uc720\ubd84\ub3c4 \ub2e4\uc2dc \uac80\ud1a0\ud558\uc138\uc694.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uc808\ub2e8\u00b7\uc808\uace1 \uc2dc\uac04\ubfd0 \uc544\ub2c8\ub77c \uc804\uccb4 \ub300\uc751 \uc2dc\uac04\uc744 \uce21\uc815\ud558\uc138\uc694<\/h3>\n\n\n<p>\ubcf4\ucda9 \uc2dc\uac04\uc744 3\uc2dc\uac04\uc73c\ub85c \uac00\uc815\ud55c\ub2e4\uba74 \uc124\ube44\uc5d0\uc11c \uac00\uacf5\ud558\ub294 \uc2dc\uac04\ub9cc \uacc4\uc0b0\ud574\uc11c\ub294 \uc548 \ub429\ub2c8\ub2e4. \uc2e0\ud638 \uc218\uac70, \uc624\ub354 \ucc98\ub9ac, \ubc30\uce58 \uad6c\uc131\uc774\ub098 \uc790\uc6d0 \ud655\ubcf4\ub97c \uc704\ud55c \ub300\uae30, \uc14b\uc5c5, \uac00\uacf5, \uac80\uc0ac, \uc288\ud37c\ub9c8\ucf13\uc73c\ub85c\uc758 \ubcf5\uadc0 \uc2dc\uac04\uc744 \ubaa8\ub450 \ud3ec\ud568\ud558\uc138\uc694. \uc815\ud574 \ub193\uc740 \uce21\uc815 \ubc94\uc704 \uc548\uc5d0\uc11c \uc774\ub8e8\uc5b4\uc9c0\ub294 \uc6b4\ubc18\uc774\ub098 \uc785\uace0 \uc791\uc5c5\ub3c4 \ud3ec\ud568\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc2dc\uac04 \uae30\uc900\uc744 \uc77c\uce58\uc2dc\ud0a4\uc138\uc694. \uc218\uc694\ub97c \uac00\ub3d9 \uc2dc\uac04\ub2f9 \uc218\ub7c9\uc73c\ub85c \ub098\ud0c0\ub0b8\ub2e4\uba74, \ub9ac\ub4dc\ud0c0\uc784\uc5d0\ub3c4 \ubcf4\ucda9\uc5d0 \uc601\ud5a5\uc744 \uc8fc\ub294 \uac00\ub3d9 \uc2dc\uac04\ub300\uc640 \uad50\ub300 \uc0ac\uc774\uc758 \ube44\uac00\ub3d9 \uc2dc\uac04\uc744 \ubc18\uc601\ud574\uc57c \ud569\ub2c8\ub2e4. \uacf5\uae09\uc5c5\uccb4\uc758 \ub2ec\ub825 \uae30\uc900 2\uc77c\uacfc \uc870\ub9bd \uacf5\uc815\uc758 \uc2dc\uac04\ub2f9 \uc0ac\uc6a9\ub7c9\uc740 \uae30\uc900\uc744 \ud658\uc0b0\ud558\uc9c0 \uc54a\uace0 \ud568\uaed8 \uacc4\uc0b0\ud560 \uc218 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774 \uacf5\uc2dd\uc73c\ub85c \ucd08\uae30 \ud55c\ub3c4\ub97c \uc815\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc2e4\uc81c \uc778\ucd9c\ub7c9, \ubcf4\ucda9 \uc2dc\uac04, \uacb0\ud488 \ubc1c\uc0dd\uc744 \uce21\uc815\ud574 \uc774 \ud55c\ub3c4\uac00 \uc801\uc808\ud55c\uc9c0 \ud655\uc778\ud558\uc138\uc694. \uc2e0\ud638\ub97c \ube60\ub728\ub9ac\ub294 \ud68c\uc218 \ub3d9\uc120\uc774\ub098 \uc608\uc0c1 \ub300\uc751 \uc2dc\uac04\uc758 2\ubc30\uac00 \uac78\ub9ac\ub294 \uc77c\uc774 \uc7a6\uc740 \uc124\ube44 \ub300\uae30\uc5f4\uc740 \uacc4\uc0b0\ub9cc \uc815\ud655\ud558\ub2e4\uace0 \ud574\uacb0\ub418\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uacf5\uc6a9 \uc124\ube44\uc5d0\uc11c\ub3c4 \uc2e0\ub8b0\ud560 \uc218 \uc788\ub294 \ubcf4\ucda9 \ub9ac\ub4dc\ud0c0\uc784 \ud655\ubcf4\ud558\uae30<\/h2>\n\n\n<p>\ube0c\ub798\ud0b7 \uc608\uc2dc\ub85c \ub3cc\uc544\uac00 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \uc774 \uc21c\ud658 \uccb4\uacc4\ub294 3\uc2dc\uac04 \uc548\uc5d0 \ubcf4\ucda9\ud558\ub294 \uac83\uc744 \uae30\uc900\uc73c\ub85c \uaddc\ubaa8\ub97c \uc815\ud588\uc9c0\ub9cc, \uc808\uace1\uae30\ub294 \uace0\uac1d \uc8fc\ubb38 \uc791\uc5c5\ub3c4 \ucc98\ub9ac\ud569\ub2c8\ub2e4. \uadf8 \uc791\uc5c5\ub4e4 \ub54c\ubb38\uc5d0 \ubcf4\ucda9\uc774 5\uc2dc\uac04\uc73c\ub85c \ub2a6\uc5b4\uc9c4\ub2e4\uba74, \uae30\uc874 \uacc4\uc0b0\uc740 \ub354 \uc774\uc0c1 \uc2e4\uc81c \uacf5\uc815\uc744 \ubc18\uc601\ud558\uc9c0 \ubabb\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc218\uc694\uc640 \uc548\uc804 \uc5ec\uc720\ub7c9\uc774 \uac19\uc744 \ub54c \ubcf4\ucda9 \uc2dc\uac04\uc774 5\uc2dc\uac04\uc774\uba74, \ucd08\uae30\uc5d0 \ud544\uc694\ud55c \uce74\ub4dc\ub294 8\uc7a5\uc774 \uc544\ub2c8\ub77c <strong>12\uc7a5<\/strong>\uc785\ub2c8\ub2e4. \uce74\ub4dc \uc218\ub97c \ub298\ub9ac\uba74 \uacf5\uae09\uc744 \uc720\uc9c0\ud558\ub294 \ub370 \ub3c4\uc6c0\uc774 \ub420 \uc218 \uc788\uc9c0\ub9cc, \uacfc\ub3c4\ud55c \ub300\uae30\uac00 \uc6d0\uc778\uc77c \uc218 \uc788\ub294 \ubb38\uc81c\uc5d0 \uc7ac\uace0\ub97c \ub354 \ud22c\uc785\ud558\ub294 \uc148\uc774\uae30\ub3c4 \ud569\ub2c8\ub2e4. \uba3c\uc800 \ub298\uc5b4\ub09c \uc2dc\uac04\uc774 \ubd88\uac00\ud53c\ud55c \uc0dd\uc0b0\ub2a5\ub825 \ud55c\uacc4 \ub54c\ubb38\uc778\uc9c0, \uc904\uc77c \uc218 \uc788\ub294 \ub300\uae30 \ub54c\ubb38\uc778\uc9c0, \uacc4\ud68d\ub300\ub85c \uc2e4\ud589\ub418\uc9c0 \uc54a\uae30 \ub54c\ubb38\uc778\uc9c0 \ud30c\uc545\ud558\uc138\uc694.<\/p>\n\n\n<p>\ubc14\ub85c \uc774\ub7f0 \uc0c1\ud669\uc5d0\uc11c SkyPlanner\uac00 \uc720\uc6a9\ud569\ub2c8\ub2e4. \uc811\uc218\ub41c \ubcf4\ucda9 \uc624\ub354\ub97c \uac19\uc740 \uc124\ube44\ub97c \uc0ac\uc6a9\ud558\ub294 \ub2e4\ub978 \uc791\uc5c5\ub4e4\uacfc \ud568\uaed8 <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-scheduling\/\">\ud558\ub098\uc758 \uc720\ud55c \uc6a9\ub7c9 \uc0dd\uc0b0 \uc77c\uc815<\/a>\uc5d0 \ub123\uc73c\uc138\uc694. \uac01 \uc624\ub354\uc758 \uc644\ub8cc \uc694\uad6c \uc2dc\uc810, \uacf5\uc815 \uacbd\ub85c, \uc218\ub7c9, \uc6b0\uc120\uc21c\uc704\ub97c \uc9c0\uc815\ud558\uc138\uc694. SkyPlanner\uc758 \uc2a4\ucf00\uc904\ub9c1 \uc778\uacf5\uc9c0\ub2a5 Arcturus\ub294 \uc124\uc815\ub41c \uc0dd\uc0b0\ub2a5\ub825, \uad50\ub300 \uadfc\ubb34, \uc120\ud6c4\ud589 \uad00\uacc4\ub97c \ubc18\uc601\ud574 \uc124\ube44 \ubc30\uc815\uacfc \uacf5\uc815\ubcc4 \uc791\uc5c5 \uc2dc\uc810\uc744 \uacc4\uc0b0\ud569\ub2c8\ub2e4. Gantt \ud654\uba74\uc5d0\uc11c\ub294 \uadf8 \uc791\uc5c5 \uc21c\uc11c\ub97c \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc790\uc7ac \uac00\uc6a9\uc131\uc744 \uace0\ub824\ud558\ub294 \uc2a4\ucf00\uc904\ub9c1\uc744 \ud65c\uc131\ud654\ud558\uba74 Arcturus\ub294 \uc0ac\uc6a9 \uac00\ub2a5\ud55c \uc790\uc7ac\uc640 \uc785\uace0 \uc608\uc815 \ubb3c\ub7c9\ub3c4 \ubc18\uc601\ud569\ub2c8\ub2e4. \ud544\uc694\ud55c \ud310\uc7ac\uac00 \uc5c6\ub294\ub370 \ube0c\ub798\ud0b7 \ubcf4\ucda9 \uc0dd\uc0b0\uc744 \uc2dc\uc791\ud560 \uc900\ube44\uac00 \ub41c \uac83\ucc98\ub7fc \ud45c\uc2dc\ub418\uc5b4\uc11c\ub294 \uc548 \ub429\ub2c8\ub2e4. SkyPlanner\ub294 \uac1c\ubc29\ud615 REST API\ub97c \ud1b5\ud574 \uc5b4\ub5a4 ERP\ub098 MES\uc640\ub3c4 \uc5f0\ub3d9\ub429\ub2c8\ub2e4. \ubcc4\ub3c4\uc758 \uacc4\ud68d \uccb4\uacc4\ub97c \ub530\ub85c \uad00\ub9ac\ud560 \ud544\uc694 \uc5c6\uc774 \uae30\uc874 \uc8fc\ubb38 \ubc0f \uc0dd\uc0b0 \ub370\uc774\ud130\ub97c \uc0dd\uc0b0 \uc77c\uc815\uacfc \uc5f0\uacb0\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc6b0\uc120\uc21c\uc704\ub294 \ub2f4\ub2f9\uc790\uac00 \uc815\ud558\uace0, \uc2a4\ucf00\uc904\ub9c1 \uacc4\uc0b0\uc740 Arcturus\uac00 \ucc98\ub9ac\ud569\ub2c8\ub2e4. \uc0c1\ud669\uc774 \ub2ec\ub77c\uc9c0\uba74 \ub2e4\uc2dc \uacc4\uc0b0\ud574 \ubcf4\ucda9 \uc624\ub354\uc640 \ub2e4\ub978 \uc624\ub354\ub97c \uc77c\uc815\uc5d0 \uc5b4\ub5bb\uac8c \ud568\uaed8 \ubc30\uce58\ud560 \uc218 \uc788\ub294\uc9c0 \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ub355\ubd84\uc5d0 \uc791\uc5c5 \uc21c\uc11c\ub97c \uc218\uc791\uc5c5\uc73c\ub85c \uc870\uc815\ud558\ub294 \uc77c\uc774 \uc904\uace0, \ub2e4\ub978 \ub0a9\ud488\uc5d0 \ucc28\uc9c8\uc744 \uc8fc\ub294 \uc904\ub3c4 \ubaa8\ub978 \ucc44 \uc77c\uc815 \ucda9\ub3cc\uc744 \ud574\uacb0\ud558\ub294 \uc77c\uc744 \ud53c\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>SkyPlanner\uc758 ASAP \ubc0f JIT \uc2a4\ucf00\uc904\ub9c1 \ubc29\ud5a5 \uc124\uc815\uc740 \uc774\ub7ec\ud55c \uc791\uc5c5 \uc2dc\uc810 \uacb0\uc815\uc744 \uc9c0\uc6d0\ud569\ub2c8\ub2e4. ASAP\ub294 \uac00\ub2a5\ud55c \uc774\ub978 \uc791\uc5c5 \uc2dc\uac04\uc744 \ucc3e\uace0, JIT\ub294 \ub0a9\uae30\uc5d0 \uac00\uae5d\uac8c \uc791\uc5c5\uc744 \ubc30\uce58\ud569\ub2c8\ub2e4. \uc5b4\ub290 \uc124\uc815\ub3c4 \uc18c\ube44 \uc2e0\ud638\ub97c \ub300\uc2e0\ud558\uc9c0\ub294 \uc54a\uc2b5\ub2c8\ub2e4. \uce78\ubc18 \uc6b4\uc601 \uaddc\uce59\uc740 \ubb34\uc5c7\uc744 \uc2b9\uc778\ud560\uc9c0 \uacb0\uc815\ud558\uace0, \uc2a4\ucf00\uc904\ub9c1\uc740 \uadf8\ub807\uac8c \uc2b9\uc778\ub41c \uc791\uc5c5\uc744 \uc5b8\uc81c \uc2e4\ud589\ud560 \uc218 \uc788\ub294\uc9c0 \uacb0\uc815\ud569\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uc77c \ub2e8\uc704 \uc2a4\ucf00\uc904\ub9c1\uc774 KJH-Comp\uc5d0 \uac00\uc838\uc628 \ubcc0\ud654<\/h3>\n\n\n<p>\ud310\uae08 \uc704\ud0c1 \uc81c\uc870\uc5c5\uccb4\uc778 <a href=\"\/ko\/%ea%b3%a0%ea%b0%9d-%ec%82%ac%eb%a1%80\/kjh-comp\/\">KJH-Comp<\/a>\ub294 \uae30\uc874\uc5d0 C9000\uacfc \uc2a4\ud504\ub808\ub4dc\uc2dc\ud2b8\ub97c \uc0ac\uc6a9\ud574 \uc8fc \ub2e8\uc704\ub85c \ub300\ub7b5\uc801\uc778 \ubd80\ud558\ub97c \ubc30\ubd84\ud588\uc2b5\ub2c8\ub2e4. \uadf8\ub7ec\ub098 \uc77c \ub2e8\uc704 \uc124\ube44 \ubc30\uc815\uc740 \uc5ec\uc804\ud788 \uc218\uc791\uc5c5\uc774\uc5c8\uc73c\uba70, \uad00\ub9ac\uc790 2\uba85\uc774 \uac01\uac01 \uc5c5\ubb34 \uc2dc\uac04\uc758 \ucd5c\uc18c \uc808\ubc18\uc744 \uc2a4\ucf00\uc904\ub9c1\uc5d0 \uc4f0\uace0 \uc788\uc5c8\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774 \ud68c\uc0ac\ub294 \uae30\uc874 ERP\ub97c \uc720\uc9c0\ud558\uba74\uc11c \uc720\ud55c \uc6a9\ub7c9 \uc2a4\ucf00\uc904\ub9c1\uacfc \uc790\ub3d9 \uc124\ube44 \ubc30\uc815\uc744 \uc704\ud574 SkyPlanner\ub97c \ub3c4\uc785\ud588\uc2b5\ub2c8\ub2e4. \ud68c\uc0ac \uce21\uc5d0 \ub530\ub974\uba74 \uae38\uc774 \uc0ac \ubbf8\ud130 \uc808\uace1\uae30\uc5d0 \ubd80\ud558\uac00 \uc313\uc774\ub294 \uc0c1\ud669\uc744 \ub354 \uba85\ud655\ud788 \ud30c\uc545\ud560 \uc218 \uc788\uac8c \ub418\uc5c8\uace0, \ucd9c\ud558\uac00 \ub354 \uae09\ud55c \uc791\uc5c5\uc774 \uc544\uc9c1 \uc11c\ub450\ub97c \ud544\uc694 \uc5c6\ub294 \uc791\uc5c5\uc5d0 \ubc00\ub9ac\ub294 \uc77c\ub3c4 \uc904\uc5c8\uc2b5\ub2c8\ub2e4. \uc2a4\ucf00\uc904\ub9c1\uc740 \uad00\ub9ac\uc790 \ub450 \uba85\uc774 \ub9e1\ub358 \uccb4\uc81c\uc5d0\uc11c \ud55c \uba85\uc774 \ub2f4\ub2f9\ud558\ub294 \uccb4\uc81c\ub85c \ubc14\ub00c\uc5c8\uc73c\uba70, \ub098\uba38\uc9c0 \ud55c \uba85\uc740 \ub2e4\ub978 \uc5c5\ubb34\ub85c \uc7ac\ubc30\uce58\ub418\uc5c8\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774 \uc0ac\ub840\ub294 \uc815\ud574\uc9c4 \uc2dc\uac04 \uc548\uc5d0 \ubcf4\ucda9\ud558\ub824\uba74 \uc5b4\ub5a4 \uc2a4\ucf00\uc904\ub9c1 \ubb38\uc81c\ub97c \ud574\uacb0\ud574\uc57c \ud558\ub294\uc9c0 \ubcf4\uc5ec \uc90d\ub2c8\ub2e4. \uc8fc\uac04 \ucd1d\ubd80\ud558\ub9cc\uc73c\ub85c\ub294 \uacf5\uc6a9 \uc124\ube44\uc5d0\uc11c \ub2e4\uc74c\uc5d0 \uc5b4\ub5a4 \uc791\uc5c5\uc744 \ud574\uc57c \ud560\uc9c0 \ud310\ub2e8\ud560 \uc218 \uc5c6\uc2b5\ub2c8\ub2e4. SkyPlanner\ub97c \uc0ac\uc6a9\ud558\uba74 \ucc98\ub9ac\ud560 \uc791\uc5c5\uc758 \uc885\ub958\uac00 \ub298\uc5b4\ub098\ub3c4 \uc77c\ubcc4 \uc791\uc5c5 \uc21c\uc11c\ub97c \uad00\ub9ac\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\ud558\ub098\uc758 \uc21c\ud658 \uccb4\uacc4\ubd80\ud130 \uc2dc\uc791\ud574 \ub300\uc751 \uc2dc\uac04 \uac80\uc99d\ud558\uae30<\/h2>\n\n\n<p>\ubc18\ubcf5 \uc0dd\uc0b0\ud558\ub294 \ubd80\ud488 \ud558\ub098\ub97c \uace8\ub77c \uadf8 \ubd80\ud488\uc744 \uc0ac\uc6a9\ud558\uace0 \uc6b4\ubc18\ud558\uace0 \uc0dd\uc0b0\ud558\ub294 \ub2f4\ub2f9\uc790\ub4e4\uacfc \ud568\uaed8 \uc2dc\ubc94 \uc6b4\uc601\ud558\uc138\uc694. \uc911\uac04 \uc7ac\uace0\ub97c \uad00\ub9ac\ud558\ub294 \uc288\ud37c\ub9c8\ucf13\uc758 \uc704\uce58\ub97c \ud45c\uc2dc\ud558\uace0, \uc6a9\uae30\ub2f9 \uc218\ub7c9\uc744 \ud45c\uc900\ud654\ud558\uace0, \ud569\uc758\ud55c \uce74\ub4dc\ub97c \ubc1c\ud589\ud55c \ub4a4, \uc5b4\ub5a4 \uc2dc\uc810\uc5d0 \uc2e0\ud638\ub97c \ub0b4\ubcf4\ub0bc\uc9c0 \uba85\ud655\ud788 \uc815\ud558\uc138\uc694. \uc2dc\uc791 \uc2dc\uc810\uc758 \uc7ac\uace0\uc640 \ubbf8\uc644\ub8cc \ubcf4\ucda9 \uc791\uc5c5\uc744 \ud655\uc778\ud558\uace0 \uc218\ub7c9\uc744 \ub300\uc870\ud574 \ub9de\ucd98 \uc0c1\ud0dc\uc5d0\uc11c \uc21c\ud658\uc744 \uc2dc\uc791\ud558\uc138\uc694.<\/p>\n\n\n<p>\uc2e0\ud638 \ubc1c\uc0dd\ubd80\ud130 \ubcf4\ucda9\ud488\uc774 \ub3cc\uc544\uc62c \ub54c\uae4c\uc9c0\uc758 \uc2e4\uc81c \uc2dc\uac04, \ubd80\uc871 \ubc1c\uc0dd, \uc0ac\uc6a9 \uac00\ub2a5\ud55c \uc7ac\uace0, \uae30\ud55c\uc774 \uc9c0\ub09c \uc2b9\uc778 \uc791\uc5c5, \uae34\uae09 \uc870\uce58 \ub0b4\uc5ed\uc744 \ucd94\uc801\ud558\uc138\uc694. \ubb38\uc81c\uac00 \uc0dd\uae30\uba74 \uc21c\ud658 \uacbd\ub85c\ub97c \ub530\ub77c \uc810\uac80\ud558\uc138\uc694. \uc2e0\ud638\uac00 \ud68c\uc218\ub418\uc5c8\ub294\uc9c0, \ubcf4\ucda9 \uc791\uc5c5\uc774 \uc77c\uc815\uc5d0 \uc7a1\ud614\ub294\uc9c0, \uc790\uc7ac\uac00 \uc900\ube44\ub418\uc5c8\ub294\uc9c0, \uc591\ud488\uc774 \uc62c\ubc14\ub978 \uc704\uce58\uc5d0 \ub3c4\ucc29\ud588\ub294\uc9c0 \ud655\uc778\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc7ac\uace0\uac00 \uacc4\uc18d \ud544\uc694 \uc774\uc0c1\uc73c\ub85c \uc720\uc9c0\ub41c\ub2e4\uba74, \ud1b5\uc81c\ub41c \uc870\uac74\uc5d0\uc11c \uce74\ub4dc \uc218\ub97c \uc904\uc5ec \ubcf4\uace0 \uacb0\uacfc\ub97c \uad00\ucc30\ud558\uc138\uc694. \ubd80\uc871\uc774 \ubc18\ubcf5\ub41c\ub2e4\uba74 \uc7ac\uace0\ub97c \ub298\ub9ac\uae30 \uc804\uc5d0 \uc18c\uc694 \uc2dc\uac04\uacfc \uc0dd\uc0b0\ub2a5\ub825\uc5d0 \ub300\ud55c \uac00\uc815\ubd80\ud130 \uc810\uac80\ud558\uc138\uc694. \uc218\uc694, \uc6a9\uae30 \ud06c\uae30, \uc14b\uc5c5 \uc6b4\uc601 \uae30\uc900 \ub610\ub294 \uad50\ub300 \uadfc\ubb34\uac00 \ubc14\ub00c\uba74 \uc21c\ud658 \uccb4\uacc4\ub97c \ub2e4\uc2dc \uac80\ud1a0\ud558\uc138\uc694.<\/p>\n\n\n<p>\uc5ec\ub7ec \uc791\uc5c5\uc774 \uc790\uc6d0\uc744 \uacf5\uc720\ud558\ub294 \uacf5\uc7a5\uc774\ub77c\uba74 SkyPlanner\ub97c \uc120\ud0dd\ud574 \uc2b9\uc778\ub41c \ubcf4\ucda9 \uc624\ub354\uc640 \uace0\uac1d \uc8fc\ubb38\uc744 \ud558\ub098\uc758 \uc0dd\uc0b0 \uc77c\uc815\uc73c\ub85c \uad00\ub9ac\ud558\uc138\uc694. \ub370\ubaa8\uc5d0 \ubc18\ubcf5 \uc0dd\uc0b0 \ubd80\ud488 \ud558\ub098\ub97c \uc120\uc815\ud574 \uadf8 \ubd80\ud488\uc758 \uc18c\ube44\uc728, \uc6a9\uae30\ub2f9 \uc218\ub7c9, \uacf5\uc815 \uacbd\ub85c, \uac19\uc740 \uc124\ube44\ub97c \uc0ac\uc6a9\ud558\ub294 \ub2e4\ub978 \uc791\uc5c5 \uc815\ubcf4\ub97c \uc900\ube44\ud574 \uc624\uc138\uc694. \uadf8\ub7ec\uba74 \uc774 \uc21c\ud658 \uccb4\uacc4\uc758 \uc791\ub3d9 \uc5ec\ubd80\ub97c \uc88c\uc6b0\ud558\ub294 \ud575\uc2ec \uc9c8\ubb38\uc744 \uac80\ud1a0\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. <strong>\uc18c\ube44\ub97c \ucda9\ub2f9\ud560 \uc7ac\uace0\uac00 \uc18c\uc9c4\ub418\uae30 \uc804\uc5d0 \ubcf4\ucda9\uc744 \uc644\ub8cc\ud560 \uc218 \uc788\ub294\uac00?<\/strong><\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/ko\/%ec%98%81%ec%97%85%ed%8c%80%ec%97%90-%eb%ac%b8%ec%9d%98\/\">SkyPlanner \ub370\ubaa8\ub97c \uc608\uc57d<\/a>\ud574 \ud574\ub2f9 \ubd80\ud488\uc744 \uc2e4\uc81c \uc0dd\uc0b0 \ud658\uacbd\uc5d0 \ub9de\ucdb0 \uac80\ud1a0\ud558\uac70\ub098, <a href=\"https:\/\/skyplanner.ai\/ko\/%ed%8f%89%ea%b0%80%ed%8c%90\/\">\ub370\ubaa8 \ub370\uc774\ud130\ub85c SkyPlanner\ub97c \uccb4\ud5d8<\/a>\ud558\uba70 \uc2a4\ucf00\uc904\ub9c1\uc774 \uc5b4\ub5bb\uac8c \uc791\ub3d9\ud558\ub294\uc9c0 \ud655\uc778\ud574 \ubcf4\uc138\uc694.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\uce78\ubc18 \uc0dd\uc0b0 \ubc29\uc2dd: \uc2e0\ud638, \uc21c\ud658 \uccb4\uacc4\uc640 \uc801\uc815 \uc218\ub7c9 \uc0b0\uc815 \ud648 &raquo; \ub9ac\uc18c\uc2a4 &raquo; \uce78\ubc18 \uc0dd\uc0b0 \ubc29\uc2dd: \uc2e0\ud638, \uc21c\ud658 \uccb4\uacc4\uc640 \uc801\uc815 \uc218\ub7c9 \uc0b0\uc815 \uc81c\uc870\uc5c5\uc758 \uce78\ubc18\uc740 \uc2e0\ud638\ub97c \ud1b5\ud574 \uc815\ud574\uc9c4 \uc218\ub7c9\uc758 \ubd80\ud488\uc744 \uc0dd\uc0b0\ud558\uac70\ub098 \uc6b4\ubc18\ud558\ub3c4\ub85d \uc2b9\uc778\ud558\ub294 \ud480 \ubc29\uc2dd\uc758 \uc0dd\uc0b0 \uad00\ub9ac \uae30\ubc95\uc785\ub2c8\ub2e4. \ud6c4\uacf5\uc815\uc5d0\uc11c \ubd80\ud488\uc744 \uc0ac\uc6a9\ud558\uba74 \ubcf4\ucda9 \uc218\uc694\uac00 \uc0dd\uae30\uace0, \uc2e0\ud638\ub294 \uacf5\uae09 \uacf5\uc815\uc5d0 \ubb34\uc5c7\uc744 \ubcf4\ucda9\ud574\uc57c \ud558\ub294\uc9c0 \uc54c\ub824\uc90d\ub2c8\ub2e4. \uc774 \uc9c0\uc2dc\ub294 \uce74\ub4dc, \ube48 \uc6a9\uae30 &#8230; <a title=\"\uce78\ubc18 \uc0dd\uc0b0 \ubc29\uc2dd: \uc2e0\ud638, \uc21c\ud658 \uccb4\uacc4\uc640 \uc801\uc815 \uc218\ub7c9 \uc0b0\uc815\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/kanban-in-manufacturing\/\" aria-label=\"Read more about \uce78\ubc18 \uc0dd\uc0b0 \ubc29\uc2dd: \uc2e0\ud638, \uc21c\ud658 \uccb4\uacc4\uc640 \uc801\uc815 \uc218\ub7c9 \uc0b0\uc815\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":105447,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[496,2558],"tags":[],"class_list":["post-105443","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-496","category-2558","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\uce78\ubc18 \uc0dd\uc0b0 \ubc29\uc2dd: \uc2e0\ud638, \uc21c\ud658 \uccb4\uacc4\uc640 \uc801\uc815 \uc218\ub7c9 \uc0b0\uc815<\/title>\n<meta name=\"description\" content=\"\uce78\ubc18 \uc0dd\uc0b0 \ubc29\uc2dd\uc73c\ub85c \ud604\uc7a5 \ubcf4\ucda9\uc744 \uad00\ub9ac\ud558\uc138\uc694. \uc0dd\uc0b0\u00b7\uc6b4\ubc18 \uc2b9\uc778 \uae30\uc900, \uce78\ubc18 \uc21c\ud658 \uc218\ub7c9 \uc0b0\uc815, \ud544\uc694\ud55c \uc124\ube44 \uc2dc\uac04 \uacc4\ud68d\uc744 \uc54c\uc544\ubcf4\uc138\uc694.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/kanban-in-manufacturing\/\" \/>\n<meta property=\"og:locale\" content=\"ko_KR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\uce78\ubc18 \uc0dd\uc0b0 \ubc29\uc2dd: \uc2e0\ud638, \uc21c\ud658 \uccb4\uacc4\uc640 \uc801\uc815 \uc218\ub7c9 \uc0b0\uc815\" \/>\n<meta property=\"og:description\" content=\"\uce78\ubc18 \uc0dd\uc0b0 \ubc29\uc2dd\uc73c\ub85c \ud604\uc7a5 \ubcf4\ucda9\uc744 \uad00\ub9ac\ud558\uc138\uc694. \uc0dd\uc0b0\u00b7\uc6b4\ubc18 \uc2b9\uc778 \uae30\uc900, \uce78\ubc18 \uc21c\ud658 \uc218\ub7c9 \uc0b0\uc815, \ud544\uc694\ud55c \uc124\ube44 \uc2dc\uac04 \uacc4\ud68d\uc744 \uc54c\uc544\ubcf4\uc138\uc694.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/kanban-in-manufacturing\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-21T23:26:46+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-21T23:30:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t<meta property=\"og:image:height\" content=\"1024\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\uae00\uc4f4\uc774\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/kanban-in-manufacturing\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/kanban-in-manufacturing\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"\uce78\ubc18 \uc0dd\uc0b0 \ubc29\uc2dd: \uc2e0\ud638, \uc21c\ud658 \uccb4\uacc4\uc640 \uc801\uc815 \uc218\ub7c9 \uc0b0\uc815\",\"datePublished\":\"2026-10-21T23:26:46+00:00\",\"dateModified\":\"2026-10-21T23:30:00+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/kanban-in-manufacturing\\\/\"},\"wordCount\":38,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/kanban-in-manufacturing\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/kanban-in-manufacturing-hero.png\",\"articleSection\":[\"\ub9ac\uc18c\uc2a4\",\"\uc81c\uc870 \ud6a8\uc728\"],\"inLanguage\":\"ko-KR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/kanban-in-manufacturing\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/kanban-in-manufacturing\\\/\",\"name\":\"\uce78\ubc18 \uc0dd\uc0b0 \ubc29\uc2dd: \uc2e0\ud638, \uc21c\ud658 \uccb4\uacc4\uc640 \uc801\uc815 \uc218\ub7c9 \uc0b0\uc815\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/kanban-in-manufacturing\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/kanban-in-manufacturing\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/kanban-in-manufacturing-hero.png\",\"datePublished\":\"2026-10-21T23:26:46+00:00\",\"dateModified\":\"2026-10-21T23:30:00+00:00\",\"description\":\"\uce78\ubc18 \uc0dd\uc0b0 \ubc29\uc2dd\uc73c\ub85c \ud604\uc7a5 \ubcf4\ucda9\uc744 \uad00\ub9ac\ud558\uc138\uc694. \uc0dd\uc0b0\u00b7\uc6b4\ubc18 \uc2b9\uc778 \uae30\uc900, \uce78\ubc18 \uc21c\ud658 \uc218\ub7c9 \uc0b0\uc815, \ud544\uc694\ud55c \uc124\ube44 \uc2dc\uac04 \uacc4\ud68d\uc744 \uc54c\uc544\ubcf4\uc138\uc694.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/kanban-in-manufacturing\\\/#breadcrumb\"},\"inLanguage\":\"ko-KR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/kanban-in-manufacturing\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/kanban-in-manufacturing\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/kanban-in-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/kanban-in-manufacturing-hero.png\",\"width\":1536,\"height\":1024,\"caption\":\"Blue containers of metal brackets with blank kanban cards wait on a factory rack and a wheeled cart.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/kanban-in-manufacturing\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\uce78\ubc18 \uc0dd\uc0b0 \ubc29\uc2dd: \uc2e0\ud638, \uc21c\ud658 \uccb4\uacc4\uc640 \uc801\uc815 \uc218\ub7c9 \uc0b0\uc815\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ko-KR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\uce78\ubc18 \uc0dd\uc0b0 \ubc29\uc2dd: \uc2e0\ud638, \uc21c\ud658 \uccb4\uacc4\uc640 \uc801\uc815 \uc218\ub7c9 \uc0b0\uc815","description":"\uce78\ubc18 \uc0dd\uc0b0 \ubc29\uc2dd\uc73c\ub85c \ud604\uc7a5 \ubcf4\ucda9\uc744 \uad00\ub9ac\ud558\uc138\uc694. \uc0dd\uc0b0\u00b7\uc6b4\ubc18 \uc2b9\uc778 \uae30\uc900, \uce78\ubc18 \uc21c\ud658 \uc218\ub7c9 \uc0b0\uc815, \ud544\uc694\ud55c \uc124\ube44 \uc2dc\uac04 \uacc4\ud68d\uc744 \uc54c\uc544\ubcf4\uc138\uc694.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/kanban-in-manufacturing\/","og_locale":"ko_KR","og_type":"article","og_title":"\uce78\ubc18 \uc0dd\uc0b0 \ubc29\uc2dd: \uc2e0\ud638, \uc21c\ud658 \uccb4\uacc4\uc640 \uc801\uc815 \uc218\ub7c9 \uc0b0\uc815","og_description":"\uce78\ubc18 \uc0dd\uc0b0 \ubc29\uc2dd\uc73c\ub85c \ud604\uc7a5 \ubcf4\ucda9\uc744 \uad00\ub9ac\ud558\uc138\uc694. \uc0dd\uc0b0\u00b7\uc6b4\ubc18 \uc2b9\uc778 \uae30\uc900, \uce78\ubc18 \uc21c\ud658 \uc218\ub7c9 \uc0b0\uc815, \ud544\uc694\ud55c \uc124\ube44 \uc2dc\uac04 \uacc4\ud68d\uc744 \uc54c\uc544\ubcf4\uc138\uc694.","og_url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/kanban-in-manufacturing\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-21T23:26:46+00:00","article_modified_time":"2026-10-21T23:30:00+00:00","og_image":[{"width":1536,"height":1024,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"\uae00\uc4f4\uc774":"Jussi M\u00e4ntyl\u00e4"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/kanban-in-manufacturing\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/kanban-in-manufacturing\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"\uce78\ubc18 \uc0dd\uc0b0 \ubc29\uc2dd: \uc2e0\ud638, \uc21c\ud658 \uccb4\uacc4\uc640 \uc801\uc815 \uc218\ub7c9 \uc0b0\uc815","datePublished":"2026-10-21T23:26:46+00:00","dateModified":"2026-10-21T23:30:00+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/kanban-in-manufacturing\/"},"wordCount":38,"publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/kanban-in-manufacturing\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero.png","articleSection":["\ub9ac\uc18c\uc2a4","\uc81c\uc870 \ud6a8\uc728"],"inLanguage":"ko-KR"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/kanban-in-manufacturing\/","url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/kanban-in-manufacturing\/","name":"\uce78\ubc18 \uc0dd\uc0b0 \ubc29\uc2dd: \uc2e0\ud638, \uc21c\ud658 \uccb4\uacc4\uc640 \uc801\uc815 \uc218\ub7c9 \uc0b0\uc815","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/kanban-in-manufacturing\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/kanban-in-manufacturing\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero.png","datePublished":"2026-10-21T23:26:46+00:00","dateModified":"2026-10-21T23:30:00+00:00","description":"\uce78\ubc18 \uc0dd\uc0b0 \ubc29\uc2dd\uc73c\ub85c \ud604\uc7a5 \ubcf4\ucda9\uc744 \uad00\ub9ac\ud558\uc138\uc694. \uc0dd\uc0b0\u00b7\uc6b4\ubc18 \uc2b9\uc778 \uae30\uc900, \uce78\ubc18 \uc21c\ud658 \uc218\ub7c9 \uc0b0\uc815, \ud544\uc694\ud55c \uc124\ube44 \uc2dc\uac04 \uacc4\ud68d\uc744 \uc54c\uc544\ubcf4\uc138\uc694.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/kanban-in-manufacturing\/#breadcrumb"},"inLanguage":"ko-KR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/kanban-in-manufacturing\/"]}]},{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/kanban-in-manufacturing\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero.png","width":1536,"height":1024,"caption":"Blue containers of metal brackets with blank kanban cards wait on a factory rack and a wheeled cart."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/kanban-in-manufacturing\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ko\/"},{"@type":"ListItem","position":2,"name":"\uce78\ubc18 \uc0dd\uc0b0 \ubc29\uc2dd: \uc2e0\ud638, \uc21c\ud658 \uccb4\uacc4\uc640 \uc801\uc815 \uc218\ub7c9 \uc0b0\uc815"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ko\/#website","url":"https:\/\/skyplanner.ai\/ko\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ko\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ko-KR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ko\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ko\/","logo":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero.png",1536,1024,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero-300x200.png",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero-768x512.png",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero-1024x683.png",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero.png",1536,1024,false],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero.png",1536,1024,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/kanban-in-manufacturing-hero-360x240.png",360,240,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ko\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\uce78\ubc18 \uc0dd\uc0b0 \ubc29\uc2dd: \uc2e0\ud638, \uc21c\ud658 \uccb4\uacc4\uc640 \uc801\uc815 \uc218\ub7c9 \uc0b0\uc815 \ud648 &raquo; \ub9ac\uc18c\uc2a4 &raquo; \uce78\ubc18 \uc0dd\uc0b0 \ubc29\uc2dd: \uc2e0\ud638, \uc21c\ud658 \uccb4\uacc4\uc640 \uc801\uc815 \uc218\ub7c9 \uc0b0\uc815 \uc81c\uc870\uc5c5\uc758 \uce78\ubc18\uc740 \uc2e0\ud638\ub97c \ud1b5\ud574 \uc815\ud574\uc9c4 \uc218\ub7c9\uc758 \ubd80\ud488\uc744 \uc0dd\uc0b0\ud558\uac70\ub098 \uc6b4\ubc18\ud558\ub3c4\ub85d \uc2b9\uc778\ud558\ub294 \ud480 \ubc29\uc2dd\uc758 \uc0dd\uc0b0 \uad00\ub9ac \uae30\ubc95\uc785\ub2c8\ub2e4. \ud6c4\uacf5\uc815\uc5d0\uc11c \ubd80\ud488\uc744 \uc0ac\uc6a9\ud558\uba74 \ubcf4\ucda9 \uc218\uc694\uac00 \uc0dd\uae30\uace0, \uc2e0\ud638\ub294 \uacf5\uae09 \uacf5\uc815\uc5d0 \ubb34\uc5c7\uc744 \ubcf4\ucda9\ud574\uc57c \ud558\ub294\uc9c0 \uc54c\ub824\uc90d\ub2c8\ub2e4. \uc774 \uc9c0\uc2dc\ub294 \uce74\ub4dc, \ube48 \uc6a9\uae30&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/105443","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/comments?post=105443"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/105443\/revisions"}],"predecessor-version":[{"id":105505,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/105443\/revisions\/105505"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media\/105447"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media?parent=105443"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/categories?post=105443"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/tags?post=105443"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}