{"id":105256,"date":"2026-10-21T19:05:45","date_gmt":"2026-10-21T19:05:45","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=105256"},"modified":"2026-10-21T19:08:07","modified_gmt":"2026-10-21T19:08:07","slug":"one-piece-flow","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/one-piece-flow\/","title":{"rendered":"\ud55c \uac1c \ud750\ub984 \uc0dd\uc0b0 (One-Piece Flow): \uc81c\uc870 \ud604\uc7a5\uc5d0\uc11c \ud6a8\uacfc\uc801\uc778 \uc870\uac74"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">\ud55c \uac1c \ud750\ub984 \uc0dd\uc0b0 (One-Piece Flow): \uc81c\uc870 \ud604\uc7a5\uc5d0\uc11c \ud6a8\uacfc\uc801\uc778 \uc870\uac74<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/ko\/\">\ud648<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/\">\ub9ac\uc18c\uc2a4<\/a> &raquo; \ud55c \uac1c \ud750\ub984 \uc0dd\uc0b0: \uc81c\uc870 \ud604\uc7a5\uc5d0\uc11c \ud6a8\uacfc\uc801\uc778 \uc870\uac74<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">\uc608\uc0c1 \uc77d\uae30 \uc2dc\uac04: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> \ubd84<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>\ud55c \uac1c \ud750\ub984 \uc0dd\uc0b0 (One-Piece Flow)\uc740 \uc774\uc1a1\ud560 \ubb3c\ub7c9\uc774 \ubaa8\uc77c \ub54c\uae4c\uc9c0 \uae30\ub2e4\ub9ac\uc9c0 \uc54a\uace0, \uac00\uacf5\uc774 \ub05d\ub09c \ubd80\ud488\uc744 \ud558\ub098\uc529 \ub2e4\uc74c \uacf5\uc815\uc73c\ub85c \ubc14\ub85c \ub118\uae30\ub294 \ubc29\uc2dd\uc785\ub2c8\ub2e4. \ub2e4\uc74c \uacf5\uc815\uc774 \uace7\ubc14\ub85c \uc791\uc5c5\ud560 \uc900\ube44\uac00 \ub418\uc5b4 \uc788\uc73c\ubbc0\ub85c, \ubd80\ud488\uc740 \ub2e4\uc2dc \ub300\uae30\uc5f4\uc5d0 \uc313\uc774\uc9c0 \uc54a\uace0 \uacf5\uc815 \uc21c\uc11c\uc5d0 \ub530\ub77c \uacc4\uc18d \uc774\ub3d9\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774 \ubc29\uc2dd\uc758 \ub9e4\ub825\uc740 \ubd84\uba85\ud569\ub2c8\ub2e4. \uac70\uc758 \uc644\uc131\ub41c \uc8fc\ubb38 \ubb3c\ub7c9\uc774 \ud314\ub808\ud2b8\ub97c \ucc44\uc6b8 \ub54c\uae4c\uc9c0 \uae30\ub2e4\ub824\ub3c4 \uace0\uac1d\uc5d0\uac8c \ub3cc\uc544\uac00\ub294 \uc774\uc810\uc740 \uc5c6\uc2b5\ub2c8\ub2e4. \ub354 \uc801\uc740 \ubb3c\ub7c9\uc744 \ub354 \uc790\uc8fc \ub118\uae30\uba74 \ub300\uae30 \uc2dc\uac04\uc744 \uc904\uc774\uace0 \ud488\uc9c8 \ubb38\uc81c\ub3c4 \ub354 \uc77c\ucc0d \ubc1c\uacac\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ub2e4\ub9cc \ud558\ub098\uc529 \uc774\uc1a1\ud558\ub294 \ubc29\uc2dd\uc740 \ub2e4\uc74c \uacf5\uc815\uc774 \ubd80\ud488\uc744 \ubc1b\uc744 \uc218 \uc788\uc744 \ub54c\ub9cc \ud6a8\uacfc\uac00 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ub530\ub77c\uc11c \uc0dd\uc0b0 \uad00\ub9ac\uc790\uc5d0\uac8c \ud55c \uac1c \ud750\ub984 \uc0dd\uc0b0\uc740 \uacf5\uc815 \uc124\uacc4\uc758 \ubb38\uc81c\uc778 \ub3d9\uc2dc\uc5d0 \uc0dd\uc0b0 \uc2a4\ucf00\uc904\ub9c1\uc758 \ubb38\uc81c\uc785\ub2c8\ub2e4. \ud604\uc7a5 \ud300\uc774 \uc2e4\ud589 \uac00\ub2a5\ud55c \ud750\ub984\uc744 \uad6c\ucd95\ud558\uba74, SkyPlanner APS\ub294 \uac01 \uacf5\uc815\uc744 \uacf5\uc7a5 \uc804\uccb4\uc758 \uc0dd\uc0b0 \ub2a5\ub825 \ubc0f \uc6b0\uc120\uc21c\uc704\uc640 \uc5f0\uacc4\ud569\ub2c8\ub2e4. \uc774\ub807\uac8c \ud574\uc57c \uc77c\ucc0d \ub118\uae34 \ubd80\ud488\uc774 \ubc14\uc05c \uc124\ube44 \uc55e\uc5d0 \uba3c\uc800 \ub3c4\ucc29\ud558\ub294 \ub370 \uadf8\uce58\uc9c0 \uc54a\uace0, \ub354 \ube68\ub9ac \uc644\uc131\ub420 \uae30\ud68c\ub97c \uc5bb\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\ud558\ub098\uc529 \ub118\uae34\ub2e4\uace0 \ub77c\uc778 \uc804\uccb4\uc5d0 \ud558\ub098\ub9cc \uc788\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4<\/h2>\n\n\n<p>\uc5ec\ub7ec \ubd80\ud488\uc744 \ub3d9\uc2dc\uc5d0 \uc0dd\uc0b0\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ud558\ub098\ub294 \uc870\ub9bd \uc911\uc774\uace0, \ub2e4\ub978 \ud558\ub098\ub294 \uac80\uc0ac \uc911\uc774\uba70, \ub610 \ub2e4\ub978 \ud558\ub098\ub294 \ud3ec\uc7a5 \uc911\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uac01 \ubd80\ud488\uc740 \ud574\ub2f9 \uacf5\uc815\uc774 \ub05d\ub098\uace0 \ub2e4\uc74c \uacf5\uc815\uc774 \uc900\ube44\ub418\uba74 \uac1c\ubcc4\uc801\uc73c\ub85c \ub118\uc5b4\uac11\ub2c8\ub2e4.<\/p>\n\n\n<p>\ub2e4\uc74c \uc138 \uac00\uc9c0 \uc218\ub7c9\uc740 \uad6c\ubd84\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\uc218\ub7c9 \uad6c\ubd84<\/th><th>\uc758\ubbf8<\/th><th>\ud55c \uac1c \ud750\ub984 \uc0dd\uc0b0\uc5d0 \ub530\ub978 \ubcc0\ud654<\/th><\/tr><\/thead><tbody><tr><td>\uc774\uc1a1 \ubc30\uce58<\/td><td>\ub2e4\uc74c \uacf5\uc815\uc73c\ub85c \ud55c\uaebc\ubc88\uc5d0 \uc774\ub3d9\ud558\ub294 \uc218\ub7c9<\/td><td>\ud55c \ubc88\uc5d0 \ud558\ub098\uc529 \ub118\uae30\ub294 \uac83\uc774 \ubaa9\ud45c<\/td><\/tr><tr><td>\uc0dd\uc0b0 \ubc30\uce58<\/td><td>\uc81c\ud488\uc774\ub098 \uc14b\uc5c5\uc744 \ubc14\uafb8\uae30 \uc804\uae4c\uc9c0 \ud55c \ucc28\ub840\uc758 \uc5f0\uc18d \uc0dd\uc0b0\uc73c\ub85c \ub9cc\ub4dc\ub294 \uc218\ub7c9<\/td><td>\ud558\ub098\ubcf4\ub2e4 \ud070 \uc218\ub7c9\uc73c\ub85c \uc720\uc9c0 \uac00\ub2a5<\/td><\/tr><tr><td>\ucd1d \uc7ac\uacf5\ud488 \uc218\ub7c9(WIP)<\/td><td>\uc815\ud574\uc9c4 \uc0dd\uc0b0 \ubc94\uc704 \uc548\uc5d0\uc11c \uac00\uacf5 \uc911\uc774\uac70\ub098 \ub300\uae30 \uc911\uc778 \ubb3c\ub7c9\uc744 \ud3ec\ud568\ud55c \ubaa8\ub4e0 \ubbf8\uc644\uc131\ud488 \uc218\ub7c9<\/td><td>\ub300\uae30\uac00 \uc904\uba74 WIP\ub3c4 \uc904\uc5b4\ub4e4 \uc218 \uc788\uc9c0\ub9cc, \ub77c\uc778 \uc804\uccb4\uc758 \uc218\ub7c9\uc774 \ud558\ub098\ub85c \uc81c\ud55c\ub418\ub294 \uac83\uc740 \uc544\ub2d8<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\ud55c \ubc88\uc758 \uc14b\uc5c5\uc73c\ub85c \ub3d9\uc77c\ud55c \ube0c\ub798\ud0b7\uc744 \uc5f0\uc18d \uac00\uacf5\ud558\uba74\uc11c, \uc644\uc131\ub418\ub294 \ube0c\ub798\ud0b7\uc744 \ud558\ub098\uc529 \ubc14\ub85c \ubc84 \uc81c\uac70 \uacf5\uc815\uc5d0 \ub118\uae38 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc774\ub294 \ube0c\ub798\ud0b7 \ud558\ub098\ub97c \uac00\uacf5\ud560 \ub54c\ub9c8\ub2e4 \uc14b\uc5c5\uc744 \ubc14\uafb8\ub294 \uac83\uacfc\ub294 \ub2e4\ub985\ub2c8\ub2e4. \uc774\uc1a1 \ubc30\uce58\ub97c \uc904\uc778\ub2e4\uace0 \ud574\uc11c \ubc18\ub4dc\uc2dc <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/batch-production-in-manufacturing\/\">\uc0dd\uc0b0 \ubc30\uce58<\/a>\ub3c4 \uac19\uc740 \ud06c\uae30\ub85c \uc904\uc5ec\uc57c \ud558\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774\uc0c1\uc801\uc73c\ub85c \uc5f0\uacb0\ub41c \uacf5\uc815 \uad6c\uac04\uc5d0\ub294 \uacf5\uc815 \uc0ac\uc774\uc758 \ub300\uae30\uc5f4\uc774 \uc5c6\uc2b5\ub2c8\ub2e4. \uc2e4\uc81c \uc0dd\uc0b0 \uacbd\ub85c\uc5d0\ub294 \uc774\ub7f0 \uad6c\uac04\uacfc \ud568\uaed8, \uad00\ub9ac \uae30\uc900\uc5d0 \ub530\ub77c \uc6b4\uc601\ud558\ub294 \ubc84\ud37c\ub098 \ubc30\uce58 \ub2e8\uc704\ub85c \ucc98\ub9ac\ud574\uc57c \ud558\ub294 \uacf5\uc815\uc774 \ud3ec\ud568\ub420 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ubd80\ud488\uc744 \ubc14\ub85c \ub118\uae30\ub294 \uad6c\uac04\uc758 \uc2dc\uc791\uacfc \ub05d\uc744 \uba85\ud655\ud788 \ud558\uc138\uc694. \uacf5\uc7a5 \uc804\uccb4\ub97c \ud55c \uac1c \ud750\ub984 \uc0dd\uc0b0\uc774\ub77c\uace0 \ubd80\ub978\ub2e4\uace0 \ud574\uc11c \ubaa8\ub4e0 \uc774\uc1a1\uc774 \uc989\uc2dc \uc774\ub8e8\uc5b4\uc9c0\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc608\uc2dc: \uac00\uacf5 \uc791\uc5c5\ub7c9\uc740 \uac19\uc544\ub3c4 \ub300\uae30\ub294 \ud06c\uac8c \uc904\uc5b4\ub4ed\ub2c8\ub2e4<\/h2>\n\n\n<p>\ub3d9\uc77c\ud55c \uc81c\ud488 \uc5f4 \uac1c\ub85c \uc774\ub8e8\uc5b4\uc9c4 \uc8fc\ubb38\uc774 \uc900\ube44, \uc870\ub9bd, \uac80\uc0ac\ub97c \uac70\uce5c\ub2e4\uace0 \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \uac01 \uacf5\uc815\uc740 \uc81c\ud488 \ud558\ub098\ub2f9 2\ubd84\uc774 \uac78\ub9bd\ub2c8\ub2e4. \uacf5\uc815\ub9c8\ub2e4 \ubcc4\ub3c4\uc758 \uc791\uc5c5\ub300\uc640 \ub2f4\ub2f9 \uc778\ub825\uc774 \uc788\uace0, \uc138 \uc791\uc5c5\ub300 \ubaa8\ub450 \uc0ac\uc6a9\ud560 \uc218 \uc788\uc73c\uba70, \uc81c\ud488\uc740 \uac00\uacf5\uc774 \ub05d\ub098\ub294 \uc989\uc2dc \uc774\ub3d9\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc774 \ub2e8\uc21c\ud654\ub41c \uc608\uc2dc\uc5d0\uc11c\ub294 \uc14b\uc5c5, \uc774\ub3d9 \uc9c0\uc5f0, \uace0\uc7a5\uc774\ub098 \ub2e4\uc74c \uacf5\uc815\uc73c\ub85c \ub118\uae30\uae30 \uc704\ud55c \uc2b9\uc778 \uac80\uc0ac\ub294 \uc5c6\ub2e4\uace0 \uac00\uc815\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\ubc30\uce58 \uc804\uccb4\ub97c \ud55c\uaebc\ubc88\uc5d0 \ub118\uae30\ub294 \ubc29\uc2dd\uc5d0\uc11c\ub294 \uc5f4 \uac1c \ubaa8\ub450 \uc900\ube44 \uacf5\uc815\uc744 \ub9c8\uce5c \ub4a4\uc5d0\uc57c \uc870\ub9bd\uc744 \uc2dc\uc791\ud569\ub2c8\ub2e4. \uc870\ub9bd\uc5d0\uc11c\ub3c4 \uc804\uccb4 \ubb3c\ub7c9\uc744 \ub9c8\uce5c \ub4a4 \uac80\uc0ac \uacf5\uc815\uc73c\ub85c \ub118\uae41\ub2c8\ub2e4. \ud558\ub098\uc529 \ub118\uae30\ub294 \ubc29\uc2dd\uc5d0\uc11c\ub294 \uc900\ube44\ub97c \ub9c8\uce5c \uccab \uc81c\ud488\uc774 \ub3c4\ucc29\ud558\uc790\ub9c8\uc790 \uc870\ub9bd\uc744 \uc2dc\uc791\ud558\uace0, \uadf8 \uc81c\ud488\uc758 \uc870\ub9bd\uc774 \ub05d\ub098\uba74 \ubc14\ub85c \uac80\uc0ac\ub97c \uc2dc\uc791\ud569\ub2c8\ub2e4.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\uacb0\uacfc<\/th><th>\uc5f4 \uac1c\ub97c \ud55c\uaebc\ubc88\uc5d0 \uc774\uc1a1<\/th><th>\ud55c \ubc88\uc5d0 \ud558\ub098\uc529 \uc774\uc1a1<\/th><\/tr><\/thead><tbody><tr><td>\uccab \uc81c\ud488\uc758 \uac80\uc0ac \uc644\ub8cc<\/td><td>42\ubd84 \ud6c4<\/td><td>6\ubd84 \ud6c4<\/td><\/tr><tr><td>\uc5f4 \uac1c \ubaa8\ub450 \uc644\ub8cc<\/td><td>60\ubd84 \ud6c4<\/td><td>24\ubd84 \ud6c4<\/td><\/tr><tr><td>\uc81c\ud488 \ud558\ub098\uac00 \uc138 \uacf5\uc815\uc744 \uac70\uce58\ub294 \ub370 \ud544\uc694\ud55c \uc21c\uc218 \uc791\uc5c5 \uc2dc\uac04<\/td><td>6\ubd84<\/td><td>6\ubd84<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\uc124\ube44\uc758 \uac00\uacf5 \uc18d\ub3c4\uac00 \ube68\ub77c\uc9c4 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4. \uac01 \uc791\uc5c5\ub300\uac00 \ubc30\uce58 \uc804\uccb4\ub97c \uae30\ub2e4\ub9ac\ub294 \ub300\uc2e0, \uc11c\ub85c \ub2e4\ub978 \uc81c\ud488\uc758 \uacf5\uc815\uc744 \ub3d9\uc2dc\uc5d0 \uc9c4\ud589\ud558\uae30 \ub54c\ubb38\uc5d0 \uc2dc\uac04\uc774 \uc904\uc5b4\ub4ed\ub2c8\ub2e4. \uc774 \uc608\uc2dc\uc5d0\uc11c\ub294 \ud55c \uac1c \ud750\ub984 \uc0dd\uc0b0\uc758 \ubaa8\ub4e0 \uacf5\uc815\uc5d0 \uc81c\ud488\uc774 \ud22c\uc785\ub418\uace0 \ub098\uba74 \uc5ec\ub7ec \uc81c\ud488\uc774 \ub3d9\uc2dc\uc5d0 \ucc98\ub9ac\ub418\uba74\uc11c 2\ubd84\ub9c8\ub2e4 \uc644\uc131\ud488 \ud558\ub098\uac00 \ub098\uc635\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774\ubc88\uc5d0\ub294 \uac80\uc0ac \uc791\uc5c5\ub300\uac00 \ub2e4\ub978 \uc8fc\ubb38\uc744 \ucc98\ub9ac \uc911\uc774\ub77c\uace0 \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \uc870\ub9bd\uc744 \ub9c8\uce5c \uccab \uc81c\ud488\uc740 \uc989\uc2dc \uac80\uc0ac\uc5d0 \ub4e4\uc5b4\uac08 \uc218 \uc5c6\uc2b5\ub2c8\ub2e4. \uc81c\ud488\uc744 \uc77c\ucc0d \ub118\uae34\ub2e4\uace0 \uc774\ubbf8 \uc7a1\ud600 \uc788\ub294 \uc791\uc5c5 \uc77c\uc815\uc774 \uc0ac\ub77c\uc9c0\uc9c0\ub294 \uc54a\uc2b5\ub2c8\ub2e4. \uc774\uc1a1 \ub300\ucc28\uc5d0 \uc2e3\ub294 \ubd80\ud488 \uc218\ub9cc \uc904\uc77c \uac83\uc774 \uc544\ub2c8\ub77c, \ub2e4\uc74c \uacf5\uc815\uc774 \ubb3c\ub7c9\uc744 \ucc98\ub9ac\ud560 \uc218 \uc788\ub3c4\ub85d \uc0dd\uc0b0 \ub2a5\ub825\uacfc \uc77c\uc815\uc744 \uc870\uc728\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc81c\uc870\uc5c5\uccb4\uac00 \ud55c \uac1c \ud750\ub984 \uc0dd\uc0b0\uc744 \ucd94\uad6c\ud558\ub294 \uc774\uc720<\/h2>\n\n\n<p>\uac00\uc7a5 \uc9c1\uc811\uc801\uc778 \uc774\uc810\uc740 \uccab \uc644\uc131\ud488\uc774 \ub098\uc624\uae30\uae4c\uc9c0 \uac78\ub9ac\ub294 \uc2dc\uac04\uc774 \uc9e7\uc544\uc9c4\ub2e4\ub294 \uac83\uc785\ub2c8\ub2e4. \uc774\uc1a1\ud560 \ubb3c\ub7c9\uc774 \ubaa8\uc77c \ub54c\uae4c\uc9c0 \uae30\ub2e4\ub9ac\uc9c0 \uc54a\uc73c\uba74 \ud6c4\uc18d \uacf5\uc815\uc744 \ub354 \uc77c\ucc0d \uc2dc\uc791\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uacf5\uc815 \uac04 \ub300\uae30\uac00 \uc904\uba74 \uacf5\uac04\uc744 \ucc28\uc9c0\ud558\uace0 \uc790\uae08\uc744 \ubb36\uc5b4 \ub450\ub294 \uc7ac\uacf5\ud488 \uc7ac\uace0\ub3c4 \uc904\uc5b4\ub4ed\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud488\uc9c8 \ud53c\ub4dc\ubc31\ub3c4 \ub354 \ube68\ub9ac \uc804\ub2ec\ub429\ub2c8\ub2e4. \uccab \uc81c\ud488\uc744 \uac80\uc0ac\ud55c \ub4a4 \uc870\ub9bd \ubb38\uc81c\ub97c \ubc1c\uacac\ud558\uba74, \uac19\uc740 \uc870\uac74\uc73c\ub85c \ub300\ub7c9 \uc0dd\uc0b0\uc744 \uacc4\uc18d\ud558\uae30 \uc804\uc5d0 \uc6d0\uc778\uc744 \uc870\uc0ac\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc774\ub807\uac8c \ud558\uba74 \uac19\uc740 \ubd88\ub7c9\uc774 \ubc18\ubcf5\ub420 \uc704\ud5d8\uc5d0 \ub178\ucd9c\ub418\ub294 \uc791\uc5c5 \ubb3c\ub7c9\uc744 \uc904\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ub2e4\ub9cc \uc774\uac83\uc774 \uac80\uc0ac\ub098 \ucda9\ubd84\ud55c \uacf5\uc815 \ub2a5\ub825\uc744 \ub300\uc2e0\ud558\ub294 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud55c \ubc88\uc5d0 \ub118\uae30\ub294 \ubb3c\ub7c9\uc774 \uc904\uba74 \uc791\uc5c5 \uc0c1\ud669\ub3c4 \ub354 \uc27d\uac8c \ud30c\uc545\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc774\uc804\uc5d0\ub294 \ub300\uae30 \ubb3c\ub7c9\uc5d0 \uac00\ub824\uc838 \uc788\ub358 \ub290\ub9b0 \uacf5\uc815\uc774 \uc774\uc81c\ub294 \ub208\uc5d0 \ub744\ub294 \ud750\ub984 \uc911\ub2e8\uc73c\ub85c \ub4dc\ub7ec\ub0a9\ub2c8\ub2e4. \uadf8 \uacb0\uacfc \ud300\uc740 \ubd88\uc548\uc815\ud55c \uc9c0\uadf8, \ubd88\uade0\ub4f1\ud55c \uc791\uc5c5\ub7c9, \uc790\uc7ac \ubd80\uc871 \ub4f1 \uad6c\uccb4\uc801\uc778 \uac1c\uc120 \uacfc\uc81c\ub97c \ucc3e\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ubb3c\ub860 \uc0c1\ucda9\ud558\ub294 \uc810\ub3c4 \uc788\uc2b5\ub2c8\ub2e4. \ubc84\ud37c\ub97c \uc5c6\uc560\uba74 \uacf5\uc815 \uac04 \uc758\uc874\ub3c4\uac00 \ub192\uc544\uc9d1\ub2c8\ub2e4. \ud55c \uacf5\uc815\uc774 \uba48\ucd94\uba74 \ub2e4\uc74c \uc791\uc5c5\ub300\ub294 \ucc98\ub9ac\ud560 \ubb3c\ub7c9\uc774 \uc5c6\uc5b4 \ub300\uae30\ud558\uac70\ub098, \uc55e \uc791\uc5c5\ub300\ub294 \uc644\uc131\ud55c \ubb3c\ub7c9\uc744 \ub118\uae30\uc9c0 \ubabb\ud574 \uba48\ucd9c \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ubc30\uce58\uac00 \uc801\uc808\ud558\uc9c0 \uc54a\uc73c\uba74 \uc7a6\uc740 \uc774\uc1a1\uc73c\ub85c \ucde8\uae09 \uc791\uc5c5\uc774 \ub298\uc5b4\ub0a0 \uc218\ub3c4 \uc788\uc2b5\ub2c8\ub2e4. \ubaa9\ud45c\ub294 \uc591\ud488\uc744 \ub354 \uc9e7\uc740 \uc2dc\uac04\uc5d0 \ub354 \uc548\uc815\uc801\uc73c\ub85c \uc644\uc131\ud558\ub294 \uac83\uc774\uc9c0, \ubd80\ud488 \ud558\ub098\uc529\uc744 \ub4e4\uace0 \uacf5\uc7a5\uc744 \uc624\uac00\ub294 \ud69f\uc218\ub97c \ub298\ub9ac\ub294 \uac83\uc774 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\ud55c \uac1c \ud750\ub984 \uc0dd\uc0b0\uc740 \uc5b4\ub5a4 \uc870\uac74\uc5d0\uc11c \ud6a8\uacfc\uc801\uc77c\uae4c\uc694?<\/h2>\n\n\n<p>\uc81c\ud488\uad70 \ud558\ub098\ub97c \uc120\uc815\ud574 \uc2e4\uc81c \uacf5\uc815 \uc21c\uc11c\ub97c \uc0b4\ud3b4\ubcf4\uc138\uc694. \uc0dd\uc0b0 \uacbd\ub85c\uac00 \uc720\uc0ac\ud558\uba74 \ub3c4\uc6c0\uc774 \ub418\uc9c0\ub9cc, \ud575\uc2ec \ud310\ub2e8 \uae30\uc900\uc740 \uac01 \uacf5\uc815\uc774 \uc2e4\ubb34\uc5d0 \ud544\uc694\ud55c \uc18d\ub3c4\ub85c \uc591\ud488\uc744 \ub2e4\uc74c \uacf5\uc815\uc5d0 \ubc18\ubcf5\ud574\uc11c \ub118\uae38 \uc218 \uc788\ub294\uc9c0\uc785\ub2c8\ub2e4.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\uc810\uac80 \ud56d\ubaa9<\/th><th>\uc801\ud569\ud55c \uc870\uac74<\/th><th>\uacf5\uc815 \uac04 \uc5f0\uacb0\uc744 \uac15\ud654\ud558\uae30 \uc804\uc5d0 \ud574\uacb0\ud560 \ubb38\uc81c<\/th><\/tr><\/thead><tbody><tr><td>\uac00\uacf5 \uc2dc\uac04<\/td><td>\uc791\uc5c5\ub7c9\uc774 \uc77c\uc815\ud558\uac8c \ubc18\ubcf5\ub418\uace0 \uc804\uccb4 \uacf5\uc815\uc774 \uace0\uac1d \uc218\uc694\ub97c \ucda9\uc871\ud560 \uc218 \uc788\uc74c<\/td><td>\uc720\ub09c\ud788 \ub290\ub9b0 \uacf5\uc815\uc774\ub098 \uc7a6\uc740 \ubcc0\ub3d9\uc73c\ub85c \uc55e \uacf5\uc815\uc758 \ubc30\ucd9c\uc774 \ub9c9\ud788\uac70\ub098 \ub4a4 \uacf5\uc815\uc5d0 \ud22c\uc785\ud560 \ubb3c\ub7c9\uc774 \ubd80\uc871\ud574\uc9d0<\/td><\/tr><tr><td>\ud488\uc9c8<\/td><td>\uac01 \uacf5\uc815\uc774 \ud569\uaca9 \uae30\uc900\uc744 \ucda9\uc871\ud558\ub294 \uc81c\ud488\uc744 \uc548\uc815\uc801\uc73c\ub85c \ub2e4\uc74c \uacf5\uc815\uc5d0 \ub118\uae40<\/td><td>\ubd88\ub7c9\uacfc \uc7ac\uc791\uc5c5\uc73c\ub85c \uacf5\uc815 \ud750\ub984\uc774 \ubc18\ubcf5\ud574\uc11c \ub04a\uae40<\/td><\/tr><tr><td>\uc124\ube44\uc640 \uc778\ub825<\/td><td>\uacf5\uc815\uc5d0\uc11c \ud544\uc694\ud55c \uc2dc\uc810\uc5d0 \uc124\ube44\uc640 \ud544\uc218 \uc778\ub825\uc744 \ud22c\uc785\ud560 \uc218 \uc788\uc74c<\/td><td>\uace0\uc7a5, \ud544\uc694\ud55c \uc219\ub828 \uc778\ub825\uc758 \ubd80\uc7ac \ub610\ub294 \ub2e4\ub978 \uc791\uc5c5\uacfc\uc758 \ubc30\uc815 \ucda9\ub3cc\ub85c \ub2e4\uc74c \uacf5\uc815\uc5d0 \ub118\uae30\uc9c0 \ubabb\ud568<\/td><\/tr><tr><td>\uc6b4\ubc18\uacfc \uc790\uc7ac \uacf5\uae09<\/td><td>\uc548\uc804\ud558\uace0 \uc9e7\uc740 \ub3d9\uc120\uc73c\ub85c \uc774\uc1a1\ud560 \uc218 \uc788\uc73c\uba70 \uc791\uc5c5 \uc704\uce58\uc5d0 \uc790\uc7ac\uac00 \uc548\uc815\uc801\uc73c\ub85c \uacf5\uae09\ub428<\/td><td>\uae34 \uc774\ub3d9 \uac70\ub9ac, \ucde8\uae09\ud558\uae30 \uc5b4\ub824\uc6b4 \uc801\uc7ac\ubb3c \ub610\ub294 \ubd80\ud488 \ubd80\uc871\uc73c\ub85c \ud558\ub098\uc529 \uc774\ub3d9\ud558\uae30\uac00 \ud604\uc2e4\uc801\uc73c\ub85c \uc5b4\ub824\uc6c0<\/td><\/tr><tr><td>\ud488\uc885 \uad50\uccb4\uc640 \ub2e4\uc74c \uacf5\uc815 \uc774\uc1a1 \uc2b9\uc778 \uaddc\uce59<\/td><td>\uc120\uc815\ud55c \uc81c\ud488 \uad6c\uc131\uc73c\ub85c \uc0dd\uc0b0\ud560 \ub54c \ud750\ub984\uc744 \ubc29\ud574\ud558\ub294 \uc14b\uc5c5\uc774\ub098 \ubc30\uce58 \ub2e8\uc704\uc758 \uc758\ubb34\uc801\uc778 \uc774\uc1a1 \ubcf4\ub958\uac00 \uc5c6\uc74c<\/td><td>\uc138\ucc99, \uacbd\ud654, \uac80\uc0ac \ub610\ub294 \uc774\uc1a1 \uc2b9\uc778 \uc694\uac74 \ub54c\ubb38\uc5d0 \ub2e4\uc74c \uacf5\uc815\uc73c\ub85c \uc989\uc2dc \uc774\ub3d9\ud560 \uc218 \uc5c6\uc74c<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\ud544\uc694\ud55c \uc81c\ud488 \ud55c \uac1c\ub2f9 \uac00\uc6a9 \uc0dd\uc0b0 \uc2dc\uac04\uc744 \ub73b\ud558\ub294 <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/takt-time\/\">\ud0dd\ud2b8 \ud0c0\uc784<\/a>\uc73c\ub85c \uc218\uc694\ub97c \ucda9\uc871\ud558\ub294 \ub370 \ud544\uc694\ud55c \uc0dd\uc0b0 \uc18d\ub3c4\ub97c \ud30c\uc545\ud558\uc138\uc694. \uc774\ub97c \ubc18\ubcf5\ud574\uc11c \ub2ec\uc131\ud560 \uc218 \uc788\ub294 \uacf5\uc815 \uc2dc\uac04 \ubc0f \uc2e4\uc81c\ub85c \uc0ac\uc6a9\ud560 \uc218 \uc788\ub294 \uc790\uc6d0\uacfc \ube44\uad50\ud574\uc57c \ud569\ub2c8\ub2e4. \ub204\uad70\uac00 \ud55c \ubc88 \ub2ec\uc131\ud55c \ucd5c\ub2e8 \uc0ac\uc774\ud074\uc744 \uae30\uc900\uc73c\ub85c \ub77c\uc778 \uade0\ud615\uc744 \ub9de\ucd94\uc9c0\ub294 \ub9c8\uc138\uc694.<\/p>\n\n\n<p>\ud2b9\uc815 \uacf5\uc815\uc758 \uc18c\uc694 \uc2dc\uac04\uc774 \ud6e8\uc52c \uae38\ub2e4\uba74 \uc791\uc5c5\ub7c9\uacfc \uc778\ub825 \ubc30\uce58\ub97c \uc0b4\ud3b4\ubcf4\uace0, \uc801\uc808\ud55c \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ucd94\uac00\ud560 \uc218 \uc788\ub294\uc9c0 \uac80\ud1a0\ud558\uc138\uc694. \ubd80\ud488\uc744 \ub354 \uc790\uc8fc \uc62e\uae34\ub2e4\uace0 \uc2e4\uc81c \ubcd1\ubaa9 \uacf5\uc815\uc774 \ud574\uc18c\ub418\uc9c0\ub294 \uc54a\uc2b5\ub2c8\ub2e4. \ub610\ud55c \ub2e4\uc74c \uacf5\uc815\uc774 \uc0dd\uc0b0\ub41c \ubb3c\ub7c9\uc744 \ucc98\ub9ac\ud560 \uc218 \uc5c6\ub294\ub370\ub3c4 \uc55e \uc791\uc5c5\ub300\uac00 \ub2e8\uc9c0 \ubc14\uc058\uac8c \ub3cc\uc544\uac00\ub294 \ubaa8\uc2b5\uc744 \ubcf4\uc774\ub824\uace0 \uc0dd\uc0b0\uc744 \uacc4\uc18d\ud574\uc11c\ub294 \uc548 \ub429\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uc18c\uaddc\ubaa8 \ubc30\uce58\ub098 \ubc84\ud37c\uac00 \ub354 \ub098\uc740 \uacbd\uc6b0<\/h3>\n\n\n<p>\uac00\uc5f4\ub85c\uc758 1\ud68c \ud22c\uc785 \ubb3c\ub7c9, \ubc30\uce58\uc2dd \ud63c\ud569\uae30 \ub610\ub294 \ud488\uc9c8 \uc2b9\uc778\uae4c\uc9c0 \ubc18\ub4dc\uc2dc \ub300\uae30\ud574\uc57c \ud558\ub294 \uc694\uac74 \ub54c\ubb38\uc5d0 \ubc30\uce58 \ub2e8\uc704\ub85c \ucc98\ub9ac\ud574\uc57c \ud558\ub294 \uad6c\uac04\uc774 \uc0dd\uae38 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uadf8 \uc804\ud6c4\uc758 \ud750\ub984\uc740 \uc5ec\uc804\ud788 \uac1c\uc120\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc804\uccb4 \uc0dd\uc0b0 \uacbd\ub85c\uc5d0 \uac19\uc740 \uc774\uc1a1 \ubc29\uc2dd\uc744 \uc5b5\uc9c0\ub85c \uc801\uc6a9\ud560 \ud544\uc694\ub294 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc5ec\ub7ec \uc81c\ud488\uad70\uc744 \ucc98\ub9ac\ud558\ub294 \uacf5\uc6a9 \uc790\uc6d0\uc740 \ub610 \ub2e4\ub978 \uc81c\uc57d\uc744 \ub9cc\ub4ed\ub2c8\ub2e4. \uc774 \uc790\uc6d0\uc744 \ud558\ub098\uc758 \uacf5\uc815 \ud750\ub984\uc5d0\ub9cc \uc804\uc6a9\uc73c\ub85c \ubc30\uc815\ud558\ub294 \uac83\uc740 \uacbd\uc81c\uc801\uc774\uc9c0 \uc54a\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uaddc\ubaa8\uc640 \uc6b4\uc601 \uae30\uc900\uc744 \uc815\ud55c \uc18c\uaddc\ubaa8 \uc120\uc785\uc120\ucd9c(FIFO) \ubc84\ud37c\ub97c \ub450\uba74, \uc790\uc6d0 \uc0ac\uc6a9\uc744 \uc870\uc728\ud558\uba74\uc11c \uc791\uc5c5 \uc21c\uc11c\ub97c \uc720\uc9c0\ud558\uace0 \uc5b4\ub290 \uc815\ub3c4\uc758 \ubcc0\ub3d9\ub3c4 \ud761\uc218\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ubc84\ud37c\uac00 \uad00\ub9ac \uc5c6\uc774 \uc313\uc544 \ub450\ub294 \uc7ac\uace0 \ub354\ubbf8\uac00 \ub418\uc9c0 \uc54a\ub3c4\ub85d \uba85\ud655\ud55c \uc218\ub7c9 \ud55c\ub3c4\uc640 \ubcf4\ucda9 \uaddc\uce59\uc744 \uc815\ud558\uc138\uc694.<\/p>\n\n\n<p>\uc5ec\ub7ec \uac1c\ub97c \ubb36\uc5b4 \ub118\uae30\ub294 \uc774\uc1a1 \ubc30\uce58\ub294 \uc5c4\ubc00\ud788 \ub9d0\ud574 \ud55c \uac1c \ud750\ub984 \uc0dd\uc0b0\uc740 \uc544\ub2d9\ub2c8\ub2e4. \ud558\uc9c0\ub9cc \uc0dd\uc0b0 \ub85c\ud2b8 \uc804\uccb4\ub97c \ud55c\uaebc\ubc88\uc5d0 \uc62e\uae30\ub294 \uac83\ubcf4\ub2e4\ub294 \uc758\ubbf8 \uc788\ub294 \uac1c\uc120\uc774 \ub420 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc804\uccb4 \uc0dd\uc0b0 \uacbd\ub85c\ub97c \uac1c\uc120\ud558\uba74\uc11c\ub3c4 \ud604\uc2e4\uc801\uc73c\ub85c \uac00\ub2a5\ud55c \ucd5c\uc18c \uc774\uc1a1 \uc218\ub7c9\uc744 \uc120\ud0dd\ud55c \ub4a4, \uc544\uc9c1 \ub354 \uc904\uc774\uc9c0 \ubabb\ud558\ub294 \uc6d0\uc778\uc744 \ud574\uacb0\ud574 \ub098\uac00\uc138\uc694.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc774\ub984\ub9cc \ub3c4\uc785\ud558\uc9c0 \ub9d0\uace0 \uc2e4\uc81c \uc774\uc1a1 \ubc29\uc2dd\uc744 \uc2dc\ubc94 \uc6b4\uc601\ud558\uc138\uc694<\/h2>\n\n\n<p>\ubc94\uc704\ub97c \uba85\ud655\ud788 \uc815\ud55c \uacf5\uc815 \uad6c\uac04\uacfc \ub300\ud45c\uc801\uc778 \uc81c\ud488 \uad6c\uc131\uc73c\ub85c \uc2dc\uc791\ud558\uc138\uc694. \uc791\uc5c5 \uc2dc\uac04\uc774 \ub354 \uae34 \uc81c\ud488 \uc0ac\uc591\uacfc, \ud6c4\uc18d \uacf5\uc815\uc5d0\uc11c \uc791\uc5c5\uc744 \uac00\uc7a5 \uc790\uc8fc \uc9c0\uc5f0\uc2dc\ud0a4\ub294 \uc790\uc6d0\ub3c4 \ud3ec\ud568\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>1. <strong>\ud604\uc7ac\uc758 \uc0dd\uc0b0 \ud750\ub984\uc744 \uae30\ub85d\ud569\ub2c8\ub2e4.<\/strong> \uccab \uc644\uc81c\ud488\uc774 \ub098\uc62c \ub54c\uae4c\uc9c0 \uac78\ub9ac\ub294 \uc2dc\uac04, \uc8fc\ubb38 \uc804\uccb4\ub97c \uc644\ub8cc\ud558\ub294 \ub370 \uac78\ub9ac\ub294 \uc2dc\uac04, \uacf5\uc815 \uac04 \ub300\uae30 \uc2dc\uac04, \uc7ac\uacf5\ud488 \uc7ac\uace0(WIP), \ud488\uc9c8 \uacb0\uacfc\ub97c \uce21\uc815\ud569\ub2c8\ub2e4. \ube44\uad50\ud560 \ub54c\ub294 \uc2dc\uc791\uc810\uacfc \uc885\ub8cc\uc810\uc744 \uc77c\uad00\ub418\uac8c \uc801\uc6a9\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>2. <strong>\uc791\uc5c5 \ubc29\uc2dd\uc744 \ud569\uc758\ud569\ub2c8\ub2e4.<\/strong> \ub204\uac00 \uc81c\ud488\uc744 \uc774\uc1a1\ud558\ub294\uc9c0, \ub2e4\uc74c \uacf5\uc815\uc5d0\uc11c \uc5b8\uc81c \uc81c\ud488\uc744 \ubc1b\uc744 \uc218 \uc788\ub294\uc9c0, \uc790\uc7ac\ub97c \uc5b4\ub5bb\uac8c \ubcf4\ucda9\ud560\uc9c0, \uc791\uc5c5\uc7a5\uc774 \uba48\ucd94\uba74 \uc5b4\ub5bb\uac8c \ub300\uc751\ud560\uc9c0 \uc815\ud569\ub2c8\ub2e4. \uc548\uc804\uacfc \ucd94\uc801\uc131\uc744 \uc720\uc9c0\ud558\uace0, \ub2e4\uc74c \uacf5\uc815\uc73c\ub85c \ub118\uae30\uae30 \uc804\uc5d0 \ud544\uc694\ud55c \uc2b9\uc778 \uac80\uc0ac\ub97c \ube60\uc9d0\uc5c6\uc774 \uc2e4\uc2dc\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>3. <strong>\uc2e4\uc81c \uac00\uc6a9 \uc870\uac74\uc5d0\uc11c \uac80\uc99d\ud569\ub2c8\ub2e4.<\/strong> \uad50\ub300\uadfc\ubb34, \uc791\uc5c5\uc790 \ubc30\uce58, \ud488\uc885 \uad50\uccb4, \ud6c4\uc18d \uacf5\uc815 \uc124\ube44\ub97c \uc0ac\uc6a9\ud558\ub294 \ub2e4\ub978 \uc8fc\ubb38\uae4c\uc9c0 \ubc18\uc601\ud569\ub2c8\ub2e4. \uc2dc\uc5f0 \uc911 \ud6c4\uc18d \uc791\uc5c5\uc7a5\uc774 \ube44\uc5b4 \uc788\uc5c8\ub2e4\uace0 \ud574\uc11c \ud3c9\uc0c1\uc2dc \uc0dd\uc0b0\uc5d0\uc11c\ub3c4 \uac19\uc740 \ubc29\uc2dd\uc73c\ub85c \uc6b4\uc601\ud560 \uc218 \uc788\ub2e4\ub294 \ub73b\uc740 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p>4. <strong>\uc804\uccb4 \uacb0\uacfc\ub97c \uac80\ud1a0\ud569\ub2c8\ub2e4.<\/strong> \ub300\uae30 \ubb3c\ub7c9\uc744 \uc2dc\ubc94 \uc6b4\uc601 \ubc94\uc704 \ubc16\uc73c\ub85c \ubc00\uc5b4\ub0b4\uac70\ub098 \ucde8\uae09 \uc791\uc5c5\uacfc \uc7ac\uc791\uc5c5\uc744 \ub298\ub9ac\uc9c0 \uc54a\uc73c\uba74\uc11c \uc8fc\ubb38\uc744 \ub354 \ube68\ub9ac \uc644\ub8cc\ud588\ub294\uc9c0 \ud655\uc778\ud569\ub2c8\ub2e4. \ub2e4\ub978 \uc644\ucda9 \uc7ac\uace0\ub97c \uc904\uc774\uae30 \uc804\uc5d0 \uc791\uc5c5 \uc911\ub2e8 \uc6d0\uc778\uc744 \uc870\uc0ac\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc2dc\ubc94 \uc6b4\uc601\uc744 \ud1b5\ud574 \uc5b4\ub5a4 \uacf5\uc815\uc744 \uc9c1\uc811 \uc5f0\uacb0\ud560 \uc218 \uc788\ub294\uc9c0, \uc5b4\ub514\uc5d0 \uad00\ub9ac\ub418\ub294 \uc644\ucda9 \uc9c0\uc810\uc744 \ub450\uc5b4 \uacf5\uc815\uc744 \ubd84\ub9ac\ud574\uc57c \ud558\ub294\uc9c0, \uac1c\uc120 \ud6a8\uacfc\ub97c \uc720\uc9c0\ud558\ub824\uba74 \ubb34\uc5c7\uc744 \ubc14\uafd4\uc57c \ud558\ub294\uc9c0 \ud30c\uc545\ud560 \uc218 \uc788\uc5b4\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">SkyPlanner\ub85c \uc120\ud0dd\ud55c \uc0dd\uc0b0 \ud750\ub984\uc744 \uacf5\uc7a5 \uc804\uccb4 \uc77c\uc815\uc5d0 \uc5f0\uacb0\ud558\uc138\uc694<\/h2>\n\n\n<p>\uc791\uc5c5\uc744 \uc5b4\ub5bb\uac8c \ud758\ub824\ubcf4\ub0bc\uc9c0 \ud569\uc758\ud588\ub2e4\uba74 \uadf8 \uc21c\uc11c\ub97c <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-scheduling\/\">\uc11c\ub85c \uc5f0\uacc4\ub41c \uc0dd\uc0b0 \uacc4\ud68d<\/a>\uc5d0 \ubc18\uc601\ud569\ub2c8\ub2e4. <a href=\"https:\/\/skyplanner.ai\/ko\/%ea%b8%b0%eb%8a%a5\/\">SkyPlanner\uc5d0\uc11c\ub294 \uc81c\ud488\ubcc4 \uacf5\uc815 \ub2e8\uacc4<\/a>\uc640 \uc791\uc5c5 \uac00\ub2a5\ud55c \uc791\uc5c5\uc7a5, \uc18c\uc694 \uc2dc\uac04, \uc120\ud6c4 \uad00\uacc4\ub97c \uc815\uc758\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc2a4\ucf00\uc904\ub9c1 \uc778\uacf5\uc9c0\ub2a5\uc778 Arcturus\ub294 \uc124\uc815\ub41c \uc0dd\uc0b0 \ub2a5\ub825\uacfc \uc6b0\uc120\uc21c\uc704\uc5d0 \ub9de\ucdb0 \uc791\uc5c5 \uc77c\uc815\uc744 \uc218\ub9bd\ud569\ub2c8\ub2e4. Gantt \ud654\uba74\uc5d0\uc11c\ub294 \uac01 \uc790\uc6d0\uc5d0 \uacf5\uc815\uc774 \uc5b8\uc81c \ubc30\uc815\ub418\uc5b4 \uc788\ub294\uc9c0 \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774\ub294 \ud6c4\uc18d \uc791\uc5c5\uc7a5\uc774 \ub2e4\ub978 \uc8fc\ubb38\ub3c4 \ucc98\ub9ac\ud560 \ub54c \ud2b9\ud788 \uc720\uc6a9\ud569\ub2c8\ub2e4. \ud750\ub984 \uac1c\uc120 \uc2dc\ubc94 \uc6b4\uc601\uc6a9 \uc791\uc5c5 \ubaa9\ub85d\uc744 \ub530\ub85c \uad00\ub9ac\ud558\uba74\uc11c \uc2dc\ud5d8 \ubd80\uc11c\uc758 \ub300\uae30 \uc791\uc5c5\uc5d0 \ub9de\ucdb0 \uc218\ub3d9\uc73c\ub85c \ub07c\uc6cc \ub123\ub294 \ub300\uc2e0, \ub3d9\uc77c\ud55c \uc790\uc6d0 \uc77c\uc815 \uc548\uc5d0\uc11c \uacf5\uc815\uc744 \uc870\uc728\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ubaa9\ub85d \uac04 \ub0b4\uc6a9\uc744 \ub9de\ucd94\ub294 \uc218\uace0\uac00 \uc904\uace0, \uc81c\ud488\uc744 \ub354 \uc77c\ucc0d \ub118\uacbc\uc744 \ub54c \ud6c4\uc18d \uacf5\uc815\uc5d0 \uc2e4\uc81c\ub85c \ucc98\ub9ac\ud560 \uc5ec\ub825\uc774 \uc788\ub294\uc9c0\ub3c4 \ub354 \uba85\ud655\ud558\uac8c \ud30c\uc545\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uacf5\uc815 \uc870\uac74\uc774 \ud5c8\uc6a9\ud558\ub294 \ubc94\uc704\uc5d0\uc11c \uc911\ucca9 \uc791\uc5c5\uc744 \uacc4\ud68d\ud558\uc138\uc694<\/h3>\n\n\n<p>SkyPlanner\uc758 \ucd5c\uc18c \uc81c\uc870 \uc9c4\ud589\ub960 \uc124\uc815\uc744 \uc0ac\uc6a9\ud558\uba74 \uc120\ud589 \uacf5\uc815\uc774 \uc644\uc804\ud788 \ub05d\ub098\uae30 \uc804\uc5d0 \ud6c4\uc18d \uacf5\uc815\uc744 \uc2dc\uc791\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ubaa8\ub4e0 \uacf5\uc815\uc774 \uc120\ud589 \uacf5\uc815\uc758 \uc804\uccb4 \uc0dd\uc0b0 \ubb3c\ub7c9\uc774 \ub05d\ub0a0 \ub54c\uae4c\uc9c0 \uae30\ub2e4\ub9b0\ub2e4\uace0 \uac00\uc815\ud558\ub294 \ub300\uc2e0, \ud5c8\uc6a9\ub418\ub294 \uacf5\uc815 \uac04 \uc911\ucca9\uc744 \uc77c\uc815\uc5d0 \ubc18\uc601\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc9c4\ud589\ub960 \uae30\uc900\uc740 \uacbd\uacfc\ud55c \uc791\uc5c5 \uc2dc\uac04\uc744 \ubc14\ud0d5\uc73c\ub85c \ud569\ub2c8\ub2e4. \uc774\ub294 \ud569\uc758\ud55c \uacf5\uc815 \uc6b4\uc601 \ubc29\uc2dd\uc744 \uc77c\uc815\uc73c\ub85c \ubaa8\ub378\ub9c1\ud558\ub294 \uc218\ub2e8\uc774\uc9c0, \uc218\ub7c9\uc744 \ud655\uc778\ud55c \ud2b9\uc815 \uc81c\ud488\uc774 \uc2e4\uc81c\ub85c \ub3c4\ucc29\ud588\uc74c\uc744 \uc54c\ub824 \uc8fc\ub294 \uc2e0\ud638\uac00 \uc544\ub2d9\ub2c8\ub2e4. \uc2e4\uc81c \uc0dd\uc0b0\ub7c9, \ucde8\uae09 \uc791\uc5c5, \ud488\uc9c8 \uc2b9\uc778 \uc694\uac74\uc5d0 \ube44\ucd94\uc5b4 \uc2dc\uc810\uc774 \uc801\uc808\ud55c\uc9c0 \uac80\uc99d\ud574\uc57c \ud569\ub2c8\ub2e4. \uc77c\uc815\uc5d0 \uacf5\uc815 \uc911\ucca9\uc744 \ubc18\uc601\ud558\ub294 \uac83\ub9cc\uc73c\ub85c \uc644\ucda9 \uc7ac\uace0\uac00 \uc5c6\ub294 \ub77c\uc778\uc774 \uad6c\ud604\ub418\uc9c0\ub294 \uc54a\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc81c\ud488 \uc5f4 \uac1c\ub97c \uc0dd\uc0b0\ud558\ub294 \uc608\uc5d0\uc11c \uc911\uc694\ud55c \uac83\uc740 \uac01 \uacf5\uc815\uc5d0 \uc2e4\uc81c\ub85c \ud544\uc694\ud55c \uc790\uc6d0\uc744 \ud655\ubcf4\ud558\uba74\uc11c \uc900\ube44, \uc870\ub9bd, \uc2dc\ud5d8\uc744 \uc77c\uc815\uc0c1 \uacb9\uccd0 \ubc30\uce58\ud560 \uc218 \uc788\ub294\uc9c0\uc785\ub2c8\ub2e4. \uc2dc\ud5d8 \uacf5\uc815\uc5d0 \uc774\ubbf8 \ub2e4\ub978 \uc791\uc5c5\uc774 \ubc30\uc815\ub418\uc5b4 \uc788\ub2e4\uba74, \uadf8 \uc790\uc6d0 \uacbd\ud569\ub3c4 \uac19\uc740 \uacc4\ud68d\uc5d0 \ubc18\uc601\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uc6b0\uc120\uc21c\uc704\uac00 \ubc14\ub00c\uc5b4\ub3c4 \uc5f0\uacc4\ub41c \uacc4\ud68d\uc744 \ud65c\uc6a9\ud558\uc138\uc694<\/h3>\n\n\n<p>\uae34\uae09 \uc8fc\ubb38\uc774 \ub4e4\uc5b4\uc624\uac70\ub098, \uc608\uc815\ub41c \uad50\ub300\uc870\ub97c \uc6b4\uc601\ud558\uc9c0 \ubabb\ud558\uac70\ub098, \uc790\uc7ac \uc785\uace0\uac00 \ub2a6\uc5b4\uc9c0\uba74 \uacf5\uc815\uc744 \uacb9\uccd0 \uc9c4\ud589\ud560 \uc5ec\uac74\ub3c4 \ub2ec\ub77c\uc9c8 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uad00\ub828 \uc6b0\uc120\uc21c\uc704\ub098 \uac00\uc6a9 \uc870\uac74\uc744 \uac31\uc2e0\ud558\uace0 Arcturus\ub85c \uc77c\uc815\uc744 \ub2e4\uc2dc \uacc4\uc0b0\ud558\uc138\uc694. \uc790\uc7ac \uac00\uc6a9\uc131\uc744 \uace0\ub824\ud558\ub294 \uc2a4\ucf00\uc904\ub9c1 \uae30\ub2a5\uc744 \ud65c\uc131\ud654\ud558\uba74 \uc790\uc7ac \ud655\ubcf4 \uc5ec\ubd80\ub3c4 \uacc4\uc0b0\uc5d0 \ubc18\uc601\ub429\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc0dd\uc0b0\uc5d0 \uad00\ud55c \uc758\uc0ac\uacb0\uc815\uacfc \uc6b0\uc120\uc21c\uc704\ub294 \ub2f4\ub2f9\uc790\uac00 \uc815\ud558\uace0, SkyPlanner\ub294 \uc774\ub97c \ubc14\ud0d5\uc73c\ub85c \uc77c\uc815\uc744 \uacc4\uc0b0\ud569\ub2c8\ub2e4. SkyPlanner\ub294 \uac1c\ubc29\ud615 REST API\ub97c \ud1b5\ud574 \uc5b4\ub5a4 ERP \ub610\ub294 MES\uc640\ub3c4 \uc5f0\ub3d9\ub418\ubbc0\ub85c, \uc774\ubbf8 \uc0ac\uc6a9 \uc911\uc778 \uc8fc\ubb38 \ubc0f \uc0dd\uc0b0 \ub370\uc774\ud130\ub97c \ud65c\uc6a9\ud574 \uc791\uc5c5\uc744 \ub354 \uc6d0\ud65c\ud558\uac8c \uc870\uc728\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc791\uc5c5 \uc21c\uc11c\ub97c \uacf5\uc720\ud55c \ub4a4 UTU\uc5d0\uc11c \ub2ec\ub77c\uc9c4 \uc810<\/h2>\n\n\n<p>UTU\uc758 Ulvila \uacf5\uc7a5\uc740 \uacfc\uac70\uc5d0 \ubd80\uc11c\ubcc4 Excel \uc2a4\ud504\ub808\ub4dc\uc2dc\ud2b8\uc5d0 \uc758\uc874\ud574 \uc0dd\uc0b0 \uacc4\ud68d\uc744 \uc218\ub9bd\ud588\uc2b5\ub2c8\ub2e4. ERP\uc5d0\uc11c \uc791\uc5c5 \uc21c\uc11c\ub97c \ubcc0\uacbd\ud574\ub3c4 \uc0dd\uc0b0 \ud604\uc7a5\uc5d0 \ud56d\uc0c1 \uc804\ub2ec\ub418\ub294 \uac83\uc740 \uc544\ub2c8\uc5c8\uace0, \uc9c1\uc6d0\ub4e4\uc740 \uc5b4\ub5a4 \uc791\uc5c5\uc744 \uc5b4\ub5a4 \uc21c\uc11c\ub85c \ud574\uc57c \ud558\ub294\uc9c0 \ud655\uc778\ud558\ub294 \ub370 \uc2dc\uac04\uc744 \ub4e4\uc5ec\uc57c \ud588\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p><a href=\"\/ko\/%ea%b3%a0%ea%b0%9d-%ec%82%ac%eb%a1%80\/utu\/\">UTU\ub294 SkyPlanner\ub97c \ub3c4\uc785\ud558\uba74\uc11c<\/a> \uacf5\uc7a5\uc758 \ubaa8\ub4e0 \ub77c\uc778\uacfc \ubd80\uc11c\ub97c \ud558\ub098\uc758 \uc2dc\uc2a4\ud15c\uc73c\ub85c \ud1b5\ud569\ud558\uace0 Oracle NetSuite \ubc0f \uae09\uc5ec \uc2dc\uc2a4\ud15c\uacfc \uc5f0\ub3d9\ud588\uc2b5\ub2c8\ub2e4. UTU\ub294 \uc790\ub3d9 \uc2a4\ucf00\uc904\ub9c1\uacfc \uc2dc\uac01\uc801\uc778 Gantt \ud0c0\uc784\ub77c\uc778\uc744 \ud568\uaed8 \ud65c\uc6a9\ud560 \uc218 \uc788\ub2e4\ub294 \uc810\uc744 \uac15\uc870\ud569\ub2c8\ub2e4. \uc791\uc5c5 \uc21c\uc11c\uac00 \ubc14\ub00c\uba74 \uc218\uc815\ub41c \uc791\uc5c5 \ub300\uae30\uc5f4\uc774 \uba87 \ucd08 \ub9cc\uc5d0 \uc124\uce58 \uc791\uc5c5\uc790\uc5d0\uac8c \uc804\ub2ec\ub429\ub2c8\ub2e4. \ub610\ud55c \uc2a4\ud504\ub808\ub4dc\uc2dc\ud2b8\ub97c \uc218\ub3d9\uc73c\ub85c \uac31\uc2e0\ud560 \ud544\uc694\uac00 \uc5c6\uc5b4\uc838 \ub9e4\uc8fc \uc57d \ub450 \uc2dc\uac04\uc744 \uc808\uc57d\ud55c\ub2e4\uace0 \ubc1d\ud614\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774 \uc0ac\ub840\ub294 \uc774\uc1a1 \ubc29\uc2dd\uc744 \ubc14\uafc0 \ub54c \uc5b4\ub5a4 \uc870\uc728\uc774 \ud544\uc694\ud55c\uc9c0 \ubcf4\uc5ec \uc90d\ub2c8\ub2e4. \uc791\uc5c5\ubb3c\uc744 \ubcf4\ub0b4\ub294 \ucabd\uacfc \ubc1b\ub294 \ucabd\uc740 \uac01\uc790 \uad00\ub9ac\ud558\ub2e4 \ub0b4\uc6a9\uc774 \uc5b4\uae0b\ub098\ub294 \ubcc4\ub3c4\uc758 \ubaa9\ub85d\uc774 \uc544\ub2c8\ub77c, \ucd5c\uc2e0 \uc791\uc5c5 \uc21c\uc11c\ub97c \ud568\uaed8 \ud655\uc778\ud560 \uc218 \uc788\uc5b4\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\ub2e4\uc74c \uacf5\uc815\uae4c\uc9c0 \uace0\ub824\ud574 \uacb0\uc815\ud558\uc138\uc694<\/h2>\n\n\n<p>\uc548\uc815\uc801\uc73c\ub85c \uc6b4\uc601\ub418\uace0 \uc791\uc5c5 \ubd80\ud558\uac00 \uc801\uc808\ud788 \uade0\ud615\uc744 \uc774\ub8e8\ub294 \uacf5\uc815 \uc0ac\uc774\uc5d0\uc11c \uc591\ud488\uc744 \ubc14\ub85c \ub118\uae38 \uc218 \uc788\ub2e4\uba74 \ud55c \uac1c \ud750\ub984 \uc0dd\uc0b0 (One-Piece Flow)\uc744 \ucd94\uc9c4\ud560 \uac00\uce58\uac00 \uc788\uc2b5\ub2c8\ub2e4. \ud55c \ubc88\uc5d0 \uc0dd\uc0b0\ud558\ub294 \uc218\ub7c9, \ud55c \ubc88\uc5d0 \uc774\uc1a1\ud558\ub294 \uc218\ub7c9, \uc804\uccb4 \uc7ac\uacf5\ud488 \uc7ac\uace0\ub294 \uc11c\ub85c \uad6c\ubd84\ud558\uace0, \uacf5\uc815\uc0c1 \ud544\uc694\ud55c \ubc30\uce58 \ub2e8\uc704\uc758 \uad6c\ubd84\uc740 \uc720\uc9c0\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774\ub7ec\ud55c \uacf5\uc815\uacfc \uacf5\uc7a5 \ub0b4 \ub2e4\ub978 \uc791\uc5c5\uc744 \uc870\uc728\ud558\ub294 \ub370 \uacc4\ud68d \uc218\ub9bd \uc2dc\uac04\uc774 \uc9c0\ub098\uce58\uac8c \ub9ce\uc774 \ub4e0\ub2e4\uba74 SkyPlanner\ub97c \uc120\ud0dd\ud558\uc138\uc694. \ud569\uc758\ud55c \uc0dd\uc0b0 \ud750\ub984\uacfc \uac19\uc740 \uc790\uc6d0\uc744 \ub450\uace0 \uacbd\ud569\ud558\ub294 \uc791\uc5c5\uc744 \ud558\ub098\uc758 \uc77c\uc815\uc73c\ub85c \uc5f0\uacb0\ud560 \uc218 \uc788\uc73c\ubbc0\ub85c, \ub2f4\ub2f9\uc790\ub294 \ubcc4\ub3c4 \ub300\uae30\uc5f4\uc744 \ub9de\ucd94\ub294 \ub300\uc2e0 \uc81c\uc57d \uc694\uc778\uc744 \ud574\uacb0\ud558\ub294 \ub370 \uc9d1\uc911\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc81c\ud488\uad70 \ud558\ub098\uc758 \uacf5\uc815 \uacbd\ub85c, \ud604\uc7ac \uc774\uc1a1 \uc218\ub7c9, \uc9c0\uc5f0\uc744 \uc720\ubc1c\ud560 \uac00\ub2a5\uc131\uc774 \uac00\uc7a5 \ud070 \uacf5\uc6a9 \uc790\uc6d0\uc744 \uc900\ube44\ud574 <a href=\"https:\/\/skyplanner.ai\/ko\/%ec%98%81%ec%97%85%ed%8c%80%ec%97%90-%eb%ac%b8%ec%9d%98\/\">SkyPlanner \ub370\ubaa8\ub97c \uc608\uc57d\ud558\uc138\uc694<\/a>. \ud5c8\uc6a9\ub418\ub294 \uacf5\uc815 \uc911\ucca9\uacfc \uc790\uc6d0\uc744 \ub450\uace0 \uacbd\ud569\ud558\ub294 \ub2e4\ub978 \uc8fc\ubb38\uc774 \ud558\ub098\uc758 \uc77c\uc815\uc5d0 \uc5b4\ub5bb\uac8c \ubc18\uc601\ub418\ub294\uc9c0 \ud655\uc778\ud574 \ubcf4\uc138\uc694. \uba3c\uc800 \uc2a4\ucf00\uc904\ub9c1 \ud654\uba74\uc744 \uc0b4\ud3b4\ubcf4\uace0 \uc2f6\ub2e4\uba74 <a href=\"https:\/\/skyplanner.ai\/ko\/%ed%8f%89%ea%b0%80%ed%8c%90\/\">\ub370\ubaa8 \ub370\uc774\ud130\ub85c SkyPlanner\ub97c \uccb4\ud5d8\ud574 \ubcf4\uc138\uc694<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\ud55c \uac1c \ud750\ub984 \uc0dd\uc0b0 (One-Piece Flow): \uc81c\uc870 \ud604\uc7a5\uc5d0\uc11c \ud6a8\uacfc\uc801\uc778 \uc870\uac74 \ud648 &raquo; \ub9ac\uc18c\uc2a4 &raquo; \ud55c \uac1c \ud750\ub984 \uc0dd\uc0b0: \uc81c\uc870 \ud604\uc7a5\uc5d0\uc11c \ud6a8\uacfc\uc801\uc778 \uc870\uac74 \ud55c \uac1c \ud750\ub984 \uc0dd\uc0b0 (One-Piece Flow)\uc740 \uc774\uc1a1\ud560 \ubb3c\ub7c9\uc774 \ubaa8\uc77c \ub54c\uae4c\uc9c0 \uae30\ub2e4\ub9ac\uc9c0 \uc54a\uace0, \uac00\uacf5\uc774 \ub05d\ub09c \ubd80\ud488\uc744 \ud558\ub098\uc529 \ub2e4\uc74c \uacf5\uc815\uc73c\ub85c \ubc14\ub85c \ub118\uae30\ub294 \ubc29\uc2dd\uc785\ub2c8\ub2e4. \ub2e4\uc74c \uacf5\uc815\uc774 \uace7\ubc14\ub85c \uc791\uc5c5\ud560 \uc900\ube44\uac00 \ub418\uc5b4 \uc788\uc73c\ubbc0\ub85c, \ubd80\ud488\uc740 \ub2e4\uc2dc \ub300\uae30\uc5f4\uc5d0 \uc313\uc774\uc9c0 \uc54a\uace0 &#8230; <a title=\"\ud55c \uac1c \ud750\ub984 \uc0dd\uc0b0 (One-Piece Flow): \uc81c\uc870 \ud604\uc7a5\uc5d0\uc11c \ud6a8\uacfc\uc801\uc778 \uc870\uac74\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/one-piece-flow\/\" aria-label=\"Read more about \ud55c \uac1c \ud750\ub984 \uc0dd\uc0b0 (One-Piece Flow): \uc81c\uc870 \ud604\uc7a5\uc5d0\uc11c \ud6a8\uacfc\uc801\uc778 \uc870\uac74\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":105260,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[496,2558],"tags":[],"class_list":["post-105256","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-496","category-2558","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\ud55c \uac1c \ud750\ub984 \uc0dd\uc0b0: \uc81c\uc870 \ud604\uc7a5\uc5d0\uc11c \ud6a8\uacfc\uc801\uc778 \uc870\uac74<\/title>\n<meta name=\"description\" content=\"\uc900\ube44\ub41c \ubd80\ud488\uc744 \ub2e4\uc74c \uacf5\uc815\uc774 \ubc14\ub85c \ubc1b\uc744 \uc218 \uc788\ub098\uc694? \ud55c \uac1c \ud750\ub984 \uc0dd\uc0b0\uc758 \ub300\uae30 \ub2e8\ucd95 \uc870\uac74\uacfc \uc0dd\uc0b0 \uc77c\uc815 \uc5f0\uacc4 \ubc29\ubc95\uc744 \uc54c\uc544\ubcf4\uc138\uc694.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/one-piece-flow\/\" \/>\n<meta property=\"og:locale\" content=\"ko_KR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\ud55c \uac1c \ud750\ub984 \uc0dd\uc0b0 (One-Piece Flow): \uc81c\uc870 \ud604\uc7a5\uc5d0\uc11c \ud6a8\uacfc\uc801\uc778 \uc870\uac74\" \/>\n<meta property=\"og:description\" content=\"\uc900\ube44\ub41c \ubd80\ud488\uc744 \ub2e4\uc74c \uacf5\uc815\uc774 \ubc14\ub85c \ubc1b\uc744 \uc218 \uc788\ub098\uc694? \ud55c \uac1c \ud750\ub984 \uc0dd\uc0b0\uc758 \ub300\uae30 \ub2e8\ucd95 \uc870\uac74\uacfc \uc0dd\uc0b0 \uc77c\uc815 \uc5f0\uacc4 \ubc29\ubc95\uc744 \uc54c\uc544\ubcf4\uc138\uc694.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/one-piece-flow\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-21T19:05:45+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-21T19:08:07+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/one-piece-flow-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\uae00\uc4f4\uc774\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/one-piece-flow\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/one-piece-flow\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"\ud55c \uac1c \ud750\ub984 \uc0dd\uc0b0 (One-Piece Flow): \uc81c\uc870 \ud604\uc7a5\uc5d0\uc11c \ud6a8\uacfc\uc801\uc778 \uc870\uac74\",\"datePublished\":\"2026-10-21T19:05:45+00:00\",\"dateModified\":\"2026-10-21T19:08:07+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/one-piece-flow\\\/\"},\"wordCount\":42,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/one-piece-flow\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/one-piece-flow-hero.png\",\"articleSection\":[\"\ub9ac\uc18c\uc2a4\",\"\uc81c\uc870 \ud6a8\uc728\"],\"inLanguage\":\"ko-KR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/one-piece-flow\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/one-piece-flow\\\/\",\"name\":\"\ud55c \uac1c \ud750\ub984 \uc0dd\uc0b0: \uc81c\uc870 \ud604\uc7a5\uc5d0\uc11c \ud6a8\uacfc\uc801\uc778 \uc870\uac74\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/one-piece-flow\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/one-piece-flow\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/one-piece-flow-hero.png\",\"datePublished\":\"2026-10-21T19:05:45+00:00\",\"dateModified\":\"2026-10-21T19:08:07+00:00\",\"description\":\"\uc900\ube44\ub41c \ubd80\ud488\uc744 \ub2e4\uc74c \uacf5\uc815\uc774 \ubc14\ub85c \ubc1b\uc744 \uc218 \uc788\ub098\uc694? \ud55c \uac1c \ud750\ub984 \uc0dd\uc0b0\uc758 \ub300\uae30 \ub2e8\ucd95 \uc870\uac74\uacfc \uc0dd\uc0b0 \uc77c\uc815 \uc5f0\uacc4 \ubc29\ubc95\uc744 \uc54c\uc544\ubcf4\uc138\uc694.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/one-piece-flow\\\/#breadcrumb\"},\"inLanguage\":\"ko-KR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/one-piece-flow\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/one-piece-flow\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/one-piece-flow-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/one-piece-flow-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Several blue brackets move individually through three connected manufacturing workstations.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/one-piece-flow\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\ud55c \uac1c \ud750\ub984 \uc0dd\uc0b0 (One-Piece Flow): \uc81c\uc870 \ud604\uc7a5\uc5d0\uc11c \ud6a8\uacfc\uc801\uc778 \uc870\uac74\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ko-KR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\ud55c \uac1c \ud750\ub984 \uc0dd\uc0b0: \uc81c\uc870 \ud604\uc7a5\uc5d0\uc11c \ud6a8\uacfc\uc801\uc778 \uc870\uac74","description":"\uc900\ube44\ub41c \ubd80\ud488\uc744 \ub2e4\uc74c \uacf5\uc815\uc774 \ubc14\ub85c \ubc1b\uc744 \uc218 \uc788\ub098\uc694? \ud55c \uac1c \ud750\ub984 \uc0dd\uc0b0\uc758 \ub300\uae30 \ub2e8\ucd95 \uc870\uac74\uacfc \uc0dd\uc0b0 \uc77c\uc815 \uc5f0\uacc4 \ubc29\ubc95\uc744 \uc54c\uc544\ubcf4\uc138\uc694.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/one-piece-flow\/","og_locale":"ko_KR","og_type":"article","og_title":"\ud55c \uac1c \ud750\ub984 \uc0dd\uc0b0 (One-Piece Flow): \uc81c\uc870 \ud604\uc7a5\uc5d0\uc11c \ud6a8\uacfc\uc801\uc778 \uc870\uac74","og_description":"\uc900\ube44\ub41c \ubd80\ud488\uc744 \ub2e4\uc74c \uacf5\uc815\uc774 \ubc14\ub85c \ubc1b\uc744 \uc218 \uc788\ub098\uc694? \ud55c \uac1c \ud750\ub984 \uc0dd\uc0b0\uc758 \ub300\uae30 \ub2e8\ucd95 \uc870\uac74\uacfc \uc0dd\uc0b0 \uc77c\uc815 \uc5f0\uacc4 \ubc29\ubc95\uc744 \uc54c\uc544\ubcf4\uc138\uc694.","og_url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/one-piece-flow\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-21T19:05:45+00:00","article_modified_time":"2026-10-21T19:08:07+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/one-piece-flow-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"\uae00\uc4f4\uc774":"Jussi M\u00e4ntyl\u00e4"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/one-piece-flow\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/one-piece-flow\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"\ud55c \uac1c \ud750\ub984 \uc0dd\uc0b0 (One-Piece Flow): \uc81c\uc870 \ud604\uc7a5\uc5d0\uc11c \ud6a8\uacfc\uc801\uc778 \uc870\uac74","datePublished":"2026-10-21T19:05:45+00:00","dateModified":"2026-10-21T19:08:07+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/one-piece-flow\/"},"wordCount":42,"publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/one-piece-flow\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/one-piece-flow-hero.png","articleSection":["\ub9ac\uc18c\uc2a4","\uc81c\uc870 \ud6a8\uc728"],"inLanguage":"ko-KR"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/one-piece-flow\/","url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/one-piece-flow\/","name":"\ud55c \uac1c \ud750\ub984 \uc0dd\uc0b0: \uc81c\uc870 \ud604\uc7a5\uc5d0\uc11c \ud6a8\uacfc\uc801\uc778 \uc870\uac74","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/one-piece-flow\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/one-piece-flow\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/one-piece-flow-hero.png","datePublished":"2026-10-21T19:05:45+00:00","dateModified":"2026-10-21T19:08:07+00:00","description":"\uc900\ube44\ub41c \ubd80\ud488\uc744 \ub2e4\uc74c \uacf5\uc815\uc774 \ubc14\ub85c \ubc1b\uc744 \uc218 \uc788\ub098\uc694? \ud55c \uac1c \ud750\ub984 \uc0dd\uc0b0\uc758 \ub300\uae30 \ub2e8\ucd95 \uc870\uac74\uacfc \uc0dd\uc0b0 \uc77c\uc815 \uc5f0\uacc4 \ubc29\ubc95\uc744 \uc54c\uc544\ubcf4\uc138\uc694.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/one-piece-flow\/#breadcrumb"},"inLanguage":"ko-KR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/one-piece-flow\/"]}]},{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/one-piece-flow\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/one-piece-flow-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/one-piece-flow-hero.png","width":1672,"height":941,"caption":"Several blue brackets move individually through three connected manufacturing workstations."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/one-piece-flow\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ko\/"},{"@type":"ListItem","position":2,"name":"\ud55c \uac1c \ud750\ub984 \uc0dd\uc0b0 (One-Piece Flow): \uc81c\uc870 \ud604\uc7a5\uc5d0\uc11c \ud6a8\uacfc\uc801\uc778 \uc870\uac74"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ko\/#website","url":"https:\/\/skyplanner.ai\/ko\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ko\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ko-KR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ko\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ko\/","logo":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/one-piece-flow-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/one-piece-flow-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/one-piece-flow-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/one-piece-flow-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/one-piece-flow-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/one-piece-flow-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/one-piece-flow-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/one-piece-flow-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ko\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\ud55c \uac1c \ud750\ub984 \uc0dd\uc0b0 (One-Piece Flow): \uc81c\uc870 \ud604\uc7a5\uc5d0\uc11c \ud6a8\uacfc\uc801\uc778 \uc870\uac74 \ud648 &raquo; \ub9ac\uc18c\uc2a4 &raquo; \ud55c \uac1c \ud750\ub984 \uc0dd\uc0b0: \uc81c\uc870 \ud604\uc7a5\uc5d0\uc11c \ud6a8\uacfc\uc801\uc778 \uc870\uac74 \ud55c \uac1c \ud750\ub984 \uc0dd\uc0b0 (One-Piece Flow)\uc740 \uc774\uc1a1\ud560 \ubb3c\ub7c9\uc774 \ubaa8\uc77c \ub54c\uae4c\uc9c0 \uae30\ub2e4\ub9ac\uc9c0 \uc54a\uace0, \uac00\uacf5\uc774 \ub05d\ub09c \ubd80\ud488\uc744 \ud558\ub098\uc529 \ub2e4\uc74c \uacf5\uc815\uc73c\ub85c \ubc14\ub85c \ub118\uae30\ub294 \ubc29\uc2dd\uc785\ub2c8\ub2e4. \ub2e4\uc74c \uacf5\uc815\uc774 \uace7\ubc14\ub85c \uc791\uc5c5\ud560 \uc900\ube44\uac00 \ub418\uc5b4 \uc788\uc73c\ubbc0\ub85c, \ubd80\ud488\uc740 \ub2e4\uc2dc \ub300\uae30\uc5f4\uc5d0 \uc313\uc774\uc9c0 \uc54a\uace0&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/105256","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/comments?post=105256"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/105256\/revisions"}],"predecessor-version":[{"id":105320,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/105256\/revisions\/105320"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media\/105260"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media?parent=105256"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/categories?post=105256"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/tags?post=105256"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}