{"id":104676,"date":"2026-10-20T21:23:51","date_gmt":"2026-10-20T21:23:51","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=104676"},"modified":"2026-10-20T21:26:11","modified_gmt":"2026-10-20T21:26:11","slug":"aggregate-planning","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/aggregate-planning\/","title":{"rendered":"\ucd1d\uad04\uc0dd\uc0b0\uacc4\ud68d: \uc0dd\uc0b0 \ud3c9\uc900\ud654, \uc218\uc694 \ucd94\uc885, \ud63c\ud569 \uc804\ub7b5 \uc911 \ubb34\uc5c7\uc744 \uc120\ud0dd\ud560\uae4c?"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">\ucd1d\uad04\uc0dd\uc0b0\uacc4\ud68d: \uc0dd\uc0b0 \ud3c9\uc900\ud654, \uc218\uc694 \ucd94\uc885, \ud63c\ud569 \uc804\ub7b5 \uc911 \ubb34\uc5c7\uc744 \uc120\ud0dd\ud560\uae4c?<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/ko\/\">\ud648<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/\">\ub9ac\uc18c\uc2a4<\/a> &raquo; \ucd1d\uad04\uc0dd\uc0b0\uacc4\ud68d: \uc0dd\uc0b0 \ud3c9\uc900\ud654, \uc218\uc694 \ucd94\uc885, \ud63c\ud569 \uc804\ub7b5 \uc911 \ubb34\uc5c7\uc744 \uc120\ud0dd\ud560\uae4c?<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">\uc608\uc0c1 \uc77d\uae30 \uc2dc\uac04: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> \ubd84<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>\ucd1d\uad04\uc0dd\uc0b0\uacc4\ud68d\uc740 \uc77c\ubc18\uc801\uc73c\ub85c \uc57d 3\u201318\uac1c\uc6d4\uc758 \uc911\uae30 \uae30\uac04\uc744 \ub300\uc0c1\uc73c\ub85c \uc81c\ud488\uad70\ubcc4 \uc0dd\uc0b0\ub7c9, \ud655\ubcf4\ud560 \uc0dd\uc0b0 \ub2a5\ub825, \uc608\uc0c1 \uc7ac\uace0 \ub610\ub294 \uc218\uc8fc\uc794\uace0\ub97c \uc815\ud569\ub2c8\ub2e4. \uc218\uc694\uac00 \ub298\uace0 \uc904 \ub54c \uc0dd\uc0b0\ub7c9\uc744 \uc77c\uc815\ud558\uac8c \uc720\uc9c0\ud560\uc9c0, \uc218\uc694\uc5d0 \ub9de\ucdb0 \uc0dd\uc0b0\ub7c9\uc744 \ubc14\uafc0\uc9c0, \ub450 \ubc29\uc2dd\uc744 \ud568\uaed8 \uc4f8\uc9c0\ub77c\ub294 \uc2e4\ubb34\uc801\uc778 \uc9c8\ubb38\uc5d0 \ub2f5\ud558\ub294 \uacc4\ud68d\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc218\uc694 \ubcc0\ub3d9\uc740 \uc5b4\ub5a4 \ubc29\uc2dd\uc73c\ub85c\ub4e0 \ud761\uc218\ud574\uc57c \ud569\ub2c8\ub2e4. \uae30\uac04\ub2f9 \uc0dd\uc0b0\ub7c9\uc744 \uc77c\uc815\ud558\uac8c \uc720\uc9c0\ud558\uba74 \uc218\uc694\uac00 \ubab0\ub9ac\uae30 \uc804\uc5d0 \uc7ac\uace0\ub97c \uc313\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc218\uc694\uc5d0 \ub9de\ucdb0 \uc0dd\uc0b0\ub7c9\uc744 \uc870\uc815\ud558\uba74 \uc774\ub7f0 \uc7ac\uace0 \ucd95\uc801\uc740 \ud53c\ud560 \uc218 \uc788\uc9c0\ub9cc, \uc2e4\uc81c\ub85c \ub298\ub9ac\uace0 \uc904\uc77c \uc218 \uc788\ub294 \uc0dd\uc0b0 \ub2a5\ub825\uc774 \ud544\uc694\ud569\ub2c8\ub2e4. \ud63c\ud569 \uc804\ub7b5\uc740 \uc7ac\uace0\uc640 \uc720\uc5f0\ud55c \uc0dd\uc0b0 \uc6b4\uc601\uc73c\ub85c \uadf8 \ubd80\ub2f4\uc744 \ub098\ub215\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc801\uc808\ud55c \uc804\ub7b5\uc744 \uc120\ud0dd\ud558\uba74 \ud65c\uc6a9\ud560 \uc218 \uc5c6\ub294 \uc7ac\uace0\ub098 \ud655\ubcf4\ud560 \uc218 \uc5c6\ub294 \uc0dd\uc0b0 \ub2a5\ub825\uc5d0 \ube44\uc6a9\uc744 \ub4e4\uc774\uc9c0 \uc54a\uc73c\uba74\uc11c\ub3c4 \ub0a9\uae30\ub97c \uc9c0\ud0ac \uc218 \uc788\uc2b5\ub2c8\ub2e4. SkyPlanner\ub294 \uc774 \uc120\ud0dd\uc744 \uc2e4\uc81c \uc0dd\uc0b0\uc73c\ub85c \uc774\uc5b4\uac08 \uc218 \uc788\ub3c4\ub85d \ub3d5\uc2b5\ub2c8\ub2e4. \uc2a4\ucf00\uc904\ub9c1 \uc778\uacf5\uc9c0\ub2a5 Arcturus\uac00 \uacc4\ud68d\uc5d0 \ud3ec\ud568\ub41c \uc624\ub354\ub97c \uc791\uc5c5\uc7a5, \uad50\ub300\uc870, \uc791\uc5c5\uc790, \uc6b0\uc120\uc21c\uc704\uc5d0 \ub9de\ucdb0 \uc870\uc728\ud569\ub2c8\ub2e4. \ub530\ub77c\uc11c \uc6d4\ubcc4 \ubaa9\ud45c \uc0dd\uc0b0\ub7c9\uacfc \uc124\ube44\ubcc4 \ub300\uae30 \uc791\uc5c5\uc744 \ub9de\ucdb0 \ubcf4\ub294 \ub370 \ub4dc\ub294 \uc2dc\uac04\uc744 \uc904\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\ucd1d\uad04\uc0dd\uc0b0\uacc4\ud68d\uc5d0\uc11c \uacb0\uc815\ud558\ub294 \uc0ac\ud56d<\/h2>\n\n\n<p>\ucd1d\uad04\uc0dd\uc0b0\uacc4\ud68d\uc740 \uac1c\ubcc4 \uc791\uc5c5\ubcf4\ub2e4 \uc0c1\uc704 \uc218\uc900\uc744 \ub2e4\ub8f9\ub2c8\ub2e4. \ud654\uc694\uc77c\uc5d0 \uc218\ud589\ud560 \uacf5\uc815\uc744 \uc124\ube44\uc5d0 \ubc30\uc815\ud558\ub294 \ub300\uc2e0, \uc81c\ud488\uad70\uc758 \uc0dd\uc0b0 \ubc0f \uc790\uc6d0 \uc6b4\uc601 \ubc29\uce68\uc744 \uc815\ud569\ub2c8\ub2e4. \uac01 \uae30\uac04\uc5d0 \uc5bc\ub9c8\ub098 \uc0dd\uc0b0\ud560\uc9c0, \uc7ac\uace0\ub97c \uc5bc\ub9c8\ub098 \ubcf4\uc720\ud560\uc9c0, \ucd94\uac00 \uc0dd\uc0b0 \ub2a5\ub825\uc774 \uc5b8\uc81c \ud544\uc694\ud55c\uc9c0\ub97c \uacb0\uc815\ud558\ub294 \uac83\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc0dd\uc0b0 \uc694\uac74\uc744 \uc11c\ub85c \ube44\uad50\ud560 \uc218 \uc788\ub294 \uc81c\ud488\ub07c\ub9ac \ubb36\uc73c\uc138\uc694. \uc720\uc0ac\ud55c \uc81c\ud488\uc73c\ub85c \uad6c\uc131\ub41c \uc81c\ud488\uad70\uc740 \uc218\ub7c9\uc744 \uae30\uc900\uc73c\ub85c \uacc4\ud68d\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ud06c\uae30\ub098 \uc0dd\uc0b0 \uacbd\ub85c\uac00 \ud06c\uac8c \ub2e4\ub974\uba74 \ud574\ub2f9 \uc790\uc6d0\uc758 \ud45c\uc900 \uc791\uc5c5\uc2dc\uac04\ucc98\ub7fc \uc758\ubbf8 \uc788\ub294 \uacf5\ud1b5 \ucc99\ub3c4\ub97c \uc0ac\uc6a9\ud558\uc138\uc694. \uc791\uc740 \ubd80\ud488 \ud558\ub098\uc640 \ubcf5\uc7a1\ud55c \uc870\ub9bd\ud488 \ud558\ub098\ub97c \ub3d9\uc77c\ud55c \ud55c \uac1c\ub85c \uac04\uc8fc\ud574 \ub354\ud558\uba74 \uc0dd\uc0b0 \ub2a5\ub825 \ubb38\uc81c\ub97c \ub193\uce60 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc6d4 \ub2e8\uc704\ub85c \uacc4\ud68d\ud558\uba74 \uacc4\uc808\uc801 \ubcc0\ud654\ub97c \ud30c\uc545\ud558\uae30 \uc88b\uc9c0\ub9cc, \uacc4\ud68d \uae30\uac04\uc740 \ud544\uc694\ud55c \uc758\uc0ac\uacb0\uc815\uc744 \ucda9\ubd84\ud788 \ud3ec\uad04\ud574\uc57c \ud569\ub2c8\ub2e4. \uc778\ub825\uc744 \uad50\uc721\ud558\uace0, \uacf5\uae09\uc5c5\uccb4\uc758 \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ud655\ubcf4\ud558\uace0, \uc218\uc694 \uc9d1\uc911\uae30\uc5d0 \uc4f8 \uc790\uc7ac\ub97c \uc900\ube44\ud558\ub824\uba74 \ub0b4\uc77c\uc758 \uc791\uc5c5 \uc21c\uc11c\ub97c \ubc14\uafc0 \ub54c\ubcf4\ub2e4 \ud6e8\uc52c \uc77c\ucc0d \uc900\ube44\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\ucd1d\uad04\uc0dd\uc0b0\uacc4\ud68d\uc740 \ub2e4\uc74c\uacfc \uac19\uc740 \uacc4\ud68d \ud65c\ub3d9\ub3c4 \uc11c\ub85c \uc5f0\uacb0\ud569\ub2c8\ub2e4.<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong><a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/%ec%a0%9c%ec%a1%b0-%eb%b6%84%ec%95%bc%ec%97%90%ec%84%9c-sop%ec%9d%98-%ed%9e%98-%ed%99%9c%ec%9a%a9%ed%95%98%ea%b8%b0\/\">S&#038;OP<\/a><\/strong>\ub294 \uc218\uc694, \uacf5\uae09, \uc7ac\ubb34 \uad00\ub828 \uc758\uc0ac\uacb0\uc815\uc744 \ud1b5\ud569\ud574 \ud569\uc758\ub41c \uc0ac\uc5c5 \uacc4\ud68d\uc744 \uc218\ub9bd\ud558\ub294 \uacfc\uc815\uc785\ub2c8\ub2e4. \uc774 \uacfc\uc815\uc5d0\uc11c \ucd1d\uad04\uc801\uc778 \uc0dd\uc0b0 \ubc29\uce68\uc744 \ub9c8\ub828\ud558\uace0 \uc2b9\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/master-production-schedule\/\">\uae30\uc900\uc0dd\uc0b0\uacc4\ud68d(MPS)<\/a><\/strong>\uc740 \uc0c1\uc704 \uacc4\ud68d\uc758 \ubc29\ud5a5\uc744 \uad6c\uccb4\ud654\ud574 \uc120\uc815\ub41c \uc81c\ud488\uc758 \uc218\ub7c9\uacfc \uacf5\uae09 \uac00\ub2a5 \uc77c\uc790\ub97c \uc815\ud569\ub2c8\ub2e4.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/rough-cut-capacity-planning\/\">\uac1c\ub7b5 \uc0dd\uc0b0\ub2a5\ub825\uacc4\ud68d(RCCP)<\/a><\/strong>\uc740 \ud575\uc2ec \uc790\uc6d0\uc73c\ub85c \uc81c\uc548\ub41c \uae30\uc900\uc0dd\uc0b0\uacc4\ud68d\uc744 \uc218\ud589\ud560 \uc218 \uc788\ub294\uc9c0 \ud655\uc778\ud569\ub2c8\ub2e4.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-scheduling\/\">\uc0c1\uc138 \uc2a4\ucf00\uc904\ub9c1<\/a><\/strong>\uc740 \uc774\ub807\uac8c \uc815\ud574\uc9c4 \uacf5\uc815\uc744 \uc790\uc6d0\uc758 \uac00\uc6a9 \uc2dc\uac04\uc5d0 \ubc30\uc815\ud569\ub2c8\ub2e4.<\/li><\/ul>\n\n\n<p>\uac01 \uc218\uc900\uc758 \uacc4\ud68d\uc740 \uc11c\ub85c \uc601\ud5a5\uc744 \uc90d\ub2c8\ub2e4. \uc624\ub354\ubcc4 \uc791\uc5c5 \uc77c\uc815\uc5d0 \ucd1d\uad04\uc0dd\uc0b0\uacc4\ud68d\uc5d0\uc11c \ud5c8\uc6a9\ud55c \uac83\ubcf4\ub2e4 \ub9ce\uc740 \uc794\uc5c5\uc774 \ubc18\ubcf5\uc801\uc73c\ub85c \ud544\uc694\ud558\ub2e4\uba74, \ud604\uc7a5\uc5d0 \uadf8 \ucc28\uc774\ub97c \uacc4\uc18d \uac10\ub2f9\ud558\ub77c\uace0 \uc694\uad6c\ud558\uae30\ubcf4\ub2e4 \uc0dd\uc0b0 \ubc29\uce68\uc744 \uc7ac\uac80\ud1a0\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\ucd1d\uad04\uc0dd\uc0b0\uacc4\ud68d\uc758 \uc0dd\uc0b0 \ud3c9\uc900\ud654\u00b7\uc218\uc694 \ucd94\uc885\u00b7\ud63c\ud569 \uc804\ub7b5<\/h2>\n\n\n<p>\ud575\uc2ec \ucc28\uc774\ub294 \uc218\uc694\uac00 \ubcc0\ud560 \ub54c \ubb34\uc5c7\uc744 \uc870\uc815\ud558\ub290\ub0d0\uc5d0 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\uc804\ub7b5<\/th><th>\ube44\uad50\uc801 \uc77c\uc815\ud558\uac8c \uc720\uc9c0\ud558\ub294 \ud56d\ubaa9<\/th><th>\uc218\uc694 \ubcc0\ub3d9\uc744 \ud761\uc218\ud558\ub294 \uc218\ub2e8<\/th><th>\uc8fc\uc694 \uc7a5\ub2e8\uc810<\/th><\/tr><\/thead><tbody><tr><td>\uc0dd\uc0b0 \ud3c9\uc900\ud654<\/td><td>\uae30\uac04\ub2f9 \uc0dd\uc0b0\ub7c9<\/td><td>\uc7ac\uace0 \ub610\ub294 \uba85\uc2dc\uc801\uc73c\ub85c \ud5c8\uc6a9\ud55c \uc218\uc8fc\uc794\uace0<\/td><td>\uc6b4\uc601\uc740 \uc548\uc815\ub418\uc9c0\ub9cc \uc7ac\uace0 \ube44\uc6a9\uacfc \uc218\uc694 \uc704\ud5d8 \ubc1c\uc0dd<\/td><\/tr><tr><td>\uc218\uc694 \ucd94\uc885<\/td><td>\uac01 \uae30\uac04\uc758 \uc218\uc694\uc5d0 \uadfc\uc811\ud55c \uc0dd\uc0b0\ub7c9<\/td><td>\uadfc\ubb34\uc2dc\uac04, \uc778\ub825 \ub610\ub294 \uadf8 \ubc16\uc758 \uac00\uc6a9 \uc0dd\uc0b0 \ub2a5\ub825<\/td><td>\uc7ac\uace0\ub294 \uc904\uc9c0\ub9cc \uc0dd\uc0b0 \ub2a5\ub825\uc744 \uc870\uc815\ud558\ub294 \ub370 \ube44\uc6a9\uacfc \uc5b4\ub824\uc6c0 \ubc1c\uc0dd<\/td><\/tr><tr><td>\ud63c\ud569<\/td><td>\uc815\ud574\uc9c4 \uae30\ubcf8 \uc0dd\uc0b0\ub7c9\uc744 \uc720\uc9c0\ud558\uba74\uc11c \ud544\uc694\ud55c \ubc94\uc704\uc5d0\uc11c \uc870\uc815<\/td><td>\uc7ac\uace0\uc640 \uc0dd\uc0b0 \ub2a5\ub825\uc758 \uc720\uc5f0\uc131\uc744 \ud568\uaed8 \ud65c\uc6a9<\/td><td>\uc0c1\ud669\uc5d0 \ub354 \uc798 \ub9de\uac8c \ub300\uc751\ud560 \uc218 \uc788\uc9c0\ub9cc \uc5ec\ub7ec \uc81c\uc57d\uc744 \ud568\uaed8 \uc870\uc728\ud574\uc57c \ud568<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<h3 class=\"wp-block-heading\">\uc0dd\uc0b0 \ud3c9\uc900\ud654 \uc804\ub7b5: \uc218\uc694 \uc9d1\uc911\uae30\uc5d0 \uc55e\uc11c \ubbf8\ub9ac \uc0dd\uc0b0\ud558\uae30<\/h3>\n\n\n<p>\uc0dd\uc0b0 \ud3c9\uc900\ud654 \uc804\ub7b5\uc740 \uc218\uc694\uac00 \ubcc0\ud574\ub3c4 \uae30\uac04\ub2f9 \uc0dd\uc0b0\ub7c9\uc744 \uc77c\uc815\ud558\uac8c \uc720\uc9c0\ud569\ub2c8\ub2e4. \uc218\uc694\uac00 \uc801\uc740 \uae30\uac04\uc5d0\ub294 \uc218\uc694\ub97c \ucd08\uacfc\ud574 \uc0dd\uc0b0\ud55c \ubb3c\ub7c9\uc774 \uc7ac\uace0\ub85c \uc313\uc774\uace0, \uc218\uc694\uac00 \ubab0\ub9ac\ub294 \uae30\uac04\uc5d0\ub294 \uadf8 \uc7ac\uace0\ub85c \ud574\ub2f9 \uae30\uac04\uc758 \uc0dd\uc0b0\ub7c9\uc744 \ubcf4\ucda9\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774 \uc804\ub7b5\uc740 \uc218\uc694\uac00 \uc548\uc815\uc801\uc73c\ub85c \uc608\uce21\ub418\uace0 \ubcf4\uad00 \ube44\uc6a9\uc744 \uac10\ub2f9\ud560 \uc218 \uc788\uc73c\uba70, \uc219\ub828 \uc778\ub825\uc744 \uc720\uc9c0\ud560 \uac00\uce58\uac00 \ud070 \ubc18\ubcf5 \uc0dd\uc0b0 \uc81c\ud488\uc5d0 \uc801\ud569\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uad6c\ub9e4\uc640 \uc0dd\uc0b0 \ubd80\ubb38\uc758 \uc5c5\ubb34\ub7c9\uc744 \ubcf4\ub2e4 \uc77c\uc815\ud558\uac8c \uc720\uc9c0\ud558\uace0, \uc9e7\uc740 \uc131\uc218\uae30\ub97c \uc704\ud574 \uc0dd\uc0b0 \ub2a5\ub825\uc744 \uae09\uaca9\ud788 \ub298\ub824\uc57c \ud560 \ud544\uc694\ub97c \uc904\uc5ec \uc90d\ub2c8\ub2e4.<\/p>\n\n\n<p>\uadf8 \ub300\uc2e0 \ube44\uc6a9\uc744 \uc77c\ucc0d \uc9c0\ucd9c\ud558\uace0 \uc7ac\uace0 \uc704\ud5d8\uc744 \uac10\uc218\ud574\uc57c \ud569\ub2c8\ub2e4. \ud310\ub9e4\ud558\uae30 \uc804\uc5d0 \uc790\uc7ac\uc640 \uc778\uac74\ube44, \ubcf4\uad00 \ube44\uc6a9\uc744 \ud22c\uc785\ud558\uac8c \ub429\ub2c8\ub2e4. \uc218\uc694\uac00 \uc904\uac70\ub098 \uc0ac\uc591\uc774 \ubc14\ub00c\uba74 \uc7ac\uace0\ub97c \ub354 \uc774\uc0c1 \ud65c\uc6a9\ud558\uc9c0 \ubabb\ud560 \uc218\ub3c4 \uc788\uc2b5\ub2c8\ub2e4. \uc27d\uac8c \ubcc0\uc9c8\ub418\ub294 \uc81c\ud488\uc774\ub098 \ub9de\ucda4\ud654 \uc218\uc900\uc774 \ub192\uc740 \uc8fc\ubb38\uc5d0\ub294 \uc774 \ubc29\uc2dd\uc744 \uc801\uc6a9\ud560 \uc5ec\uc9c0\uac00 \ud6e8\uc52c \uc801\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ubbf8\ub9ac \uc0dd\uc0b0\ud560 \uc218 \uc5c6\ub294 \uacbd\uc6b0\uc5d0\ub294 \uc77c\uc815\ud55c \uc0dd\uc0b0\ub7c9\uc744 \uc720\uc9c0\ud558\ub2e4\uac00 \uc218\uc694 \uc9d1\uc911\uae30\uc5d0 \uc218\uc8fc\uc794\uace0\uac00 \uc313\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc774\ub294 \ud5c8\uc6a9 \uac00\ub2a5\ud55c \ub9ac\ub4dc\ud0c0\uc784\uc744 \uc804\uc81c\ub85c \ud55c \uc11c\ube44\uc2a4 \uc218\uc900\uc758 \uacb0\uc815\uc774\uc9c0, \uc544\ubb34 \ub300\uac00 \uc5c6\uc774 \uc7ac\uace0\ub97c \ub300\uccb4\ud558\ub294 \ubc29\ubc95\uc774 \uc544\ub2d9\ub2c8\ub2e4. \ub610\ud55c \uc778\ub825 \uaddc\ubaa8\ub97c \uc77c\uc815\ud558\uac8c \uc720\uc9c0\ud558\ub294 \uac83\uacfc \uae30\uac04\ub2f9 \uc0dd\uc0b0\ub7c9\uc744 \uc77c\uc815\ud558\uac8c \uc720\uc9c0\ud558\ub294 \uac83\uc740 \uad6c\ubd84\ud574\uc57c \ud569\ub2c8\ub2e4. \uc9c1\uc6d0 \uc218\uac00 \uac19\uc544\ub3c4 \uc794\uc5c5\uc2dc\uac04\uc744 \ubc14\uafb8\uba74 \uc0dd\uc0b0\ub7c9\uc774 \ub2ec\ub77c\uc9d1\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uc218\uc694 \ucd94\uc885 \uc804\ub7b5: \uc218\uc694\uc5d0 \ub9de\ucdb0 \uc0dd\uc0b0\ub7c9 \uc870\uc815\ud558\uae30<\/h3>\n\n\n<p>\uc218\uc694 \ucd94\uc885 \uc804\ub7b5\uc740 \uac01 \uae30\uac04\uc758 \uc218\uc694\ub97c \ucda9\uc871\ud558\ub3c4\ub85d \uc0dd\uc0b0\ub7c9\uc744 \ub298\ub9ac\uac70\ub098 \uc904\uc785\ub2c8\ub2e4. \uc794\uc5c5, \uad50\ub300\uc870 \ucd94\uac00, \uc784\uc2dc \uc778\ub825, \uc678\uc8fc \ub4f1\uc73c\ub85c \uc0dd\uc0b0 \ub2a5\ub825\uc744 \uc870\uc815\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ucc44\uc6a9\uacfc \ud574\uace0\ub3c4 \uac00\ub2a5\ud55c \uc218\ub2e8\uc774\uc9c0\ub9cc, \uc218\uc694\ub97c \ub530\ub77c\uac00\ub294 \ubc29\ubc95\uc774 \uadf8\uac83\ubfd0\uc778 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc7a5\uc810\uc740 \uc7ac\uace0 \uc704\ud5d8\uc744 \uc904\uc77c \uc218 \uc788\ub2e4\ub294 \uac83\uc785\ub2c8\ub2e4. \ub098\uc911\uc5d0 \ud314\ub9b4 \uac83\uc774\ub77c\ub294 \uc608\uce21\ub9cc \ubbff\uace0 \ub300\ub7c9\uc73c\ub85c \ubbf8\ub9ac \uc0dd\uc0b0\ud558\ub294 \uc77c\uc744 \ud53c\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc7ac\uace0\ub85c \ubcf4\uad00\ud558\ub294 \uac83\uc774 \uacbd\uc81c\uc801\uc774\uc9c0 \uc54a\uac70\ub098 \uace0\uac1d \uc0ac\uc591\uc744 \ucda9\ubd84\ud788 \uc77c\ucc0d \uc54c \uc218 \uc5c6\ub294 \uc81c\ud488\uc5d0\uc11c \ud2b9\ud788 \uc911\uc694\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc5b4\ub824\uc6b4 \uc810\uc740 \ud544\uc694\ud55c \uc2dc\uc810\uc5d0 \ucd94\uac00 \ubb3c\ub7c9\uc744 \uc0dd\uc0b0\ud558\ub294 \uac83\uc785\ub2c8\ub2e4. \uc219\ub828 \uc791\uc5c5\uc790\ub97c \ucc44\uc6a9\ud558\uac70\ub098 \uad50\uc721\ud558\ub294 \ub370\ub294 \uc218\uac1c\uc6d4\uc774 \uac78\ub9b4 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uad50\ub300\uc870\ub97c \ucd94\uac00\ud558\ub824\uba74 \uc0dd\uc0b0 \ub2a5\ub825 \uacc4\ud68d\uc758 \uc218\uce58\ub9cc \ub192\uc77c \uac83\uc774 \uc544\ub2c8\ub77c \uc778\ub825, \uc124\ube44, \uc790\uc7ac, \uc9c0\uc6d0 \uae30\ub2a5\uc744 \uac16\ucdb0\uc57c \ud569\ub2c8\ub2e4. \uacf5\uae09\uc5c5\uccb4\ub3c4 \uac19\uc740 \uc2dc\uae30\uc5d0 \uacc4\uc808\uc801 \uc218\uc694 \uae09\uc99d\uc744 \uacaa\uc744 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc0dd\uc0b0\uc744 \uc720\uc5f0\ud558\uac8c \uc870\uc815\ud560 \uc218 \uc788\ub294 \uc5ec\ub825\ub3c4 \ud55c\uacc4\uc640 \ub9ac\ub4dc\ud0c0\uc784\uc774 \uc788\ub294 \uc790\uc6d0\uc73c\ub85c \ubcf4\uc544\uc57c \ud569\ub2c8\ub2e4. \uc2e4\uc81c\ub85c \ud655\ubcf4\ud560 \uc218 \uc5c6\ub294 \uc794\uc5c5\uc744 \uc804\uc81c\ub85c \ud55c \uc218\uc694 \ucd94\uc885 \uacc4\ud68d\uc740 \uc7ac\uace0\ub97c \uc904\uc774\ub294 \ud574\ubc95\uc774 \uc544\ub2c8\ub77c \uc218\uc694\ub97c \ucda9\uc871\ud558\uc9c0 \ubabb\ud558\ub294 \uacc4\ud68d\uc785\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\ud63c\ud569 \uc804\ub7b5: \uc7ac\uace0\uc640 \ucd94\uac00 \uc0dd\uc0b0\uc758 \ubd84\ub2f4 \uc815\ud558\uae30<\/h3>\n\n\n<p>\ud63c\ud569 \uc804\ub7b5\uc740 \uc548\uc815\uc801\uc778 \uae30\ubcf8 \uc0dd\uc0b0\ub7c9\uc744 \uc720\uc9c0\ud558\uba74\uc11c \ud544\uc694\ud55c \ubd80\ubd84\uc5d0\uc11c \uc0dd\uc0b0\ub7c9\uc744 \uc870\uc815\ud558\ub294 \ubc29\uc2dd\uc785\ub2c8\ub2e4. \uc218\uc694\uac00 \ubab0\ub9ac\uae30 \uc804\uc5d0 \uc7ac\uace0\ub97c \uc77c\ubd80 \uc313\uc544 \ub450\uace0, \ub098\uba38\uc9c0 \uc218\uc694 \uc99d\uac00\ubd84\uc740 \uc2b9\uc778\ub41c \uc794\uc5c5\uc774\ub098 \uc678\uc8fc\ub85c \ucda9\ub2f9\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc0dd\uc0b0 \ud3c9\uc900\ud654\ub098 \uc218\uc694 \ucd94\uc885 \uc911 \uc5b4\ub290 \ud55c\ucabd\ub9cc\uc73c\ub85c \ub300\uc751\ud558\uae30 \uc5b4\ub824\uc6b8 \ub54c \uc720\uc6a9\ud569\ub2c8\ub2e4. \ubcf4\uad00 \uacf5\uac04\uc774 \uc81c\ud55c\uc801\uc778 \ub370\ub2e4 \uc218\uc694 \uc815\uc810\uc758 \uc804\uccb4 \ubb3c\ub7c9\uc744 \uac10\ub2f9\ud560 \ub9cc\ud07c \uc778\ub825\uc744 \ub298\ub9b4 \uc218\ub3c4 \uc5c6\ub294 \uacbd\uc6b0\uac00 \uc788\uc2b5\ub2c8\ub2e4. \uc774\ub54c\ub294 \uc5bc\ub9c8\ub098 \ub9ce\uc740 \uc7ac\uace0\ub97c \ubcf4\uc720\ud560 \uac00\uce58\uac00 \uc788\ub294\uc9c0, \ucd94\uac00 \uc0dd\uc0b0\uc744 \uc5bc\ub9c8\ub098 \ud655\uc2e4\ud558\uac8c \ud655\ubcf4\ud560 \uc218 \uc788\ub294\uc9c0 \uad6c\uccb4\uc801\uc73c\ub85c \ud310\ub2e8\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud63c\ud569 \uc804\ub7b5\uc774\ub77c\uace0 \ud574\uc11c \ubc18\ub4dc\uc2dc \ube44\uc6a9\uc774 \uac00\uc7a5 \ub0ae\uc740 \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4. \ub2e4\ub978 \uc804\ub7b5\uacfc \ub3d9\uc77c\ud55c \uc218\uc694, \uae30\ub300 \uc11c\ube44\uc2a4 \uc218\uc900, \uae30\ub9d0\uc7ac\uace0 \ubaa9\ud45c\ub97c \uae30\uc900\uc73c\ub85c \uc0c1\ud669\uc5d0 \ub354 \uc801\ud569\ud55c \uc870\ud569\uc744 \ube44\uad50\ud560 \uc218 \uc788\ub2e4\ub294 \uc758\ubbf8\uc785\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\ucd1d\uad04\uc0dd\uc0b0\uacc4\ud68d \uc608\uc2dc: \uc218\uc694 \uc815\uc810\uc758 \ubb3c\ub7c9\uc744 \uc5b4\ub5bb\uac8c \uac10\ub2f9\ud560\uae4c?<\/h2>\n\n\n<p>\ud55c \uc81c\uc870\uc5c5\uccb4\uac00 \ud45c\uc900 \ud558\uc6b0\uc9d5 \uc81c\ud488\uad70\uc758 \uc0dd\uc0b0 \uacc4\ud68d\uc744 \uc138\uc6b4\ub2e4\uace0 \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \uc218\uc694\ub294 <strong>\uae30\uac04 1\uc5d0 800\uac1c, \uae30\uac04 2\uc5d0 1,200\uac1c, \uae30\uac04 3\uc5d0 1,600\uac1c<\/strong>\uc785\ub2c8\ub2e4. \uac01 \uae30\uac04\uc758 \uc791\uc5c5\uc2dc\uac04\uc740 \uac19\uc73c\uba70, \uc815\uaddc \uc0dd\uc0b0 \ub2a5\ub825\uc740 \uae30\uac04\ub2f9 1,200\uac1c\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>\uae30\ucd08\uc7ac\uace0\ub294 \uc5c6\uace0 \ud3d0\uae30 \uc190\uc2e4\uc774\ub098 \uc218\uc8fc\uc794\uace0\ub3c4 \uc5c6\uc73c\uba70, \uae30\uac04 3\uc774 \ub05d\ub0a0 \ub54c \uc7ac\uace0\ub97c \ub0a8\uae30\uc9c0 \uc54a\ub294 \uac83\uc744 \ubaa9\ud45c\ub85c \ud55c\ub2e4\uace0 \uac00\uc815\ud569\ub2c8\ub2e4. \uc81c\ud488\uc740 \ubcf4\uad00\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uac01 \uae30\uac04\uc758 \uc0dd\uc0b0 \ubb3c\ub7c9\uc740 \ud574\ub2f9 \uc218\uc694\ub97c \ucda9\uc871\ud574\uc57c \ud558\ub294 \uc2dc\uc810\uae4c\uc9c0 \uc900\ube44\ub41c\ub2e4\uace0 \uac00\uc815\ud558\uba70, \uc774 \ub2e8\uc21c \ube44\uad50\ub85c \uc77c\ubcc4 \ub0a9\ud488\uc77c\uc744 \ud655\uc815\ud560 \uc218\ub294 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc138 \uac00\uc9c0 \ubc29\uce68 \ubaa8\ub450 \ucd1d\uc0dd\uc0b0\ub7c9\uc740 <strong>3,600\uac1c<\/strong>\ub85c \uac19\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\uc0dd\uc0b0 \ubc29\uce68<\/th><th>\uae30\uac04 1 \/ 2 \/ 3\uc758 \uc0dd\uc0b0\ub7c9<\/th><th>\uae30\uac04 1 \/ 2 \/ 3\uc758 \uae30\ub9d0\uc7ac\uace0<\/th><th>\ud655\ubcf4\ud574\uc57c \ud560 \uc0ac\ud56d<\/th><\/tr><\/thead><tbody><tr><td>\uc0dd\uc0b0 \ud3c9\uc900\ud654<\/td><td>1,200 \/ 1,200 \/ 1,200<\/td><td>400 \/ 400 \/ 0<\/td><td>\uc120\ud589 \uc0dd\uc0b0\ud55c \uc7ac\uace0\ub97c \uc704\ud55c \ubcf4\uad00 \uacf5\uac04\uacfc \uc790\uae08<\/td><\/tr><tr><td>\uc218\uc694 \ucd94\uc885<\/td><td>800 \/ 1,200 \/ 1,600<\/td><td>0 \/ 0 \/ 0<\/td><td>\uae30\uac04 3\uc5d0 \uc815\uaddc \uc0dd\uc0b0\ub7c9\ubcf4\ub2e4 400\uac1c\ub97c \ub354 \uc0dd\uc0b0\ud560 \ub2a5\ub825<\/td><\/tr><tr><td>\ud63c\ud569<\/td><td>1,000 \/ 1,200 \/ 1,400<\/td><td>200 \/ 200 \/ 0<\/td><td>\uc77c\ubd80 \uc7ac\uace0\uc640 \uae30\uac04 3\uc5d0 200\uac1c\ub97c \ucd94\uac00 \uc0dd\uc0b0\ud560 \ub2a5\ub825<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\uc7ac\uace0\ub294 \ub2e4\uc74c\uacfc \uac19\uc774 \uacc4\uc0b0\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>\uae30\ub9d0\uc7ac\uace0 = \uae30\ucd08\uc7ac\uace0 + \uc0dd\uc0b0\ub7c9 \u2212 \uc218\uc694.<\/strong><\/p>\n\n\n<p>\uc0dd\uc0b0 \ud3c9\uc900\ud654 \ubc29\uce68\uc5d0\uc11c \uae30\uac04 1\uc758 \uae30\ub9d0\uc7ac\uace0\ub294 0 + 1,200 \u2212 800 = 400\uac1c\uc785\ub2c8\ub2e4. \uae30\uac04 2\uc5d0\ub3c4 \uc774 \uc7ac\uace0\ub7c9\uc740 \uadf8\ub300\ub85c \uc720\uc9c0\ub429\ub2c8\ub2e4. \uae30\uac04 3\uc5d0\ub294 \ubcf4\uad00 \uc911\uc774\ub358 400\uac1c\uc640 \uc0c8\ub85c \uc0dd\uc0b0\ud55c 1,200\uac1c\ub97c \ud569\uccd0 \uc218\uc694 1,600\uac1c\ub97c \ucda9\uc871\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud63c\ud569 \ubc29\uce68\uc5d0\uc11c\ub294 \uc644\ucda9 \uc7ac\uace0\ub97c 200\uac1c\ub9cc \uc313\uc2b5\ub2c8\ub2e4. \uae30\uac04 3\uc5d0\ub294 \uc774 \uc7ac\uace0\uc640 \uc0dd\uc0b0\ub7c9 1,400\uac1c\ub97c \ud569\uccd0 \ub3d9\uc77c\ud55c \uc218\uc694\ub97c \ucda9\uc871\ud569\ub2c8\ub2e4. \uc0dd\uc0b0 \ud3c9\uc900\ud654\ub9cc \uc801\uc6a9\ud588\uc744 \ub54c\uc640 \ube44\uad50\ud558\uba74 \ucd5c\ub300 \uae30\ub9d0\uc7ac\uace0\uac00 \uc808\ubc18\uc73c\ub85c, \uc218\uc694 \ucd94\uc885\ub9cc \uc801\uc6a9\ud588\uc744 \ub54c\uc640 \ube44\uad50\ud558\uba74 \uc218\uc694 \uc815\uc810\uc5d0 \ud544\uc694\ud55c \ucd94\uac00 \uc0dd\uc0b0\ub7c9\uc774 \uc808\ubc18\uc73c\ub85c \uc904\uc5b4\ub4ed\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774\uc81c \uacbd\uc601\uc9c4\uc774 \ud5c8\uc6a9\ud558\ub294 \uae30\ub9d0 \uc7ac\uace0\uac00 \ucd5c\ub300 200\uac1c\uc774\uace0, 3\uae30\uc5d0\ub294 \ucd94\uac00\ub85c \uc0dd\uc0b0\ud560 \uc218 \uc788\ub294 \ubb3c\ub7c9\ub3c4 200\uac1c\ubfd0\uc774\ub77c\uace0 \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \uc0dd\uc0b0\ub7c9\uc744 \uc77c\uc815\ud558\uac8c \uc720\uc9c0\ud558\ub294 \uc804\ub7b5\uc740 \uc7ac\uace0 \ud55c\ub3c4\ub97c \ucd08\uacfc\ud558\uace0, \uc218\uc694\uc5d0 \ub9de\ucdb0 \uc0dd\uc0b0\ub7c9\uc744 \uc870\uc815\ud558\ub294 \uc804\ub7b5\uc740 \ucd94\uac00 \uc0dd\uc0b0 \ub2a5\ub825\uc758 \ud55c\ub3c4\ub97c \ucd08\uacfc\ud569\ub2c8\ub2e4. \uc774 \ubaa8\ud615\uc5d0\uc11c \ud63c\ud569 \uc804\ub7b5\uc740 \ub450 \ud55c\ub3c4\ub97c \ubaa8\ub450 \ucda9\uc871\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\ub530\ub77c\uc11c \ud63c\ud569 \uc804\ub7b5\uc740 \uc2e4\ud589 \uac00\ub2a5\ud55c \ud6c4\ubcf4\uc77c \ubfd0, \ube44\uc6a9\uc774 \uac00\uc7a5 \ub0ae\uc740 \ub300\uc548\uc73c\ub85c \uc785\uc99d\ub41c \uac83\uc740 \uc544\ub2d9\ub2c8\ub2e4. \uc5ec\uc804\ud788 \ub300\uc548\ubcc4 \ube44\uc6a9\uc744 \uc0b0\uc815\ud558\uace0 \uc2e4\uc81c \uc81c\ud488 \uad6c\uc131\uacfc \uc2dc\uc810\uc744 \ud655\uc778\ud574\uc57c \ud569\ub2c8\ub2e4. \uc218\uc694 \uc815\uc810\uc774 \uc0ac\ub77c\uc9c0\uba74 \ud63c\ud569 \uc804\ub7b5\uc5d0\uc11c\ub3c4 \uc7ac\uace0 \ubd80\ub2f4\uc774 \ub0a8\uc2b5\ub2c8\ub2e4. \uc218\uc694\uac00 3\uae30 \ucd08\ubc18\uc5d0 \ubc1c\uc0dd\ud55c\ub2e4\uba74 \ucd94\uac00 \uc0dd\uc0b0\ubd84\ub3c4 \uadf8\uc5d0 \ub9de\ucdb0 \uc77c\ucc0d \uc900\ube44\ub418\uc5b4\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc2e4\ud589 \uac00\ub2a5\ud55c \uc804\ub7b5\uc744 \uc120\ud0dd\ud558\ub294 \ubc29\ubc95<\/h2>\n\n\n<p>\uba3c\uc800 \uc218\uc694\uc640 \uc7ac\uace0\uc758 \uae30\uc900\uc744 \uc77c\uad00\ub418\uac8c \uc815\ub9bd\ud558\uc138\uc694. \uac19\uc740 \uc18c\uc694\ub7c9\uc774 \ub450 \ubc88 \uc9d1\uacc4\ub418\uc9c0 \uc54a\ub3c4\ub85d \ud655\uc815 \uc8fc\ubb38\uacfc \ub098\uba38\uc9c0 \uc218\uc694 \uc608\uce21\uce58\ub97c \ub300\uc870\ud574 \uc870\uc815\ud574\uc57c \ud569\ub2c8\ub2e4. \uc0ac\uc6a9 \uac00\ub2a5\ud55c \uae30\ucd08 \uc7ac\uace0, \uc774\ubbf8 \ud655\uc815\ub41c \uc0dd\uc0b0 \ubb3c\ub7c9, \uadf8\ub9ac\uace0 \ud5c8\uc6a9\ud560 \uae30\ub9d0 \uc7ac\uace0 \ub610\ub294 \uc218\uc8fc\uc794\uace0\ub97c \uae30\ub85d\ud558\uc138\uc694.<\/p>\n\n\n<p>\uadf8\ub2e4\uc74c\uc5d0\ub294 \uc138 \uc804\ub7b5\uc758 \ud569\uacc4 \uc218\uce58\uac00 \uc5bc\ub9c8\ub098 \uc88b\uc544 \ubcf4\uc774\ub294\uc9c0\uac00 \uc544\ub2c8\ub77c, \uc2e4\uc81c\ub85c \uc2e4\ud589\ud560 \uc218 \uc788\ub294 \ub300\uc548\uc744 \ube44\uad50\ud558\uc138\uc694.<\/p>\n\n\n<p>1. <strong>\uc81c\uc57d \uc870\uac74\ubd80\ud130 \ud655\uc778\ud558\uc138\uc694.<\/strong> \ubcf4\uad00 \uac00\ub2a5 \uae30\uac04, \ubcf4\uad00 \uacf5\uac04, \uc6b4\uc804\uc790\ubcf8, \uc2b9\uc778\ub41c \ucd08\uacfc\uadfc\ubb34, \ud655\ubcf4 \uac00\ub2a5\ud55c \uc791\uc5c5 \uc219\ub828\ub3c4, \uacf5\uae09\uc5c5\uccb4 \ub9ac\ub4dc\ud0c0\uc784, \uace0\uac1d\uc774 \ud5c8\uc6a9\ud560 \uc218 \uc788\ub294 \ub300\uae30 \uc2dc\uac04\uc744 \uc810\uac80\ud558\uc138\uc694. \ud655\ubcf4\ud560 \uc218 \uc5c6\ub294 \uc790\uc6d0\uc5d0 \uc758\uc874\ud558\ub294 \ub300\uc548\uc740 \uc81c\uc678\ud574\uc57c \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>2. <strong>\uad00\ub828 \ube44\uc6a9\uc744 \ube60\uc9d0\uc5c6\uc774 \ube44\uad50\ud558\uc138\uc694.<\/strong> \uc815\uaddc \uc0dd\uc0b0, \uc720\uae09 \uc720\ud734\uc2dc\uac04, \ucd08\uacfc\uadfc\ubb34, \uc7ac\uace0 \uc720\uc9c0, \ucc44\uc6a9\u00b7\uad50\uc721, \uc678\uc8fc \ube44\uc6a9\uacfc \uac10\uc218\ud558\uae30\ub85c \ud55c \ub0a9\uae30 \uc9c0\uc5f0\uc758 \uc601\ud5a5\uae4c\uc9c0 \ud3ec\ud568\ud558\uc138\uc694. \ubaa8\ub4e0 \ub300\uc548\uc5d0 \uac19\uc740 \ube44\uc6a9 \uc0b0\uc815 \uae30\uc900\uc744 \uc801\uc6a9\ud574\uc57c \ud569\ub2c8\ub2e4. \ucd08\uacfc\uadfc\ubb34 \ub2e8\uac00\uc5d0 \uae30\ubcf8\uae09\uc774 \uc774\ubbf8 \ud3ec\ud568\ub418\uc5b4 \uc788\ub2e4\uba74 \uae30\ubcf8\uae09\uc744 \uc911\ubcf5 \uacc4\uc0b0\ud558\uc9c0 \ub9c8\uc138\uc694.<\/p>\n\n\n<p>3. <strong>\uc218\uc694\uac00 \ub2e4\ub974\uac8c \ub098\ud0c0\ub098\ub294 \uacbd\uc6b0\ub3c4 \uac80\ud1a0\ud558\uc138\uc694.<\/strong> \uc218\uc694 \uc815\uc810\uc774 \uc608\uc0c1\ubcf4\ub2e4 \ub0ae\uac70\ub098 \ub192\uc744 \ub54c, \ub610\ub294 \uc77c\ucc0d \ucc3e\uc544\uc62c \ub54c \uc5b4\ub5a4 \uc77c\uc774 \uc0dd\uae38\uc9c0 \ud655\uc778\ud558\uc138\uc694. \ud2b9\uc815 \uc608\uce21\uc5d0\uc11c\ub294 \ube44\uc6a9\uc774 \uc870\uae08 \ub0ae\uc740 \uacc4\ud68d\uc774\ub77c\ub3c4 \uc218\uc694\uac00 \ub2ec\ub77c\uc9c0\uba74 \ubbf8\ud310\ub9e4 \uc7ac\uace0\uac00 \ud6e8\uc52c \ub9ce\uc774 \ub0a8\uac70\ub098 \uac10\ub2f9\ud560 \uc218 \uc5c6\uc744 \ub9cc\ud07c \uc0dd\uc0b0 \ub2a5\ub825\uc774 \ubd80\uc871\ud574\uc9c8 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>4. <strong>\uc218\ub7c9\ubfd0 \uc544\ub2c8\ub77c \uc2e4\ud589 \uc870\uce58\uae4c\uc9c0 \uc2b9\uc778\ud558\uc138\uc694.<\/strong> \ucd94\uac00 \uad50\ub300\uc870 \ud655\ubcf4, \uc790\uc7ac \uad6c\ub9e4, \uacf5\uae09\uc5c5\uccb4 \uc0dd\uc0b0 \ub2a5\ub825 \uc608\uc57d\uc744 \ub204\uac00 \uc5b8\uc81c\uae4c\uc9c0 \ub9e1\uc744\uc9c0 \uba85\uc2dc\ud558\uc138\uc694. \uc2e4\uc81c \uc218\uc694\uc640 \uc0dd\uc0b0\ub7c9\uc744 \uae30\uc900\uc73c\ub85c \uacc4\ud68d\uc744 \uac80\ud1a0\ud558\uace0, \uc5b4\ub5a4 \uacbd\uc6b0\uc5d0 \uacc4\ud68d\uc744 \ubcc0\uacbd\ud560\uc9c0\ub3c4 \uba85\ud655\ud788 \uc815\ud574 \ub450\uc138\uc694.<\/p>\n\n\n<p>\uc218\uc8fc\uc0dd\uc0b0\uc5d0\uc11c\ub294 \uc644\uc81c\ud488 \uc7ac\uace0\ubcf4\ub2e4 \uc791\uc5c5 \ubd80\ud558\uc640 \uc218\uc8fc\uc794\uace0\uac00 \ucd1d\uad04\uc0dd\uc0b0\uacc4\ud68d\uc5d0 \ub354 \uc720\uc6a9\ud55c \uc9c0\ud45c\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ucd5c\uc885 \ud488\ubaa9\uc774 \ubaa8\ub450 \uc815\ud574\uc9c0\uae30 \uc804\uc5d0\ub3c4 \uc0dd\uc0b0 \ub2a5\ub825\uc744 \uacc4\ud68d\ud560 \uc218\ub294 \uc788\uc9c0\ub9cc, \uc694\uad6c\uc0ac\ud56d\uc774 \uc544\uc9c1 \uc815\ud574\uc9c0\uc9c0 \uc54a\uc740 \uace0\uac1d \ub9de\ucda4\ud615 \uc81c\ud488\uc744 \ubbf8\ub9ac \uc0dd\uc0b0\ud560 \uc218\ub294 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uace0\uac1d\uc5d0\uac8c \uc57d\uc18d\ud55c \uc11c\ube44\uc2a4 \uc218\uc900\uacfc \ud5c8\uc6a9 \uac00\ub2a5\ud55c \uc704\ud5d8 \ubc94\uc704\ub97c \uc9c0\ud0a4\uba74\uc11c \uc2e4\ud589\ud560 \uc218 \uc788\ub294 \ub300\uc548 \uc911 \ube44\uc6a9\uc774 \uac00\uc7a5 \ub0ae\uc740 \uac83\uc744 \uc120\ud0dd\ud558\uc138\uc694. \uadf8\ub7f0 \ub2e4\uc74c \uadf8 \uc57d\uc18d\uc744 \uc9c0\ud0a4\ub294 \ub370 \ud544\uc694\ud55c \uc21c\uc11c\ub300\ub85c \uc791\uc5c5\uc744 \uc218\ud589\ud560 \uc218 \uc788\ub294\uc9c0 \ud655\uc778\ud558\uc138\uc694.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc120\ud0dd\ud55c \uc804\ub7b5\uc744 SkyPlanner\ub85c \uc791\uc5c5 \uc77c\uc815\uc5d0 \ubc18\uc601\ud558\uc138\uc694<\/h2>\n\n\n<p>\ud63c\ud569 \uc804\ub7b5 \uc608\uc2dc\uc5d0\uc11c\ub294 3\uae30\uc5d0 200\uac1c\ub97c \ucd94\uac00\ub85c \uc0dd\uc0b0\ud574\uc57c \ud569\ub2c8\ub2e4. \uc774 \uc218\uce58\ub294 \ucd94\uac00 \ubb3c\ub7c9\uc744 \uacf5\uc7a5 \ub0b4\uc5d0\uc11c \uc2e4\uc81c\ub85c \uc0dd\uc0b0\ud560 \uacbd\ub85c\uac00 \uc788\uc5b4\uc57c \uc758\ubbf8\uac00 \uc788\uc2b5\ub2c8\ub2e4. \ub9c8\ubb34\ub9ac \uacf5\uc815\uc774 \uc774\ubbf8 \uac00\ub4dd \ucc28 \uc788\uac70\ub098 \ud544\uc694\ud55c \uc0dd\uc0b0 \uc2dc\uc810\uc774 \uc9c0\ub09c \ub4a4\uc5d0 \uc790\uc7ac\uac00 \ub3c4\ucc29\ud55c\ub2e4\uba74, \uae30\uacc4\uac00\uacf5 \uc2dc\uac04\uc744 \ub298\ub824\ub3c4 \ub3c4\uc6c0\uc774 \ub418\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>SkyPlanner APS\ub97c \ud65c\uc6a9\ud574 \uc2b9\uc778\ub41c \uc0dd\uc0b0 \uc804\ub7b5\uc744 \uc2e4\uc81c \uc791\uc5c5\uc73c\ub85c \uc5f0\uacb0\ud558\uc138\uc694. \uc218\uc694 \uc608\uce21\uacfc \uc81c\ud488\uad70\ubcc4 \uc7ac\uace0\u00b7\uc0dd\uc0b0 \ub2a5\ub825 \uacb0\uc815\uc740 \uae30\uc874 \uacc4\ud68d \uc218\ub9bd \uacfc\uc815\uc5d0\uc11c \uc218\ud589\ud558\uace0, \uc774\ub97c \uc2e4\ud589\ud560 \uc0dd\uc0b0 \uc624\ub354\ub97c SkyPlanner\uc5d0 \uc81c\uacf5\ud558\uba74 \ub429\ub2c8\ub2e4. \uc774\ub294 \uc2a4\ucf00\uc904\ub9c1 \ub2e8\uacc4\ub85c \uc5c5\ubb34\ub97c \ub118\uae30\ub294 \uac83\uc774\uc9c0, \uc81c\ud488\uad70 \uc218\uc694 \uc608\uce21\uc744 \uc790\ub3d9\uc73c\ub85c \uc624\ub354\ub85c \ubcc0\ud658\ud558\ub294 \uac83\uc774 \uc544\ub2d9\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc81c\ud488\ubcc4 \uacf5\uc815 \ub2e8\uacc4, \uc18c\uc694 \uc2dc\uac04, \uc791\uc5c5 \uac00\ub2a5\ud55c \uc124\ube44\u00b7\uc791\uc5c5\uc7a5, \uc790\uc7ac\uc640 \uc790\uc7ac\uba85\uc138\uc11c\ub294 \ud55c \ubc88 \uc124\uc815\ud574 \ub461\ub2c8\ub2e4. \uac01 \uc624\ub354 \ud488\ubaa9\uc5d0\ub294 \ud574\ub2f9 \uc81c\ud488\uc758 \uc0dd\uc0b0 \uacbd\ub85c\uac00 \uadf8\ub300\ub85c \uc801\uc6a9\ub418\uba70, \uc218\ub7c9\uacfc \ub0a9\uae30\uc77c\uc5d0 \ub530\ub77c \uc0c8\ub85c\uc6b4 \uc0dd\uc0b0 \uc694\uad6c\uc0ac\ud56d\uc774 \uc815\ud574\uc9d1\ub2c8\ub2e4. Arcturus\ub294 \uc624\ub354\ub97c \ud568\uaed8 \uc2a4\ucf00\uc904\ub9c1\ud558\ubbc0\ub85c \ud2b9\uc815 \uc81c\ud488\uad70\uc758 \uc218\uc694 \uc815\uc810\ub3c4 \uac19\uc740 \uc790\uc6d0\uc744 \uc0ac\uc6a9\ud558\ub294 \ub2e4\ub978 \uc791\uc5c5\uacfc \ubd84\ub9ac\ud574\uc11c \ub2e4\ub8e8\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud63c\ud569 \uc804\ub7b5\uc744 \uc801\uc6a9\ud560 \ub54c\ub294 \uae30\uc874 \uc624\ub354\uc640 \ud568\uaed8 \uc2b9\uc778\ub41c \ucd94\uac00 \uc791\uc5c5 \uc2dc\uac04\uc744 \ud574\ub2f9 \uad50\ub300\uc870\uc640 \uc791\uc5c5\uc790 \uac00\uc6a9 \uc2dc\uac04\uc5d0 \ubc18\uc601\ud558\uc138\uc694. \uc790\uc7ac \uac00\uc6a9\uc131\uc744 \uace0\ub824\ud558\ub294 \uc2a4\ucf00\uc904\ub9c1 \uae30\ub2a5\uc744 \ud65c\uc131\ud654\ud558\uba74, \uc2dc\uc2a4\ud15c\uc5d0 \uae30\ub85d\ub41c \uc790\uc7ac \uac00\uc6a9 \uc2dc\uc810\ub3c4 \uc791\uc5c5 \uc2dc\uc791 \uc2dc\uc810\uc5d0 \uc601\ud5a5\uc744 \uc90d\ub2c8\ub2e4. \uc77c\uc815\uc744 \ub2e4\uc2dc \uacc4\uc0b0\ud55c \ub4a4 Gantt \ud0c0\uc784\ub77c\uc778\uc5d0\uc11c \uacf5\uc815\ubcc4 \uc77c\uc815\uc744 \ud655\uc778\ud558\uc138\uc694.<\/p>\n\n\n<p>\uadf8\ub7ec\uba74 \ucd1d\uad04\uc0dd\uc0b0\uacc4\ud68d \ud45c\ub9cc\uc73c\ub85c\ub294 \ub2f5\ud560 \uc218 \uc5c6\uc5c8\ub358 \uc9c8\ubb38\uc744 \uac80\ud1a0\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ud558\uc6b0\uc9d5\uc774 \ud544\uc694\ud55c \uc2dc\uc810\uc5d0 \uc644\uc131\ub418\ub294\uc9c0, \ub2e4\ub978 \uc624\ub354\uc5d0\ub294 \uc5b4\ub5a4 \uc601\ud5a5\uc774 \uc0dd\uae30\ub294\uc9c0 \ud655\uc778\ud558\ub294 \uac83\uc785\ub2c8\ub2e4. \uc81c\uc57d \ub54c\ubb38\uc5d0 \ubaa9\ud45c\ub97c \ub2ec\uc131\ud560 \uc218 \uc5c6\ub2e4\uba74 \uc6b0\uc120\uc21c\uc704\ub97c \ubc14\uafc0\uc9c0, \ub2e4\ub978 \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ud655\ubcf4\ud560\uc9c0, \ud655\uc815\ud55c \uc0dd\uc0b0 \ubb3c\ub7c9\uc744 \uc870\uc815\ud560\uc9c0 \uacb0\uc815\ud558\uc138\uc694. \uc2a4\ucf00\uc904\ub9c1 \uacc4\uc0b0\uc740 Arcturus\uac00 \ucc98\ub9ac\ud558\uace0, \uc774\ub7ec\ud55c \uacb0\uc815\uc758 \ud1b5\uc81c\uad8c\uc740 \ub2f4\ub2f9\uc790\uac00 \uac16\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>SkyPlanner\ub294 \uac1c\ubc29\ud615 REST API\ub97c \ud1b5\ud574 \ubaa8\ub4e0 ERP \ub610\ub294 MES\uc640 \uc5f0\ub3d9\ub429\ub2c8\ub2e4. \uae30\uc874 \uc5c5\ubb34 \uc2dc\uc2a4\ud15c\uc744 \uadf8\ub300\ub85c \uc720\uc9c0\ud558\uba74\uc11c, \uc2b9\uc778\ub41c \ubb3c\ub7c9\uc744 \uc0dd\uc0b0 \uc77c\uc815\uc5d0 \ubc30\uce58\ud558\uace0 \uc0c1\ud669 \ubcc0\ud654\uc5d0 \ub9de\ucdb0 \uc77c\uc815\uc744 \uc870\uc815\ud558\ub294 \uc218\uc791\uc5c5\uc744 SkyPlanner\ub85c \uc904\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uad50\ub300\uc870\ubcc4 \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ud30c\uc545\ud55c \ub4a4 Fredman Operations\uc5d0\uc11c \ub2ec\ub77c\uc9c4 \uc810<\/h3>\n\n\n<p>\uc8fc\ubc29\uc6a9\ud488\uacfc \ud3ec\uc7a5 \uc81c\ud488\uc744 \uc81c\uc870\ud558\ub294 <a href=\"\/ko\/%ea%b3%a0%ea%b0%9d-%ec%82%ac%eb%a1%80\/fredman-operations\/\">\ud540\ub780\ub4dc \uc81c\uc870\uc5c5\uccb4 Fredman Operations<\/a>\ub294 \uc8fc\ubb38\ub7c9\uc774 \ub298\uc5b4\ub098\uba74\uc11c \uad50\ub300\uc870\ubcc4 \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ub354 \uba85\ud655\ud788 \ud30c\uc545\ud574\uc57c \ud588\uc2b5\ub2c8\ub2e4. \uc774\uc804\uc5d0\ub294 \uc791\uc5c5 \uce74\ub4dc\ub97c \uc2dc\uc2a4\ud15c \uac04\uc5d0 \uc218\uc791\uc5c5\uc73c\ub85c \uc62e\uacbc\uace0, \uc0dd\uc0b0\uacc4\ud68d \ub2f4\ub2f9\uc790\ub294 \uc124\ube44 \uac00\uc6a9\uc131\uc744 \uc815\ud655\ud788 \ud30c\uc545\ud558\uc9c0 \ubabb\ud55c \uc0c1\ud0dc\uc5d0\uc11c \uc791\uc5c5 \uc6b0\uc120\uc21c\uc704\ub97c \uc815\ud588\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>SkyPlanner\ub97c \ub3c4\uc785\ud558\uba74\uc11c L7\uacfc LTR\uc744 \uc5f0\uacb0\ud558\uace0, \uc124\ube44, \uc5ec\uc720 \uc0dd\uc0b0 \ub2a5\ub825\uacfc \uc774\ubbf8 \ubc30\uc815\ub41c \uc0dd\uc0b0 \ub2a5\ub825, \uc791\uc5c5 \uc9c4\ud589 \uc0c1\ud669\uc744 \ud558\ub098\uc758 \uacf5\uc6a9 Gantt \ud654\uba74\uc5d0\uc11c \ud655\uc778\ud560 \uc218 \uc788\uac8c \ub418\uc5c8\uc2b5\ub2c8\ub2e4. Fredman\uc740 \ucd08\uacfc\uadfc\ubb34\uc758 \ud544\uc694\uc131\uc774 \uc904\uace0 \uc77c\uc815 \ubcc0\uacbd\uc5d0 \ub354 \ube60\ub974\uac8c \ub300\uc751\ud560 \uc218 \uc788\uac8c \ub418\uc5c8\ub2e4\uace0 \uc804\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774\ub807\uac8c \uc791\uc5c5\uacfc \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ud30c\uc545\ud560 \uc218 \uc788\uc73c\uba74 \uc218\uc694 \uc815\uc810\uc5d0 \ub300\uc751\ud560 \uadfc\uac70\uac00 \ub354 \ud0c4\ud0c4\ud574\uc9d1\ub2c8\ub2e4. \ucd08\uacfc\uadfc\ubb34 \ud655\ub300\ub97c \uc720\uc77c\ud55c \ud574\ubc95\uc73c\ub85c \ubcf4\uae30 \uc804\uc5d0 \uc791\uc5c5\uacfc \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ud568\uaed8 \uac80\ud1a0\ud560 \uc218 \uc788\uae30 \ub54c\ubb38\uc785\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\ub2e4\uac00\uc62c \uc218\uc694 \uc815\uc810\uc744 \uacc4\ud68d\uc5d0 \ubc18\uc601\ud558\uc138\uc694<\/h2>\n\n\n<p>\ub2e4\uc74c \uc131\uc218\uae30\uc758 \ubaa9\ud45c\ub97c \uc2b9\uc778\ud558\uae30 \uc804\uc5d0 \uc218\uc694 \ubcc0\ub3d9\uc744 \uc5b4\ub514\uc11c \ud761\uc218\ud560\uc9c0 \ud655\uc778\ud558\uc138\uc694. \uc7ac\uace0\ub85c \ub300\uc751\ud55c\ub2e4\uba74 \ud574\ub2f9 \uc81c\ud488\uc744 \ubbf8\ub9ac \uc0dd\uc0b0\ud560 \uac00\uce58\uac00 \uc788\ub294\uc9c0 \uc810\uac80\ud558\uc138\uc694. \ucd94\uac00 \uc0dd\uc0b0 \ub2a5\ub825\uc73c\ub85c \ub300\uc751\ud55c\ub2e4\uba74 \uc778\ub825\uacfc \uc790\uc6d0\uc744 \ud655\ubcf4\ud558\uc138\uc694. \ub458 \ub2e4 \ud65c\uc6a9\ud55c\ub2e4\uba74 \uac01\uac01\uc758 \ud55c\ub3c4\ub97c \uba85\ud655\ud788 \uc815\ud558\uc138\uc694.<\/p>\n\n\n<p>\uadf8\ub7f0 \ub2e4\uc74c SkyPlanner\ub85c \uc774\ub7ec\ud55c \uacb0\uc815\uc744 \ud604\uc7a5\uc5d0\uc11c \uc644\ub8cc\ud574\uc57c \ud560 \uc624\ub354\uc640 \uc5f0\uacb0\ud558\uc138\uc694. \uc81c\ud488\uad70 \ud558\ub098\uc758 \uc218\uc694 \ud328\ud134, \uc2b9\uc778\ub41c \uc0dd\uc0b0 \uc218\ub7c9, \uc774\ub97c \uc0dd\uc0b0\ud560 \uad50\ub300\uc870 \uacc4\ud68d\uc744 \uc900\ube44\ud574 <a href=\"https:\/\/skyplanner.ai\/ko\/%ec%98%81%ec%97%85%ed%8c%80%ec%97%90-%eb%ac%b8%ec%9d%98\/\">\ub370\ubaa8\ub97c \uc608\uc57d\ud558\uc138\uc694<\/a>. \uc774 \uc790\ub8cc\ub97c \ubc14\ud0d5\uc73c\ub85c Arcturus\uc640 Gantt \uc77c\uc815\uc774 \uc6d4\uac04 \uacc4\ud68d\uc744 \uc0dd\uc0b0 \ud604\uc7a5\uc5d0 \uc801\uc6a9\ud558\ub294 \ub370 \ub4dc\ub294 \uc791\uc5c5\uc744 \uc5b4\ub5bb\uac8c \uc904\uc77c \uc218 \uc788\ub294\uc9c0 \uad6c\uccb4\uc801\uc73c\ub85c \uc0b4\ud3b4\ubcfc \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc2a4\ucf00\uc904\ub9c1 \uc5c5\ubb34 \ud750\ub984\uc744 \uba3c\uc800 \uc0b4\ud3b4\ubcf4\uace0 \uc2f6\ub2e4\uba74 <a href=\"https:\/\/skyplanner.ai\/ko\/%ed%8f%89%ea%b0%80%ed%8c%90\/\">\ub370\ubaa8 \ub370\uc774\ud130\ub85c \uccb4\ud5d8\uc744 \uc2dc\uc791\ud558\uc138\uc694<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\ucd1d\uad04\uc0dd\uc0b0\uacc4\ud68d: \uc0dd\uc0b0 \ud3c9\uc900\ud654, \uc218\uc694 \ucd94\uc885, \ud63c\ud569 \uc804\ub7b5 \uc911 \ubb34\uc5c7\uc744 \uc120\ud0dd\ud560\uae4c? \ud648 &raquo; \ub9ac\uc18c\uc2a4 &raquo; \ucd1d\uad04\uc0dd\uc0b0\uacc4\ud68d: \uc0dd\uc0b0 \ud3c9\uc900\ud654, \uc218\uc694 \ucd94\uc885, \ud63c\ud569 \uc804\ub7b5 \uc911 \ubb34\uc5c7\uc744 \uc120\ud0dd\ud560\uae4c? \ucd1d\uad04\uc0dd\uc0b0\uacc4\ud68d\uc740 \uc77c\ubc18\uc801\uc73c\ub85c \uc57d 3\u201318\uac1c\uc6d4\uc758 \uc911\uae30 \uae30\uac04\uc744 \ub300\uc0c1\uc73c\ub85c \uc81c\ud488\uad70\ubcc4 \uc0dd\uc0b0\ub7c9, \ud655\ubcf4\ud560 \uc0dd\uc0b0 \ub2a5\ub825, \uc608\uc0c1 \uc7ac\uace0 \ub610\ub294 \uc218\uc8fc\uc794\uace0\ub97c \uc815\ud569\ub2c8\ub2e4. \uc218\uc694\uac00 \ub298\uace0 \uc904 \ub54c \uc0dd\uc0b0\ub7c9\uc744 \uc77c\uc815\ud558\uac8c \uc720\uc9c0\ud560\uc9c0, \uc218\uc694\uc5d0 \ub9de\ucdb0 \uc0dd\uc0b0\ub7c9\uc744 \ubc14\uafc0\uc9c0, \ub450 \ubc29\uc2dd\uc744 \ud568\uaed8 &#8230; <a title=\"\ucd1d\uad04\uc0dd\uc0b0\uacc4\ud68d: \uc0dd\uc0b0 \ud3c9\uc900\ud654, \uc218\uc694 \ucd94\uc885, \ud63c\ud569 \uc804\ub7b5 \uc911 \ubb34\uc5c7\uc744 \uc120\ud0dd\ud560\uae4c?\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/aggregate-planning\/\" aria-label=\"Read more about \ucd1d\uad04\uc0dd\uc0b0\uacc4\ud68d: \uc0dd\uc0b0 \ud3c9\uc900\ud654, \uc218\uc694 \ucd94\uc885, \ud63c\ud569 \uc804\ub7b5 \uc911 \ubb34\uc5c7\uc744 \uc120\ud0dd\ud560\uae4c?\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":104680,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2530,496],"tags":[],"class_list":["post-104676","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps--","category-496","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\ucd1d\uad04\uc0dd\uc0b0\uacc4\ud68d: \uc0dd\uc0b0 \ud3c9\uc900\ud654, \uc218\uc694 \ucd94\uc885, \ud63c\ud569 \uc804\ub7b5 \uc911 \ubb34\uc5c7\uc744 \uc120\ud0dd\ud560\uae4c?<\/title>\n<meta name=\"description\" content=\"\uc218\uc694 \uae09\uc99d\uc5d0 \uc7ac\uace0\ub85c \ub300\ube44\ud560\uae4c\uc694, \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ub298\ub9b4\uae4c\uc694? \ud558\ub098\uc758 \uc0ac\ub840\ub85c \ucd1d\uad04\uc0dd\uc0b0\uacc4\ud68d \uc804\ub7b5\uc744 \ube44\uad50\ud558\uace0 \uacc4\ud68d\uc744 \uc791\uc5c5 \uc77c\uc815\uc73c\ub85c \uad6c\uccb4\ud654\ud558\uc138\uc694.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/aggregate-planning\/\" \/>\n<meta property=\"og:locale\" content=\"ko_KR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\ucd1d\uad04\uc0dd\uc0b0\uacc4\ud68d: \uc0dd\uc0b0 \ud3c9\uc900\ud654, \uc218\uc694 \ucd94\uc885, \ud63c\ud569 \uc804\ub7b5 \uc911 \ubb34\uc5c7\uc744 \uc120\ud0dd\ud560\uae4c?\" \/>\n<meta property=\"og:description\" content=\"\uc218\uc694 \uae09\uc99d\uc5d0 \uc7ac\uace0\ub85c \ub300\ube44\ud560\uae4c\uc694, \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ub298\ub9b4\uae4c\uc694? \ud558\ub098\uc758 \uc0ac\ub840\ub85c \ucd1d\uad04\uc0dd\uc0b0\uacc4\ud68d \uc804\ub7b5\uc744 \ube44\uad50\ud558\uace0 \uacc4\ud68d\uc744 \uc791\uc5c5 \uc77c\uc815\uc73c\ub85c \uad6c\uccb4\ud654\ud558\uc138\uc694.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/aggregate-planning\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-20T21:23:51+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-20T21:26:11+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/aggregate-planning-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\uae00\uc4f4\uc774\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/aggregate-planning\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/aggregate-planning\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"\ucd1d\uad04\uc0dd\uc0b0\uacc4\ud68d: \uc0dd\uc0b0 \ud3c9\uc900\ud654, \uc218\uc694 \ucd94\uc885, \ud63c\ud569 \uc804\ub7b5 \uc911 \ubb34\uc5c7\uc744 \uc120\ud0dd\ud560\uae4c?\",\"datePublished\":\"2026-10-20T21:23:51+00:00\",\"dateModified\":\"2026-10-20T21:26:11+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/aggregate-planning\\\/\"},\"wordCount\":33,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/aggregate-planning\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/aggregate-planning-hero.png\",\"articleSection\":[\"APS \ubc0f \uc2a4\ucf00\uc904\ub9c1\",\"\ub9ac\uc18c\uc2a4\"],\"inLanguage\":\"ko-KR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/aggregate-planning\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/aggregate-planning\\\/\",\"name\":\"\ucd1d\uad04\uc0dd\uc0b0\uacc4\ud68d: \uc0dd\uc0b0 \ud3c9\uc900\ud654, \uc218\uc694 \ucd94\uc885, \ud63c\ud569 \uc804\ub7b5 \uc911 \ubb34\uc5c7\uc744 \uc120\ud0dd\ud560\uae4c?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/aggregate-planning\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/aggregate-planning\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/aggregate-planning-hero.png\",\"datePublished\":\"2026-10-20T21:23:51+00:00\",\"dateModified\":\"2026-10-20T21:26:11+00:00\",\"description\":\"\uc218\uc694 \uae09\uc99d\uc5d0 \uc7ac\uace0\ub85c \ub300\ube44\ud560\uae4c\uc694, \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ub298\ub9b4\uae4c\uc694? \ud558\ub098\uc758 \uc0ac\ub840\ub85c \ucd1d\uad04\uc0dd\uc0b0\uacc4\ud68d \uc804\ub7b5\uc744 \ube44\uad50\ud558\uace0 \uacc4\ud68d\uc744 \uc791\uc5c5 \uc77c\uc815\uc73c\ub85c \uad6c\uccb4\ud654\ud558\uc138\uc694.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/aggregate-planning\\\/#breadcrumb\"},\"inLanguage\":\"ko-KR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/aggregate-planning\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/aggregate-planning\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/aggregate-planning-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/aggregate-planning-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Stored blue housings and additional production equipment illustrate two ways to prepare for a demand peak.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/aggregate-planning\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\ucd1d\uad04\uc0dd\uc0b0\uacc4\ud68d: \uc0dd\uc0b0 \ud3c9\uc900\ud654, \uc218\uc694 \ucd94\uc885, \ud63c\ud569 \uc804\ub7b5 \uc911 \ubb34\uc5c7\uc744 \uc120\ud0dd\ud560\uae4c?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ko-KR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\ucd1d\uad04\uc0dd\uc0b0\uacc4\ud68d: \uc0dd\uc0b0 \ud3c9\uc900\ud654, \uc218\uc694 \ucd94\uc885, \ud63c\ud569 \uc804\ub7b5 \uc911 \ubb34\uc5c7\uc744 \uc120\ud0dd\ud560\uae4c?","description":"\uc218\uc694 \uae09\uc99d\uc5d0 \uc7ac\uace0\ub85c \ub300\ube44\ud560\uae4c\uc694, \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ub298\ub9b4\uae4c\uc694? \ud558\ub098\uc758 \uc0ac\ub840\ub85c \ucd1d\uad04\uc0dd\uc0b0\uacc4\ud68d \uc804\ub7b5\uc744 \ube44\uad50\ud558\uace0 \uacc4\ud68d\uc744 \uc791\uc5c5 \uc77c\uc815\uc73c\ub85c \uad6c\uccb4\ud654\ud558\uc138\uc694.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/aggregate-planning\/","og_locale":"ko_KR","og_type":"article","og_title":"\ucd1d\uad04\uc0dd\uc0b0\uacc4\ud68d: \uc0dd\uc0b0 \ud3c9\uc900\ud654, \uc218\uc694 \ucd94\uc885, \ud63c\ud569 \uc804\ub7b5 \uc911 \ubb34\uc5c7\uc744 \uc120\ud0dd\ud560\uae4c?","og_description":"\uc218\uc694 \uae09\uc99d\uc5d0 \uc7ac\uace0\ub85c \ub300\ube44\ud560\uae4c\uc694, \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ub298\ub9b4\uae4c\uc694? \ud558\ub098\uc758 \uc0ac\ub840\ub85c \ucd1d\uad04\uc0dd\uc0b0\uacc4\ud68d \uc804\ub7b5\uc744 \ube44\uad50\ud558\uace0 \uacc4\ud68d\uc744 \uc791\uc5c5 \uc77c\uc815\uc73c\ub85c \uad6c\uccb4\ud654\ud558\uc138\uc694.","og_url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/aggregate-planning\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-20T21:23:51+00:00","article_modified_time":"2026-10-20T21:26:11+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/aggregate-planning-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"\uae00\uc4f4\uc774":"Jussi M\u00e4ntyl\u00e4"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/aggregate-planning\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/aggregate-planning\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"\ucd1d\uad04\uc0dd\uc0b0\uacc4\ud68d: \uc0dd\uc0b0 \ud3c9\uc900\ud654, \uc218\uc694 \ucd94\uc885, \ud63c\ud569 \uc804\ub7b5 \uc911 \ubb34\uc5c7\uc744 \uc120\ud0dd\ud560\uae4c?","datePublished":"2026-10-20T21:23:51+00:00","dateModified":"2026-10-20T21:26:11+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/aggregate-planning\/"},"wordCount":33,"publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/aggregate-planning\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/aggregate-planning-hero.png","articleSection":["APS \ubc0f \uc2a4\ucf00\uc904\ub9c1","\ub9ac\uc18c\uc2a4"],"inLanguage":"ko-KR"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/aggregate-planning\/","url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/aggregate-planning\/","name":"\ucd1d\uad04\uc0dd\uc0b0\uacc4\ud68d: \uc0dd\uc0b0 \ud3c9\uc900\ud654, \uc218\uc694 \ucd94\uc885, \ud63c\ud569 \uc804\ub7b5 \uc911 \ubb34\uc5c7\uc744 \uc120\ud0dd\ud560\uae4c?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/aggregate-planning\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/aggregate-planning\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/aggregate-planning-hero.png","datePublished":"2026-10-20T21:23:51+00:00","dateModified":"2026-10-20T21:26:11+00:00","description":"\uc218\uc694 \uae09\uc99d\uc5d0 \uc7ac\uace0\ub85c \ub300\ube44\ud560\uae4c\uc694, \uc0dd\uc0b0 \ub2a5\ub825\uc744 \ub298\ub9b4\uae4c\uc694? \ud558\ub098\uc758 \uc0ac\ub840\ub85c \ucd1d\uad04\uc0dd\uc0b0\uacc4\ud68d \uc804\ub7b5\uc744 \ube44\uad50\ud558\uace0 \uacc4\ud68d\uc744 \uc791\uc5c5 \uc77c\uc815\uc73c\ub85c \uad6c\uccb4\ud654\ud558\uc138\uc694.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/aggregate-planning\/#breadcrumb"},"inLanguage":"ko-KR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/aggregate-planning\/"]}]},{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/aggregate-planning\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/aggregate-planning-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/aggregate-planning-hero.png","width":1672,"height":941,"caption":"Stored blue housings and additional production equipment illustrate two ways to prepare for a demand peak."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/aggregate-planning\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ko\/"},{"@type":"ListItem","position":2,"name":"\ucd1d\uad04\uc0dd\uc0b0\uacc4\ud68d: \uc0dd\uc0b0 \ud3c9\uc900\ud654, \uc218\uc694 \ucd94\uc885, \ud63c\ud569 \uc804\ub7b5 \uc911 \ubb34\uc5c7\uc744 \uc120\ud0dd\ud560\uae4c?"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ko\/#website","url":"https:\/\/skyplanner.ai\/ko\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ko\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ko-KR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ko\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ko\/","logo":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/aggregate-planning-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/aggregate-planning-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/aggregate-planning-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/aggregate-planning-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/aggregate-planning-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/aggregate-planning-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/aggregate-planning-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/aggregate-planning-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ko\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\ucd1d\uad04\uc0dd\uc0b0\uacc4\ud68d: \uc0dd\uc0b0 \ud3c9\uc900\ud654, \uc218\uc694 \ucd94\uc885, \ud63c\ud569 \uc804\ub7b5 \uc911 \ubb34\uc5c7\uc744 \uc120\ud0dd\ud560\uae4c? \ud648 &raquo; \ub9ac\uc18c\uc2a4 &raquo; \ucd1d\uad04\uc0dd\uc0b0\uacc4\ud68d: \uc0dd\uc0b0 \ud3c9\uc900\ud654, \uc218\uc694 \ucd94\uc885, \ud63c\ud569 \uc804\ub7b5 \uc911 \ubb34\uc5c7\uc744 \uc120\ud0dd\ud560\uae4c? \ucd1d\uad04\uc0dd\uc0b0\uacc4\ud68d\uc740 \uc77c\ubc18\uc801\uc73c\ub85c \uc57d 3\u201318\uac1c\uc6d4\uc758 \uc911\uae30 \uae30\uac04\uc744 \ub300\uc0c1\uc73c\ub85c \uc81c\ud488\uad70\ubcc4 \uc0dd\uc0b0\ub7c9, \ud655\ubcf4\ud560 \uc0dd\uc0b0 \ub2a5\ub825, \uc608\uc0c1 \uc7ac\uace0 \ub610\ub294 \uc218\uc8fc\uc794\uace0\ub97c \uc815\ud569\ub2c8\ub2e4. \uc218\uc694\uac00 \ub298\uace0 \uc904 \ub54c \uc0dd\uc0b0\ub7c9\uc744 \uc77c\uc815\ud558\uac8c \uc720\uc9c0\ud560\uc9c0, \uc218\uc694\uc5d0 \ub9de\ucdb0 \uc0dd\uc0b0\ub7c9\uc744 \ubc14\uafc0\uc9c0, \ub450 \ubc29\uc2dd\uc744 \ud568\uaed8&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/104676","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/comments?post=104676"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/104676\/revisions"}],"predecessor-version":[{"id":104740,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/104676\/revisions\/104740"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media\/104680"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media?parent=104676"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/categories?post=104676"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/tags?post=104676"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}