{"id":102542,"date":"2026-10-20T13:56:48","date_gmt":"2026-10-20T13:56:48","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=102542"},"modified":"2026-10-20T13:58:39","modified_gmt":"2026-10-20T13:58:39","slug":"work-in-process-inventory","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/work-in-process-inventory\/","title":{"rendered":"\uc7ac\uacf5\ud488 \uc7ac\uace0: \uc218\ub7c9 \ud30c\uc545\ubd80\ud130 \uc6d0\uac00 \uacc4\uc0b0\uacfc \uad00\ub9ac\uae4c\uc9c0"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">\uc7ac\uacf5\ud488 \uc7ac\uace0: \uc218\ub7c9 \ud30c\uc545\ubd80\ud130 \uc6d0\uac00 \uacc4\uc0b0\uacfc \uad00\ub9ac\uae4c\uc9c0<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/ko\/\">\ud648<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/\">\ub9ac\uc18c\uc2a4<\/a> &raquo; \uc7ac\uacf5\ud488 \uc7ac\uace0: \uc218\ub7c9 \ud30c\uc545\ubd80\ud130 \uc6d0\uac00 \uacc4\uc0b0\uacfc \uad00\ub9ac\uae4c\uc9c0<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">\uc608\uc0c1 \uc77d\uae30 \uc2dc\uac04: <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> \ubd84<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>\uc7ac\uacf5\ud488 \uc7ac\uace0(WIP)\ub294 \uc0dd\uc0b0\uc5d0 \ud22c\uc785\ub418\uc5c8\uc9c0\ub9cc \uc544\uc9c1 \uc644\uc131\ub418\uc9c0 \uc54a\uc740 \uc81c\ud488\uc744 \ub9d0\ud569\ub2c8\ub2e4. \ud604\uc7ac \uac00\uacf5 \uc911\uc778 \ubd80\ud488\ubfd0 \uc544\ub2c8\ub77c \uacf5\uc815 \uc0ac\uc774\uc5d0\uc11c \ub300\uae30 \uc911\uc778 \ubbf8\uc644\uc131\ud488\ub3c4 \ud3ec\ud568\ub429\ub2c8\ub2e4. \ud68c\uacc4\uc5d0\uc11c WIP\ub294 \uc774\ub7ec\ud55c \ubbf8\uc644\uc131\ud488\uc5d0 \uc9c0\uae08\uae4c\uc9c0 \ub204\uc801\ub41c \uc81c\uc870\uc6d0\uac00\ub97c \ub73b\ud558\uae30\ub3c4 \ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774 \ub450 \uad00\uc810\uc740 \uc11c\ub85c \ub2e4\ub978 \uc9c8\ubb38\uc5d0 \ub2f5\ud569\ub2c8\ub2e4. \uc218\ub7c9\uc740 \uc544\uc9c1 \uc644\uc131\ub418\uc9c0 \uc54a\uc740 \uc81c\ud488\uc774 \uc5bc\ub9c8\ub098 \uc788\ub294\uc9c0, \uc6d0\uac00\ub294 \uadf8 \uc81c\ud488\uc5d0 \uc81c\uc870\uc6d0\uac00\uac00 \uc5bc\ub9c8\ub098 \ud22c\uc785\ub418\uc5c8\ub294\uc9c0\ub97c \ubcf4\uc5ec\uc90d\ub2c8\ub2e4. \ud558\uc9c0\ub9cc \uc5b4\ub290 \ud558\ub098\ub9cc\uc73c\ub85c\ub294 \ud2b9\uc815 \ubc30\uce58\uac00 \uc6d4\uc694\uc77c\ubd80\ud130 \ub300\uae30 \uc911\uc778 \uc774\uc720\ub098 \uc5b8\uc81c \uc0dd\uc0b0\uc744 \ub9c8\uce60 \uc218 \uc788\ub294\uc9c0 \uc54c \uc218 \uc5c6\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc0dd\uc0b0 \uad00\ub9ac\uc790\uc5d0\uac8c\ub294 \ubc14\ub85c \uc774 \ub2e4\uc74c \uc9c8\ubb38\uc774 \uc911\uc694\ud569\ub2c8\ub2e4. SkyPlanner APS\ub294 \ub0a8\uc740 \uacf5\uc815\uc744 \uc0dd\uc0b0 \ub2a5\ub825, \uc790\uc7ac \uc900\ube44 \uc0c1\ud0dc, \uc6b0\uc120\uc21c\uc704\uc640 \uc5f0\uacb0\ud574 \ub300\uae30 \ubb3c\ub7c9\uc744 \uacc4\uc18d \ub298\ub9ac\ub294 \ub300\uc2e0 \uc791\uc5c5\uc744 \uc644\ub8cc\ud560 \uc218 \uc788\ub3c4\ub85d \ub3d5\uc2b5\ub2c8\ub2e4. \uc791\uc5c5 \uc2dc\uc810\uc744 \ub354 \uc801\uc808\ud558\uac8c \uc870\uc815\ud558\uba74 \ubd88\ud544\uc694\ud55c \uc7ac\uacf5\ud488\uacfc \uadf8\uc5d0 \ubb36\uc778 \uc790\uae08\uc744 \uc904\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc5b4\ub514\uae4c\uc9c0 \uc7ac\uacf5\ud488\uc5d0 \ud3ec\ud568\ub420\uae4c\uc694?<\/h2>\n\n\n<p>\uc81c\uc870 \ud750\ub984\uc5d0 \ub530\ub77c \uc7ac\uace0\ub97c \uc138 \ub2e8\uacc4\ub85c \ub098\ub204\uc5b4 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>\uc6d0\uc7ac\ub8cc:<\/strong> \uc0dd\uc0b0\uc5d0 \uc0ac\uc6a9\ub418\uae30\ub97c \uae30\ub2e4\ub9ac\ub294 \uc790\uc7ac\uc640 \uad6c\ub9e4 \ubd80\ud488\uc785\ub2c8\ub2e4.<\/li><li><strong>\uc7ac\uacf5\ud488:<\/strong> \uc0dd\uc0b0\uc744 \uc2dc\uc791\ud588\uc9c0\ub9cc \uc544\uc9c1 \uc81c\uc870, \uc870\ub9bd \ub610\ub294 \ud544\uc218 \ucd5c\uc885 \uac80\uc0ac\uac00 \ub0a8\uc544 \uc788\ub294 \uc81c\ud488\uc785\ub2c8\ub2e4.<\/li><li><strong>\uc644\uc81c\ud488:<\/strong> \uc544\uc9c1 \ud310\ub9e4\ub418\uac70\ub098 \ucd9c\ud558\ub418\uc9c0 \uc54a\uc558\ub354\ub77c\ub3c4 \uc0dd\uc0b0\uc774 \uc644\ub8cc\ub41c \uc81c\ud488\uc785\ub2c8\ub2e4.<\/li><\/ul>\n\n\n<p>\uae30\uacc4 \uac00\uacf5\uc744 \ub9c8\uce58\uace0 \ucf54\ud305\uc744 \uae30\ub2e4\ub9ac\ub294 \ud558\uc6b0\uc9d5\uc740 \uc7ac\uacf5\ud488\uc785\ub2c8\ub2e4. \uc870\ub9bd\uc740 \ub05d\ub0ac\uc9c0\ub9cc \uc644\ub8cc\uc5d0 \ud544\uc694\ud55c \ucd5c\uc885 \uac80\uc0ac\ub97c \uae30\ub2e4\ub9ac\ub294 \uc81c\ud488\ub3c4 \ub9c8\ucc2c\uac00\uc9c0\uc785\ub2c8\ub2e4. \ubc18\uba74 \uc0dd\uc0b0\uc774 \uc644\ub8cc\ub418\uace0 \ud569\uaca9 \ud310\uc815\uc744 \ubc1b\uc544 \ubc30\uc1a1 \ucc28\ub7c9\uc744 \uae30\ub2e4\ub9ac\ub294 \uc81c\ud488\uc740 \uc7ac\uacf5\ud488\uc774 \uc544\ub2c8\ub77c \uc644\uc81c\ud488\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>\ub300\uae30 \uc911\uc774\ub77c\uace0 \ud574\uc11c \ubbf8\uc644\uc131\ud488\uc744 \uc7ac\uacf5\ud488 \uc218\ub7c9\uc5d0\uc11c \uc81c\uc678\ud558\uc9c0\ub294 \uc54a\uc2b5\ub2c8\ub2e4. \uc2e4\uc81c\ub85c \uae30\uacc4\uac00 \uc791\uc5c5\ud558\uc9c0 \uc54a\ub294 \uc2dc\uac04\uc774\ub77c\ub3c4 \uacf5\uc815 \ub300\uae30, \uc774\uc1a1, \ubcf4\ub958\uac00 \uc81c\ud488\uc758 \uc804\uccb4 \uc0dd\uc0b0 \uc18c\uc694 \uc2dc\uac04\uc5d0\uc11c \ud070 \ube44\uc911\uc744 \ucc28\uc9c0\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc601\uc5b4\ub85c\ub294 <strong>\uc9c4\ud589 \uc911\uc778 \uc791\uc5c5\uc744 \ub73b\ud558\ub294 work in progress<\/strong>\ub77c\ub294 \ud45c\ud604\ub3c4 \uc4f0\uc785\ub2c8\ub2e4. \uae30\uc5c5\uacfc \uc5c5\uc885\uc5d0 \ub530\ub77c \uc6a9\ubc95\uc740 \ub2e4\ub974\uc9c0\ub9cc, \uc774 \uac00\uc774\ub4dc\uc5d0\uc11c WIP\ub294 \uc81c\uc870 \uacfc\uc815\uc758 \ubbf8\uc644\uc131 \uc7ac\uace0\ub97c \ub73b\ud569\ub2c8\ub2e4. \ud504\ub85c\uc81d\ud2b8 \ub300\uae08 \uccad\uad6c\ub97c \uc704\ud55c \uacc4\uc0b0\uc774\ub098 \uc18c\ud504\ud2b8\uc6e8\uc5b4 \uac1c\ubc1c\ud300\uc758 \uc791\uc5c5 \ubcf4\ub4dc\uc5d0 \uc788\ub294 \uacfc\uc81c \uc218\ub97c \uc758\ubbf8\ud558\uc9c0\ub294 \uc54a\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc7ac\uacf5\ud488\uc758 \uc2e4\uc81c \uc218\ub7c9\uc744 \ud30c\uc545\ud558\ub294 \ubc29\ubc95<\/h2>\n\n\n<p>\uba3c\uc800 \uc9d1\uacc4 \ubc94\uc704\ub97c \uba85\ud655\ud788 \uc815\ud558\uc138\uc694. \uc608\ub97c \ub4e4\uc5b4 \ud2b9\uc815 \uc81c\ud488\uad70\uc758 \uccab \uc81c\uc870 \uacf5\uc815\ubd80\ud130 \ucd5c\uc885 \ud569\uaca9 \ud310\uc815\uae4c\uc9c0\ub97c \ubc94\uc704\ub85c \uc815\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uadf8\ub7f0 \ub2e4\uc74c \uc815\ud574\uc9c4 \uc2dc\uc810\uc5d0 \uadf8 \ubc94\uc704 \uc548\uc5d0 \uc788\ub294 \ubbf8\uc644\uc131\ud488\uc744 \uc149\ub2c8\ub2e4. \ubc8c\ud06c \uc0dd\uc0b0\uc5d0\uc11c\ub294 \uac1c\uc218 \ub300\uc2e0 \ud0ac\ub85c\uadf8\ub7a8\uc774\ub098 \ub9ac\ud130\uac00 \ub354 \uc801\uc808\ud55c \ub2e8\uc704\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ud55c \uacf5\uc7a5\uc5d0\uc11c \ub3d9\uc77c\ud55c \ud558\uc6b0\uc9d5\uc73c\ub85c \uad6c\uc131\ub41c \uc81c\ud488\uad70 \ud558\ub098\ub97c \ucd94\uc801\ud55c\ub2e4\uace0 \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \uae08\uc694\uc77c \uad50\ub300 \uadfc\ubb34\uac00 \ub05d\ub0a0 \ub54c \ud655\uc778\ud55c \ud604\ud669\uc740 \ub2e4\uc74c\uacfc \uac19\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\ud604\uc7ac \uc704\uce58<\/th><th>\ubbf8\uc644\uc131 \ud558\uc6b0\uc9d5 \uc218\ub7c9<\/th><th>\ub0a8\uc740 \uc791\uc5c5<\/th><\/tr><\/thead><tbody><tr><td>\uae30\uacc4 \uac00\uacf5 \uc911<\/td><td>20<\/td><td>\uae30\uacc4 \uac00\uacf5 \uc644\ub8cc, \ub9c8\uac10 \ubc0f \uac80\uc0ac<\/td><\/tr><tr><td>\ub9c8\uac10 \ub300\uae30<\/td><td>60<\/td><td>\ub9c8\uac10 \ubc0f \uac80\uc0ac<\/td><\/tr><tr><td>\ucd5c\uc885 \uac80\uc0ac \ub300\uae30<\/td><td>20<\/td><td>\uac80\uc0ac \ubc0f \ud569\uaca9 \ud310\uc815<\/td><\/tr><tr><td><strong>\uc7ac\uacf5\ud488 \ud569\uacc4<\/strong><\/td><td><strong>100<\/strong><\/td><td><strong>\ud604\uc7ac \uc704\uce58\uc5d0 \ub530\ub77c \ub0a8\uc740 \uc791\uc5c5\ub7c9\uc774 \ub2e4\ub984<\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\uac01 \ud558\uc6b0\uc9d5\uc740 \ud604\uc7ac \uc704\uce58\uc5d0\uc11c \ud55c \ubc88\ub9cc \uc9d1\uacc4\ud569\ub2c8\ub2e4. \uc0dd\uc0b0 \uacbd\ub85c\uc5d0 \ub0a8\uc544 \uc788\ub294 \uacf5\uc815\ub9c8\ub2e4 \uac19\uc740 \ubc30\uce58\ub97c \ubc18\ubcf5\ud574\uc11c \uc138\uba74 \uc548 \ub429\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc9d1\uacc4 \ubc94\uc704\ub97c \ub4dc\ub098\ub4e0 \uc218\ub7c9\uc73c\ub85c\ub3c4 \uc7ac\uacf5\ud488 \uc99d\uac10\uc744 \ub300\uc870\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc8fc \ucd08\uc5d0 \ubbf8\uc644\uc131 \ud558\uc6b0\uc9d5\uc774 120\uac1c \uc788\uc5c8\uace0, \ud55c \uc8fc \ub3d9\uc548 480\uac1c\uac00 \ucd94\uac00\ub85c \uc0dd\uc0b0\uc5d0 \ud22c\uc785\ub418\uc5c8\uc73c\uba70 500\uac1c\uac00 \uc644\uc81c\ud488\uc774 \ub418\uc5c8\ub2e4\uace0 \uac00\uc815\ud574 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \ud3d0\uae30\ub098 \uadf8 \ubc16\uc758 \uc218\ub7c9 \ubcc0\ub3d9\uc774 \uc5c6\ub2e4\uba74 \ub2e4\uc74c\uacfc \uac19\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>\uae30\ub9d0 \uc7ac\uacf5\ud488 = 120 + 480 \u2212 500 = \ud558\uc6b0\uc9d5 100\uac1c<\/strong><\/p>\n\n\n<p>\uc774 \uacc4\uc0b0 \uacb0\uacfc\uac00 \uc2e4\uc81c \uc2e4\uc0ac \uc218\ub7c9\uacfc \ub2e4\ub974\ub2e4\uba74 \uc0dd\uc0b0 \uc2e4\uc801\uc744 \ud310\ub2e8\ud558\uae30 \uc804\uc5d0 \uc644\ub8cc \uc2e4\uc801 \ub204\ub77d, \ubbf8\uae30\ub85d \uc774\uc1a1, \ud3d0\uae30, \uc9d1\uacc4 \ub9c8\uac10 \uc2dc\uc810\uc744 \ud655\uc778\ud558\uc138\uc694.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uc218\ub7c9\uacfc \ub0a8\uc740 \uc791\uc5c5 \ubd80\ud558\ub294 \ub2e4\ub985\ub2c8\ub2e4<\/h3>\n\n\n<p>\ud45c\uc758 \ubbf8\uc644\uc131\ud488\uc740 \ubaa8\ub450 100\uac1c\uc774\uc9c0\ub9cc, \uac80\uc0ac \ub300\uae30 \uc911\uc778 20\uac1c\ub294 \uc544\uc9c1 \uae30\uacc4 \uac00\uacf5 \uc911\uc778 20\uac1c\ubcf4\ub2e4 \ub0a8\uc740 \uc791\uc5c5\uc774 \ud6e8\uc52c \uc801\uc2b5\ub2c8\ub2e4. \ub530\ub77c\uc11c \ub300\uae30 \uc218\ub7c9\uc774 \uac19\ub354\ub77c\ub3c4 \ud544\uc694\ud55c \uc0dd\uc0b0 \ub2a5\ub825\uc740 \ud06c\uac8c \ub2e4\ub97c \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc5ec\ub7ec \uc81c\ud488\uc744 \ud568\uaed8 \uc0dd\uc0b0\ud558\ub294 \uacf5\uc7a5\uc5d0\uc11c\ub294 \uc791\uc5c5\uc9c0\uc2dc \uac74\uc218\ub9cc\uc73c\ub85c \ud30c\uc545\ud560 \uc218 \uc788\ub294 \uc815\ubcf4\uac00 \ub354\uc6b1 \uc81c\ud55c\uc801\uc785\ub2c8\ub2e4. \uc5b4\ub5a4 \uc791\uc5c5\uc9c0\uc2dc\ub294 \uc9e7\uc740 \uac80\uc0ac\ub9cc \ub0a8\uc544 \uc788\uc9c0\ub9cc, \ub2e4\ub978 \uc791\uc5c5\uc9c0\uc2dc\ub294 \uc5ec\ub7ec \uc790\uc6d0\uc5d0\uc11c \uba70\uce60\uac04 \uc791\uc5c5\ud574\uc57c \ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc218\ub7c9\uc740 \uc81c\ud488\ubcc4 \ub610\ub294 \uc758\ubbf8 \uc788\ub294 \uc81c\ud488\uad70\ubcc4\ub85c \uad00\ub9ac\ud558\uace0, \ub0a8\uc740 \uacf5\uc815\uc758 \uc18c\uc694 \uc2dc\uac04\uc73c\ub85c \ubd80\ud558\ub97c \ud30c\uc545\ud558\uc138\uc694. \uc774 \ubd80\ud558\ub294 \uc2dc\uac04 \ub2e8\uc704\ub85c \ud45c\uc2dc\ud574\uc57c \ud569\ub2c8\ub2e4. \uc7ac\uacf5\ud488 \uc218\ub7c9\uc774\ub098 \uc7ac\uacf5\ud488 \uae08\uc561\uacfc\ub294 \ub2e4\ub978 \uc9c0\ud45c\uc785\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc7ac\uacf5\ud488 \uc7ac\uace0 \uc6d0\uac00 \uacc4\uc0b0\uc2dd<\/h2>\n\n\n<p>\uc77c\uc815 \uae30\uac04\uc758 \uc6d0\uac00 \uc99d\uac10\uc744 \ub2e8\uc21c\ud654\ud574 \ub300\uc870\ud558\uba74 \ub2e4\uc74c\uacfc \uac19\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>\uae30\ub9d0 \uc7ac\uacf5\ud488 \uc6d0\uac00 = \uae30\ucd08 \uc7ac\uacf5\ud488 \uc6d0\uac00 + \ub2f9\uae30 \ud22c\uc785 \uc81c\uc870\uc6d0\uac00 \u2212 \ub2f9\uae30\uc81c\ud488\uc81c\uc870\uc6d0\uac00<\/strong><\/p>\n\n\n<p>\ub2f9\uae30 \ud22c\uc785 \uc81c\uc870\uc6d0\uac00\uc5d0\ub294 \uc0ac\uc6a9\ud55c \uc9c1\uc811\uc7ac\ub8cc\ube44, \uc9c1\uc811\ub178\ubb34\ube44, \ubc30\ubd80\ub41c \uc81c\uc870\uac04\uc811\ube44\uac00 \ud3ec\ud568\ub429\ub2c8\ub2e4. <strong>\ub2f9\uae30\uc81c\ud488\uc81c\uc870\uc6d0\uac00(COGM)<\/strong>\ub294 \uc0dd\uc0b0\uc774 \uc644\ub8cc\ub418\uba74\uc11c \uc7ac\uacf5\ud488\uc5d0\uc11c \ub300\uccb4\ub418\ub294 \uc6d0\uac00\uc785\ub2c8\ub2e4. \ud310\ub9e4\uac00\uaca9\uc774\ub098 \ud574\ub2f9 \uae30\uac04\uc5d0 \ud310\ub9e4\ub41c \uc81c\ud488\uc758 \ub9e4\ucd9c\uc6d0\uac00\uc640\ub294 \ub2e4\ub985\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774\ubc88\uc5d0\ub294 \ubcc4\ub3c4\uc758 \uc6d4\uac04 \uc6d0\uac00 \uc608\uc2dc\ub97c \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \uae30\ucd08 \uc7ac\uacf5\ud488 \uc6d0\uac00\ub294 $18,000\uc774\uace0, \uc81c\uc870 \uacfc\uc815\uc5d0\uc11c $72,000\uac00 \ucd94\uac00\ub85c \ud22c\uc785\ub418\uc5c8\uc73c\uba70, \uc6d0\uac00\uac00 $65,000\uc778 \uc81c\ud488\uc758 \uc0dd\uc0b0\uc774 \uc644\ub8cc\ub418\uc5b4 \uc644\uc81c\ud488 \uc7ac\uace0\ub85c \ub300\uccb4\ub418\uc5c8\uc2b5\ub2c8\ub2e4. \ub2e4\ub978 \uc870\uc815 \uc0ac\ud56d\uc774 \uc5c6\ub2e4\uba74 \ub2e4\uc74c\uacfc \uac19\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p><strong>$18,000 + $72,000 \u2212 $65,000 = \uae30\ub9d0 \uc7ac\uacf5\ud488 \uc6d0\uac00 $25,000<\/strong><\/p>\n\n\n<p>\uc774\ub294 \uc6d0\uac00 \uc794\uc561\uc774\uc9c0, \uc218\ub7c9 25,000\uac1c\ub098 \ubbf8\ub798 \uc774\uc775 $25,000\ub97c \ub73b\ud558\uc9c0 \uc54a\uc2b5\ub2c8\ub2e4. \uc774 \uc608\uc2dc\ub294 \uc55e\uc11c \uc0b4\ud3b4\ubcf8 \ud558\uc6b0\uc9d5 \uc218\ub7c9 \uc608\uc2dc\uc640\ub294 \ubcc4\uac1c\uc785\ub2c8\ub2e4.<\/p>\n\n\n<h3 class=\"wp-block-heading\">\uc218\ub7c9\ub9cc\uc73c\ub85c \uc7ac\uacf5\ud488 \uae08\uc561\uc744 \uc54c \uc218 \uc5c6\ub294 \uc774\uc720<\/h3>\n\n\n<p>\ubbf8\uc644\uc131\ud488\uc5d0\ub294 \uc9c0\uae08\uae4c\uc9c0 \ud574\ub2f9 \uc81c\ud488\uc5d0 \ubc30\ubd80\ub41c \uc6d0\uac00\ub9cc \ub204\uc801\ub418\uc5b4 \uc788\uc2b5\ub2c8\ub2e4. \ubaa8\ub4e0 \ubbf8\uc644\uc131\ud488 \uc218\ub7c9\uc5d0 \uc644\uc81c\ud488 \ud55c \uac1c\uc758 \uc804\uccb4 \uc6d0\uac00\ub97c \uacf1\ud558\uba74 \uc7ac\uacf5\ud488 \uc794\uc561\uc774 \uacfc\ub300 \uacc4\uc0c1\ub420 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ub610\ud55c \u2018\uc804\uccb4 \uc0dd\uc0b0 \uacbd\ub85c\uc758 \uc808\ubc18\uc744 \uc9c0\ub0ac\ub2e4\u2019\uace0 \ud574\uc11c \ucd1d\uc6d0\uac00\uc758 \uc808\ubc18\uc774 \ud22c\uc785\ub418\uc5c8\ub2e4\uace0 \ubcfc \uc218\ub3c4 \uc5c6\uc2b5\ub2c8\ub2e4. \uace0\uac00\uc758 \uc790\uc7ac\ub294 \ucd08\uae30\uc5d0 \ud22c\uc785\ub418\uace0 \ub178\ubb34\ube44\uc640 \uac00\uacf5\ube44\ub294 \ub098\uc911\uc5d0 \ub204\uc801\ub420 \uc218 \uc788\uae30 \ub54c\ubb38\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc7ac\ubb34\ud300\uc5d0\uc11c \uc801\uc6a9\ud558\ub294 \uc6d0\uac00 \uae30\ub85d\uacfc \ud68c\uacc4 \uc815\ucc45\uc744 \uae30\uc900\uc73c\ub85c \uc0bc\uc73c\uc138\uc694. \uae30\ucd08 \uc794\uc561\uc5d0 \ub2f9\uae30 \uc99d\uac10\uc744 \ubc18\uc601\ud558\ub294 \uacc4\uc0b0\uc740 \uc6d0\uac00\uc758 \ud750\ub984\uc744 \uc124\uba85\ud569\ub2c8\ub2e4. \uc7ac\ubb34 \ubcf4\uace0\ub97c \uc704\ud574\uc11c\ub294 \uc801\uc6a9 \ud68c\uacc4\uae30\uc900\uc5d0 \ub530\ub978 \ud3c9\uac00 \uc870\uc815\uc774 \ucd94\uac00\ub85c \ud544\uc694\ud560 \uc218\ub3c4 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc0dd\uc0b0 \uc758\uc0ac\uacb0\uc815\uc5d0\uc11c \uad6c\ubd84\ud574\uc57c \ud560 \ud575\uc2ec\uc740 \ub354 \uac04\ub2e8\ud569\ub2c8\ub2e4. \ub204\uc801 \uc6d0\uac00\ub294 \uc9c0\uae08\uae4c\uc9c0 \ud22c\uc785\ub41c \ube44\uc6a9\uc744 \ubcf4\uc5ec\uc8fc\uace0, \ub0a8\uc740 \uc0dd\uc0b0 \uacbd\ub85c\ub294 \uc644\ub8cc\uae4c\uc9c0 \ubb34\uc5c7\uc774 \ub354 \ud544\uc694\ud55c\uc9c0 \ubcf4\uc5ec\uc90d\ub2c8\ub2e4. \uc5b4\ub290 \ud55c\ucabd\uc73c\ub85c \ub2e4\ub978 \ucabd\uc744 \ub300\uc2e0\ud560 \uc218\ub294 \uc5c6\uc73c\uba70, \ub450 \uad00\uc810\uc774 \ubaa8\ub450 \ud544\uc694\ud569\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc7ac\uacf5\ud488\uc774 \ub9ce\uac70\ub098 \uc801\ub2e4\ub294 \uac83\uc740 \ubb34\uc5c7\uc744 \uc758\ubbf8\ud560\uae4c\uc694?<\/h2>\n\n\n<p>\uc7ac\uacf5\ud488 \uc218\uce58\uac00 \ud06c\uba74 \uc6d0\uc778\uc744 \uc870\uc0ac\ud574\uc57c \ud558\uc9c0\ub9cc, \uadf8 \uc218\uce58\ub9cc\uc73c\ub85c \uc9c4\ub2e8\uc744 \ub0b4\ub9b4 \uc218\ub294 \uc5c6\uc2b5\ub2c8\ub2e4. \uc218\uc694 \uc99d\uac00\ub098 \uc81c\ud488 \uad6c\uc131\uc758 \ubcc0\ud654, \uc758\ub3c4\uc801\uc73c\ub85c \ud655\ubcf4\ud574 \ub454 \uc0dd\uc0b0 \ub2a5\ub825, \uc791\uc5c5 \uc911\ub2e8\uc73c\ub85c \uc778\ud55c \ubb3c\ub7c9 \uc801\uccb4\uac00 \ubc18\uc601\ub41c \uacb0\uacfc\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc218\uce58\uac00 \uc791\uc73c\uba74 \uc0dd\uc0b0 \ud750\ub984\uc774 \uc6d0\ud65c\ud558\ub2e4\ub294 \ub73b\uc77c \uc218\ub3c4 \uc788\uc9c0\ub9cc, \ud575\uc2ec \uc790\uc6d0\uc5d0 \ud22c\uc785\ud560 \uc900\ube44\uac00 \ub41c \uc791\uc5c5\uc774 \ub108\ubb34 \uc801\ub2e4\ub294 \ub73b\uc77c \uc218\ub3c4 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ubaa9\ud45c\ub294 \uc7ac\uacf5\ud488\uc744 \uc5c6\uc560\ub294 \uac83\uc774 \uc544\ub2d9\ub2c8\ub2e4. \ubd88\ud544\uc694\ud558\uac8c \uc77c\ucc0d \ucc29\uc218\ud558\uac70\ub098 \ub300\uae30\uc640 \uc6b4\ubc18\uc744 \ub298\ub9ac\uc9c0 \uc54a\uc73c\uba74\uc11c, \uc548\uc815\uc801\uc778 \uc0dd\uc0b0 \uc644\ub8cc\uc5d0 \ud544\uc694\ud55c \uc801\uc808\ud55c \uc791\uc5c5\uc744 \ucda9\ubd84\ud788 \ud655\ubcf4\ud558\ub294 \uac83\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>\ub9c8\uac10\uc744 \uae30\ub2e4\ub9ac\ub358 \ud558\uc6b0\uc9d5 60\uac1c\ub85c \ub3cc\uc544\uac00 \ubcf4\uaca0\uc2b5\ub2c8\ub2e4. \uc624\ub298 \uc624\ud6c4\uc5d0 \uc608\uc815\ub41c \ub9c8\uac10 \uc791\uc5c5\uc744 \uc704\ud574 \uc624\ub298 \uc544\uce68 \uae30\uacc4 \uac00\uacf5\uc744 \ub9c8\ucce4\ub2e4\uba74 \uc774 \ub300\uae30\ub294 \ucda9\ubd84\ud788 \ud569\ub9ac\uc801\uc77c \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ubc18\uba74 \ub9c8\uac10 \uc790\uc6d0\uc774 \ub2e4\ub978 \uc8fc\ubb38\uc744 \ucc98\ub9ac\ud558\ub294 \ub3d9\uc548 \uc77c\uc8fc\uc77c\uc9f8 \uae30\ub2e4\ub9ac\uace0 \uc788\ub2e4\uba74, \uac19\uc740 \uc218\ub7c9\uc774\ub77c\ub3c4 \uc804\ud600 \ub2e4\ub978 \ubb38\uc81c\ub97c \ub098\ud0c0\ub0c5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc774 \ub300\uae30 \ubb3c\ub7c9\uc744 \ud574\uc11d\ud558\ub824\uba74 \ub2e4\uc74c\uc744 \ud655\uc778\ud558\uc138\uc694.<\/p>\n\n\n<p>1. <strong>\uacbd\uacfc \uc2dc\uac04:<\/strong> \uc774 \ubc30\uce58\ub294 \uc5b8\uc81c \uc0dd\uc0b0\uc5d0 \ud22c\uc785\ub418\uc5c8\uace0, \ud604\uc7ac \uc704\uce58\uc5d0\uc11c \uc5bc\ub9c8\ub098 \uc624\ub798 \uae30\ub2e4\ub838\ub098\uc694?<\/p>\n\n\n<p>2. <strong>\ub2e4\uc74c \uacf5\uc815:<\/strong> \uc791\uc5c5\uc744 \uc9c4\ud589\ud558\ub824\uba74 \uc5b4\ub5a4 \uc790\uc6d0, \uc790\uc7ac \ub610\ub294 \uc2b9\uc778\uc774 \ud544\uc694\ud55c\uac00\uc694?<\/p>\n\n\n<p>3. <strong>\uc644\ub8cc \uc608\uc815 \uc2dc\uc810:<\/strong> \ub0a8\uc740 \uacf5\uc815\uc744 \uc5b8\uc81c \uc218\ud589\ud560 \uc218 \uc788\uc73c\uba70, \uadf8 \uc77c\uc815\uc73c\ub85c \uc8fc\ubb38\uc758 \uc57d\uc18d \ub0a9\uae30\ub97c \uc9c0\ud0ac \uc218 \uc788\ub098\uc694?<\/p>\n\n\n<p>4. <strong>\ub300\uae30 \uc774\uc720:<\/strong> \uacc4\ud68d\ub41c \uc644\ucda9 \ubb3c\ub7c9\uc778\uac00\uc694, \uc544\ub2c8\uba74 \uc0dd\uc0b0 \ub2a5\ub825 \uacbd\ud569, \uc790\uc7ac \ubd80\uc871, \ud488\uc9c8 \ubb38\uc81c\uc5d0 \ub530\ub978 \ubcf4\ub958 \ub610\ub294 \ub2e4\ub978 \uc791\uc5c5 \uc911\ub2e8 \ub54c\ubb38\uc778\uac00\uc694?<\/p>\n\n\n<p>\uc774\ub807\uac8c \ud655\uc778\ud558\uba74 \u2018\uc7ac\uacf5\ud488\uc774 \ub108\ubb34 \ub9ce\ub2e4\u2019\ub294 \ub9c9\uc5f0\ud55c \ubb38\uc81c\ub97c \uc2e4\ud589 \uac00\ub2a5\ud55c \uc758\uc0ac\uacb0\uc815\uc73c\ub85c \ubc14\uafc0 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uad6c\ub9e4 \ubd80\ud488 \ubd80\uc871\uacfc \ub9c8\uac10 \uc791\uc5c5\uc7a5\uc758 \uacfc\ubd80\ud558\ub294 \uc11c\ub85c \ub2e4\ub978 \ub300\uc751\uc774 \ud544\uc694\ud569\ub2c8\ub2e4. \uae30\uacc4 \uac00\uacf5\uc5d0 \ubc30\uce58\ub97c \ud558\ub098 \ub354 \ud22c\uc785\ud55c\ub2e4\uace0 \uc5b4\ub290 \ubb38\uc81c\ub3c4 \ud574\uacb0\ub418\uc9c0\ub294 \uc54a\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc7ac\uacf5\ud488\uc740 <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/manufacturing-throughput\/\">\uc0dd\uc0b0 \uc644\ub8cc\ub7c9<\/a> \ubc0f \ub0a9\uae30 \uc2e4\uc801\uacfc \ud568\uaed8 \uac80\ud1a0\ud558\uc138\uc694. \ub2e4\ub978 \uc720\ucd9c\uc774 \uc5c6\ub294 \uc0c1\ud0dc\uc5d0\uc11c \uc644\uc81c\ud488\uc73c\ub85c \ube60\uc838\ub098\uac00\ub294 \uc218\ub7c9\ubcf4\ub2e4 \uc0dd\uc0b0\uc5d0 \ud22c\uc785\ub418\ub294 \uc218\ub7c9\uc774 \ub9ce\uc73c\uba74 \uc7ac\uacf5\ud488 \uc7ac\uace0\uac00 \uc313\uc785\ub2c8\ub2e4. \uc0dd\uc0b0\uc5d0 \ub4e4\uc5b4\uc624\ub294 \uc8fc\ubb38\uc774 \ub04a\uaca8\uc11c \uc7ac\uacf5\ud488\uc774 \uc904\uc5c8\ub2e4\uba74 \uacf5\uc815\uc774 \uac1c\uc120\ub418\uc5c8\ub2e4\ub294 \uc99d\uac70\uac00 \uc544\ub2d9\ub2c8\ub2e4. \uc81c\ud488 \uad6c\uc131\uc758 \ubcc0\ud654\uac00 \uac1c\uc120\uc73c\ub85c \ubcf4\uc774\uc9c0 \uc54a\ub3c4\ub85d \uc720\uc0ac\ud55c \uae30\uac04\uacfc \uc81c\ud488\uad70\uc744 \ube44\uad50\ud558\uc138\uc694.<\/p>\n\n\n<h2 class=\"wp-block-heading\">SkyPlanner\ub85c \uc7ac\uacf5\ud488\uc744 \uc644\uc131\ud558\uae30 \uc704\ud55c \uc0dd\uc0b0 \uc77c\uc815\uc744 \uc138\uc6b0\uc138\uc694<\/h2>\n\n\n<p>\uc791\uc5c5\uc774 \uc5b4\ub514\uc5d0\uc11c \ub300\uae30\ud558\ub294\uc9c0 \ud30c\uc545\ud588\ub2e4\uba74 \uc2a4\ucf00\uc904\ub9c1\uc5d0\uc11c \ud480\uc5b4\uc57c \ud560 \uc9c8\ubb38\ub3c4 \uba85\ud655\ud574\uc9d1\ub2c8\ub2e4. \uacf5\uc7a5\uc5d0\uc11c \uc644\ub8cc\ud574\uc57c \ud560 \ub2e4\ub978 \ubaa8\ub4e0 \uc791\uc5c5\uacfc \ud568\uaed8, \uc774 \uc791\uc5c5\uc758 \ub0a8\uc740 \uacf5\uc815\uc744 \uc5b4\ub5bb\uac8c \uc77c\uc815\uc5d0 \ubc30\uce58\ud560 \uac83\uc778\uac00\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>SkyPlanner\ub294 \uc791\uc5c5\uc7a5, \uad50\ub300 \uadfc\ubb34, \uc791\uc5c5\uc790, \uacf5\uc815 \ub2e8\uacc4\uc640 \uc18c\uc694 \uc2dc\uac04\uc744 \ud558\ub098\uc758 <a href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/production-scheduling\/\">\uacf5\ud1b5 \uc0dd\uc0b0 \uc77c\uc815<\/a>\uc5d0 \ud1b5\ud569\ud569\ub2c8\ub2e4. \uc2a4\ucf00\uc904\ub9c1 \uc778\uacf5\uc9c0\ub2a5\uc778 Arcturus\ub294 \uc124\uc815\ub41c \uc0dd\uc0b0 \ub2a5\ub825, \uc120\ud6c4\ud589 \uad00\uacc4, \uc6b0\uc120\uc21c\uc704\ub97c \uae30\uc900\uc73c\ub85c \uacf5\uc815\uc744 \ubc30\uce58\ud569\ub2c8\ub2e4. \uac01 \ubd80\uc11c\uac00 \uc790\uccb4 \ub300\uae30 \ubaa9\ub85d\uc744 \ub530\ub85c \uad00\ub9ac\ud558\ub294 \ub300\uc2e0, Gantt \ud654\uba74\uc5d0\uc11c \uc790\uc6d0\ubcc4\ub85c \uacc4\ud68d\ub41c \uc791\uc5c5 \uc21c\uc11c\ub97c \ud655\uc778\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\ub300\uae30 \uc911\uc778 \ud558\uc6b0\uc9d5\uc758 \ub9c8\uac10 \uacf5\uc815\uc744 \uc55e\ub4a4 \uc791\uc5c5\uacfc \ud568\uaed8 \uc0b4\ud3b4\ubcfc \uc218 \uc788\uc2b5\ub2c8\ub2e4. \ud574\ub2f9 \uc790\uc6d0\uc774 \uba3c\uc800 \uc57d\uc18d\ub41c \uc791\uc5c5\uc5d0 \ubc30\uc815\ub418\uc5b4 \uc788\ub098\uc694? \ub9c8\uac10 \ud6c4 \uac80\uc0ac \uacf5\uc815\uc744 \uc77c\uc815\uc5d0 \ubc30\uce58\ud560 \uc5ec\uc720\uac00 \uc788\ub098\uc694? \uc9c0\uae08 \ud558\uc6b0\uc9d5 \ubc30\uce58\ub97c \ud558\ub098 \ub354 \uc2dc\uc791\ud558\uba74 \ub300\uae30 \ubb3c\ub7c9\ub9cc \ub298\uc5b4\ub098\ub294 \uac83\uc740 \uc544\ub2d0\uae4c\uc694?<\/p>\n\n\n<p>\uc790\uc7ac \uac00\uc6a9\uc131\uc744 \uace0\ub824\ud558\ub294 \uc2a4\ucf00\uc904\ub9c1 \uae30\ub2a5\uc744 \ud65c\uc131\ud654\ud558\uba74 Arcturus\ub294 \uc7ac\uace0\uc640 \uc785\uace0 \uc608\uc815 \uc790\uc7ac\uc758 \uac00\uc6a9\uc131\ub3c4 \ud568\uaed8 \ubc18\uc601\ud569\ub2c8\ub2e4. \ud6c4\uc18d \uacf5\uc815\uc5d0 \uad6c\ub9e4 \ubd80\ud488\uc774 \ud544\uc694\ud55c \uacbd\uc6b0 \ud2b9\ud788 \uc911\uc694\ud569\ub2c8\ub2e4. \uc870\ub9bd\uae4c\uc9c0 \uc791\uc5c5\uc744 \uc774\uc5b4\uac08 \uc218 \uc5c6\ub2e4\uba74 \uccab \uacf5\uc815\uc758 \uae30\uacc4\uac00 \ube44\uc5b4 \uc788\ub2e4\ub294 \uac83\ub9cc\uc73c\ub85c\ub294 \ucda9\ubd84\ud558\uc9c0 \uc54a\uae30 \ub54c\ubb38\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p>\uacc4\ud68d\uc774 \uacc4\uc18d \uc720\ud6a8\ud558\ub824\uba74 \uc9c4\ud589 \uc815\ubcf4\uac00 \ud544\uc694\ud569\ub2c8\ub2e4. SkyPlanner\uc758 Timer\ub294 \uc791\uc5c5 \uc2dc\uc791\uacfc \uc911\uc9c0, \uc0dd\uc0b0 \uc218\ub7c9\uc744 \uae30\ub85d\ud558\uba70, \uac1c\ubc29\ud615 REST API\ub97c \ud1b5\ud574 \ubaa8\ub4e0 ERP \ub610\ub294 MES\uc640 \uc5f0\ub3d9\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc9c4\ud589 \uc0c1\ud669, \uac00\uc6a9\uc131 \ub610\ub294 \uc6b0\uc120\uc21c\uc704\uac00 \ubc14\ub00c\uba74 Arcturus\ub294 \uac31\uc2e0\ub41c \uc815\ubcf4\ub97c \uae30\uc900\uc73c\ub85c \uc77c\uc815\uc744 \ub2e4\uc2dc \uacc4\uc0b0\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4. \uc6b0\uc120\uc21c\uc704\ub294 \ub2f4\ub2f9\uc790\uac00 \uc815\ud558\uace0, \uc77c\uc815 \uacc4\uc0b0\uc740 \uc778\uacf5\uc9c0\ub2a5\uc774 \ucc98\ub9ac\ud569\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc124\ube44\ubcc4 \uc791\uc5c5 \ub300\uae30\uc5f4\uc744 \ub9e4\uc77c \uc218\uc815\ud558\ub294 \uc218\uace0\uac00 \uc904\uace0, \uc5b4\ub5a4 \uc791\uc5c5\uc744 \uc9c4\ud589\ud560\uc9c0 \ud310\ub2e8\ud558\ub294 \uadfc\uac70\uac00 \ub354 \uba85\ud655\ud574\uc9d1\ub2c8\ub2e4. \ub0a9\ud488\uc5d0 \ud544\uc694\ud55c \ubbf8\uc644\ub8cc \uc791\uc5c5\uc5d0 \uc9d1\uc911\ud558\uba74\uc11c, \ub108\ubb34 \uc774\ub978 \uc2dc\uc810\uc5d0 \uc0dd\uc0b0 \uc624\ub354\uc5d0 \uc790\uc7ac\uc640 \uc778\ub825\uc744 \ucd94\uac00\ub85c \ud22c\uc785\ud558\ub294 \uc77c\uc744 \ud53c\ud560 \uc218 \uc788\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>\uc0dd\uc0b0\uc744 \uc644\ub8cc\ud558\ub294 \uac83\ub9cc\uc73c\ub85c \ud604\uae08\uc774 \ud68c\uc218\ub418\uc9c0\ub294 \uc54a\uc2b5\ub2c8\ub2e4. \uc7ac\uacf5\ud488\uc774 \uc644\uc81c\ud488 \uc7ac\uace0\ub85c \ubc14\ub00c\uc5b4\ub3c4 \uc0c1\ud0dc\ub9cc \ub2ec\ub77c\uc9c8 \ubfd0 \uc5ec\uc804\ud788 \uc7ac\uace0\uc785\ub2c8\ub2e4. \uc7ac\ubb34\uc801 \uc774\uc775\uc740 \ub2e8\uc21c\ud788 \uc7ac\uacf5\ud488 \uc218\uce58\ub97c \uc904\uc774\ub294 \ub370\uc11c \ub098\uc624\ub294 \uac83\uc774 \uc544\ub2c8\ub77c, \ubd88\ud544\uc694\ud55c \uc7ac\uace0\ub97c \uc904\uc774\uace0 \uace0\uac1d \uc218\uc694\uc5d0 \ub9de\ub294 \uc791\uc5c5\uc744 \uc644\ub8cc\uae4c\uc9c0 \uc774\uc5b4\uac00\ub294 \ub370\uc11c \ub098\uc635\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\uc791\uc5c5 \uc2dc\uc810\uc744 \uac1c\uc120\ud574 \ub2ec\ub77c\uc9c4 Mamec\uc758 \uc0dd\uc0b0 \ud604\uc7a5<\/h2>\n\n\n<p>\uc0b0\uc5c5\uc6a9 \ud63c\ud569 \uc7a5\ube44\ub97c \uc81c\uc870\ud558\uace0 \ucca8\ub2e8 \uc81c\ud488\uc744 \uc704\ud0c1 \uc0dd\uc0b0\ud558\ub294 \ud540\ub780\ub4dc \uc81c\uc870\uc5c5\uccb4 Mamec\uc740 \uacfc\uac70\uc5d0 \uc885\uc774 \uc791\uc5c5\uc9c0\uc2dc\uc11c\uc5d0 \uc801\ud78c \ub0a9\ud488\uc77c\uc744 \uae30\uc900\uc73c\ub85c, \uc11c\ub85c \uc5f0\uad00\ub41c \uc218\ucc9c \uac74\uc758 \uc791\uc5c5\uc9c0\uc2dc \uc6b0\uc120\uc21c\uc704\ub97c \uc815\ud588\uc2b5\ub2c8\ub2e4. ERP\uc758 \uacc4\ud68d \uae30\ub2a5\uc73c\ub85c\ub294 \uc804\uccb4 \uc0c1\ud669\uc744 \ud30c\uc545\ud560 \uc218 \uc5c6\uc5c8\uace0, \uacbd\uc601\uc9c4\uc740 \uc8fc\uad00\uc801\uc778 \ucd94\uc815\uc5d0 \uc758\uc874\ud574 \uc0dd\uc0b0 \ubd80\ud558\ub97c \ud310\ub2e8\ud588\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p>Mamec\uc740 Oscar ERP \ud658\uacbd\uc5d0 SkyPlanner\ub97c \uc5f0\ub3d9\ud558\uba74\uc11c \uc720\ud55c \uc6a9\ub7c9 \uc2a4\ucf00\uc904\ub9c1\uc744 \ub3c4\uc785\ud558\uace0, \uc0dd\uc0b0 \uc624\ub354\ubcc4 \uc9c4\ud589 \uc0c1\ud669\uacfc \uc77c\uc815\uc744 \ud568\uaed8 \ud655\uc778\ud560 \uc218 \uc788\uac8c \ub418\uc5c8\uc2b5\ub2c8\ub2e4. \uc9c1\uc6d0\ub4e4\uc740 \uc0c1\ud669\uc5d0 \ub300\ud55c \uac01\uc790\uc758 \ud574\uc11d\uc5d0 \uc758\uc874\ud558\ub294 \ub300\uc2e0 \ud574\ub2f9 \uc624\ub354\ub97c \uc9c1\uc811 \uc870\ud68c\ud560 \uc218 \uc788\uac8c \ub418\uc5c8\uc2b5\ub2c8\ub2e4.<\/p>\n\n\n<p><a href=\"\/ko\/%ea%b3%a0%ea%b0%9d-%ec%82%ac%eb%a1%80\/mamec\/\">Mamec\uc5d0 \ub530\ub974\uba74<\/a> \uc791\uc5c5\uc744 \uc801\uc808\ud55c \uc2dc\uc810\uc5d0 \uc2dc\uc791\ud558\uac8c \ub418\uba74\uc11c \ub9ac\ub4dc\ud0c0\uc784\uc774 \ub354 \ud569\ub9ac\uc801\uc73c\ub85c \ubc14\ub00c\uace0, \uacc4\ud68d \uc218\ub9bd \uc5c5\ubb34\uc758 \ubd80\ub2f4\uc774 \uc904\uc5c8\uc73c\uba70, \uc7ac\uacf5\ud488\uc5d0 \ubd88\ud544\uc694\ud558\uac8c \ubb36\uc774\ub294 \uc6b4\uc804\uc790\ubcf8\ub3c4 \uac10\uc18c\ud588\uc2b5\ub2c8\ub2e4. \uc774 \uc0ac\ub840\ub294 \uc7ac\uacf5\ud488 \uc7ac\uace0\uc640 \uc0dd\uc0b0 \uc2a4\ucf00\uc904\ub9c1\uc774 \ud604\uc7a5\uc5d0\uc11c \uc5b4\ub5bb\uac8c \uc5f0\uacb0\ub418\ub294\uc9c0 \ubcf4\uc5ec\uc90d\ub2c8\ub2e4. \uacf5\uc7a5\uc5d0\ub294 \uc5ec\uc804\ud788 \uc0dd\uc0b0 \uc911\uc778 \uc791\uc5c5\uc774 \uc788\uc9c0\ub9cc, \uac01 \uc791\uc5c5\uc774 \uc5b8\uc81c \uc0dd\uc0b0\uc5d0 \ub4e4\uc5b4\uac00\uc57c \ud558\ub294\uc9c0 \ud310\ub2e8\ud560 \uadfc\uac70\uac00 \ub354 \uba85\ud655\ud574\uc9c4 \uac83\uc785\ub2c8\ub2e4.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\ub108\ubb34 \uc624\ub798 \ub300\uae30\ud55c \ubc30\uce58 \ud558\ub098\ubd80\ud130 \uc0b4\ud3b4\ubcf4\uc138\uc694<\/h2>\n\n\n<p>\ud300\uc5d0\uc11c \uc9c0\uc5f0 \uc0c1\ud669\uc744 \uc798 \uc54c\uace0 \uc788\ub294 \ubbf8\uc644\ub8cc \uc0dd\uc0b0 \uc624\ub354 \ud558\ub098\ub97c \uace8\ub77c\ubcf4\uc138\uc694. \ud574\ub2f9 \uc624\ub354\uc758 \ud604\uc7ac \uacf5\uc815 \uc704\uce58, \ub0a8\uc740 \uacf5\uc815, \ud544\uc694\ud55c \uc790\uc7ac, \uc57d\uc18d\ud55c \ub0a9\uae30\ub97c \uc815\ub9ac\ud574 SkyPlanner \ub370\ubaa8\uc5d0 \uac00\uc838\uc624\uc138\uc694. \uac19\uc740 \uc790\uc6d0\uc744 \ub193\uace0 \uacbd\uc7c1\ud558\ub294 \ub2e4\ub978 \uc624\ub354\uae4c\uc9c0 \uace0\ub824\ud588\uc744 \ub54c, \ud574\ub2f9 \uc624\ub354\ub97c \uc644\ub8cc\ud558\uae30 \uc704\ud55c \uc804\uccb4 \uc77c\uc815\uc774 \uc5b4\ub5bb\uac8c \uc5f0\uacb0\ub418\ub294\uc9c0 \ud655\uc778\ud558\ub294 \uac83\uc774 \ud575\uc2ec\uc785\ub2c8\ub2e4.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/ko\/%ec%98%81%ec%97%85%ed%8c%80%ec%97%90-%eb%ac%b8%ec%9d%98\/\">SkyPlanner \ub370\ubaa8\ub97c \uc608\uc57d<\/a>\ud574 \uc2e4\uc81c \uc0dd\uc0b0 \uc0c1\ud669\uc5d0 \ub9de\ub294 \uacc4\ud68d\uc744 \ud568\uaed8 \uc0b4\ud3b4\ubcf4\uac70\ub098, \uba3c\uc800 <a href=\"https:\/\/skyplanner.ai\/ko\/%ed%8f%89%ea%b0%80%ed%8c%90\/\">\ub370\ubaa8 \ub370\uc774\ud130\ub85c SkyPlanner\ub97c \uccb4\ud5d8\ud574 \ubcf4\uc138\uc694<\/a>. \uc7ac\uacf5\ud488 \uc7ac\uace0 \uc218\uce58\ub97c \uac1c\uc120\ud558\ub824\uba74 \uba3c\uc800 \ubbf8\uc644\ub8cc \uc791\uc5c5\uc744 \uc774\ud574\ud574\uc57c \ud569\ub2c8\ub2e4. \ub354 \ub098\uc740 \uc0dd\uc0b0 \uc77c\uc815\uc740 \uc774\ub97c \uc2e4\uc81c \uac1c\uc120\uc73c\ub85c \uc62e\uae30\ub294 \ub370 \ub3c4\uc6c0\uc774 \ub429\ub2c8\ub2e4.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\uc7ac\uacf5\ud488 \uc7ac\uace0: \uc218\ub7c9 \ud30c\uc545\ubd80\ud130 \uc6d0\uac00 \uacc4\uc0b0\uacfc \uad00\ub9ac\uae4c\uc9c0 \ud648 &raquo; \ub9ac\uc18c\uc2a4 &raquo; \uc7ac\uacf5\ud488 \uc7ac\uace0: \uc218\ub7c9 \ud30c\uc545\ubd80\ud130 \uc6d0\uac00 \uacc4\uc0b0\uacfc \uad00\ub9ac\uae4c\uc9c0 \uc7ac\uacf5\ud488 \uc7ac\uace0(WIP)\ub294 \uc0dd\uc0b0\uc5d0 \ud22c\uc785\ub418\uc5c8\uc9c0\ub9cc \uc544\uc9c1 \uc644\uc131\ub418\uc9c0 \uc54a\uc740 \uc81c\ud488\uc744 \ub9d0\ud569\ub2c8\ub2e4. \ud604\uc7ac \uac00\uacf5 \uc911\uc778 \ubd80\ud488\ubfd0 \uc544\ub2c8\ub77c \uacf5\uc815 \uc0ac\uc774\uc5d0\uc11c \ub300\uae30 \uc911\uc778 \ubbf8\uc644\uc131\ud488\ub3c4 \ud3ec\ud568\ub429\ub2c8\ub2e4. \ud68c\uacc4\uc5d0\uc11c WIP\ub294 \uc774\ub7ec\ud55c \ubbf8\uc644\uc131\ud488\uc5d0 \uc9c0\uae08\uae4c\uc9c0 \ub204\uc801\ub41c \uc81c\uc870\uc6d0\uac00\ub97c \ub73b\ud558\uae30\ub3c4 \ud569\ub2c8\ub2e4. \uc774 \ub450 \uad00\uc810\uc740 \uc11c\ub85c \ub2e4\ub978 \uc9c8\ubb38\uc5d0 \ub2f5\ud569\ub2c8\ub2e4. \uc218\ub7c9\uc740 &#8230; <a title=\"\uc7ac\uacf5\ud488 \uc7ac\uace0: \uc218\ub7c9 \ud30c\uc545\ubd80\ud130 \uc6d0\uac00 \uacc4\uc0b0\uacfc \uad00\ub9ac\uae4c\uc9c0\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/work-in-process-inventory\/\" aria-label=\"Read more about \uc7ac\uacf5\ud488 \uc7ac\uace0: \uc218\ub7c9 \ud30c\uc545\ubd80\ud130 \uc6d0\uac00 \uacc4\uc0b0\uacfc \uad00\ub9ac\uae4c\uc9c0\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":102580,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[496,2558],"tags":[],"class_list":["post-102542","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-496","category-2558","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\uc7ac\uacf5\ud488 \uc7ac\uace0: \uc218\ub7c9 \ud30c\uc545\ubd80\ud130 \uc6d0\uac00 \uacc4\uc0b0\uacfc \uad00\ub9ac\uae4c\uc9c0<\/title>\n<meta name=\"description\" content=\"\uc7ac\uacf5\ud488 \uc7ac\uace0\ub97c \ud30c\uc545\ud558\uace0 \uc6d0\uac00\ub97c \uacc4\uc0b0\ud574 \uc644\ub8cc \uc9c0\uc5f0 \uc6d0\uc778\uc744 \ucc3e\uc73c\uc138\uc694. SkyPlanner\ub85c \ubd88\ud544\uc694\ud55c \uc7ac\uacf5\ud488\uc744 \uc904\uc774\ub294 \ubc29\ubc95\uc744 \uc54c\uc544\ubcf4\uc138\uc694.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/work-in-process-inventory\/\" \/>\n<meta property=\"og:locale\" content=\"ko_KR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\uc7ac\uacf5\ud488 \uc7ac\uace0: \uc218\ub7c9 \ud30c\uc545\ubd80\ud130 \uc6d0\uac00 \uacc4\uc0b0\uacfc \uad00\ub9ac\uae4c\uc9c0\" \/>\n<meta property=\"og:description\" content=\"\uc7ac\uacf5\ud488 \uc7ac\uace0\ub97c \ud30c\uc545\ud558\uace0 \uc6d0\uac00\ub97c \uacc4\uc0b0\ud574 \uc644\ub8cc \uc9c0\uc5f0 \uc6d0\uc778\uc744 \ucc3e\uc73c\uc138\uc694. SkyPlanner\ub85c \ubd88\ud544\uc694\ud55c \uc7ac\uacf5\ud488\uc744 \uc904\uc774\ub294 \ubc29\ubc95\uc744 \uc54c\uc544\ubcf4\uc138\uc694.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/work-in-process-inventory\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-20T13:56:48+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-20T13:58:39+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1984\" \/>\n\t<meta property=\"og:image:height\" content=\"1116\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\uae00\uc4f4\uc774\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/work-in-process-inventory\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/work-in-process-inventory\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"\uc7ac\uacf5\ud488 \uc7ac\uace0: \uc218\ub7c9 \ud30c\uc545\ubd80\ud130 \uc6d0\uac00 \uacc4\uc0b0\uacfc \uad00\ub9ac\uae4c\uc9c0\",\"datePublished\":\"2026-10-20T13:56:48+00:00\",\"dateModified\":\"2026-10-20T13:58:39+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/work-in-process-inventory\\\/\"},\"wordCount\":34,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/work-in-process-inventory\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-in-process-inventory-hero-1.png\",\"articleSection\":[\"\ub9ac\uc18c\uc2a4\",\"\uc81c\uc870 \ud6a8\uc728\"],\"inLanguage\":\"ko-KR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/work-in-process-inventory\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/work-in-process-inventory\\\/\",\"name\":\"\uc7ac\uacf5\ud488 \uc7ac\uace0: \uc218\ub7c9 \ud30c\uc545\ubd80\ud130 \uc6d0\uac00 \uacc4\uc0b0\uacfc \uad00\ub9ac\uae4c\uc9c0\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/work-in-process-inventory\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/work-in-process-inventory\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-in-process-inventory-hero-1.png\",\"datePublished\":\"2026-10-20T13:56:48+00:00\",\"dateModified\":\"2026-10-20T13:58:39+00:00\",\"description\":\"\uc7ac\uacf5\ud488 \uc7ac\uace0\ub97c \ud30c\uc545\ud558\uace0 \uc6d0\uac00\ub97c \uacc4\uc0b0\ud574 \uc644\ub8cc \uc9c0\uc5f0 \uc6d0\uc778\uc744 \ucc3e\uc73c\uc138\uc694. SkyPlanner\ub85c \ubd88\ud544\uc694\ud55c \uc7ac\uacf5\ud488\uc744 \uc904\uc774\ub294 \ubc29\ubc95\uc744 \uc54c\uc544\ubcf4\uc138\uc694.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/work-in-process-inventory\\\/#breadcrumb\"},\"inLanguage\":\"ko-KR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/work-in-process-inventory\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/work-in-process-inventory\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-in-process-inventory-hero-1.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-in-process-inventory-hero-1.png\",\"width\":1984,\"height\":1116,\"caption\":\"Unfinished metal housings wait between machining and finishing, illustrating work-in-process inventory.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/%eb%a6%ac%ec%86%8c%ec%8a%a4\\\/work-in-process-inventory\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\uc7ac\uacf5\ud488 \uc7ac\uace0: \uc218\ub7c9 \ud30c\uc545\ubd80\ud130 \uc6d0\uac00 \uacc4\uc0b0\uacfc \uad00\ub9ac\uae4c\uc9c0\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ko-KR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ko\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ko-KR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\uc7ac\uacf5\ud488 \uc7ac\uace0: \uc218\ub7c9 \ud30c\uc545\ubd80\ud130 \uc6d0\uac00 \uacc4\uc0b0\uacfc \uad00\ub9ac\uae4c\uc9c0","description":"\uc7ac\uacf5\ud488 \uc7ac\uace0\ub97c \ud30c\uc545\ud558\uace0 \uc6d0\uac00\ub97c \uacc4\uc0b0\ud574 \uc644\ub8cc \uc9c0\uc5f0 \uc6d0\uc778\uc744 \ucc3e\uc73c\uc138\uc694. SkyPlanner\ub85c \ubd88\ud544\uc694\ud55c \uc7ac\uacf5\ud488\uc744 \uc904\uc774\ub294 \ubc29\ubc95\uc744 \uc54c\uc544\ubcf4\uc138\uc694.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/work-in-process-inventory\/","og_locale":"ko_KR","og_type":"article","og_title":"\uc7ac\uacf5\ud488 \uc7ac\uace0: \uc218\ub7c9 \ud30c\uc545\ubd80\ud130 \uc6d0\uac00 \uacc4\uc0b0\uacfc \uad00\ub9ac\uae4c\uc9c0","og_description":"\uc7ac\uacf5\ud488 \uc7ac\uace0\ub97c \ud30c\uc545\ud558\uace0 \uc6d0\uac00\ub97c \uacc4\uc0b0\ud574 \uc644\ub8cc \uc9c0\uc5f0 \uc6d0\uc778\uc744 \ucc3e\uc73c\uc138\uc694. SkyPlanner\ub85c \ubd88\ud544\uc694\ud55c \uc7ac\uacf5\ud488\uc744 \uc904\uc774\ub294 \ubc29\ubc95\uc744 \uc54c\uc544\ubcf4\uc138\uc694.","og_url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/work-in-process-inventory\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-20T13:56:48+00:00","article_modified_time":"2026-10-20T13:58:39+00:00","og_image":[{"width":1984,"height":1116,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"\uae00\uc4f4\uc774":"Jussi M\u00e4ntyl\u00e4"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/work-in-process-inventory\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/work-in-process-inventory\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"\uc7ac\uacf5\ud488 \uc7ac\uace0: \uc218\ub7c9 \ud30c\uc545\ubd80\ud130 \uc6d0\uac00 \uacc4\uc0b0\uacfc \uad00\ub9ac\uae4c\uc9c0","datePublished":"2026-10-20T13:56:48+00:00","dateModified":"2026-10-20T13:58:39+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/work-in-process-inventory\/"},"wordCount":34,"publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/work-in-process-inventory\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","articleSection":["\ub9ac\uc18c\uc2a4","\uc81c\uc870 \ud6a8\uc728"],"inLanguage":"ko-KR"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/work-in-process-inventory\/","url":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/work-in-process-inventory\/","name":"\uc7ac\uacf5\ud488 \uc7ac\uace0: \uc218\ub7c9 \ud30c\uc545\ubd80\ud130 \uc6d0\uac00 \uacc4\uc0b0\uacfc \uad00\ub9ac\uae4c\uc9c0","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ko\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/work-in-process-inventory\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/work-in-process-inventory\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","datePublished":"2026-10-20T13:56:48+00:00","dateModified":"2026-10-20T13:58:39+00:00","description":"\uc7ac\uacf5\ud488 \uc7ac\uace0\ub97c \ud30c\uc545\ud558\uace0 \uc6d0\uac00\ub97c \uacc4\uc0b0\ud574 \uc644\ub8cc \uc9c0\uc5f0 \uc6d0\uc778\uc744 \ucc3e\uc73c\uc138\uc694. SkyPlanner\ub85c \ubd88\ud544\uc694\ud55c \uc7ac\uacf5\ud488\uc744 \uc904\uc774\ub294 \ubc29\ubc95\uc744 \uc54c\uc544\ubcf4\uc138\uc694.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/work-in-process-inventory\/#breadcrumb"},"inLanguage":"ko-KR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/work-in-process-inventory\/"]}]},{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/work-in-process-inventory\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png","width":1984,"height":1116,"caption":"Unfinished metal housings wait between machining and finishing, illustrating work-in-process inventory."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ko\/%eb%a6%ac%ec%86%8c%ec%8a%a4\/work-in-process-inventory\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ko\/"},{"@type":"ListItem","position":2,"name":"\uc7ac\uacf5\ud488 \uc7ac\uace0: \uc218\ub7c9 \ud30c\uc545\ubd80\ud130 \uc6d0\uac00 \uacc4\uc0b0\uacfc \uad00\ub9ac\uae4c\uc9c0"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ko\/#website","url":"https:\/\/skyplanner.ai\/ko\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ko\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ko\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ko-KR"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ko\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ko\/","logo":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/ko\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"ko-KR","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png",1984,1116,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1.png",1984,1116,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-in-process-inventory-hero-1-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ko\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\uc7ac\uacf5\ud488 \uc7ac\uace0: \uc218\ub7c9 \ud30c\uc545\ubd80\ud130 \uc6d0\uac00 \uacc4\uc0b0\uacfc \uad00\ub9ac\uae4c\uc9c0 \ud648 &raquo; \ub9ac\uc18c\uc2a4 &raquo; \uc7ac\uacf5\ud488 \uc7ac\uace0: \uc218\ub7c9 \ud30c\uc545\ubd80\ud130 \uc6d0\uac00 \uacc4\uc0b0\uacfc \uad00\ub9ac\uae4c\uc9c0 \uc7ac\uacf5\ud488 \uc7ac\uace0(WIP)\ub294 \uc0dd\uc0b0\uc5d0 \ud22c\uc785\ub418\uc5c8\uc9c0\ub9cc \uc544\uc9c1 \uc644\uc131\ub418\uc9c0 \uc54a\uc740 \uc81c\ud488\uc744 \ub9d0\ud569\ub2c8\ub2e4. \ud604\uc7ac \uac00\uacf5 \uc911\uc778 \ubd80\ud488\ubfd0 \uc544\ub2c8\ub77c \uacf5\uc815 \uc0ac\uc774\uc5d0\uc11c \ub300\uae30 \uc911\uc778 \ubbf8\uc644\uc131\ud488\ub3c4 \ud3ec\ud568\ub429\ub2c8\ub2e4. \ud68c\uacc4\uc5d0\uc11c WIP\ub294 \uc774\ub7ec\ud55c \ubbf8\uc644\uc131\ud488\uc5d0 \uc9c0\uae08\uae4c\uc9c0 \ub204\uc801\ub41c \uc81c\uc870\uc6d0\uac00\ub97c \ub73b\ud558\uae30\ub3c4 \ud569\ub2c8\ub2e4. \uc774 \ub450 \uad00\uc810\uc740 \uc11c\ub85c \ub2e4\ub978 \uc9c8\ubb38\uc5d0 \ub2f5\ud569\ub2c8\ub2e4. \uc218\ub7c9\uc740&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/102542","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/comments?post=102542"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/102542\/revisions"}],"predecessor-version":[{"id":102661,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/posts\/102542\/revisions\/102661"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media\/102580"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/media?parent=102542"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/categories?post=102542"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/ko\/wp-json\/wp\/v2\/tags?post=102542"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}