{"id":110968,"date":"2026-10-27T10:47:38","date_gmt":"2026-10-27T10:47:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=110968"},"modified":"2026-10-27T10:49:39","modified_gmt":"2026-10-27T10:49:39","slug":"supplier-performance-metrics","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/ja\/%e3%83%aa%e3%82%bd%e3%83%bc%e3%82%b9\/supplier-performance-metrics\/","title":{"rendered":"\u751f\u7523\u3092\u5b88\u308b\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u8a55\u4fa1\u6307\u6a19"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">\u751f\u7523\u3092\u5b88\u308b\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u8a55\u4fa1\u6307\u6a19<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/ja\/\">\u30db\u30fc\u30e0<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/ja\/%e3%83%aa%e3%82%bd%e3%83%bc%e3%82%b9\/\">\u30ea\u30bd\u30fc\u30b9<\/a> &raquo; \u751f\u7523\u3092\u5b88\u308b\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u8a55\u4fa1\u6307\u6a19<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">\u63a8\u5b9a\u8aad\u66f8\u6642\u9593\uff1a <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> \u5206<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u306e\u6708\u6b21\u8a55\u4fa1\u304c\u826f\u597d\u3067\u3082\u3001\u90e8\u54c1\u304c1\u3064\u8db3\u308a\u306a\u3044\u3060\u3051\u3067\u6700\u512a\u5148\u306e\u53d7\u6ce8\u6848\u4ef6\u304c\u6b62\u307e\u308b\u3053\u3068\u304c\u3042\u308a\u307e\u3059\u3002\u8abf\u9054\u90e8\u9580\u306b\u306f\u8a31\u5bb9\u7bc4\u56f2\u306e\u5e73\u5747\u5024\u306b\u898b\u3048\u3066\u3082\u3001\u751f\u7523\u73fe\u5834\u3067\u306f\u8a2d\u5099\u304c\u5f85\u6a5f\u3057\u3001\u7d44\u7acb\u304c\u5b8c\u4e86\u305b\u305a\u3001\u9867\u5ba2\u3078\u306e\u7d0d\u671f\u7d04\u675f\u304c\u5371\u3046\u304f\u306a\u3063\u3066\u3044\u307e\u3059\u3002<\/p>\n\n\n<p>\u9069\u5207\u306a\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u8a55\u4fa1\u6307\u6a19\u306f\u3001\u8abf\u9054\u3068\u751f\u7523\u306e\u53cc\u65b9\u304c\u3088\u308a\u3088\u3044\u5224\u65ad\u3092\u4e0b\u3059\u52a9\u3051\u306b\u306a\u308a\u307e\u3059\u3002\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u304c\u7d04\u675f\u3092\u5b88\u3063\u3066\u3044\u308b\u304b\u3001\u3069\u3053\u3067\u5b9f\u7e3e\u304c\u60aa\u5316\u3057\u3066\u3044\u308b\u304b\u3001\u3069\u306e\u554f\u984c\u306b\u5bfe\u51e6\u3059\u3079\u304d\u304b\u304c\u5206\u304b\u308b\u304b\u3089\u3067\u3059\u3002\u305f\u3060\u3057\u3001\u6570\u5024\u306f\u660e\u78ba\u3067\u5171\u901a\u306e\u57fa\u6e96\u306b\u57fa\u3065\u3044\u3066\u6e2c\u5b9a\u3057\u306a\u3051\u308c\u3070\u306a\u308a\u307e\u305b\u3093\u3002\u307e\u305f\u3001\u4eca\u8d77\u304d\u3066\u3044\u308b\u8cc7\u6750\u4e0d\u8db3\u306b\u306f\u3001\u6b21\u306e\u8a55\u4fa1\u898b\u76f4\u3057\u3092\u5f85\u305f\u305a\u306b\u5bfe\u5fdc\u3059\u308b\u5fc5\u8981\u304c\u3042\u308a\u307e\u3059\u3002<\/p>\n\n\n<p>\u3053\u3053\u3067\u3001\u8a55\u4fa1\u3068\u30b9\u30b1\u30b8\u30e5\u30fc\u30ea\u30f3\u30b0\u304c\u3064\u306a\u304c\u308a\u307e\u3059\u3002\u8a55\u4fa1\u8868\u306f\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u306e\u5b9f\u7e3e\u6539\u5584\u306b\u6d3b\u7528\u3057\u3001SkyPlanner APS\u3067\u306f\u3001\u66f4\u65b0\u3055\u308c\u305f\u8cc7\u6750\u306e\u5229\u7528\u53ef\u80fd\u6642\u671f\u3092\u57fa\u306b\u3001\u307b\u304b\u306e\u53d7\u6ce8\u6848\u4ef6\u3082\u8003\u616e\u3057\u305f\u5b9f\u884c\u53ef\u80fd\u306a\u751f\u7523\u8a08\u753b\u3092\u7acb\u3066\u307e\u3057\u3087\u3046\u3002\u8a2d\u5099\u3054\u3068\u306b\u4f5c\u696d\u9806\u3092\u4fee\u6b63\u3059\u308b\u624b\u9593\u304c\u6e1b\u308a\u3001\u7d0d\u671f\u3078\u306e\u5f71\u97ff\u3082\u65e9\u3044\u6bb5\u968e\u3067\u628a\u63e1\u3067\u304d\u307e\u3059\u3002<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u8a55\u4fa1\u6307\u6a19\u3068\u306f<\/h2>\n\n\n<p>\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u8a55\u4fa1\u6307\u6a19\u3068\u306f\u3001\u7d0d\u671f\u3001\u54c1\u8cea\u3001\u30b3\u30b9\u30c8\u3001\u30b5\u30fc\u30d3\u30b9\u306b\u3064\u3044\u3066\u3001\u5408\u610f\u3057\u305f\u8981\u4ef6\u3092\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u304c\u3069\u306e\u7a0b\u5ea6\u6e80\u305f\u3057\u3066\u3044\u308b\u304b\u3092\u6e2c\u308b\u3082\u306e\u3067\u3059\u3002\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u8a55\u4fa1\u8868\u306b\u306f\u3001\u9078\u3093\u3060\u6307\u6a19\u3092\u307e\u3068\u3081\u307e\u3059\u3002\u3053\u308c\u306b\u3088\u308a\u3001\u8abf\u9054\u90e8\u9580\u306f\u4e00\u8cab\u3057\u305f\u57fa\u6e96\u3067\u5b9f\u7e3e\u3092\u78ba\u8a8d\u3057\u3001\u6539\u5584\u7b56\u306b\u3064\u3044\u3066\u5408\u610f\u3067\u304d\u307e\u3059\u3002<\/p>\n\n\n<p>\u88fd\u9020\u696d\u3067\u7279\u306b\u5f79\u7acb\u3064\u306e\u306f\u3001\u5b9f\u52d9\u4e0a\u306e\u7591\u554f\u306b\u7b54\u3048\u3089\u308c\u308b\u6307\u6a19\u3067\u3059\u3002\u5fc5\u8981\u306a\u6570\u91cf\u304c\u7d04\u675f\u3069\u304a\u308a\u306e\u6642\u671f\u306b\u5c4a\u3044\u305f\u304b\u3001\u751f\u7523\u306b\u4f7f\u7528\u3067\u304d\u308b\u72b6\u614b\u3060\u3063\u305f\u304b\u3001\u63d0\u793a\u3055\u308c\u305f\u30ea\u30fc\u30c9\u30bf\u30a4\u30e0\u306f\u4fe1\u983c\u3067\u304d\u305f\u304b\u3001\u72b6\u6cc1\u304c\u5909\u308f\u3063\u305f\u3068\u304d\u306b\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u306f\u6709\u52b9\u306a\u5bfe\u5fdc\u3092\u53d6\u308c\u305f\u304b\u3001\u3068\u3044\u3063\u305f\u70b9\u3092\u78ba\u8a8d\u3057\u307e\u3059\u3002<\/p>\n\n\n<p>\u3053\u308c\u3089\u306f\u3001\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u304b\u3089\u81ea\u793e\u3078\u306e\u4f9b\u7d66\u3092\u6e2c\u308b\u6307\u6a19\u3067\u3059\u3002<a href=\"https:\/\/skyplanner.ai\/ja\/%e3%83%aa%e3%82%bd%e3%83%bc%e3%82%b9\/on-time-delivery-manufacturing\/\">\u81ea\u793e\u5de5\u5834\u304b\u3089\u9867\u5ba2\u3078\u306e\u7d0d\u671f\u9075\u5b88\u7387<\/a>\u3068\u306f\u7570\u306a\u308a\u307e\u3059\u304c\u3001\u5165\u8377\u5074\u306e\u5b9f\u7e3e\u304c\u60aa\u3051\u308c\u3070\u3001\u9867\u5ba2\u3078\u306e\u7d0d\u671f\u306b\u3082\u5f71\u97ff\u3059\u308b\u3053\u3068\u304c\u3042\u308a\u307e\u3059\u3002<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u5224\u65ad\u306b\u3064\u306a\u304c\u308b\u6307\u6a19\u304b\u3089\u59cb\u3081\u308b<\/h2>\n\n\n<p>\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u304c\u81ea\u793e\u306e\u64cd\u696d\u306b\u3069\u306e\u3088\u3046\u306a\u652f\u969c\u3092\u53ca\u307c\u3057\u5f97\u308b\u304b\u3092\u8e0f\u307e\u3048\u3001\u6307\u6a19\u3092\u5c11\u6570\u306b\u7d5e\u308a\u307e\u3057\u3087\u3046\u3002\u4ee5\u4e0b\u306e\u6307\u6a19\u306f\u3001\u8abf\u9054\u90e8\u9580\u3068\u751f\u7523\u90e8\u9580\u304c\u8a55\u4fa1\u3092\u59cb\u3081\u308b\u969b\u306e\u571f\u53f0\u306b\u306a\u308a\u307e\u3059\u3002<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>\u6307\u6a19<\/th><th>\u660e\u78ba\u306a\u6e2c\u5b9a\u57fa\u6e96<\/th><th>\u5224\u65ad\u3067\u304d\u308b\u3053\u3068<\/th><\/tr><\/thead><tbody><tr><td>\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u306e\u7d0d\u671f\u9075\u5b88\u7387<\/td><td>\u5408\u610f\u3057\u305f\u7d0d\u5165\u671f\u9593\u3092\u5b88\u3063\u305f\u7d0d\u5165\u4e88\u5b9a\u660e\u7d30\u6570 \u00f7 \u5bfe\u8c61\u671f\u9593\u306b\u7d0d\u671f\u3092\u8fce\u3048\u308b\u7d0d\u5165\u4e88\u5b9a\u660e\u7d30\u6570 \u00d7 100<\/td><td>\u3069\u306e\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u304c\u7e70\u308a\u8fd4\u3057\u7d0d\u671f\u306e\u7d04\u675f\u3092\u5b88\u308c\u3066\u3044\u306a\u3044\u304b<\/td><\/tr><tr><td>\u7d0d\u671f\u30fb\u5168\u91cf\u9075\u5b88\u7387<\/td><td>\u7d0d\u671f\u3092\u8fce\u3048\u308b\u660e\u7d30\u306e\u3046\u3061\u3001\u6240\u5b9a\u306e\u7d0d\u5165\u671f\u9593\u5185\u306b\u5fc5\u8981\u6570\u91cf\u306e\u5168\u91cf\u3092\u53d7\u3051\u5165\u308c\u305f\u660e\u7d30\u6570 \u00f7 \u7d0d\u671f\u3092\u8fce\u3048\u308b\u660e\u7d30\u6570 \u00d7 100<\/td><td>\u7d04\u675f\u3055\u308c\u305f\u6570\u91cf\u3067\u4e88\u5b9a\u306e\u4f5c\u696d\u3092\u9032\u3081\u3089\u308c\u308b\u304b<\/td><\/tr><tr><td>\u53d7\u5165\u54c1\u8cea<\/td><td>\u4e0d\u5408\u683c\u6570\u91cf \u00f7 \u53d7\u5165\u6570\u91cf \u00d7 100\u3002\u672a\u5224\u5b9a\u306e\u8cc7\u6750\u306f\u5225\u9014\u628a\u63e1\u3059\u308b<\/td><td>\u5165\u8377\u3057\u305f\u8cc7\u6750\u306f\u751f\u7523\u306b\u4f7f\u7528\u3067\u304d\u308b\u54c1\u8cea\u304b<\/td><\/tr><tr><td>\u5b9f\u969b\u306e\u30ea\u30fc\u30c9\u30bf\u30a4\u30e0\u3068\u305d\u306e\u3070\u3089\u3064\u304d<\/td><td>\u5408\u610f\u3057\u305f\u767a\u6ce8\u306e\u8d77\u70b9\u304b\u3089\u5165\u8377\u307e\u3067\u306e\u7d4c\u904e\u6642\u9593\u3002\u540c\u3058\u66a6\u65e5\u30fb\u7a3c\u50cd\u65e5\u306e\u57fa\u6e96\u3067\u7b97\u51fa\u3059\u308b<\/td><td>\u3053\u306e\u8cc7\u6750\u306f\u5b9f\u969b\u306b\u306f\u3069\u308c\u3060\u3051\u524d\u306b\u767a\u6ce8\u3059\u308b\u5fc5\u8981\u304c\u3042\u308b\u304b<\/td><\/tr><tr><td>\u554f\u984c\u767a\u751f\u6642\u306e\u5bfe\u5fdc<\/td><td>\u5b9a\u7fa9\u3057\u305f\u554f\u984c\u901a\u77e5\u306e\u6642\u70b9\u304b\u3089\u3001\u7acb\u3066\u76f4\u3057\u306b\u4f7f\u3048\u308b\u56de\u7b54\u3092\u5f97\u308b\u307e\u3067\u306e\u6642\u9593<\/td><td>\u8a08\u753b\u62c5\u5f53\u8005\u304c\u9069\u6642\u306b\u7acb\u3066\u76f4\u3057\u306e\u5224\u65ad\u3092\u4e0b\u305b\u308b\u304b<\/td><\/tr><tr><td>\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u306b\u8d77\u56e0\u3059\u308b\u751f\u7523\u306e\u6df7\u4e71\u306b\u4f34\u3046\u30b3\u30b9\u30c8<\/td><td>\u5408\u610f\u3057\u305f\u30eb\u30fc\u30eb\u306b\u5f93\u3044\u3001\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u306b\u8d77\u56e0\u3059\u308b\u3068\u3057\u3066\u8a18\u9332\u3057\u305f\u8ffd\u52a0\u904b\u8cc3\u3001\u9078\u5225\u3001\u624b\u76f4\u3057\u306a\u3069\u306e\u8cbb\u7528<\/td><td>\u8cfc\u5165\u4fa1\u683c\u306e\u9670\u306b\u3001\u4f9b\u7d66\u4e0a\u306e\u554f\u984c\u306b\u3088\u308b\u591a\u984d\u306e\u30b3\u30b9\u30c8\u304c\u96a0\u308c\u3066\u3044\u306a\u3044\u304b<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>\u3053\u308c\u3089\u306e\u5b9a\u7fa9\u306f\u4e00\u4f8b\u3067\u3042\u308a\u3001\u3069\u3053\u306b\u3067\u3082\u9069\u7528\u3067\u304d\u308b\u63a1\u70b9\u30eb\u30fc\u30eb\u3067\u306f\u3042\u308a\u307e\u305b\u3093\u3002\u30c7\u30fc\u30bf\u306e\u7ba1\u7406\u8cac\u4efb\u8005\u3068\u6e2c\u5b9a\u57fa\u6e96\u3092\u5408\u610f\u3057\u3001\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u306b\u3082\u4f1d\u3048\u307e\u3057\u3087\u3046\u3002\u6cd5\u4ee4\u9075\u5b88\u3084\u8a8d\u8a3c\u306a\u3069\u3001\u54c1\u76ee\u30ab\u30c6\u30b4\u30ea\u30fc\u56fa\u6709\u306e\u8981\u4ef6\u304c\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u306e\u627f\u8a8d\u3084\u8cc7\u6750\u306e\u4f7f\u7528\u53ef\u5426\u306b\u95a2\u308f\u308b\u5834\u5408\u306f\u3001\u305d\u308c\u3089\u306e\u6307\u6a19\u3082\u52a0\u3048\u307e\u3059\u3002<\/p>\n\n\n<p>\u627f\u8a8d\u306b\u95a2\u308f\u308b\u91cd\u5927\u306a\u8981\u4ef6\u3078\u306e\u4e0d\u9069\u5408\u306f\u3001\u305d\u308c\u81ea\u4f53\u3092\u660e\u78ba\u306b\u793a\u3059\u5fc5\u8981\u304c\u3042\u308a\u307e\u3059\u3002\u4fa1\u683c\u306e\u8a55\u4fa1\u304c\u9ad8\u3044\u304b\u3089\u3068\u3044\u3063\u3066\u3001\u8cc7\u6750\u3092\u53d7\u3051\u5165\u308c\u3089\u308c\u306a\u3044\u307b\u3069\u306e\u4e0d\u9069\u5408\u304c\u7dcf\u5408\u8a55\u4fa1\u306e\u5e73\u5747\u70b9\u306b\u57cb\u3082\u308c\u3066\u306f\u3044\u3051\u307e\u305b\u3093\u3002<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u3092\u6bd4\u8f03\u3059\u308b\u524d\u306b\u3001\u96c6\u8a08\u5358\u4f4d\u3068\u65e5\u4ed8\u3092\u5b9a\u7fa9\u3059\u308b<\/h2>\n\n\n<p>\u4f55\u3092\u4e00\u4ef6\u3068\u3057\u3066\u6570\u3048\u308b\u306e\u304b\u304c\u5206\u304b\u3089\u306a\u3051\u308c\u3070\u3001\u7d0d\u671f\u9075\u5b88\u7387\u306e\u6570\u5b57\u306b\u610f\u5473\u306f\u307b\u3068\u3093\u3069\u3042\u308a\u307e\u305b\u3093\u3002\u4e00\u3064\u306e\u767a\u6ce8\u306b\u8907\u6570\u306e\u660e\u7d30\u3084\u7570\u306a\u308b\u7d0d\u671f\u304c\u542b\u307e\u308c\u3001\u5206\u7d0d\u3055\u308c\u308b\u3053\u3068\u3082\u3042\u308a\u307e\u3059\u3002\u767a\u6ce8\u5168\u4f53\u3092\u4e00\u4ef6\u3068\u3059\u308b\u5834\u5408\u3068\u3001\u7d0d\u5165\u4e88\u5b9a\u660e\u7d30\u3054\u3068\u3001\u3042\u308b\u3044\u306f\u5b9f\u969b\u306e\u5165\u8377\u3054\u3068\u306b\u6570\u3048\u308b\u5834\u5408\u3068\u3067\u306f\u3001\u7d50\u679c\u304c\u5909\u308f\u308a\u307e\u3059\u3002<\/p>\n\n\n<p>\u88fd\u9020\u696d\u306e\u5b9f\u52d9\u306b\u5f79\u7acb\u3064\u8a55\u4fa1\u8868\u3067\u306f\u3001\u54c1\u76ee\u30fb\u6570\u91cf\u30fb\u7d0d\u671f\u3092\u3072\u3068\u307e\u3068\u307e\u308a\u3068\u3059\u308b\u300c\u7d0d\u5165\u4e88\u5b9a\u660e\u7d30\u300d\u304c\u96c6\u8a08\u5358\u4f4d\u3068\u3057\u3066\u9069\u3057\u3066\u3044\u308b\u3053\u3068\u304c\u591a\u304f\u3042\u308a\u307e\u3059\u3002\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u304c\u5206\u7d0d\u3057\u3066\u3082\u3001\u5143\u306e\u660e\u7d30\u3092\u540c\u3058\u5358\u4f4d\u3068\u3057\u3066\u6271\u3044\u7d9a\u3051\u307e\u3057\u3087\u3046\u3002\u305d\u3046\u3057\u306a\u3051\u308c\u3070\u30011\u4ef6\u306e\u7d04\u675f\u304c\u672a\u5b8c\u4e86\u306a\u306e\u306b\u3001\u5c11\u91cf\u305a\u3064\u306e\u5165\u8377\u3092\u4f55\u4ef6\u3082\u306e\u7d0d\u5165\u6210\u529f\u3068\u3057\u3066\u6570\u3048\u3066\u3057\u307e\u3044\u304b\u306d\u307e\u305b\u3093\u3002<\/p>\n\n\n<p>\u6b21\u306e\u65e5\u4ed8\u306f\u533a\u5225\u3057\u3066\u7ba1\u7406\u3057\u307e\u3059\u3002<\/p>\n\n\n<ul class=\"wp-block-list\"><li>\u5e0c\u671b\u7d0d\u671f\uff1a\u81ea\u793e\u304c\u8cc7\u6750\u306e\u7d0d\u5165\u3092\u5e0c\u671b\u3057\u305f\u65e5\u3002<\/li><li>\u5f53\u521d\u56de\u7b54\u7d0d\u671f\uff1a\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u304c\u6700\u521d\u306b\u5f15\u304d\u53d7\u3051\u305f\u7d0d\u671f\u306e\u7d04\u675f\u3002<\/li><li>\u6700\u65b0\u56de\u7b54\u7d0d\u671f\uff1a\u8a08\u753b\u306e\u7acb\u3066\u76f4\u3057\u306b\u7528\u3044\u308b\u3001\u73fe\u6642\u70b9\u3067\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u304c\u7d04\u675f\u3057\u3066\u3044\u308b\u7d0d\u671f\u3002<\/li><li>\u5b9f\u5165\u8377\u65e5\uff1a\u5408\u610f\u3057\u305f\u53d7\u5165\u5834\u6240\u306b\u8cc7\u6750\u304c\u5230\u7740\u3057\u305f\u65e5\u3002<\/li><li>\u4f7f\u7528\u53ef\u80fd\u65e5\uff1a\u5fc5\u8981\u306a\u4f7f\u7528\u627f\u8a8d\u306a\u3069\u3092\u7d4c\u3066\u3001\u5fc5\u8981\u306a\u8cc7\u6750\u3092\u751f\u7523\u306b\u6295\u5165\u3067\u304d\u308b\u65e5\u3002<\/li><\/ul>\n\n\n<p>\u7d04\u675f\u3092\u5b88\u308b\u4fe1\u983c\u6027\u306f\u3001\u5f53\u521d\u56de\u7b54\u7d0d\u671f\u306a\u3069\u3001\u5909\u66f4\u305b\u305a\u306b\u4fdd\u5b58\u3057\u305f\u57fa\u6e96\u306b\u7167\u3089\u3057\u3066\u8a55\u4fa1\u3057\u307e\u3059\u3002\u5e0c\u671b\u7d0d\u671f\u3078\u306e\u5bfe\u5fdc\u3082\u91cd\u8981\u306a\u5834\u5408\u306f\u3001\u5225\u9014\u8ffd\u8de1\u3057\u307e\u3057\u3087\u3046\u3002\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u304c\u56de\u7b54\u7d0d\u671f\u3092\u5b88\u3063\u3066\u3044\u3066\u3082\u3001\u305d\u306e\u65e5\u4ed8\u81ea\u4f53\u304c\u81ea\u793e\u306e\u5fc5\u8981\u6642\u671f\u3088\u308a\u9045\u3044\u3053\u3068\u304c\u3042\u308b\u305f\u3081\u3067\u3059\u3002\u7d0d\u671f\u306e\u7d04\u675f\u304c\u5909\u308f\u308b\u305f\u3073\u306b\u3001\u57fa\u6e96\u3092\u9ed9\u3063\u3066\u4e0a\u66f8\u304d\u3057\u3066\u306f\u3044\u3051\u307e\u305b\u3093\u3002\u9867\u5ba2\u90fd\u5408\u3067\u5408\u610f\u306e\u3046\u3048\u65e5\u7a0b\u3092\u5909\u66f4\u3057\u305f\u5834\u5408\u306f\u3001\u7406\u7531\u3092\u8a18\u9332\u3057\u3001\u8a55\u4fa1\u8868\u3067\u306e\u6271\u3044\u3092\u660e\u78ba\u306b\u3057\u307e\u3059\u3002<\/p>\n\n\n<p>\u4e00\u65b9\u3001\u751f\u7523\u90e8\u9580\u306b\u306f\u3001\u73fe\u6642\u70b9\u3067\u6700\u3082\u4fe1\u983c\u3067\u304d\u308b\u8cc7\u6750\u306e\u5229\u7528\u53ef\u80fd\u6642\u671f\u306b\u95a2\u3059\u308b\u60c5\u5831\u304c\u5fc5\u8981\u3067\u3059\u3002\u5f53\u521d\u306e\u7d04\u675f\u306f\u4f55\u304c\u5b88\u3089\u308c\u306a\u304b\u3063\u305f\u304b\u3092\u8aac\u660e\u3057\u3001\u4fe1\u983c\u3067\u304d\u308b\u6700\u65b0\u306e\u8cc7\u6750\u4f7f\u7528\u53ef\u80fd\u65e5\u306f\u3001\u6b21\u306b\u3069\u306e\u4f5c\u696d\u3092\u9032\u3081\u3089\u308c\u308b\u304b\u3092\u5224\u65ad\u3059\u308b\u52a9\u3051\u306b\u306a\u308a\u307e\u3059\u3002<\/p>\n\n\n<p>\u7d0d\u5165\u3092\u8a31\u5bb9\u3059\u308b\u671f\u9593\u3082\u5b9a\u7fa9\u3057\u307e\u3057\u3087\u3046\u3002\u65e9\u3059\u304e\u308b\u7d0d\u5165\u306f\u8377\u6271\u3044\u3084\u4fdd\u7ba1\u306e\u554f\u984c\u3092\u62db\u304f\u3053\u3068\u304c\u3042\u308b\u305f\u3081\u3001\u7d0d\u671f\u524d\u306a\u3089\u3044\u3064\u3067\u3082\u300c\u7d0d\u671f\u9075\u5b88\u300d\u3068\u306f\u9650\u308a\u307e\u305b\u3093\u3002\u6a19\u6e96\u3068\u3055\u308c\u308b\u5272\u5408\u3084\u65e5\u6570\u3092\u305d\u306e\u307e\u307e\u4f7f\u3046\u306e\u3067\u306f\u306a\u304f\u3001\u8cc7\u6750\u306e\u7279\u6027\u3068\u53d7\u5165\u4f53\u5236\u306b\u5fdc\u3058\u3066\u8a31\u5bb9\u7bc4\u56f2\u3092\u6c7a\u3081\u307e\u3059\u3002<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u7d0d\u671f\u3068\u54c1\u8cea\u3092\u4f75\u305b\u3066\u898b\u308b<\/h2>\n\n\n<p>\u7d0d\u671f\u9075\u5b88\u7387\u306f\u3001\u7d0d\u5165\u304c\u6240\u5b9a\u306e\u7d0d\u671f\u57fa\u6e96\u3092\u6e80\u305f\u3057\u305f\u304b\u3092\u793a\u3057\u307e\u3059\u3002\u751f\u7523\u306b\u4f7f\u3048\u308b\u8cc7\u6750\u304c\u5341\u5206\u306a\u6570\u91cf\u5c4a\u3044\u305f\u304b\u307e\u3067\u5206\u304b\u308b\u3068\u306f\u9650\u308a\u307e\u305b\u3093\u3002<\/p>\n\n\n<p>\u7d0d\u671f\u30fb\u5168\u91cf\u9075\u5b88\u7387\u3067\u306f\u3001\u540c\u3058\u96c6\u8a08\u5358\u4f4d\u306b\u3064\u3044\u3066\u3001\u7d0d\u671f\u3068\u7d04\u675f\u3057\u305f\u6570\u91cf\u306e\u4e21\u65b9\u3092\u6e80\u305f\u3059\u3053\u3068\u3092\u6761\u4ef6\u306b\u3057\u307e\u3059\u3002\u54c1\u8cea\u306e\u5408\u5426\u306f\u5225\u306b\u660e\u793a\u3059\u308b\u304b\u3001\u54c1\u8cea\u5408\u683c\u3082\u6761\u4ef6\u306b\u542b\u3081\u305f\u8907\u5408\u6307\u6a19\u3092\u660e\u78ba\u306b\u5b9a\u7fa9\u3057\u3066\u304f\u3060\u3055\u3044\u3002OTD\u3001OTIF\u3001\u54c1\u8cea\u5408\u683c\u3092\u540c\u3058\u610f\u5473\u306e\u540d\u79f0\u3068\u3057\u3066\u4f7f\u3063\u3066\u306f\u3044\u3051\u307e\u305b\u3093\u3002<\/p>\n\n\n<p>\u90e8\u54c1100\u500b\u306e\u7d0d\u5165\u4e88\u5b9a\u660e\u7d30\u3092\u8003\u3048\u3066\u307f\u307e\u3057\u3087\u3046\u300280\u500b\u306f\u5408\u610f\u3057\u305f\u671f\u9593\u5185\u306b\u5c4a\u304d\u3001\u6b8b\u308a20\u500b\u306f\u9045\u308c\u3066\u5c4a\u304d\u307e\u3057\u305f\u3002\u660e\u7d30\u306e\u5168\u91cf\u3092\u6761\u4ef6\u3068\u3059\u308b\u30eb\u30fc\u30eb\u3067\u306f\u3001\u3053\u306e\u660e\u7d30\u306f\u7d0d\u671f\u30fb\u5168\u91cf\u9075\u5b88\u306e\u6761\u4ef6\u3092\u6e80\u305f\u3057\u307e\u305b\u3093\u300280\u500b\u3067\u5c0f\u3055\u306a\u751f\u7523\u30ed\u30c3\u30c8\u3092\u9032\u3081\u3089\u308c\u308b\u53ef\u80fd\u6027\u306f\u3042\u308a\u307e\u3059\u304c\u3001\u305d\u308c\u306f\u30b9\u30b1\u30b8\u30e5\u30fc\u30ea\u30f3\u30b0\u4e0a\u306e\u5224\u65ad\u3067\u3059\u3002\u5f53\u521d\u306e\u7d0d\u5165\u7d04\u675f\u3092\u5b8c\u4e86\u6271\u3044\u306b\u3059\u308b\u7406\u7531\u306b\u306f\u306a\u308a\u307e\u305b\u3093\u3002<\/p>\n\n\n<p>\u53d7\u5165\u54c1\u8cea\u306b\u3082\u540c\u3058\u3088\u3046\u306a\u6ce8\u610f\u304c\u5fc5\u8981\u3067\u3059\u3002\u4e0d\u5408\u683c\u54c1\u306e\u6570\u91cf\u6bd4\u7387\u3068\u3001\u82e6\u60c5\u304c\u767a\u751f\u3057\u305f\u7d0d\u5165\u306e\u5272\u5408\u306f\u3001\u6e2c\u3063\u3066\u3044\u308b\u3082\u306e\u304c\u7570\u306a\u308a\u307e\u3059\u30021\u500b\u3060\u3051\u306e\u4e0d\u5408\u683c\u3068\u3001\u30ed\u30c3\u30c8\u5168\u4f53\u304c\u4f7f\u7528\u4e0d\u80fd\u306a\u72b6\u614b\u3092\u3001\u5b9a\u7fa9\u306e\u66d6\u6627\u306a\u300c\u54c1\u8cea\u30b9\u30b3\u30a2\u300d\u306b\u57cb\u3082\u308c\u3055\u305b\u3066\u306f\u3044\u3051\u307e\u305b\u3093\u3002\u54c1\u76ee\u30ab\u30c6\u30b4\u30ea\u30fc\u306b\u3088\u3063\u3066\u306f\u3001\u53d7\u5165\u6570\u91cf100\u4e07\u500b\u5f53\u305f\u308a\u306e\u4e0d\u5408\u683c\u6570\u91cf\u3092\u8868\u3059PPM\u3082\u5f79\u7acb\u3061\u307e\u3059\u3002\u305d\u306e\u5834\u5408\u3082\u3001\u96c6\u8a08\u5358\u4f4d\u3068\u691c\u67fb\u5bfe\u8c61\u306e\u7bc4\u56f2\u3092\u7d71\u4e00\u3057\u307e\u3057\u3087\u3046\u3002<\/p>\n\n\n<p>\u691c\u67fb\u5f85\u3061\u306e\u8cc7\u6750\u306f\u3001\u81ea\u52d5\u7684\u306b\u5408\u683c\u306b\u3082\u4e0d\u5408\u683c\u306b\u3082\u306a\u308a\u307e\u305b\u3093\u3002\u691c\u67fb\u304c\u672a\u5b8c\u4e86\u306a\u3060\u3051\u306a\u306e\u306b\u54c1\u8cea\u5b9f\u7e3e\u304c\u826f\u597d\u306b\u898b\u3048\u308b\u3053\u3068\u304c\u306a\u3044\u3088\u3046\u3001\u5224\u5b9a\u5f85\u3061\u306e\u72b6\u614b\u3092\u660e\u793a\u3057\u307e\u3057\u3087\u3046\u3002\u751f\u7523\u306b\u3068\u3063\u3066\u5fc5\u8981\u306a\u306e\u306f\u3001\u30c8\u30e9\u30c3\u30af\u306e\u5230\u7740\u4e88\u5b9a\u3060\u3051\u3067\u306a\u304f\u3001\u5fc5\u8981\u6570\u91cf\u304c\u5b9f\u969b\u306b\u3044\u3064\u4f7f\u7528\u53ef\u80fd\u306b\u306a\u308b\u304b\u3092\u660e\u3089\u304b\u306b\u3059\u308b\u3053\u3068\u3067\u3059\u3002<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u672a\u7d0d\u3092\u9664\u5916\u3057\u305f\u7d0d\u671f\u8a55\u4fa1\u3092\u907f\u3051\u308b<\/h2>\n\n\n<p>\u5206\u6bcd\u306e\u53d6\u308a\u65b9\u306b\u3088\u3063\u3066\u306f\u3001\u7ba1\u7406\u3057\u305f\u3044\u554f\u984c\u305d\u306e\u3082\u306e\u304c\u898b\u3048\u306a\u304f\u306a\u308a\u307e\u3059\u3002\u305d\u306e\u6708\u306b\u5165\u8377\u3057\u305f\u5206\u3060\u3051\u3092\u6570\u3048\u308b\u3068\u3001\u5c4a\u304b\u306a\u304b\u3063\u305f\u5206\u304c\u8a08\u7b97\u304b\u3089\u629c\u3051\u843d\u3061\u308b\u53ef\u80fd\u6027\u304c\u3042\u308a\u307e\u3059\u3002<\/p>\n\n\n<p>\u3042\u308b\u6708\u306b20\u4ef6\u306e\u7d0d\u5165\u4e88\u5b9a\u660e\u7d30\u304c\u7d0d\u671f\u3092\u8fce\u3048\u305f\u3068\u3057\u307e\u3059\u3002\u6708\u672b\u307e\u3067\u306b18\u4ef6\u304c\u5165\u8377\u3057\u3001\u305d\u306e\u3046\u306116\u4ef6\u304c\u5408\u610f\u3057\u305f\u7d0d\u5165\u671f\u9593\u3092\u5b88\u308a\u307e\u3057\u305f\u3002\u6b8b\u308a2\u4ef6\u306f\u672a\u7d0d\u3067\u3057\u305f\u3002<\/p>\n\n\n<p>\u7d0d\u671f\u3092\u8fce\u3048\u305f\u660e\u7d30\u3092\u5206\u6bcd\u306b\u3059\u308b\u3068\u3001\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u306eOTD\u306f<strong>16 \u00f7 20 \u00d7 100 = 80%<\/strong>\u3067\u3059\u3002\u5165\u8377\u6e08\u307f\u306e\u660e\u7d30\u3060\u3051\u3067\u8a08\u7b97\u3059\u308b\u3068\u3001\u5c0f\u6570\u7b2c1\u4f4d\u306b\u4e38\u3081\u3066<strong>16 \u00f7 18 \u00d7 100 = 88.9%<\/strong>\u306b\u306a\u308a\u307e\u3059\u3002\u3069\u3061\u3089\u3082\u3001\u5bfe\u8c61\u3068\u306a\u308b\u6bcd\u96c6\u56e3\u3092\u5b9a\u7fa9\u3059\u308c\u3070\u6210\u308a\u7acb\u3064\u8a08\u7b97\u3067\u3059\u304c\u3001\u7b54\u3048\u3066\u3044\u308b\u554f\u3044\u304c\u7570\u306a\u308a\u307e\u3059\u3002\u5165\u8377\u6e08\u307f\u3060\u3051\u306e\u6570\u5024\u3067\u306f\u3001\u305d\u306e\u6708\u306b\u7d0d\u671f\u3092\u8fce\u3048\u305f\u3059\u3079\u3066\u306e\u7d04\u675f\u3092\u3001\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u304c\u3069\u308c\u3060\u3051\u78ba\u5b9f\u306b\u679c\u305f\u3057\u305f\u304b\u306f\u5206\u304b\u308a\u307e\u305b\u3093\u3002<\/p>\n\n\n<p>\u7d0d\u671f\u3092\u904e\u304e\u3066\u3082\u672a\u7d0d\u306e\u660e\u7d30\u306f\u3001\u7d4c\u904e\u65e5\u6570\u3068\u5bfe\u8c61\u8cc7\u6750\u3092\u542b\u3081\u3066\u898b\u3048\u308b\u72b6\u614b\u306b\u3057\u3066\u304a\u304d\u307e\u3057\u3087\u3046\u3002\u30ad\u30e3\u30f3\u30bb\u30eb\u3001\u5909\u66f4\u3001\u96c6\u8a08\u671f\u9593\u306e\u7de0\u3081\u306b\u3064\u3044\u3066\u306f\u3001\u6587\u66f8\u5316\u3057\u305f\u30eb\u30fc\u30eb\u3092\u9069\u7528\u3057\u307e\u3059\u3002\u6bd4\u8f03\u3059\u308b\u3059\u3079\u3066\u306e\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u306b\u540c\u3058\u30eb\u30fc\u30eb\u3092\u4f7f\u3044\u3001\u7d50\u679c\u306b\u7570\u8b70\u304c\u51fa\u305f\u969b\u306b\u8ffd\u8de1\u3067\u304d\u308b\u3088\u3046\u3001\u96c6\u8a08\u306e\u57fa\u306b\u306a\u3063\u305f\u660e\u7d30\u8a18\u9332\u3082\u6b8b\u3057\u3066\u304f\u3060\u3055\u3044\u3002<\/p>\n\n\n<p>\u5272\u5408\u306b\u306f\u3001\u8a55\u4fa1\u5bfe\u8c61\u306e\u4ef6\u6570\u3082\u4f75\u8a18\u3057\u307e\u3059\u3002\u6570\u4ef6\u306e\u7d0d\u5165\u306e\u3046\u30611\u4ef6\u306b\u4e0d\u5c65\u884c\u304c\u3042\u3063\u305f\u5834\u5408\u3068\u3001\u6570\u767e\u4ef6\u306b\u308f\u305f\u3063\u3066\u540c\u3058\u554f\u984c\u304c\u7d9a\u3044\u3066\u3044\u308b\u5834\u5408\u3067\u306f\u3001\u8a55\u4fa1\u306e\u4ed5\u65b9\u304c\u7570\u306a\u308a\u307e\u3059\u3002\u3059\u3079\u3066\u306e\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u3092\u540c\u3058\u6761\u4ef6\u3067\u9806\u4f4d\u4ed8\u3051\u3059\u308b\u306e\u3067\u306f\u306a\u304f\u3001\u985e\u4f3c\u3059\u308b\u8cc7\u6750\u533a\u5206\u3084\u4f9b\u7d66\u6761\u4ef6\u306e\u4e2d\u3067\u6bd4\u8f03\u3057\u3066\u304f\u3060\u3055\u3044\u3002<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u30ea\u30fc\u30c9\u30bf\u30a4\u30e0\u306e\u5b89\u5b9a\u6027\u3001\u5bfe\u5fdc\u529b\u3001\u5b9f\u969b\u306e\u30b3\u30b9\u30c8\u3092\u6e2c\u308b<\/h2>\n\n\n<p>\u63d0\u793a\u3055\u308c\u305f\u30ea\u30fc\u30c9\u30bf\u30a4\u30e0\u304c\u77ed\u3044\u3053\u3068\u306f\u9b45\u529b\u3067\u3059\u304c\u3001\u751f\u7523\u8a08\u753b\u3092\u5de6\u53f3\u3059\u308b\u306e\u306f\u5b9f\u7e3e\u3067\u3059\u3002\u5fc5\u8981\u4e8b\u9805\u304c\u3059\u3079\u3066\u305d\u308d\u3063\u305f\u767a\u6ce8\u66f8\u306e\u767a\u884c\u6642\u70b9\u306a\u3069\u3001\u8a08\u6e2c\u306e\u8d77\u70b9\u3092\u5b9a\u7fa9\u3057\u3001\u5165\u8377\u307e\u3067\u306e\u671f\u9593\u3092\u66a6\u65e5\u307e\u305f\u306f\u7a3c\u50cd\u65e5\u306e\u3069\u3061\u3089\u304b\u306b\u7d71\u4e00\u3057\u3066\u6e2c\u5b9a\u3057\u307e\u3059\u3002\u5e73\u5747\u3060\u3051\u3067\u306a\u304f\u3001\u3070\u3089\u3064\u304d\u3082\u628a\u63e1\u3057\u3066\u304f\u3060\u3055\u3044\u3002\u5b89\u5b9a\u3057\u3066\u7d0d\u5165\u3055\u308c\u308b\u5834\u5408\u3068\u3001\u5927\u5e45\u306a\u524d\u5012\u3057\u3068\u9045\u5ef6\u3092\u7e70\u308a\u8fd4\u3059\u5834\u5408\u3067\u306f\u3001\u4f9b\u7d66\u306e\u5b9f\u614b\u304c\u7570\u306a\u308a\u307e\u3059\u3002<\/p>\n\n\n<p>\u7d04\u675f\u3055\u308c\u305f\u30ea\u30fc\u30c9\u30bf\u30a4\u30e0\u3068\u5b9f\u969b\u306e\u30ea\u30fc\u30c9\u30bf\u30a4\u30e0\u306f\u3001\u5206\u3051\u3066\u7ba1\u7406\u3057\u307e\u3059\u3002\u7d04\u675f\u306e\u671f\u9650\u304c\u7e70\u308a\u8fd4\u3057\u5ef6\u9577\u3055\u308c\u305f\u7d50\u679c\u3001\u4f9b\u7d66\u306e\u5b9f\u614b\u304c\u4ee5\u524d\u3088\u308a\u5b89\u5b9a\u3057\u3066\u3044\u308b\u3088\u3046\u306b\u898b\u3048\u3066\u306f\u3044\u3051\u307e\u305b\u3093\u3002\u8f38\u9001\u3084\u53d7\u5165\u691c\u67fb\u306b\u3088\u3063\u3066\u751f\u7523\u3067\u4f7f\u7528\u3067\u304d\u308b\u307e\u3067\u306b\u6642\u9593\u304c\u304b\u304b\u308b\u5834\u5408\u306f\u3001\u5165\u8377\u3057\u305f\u6642\u70b9\u3067\u4f7f\u7528\u53ef\u80fd\u3068\u898b\u306a\u3055\u305a\u3001\u305d\u308c\u305e\u308c\u306e\u6240\u8981\u6642\u9593\u3092\u660e\u793a\u3057\u3066\u304f\u3060\u3055\u3044\u3002<\/p>\n\n\n<p>\u5bfe\u5fdc\u529b\u3092\u8a55\u4fa1\u3059\u308b\u306b\u306f\u3001\u3069\u306e\u3088\u3046\u306a\u56de\u7b54\u3092\u6709\u52b9\u3068\u898b\u306a\u3059\u304b\u3092\u6c7a\u3081\u307e\u3059\u3002\u300c\u78ba\u8a8d\u4e2d\u3067\u3059\u300d\u3068\u3044\u3046\u9023\u7d61\u3068\u3001\u4fe1\u983c\u3067\u304d\u308b\u6570\u91cf\u30fb\u65e5\u4ed8\u3092\u793a\u3057\u305f\u633d\u56de\u7b56\u306e\u56de\u7b54\u306f\u540c\u3058\u3067\u306f\u3042\u308a\u307e\u305b\u3093\u3002\u5f8c\u8005\u306e\u56de\u7b54\u304c\u5f97\u3089\u308c\u308b\u307e\u3067\u306e\u6642\u9593\u3092\u6e2c\u5b9a\u3057\u3001\u5408\u610f\u3057\u305f\u662f\u6b63\u63aa\u7f6e\u304c\u5b8c\u4e86\u3057\u3001\u52b9\u679c\u3092\u4e0a\u3052\u3066\u3044\u308b\u304b\u3082\u8ffd\u8de1\u3057\u307e\u3059\u3002\u8abf\u9054\u90e8\u9580\u306b\u5fc5\u8981\u306a\u306e\u306f\u3001\u30e1\u30fc\u30eb\u306b\u8fd4\u4fe1\u304c\u3042\u3063\u305f\u3068\u3044\u3046\u8a18\u9332\u3060\u3051\u3067\u306f\u306a\u304f\u3001\u6b21\u306e\u884c\u52d5\u3092\u5224\u65ad\u3059\u308b\u6839\u62e0\u3067\u3059\u3002<\/p>\n\n\n<p>\u30b3\u30b9\u30c8\u6307\u6a19\u306f\u3001\u4f55\u3092\u512a\u5148\u3057\u3001\u4f55\u3092\u72a0\u7272\u306b\u3057\u3066\u3044\u308b\u304b\u3092\u660e\u78ba\u306b\u3059\u308b\u305f\u3081\u306b\u4f7f\u3044\u307e\u3059\u3002\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u306b\u8d77\u56e0\u3059\u308b\u554f\u984c\u3068\u81ea\u793e\u5074\u304b\u3089\u306e\u5909\u66f4\u3092\u533a\u5225\u3057\u306a\u304c\u3089\u3001\u8ffd\u52a0\u306e\u8f38\u9001\u8cbb\u3001\u9078\u5225\u8cbb\u3001\u624b\u76f4\u3057\u8cbb\u306a\u3069\u3001\u4f9b\u7d66\u306e\u6df7\u4e71\u306b\u4f34\u3046\u95a2\u9023\u8cbb\u7528\u3092\u4e00\u8cab\u3057\u305f\u65b9\u6cd5\u3067\u8a18\u9332\u3057\u3066\u304f\u3060\u3055\u3044\u3002\u3053\u3046\u3057\u305f\u8cbb\u7528\u306f\u8cfc\u5165\u4fa1\u683c\u3068\u4f75\u305b\u3066\u691c\u8a0e\u3057\u307e\u3059\u3002\u7d0d\u5165\u306e\u305f\u3073\u306b\u7dca\u6025\u306e\u633d\u56de\u5bfe\u5fdc\u304c\u5fc5\u8981\u3067\u3042\u308c\u3070\u3001\u5358\u4fa1\u306e\u5b89\u3044\u90e8\u54c1\u304c\u7d50\u679c\u7684\u306b\u9ad8\u304f\u3064\u304f\u3053\u3068\u3082\u3042\u308a\u307e\u3059\u3002<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u884c\u52d5\u306b\u3064\u306a\u304c\u308b\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u8a55\u4fa1\u8868\u3092\u4f5c\u308b<\/h2>\n\n\n<p>\u5b9f\u7528\u7684\u306a\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u8a55\u4fa1\u8868\u306b\u306f\u3001\u9078\u5b9a\u3057\u305f\u6307\u6a19\u3054\u3068\u306b\u73fe\u5728\u306e\u5b9f\u7e3e\u3001\u76ee\u6a19\u3001\u63a8\u79fb\u3001\u8a55\u4fa1\u5bfe\u8c61\u4ef6\u6570\u3092\u793a\u3057\u307e\u3059\u3002\u307e\u305f\u3001\u554f\u984c\u3092\u88cf\u4ed8\u3051\u308b\u8a18\u9332\u3001\u6b21\u306e\u5bfe\u5fdc\u306e\u8cac\u4efb\u8005\u3001\u9032\u6357\u3092\u78ba\u8a8d\u3059\u308b\u65e5\u4ed8\u3082\u660e\u8a18\u3057\u307e\u3059\u3002<\/p>\n\n\n<p>\u5224\u5b9a\u57fa\u6e96\u306f\u3001\u54c1\u76ee\u306e\u533a\u5206\u3068\u751f\u7523\u3078\u306e\u30ea\u30b9\u30af\u306b\u5fdc\u3058\u3066\u8a2d\u5b9a\u3057\u307e\u3059\u3002\u5358\u4fa1\u304c\u5b89\u304f\u3066\u3082\u3001\u8abf\u9054\u5148\u304c1\u793e\u3057\u304b\u306a\u3044\u90e8\u54c1\u304c\u6b20\u54c1\u3059\u308c\u3070\u3001\u7d44\u7acb\u304c\u6b62\u307e\u308b\u3053\u3068\u304c\u3042\u308a\u307e\u3059\u3002\u305d\u306e\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u304b\u3089\u306e\u8cfc\u5165\u91d1\u984d\u3060\u3051\u3067\u306f\u3001\u3053\u3046\u3057\u305f\u30ea\u30b9\u30af\u306e\u5927\u304d\u3055\u3092\u9069\u5207\u306b\u6e2c\u308c\u307e\u305b\u3093\u3002\u52a0\u91cd\u5e73\u5747\u306b\u3088\u308b\u7dcf\u5408\u8a55\u4fa1\u3092\u4f7f\u3046\u5834\u5408\u3082\u3001\u500b\u5225\u6307\u6a19\u306e\u7d50\u679c\u3092\u78ba\u8a8d\u3067\u304d\u308b\u3088\u3046\u306b\u3057\u3001\u5e73\u5747\u70b9\u306b\u304b\u304b\u308f\u3089\u305a\u5bfe\u5fdc\u304c\u5fc5\u8981\u3068\u306a\u308b\u91cd\u5927\u306a\u4e0d\u5c65\u884c\u3092\u5b9a\u3081\u3066\u304f\u3060\u3055\u3044\u3002<\/p>\n\n\n<p>\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u306e\u6539\u5584\u306b\u5411\u3051\u3001\u5b9a\u671f\u7684\u306a\u30ec\u30d3\u30e5\u30fc\u306e\u983b\u5ea6\u3092\u5408\u610f\u3057\u307e\u3059\u3002\u30ea\u30b9\u30af\u304c\u9ad8\u3044\u5834\u5408\u3084\u5b9f\u7e3e\u304c\u4f4e\u4e0b\u3057\u3066\u3044\u308b\u5834\u5408\u306f\u3001\u5fc5\u8981\u306b\u5fdc\u3058\u3066\u91cd\u70b9\u7684\u306b\u78ba\u8a8d\u3057\u3066\u304f\u3060\u3055\u3044\u3002\u30ec\u30d3\u30e5\u30fc\u3067\u306f\u3001\u554f\u984c\u304c\u7e70\u308a\u8fd4\u3055\u308c\u308b\u539f\u56e0\u3092\u7279\u5b9a\u3057\u3001\u5177\u4f53\u7684\u306a\u6539\u5584\u7b56\u3092\u5408\u610f\u3057\u307e\u3059\u3002\u4f8b\u3048\u3070\u3001\u4e88\u5b9a\u3069\u304a\u308a\u51fa\u8377\u3067\u304d\u306a\u3044\u5834\u5408\u306e\u65e9\u671f\u9023\u7d61\u3001\u7d0d\u671f\u56de\u7b54\u30d7\u30ed\u30bb\u30b9\u306e\u898b\u76f4\u3057\u3001\u7e70\u308a\u8fd4\u3057\u767a\u751f\u3059\u308b\u4e0d\u826f\u3078\u306e\u662f\u6b63\u63aa\u7f6e\u306a\u3069\u3067\u3059\u3002<\/p>\n\n\n<p>\u305f\u3060\u3057\u3001\u672a\u89e3\u6d88\u306e\u8cc7\u6750\u4e0d\u8db3\u3078\u306e\u5bfe\u5fdc\u3092\u3001\u305d\u306e\u4f1a\u8b70\u307e\u3067\u5f85\u3063\u3066\u306f\u3044\u3051\u307e\u305b\u3093\u3002\u8a55\u4fa1\u8868\u304c\u793a\u3059\u306e\u306f\u5b9f\u7e3e\u306e\u50be\u5411\u3067\u3059\u3002\u751f\u7523\u73fe\u5834\u306b\u306f\u3001\u4eca\u306e\u72b6\u6cc1\u306b\u5373\u3057\u305f\u633d\u56de\u7b56\u306e\u5224\u65ad\u304c\u5fc5\u8981\u3067\u3059\u3002<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u4f9b\u7d66\u306e\u554f\u984c\u306b\u5bfe\u5fdc\u3067\u304d\u308b\u751f\u7523\u30b9\u30b1\u30b8\u30e5\u30fc\u30eb\u3092\u7d44\u3080<\/h2>\n\n\n<p>\u7d0d\u5165\u4e88\u5b9a\u304c\u5909\u308f\u3063\u305f\u3089\u3001\u307e\u305a\u5bfe\u8c61\u306e\u90e8\u54c1\u3001\u6570\u91cf\u3001\u4fe1\u983c\u3067\u304d\u308b\u4f7f\u7528\u53ef\u80fd\u65e5\u3092\u78ba\u8a8d\u3057\u307e\u3059\u3002\u305d\u306e\u8cc7\u6750\u3092\u5fc5\u8981\u3068\u3059\u308b\u88fd\u9020\u6307\u56f3\u3092\u7279\u5b9a\u3057\u3001\u53d7\u5165\u308c\u304c\u8a8d\u3081\u3089\u308c\u305f\u4e00\u90e8\u306e\u6570\u91cf\u3067\u4f5c\u696d\u3092\u9032\u3081\u3089\u308c\u308b\u304b\u3082\u78ba\u8a8d\u3057\u3066\u304f\u3060\u3055\u3044\u3002\u305d\u306e\u3046\u3048\u3067\u3001\u8a72\u5f53\u3059\u308b\u4f5c\u696d\u3092\u5de5\u5834\u5185\u306e\u4ed6\u306e\u4f5c\u696d\u3068\u8abf\u6574\u3057\u307e\u3059\u3002<\/p>\n\n\n<p>\u3053\u306e\u30b9\u30b1\u30b8\u30e5\u30fc\u30eb\u8abf\u6574\u306b\u306f\u3001SkyPlanner APS\u304c\u9069\u3057\u3066\u3044\u307e\u3059\u3002\u767a\u6ce8\u66f8\u306b\u306f\u5165\u8377\u4e88\u5b9a\u65e5\u3001\u78ba\u5b9a\u7d0d\u671f\u3001\u5165\u8377\u5b9f\u7e3e\u65e5\u3092\u4fdd\u6301\u3067\u304d\u3001\u767a\u6ce8\u660e\u7d30\u3092\u88fd\u9020\u6307\u56f3\u306b\u95a2\u9023\u4ed8\u3051\u308b\u3053\u3068\u304c\u3067\u304d\u307e\u3059\u3002\u8cc7\u6750\u3092\u8003\u616e\u3057\u305f\u30b9\u30b1\u30b8\u30e5\u30fc\u30ea\u30f3\u30b0\u3092\u8a2d\u5b9a\u3059\u308b\u3068\u3001\u66f4\u65b0\u30fb\u7ba1\u7406\u3057\u3066\u3044\u308b\u5165\u8377\u60c5\u5831\u304c\u30b9\u30b1\u30b8\u30e5\u30fc\u30eb\u8a08\u7b97\u306b\u53cd\u6620\u3055\u308c\u307e\u3059\u3002SkyPlanner\u306eAI\u30b9\u30b1\u30b8\u30e5\u30fc\u30ea\u30f3\u30b0\u30a8\u30f3\u30b8\u30f3\u3067\u3042\u308bArcturus\u306f\u3001\u8cc7\u6750\u3001\u751f\u7523\u80fd\u529b\u3001\u512a\u5148\u9806\u4f4d\u3001\u5de5\u7a0b\u9593\u306e\u4f9d\u5b58\u95a2\u4fc2\u3092\u8e0f\u307e\u3048\u3066\u4f5c\u696d\u3092\u914d\u7f6e\u3057\u3001\u305d\u306e\u7d50\u679c\u3092Gantt\u30d3\u30e5\u30fc\u3067\u78ba\u8a8d\u3067\u304d\u307e\u3059\u3002<\/p>\n\n\n<p>\u3053\u308c\u306b\u3088\u308a\u3001\u8a08\u753b\u62c5\u5f53\u8005\u306e\u4ed5\u4e8b\u306e\u9032\u3081\u65b9\u3082\u5909\u308f\u308a\u307e\u3059\u3002\u5f71\u97ff\u3092\u53d7\u3051\u308b\u5de5\u7a0b\u3092\u4e00\u3064\u305a\u3064\u79fb\u52d5\u3057\u3001\u6b21\u306e\u8a2d\u5099\u306e\u4f5c\u696d\u9806\u3092\u624b\u4f5c\u696d\u3067\u8abf\u6574\u3059\u308b\u4ee3\u308f\u308a\u306b\u3001\u8cc7\u6750\u60c5\u5831\u3092\u66f4\u65b0\u3057\u3066<a href=\"https:\/\/skyplanner.ai\/ja\/%e3%83%aa%e3%82%bd%e3%83%bc%e3%82%b9\/production-scheduling\/\">\u30b9\u30b1\u30b8\u30e5\u30fc\u30eb\u3092\u518d\u8a08\u7b97<\/a>\u3057\u3001\u9867\u5ba2\u306b\u7d04\u675f\u3057\u305f\u7d0d\u671f\u3078\u306e\u5f71\u97ff\u3092\u78ba\u8a8d\u3057\u307e\u3059\u3002\u512a\u5148\u9806\u4f4d\u3084\u30b9\u30b1\u30b8\u30e5\u30fc\u30ea\u30f3\u30b0\u30eb\u30fc\u30eb\u3092\u901a\u3058\u3066\u3001\u5f15\u304d\u7d9a\u304d\u62c5\u5f53\u8005\u304c\u8a08\u753b\u3092\u30b3\u30f3\u30c8\u30ed\u30fc\u30eb\u3067\u304d\u307e\u3059\u3002<\/p>\n\n\n<p>\u4f8b\u3048\u3070\u3001\u7d0d\u5165\u304c\u9045\u308c\u3066\u3044\u308b\u92f3\u7269\u306e\u78ba\u5b9a\u7d0d\u671f\u304c\u3001\u3055\u3089\u306b\u5f8c\u308d\u306b\u305a\u308c\u305f\u3068\u3057\u307e\u3059\u3002\u305d\u306e\u92f3\u7269\u306e\u6a5f\u68b0\u52a0\u5de5\u5de5\u7a0b\u3068\u7d44\u7acb\u5de5\u7a0b\u3092\u52d5\u304b\u3059\u5fc5\u8981\u304c\u3042\u308a\u307e\u3059\u304c\u3001\u540c\u3058\u8a2d\u5099\u3084\u4eba\u54e1\u306f\u4ed6\u306e\u88fd\u9020\u6307\u56f3\u3067\u3082\u4f7f\u308f\u308c\u307e\u3059\u3002SkyPlanner\u306f\u3001\u3053\u308c\u3089\u306e\u7af6\u5408\u3059\u308b\u8ca0\u8377\u3092\u540c\u3058\u8a08\u7b97\u306b\u53d6\u308a\u8fbc\u307f\u3001\u3069\u306e\u4f5c\u696d\u3092\u9032\u3081\u3089\u308c\u308b\u304b\u3001\u3069\u306e\u7d0d\u671f\u7d04\u675f\u306b\u5bfe\u5fdc\u304c\u5fc5\u8981\u304b\u3092\u628a\u63e1\u3057\u3084\u3059\u304f\u3057\u307e\u3059\u3002\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u304b\u3089\u306e\u65b0\u3057\u3044\u7d0d\u671f\u56de\u7b54\u3092\u3001\u767a\u6ce8\u66f8\u4e0a\u306e\u5358\u306a\u308b\u30e1\u30e2\u3067\u7d42\u308f\u3089\u305b\u305a\u3001\u5de5\u5834\u5168\u4f53\u306e\u8a08\u753b\u306b\u53cd\u6620\u3067\u304d\u307e\u3059\u3002<\/p>\n\n\n<p>\u4f7f\u7528\u53ef\u80fd\u306b\u306a\u308b\u898b\u8fbc\u307f\u3068\u3001\u5b9f\u969b\u306e\u5165\u8377\u306f\u5225\u306e\u3082\u306e\u3067\u3059\u3002SkyPlanner\u3067\u306f\u3001\u767a\u6ce8\u66f8\u3092\u5165\u8377\u6e08\u307f\u3068\u3057\u3066\u78ba\u5b9a\u3059\u308b\u3068\u5728\u5eab\u304c\u66f4\u65b0\u3055\u308c\u307e\u3059\u3002\u54c1\u8cea\u4e0a\u306e\u4f7f\u7528\u627f\u8a8d\u304c\u5fc5\u8981\u306a\u5834\u5408\u306f\u3001\u305d\u306e\u6642\u671f\u3092\u8a08\u753b\u306b\u4f7f\u3046\u4f7f\u7528\u53ef\u80fd\u65e5\u306b\u53cd\u6620\u3057\u3001\u307e\u3060\u4fdd\u7559\u4e2d\u306e\u8cc7\u6750\u3092\u524d\u63d0\u306b\u30b9\u30b1\u30b8\u30e5\u30fc\u30eb\u3092\u7d44\u307e\u306a\u3044\u3088\u3046\u306b\u3057\u3066\u304f\u3060\u3055\u3044\u3002<\/p>\n\n\n<p>SkyPlanner\u306f\u3001<a href=\"https:\/\/skyplanner.ai\/ja\/%e7%b5%b1%e5%90%88\/\">\u516c\u958bREST API\u3092\u901a\u3058\u3066\u3001\u3042\u3089\u3086\u308bERP\u3084MES\u3068\u9023\u643a\u3067\u304d\u307e\u3059<\/a>\u3002\u8a08\u753b\u3092\u6539\u5584\u3059\u308b\u305f\u3081\u3060\u3051\u306b\u7a3c\u50cd\u4e2d\u306eERP\u3092\u7f6e\u304d\u63db\u3048\u308b\u5fc5\u8981\u306f\u306a\u304f\u3001\u65e2\u5b58\u306e\u8cfc\u8cb7\u30fb\u751f\u7523\u60c5\u5831\u3092\u6709\u9650\u80fd\u529b\u30b9\u30b1\u30b8\u30e5\u30fc\u30ea\u30f3\u30b0\u306b\u6d3b\u7528\u3067\u304d\u307e\u3059\u3002<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u8cc7\u6750\u306e\u53ef\u8996\u5316\u304cEskomatic\u306b\u3082\u305f\u3089\u3057\u305f\u5909\u5316<\/h2>\n\n\n<p>\u30d5\u30a3\u30f3\u30e9\u30f3\u30c9\u3067\u6a5f\u68b0\u52a0\u5de5\u3092\u53d7\u8a17\u3059\u308bEskomatic\u306f\u3001\u4ee5\u524d\u306f\u8001\u673d\u5316\u3057\u305fERP\u3068\u751f\u7523\u7ba1\u7406\u30b7\u30b9\u30c6\u30e0\u3092\u4f7f\u3044\u3001\u4f5c\u696d\u9806\u306e\u8abf\u6574\u3092\u4e3b\u306b\u624b\u4f5c\u696d\u3067\u884c\u3063\u3066\u3044\u307e\u3057\u305f\u3002\u4f5c\u696d\u306e\u958b\u59cb\u4e88\u5b9a\u304c\u76ee\u524d\u306b\u8feb\u3063\u3066\u304b\u3089\u8cc7\u6750\u4e0d\u8db3\u304c\u5224\u660e\u3059\u308b\u3053\u3068\u3082\u3042\u308a\u3001\u62c5\u5f53\u8005\u306f\u305d\u306e\u5f71\u97ff\u3078\u306e\u5bfe\u51e6\u306b\u8ffd\u308f\u308c\u3066\u3044\u307e\u3057\u305f\u3002<\/p>\n\n\n<p>SkyPlanner\u306e\u5c0e\u5165\u5f8c\u306f\u3001\u4f5c\u696d\u9806\u306e\u53ef\u8996\u5316\u3068\u8ca0\u8377\u3092\u8003\u616e\u3057\u305f\u81ea\u52d5\u30b9\u30b1\u30b8\u30e5\u30fc\u30ea\u30f3\u30b0\u306b\u3088\u308a\u3001\u4eca\u5f8c\u306e\u4f5c\u696d\u3092\u628a\u63e1\u3057\u3084\u3059\u304f\u306a\u308a\u307e\u3057\u305f\u3002Eskomatic\u306f\u3001\u7d0d\u671f\u8a2d\u5b9a\u306e\u7cbe\u5ea6\u304c\u4e0a\u304c\u308a\u3001\u8cc7\u6750\u4e0d\u8db3\u306b\u3088\u308b\u751f\u7523\u505c\u6b62\u304c\u6e1b\u3063\u305f\u3068\u5831\u544a\u3057\u3066\u3044\u307e\u3059\u3002\u751f\u7523\u8a08\u753b\u30de\u30cd\u30fc\u30b8\u30e3\u30fc\u306eTommi M\u00e4nnist\u00f6\u6c0f\u306f\u3001\u7279\u306b\u7d0d\u671f\u8a2d\u5b9a\u306b\u304a\u3051\u308b\u6709\u7528\u6027\u3092\u9ad8\u304f\u8a55\u4fa1\u3057\u3066\u3044\u307e\u3059\u3002<\/p>\n\n\n<p>\u3053\u306e\u4e8b\u4f8b\u306f\u3001\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u8a55\u4fa1\u8868\u306e\u6d3b\u7528\u306b\u3082\u5b9f\u8df5\u7684\u306a\u793a\u5506\u3092\u4e0e\u3048\u307e\u3059\u3002\u4f9b\u7d66\u306e\u4e0d\u5b89\u5b9a\u3055\u3092\u7279\u5b9a\u3059\u308b\u3053\u3068\u306b\u306f\u4fa1\u5024\u304c\u3042\u308a\u307e\u3059\u304c\u3001\u5de5\u5834\u304c\u5bfe\u5fdc\u3059\u308b\u306b\u306f\u3001\u5b9f\u969b\u306e\u4f5c\u696d\u3078\u306e\u5f71\u97ff\u3092\u628a\u63e1\u3059\u308b\u3053\u3068\u304c\u91cd\u8981\u3067\u3059\u3002<a href=\"\/ja\/%e3%81%8a%e5%ae%a2%e6%a7%98%e4%ba%8b%e4%be%8b\/eskomatic\/\">Eskomatic\u306e\u4e8b\u4f8b<\/a>\u306f\u3001\u8cc7\u6750\u306e\u53ef\u8996\u5316\u3068\u30b9\u30b1\u30b8\u30e5\u30fc\u30ea\u30f3\u30b0\u3092\u7d50\u3073\u4ed8\u3051\u308b\u4fa1\u5024\u3092\u793a\u3057\u3066\u3044\u307e\u3059\u3002<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u6b21\u306e\u7d0d\u5165\u9045\u5ef6\u304c\u751f\u7523\u306b\u4e0e\u3048\u308b\u5f71\u97ff\u3092\u78ba\u8a8d\u3059\u308b<\/h2>\n\n\n<p>\u307e\u305a\u3001\u8cfc\u8cb7\u62c5\u5f53\u8005\u3001\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u3001\u751f\u7523\u8a08\u753b\u62c5\u5f53\u8005\u304c\u6307\u6a19\u306e\u5b9a\u7fa9\u3092\u5171\u901a\u7406\u89e3\u3067\u304d\u308b\u8a55\u4fa1\u8868\u3092\u7528\u610f\u3057\u307e\u3057\u3087\u3046\u3002\u8a55\u4fa1\u306e\u57fa\u6e96\u3068\u3059\u308b\u7d0d\u5165\u306e\u7d04\u675f\u306f\u5143\u306e\u8a18\u9332\u3092\u4fdd\u6301\u3057\u3001\u6570\u91cf\u304c\u305d\u308d\u3063\u3066\u3044\u306a\u3044\u8cc7\u6750\u3084\u4f7f\u7528\u3067\u304d\u306a\u3044\u8cc7\u6750\u3092\u660e\u793a\u3057\u3066\u3001\u554f\u984c\u3054\u3068\u306b\u5bfe\u5fdc\u3092\u6c7a\u3081\u3066\u304f\u3060\u3055\u3044\u3002<\/p>\n\n\n<p>\u6b21\u306b\u3001\u73fe\u72b6\u306b\u57fa\u3065\u3044\u305f\u8a08\u753b\u3092\u751f\u7523\u73fe\u5834\u306b\u793a\u3057\u307e\u3057\u3087\u3046\u3002<a href=\"https:\/\/skyplanner.ai\/ja\/%e5%96%b6%e6%a5%ad%e6%8b%85%e5%bd%93\/\">SkyPlanner\u306e\u30c7\u30e2\u3092\u4e88\u7d04<\/a>\u3057\u3001\u7d0d\u5165\u304c\u9045\u308c\u3066\u3044\u308b\u8cc7\u6750\u30921\u3064\u3001\u305d\u306e\u65b0\u3057\u3044\u78ba\u5b9a\u7d0d\u671f\u3001\u540c\u3058\u8a2d\u5099\u3084\u4eba\u54e1\u3092\u53d6\u308a\u5408\u3046\u88fd\u9020\u6307\u56f3\u306e\u60c5\u5831\u3092\u3054\u7528\u610f\u304f\u3060\u3055\u3044\u3002SkyPlanner\u306b\u3088\u3063\u3066\u624b\u4f5c\u696d\u3067\u306e\u30b9\u30b1\u30b8\u30e5\u30fc\u30eb\u518d\u8abf\u6574\u3092\u3069\u3046\u6e1b\u3089\u305b\u308b\u304b\u3001\u307e\u305f\u3001\u81ea\u793e\u5de5\u5834\u306e\u7d0d\u671f\u3078\u306e\u5f71\u97ff\u3092\u3069\u3046\u628a\u63e1\u3067\u304d\u308b\u304b\u3092\u78ba\u8a8d\u3059\u308b\u306e\u306b\u5f79\u7acb\u3061\u307e\u3059\u3002<\/p>\n\n\n<p>\u307e\u305a\u306f\u30b9\u30b1\u30b8\u30e5\u30fc\u30ea\u30f3\u30b0\u3092\u8a66\u3057\u3066\u307f\u305f\u3044\u65b9\u306f\u3001<a href=\"https:\/\/skyplanner.ai\/ja\/%e3%83%88%e3%83%a9%e3%82%a4%e3%82%a2%e3%83%ab\/\">\u30c7\u30e2\u30c7\u30fc\u30bf\u3067SkyPlanner\u3092\u304a\u8a66\u3057\u304f\u3060\u3055\u3044<\/a>\u3002<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>\u751f\u7523\u3092\u5b88\u308b\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u8a55\u4fa1\u6307\u6a19 \u30db\u30fc\u30e0 &raquo; \u30ea\u30bd\u30fc\u30b9 &raquo; \u751f\u7523\u3092\u5b88\u308b\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u8a55\u4fa1\u6307 &#8230; <a title=\"\u751f\u7523\u3092\u5b88\u308b\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u8a55\u4fa1\u6307\u6a19\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/ja\/%e3%83%aa%e3%82%bd%e3%83%bc%e3%82%b9\/supplier-performance-metrics\/\" aria-label=\"Read more about \u751f\u7523\u3092\u5b88\u308b\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u8a55\u4fa1\u6307\u6a19\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":110975,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[435,2557],"tags":[],"class_list":["post-110968","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-435","category-2557","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u751f\u7523\u3092\u5b88\u308b\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u8a55\u4fa1\u6307\u6a19<\/title>\n<meta name=\"description\" content=\"\u516c\u5e73\u306b\u6bd4\u8f03\u3067\u304d\u308b\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u8a55\u4fa1\u6307\u6a19\u3092\u9078\u3073\u3001\u5b9f\u7528\u7684\u306a\u8a55\u4fa1\u8868\u3092\u4f5c\u6210\u3002SkyPlanner\u3067\u8cc7\u6750\u306e\u9045\u308c\u3092\u7e54\u308a\u8fbc\u307f\u3001\u5b9f\u884c\u53ef\u80fd\u306a\u751f\u7523\u8a08\u753b\u306b\u3064\u306a\u3052\u307e\u3059\u3002\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/ja\/%e3%83%aa%e3%82%bd%e3%83%bc%e3%82%b9\/supplier-performance-metrics\/\" \/>\n<meta property=\"og:locale\" content=\"ja_JP\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u751f\u7523\u3092\u5b88\u308b\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u8a55\u4fa1\u6307\u6a19\" \/>\n<meta property=\"og:description\" content=\"\u516c\u5e73\u306b\u6bd4\u8f03\u3067\u304d\u308b\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u8a55\u4fa1\u6307\u6a19\u3092\u9078\u3073\u3001\u5b9f\u7528\u7684\u306a\u8a55\u4fa1\u8868\u3092\u4f5c\u6210\u3002SkyPlanner\u3067\u8cc7\u6750\u306e\u9045\u308c\u3092\u7e54\u308a\u8fbc\u307f\u3001\u5b9f\u884c\u53ef\u80fd\u306a\u751f\u7523\u8a08\u753b\u306b\u3064\u306a\u3052\u307e\u3059\u3002\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/ja\/%e3%83%aa%e3%82%bd%e3%83%bc%e3%82%b9\/supplier-performance-metrics\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-27T10:47:38+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-27T10:49:39+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/supplier-performance-metrics-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1774\" \/>\n\t<meta property=\"og:image:height\" content=\"887\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u57f7\u7b46\u8005\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ja\\\/%e3%83%aa%e3%82%bd%e3%83%bc%e3%82%b9\\\/supplier-performance-metrics\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ja\\\/%e3%83%aa%e3%82%bd%e3%83%bc%e3%82%b9\\\/supplier-performance-metrics\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ja\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"\u751f\u7523\u3092\u5b88\u308b\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u8a55\u4fa1\u6307\u6a19\",\"datePublished\":\"2026-10-27T10:47:38+00:00\",\"dateModified\":\"2026-10-27T10:49:39+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ja\\\/%e3%83%aa%e3%82%bd%e3%83%bc%e3%82%b9\\\/supplier-performance-metrics\\\/\"},\"wordCount\":34,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ja\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ja\\\/%e3%83%aa%e3%82%bd%e3%83%bc%e3%82%b9\\\/supplier-performance-metrics\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/supplier-performance-metrics-hero.png\",\"articleSection\":[\"\u30ea\u30bd\u30fc\u30b9\",\"\u88fd\u9020\u52b9\u7387\"],\"inLanguage\":\"ja\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ja\\\/%e3%83%aa%e3%82%bd%e3%83%bc%e3%82%b9\\\/supplier-performance-metrics\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ja\\\/%e3%83%aa%e3%82%bd%e3%83%bc%e3%82%b9\\\/supplier-performance-metrics\\\/\",\"name\":\"\u751f\u7523\u3092\u5b88\u308b\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u8a55\u4fa1\u6307\u6a19\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ja\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ja\\\/%e3%83%aa%e3%82%bd%e3%83%bc%e3%82%b9\\\/supplier-performance-metrics\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ja\\\/%e3%83%aa%e3%82%bd%e3%83%bc%e3%82%b9\\\/supplier-performance-metrics\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/supplier-performance-metrics-hero.png\",\"datePublished\":\"2026-10-27T10:47:38+00:00\",\"dateModified\":\"2026-10-27T10:49:39+00:00\",\"description\":\"\u516c\u5e73\u306b\u6bd4\u8f03\u3067\u304d\u308b\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u8a55\u4fa1\u6307\u6a19\u3092\u9078\u3073\u3001\u5b9f\u7528\u7684\u306a\u8a55\u4fa1\u8868\u3092\u4f5c\u6210\u3002SkyPlanner\u3067\u8cc7\u6750\u306e\u9045\u308c\u3092\u7e54\u308a\u8fbc\u307f\u3001\u5b9f\u884c\u53ef\u80fd\u306a\u751f\u7523\u8a08\u753b\u306b\u3064\u306a\u3052\u307e\u3059\u3002\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ja\\\/%e3%83%aa%e3%82%bd%e3%83%bc%e3%82%b9\\\/supplier-performance-metrics\\\/#breadcrumb\"},\"inLanguage\":\"ja\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/ja\\\/%e3%83%aa%e3%82%bd%e3%83%bc%e3%82%b9\\\/supplier-performance-metrics\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"ja\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ja\\\/%e3%83%aa%e3%82%bd%e3%83%bc%e3%82%b9\\\/supplier-performance-metrics\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/supplier-performance-metrics-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/supplier-performance-metrics-hero.png\",\"width\":1774,\"height\":887,\"caption\":\"A missing incoming casting and a clock connect to machining and assembly work affected by a supplier delay.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ja\\\/%e3%83%aa%e3%82%bd%e3%83%bc%e3%82%b9\\\/supplier-performance-metrics\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/ja\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u751f\u7523\u3092\u5b88\u308b\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u8a55\u4fa1\u6307\u6a19\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ja\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ja\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ja\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/ja\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"ja\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ja\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/ja\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ja\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ja\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ja\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/ja\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"ja\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u751f\u7523\u3092\u5b88\u308b\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u8a55\u4fa1\u6307\u6a19","description":"\u516c\u5e73\u306b\u6bd4\u8f03\u3067\u304d\u308b\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u8a55\u4fa1\u6307\u6a19\u3092\u9078\u3073\u3001\u5b9f\u7528\u7684\u306a\u8a55\u4fa1\u8868\u3092\u4f5c\u6210\u3002SkyPlanner\u3067\u8cc7\u6750\u306e\u9045\u308c\u3092\u7e54\u308a\u8fbc\u307f\u3001\u5b9f\u884c\u53ef\u80fd\u306a\u751f\u7523\u8a08\u753b\u306b\u3064\u306a\u3052\u307e\u3059\u3002","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/ja\/%e3%83%aa%e3%82%bd%e3%83%bc%e3%82%b9\/supplier-performance-metrics\/","og_locale":"ja_JP","og_type":"article","og_title":"\u751f\u7523\u3092\u5b88\u308b\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u8a55\u4fa1\u6307\u6a19","og_description":"\u516c\u5e73\u306b\u6bd4\u8f03\u3067\u304d\u308b\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u8a55\u4fa1\u6307\u6a19\u3092\u9078\u3073\u3001\u5b9f\u7528\u7684\u306a\u8a55\u4fa1\u8868\u3092\u4f5c\u6210\u3002SkyPlanner\u3067\u8cc7\u6750\u306e\u9045\u308c\u3092\u7e54\u308a\u8fbc\u307f\u3001\u5b9f\u884c\u53ef\u80fd\u306a\u751f\u7523\u8a08\u753b\u306b\u3064\u306a\u3052\u307e\u3059\u3002","og_url":"https:\/\/skyplanner.ai\/ja\/%e3%83%aa%e3%82%bd%e3%83%bc%e3%82%b9\/supplier-performance-metrics\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-27T10:47:38+00:00","article_modified_time":"2026-10-27T10:49:39+00:00","og_image":[{"width":1774,"height":887,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/supplier-performance-metrics-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"\u57f7\u7b46\u8005":"Jussi M\u00e4ntyl\u00e4"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/ja\/%e3%83%aa%e3%82%bd%e3%83%bc%e3%82%b9\/supplier-performance-metrics\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ja\/%e3%83%aa%e3%82%bd%e3%83%bc%e3%82%b9\/supplier-performance-metrics\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/ja\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"\u751f\u7523\u3092\u5b88\u308b\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u8a55\u4fa1\u6307\u6a19","datePublished":"2026-10-27T10:47:38+00:00","dateModified":"2026-10-27T10:49:39+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/ja\/%e3%83%aa%e3%82%bd%e3%83%bc%e3%82%b9\/supplier-performance-metrics\/"},"wordCount":34,"publisher":{"@id":"https:\/\/skyplanner.ai\/ja\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/ja\/%e3%83%aa%e3%82%bd%e3%83%bc%e3%82%b9\/supplier-performance-metrics\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/supplier-performance-metrics-hero.png","articleSection":["\u30ea\u30bd\u30fc\u30b9","\u88fd\u9020\u52b9\u7387"],"inLanguage":"ja"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/ja\/%e3%83%aa%e3%82%bd%e3%83%bc%e3%82%b9\/supplier-performance-metrics\/","url":"https:\/\/skyplanner.ai\/ja\/%e3%83%aa%e3%82%bd%e3%83%bc%e3%82%b9\/supplier-performance-metrics\/","name":"\u751f\u7523\u3092\u5b88\u308b\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u8a55\u4fa1\u6307\u6a19","isPartOf":{"@id":"https:\/\/skyplanner.ai\/ja\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/ja\/%e3%83%aa%e3%82%bd%e3%83%bc%e3%82%b9\/supplier-performance-metrics\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/ja\/%e3%83%aa%e3%82%bd%e3%83%bc%e3%82%b9\/supplier-performance-metrics\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/supplier-performance-metrics-hero.png","datePublished":"2026-10-27T10:47:38+00:00","dateModified":"2026-10-27T10:49:39+00:00","description":"\u516c\u5e73\u306b\u6bd4\u8f03\u3067\u304d\u308b\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u8a55\u4fa1\u6307\u6a19\u3092\u9078\u3073\u3001\u5b9f\u7528\u7684\u306a\u8a55\u4fa1\u8868\u3092\u4f5c\u6210\u3002SkyPlanner\u3067\u8cc7\u6750\u306e\u9045\u308c\u3092\u7e54\u308a\u8fbc\u307f\u3001\u5b9f\u884c\u53ef\u80fd\u306a\u751f\u7523\u8a08\u753b\u306b\u3064\u306a\u3052\u307e\u3059\u3002","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/ja\/%e3%83%aa%e3%82%bd%e3%83%bc%e3%82%b9\/supplier-performance-metrics\/#breadcrumb"},"inLanguage":"ja","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/ja\/%e3%83%aa%e3%82%bd%e3%83%bc%e3%82%b9\/supplier-performance-metrics\/"]}]},{"@type":"ImageObject","inLanguage":"ja","@id":"https:\/\/skyplanner.ai\/ja\/%e3%83%aa%e3%82%bd%e3%83%bc%e3%82%b9\/supplier-performance-metrics\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/supplier-performance-metrics-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/supplier-performance-metrics-hero.png","width":1774,"height":887,"caption":"A missing incoming casting and a clock connect to machining and assembly work affected by a supplier delay."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/ja\/%e3%83%aa%e3%82%bd%e3%83%bc%e3%82%b9\/supplier-performance-metrics\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/ja\/"},{"@type":"ListItem","position":2,"name":"\u751f\u7523\u3092\u5b88\u308b\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u8a55\u4fa1\u6307\u6a19"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/ja\/#website","url":"https:\/\/skyplanner.ai\/ja\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/ja\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/ja\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"ja"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/ja\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/ja\/","logo":{"@type":"ImageObject","inLanguage":"ja","@id":"https:\/\/skyplanner.ai\/ja\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/ja\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/ja\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"ja","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/supplier-performance-metrics-hero.png",1774,887,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/supplier-performance-metrics-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/supplier-performance-metrics-hero-300x150.png",300,150,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/supplier-performance-metrics-hero-768x384.png",768,384,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/supplier-performance-metrics-hero-1024x512.png",1024,512,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/supplier-performance-metrics-hero-1536x768.png",1536,768,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/supplier-performance-metrics-hero.png",1774,887,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/supplier-performance-metrics-hero-360x180.png",360,180,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/ja\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"\u751f\u7523\u3092\u5b88\u308b\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u8a55\u4fa1\u6307\u6a19 \u30db\u30fc\u30e0 &raquo; \u30ea\u30bd\u30fc\u30b9 &raquo; \u751f\u7523\u3092\u5b88\u308b\u30b5\u30d7\u30e9\u30a4\u30e4\u30fc\u8a55\u4fa1\u6307&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/ja\/wp-json\/wp\/v2\/posts\/110968","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/ja\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/ja\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ja\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ja\/wp-json\/wp\/v2\/comments?post=110968"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/ja\/wp-json\/wp\/v2\/posts\/110968\/revisions"}],"predecessor-version":[{"id":111031,"href":"https:\/\/skyplanner.ai\/ja\/wp-json\/wp\/v2\/posts\/110968\/revisions\/111031"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/ja\/wp-json\/wp\/v2\/media\/110975"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/ja\/wp-json\/wp\/v2\/media?parent=110968"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/ja\/wp-json\/wp\/v2\/categories?post=110968"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/ja\/wp-json\/wp\/v2\/tags?post=110968"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}