{"id":96602,"date":"2026-10-08T07:53:30","date_gmt":"2026-10-08T07:53:30","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=96602"},"modified":"2026-10-08T10:55:09","modified_gmt":"2026-10-08T10:55:09","slug":"make-to-order","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/id\/sumber-daya\/make-to-order\/","title":{"rendered":"Make to order: cara merencanakan tanggal pengiriman"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Make to order: cara merencanakan tanggal pengiriman<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/id\/\">Beranda<\/a> &raquo; <a href=\"\/id\/sumber-daya\/\">Sumber Daya<\/a> &raquo; Make to order: cara merencanakan tanggal pengiriman<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Perkiraan waktu baca: <\/span><span class=\"yoast-reading-time__reading-time\">9<\/span><span class=\"yoast-reading-time__time-unit\"> menit<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Make to order (MTO) adalah pendekatan produksi di mana pembuatan baru dimulai setelah pesanan pelanggan masuk. Alih-alih mengirim produk jadi dari stok, pabrik membuatnya khusus untuk pesanan tersebut. Karena itu, pelanggan menunggu proses produksi, bukan hanya pengiriman.<\/p>\n\n\n<p>Bagi seorang perencana produksi, tantangannya adalah mengubah tanggal pengiriman yang diminta menjadi rencana yang realistis. Material yang sudah tersedia saja belum cukup jika pekerjaan harus melewati sumber daya produksi yang sudah terikat dengan pesanan lain. Sebelum menjanjikan tanggal, periksa seluruh alur produksi dan dampaknya terhadap komitmen yang sudah ada.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Apa itu make to order?<\/h2>\n\n\n<p>Dalam produksi make to order, pesanan pelanggan menjadi pemicu pembuatan produk. Produknya mungkin sudah didesain, dan langkah produksinya mungkin sudah ditetapkan. MTO tidak mengharuskan setiap pesanan menjadi proyek rekayasa baru atau produk yang unik.<\/p>\n\n\n<p>MTO juga tidak berarti pabrik tanpa persediaan. Bahan baku, komponen pembelian, dan barang dalam proses (work in progress) semuanya bisa disimpan sebagai stok. Bedanya, produk jadi dibuat untuk sebuah pesanan, bukan diproduksi lebih dulu untuk menunggu pembeli.<\/p>\n\n\n<p>Anggap pesanan sebagai alasan untuk memproduksi, bukan bukti bahwa produksi bisa langsung dimulai. Material mungkin belum tiba, dan stasiun kerja yang dibutuhkan bisa jadi sedang terpakai. Pesanan tetap harus mendapat tempat di <a href=\"\/id\/sumber-daya\/apa-itu-penjadwalan-produksi\/\">jadwal produksi<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Make to order vs make to stock, assemble to order, dan engineer to order<\/h2>\n\n\n<p>Pendekatan-pendekatan ini berbeda dalam seberapa banyak pekerjaan yang sudah selesai sebelum pelanggan memesan dan apa saja yang masih harus ditunggu pelanggan.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Pendekatan<\/th><th>Sebelum pesanan pelanggan<\/th><th>Yang dipicu oleh pesanan<\/th><th>Yang ditunggu pelanggan<\/th><\/tr><\/thead><tbody><tr><td>Make to order (MTO)<\/td><td>Desain produk dan persiapan produksi mungkin sudah ada; material atau komponen mungkin sudah distok<\/td><td>Pembuatan produk untuk pesanan tersebut<\/td><td>Ketersediaan material bila diperlukan, produksi, dan pengiriman<\/td><\/tr><tr><td>Make to stock (MTS)<\/td><td>Produk jadi dibuat untuk permintaan yang diperkirakan<\/td><td>Alokasi dan pengiriman produk dari stok<\/td><td>Pemenuhan pesanan dan pengiriman jika stok tersedia<\/td><\/tr><tr><td>Assemble to order (ATO)<\/td><td>Komponen atau modul disiapkan dan disimpan sebagai stok<\/td><td>Perakitan akhir sesuai konfigurasi yang dipilih<\/td><td>Perakitan dan pengiriman, ditambah komponen yang belum tersedia<\/td><\/tr><tr><td>Engineer to order (ETO)<\/td><td>Kemampuan umum atau elemen desain mungkin sudah ada<\/td><td>Rekayasa yang cukup besar khusus untuk pesanan, selain proses manufaktur<\/td><td>Rekayasa, pengadaan, produksi, dan pengiriman<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Batasan antarpendekatan tidak selalu kaku. Produk MTO mungkin memerlukan perubahan desain kecil tanpa berubah menjadi proyek ETO penuh. Sebuah pabrik juga dapat memakai pendekatan yang berbeda untuk keluarga produk yang berbeda.<\/p>\n\n\n<p>Job shop adalah konsep yang berbeda. Job shop menggambarkan bagaimana berbagai job yang beragam bergerak melalui sumber daya produksi yang dipakai bersama. Make to order menggambarkan hubungan antara pesanan pelanggan dan dimulainya produksi. Sebuah job shop bisa membuat produk secara make to order, tetapi kedua istilah ini tidak bersinonim.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Manfaat dan trade-off produksi make to order<\/h2>\n\n\n<p>MTO dapat mengurangi risiko menyimpan varian produk jadi yang tidak dibeli pelanggan. MTO juga memungkinkan produksi mengikuti pesanan yang sebenarnya, tanpa bergantung sepenuhnya pada perkiraan bauran produk jadi.<\/p>\n\n\n<p>Trade-off-nya, pelanggan harus menunggu selama produksi berlangsung. Buffer barang jadi tidak bisa menyerap keterlambatan seperti pada produk MTS yang sudah tersedia di stok. Ketersediaan material, beban sumber daya produksi, dan kedatangan pesanan lain semuanya memengaruhi tanggal yang dijanjikan.<\/p>\n\n\n<p>Volume pesanan dan bauran produk bisa berubah-ubah, sehingga lead time kemarin belum tentu menjadi perkiraan yang andal untuk pesanan hari ini. MTO tidak otomatis lebih murah, dan tidak menghilangkan biaya persediaan. Cocok atau tidaknya MTO bergantung sebagian pada seberapa beragam produk yang dibutuhkan pelanggan dan berapa lama mereka bersedia menunggu.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Cara merencanakan tanggal pengiriman sebelum pesanan dirilis<\/h2>\n\n\n<p>Pisahkan tanggal yang diminta pelanggan dari tanggal yang dapat didukung oleh rencana produksi saat ini. Setelah itu, lakukan pemeriksaan berikut sebelum merilis job atau mengonfirmasi janji pengiriman secara komersial.<\/p>\n\n\n<h3 class=\"wp-block-heading\">1. Pastikan apa yang harus dibuat<\/h3>\n\n\n<p>Periksa produk, kuantitas, konfigurasi, dan langkah produksi yang diperlukan. Lengkapi spesifikasi yang masih kurang sebelum menganggap <a href=\"\/id\/sumber-daya\/work-order\/\">pesanan siap dijadwalkan<\/a>. Catat tanggal pengiriman yang diminta, tetapi jangan jadikan tanggal itu bukti bahwa pekerjaannya muat.<\/p>\n\n\n<p>Perubahan kuantitas atau konfigurasi dapat mengubah pekerjaan yang dibutuhkan. Rencanakan pesanan yang sebenarnya, bukan lead time job serupa yang diingat dari sebelumnya.<\/p>\n\n\n<h3 class=\"wp-block-heading\">2. Periksa material dan komponen pembelian<\/h3>\n\n\n<p>Tentukan apa yang sudah tersedia dan apa yang harus dibeli atau diisi ulang. Untuk item yang belum ada, periksa kapan item tersebut diperkirakan dapat dipakai pada langkah produksi yang bersangkutan. Pesanan jangan dianggap bisa dimulai hanya karena purchase order sudah dibuat.<\/p>\n\n\n<p>Bedakan ketersediaan yang sudah dikonfirmasi dari asumsi yang masih perlu dicek. Jika tanggal kedatangan yang kritis belum pasti, tampilkan ketidakpastian itu dengan jelas sebelum berkomitmen kepada pelanggan.<\/p>\n\n\n<h3 class=\"wp-block-heading\">3. Periksa alur produksi dan sumber daya yang tersedia<\/h3>\n\n\n<p>Pastikan urutan operasi, stasiun kerja yang memenuhi syarat, shift, dan jam kerja. Sertakan pekerjaan setup jika memengaruhi jadwal. Setiap operasi membutuhkan pekerjaan sebelumnya sudah selesai dan sumber daya produksi yang diperlukan tersedia.<\/p>\n\n\n<p>Stasiun kerja yang kosong di awal alur produksi belum menentukan tanggal selesai. Job tersebut masih bisa menunggu sumber daya bersama yang berada lebih jauh di hilir.<\/p>\n\n\n<h3 class=\"wp-block-heading\">4. Masukkan job ke dalam beban kerja yang sudah ada<\/h3>\n\n\n<p>Tempatkan pesanan bersama pekerjaan yang sudah terjadwal, termasuk beban pada setiap <a href=\"\/id\/sumber-daya\/bottleneck-produksi\/\">bottleneck<\/a>. Jangan memperkirakan waktu selesainya seolah-olah pabrik dalam keadaan kosong.<\/p>\n\n\n<p>Sebagai contoh hipotetis, material untuk pesanan baru sudah siap dan operasi pertamanya punya ruang. Namun, sumber daya finishing yang dipakai bersama sudah terikat pada pesanan lain. Memulai job baru sekarang tidak menghilangkan antrean di finishing tersebut. Perkiraan pengiriman harus memperhitungkannya.<\/p>\n\n\n<h3 class=\"wp-block-heading\">5. Periksa penyelesaian dan pengiriman secara terpisah<\/h3>\n\n\n<p>Tinjau kapan seluruh alur produksi bisa selesai, bukan hanya operasi pertama atau terakhir secara terpisah. Setelah itu, perhitungkan pekerjaan inspeksi, pengemasan, dispatch, atau transportasi terpisah yang dibutuhkan untuk pesanan tersebut.<\/p>\n\n\n<p>Tanggal selesai di pabrik dan tanggal barang tiba di pelanggan adalah dua tonggak yang berbeda. Pastikan mana yang diharapkan pelanggan sebelum menyampaikan janji pengiriman.<\/p>\n\n\n<h3 class=\"wp-block-heading\">6. Putuskan apa yang perlu diubah jika tanggal yang diminta tidak muat<\/h3>\n\n\n<p>Planner mungkin perlu mengubah prioritas, mempertimbangkan sumber daya alternatif yang tersedia, atau membicarakan tanggal pengiriman yang berbeda. Periksa dampaknya pada pesanan lain sebelum memutuskan perubahan. Memajukan satu job mendesak dapat memundurkan job milik pelanggan lain.<\/p>\n\n\n<p>Hasil yang berguna adalah rencana produksi yang layak, gambaran yang jelas tentang ketidakpastian yang tersisa, dan keputusan pengiriman yang terinformasi. Tanggal yang diminta saja bukan salah satu dari ketiganya.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Apa yang berubah saat pesanan mendadak atau keterlambatan datang?<\/h2>\n\n\n<p>Pesanan mendadak, keterlambatan pengiriman material, atau perubahan kapasitas dapat memengaruhi beberapa pesanan yang memakai sumber daya produksi yang sama. Periksa ulang alur produksi yang terdampak, jangan hanya menggeser satu operasi terakhir di jadwal.<\/p>\n\n\n<p>Mulailah dari apa yang berubah. Jika material terlambat, tentukan operasi mana yang bergantung padanya. Jika kapasitas tidak tersedia, periksa pekerjaan yang ditugaskan ke sumber daya tersebut dan akibatnya bagi langkah-langkah berikutnya. Untuk pesanan mendadak, tentukan prioritasnya dan periksa komitmen yang sudah ada mana yang tergeser olehnya.<\/p>\n\n\n<p>Planner yang menentukan prioritas; penjadwalan berbasis AI mengikuti keputusan tersebut. Jadwal yang diperbarui membantu menunjukkan konsekuensinya, tetapi perubahan janji kepada pelanggan tetap harus ditangani sebagai keputusan bisnis. Jaga agar rencana produksi dan komitmen pengiriman yang sudah disampaikan tetap selaras saat kondisi berubah.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Bagaimana SkyPlanner mendukung penjadwalan make to order<\/h2>\n\n\n<p><a href=\"\/id\/\">SkyPlanner APS<\/a> menyusun jadwal produksi dari pesanan, langkah proses, dan sumber daya produksi yang tersedia. Mesin penjadwalan berbasis AI-nya, Arcturus, menugaskan pekerjaan ke stasiun kerja dengan memperhitungkan ketersediaan material, shift, prioritas, dan tanggal pengiriman. Timeline Gantt menampilkan rencana yang dihasilkan sehingga planner dapat melihat bagaimana job berbagi kapasitas.<\/p>\n\n\n<p>SkyPlanner terintegrasi dengan sistem ERP atau MES apa pun melalui REST API yang terbuka. Data pesanan, material, dan produksi dapat menghubungkan sistem bisnis yang sudah ada dengan penjadwalan. SkyPlanner tidak menggantikan ERP, dan integrasi melalui API tidak boleh disamakan dengan konektor native siap pakai untuk setiap sistem.<\/p>\n\n\n<p>Saat Autopilot diaktifkan, SkyPlanner dapat memperbarui jadwal ketika pesanan baru masuk, penyelesaian pekerjaan dicatat, atau kapasitas berubah. Planner tetap memegang kendali lewat prioritas dan kunci (lock). Membuat jadwal tidak sama dengan otomatis mengonfirmasi janji pengiriman kepada pelanggan.<\/p>\n\n\n<p>Untuk menilai bagaimana jadwal menangani pesanan yang saling berebut kapasitas, <a href=\"\/id\/uji-coba\/\">Mulai uji coba gratis<\/a>. Jelajahi produk dengan data demo atau gunakan jalur Getting Started dengan bantuan AI di SkyPlanner Assistant. Perhatikan apakah rencana tersebut menampilkan dengan jelas ketergantungan material, beban sumber daya bersama, dan konsekuensi dari prioritas yang Anda tetapkan.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Pertanyaan yang sering diajukan<\/h2>\n\n\n<h3 class=\"wp-block-heading\">Apa yang dimaksud dengan make to order?<\/h3>\n\n\n<p>Make to order berarti produksi baru dimulai setelah pesanan pelanggan masuk. Produk jadi dibuat khusus untuk pesanan tersebut, bukan dikirim dari stok produk yang sudah diproduksi sebelumnya.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Apakah make to order berarti tidak ada persediaan sama sekali?<\/h3>\n\n\n<p>Tidak. Produsen MTO tetap dapat menyimpan material, komponen, dan barang dalam proses (work in progress). Perbedaan utamanya ada pada produk jadi: produk jadi dibuat untuk pesanan pelanggan, bukan disimpan di gudang untuk mengantisipasi pesanan yang belum datang.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Apa perbedaan antara make to order dan make to stock?<\/h3>\n\n\n<p>MTO memulai produksi sebagai respons atas pesanan, sehingga pelanggan harus menunggu hingga produksi selesai. MTS memproduksi produk jadi sebelum ada pesanan, sehingga pesanan dapat dipenuhi dari stok selama produk yang dibutuhkan tersedia.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Apakah make to order sama dengan engineer to order?<\/h3>\n\n\n<p>Tidak. Pada ETO, setiap pesanan memerlukan pekerjaan rekayasa yang cukup besar, baik sebelum maupun selama produksi berjalan. MTO dapat menggunakan desain produk yang sudah ada, meskipun perubahan kecil sesuai pesanan tetap mungkin dilakukan.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Apakah make to order sama dengan job shop?<\/h3>\n\n\n<p>Tidak. MTO menjelaskan kapan produksi dimulai dibandingkan dengan waktu pesanan pelanggan masuk. Job shop menggambarkan aliran berbagai job yang beragam melalui sumber daya produksi yang digunakan bersama. Satu pabrik bisa menerapkan keduanya, tetapi keduanya menjelaskan aspek produksi yang berbeda.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Bagaimana cara merencanakan tanggal pengiriman untuk job make to order?<\/h3>\n\n\n<p>Periksa ketersediaan material, urutan operasi, sumber daya produksi yang memenuhi syarat, serta beban kerjanya saat ini. Tinjau penyelesaian seluruh rute produksi, lalu hitung pengiriman dan transportasi secara terpisah. Jika prioritas berubah, periksa dampaknya terhadap pesanan lain sebelum menjanjikan tanggal tersebut.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Apakah SkyPlanner bisa bekerja dengan ERP yang sudah kami gunakan?<\/h3>\n\n\n<p>Ya. SkyPlanner terintegrasi dengan sistem ERP atau MES apa pun melalui REST API terbukanya. Koneksi ini perlu diimplementasikan sesuai sistem dan alur data yang bersangkutan; bukan berarti setiap ERP memiliki konektor native siap pakai yang sama.<\/p>\n\n<\/div>\n<\/div>\n\n<script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"What does make to order mean?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Make to order means manufacturing starts after a customer order arrives. The finished product is made for that order rather than shipped from a stock of products manufactured in advance.\"}},{\"@type\":\"Question\",\"name\":\"Does make to order mean there is no inventory?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. An MTO manufacturer can hold materials, components and work in progress. The main distinction concerns finished products: they are manufactured for customer orders rather than stocked in anticipation of those orders.\"}},{\"@type\":\"Question\",\"name\":\"What is the difference between make to order and make to stock?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"MTO starts manufacturing in response to an order, so the customer waits for production. MTS manufactures finished products ahead of orders, allowing fulfilment from stock when the required product is available.\"}},{\"@type\":\"Question\",\"name\":\"Is make to order the same as engineer to order?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. ETO includes substantial engineering for the individual order before or alongside manufacturing. MTO can use an existing product design, although smaller order-specific changes are possible.\"}},{\"@type\":\"Question\",\"name\":\"Is make to order the same as a job shop?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. MTO describes when manufacturing starts in relation to the customer order. A job shop describes the flow of varied jobs through shared resources. A factory can use both, but they describe different aspects of production.\"}},{\"@type\":\"Question\",\"name\":\"How do you plan a delivery date for a make-to-order job?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Check material availability, the sequence of operations, eligible resources and their existing workload. Review completion of the whole production route, then account separately for dispatch and transport. If priorities change, check the effect on other orders before promising the date.\"}},{\"@type\":\"Question\",\"name\":\"Can SkyPlanner work with our existing ERP?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Yes. SkyPlanner integrates with any ERP or MES system through its open REST API. The connection needs to be implemented for the relevant system and data flow; this does not mean every ERP has the same ready-made native connector.\"}}]}<\/script>\n\n","protected":false},"excerpt":{"rendered":"<p>Make to order: cara merencanakan tanggal pengiriman Beranda &raquo; Sumber Daya &raquo; Make to order: cara merencanakan tanggal pengiriman Make to order (MTO) adalah pendekatan produksi di mana pembuatan baru dimulai setelah pesanan pelanggan masuk. Alih-alih mengirim produk jadi dari stok, pabrik membuatnya khusus untuk pesanan tersebut. Karena itu, pelanggan menunggu proses produksi, bukan hanya &#8230; <a title=\"Make to order: cara merencanakan tanggal pengiriman\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/id\/sumber-daya\/make-to-order\/\" aria-label=\"Baca selengkapnya tentang Make to order: cara merencanakan tanggal pengiriman\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":97068,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2527,416],"tags":[],"class_list":["post-96602","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-scheduling","category-sumber-daya","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Make to order: cara merencanakan tanggal pengiriman &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"Make to order memulai produksi setelah pesanan masuk. Pelajari cara memeriksa material, kapasitas, dan prioritas sebelum menjanjikan tanggal pengiriman.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/id\/sumber-daya\/make-to-order\/\" \/>\n<meta property=\"og:locale\" content=\"id_ID\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Make to order: cara merencanakan tanggal pengiriman\" \/>\n<meta property=\"og:description\" content=\"Make to order memulai produksi setelah pesanan masuk. Pelajari cara memeriksa material, kapasitas, dan prioritas sebelum menjanjikan tanggal pengiriman.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/id\/sumber-daya\/make-to-order\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-08T07:53:30+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-08T10:55:09+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Ditulis oleh\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimasi waktu membaca\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 menit\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/sumber-daya\\\/make-to-order\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/sumber-daya\\\/make-to-order\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Make to order: cara merencanakan tanggal pengiriman\",\"datePublished\":\"2026-10-08T07:53:30+00:00\",\"dateModified\":\"2026-10-08T10:55:09+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/sumber-daya\\\/make-to-order\\\/\"},\"wordCount\":1653,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/sumber-daya\\\/make-to-order\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-make-to-order-hero.png\",\"articleSection\":[\"APS &amp; Scheduling\",\"sumber daya\"],\"inLanguage\":\"id\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/sumber-daya\\\/make-to-order\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/sumber-daya\\\/make-to-order\\\/\",\"name\":\"Make to order: cara merencanakan tanggal pengiriman &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/sumber-daya\\\/make-to-order\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/sumber-daya\\\/make-to-order\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-make-to-order-hero.png\",\"datePublished\":\"2026-10-08T07:53:30+00:00\",\"dateModified\":\"2026-10-08T10:55:09+00:00\",\"description\":\"Make to order memulai produksi setelah pesanan masuk. Pelajari cara memeriksa material, kapasitas, dan prioritas sebelum menjanjikan tanggal pengiriman.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/sumber-daya\\\/make-to-order\\\/#breadcrumb\"},\"inLanguage\":\"id\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/id\\\/sumber-daya\\\/make-to-order\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"id\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/sumber-daya\\\/make-to-order\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-make-to-order-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-make-to-order-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"One custom housing waits while another occupies the finishing resource needed to complete both orders.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/sumber-daya\\\/make-to-order\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Make to order: cara merencanakan tanggal pengiriman\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"id\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"id\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@SkyPlannerAPS\",\"https:\\\/\\\/www.capterra.com\\\/p\\\/265911\\\/SkyPlanner-APS\\\/\",\"https:\\\/\\\/www.trustradius.com\\\/products\\\/skyplanner-aps\\\/reviews\",\"https:\\\/\\\/www.saasworthy.com\\\/product\\\/skyplanner-aps\",\"https:\\\/\\\/sourceforge.net\\\/software\\\/product\\\/SkyPlanner-APS\\\/\",\"https:\\\/\\\/www.g2.com\\\/products\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.getapp.com\\\/project-management-planning-software\\\/a\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.softwareadvice.com\\\/cmms\\\/skyplanner-aps-profile\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"id\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Make to order: cara merencanakan tanggal pengiriman &#8211; SkyPlanner","description":"Make to order memulai produksi setelah pesanan masuk. Pelajari cara memeriksa material, kapasitas, dan prioritas sebelum menjanjikan tanggal pengiriman.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/id\/sumber-daya\/make-to-order\/","og_locale":"id_ID","og_type":"article","og_title":"Make to order: cara merencanakan tanggal pengiriman","og_description":"Make to order memulai produksi setelah pesanan masuk. Pelajari cara memeriksa material, kapasitas, dan prioritas sebelum menjanjikan tanggal pengiriman.","og_url":"https:\/\/skyplanner.ai\/id\/sumber-daya\/make-to-order\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-08T07:53:30+00:00","article_modified_time":"2026-10-08T10:55:09+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Ditulis oleh":"Jussi M\u00e4ntyl\u00e4","Estimasi waktu membaca":"8 menit"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/id\/sumber-daya\/make-to-order\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/id\/sumber-daya\/make-to-order\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/id\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Make to order: cara merencanakan tanggal pengiriman","datePublished":"2026-10-08T07:53:30+00:00","dateModified":"2026-10-08T10:55:09+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/id\/sumber-daya\/make-to-order\/"},"wordCount":1653,"publisher":{"@id":"https:\/\/skyplanner.ai\/id\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/id\/sumber-daya\/make-to-order\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","articleSection":["APS &amp; Scheduling","sumber daya"],"inLanguage":"id"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/id\/sumber-daya\/make-to-order\/","url":"https:\/\/skyplanner.ai\/id\/sumber-daya\/make-to-order\/","name":"Make to order: cara merencanakan tanggal pengiriman &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/id\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/id\/sumber-daya\/make-to-order\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/id\/sumber-daya\/make-to-order\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","datePublished":"2026-10-08T07:53:30+00:00","dateModified":"2026-10-08T10:55:09+00:00","description":"Make to order memulai produksi setelah pesanan masuk. Pelajari cara memeriksa material, kapasitas, dan prioritas sebelum menjanjikan tanggal pengiriman.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/id\/sumber-daya\/make-to-order\/#breadcrumb"},"inLanguage":"id","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/id\/sumber-daya\/make-to-order\/"]}]},{"@type":"ImageObject","inLanguage":"id","@id":"https:\/\/skyplanner.ai\/id\/sumber-daya\/make-to-order\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","width":1672,"height":941,"caption":"One custom housing waits while another occupies the finishing resource needed to complete both orders."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/id\/sumber-daya\/make-to-order\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/id\/"},{"@type":"ListItem","position":2,"name":"Make to order: cara merencanakan tanggal pengiriman"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/id\/#website","url":"https:\/\/skyplanner.ai\/id\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/id\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/id\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"id"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/id\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/id\/","logo":{"@type":"ImageObject","inLanguage":"id","@id":"https:\/\/skyplanner.ai\/id\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/id\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882","https:\/\/www.linkedin.com\/company\/skyplanner-aps\/","https:\/\/www.youtube.com\/@SkyPlannerAPS","https:\/\/www.capterra.com\/p\/265911\/SkyPlanner-APS\/","https:\/\/www.trustradius.com\/products\/skyplanner-aps\/reviews","https:\/\/www.saasworthy.com\/product\/skyplanner-aps","https:\/\/sourceforge.net\/software\/product\/SkyPlanner-APS\/","https:\/\/www.g2.com\/products\/skyplanner-aps\/","https:\/\/www.getapp.com\/project-management-planning-software\/a\/skyplanner-aps\/","https:\/\/www.softwareadvice.com\/cmms\/skyplanner-aps-profile\/"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/id\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"id","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/id\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Make to order: cara merencanakan tanggal pengiriman Beranda &raquo; Sumber Daya &raquo; Make to order: cara merencanakan tanggal pengiriman Make to order (MTO) adalah pendekatan produksi di mana pembuatan baru dimulai setelah pesanan pelanggan masuk. Alih-alih mengirim produk jadi dari stok, pabrik membuatnya khusus untuk pesanan tersebut. Karena itu, pelanggan menunggu proses produksi, bukan hanya&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/posts\/96602","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/comments?post=96602"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/posts\/96602\/revisions"}],"predecessor-version":[{"id":96926,"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/posts\/96602\/revisions\/96926"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/media\/97068"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/media?parent=96602"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/categories?post=96602"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/tags?post=96602"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}