{"id":44127,"date":"2024-10-15T08:06:16","date_gmt":"2024-10-15T08:06:16","guid":{"rendered":"https:\/\/skyplanner.ai\/sumber-daya\/perangkat-lunak-bersarang-apa-itu-dan-bagaimana-cara-kerjanya\/"},"modified":"2024-10-23T08:22:32","modified_gmt":"2024-10-23T08:22:32","slug":"perangkat-lunak-bersarang-apa-itu-dan-bagaimana-cara-kerjanya","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/id\/sumber-daya\/perangkat-lunak-bersarang-apa-itu-dan-bagaimana-cara-kerjanya\/","title":{"rendered":"Perangkat Lunak Bersarang: Apa itu dan bagaimana cara kerjanya?"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\" id=\"h-nesting-sofware-what-it-is-and-how-it-works\">Perangkat Lunak Bersarang: Apa itu dan bagaimana cara kerjanya?<\/h1>\n\n\n<div class=\"gb-container gb-container-e8026af9\">\n\n<p><a href=\"https:\/\/skyplanner.ai\/id\/\">Beranda<\/a> &#8221; <a href=\"https:\/\/skyplanner.ai\/id\/sumber-daya\/\">Sumber Daya<\/a> &#8221; Perangkat Lunak Bersarang: Apa itu dan bagaimana cara kerjanya?<\/p>\n\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" viewbox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Perkiraan waktu membaca: <\/span><span class=\"yoast-reading-time__reading-time\">12<\/span><span class=\"yoast-reading-time__time-unit\"> menit<\/span><\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f0fd57d0\">\n<div class=\"gb-container gb-container-31dfeab3\"><div class=\"gb-inside-container\">\n\n<p class=\"has-text-align-left\"><strong>Perangkat lunak Nesting adalah solusi yang meningkatkan pengaturan bentuk pada bahan datar, memaksimalkan penggunaan bahan dan meminimalkan limbah.<\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p>Setiap produsen selalu mencari cara untuk mengurangi limbah. Entah itu mengurangi bahan sisa, menghemat waktu yang berharga, atau menggunakan energi dengan lebih efisien, manajemen sumber daya yang lebih cerdas akan memberikan hasil yang lebih baik. Menemukan alat yang tepat untuk melakukan hal ini adalah kuncinya, dan di situlah perangkat lunak nesting berperan. Alat ini membantu menghemat waktu di antara tugas-tugas, mengurangi biaya, dan merampingkan cara penggunaan bahan selama produksi, meminimalkan limbah, serta mendukung komitmen Anda terhadap<a href=\"https:\/\/skyplanner.ai\/id\/sumber-daya\/meningkatkan-manufaktur-ramah-lingkungan-dengan-aps\/\"> manufaktur ramah<\/a> lingkungan.   <\/p>\n\n\n\n<p>Dalam artikel ini, kita akan membahas apa itu perangkat lunak nesting, bagaimana solusi ini bekerja, dan perbedaan besar yang dapat diberikannya pada proses produksi Anda. Kami juga akan membahas bagaimana memasangkan perangkat lunak ini dengan SkyPlanner dapat meningkatkan efisiensi di antara proses Anda. <\/p>\n\n\n\t\t\t\t<div class=\"wp-block-uagb-table-of-contents uagb-toc__align-left uagb-toc__columns-1  uagb-block-3df69bf8      \"\n\t\t\t\t\tdata-scroll= \"1\"\n\t\t\t\t\tdata-offset= \"30\"\n\t\t\t\t\tstyle=\"\"\n\t\t\t\t>\n\t\t\t\t<div class=\"uagb-toc__wrap\">\n\t\t\t\t\t\t<div class=\"uagb-toc__title\">\n\t\t\t\t\t\t\tTable Of Contents\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"uagb-toc__list-wrap \">\n\t\t\t\t\t\t<ol class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#perangkat-lunak-bersarang-apa-itu-dan-bagaimana-cara-kerjanya\" class=\"uagb-toc-link__trigger\">Perangkat Lunak Bersarang: Apa itu dan bagaimana cara kerjanya?<\/a><ul class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#memahami-perangkat-lunak-bersarang\" class=\"uagb-toc-link__trigger\">Memahami Perangkat Lunak Bersarang<\/a><li class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#bersarang-di-bidang-manufaktur-bagaimana-cara-kerjanya\" class=\"uagb-toc-link__trigger\">Bersarang di bidang manufaktur: Bagaimana cara kerjanya?<\/a><li class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#5-manfaat-utama-perangkat-lunak-nesting-di-bidang-manufaktur\" class=\"uagb-toc-link__trigger\">5 Manfaat Utama Perangkat Lunak Nesting di Bidang Manufaktur<\/a><li class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#industri-yang-mendapatkan-manfaat-besar-dari-perangkat-lunak-nesting\" class=\"uagb-toc-link__trigger\">Industri yang Mendapatkan Manfaat Besar dari Perangkat Lunak Nesting<\/a><li class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#pekerjaan-perakitan-fitur-utama-di-skyplanner\" class=\"uagb-toc-link__trigger\">Pekerjaan perakitan: Fitur utama di SkyPlanner<\/a><\/ul><\/ol>\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\n\n\n<h2 class=\"wp-block-heading\" id=\"h-understanding-nesting-software\">Memahami Perangkat Lunak Bersarang<\/h2>\n\n\n\n<p><strong>Perangkat lunak Nesting adalah solusi yang meningkatkan pengaturan bentuk pada bahan datar, memaksimalkan penggunaan bahan dan meminimalkan limbah.<\/strong>  Mesin ini juga dapat menggabungkan komponen dari pesanan yang berbeda ke dalam lembar material yang sama, sehingga semakin meningkatkan efisiensi. Produsen di industri seperti pertukangan kayu, fabrikasi lembaran logam, dan permesinan CNC mengandalkannya untuk memastikan bahwa mereka memotong bahan seefisien mungkin. <\/p>\n\n\n\n<p>Perangkat lunak Nesting melakukan pekerjaan berat dalam merencanakan bagaimana cara memasang komponen 2D dan 3D secara tepat pada ruang material, yang sangat sulit dicapai secara manual.  <strong>Secara keseluruhan, perangkat lunak Nesting dirancang untuk menghilangkan pemborosan yang tidak perlu sekaligus mempercepat produksi, sehingga menjadikannya alat yang penting bagi produsen yang ingin meningkatkan efisiensi.<\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Bersarang di bidang manufaktur: Bagaimana cara kerjanya?<\/h2>\n\n\n\n<p>Perangkat lunak Nesting mengatur bentuk atau bagian untuk membuat produk pada selembar bahan datar dengan cara seefisien mungkin untuk meminimalkan pemborosan. Perangkat lunak ini menganalisis dimensi material dan bentuk yang perlu dipotong, kemudian menentukan tata letak terbaik. Tata letak ini memungkinkan produsen untuk menggunakan setiap bagian dari bahan, sehingga menyisakan sedikit sisa.  <\/p>\n\n\n\n<p>Contoh mudahnya adalah produsen jendela yang menggunakan selembar kaca besar dan perlu memotong beberapa panel jendela untuk pesanan yang berbeda darinya. Perangkat lunak nesting akan menghitung cara terbaik untuk mengatur panel-panel tersebut pada lembaran kaca sehingga Anda dapat memotong jumlah maksimum jendela dengan sisa kaca yang paling sedikit. Hal yang sama berlaku untuk kayu-jika Anda memotong potongan untuk furnitur, perangkat lunak ini akan memastikan Anda mendapatkan hasil maksimal dari setiap lembar kayu, meminimalkan limbah dan memangkas biaya.  <\/p>\n\n\n\n<p>Tidak seperti membuat tata letak secara manual, perangkat lunak ini dengan cepat dan akurat menentukan cara terbaik untuk mengatur bahan, menjadikannya alat yang sangat berguna dalam manufaktur modern.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">5 Manfaat Utama Perangkat Lunak Nesting di Bidang Manufaktur<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Meminimalkan Pemborosan Material<\/strong>: Perangkat lunak Nesting memastikan bahwa setiap bagian dari bahan digunakan secara efisien, yang berarti lebih sedikit sisa bahan yang berakhir di tempat sampah. Misalnya, jika Anda memotong panel jendela dari selembar kaca, perangkat lunak akan mengatur pemotongan untuk menyisakan potongan yang minimal, sehingga Anda dapat menghemat uang untuk bahan baku. <\/li>\n\n\n\n<li><strong>Menghemat Waktu Produksi<\/strong>: Perencanaan manual memakan waktu dan rentan terhadap kesalahan. Perangkat lunak Nesting mengotomatiskan proses tata letak, sehingga perencana produksi tidak perlu menghabiskan waktu berjam-jam untuk memikirkan cara menyesuaikan bentuk pada sebuah lembaran. <\/li>\n\n\n\n<li><strong>Meningkatkan Efisiensi Produksi<\/strong>: Perangkat lunak ini mempercepat proses produksi dengan menciptakan tata letak pemotongan yang tepat. Mesin bekerja lebih lancar, dan siklus produksi menjadi lebih pendek. <\/li>\n\n\n\n<li><strong>Mendukung Manufaktur Berkelanjutan<\/strong>: Tidak mengherankan jika perangkat lunak nesting sangat cocok dengan praktik berkelanjutan. Dengan mengurangi limbah material dan meningkatkan efisiensi produksi, perangkat lunak ini membantu produsen mengurangi dampaknya terhadap lingkungan, lebih sedikit limbah berarti lebih sedikit bahan mentah yang dibutuhkan, yang baik untuk bisnis dan planet ini. <\/li>\n\n\n\n<li><strong>Mengurangi Biaya Secara Keseluruhan<\/strong>: Lebih sedikit limbah dan produksi yang lebih cepat secara langsung berdampak pada keuntungan Anda. Anda menghemat biaya material dan mengurangi biaya tenaga kerja dan energi. Perangkat lunak Nesting membuat seluruh proses menjadi lebih ramping, sehingga Anda dapat melakukan lebih banyak hal dengan lebih sedikit.  <\/li>\n<\/ol>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f7e777f3\">\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Production planning and scheduling product image straight view\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Advanced production planning with AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Read more about our approach to production planning and optimization leveraging the power of AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"https:\/\/skyplanner.ai\/\" aria-label=\"Book a demo\">Production planning with AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div>\n\n\n<h2 class=\"wp-block-heading\" id=\"h-industries-that-benefit-greatly-from-nesting-software\">Industri yang Mendapatkan Manfaat Besar dari Perangkat Lunak Nesting<\/h2>\n\n\n\n<h4 class=\"gb-headline gb-headline-c013d753 gb-headline-text\">Manufaktur Kaca<\/h4>\n\n\n\n<p><text x=\"-9999\" y=\"-9999\"><\/text><path d=\"M37.5324 16.8707C37.9808 15.5241 38.1363 14.0974 37.9886 12.6859C37.8409 11.2744 37.3934 9.91076 36.676 8.68622C35.6126 6.83404 33.9882 5.3676 32.0373 4.4985C30.0864 3.62941 27.9098 3.40259 25.8215 3.85078C24.8796 2.7893 23.7219 1.94125 22.4257 1.36341C21.1295 0.785575 19.7249 0.491269 18.3058 0.500197C16.1708 0.495044 14.0893 1.16803 12.3614 2.42214C10.6335 3.67624 9.34853 5.44666 8.6917 7.47815C7.30085 7.76286 5.98686 8.3414 4.8377 9.17505C3.68854 10.0087 2.73073 11.0782 2.02839 12.312C0.956464 14.1591 0.498905 16.2988 0.721698 18.4228C0.944492 20.5467 1.83612 22.5449 3.268 24.1293C2.81966 25.4759 2.66413 26.9026 2.81182 28.3141C2.95951 29.7256 3.40701 31.0892 4.12437 32.3138C5.18791 34.1659 6.8123 35.6322 8.76321 36.5013C10.7141 37.3704 12.8907 37.5973 14.9789 37.1492C15.9208 38.2107 17.0786 39.0587 18.3747 39.6366C19.6709 40.2144 21.0755 40.5087 22.4946 40.4998C24.6307 40.5054 26.7133 39.8321 28.4418 38.5772C30.1704 37.3223 31.4556 35.5506 32.1119 33.5179C33.5027 33.2332 34.8167 32.6547 35.9659 31.821C37.115 30.9874 38.0728 29.9178 38.7752 28.684C39.8458 26.8371 40.3023 24.6979 40.0789 22.5748C39.8556 20.4517 38.9639 18.4544 37.5324 16.8707ZM22.4978 37.8849C20.7443 37.8874 19.0459 37.2733 17.6994 36.1501C17.7601 36.117 17.8666 36.0586 17.936 36.0161L25.9004 31.4156C26.1003 31.3019 26.2663 31.137 26.3813 30.9378C26.4964 30.7386 26.5563 30.5124 26.5549 30.2825V19.0542L29.9213 20.998C29.9389 21.0068 29.9541 21.0198 29.9656 21.0359C29.977 21.052 29.9842 21.0707 29.9867 21.0902V30.3889C29.9842 32.375 29.1946 34.2791 27.7909 35.6841C26.3872 37.0892 24.4838 37.8806 22.4978 37.8849ZM6.39227 31.0064C5.51397 29.4888 5.19742 27.7107 5.49804 25.9832C5.55718 26.0187 5.66048 26.0818 5.73461 26.1244L13.699 30.7248C13.8975 30.8408 14.1233 30.902 14.3532 30.902C14.583 30.902 14.8088 30.8408 15.0073 30.7248L24.731 25.1103V28.9979C24.7321 29.0177 24.7283 29.0376 24.7199 29.0556C24.7115 29.0736 24.6988 29.0893 24.6829 29.1012L16.6317 33.7497C14.9096 34.7416 12.8643 35.0097 10.9447 34.4954C9.02506 33.9811 7.38785 32.7263 6.39227 31.0064ZM4.29707 13.6194C5.17156 12.0998 6.55279 10.9364 8.19885 10.3327C8.19885 10.4013 8.19491 10.5228 8.19491 10.6071V19.808C8.19351 20.0378 8.25334 20.2638 8.36823 20.4629C8.48312 20.6619 8.64893 20.8267 8.84863 20.9404L18.5723 26.5542L15.206 28.4979C15.1894 28.5089 15.1703 28.5155 15.1505 28.5173C15.1307 28.5191 15.1107 28.516 15.0924 28.5082L7.04046 23.8557C5.32135 22.8601 4.06716 21.2235 3.55289 19.3046C3.03862 17.3858 3.30624 15.3413 4.29707 13.6194ZM31.955 20.0556L22.2312 14.4411L25.5976 12.4981C25.6142 12.4872 25.6333 12.4805 25.6531 12.4787C25.6729 12.4769 25.6928 12.4801 25.7111 12.4879L33.7631 17.1364C34.9967 17.849 36.0017 18.8982 36.6606 20.1613C37.3194 21.4244 37.6047 22.849 37.4832 24.2684C37.3617 25.6878 36.8382 27.0432 35.9743 28.1759C35.1103 29.3086 33.9415 30.1717 32.6047 30.6641C32.6047 30.5947 32.6047 30.4733 32.6047 30.3889V21.188C32.6066 20.9586 32.5474 20.7328 32.4332 20.5338C32.319 20.3348 32.154 20.1698 31.955 20.0556ZM35.3055 15.0128C35.2464 14.9765 35.1431 14.9142 35.069 14.8717L27.1045 10.2712C26.906 10.1554 26.6803 10.0943 26.4504 10.0943C26.2206 10.0943 25.9948 10.1554 25.7963 10.2712L16.0726 15.8858V11.9982C16.0715 11.9783 16.0753 11.9585 16.0837 11.9405C16.0921 11.9225 16.1048 11.9068 16.1207 11.8949L24.1719 7.25025C25.4053 6.53903 26.8158 6.19376 28.2383 6.25482C29.6608 6.31589 31.0364 6.78077 32.2044 7.59508C33.3723 8.40939 34.2842 9.53945 34.8334 10.8531C35.3826 12.1667 35.5464 13.6095 35.3055 15.0128ZM14.2424 21.9419L10.8752 19.9981C10.8576 19.9893 10.8423 19.9763 10.8309 19.9602C10.8195 19.9441 10.8122 19.9254 10.8098 19.9058V10.6071C10.8107 9.18295 11.2173 7.78848 11.9819 6.58696C12.7466 5.38544 13.8377 4.42659 15.1275 3.82264C16.4173 3.21869 17.8524 2.99464 19.2649 3.1767C20.6775 3.35876 22.0089 3.93941 23.1034 4.85067C23.0427 4.88379 22.937 4.94215 22.8668 4.98473L14.9024 9.58517C14.7025 9.69878 14.5366 9.86356 14.4215 10.0626C14.3065 10.2616 14.2466 10.4877 14.2479 10.7175L14.2424 21.9419ZM16.071 17.9991L20.4018 15.4978L24.7325 17.9975V22.9985L20.4018 25.4983L16.071 22.9985V17.9991Z\" fill=\"currentColor\"><\/path>Perangkat lunak Nesting membantu produsen mengatur panel kaca secara efisien pada lembaran besar, memastikan mereka menggunakan bahan sebanyak mungkin. Bayangkan memotong jendela atau cermin-dengan menghitung tata letak terbaik, perangkat lunak ini mengurangi sisa potongan, menghemat kaca dan uang. Hal ini sangat penting dalam industri yang bahan bakunya mahal.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-a34394b5 gb-headline-text\">Produksi Mebel dan Pertukangan Kayu<\/h4>\n\n\n\n<p>Ketika Anda bekerja dengan kayu, setiap inci sangat berarti-terutama untuk material mahal seperti kayu keras. Perangkat lunak Nesting membantu perencana produksi mengetahui cara paling efisien untuk memotong potongan untuk furnitur, mengurangi limbah, dan memastikan Anda mendapatkan hasil maksimal dari setiap lembar. Lebih sedikit limbah kayu berarti biaya yang lebih rendah dan produksi yang lebih berkelanjutan.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-2bad86e6 gb-headline-text\">Manufaktur Tekstil dan Pakaian Jadi<\/h4>\n\n\n\n<p>Dalam industri seperti fesyen, di mana kain seperti sutra bisa sangat mahal, limbah dapat dengan cepat bertambah. Perangkat lunak Nesting mengatur potongan kain untuk meminimalkan limbah, memastikan produsen menggunakan setiap bahan dengan cara yang paling efisien. Baik itu gaun atau pelapis kelas atas, perangkat lunak ini membantu perencana dalam memotong kain secara lebih efektif, menghemat biaya, dan menyelaraskan dengan praktik <strong>manufaktur ramah<\/strong> lingkungan.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-6aecb910 gb-headline-text\">Fabrikasi Logam<\/h4>\n\n\n\n<p>Baik Anda memotong baja untuk mobil atau aluminium untuk komponen pesawat terbang, perangkat lunak nesting akan mengatur lembaran logam dengan sangat efisien. Hal ini membantu mengurangi besi tua, sehingga menghasilkan penghematan besar dari waktu ke waktu. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-4dbad421 gb-headline-text\">Manufaktur Kedirgantaraan<\/h4>\n\n\n\n<p>Produsen kedirgantaraan berurusan dengan bahan berbiaya tinggi seperti serat karbon atau titanium, di mana limbahnya mahal, dan presisi tidak bisa ditawar. Perangkat lunak ini secara hati-hati mengatur bahan-bahan ini untuk memastikan produsen menggunakan setiap bagian secara efisien. Hasilnya bukan hanya penghematan biaya material tetapi juga peningkatan efisiensi produksi-keduanya merupakan kunci dalam industri yang menuntut kesempurnaan.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-2c602590 gb-headline-text\">Produksi Material Plastik dan Komposit<\/h4>\n\n\n\n<p>Dalam industri seperti pengemasan atau elektronik, di mana bahan plastik dan komposit digunakan, perangkat lunak nesting membantu mengurangi limbah dengan mengoptimalkan cara pemotongan lembaran. Hal ini sangat penting ketika Anda memproduksi dalam skala besar. Lebih sedikit limbah berarti lebih sedikit bahan baku yang dibutuhkan, yang berarti biaya yang lebih rendah dan proses produksi yang lebih efisien.  <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-35a13511 gb-headline-text\">Industri Kulit dan Alas Kaki<\/h4>\n\n\n\n<p>Kulit adalah bahan lain di mana setiap potongan sangat berarti, terutama ketika bekerja dengan kulit berkualitas tinggi atau mahal. Perangkat lunak Nesting mengatur potongan-potongan yang dibutuhkan untuk sepatu, tas, atau aksesori lainnya untuk meminimalkan sisa kulit. Ini berarti produsen dapat membuat lebih banyak produk dari jumlah bahan yang sama, memangkas biaya dan mengurangi limbah.  <\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-3cd85835 gb-headline-text\">Pekerjaan perakitan: Fitur utama di SkyPlanner<\/h2>\n\n\n\n<p>Perangkat lunak nesting dan <a href=\"https:\/\/skyplanner.ai\/id\/\">penjadwalan produksi SkyPlanner dengan AI<\/a> menciptakan kombinasi yang kuat untuk merampingkan produksi dan menurunkan biaya. Sementara perangkat lunak nesting berfokus pada pembuatan tata letak pemotongan yang paling optimal untuk meminimalkan pemborosan material, SkyPlanner melangkah untuk menangani tahap berikutnya. Dengan menggunakan penjadwalan berbasis AI, khususnya dengan fitur pekerjaan perakitan, SkyPlanner menyelaraskan beberapa pesanan menjadi satu tugas yang efisien berdasarkan tata letak ideal perangkat lunak nesting. Hal ini memungkinkan produsen untuk memotong suku cadang dari pesanan yang berbeda secara bersamaan dari bahan yang sama, sehingga secara signifikan mengurangi limbah dan mempercepat produksi. Alat bantu tradisional seperti<a href=\"https:\/\/skyplanner.ai\/id\/sumber-daya\/tantangan-perencanaan-produksi-excel-solusi-skyplanner-aps\/\"> perencanaan produksi Excel<\/a> tidak dapat bersaing dengan tingkat presisi dan efisiensi seperti ini.    <\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"366\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Assembly-Job-Skyplanner-1024x366.png\" alt=\"Pekerjaan Perakitan Skyplanner\" class=\"wp-image-44072\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Assembly-Job-Skyplanner-1024x366.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Assembly-Job-Skyplanner-300x107.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Assembly-Job-Skyplanner-768x274.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Assembly-Job-Skyplanner.png 1419w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/id\/sumber-daya\/advanced-planning-and-scheduling\/\">Sistem Perencanaan dan Penjadwalan Tingkat Lanjut<\/a> dengan AI ini memastikan pemanfaatan sumber daya yang optimal, <a href=\"https:\/\/skyplanner.ai\/id\/sumber-daya\/kurangi-biaya-produksi-dengan-aps\/\">mengurangi biaya produksi<\/a>, dan meminimalkan waktu tunggu. Dengan menggabungkan presisi perangkat lunak nesting dengan penjadwalan cerdas SkyPlanner, produsen dapat mencapai solusi yang sangat efisien dan fleksibel yang mengoptimalkan produksi dari awal hingga akhir. <\/p>\n\n\n\n<p>Apa yang Anda tunggu? Cobalah <a href=\"https:\/\/skyplanner.ai\/id\/uji-coba\/\">uji coba gratis selama 2 minggu<\/a> dan rasakan perbedaan yang dapat dibuat oleh perangkat lunak nesting dan SkyPlanner dalam proses produksi Anda. <a href=\"https:\/\/skyplanner.ai\/id\/hubungi-bagian-penjualan\/\">Hubungi tim profesional kami<\/a> hari ini untuk mempelajari lebih lanjut tentang layanan integrasi tanpa batas kami dan mulai mengoptimalkan efisiensi Anda! <\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe title=\"Assembly Jobs: Save time and reduce costs in your processes\" width=\"1200\" height=\"675\" src=\"https:\/\/www.youtube.com\/embed\/i5i94qP5VZo?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n\n\n<div class=\"gb-container gb-container-92545123\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-0a61546f\">\n<div class=\"gb-grid-column gb-grid-column-e4183086\"><div class=\"gb-container gb-container-e4183086\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-84ccbb5d\"><div class=\"gb-container gb-container-84ccbb5d\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Perangkat Lunak Bersarang: Apa itu dan bagaimana cara kerjanya? Beranda &#8221; Sumber Daya &#8221; Perangkat Lunak Bersarang: Apa itu dan bagaimana cara kerjanya? Perangkat lunak Nesting adalah solusi yang meningkatkan pengaturan bentuk pada bahan datar, memaksimalkan penggunaan bahan dan meminimalkan limbah. Setiap produsen selalu mencari cara untuk mengurangi limbah. Entah itu mengurangi bahan sisa, menghemat &#8230; <a title=\"Perangkat Lunak Bersarang: Apa itu dan bagaimana cara kerjanya?\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/id\/sumber-daya\/perangkat-lunak-bersarang-apa-itu-dan-bagaimana-cara-kerjanya\/\" aria-label=\"Baca selengkapnya tentang Perangkat Lunak Bersarang: Apa itu dan bagaimana cara kerjanya?\">Read more<\/a><\/p>\n","protected":false},"author":6,"featured_media":43956,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2555,416],"tags":[],"class_list":["post-44127","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-efisiensi-manufaktur","category-sumber-daya","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Perangkat Lunak Bersarang: Apa itu dan bagaimana cara kerjanya? &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"Perangkat lunak Nesting adalah solusi yang meningkatkan pengaturan bentuk pada bahan datar, memaksimalkan penggunaan bahan dan meminimalkan limbah.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/id\/sumber-daya\/perangkat-lunak-bersarang-apa-itu-dan-bagaimana-cara-kerjanya\/\" \/>\n<meta property=\"og:locale\" content=\"id_ID\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Perangkat Lunak Bersarang: Apa itu dan bagaimana cara kerjanya?\" \/>\n<meta property=\"og:description\" content=\"Perangkat lunak Nesting adalah solusi yang meningkatkan pengaturan bentuk pada bahan datar, memaksimalkan penggunaan bahan dan meminimalkan limbah.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/id\/sumber-daya\/perangkat-lunak-bersarang-apa-itu-dan-bagaimana-cara-kerjanya\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2024-10-15T08:06:16+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-10-23T08:22:32+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Nesting-software-1024x683.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Ditulis oleh\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimasi waktu membaca\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 menit\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/sumber-daya\\\/perangkat-lunak-bersarang-apa-itu-dan-bagaimana-cara-kerjanya\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/sumber-daya\\\/perangkat-lunak-bersarang-apa-itu-dan-bagaimana-cara-kerjanya\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"Perangkat Lunak Bersarang: Apa itu dan bagaimana cara kerjanya?\",\"datePublished\":\"2024-10-15T08:06:16+00:00\",\"dateModified\":\"2024-10-23T08:22:32+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/sumber-daya\\\/perangkat-lunak-bersarang-apa-itu-dan-bagaimana-cara-kerjanya\\\/\"},\"wordCount\":1294,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/sumber-daya\\\/perangkat-lunak-bersarang-apa-itu-dan-bagaimana-cara-kerjanya\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/Nesting-software.png\",\"articleSection\":[\"Efisiensi Manufaktur\",\"sumber daya\"],\"inLanguage\":\"id\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/sumber-daya\\\/perangkat-lunak-bersarang-apa-itu-dan-bagaimana-cara-kerjanya\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/sumber-daya\\\/perangkat-lunak-bersarang-apa-itu-dan-bagaimana-cara-kerjanya\\\/\",\"name\":\"Perangkat Lunak Bersarang: Apa itu dan bagaimana cara kerjanya? &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/sumber-daya\\\/perangkat-lunak-bersarang-apa-itu-dan-bagaimana-cara-kerjanya\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/sumber-daya\\\/perangkat-lunak-bersarang-apa-itu-dan-bagaimana-cara-kerjanya\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/Nesting-software.png\",\"datePublished\":\"2024-10-15T08:06:16+00:00\",\"dateModified\":\"2024-10-23T08:22:32+00:00\",\"description\":\"Perangkat lunak Nesting adalah solusi yang meningkatkan pengaturan bentuk pada bahan datar, memaksimalkan penggunaan bahan dan meminimalkan limbah.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/sumber-daya\\\/perangkat-lunak-bersarang-apa-itu-dan-bagaimana-cara-kerjanya\\\/#breadcrumb\"},\"inLanguage\":\"id\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/id\\\/sumber-daya\\\/perangkat-lunak-bersarang-apa-itu-dan-bagaimana-cara-kerjanya\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"id\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/sumber-daya\\\/perangkat-lunak-bersarang-apa-itu-dan-bagaimana-cara-kerjanya\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/Nesting-software.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2024\\\/10\\\/Nesting-software.png\",\"width\":4990,\"height\":3327,\"caption\":\"Nesting software. Image for Illustrative purposes.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/sumber-daya\\\/perangkat-lunak-bersarang-apa-itu-dan-bagaimana-cara-kerjanya\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Perangkat Lunak Bersarang: Apa itu dan bagaimana cara kerjanya?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"id\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"id\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"id\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Perangkat Lunak Bersarang: Apa itu dan bagaimana cara kerjanya? &#8211; SkyPlanner","description":"Perangkat lunak Nesting adalah solusi yang meningkatkan pengaturan bentuk pada bahan datar, memaksimalkan penggunaan bahan dan meminimalkan limbah.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/id\/sumber-daya\/perangkat-lunak-bersarang-apa-itu-dan-bagaimana-cara-kerjanya\/","og_locale":"id_ID","og_type":"article","og_title":"Perangkat Lunak Bersarang: Apa itu dan bagaimana cara kerjanya?","og_description":"Perangkat lunak Nesting adalah solusi yang meningkatkan pengaturan bentuk pada bahan datar, memaksimalkan penggunaan bahan dan meminimalkan limbah.","og_url":"https:\/\/skyplanner.ai\/id\/sumber-daya\/perangkat-lunak-bersarang-apa-itu-dan-bagaimana-cara-kerjanya\/","og_site_name":"SkyPlanner","article_published_time":"2024-10-15T08:06:16+00:00","article_modified_time":"2024-10-23T08:22:32+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Nesting-software-1024x683.png","type":"image\/png"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Ditulis oleh":"SkyPlanner","Estimasi waktu membaca":"12 menit"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/id\/sumber-daya\/perangkat-lunak-bersarang-apa-itu-dan-bagaimana-cara-kerjanya\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/id\/sumber-daya\/perangkat-lunak-bersarang-apa-itu-dan-bagaimana-cara-kerjanya\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/id\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"Perangkat Lunak Bersarang: Apa itu dan bagaimana cara kerjanya?","datePublished":"2024-10-15T08:06:16+00:00","dateModified":"2024-10-23T08:22:32+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/id\/sumber-daya\/perangkat-lunak-bersarang-apa-itu-dan-bagaimana-cara-kerjanya\/"},"wordCount":1294,"publisher":{"@id":"https:\/\/skyplanner.ai\/id\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/id\/sumber-daya\/perangkat-lunak-bersarang-apa-itu-dan-bagaimana-cara-kerjanya\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Nesting-software.png","articleSection":["Efisiensi Manufaktur","sumber daya"],"inLanguage":"id"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/id\/sumber-daya\/perangkat-lunak-bersarang-apa-itu-dan-bagaimana-cara-kerjanya\/","url":"https:\/\/skyplanner.ai\/id\/sumber-daya\/perangkat-lunak-bersarang-apa-itu-dan-bagaimana-cara-kerjanya\/","name":"Perangkat Lunak Bersarang: Apa itu dan bagaimana cara kerjanya? &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/id\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/id\/sumber-daya\/perangkat-lunak-bersarang-apa-itu-dan-bagaimana-cara-kerjanya\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/id\/sumber-daya\/perangkat-lunak-bersarang-apa-itu-dan-bagaimana-cara-kerjanya\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Nesting-software.png","datePublished":"2024-10-15T08:06:16+00:00","dateModified":"2024-10-23T08:22:32+00:00","description":"Perangkat lunak Nesting adalah solusi yang meningkatkan pengaturan bentuk pada bahan datar, memaksimalkan penggunaan bahan dan meminimalkan limbah.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/id\/sumber-daya\/perangkat-lunak-bersarang-apa-itu-dan-bagaimana-cara-kerjanya\/#breadcrumb"},"inLanguage":"id","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/id\/sumber-daya\/perangkat-lunak-bersarang-apa-itu-dan-bagaimana-cara-kerjanya\/"]}]},{"@type":"ImageObject","inLanguage":"id","@id":"https:\/\/skyplanner.ai\/id\/sumber-daya\/perangkat-lunak-bersarang-apa-itu-dan-bagaimana-cara-kerjanya\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Nesting-software.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Nesting-software.png","width":4990,"height":3327,"caption":"Nesting software. Image for Illustrative purposes."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/id\/sumber-daya\/perangkat-lunak-bersarang-apa-itu-dan-bagaimana-cara-kerjanya\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/id\/"},{"@type":"ListItem","position":2,"name":"Perangkat Lunak Bersarang: Apa itu dan bagaimana cara kerjanya?"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/id\/#website","url":"https:\/\/skyplanner.ai\/id\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/id\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/id\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"id"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/id\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/id\/","logo":{"@type":"ImageObject","inLanguage":"id","@id":"https:\/\/skyplanner.ai\/id\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/id\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/id\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"id","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Nesting-software.png",4990,3327,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Nesting-software-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Nesting-software-300x200.png",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Nesting-software-768x512.png",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Nesting-software-1024x683.png",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Nesting-software-1536x1024.png",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Nesting-software-2048x1365.png",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2024\/10\/Nesting-software.png",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/id\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"Perangkat Lunak Bersarang: Apa itu dan bagaimana cara kerjanya? Beranda &#8221; Sumber Daya &#8221; Perangkat Lunak Bersarang: Apa itu dan bagaimana cara kerjanya? Perangkat lunak Nesting adalah solusi yang meningkatkan pengaturan bentuk pada bahan datar, memaksimalkan penggunaan bahan dan meminimalkan limbah. Setiap produsen selalu mencari cara untuk mengurangi limbah. Entah itu mengurangi bahan sisa, menghemat&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/posts\/44127","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/comments?post=44127"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/posts\/44127\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/media\/43956"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/media?parent=44127"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/categories?post=44127"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/tags?post=44127"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}