{"id":34021,"date":"2023-09-21T12:29:53","date_gmt":"2023-09-21T12:29:53","guid":{"rendered":"https:\/\/skyplanner.ai\/uncategorized-id\/gaji-manajer-produksi-di-belanda-2023\/"},"modified":"2026-10-03T10:09:41","modified_gmt":"2026-10-03T10:09:41","slug":"gaji-manajer-produksi-di-belanda-2026","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/id\/sumber-daya\/gaji-manajer-produksi-di-belanda-2026\/","title":{"rendered":"Gaji Manager Produksi di Belanda 2026"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Gaji Manager Produksi di Belanda 2026<\/h1>\n\n\n\n<h2 class=\"wp-block-heading\">Gaji manager produksi per bulan dan per tahun<\/h2>\n\n\n\n<p>\u20ac2.588\u2013\u20ac9.620 bruto per bulan adalah rentang gaji manager produksi di Belanda yang dilaporkan oleh <a href=\"https:\/\/www.paylab.com\/nl\/salaryinfo\/management\/production-manager\">Paylab<\/a> (diperiksa pada 3 Oktober 2026). Rentang tersebut mencakup 80% responden dalam kategori Production Manager.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Periode pembayaran<\/th><th>Gaji bruto<\/th><th>Dasar<\/th><\/tr><\/thead><tbody><tr><td>Bulan<\/td><td>\u20ac2.588\u2013\u20ac9.620<\/td><td>Rentang bulanan yang dilaporkan<\/td><\/tr><tr><td>Tahun<\/td><td>\u20ac31.056\u2013\u20ac115.440<\/td><td>Perhitungan: rentang bulanan \u00d712<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>Gaji bruto adalah penghasilan sebelum pajak dan potongan lainnya. Perhitungan tahunan memberikan satuan umum untuk membandingkan gaji di Belanda dengan angka tahunan di negara-negara tetangga.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Apa yang memengaruhi gaji manager produksi?<\/h2>\n\n\n\n<p>Wilayah, lama pengalaman, dan ukuran perusahaan memengaruhi gaji. Faktor-faktor ini disoroti oleh sumber data gaji Belanda.<\/p>\n\n\n\n<p>Peran ini menggabungkan koordinasi produksi, manajemen kapasitas, anggaran, kepemimpinan tim, kualitas, dan keselamatan. Manager produksi memimpin operasi yang lebih luas, sedangkan perencana produksi berfokus pada perencanaan dan penjadwalan produksi; lihat <a href=\"\/id\/sumber-daya\/deskripsi-pekerjaan-manajer-produksi\/\">deskripsi pekerjaan manager produksi<\/a> untuk tanggung jawab yang terlibat.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Bagaimana perbandingan Belanda dengan Jerman?<\/h2>\n\n\n\n<p>Di seberang perbatasan, <a href=\"https:\/\/www.hays.de\/jobprofile\/produktionsleiter\">Hays<\/a> melaporkan rata-rata gaji tahunan \u20ac64.000 untuk manager produksi di Jerman, dengan \u20ac46.000 untuk manager junior dan lebih dari \u20ac77.000 untuk manager senior. Artikel <a href=\"\/id\/sumber-daya\/gaji-manajer-produksi-di-jerman-2026\/\">gaji manager produksi di Jerman<\/a> membahas angka-angka ini.<\/p>\n\n\n\n<p>Rentang di Belanda setara dengan \u20ac31.056\u2013\u20ac115.440 bruto per tahun. Rata-rata Jerman sebesar \u20ac64.000 berada dalam rentang tersebut, sehingga memberi Anda titik referensi saat mempertimbangkan peran di salah satu negara.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Jadwalkan produksi dengan SkyPlanner APS<\/h2>\n\n\n\n<p>SkyPlanner APS adalah software APS (Advanced Planning and Scheduling) untuk produsen di sektor manufaktur diskret. AI-nya secara otomatis mengoptimalkan jadwal pabrik dengan mempertimbangkan ketersediaan material, shift, prioritas, dan tanggal pengiriman. Bagi manager yang mengoordinasikan kapasitas dan komitmen pengiriman, <a href=\"\/id\/\">software penjadwalan produksi<\/a> menyatukan masukan penjadwalan tersebut dalam satu alur kerja.<\/p>\n\n\n\n<p><a href=\"\/id\/hubungi-bagian-penjualan\/\">Pesan demo<\/a> untuk mengeksplorasi SkyPlanner APS bagi tim produksi Anda.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Pertanyaan yang sering diajukan<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Berapa gaji manager produksi per bulan di Belanda?<\/h3>\n\n\n\n<p>Rentang gaji bruto bulanan adalah \u20ac2.588\u2013\u20ac9.620, mencakup 80% responden dalam kategori Production Manager. Jika dihitung selama 12 bulan, jumlahnya menjadi \u20ac31.056\u2013\u20ac115.440 bruto per tahun.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Berapa gaji manager produksi per tahun di Belanda?<\/h3>\n\n\n\n<p>Gaji tahunan yang dihitung adalah \u20ac31.056\u2013\u20ac115.440 bruto, diperoleh dengan mengalikan rentang bulanan \u20ac2.588\u2013\u20ac9.620 dengan 12.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Apakah gaji manager produksi bruto atau neto?<\/h3>\n\n\n\n<p>Angka tersebut adalah gaji bruto, sebelum pajak dan potongan lainnya. Gaji neto adalah jumlah yang diterima setelah potongan.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Faktor apa yang dapat meningkatkan gaji manager produksi?<\/h3>\n\n\n\n<p>Wilayah, lama pengalaman, dan ukuran perusahaan adalah faktor gaji yang disebutkan oleh sumber Belanda.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Bagaimana perbandingan gaji manager produksi di Belanda dengan Jerman?<\/h3>\n\n\n\n<p>Rentang Belanda yang dihitung adalah \u20ac31.056\u2013\u20ac115.440 bruto per tahun. Rata-rata yang dilaporkan di Jerman adalah \u20ac64.000 per tahun, dengan \u20ac46.000 untuk manager junior dan lebih dari \u20ac77.000 untuk manager senior.<\/p>\n\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Gaji Manager Produksi di Belanda 2026 Gaji manager produksi per bulan dan per tahun \u20ac2.588\u2013\u20ac9.620 bruto per bulan adalah rentang gaji manager produksi di Belanda yang dilaporkan oleh Paylab (diperiksa pada 3 Oktober 2026). Rentang tersebut mencakup 80% responden dalam kategori Production Manager. Periode pembayaran Gaji bruto Dasar Bulan \u20ac2.588\u2013\u20ac9.620 Rentang bulanan yang dilaporkan Tahun &#8230; <a title=\"Gaji Manager Produksi di Belanda 2026\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/id\/sumber-daya\/gaji-manajer-produksi-di-belanda-2026\/\" aria-label=\"Baca selengkapnya tentang Gaji Manager Produksi di Belanda 2026\">Read more<\/a><\/p>\n","protected":false},"author":6,"featured_media":34379,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2723,416],"tags":[],"class_list":["post-34021","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-karier-dan-gaji","category-sumber-daya","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Gaji manager produksi di Belanda 2026 &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"\u20ac2.588\u2013\u20ac9.620 bruto per bulan untuk manager produksi di Belanda. Lihat gaji tahunan hasil perhitungan, faktor gaji, dan perbandingan dengan Jerman.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/id\/sumber-daya\/gaji-manajer-produksi-di-belanda-2026\/\" \/>\n<meta property=\"og:locale\" content=\"id_ID\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Gaji Manager Produksi di Belanda 2026\" \/>\n<meta property=\"og:description\" content=\"\u20ac2.588\u2013\u20ac9.620 bruto per bulan untuk manager produksi di Belanda. Lihat gaji tahunan hasil perhitungan, faktor gaji, dan perbandingan dengan Jerman.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/id\/sumber-daya\/gaji-manajer-produksi-di-belanda-2026\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2023-09-21T12:29:53+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-03T10:09:41+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-the-Netherlands-1024x683.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Ditulis oleh\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimasi waktu membaca\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 menit\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/sumber-daya\\\/gaji-manajer-produksi-di-belanda-2026\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/sumber-daya\\\/gaji-manajer-produksi-di-belanda-2026\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"Gaji Manager Produksi di Belanda 2026\",\"datePublished\":\"2023-09-21T12:29:53+00:00\",\"dateModified\":\"2026-10-03T10:09:41+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/sumber-daya\\\/gaji-manajer-produksi-di-belanda-2026\\\/\"},\"wordCount\":405,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/sumber-daya\\\/gaji-manajer-produksi-di-belanda-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Production-Manager-Salary-in-the-Netherlands.png\",\"articleSection\":[\"Karier dan Gaji\",\"sumber daya\"],\"inLanguage\":\"id\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/sumber-daya\\\/gaji-manajer-produksi-di-belanda-2026\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/sumber-daya\\\/gaji-manajer-produksi-di-belanda-2026\\\/\",\"name\":\"Gaji manager produksi di Belanda 2026 &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/sumber-daya\\\/gaji-manajer-produksi-di-belanda-2026\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/sumber-daya\\\/gaji-manajer-produksi-di-belanda-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Production-Manager-Salary-in-the-Netherlands.png\",\"datePublished\":\"2023-09-21T12:29:53+00:00\",\"dateModified\":\"2026-10-03T10:09:41+00:00\",\"description\":\"\u20ac2.588\u2013\u20ac9.620 bruto per bulan untuk manager produksi di Belanda. Lihat gaji tahunan hasil perhitungan, faktor gaji, dan perbandingan dengan Jerman.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/sumber-daya\\\/gaji-manajer-produksi-di-belanda-2026\\\/#breadcrumb\"},\"inLanguage\":\"id\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/id\\\/sumber-daya\\\/gaji-manajer-produksi-di-belanda-2026\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"id\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/sumber-daya\\\/gaji-manajer-produksi-di-belanda-2026\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Production-Manager-Salary-in-the-Netherlands.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Production-Manager-Salary-in-the-Netherlands.png\",\"width\":4990,\"height\":3327,\"caption\":\"Production Manager Salary in the Netherlands\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/sumber-daya\\\/gaji-manajer-produksi-di-belanda-2026\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Gaji Manager Produksi di Belanda 2026\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"id\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"id\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"id\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Gaji manager produksi di Belanda 2026 &#8211; SkyPlanner","description":"\u20ac2.588\u2013\u20ac9.620 bruto per bulan untuk manager produksi di Belanda. Lihat gaji tahunan hasil perhitungan, faktor gaji, dan perbandingan dengan Jerman.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/id\/sumber-daya\/gaji-manajer-produksi-di-belanda-2026\/","og_locale":"id_ID","og_type":"article","og_title":"Gaji Manager Produksi di Belanda 2026","og_description":"\u20ac2.588\u2013\u20ac9.620 bruto per bulan untuk manager produksi di Belanda. Lihat gaji tahunan hasil perhitungan, faktor gaji, dan perbandingan dengan Jerman.","og_url":"https:\/\/skyplanner.ai\/id\/sumber-daya\/gaji-manajer-produksi-di-belanda-2026\/","og_site_name":"SkyPlanner","article_published_time":"2023-09-21T12:29:53+00:00","article_modified_time":"2026-10-03T10:09:41+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-the-Netherlands-1024x683.png","type":"image\/png"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Ditulis oleh":"SkyPlanner","Estimasi waktu membaca":"2 menit"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/id\/sumber-daya\/gaji-manajer-produksi-di-belanda-2026\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/id\/sumber-daya\/gaji-manajer-produksi-di-belanda-2026\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/id\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"Gaji Manager Produksi di Belanda 2026","datePublished":"2023-09-21T12:29:53+00:00","dateModified":"2026-10-03T10:09:41+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/id\/sumber-daya\/gaji-manajer-produksi-di-belanda-2026\/"},"wordCount":405,"publisher":{"@id":"https:\/\/skyplanner.ai\/id\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/id\/sumber-daya\/gaji-manajer-produksi-di-belanda-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-the-Netherlands.png","articleSection":["Karier dan Gaji","sumber daya"],"inLanguage":"id"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/id\/sumber-daya\/gaji-manajer-produksi-di-belanda-2026\/","url":"https:\/\/skyplanner.ai\/id\/sumber-daya\/gaji-manajer-produksi-di-belanda-2026\/","name":"Gaji manager produksi di Belanda 2026 &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/id\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/id\/sumber-daya\/gaji-manajer-produksi-di-belanda-2026\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/id\/sumber-daya\/gaji-manajer-produksi-di-belanda-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-the-Netherlands.png","datePublished":"2023-09-21T12:29:53+00:00","dateModified":"2026-10-03T10:09:41+00:00","description":"\u20ac2.588\u2013\u20ac9.620 bruto per bulan untuk manager produksi di Belanda. Lihat gaji tahunan hasil perhitungan, faktor gaji, dan perbandingan dengan Jerman.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/id\/sumber-daya\/gaji-manajer-produksi-di-belanda-2026\/#breadcrumb"},"inLanguage":"id","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/id\/sumber-daya\/gaji-manajer-produksi-di-belanda-2026\/"]}]},{"@type":"ImageObject","inLanguage":"id","@id":"https:\/\/skyplanner.ai\/id\/sumber-daya\/gaji-manajer-produksi-di-belanda-2026\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-the-Netherlands.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-the-Netherlands.png","width":4990,"height":3327,"caption":"Production Manager Salary in the Netherlands"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/id\/sumber-daya\/gaji-manajer-produksi-di-belanda-2026\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/id\/"},{"@type":"ListItem","position":2,"name":"Gaji Manager Produksi di Belanda 2026"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/id\/#website","url":"https:\/\/skyplanner.ai\/id\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/id\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/id\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"id"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/id\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/id\/","logo":{"@type":"ImageObject","inLanguage":"id","@id":"https:\/\/skyplanner.ai\/id\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/id\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/id\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"id","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-the-Netherlands.png",4990,3327,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-the-Netherlands-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-the-Netherlands-300x200.png",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-the-Netherlands-768x512.png",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-the-Netherlands-1024x683.png",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-the-Netherlands-1536x1024.png",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-the-Netherlands-2048x1365.png",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-the-Netherlands.png",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/id\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"Gaji Manager Produksi di Belanda 2026 Gaji manager produksi per bulan dan per tahun \u20ac2.588\u2013\u20ac9.620 bruto per bulan adalah rentang gaji manager produksi di Belanda yang dilaporkan oleh Paylab (diperiksa pada 3 Oktober 2026). Rentang tersebut mencakup 80% responden dalam kategori Production Manager. Periode pembayaran Gaji bruto Dasar Bulan \u20ac2.588\u2013\u20ac9.620 Rentang bulanan yang dilaporkan Tahun&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/posts\/34021","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/comments?post=34021"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/posts\/34021\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/media\/34379"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/media?parent=34021"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/categories?post=34021"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/tags?post=34021"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}