{"id":106888,"date":"2026-10-23T13:42:12","date_gmt":"2026-10-23T13:42:12","guid":{"rendered":"https:\/\/skyplanner.ai\/integrasi\/erp\/oracle-fusion-cloud\/panduan-integrasi\/"},"modified":"2026-10-23T13:42:12","modified_gmt":"2026-10-23T13:42:12","slug":"panduan-integrasi","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/id\/integrasi\/erp\/oracle-fusion-cloud\/panduan-integrasi\/","title":{"rendered":"Panduan Integrasi Oracle Fusion Cloud untuk Penjadwalan Produksi dengan SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/id\/integrasi\/\">Integrasi<\/a> \/ <a href=\"\/id\/integrasi\/erp\/\">ERP<\/a> \/ Oracle Fusion Cloud<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Panduan Integrasi Oracle Fusion Cloud <span class=\"hl\">untuk Penjadwalan Produksi dengan SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Panduan integrasi Oracle Fusion Cloud ini menjelaskan kepada mitra dan tim TI cara menghubungkan Oracle Fusion Cloud Manufacturing dengan SkyPlanner APS. SkyPlanner terintegrasi dua arah dengan Oracle Fusion Cloud melalui resource REST milik Oracle:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>Data yang masuk mencakup work order beserta operasinya, definisi kerja, work center, sumber daya produksi, kalender, item, struktur item, saldo persediaan yang tersedia, dan pesanan pembelian.<\/li>\n\n\n<li>Tanggal mulai dan selesai yang direncanakan dikirim kembali ke setiap operasi work order.<\/li>\n\n\n<li>Konfirmasi operator dikirim kembali sebagai transaksi operasi dan transaksi sumber daya produksi.<\/li>\n\n\n<li>Webhook SkyPlanner langsung mengirim perubahan jadwal saat terjadi.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/id\/uji-coba\/\">Mulai uji coba gratis<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/id\/hubungi-bagian-penjualan\/\">Jadwalkan demo<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Penjadwalan produksi<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Linimasa Gantt SkyPlanner APS dengan job yang dijadwalkan di berbagai stasiun kerja dan daftar pesanan di bawahnya.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Tim SkyPlanner mengonfigurasi integrasi sesuai konfigurasi Oracle Fusion Cloud Anda selama proses penyiapan awal dan memberikan dukungan setelah sistem mulai digunakan. Panduan ini ditujukan bagi mitra dan pengembang yang ingin berpartisipasi atau membangun integrasi sendiri menggunakan REST API SkyPlanner yang terdokumentasi (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">referensi API<\/a>).<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"oracle-fusion-cloud-s-integration-interfaces\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Antarmuka integrasi Oracle Fusion Cloud<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Oracle Fusion Cloud menyediakan tiga jalur data bagi sistem penjadwalan eksternal:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>REST API untuk Oracle Fusion Cloud SCM.<\/strong> Jalur dasarnya adalah <code>\/fscmRestApi\/resources\/11.13.18.05\/<\/code>. Resource yang digunakan sistem penjadwalan adalah <code>workOrders<\/code> (beserta resource turunannya, yaitu <code>WorkOrderOperation<\/code>, <code>WorkOrderOperationResource<\/code>, dan <code>WorkOrderOperationMaterial<\/code>), <code>processWorkOrders<\/code>, <code>workDefinitions<\/code>, <code>workCenters<\/code>, <code>productionResources<\/code>, <code>calendars<\/code>, <code>itemsV2<\/code>, <code>itemStructures<\/code>, dan <code>inventoryOnhandBalances<\/code>. Progres dikirim ke <code>operationTransactions<\/code>, <code>resourceTransactions<\/code>, dan <code>materialTransactions<\/code>. Pesanan pembelian diambil dari <code>purchaseOrders<\/code> di Procurement REST API. (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fasrp\/rest-endpoints.html\">Endpoint REST<\/a>)<\/li>\n\n\n<li><strong>File-Based Data Import (FBDI).<\/strong> Proses Import Work Orders membuat atau memperbarui work order beserta operasi dan sumber daya produksi untuk operasi tersebut dari templat, sedangkan Import Work Order Resource Transactions memuat catatan transaksi sumber daya produksi. Oracle menyatakan dengan jelas batasan waktunya: &#8220;This option isn&#8217;t suitable for importing manufacturing data on a real-time basis.&#8221; (Opsi ini tidak cocok untuk mengimpor data manufaktur secara waktu nyata.) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/faips\/mfg-file-based-data-import-fbdi.html\">sumber<\/a>)<\/li>\n\n\n<li><strong>Oracle Integration (OIC).<\/strong> Platform integrasi Oracle menangani aliran data antara Fusion dan sistem lain. Salah satu resep Oracle Integration memantau event Work Order Status Change di Oracle Fusion Cloud Manufacturing (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/paas\/integration-cloud\/sync-kanban-scm\/index.html\">sumber<\/a>). Gunakan jalur ini jika perusahaan Anda sudah menggunakan OIC.<\/li>\n\n<\/ol>\n\n\n<p>REST menjadi jalur utama untuk penjadwalan waktu nyata. FBDI cocok untuk pemuatan awal master data.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"authentication-and-access\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Autentikasi dan akses<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Keamanan REST Oracle.<\/strong> &#8220;Fusion Applications REST APIs use a global Oracle Web Services Manager (OWSM) security policy called Multi Token Over SSL RESTful Service Policy.&#8221; (REST API Fusion Applications menggunakan kebijakan keamanan global Oracle Web Services Manager (OWSM) bernama Multi Token Over SSL RESTful Service Policy.) Kebijakan ini menerima autentikasi Basic melalui SSL dan autentikasi berbasis token, seperti bearer token SAML 2.0. (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fasrp\/Quick_Start.html\">Panduan mulai cepat<\/a>)<\/li>\n\n\n<li><strong>Pengguna integrasi.<\/strong> Buat pengguna Oracle khusus untuk integrasi. Berikan peran jabatan yang menyediakan hak akses yang diperlukan untuk work order, definisi kerja, persediaan, dan transaksi, dengan akses terbatas pada organisasi manufaktur yang termasuk dalam lingkup integrasi.<\/li>\n\n\n<li><strong>Paginasi.<\/strong> Oracle membatasi jumlah rekaman yang dikembalikan oleh satu panggilan SCM REST. Karena itu, baca data dengan <code>limit<\/code> dan <code>offset<\/code>, lalu filter berdasarkan organisasi dan status (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/faips\/scm-rest-services.html\">sumber<\/a>)<\/li>\n\n<\/ul>\n\n\n<p>Di sisi SkyPlanner, REST API menggunakan token API pada header <code>Authorization-Token<\/code> untuk autentikasi (SkyPlanner Settings &gt; API) dan didokumentasikan dalam Swagger\/OpenAPI. <a href=\"\/id\/docs\/tutorial-integrasi\/\">Tutorial integrasi<\/a> memandu Anda melakukan panggilan awal.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"events-and-polling\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Event dan polling<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Data di sisi Oracle diambil melalui polling. Kueri REST dengan filter mengambil work order baru dan yang berubah, perubahan status rilis, saldo persediaan yang tersedia, serta pesanan pembelian. Frekuensinya diatur per pabrik, mulai dari setiap beberapa menit untuk work order hingga setiap jam untuk stok. Jika Anda menggunakan Oracle Integration, event Work Order Status Change dapat memicu pembacaan langsung.<\/p>\n\n\n<p>SkyPlanner mengirim webhook saat status atau jadwal berubah, sehingga pengiriman data kembali ke Oracle dipicu oleh event.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Pemetaan data<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Objek Oracle Fusion Cloud (resource REST)<\/th><th>Objek SkyPlanner<\/th><th>Arah<\/th><th>Frekuensi<\/th><\/tr><\/thead><tbody><tr><td>Item (<code>itemsV2<\/code>), satuan ukur<\/td><td>Produk dan material<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>Pemuatan awal, lalu polling<\/td><\/tr><tr><td>Struktur item (<code>itemStructures<\/code>)<\/td><td>Struktur produk, subproduk, material per produk<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>Pemuatan awal, lalu saat ada perubahan<\/td><\/tr><tr><td>Definisi kerja (<code>workDefinitions<\/code>): operasi, sumber daya produksi untuk operasi, penggunaan, Basis Type<\/td><td>Langkah proses beserta durasi, waktu penyiapan, dan waktu pembongkaran<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>Pemuatan awal, lalu saat ada perubahan<\/td><\/tr><tr><td>Work center (<code>workCenters<\/code>), sumber daya produksi (<code>productionResources<\/code>) untuk peralatan dan tenaga kerja<\/td><td>Stasiun kerja, kelompok stasiun kerja, personel, tingkat efisiensi<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>Pemuatan awal, jarang diperbarui setelahnya<\/td><\/tr><tr><td>Kalender dan sif (<code>calendars<\/code>, pengecualian sif)<\/td><td>Sif dan hari libur kerja<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>Setiap hari, atau kelola sif sendiri di SkyPlanner<\/td><\/tr><tr><td>Organisasi manufaktur<\/td><td>Kelompok stasiun kerja per pabrik<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>Pemuatan awal<\/td><\/tr><tr><td>Work order (<code>workOrders<\/code>, <code>processWorkOrders<\/code>) beserta <code>WorkOrderOperation<\/code> dan <code>WorkOrderOperationMaterial<\/code><\/td><td>Pesanan dan job beserta tenggat waktu dan kebutuhan material<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>Polling setiap beberapa menit<\/td><\/tr><tr><td>Saldo persediaan yang tersedia (<code>inventoryOnhandBalances<\/code>)<\/td><td>Saldo stok<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>Polling setiap jam atau saat penjadwalan dijalankan<\/td><\/tr><tr><td>Pesanan pembelian (<code>purchaseOrders<\/code>) beserta tanggal yang dijanjikan<\/td><td>Pesanan pembelian, material masuk berdasarkan tanggal pengiriman<\/td><td>Oracle \u2192 SkyPlanner<\/td><td>Polling setiap jam atau saat penjadwalan dijalankan<\/td><\/tr><tr><td><code>WorkOrderOperation<\/code> <code>PlannedStartDate<\/code>, <code>PlannedCompletionDate<\/code> (PATCH)<\/td><td>Waktu mulai dan selesai yang direncanakan per job<\/td><td>SkyPlanner \u2192 Oracle<\/td><td>Saat jadwal berubah, melalui webhook SkyPlanner<\/td><\/tr><tr><td>Tanggal <code>WorkOrderOperationResource<\/code> (PATCH)<\/td><td>Alokasi sumber daya produksi per job<\/td><td>SkyPlanner \u2192 Oracle<\/td><td>Saat jadwal berubah, jika opsi ini dipilih<\/td><\/tr><tr><td><code>operationTransactions<\/code> (POST)<\/td><td>Jumlah yang selesai per operasi<\/td><td>SkyPlanner \u2192 Oracle<\/td><td>Setiap konfirmasi<\/td><\/tr><tr><td><code>resourceTransactions<\/code> (POST)<\/td><td>Catatan waktu: waktu tenaga kerja dan mesin<\/td><td>SkyPlanner \u2192 Oracle<\/td><td>Setiap konfirmasi atau setiap sif, jika opsi ini dipilih<\/td><\/tr><tr><td>Tidak ada di Oracle Fusion Cloud<\/td><td>Matriks waktu penyiapan, perkakas sebagai sumber daya produksi dengan kapasitas terbatas, mesin dan personel alternatif<\/td><td>Dikelola di SkyPlanner<\/td><td>Dikonfigurasi selama penyiapan awal<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Pola integrasi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. Pemuatan awal master data.<\/strong> Baca item, struktur item, definisi kerja, work center, sumber daya produksi, dan kalender melalui REST, atau muat satu kali dari hasil ekstraksi FBDI. Tentukan pemetaan work center dengan cermat: work center dengan empat mesin yang tercatat sebagai sumber daya produksi yang sama dipetakan menjadi satu kelompok stasiun kerja atau empat stasiun kerja. Setiap organisasi manufaktur menjadi satu kelompok stasiun kerja, sehingga semua pabrik tercakup dalam satu rencana.<\/p>\n\n\n<p><strong>2. Sinkronisasi work order.<\/strong> Baca work order yang sudah maupun belum dirilis beserta operasi dan materialnya, serta pesanan pembelian yang masih terbuka. SkyPlanner menganggap material yang dipesan tersedia pada tanggal pengiriman PO dan memperbarui stok saat PO ditandai Delivered.<\/p>\n\n\n<p>Jadwalkan work order, bukan pesanan terencana dari Supply Planning. Pesanan terencana harus diubah menjadi work order di Oracle terlebih dahulu.<\/p>\n\n\n<p><strong>3. Penulisan kembali jadwal.<\/strong> Saat mesin penjadwalan menempatkan atau memindahkan job, webhook SkyPlanner memicu PATCH pada <code>workOrders\/{WorkOrderId}\/child\/WorkOrderOperation\/{WorkOrderOperationId}<\/code> dengan <code>PlannedStartDate<\/code> dan <code>PlannedCompletionDate<\/code>. Aturan Oracle berlaku: &#8220;The planned start date must not occur before the start date of the work order or after the finish date of the work order.&#8221; (Tanggal mulai yang direncanakan tidak boleh mendahului tanggal mulai work order atau melewati tanggal selesainya.) (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fasrp\/op-workorders-workorderid-child-workorderoperation-workorderoperationid-patch.html\">sumber<\/a>) Karena itu, jika jadwal baru berada di luar rentang tanggal tersebut, integrasi memperbarui tanggal pada header work order melalui PATCH terlebih dahulu, lalu memperbarui operasinya.<\/p>\n\n\n<p><strong>4. Konfirmasi di lantai produksi.<\/strong> Operator mencatat pekerjaan melalui SkyPlanner Mobile Confirmations atau Production Timer, dan catatan waktunya menjaga jadwal tetap mutakhir. Jumlah yang selesai dikirim ke <code>operationTransactions<\/code>, sedangkan waktu tenaga kerja dan mesin dikirim ke <code>resourceTransactions<\/code>. Jika pabrik Anda sudah melaporkan progres di Oracle, SkyPlanner membaca progres tersebut sebagai gantinya.<\/p>\n\n\n<p><strong>5. Aturan kepemilikan data dan penanganan konflik.<\/strong> Dokumentasikan aturan ini sebelum sistem mulai digunakan:<\/p>\n\n\n<figure class=\"wp-block-table ind-table\"><table><thead><tr><th>Data<\/th><th>Pemilik<\/th><\/tr><\/thead><tbody><tr><td>Item, struktur item, definisi kerja, jumlah, status work order<\/td><td>Oracle Fusion Cloud<\/td><\/tr><tr><td>Urutan operasi, waktu mulai dan selesai, alokasi sumber daya produksi<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Matriks waktu persiapan, kebutuhan alat dan operator, sumber daya produksi alternatif<\/td><td>SkyPlanner<\/td><\/tr><tr><td>Shift dan hari nonkerja<\/td><td>Satu sistem, dipilih saat penentuan lingkup<\/td><\/tr><tr><td>Transaksi sumber daya produksi, operasi, dan material<\/td><td>Oracle, dengan data yang dimasukkan langsung di sana atau dikirim dari catatan waktu SkyPlanner<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Tentukan satu sistem yang menulis tanggal operasi. SkyPlanner tidak memerlukan area kerja penjadwalan Oracle, sehingga menggantikan Production Scheduling sebagai sistem yang menulis tanggal rencana. Jika Production Scheduling masih merilis jadwal, pisahkan organisasi yang ditanganinya dari organisasi yang dijadwalkan oleh SkyPlanner.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"typical-project-steps\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Tahapan proyek pada umumnya<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Implementasi biasanya selesai dalam hitungan minggu setelah proses orientasi dimulai, bahkan untuk perusahaan besar. Sebelum itu, validasi jadwal selama uji coba gratis 30 hari menggunakan work center, definisi kerja, dan work order terbuka yang diekspor dari Oracle dalam format CSV atau Excel.<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Pemetaan.<\/strong> Tetapkan tabel pemetaan, aturan kepemilikan data, organisasi yang tercakup, frekuensi sinkronisasi, serta apakah transaksi akan dikirim kembali.<\/li>\n\n\n<li><strong>Akses Oracle.<\/strong> Buat akun pengguna integrasi dan perannya. Lakukan pengujian terlebih dahulu di lingkungan Oracle nonproduksi.<\/li>\n\n\n<li><strong>Pemuatan awal.<\/strong> Muat item, struktur item, definisi kerja, work center, sumber daya produksi, dan kalender.<\/li>\n\n\n<li><strong>Sinkronisasi work order dan pesanan pembelian.<\/strong> Lakukan polling dengan filter, paginasi, dan percobaan ulang.<\/li>\n\n\n<li><strong>Pengaturan batasan di SkyPlanner.<\/strong> Atur matriks waktu persiapan, alat, jumlah operator per job, serta mesin atau personel alternatif.<\/li>\n\n\n<li><strong>Penulisan kembali jadwal.<\/strong> Jalankan PATCH yang dipicu webhook SkyPlanner, beserta pengiriman transaksi jika dipilih.<\/li>\n\n\n<li><strong>Pengujian paralel.<\/strong> Jalankan SkyPlanner berdampingan dengan rencana saat ini, bandingkan tanggalnya, lalu perbaiki master data.<\/li>\n\n\n<li><strong>Mulai penggunaan operasional.<\/strong> Aktifkan penulisan kembali data secara bertahap per pabrik setelah datanya cocok.<\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"what-to-plan-for-in-an-oracle-fusion-cloud-integ\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Hal yang perlu diantisipasi dalam integrasi Oracle Fusion Cloud<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Perilaku bawaan penjadwal.<\/strong> Mesin Oracle yang tidak memperhitungkan batasan berjalan saat pembuatan dan pada &#8220;certain update actions.&#8221; (tindakan pembaruan tertentu) Uji di lingkungan Anda untuk mengetahui pembaruan mana yang menghitung ulang tanggal, dan pastikan SkyPlanner menjadi sistem terakhir yang menulis tanggal operasi.<\/li>\n\n\n<li><strong>Rentang waktu work order.<\/strong> Tanggal operasi harus berada dalam rentang tanggal mulai hingga selesai work order. Perbarui header melalui PATCH terlebih dahulu.<\/li>\n\n\n<li><strong>Basis Type.<\/strong> Penggunaan sumber daya produksi dihitung per unit hanya jika Basis Type bernilai Variable. Nilai Fixed berarti waktu tetap per operasi. Lakukan konversi saat impor; jika tidak, semua durasi akan salah.<\/li>\n\n\n<li><strong>Manufaktur diskret dan proses.<\/strong> Pabrik diskret menggunakan <code>workOrders<\/code>, sedangkan pabrik proses menggunakan <code>processWorkOrders<\/code>. Petakan keduanya jika Anda menjalankan kedua jenis manufaktur tersebut.<\/li>\n\n\n<li><strong>Paginasi.<\/strong> Oracle membatasi jumlah rekaman per panggilan REST. Terapkan paginasi pada setiap kueri dan filter berdasarkan organisasi serta status.<\/li>\n\n\n<li><strong>Pembaruan triwulanan.<\/strong> Oracle memperbarui Fusion setiap triwulan. Tetapkan versi REST yang digunakan dalam path dan uji ulang setelah setiap pembaruan.<\/li>\n\n\n<li><strong>Aturan status.<\/strong> Work order berstatus Pending Approval atau yang sudah ditutup tidak boleh diberi tanggal baru. Kecualikan keduanya dengan filter saat membaca data.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-and-supports-the-oracle-fusion-cl\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Siapa yang mengonfigurasi dan mendukung integrasi Oracle Fusion Cloud<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Tim SkyPlanner mengonfigurasinya selama proses orientasi dan memberikan dukungan setelah sistem mulai digunakan,<\/strong> untuk resource REST dan organisasi yang telah disepakati. Setiap pabrik menggunakan Oracle Fusion Cloud dengan cara berbeda, dan pemahaman tentang perbedaan itulah yang diterapkan di sini.<\/li>\n\n\n<li><strong>Mitra Oracle Anda dapat ikut terlibat.<\/strong> Mitra memahami organisasi, peran, dan ekstensi Anda, serta dapat menyiapkan akun pengguna integrasi, peran, dan alur Oracle Integration yang diperlukan bersama tim SkyPlanner.<\/li>\n\n\n<li><strong>Pengembang internal Anda dapat mengembangkannya lebih lanjut<\/strong> melalui REST API SkyPlanner dengan token API. Token API sudah cukup untuk memulai, dan tim SkyPlanner membantu bila diperlukan. Dokumentasi tersedia di <a href=\"\/id\/docs\/tutorial-integrasi\/\">dokumentasi integrasi SkyPlanner<\/a>.<\/li>\n\n<\/ol>\n\n\n<p>Harga SkyPlanner mulai dari 199 \u20ac per bulan, termasuk 5 stasiun kerja, dengan penagihan bulanan. Penawaran harga integrasi diberikan di awal bersama paket Anda, sesuai proses dan kebutuhan Anda. Lihat <a href=\"\/id\/harga\/\">harga<\/a>, <a href=\"\/id\/integrasi\/erp\/oracle-fusion-cloud\/penjadwalan-produksi\/\">penjadwalan produksi dengan kapasitas mesin dan tenaga kerja yang tersedia untuk Oracle Fusion Cloud<\/a>, <a href=\"\/id\/integrasi\/erp\/oracle-fusion-cloud\/\">halaman Oracle Fusion Cloud<\/a>, dan <a href=\"\/id\/integrasi\/erp\/\">pusat integrasi ERP<\/a>. Menggunakan NetSuite? Lihat <a href=\"\/id\/integrasi\/erp\/netsuite\/panduan-integrasi\/\">panduan integrasi NetSuite<\/a>.<\/p>\n\n\n<div class=\"wp-block-buttons ind-prose__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/id\/uji-coba\/\">Mulai uji coba gratis<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/id\/hubungi-bagian-penjualan\/\">Jadwalkan demo<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ulasan SkyPlanner dari perusahaan manufaktur<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, Spesialis Rantai Pasok di UTU, di lantai produksi panel listrik di Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 jam<\/b><span>dihemat setiap minggu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner telah membawa perencanaan produksi kami dari lembar kerja Excel ke optimasi produksi secara real-time.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, Spesialis Rantai Pasok<\/b><br>UTU \u00b7 Panel listrik dan perangkat hubung bagi<\/p>\n\n\n<p class=\"ind-cust__result\">Perencanaan produksi menghemat 2 jam waktu kerja setiap minggu, dan antrean kerja baru sampai ke lini produksi dalam hitungan detik.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/id\/kisah-pelanggan\/utu\/\">Baca ulasan UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operator mengenakan pakaian ruang bersih di lini pengisian botol pabrik farmasi Laboratory &amp; Allied di Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>efisiensi produksi<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cEfisiensi produksi meningkat 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, Kepala TI<\/b><br>Laboratory &amp; Allied \u00b7 Manufaktur farmasi<\/p>\n\n\n<p class=\"ind-cust__result\">Efisiensi produksi meningkat 90%, dan penyusunan rencana tiga bulan yang dioptimalkan untuk seluruh stasiun kerja memerlukan waktu kurang dari 30 menit.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/id\/kisah-pelanggan\/laboratory-allied\/\">Baca ulasan Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Tampak udara pabrik perlengkapan keselamatan atap Piristeel di Kauhava\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>keandalan pengiriman<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner membuat hambatan produksi lebih mudah diidentifikasi dan pengelolaan produksi menjadi lebih jelas.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, Manajer Produksi<\/b><br>Piristeel \u00b7 Perlengkapan keselamatan atap dan sistem air hujan<\/p>\n\n\n<p class=\"ind-cust__result\">Keandalan pengiriman mencapai 99,2% tahun ini, dan penjadwalan menghemat hingga empat jam waktu kerja per hari.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/id\/kisah-pelanggan\/piristeel\/\">Baca ulasan Piristeel<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/25-73c14230-f628-43c7-9890-005acea9125f.jpg\" alt=\"Hannu Ryyn\u00e4nen, CEO Mamec, di ruang produksi perusahaan di Lohja\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/26-733d2728-780d-4b41-b834-e23619dad50c.png\" alt=\"Mamec\" width=\"106\" height=\"20\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>1.000-an<\/b><span>work order dijadwalkan otomatis<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cKini kami mengendalikan produksi dengan cara yang berbeda, dan pemahaman kami tentang kapasitas sudah berada di tingkat yang sama sekali berbeda.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Ryyn\u00e4nen, CEO<\/b><br>Mamec \u00b7 Mixer industri, pompa, dan manufaktur kontrak berteknologi tinggi<\/p>\n\n\n<p class=\"ind-cust__result\">Ribuan work order dijadwalkan secara otomatis, dan seluruh organisasi dapat memantau produksi secara real-time.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/id\/kisah-pelanggan\/mamec\/\">Baca ulasan Mamec<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Pertanyaan umum<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Apakah Oracle Fusion Cloud memiliki API untuk work order?<\/summary>\n<p class=\"sp-faq__a\">Ya. REST API untuk Oracle Fusion Cloud SCM menyediakan <code>workOrders<\/code> dengan objek anak untuk operasi, sumber daya produksi, dan material, serta <code>processWorkOrders<\/code> untuk manufaktur proses. API ini mendukung GET, POST, dan PATCH.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Bagaimana tanggal rencana ditulis kembali ke Oracle Fusion Cloud?<\/summary>\n<p class=\"sp-faq__a\">Melalui PATCH pada objek anak <code>WorkOrderOperation<\/code> dari work order, dengan menetapkan <code>PlannedStartDate<\/code> dan <code>PlannedCompletionDate<\/code>. Tanggal operasi harus tetap berada dalam rentang tanggal work order, sehingga header diperbarui melalui PATCH terlebih dahulu bila diperlukan.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Bagaimana konfirmasi operator dikirim ke Oracle?<\/summary>\n<p class=\"sp-faq__a\">Jumlah yang selesai dikirim ke <code>operationTransactions<\/code>, sedangkan waktu tenaga kerja dan mesin dikirim ke <code>resourceTransactions<\/code>. Keduanya merupakan resource REST yang menerima POST di Fusion Manufacturing.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Apakah Oracle Fusion Cloud mendukung webhook?<\/summary>\n<p class=\"sp-faq__a\">Fusion menerbitkan peristiwa bisnis seperti Work Order Status Change, dan Oracle Integration dapat berlangganan peristiwa tersebut. Tanpa Oracle Integration, integrasi memeriksa REST API secara berkala sesuai jadwal yang ditetapkan untuk tiap pabrik. Webhook SkyPlanner sendiri mengirimkan perubahan jadwal begitu perubahan terjadi.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Sebaiknya mitra Oracle menawarkan Oracle Production Scheduling atau SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner, jika pelanggan menginginkan satu jadwal lintas pabrik yang memperhitungkan kapasitas nyata mesin dan tenaga kerja serta selalu diperbarui secara otomatis. Production Scheduling diaktifkan dalam penawaran Supply Chain Planning, menyusun jadwal per organisasi penjadwalan, dan menerapkan aturan changeover hanya pada peralatan satu unit (<a href=\"https:\/\/docs.oracle.com\/en\/cloud\/saas\/supply-chain-and-manufacturing\/26c\/fapsu\/changeover-rules.html\">dokumentasi Oracle<\/a>). SkyPlanner terhubung melalui SCM REST API, menyusun ulang rencana secara otomatis, serta merencanakan changeover, perkakas, tim kerja, dan material. Jumlah penggunanya tidak dibatasi, dengan harga mulai dari 199 \u20ac per bulan.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Bisakah kami mencoba SkyPlanner sebelum membangun integrasi?<\/summary>\n<p class=\"sp-faq__a\">Ya. Uji coba gratis selama 30 hari mendukung hingga 20 stasiun kerja dengan impor CSV atau Excel dari Oracle, tanpa memerlukan kartu kredit. <a href=\"\/id\/uji-coba\/\">Mulai uji coba<\/a>, atau <a href=\"\/id\/hubungi-bagian-penjualan\/\">hubungi tim penjualan<\/a> untuk menentukan lingkup integrasi.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integrasi \/ ERP \/ Oracle Fusion Cloud Panduan Integrasi Oracle Fusion Cloud untuk Penjadwalan Produksi dengan SkyPlanner APS Panduan integrasi Oracle Fusion Cloud ini menjelaskan kepada mitra dan tim TI cara menghubungkan Oracle Fusion Cloud Manufacturing dengan SkyPlanner APS. SkyPlanner terintegrasi dua arah dengan Oracle Fusion Cloud melalui resource REST milik Oracle: skyplanner.ai \u00b7 Penjadwalan &#8230; <a title=\"Panduan Integrasi Oracle Fusion Cloud untuk Penjadwalan Produksi dengan SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/id\/integrasi\/erp\/oracle-fusion-cloud\/panduan-integrasi\/\" aria-label=\"Baca selengkapnya tentang Panduan Integrasi Oracle Fusion Cloud untuk Penjadwalan Produksi dengan SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":106163,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-106888","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Panduan Integrasi APS Oracle Cloud untuk Penjadwalan Produksi<\/title>\n<meta name=\"description\" content=\"Oracle Fusion Cloud\u2013SkyPlanner APS: SCM REST API, workOrders PATCH untuk tanggal operasi, transaksi operasi dan sumber daya, pemetaan, kiat proyek.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/id\/integrasi\/erp\/oracle-fusion-cloud\/panduan-integrasi\/\" \/>\n<meta property=\"og:locale\" content=\"id_ID\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Panduan Integrasi Oracle Fusion Cloud untuk Penjadwalan Produksi dengan SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Oracle Fusion Cloud\u2013SkyPlanner APS: SCM REST API, workOrders PATCH untuk tanggal operasi, transaksi operasi dan sumber daya, pemetaan, kiat proyek.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/id\/integrasi\/erp\/oracle-fusion-cloud\/panduan-integrasi\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Estimasi waktu membaca\" \/>\n\t<meta name=\"twitter:data1\" content=\"11 menit\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/integrasi\\\/erp\\\/oracle-fusion-cloud\\\/panduan-integrasi\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/integrasi\\\/erp\\\/oracle-fusion-cloud\\\/panduan-integrasi\\\/\",\"name\":\"Panduan Integrasi APS Oracle Cloud untuk Penjadwalan Produksi\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#website\"},\"datePublished\":\"2026-10-23T13:42:12+00:00\",\"description\":\"Oracle Fusion Cloud\u2013SkyPlanner APS: SCM REST API, workOrders PATCH untuk tanggal operasi, transaksi operasi dan sumber daya, pemetaan, kiat proyek.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/integrasi\\\/erp\\\/oracle-fusion-cloud\\\/panduan-integrasi\\\/#breadcrumb\"},\"inLanguage\":\"id\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/id\\\/integrasi\\\/erp\\\/oracle-fusion-cloud\\\/panduan-integrasi\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/integrasi\\\/erp\\\/oracle-fusion-cloud\\\/panduan-integrasi\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integrasi perangkat lunak ERP dan MES dengan SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/integrasi\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS untuk ERP Anda\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/integrasi\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS untuk Oracle Fusion Cloud: Penjadwalan Produksi Sesuai Kapasitas\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/integrasi\\\/erp\\\/oracle-fusion-cloud\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Panduan Integrasi Oracle Fusion Cloud untuk Penjadwalan Produksi dengan SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"id\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"id\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Panduan Integrasi APS Oracle Cloud untuk Penjadwalan Produksi","description":"Oracle Fusion Cloud\u2013SkyPlanner APS: SCM REST API, workOrders PATCH untuk tanggal operasi, transaksi operasi dan sumber daya, pemetaan, kiat proyek.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/id\/integrasi\/erp\/oracle-fusion-cloud\/panduan-integrasi\/","og_locale":"id_ID","og_type":"article","og_title":"Panduan Integrasi Oracle Fusion Cloud untuk Penjadwalan Produksi dengan SkyPlanner APS","og_description":"Oracle Fusion Cloud\u2013SkyPlanner APS: SCM REST API, workOrders PATCH untuk tanggal operasi, transaksi operasi dan sumber daya, pemetaan, kiat proyek.","og_url":"https:\/\/skyplanner.ai\/id\/integrasi\/erp\/oracle-fusion-cloud\/panduan-integrasi\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Estimasi waktu membaca":"11 menit"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/id\/integrasi\/erp\/oracle-fusion-cloud\/panduan-integrasi\/","url":"https:\/\/skyplanner.ai\/id\/integrasi\/erp\/oracle-fusion-cloud\/panduan-integrasi\/","name":"Panduan Integrasi APS Oracle Cloud untuk Penjadwalan Produksi","isPartOf":{"@id":"https:\/\/skyplanner.ai\/id\/#website"},"datePublished":"2026-10-23T13:42:12+00:00","description":"Oracle Fusion Cloud\u2013SkyPlanner APS: SCM REST API, workOrders PATCH untuk tanggal operasi, transaksi operasi dan sumber daya, pemetaan, kiat proyek.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/id\/integrasi\/erp\/oracle-fusion-cloud\/panduan-integrasi\/#breadcrumb"},"inLanguage":"id","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/id\/integrasi\/erp\/oracle-fusion-cloud\/panduan-integrasi\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/id\/integrasi\/erp\/oracle-fusion-cloud\/panduan-integrasi\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/id\/"},{"@type":"ListItem","position":2,"name":"Integrasi perangkat lunak ERP dan MES dengan SkyPlanner","item":"https:\/\/skyplanner.ai\/id\/integrasi\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS untuk ERP Anda","item":"https:\/\/skyplanner.ai\/id\/integrasi\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS untuk Oracle Fusion Cloud: Penjadwalan Produksi Sesuai Kapasitas","item":"https:\/\/skyplanner.ai\/id\/integrasi\/erp\/oracle-fusion-cloud\/"},{"@type":"ListItem","position":5,"name":"Panduan Integrasi Oracle Fusion Cloud untuk Penjadwalan Produksi dengan SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/id\/#website","url":"https:\/\/skyplanner.ai\/id\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/id\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/id\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"id"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/id\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/id\/","logo":{"@type":"ImageObject","inLanguage":"id","@id":"https:\/\/skyplanner.ai\/id\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/id\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/id\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integrasi \/ ERP \/ Oracle Fusion Cloud Panduan Integrasi Oracle Fusion Cloud untuk Penjadwalan Produksi dengan SkyPlanner APS Panduan integrasi Oracle Fusion Cloud ini menjelaskan kepada mitra dan tim TI cara menghubungkan Oracle Fusion Cloud Manufacturing dengan SkyPlanner APS. SkyPlanner terintegrasi dua arah dengan Oracle Fusion Cloud melalui resource REST milik Oracle: skyplanner.ai \u00b7 Penjadwalan&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/pages\/106888","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/comments?post=106888"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/pages\/106888\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/pages\/106163"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/media?parent=106888"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}