{"id":101167,"date":"2026-10-17T13:00:38","date_gmt":"2026-10-17T13:00:38","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=101167"},"modified":"2026-10-17T13:00:38","modified_gmt":"2026-10-17T13:00:38","slug":"panduan-integrasi","status":"publish","type":"page","link":"https:\/\/skyplanner.ai\/id\/integrasi\/erp\/sap-s4hana\/panduan-integrasi\/","title":{"rendered":"Panduan Integrasi SAP S\/4HANA untuk Penjadwalan Produksi dengan SkyPlanner APS"},"content":{"rendered":"\n<div class=\"wp-block-group sp-industry-page sp-industry sp-page sp-erp-page\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<section class=\"wp-block-group fx-hero\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__grid\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-hero__copy sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p class=\"fx-eyebrow ind-crumbs\"><span><a href=\"\/id\/integrasi\/\">Integrasi<\/a> \/ <a href=\"\/id\/integrasi\/erp\/\">ERP<\/a> \/ SAP S\/4HANA<\/span><\/p>\n\n\n<h1 class=\"wp-block-heading fx-hero__title\">Panduan Integrasi SAP S\/4HANA <span class=\"hl\">untuk Penjadwalan Produksi dengan SkyPlanner APS<\/span><\/h1>\n\n\n<div class=\"wp-block-group fx-hero__sub ind-hero__intro\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Panduan ini menjelaskan kepada mitra SAP, tim TI, dan pembeli teknis cara SkyPlanner APS terhubung dengan SAP S\/4HANA. SkyPlanner terintegrasi dua arah dengan S\/4HANA melalui API OData yang telah dirilis SAP:<\/p>\n\n\n<ul class=\"wp-block-list fxv-deliver__bul\">\n\n<li>Data perintah produksi, operasi, kapasitas work center, stok, dan pesanan pembelian yang masih terbuka masuk ke SkyPlanner.<\/li>\n\n\n<li>Tanggal mulai yang direncanakan dikirim kembali ke setiap operasi dalam perintah produksi.<\/li>\n\n\n<li>Catatan waktu operator dibukukan sebagai konfirmasi perintah produksi.<\/li>\n\n\n<li>Webhook SkyPlanner mengirim perubahan jadwal begitu perubahan terjadi.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-buttons fx-hero__actions is-layout-flex wp-block-buttons-is-layout-flex\">\n\n<div class=\"wp-block-button sp-btn sp-btn--green sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/id\/uji-coba\/\">Mulai uji coba gratis<\/a><\/div>\n\n\n<div class=\"wp-block-button sp-btn sp-btn--outline sp-btn--lg\"><a class=\"wp-block-button__link wp-element-button\" href=\"\/id\/hubungi-bagian-penjualan\/\">Jadwalkan demo<\/a><\/div>\n\n<\/div>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group fx-hero__media sp-min0\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"fx-shot\"><div class=\"fx-shot__bar\" aria-hidden=\"true\"><i><\/i><i><\/i><i><\/i><span>skyplanner.ai \u00b7 Penjadwalan produksi<\/span><\/div><img fetchpriority=\"high\" decoding=\"async\" loading=\"eager\" width=\"1024\" height=\"685\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/features-v2\/20-d7d44cbc-5430-4f97-99f5-fca4632862ef.png\" alt=\"Linimasa Gantt SkyPlanner APS dengan pekerjaan yang dijadwalkan di berbagai stasiun kerja dan daftar pesanan di bawahnya.\"><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--intro\" id=\"overview\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Material, BOM, routing, perintah produksi, persediaan, dan perhitungan biaya tetap dikelola di S\/4HANA. Tim SkyPlanner mengonfigurasi integrasi sesuai konfigurasi S\/4HANA Anda selama proses orientasi dan memberikan dukungan setelah sistem mulai digunakan. Untuk memahami manfaat bisnisnya, lihat <a href=\"\/id\/integrasi\/erp\/sap-s4hana\/\">halaman penjadwalan produksi SAP S\/4HANA<\/a>. Untuk mengetahui kemampuan penjadwalan bawaan S\/4HANA, baca <a href=\"\/id\/integrasi\/erp\/sap-s4hana\/penjadwalan-produksi\/\">Apakah SAP S\/4HANA memiliki penjadwalan produksi?<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"sap-s-4hana-integration-options\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Pilihan integrasi SAP S\/4HANA<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>S\/4HANA menyediakan antarmuka integrasi melalui layanan OData yang telah dirilis dan tercantum di SAP Business Accelerator Hub (api.sap.com). Integrasi penjadwalan menggunakan layanan OData V2. IDoc dan BAPI masih tersedia, tetapi panduan ini menggunakan API OData yang telah dirilis.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Autentikasi menurut edisi<\/h3>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>On-premise dan Private Edition.<\/strong> Layanan diaktifkan di SAP Gateway melalui transaksi <code>\/IWFND\/MAINT_SERVICE<\/code>. Pengguna integrasi memerlukan objek otorisasi yang sesuai, misalnya <code>C_AFRU_AWK<\/code> untuk konfirmasi, <code>C_AFKO_AWK<\/code> untuk item pergerakan barang yang dibukukan bersama konfirmasi tersebut, dan <code>M_PLAF_ORG<\/code> untuk order terencana.<\/li>\n\n\n<li><strong>Public Edition.<\/strong> Layanan hanya dapat diakses melalui communication arrangement. Dengan mengikuti <a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_CLOUD\/55a7cb346519450cb9e6d21c1ecd6ec1\/36ea4658c0c51f60e10000000a44147b.html\">panduan SAP untuk menyiapkan komunikasi masuk<\/a>, Anda membuat pengguna komunikasi, sistem komunikasi, dan communication arrangement di aplikasi <strong>Communication Arrangements<\/strong>, berdasarkan skenario komunikasi SAP (<code>SAP_COM_xxxx<\/code>). Skenario ini menentukan layanan yang dapat diakses dan metode autentikasi yang tersedia:<\/li>\n\n<\/ul>\n\n\n<p>&#8211; berbasis token: alur bearer OAuth, SAML, atau OpenID Connect, dengan penerusan identitas ke pengguna bisnis &#8211; sertifikat klien &#8211; autentikasi dasar dengan pengguna komunikasi teknis<\/p>\n\n\n<p>SAP merekomendasikan autentikasi dengan token atau sertifikat.<\/p>\n\n\n<p>Di sisi SkyPlanner, tersedia REST API dengan autentikasi token API yang didokumentasikan dalam Swagger\/OpenAPI (<a href=\"https:\/\/integration.skyplanner.app\/api\/swagger\">referensi API<\/a>). Dengan demikian, middleware menangani autentikasi SAP di satu sisi dan token API SkyPlanner di sisi lainnya.<\/p>\n\n\n<h3 class=\"wp-block-heading\">API untuk penjadwalan produksi<\/h3>\n\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Layanan<\/th><th>Entitas dan tindakan yang digunakan<\/th><th>Kegunaan<\/th><\/tr><\/thead><tbody><tr><td><a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/ed408e9ecb144e6eb09e6883d25a7262.html\"><code>API_PRODUCTION_ORDER_2_SRV<\/code><\/a> (Production Order, Version 2)<\/td><td><code>A_ProductionOrder_2<\/code>, <code>A_ProductionOrderItem_2<\/code>, <code>A_ProductionOrderOperation_2<\/code>, <code>A_ProductionOrderComponent_2<\/code>, <code>A_ProductionOrderStatus_2<\/code>, <code>A_ProductionRsceTools_2<\/code>; tindakan <code>ReleaseOrder<\/code>, <code>ReleaseOperation<\/code>, <code>ScheduleProductionOrderOperation<\/code><\/td><td>Order, operasi, komponen, PRT, status, penulisan kembali jadwal<\/td><\/tr><tr><td><a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/62ec4758c3f90a02e10000000a44147b.html\"><code>API_WORK_CENTERS<\/code><\/a><\/td><td><code>A_WorkCenters<\/code>, <code>A_WorkCenterAllCapacity_2<\/code>, <code>A_WorkCenterCapacity<\/code>, <code>A_WorkCenterCapacityInterval_2<\/code>, <code>A_WorkCenterCapacityShift_2<\/code>, <code>A_WorkCenterCapPerBucket<\/code><\/td><td>Work center, kategori kapasitas, interval, dan sif<\/td><\/tr><tr><td><a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/2dd233df3bc947d6b402d246ed887b5a.html\"><code>API_PRODUCTION_ROUTING<\/code><\/a><\/td><td><code>ProductionRoutingHeader<\/code>, <code>ProductionRoutingSequence<\/code>, <code>ProductionRoutingOperation<\/code>, <code>ProductionRoutingSubOperation<\/code>, <code>ProductionRoutingMatlAssgmt<\/code>, <code>ProductionRoutingOpCompAlloc<\/code><\/td><td>Routing standar untuk perencanaan sebelum order dibuat<\/td><\/tr><tr><td><code>API_BILL_OF_MATERIAL_SRV;v=2<\/code><\/td><td><code>MaterialBOM<\/code>, <code>MaterialBOMItem<\/code>, <code>MaterialBOMSubItem<\/code><\/td><td>Struktur produk bertingkat<\/td><\/tr><tr><td><code>API_PRODUCT_SRV<\/code> (Product Master A2X)<\/td><td><code>A_Product<\/code><\/td><td>Material (disebut Product dalam API). SAP kini merekomendasikan API Product (Version 2) untuk sebagian besar entitas produk<\/td><\/tr><tr><td><a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/43ae2e5876b4a107e10000000a441470.html\"><code>API_PLANNED_ORDERS<\/code><\/a><\/td><td><code>A_PlannedOrder<\/code>, <code>A_PlannedOrderComponent<\/code>, <code>A_PlannedOrderCapacity<\/code><\/td><td>Hasil MRP Live sebelum konversi<\/td><\/tr><tr><td><code>API_MATERIAL_STOCK_SRV<\/code><\/td><td><code>A_MaterialStock<\/code>, <code>A_MatlStkInAcctMod<\/code><\/td><td>Stok per pabrik dan lokasi penyimpanan untuk mengetahui ketersediaan material<\/td><\/tr><tr><td><code>API_PURCHASEORDER_PROCESS_SRV<\/code><\/td><td><code>A_PurchaseOrder<\/code>, <code>A_PurchaseOrderItem<\/code><\/td><td>Order pembelian yang belum tuntas untuk material yang akan datang<\/td><\/tr><tr><td><a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/e77b762e243b4045ad1f1f048f6aab87.html\"><code>API_PROD_ORDER_CONFIRMATION_2_SRV<\/code><\/a><\/td><td><code>ProdnOrdConf2<\/code>, <code>ProdnOrdConfMatlDocItm<\/code>; tindakan <code>GetConfProposal<\/code>, <code>GetGdsMvtProposal<\/code>, <code>CancelProdnOrdConf<\/code><\/td><td>Konfirmasi dan pergerakan barang dari lantai produksi<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Dalam API order produksi, operasi diidentifikasi dengan gabungan kunci <code>OrderInternalBillOfOperations<\/code> dan <code>OrderIntBillOfOperationsItem<\/code>, bukan nomor operasi yang dilihat perencana. Sementara itu, <code>GetConfProposal<\/code> pada API konfirmasi merujuk operasi yang sama menggunakan <code>OrderID<\/code> dan <code>OrderOperation<\/code>. Simpan kunci internal dan nomor operasi di SkyPlanner sejak pemuatan data pertama.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Peristiwa<\/h3>\n\n\n<p>S\/4HANA memicu <a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/1d609d0a1ecb48c7b46831a3d473288f.html\">peristiwa bisnis<\/a> <strong>Production Order Created<\/strong> dan <strong>Production Order Changed<\/strong> dengan <code>ManufacturingOrder<\/code>, <code>ProductionOrder<\/code>, <code>ProductionOrderType<\/code>, dan <code>ProductionPlant<\/code> di dalam payload. Payload hanya memuat kunci, sehingga integrasi membaca ulang order beserta operasinya. Peristiwa Changed dipicu setiap kali order berubah, jadi terapkan debounce. Untuk arah sebaliknya, webhook SkyPlanner mengirimkan pembaruan secara real time saat jadwal atau status job berubah.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Memulai dengan berkas<\/h3>\n\n\n<p>Untuk uji coba, ekspor perintah produksi dan work center dari laporan daftar S\/4HANA ke Excel atau CSV, lalu impor ke SkyPlanner. Dengan cara ini, hasil penjadwalan dapat dibuktikan sebelum siapa pun mengubah konfigurasi Gateway atau communication arrangements.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"data-mapping-sap-s-4hana-to-skyplanner\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Pemetaan data: SAP S\/4HANA ke SkyPlanner<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"wp-block-table ind-table ind-table--wide\"><table><thead><tr><th>Entitas \/ endpoint S\/4HANA<\/th><th>Objek SkyPlanner<\/th><th>Arah<\/th><th>Frekuensi<\/th><\/tr><\/thead><tbody><tr><td><code>A_Product<\/code> (Material)<\/td><td>Produk atau material<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Pemuatan awal, lalu pembaruan delta secara terjadwal<\/td><\/tr><tr><td><code>MaterialBOM<\/code>, <code>MaterialBOMItem<\/code><\/td><td>Struktur produk, subproduk<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Pemuatan awal, lalu secara terjadwal<\/td><\/tr><tr><td><code>A_WorkCenters<\/code><\/td><td>Stasiun kerja<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Pemuatan awal, lalu saat ada perubahan<\/td><\/tr><tr><td><code>A_WorkCenterCapacity<\/code>, <code>A_WorkCenterCapacityInterval_2<\/code>, <code>A_WorkCenterCapacityShift_2<\/code><\/td><td>Kapasitas dan sif<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Pemuatan awal, lalu secara terjadwal<\/td><\/tr><tr><td><code>ProductionRoutingHeader<\/code>, <code>ProductionRoutingOperation<\/code><\/td><td>Tahapan proses dan waktu standar<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Pemuatan awal, lalu secara terjadwal<\/td><\/tr><tr><td><code>A_ProductionOrder_2<\/code> (sudah dirilis atau dibuat)<\/td><td>Order beserta tanggal jatuh tempo<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Mendekati real time saat peristiwa Created\/Changed dipicu, atau melalui polling terjadwal<\/td><\/tr><tr><td><code>A_ProductionOrderOperation_2<\/code><\/td><td>Job (tahap proses di suatu stasiun kerja)<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Bersamaan dengan order<\/td><\/tr><tr><td><code>A_ProductionRsceTools_2<\/code> (sumber daya\/peralatan produksi)<\/td><td>Peralatan, dijadwalkan sebagai sumber daya bersama dengan kapasitas terbatas<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Bersamaan dengan order<\/td><\/tr><tr><td><code>A_ProductionOrderComponent_2<\/code>, <code>A_MaterialStock<\/code><\/td><td>Kebutuhan material dan stok<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Terjadwal, dengan interval yang disepakati saat penentuan lingkup<\/td><\/tr><tr><td><code>A_PurchaseOrder<\/code>, <code>A_PurchaseOrderItem<\/code> (<code>API_PURCHASEORDER_PROCESS_SRV<\/code>): kuantitas yang belum diterima dan tanggal pengiriman pada baris jadwal<\/td><td>Order pembelian \/ material yang akan datang beserta perkiraan tanggal pengiriman<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Terjadwal, dengan interval yang disepakati saat penentuan lingkup<\/td><\/tr><tr><td><code>A_PlannedOrder<\/code> (opsional)<\/td><td>Order yang direncanakan sebelum konversi<\/td><td>S\/4HANA \u2192 SkyPlanner<\/td><td>Setiap kali MRP Live selesai dijalankan<\/td><\/tr><tr><td><code>ScheduleProductionOrderOperation<\/code> (waktu mulai operasi, mode maju)<\/td><td>Jadwal<\/td><td>SkyPlanner \u2192 S\/4HANA<\/td><td>Saat jadwal berubah, melalui webhook<\/td><\/tr><tr><td><code>ProdnOrdConf2<\/code> (hasil baik, scrap, aktivitas)<\/td><td>Catatan waktu dan kuantitas<\/td><td>SkyPlanner \u2192 S\/4HANA<\/td><td>Setiap peristiwa pencatatan atau secara batch<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"integration-patterns\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Pola integrasi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p><strong>1. Pemuatan master data.<\/strong> Muat material, BOM, work center beserta interval kapasitas dan sifnya, serta routing. Pada tahap ini, tentukan sistem yang mengelola sif. Pembagian yang efektif: kalender pabrik tetap di S\/4HANA, sedangkan rincian pola sif, ketidakhadiran, dan lembur dikelola di SkyPlanner, tempat perencana mengubahnya setiap hari.<\/p>\n\n\n<p><strong>2. Sinkronisasi order.<\/strong> Berlangganan peristiwa Production Order Created\/Changed, atau lakukan polling <code>A_ProductionOrder_2<\/code> berdasarkan stempel waktu perubahan jika peristiwa bisnis belum disiapkan. Filter berdasarkan pabrik, jenis order, dan status. Kirim order saat dibuat agar SkyPlanner dapat merencanakannya lebih awal, lalu rilis order di S\/4HANA (<code>ReleaseOrder<\/code> atau <code>ReleaseOperation<\/code>) setelah SkyPlanner menjadwalkannya.<\/p>\n\n\n<p><strong>3. Penulisan kembali jadwal.<\/strong> Saat webhook SkyPlanner melaporkan perubahan jadwal, integrasi memanggil <a href=\"https:\/\/help.sap.com\/docs\/SAP_S4HANA_ON-PREMISE\/a6f0333202384ba2b48a841a4a6deb1b\/fcab73a7730e4f88b40134fe4c719f56.html\"><code>ScheduleProductionOrderOperation<\/code><\/a> di <code>API_PRODUCTION_ORDER_2_SRV<\/code> untuk setiap operasi yang berubah. Data yang dikirim:<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><code>ManufacturingOrder<\/code>, <code>OrderInternalBillOfOperations<\/code>, dan <code>OrderIntBillOfOperationsItem<\/code> sebagai kunci<\/li>\n\n\n<li><code>OpSchedulingMode<\/code> F (maju), dengan tanggal dan waktu mulai dari SkyPlanner dalam <code>OpSchedldStartDate<\/code> dan <code>OpSchedldStartTime<\/code><\/li>\n\n\n<li><code>OpSchedulingStatus<\/code> DISP (dispatch) dan <code>OpSchedulingStrategy<\/code> M yang wajib disertakan<\/li>\n\n\n<li>ETag dalam <code>if-match<\/code><\/li>\n\n<\/ul>\n\n\n<p>Semua operasi dalam satu perintah dimasukkan ke satu change set sesuai urutan di SkyPlanner, sehingga S\/4HANA menetapkan seluruh rencana perintah tersebut dalam satu panggilan. Mode K tidak pernah digunakan karena mempertahankan tanggal operasi semula dan mengabaikan tanggal yang dikirim.<\/p>\n\n\n<p>SkyPlanner menghitung durasi operasi dari nilai standar routing dan rumus kapasitas work center yang sama dengan yang digunakan S\/4HANA. Karena itu, tanggal selesai yang dihitung S\/4HANA dari tanggal mulai yang dikirim akan sesuai dengan rencana SkyPlanner. Setelah setiap change set, integrasi membaca ulang operasi dan menandai tanggal yang berbeda agar perencana dapat melihatnya sebelum sif berikutnya.<\/p>\n\n\n<p><strong>4. Konfirmasi dari lantai produksi.<\/strong> Setiap catatan waktu dari Mobile Confirmations atau Production Timer menjadi konfirmasi di S\/4HANA. Webhook SkyPlanner memicu pengiriman <code>ProdnOrdConf2<\/code> yang memuat kuantitas hasil baik, scrap, dan waktu aktivitas. Integrasi terlebih dahulu memanggil <code>GetConfProposal<\/code> agar S\/4HANA mengusulkan kuantitas, aktivitas, tanggal, dan data personel. <code>GetGdsMvtProposal<\/code> mengusulkan pergerakan barang.<\/p>\n\n\n<p><strong>Material yang akan datang.<\/strong> Pesanan pembelian yang masih terbuka termasuk dalam sinkronisasi masuk. SkyPlanner menganggap material yang dipesan tersedia pada perkiraan tanggal pengiriman yang tercantum di PO. Pekerjaan yang menunggu komponen yang dibeli dijadwalkan pada hari kedatangan material, tanpa terhambat oleh jumlah stok hari ini.<\/p>\n\n\n<p>S\/4HANA tetap menjadi sumber data acuan untuk penerimaan: saat penerimaan barang dibukukan, stok bertambah dan jumlah yang belum diterima pada item PO berkurang. Sinkronisasi berikutnya memperbarui stok di SkyPlanner dan memberi status Delivered pada PO yang telah diterima seluruhnya. Setelah penerimaan sebagian, sisa jumlah yang belum diterima tetap tercatat akan datang pada tanggal di baris jadwalnya. Penanganan pesanan pembelian di SkyPlanner dijelaskan dalam <a href=\"\/id\/docs\/tutorial-integrasi\/\">dokumentasi SkyPlanner<\/a>.<\/p>\n\n\n<p><strong>5. Aturan tanggung jawab data.<\/strong> S\/4HANA mengelola kuantitas, BOM, routing, perhitungan biaya, dan status. SkyPlanner mengelola urutan, penetapan stasiun kerja, dan tanggal operasi. Jangan pernah membiarkan kedua sistem menulis ke kolom yang sama. Jika perencana masih memindahkan operasi di Capacity Scheduling Board, tentukan perubahan mana yang diutamakan. Pilihannya: sinkronisasi perintah berikutnya membawa perubahan tersebut ke SkyPlanner, atau work center itu tetap berada di luar lingkup SkyPlanner.<\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"what-the-project-contains\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Cakupan proyek<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Implementasi biasanya selesai dalam hitungan minggu sejak proses orientasi dimulai, bahkan untuk perusahaan besar. Sebagian besar pabrik memulai dengan uji coba gratis selama 30 hari menggunakan hasil ekspor CSV atau Excel. Dengan begitu, hasil penjadwalan terbukti menggunakan data mereka sendiri sebelum pengerjaan API dimulai. Proyek S\/4HANA kemudian mencakup:<\/p>\n\n\n<ol class=\"wp-block-list\">\n\n<li><strong>Penentuan lingkup:<\/strong> pabrik, jenis perintah, edisi dan model autentikasi, serta sistem yang bertanggung jawab atas setiap kolom.<\/li>\n\n\n<li><strong>Akses SAP:<\/strong> aktivasi layanan Gateway atau communication arrangement, beserta pengguna teknis dan objek otorisasi.<\/li>\n\n\n<li><strong>Pemetaan master data:<\/strong> kategori kapasitas, interval, dan sif work center; pemetaan nilai standar routing ke durasi di SkyPlanner; serta satuan ukur.<\/li>\n\n\n<li><strong>Pemuatan awal:<\/strong> material, BOM, routing, dan work center beserta kapasitasnya.<\/li>\n\n\n<li><strong>Sinkronisasi perintah produksi dan pesanan pembelian:<\/strong> perintah produksi dan operasi disinkronkan melalui peristiwa Created\/Changed atau polling, sedangkan stok dan pesanan pembelian yang masih terbuka disinkronkan secara terjadwal.<\/li>\n\n\n<li><strong>Penulisan kembali jadwal:<\/strong> <code>ScheduleProductionOrderOperation<\/code> dengan penanganan ETag dan antrean percobaan ulang.<\/li>\n\n\n<li><strong>Konfirmasi dari lantai produksi:<\/strong> catatan waktu dibukukan sebagai konfirmasi <code>ProdnOrdConf2<\/code>.<\/li>\n\n\n<li><strong>Pengujian paralel dengan rencana saat ini:<\/strong> jadwal SkyPlanner dijalankan berdampingan dengan pemerataan beban yang sudah digunakan hingga perencana memercayainya.<\/li>\n\n\n<li><strong>Mulai digunakan secara operasional.<\/strong><\/li>\n\n<\/ol>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"sap-s-4hana-pitfalls\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Kendala yang perlu diwaspadai di SAP S\/4HANA<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Penulisan kembali dilakukan melalui pemanggilan tindakan dengan ETag.<\/strong> Cara yang didokumentasikan untuk menjadwalkan operasi adalah <code>ScheduleProductionOrderOperation<\/code>, bukan PATCH pada <code>A_ProductionOrderOperation_2<\/code>. Mode F menjadwalkan maju dari waktu mulai dan B menjadwalkan mundur dari waktu selesai, sedangkan K dan S mempertahankan tanggal yang ada dan mengabaikan tanggal yang Anda kirim. ETag dalam <code>if-match<\/code> dibentuk dari <code>LastChangeDateTime<\/code> order (YYYYMMDDHHMMSS), sehingga setiap perubahan pada order membuat ETag tersebut tidak lagi berlaku. Terapkan pembacaan sebelum penulisan dan antrean percobaan ulang.<\/li>\n\n\n<li><strong>Kapasitas tidak tersimpan di header work center.<\/strong> Kapasitas tersedia ditentukan oleh kategori kapasitas (001 mesin, 002 tenaga kerja), kalender pabrik, serta interval dan sif yang menggantikan ketentuan kalender tersebut. Rumus kapasitas mengubah nilai standar routing menjadi kebutuhan penyiapan, pemrosesan, dan pembongkaran. Baca <code>A_WorkCenterCapacityInterval_2<\/code> dan entitas sif, lalu sepakati cara mengonversi rumus menjadi durasi di SkyPlanner.<\/li>\n\n\n<li><strong>Nilai standar perlu dibenahi.<\/strong> Routing yang dipelihara untuk perhitungan biaya sering memuat waktu persiapan rata-rata atau mencatat persiapan pada kategori kapasitas yang salah.<\/li>\n\n\n<li><strong>Aturan konfirmasi bersifat ketat.<\/strong> SAP merekomendasikan pemanggilan batch untuk pembukuan massal. Satu change set harus berhasil seluruhnya atau gagal seluruhnya, sehingga satu catatan waktu yang tidak valid akan memblokir seluruh catatan lain dalam set tersebut. Pembatalan dalam batch harus dijalankan dengan urutan <code>ConfirmationCount<\/code> terbalik. Anda tidak dapat mencampur jenis konfirmasi pada satu order, membukukan pergerakan barang tanpa konfirmasi, atau mengonfirmasi operasi yang titik pemicunya memerlukan kotak dialog.<\/li>\n\n\n<li><strong>Periksa apakah PP\/DS aktif.<\/strong> PP\/DS terintegrasi memerlukan aktivitas Customizing <strong>Activate Advanced Planning and Scheduling<\/strong> dan SAP HANA integrated liveCache. SAP menjualnya sebagai produk terpisah, yaitu <a href=\"https:\/\/www.sap.com\/products\/scm\/manufacturing-for-planning-and-scheduling.html\">SAP S\/4HANA Manufacturing for planning and scheduling<\/a>. Jika fitur ini aktif, tentukan sistem penjadwal untuk setiap material: material yang ditandai untuk perencanaan lanjutan menjadi tanggung jawab PP\/DS. Untuk API planned order, SAP juga menyatakan: &#8220;Automatic integration to PP\/DS is not enabled from this API.&#8221; (Integrasi otomatis ke sistem tersebut tidak diaktifkan melalui API ini.)<\/li>\n\n\n<li><strong>Satuan ukur.<\/strong> Kuantitas operasi, kuantitas dasar routing, dan satuan konfirmasi bisa berbeda. Lakukan konversi secara eksplisit menggunakan satuan operasi, bukan satuan dasar material.<\/li>\n\n\n<li><strong>Perbedaan antaredisi.<\/strong> <a href=\"https:\/\/learning.sap.com\/courses\/exploring-the-capacity-planning-in-sap-s-4hana\/outlining-sap-s-4hana-capacity-planning\">SAP Learning<\/a> menunjukkan bahwa tabel perencanaan klasik CM21\/CM22 digantikan oleh Manage Work Center Capacity, Capacity Scheduling Table, dan Capacity Scheduling Board. Public Edition hanya menyediakan API melalui communication scenarios, dan versi layanan yang tersedia dapat berbeda dari versi on-premise. API routing tidak dapat menghapus routing atau memperbarui penetapan material. Saat penentuan lingkup, tim SkyPlanner menetapkan versi layanan untuk setiap sistem pelanggan dengan merujuk pada entri API Business Accelerator Hub untuk rilis tersebut.<\/li>\n\n\n<li><strong>Batasan yang tidak tercakup dalam routing.<\/strong> Kelola changeover yang bergantung pada urutan, benturan penggunaan alat, dan operasi dengan beberapa operator di SkyPlanner, bukan dalam nilai standar routing. Matriks waktu persiapan menyimpan waktu changeover untuk setiap pasangan produk. Ketersediaan alat dari PRT perintah terbatas: alat hanya dapat digunakan di satu stasiun kerja pada satu waktu, sementara satu operasi dapat memerlukan beberapa orang sekaligus.<\/li>\n\n<\/ul>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"who-configures-the-integration\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head ind-head--prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Siapa yang mengonfigurasi integrasi<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-prose\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<p>Berbagai kendala di atas menjadikan konfigurasi sebagai pekerjaan inti. Setiap pabrik menjalankan S\/4HANA secara berbeda: jenis perintah, kategori kapasitas, nilai standar routing, user exit, dan edisi yang digunakan semuanya memengaruhi pemetaan.<\/p>\n\n\n<ul class=\"wp-block-list\">\n\n<li><strong>Tim SkyPlanner mengonfigurasi integrasi<\/strong> agar sesuai dengan sistem S\/4HANA Anda selama proses orientasi, menggunakan API yang telah dirilis untuk S\/4HANA serta REST API dan webhook SkyPlanner. Tim ini juga memberikan dukungan integrasi setelah sistem mulai digunakan. Ini adalah pilihan standar, sehingga Anda memiliki satu pihak yang bertanggung jawab atas penjadwal dan koneksinya ke S\/4HANA.<\/li>\n\n\n<li><strong>Mitra SAP Anda<\/strong> juga dapat membangun integrasi ini dengan mengacu pada dokumentasi Swagger\/OpenAPI SkyPlanner serta pemahaman mereka tentang jenis perintah dan konfigurasi Basis Anda.<\/li>\n\n\n<li><strong>Tim pengembang Anda sendiri<\/strong> dapat membangun integrasi secara langsung atau melalui SAP Integration Suite maupun SAP BTP, menggunakan REST API yang terdokumentasi, autentikasi token API, dan webhook (<a href=\"\/id\/docs\/tutorial-integrasi\/\">tutorial integrasi<\/a>). Cukup dengan kunci API untuk memulai, dan tim SkyPlanner siap membantu saat mereka membutuhkan bantuan.<\/li>\n\n<\/ul>\n\n\n<p>SkyPlanner sudah digunakan berdampingan dengan SAP: tim TI internal Laboratory &amp; Allied menghubungkan SAP Business One on HANA ke SkyPlanner dengan bantuan SkyPlanner. Dokumentasi fitur tersedia untuk umum di <a href=\"\/id\/docs\/tutorial-integrasi\/\">dokumentasi SkyPlanner<\/a>.<\/p>\n\n\n<p>Apa pun pilihan Anda, validasi jadwal terlebih dahulu melalui uji coba gratis selama 30 hari (hingga 20 stasiun kerja, tanpa kartu kredit). Setelah itu, integrasi dibangun untuk rencana yang sudah dipercaya oleh perencana Anda. Setelah uji coba, harga mulai dari 199 \u20ac per bulan, sudah termasuk 5 stasiun kerja, dengan penagihan bulanan. Penawaran biaya integrasi diberikan di awal sesuai proses dan kebutuhan Anda, bersama paket pilihan Anda, sehingga seluruh biaya sudah diketahui sebelum Anda memulai.<\/p>\n\n\n<p>Lihat <a href=\"\/id\/harga\/\">harga<\/a>, <a href=\"\/id\/fitur\/\">fitur<\/a>, dan <a href=\"\/id\/kisah-pelanggan\/\">ulasan pelanggan<\/a> untuk mendapatkan gambaran lebih lengkap.<\/p>\n\n\n<p><a href=\"\/id\/uji-coba\/\">Mulai uji coba gratis<\/a> <a href=\"\/id\/hubungi-bagian-penjualan\/\">Hubungi tim penjualan<\/a><\/p>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section ind-sec--alt\" id=\"customers\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Ulasan SkyPlanner dari perusahaan manufaktur<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group ind-custs\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/utu-kalle-kalliomaki-2026.jpg\" alt=\"Kalle Kalliom\u00e4ki, Spesialis Rantai Pasok di UTU, di area produksi panel listrik di Ulvila\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/23-beca6df2-3fa2-4315-80e8-7c38a9e3d2e1.png\" alt=\"UTU\" width=\"69\" height=\"59\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>2 h<\/b><span>dihemat setiap minggu<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cDengan SkyPlanner, perencanaan produksi kami telah beralih dari lembar kerja Excel ke optimalisasi produksi secara waktu nyata.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Kalle Kalliom\u00e4ki, Spesialis Rantai Pasok<\/b><br>UTU \u00b7 Panel distribusi listrik dan perangkat hubung bagi<\/p>\n\n\n<p class=\"ind-cust__result\">Perencanaan produksi menghemat 2 jam kerja setiap minggu, dan antrean kerja baru sampai ke lini produksi dalam hitungan detik.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/id\/customers\/utu\/\">Baca ulasan UTU<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-35ce8dff-f7d0-4cf3-9e71-0fe7e7ff88d3.jpg\" alt=\"Operator berpakaian ruang bersih di lini pengisian botol di pabrik farmasi Laboratory &amp; Allied di Nairobi\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/09-8c2deb57-ac1c-468b-ad64-fafb9debd7eb.png\" alt=\"Laboratory &amp; Allied\" width=\"71\" height=\"44\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>+90%<\/b><span>efisiensi produksi<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cEfisiensi produksi meningkat 90%.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Abdul Rucyinga, Kepala TI<\/b><br>Laboratory &amp; Allied \u00b7 Manufaktur farmasi<\/p>\n\n\n<p class=\"ind-cust__result\">Efisiensi produksi meningkat 90%, dan penyusunan rencana yang optimal untuk tiga bulan di seluruh stasiun kerja membutuhkan waktu kurang dari 30 menit.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/id\/customers\/laboratory-allied\/\">Baca ulasan Laboratory &amp; Allied<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/02-3a675468-ac30-4369-b781-b03bbf3f9d21.jpg\" alt=\"Foto udara pabrik perlengkapan keselamatan atap Piristeel di Kauhava\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-cec60b32-3b28-48a8-9520-1f12fd8061ee.png\" alt=\"Piristeel\" width=\"96\" height=\"46\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>99,2%<\/b><span>keandalan pengiriman<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner membuat hambatan produksi lebih mudah terlihat dan pengelolaan produksi lebih jelas.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Toni Tuori, Manajer Produksi<\/b><br>Piristeel \u00b7 Perlengkapan keselamatan atap dan sistem air hujan<\/p>\n\n\n<p class=\"ind-cust__result\">Keandalan pengiriman mencapai 99,2% tahun ini, dan penjadwalan menghemat hingga empat jam waktu kerja per hari.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/id\/customers\/piristeel\/\">Baca ulasan Piristeel<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n\n<article class=\"wp-block-group ind-cust ind-cust--photo\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<figure class=\"ind-cust__photo\"><img src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/07-d99dfa98-8de6-4a48-9bad-9560584a9a24.jpg\" alt=\"Seorang juru las KJH-Comp menggerinda struktur baja yang telah dilas di pabrik Alah\u00e4rm\u00e4\" loading=\"lazy\" decoding=\"async\"><\/figure><div class=\"ind-cust__top\"><img class=\"ind-cust__logo\" src=\"\/wp-content\/themes\/generatepress-child\/assets\/img\/customers-v1\/08-b4d7c595-f03f-4472-afad-29a42f77e660.png\" alt=\"KJH-Comp\" width=\"126\" height=\"34\" loading=\"lazy\" decoding=\"async\"><p class=\"ind-cust__metric\"><b>98%<\/b><span>keandalan pengiriman, naik dari sekitar 50%<\/span><\/p><\/div>\n\n\n<p class=\"ind-cust__quote\">\u201cSkyPlanner berperan menentukan dalam menjaga keandalan pengiriman kami.\u201d<\/p>\n\n\n<p class=\"ind-cust__who\"><b>Hannu Lahtinen, Direktur Utama<\/b><br>KJH-Comp \u00b7 Fabrikasi pelat logam dan manufaktur kontrak<\/p>\n\n\n<p class=\"ind-cust__result\">Keandalan pengiriman naik dari sekitar 50% hingga mencapai 98%, dan penjadwalan kini hanya membutuhkan satu supervisor, bukan dua.<\/p>\n\n\n<p class=\"ind-cust__go\"><a href=\"\/id\/customers\/kjh-comp\/\">Baca ulasan KJH-Comp<\/a><svg class=\"ind-cust__arrow\" viewBox=\"0 0 20 20\" fill=\"none\" aria-hidden=\"true\"><path d=\"M4 10h11M11 5l5 5-5 5\" stroke=\"currentColor\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><\/p>\n\n<\/div><\/article>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n\n<section class=\"wp-block-group sp-section\" id=\"faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group sp-container\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<div class=\"wp-block-group fx-head fx-head--center\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<h2 class=\"wp-block-heading\">Pertanyaan umum<\/h2>\n\n<\/div><\/div>\n\n\n<div class=\"wp-block-group sp-faq fx-faq\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Bagaimana SkyPlanner APS terhubung ke SAP S\/4HANA?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner APS terintegrasi dua arah dengan SAP S\/4HANA. Order produksi, operasi, routing, work center, stok, dan order pembelian masuk melalui API OData yang dirilis SAP. Tanggal operasi dikirim kembali melalui <code>ScheduleProductionOrderOperation<\/code>, sedangkan jam kerja yang dicatat dikirim sebagai konfirmasi <code>ProdnOrdConf2<\/code>. Pengiriman ini dipicu oleh webhook SkyPlanner.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Siapa yang membangun dan memelihara integrasi ini?<\/summary>\n<p class=\"sp-faq__a\">Tim SkyPlanner mengonfigurasi integrasi sesuai konfigurasi S\/4HANA Anda selama proses orientasi dan memberikan dukungan setelah sistem mulai digunakan. Penawaran biaya integrasi diberikan di awal sesuai proses dan kebutuhan Anda. Jika mitra SAP atau pengembang Anda sendiri membangunnya menggunakan REST API, integrasi tersebut menjadi tanggung jawab mereka, dan tim SkyPlanner membantu bila diperlukan.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Bagaimana tanggal operasi ditulis kembali, dan apakah S\/4HANA mempertahankan urutannya?<\/summary>\n<p class=\"sp-faq__a\">Melalui tindakan <code>ScheduleProductionOrderOperation<\/code> di <code>API_PRODUCTION_ORDER_2_SRV<\/code>, menggunakan mode maju dengan status dispatch serta tanggal dan waktu mulai dari SkyPlanner. Operasi setiap order dikirim dalam satu change set sesuai urutan di SkyPlanner. Durasi berasal dari nilai standar routing yang juga digunakan S\/4HANA. Integrasi membaca ulang setiap operasi dan menandai setiap perbedaan.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Bagaimana konfirmasi dikirim ke S\/4HANA?<\/summary>\n<p class=\"sp-faq__a\">Saat operator mencatat pekerjaan di SkyPlanner, webhook dipicu. Integrasi kemudian membukukan konfirmasi melalui <code>API_PROD_ORDER_CONFIRMATION_2_SRV<\/code> yang memuat kuantitas hasil baik, scrap, dan waktu aktivitas.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Apakah integrasi ini bisa digunakan dengan S\/4HANA Cloud Public Edition?<\/summary>\n<p class=\"sp-faq__a\">Ya. Akses dilakukan melalui communication arrangement untuk communication scenario yang terkait. Selama penentuan lingkup, tim SkyPlanner mencocokkan versi API perintah produksi dengan rilis Public Edition Anda. Untuk instalasi on-premise dan Private Edition, akses menggunakan aktivasi layanan Gateway.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Kami sudah memiliki PP\/DS. Apakah kami memerlukan SkyPlanner?<\/summary>\n<p class=\"sp-faq__a\">SkyPlanner melayani pabrik dan lokasi yang tidak memiliki lisensi PP\/DS atau personel untuk menjalankannya. Tidak diperlukan pengaktifan melalui Customizing, liveCache, ataupun server pengoptimal; di sisi SAP, cukup tersedia OData API yang telah dirilis. Mesin Arcturus menyusun jadwal produksi yang memperhitungkan kapasitas nyata mesin dan tenaga kerja dalam hitungan detik, dan Autopilot menjadwalkan ulang secara otomatis saat terjadi perubahan produksi.<\/p>\n<\/details>\n\n\n<details class=\"wp-block-details sp-faq__item is-layout-flow wp-block-details-is-layout-flow\"><summary>Bisakah kami menguji sebelum pekerjaan integrasi dimulai, dan berapa lama proyeknya berlangsung?<\/summary>\n<p class=\"sp-faq__a\">Ya. Impor pesanan produksi dan work center dari hasil ekspor S\/4HANA selama uji coba gratis 30 hari, lalu bangun integrasi API setelah jadwal berjalan dengan baik. Implementasi biasanya selesai dalam beberapa minggu setelah proses orientasi dimulai. Untuk menentukan lingkup lingkungan sistem Anda, <a href=\"\/id\/hubungi-bagian-penjualan\/\">hubungi tim penjualan<\/a> atau <a href=\"\/id\/uji-coba\/\">mulai uji coba gratis<\/a>.<\/p>\n<\/details>\n\n<\/div><\/div>\n\n<\/div><\/div>\n\n<\/div><\/section>\n\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Integrasi \/ ERP \/ SAP S\/4HANA Panduan Integrasi SAP S\/4HANA untuk Penjadwalan Produksi dengan SkyPlanner APS Panduan ini menjelaskan kepada mitra SAP, tim TI, dan pembeli teknis cara SkyPlanner APS terhubung dengan SAP S\/4HANA. SkyPlanner terintegrasi dua arah dengan S\/4HANA melalui API OData yang telah dirilis SAP: skyplanner.ai \u00b7 Penjadwalan produksi Material, BOM, routing, perintah &#8230; <a title=\"Panduan Integrasi SAP S\/4HANA untuk Penjadwalan Produksi dengan SkyPlanner APS\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/id\/integrasi\/erp\/sap-s4hana\/panduan-integrasi\/\" aria-label=\"Baca selengkapnya tentang Panduan Integrasi SAP S\/4HANA untuk Penjadwalan Produksi dengan SkyPlanner APS\">Read more<\/a><\/p>\n","protected":false},"author":3,"featured_media":0,"parent":100809,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"class_list":["post-101167","page","type-page","status-publish"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Integrasi SAP S\/4HANA untuk Penjadwalan APS | SkyPlanner<\/title>\n<meta name=\"description\" content=\"Integrasi SkyPlanner APS\u2013SAP S\/4HANA: API OData, communication arrangements, tulis balik ScheduleProductionOrderOperation, pemetaan data dan kendala.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/id\/integrasi\/erp\/sap-s4hana\/panduan-integrasi\/\" \/>\n<meta property=\"og:locale\" content=\"id_ID\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Panduan Integrasi SAP S\/4HANA untuk Penjadwalan Produksi dengan SkyPlanner APS\" \/>\n<meta property=\"og:description\" content=\"Integrasi SkyPlanner APS\u2013SAP S\/4HANA: API OData, communication arrangements, tulis balik ScheduleProductionOrderOperation, pemetaan data dan kendala.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/id\/integrasi\/erp\/sap-s4hana\/panduan-integrasi\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Estimasi waktu membaca\" \/>\n\t<meta name=\"twitter:data1\" content=\"14 menit\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/integrasi\\\/erp\\\/sap-s4hana\\\/panduan-integrasi\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/integrasi\\\/erp\\\/sap-s4hana\\\/panduan-integrasi\\\/\",\"name\":\"Integrasi SAP S\\\/4HANA untuk Penjadwalan APS | SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#website\"},\"datePublished\":\"2026-10-17T13:00:38+00:00\",\"description\":\"Integrasi SkyPlanner APS\u2013SAP S\\\/4HANA: API OData, communication arrangements, tulis balik ScheduleProductionOrderOperation, pemetaan data dan kendala.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/integrasi\\\/erp\\\/sap-s4hana\\\/panduan-integrasi\\\/#breadcrumb\"},\"inLanguage\":\"id\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/id\\\/integrasi\\\/erp\\\/sap-s4hana\\\/panduan-integrasi\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/integrasi\\\/erp\\\/sap-s4hana\\\/panduan-integrasi\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Integrasi perangkat lunak ERP dan MES dengan SkyPlanner\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/integrasi\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"SkyPlanner APS untuk ERP Anda\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/integrasi\\\/erp\\\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"SkyPlanner APS untuk SAP S\\\/4HANA: Penjadwalan Produksi\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/integrasi\\\/erp\\\/sap-s4hana\\\/\"},{\"@type\":\"ListItem\",\"position\":5,\"name\":\"Panduan Integrasi SAP S\\\/4HANA untuk Penjadwalan Produksi dengan SkyPlanner APS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"id\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"id\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Integrasi SAP S\/4HANA untuk Penjadwalan APS | SkyPlanner","description":"Integrasi SkyPlanner APS\u2013SAP S\/4HANA: API OData, communication arrangements, tulis balik ScheduleProductionOrderOperation, pemetaan data dan kendala.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/id\/integrasi\/erp\/sap-s4hana\/panduan-integrasi\/","og_locale":"id_ID","og_type":"article","og_title":"Panduan Integrasi SAP S\/4HANA untuk Penjadwalan Produksi dengan SkyPlanner APS","og_description":"Integrasi SkyPlanner APS\u2013SAP S\/4HANA: API OData, communication arrangements, tulis balik ScheduleProductionOrderOperation, pemetaan data dan kendala.","og_url":"https:\/\/skyplanner.ai\/id\/integrasi\/erp\/sap-s4hana\/panduan-integrasi\/","og_site_name":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Estimasi waktu membaca":"14 menit"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/id\/integrasi\/erp\/sap-s4hana\/panduan-integrasi\/","url":"https:\/\/skyplanner.ai\/id\/integrasi\/erp\/sap-s4hana\/panduan-integrasi\/","name":"Integrasi SAP S\/4HANA untuk Penjadwalan APS | SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/id\/#website"},"datePublished":"2026-10-17T13:00:38+00:00","description":"Integrasi SkyPlanner APS\u2013SAP S\/4HANA: API OData, communication arrangements, tulis balik ScheduleProductionOrderOperation, pemetaan data dan kendala.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/id\/integrasi\/erp\/sap-s4hana\/panduan-integrasi\/#breadcrumb"},"inLanguage":"id","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/id\/integrasi\/erp\/sap-s4hana\/panduan-integrasi\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/id\/integrasi\/erp\/sap-s4hana\/panduan-integrasi\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/id\/"},{"@type":"ListItem","position":2,"name":"Integrasi perangkat lunak ERP dan MES dengan SkyPlanner","item":"https:\/\/skyplanner.ai\/id\/integrasi\/"},{"@type":"ListItem","position":3,"name":"SkyPlanner APS untuk ERP Anda","item":"https:\/\/skyplanner.ai\/id\/integrasi\/erp\/"},{"@type":"ListItem","position":4,"name":"SkyPlanner APS untuk SAP S\/4HANA: Penjadwalan Produksi","item":"https:\/\/skyplanner.ai\/id\/integrasi\/erp\/sap-s4hana\/"},{"@type":"ListItem","position":5,"name":"Panduan Integrasi SAP S\/4HANA untuk Penjadwalan Produksi dengan SkyPlanner APS"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/id\/#website","url":"https:\/\/skyplanner.ai\/id\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/id\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/id\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"id"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/id\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/id\/","logo":{"@type":"ImageObject","inLanguage":"id","@id":"https:\/\/skyplanner.ai\/id\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/id\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/id\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Integrasi \/ ERP \/ SAP S\/4HANA Panduan Integrasi SAP S\/4HANA untuk Penjadwalan Produksi dengan SkyPlanner APS Panduan ini menjelaskan kepada mitra SAP, tim TI, dan pembeli teknis cara SkyPlanner APS terhubung dengan SAP S\/4HANA. SkyPlanner terintegrasi dua arah dengan S\/4HANA melalui API OData yang telah dirilis SAP: skyplanner.ai \u00b7 Penjadwalan produksi Material, BOM, routing, perintah&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/pages\/101167","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/comments?post=101167"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/pages\/101167\/revisions"}],"up":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/pages\/100809"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/media?parent=101167"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}