{"id":79048,"date":"2025-05-09T08:57:16","date_gmt":"2025-05-09T08:57:16","guid":{"rendered":"https:\/\/skyplanner.ai\/docs\/semua-laporan-timelog\/"},"modified":"2025-10-08T07:13:50","modified_gmt":"2025-10-08T07:13:50","password":"","slug":"semua-laporan-timelog","status":"publish","type":"docs","link":"https:\/\/skyplanner.ai\/id\/docs\/semua-laporan-timelog\/","title":{"rendered":"Semua laporan Timelog"},"content":{"rendered":"\n<p><strong>Laporan Semua<\/strong> Catatan <strong>Waktu<\/strong> adalah daftar terperinci dari semua hal yang direkam menggunakan pengatur <strong>waktu SkyPlanner.<\/strong> Laporan ini melacak pekerjaan yang sedang dilakukan di lantai pabrik, langkah demi langkah, orang demi orang, dengan waktu dan hasil yang tepat. <\/p>\n\n<p>Sangat bagus untuk memeriksa bagaimana setiap tugas berjalan, berapa lama waktu yang dibutuhkan, siapa yang melakukannya, dan apakah ada masalah. Anda bahkan bisa menyetujui atau mengedit informasi secara langsung dalam laporan. <\/p>\n\n<p>Berikut ini adalah arti dari setiap kolom:<\/p>\n\n<ul class=\"wp-block-list\">\n<li><strong>Status Pekerjaan<\/strong>: Menampilkan status pekerjaan saat ini (seperti sedang berlangsung, selesai, atau dijeda).<\/li>\n\n\n\n<li><strong>Status Catatan Waktu<\/strong>: Memberitahukan kepada Anda jika log sedang aktif, selesai, atau perlu ditinjau.<\/li>\n\n\n\n<li><strong>Nomor Pekerjaan<\/strong>: ID atau kode untuk pekerjaan yang sedang dilakukan.<\/li>\n\n\n\n<li><strong>Nomor Kontrol<\/strong>: Nomor internal yang digunakan untuk melacak pekerjaan untuk kualitas atau catatan.<\/li>\n\n\n\n<li><strong>Langkah #<\/strong>: Tahap dalam proses (seperti Langkah 1, Langkah 2, dst.).<\/li>\n\n\n\n<li><strong>Stasiun kerja<\/strong>: Stasiun atau area spesifik tempat tugas sedang dikerjakan.<\/li>\n\n\n\n<li><strong>Tahap kerja<\/strong>: Tugas aktual yang sedang dilakukan (seperti pengelasan, perakitan, atau pengecatan).<\/li>\n\n\n\n<li><strong>Kode Produk<\/strong>: Kode yang mengidentifikasi produk yang sedang dikerjakan.<\/li>\n\n\n\n<li><strong>Orang<\/strong>: Siapa yang melakukan pekerjaan.<\/li>\n\n\n\n<li><strong>Mulai<\/strong>: Saat tugas dimulai.<\/li>\n\n\n\n<li><strong>Selesai<\/strong>: Ketika tugas berakhir.<\/li>\n\n\n\n<li><strong>Selesai (pcs)<\/strong>: Berapa banyak bagian yang sudah selesai dari tugas ini.<\/li>\n\n\n\n<li><strong>Rusak (pcs)<\/strong>: Berapa banyak bagian yang memiliki cacat atau kesalahan.<\/li>\n\n\n\n<li><strong>Waktu<\/strong> yang Dicatat: Jumlah waktu yang dihabiskan orang tersebut untuk mengerjakan tugas.<\/li>\n\n\n\n<li><strong>Catatan<\/strong>: Komentar atau info tambahan yang ditambahkan oleh operator.<\/li>\n\n\n\n<li><strong>Tindakan<\/strong>: Tombol atau opsi untuk menyetujui, mengedit, atau meninjau catatan waktu.<\/li>\n<\/ul>\n\n<p><strong>Mengapa ini berguna:<\/strong><\/p>\n\n<p>Laporan Semua Catatan Waktu dari SkyPlanner membantu Anda mengetahui bagaimana pekerjaan sebenarnya diselesaikan. Laporan ini menunjukkan apa yang berhasil, di mana masalah mungkin terjadi, dan berapa lama waktu yang dibutuhkan untuk menyelesaikan tugas. Ini sangat membantu bagi manajer, supervisor, dan siapa pun yang mencoba meningkatkan alur kerja dan kinerja tim.  <\/p>\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Laporan Semua Catatan Waktu adalah daftar terperinci dari semua hal yang direkam menggunakan pengatur waktu SkyPlanner. Laporan ini melacak pekerjaan yang sedang dilakukan di lantai pabrik, langkah demi langkah, orang demi orang, dengan waktu dan hasil yang tepat. Sangat bagus untuk memeriksa bagaimana setiap tugas berjalan, berapa lama waktu yang dibutuhkan, siapa yang melakukannya, dan &#8230; <a title=\"Semua laporan Timelog\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/id\/docs\/semua-laporan-timelog\/\" aria-label=\"Baca selengkapnya tentang Semua laporan Timelog\">Read more<\/a><\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"doc_category":[1716],"doc_tag":[],"class_list":["post-79048","docs","type-docs","status-publish","hentry","doc_category-aplikasi-dan-pengatur-waktu-shopfloor"],"acf":[],"year_month":"2026-11","word_count":284,"total_views":"179","reactions":{"happy":"0","normal":"0","sad":"0"},"author_info":{"name":"SkyPlanner","author_nicename":"bettina","author_url":"https:\/\/skyplanner.ai\/id\/author\/bettina\/"},"doc_category_info":[{"term_name":"Aplikasi dan Pengatur Waktu ShopFloor","term_url":"https:\/\/skyplanner.ai\/id\/docs-category\/aplikasi-dan-pengatur-waktu-shopfloor\/"}],"doc_tag_info":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Semua laporan Timelog &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"Laporan Semua Catatan Waktu adalah daftar terperinci dari semua yang direkam menggunakan pengatur waktu SkyPlanner. Laporan ini melacak pekerjaan yang sedang dilakukan langkah demi langkah, orang...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/id\/docs\/semua-laporan-timelog\/\" \/>\n<meta property=\"og:locale\" content=\"id_ID\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Semua laporan Timelog\" \/>\n<meta property=\"og:description\" content=\"Laporan Semua Catatan Waktu adalah daftar terperinci dari semua yang direkam menggunakan pengatur waktu SkyPlanner. Laporan ini melacak pekerjaan yang sedang dilakukan langkah demi langkah, orang...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/id\/docs\/semua-laporan-timelog\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:modified_time\" content=\"2025-10-08T07:13:50+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Estimasi waktu membaca\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 menit\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/docs\\\/semua-laporan-timelog\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/docs\\\/semua-laporan-timelog\\\/\",\"name\":\"Semua laporan Timelog &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#website\"},\"datePublished\":\"2025-05-09T08:57:16+00:00\",\"dateModified\":\"2025-10-08T07:13:50+00:00\",\"description\":\"Laporan Semua Catatan Waktu adalah daftar terperinci dari semua yang direkam menggunakan pengatur waktu SkyPlanner. Laporan ini melacak pekerjaan yang sedang dilakukan langkah demi langkah, orang...\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/docs\\\/semua-laporan-timelog\\\/#breadcrumb\"},\"inLanguage\":\"id\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/id\\\/docs\\\/semua-laporan-timelog\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/docs\\\/semua-laporan-timelog\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Docs\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/docs\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Semua laporan Timelog\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"id\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"id\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Semua laporan Timelog &#8211; SkyPlanner","description":"Laporan Semua Catatan Waktu adalah daftar terperinci dari semua yang direkam menggunakan pengatur waktu SkyPlanner. Laporan ini melacak pekerjaan yang sedang dilakukan langkah demi langkah, orang...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/id\/docs\/semua-laporan-timelog\/","og_locale":"id_ID","og_type":"article","og_title":"Semua laporan Timelog","og_description":"Laporan Semua Catatan Waktu adalah daftar terperinci dari semua yang direkam menggunakan pengatur waktu SkyPlanner. Laporan ini melacak pekerjaan yang sedang dilakukan langkah demi langkah, orang...","og_url":"https:\/\/skyplanner.ai\/id\/docs\/semua-laporan-timelog\/","og_site_name":"SkyPlanner","article_modified_time":"2025-10-08T07:13:50+00:00","twitter_card":"summary_large_image","twitter_misc":{"Estimasi waktu membaca":"1 menit"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/id\/docs\/semua-laporan-timelog\/","url":"https:\/\/skyplanner.ai\/id\/docs\/semua-laporan-timelog\/","name":"Semua laporan Timelog &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/id\/#website"},"datePublished":"2025-05-09T08:57:16+00:00","dateModified":"2025-10-08T07:13:50+00:00","description":"Laporan Semua Catatan Waktu adalah daftar terperinci dari semua yang direkam menggunakan pengatur waktu SkyPlanner. Laporan ini melacak pekerjaan yang sedang dilakukan langkah demi langkah, orang...","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/id\/docs\/semua-laporan-timelog\/#breadcrumb"},"inLanguage":"id","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/id\/docs\/semua-laporan-timelog\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/id\/docs\/semua-laporan-timelog\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/id\/"},{"@type":"ListItem","position":2,"name":"Docs","item":"https:\/\/skyplanner.ai\/id\/docs\/"},{"@type":"ListItem","position":3,"name":"Semua laporan Timelog"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/id\/#website","url":"https:\/\/skyplanner.ai\/id\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/id\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/id\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"id"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/id\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/id\/","logo":{"@type":"ImageObject","inLanguage":"id","@id":"https:\/\/skyplanner.ai\/id\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/id\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/id\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"Laporan Semua Catatan Waktu adalah daftar terperinci dari semua hal yang direkam menggunakan pengatur waktu SkyPlanner. Laporan ini melacak pekerjaan yang sedang dilakukan di lantai pabrik, langkah demi langkah, orang demi orang, dengan waktu dan hasil yang tepat. Sangat bagus untuk memeriksa bagaimana setiap tugas berjalan, berapa lama waktu yang dibutuhkan, siapa yang melakukannya, dan&hellip;","knowledge_base_info":[],"knowledge_base_slug":[],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/docs\/79048","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/docs"}],"about":[{"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/types\/docs"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/comments?post=79048"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/docs\/79048\/revisions"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/media?parent=79048"}],"wp:term":[{"taxonomy":"doc_category","embeddable":true,"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/doc_category?post=79048"},{"taxonomy":"doc_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/doc_tag?post=79048"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}