{"id":74640,"date":"2025-03-19T12:22:53","date_gmt":"2025-03-19T12:22:53","guid":{"rendered":"https:\/\/skyplanner.ai\/docs\/cara-menghitung-harga-skyplanner-anda\/"},"modified":"2026-09-03T18:25:58","modified_gmt":"2026-09-03T18:25:58","password":"","slug":"cara-menghitung-harga-skyplanner-anda","status":"publish","type":"docs","link":"https:\/\/skyplanner.ai\/id\/docs\/cara-menghitung-harga-skyplanner-anda\/","title":{"rendered":"Cara menghitung Harga SkyPlanner Anda"},"content":{"rendered":"\n<p>Dalam video ini, kami menjelaskan model penetapan harga SkyPlanner, yang didasarkan pada jumlah workstation dalam pengaturan produksi Anda.<\/p>\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe title=\"SkyPlanner pricing and the definition of a Workstation\" width=\"1200\" height=\"675\" src=\"https:\/\/www.youtube.com\/embed\/dv-q79c78LA?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n\n<h2 class=\"wp-block-heading\">Apa yang dimaksud dengan Workstation?<\/h2>\n\n<p>Stasiun kerja mengacu pada sumber daya produksi tunggal dengan antrean kerja terjadwal, biasanya menangani satu tugas pada satu waktu. Ini bisa berupa mesin produksi atau titik kerja tertentu, seperti stasiun pengelasan, di mana individu yang berbeda beroperasi selama berbagai shift. <\/p>\n\n<h2 class=\"wp-block-heading\">Layanan Tambahan<\/h2>\n\n<p>Harap diperhatikan bahwa harga yang dibahas dalam video ini hanya berlaku untuk workstation. Layanan tambahan, seperti <strong>\n  <a href=\"https:\/\/skyplanner.ai\/id\/onboarding-terpandu\/\">orientasi<\/a>\n<\/strong>, <strong>\n  <a href=\"https:\/\/skyplanner.ai\/id\/integrasi\/\">integrasi dengan sistem yang sudah ada<\/a>\n<\/strong>dan <strong>\n  <a href=\"https:\/\/skyplanner.ai\/id\/layanan-kustomisasi\/\">kustomisasi<\/a>\n<\/strong>tersedia untuk menyesuaikan SkyPlanner dengan kebutuhan spesifik perusahaan Anda. Layanan ini <strong>tidak termasuk<\/strong> dalam harga stasiun kerja standar dan dapat diberikan berdasarkan permintaan.   <\/p>\n\n<p>Silakan kunjungi <a href=\"https:\/\/skyplanner.ai\/id\/harga\/\">halaman harga<\/a> kami untuk perincian terperinci dan untuk menghitung biaya spesifik Anda.<\/p>\n\n<p>Untuk informasi lebih lanjut atau untuk mendiskusikan kebutuhan unik Anda, hubungi tim kami.<\/p>\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Dalam video ini, kami menjelaskan model penetapan harga SkyPlanner, yang didasarkan pada jumlah workstation dalam pengaturan produksi Anda. Apa yang dimaksud dengan Workstation? Stasiun kerja mengacu pada sumber daya produksi tunggal dengan antrean kerja terjadwal, biasanya menangani satu tugas pada satu waktu. Ini bisa berupa mesin produksi atau titik kerja tertentu, seperti stasiun pengelasan, di &#8230; <a title=\"Cara menghitung Harga SkyPlanner Anda\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/id\/docs\/cara-menghitung-harga-skyplanner-anda\/\" aria-label=\"Baca selengkapnya tentang Cara menghitung Harga SkyPlanner Anda\">Read more<\/a><\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"doc_category":[1547],"doc_tag":[],"class_list":["post-74640","docs","type-docs","status-publish","hentry","doc_category-panduan-video"],"acf":[],"year_month":"2026-11","word_count":149,"total_views":"194","reactions":{"happy":"0","normal":"0","sad":"0"},"author_info":{"name":"SkyPlanner","author_nicename":"bettina","author_url":"https:\/\/skyplanner.ai\/id\/author\/bettina\/"},"doc_category_info":[{"term_name":"Panduan Video","term_url":"https:\/\/skyplanner.ai\/id\/docs-category\/panduan-video\/"}],"doc_tag_info":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Cara menghitung Harga SkyPlanner Anda &#8211; SkyPlanner<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/id\/docs\/cara-menghitung-harga-skyplanner-anda\/\" \/>\n<meta property=\"og:locale\" content=\"id_ID\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Cara menghitung Harga SkyPlanner Anda\" \/>\n<meta property=\"og:description\" content=\"Dalam video ini, kami menjelaskan model penetapan harga SkyPlanner, yang didasarkan pada jumlah workstation dalam pengaturan produksi Anda. Apa yang dimaksud dengan Workstation? Stasiun kerja mengacu pada sumber daya produksi tunggal dengan antrean kerja terjadwal, biasanya menangani satu tugas pada satu waktu. Ini bisa berupa mesin produksi atau titik kerja tertentu, seperti stasiun pengelasan, di ... Read more\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/id\/docs\/cara-menghitung-harga-skyplanner-anda\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-03T18:25:58+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Estimasi waktu membaca\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 menit\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/docs\\\/cara-menghitung-harga-skyplanner-anda\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/docs\\\/cara-menghitung-harga-skyplanner-anda\\\/\",\"name\":\"Cara menghitung Harga SkyPlanner Anda &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#website\"},\"datePublished\":\"2025-03-19T12:22:53+00:00\",\"dateModified\":\"2026-09-03T18:25:58+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/docs\\\/cara-menghitung-harga-skyplanner-anda\\\/#breadcrumb\"},\"inLanguage\":\"id\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/id\\\/docs\\\/cara-menghitung-harga-skyplanner-anda\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/docs\\\/cara-menghitung-harga-skyplanner-anda\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Docs\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/docs\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Cara menghitung Harga SkyPlanner Anda\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"id\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"id\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/id\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Cara menghitung Harga SkyPlanner Anda &#8211; SkyPlanner","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/id\/docs\/cara-menghitung-harga-skyplanner-anda\/","og_locale":"id_ID","og_type":"article","og_title":"Cara menghitung Harga SkyPlanner Anda","og_description":"Dalam video ini, kami menjelaskan model penetapan harga SkyPlanner, yang didasarkan pada jumlah workstation dalam pengaturan produksi Anda. Apa yang dimaksud dengan Workstation? Stasiun kerja mengacu pada sumber daya produksi tunggal dengan antrean kerja terjadwal, biasanya menangani satu tugas pada satu waktu. Ini bisa berupa mesin produksi atau titik kerja tertentu, seperti stasiun pengelasan, di ... Read more","og_url":"https:\/\/skyplanner.ai\/id\/docs\/cara-menghitung-harga-skyplanner-anda\/","og_site_name":"SkyPlanner","article_modified_time":"2026-09-03T18:25:58+00:00","twitter_card":"summary_large_image","twitter_misc":{"Estimasi waktu membaca":"1 menit"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/id\/docs\/cara-menghitung-harga-skyplanner-anda\/","url":"https:\/\/skyplanner.ai\/id\/docs\/cara-menghitung-harga-skyplanner-anda\/","name":"Cara menghitung Harga SkyPlanner Anda &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/id\/#website"},"datePublished":"2025-03-19T12:22:53+00:00","dateModified":"2026-09-03T18:25:58+00:00","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/id\/docs\/cara-menghitung-harga-skyplanner-anda\/#breadcrumb"},"inLanguage":"id","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/id\/docs\/cara-menghitung-harga-skyplanner-anda\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/id\/docs\/cara-menghitung-harga-skyplanner-anda\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/id\/"},{"@type":"ListItem","position":2,"name":"Docs","item":"https:\/\/skyplanner.ai\/id\/docs\/"},{"@type":"ListItem","position":3,"name":"Cara menghitung Harga SkyPlanner Anda"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/id\/#website","url":"https:\/\/skyplanner.ai\/id\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/id\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/id\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"id"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/id\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/id\/","logo":{"@type":"ImageObject","inLanguage":"id","@id":"https:\/\/skyplanner.ai\/id\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/id\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]}]}},"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"betterdocs-category-thumb":false},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/id\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"Dalam video ini, kami menjelaskan model penetapan harga SkyPlanner, yang didasarkan pada jumlah workstation dalam pengaturan produksi Anda. Apa yang dimaksud dengan Workstation? Stasiun kerja mengacu pada sumber daya produksi tunggal dengan antrean kerja terjadwal, biasanya menangani satu tugas pada satu waktu. Ini bisa berupa mesin produksi atau titik kerja tertentu, seperti stasiun pengelasan, di&hellip;","knowledge_base_info":[],"knowledge_base_slug":[],"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/docs\/74640","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/docs"}],"about":[{"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/types\/docs"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/comments?post=74640"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/docs\/74640\/revisions"}],"predecessor-version":[{"id":95050,"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/docs\/74640\/revisions\/95050"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/media?parent=74640"}],"wp:term":[{"taxonomy":"doc_category","embeddable":true,"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/doc_category?post=74640"},{"taxonomy":"doc_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/id\/wp-json\/wp\/v2\/doc_tag?post=74640"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}