{"id":99756,"date":"2026-10-16T07:53:34","date_gmt":"2026-10-16T07:53:34","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=99756"},"modified":"2026-10-16T10:12:25","modified_gmt":"2026-10-16T10:12:25","slug":"capable-to-promise","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/hu\/forrasok\/capable-to-promise\/","title":{"rendered":"Capable to promise: ellen\u0151rizze a rendel\u00e9st, miel\u0151tt elv\u00e1llalja"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Capable to promise: ellen\u0151rizze a rendel\u00e9st, miel\u0151tt elv\u00e1llalja<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/hu\/\">Kezd\u0151lap<\/a> &raquo; <a href=\"\/hu\/forrasok\/\">Er\u0151forr\u00e1sok<\/a> &raquo; Capable to promise: ellen\u0151rizze a rendel\u00e9st, miel\u0151tt elv\u00e1llalja<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Becs\u00fclt olvas\u00e1si id\u0151: <\/span><span class=\"yoast-reading-time__reading-time\">7<\/span><span class=\"yoast-reading-time__time-unit\"> perc<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>A capable to promise (CTP) m\u00f3dszerrel ellen\u0151rizhet\u0151, hogy a k\u00e9rt mennyis\u00e9g legy\u00e1rthat\u00f3-e, \u00e9s ha igen, mikorra. Ehhez az anyagok rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1t \u00e9s a munk\u00e1hoz sz\u00fcks\u00e9ges gy\u00e1rt\u00e1si kapacit\u00e1st egyar\u00e1nt figyelembe veszi. \u00cdgy az \u00e9rt\u00e9kes\u00edt\u00e9s akkor is megalapozott sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151t v\u00e1llalhat, ha az \u00e1ru nem sz\u00e1ll\u00edthat\u00f3 ki egyszer\u0171en k\u00e9szletr\u0151l.<\/p>\n\n\n<p>Ezt m\u00e9g azel\u0151tt kell tiszt\u00e1zni, hogy igent mondana. A vev\u0151 \u00e1ltal k\u00e9rt hat\u00e1rid\u0151 azt mutatja meg, mivel lehetne elnyerni a rendel\u00e9st. A szok\u00e1sos \u00e1tfut\u00e1si id\u0151 azt jelzi, \u00e1ltal\u00e1ban mennyi id\u0151re van sz\u00fcks\u00e9g. Azt azonban egyik sem \u00e1rulja el, hogy ez a konkr\u00e9t munka belef\u00e9r-e a m\u00e1r elv\u00e1llalt feladatok mell\u00e9.<\/p>\n\n\n<p>A SkyPlanner APS Job Prospects funkci\u00f3j\u00e1val m\u00e9g a gy\u00e1rt\u00e1s v\u00e1llal\u00e1sa el\u0151tt ellen\u0151rizheti, milyen re\u00e1lis sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k adhat\u00f3k a lehets\u00e9ges megrendel\u00e9sekre. \u00dctemezze be a m\u00e9g nem v\u00e9gleges\u00edtett munk\u00e1t az aktu\u00e1lis terhel\u00e9s mell\u00e9, tekintse \u00e1t a tervezett befejez\u00e9si id\u0151pontokat, \u00e9s n\u00e9zze meg a Gantt-diagramon a k\u00f6rnyez\u0151 feladatokat. \u00cdgy nem kell \u00fajra \u00f6ssze\u00e1ll\u00edtania a g\u00e9pekre v\u00e1r\u00f3 munk\u00e1k sorrendj\u00e9t ahhoz, hogy v\u00e1laszt adjon az \u00e9rt\u00e9kes\u00edt\u00e9snek: arra az aj\u00e1nlatra \u00f6sszpontos\u00edthat, amelyet az \u00fczem teljes\u00edteni tud.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mi a k\u00fcl\u00f6nbs\u00e9g a capable to promise \u00e9s az available to promise k\u00f6z\u00f6tt?<\/h2>\n\n\n<p>Az available to promise (ATP) azt vizsg\u00e1lja, hogy a megl\u00e9v\u0151 ig\u00e9nyek figyelembev\u00e9tele ut\u00e1n mekkora mennyis\u00e9g \u00e1ll m\u00e9g rendelkez\u00e9sre \u00faj rendel\u00e9sekhez. Ebbe a m\u00e9g le nem k\u00f6t\u00f6tt k\u00e9szlet \u00e9s a tervezett bev\u00e9telez\u00e9sek is beletartozhatnak, nem csup\u00e1n az, ami ma fizikailag a rakt\u00e1rban van.<\/p>\n\n\n<p>A CTP ehhez a gy\u00e1rt\u00e1s k\u00e9rd\u00e9s\u00e9t is hozz\u00e1teszi: ha a k\u00e9szterm\u00e9k nem \u00e1ll rendelkez\u00e9sre, legy\u00e1rthat\u00f3-e a sz\u00fcks\u00e9ges id\u0151n bel\u00fcl az el\u00e9rhet\u0151 anyagokkal \u00e9s kapacit\u00e1ssal?<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>K\u00e9rd\u00e9s<\/th><th>Available to promise (ATP) \u2013 rendelkez\u00e9sre \u00e1ll\u00f3 mennyis\u00e9g<\/th><th>Capable to promise (CTP) \u2013 gy\u00e1rthat\u00f3s\u00e1g \u00e9s hat\u00e1rid\u0151<\/th><\/tr><\/thead><tbody><tr><td>Mi alapj\u00e1n ad v\u00e1laszt?<\/td><td>A m\u00e9g le nem k\u00f6t\u00f6tt k\u00e9szlet \u00e9s a tervezett be\u00e9rkez\u00e9sek alapj\u00e1n<\/td><td>Az anyagok rendelkez\u00e9sre \u00e1ll\u00e1sa \u00e9s a gy\u00e1rt\u00e1shoz sz\u00fcks\u00e9ges kapacit\u00e1s alapj\u00e1n<\/td><\/tr><tr><td>Milyen aj\u00e1nlat kialak\u00edt\u00e1s\u00e1ban seg\u00edti az \u00e9rt\u00e9kes\u00edt\u00e9st?<\/td><td>A rendelkez\u00e9sre \u00e1ll\u00f3 mennyis\u00e9gb\u0151l mikor \u00e9s mennyi sz\u00e1ll\u00edthat\u00f3<\/td><td>Tov\u00e1bbi gy\u00e1rt\u00e1ssal mikor \u00e9s mekkora mennyis\u00e9g teljes\u00edthet\u0151<\/td><\/tr><tr><td>Mikor fontos ez a k\u00fcl\u00f6nbs\u00e9g?<\/td><td>Ha az \u00e1ru k\u00e9szletr\u0151l vagy v\u00e1rhat\u00f3 be\u00e9rkez\u00e9sekb\u0151l biztos\u00edthat\u00f3<\/td><td>Ha a rendel\u00e9shez m\u00e9g gy\u00e1rt\u00e1s vagy \u00f6sszeszerel\u00e9s sz\u00fcks\u00e9ges, m\u00e1s munk\u00e1kkal k\u00f6z\u00f6s er\u0151forr\u00e1sokon<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Az ATP akkor hasznos, ha a rendel\u00e9s a rendelkez\u00e9sre \u00e1ll\u00f3 mennyis\u00e9gb\u0151l teljes\u00edthet\u0151. A CTP k\u00fcl\u00f6n\u00f6sen a <a href=\"\/hu\/forrasok\/rendelesre-gyartas\/\">rendel\u00e9sre gy\u00e1rt\u00e1s<\/a> \u00e9s a <a href=\"\/hu\/forrasok\/rendelesre-torteno-osszeszereles\/\">rendel\u00e9sre t\u00f6rt\u00e9n\u0151 \u00f6sszeszerel\u00e9s<\/a> eset\u00e9n \u00e9rt\u00e9kes: ilyenkor a megrendel\u00e9s elfogad\u00e1sa \u00faj munk\u00e1t jelent, amelynek helyet kell tal\u00e1lni az \u00fczemben.<\/p>\n\n\n<p>Att\u00f3l, hogy minden alkatr\u00e9sz rendelkez\u00e9sre \u00e1ll, m\u00e9g nem biztos, hogy van kapacit\u00e1s az \u00f6sszeszerel\u00e9sre. Ugyanakkor a k\u00e9szterm\u00e9kk\u00e9szlet hi\u00e1nya sem jelenti azt, hogy el kell utas\u00edtani a vev\u0151t. A CTP seg\u00edt megtal\u00e1lni a lehet\u0151s\u00e9get e k\u00e9t felt\u00e9telez\u00e9s k\u00f6z\u00f6tt.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Egy \u00faj v\u00e1llal\u00e1s vesz\u00e9lybe sodorhat egy kor\u00e1bbit<\/h2>\n\n\n<p>K\u00e9pzeljen el egy b\u00e9rforg\u00e1csol\u00f3 \u00fczemet, amely tengelyekb\u0151l \u00e9s szerel\u0151lapokb\u00f3l \u00e1ll\u00f3 k\u00e9szletre ad aj\u00e1nlatot. Az anyag rendelkez\u00e9sre \u00e1ll, az \u00e9rt\u00e9kes\u00edt\u00e9s pedig p\u00e9nteki kisz\u00e1ll\u00edt\u00e1st szeretne aj\u00e1nlani.<\/p>\n\n\n<p>A tengelyek eszterg\u00e1l\u00e1sa \u00e9s ellen\u0151rz\u00e9se cs\u00fct\u00f6rt\u00f6kre elk\u00e9sz\u00fclhet. A lapokat viszont olyan megmunk\u00e1l\u00f3k\u00f6zponton kell marni, amelyet m\u00e1r elv\u00e1llalt rendel\u00e9sek k\u00f6tnek le. A jelenlegi sorrend mellett csak a k\u00f6vetkez\u0151 h\u00e9ten k\u00e9sz\u00fcln\u00e9nek el.<\/p>\n\n\n<p>A rendel\u00e9s nem att\u00f3l lesz k\u00e9sz, hogy a legegyszer\u0171bben gy\u00e1rthat\u00f3 t\u00e9tele elk\u00e9sz\u00fcl. Ha a vev\u0151nek a teljes k\u00e9szletre van sz\u00fcks\u00e9ge, a lapok hat\u00e1rozz\u00e1k meg, mikor indulhat el a sz\u00e1ll\u00edtm\u00e1ny. Egy k\u00e9szletellen\u0151rz\u00e9s nem mutatn\u00e1 meg a mar\u00e1sra v\u00e1r\u00f3 munk\u00e1kat, a szok\u00e1sos \u00e1tfut\u00e1si id\u0151 pedig nem t\u00fckr\u00f6zn\u00e9 a g\u00e9p aktu\u00e1lis terhel\u00e9s\u00e9t.<\/p>\n\n\n<p>A lapok el\u0151resorol\u00e1s\u00e1val tal\u00e1n tarthat\u00f3 lenne a p\u00e9ntek, de ez egy megl\u00e9v\u0151 vev\u0151 munk\u00e1j\u00e1t is k\u00e9sleltetheti. Ez nem szabad kapacit\u00e1s. Arr\u00f3l kell d\u00f6nteni, melyik v\u00e1llal\u00e1s \u00e9lvezzen els\u0151bbs\u00e9get.<\/p>\n\n\n<p>Egy hasznos CTP-ellen\u0151rz\u00e9s ez\u00e9rt egyszerre k\u00e9t k\u00e9rd\u00e9sre ad v\u00e1laszt: <strong>mikor k\u00e9sz\u00fclhet el ez a rendel\u00e9s, \u00e9s hogyan \u00e9rinti a m\u00e1r elv\u00e1llalt munk\u00e1kat, ha helyet szor\u00edtunk neki?<\/strong> Ha mindkett\u0151t l\u00e1tja, \u00fagy nyerheti el az \u00faj megrendel\u00e9st, hogy annak \u00e1r\u00e1t nem csak a visszaigazol\u00e1s ut\u00e1n ismeri fel.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ellen\u0151rizze a leend\u0151 rendel\u00e9st a SkyPlannerben<\/h2>\n\n\n<p>A SkyPlanner a k\u00e9rd\u00e9ses munk\u00e1t beilleszti az \u00fctemtervbe. \u00dctemez\u0151 mesters\u00e9ges intelligenci\u00e1ja, az Arcturus a be\u00e1ll\u00edtott <a href=\"\/hu\/forrasok\/mi-a-termelesutemezes\/\">gy\u00e1rt\u00e1si er\u0151forr\u00e1sok, f\u00fcgg\u0151s\u00e9gek \u00e9s priorit\u00e1sok<\/a> alapj\u00e1n sz\u00e1m\u00edtja ki a m\u0171veletek hely\u00e9t. \u00cdgy a k\u00e9sz \u00fctemtervet tekintheti \u00e1t ahelyett, hogy minden m\u0171veletet k\u00e9zzel kellene beosztania.<\/p>\n\n\n<p>A rendel\u00e9s elv\u00e1llal\u00e1s\u00e1r\u00f3l n\u00e9h\u00e1ny egyszer\u0171 l\u00e9p\u00e9sben hozhat megalapozott d\u00f6nt\u00e9st.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Azt a munk\u00e1t \u00fctemezze, amelyre az \u00e9rt\u00e9kes\u00edt\u00e9s t\u00e9nylegesen aj\u00e1nlatot ad<\/h3>\n\n\n<p>Hozza l\u00e9tre a rendel\u00e9st, \u00e9s jel\u00f6lje a tervezett rendel\u00e9si t\u00e9teleket el\u0151zetes t\u00e9telk\u00e9nt (Prospect). A k\u00e9rt term\u00e9keket, mennyis\u00e9geket \u00e9s a sz\u00fcks\u00e9ges m\u0171veleteket r\u00f6gz\u00edtse, ne egy \u00e1tlagos id\u0151tartam\u00fa, \u00e1ltal\u00e1nos gy\u00e1rt\u00e1si feladattal teszteljen. \u00dctemezze be a munk\u00e1t, \u00e9s a terv elfogad\u00e1sa el\u0151tt n\u00e9zze meg, hov\u00e1 ker\u00fclne az id\u0151vonalon. \u00cdgy m\u00e1r az el\u0151zetes \u00e1llapotban, az \u00e9rt\u00e9kes\u00edt\u00e9s v\u00e9gleges\u00edt\u00e9se el\u0151tt felm\u00e9rheti a re\u00e1lis befejez\u00e9si id\u0151pontot.<\/p>\n\n\n<p>Azok az adatok fontosak, amelyek megv\u00e1ltoztathatj\u00e1k a v\u00e1laszt: mely er\u0151forr\u00e1sok alkalmasak a munk\u00e1ra, mennyi id\u0151t ig\u00e9nyelnek a m\u0171veletek \u00e9s az \u00e1t\u00e1ll\u00e1sok, milyen m\u0171szakokkal lehet sz\u00e1molni, mikor \u00e1ll rendelkez\u00e9sre az anyag, \u00e9s mely rendel\u00e9sek k\u00f6tnek m\u00e1r le kapacit\u00e1st. Ha az anyagell\u00e1t\u00e1st figyelembe vev\u0151 \u00fctemez\u00e9s be van kapcsolva, az Arcturus a sz\u00e1m\u00edt\u00e1s sor\u00e1n az anyagok rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1val is sz\u00e1mol.<\/p>\n\n\n<p>A p\u00e9ldabeli forg\u00e1csol\u00f3\u00fczemben ez azt jelenti, hogy a tengelyeket \u00e9s a lapokat is be kell \u00fctemezni. A hosszabb gy\u00e1rt\u00e1si \u00fatvonal kihagy\u00e1s\u00e1val az aj\u00e1nlott hat\u00e1rid\u0151 ugyan vonz\u00f3bbnak t\u0171nne, de a teljes rendel\u00e9s ett\u0151l m\u00e9g nem v\u00e1lna sz\u00e1ll\u00edthat\u00f3v\u00e1.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ne csak a k\u00e9rt hat\u00e1rid\u0151t n\u00e9zze, hanem a befejez\u00e9si id\u0151pontokat is<\/h3>\n\n\n<p>Az el\u0151zetes rendel\u00e9s \u00fctemez\u00e9se ut\u00e1n tekintse \u00e1t minden rendel\u00e9si t\u00e9tel tervezett befejez\u00e9si id\u0151pontj\u00e1t. A legk\u00e9s\u0151bb elk\u00e9sz\u00fcl\u0151 t\u00e9tel mutatja meg, hogy az aktu\u00e1lis terhel\u00e9s mellett mikor fejez\u0151dhet be a teljes rendel\u00e9s gy\u00e1rt\u00e1sa; ebb\u0151l indulhat ki a teljes rendel\u00e9sre v\u00e1llalt hat\u00e1rid\u0151 meghat\u00e1roz\u00e1sakor.<\/p>\n\n\n<p>Ezt az id\u0151pontot k\u00fcl\u00f6n\u00edtse el att\u00f3l, amikor a vev\u0151 \u00e1tveszi az \u00e1rut. Sz\u00e1moljon az ellen\u0151rz\u00e9s, a csomagol\u00e1s, a kisz\u00e1ll\u00edt\u00e1s el\u0151k\u00e9sz\u00edt\u00e9se \u00e9s a fuvaroz\u00e1s minden olyan id\u0151ig\u00e9ny\u00e9vel, amely m\u00e9g nem szerepel a tervben. Az \u00e9rt\u00e9kes\u00edt\u00e9s \u00e9s a gy\u00e1rt\u00e1s sz\u00e1m\u00e1ra is legyen egy\u00e9rtelm\u0171, hogy az aj\u00e1nlott napon az \u00e1ru \u00e1tvehet\u0151, \u00fatnak indul, vagy m\u00e1r meg is \u00e9rkezik a vev\u0151h\u00f6z.<\/p>\n\n\n<p>Ez a k\u00fcl\u00f6nbs\u00e9g ak\u00f6z\u00f6tt, hogy csup\u00e1n megad egy k\u00edv\u00e1nt d\u00e1tumot, vagy ellen\u0151rzi is, hogy a gy\u00e1rt\u00e1s k\u00e9pes-e tartani azt. A vev\u0151nek tett v\u00e1llal\u00e1s\u00e9rt \u00d6n felel; a SkyPlanner az \u00fctemezett befejez\u00e9si id\u0151pontokat adja meg, amelyekkel megalapozhatja ezt a v\u00e1llal\u00e1st.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Tekintse \u00e1t a t\u00f6bbi v\u00e1llal\u00e1st is<\/h3>\n\n\n<p>A <a href=\"\/hu\/forrasok\/gantt-diagram-a-termeles-tervezesehez\/\">Gantt-diagramon<\/a> a megl\u00e9v\u0151 rendel\u00e9sek mellett tekintse \u00e1t a tervezett munk\u00e1t. Ha a kor\u00e1bbi befejez\u00e9s \u00e9rdek\u00e9ben m\u00f3dos\u00edtja a priorit\u00e1s\u00e1t, sz\u00e1m\u00edtsa \u00fajra az \u00fctemtervet, \u00e9s az aj\u00e1nlat elfogad\u00e1sa el\u0151tt ellen\u0151rizze, mi mozdul m\u00e9g el.<\/p>\n\n\n<p>A priorit\u00e1sokat \u00d6n hat\u00e1rozza meg, az \u00fctemez\u00e9si d\u00f6nt\u00e9seket pedig z\u00e1rol\u00e1sokkal v\u00e9dheti. Az Arcturus ezen keretek k\u00f6z\u00f6tt v\u00e9gzi el a sz\u00e1m\u00edt\u00e1st. \u00cdgy a megbesz\u00e9l\u00e9sen arr\u00f3l d\u00f6nthetnek, \u00e9rdemes-e elv\u00e1llalni a soron k\u00edv\u00fcli rendel\u00e9st, ahelyett, hogy k\u00e9zzel kellene \u00e1trendeznie a munkasorokat annak kider\u00edt\u00e9s\u00e9re, mit szor\u00edtana ki.<\/p>\n\n\n<p>A SkyPlanner a <a href=\"\/hu\/integraciok\/\">ny\u00edlt REST API<\/a> r\u00e9v\u00e9n b\u00e1rmely ERP- vagy MES-rendszerrel integr\u00e1lhat\u00f3. Megtarthatja megl\u00e9v\u0151 rendel\u00e9skezel\u0151 rendszer\u00e9t, \u00e9s \u00f6sszekapcsolhatja azzal az \u00fctemez\u00e9si n\u00e9zettel, amelyre ezekhez a sz\u00e1ll\u00edt\u00e1si d\u00f6nt\u00e9sekhez sz\u00fcks\u00e9ge van.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Az eredm\u00e9nyb\u0151l aj\u00e1nlat sz\u00fclessen, ne csup\u00e1n igen vagy nem<\/h2>\n\n\n<p>Ha a k\u00e9rt mennyis\u00e9g a k\u00e9rt hat\u00e1rid\u0151re \u00fagy \u00fctemezhet\u0151 be, hogy az nem j\u00e1r elfogadhatatlan k\u00f6vetkezm\u00e9nyekkel a megl\u00e9v\u0151 munk\u00e1kra n\u00e9zve, megalapozottabban igazolhatja vissza a rendel\u00e9st. Ha nem, \u00e9rdemes olyan alternat\u00edv\u00e1t aj\u00e1nlani, amelyet a vev\u0151 elfogadhat.<\/p>\n\n\n<p>A p\u00e9ldabeli forg\u00e1csol\u00f3\u00fczem rendel\u00e9s\u00e9n\u00e9l ezek a lehet\u0151s\u00e9gek j\u00f6hetnek sz\u00f3ba:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Aj\u00e1nlja a teljes rendel\u00e9s k\u00e9s\u0151bbi sz\u00e1ll\u00edt\u00e1s\u00e1t.<\/strong> Tartsa meg a megl\u00e9v\u0151 v\u00e1llal\u00e1sokat, \u00e9s olyan hat\u00e1rid\u0151t adjon, amelyet a lapok hosszabb gy\u00e1rt\u00e1si \u00fatvonala lehet\u0151v\u00e9 tesz.<\/li><li><strong>Egyeztessen a r\u00e9szsz\u00e1ll\u00edt\u00e1sr\u00f3l.<\/strong> Ha a vev\u0151 a tengelyeket \u00f6n\u00e1ll\u00f3an is fel tudja haszn\u00e1lni, aj\u00e1nlja fel, hogy azokat el\u0151bb, a lapokat pedig k\u00e9s\u0151bb sz\u00e1ll\u00edtja. Miel\u0151tt t\u00f6bbletkezel\u00e9ssel \u00e9s \u00fajabb fuvarral j\u00e1r\u00f3 megold\u00e1st v\u00e1lasztana, tiszt\u00e1zza, hogy a r\u00e9szsz\u00e1ll\u00edt\u00e1s val\u00f3ban hasznos-e a vev\u0151nek.<\/li><li><strong>Vizsg\u00e1lja meg, m\u00f3dos\u00edtott tervvel v\u00e1llalhat\u00f3-e kor\u00e1bbi hat\u00e1rid\u0151.<\/strong> Egy j\u00f3v\u00e1hagyott pluszm\u0171szak vagy m\u00e1sik alkalmas er\u0151forr\u00e1s seg\u00edthet. Miel\u0151tt kor\u00e1bbi hat\u00e1rid\u0151t aj\u00e1nlana, vezesse \u00e1t a kapacit\u00e1s v\u00e1ltoz\u00e1sait, \u00e9s sz\u00e1m\u00edtsa \u00fajra az \u00fctemtervet.<\/li><li><strong>\u00c1llapodjanak meg egy\u00e9rtelm\u0171en az el\u0151resorol\u00e1s \u00e1r\u00e1ban.<\/strong> Ha a vezet\u00e9s \u00fagy d\u00f6nt, hogy ezt a rendel\u00e9st el\u0151reveszi, azonos\u00edts\u00e1k az \u00e9rintett v\u00e1llal\u00e1sokat, \u00e9s tudatosan kezelj\u00e9k a k\u00f6vetkezm\u00e9nyeket.<\/li><\/ul>\n\n\n<p>Ezek \u00fczleti d\u00f6nt\u00e9sek, nem csup\u00e1n az \u00fctemez\u00e9s m\u00f3dos\u00edt\u00e1sai. A soron k\u00edv\u00fcl v\u00e1llalt rendel\u00e9s a v\u00e1rtn\u00e1l kev\u00e9sb\u00e9 lehet nyeres\u00e9ges, ha az \u00e1r nem fedezi a t\u00fal\u00f3r\u00e1t, a dr\u00e1g\u00e1bb fuvart vagy a fennakad\u00e1sokat. Az elfogad\u00e1s el\u0151tti ellen\u0151rz\u00e9s lehet\u0151s\u00e9get ad arra, hogy be\u00e1razza a t\u00f6bbletmunk\u00e1t, vagy kedvez\u0151bb hat\u00e1rid\u0151t egyeztessen.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mindig az aktu\u00e1lis terhel\u00e9s alapj\u00e1n v\u00e1llaljon hat\u00e1rid\u0151t<\/h2>\n\n\n<p>A tegnapi \u00fctemtervre alapozott aj\u00e1nlat m\u00e1r nem biztos, hogy tarthat\u00f3 egy \u00fajabb rendel\u00e9s elfogad\u00e1sa vagy egy anyagbe\u00e9rkez\u00e9s cs\u00fasz\u00e1sa ut\u00e1n. Ellen\u0151rizze \u00fajra a leend\u0151 rendel\u00e9st, ha a hat\u00e1rid\u0151 alapj\u00e1ul szolg\u00e1l\u00f3 felt\u00e9telek m\u00e9g a vev\u0151 visszaigazol\u00e1sa el\u0151tt megv\u00e1ltoznak.<\/p>\n\n\n<p>A be\u00fctemezett el\u0151zetes t\u00e9telek belesz\u00e1m\u00edtanak a tervez\u00e9si terhel\u00e9sbe, \u00e9s kapacit\u00e1st foglalnak le. Az \u00e9rt\u00e9kes\u00edt\u00e9s \u00edgy figyelembe veheti a lehets\u00e9ges megrendel\u00e9seket, ahelyett, hogy minden aj\u00e1nlatn\u00e1l ugyanazzal a l\u00e1tsz\u00f3lag szabad kapacit\u00e1ssal sz\u00e1molna. \u00c1llapodjanak meg arr\u00f3l, mely lehets\u00e9ges megrendel\u00e9seket \u00fctemezik be, ki tartja \u0151ket naprak\u00e9szen, \u00e9s mikort\u00f3l ne befoly\u00e1solja tov\u00e1bb a tervet egy el nem fogadott aj\u00e1nlat. Amikor a vev\u0151 meger\u0151s\u00edti a megrendel\u00e9st, t\u00f6r\u00f6lje az el\u0151zetes jel\u00f6l\u00e9st, \u00e9s \u00fctemezze be a munk\u00e1t v\u00e9gleges\u00edtett rendel\u00e9sk\u00e9nt. \u00cdgy az aj\u00e1nlat \u00e9s a gy\u00e1rt\u00e1si v\u00e1llal\u00e1s \u00f6sszhangban marad, az elavult aj\u00e1nlatok pedig nem fedik el a felhaszn\u00e1lhat\u00f3 kapacit\u00e1st.<\/p>\n\n\n<p>A rendel\u00e9s elv\u00e1llal\u00e1sa ut\u00e1n is tartsa naprak\u00e9szen a priorit\u00e1sokat, az er\u0151forr\u00e1sok rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1t \u00e9s az anyagell\u00e1t\u00e1si adatokat. A sz\u00e1m\u00edt\u00e1sra alapozott hat\u00e1rid\u0151-v\u00e1llal\u00e1s akkor hasznos, ha a t\u00e9nylegesen v\u00e1rhat\u00f3 \u00fczemi k\u00f6r\u00fclm\u00e9nyeket ellen\u0151rzi, nem pedig olyan tervb\u0151l indul ki, amely szerint minden m\u0171szak \u00e9s anyagbe\u00e9rkez\u00e9s az eredeti elk\u00e9pzel\u00e9sek szerint alakul.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Megalapozottabb sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k a mindennapokban<\/h2>\n\n\n<p>A finn b\u00e9rforg\u00e1csol\u00f3 v\u00e1llalat, az Eskomatic kor\u00e1bban nagyr\u00e9szt k\u00e9zzel tartotta karban a munkasorokat egy r\u00e9gebbi ERP- \u00e9s termel\u00e9sir\u00e1ny\u00edt\u00e1si rendszerben. Lassan \u00e1llt \u00f6ssze az \u00e1tfog\u00f3 k\u00e9p, az anyagell\u00e1t\u00e1s korl\u00e1tozott \u00e1tl\u00e1that\u00f3s\u00e1ga miatt pedig el\u0151fordulhatott, hogy csak k\u00f6zvetlen\u00fcl a munka kezdete el\u0151tt der\u00fclt f\u00e9ny a hi\u00e1nyokra.<\/p>\n\n\n<p>A SkyPlannerrel a csapat vizu\u00e1lis, Gantt-diagramon megjelen\u0151 munkasort \u00e9s a megl\u00e9v\u0151 ERP-adatokhoz kapcsol\u00f3d\u00f3 automatikus terhel\u00e9s\u00fctemez\u00e9st kapott. <a href=\"\/hu\/ugyfeltortenetek\/eskomatic\/\">Az Eskomatic besz\u00e1mol\u00f3ja szerint<\/a> az \u00e1tl\u00e1that\u00f3bb gy\u00e1rt\u00e1si terhel\u00e9s megk\u00f6nny\u00edti a re\u00e1lis sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k meghat\u00e1roz\u00e1s\u00e1t, \u00edgy pontosabb id\u0151pontokat tudnak adni a vev\u0151knek. Tommi M\u00e4nnist\u00f6 gy\u00e1rt\u00e1stervez\u00e9si vezet\u0151 a mindennapi haszn\u00e1lat egyik kiemelked\u0151 el\u0151nyek\u00e9nt eml\u00edti a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k meghat\u00e1roz\u00e1s\u00e1t.<\/p>\n\n\n<p>Ez\u00e9rt \u00e9rdemes a SkyPlannert v\u00e1lasztani erre a feladatra: az \u00e9rt\u00e9kes\u00edt\u00e9s az \u00fctemezett munk\u00e1kon alapul\u00f3 v\u00e1laszt kap, a gy\u00e1rt\u00e1stervez\u0151nek pedig nem kell k\u00e9zzel \u00f6ssze\u00e1ll\u00edtania az ehhez sz\u00fcks\u00e9ges k\u00e9pet.<\/p>\n\n\n<p><a href=\"\/hu\/kapcsolat-ertekesites\/\">Foglaljon SkyPlanner-bemutat\u00f3t<\/a>, \u00e9s k\u00e9sz\u00fclj\u00f6n egy leend\u0151 rendel\u00e9s p\u00e9ld\u00e1j\u00e1val: adja meg a k\u00e9rt hat\u00e1rid\u0151t, \u00e9s nevezze meg azt az er\u0151forr\u00e1st, amely v\u00e1rhat\u00f3an legink\u00e1bb h\u00e1tr\u00e1ltatn\u00e1 a teljes\u00edt\u00e9st. A megbesz\u00e9l\u00e9sen k\u00f6z\u00f6sen \u00e1ttekinthetik, hogyan ellen\u0151rizhetn\u00e9 az aj\u00e1nlatot a megl\u00e9v\u0151 v\u00e1llal\u00e1sok mellett, m\u00e9g a visszaigazol\u00e1s el\u0151tt. Ha el\u0151bb \u00f6n\u00e1ll\u00f3an ismerkedne a rendszerrel, <a href=\"\/hu\/proba\/\">pr\u00f3b\u00e1lja ki a SkyPlannert mintaadatokkal<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Capable to promise: ellen\u0151rizze a rendel\u00e9st, miel\u0151tt elv\u00e1llalja Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Capable to promise: ellen\u0151rizze a rendel\u00e9st, miel\u0151tt elv\u00e1llalja A capable to promise (CTP) m\u00f3dszerrel ellen\u0151rizhet\u0151, hogy a k\u00e9rt mennyis\u00e9g legy\u00e1rthat\u00f3-e, \u00e9s ha igen, mikorra. Ehhez az anyagok rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1t \u00e9s a munk\u00e1hoz sz\u00fcks\u00e9ges gy\u00e1rt\u00e1si kapacit\u00e1st egyar\u00e1nt figyelembe veszi. \u00cdgy az \u00e9rt\u00e9kes\u00edt\u00e9s akkor is &#8230; <a title=\"Capable to promise: ellen\u0151rizze a rendel\u00e9st, miel\u0151tt elv\u00e1llalja\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/capable-to-promise\/\" aria-label=\"Read more about Capable to promise: ellen\u0151rizze a rendel\u00e9st, miel\u0151tt elv\u00e1llalja\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":99840,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2526,312],"tags":[],"class_list":["post-99756","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-es-utemezes","category-forrasok","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Capable to promise: ellen\u0151rizze a rendel\u00e9st, miel\u0151tt elv\u00e1llalja<\/title>\n<meta name=\"description\" content=\"Teljes\u00edthet\u0151 az \u00faj rendel\u00e9s m\u00e1s vev\u0151k k\u00e9sleltet\u00e9se n\u00e9lk\u00fcl? Capable to promise \u00e9s SkyPlanner: ellen\u0151rizze a kapacit\u00e1st, miel\u0151tt hat\u00e1rid\u0151t v\u00e1llal.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/capable-to-promise\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Capable to promise: ellen\u0151rizze a rendel\u00e9st, miel\u0151tt elv\u00e1llalja\" \/>\n<meta property=\"og:description\" content=\"Teljes\u00edthet\u0151 az \u00faj rendel\u00e9s m\u00e1s vev\u0151k k\u00e9sleltet\u00e9se n\u00e9lk\u00fcl? Capable to promise \u00e9s SkyPlanner: ellen\u0151rizze a kapacit\u00e1st, miel\u0151tt hat\u00e1rid\u0151t v\u00e1llal.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/forrasok\/capable-to-promise\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-16T07:53:34+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-16T10:12:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t<meta property=\"og:image:height\" content=\"864\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Szerz\u0151:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data2\" content=\"13 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/capable-to-promise\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/capable-to-promise\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Capable to promise: ellen\u0151rizze a rendel\u00e9st, miel\u0151tt elv\u00e1llalja\",\"datePublished\":\"2026-10-16T07:53:34+00:00\",\"dateModified\":\"2026-10-16T10:12:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/capable-to-promise\\\/\"},\"wordCount\":2681,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/capable-to-promise\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/capable-to-promise-hero-1.png\",\"articleSection\":[\"APS \u00e9s \u00fctemez\u00e9s\",\"forr\u00e1sok\"],\"inLanguage\":\"hu-HU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/capable-to-promise\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/capable-to-promise\\\/\",\"name\":\"Capable to promise: ellen\u0151rizze a rendel\u00e9st, miel\u0151tt elv\u00e1llalja\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/capable-to-promise\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/capable-to-promise\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/capable-to-promise-hero-1.png\",\"datePublished\":\"2026-10-16T07:53:34+00:00\",\"dateModified\":\"2026-10-16T10:12:25+00:00\",\"description\":\"Teljes\u00edthet\u0151 az \u00faj rendel\u00e9s m\u00e1s vev\u0151k k\u00e9sleltet\u00e9se n\u00e9lk\u00fcl? Capable to promise \u00e9s SkyPlanner: ellen\u0151rizze a kapacit\u00e1st, miel\u0151tt hat\u00e1rid\u0151t v\u00e1llal.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/capable-to-promise\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/capable-to-promise\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/capable-to-promise\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/capable-to-promise-hero-1.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/capable-to-promise-hero-1.png\",\"width\":1536,\"height\":864,\"caption\":\"Turned shafts await a mounting plate beside a milling machine before the complete order can ship.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/capable-to-promise\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Capable to promise: ellen\u0151rizze a rendel\u00e9st, miel\u0151tt elv\u00e1llalja\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Capable to promise: ellen\u0151rizze a rendel\u00e9st, miel\u0151tt elv\u00e1llalja","description":"Teljes\u00edthet\u0151 az \u00faj rendel\u00e9s m\u00e1s vev\u0151k k\u00e9sleltet\u00e9se n\u00e9lk\u00fcl? Capable to promise \u00e9s SkyPlanner: ellen\u0151rizze a kapacit\u00e1st, miel\u0151tt hat\u00e1rid\u0151t v\u00e1llal.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/forrasok\/capable-to-promise\/","og_locale":"hu_HU","og_type":"article","og_title":"Capable to promise: ellen\u0151rizze a rendel\u00e9st, miel\u0151tt elv\u00e1llalja","og_description":"Teljes\u00edthet\u0151 az \u00faj rendel\u00e9s m\u00e1s vev\u0151k k\u00e9sleltet\u00e9se n\u00e9lk\u00fcl? Capable to promise \u00e9s SkyPlanner: ellen\u0151rizze a kapacit\u00e1st, miel\u0151tt hat\u00e1rid\u0151t v\u00e1llal.","og_url":"https:\/\/skyplanner.ai\/hu\/forrasok\/capable-to-promise\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-16T07:53:34+00:00","article_modified_time":"2026-10-16T10:12:25+00:00","og_image":[{"width":1536,"height":864,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Szerz\u0151:":"Jussi M\u00e4ntyl\u00e4","Becs\u00fclt olvas\u00e1si id\u0151":"13 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/capable-to-promise\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/capable-to-promise\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Capable to promise: ellen\u0151rizze a rendel\u00e9st, miel\u0151tt elv\u00e1llalja","datePublished":"2026-10-16T07:53:34+00:00","dateModified":"2026-10-16T10:12:25+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/capable-to-promise\/"},"wordCount":2681,"publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/capable-to-promise\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png","articleSection":["APS \u00e9s \u00fctemez\u00e9s","forr\u00e1sok"],"inLanguage":"hu-HU"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/capable-to-promise\/","url":"https:\/\/skyplanner.ai\/hu\/forrasok\/capable-to-promise\/","name":"Capable to promise: ellen\u0151rizze a rendel\u00e9st, miel\u0151tt elv\u00e1llalja","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/capable-to-promise\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/capable-to-promise\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png","datePublished":"2026-10-16T07:53:34+00:00","dateModified":"2026-10-16T10:12:25+00:00","description":"Teljes\u00edthet\u0151 az \u00faj rendel\u00e9s m\u00e1s vev\u0151k k\u00e9sleltet\u00e9se n\u00e9lk\u00fcl? Capable to promise \u00e9s SkyPlanner: ellen\u0151rizze a kapacit\u00e1st, miel\u0151tt hat\u00e1rid\u0151t v\u00e1llal.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/capable-to-promise\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/forrasok\/capable-to-promise\/"]}]},{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/capable-to-promise\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png","width":1536,"height":864,"caption":"Turned shafts await a mounting plate beside a milling machine before the complete order can ship."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/capable-to-promise\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"Capable to promise: ellen\u0151rizze a rendel\u00e9st, miel\u0151tt elv\u00e1llalja"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png",1536,864,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png",1536,864,false],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1.png",1536,864,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/capable-to-promise-hero-1-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Capable to promise: ellen\u0151rizze a rendel\u00e9st, miel\u0151tt elv\u00e1llalja Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Capable to promise: ellen\u0151rizze a rendel\u00e9st, miel\u0151tt elv\u00e1llalja A capable to promise (CTP) m\u00f3dszerrel ellen\u0151rizhet\u0151, hogy a k\u00e9rt mennyis\u00e9g legy\u00e1rthat\u00f3-e, \u00e9s ha igen, mikorra. Ehhez az anyagok rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1t \u00e9s a munk\u00e1hoz sz\u00fcks\u00e9ges gy\u00e1rt\u00e1si kapacit\u00e1st egyar\u00e1nt figyelembe veszi. \u00cdgy az \u00e9rt\u00e9kes\u00edt\u00e9s akkor is&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/99756","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=99756"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/99756\/revisions"}],"predecessor-version":[{"id":99879,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/99756\/revisions\/99879"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media\/99840"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=99756"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/categories?post=99756"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/tags?post=99756"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}