{"id":99669,"date":"2026-10-16T05:16:05","date_gmt":"2026-10-16T05:16:05","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=99669"},"modified":"2026-10-16T05:16:55","modified_gmt":"2026-10-16T05:16:55","slug":"rendelesre-konfiguralas","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesre-konfiguralas\/","title":{"rendered":"Rendel\u00e9sre konfigur\u00e1l\u00e1s: a vev\u0151 v\u00e1laszt\u00e1s\u00e1t\u00f3l a kisz\u00e1ll\u00edt\u00e1sig"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Rendel\u00e9sre konfigur\u00e1l\u00e1s: a vev\u0151 v\u00e1laszt\u00e1s\u00e1t\u00f3l a kisz\u00e1ll\u00edt\u00e1sig<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/hu\/\">Kezd\u0151lap<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/\">Er\u0151forr\u00e1sok<\/a> &raquo; Rendel\u00e9sre konfigur\u00e1l\u00e1s: a vev\u0151 v\u00e1laszt\u00e1s\u00e1t\u00f3l a kisz\u00e1ll\u00edt\u00e1sig<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Becs\u00fclt olvas\u00e1si id\u0151: <\/span><span class=\"yoast-reading-time__reading-time\">8<\/span><span class=\"yoast-reading-time__time-unit\"> perc<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>A rendel\u00e9sre konfigur\u00e1l\u00e1s (CTO) sor\u00e1n a term\u00e9k a vev\u0151 \u00e1ltal kiv\u00e1lasztott, el\u0151re meghat\u00e1rozott \u00e9s egym\u00e1ssal kompatibilis opci\u00f3kb\u00f3l k\u00e9sz\u00fcl. A vev\u0151 az ig\u00e9nyeinek megfelel\u0151 kombin\u00e1ci\u00f3t kapja, a gy\u00e1rt\u00f3 pedig bev\u00e1lt tervekre \u00e9s a term\u00e9kre vonatkoz\u00f3 szab\u00e1lyokra t\u00e1maszkodik, ahelyett, hogy minden rendel\u00e9st az alapokt\u00f3l tervezne meg.<\/p>\n\n\n<p>A m\u00f3dszer vonzereje a v\u00e1laszt\u00e1si lehet\u0151s\u00e9g: ugyanazok\u00e9rt a tervez\u00e9si d\u00f6nt\u00e9sek\u00e9rt nem kell \u00fajra \u00e9s \u00fajra fizetni. A j\u00f3v\u00e1hagyott kombin\u00e1ci\u00f3 gy\u00e1rt\u00e1s\u00e1hoz azonban tov\u00e1bbra is megfelel\u0151 anyagokra, gy\u00e1rt\u00e1si m\u0171veletekre \u00e9s id\u0151re van sz\u00fcks\u00e9g. Att\u00f3l, hogy egy term\u00e9k \u00e9rt\u00e9kes\u00edthet\u0151, m\u00e9g nem biztos, hogy j\u00f6v\u0151 p\u00e9nteken ki is sz\u00e1ll\u00edthat\u00f3.<\/p>\n\n\n<p>A SkyPlanner APS ennek a m\u00e1sodik kih\u00edv\u00e1snak a kezel\u00e9s\u00e9ben seg\u00edt. Az \u00fctemez\u00e9st v\u00e9gz\u0151 mesters\u00e9ges intelligenci\u00e1ja, az Arcturus kisz\u00e1m\u00edtja, hogy a t\u00f6bbi rendel\u00e9s mellett mikor v\u00e9gezhet\u0151k el a sz\u00fcks\u00e9ges munk\u00e1k. \u00d6n egy Gantt-\u00fctemterven l\u00e1tja az eredm\u00e9nyt, \u00e9s meghat\u00e1rozza a priorit\u00e1sokat, ahelyett, hogy a rendel\u00e9s\u00f6sszet\u00e9tel minden v\u00e1ltoz\u00e1sakor \u00fajra \u00f6ssze\u00e1ll\u00edtan\u00e1 az egyes munka\u00e1llom\u00e1sok munkasorrendj\u00e9t.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mit\u0151l lesz egy term\u00e9k rendel\u00e9sre konfigur\u00e1lhat\u00f3?<\/h2>\n\n\n<p>A CTO m\u00e1r a vev\u0151i rendel\u00e9s el\u0151tt elkezd\u0151dik. A m\u0171szaki tervez\u0151k meghat\u00e1rozz\u00e1k a term\u00e9k \u00e9p\u00edt\u0151elemeit, a megengedett v\u00e1laszt\u00e1si lehet\u0151s\u00e9geket \u00e9s azokat a szab\u00e1lyokat, amelyek biztos\u00edtj\u00e1k az elemek egy\u00fcttm\u0171k\u00f6d\u00e9s\u00e9t. Az \u00e9rt\u00e9kes\u00edt\u00e9s ezut\u00e1n ebb\u0151l a j\u00f3v\u00e1hagyott k\u00edn\u00e1latb\u00f3l v\u00e1laszt.<\/p>\n\n\n<p>K\u00e9pzelj\u00fcnk el egy modul\u00e1ris sz\u00e1ll\u00edt\u00f3p\u00e1ly\u00e1kat gy\u00e1rt\u00f3 v\u00e1llalatot. A vev\u0151k szabv\u00e1nyos sz\u00e9less\u00e9gek \u00e9s hossz\u00fas\u00e1gok, szalagt\u00edpusok, v\u00e1zanyagok, hajt\u00e1sok \u00e9s \u00e9rz\u00e9kel\u0151csomagok k\u00f6z\u00fcl v\u00e1laszthatnak. Szab\u00e1lyok r\u00f6gz\u00edtik, hogy mely hajt\u00e1sok felelnek meg az egyes terhel\u00e9sekhez \u00e9s sebess\u00e9gekhez, mely szalagok alkalmasak az adott felhaszn\u00e1l\u00e1sra, \u00e9s milyen \u00e9rz\u00e9kel\u0151-elrendez\u00e9sek \u00e9rhet\u0151k el. Az \u00e9rv\u00e9nyes konfigur\u00e1ci\u00f3 teh\u00e1t egy m\u00e1r kidolgozott megold\u00e1st jel\u00f6l, nem egy megv\u00e1laszolatlan m\u0171szaki k\u00e9rd\u00e9st.<\/p>\n\n\n<p>A kiv\u00e1lasztott opci\u00f3k ett\u0151l m\u00e9g jelent\u0151s gy\u00e1rt\u00e1si munk\u00e1t ig\u00e9nyelhetnek. A rozsdamentes ac\u00e9lv\u00e1zat p\u00e9ld\u00e1ul a sz\u00e1ll\u00edt\u00f3p\u00e1lya \u00f6sszeszerel\u00e9se el\u0151tt le kellhet gy\u00e1rtani \u00e9s pol\u00edrozni. A CTO nem jelenti azt, hogy minden alkatr\u00e9sz m\u00e1r a polcon van, vagy hogy a rendel\u00e9s teljes\u00edt\u00e9s\u00e9hez csup\u00e1n v\u00e9gszerel\u00e9s sz\u00fcks\u00e9ges.<\/p>\n\n\n<p>A hat\u00e1rt a j\u00f3v\u00e1hagyott m\u0171szaki megold\u00e1sok k\u00f6re jelenti. Ha a vev\u0151 ezen k\u00edv\u00fcl es\u0151 terhel\u00e9st vagy emelked\u00e9si sz\u00f6get k\u00e9r, az ig\u00e9nyt a m\u0171szaki tervez\u0151knek kell \u00e9rt\u00e9kelni\u00fck. Ilyenkor szabv\u00e1nyos alternat\u00edv\u00e1t k\u00edn\u00e1lhat, vagy tervez\u00e9si feladatk\u00e9nt kezelheti a kiv\u00e9telt, ahelyett, hogy k\u00fcl\u00f6n vizsg\u00e1lat n\u00e9lk\u00fcl \u00e1tengedn\u00e9 a konfigur\u00e1l\u00e1si folyamaton.<\/p>\n\n\n<h3 class=\"wp-block-heading\">A CTO, az ETO, az MTO \u00e9s az ATO m\u00e1st-m\u00e1st \u00edr le<\/h3>\n\n\n<p>Ezek a fogalmak seg\u00edtenek jellemezni egy rendel\u00e9st, de nem mindig z\u00e1rj\u00e1k ki egym\u00e1st:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Rendel\u00e9sre konfigur\u00e1l\u00e1s:<\/strong> Mib\u0151l v\u00e1laszthat a vev\u0151? A term\u00e9k el\u0151re meghat\u00e1rozott, egym\u00e1ssal kompatibilis opci\u00f3kb\u00f3l \u00e1ll \u00f6ssze.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/egyedi-tervezes-es-gyartas-rendelesre\/\">Egyedi tervez\u00e9s \u00e9s gy\u00e1rt\u00e1s rendel\u00e9sre (ETO)<\/a>:<\/strong> \u00daj tervez\u00e9si munk\u00e1t ig\u00e9nyel a k\u00e9r\u00e9s? A vev\u0151 sz\u00e1m\u00e1ra egyedi megold\u00e1st kell kidolgozni, amelyhez ak\u00e1r szabv\u00e1nyos alkatr\u00e9szek is felhaszn\u00e1lhat\u00f3k.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesre-gyartas\/\">Rendel\u00e9sre gy\u00e1rt\u00e1s (MTO)<\/a>:<\/strong> Mi ind\u00edtja el a gy\u00e1rt\u00e1st? A termel\u00e9s a vev\u0151i rendel\u00e9s ut\u00e1n kezd\u0151dik, \u00e9s m\u00e1r megl\u00e9v\u0151 terv alapj\u00e1n is t\u00f6rt\u00e9nhet.<\/li><li><strong><a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesre-torteno-osszeszereles\/\">Rendel\u00e9sre t\u00f6rt\u00e9n\u0151 \u00f6sszeszerel\u00e9s (ATO)<\/a>:<\/strong> Mi \u00e1ll k\u00e9szen m\u00e1r a rendel\u00e9s el\u0151tt? Az alkatr\u00e9szek vagy r\u00e9szegys\u00e9gek m\u00e1r a rendel\u00e9s el\u0151tt k\u00e9szen \u00e1llnak; a kiv\u00e1lasztott k\u00e9szterm\u00e9ket ezt k\u00f6vet\u0151en szerelik \u00f6ssze.<\/li><\/ul>\n\n\n<p>A sz\u00e1ll\u00edt\u00f3p\u00e1ly\u00e1t rendel\u00e9sre konfigur\u00e1lhatj\u00e1k, majd rendel\u00e9sre gy\u00e1rthatj\u00e1k le. Egy m\u00e1sik term\u00e9kcsal\u00e1dn\u00e1l ugyanezt a konfigur\u00e1l\u00e1si elvet alkalmazhatj\u00e1k \u00fagy, hogy a k\u00e9szleten tartott modulokat szerelik \u00f6ssze rendel\u00e9sre. A konfigur\u00e1l\u00e1s a v\u00e1laszt\u00e1s m\u00f3dj\u00e1t \u00edrja le; a gy\u00e1rt\u00e1si strat\u00e9gia hat\u00e1rozza meg, hogy a v\u00e1laszt\u00e1s ut\u00e1n milyen munk\u00e1k maradnak h\u00e1tra.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mikor \u00e9ri meg a rendel\u00e9sre konfigur\u00e1l\u00e1s?<\/h2>\n\n\n<p>A CTO akkor igaz\u00e1n j\u00f3 v\u00e1laszt\u00e1s, ha a vev\u0151knek \u00e9rdemi v\u00e1laszt\u00e9kra van sz\u00fcks\u00e9g\u00fck, de a m\u00f6g\u00f6tte \u00e1ll\u00f3 tervez\u00e9si munka jelent\u0151s r\u00e9sze ism\u00e9tl\u0151dik. Legink\u00e1bb azokn\u00e1l a term\u00e9kcsal\u00e1dokn\u00e1l \u00e9rdemes alkalmazni, ahol kezelhet\u0151 sz\u00e1m\u00fa modullal \u00e9s szab\u00e1llyal a kereslet sz\u00e1mottev\u0151 r\u00e9sze lefedhet\u0151.<\/p>\n\n\n<p>N\u00e9zze \u00e1t a k\u00f6zelm\u00falt rendel\u00e9seit. Mely elt\u00e9r\u00e9sek teremtenek val\u00f3di \u00e9rt\u00e9ket a vev\u0151nek? Melyek miatt ker\u00fclnek \u00fajra \u00e9s \u00fajra ugyanazok a k\u00e9rd\u00e9sek a m\u0171szaki tervez\u0151kh\u00f6z? A rendszeresen v\u00e1lasztott m\u00e9retek, anyagok, teljes\u00edtm\u00e9nyv\u00e1ltozatok vagy tartoz\u00e9kok szabv\u00e1nyos\u00edthat\u00f3k, ha kombin\u00e1ci\u00f3ik megfelel\u0151s\u00e9ge el\u0151zetesen ellen\u0151rizhet\u0151.<\/p>\n\n\n<p>Az el\u0151ny\u00f6k az ism\u00e9tl\u0151d\u0151 munka elhagy\u00e1s\u00e1b\u00f3l sz\u00e1rmaznak. Az \u00e9rt\u00e9kes\u00edt\u00e9s kevesebb egyeztet\u00e9ssel k\u00edn\u00e1lhat j\u00f3v\u00e1hagyott kombin\u00e1ci\u00f3kat. A m\u0171szaki tervez\u0151k t\u00f6bb id\u0151t ford\u00edthatnak \u00faj megold\u00e1sokra \u00e9s val\u00f3di kiv\u00e9telekre. A beszerz\u00e9s \u00e9s a termel\u00e9s kisz\u00e1m\u00edthat\u00f3bb, ism\u00e9tl\u0151d\u0151 ig\u00e9nyekkel dolgozhat. \u00cdgy sz\u00e9lesebb v\u00e1laszt\u00e9kot k\u00edn\u00e1lhat an\u00e9lk\u00fcl, hogy minden \u00e9rt\u00e9kes\u00edt\u00e9st \u00faj fejleszt\u00e9si projektk\u00e9nt kezelne.<\/p>\n\n\n<p>Ezek az el\u0151ny\u00f6k azonban befektet\u00e9st ig\u00e9nyelnek. Valakinek meg kell terveznie a modulokat, karban kell tartania a kompatibilit\u00e1si szab\u00e1lyokat, \u00e9s az alkatr\u00e9szek vagy tervek v\u00e1ltoz\u00e1sakor hozz\u00e1juk kell igaz\u00edtania a gy\u00e1rt\u00e1si adatokat. Egy ritk\u00e1n \u00e9rt\u00e9kes\u00edtett opci\u00f3, amely k\u00fcl\u00f6n ell\u00e1t\u00e1si l\u00e1ncot \u00e9s egyedi gy\u00e1rt\u00e1si \u00fatvonalat ig\u00e9nyel, t\u00f6bbe ker\u00fclhet, mint amennyit hoz. A nagyobb v\u00e1laszt\u00e9k nem jelent automatikusan jobb aj\u00e1nlatot.<\/p>\n\n\n<p>Kezdjen egy olyan term\u00e9kcsal\u00e1ddal, ahol az ism\u00e9tl\u0151d\u00e9s egy\u00e9rtelm\u0171. Hat\u00e1rozza meg az el\u00e9rhet\u0151 opci\u00f3kat \u00e9s a kiv\u00e9telek kezel\u00e9s\u00e9nek menet\u00e9t, majd ellen\u0151rizze, hogy az \u00e9rt\u00e9kes\u00edt\u00e9s, a m\u0171szaki tervez\u00e9s \u00e9s a termel\u00e9s ugyan\u00fagy \u00e9rtelmezi-e ugyanazt a konfigur\u00e1ci\u00f3t. Azt szabv\u00e1nyos\u00edtsa, amit a vev\u0151k rendszeresen v\u00e1s\u00e1rolnak, ne minden k\u00fcl\u00f6nleges ig\u00e9nyt, amely valaha be\u00e9rkezett.<\/p>\n\n\n<p>A CTO kev\u00e9sb\u00e9 el\u0151ny\u00f6s, ha a rendel\u00e9sek t\u00f6bbs\u00e9ge val\u00f3ban \u00faj tervez\u00e9si munk\u00e1t ig\u00e9nyel, vagy ha a vev\u0151k nem hajland\u00f3k kiv\u00e1rni a m\u00e9g h\u00e1tral\u00e9v\u0151 gy\u00e1rt\u00e1st. Az azonnal sz\u00fcks\u00e9ges, n\u00e9pszer\u0171 term\u00e9keket c\u00e9lszer\u0171bb lehet k\u00e9szterm\u00e9kk\u00e9szletr\u0151l sz\u00e1ll\u00edtani. Az egyes term\u00e9kcsal\u00e1dokn\u00e1l elt\u00e9r\u0151 megk\u00f6zel\u00edt\u00e9sek is alkalmazhat\u00f3k an\u00e9lk\u00fcl, hogy ett\u0151l az \u00fczem \u00e1tfog\u00f3 strat\u00e9gi\u00e1ja k\u00f6vetkezetlenn\u00e9 v\u00e1lna.<\/p>\n\n\n<h2 class=\"wp-block-heading\">A kiv\u00e1lasztott opci\u00f3kb\u00f3l legyen gy\u00e1rt\u00e1sra k\u00e9sz rendel\u00e9s<\/h2>\n\n\n<p>A konfigur\u00e1ci\u00f3b\u00f3l a termel\u00e9snek egy\u00e9rtelm\u0171en l\u00e1tnia kell, mit kell gy\u00e1rtania; ne a gy\u00e1rt\u00e1stervez\u0151nek kelljen ezt az \u00e1raj\u00e1nlatb\u00f3l \u00f6sszeraknia. Az \u00e1tad\u00e1skor sz\u00fcks\u00e9g van a kiv\u00e1lasztott specifik\u00e1ci\u00f3ra, valamint a hozz\u00e1 tartoz\u00f3 anyagsz\u00fcks\u00e9gletre, m\u0171veleti sorrendre, id\u0151tartamokra \u00e9s a munk\u00e1hoz alkalmas er\u0151forr\u00e1sokra.<\/p>\n\n\n<p>A term\u00e9kkonfigur\u00e1tor ellen\u0151rzi a kiv\u00e1lasztott opci\u00f3k megfelel\u0151s\u00e9g\u00e9t. A konfigur\u00e1l\u00e1st, \u00e1raz\u00e1st \u00e9s aj\u00e1nlatad\u00e1st t\u00e1mogat\u00f3 CPQ-szoftver az \u00e1rk\u00e9pz\u00e9sben \u00e9s az aj\u00e1nlat elk\u00e9sz\u00edt\u00e9s\u00e9ben is seg\u00edthet. Az ERP t\u00e1rolhatja az elfogadott rendel\u00e9st \u00e9s a gy\u00e1rt\u00e1si adatokat. A r\u00e9szletes \u00fctemez\u00e9s ezut\u00e1n meghat\u00e1rozza, hogy a rendelkez\u00e9sre \u00e1ll\u00f3 id\u0151ben mikor v\u00e9gezhet\u0151k el a sz\u00fcks\u00e9ges munk\u00e1k. Ezek \u00f6sszekapcsol\u00f3d\u00f3 feladatok: egy kombin\u00e1ci\u00f3 \u00e9rv\u00e9nyes\u00edt\u00e9se \u00f6nmag\u00e1ban m\u00e9g nem foglal le gy\u00e1rt\u00e1si kapacit\u00e1st.<\/p>\n\n\n<p>Az elk\u00e9pzelt sz\u00e1ll\u00edt\u00f3p\u00e1lya-gy\u00e1rt\u00f3n\u00e1l p\u00e9ld\u00e1ul \u00edgy befoly\u00e1solhatj\u00e1k a vev\u0151 v\u00e1laszt\u00e1sai a gy\u00e1rt\u00e1stervez\u00e9st:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>A vev\u0151 v\u00e1laszt\u00e1sa<\/th><th>Gy\u00e1rt\u00e1si vagy beszerz\u00e9si k\u00f6vetkezm\u00e9ny<\/th><th>Az \u00fctemez\u00e9shez sz\u00fcks\u00e9ges adatok<\/th><\/tr><\/thead><tbody><tr><td>Rozsdamentes ac\u00e9lv\u00e1z<\/td><td>Elt\u00e9r\u0151 anyag, gy\u00e1rt\u00e1s \u00e9s pol\u00edroz\u00e1s<\/td><td>A megfelel\u0151 anyag rendelkez\u00e9sre \u00e1ll\u00e1sa \u00e9s a sz\u00fcks\u00e9ges m\u0171veletek<\/td><\/tr><tr><td>Bevonatos ac\u00e9lv\u00e1z<\/td><td>Gy\u00e1rt\u00e1s, majd a j\u00f3v\u00e1hagyott bevonatol\u00e1si m\u0171veletsor<\/td><td>Megmunk\u00e1l\u00e1si, \u00e1t\u00e1ll\u00e1si \u00e9s sz\u00fcks\u00e9g szerinti v\u00e1rakoz\u00e1si id\u0151k<\/td><\/tr><tr><td>Nagyobb, j\u00f3v\u00e1hagyott hajt\u00e1s<\/td><td>M\u00e1s beszerzett alkatr\u00e9sz \u00e9s elt\u00e9r\u0151 \u00f6sszeszerel\u00e9si k\u00f6vetelm\u00e9nyek<\/td><td>Az alkatr\u00e9sz rendelkez\u00e9sre \u00e1ll\u00e1sa \u00e9s a megfelel\u0151 m\u0171veleti id\u0151k<\/td><\/tr><tr><td>Opcion\u00e1lis \u00e9rz\u00e9kel\u0151csomag<\/td><td>Tov\u00e1bbi szerel\u00e9si \u00e9s ellen\u0151rz\u00e9si feladatok<\/td><td>A befejez\u00e9shez sz\u00fcks\u00e9ges t\u00f6bbletmunka \u00e9s er\u0151forr\u00e1sok<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Minden opci\u00f3 k\u00f6vetkezm\u00e9nyeit vezesse \u00e1t a rendel\u00e9sbe. Ha csak a le\u00edr\u00e1s v\u00e1ltozik, az alap\u00e9rtelmezett gy\u00e1rt\u00e1si \u00fatvonal viszont \u00e9rintetlen marad, az \u00e9ppen eladott munka egy r\u00e9sze rejtve marad.<\/p>\n\n\n<p>Gondoskodjon arr\u00f3l, hogy a kiv\u00e1lasztott konfigur\u00e1ci\u00f3 a gy\u00e1rt\u00e1sba ad\u00e1skor \u00e9s a k\u00e9s\u0151bbi m\u00f3dos\u00edt\u00e1sok sor\u00e1n is azonos\u00edthat\u00f3 maradjon. \u00c1llapodjanak meg abban, ki friss\u00edti az anyag- \u00e9s munkaig\u00e9nyeket, ha a vev\u0151 m\u00e1sik opci\u00f3t v\u00e1laszt. A szalag vagy a v\u00e1z m\u00f3dos\u00edt\u00e1sa a beszerzett alkatr\u00e9szekre, a m\u00e1r megkezdett munk\u00e1ra \u00e9s a befejez\u00e9si d\u00e1tumra is hat\u00e1ssal lehet. Ezt \u00e9rt\u00e9kelend\u0151 rendel\u00e9sm\u00f3dos\u00edt\u00e1sk\u00e9nt kezelje, ne csup\u00e1n az \u00e1raj\u00e1nlat egy \u00faj sorak\u00e9nt.<\/p>\n\n\n<h2 class=\"wp-block-heading\">A konkr\u00e9t v\u00e1ltozatot \u00fctemezze, ne az \u00e1tlagterm\u00e9ket<\/h2>\n\n\n<p>T\u00e9rj\u00fcnk vissza a sz\u00e1ll\u00edt\u00f3p\u00e1lya-gy\u00e1rt\u00f3hoz. Az \u00e9rt\u00e9kes\u00edt\u00e9s t\u00f6bb rendel\u00e9st kap a rozsdamentes ac\u00e9l v\u00e1ltozatra. A sz\u00e1ll\u00edt\u00f3p\u00e1ly\u00e1k darabsz\u00e1ma a megszokott, de most t\u00f6bb ig\u00e9nyel pol\u00edroz\u00e1st. Az \u00fczem szok\u00e1sos \u00e1tfut\u00e1si ideje nem v\u00e1ltozott, a pol\u00edroz\u00e1st v\u00e9gz\u0151 er\u0151forr\u00e1s terhel\u00e9se viszont igen.<\/p>\n\n\n<p>Ha a gy\u00e1rt\u00e1stervez\u0151 minden sz\u00e1ll\u00edt\u00f3p\u00e1ly\u00e1t \u00e1tlagos darabk\u00e9nt \u00fctemez, ezek a t\u00f6bbletm\u0171veletek eg\u00e9szen addig l\u00e1thatatlanok maradhatnak, am\u00edg a termel\u00e9s el nem jut hozz\u00e1juk. A v\u00e1zak gy\u00e1rt\u00e1sa gyorsan elk\u00e9sz\u00fclhet, ut\u00e1na viszont pol\u00edroz\u00e1sra v\u00e1rnak. Att\u00f3l, hogy t\u00f6bb v\u00e1z gy\u00e1rt\u00e1s\u00e1t ind\u00edtj\u00e1k el, m\u00e9g nem lesz nagyobb a pol\u00edroz\u00e1si kapacit\u00e1s.<\/p>\n\n\n<p>A kisz\u00e1ll\u00edt\u00e1shoz ez\u00e9rt azt \u00e9rdemes megk\u00e9rdezni: mikor fejezhet\u0151 be a rendel\u00e9s t\u00e9nyleges munk\u00e1ja, figyelembe v\u00e9ve az anyagokat \u00e9s a <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/veges-kapacitasu-utemezes\/\">m\u00e1s vev\u0151k sz\u00e1m\u00e1ra m\u00e1r lek\u00f6t\u00f6tt kapacit\u00e1st<\/a>?<\/p>\n\n\n<p>A SkyPlanner ezt a munk\u00e1t egy \u00f6sszef\u00fcgg\u0151 gy\u00e1rt\u00e1si \u00fctemtervben helyezi el. \u00d6n hat\u00e1rozza meg a m\u0171veleti l\u00e9p\u00e9seket, az id\u0151tartamokat, a munka\u00e1llom\u00e1sokat, a m\u0171szakokat \u00e9s az er\u0151forr\u00e1sig\u00e9nyeket. Az ism\u00e9telten felhaszn\u00e1lhat\u00f3 term\u00e9kadatokhoz bev\u00e1lt gy\u00e1rt\u00e1si \u00fatvonalak rendelhet\u0151k, az \u00fctemezend\u0151 munk\u00e1t pedig a rendel\u00e9si t\u00e9telek k\u00e9pviselik. A konfigur\u00e1lt rendel\u00e9snek a kiv\u00e1lasztott v\u00e1ltozathoz tartoz\u00f3 m\u0171veletekkel \u00e9s anyagokkal kell a tervez\u00e9sbe ker\u00fclnie.<\/p>\n\n\n<p>Az Arcturus az \u00d6n \u00e1ltal meghat\u00e1rozott kapacit\u00e1s, f\u00fcgg\u0151s\u00e9gek \u00e9s \u00fctemez\u00e9si szab\u00e1lyok alapj\u00e1n sz\u00e1m\u00edtja ki a rendel\u00e9sek m\u0171veleteinek sorrendj\u00e9t. A Gantt-n\u00e9zetben er\u0151forr\u00e1sokon \u00e1t k\u00f6vetheti a munk\u00e1t, \u00e9s l\u00e1thatja az ugyanaz\u00e9rt a kapacit\u00e1s\u00e9rt verseng\u0151 rendel\u00e9sek hat\u00e1s\u00e1t. \u00cdgy a pol\u00edroz\u00e1sra v\u00e1r\u00f3 munk\u00e1k m\u00e1r a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151 \u00e9rt\u00e9kel\u00e9sekor sz\u00e1m\u00edt\u00e1sba ker\u00fclnek, nem csak k\u00e9s\u0151bb okoznak meglepet\u00e9st az \u00fczemben.<\/p>\n\n\n<p>Ha az anyagok rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1t figyelembe vev\u0151 \u00fctemez\u00e9s enged\u00e9lyezve van, az anyagell\u00e1t\u00e1s is beker\u00fcl a sz\u00e1m\u00edt\u00e1sba. Egy k\u00e9s\u0151bbre v\u00e1rt, beszerzett hajt\u00e1s nem kezelhet\u0151 \u00fagy, mintha m\u00e1r rendelkez\u00e9sre \u00e1llna. Tartsa naprak\u00e9szen az ell\u00e1t\u00e1si adatokat, \u00e9s v\u00e1ltoz\u00e1s eset\u00e9n sz\u00e1molja \u00fajra az \u00fctemtervet.<\/p>\n\n\n<p>\u00d6n hat\u00e1rozza meg a priorit\u00e1sokat, \u00e9s r\u00f6gz\u00edt\u00e9sekkel v\u00e9dheti az \u00fctemez\u00e9si d\u00f6nt\u00e9seket. Ha egy s\u00fcrg\u0151s sz\u00e1ll\u00edt\u00f3p\u00e1lya els\u0151bbs\u00e9get kap, az Arcturus ezekhez az utas\u00edt\u00e1sokhoz igazodva sz\u00e1mol \u00fajra; \u00d6n pedig a t\u00f6bbi rendel\u00e9s \u00edgy kialakul\u00f3 d\u00e1tumait is \u00e1ttekinti. Kevesebb k\u00e9zi munk\u00e1t ig\u00e9nyel a munkasorrendek karbantart\u00e1sa, \u00e9s egy\u00e9rtelm\u0171bb alapokon d\u00f6nthet arr\u00f3l, mely v\u00e1llal\u00e1sokat k\u00edv\u00e1nja meg\u0151rizni.<\/p>\n\n\n<p>A SkyPlanner a <a href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/\">ny\u00edlt REST API<\/a> seg\u00edts\u00e9g\u00e9vel b\u00e1rmely ERP- vagy MES-rendszerrel integr\u00e1lhat\u00f3. Megl\u00e9v\u0151 rendel\u00e9si, term\u00e9k- \u00e9s gy\u00e1rt\u00e1si adatait kapcsolja \u00f6ssze a r\u00e9szletes \u00fctemez\u00e9ssel, ahelyett, hogy az ERP cser\u00e9j\u00e9vel kezdene. A CTO bevezet\u00e9sekor t\u00e9rk\u00e9pezze fel, hogyan lesz a kiv\u00e1lasztott v\u00e1ltozatb\u00f3l a megfelel\u0151 anyag- \u00e9s m\u0171veleti adat ebben az adatfolyamban. Ez teremti meg a gyakorlati kapcsolatot az eladott term\u00e9k \u00e9s az Arcturus \u00e1ltal \u00fctemezett munka k\u00f6z\u00f6tt.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mit v\u00e1ltoztatott az egys\u00e9ges \u00fctemez\u00e9s az UTU-n\u00e1l?<\/h2>\n\n\n<p>Az UTU villamos eloszt\u00f3- \u00e9s kapcsol\u00f3berendez\u00e9seket gy\u00e1rt. A SkyPlanner bevezet\u00e9se el\u0151tt a r\u00e9szlegek k\u00fcl\u00f6n Excel-terveket vezettek, \u00e9s az ERP-ben v\u00e9grehajtott sorrendm\u00f3dos\u00edt\u00e1sok nem mindig jutottak el az \u00fczembe. Neh\u00e9z volt \u00e1tl\u00e1tni a t\u00e9nyleges kapacit\u00e1st, ez\u00e9rt a v\u00e1llalt sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k betart\u00e1s\u00e1hoz \u00fajra \u00e9s \u00fajra \u00e1t kellett rendezni a terveket.<\/p>\n\n\n<p>Az Oracle NetSuite \u00e9s a b\u00e9rsz\u00e1mfejt\u00e9si rendszer SkyPlanner-integr\u00e1ci\u00f3j\u00e1val az UTU egyetlen tervez\u00e9si rendszerbe vonta \u00f6ssze az \u00fczem gy\u00e1rt\u00f3sorait \u00e9s r\u00e9szlegeit. A csapat az automatikus \u00fctemez\u00e9s \u00e9s a Gantt-n\u00e9zet egy\u00fcttes el\u0151nyeit emeli ki: a kapacit\u00e1s, a terhel\u00e9s \u00e9s a munkasorrend egyszerre v\u00e1lik l\u00e1that\u00f3v\u00e1.<\/p>\n\n\n<p>Az <a href=\"https:\/\/skyplanner.ai\/hu\/ugyfeltortenetek\/utu\/\">UTU SkyPlanner-\u00e9rt\u00e9kel\u00e9s\u00e9ben<\/a> a v\u00e1llalat arr\u00f3l sz\u00e1mol be, hogy hetente mintegy k\u00e9t \u00f3r\u00e1t takar\u00edt meg, amelyet kor\u00e1bban t\u00e1bl\u00e1zatok friss\u00edt\u00e9s\u00e9re ford\u00edtott. Emellett pontosabban tudja \u00fctemezni a projektek kisz\u00e1ll\u00edt\u00e1sait, a friss\u00edtett munkasorrend pedig m\u00e1sodpercek alatt eljut a gy\u00e1rt\u00f3sorra. Ez az el\u0151nye annak, ha a rendel\u00e9st \u00f6sszekapcsoljuk a t\u00e9nylegesen elv\u00e9gzend\u0151 munk\u00e1val: kevesebb energi\u00e1t ig\u00e9nyel a k\u00fcl\u00f6n\u00e1ll\u00f3 tervek karbantart\u00e1sa, \u00e9s a sorrend v\u00e1ltoz\u00e1sakor k\u00f6nnyebb \u00f6sszehangolni a munk\u00e1t.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Teljes\u00edtse k\u00f6nnyebben a vev\u0151 \u00e1ltal v\u00e1lasztott v\u00e1ltozatra sz\u00f3l\u00f3 rendel\u00e9st<\/h2>\n\n\n<p>A CTO \u00e9rt\u00e9ke abban rejlik, hogy a visszat\u00e9r\u0151 vev\u0151i ig\u00e9nyekb\u0151l \u00fajra \u00e9s \u00fajra v\u00e1laszthat\u00f3 term\u00e9kopci\u00f3kat alak\u00edt ki. \u0150rizze meg ezt az el\u0151nyt a gy\u00e1rt\u00e1s teljes folyamat\u00e1ban: a kiv\u00e1lasztott v\u00e1ltozathoz t\u00e9nylegesen sz\u00fcks\u00e9ges munk\u00e1kkal sz\u00e1moljon, a sz\u00e1ll\u00edt\u00e1s teljes\u00edthet\u0151s\u00e9g\u00e9t pedig a m\u00e1s rendel\u00e9sekkel k\u00f6z\u00f6sen haszn\u00e1lt er\u0151forr\u00e1sok figyelembev\u00e9tel\u00e9vel m\u00e9rje fel.<\/p>\n\n\n<p>V\u00e1lassza a SkyPlanner megold\u00e1s\u00e1t, ha ez az \u00f6sszehangol\u00e1s m\u00e1r napi szint\u0171 \u00e1t\u00fctemez\u00e9si terhet jelent. Az Arcturus elv\u00e9gzi az \u00fctemez\u00e9si sz\u00e1m\u00edt\u00e1sokat, a Gantt-n\u00e9zet megmutatja a k\u00f6vetkezm\u00e9nyeket, a priorit\u00e1sokr\u00f3l pedig tov\u00e1bbra is \u00d6n d\u00f6nt. \u00cdgy t\u00f6bb ideje maradhat a t\u00e9nyleges sz\u0171k keresztmetszet kezel\u00e9s\u00e9re, \u00e9s kevesebbet kell a munk\u00e1k \u00e1thelyez\u00e9s\u00e9vel t\u00f6ltenie az\u00e9rt, hogy a k\u00fcl\u00f6n\u00e1ll\u00f3 munkasorok \u00f6sszhangban maradjanak.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/hu\/kapcsolat-ertekesites\/\">Foglaljon SkyPlanner-bemutat\u00f3t<\/a>, \u00e9s hozzon p\u00e9ldak\u00e9nt k\u00e9t gyakori konfigur\u00e1ci\u00f3t, a k\u00f6zt\u00fck elt\u00e9r\u0151 m\u0171veleteket \u00e9s egy k\u00f6z\u00f6sen haszn\u00e1lt er\u0151forr\u00e1st. Ezek j\u00f3 kiindul\u00f3pontot adnak ahhoz, hogy megn\u00e9zz\u00fck, hogyan illeszkedn\u00e9nek az \u00d6n term\u00e9kv\u00e1ltozatai egy re\u00e1lis gy\u00e1rt\u00e1si \u00fctemtervbe. Ha el\u0151bb ink\u00e1bb \u00f6n\u00e1ll\u00f3an ismerkedne a rendszerrel, <a href=\"https:\/\/skyplanner.ai\/hu\/proba\/\">pr\u00f3b\u00e1lja ki a SkyPlanner megold\u00e1s\u00e1t dem\u00f3adatokkal<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Rendel\u00e9sre konfigur\u00e1l\u00e1s: a vev\u0151 v\u00e1laszt\u00e1s\u00e1t\u00f3l a kisz\u00e1ll\u00edt\u00e1sig Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Rendel\u00e9sre konfigur\u00e1l\u00e1s: a vev\u0151 v\u00e1laszt\u00e1s\u00e1t\u00f3l a kisz\u00e1ll\u00edt\u00e1sig A rendel\u00e9sre konfigur\u00e1l\u00e1s (CTO) sor\u00e1n a term\u00e9k a vev\u0151 \u00e1ltal kiv\u00e1lasztott, el\u0151re meghat\u00e1rozott \u00e9s egym\u00e1ssal kompatibilis opci\u00f3kb\u00f3l k\u00e9sz\u00fcl. A vev\u0151 az ig\u00e9nyeinek megfelel\u0151 kombin\u00e1ci\u00f3t kapja, a gy\u00e1rt\u00f3 pedig bev\u00e1lt tervekre \u00e9s a term\u00e9kre vonatkoz\u00f3 szab\u00e1lyokra t\u00e1maszkodik, ahelyett, &#8230; <a title=\"Rendel\u00e9sre konfigur\u00e1l\u00e1s: a vev\u0151 v\u00e1laszt\u00e1s\u00e1t\u00f3l a kisz\u00e1ll\u00edt\u00e1sig\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesre-konfiguralas\/\" aria-label=\"Read more about Rendel\u00e9sre konfigur\u00e1l\u00e1s: a vev\u0151 v\u00e1laszt\u00e1s\u00e1t\u00f3l a kisz\u00e1ll\u00edt\u00e1sig\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":99687,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2526,312],"tags":[],"class_list":["post-99669","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-es-utemezes","category-forrasok","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Rendel\u00e9sre konfigur\u00e1l\u00e1s: a vev\u0151 v\u00e1laszt\u00e1s\u00e1t\u00f3l a kisz\u00e1ll\u00edt\u00e1sig<\/title>\n<meta name=\"description\" content=\"Term\u00e9kv\u00e1laszt\u00e9k minden rendel\u00e9s \u00fajratervez\u00e9se n\u00e9lk\u00fcl. Mikor j\u00f3 a rendel\u00e9sre konfigur\u00e1l\u00e1s, \u00e9s hogyan \u00fctemezi a SkyPlanner az egyes v\u00e1ltozatok gy\u00e1rt\u00e1s\u00e1t?\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesre-konfiguralas\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Rendel\u00e9sre konfigur\u00e1l\u00e1s: a vev\u0151 v\u00e1laszt\u00e1s\u00e1t\u00f3l a kisz\u00e1ll\u00edt\u00e1sig\" \/>\n<meta property=\"og:description\" content=\"Term\u00e9kv\u00e1laszt\u00e9k minden rendel\u00e9s \u00fajratervez\u00e9se n\u00e9lk\u00fcl. Mikor j\u00f3 a rendel\u00e9sre konfigur\u00e1l\u00e1s, \u00e9s hogyan \u00fctemezi a SkyPlanner az egyes v\u00e1ltozatok gy\u00e1rt\u00e1s\u00e1t?\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesre-konfiguralas\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-16T05:16:05+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-16T05:16:55+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Szerz\u0151:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data2\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/rendelesre-konfiguralas\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/rendelesre-konfiguralas\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Rendel\u00e9sre konfigur\u00e1l\u00e1s: a vev\u0151 v\u00e1laszt\u00e1s\u00e1t\u00f3l a kisz\u00e1ll\u00edt\u00e1sig\",\"datePublished\":\"2026-10-16T05:16:05+00:00\",\"dateModified\":\"2026-10-16T05:16:55+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/rendelesre-konfiguralas\\\/\"},\"wordCount\":3017,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/rendelesre-konfiguralas\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/configure-to-order-hero.png\",\"articleSection\":[\"APS \u00e9s \u00fctemez\u00e9s\",\"forr\u00e1sok\"],\"inLanguage\":\"hu-HU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/rendelesre-konfiguralas\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/rendelesre-konfiguralas\\\/\",\"name\":\"Rendel\u00e9sre konfigur\u00e1l\u00e1s: a vev\u0151 v\u00e1laszt\u00e1s\u00e1t\u00f3l a kisz\u00e1ll\u00edt\u00e1sig\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/rendelesre-konfiguralas\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/rendelesre-konfiguralas\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/configure-to-order-hero.png\",\"datePublished\":\"2026-10-16T05:16:05+00:00\",\"dateModified\":\"2026-10-16T05:16:55+00:00\",\"description\":\"Term\u00e9kv\u00e1laszt\u00e9k minden rendel\u00e9s \u00fajratervez\u00e9se n\u00e9lk\u00fcl. Mikor j\u00f3 a rendel\u00e9sre konfigur\u00e1l\u00e1s, \u00e9s hogyan \u00fctemezi a SkyPlanner az egyes v\u00e1ltozatok gy\u00e1rt\u00e1s\u00e1t?\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/rendelesre-konfiguralas\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/rendelesre-konfiguralas\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/rendelesre-konfiguralas\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/configure-to-order-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/configure-to-order-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"A modular conveyor with alternative belts, drive modules and a sensor bracket for predefined product choices.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/rendelesre-konfiguralas\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Rendel\u00e9sre konfigur\u00e1l\u00e1s: a vev\u0151 v\u00e1laszt\u00e1s\u00e1t\u00f3l a kisz\u00e1ll\u00edt\u00e1sig\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Rendel\u00e9sre konfigur\u00e1l\u00e1s: a vev\u0151 v\u00e1laszt\u00e1s\u00e1t\u00f3l a kisz\u00e1ll\u00edt\u00e1sig","description":"Term\u00e9kv\u00e1laszt\u00e9k minden rendel\u00e9s \u00fajratervez\u00e9se n\u00e9lk\u00fcl. Mikor j\u00f3 a rendel\u00e9sre konfigur\u00e1l\u00e1s, \u00e9s hogyan \u00fctemezi a SkyPlanner az egyes v\u00e1ltozatok gy\u00e1rt\u00e1s\u00e1t?","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesre-konfiguralas\/","og_locale":"hu_HU","og_type":"article","og_title":"Rendel\u00e9sre konfigur\u00e1l\u00e1s: a vev\u0151 v\u00e1laszt\u00e1s\u00e1t\u00f3l a kisz\u00e1ll\u00edt\u00e1sig","og_description":"Term\u00e9kv\u00e1laszt\u00e9k minden rendel\u00e9s \u00fajratervez\u00e9se n\u00e9lk\u00fcl. Mikor j\u00f3 a rendel\u00e9sre konfigur\u00e1l\u00e1s, \u00e9s hogyan \u00fctemezi a SkyPlanner az egyes v\u00e1ltozatok gy\u00e1rt\u00e1s\u00e1t?","og_url":"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesre-konfiguralas\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-16T05:16:05+00:00","article_modified_time":"2026-10-16T05:16:55+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Szerz\u0151:":"Jussi M\u00e4ntyl\u00e4","Becs\u00fclt olvas\u00e1si id\u0151":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesre-konfiguralas\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesre-konfiguralas\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Rendel\u00e9sre konfigur\u00e1l\u00e1s: a vev\u0151 v\u00e1laszt\u00e1s\u00e1t\u00f3l a kisz\u00e1ll\u00edt\u00e1sig","datePublished":"2026-10-16T05:16:05+00:00","dateModified":"2026-10-16T05:16:55+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesre-konfiguralas\/"},"wordCount":3017,"publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesre-konfiguralas\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","articleSection":["APS \u00e9s \u00fctemez\u00e9s","forr\u00e1sok"],"inLanguage":"hu-HU"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesre-konfiguralas\/","url":"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesre-konfiguralas\/","name":"Rendel\u00e9sre konfigur\u00e1l\u00e1s: a vev\u0151 v\u00e1laszt\u00e1s\u00e1t\u00f3l a kisz\u00e1ll\u00edt\u00e1sig","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesre-konfiguralas\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesre-konfiguralas\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","datePublished":"2026-10-16T05:16:05+00:00","dateModified":"2026-10-16T05:16:55+00:00","description":"Term\u00e9kv\u00e1laszt\u00e9k minden rendel\u00e9s \u00fajratervez\u00e9se n\u00e9lk\u00fcl. Mikor j\u00f3 a rendel\u00e9sre konfigur\u00e1l\u00e1s, \u00e9s hogyan \u00fctemezi a SkyPlanner az egyes v\u00e1ltozatok gy\u00e1rt\u00e1s\u00e1t?","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesre-konfiguralas\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesre-konfiguralas\/"]}]},{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesre-konfiguralas\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png","width":1672,"height":941,"caption":"A modular conveyor with alternative belts, drive modules and a sensor bracket for predefined product choices."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesre-konfiguralas\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"Rendel\u00e9sre konfigur\u00e1l\u00e1s: a vev\u0151 v\u00e1laszt\u00e1s\u00e1t\u00f3l a kisz\u00e1ll\u00edt\u00e1sig"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/configure-to-order-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Rendel\u00e9sre konfigur\u00e1l\u00e1s: a vev\u0151 v\u00e1laszt\u00e1s\u00e1t\u00f3l a kisz\u00e1ll\u00edt\u00e1sig Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Rendel\u00e9sre konfigur\u00e1l\u00e1s: a vev\u0151 v\u00e1laszt\u00e1s\u00e1t\u00f3l a kisz\u00e1ll\u00edt\u00e1sig A rendel\u00e9sre konfigur\u00e1l\u00e1s (CTO) sor\u00e1n a term\u00e9k a vev\u0151 \u00e1ltal kiv\u00e1lasztott, el\u0151re meghat\u00e1rozott \u00e9s egym\u00e1ssal kompatibilis opci\u00f3kb\u00f3l k\u00e9sz\u00fcl. A vev\u0151 az ig\u00e9nyeinek megfelel\u0151 kombin\u00e1ci\u00f3t kapja, a gy\u00e1rt\u00f3 pedig bev\u00e1lt tervekre \u00e9s a term\u00e9kre vonatkoz\u00f3 szab\u00e1lyokra t\u00e1maszkodik, ahelyett,&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/99669","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=99669"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/99669\/revisions"}],"predecessor-version":[{"id":99727,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/99669\/revisions\/99727"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media\/99687"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=99669"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/categories?post=99669"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/tags?post=99669"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}