{"id":99581,"date":"2026-10-16T03:54:21","date_gmt":"2026-10-16T03:54:21","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=99581"},"modified":"2026-10-16T03:55:12","modified_gmt":"2026-10-16T03:55:12","slug":"sokfele-termek-kis-sorozatu-gyartasa","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/hu\/forrasok\/sokfele-termek-kis-sorozatu-gyartasa\/","title":{"rendered":"Sokf\u00e9le term\u00e9k kis sorozat\u00fa gy\u00e1rt\u00e1sa: ford\u00edtsa el\u0151ny\u00e9re a v\u00e1laszt\u00e9kot"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Sokf\u00e9le term\u00e9k kis sorozat\u00fa gy\u00e1rt\u00e1sa: ford\u00edtsa el\u0151ny\u00e9re a v\u00e1laszt\u00e9kot<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/hu\/\">Kezd\u0151lap<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/\">Er\u0151forr\u00e1sok<\/a> &raquo; Sokf\u00e9le term\u00e9k kis sorozat\u00fa gy\u00e1rt\u00e1sa: ford\u00edtsa el\u0151ny\u00e9re a v\u00e1laszt\u00e9kot<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Becs\u00fclt olvas\u00e1si id\u0151: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> perc<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>A sokf\u00e9le term\u00e9k kis sorozat\u00fa gy\u00e1rt\u00e1sa (HMLV) azt jelenti, hogy sz\u00e9les term\u00e9kv\u00e1laszt\u00e9kot \u00e1ll\u00edtanak el\u0151, de az egyes term\u00e9kekb\u0151l csak kis mennyis\u00e9get. Egy \u00fczem p\u00e9ld\u00e1ul sokf\u00e9le alkatr\u00e9szt, berendez\u00e9sv\u00e1ltozatot vagy speci\u00e1lis r\u00e9szegys\u00e9get gy\u00e1rthat an\u00e9lk\u00fcl, hogy b\u00e1rmelyikb\u0151l t\u00f6meggy\u00e1rt\u00e1sra jellemz\u0151 mennyis\u00e9g k\u00e9sz\u00fclne.<\/p>\n\n\n<p>A vev\u0151k gyakran \u00e9ppen a sz\u00e9les v\u00e1laszt\u00e9k miatt v\u00e1lasztj\u00e1k az \u00d6n c\u00e9g\u00e9t. A pontosan megfelel\u0151 m\u0171szaki tartalm\u00fa term\u00e9kre van sz\u00fcks\u00e9g\u00fck, sz\u00e1mukra kezelhet\u0151 mennyis\u00e9gben \u2013 nem pedig nagy t\u00e9telben egy olyan szabv\u00e1nyterm\u00e9kre, amely csak majdnem felel meg az ig\u00e9nyeiknek. A gy\u00e1rt\u00f3 sz\u00e1m\u00e1ra az a kih\u00edv\u00e1s, hogy ezt a v\u00e1laszt\u00e9kot \u00fagy biztos\u00edtsa, hogy az el\u0151k\u00e9sz\u00edt\u00e9s, a v\u00e1rakoz\u00e1s \u00e9s a folyamatos \u00fajratervez\u00e9s ne em\u00e9ssze fel az \u00e1rr\u00e9st.<\/p>\n\n\n<p>A <a href=\"https:\/\/skyplanner.ai\/hu\/funkciok\/\">SkyPlanner APS<\/a> abban seg\u00edt, ami a v\u00e1laszt\u00e9k b\u0151v\u00fcl\u00e9s\u00e9vel egyre nehezebb: \u00f6sszehangolja a k\u00f6z\u00f6s gy\u00e1rt\u00e1si er\u0151forr\u00e1sokra jut\u00f3 sokf\u00e9le ig\u00e9nyt. A rendszer \u00fctemez\u00e9s\u00e9rt felel\u0151s mesters\u00e9ges intelligenci\u00e1ja, az Arcturus az er\u0151forr\u00e1sok, az anyagok \u00e9s a priorit\u00e1sok figyelembev\u00e9tel\u00e9vel sz\u00e1m\u00edtja ki a munk\u00e1k sorrendj\u00e9t. \u00cdgy \u00e1ttekinthet\u0151 tervet kap ahelyett, hogy \u00fajabb v\u00e1rakoz\u00f3 feladatokat kellene k\u00e9zzel \u00e1trendeznie.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mit jelent a sz\u00e9les v\u00e1laszt\u00e9k \u00e9s a kis sorozat a gy\u00e1rt\u00e1sban?<\/h2>\n\n\n<p>A \u201esz\u00e9les v\u00e1laszt\u00e9k\u201d a term\u00e9kek vagy v\u00e1ltozatok sokf\u00e9les\u00e9g\u00e9re utal. A \u201ekis sorozat\u201d az egyes term\u00e9kekb\u0151l gy\u00e1rtott mennyis\u00e9get jel\u00f6li. Ez nem felt\u00e9tlen\u00fcl jelenti azt, hogy az \u00fczemnek kev\u00e9s a munk\u00e1ja: sok kis rendel\u00e9s egy nagy gy\u00e1rt\u00f3\u00fczem kapacit\u00e1s\u00e1t is lek\u00f6theti.<\/p>\n\n\n<p>Nincs olyan \u00e1ltal\u00e1nos sorozatnagys\u00e1g-hat\u00e1r, amely minden ipar\u00e1gban elv\u00e1lasztan\u00e1 a HMLV gy\u00e1rt\u00e1st a t\u00f6bbit\u0151l. A gyakorlatban az a k\u00e9rd\u00e9s, hogy a sokf\u00e9les\u00e9g \u00e9s a gyakori v\u00e1ltoz\u00e1sok meghat\u00e1rozz\u00e1k-e a gy\u00e1rt\u00e1s el\u0151k\u00e9sz\u00edt\u00e9s\u00e9t, l\u00e9tsz\u00e1mig\u00e9ny\u00e9t \u00e9s \u00fctemez\u00e9s\u00e9t. Egy kis mennyis\u00e9gre sz\u00f3l\u00f3 ism\u00e9tl\u0151d\u0151 rendel\u00e9s ugyan\u00fagy r\u00e9sze lehet ennek a k\u00f6rnyezetnek, mint egy protot\u00edpus.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Gy\u00e1rt\u00e1si jellemz\u0151<\/th><th>Sz\u00e9les v\u00e1laszt\u00e9k, kis sorozatok<\/th><th>Sz\u0171k v\u00e1laszt\u00e9k, nagy sorozatok<\/th><\/tr><\/thead><tbody><tr><td>Term\u00e9kv\u00e1laszt\u00e9k<\/td><td>Sokf\u00e9le term\u00e9k vagy v\u00e1ltozat<\/td><td>Sz\u0171kebb v\u00e1laszt\u00e9k, ism\u00e9tl\u0151d\u0151 gy\u00e1rt\u00e1ssal<\/td><\/tr><tr><td>Gy\u00e1rt\u00e1si sorozatok<\/td><td>Az egyes term\u00e9kekb\u0151l kisebb mennyis\u00e9g k\u00e9sz\u00fcl<\/td><td>Ugyanabb\u00f3l a term\u00e9kb\u0151l hosszabb sorozatok k\u00e9sz\u00fclnek<\/td><\/tr><tr><td>Er\u0151forr\u00e1sok haszn\u00e1lata<\/td><td>A k\u00f6z\u00f6sen haszn\u00e1lt berendez\u00e9sek k\u00fcl\u00f6nb\u00f6z\u0151 munk\u00e1khoz alkalmazkodnak<\/td><td>A berendez\u00e9sek ism\u00e9tl\u0151d\u0151 feladatokra dedik\u00e1lhat\u00f3k<\/td><\/tr><tr><td>A tervez\u00e9s f\u0151 szempontja<\/td><td>A v\u00e1ltoz\u00f3 ig\u00e9nyek \u00e9s az \u00e1t\u00e1ll\u00e1sok \u00f6sszehangol\u00e1sa<\/td><td>Megb\u00edzhat\u00f3, hat\u00e9kony, ism\u00e9tl\u0151d\u0151 gy\u00e1rt\u00e1si folyamat fenntart\u00e1sa<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>HMLV gy\u00e1rt\u00e1ssal tal\u00e1lkozhatunk t\u00f6bbek k\u00f6z\u00f6tt a b\u00e9rforg\u00e1csol\u00e1sban, az elektronikai gy\u00e1rt\u00e1sban, az ipari berendez\u00e9sek gy\u00e1rt\u00e1s\u00e1ban \u00e9s a speci\u00e1lis \u00f6sszeszerel\u00e9si munk\u00e1kn\u00e1l. Egyes term\u00e9kek elt\u00e9r\u0151 gy\u00e1rt\u00e1si \u00fatvonalat k\u00f6vetnek; m\u00e1sok ugyanazon a m\u0171veletsoron haladnak v\u00e9gig, de m\u00e1s szersz\u00e1mot, anyagot vagy tesztprogramot ig\u00e9nyelnek.<\/p>\n\n\n<p>A HMLV ez\u00e9rt nem a <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/muhelyrendszeru-gyartas\/\">m\u0171helyrendszer\u0171 gy\u00e1rt\u00e1s (job shop)<\/a> m\u00e1sik neve. A job shop azt \u00edrja le, hogy a munk\u00e1k elt\u00e9r\u0151 \u00fatvonalakon haladnak a k\u00f6z\u00f6sen haszn\u00e1lt er\u0151forr\u00e1sok k\u00f6z\u00f6tt. A HMLV ezzel szemben a term\u00e9k\u00f6sszet\u00e9telt \u00e9s a mennyis\u00e9geket jellemzi. Hasonl\u00f3k\u00e9ppen a <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesre-gyartas\/\">rendel\u00e9sre gy\u00e1rt\u00e1s<\/a> azt hat\u00e1rozza meg, mi ind\u00edtja el a gy\u00e1rt\u00e1st, m\u00edg a <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/szakaszos-gyartas\/\">szakaszos gy\u00e1rt\u00e1s<\/a> sor\u00e1n meghat\u00e1rozott mennyis\u00e9get \u00e1ll\u00edtanak el\u0151 egy\u00fctt. Egy \u00fczemre mind a n\u00e9gy le\u00edr\u00e1s igaz lehet, de mindegyik m\u00e1s k\u00e9rd\u00e9sre ad v\u00e1laszt.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mikor j\u00f3 \u00fczleti d\u00f6nt\u00e9s a HMLV gy\u00e1rt\u00e1s?<\/h2>\n\n\n<p>A HMLV gy\u00e1rt\u00e1snak akkor van \u00e9rtelme, ha a vev\u0151k annyira \u00e9rt\u00e9kelik a v\u00e1laszt\u00e9kot, hogy az indokolja a biztos\u00edt\u00e1s\u00e1hoz sz\u00fcks\u00e9ges munk\u00e1t. Ilyen lehet egy adott alkalmaz\u00e1shoz sz\u00fcks\u00e9ges alkatr\u00e9sz, egy berendez\u00e9s v\u00e1laszthat\u00f3 kivitele, egy kis t\u00e9tel\u0171 p\u00f3talkatr\u00e9sz-rendel\u00e9s vagy egy olyan term\u00e9k, amelynek terve m\u00e9g m\u00f3dosul.<\/p>\n\n\n<p>Az \u00fczleti el\u0151ny\u00f6k k\u00e9zzelfoghat\u00f3k:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Olyan ig\u00e9nyeket is kiszolg\u00e1lhat, amelyek nem indokolj\u00e1k a t\u00f6meggy\u00e1rt\u00e1st.<\/strong> Kis mennyis\u00e9gekkel is kiszolg\u00e1lhat\u00f3k a speci\u00e1lis ig\u00e9ny\u0171 vev\u0151k, valamint a sz\u0171k piaci ter\u00fcleteken visszat\u00e9r\u0151en felmer\u00fcl\u0151 felhaszn\u00e1l\u00e1si ig\u00e9nyek.<\/li><li><strong>V\u00e1laszt\u00e9kot k\u00edn\u00e1lhat an\u00e9lk\u00fcl, hogy minden k\u00e9szterm\u00e9kv\u00e1ltozatot el\u0151re legy\u00e1rtana.<\/strong> A kisebb mennyis\u00e9gek gy\u00e1rt\u00e1sa cs\u00f6kkentheti az eladatlan vagy id\u0151k\u00f6zben lev\u00e1ltott term\u00e9kekb\u0151l ered\u0151 kock\u00e1zatot.<\/li><li><strong>A sorozatok k\u00f6z\u00f6tt m\u00f3dos\u00edthat a term\u00e9ken.<\/strong> Ha kisebb mennyis\u00e9g gy\u00e1rt\u00e1sa mellett k\u00f6telezi el mag\u00e1t, nagyobb mozg\u00e1st\u00e9r marad a tervm\u00f3dos\u00edt\u00e1sokra vagy az elt\u00e9r\u0151 vev\u0151i ig\u00e9nyekre.<\/li><li><strong>Rugalmas kiszolg\u00e1l\u00e1ssal visszat\u00e9r\u0151 megrendel\u00e9seket szerezhet.<\/strong> A kis rendel\u00e9sek megb\u00edzhat\u00f3 teljes\u00edt\u00e9se \u00e9rt\u00e9kesebb lehet a vev\u0151nek, mint egy j\u00f3val nagyobb t\u00e9telre el\u00e9rhet\u0151 legalacsonyabb darab\u00e1r.<\/li><\/ul>\n\n\n<p>Mindez\u00e9rt az egy darabra jut\u00f3 el\u0151k\u00e9sz\u00edt\u00e9si r\u00e1ford\u00edt\u00e1ssal kell fizetni. Programoz\u00e1sra, k\u00e9sz\u00fcl\u00e9kez\u00e9sre, dokument\u00e1ci\u00f3ra \u00e9s els\u0151darab-ellen\u0151rz\u00e9sre r\u00f6vid sorozatn\u00e1l is sz\u00fcks\u00e9g lehet. Az \u00e1rnak \u00e9s a v\u00e1llalt sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151nek ezt a munk\u00e1t is t\u00fckr\u00f6znie kell, nem csup\u00e1n azt az id\u0151t, am\u00edg a g\u00e9p az alkatr\u00e9szeket gy\u00e1rtja.<\/p>\n\n\n<p>Egy kiforrott, nagy kereslet\u0171 term\u00e9kn\u00e9l m\u00e9g egy sz\u00e9les v\u00e1laszt\u00e9kot k\u00edn\u00e1l\u00f3 v\u00e1llalkoz\u00e1sban is indokolt lehet a dedik\u00e1lt gy\u00e1rt\u00e1si folyamat vagy az ut\u00e1np\u00f3tl\u00e1si k\u00e9szlet fenntart\u00e1sa. Egy ritk\u00e1n rendelt v\u00e1ltozatot viszont c\u00e9lszer\u0171bb lehet csak ig\u00e9ny eset\u00e9n gy\u00e1rtani. Ezt a d\u00f6nt\u00e9st term\u00e9kcsal\u00e1donk\u00e9nt \u00e9s a kereslet alakul\u00e1sa alapj\u00e1n hozza meg, ne egyetlen szab\u00e1lyt alkalmazzon a teljes k\u00edn\u00e1latra.<\/p>\n\n\n<p>A HMLV teh\u00e1t nem jelent \u00edg\u00e9retet sem a k\u00e9szletek teljes megsz\u00fcntet\u00e9s\u00e9re, sem az azonnali testreszab\u00e1sra. A v\u00e1ltozatos ig\u00e9nyek kiszolg\u00e1l\u00e1s\u00e1nak egyik m\u00f3dja. Akkor lesz nyeres\u00e9ges, ha k\u00e9zben tartja e rugalmass\u00e1g k\u00f6lts\u00e9g\u00e9t.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Tartsa k\u00e9zben a sokf\u00e9les\u00e9gb\u0151l ad\u00f3d\u00f3 t\u00f6bbletmunk\u00e1t<\/h2>\n\n\n<p>A megold\u00e1s nem az, hogy minden term\u00e9k egyforma legyen. Ink\u00e1bb a gy\u00e1rt\u00e1s ism\u00e9tl\u0151d\u0151 r\u00e9szeit kell egyszer\u0171bb\u00e9 tenni, hogy a val\u00f3di k\u00fcl\u00f6nbs\u00e9gek ne okozzanak elker\u00fclhet\u0151 fennakad\u00e1sokat.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Term\u00e9kcsal\u00e1dokra k\u00e9sz\u00fclj\u00f6n fel, hogy ne minden term\u00e9k k\u00fcl\u00f6n meglepet\u00e9st jelentsen<\/h3>\n\n\n<p>Keresse meg azokat a term\u00e9keket, amelyekhez azonos anyagok, k\u00e9sz\u00fcl\u00e9kek, szersz\u00e1mok, szerel\u00e9si m\u00f3dszerek vagy tesztel\u00e9si megold\u00e1sok haszn\u00e1lhat\u00f3k. Ezek a hasonl\u00f3s\u00e1gok akkor is lehet\u0151v\u00e9 tehetik a k\u00f6z\u00f6s el\u0151k\u00e9sz\u00edt\u00e9st, ha a k\u00e9szterm\u00e9kek k\u00fcl\u00f6nb\u00f6znek.<\/p>\n\n\n<p>\u0150rizze meg a bev\u00e1lt be\u00e1ll\u00edt\u00e1si utas\u00edt\u00e1sokat, \u00e9s r\u00f6gz\u00edtse, mi v\u00e1ltozik az egyes v\u00e1ltozatok k\u00f6z\u00f6tt. Ahol a folyamat megengedi, k\u00e9sz\u00edtse el\u0151 a szersz\u00e1mokat, programokat \u00e9s anyagokat m\u00e9g azel\u0151tt, hogy az er\u0151forr\u00e1s felszabadulna. A gyorscser\u00e9s k\u00e9sz\u00fcl\u00e9kekkel \u00e9s az \u00e1ll\u00f3 g\u00e9pen k\u00edv\u00fcl v\u00e9gzett el\u0151k\u00e9sz\u00edt\u00e9ssel ler\u00f6vid\u00edthet\u0151 a sorozatok k\u00f6z\u00f6tti kies\u00e9s.<\/p>\n\n\n<p>Ugyanez az elv \u00e9rv\u00e9nyes a munkat\u00e1rsakra is. Gondoskodjon arr\u00f3l, hogy a kapcsol\u00f3d\u00f3 term\u00e9kcsal\u00e1dok feladatait t\u00f6bben is el tudj\u00e1k v\u00e9gezni, \u00e9s tegye k\u00f6nnyen el\u00e9rhet\u0151v\u00e9 az aktu\u00e1lis rajzot, annak \u00e9rv\u00e9nyes m\u00f3dos\u00edt\u00e1si \u00e1llapot\u00e1t \u00e9s az ellen\u0151rz\u00e9si k\u00f6vetelm\u00e9nyeket. Ha egy adott term\u00e9kcsal\u00e1d el\u0151k\u00e9sz\u00edt\u00e9s\u00e9hez csak egyetlen ember \u00e9rt, az \u0151 rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1t m\u00e1r a gy\u00e1rt\u00e1si d\u00f6nt\u00e9sn\u00e9l figyelembe kell venni \u2013 nem el\u00e9g az utols\u00f3 pillanatban, az \u00fczemben egyeztetni r\u00f3la.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Cs\u00f6kkentse az \u00e1t\u00e1ll\u00e1sokat a sz\u00e1ll\u00edt\u00e1sok vesz\u00e9lyeztet\u00e9se n\u00e9lk\u00fcl<\/h3>\n\n\n<p>A hasonl\u00f3 munk\u00e1k egym\u00e1s ut\u00e1ni elv\u00e9gz\u00e9s\u00e9vel elker\u00fclhet\u0151k az ism\u00e9telt szersz\u00e1m-, anyag- vagy sz\u00ednv\u00e1lt\u00e1sok. Egy hossz\u00fa, \u00f6sszevont gy\u00e1rt\u00e1si sorozat viszont feltarthatja egy m\u00e1sik term\u00e9k s\u00fcrg\u0151s rendel\u00e9s\u00e9t.<\/p>\n\n\n<p>Nem el\u00e9g azt k\u00e9rdezni: \u201eMelyik sorrend j\u00e1r a legkevesebb \u00e1t\u00e1ll\u00e1ssal?\u201d A hasznos k\u00e9rd\u00e9s ink\u00e1bb ez: \u201eMely \u00e1t\u00e1ll\u00e1sokat takar\u00edthatjuk meg \u00fagy, hogy a fontos sz\u00e1ll\u00edt\u00e1sokat is biztos\u00edtsuk?\u201d<\/p>\n\n\n<p>A SkyPlanner a term\u00e9ktulajdons\u00e1gok \u00e9s a munka\u00e1llom\u00e1sokhoz megadott hasonl\u00f3s\u00e1gi szab\u00e1lyok seg\u00edts\u00e9g\u00e9vel t\u00e1mogatja ezt az egyens\u00falyt. El\u0151nyben r\u00e9szes\u00edtheti az azonos tulajdons\u00e1g\u00fa \u2013 p\u00e9ld\u00e1ul azonos szersz\u00e1mot vagy anyagot ig\u00e9nyl\u0151 \u2013 gy\u00e1rt\u00e1si feladatok egym\u00e1s ut\u00e1ni \u00fctemez\u00e9s\u00e9t, \u00e9s be\u00e1ll\u00edthatja, milyen er\u0151sen befoly\u00e1solja ez a csoportos\u00edt\u00e1s az \u00fctemtervet. Az \u00e1t\u00e1ll\u00e1siid\u0151-m\u00e1trixban megadhatja a k\u00fcl\u00f6nb\u00f6z\u0151 tulajdons\u00e1g\u00e9rt\u00e9kek k\u00f6z\u00f6tti \u00e1t\u00e1ll\u00e1sok id\u0151tartam\u00e1t. \u00cdgy az \u00e1t\u00e1ll\u00e1s k\u00f6lts\u00e9ge beker\u00fcl a tervez\u00e9si sz\u00e1m\u00edt\u00e1sba, nem pedig ut\u00f3lag, k\u00fcl\u00f6n korrekci\u00f3k\u00e9nt kell sz\u00e1molni vele.<\/p>\n\n\n<p>A felesleges \u00e1t\u00e1ll\u00e1sok cs\u00f6kkent\u00e9s\u00e9vel id\u0151 szabadul fel az \u00e9rt\u00e9kteremt\u0151 munk\u00e1ra. <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/smed\/\">Mag\u00e1nak a fizikai \u00e1t\u00e1ll\u00e1snak a ler\u00f6vid\u00edt\u00e9se<\/a> pedig megk\u00f6nny\u00edti a kisebb sorozatok beilleszt\u00e9s\u00e9t. Az \u00fctemez\u00e9s \u00e9s az \u00fczemi folyamatok fejleszt\u00e9se k\u00f6lcs\u00f6n\u00f6sen er\u0151s\u00edti egym\u00e1st.<\/p>\n\n\n<h3 class=\"wp-block-heading\">A folyamatos \u00e1raml\u00e1s \u00e9rdek\u00e9ben ind\u00edtsa a munk\u00e1kat, ne csak az\u00e9rt, hogy mindenki dolgozzon<\/h3>\n\n\n<p>Egy \u00fajabb kis rendel\u00e9s elind\u00edt\u00e1sa hasznos l\u00e9p\u00e9snek t\u0171nik. Ha azonban a k\u00f6vetkez\u0151 m\u0171veletn\u00e9l m\u00e1r feltorl\u00f3dtak a munk\u00e1k, lehet, hogy csup\u00e1n egy \u00fajabb f\u00e9lk\u00e9sz term\u00e9kkel b\u0151v\u00edti a v\u00e1rakoz\u00f3k sor\u00e1t.<\/p>\n\n\n<p>A munk\u00e1k ind\u00edt\u00e1sakor vegye figyelembe az anyagokat, az el\u0151k\u00e9sz\u00edt\u00e9st \u00e9s a k\u00f6vetkez\u0151 m\u0171veletek kapacit\u00e1s\u00e1t. A sz\u00e1ll\u00edt\u00e1sokat korl\u00e1toz\u00f3 m\u0171veletekn\u00e9l mindig legyen elv\u00e9gz\u00e9sre k\u00e9sz munka, de ne terhelje \u0151ket mindennel, amit a megel\u0151z\u0151 l\u00e9p\u00e9sekben el lehetne ind\u00edtani.<\/p>\n\n\n<p>Ezzel cs\u00f6kkenthet\u0151 a sok nyitott, egyszerre figyelmet ig\u00e9nyl\u0151 feladat okozta zavar. Az elt\u00e9r\u00e9sek is k\u00f6nnyebben \u00e9szrevehet\u0151k: egy hi\u00e1nyz\u00f3 alkatr\u00e9sz, egy nem el\u00e9rhet\u0151 szakember vagy egy olyan rendel\u00e9s, amelynek h\u00e1tral\u00e9v\u0151 m\u0171veletei m\u00e1r nem f\u00e9rnek bele a v\u00e1llalt hat\u00e1rid\u0151be.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ugyanaz a mennyis\u00e9g eg\u00e9szen m\u00e1s gy\u00e1rt\u00e1si hetet jelenthet<\/h2>\n\n\n<p>K\u00e9pzelj\u00fcnk el egy ipari vez\u00e9rl\u0151egys\u00e9geket gy\u00e1rt\u00f3 v\u00e1llalatot. K\u00edn\u00e1lat\u00e1ban sokf\u00e9le v\u00e1ltozat szerepel, de t\u00f6bbs\u00e9g\u00fck azonos szerel\u00e9si er\u0151forr\u00e1sokat haszn\u00e1l, \u00e9s v\u00e9gs\u0151 tesztel\u00e9sen megy kereszt\u00fcl.<\/p>\n\n\n<p>Az egyik h\u00e9ten a rendel\u00e9s\u00e1llom\u00e1ny z\u00f6m\u00e9t j\u00f3l ismert, egyszer\u0171en tesztelhet\u0151 egys\u00e9gek adj\u00e1k. Ekkor az \u00f6sszeszerel\u00e9sre nehezedik a legnagyobb terhel\u00e9s. Egy m\u00e1sik h\u00e9ten a vev\u0151k \u00f6sszesen ugyanannyi egys\u00e9get rendelnek, de t\u00f6bb olyan v\u00e1ltozatot, amely hosszabb, speci\u00e1lis teszteket \u00e9s m\u00e1s k\u00e9sz\u00fcl\u00e9keket ig\u00e9nyel. Az \u00f6sszeszerel\u00e9sn\u00e9l most marad szabad kapacit\u00e1s, a tesztel\u00e9si er\u0151forr\u00e1sn\u00e1l viszont sor alakul ki.<\/p>\n\n\n<p>A heti darabsz\u00e1mc\u00e9l alapj\u00e1n a k\u00e9t h\u00e9t hasonl\u00f3nak t\u0171nik. Az er\u0151forr\u00e1sig\u00e9ny\u00fck azonban nem azonos.<\/p>\n\n\n<p>A m\u00e1sodik h\u00e9ten seg\u00edthet az \u00f6sszeegyeztethet\u0151 tesztbe\u00e1ll\u00edt\u00e1sokat ig\u00e9nyl\u0151 munk\u00e1k csoportos\u00edt\u00e1sa. Az is megold\u00e1s lehet, ha az arra alkalmas munk\u00e1kat m\u00e1sik megfelel\u0151 er\u0151forr\u00e1shoz rendelik, vagy t\u00f6bb olyan id\u0151t biztos\u00edtanak a tesztel\u00e9sre, amikor a sz\u00fcks\u00e9ges szem\u00e9lyzet is rendelkez\u00e9sre \u00e1ll. Az \u00f6sszeszerel\u00e9s teljes\u00edtm\u00e9ny\u00e9nek puszta n\u00f6vel\u00e9s\u00e9vel csak t\u00f6bb egys\u00e9g v\u00e1rakozna ugyanann\u00e1l a sz\u0171k keresztmetszetn\u00e9l.<\/p>\n\n\n<p>Ez a HMLV gy\u00e1rt\u00e1s k\u00f6zponti tervez\u00e9si probl\u00e9m\u00e1ja: <strong>a term\u00e9k\u00f6sszet\u00e9telt\u0151l f\u00fcgg, mi f\u00e9r bele a kapacit\u00e1sba, nem csup\u00e1n az \u00f6sszmennyis\u00e9gt\u0151l<\/strong>. Miel\u0151tt \u00fajabb v\u00e1ltozat gy\u00e1rt\u00e1s\u00e1t vagy kor\u00e1bbi hat\u00e1rid\u0151t v\u00e1llalna, l\u00e1tnia kell, hogyan f\u00e9rnek el a hozz\u00e1 tartoz\u00f3 munk\u00e1k a megl\u00e9v\u0151 v\u00e1llal\u00e1sok mellett. Nem biztos, hogy az el\u0151z\u0151 h\u00e9ten kezelt sz\u0171k keresztmetszet korl\u00e1tozza az e heti sz\u00e1ll\u00edt\u00e1sokat is.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Kezelje a v\u00e1ltoz\u00f3 term\u00e9k\u00f6sszet\u00e9telt egyetlen gy\u00e1rt\u00e1si \u00fctemtervben<\/h2>\n\n\n<p>A SkyPlanner \u00f6sszekapcsolja a term\u00e9k\u00f6sszet\u00e9telt az el\u0151\u00e1ll\u00edt\u00e1shoz sz\u00fcks\u00e9ges er\u0151forr\u00e1sokkal. \u00d6n megadja a term\u00e9kek gy\u00e1rt\u00e1si m\u0171veleteit, azok id\u0151tartam\u00e1t \u00e9s az alkalmas munka\u00e1llom\u00e1sokat, valamint a m\u0171szakokat, g\u00e9pkezel\u0151ket, anyagokat \u00e9s gy\u00e1rt\u00e1si priorit\u00e1sokat. Az Arcturus a be\u00e1ll\u00edtott kapacit\u00e1s \u00e9s a f\u00fcgg\u0151s\u00e9gek figyelembev\u00e9tel\u00e9vel \u00fctemezi a m\u0171veleteket.<\/p>\n\n\n<p>Az elk\u00e9pzelt vez\u00e9rl\u0151egys\u00e9g-gy\u00e1rt\u00f3n\u00e1l a speci\u00e1lis tesztel\u00e9s kezdett\u0151l fogva a terv r\u00e9sze. Az id\u0151ig\u00e9ny\u00e9vel nem csak ut\u00f3lag, az \u00f6sszeszerel\u00e9s befejez\u00e9se ut\u00e1n sz\u00e1molnak. A Gantt-id\u0151vonal megmutatja az er\u0151forr\u00e1sokon \u00e1t\u00edvel\u0151, \u00f6sszef\u00fcgg\u0151 munk\u00e1kat, \u00edgy a gy\u00e1rt\u00e1stervez\u0151 l\u00e1thatja a v\u00e1rhat\u00f3 befejez\u00e9st \u00e9s azt is, hol v\u00e1rakozik egy rendel\u00e9s.<\/p>\n\n\n<p>H\u00e1rom funkci\u00f3 k\u00fcl\u00f6n\u00f6sen hasznos, ha a gy\u00e1rtand\u00f3 term\u00e9kek \u00f6sszet\u00e9tele gyakran v\u00e1ltozik:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Anyagell\u00e1t\u00e1st figyelembe vev\u0151 \u00fctemez\u00e9s.<\/strong> Ha ez a szab\u00e1ly enged\u00e9lyezve van, az anyagok rendelkez\u00e9sre \u00e1ll\u00e1sa is befoly\u00e1solja a sz\u00e1m\u00edt\u00e1st. \u00cdgy egy hi\u00e1nyz\u00f3 alkatr\u00e9sz m\u00f3dos\u00edthatja, hogy mely feladatok \u00fctemezhet\u0151k, ahelyett, hogy a hi\u00e1ny csak k\u00f6zvetlen\u00fcl a munka megkezd\u00e9se el\u0151tt der\u00fclne ki.<\/li><li><strong>Priorit\u00e1sok \u00e9s r\u00f6gz\u00edt\u00e9sek.<\/strong> \u00d6n szab\u00e1lyozza az \u00fctemez\u00e9si sorrendet meghat\u00e1roz\u00f3 t\u00e9nyez\u0151ket, \u00e9s r\u00f6gz\u00edtheti azokat a feladatokat, amelyek helye nem v\u00e1ltozhat. \u00d6n d\u00f6nti el, mely v\u00e1llal\u00e1sok fontosak; az Arcturus pedig kisz\u00e1m\u00edtja, hogyan f\u00e9rnek el k\u00f6r\u00fcl\u00f6tt\u00fck az ugyanazok\u00e9rt az er\u0151forr\u00e1sok\u00e9rt verseng\u0151 m\u0171veletek.<\/li><li><strong>Szab\u00e1lyozott \u00fajratervez\u00e9s.<\/strong> Ha v\u00e1ltoznak a rendel\u00e9sek, a kapacit\u00e1sok vagy a gy\u00e1rt\u00e1s el\u0151rehalad\u00e1sa, az Arcturus \u00fajrasz\u00e1m\u00edthatja az \u00e9rintett tervet. Ha az Autopilot enged\u00e9lyezve van, a be\u00e1ll\u00edtott esem\u00e9nyek vagy egy id\u0151z\u00edt\u0151 elind\u00edthatj\u00e1k az \u00fajra\u00fctemez\u00e9st, mik\u00f6zben a szab\u00e1lyok \u00e9s a r\u00f6gz\u00edt\u00e9sek \u00e9rv\u00e9nyben maradnak.<\/li><\/ul>\n\n\n<p>\u00cdgy kevesebb id\u0151t kell a feladatok \u00fajb\u00f3li kioszt\u00e1s\u00e1ra ford\u00edtani, \u00e9s megalapozottabban lehet v\u00e1llal\u00e1sokat tenni az \u00fcgyfeleknek. Miel\u0151tt eld\u00f6nti, hogy v\u00e1llalhat\u00f3-e az \u00faj \u00edg\u00e9ret, megvizsg\u00e1lhatja, hogyan hat a priorit\u00e1s m\u00f3dos\u00edt\u00e1sa a t\u00f6bbi munk\u00e1ra.<\/p>\n\n\n<p>A SkyPlanner a <a href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/\">ny\u00edlt REST API<\/a> seg\u00edts\u00e9g\u00e9vel b\u00e1rmely ERP vagy MES rendszerhez csatlakoztathat\u00f3. A megl\u00e9v\u0151 rendel\u00e9si \u00e9s gy\u00e1rt\u00e1si adatok felhaszn\u00e1lhat\u00f3k az \u00fctemez\u00e9shez, \u00edgy a sz\u00e9lesebb term\u00e9kv\u00e1laszt\u00e9k kezel\u00e9s\u00e9t nem kell az ERP lecser\u00e9l\u00e9s\u00e9vel kezdeni.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Eskomatic: jobban tervezhet\u0151 sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k sz\u00e9les term\u00e9kv\u00e1laszt\u00e9k mellett<\/h3>\n\n\n<p>A finn Eskomatic b\u00e9rforg\u00e1csol\u00e1ssal foglalkozik, \u00e9s t\u00f6bb ipar\u00e1gat szolg\u00e1l ki sz\u00e9les term\u00e9kv\u00e1laszt\u00e9kkal, v\u00e1ltoz\u00f3 sorozatnagys\u00e1gokkal. Kor\u00e1bbi termel\u00e9sir\u00e1ny\u00edt\u00e1si rendszere nagyr\u00e9szt k\u00e9zzel \u00f6ssze\u00e1ll\u00edtott munkasorokra t\u00e1maszkodott, az anyagell\u00e1t\u00e1s korl\u00e1tozott \u00e1tl\u00e1that\u00f3s\u00e1ga pedig megnehez\u00edtette a hi\u00e1nyok el\u0151rejelz\u00e9s\u00e9t.<\/p>\n\n\n<p>A SkyPlanner megl\u00e9v\u0151 ERP rendszerhez val\u00f3 csatlakoztat\u00e1s\u00e1val a csapat \u00e1ttekinthet\u0151bb Gantt-n\u00e9zetet kapott a v\u00e1rhat\u00f3 terhel\u00e9sr\u0151l, \u00e9s automatikusan \u00fctemezheti a terhel\u00e9st. Az Eskomatic besz\u00e1mol\u00f3ja szerint pontosabban tudj\u00e1k meghat\u00e1rozni a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket, \u00e9s ritk\u00e1bbak az anyaghi\u00e1ny miatti termel\u00e9sle\u00e1ll\u00e1sok. A v\u00e1llalat gy\u00e1rt\u00e1stervez\u00e9si vezet\u0151je k\u00fcl\u00f6n\u00f6sen azt \u00e9rt\u00e9keli, hogy az eszk\u00f6z nap mint nap megb\u00edzhat\u00f3 t\u00e1mogat\u00e1st ny\u00fajt a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k meghat\u00e1roz\u00e1s\u00e1hoz.<\/p>\n\n\n<p>Ez nemcsak a forg\u00e1csol\u00e1sban fontos: a sokf\u00e9les\u00e9g k\u00f6nnyebben kezelhet\u0151, ha a csapat l\u00e1tja a r\u00e1 v\u00e1r\u00f3 munk\u00e1t, \u00e9s azt is, hogy rendelkez\u00e9sre \u00e1llnak-e a terv megval\u00f3s\u00edt\u00e1s\u00e1hoz sz\u00fcks\u00e9ges felt\u00e9telek. <a href=\"https:\/\/skyplanner.ai\/hu\/ugyfeltortenetek\/eskomatic\/\">Az Eskomatic SkyPlanner-\u00e9rt\u00e9kel\u00e9se<\/a> bemutatja, mit jelent ez a v\u00e1ltoz\u00e1s a mindennapi munk\u00e1ban.<\/p>\n\n\n<h2 class=\"wp-block-heading\">M\u00e9rje meg, megt\u00e9r\u00fcl-e a rugalmass\u00e1g<\/h2>\n\n\n<p>Egyetlen termel\u00e9si vagy kihaszn\u00e1lts\u00e1gi mutat\u00f3 elfedheti, ha a term\u00e9k\u00f6sszet\u00e9tel kedvez\u0151tlen ir\u00e1nyba v\u00e1ltozik. \u00c9rdemes t\u00f6bb mutat\u00f3t egy\u00fctt vizsg\u00e1lni, lehet\u0151leg term\u00e9kcsal\u00e1donk\u00e9nt:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Hat\u00e1rid\u0151re t\u00f6rt\u00e9n\u0151 sz\u00e1ll\u00edt\u00e1s:<\/strong> a kis mennyis\u00e9g\u0171 \u00e9s a szok\u00e1sost\u00f3l elt\u00e9r\u0151 rendel\u00e9seket az \u00edg\u00e9rt hat\u00e1rid\u0151re teljes\u00edtik, vagy ezek \u00fajra \u00e9s \u00fajra h\u00e1tr\u00e9bb ker\u00fclnek a sorban?<\/li><li><strong>\u00c1t\u00e1ll\u00edt\u00e1si r\u00e1ford\u00edt\u00e1s:<\/strong> a sz\u0171k\u00f6s kapacit\u00e1s\u00fa er\u0151forr\u00e1sok idej\u00e9b\u0151l mennyit k\u00f6t le az el\u0151k\u00e9sz\u00edt\u00e9s, \u00e9s mely term\u00e9kek k\u00f6z\u00f6tti \u00e1t\u00e1ll\u00e1sok em\u00e9sztik fel ezt az id\u0151t?<\/li><li><strong>\u00c1tfut\u00e1si id\u0151 \u00e9s befejezetlen termel\u00e9s:<\/strong> folyamatosan haladnak a rendel\u00e9sek a gy\u00e1rt\u00e1sban, vagy egyre t\u00f6bb id\u0151t t\u00f6ltenek v\u00e1rakoz\u00e1ssal a m\u0171veletek k\u00f6z\u00f6tt?<\/li><li><strong>Ism\u00e9tl\u0151d\u0151 rendel\u00e9sek \u00e1rr\u00e9se:<\/strong> az alkalmazott \u00e1r megfelel\u0151 fedezetet ny\u00fajt a t\u00e9nyleges el\u0151k\u00e9sz\u00edt\u00e9si, gy\u00e1rt\u00e1si \u00e9s ut\u00f3munkak\u00f6lts\u00e9gekre?<\/li><\/ul>\n\n\n<p>A gy\u00e1rt\u00e1stervez\u0151 munkaterhel\u00e9s\u00e9re is figyeljen. Ha a sz\u00e9lesebb v\u00e1laszt\u00e9k miatt minden d\u00e9lel\u0151tt a munkasorok \u00fajb\u00f3li \u00f6ssze\u00e1ll\u00edt\u00e1s\u00e1val telik, a v\u00e1llalkoz\u00e1sban a fizikai korl\u00e1tok mell\u00e9 egy adminisztrat\u00edv korl\u00e1t is ker\u00fclt.<\/p>\n\n\n<p>Az eredm\u00e9nyek alapj\u00e1n jav\u00edtson az el\u0151k\u00e9sz\u00edt\u00e9sen, vizsg\u00e1lja fel\u00fcl az adott term\u00e9kcsal\u00e1d kezel\u00e9s\u00e9nek szab\u00e1lyait, vagy m\u00f3dos\u00edtsa az \u00fctemez\u00e9si priorit\u00e1sokat. Nem az a c\u00e9l, hogy minden\u00e1ron a lehet\u0151 legsz\u00e9lesebb legyen a v\u00e1laszt\u00e9k, hanem hogy a v\u00e1llalkoz\u00e1s a vev\u0151k \u00e1ltal keresett term\u00e9keket fenntarthat\u00f3 k\u00f6lts\u00e9ggel \u00e9s \u00e1tfut\u00e1si id\u0151vel sz\u00e1ll\u00edtsa.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Tegye k\u00f6nnyebb\u00e9 a teljes term\u00e9kv\u00e1laszt\u00e9k sz\u00e1ll\u00edt\u00e1s\u00e1t<\/h2>\n\n\n<p>V\u00e1lassza a SkyPlannert, ha a sokf\u00e9le munka k\u00f6z\u00f6s er\u0151forr\u00e1sokon t\u00f6rt\u00e9n\u0151 \u00f6sszehangol\u00e1sa k\u00e9zzel m\u00e1r t\u00fal nagy terhet jelent. Az Arcturus elv\u00e9gzi az \u00fctemez\u00e9si sz\u00e1m\u00edt\u00e1sokat, az \u00e1t\u00e1ll\u00e1si ig\u00e9nyeket figyelembe vev\u0151 csoportos\u00edt\u00e1s cs\u00f6kkenti az elker\u00fclhet\u0151 \u00e1t\u00e1ll\u00e1sok sz\u00e1m\u00e1t, a k\u00f6z\u00f6s Gantt-n\u00e9zet pedig seg\u00edt abban, hogy a sz\u00e1ll\u00edt\u00e1si d\u00f6nt\u00e9sek \u00f6sszhangban maradjanak a gy\u00e1rt\u00e1ssal.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/hu\/kapcsolat-ertekesites\/\">Foglaljon SkyPlanner-bemutat\u00f3t<\/a>, \u00e9s hozzon p\u00e9ld\u00e1t k\u00e9t elt\u00e9r\u0151 term\u00e9kcsal\u00e1db\u00f3l: egy j\u00f3l ismert, rendszeresen gy\u00e1rtott term\u00e9ket \u00e9s egy olyan v\u00e1ltozatot, amely rendszeresen felbor\u00edtja a tervet. K\u00e9sz\u00fclj\u00f6n fel az el\u0151k\u00e9sz\u00edt\u00e9si ig\u00e9nyeikre, k\u00f6z\u00f6s er\u0151forr\u00e1saikra \u00e9s sz\u00e1ll\u00edt\u00e1si k\u00f6vetelm\u00e9nyeikre vonatkoz\u00f3 adatokkal. N\u00e9zze meg, hogyan hat a term\u00e9k\u00f6sszet\u00e9tel v\u00e1ltoz\u00e1sa az \u00fctemtervre, \u00e9s mit tehet ennek kezel\u00e9s\u00e9re.<\/p>\n\n\n<p>El\u0151bb ink\u00e1bb \u00f6n\u00e1ll\u00f3an ismerkedne a rendszerrel? <a href=\"https:\/\/skyplanner.ai\/hu\/proba\/\">Pr\u00f3b\u00e1lja ki a SkyPlannert mintaadatokkal<\/a>, \u00e9s n\u00e9zze meg, hogyan \u00e1llnak \u00f6ssze a rendel\u00e9sek, a priorit\u00e1sok \u00e9s a kapacit\u00e1sok egyetlen tervv\u00e9.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Sokf\u00e9le term\u00e9k kis sorozat\u00fa gy\u00e1rt\u00e1sa: ford\u00edtsa el\u0151ny\u00e9re a v\u00e1laszt\u00e9kot Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Sokf\u00e9le term\u00e9k kis sorozat\u00fa gy\u00e1rt\u00e1sa: ford\u00edtsa el\u0151ny\u00e9re a v\u00e1laszt\u00e9kot A sokf\u00e9le term\u00e9k kis sorozat\u00fa gy\u00e1rt\u00e1sa (HMLV) azt jelenti, hogy sz\u00e9les term\u00e9kv\u00e1laszt\u00e9kot \u00e1ll\u00edtanak el\u0151, de az egyes term\u00e9kekb\u0151l csak kis mennyis\u00e9get. Egy \u00fczem p\u00e9ld\u00e1ul sokf\u00e9le alkatr\u00e9szt, berendez\u00e9sv\u00e1ltozatot vagy speci\u00e1lis r\u00e9szegys\u00e9get gy\u00e1rthat an\u00e9lk\u00fcl, hogy &#8230; <a title=\"Sokf\u00e9le term\u00e9k kis sorozat\u00fa gy\u00e1rt\u00e1sa: ford\u00edtsa el\u0151ny\u00e9re a v\u00e1laszt\u00e9kot\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/sokfele-termek-kis-sorozatu-gyartasa\/\" aria-label=\"Read more about Sokf\u00e9le term\u00e9k kis sorozat\u00fa gy\u00e1rt\u00e1sa: ford\u00edtsa el\u0151ny\u00e9re a v\u00e1laszt\u00e9kot\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":99600,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2526,312],"tags":[],"class_list":["post-99581","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-es-utemezes","category-forrasok","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Sokf\u00e9le term\u00e9k kis sorozat\u00fa gy\u00e1rt\u00e1sa: a v\u00e1laszt\u00e9k el\u0151nye<\/title>\n<meta name=\"description\" content=\"Sz\u00e9les v\u00e1laszt\u00e9k az \u00e1rr\u00e9s \u00e9s a sz\u00e1ll\u00edt\u00e1sok k\u00e9zben tart\u00e1s\u00e1val. Mikor j\u00f3 a HMLV, \u00e9s hogyan seg\u00edt a SkyPlanner a v\u00e1ltoz\u00f3 term\u00e9k\u00f6sszet\u00e9tel \u00fctemez\u00e9s\u00e9ben?\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/sokfele-termek-kis-sorozatu-gyartasa\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Sokf\u00e9le term\u00e9k kis sorozat\u00fa gy\u00e1rt\u00e1sa: ford\u00edtsa el\u0151ny\u00e9re a v\u00e1laszt\u00e9kot\" \/>\n<meta property=\"og:description\" content=\"Sz\u00e9les v\u00e1laszt\u00e9k az \u00e1rr\u00e9s \u00e9s a sz\u00e1ll\u00edt\u00e1sok k\u00e9zben tart\u00e1s\u00e1val. Mikor j\u00f3 a HMLV, \u00e9s hogyan seg\u00edt a SkyPlanner a v\u00e1ltoz\u00f3 term\u00e9k\u00f6sszet\u00e9tel \u00fctemez\u00e9s\u00e9ben?\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/forrasok\/sokfele-termek-kis-sorozatu-gyartasa\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-16T03:54:21+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-16T03:55:12+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/high-mix-low-volume-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Szerz\u0151:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data2\" content=\"18 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/sokfele-termek-kis-sorozatu-gyartasa\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/sokfele-termek-kis-sorozatu-gyartasa\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Sokf\u00e9le term\u00e9k kis sorozat\u00fa gy\u00e1rt\u00e1sa: ford\u00edtsa el\u0151ny\u00e9re a v\u00e1laszt\u00e9kot\",\"datePublished\":\"2026-10-16T03:54:21+00:00\",\"dateModified\":\"2026-10-16T03:55:12+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/sokfele-termek-kis-sorozatu-gyartasa\\\/\"},\"wordCount\":3660,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/sokfele-termek-kis-sorozatu-gyartasa\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/high-mix-low-volume-manufacturing-hero.png\",\"articleSection\":[\"APS \u00e9s \u00fctemez\u00e9s\",\"forr\u00e1sok\"],\"inLanguage\":\"hu-HU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/sokfele-termek-kis-sorozatu-gyartasa\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/sokfele-termek-kis-sorozatu-gyartasa\\\/\",\"name\":\"Sokf\u00e9le term\u00e9k kis sorozat\u00fa gy\u00e1rt\u00e1sa: a v\u00e1laszt\u00e9k el\u0151nye\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/sokfele-termek-kis-sorozatu-gyartasa\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/sokfele-termek-kis-sorozatu-gyartasa\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/high-mix-low-volume-manufacturing-hero.png\",\"datePublished\":\"2026-10-16T03:54:21+00:00\",\"dateModified\":\"2026-10-16T03:55:12+00:00\",\"description\":\"Sz\u00e9les v\u00e1laszt\u00e9k az \u00e1rr\u00e9s \u00e9s a sz\u00e1ll\u00edt\u00e1sok k\u00e9zben tart\u00e1s\u00e1val. Mikor j\u00f3 a HMLV, \u00e9s hogyan seg\u00edt a SkyPlanner a v\u00e1ltoz\u00f3 term\u00e9k\u00f6sszet\u00e9tel \u00fctemez\u00e9s\u00e9ben?\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/sokfele-termek-kis-sorozatu-gyartasa\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/sokfele-termek-kis-sorozatu-gyartasa\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/sokfele-termek-kis-sorozatu-gyartasa\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/high-mix-low-volume-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/high-mix-low-volume-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Small groups of different control-unit variants share preparation and testing resources.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/sokfele-termek-kis-sorozatu-gyartasa\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Sokf\u00e9le term\u00e9k kis sorozat\u00fa gy\u00e1rt\u00e1sa: ford\u00edtsa el\u0151ny\u00e9re a v\u00e1laszt\u00e9kot\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Sokf\u00e9le term\u00e9k kis sorozat\u00fa gy\u00e1rt\u00e1sa: a v\u00e1laszt\u00e9k el\u0151nye","description":"Sz\u00e9les v\u00e1laszt\u00e9k az \u00e1rr\u00e9s \u00e9s a sz\u00e1ll\u00edt\u00e1sok k\u00e9zben tart\u00e1s\u00e1val. Mikor j\u00f3 a HMLV, \u00e9s hogyan seg\u00edt a SkyPlanner a v\u00e1ltoz\u00f3 term\u00e9k\u00f6sszet\u00e9tel \u00fctemez\u00e9s\u00e9ben?","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/forrasok\/sokfele-termek-kis-sorozatu-gyartasa\/","og_locale":"hu_HU","og_type":"article","og_title":"Sokf\u00e9le term\u00e9k kis sorozat\u00fa gy\u00e1rt\u00e1sa: ford\u00edtsa el\u0151ny\u00e9re a v\u00e1laszt\u00e9kot","og_description":"Sz\u00e9les v\u00e1laszt\u00e9k az \u00e1rr\u00e9s \u00e9s a sz\u00e1ll\u00edt\u00e1sok k\u00e9zben tart\u00e1s\u00e1val. Mikor j\u00f3 a HMLV, \u00e9s hogyan seg\u00edt a SkyPlanner a v\u00e1ltoz\u00f3 term\u00e9k\u00f6sszet\u00e9tel \u00fctemez\u00e9s\u00e9ben?","og_url":"https:\/\/skyplanner.ai\/hu\/forrasok\/sokfele-termek-kis-sorozatu-gyartasa\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-16T03:54:21+00:00","article_modified_time":"2026-10-16T03:55:12+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/high-mix-low-volume-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Szerz\u0151:":"Jussi M\u00e4ntyl\u00e4","Becs\u00fclt olvas\u00e1si id\u0151":"18 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/sokfele-termek-kis-sorozatu-gyartasa\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/sokfele-termek-kis-sorozatu-gyartasa\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Sokf\u00e9le term\u00e9k kis sorozat\u00fa gy\u00e1rt\u00e1sa: ford\u00edtsa el\u0151ny\u00e9re a v\u00e1laszt\u00e9kot","datePublished":"2026-10-16T03:54:21+00:00","dateModified":"2026-10-16T03:55:12+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/sokfele-termek-kis-sorozatu-gyartasa\/"},"wordCount":3660,"publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/sokfele-termek-kis-sorozatu-gyartasa\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/high-mix-low-volume-manufacturing-hero.png","articleSection":["APS \u00e9s \u00fctemez\u00e9s","forr\u00e1sok"],"inLanguage":"hu-HU"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/sokfele-termek-kis-sorozatu-gyartasa\/","url":"https:\/\/skyplanner.ai\/hu\/forrasok\/sokfele-termek-kis-sorozatu-gyartasa\/","name":"Sokf\u00e9le term\u00e9k kis sorozat\u00fa gy\u00e1rt\u00e1sa: a v\u00e1laszt\u00e9k el\u0151nye","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/sokfele-termek-kis-sorozatu-gyartasa\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/sokfele-termek-kis-sorozatu-gyartasa\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/high-mix-low-volume-manufacturing-hero.png","datePublished":"2026-10-16T03:54:21+00:00","dateModified":"2026-10-16T03:55:12+00:00","description":"Sz\u00e9les v\u00e1laszt\u00e9k az \u00e1rr\u00e9s \u00e9s a sz\u00e1ll\u00edt\u00e1sok k\u00e9zben tart\u00e1s\u00e1val. Mikor j\u00f3 a HMLV, \u00e9s hogyan seg\u00edt a SkyPlanner a v\u00e1ltoz\u00f3 term\u00e9k\u00f6sszet\u00e9tel \u00fctemez\u00e9s\u00e9ben?","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/sokfele-termek-kis-sorozatu-gyartasa\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/forrasok\/sokfele-termek-kis-sorozatu-gyartasa\/"]}]},{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/sokfele-termek-kis-sorozatu-gyartasa\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/high-mix-low-volume-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/high-mix-low-volume-manufacturing-hero.png","width":1672,"height":941,"caption":"Small groups of different control-unit variants share preparation and testing resources."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/sokfele-termek-kis-sorozatu-gyartasa\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"Sokf\u00e9le term\u00e9k kis sorozat\u00fa gy\u00e1rt\u00e1sa: ford\u00edtsa el\u0151ny\u00e9re a v\u00e1laszt\u00e9kot"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/high-mix-low-volume-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/high-mix-low-volume-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/high-mix-low-volume-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/high-mix-low-volume-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/high-mix-low-volume-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/high-mix-low-volume-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/high-mix-low-volume-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/high-mix-low-volume-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Sokf\u00e9le term\u00e9k kis sorozat\u00fa gy\u00e1rt\u00e1sa: ford\u00edtsa el\u0151ny\u00e9re a v\u00e1laszt\u00e9kot Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Sokf\u00e9le term\u00e9k kis sorozat\u00fa gy\u00e1rt\u00e1sa: ford\u00edtsa el\u0151ny\u00e9re a v\u00e1laszt\u00e9kot A sokf\u00e9le term\u00e9k kis sorozat\u00fa gy\u00e1rt\u00e1sa (HMLV) azt jelenti, hogy sz\u00e9les term\u00e9kv\u00e1laszt\u00e9kot \u00e1ll\u00edtanak el\u0151, de az egyes term\u00e9kekb\u0151l csak kis mennyis\u00e9get. Egy \u00fczem p\u00e9ld\u00e1ul sokf\u00e9le alkatr\u00e9szt, berendez\u00e9sv\u00e1ltozatot vagy speci\u00e1lis r\u00e9szegys\u00e9get gy\u00e1rthat an\u00e9lk\u00fcl, hogy&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/99581","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=99581"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/99581\/revisions"}],"predecessor-version":[{"id":99640,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/99581\/revisions\/99640"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media\/99600"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=99581"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/categories?post=99581"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/tags?post=99581"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}