{"id":99320,"date":"2026-10-15T20:34:27","date_gmt":"2026-10-15T20:34:27","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=99320"},"modified":"2026-10-19T15:12:41","modified_gmt":"2026-10-19T15:12:41","slug":"keszletre-gyartas","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/hu\/forrasok\/keszletre-gyartas\/","title":{"rendered":"K\u00e9szletre gy\u00e1rt\u00e1s: ut\u00e1np\u00f3tl\u00e1s, miel\u0151tt a vev\u0151nek v\u00e1rnia kell"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">K\u00e9szletre gy\u00e1rt\u00e1s: ut\u00e1np\u00f3tl\u00e1s, miel\u0151tt a vev\u0151nek v\u00e1rnia kell<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/hu\/\">Kezd\u0151lap<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/\">Er\u0151forr\u00e1sok<\/a> &raquo; K\u00e9szletre gy\u00e1rt\u00e1s: ut\u00e1np\u00f3tl\u00e1s, miel\u0151tt a vev\u0151nek v\u00e1rnia kell<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Becs\u00fclt olvas\u00e1si id\u0151: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> perc<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Egy vev\u0151 holnapra k\u00e9r egy standard term\u00e9ket. Ha az m\u00e1r rakt\u00e1ron van, el\u0151 lehet k\u00e9sz\u00edteni a sz\u00e1ll\u00edtm\u00e1nyt, \u00e9s nem kell arra k\u00e9rni a vev\u0151t, hogy v\u00e1rja meg a gy\u00e1rt\u00e1st. \u00c9ppen ez a k\u00e9szletre gy\u00e1rt\u00e1s vonzereje: a term\u00e9k m\u00e9g a megrendel\u00e9s be\u00e9rkez\u00e9se el\u0151tt elk\u00e9sz\u00fcl.<\/p>\n\n\n<p>A nehezebb d\u00f6nt\u00e9seket azonban m\u00e9g az \u00e9rt\u00e9kes\u00edt\u00e9s el\u0151tt kell meghozni. Mely term\u00e9kekb\u0151l \u00e9rdemes k\u00e9szterm\u00e9kk\u00e9szletet tartani, mennyit kell gy\u00e1rtani bel\u0151l\u00fck, \u00e9s mikorra kell elk\u00e9sz\u00fclnie a k\u00f6vetkez\u0151 t\u00e9telnek? A rosszul megv\u00e1lasztott v\u00e1ltozat k\u00e9szletez\u00e9se t\u0151k\u00e9t k\u00f6t le. Ha pedig a megfelel\u0151 v\u00e1ltozat ut\u00e1np\u00f3tl\u00e1sa k\u00e9sik, elv\u00e9sz az a sz\u00e1ll\u00edt\u00e1si el\u0151ny, amely\u00e9rt a k\u00e9szlettart\u00e1s k\u00f6lts\u00e9g\u00e9t v\u00e1llaltuk.<\/p>\n\n\n<p>A j\u00f3l haszn\u00e1lhat\u00f3 MTS-terv ezeket a d\u00f6nt\u00e9seket az \u00fczem t\u00e9nyleges terhel\u00e9s\u00e9hez igaz\u00edtja. A SkyPlanner APS seg\u00edt az ut\u00e1np\u00f3tl\u00e1st az ugyanazokat a g\u00e9peket \u00e9s dolgoz\u00f3kat ig\u00e9nyl\u0151 t\u00f6bbi gy\u00e1rt\u00e1si feladattal egy\u00fctt \u00fctemezni. \u00cdgy a k\u00e9szletre gy\u00e1rt\u00e1s re\u00e1lis helyet kap a tervben, nem csup\u00e1n a s\u00fcrg\u0151s rendel\u00e9sek ut\u00e1n megmarad\u00f3 id\u0151 jut r\u00e1.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mi a k\u00e9szletre gy\u00e1rt\u00e1s?<\/h2>\n\n\n<p>A k\u00e9szletre gy\u00e1rt\u00e1s (MTS) olyan termel\u00e9si strat\u00e9gia, amelyben a gy\u00e1rt\u00f3 a v\u00e1rhat\u00f3 keresletre k\u00e9sz\u00edt k\u00e9szterm\u00e9keket, m\u00e9g az ezekkel teljes\u00edtend\u0151 konkr\u00e9t vev\u0151i megrendel\u00e9sek be\u00e9rkez\u00e9se el\u0151tt. A vev\u0151ket ezut\u00e1n a rendelkez\u00e9sre \u00e1ll\u00f3 k\u00e9szterm\u00e9kk\u00e9szletb\u0151l szolg\u00e1lja ki.<\/p>\n\n\n<p>A gy\u00e1rt\u00e1st el\u0151rejelz\u00e9s, k\u00e9szlet-ut\u00e1np\u00f3tl\u00e1si szab\u00e1lyzat, illetve a v\u00e1rhat\u00f3 kereslet \u00e9s a vev\u0151i v\u00e1llal\u00e1sok egy\u00fcttese is vez\u00e9relheti. A l\u00e9nyeg az, hogy a gy\u00e1rt\u00e1s elind\u00edt\u00e1s\u00e1hoz nem kell minden egyes vev\u0151i megrendel\u00e9st megv\u00e1rni.<\/p>\n\n\n<p>K\u00e9pzelj\u00fcnk el egy gy\u00e1rt\u00f3t, amely standard cseresz\u0171r\u0151ket \u00e9rt\u00e9kes\u00edt. A vev\u0151k rendszeresen ugyanazokat a kiviteleket v\u00e1s\u00e1rolj\u00e1k, \u00e9s gyors felad\u00e1st v\u00e1rnak el. A gy\u00e1rt\u00f3 m\u00e9g a megrendel\u00e9sek el\u0151tt elk\u00e9sz\u00edti ezeket a sz\u0171r\u0151ket, majd a fogy\u00e1s \u00fctem\u00e9ben p\u00f3tolja a k\u00e9szterm\u00e9kk\u00e9szletet. Egy bizonytalan kereslet\u0171, egyedi sz\u0171r\u0151t viszont lehet, hogy csak akkor gy\u00e1rt le, amikor azt egy vev\u0151 megrendeli.<\/p>\n\n\n<p>Az MTS-t gyakran tol\u00f3elv\u0171 strat\u00e9gi\u00e1nak nevezik, mert a gy\u00e1rt\u00e1st a v\u00e1rhat\u00f3 kereslet ind\u00edtja el, m\u00e9g az \u00e9rt\u00e9kes\u00edt\u00e9s el\u0151tt. Ez nem azt jelenti, hogy minden g\u00e9pet teljes kapacit\u00e1ssal j\u00e1ratunk, majd rem\u00e9nyked\u00fcnk a term\u00e9kek elad\u00e1s\u00e1ban. Az \u00fczleti c\u00e9l a rendelkez\u00e9sre \u00e1ll\u00e1s: elegend\u0151 k\u00e9szterm\u00e9ket tartani a megfelel\u0151 v\u00e1laszt\u00e9kb\u00f3l a vev\u0151k kiszolg\u00e1l\u00e1s\u00e1hoz, an\u00e9lk\u00fcl, hogy k\u00f6lts\u00e9ges, lassan forg\u00f3 k\u00e9szletet halmozn\u00e1nk fel.<\/p>\n\n\n<h3 class=\"wp-block-heading\">K\u00e9szletre gy\u00e1rt\u00e1s vagy rendel\u00e9sre gy\u00e1rt\u00e1s<\/h3>\n\n\n<p>A k\u00fcl\u00f6nbs\u00e9g abban \u00e1ll, hogy mi ind\u00edtja el a gy\u00e1rt\u00e1st, \u00e9s mire kell v\u00e1rnia a vev\u0151nek.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Szempont<\/th><th>K\u00e9szletre gy\u00e1rt\u00e1s<\/th><th>Rendel\u00e9sre gy\u00e1rt\u00e1s<\/th><\/tr><\/thead><tbody><tr><td>Mi ind\u00edtja el a gy\u00e1rt\u00e1st?<\/td><td>V\u00e1rhat\u00f3 kereslet vagy a k\u00e9szterm\u00e9kk\u00e9szlet p\u00f3tl\u00e1s\u00e1nak ig\u00e9nye<\/td><td>Konkr\u00e9t vev\u0151i megrendel\u00e9s<\/td><\/tr><tr><td>Mire v\u00e1r a vev\u0151?<\/td><td>Kiszed\u00e9sre, csomagol\u00e1sra \u00e9s felad\u00e1sra, ha a sz\u00fcks\u00e9ges k\u00e9szlet rendelkez\u00e9sre \u00e1ll<\/td><td>A gy\u00e1rt\u00e1sra \u00e9s a kisz\u00e1ll\u00edt\u00e1s el\u0151k\u00e9sz\u00edt\u00e9s\u00e9re is<\/td><\/tr><tr><td>F\u0151 kock\u00e1zat<\/td><td>Eladatlan, elavult vagy lej\u00e1rt k\u00e9szterm\u00e9kk\u00e9szlet<\/td><td>Az \u00e9rt\u00e9kes\u00edt\u00e9st k\u00f6vet\u0151 sorban \u00e1ll\u00e1s \u00e9s gy\u00e1rt\u00e1si \u00e1tfut\u00e1si id\u0151<\/td><\/tr><tr><td>Mikor c\u00e9lszer\u0171 alkalmazni?<\/td><td>Gyors kiszolg\u00e1l\u00e1st ig\u00e9nyl\u0151, standard term\u00e9kek ir\u00e1nti ism\u00e9tl\u0151d\u0151 kereslet eset\u00e9n<\/td><td>Kev\u00e9sb\u00e9 kisz\u00e1m\u00edthat\u00f3 kereslet\u0171 v\u00e1ltozatok vagy vev\u0151specifikus ig\u00e9nyek eset\u00e9n<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Egy \u00fczemen bel\u00fcl mindkett\u0151 alkalmazhat\u00f3: a standard v\u00e1laszt\u00e9k k\u00e9szleten tarthat\u00f3, a <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesre-gyartas\/\">ritk\u00e1bb v\u00e1ltozatok pedig rendel\u00e9sre gy\u00e1rthat\u00f3k<\/a>. Ezek a term\u00e9kek ett\u0151l m\u00e9g ugyanazok\u00e9rt a gy\u00e1rt\u00e1si er\u0151forr\u00e1sok\u00e9rt versenyezhetnek, ez\u00e9rt az \u00fctemtervben mindk\u00e9t t\u00edpus\u00fa munk\u00e1t egy\u00fctt kell kezelni.<\/p>\n\n\n<p>Az MTS nem azonos a t\u00f6meggy\u00e1rt\u00e1ssal sem. Azt \u00edrja le, hogy mi\u00e9rt indul el a gy\u00e1rt\u00e1s; a <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/szakaszos-gyartas\/\">t\u00e9teles<\/a>, a t\u00f6meg- \u00e9s a folyamatos gy\u00e1rt\u00e1s viszont a munka megszervez\u00e9s\u00e9nek m\u00f3dj\u00e1t jel\u00f6li. Egy ut\u00e1np\u00f3tl\u00e1si t\u00e9tel akkor is k\u00e9szletre k\u00e9sz\u00fclhet, ha az \u00fczem kis mennyis\u00e9g\u0171, vev\u0151specifikus rendel\u00e9seket is teljes\u00edt.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mikor \u00e9ri meg k\u00e9szletre gy\u00e1rtani?<\/h2>\n\n\n<p>Az MTS alkalmaz\u00e1s\u00e1r\u00f3l term\u00e9kenk\u00e9nt vagy term\u00e9kcsal\u00e1donk\u00e9nt \u00e9rdemes d\u00f6nteni, nem puszt\u00e1n az \u00fczem hagyom\u00e1nyos m\u0171k\u00f6d\u00e9s\u00e9t k\u00f6vetve. A megalapozott v\u00e1laszt\u00e1shoz n\u00e9gy k\u00e9rd\u00e9st c\u00e9lszer\u0171 feltenni.<\/p>\n\n\n<p><strong>Rendszeresen azonos kivitel\u0171 term\u00e9keket v\u00e1s\u00e1rolnak a vev\u0151k?<\/strong> Egy \u00e1lland\u00f3 standard v\u00e1laszt\u00e9kb\u00f3l k\u00f6nnyebb k\u00e9szletet tartani, mint t\u00f6bb sz\u00e1z, ritk\u00e1n keresett kombin\u00e1ci\u00f3b\u00f3l. Egy term\u00e9kcsal\u00e1d ir\u00e1nti er\u0151s kereslet m\u00e9g nem jelenti azt, hogy minden m\u00e9ret, sz\u00edn vagy fel\u00fcletkialak\u00edt\u00e1s egyform\u00e1n j\u00f3l fogy.<\/p>\n\n\n<p><strong>El\u00e9g j\u00f3l el\u0151re jelezhet\u0151 a kereslet az ut\u00e1np\u00f3tl\u00e1s \u00e1tfut\u00e1si idej\u00e9re?<\/strong> Megb\u00edzhat\u00f3 k\u00e9pre van sz\u00fcks\u00e9g arr\u00f3l, hogy mennyi fogy el, mire egy \u00fajabb t\u00e9tel el\u00e9rhet\u0151v\u00e9 v\u00e1lik. A kor\u00e1bbi \u00e9rt\u00e9kes\u00edt\u00e9si adatok seg\u00edtenek, de az akci\u00f3k, a szezon\u00e1lis v\u00e1ltoz\u00e1sok \u00e9s az ismert vev\u0151i v\u00e1llal\u00e1sok m\u00f3dos\u00edthatj\u00e1k a k\u00e9pet. Ne csak a teljes \u00e9rt\u00e9kes\u00edt\u00e9si mennyis\u00e9get vizsg\u00e1ljuk, hanem annak term\u00e9kenk\u00e9nti \u00f6sszet\u00e9tel\u00e9t is.<\/p>\n\n\n<p><strong>Megv\u00e1rj\u00e1k a vev\u0151k a gy\u00e1rt\u00e1st?<\/strong> Ha a piac gyorsabb felad\u00e1st v\u00e1r el, mint amennyi id\u0151 alatt a gy\u00e1rt\u00e1si folyamat megb\u00edzhat\u00f3an befejezhet\u0151, az el\u0151re gy\u00e1rt\u00e1s seg\u00edthet \u00faj megrendel\u00e9seket szerezni \u00e9s megtartani a vev\u0151ket. Ha a vev\u0151k elfogadj\u00e1k a gy\u00e1rt\u00e1si \u00e1tfut\u00e1si id\u0151t, a k\u00e9szterm\u00e9kk\u00e9szlet tart\u00e1sa kisebb \u00e9rt\u00e9ket jelenthet.<\/p>\n\n\n<p><strong>Meg\u0151rzi a term\u00e9k a haszn\u00e1lhat\u00f3s\u00e1g\u00e1t a t\u00e1rol\u00e1s sor\u00e1n?<\/strong> Az eltarthat\u00f3s\u00e1g, a m\u0171szaki m\u00f3dos\u00edt\u00e1sok, a t\u00e1rol\u00e1si k\u00f6r\u00fclm\u00e9nyek \u00e9s a k\u00e9szletben lek\u00f6t\u00f6tt t\u0151ke egyar\u00e1nt sz\u00e1m\u00edtanak. Az azonnal el\u00e9rhet\u0151 term\u00e9k csak akkor \u00e9rt\u00e9kes, ha tov\u00e1bbra is az, amit a vev\u0151 keres.<\/p>\n\n\n<p>Az MTS hat\u00e9kony gy\u00e1rt\u00e1si sorozatokkal \u00e9s kevesebb \u00e1t\u00e1ll\u00e1ssal cs\u00f6kkentheti a gy\u00e1rt\u00e1si k\u00f6lts\u00e9get. Azt is lehet\u0151v\u00e9 teheti, hogy a vev\u0151nek ne kelljen kiv\u00e1rnia a gy\u00e1rt\u00e1si \u00e1tfut\u00e1si id\u0151t a sz\u00e1ll\u00edt\u00e1sig. Ezeknek az el\u0151ny\u00f6knek azonban meg kell haladniuk a t\u00e1rol\u00e1s, az anyagmozgat\u00e1s, a finansz\u00edroz\u00e1s \u00e9s a k\u00e9szletvesztes\u00e9g k\u00f6lts\u00e9geit. Az olcs\u00f3bban el\u0151\u00e1ll\u00edtott, de soha el nem adott term\u00e9k nem jelent megtakar\u00edt\u00e1st.<\/p>\n\n\n<p>Vegyes term\u00e9kv\u00e1laszt\u00e9kn\u00e1l gyakran \u00e9szszer\u0171bb term\u00e9kenk\u00e9nt elt\u00e9r\u0151 szab\u00e1lyokat alkalmazni, mint az eg\u00e9sz \u00fczemre egyetlen m\u00f3dszert kijel\u00f6lni: p\u00f3toljuk a megb\u00edzhat\u00f3an fogy\u00f3 term\u00e9keket, vizsg\u00e1ljuk fel\u00fcl a tart\u00f3san rakt\u00e1ron marad\u00f3kat, \u00e9s v\u00e1lasszunk m\u00e1s gy\u00e1rt\u00e1si strat\u00e9gi\u00e1t ott, ahol t\u00fal bizonytalan a kereslet.<\/p>\n\n\n<h2 class=\"wp-block-heading\">A v\u00e1rhat\u00f3 kereslett\u0151l a k\u00f6vetkez\u0151 ut\u00e1np\u00f3tl\u00e1si t\u00e9telig<\/h2>\n\n\n<p>Az MTS a gyakorlatban ism\u00e9tl\u0151d\u0151 folyamat: \u00e1ttekintj\u00fck a keresletet \u00e9s a felhaszn\u00e1lhat\u00f3 k\u00e9szletet, d\u00f6nt\u00fcnk az ut\u00e1np\u00f3tl\u00e1sr\u00f3l, \u00fctemezz\u00fck azt, majd a fogy\u00e1s \u00e9s a gy\u00e1rt\u00e1s v\u00e1ltoz\u00e1saihoz igaz\u00edtjuk a tervet.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Tiszt\u00e1zzuk, mi \u00e1ll t\u00e9nylegesen rendelkez\u00e9sre<\/h3>\n\n\n<p>K\u00fcl\u00f6n\u00edts\u00fck el a felhaszn\u00e1lhat\u00f3 k\u00e9szterm\u00e9kk\u00e9szletet a m\u00e1r lefoglalt, felszabad\u00edt\u00e1sra v\u00e1r\u00f3 vagy m\u00e1s okb\u00f3l nem el\u00e9rhet\u0151 mennyis\u00e9gekt\u0151l. A nyitott gy\u00e1rt\u00e1si rendel\u00e9seket is ellen\u0151rizz\u00fck: egy m\u00e1r gy\u00e1rt\u00e1sban l\u00e9v\u0151 t\u00e9tel k\u00e9s\u0151bbi ut\u00e1np\u00f3tl\u00e1st jelent, nem pedig okot arra, hogy ugyanazt a mennyis\u00e9get \u00fajra gy\u00e1rt\u00e1sba adjuk.<\/p>\n\n\n<p>Azt is n\u00e9zz\u00fck meg, mikorra k\u00e9sz\u00fcl el ez az ut\u00e1np\u00f3tl\u00e1s. Ha egy t\u00e9tel csak a k\u00e9szlet v\u00e1rhat\u00f3 kifogy\u00e1sa ut\u00e1n k\u00e9sz\u00fcl el, att\u00f3l m\u00e9g nem biztos\u00edtja a kor\u00e1bbi sz\u00e1ll\u00edt\u00e1sokat, hogy a mennyis\u00e9ge m\u00e1r szerepel a rendszerben.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Hat\u00e1rozzuk meg a mennyis\u00e9get \u00e9s a rendelkez\u00e9sre \u00e1ll\u00e1s d\u00e1tum\u00e1t<\/h3>\n\n\n<p>A meghat\u00e1rozott k\u00e9szletez\u00e9si szab\u00e1lyok alapj\u00e1n d\u00f6ntse el, mely term\u00e9kek k\u00e9szlet\u00e9t kell felt\u00f6lteni. Rendel\u00e9si pont alkalmaz\u00e1sakor a k\u00e9szletszint egy k\u00fcsz\u00f6b\u00e9rt\u00e9k el\u00e9r\u00e9sekor fel\u00fclvizsg\u00e1latot ind\u00edthat el; id\u0151szakos fel\u00fclvizsg\u00e1lat eset\u00e9n a k\u00e9szletfelt\u00f6lt\u00e9s el\u0151re meghat\u00e1rozott id\u0151k\u00f6z\u00f6nk\u00e9nt tervezhet\u0151. A <a href=\"\/hu\/forrasok\/biztonsagi-keszlet\/\">biztons\u00e1gi k\u00e9szlet<\/a> tartal\u00e9kot ny\u00fajt a bizonytalans\u00e1gok kezel\u00e9s\u00e9hez. Ezek egyike sem teszi azonban sz\u00fcks\u00e9gtelenn\u00e9 a kereslet, a gy\u00e1rt\u00e1si \u00e1tfut\u00e1si id\u0151 \u00e9s a megl\u00e9v\u0151 k\u00e9szlet ellen\u0151rz\u00e9s\u00e9t.<\/p>\n\n\n<p>A d\u00f6nt\u00e9s alapj\u00e1n adjuk meg a gy\u00e1rt\u00e1shoz sz\u00fcks\u00e9ges konkr\u00e9t adatokat: melyik term\u00e9kb\u0151l mekkora mennyis\u00e9gre van sz\u00fcks\u00e9g, \u00e9s mikorra kell a k\u00e9szterm\u00e9keknek rendelkez\u00e9sre \u00e1llniuk. Sz\u00e1moljunk a gy\u00e1rt\u00e1si m\u0171veletekkel, valamint minden olyan ellen\u0151rz\u00e9ssel, felszabad\u00edt\u00e1ssal \u00e9s csomagol\u00e1ssal, amely sz\u00fcks\u00e9ges ahhoz, hogy a term\u00e9kekkel megrendel\u00e9seket lehessen teljes\u00edteni.<\/p>\n\n\n<p>A <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/master-production-schedule\/\">termel\u00e9si f\u0151terv<\/a> \u00e1tfog\u00f3bb, id\u0151szakokra bontott k\u00e9pet ad a kiv\u00e1lasztott term\u00e9kekr\u0151l \u00e9s mennyis\u00e9gekr\u0151l. A k\u00f6vetkez\u0151 k\u00e9rd\u00e9s m\u00e1r k\u00f6zvetlenebb: id\u0151ben v\u00e9gig tud-e haladni ez az ut\u00e1np\u00f3tl\u00e1si t\u00e9tel a gy\u00e1rt\u00e1si \u00fatvonal\u00e1n?<\/p>\n\n\n<h3 class=\"wp-block-heading\">Vizsg\u00e1ljuk meg a t\u00e9telt a t\u00f6bbi gy\u00e1rt\u00e1si feladattal egy\u00fctt<\/h3>\n\n\n<p>Vegy\u00fck figyelembe az ugyanazokat az er\u0151forr\u00e1sokat m\u00e1r ig\u00e9nybe vev\u0151 t\u00f6bbi gy\u00e1rt\u00e1si feladatot is, ne csak a t\u00f6bbi MTS-t\u00e9telt. Ellen\u0151rizz\u00fck az anyagokat, az alkalmas munka\u00e1llom\u00e1sokat, a m\u0171szakokat, a g\u00e9pkezel\u0151k rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1t, a megmunk\u00e1l\u00e1si id\u0151t \u00e9s az \u00e1t\u00e1ll\u00e1sokat. K\u00f6vess\u00fck v\u00e9gig a gy\u00e1rt\u00e1si \u00fatvonal k\u00e9s\u0151bbi m\u0171veleteit is: az els\u0151 g\u00e9pen t\u00f6rt\u00e9n\u0151 korai kezd\u00e9s m\u00e9g nem jelent id\u0151ben rendelkez\u00e9sre \u00e1ll\u00f3 k\u00e9szterm\u00e9ket.<\/p>\n\n\n<p>Egy nagyobb gy\u00e1rt\u00e1si sorozat t\u00f6bb darabra oszthatja sz\u00e9t az \u00e1t\u00e1ll\u00e1s k\u00f6lts\u00e9g\u00e9t, de hosszabb id\u0151re foglalja le a kapacit\u00e1st, \u00e9s nagyobb k\u00e9szletet is hoz l\u00e9tre. Olyan mennyis\u00e9get v\u00e1lasszunk, amely illeszkedik a k\u00e9szletez\u00e9si szab\u00e1lyokhoz \u00e9s a gy\u00e1rt\u00e1si helyzethez, ne csup\u00e1n az\u00e9rt terhelj\u00fcnk le egy g\u00e9pet, mert ma \u00e9ppen szabad.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mi\u00e9rt kell helyet kapnia az ut\u00e1np\u00f3tl\u00e1snak a k\u00f6z\u00f6s \u00fctemtervben?<\/h2>\n\n\n<p>K\u00e9pzelj\u00fcnk el egy gy\u00e1rt\u00f3t, amely standard t\u00e1rol\u00f3ed\u00e9nyeket tart k\u00e9szleten, mik\u00f6zben k\u00fcl\u00f6nleges v\u00e1ltozatokat rendel\u00e9sre k\u00e9sz\u00edt. A k\u00f6vetkez\u0151 standard t\u00e9telre m\u00e9g a jelenlegi k\u00e9szlet v\u00e1rhat\u00f3 kifogy\u00e1sa el\u0151tt sz\u00fcks\u00e9g van. A t\u00e9telnek az alak\u00edt\u00e1son, majd egy k\u00f6z\u00f6sen haszn\u00e1lt csomagol\u00f3soron kell v\u00e9gighaladnia.<\/p>\n\n\n<p>Ekkor be\u00e9rkezik egy kis mennyis\u00e9g\u0171, s\u00fcrg\u0151s rendel\u00e9s egy k\u00fcl\u00f6nleges v\u00e1ltozatra. Konkr\u00e9t vev\u0151 \u00e9s v\u00e1llalt felad\u00e1si d\u00e1tum tartozik hozz\u00e1. Az ut\u00e1np\u00f3tl\u00e1si t\u00e9telhez m\u00e9g nem kapcsol\u00f3dnak egyedi vev\u0151k, ez\u00e9rt \u00e1rtalmatlannak t\u0171nik k\u00e9s\u0151bbre tolni.<\/p>\n\n\n<p>Az alak\u00edt\u00e1s m\u00e9g belef\u00e9r. A csomagol\u00e1s m\u00e1r nem. Miut\u00e1n a s\u00fcrg\u0151s rendel\u00e9s elfoglalja a hely\u00e9t, a standard t\u00e9tel t\u00fal k\u00e9s\u0151n k\u00e9sz\u00fcl el ahhoz, hogy a v\u00e1rhat\u00f3 hi\u00e1ny el\u0151tt p\u00f3tolja a k\u00e9szletet. A mai s\u00fcrg\u0151s sz\u00e1ll\u00edt\u00e1s \u00e9szrev\u00e9tlen\u00fcl megteremtette a holnapi ell\u00e1t\u00e1si probl\u00e9m\u00e1t.<\/p>\n\n\n<p>Nem mindig az a helyes megold\u00e1s, hogy az ut\u00e1np\u00f3tl\u00e1st vessz\u00fck el\u0151re. M\u00f3dos\u00edthatjuk a sorrendet, ig\u00e9nybe vehet\u00fcnk egy m\u00e1sik alkalmas er\u0151forr\u00e1st, beiktathatunk egy j\u00f3v\u00e1hagyott m\u0171szakot, vagy m\u00f3dos\u00edthatunk egy v\u00e1llal\u00e1st. Az a fontos, hogy m\u00e1r a d\u00f6nt\u00e9s el\u0151tt l\u00e1ssuk a k\u00f6vetkezm\u00e9nyeket.<\/p>\n\n\n<p><strong>A k\u00e9szletre gy\u00e1rt\u00e1si rendel\u00e9s priorit\u00e1s\u00e1t az hat\u00e1rozza meg, hogy milyen term\u00e9kell\u00e1t\u00e1st biztos\u00edt, ne az, hogy nem tartozik hozz\u00e1 vev\u0151n\u00e9v.<\/strong> Az \u00fcres polc t\u00f6bb k\u00e9s\u0151bbi rendel\u00e9st is \u00e9rinthet, m\u00edg egy ut\u00e1np\u00f3tl\u00e1si t\u00e9tel biztons\u00e1ggal v\u00e1rhat, ha a megl\u00e9v\u0151 k\u00e9szlet m\u00e9g b\u0151s\u00e9gesen fedezi a v\u00e1rhat\u00f3 fogy\u00e1st. A tervez\u0151nek egyszerre kell l\u00e1tnia az ut\u00e1np\u00f3tl\u00e1si ig\u00e9nyt \u00e9s a vele verseng\u0151 gy\u00e1rt\u00e1si feladatokat.<\/p>\n\n\n<h2 class=\"wp-block-heading\">B\u00edzza az id\u0151z\u00edt\u00e9s kisz\u00e1m\u00edt\u00e1s\u00e1t a SkyPlanner rendszerre, \u00e9s \u00f6sszpontos\u00edtson a term\u00e9kell\u00e1t\u00e1sra<\/h2>\n\n\n<p>A SkyPlanner egyetlen gy\u00e1rt\u00e1si \u00fctemtervben kezeli a munka\u00e1llom\u00e1sokat, a m\u0171szakokat, a g\u00e9pkezel\u0151ket, az anyagokat \u00e9s a priorit\u00e1sokat. \u00dctemez\u0151 mesters\u00e9ges intelligenci\u00e1ja, az Arcturus a be\u00e1ll\u00edtott kapacit\u00e1s, f\u00fcgg\u0151s\u00e9gek \u00e9s \u00fctemez\u00e9si szab\u00e1lyok alapj\u00e1n sz\u00e1m\u00edtja ki, hov\u00e1 illeszthet\u0151k be a m\u0171veletek. A <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/gantt-diagram-a-termeles-tervezesehez\/\">Gantt-id\u0151vonal<\/a> er\u0151forr\u00e1sonk\u00e9nt mutatja meg az \u00edgy \u00fctemezett feladatokat \u00e9s azok v\u00e1rhat\u00f3 befejez\u00e9s\u00e9t.<\/p>\n\n\n<p>A t\u00e1rol\u00f3ed\u00e9nyeket gy\u00e1rt\u00f3 \u00fczem sz\u00e1m\u00e1ra ez azt jelenti, hogy a k\u00e9szletre k\u00e9sz\u00fcl\u0151 t\u00e9telt \u00e9s a s\u00fcrg\u0151s egyedi rendel\u00e9st ugyanabban a tervben l\u00e1thatja. M\u0171veleteik az alak\u00edt\u00e1st\u00f3l a csomagol\u00e1sig v\u00e9gigk\u00f6vethet\u0151k, nem kell minden v\u00e1rakoz\u00e1si sort k\u00fcl\u00f6n probl\u00e9mak\u00e9nt kezelni. Ha v\u00e1ltoznak a priorit\u00e1sok, az Arcturus \u00fajrasz\u00e1m\u00edtja az id\u0151z\u00edt\u00e9st, a Gantt-n\u00e9zet pedig megmutatja ennek hat\u00e1s\u00e1t a t\u00f6bbi gy\u00e1rt\u00e1si feladatra.<\/p>\n\n\n<p>\u00cdgy a tervez\u0151nek nem kell k\u00e9zzel \u00fajra \u00f6ssze\u00e1ll\u00edtania minden g\u00e9p feladatsor\u00e1t. A szabad kapacit\u00e1s is jobban kihaszn\u00e1lhat\u00f3: l\u00e1that\u00f3, hol v\u00e9gezhet\u0151 el a munka, \u00e9s hol marad t\u00e9nyleges \u00fctk\u00f6z\u00e9s. Nem kell \u00fajabb t\u00e9teleket elind\u00edtani a kor\u00e1bbi m\u0171veleteken csak az\u00e9rt, hogy k\u00e9s\u0151bb a csomagol\u00e1sn\u00e1l v\u00e1rakozzanak.<\/p>\n\n\n<p>\u00d6n d\u00f6nti el, mely v\u00e1llal\u00e1sok a legfontosabbak, \u00e9s ennek megfelel\u0151en \u00e1ll\u00edtja be a priorit\u00e1sokat. A z\u00e1rol\u00e1sok meg\u0151rzik azokat az \u00fctemez\u00e9si d\u00f6nt\u00e9seket, amelyeknek v\u00e1ltozatlanul kell maradniuk. Ha az anyagok rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1t figyelembe vev\u0151 \u00fctemez\u00e9s be van kapcsolva, a sz\u00e1m\u00edt\u00e1s az anyagell\u00e1t\u00e1ssal is sz\u00e1mol. \u00cdgy az ut\u00e1np\u00f3tl\u00e1si t\u00e9tel id\u0151z\u00edt\u00e9se nem abb\u00f3l indul ki, mintha a hi\u00e1nyz\u00f3 anyagok m\u00e1r rendelkez\u00e9sre \u00e1lln\u00e1nak.<\/p>\n\n\n<p><strong>A SkyPlanner b\u00e1rmely ERP- vagy MES-rendszerrel integr\u00e1lhat\u00f3 a <a href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/\">ny\u00edlt REST API<\/a> seg\u00edts\u00e9g\u00e9vel.<\/strong> Vonja be az \u00fctemez\u00e9s sz\u00e1m\u00edt\u00e1s\u00e1ba a megl\u00e9v\u0151 rendszereiben meghozott k\u00e9szletfelt\u00f6lt\u00e9si d\u00f6nt\u00e9seket \u00e9s az ott t\u00e1rolt termel\u00e9si adatokat. A k\u00e9szletsz\u00fcks\u00e9gletet az ERP-rendszer vagy a k\u00e9szlettervez\u00e9si folyamat hat\u00e1rozhatja meg; a SkyPlanner pedig \u00f6sszehangolja az el\u0151\u00e1ll\u00edt\u00e1shoz sz\u00fcks\u00e9ges m\u0171veleteket az \u00fczem t\u00f6bbi feladat\u00e1val.<\/p>\n\n\n<p>Az el\u0151ny az, hogy kor\u00e1bban tud l\u00e9pni. Ha a v\u00e1rhat\u00f3 befejez\u00e9s m\u00e1r nem teszi lehet\u0151v\u00e9 a k\u00e9szletsz\u00fcks\u00e9glet id\u0151beni kiel\u00e9g\u00edt\u00e9s\u00e9t, m\u00e9g id\u0151ben feloldhatja a kapacit\u00e1s\u00fctk\u00f6z\u00e9st, vagy m\u00f3dos\u00edthatja a k\u00e9szletfelt\u00f6lt\u00e9si d\u00f6nt\u00e9st. A jobb \u00fctemez\u00e9s seg\u00edt fenntartani a term\u00e9kek el\u00e9rhet\u0151s\u00e9g\u00e9t an\u00e9lk\u00fcl, hogy minden fennakad\u00e1sra az egyre nagyobb tartal\u00e9kk\u00e9szlet lenne a v\u00e1lasz.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Opes: kisz\u00e1m\u00edthat\u00f3 kereslet mellett is rugalmas gy\u00e1rt\u00e1sra van sz\u00fcks\u00e9g<\/h2>\n\n\n<p>A speci\u00e1lis term\u00e9keket gy\u00e1rt\u00f3 finn Opes Corporation k\u00e9szletre gy\u00e1rt, \u00e1ltal\u00e1ban a vev\u0151k el\u0151re l\u00e1that\u00f3, h\u00e1rom h\u00f3napra sz\u00f3l\u00f3 v\u00e1llal\u00e1sai alapj\u00e1n. A v\u00e1llalat <a href=\"https:\/\/skyplanner.ai\/hu\/ugyfeltortenetek\/opes-corporation\/\">SkyPlannerrel szerzett tapasztalatai<\/a> megmutatj\u00e1k, mi\u00e9rt fontos a gy\u00e1rt\u00e1s \u00e1tl\u00e1that\u00f3s\u00e1ga akkor is, ha a kereslet viszonylag kisz\u00e1m\u00edthat\u00f3.<\/p>\n\n\n<p>A v\u00e1llalat kor\u00e1bban Excelt \u00e9s k\u00fcl\u00f6n rakt\u00e1rkezel\u0151 alkalmaz\u00e1st haszn\u00e1lt, \u00edgy az inform\u00e1ci\u00f3kat t\u00f6bb helyen t\u00e1rolt\u00e1k. A bevezet\u00e9s sor\u00e1n a SkyPlannert a Visma Nova rendszerrel integr\u00e1lt\u00e1k. Az Opes besz\u00e1mol\u00f3ja szerint az\u00f3ta jobban \u00e1tl\u00e1tj\u00e1k a kapacit\u00e1sokat, \u00e9s gyorsabban m\u00f3dos\u00edtj\u00e1k az \u00fctemtervet, ha term\u00e9kfejleszt\u00e9si pr\u00f3bagy\u00e1rt\u00e1sok vagy s\u00fcrg\u0151s, kis mennyis\u00e9g\u0171 rendel\u00e9sek ker\u00fclnek a gy\u00e1rt\u00e1sba. A csapat l\u00e1tja, mikor k\u00e9sz\u00fclnek el a gy\u00e1rt\u00e1si feladatok, \u00e9s hogyan hatnak a v\u00e1ltoz\u00e1sok a sz\u00e1ll\u00edt\u00e1si id\u0151pontokra.<\/p>\n\n\n<p>A k\u00e9szletre gy\u00e1rt\u00f3 \u00fczemek sz\u00e1m\u00e1ra ez a l\u00e9nyeges tanuls\u00e1g: a kisz\u00e1m\u00edthat\u00f3 kereslet nem z\u00e1rja ki a fennakad\u00e1sokat. Ha a v\u00e1rakoz\u00f3 feladatok \u00e9s a kapacit\u00e1sok egy\u00fctt l\u00e1that\u00f3k, k\u00f6nnyebb beilleszteni a v\u00e1ratlan munk\u00e1kat a k\u00e9szterm\u00e9kek rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1t biztos\u00edt\u00f3 gy\u00e1rt\u00e1s mell\u00e9.<\/p>\n\n\n<p>Az Opes egyszer\u0171bb termel\u00e9si jelent\u00e9sekr\u0151l \u00e9s az \u00faj gy\u00e1rt\u00e1stervez\u0151k gyorsabb betanul\u00e1s\u00e1r\u00f3l is besz\u00e1mol. Az \u00e9rt\u00e9ket az adja, hogy a gy\u00e1rt\u00e1si tervet m\u00e1sok is meg\u00e9rtik \u00e9s m\u00f3dos\u00edtani tudj\u00e1k, nem pedig csak a k\u00e9sz\u00edt\u0151je ismeri a m\u0171k\u00f6d\u00e9s\u00e9t.<\/p>\n\n\n<h2 class=\"wp-block-heading\">K\u00f6nny\u00edtse meg a k\u00f6vetkez\u0151 k\u00e9szletfelt\u00f6lt\u0151 t\u00e9tel elk\u00e9sz\u00edt\u00e9s\u00e9t<\/h2>\n\n\n<p>A k\u00e9szletre gy\u00e1rt\u00e1s akkor m\u0171k\u00f6dik j\u00f3l, ha a gyorsabb kiszolg\u00e1l\u00e1s el\u0151nye meg\u00e9ri a k\u00e9szletbe fektetett t\u0151k\u00e9t. Olyan term\u00e9keket v\u00e1lasszon, amelyekn\u00e9l megalapozottan sz\u00e1m\u00edthat visszat\u00e9r\u0151 keresletre, vizsg\u00e1lja fel\u00fcl a t\u00e9nyleges k\u00e9szletsz\u00fcks\u00e9gletet, \u00e9s tervezzen a k\u00e9szletfelt\u00f6lt\u00e9shez re\u00e1lisan megval\u00f3s\u00edthat\u00f3 gy\u00e1rt\u00e1si \u00fatvonalat.<\/p>\n\n\n<p>Az eredm\u00e9ny mindk\u00e9t oldal\u00e1t k\u00f6vesse nyomon: a term\u00e9kek el\u00e9rhet\u0151s\u00e9g\u00e9t \u00e9s a k\u00e9szlethi\u00e1nyokat, de az elfekv\u0151 k\u00e9szleteket, a k\u00e9szletben lek\u00f6t\u00f6tt t\u0151k\u00e9t \u00e9s a kiszolg\u00e1l\u00e1si szint fenntart\u00e1s\u00e1hoz sz\u00fcks\u00e9ges gy\u00e1rt\u00e1si r\u00e1ford\u00edt\u00e1st is. \u00d6nmag\u00e1ban a g\u00e9pek magas kihaszn\u00e1lts\u00e1ga nem mutatja meg, hogy megt\u00e9r\u00fcl-e a k\u00e9szletre gy\u00e1rt\u00e1si strat\u00e9gia.<\/p>\n\n\n<p>V\u00e1lassza a SkyPlannert, ha a k\u00e9szletfelt\u00f6lt\u00e9s \u00e9s az ugyanaz\u00e9rt a kapacit\u00e1s\u00e9rt verseng\u0151 gy\u00e1rt\u00e1si feladatok k\u00e9zi \u00f6sszehangol\u00e1sa m\u00e1r mindennapos terhet jelent. Az Arcturus elv\u00e9gzi az \u00fctemez\u00e9si sz\u00e1m\u00edt\u00e1sokat; \u00d6n hat\u00e1rozza meg a priorit\u00e1sokat, \u00e9s a Gantt-n\u00e9zetben tekintheti \u00e1t a k\u00f6vetkezm\u00e9nyeket.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/hu\/kapcsolat-ertekesites\/\">Foglaljon SkyPlanner-bemutat\u00f3t<\/a>, \u00e9s hozzon p\u00e9ldak\u00e9nt egy rendszeresen k\u00e9szleten tartott term\u00e9ket a gy\u00e1rt\u00e1si \u00fatvonal\u00e1val egy\u00fctt, valamint egy s\u00fcrg\u0151s gy\u00e1rt\u00e1si feladatot, amely nemr\u00e9g h\u00e1tt\u00e9rbe szor\u00edtotta annak k\u00e9szletfelt\u00f6lt\u00e9s\u00e9t. \u00cdgy konkr\u00e9t p\u00e9ld\u00e1n l\u00e1thatja, hogyan seg\u00edthet a k\u00f6z\u00f6s \u00fctemterv fenntartani a term\u00e9kek el\u00e9rhet\u0151s\u00e9g\u00e9t \u00e9s jobban kihaszn\u00e1lni a kapacit\u00e1sokat. Ha el\u0151bb \u00f6n\u00e1ll\u00f3an ismerkedne a rendszerrel, <a href=\"https:\/\/skyplanner.ai\/hu\/proba\/\">pr\u00f3b\u00e1lja ki a SkyPlannert bemutat\u00f3adatokkal<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>K\u00e9szletre gy\u00e1rt\u00e1s: ut\u00e1np\u00f3tl\u00e1s, miel\u0151tt a vev\u0151nek v\u00e1rnia kell Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; K\u00e9szletre gy\u00e1rt\u00e1s: ut\u00e1np\u00f3tl\u00e1s, miel\u0151tt a vev\u0151nek v\u00e1rnia kell Egy vev\u0151 holnapra k\u00e9r egy standard term\u00e9ket. Ha az m\u00e1r rakt\u00e1ron van, el\u0151 lehet k\u00e9sz\u00edteni a sz\u00e1ll\u00edtm\u00e1nyt, \u00e9s nem kell arra k\u00e9rni a vev\u0151t, hogy v\u00e1rja meg a gy\u00e1rt\u00e1st. \u00c9ppen ez a k\u00e9szletre gy\u00e1rt\u00e1s vonzereje: &#8230; <a title=\"K\u00e9szletre gy\u00e1rt\u00e1s: ut\u00e1np\u00f3tl\u00e1s, miel\u0151tt a vev\u0151nek v\u00e1rnia kell\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/keszletre-gyartas\/\" aria-label=\"Read more about K\u00e9szletre gy\u00e1rt\u00e1s: ut\u00e1np\u00f3tl\u00e1s, miel\u0151tt a vev\u0151nek v\u00e1rnia kell\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":99338,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2526,312],"tags":[],"class_list":["post-99320","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-es-utemezes","category-forrasok","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>K\u00e9szletre gy\u00e1rt\u00e1s: ut\u00e1np\u00f3tl\u00e1s, miel\u0151tt a vev\u0151nek v\u00e1rnia kell<\/title>\n<meta name=\"description\" content=\"A k\u00e9szletre gy\u00e1rt\u00e1s gyors\u00edthatja a sz\u00e1ll\u00edt\u00e1st, ha id\u0151ben k\u00e9sz az ut\u00e1np\u00f3tl\u00e1s. Mikor \u00e9ri meg, \u00e9s hogyan \u00fctemezhet\u0151 a k\u00e9szletfelt\u00f6lt\u00e9s a SkyPlannerrel?\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/keszletre-gyartas\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"K\u00e9szletre gy\u00e1rt\u00e1s: ut\u00e1np\u00f3tl\u00e1s, miel\u0151tt a vev\u0151nek v\u00e1rnia kell\" \/>\n<meta property=\"og:description\" content=\"A k\u00e9szletre gy\u00e1rt\u00e1s gyors\u00edthatja a sz\u00e1ll\u00edt\u00e1st, ha id\u0151ben k\u00e9sz az ut\u00e1np\u00f3tl\u00e1s. Mikor \u00e9ri meg, \u00e9s hogyan \u00fctemezhet\u0151 a k\u00e9szletfelt\u00f6lt\u00e9s a SkyPlannerrel?\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/forrasok\/keszletre-gyartas\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-15T20:34:27+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-19T15:12:41+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-to-stock-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1774\" \/>\n\t<meta property=\"og:image:height\" content=\"887\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Szerz\u0151:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data2\" content=\"18 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/keszletre-gyartas\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/keszletre-gyartas\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"K\u00e9szletre gy\u00e1rt\u00e1s: ut\u00e1np\u00f3tl\u00e1s, miel\u0151tt a vev\u0151nek v\u00e1rnia kell\",\"datePublished\":\"2026-10-15T20:34:27+00:00\",\"dateModified\":\"2026-10-19T15:12:41+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/keszletre-gyartas\\\/\"},\"wordCount\":3611,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/keszletre-gyartas\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/make-to-stock-hero.png\",\"articleSection\":[\"APS \u00e9s \u00fctemez\u00e9s\",\"forr\u00e1sok\"],\"inLanguage\":\"hu-HU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/keszletre-gyartas\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/keszletre-gyartas\\\/\",\"name\":\"K\u00e9szletre gy\u00e1rt\u00e1s: ut\u00e1np\u00f3tl\u00e1s, miel\u0151tt a vev\u0151nek v\u00e1rnia kell\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/keszletre-gyartas\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/keszletre-gyartas\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/make-to-stock-hero.png\",\"datePublished\":\"2026-10-15T20:34:27+00:00\",\"dateModified\":\"2026-10-19T15:12:41+00:00\",\"description\":\"A k\u00e9szletre gy\u00e1rt\u00e1s gyors\u00edthatja a sz\u00e1ll\u00edt\u00e1st, ha id\u0151ben k\u00e9sz az ut\u00e1np\u00f3tl\u00e1s. Mikor \u00e9ri meg, \u00e9s hogyan \u00fctemezhet\u0151 a k\u00e9szletfelt\u00f6lt\u00e9s a SkyPlannerrel?\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/keszletre-gyartas\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/keszletre-gyartas\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/keszletre-gyartas\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/make-to-stock-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/make-to-stock-hero.png\",\"width\":1774,\"height\":887,\"caption\":\"Standard stock containers and special orders share a packing line beside a finished-stock rack.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/keszletre-gyartas\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"K\u00e9szletre gy\u00e1rt\u00e1s: ut\u00e1np\u00f3tl\u00e1s, miel\u0151tt a vev\u0151nek v\u00e1rnia kell\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"K\u00e9szletre gy\u00e1rt\u00e1s: ut\u00e1np\u00f3tl\u00e1s, miel\u0151tt a vev\u0151nek v\u00e1rnia kell","description":"A k\u00e9szletre gy\u00e1rt\u00e1s gyors\u00edthatja a sz\u00e1ll\u00edt\u00e1st, ha id\u0151ben k\u00e9sz az ut\u00e1np\u00f3tl\u00e1s. Mikor \u00e9ri meg, \u00e9s hogyan \u00fctemezhet\u0151 a k\u00e9szletfelt\u00f6lt\u00e9s a SkyPlannerrel?","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/forrasok\/keszletre-gyartas\/","og_locale":"hu_HU","og_type":"article","og_title":"K\u00e9szletre gy\u00e1rt\u00e1s: ut\u00e1np\u00f3tl\u00e1s, miel\u0151tt a vev\u0151nek v\u00e1rnia kell","og_description":"A k\u00e9szletre gy\u00e1rt\u00e1s gyors\u00edthatja a sz\u00e1ll\u00edt\u00e1st, ha id\u0151ben k\u00e9sz az ut\u00e1np\u00f3tl\u00e1s. Mikor \u00e9ri meg, \u00e9s hogyan \u00fctemezhet\u0151 a k\u00e9szletfelt\u00f6lt\u00e9s a SkyPlannerrel?","og_url":"https:\/\/skyplanner.ai\/hu\/forrasok\/keszletre-gyartas\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-15T20:34:27+00:00","article_modified_time":"2026-10-19T15:12:41+00:00","og_image":[{"width":1774,"height":887,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-to-stock-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Szerz\u0151:":"Jussi M\u00e4ntyl\u00e4","Becs\u00fclt olvas\u00e1si id\u0151":"18 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/keszletre-gyartas\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/keszletre-gyartas\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"K\u00e9szletre gy\u00e1rt\u00e1s: ut\u00e1np\u00f3tl\u00e1s, miel\u0151tt a vev\u0151nek v\u00e1rnia kell","datePublished":"2026-10-15T20:34:27+00:00","dateModified":"2026-10-19T15:12:41+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/keszletre-gyartas\/"},"wordCount":3611,"publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/keszletre-gyartas\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-to-stock-hero.png","articleSection":["APS \u00e9s \u00fctemez\u00e9s","forr\u00e1sok"],"inLanguage":"hu-HU"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/keszletre-gyartas\/","url":"https:\/\/skyplanner.ai\/hu\/forrasok\/keszletre-gyartas\/","name":"K\u00e9szletre gy\u00e1rt\u00e1s: ut\u00e1np\u00f3tl\u00e1s, miel\u0151tt a vev\u0151nek v\u00e1rnia kell","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/keszletre-gyartas\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/keszletre-gyartas\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-to-stock-hero.png","datePublished":"2026-10-15T20:34:27+00:00","dateModified":"2026-10-19T15:12:41+00:00","description":"A k\u00e9szletre gy\u00e1rt\u00e1s gyors\u00edthatja a sz\u00e1ll\u00edt\u00e1st, ha id\u0151ben k\u00e9sz az ut\u00e1np\u00f3tl\u00e1s. Mikor \u00e9ri meg, \u00e9s hogyan \u00fctemezhet\u0151 a k\u00e9szletfelt\u00f6lt\u00e9s a SkyPlannerrel?","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/keszletre-gyartas\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/forrasok\/keszletre-gyartas\/"]}]},{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/keszletre-gyartas\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-to-stock-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-to-stock-hero.png","width":1774,"height":887,"caption":"Standard stock containers and special orders share a packing line beside a finished-stock rack."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/keszletre-gyartas\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"K\u00e9szletre gy\u00e1rt\u00e1s: ut\u00e1np\u00f3tl\u00e1s, miel\u0151tt a vev\u0151nek v\u00e1rnia kell"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-to-stock-hero.png",1774,887,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-to-stock-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-to-stock-hero-300x150.png",300,150,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-to-stock-hero-768x384.png",768,384,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-to-stock-hero-1024x512.png",1024,512,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-to-stock-hero-1536x768.png",1536,768,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-to-stock-hero.png",1774,887,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/make-to-stock-hero-360x180.png",360,180,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"K\u00e9szletre gy\u00e1rt\u00e1s: ut\u00e1np\u00f3tl\u00e1s, miel\u0151tt a vev\u0151nek v\u00e1rnia kell Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; K\u00e9szletre gy\u00e1rt\u00e1s: ut\u00e1np\u00f3tl\u00e1s, miel\u0151tt a vev\u0151nek v\u00e1rnia kell Egy vev\u0151 holnapra k\u00e9r egy standard term\u00e9ket. Ha az m\u00e1r rakt\u00e1ron van, el\u0151 lehet k\u00e9sz\u00edteni a sz\u00e1ll\u00edtm\u00e1nyt, \u00e9s nem kell arra k\u00e9rni a vev\u0151t, hogy v\u00e1rja meg a gy\u00e1rt\u00e1st. \u00c9ppen ez a k\u00e9szletre gy\u00e1rt\u00e1s vonzereje:&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/99320","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=99320"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/99320\/revisions"}],"predecessor-version":[{"id":99378,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/99320\/revisions\/99378"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media\/99338"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=99320"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/categories?post=99320"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/tags?post=99320"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}