{"id":99145,"date":"2026-10-15T15:53:51","date_gmt":"2026-10-15T15:53:51","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=99145"},"modified":"2026-10-15T15:54:47","modified_gmt":"2026-10-15T15:54:47","slug":"durva-kapacitastervezes","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/hu\/forrasok\/durva-kapacitastervezes\/","title":{"rendered":"Durva kapacit\u00e1stervez\u00e9s: az MPS ellen\u0151rz\u00e9se RCCP-vel"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Durva kapacit\u00e1stervez\u00e9s: az MPS ellen\u0151rz\u00e9se RCCP-vel<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/hu\/\">Kezd\u0151lap<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/\">Er\u0151forr\u00e1sok<\/a> &raquo; Durva kapacit\u00e1stervez\u00e9s: az MPS ellen\u0151rz\u00e9se RCCP-vel<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Becs\u00fclt olvas\u00e1si id\u0151: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> perc<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>A gy\u00e1rt\u00e1si f\u0151terv r\u00f6gz\u00edti, hogy mit k\u00edv\u00e1nunk gy\u00e1rtani. A durva kapacit\u00e1stervez\u00e9s azt vizsg\u00e1lja, hogy a kritikus er\u0151forr\u00e1sok kapacit\u00e1sa elegend\u0151-e ehhez. Ezt m\u00e9g azel\u0151tt fontos ellen\u0151rizni, hogy a beszerz\u00e9s, a termel\u00e9s \u00e9s az \u00e9rt\u00e9kes\u00edt\u00e9s egy olyan terv alapj\u00e1n kezdene dolgozni, amelyet az \u00fczem nem tud teljes\u00edteni.<\/p>\n\n\n<p>A durva kapacit\u00e1stervez\u00e9s (RCCP) a tervezett gy\u00e1rt\u00e1si mennyis\u00e9gekb\u0151l kisz\u00e1m\u00edtja a kulcsfontoss\u00e1g\u00fa er\u0151forr\u00e1sok terhel\u00e9s\u00e9t, majd \u00f6sszeveti azt a rendelkez\u00e9sre \u00e1ll\u00f3 kapacit\u00e1ssal. \u00cdgy m\u00e1r kor\u00e1n eld\u00f6nthet\u0151, hogy megtarthat\u00f3-e a gy\u00e1rt\u00e1si f\u0151terv, m\u00f3dos\u00edtani kell-e a mennyis\u00e9geket vagy az id\u0151pontokat, esetleg t\u00f6bbletkapacit\u00e1sra van sz\u00fcks\u00e9g.<\/p>\n\n\n<p>Att\u00f3l azonban, hogy egy h\u00e9t \u00f6sszes\u00edtett terhel\u00e9se belef\u00e9r a kapacit\u00e1sba, m\u00e9g nem \u00e1ll el\u0151 a gy\u00e1rt\u00e1si feladatok v\u00e9grehajthat\u00f3 sorrendje. Lehet, hogy egy g\u00e9pnek \u00f6sszess\u00e9g\u00e9ben elegend\u0151 ideje van, m\u00e9gsem \u00e1ll rendelkez\u00e9sre akkor, amikor egy s\u00fcrg\u0151s rendel\u00e9shez sz\u00fcks\u00e9g lenne r\u00e1. Az RCCP-vel ellen\u0151rizze a gy\u00e1rt\u00e1si v\u00e1llal\u00e1sok teljes\u00edthet\u0151s\u00e9g\u00e9t, majd a SkyPlanner APS seg\u00edts\u00e9g\u00e9vel alak\u00edtsa \u00f6sszehangolt \u00fctemtervv\u00e9 a hozz\u00e1juk tartoz\u00f3 feladatokat. Az Arcturus az er\u0151forr\u00e1sok \u00e9s az \u00d6n \u00e1ltal megadott priorit\u00e1sok alapj\u00e1n sz\u00e1m\u00edtja ki az id\u0151z\u00edt\u00e9st; a Gantt-id\u0151vonalon pedig l\u00e1that\u00f3v\u00e1 v\u00e1lik, hogy ez mit jelent a gy\u00e1rt\u00e1s \u00e9s a sz\u00e1ll\u00edt\u00e1s szempontj\u00e1b\u00f3l.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mi a durva kapacit\u00e1stervez\u00e9s?<\/h2>\n\n\n<p>Az RCCP <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/master-production-schedule\/\">a gy\u00e1rt\u00e1si f\u0151terv (MPS)<\/a> kapacit\u00e1sellen\u0151rz\u00e9se. Azokra az er\u0151forr\u00e1sokra \u00f6sszpontos\u00edt, amelyek akad\u00e1lyozhatj\u00e1k a terv teljes\u00edt\u00e9s\u00e9t: p\u00e9ld\u00e1ul egy sz\u0171k keresztmetszetet jelent\u0151 g\u00e9pcsoportra, speci\u00e1lis szaktud\u00e1ssal rendelkez\u0151 szerel\u0151csapatra, kemenc\u00e9re vagy korl\u00e1tozott kapacit\u00e1s\u00fa gy\u00e1rt\u00f3sorra.<\/p>\n\n\n<p>A k\u00f6zponti k\u00e9rd\u00e9s konkr\u00e9t: az egyes tervez\u00e9si id\u0151szakokban mekkora kapacit\u00e1st ig\u00e9nyel az MPS az adott er\u0151forr\u00e1st\u00f3l, \u00e9s ebb\u0151l mennyi biztos\u00edthat\u00f3 re\u00e1lisan?<\/p>\n\n\n<p>Az\u00e9rt \u201edurva\u201d kapacit\u00e1stervez\u00e9s, mert a jelent\u0151s elt\u00e9r\u00e9sek felismer\u00e9s\u00e9hez nem kell minden m\u0171velet sorrendj\u00e9t meghat\u00e1rozni. Kiv\u00e1lasztjuk a kritikus er\u0151forr\u00e1sokat, \u00e9s egyszer\u0171s\u00edtett modellel sz\u00e1m\u00edtjuk ki a kapacit\u00e1sig\u00e9ny\u00fcket. Az RCCP \u00edgy akkor seg\u00edti a d\u00f6nt\u00e9st, amikor m\u00e9g van id\u0151 m\u00f3dos\u00edtani a gy\u00e1rt\u00e1si v\u00e1llal\u00e1sokat, tov\u00e1bbi m\u0171szakokat szervezni vagy egyeztetni az alv\u00e1llalkoz\u00f3i kapacit\u00e1s ig\u00e9nybev\u00e9tel\u00e9r\u0151l.<\/p>\n\n\n<p>Sok gy\u00e1rt\u00f3n\u00e1l hasznos a heti bont\u00e1s, de az RCCP-hez nincs \u00e1ltal\u00e1nosan el\u0151\u00edrt, hetekben vagy h\u00f3napokban megadott id\u0151t\u00e1v. A tervez\u00e9si horizont fedje le a meghozand\u00f3 d\u00f6nt\u00e9seket, az id\u0151szakok hossza pedig tegye l\u00e1that\u00f3v\u00e1 azokat a t\u00falterhel\u00e9seket, amelyeket ezekkel a d\u00f6nt\u00e9sekkel kell kezelni. Egy hosszabb \u00e1tfut\u00e1si idej\u0171 kapacit\u00e1sm\u00f3dos\u00edt\u00e1sr\u00f3l kor\u00e1bban kell d\u00f6nteni, mint egy t\u00fal\u00f3r\u00e1s m\u0171szakr\u00f3l.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Az RCCP helye: MPS, MRP, CRP \u00e9s gy\u00e1rt\u00e1s\u00fctemez\u00e9s<\/h2>\n\n\n<p>Ezek a tervez\u00e9si tev\u00e9kenys\u00e9gek m\u00e1s-m\u00e1s k\u00e9rd\u00e9sre adnak v\u00e1laszt:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Tev\u00e9kenys\u00e9g<\/th><th>F\u0151 k\u00e9rd\u00e9s<\/th><th>Jellemz\u0151 r\u00e9szletezetts\u00e9g<\/th><\/tr><\/thead><tbody><tr><td>A gy\u00e1rt\u00e1si f\u0151terv \u00f6ssze\u00e1ll\u00edt\u00e1sa<\/td><td>Milyen term\u00e9keket, milyen mennyis\u00e9gben \u00e9s mely id\u0151szakokban gy\u00e1rtsunk?<\/td><td>A f\u0151tervben szerepl\u0151 term\u00e9kek \u00e9s a tervezett elk\u00e9sz\u00fcl\u00e9si mennyis\u00e9gek<\/td><\/tr><tr><td>Durva kapacit\u00e1stervez\u00e9s<\/td><td>Elegend\u0151 a kulcsfontoss\u00e1g\u00fa er\u0151forr\u00e1sok kapacit\u00e1sa a gy\u00e1rt\u00e1si f\u0151terv teljes\u00edt\u00e9s\u00e9hez?<\/td><td>A kritikus er\u0151forr\u00e1sok terhel\u00e9se id\u0151szakonk\u00e9nt<\/td><\/tr><tr><td>Anyagsz\u00fcks\u00e9glet-tervez\u00e9s (MRP)<\/td><td>Milyen anyagokra \u00e9s alkatr\u00e9szekre van sz\u00fcks\u00e9g, \u00e9s mikor?<\/td><td>A term\u00e9kstrukt\u00far\u00e1kb\u00f3l \u00e9s az ell\u00e1t\u00e1si adatokb\u00f3l levezetett sz\u00fcks\u00e9gletek<\/td><\/tr><tr><td>Kapacit\u00e1ssz\u00fcks\u00e9glet-tervez\u00e9s (CRP)<\/td><td>Mekkora kapacit\u00e1st ig\u00e9nyel a r\u00e9szletes anyagterv?<\/td><td>R\u00e9szletesebb kapacit\u00e1sig\u00e9nyek m\u0171veletenk\u00e9nt \u00e9s munkahelyenk\u00e9nt<\/td><\/tr><tr><td>R\u00e9szletes gy\u00e1rt\u00e1s\u00fctemez\u00e9s<\/td><td>Melyik gy\u00e1rt\u00e1si feladat hol \u00e9s mikor fusson?<\/td><td>Munkahelyek, m\u0171veletek, m\u0171szakok, f\u00fcgg\u0151s\u00e9gek \u00e9s a gy\u00e1rt\u00e1si feladatok priorit\u00e1sai<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Az MPS \u00e9s az RCCP k\u00f6z\u00f6tt folyamatos visszacsatol\u00e1sra van sz\u00fcks\u00e9g. Ha a kapacit\u00e1sellen\u0151rz\u00e9s szerint a terv nem teljes\u00edthet\u0151, m\u00f3dos\u00edtsa a javasolt tervet vagy a rendelkez\u00e9sre \u00e1ll\u00f3 kapacit\u00e1st, majd ism\u00e9telje meg az ellen\u0151rz\u00e9st. Ne adjon tov\u00e1bb t\u00falterhel\u00e9st okoz\u00f3 gy\u00e1rt\u00e1si f\u0151tervet abban a rem\u00e9nyben, hogy a r\u00e9szletes \u00fctemez\u00e9s majd el\u0151teremti a hi\u00e1nyz\u00f3 \u00f3r\u00e1kat.<\/p>\n\n\n<p>A ford\u00edtott ir\u00e1ny\u00fa visszacsatol\u00e1s is fontos: ha a r\u00e9szletes \u00fctemez\u00e9s visszat\u00e9r\u0151 sz\u0171k keresztmetszetet t\u00e1r fel, ezt vegye figyelembe a kapacit\u00e1sra vonatkoz\u00f3 felt\u00e9telez\u00e9sekben. El\u0151fordulhat, hogy egy er\u0151forr\u00e1s az el\u0151z\u0151 negyed\u00e9v term\u00e9k\u00f6sszet\u00e9tele mellett m\u00e9g nem volt kritikus, a k\u00f6vetkez\u0151 RCCP-ellen\u0151rz\u00e9sbe azonban m\u00e1r be kell vonni.<\/p>\n\n\n<h2 class=\"wp-block-heading\">A durva kapacit\u00e1ssz\u00fcks\u00e9glet kisz\u00e1m\u00edt\u00e1sa<\/h2>\n\n\n<p>Az MPS-ben szerepl\u0151 gy\u00e1rt\u00e1si mennyis\u00e9gekb\u0151l induljon ki, \u00e9s ne adja hozz\u00e1juk m\u00e9g egyszer az \u00e9rt\u00e9kes\u00edt\u00e9si ig\u00e9nyt. A gy\u00e1rt\u00e1si f\u0151tervnek m\u00e1r a gy\u00e1rt\u00e1sr\u00f3l hozott d\u00f6nt\u00e9st kell t\u00fckr\u00f6znie. Ha ugyanazt az ig\u00e9nyt \u00fajra besz\u00e1m\u00edtja, a sz\u00e1m\u00edtott terhel\u00e9s a val\u00f3sn\u00e1l nagyobb lesz.<\/p>\n\n\n<p>\u00d3raalap\u00fa modell eset\u00e9n:<\/p>\n\n\n<p><strong>Sz\u00fcks\u00e9ges er\u0151forr\u00e1s\u00f3r\u00e1k = az (MPS-mennyis\u00e9g \u00d7 egys\u00e9gnyi term\u00e9kre jut\u00f3 er\u0151forr\u00e1s\u00f3r\u00e1k) szorzatok \u00f6sszege + az esetlegesen k\u00fcl\u00f6n modellezett \u00e1t\u00e1ll\u00e1si \u00f3r\u00e1k.<\/strong><\/p>\n\n\n<p>V\u00e9gezze el a sz\u00e1m\u00edt\u00e1st minden kiv\u00e1lasztott er\u0151forr\u00e1sra \u00e9s id\u0151szakra. Ezut\u00e1n azonos m\u00e9rt\u00e9kegys\u00e9gben vesse \u00f6ssze az ig\u00e9nyt a kapacit\u00e1ssal:<\/p>\n\n\n<p><strong>Kapacit\u00e1sterhel\u00e9si ar\u00e1ny = sz\u00fcks\u00e9ges \u00f3r\u00e1k \u00f7 rendelkez\u00e9sre \u00e1ll\u00f3 \u00f3r\u00e1k \u00d7 100%.<\/strong><\/p>\n\n\n<p>A 100% feletti ar\u00e1ny az alkalmazott felt\u00e9telez\u00e9sek mellett t\u00falterhel\u00e9st jelez. A 100% alatti ar\u00e1ny azt jelenti, hogy az \u00f6sszes\u00edtett ig\u00e9ny belef\u00e9r a kapacit\u00e1sba, de nem bizony\u00edtja, hogy minden gy\u00e1rt\u00e1si feladat a saj\u00e1t hat\u00e1ridej\u00e9re elk\u00e9sz\u00fclhet.<\/p>\n\n\n<p>A sz\u00e1m\u00edt\u00e1st \u00f6t l\u00e9p\u00e9sben \u00e9p\u00edtse fel:<\/p>\n\n\n<p>1. <strong>V\u00e1lassza ki a kritikus er\u0151forr\u00e1sokat.<\/strong> Vegye sz\u00e1m\u00edt\u00e1sba azokat a g\u00e9peket, szaktud\u00e1sokat \u00e9s gy\u00e1rt\u00f3sorokat, amelyek korl\u00e1tozhatj\u00e1k a v\u00e1llal\u00e1sok teljes\u00edt\u00e9s\u00e9t. Ker\u00fclje az \u00fczemi szint\u0171 \u00f6sszes\u00edt\u00e9st, amelyben az egyik er\u0151forr\u00e1s szabad kapacit\u00e1sa elfedi a m\u00e1sik t\u00falterhel\u00e9s\u00e9t.<\/p>\n\n\n<p>2. <strong>Hat\u00e1rozza meg az er\u0151forr\u00e1sig\u00e9nyeket.<\/strong> A f\u0151terv minden term\u00e9k\u00e9hez haszn\u00e1ljon egys\u00e9ges elvek alapj\u00e1n \u00f6ssze\u00e1ll\u00edtott kapacit\u00e1sjegyz\u00e9ket vagy er\u0151forr\u00e1sprofilt. A g\u00e9p\u00f3r\u00e1kat \u00e9s a munka\u00f3r\u00e1kat kezelje k\u00fcl\u00f6n. Sz\u00e1molja bele a kapcsol\u00f3d\u00f3 alkatr\u00e9szek gy\u00e1rt\u00e1si munk\u00e1j\u00e1t is, de \u00fcgyeljen arra, hogy m\u00e1shol ne sz\u00e1m\u00edtsa be \u00fajra.<\/p>\n\n\n<p>3. <strong>A megfelel\u0151 id\u0151szakra tervezze a terhel\u00e9st.<\/strong> Ha egy kritikus m\u0171veletet a k\u00e9szterm\u00e9k esed\u00e9kess\u00e9ge el\u0151tt kell elv\u00e9gezni, az er\u0151forr\u00e1sig\u00e9ny\u00e9t is ennek megfelel\u0151en helyezze kor\u00e1bbra. Ellenkez\u0151 esetben az egyszer\u0171s\u00e9g kedv\u00e9\u00e9rt az elk\u00e9sz\u00fcl\u00e9s het\u00e9re sz\u00e1m\u00edtott terhel\u00e9s elfedhet egy kor\u00e1bbi kapacit\u00e1shi\u00e1nyt.<\/p>\n\n\n<p>4. <strong>Re\u00e1lisan sz\u00e1m\u00edtsa ki a rendelkez\u00e9sre \u00e1ll\u00f3 kapacit\u00e1st.<\/strong> Vegye alapul a munkanapt\u00e1rt, a l\u00e9tsz\u00e1mot \u00e9s a tervezett le\u00e1ll\u00e1sokat. A teljes\u00edtm\u00e9nyvesztes\u00e9geket k\u00f6vetkezetesen vegye figyelembe; ugyanazt a vesztes\u00e9get ne vonja le k\u00e9tszer.<\/p>\n\n\n<p>5. <strong>Vizsg\u00e1lja meg az elt\u00e9r\u00e9seket, \u00e9s sz\u00e1molja \u00fajra a tervet.<\/strong> R\u00f6gz\u00edtse a javasolt int\u00e9zked\u00e9st, az \u00e9rintett er\u0151forr\u00e1st \u00e9s id\u0151szakot, valamint a m\u00f3dos\u00edtott terhel\u00e9st. Am\u00edg nincs elfogadott int\u00e9zked\u00e9s a kezel\u00e9s\u00e9re, a t\u00falterhel\u00e9s tov\u00e1bbra is fenn\u00e1ll.<\/p>\n\n\n<p>Ha a gy\u00e1rt\u00f3sor kapacit\u00e1s\u00e1t c\u00e9lszer\u0171bb kibocs\u00e1tott mennyis\u00e9gben tervezni, haszn\u00e1ljon kibocs\u00e1t\u00e1si r\u00e1t\u00e1n alapul\u00f3 \u00f6sszehasonl\u00edt\u00e1st: a tervezett darabsz\u00e1mot vesse \u00f6ssze az adott id\u0151szakban el\u00e9rhet\u0151 darabsz\u00e1mmal. \u00dcgyeljen arra, hogy a r\u00e1ta t\u00fckr\u00f6zze a term\u00e9k\u00f6sszet\u00e9telt; az elt\u00e9r\u0151 term\u00e9kek darabsz\u00e1mai nem mindig kezelhet\u0151k egyen\u00e9rt\u00e9k\u0171k\u00e9nt.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Melyik RCCP-m\u00f3dszert \u00e9rdemes haszn\u00e1lni?<\/h3>\n\n\n<p>H\u00e1rom elterjedt megk\u00f6zel\u00edt\u00e9s k\u00edn\u00e1l v\u00e1laszt\u00e1st az egyszer\u0171bb sz\u00e1m\u00edt\u00e1s \u00e9s a terhel\u00e9s pontosabb felt\u00e9rk\u00e9pez\u00e9se k\u00f6z\u00f6tt:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Az \u00f6sszes\u00edtett t\u00e9nyez\u0151k\u00f6n alapul\u00f3 kapacit\u00e1stervez\u00e9s (CPOF)<\/strong> az MPS-b\u0151l teljes munkaterhel\u00e9st sz\u00e1m\u00edt, majd ezt a kor\u00e1bbi er\u0151forr\u00e1s-felhaszn\u00e1l\u00e1si ar\u00e1nyok szerint osztja el. Gyors k\u00f6zel\u00edt\u00e9st ad, de v\u00e1ltoz\u00f3 term\u00e9k\u00f6sszet\u00e9tel mellett a m\u00faltbeli ar\u00e1nyok f\u00e9lrevezet\u0151k lehetnek.<\/li><li><strong>A kapacit\u00e1sjegyz\u00e9kek<\/strong> term\u00e9kenk\u00e9nt adj\u00e1k meg a kritikus er\u0151forr\u00e1sok sz\u00fcks\u00e9ges \u00f3rasz\u00e1m\u00e1t. Megmutatj\u00e1k, mi\u00e9rt okozhat k\u00e9t, azonos \u00f6sszmennyis\u00e9get tartalmaz\u00f3 gy\u00e1rt\u00e1si f\u0151terv eg\u00e9szen elt\u00e9r\u0151 sz\u0171k keresztmetszeteket.<\/li><li><strong>Az er\u0151forr\u00e1sprofilok<\/strong> az \u00e1tfut\u00e1si id\u0151b\u0151l ad\u00f3d\u00f3 id\u0151beli eltol\u00e1sokkal id\u0151szakokra is bontj\u00e1k ezeket az ig\u00e9nyeket. Seg\u00edtenek felismerni, ha egy kritikus m\u0171veletet a k\u00e9szterm\u00e9k elk\u00e9sz\u00fcl\u00e9s\u00e9n\u00e9l kor\u00e1bbi id\u0151szakban kell elv\u00e9gezni.<\/li><\/ul>\n\n\n<p>A legegyszer\u0171bb olyan modellt haszn\u00e1lja, amely m\u00e9g r\u00e1vil\u00e1g\u00edt a meghozand\u00f3 d\u00f6nt\u00e9sre. A kapacit\u00e1sjegyz\u00e9ken alapul\u00f3 sz\u00e1m\u00edt\u00e1s j\u00f3 kiindul\u00f3pont, ha a term\u00e9kek elt\u00e9r\u0151 m\u00e9rt\u00e9kben terhelik a k\u00f6z\u00f6sen haszn\u00e1lt er\u0151forr\u00e1sokat. Ahol a gy\u00e1rt\u00e1si \u00fatvonal t\u00f6bb tervez\u00e9si id\u0151szakon \u00edvel \u00e1t, alkalmazzon id\u0151beli eltol\u00e1sokat.<\/p>\n\n\n<h2 class=\"wp-block-heading\">RCCP-p\u00e9lda: egy h\u00e9t, amelyb\u0151l 19 g\u00e9p\u00f3ra hi\u00e1nyzik<\/h2>\n\n\n<p>K\u00e9pzelj\u00fcnk el egy gy\u00e1rt\u00f3t, amely k\u00e9tf\u00e9le szivatty\u00faegys\u00e9get k\u00e9sz\u00edt, A-t \u00e9s B-t. Mindkett\u0151 ugyanazt a megmunk\u00e1l\u00f3 g\u00e9pcsoportot \u00e9s szerel\u0151csapatot veszi ig\u00e9nybe. Ebben az egyszer\u0171s\u00edtett p\u00e9ld\u00e1ban a kritikus m\u0171veletek ugyanarra a h\u00e9tre esnek, mint az elk\u00e9sz\u00fcl\u00e9s, a darabonk\u00e9nti id\u0151norm\u00e1k pedig m\u00e1r tartalmazz\u00e1k az \u00e1t\u00e1ll\u00e1si id\u0151 felt\u00e9telezett ar\u00e1nyos r\u00e9sz\u00e9t.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Term\u00e9k<\/th><th>Megmunk\u00e1l\u00e1si g\u00e9p\u00f3ra darabonk\u00e9nt<\/th><th>Szerel\u00e9si munka\u00f3ra darabonk\u00e9nt<\/th><th>1. heti MPS<\/th><th>2. heti MPS<\/th><th>3. heti MPS<\/th><\/tr><\/thead><tbody><tr><td>A<\/td><td>0,40<\/td><td>0,25<\/td><td>120<\/td><td>180<\/td><td>100<\/td><\/tr><tr><td>B<\/td><td>0,75<\/td><td>0,50<\/td><td>80<\/td><td>100<\/td><td>80<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>A forg\u00e1csol\u00f3 g\u00e9pcsoport k\u00e9t g\u00e9pb\u0151l \u00e1ll. Mindk\u00e9t g\u00e9p napi k\u00e9t nyolc\u00f3r\u00e1s m\u0171szakban \u00fczemel, \u00f6t napon \u00e1t. A napt\u00e1r szerinti kapacit\u00e1s: 2 g\u00e9p \u00d7 napi 2 m\u0171szak \u00d7 m\u0171szakonk\u00e9nt 8 \u00f3ra \u00d7 5 nap = 160 g\u00e9p\u00f3ra. A tervez\u00e9shez haszn\u00e1lt 80%-os kapacit\u00e1st\u00e9nyez\u0151vel sz\u00e1molva hetente 128 g\u00e9p\u00f3ra \u00e1ll rendelkez\u00e9sre. Ez a t\u00e9nyez\u0151 m\u00e1r figyelembe veszi a v\u00e1rhat\u00f3 kapacit\u00e1svesztes\u00e9geket, ez\u00e9rt ezeket nem vonjuk le m\u00e9g egyszer.<\/p>\n\n\n<p>A szerel\u0151csapat rendelkez\u00e9sre \u00e1ll\u00f3 kapacit\u00e1sa heti 96 munka\u00f3ra, amelyet k\u00fcl\u00f6n, a csapat l\u00e9tsz\u00e1ma \u00e9s munkanapt\u00e1ra alapj\u00e1n sz\u00e1m\u00edtunk ki.<\/p>\n\n\n<p>A 2. heti megmunk\u00e1l\u00e1s kapacit\u00e1sig\u00e9nye:<\/p>\n\n\n<p><strong>(180 \u00d7 0,40) + (100 \u00d7 0,75) = 147 g\u00e9p\u00f3ra.<\/strong><\/p>\n\n\n<p>Ez 19 \u00f3r\u00e1val haladja meg a rendelkez\u00e9sre \u00e1ll\u00f3 128 \u00f3r\u00e1t, ami egy tizedesjegyre kerek\u00edtve 114,8%-os kapacit\u00e1sterhel\u00e9si ar\u00e1nyt jelent.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Kritikus er\u0151forr\u00e1s<\/th><th>Heti rendelkez\u00e9sre \u00e1ll\u00f3 \u00f3r\u00e1k<\/th><th>1. heti \u00f3rasz\u00fcks\u00e9glet<\/th><th>2. heti \u00f3rasz\u00fcks\u00e9glet<\/th><th>3. heti \u00f3rasz\u00fcks\u00e9glet<\/th><\/tr><\/thead><tbody><tr><td>Megmunk\u00e1l\u00f3 g\u00e9pcsoport<\/td><td>128<\/td><td>108<\/td><td>147<\/td><td>100<\/td><\/tr><tr><td>Szerel\u0151csapat<\/td><td>96<\/td><td>70<\/td><td>95<\/td><td>65<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>A szerel\u00e9s minden h\u00e9ten belef\u00e9r a rendelkez\u00e9sre \u00e1ll\u00f3 kapacit\u00e1sba, de a szabad szerel\u00e9si munka\u00f3r\u00e1k nem helyettes\u00edthetik a megmunk\u00e1l\u00e1shoz sz\u00fcks\u00e9ges g\u00e9p\u00f3r\u00e1kat. A 3. h\u00e9t szabad g\u00e9pkapacit\u00e1sa sem oldja meg a 2. h\u00e9tre v\u00e1llalt sz\u00e1ll\u00edt\u00e1st, hacsak nem v\u00e1ltozik a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151.<\/p>\n\n\n<h3 class=\"wp-block-heading\">A t\u00falterhel\u00e9s ismeret\u00e9ben hozzon d\u00f6nt\u00e9st<\/h3>\n\n\n<p>Az egyik lehet\u0151s\u00e9g, hogy a 2. h\u00e9tre tov\u00e1bbi 19 felhaszn\u00e1lhat\u00f3 megmunk\u00e1l\u00e1si g\u00e9p\u00f3r\u00e1t biztos\u00edt. A k\u00f6lts\u00e9geket \u00e9s a sz\u00fcks\u00e9ges l\u00e9tsz\u00e1mot m\u00e9g ellen\u0151rizni kell, de a kapacit\u00e1sig\u00e9nyre adott v\u00e1lasz egy\u00e9rtelm\u0171.<\/p>\n\n\n<p>M\u00e1sik lehet\u0151s\u00e9g, hogy az A term\u00e9kb\u0151l 50 darabot a 2. h\u00e9t helyett az 1. h\u00e9ten gy\u00e1rt le. Ezzel 20 megmunk\u00e1l\u00e1si g\u00e9p\u00f3ra \u00e9s 12,5 szerel\u00e9si munka\u00f3ra ker\u00fcl kor\u00e1bbra:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Kritikus er\u0151forr\u00e1s<\/th><th>M\u00f3dos\u00edtott 1. heti terhel\u00e9s<\/th><th>M\u00f3dos\u00edtott 2. heti terhel\u00e9s<\/th><th>Heti kapacit\u00e1s<\/th><\/tr><\/thead><tbody><tr><td>Megmunk\u00e1l\u00f3 g\u00e9pcsoport<\/td><td>128<\/td><td>127<\/td><td>128<\/td><\/tr><tr><td>Szerel\u0151csapat<\/td><td>82,5<\/td><td>82,5<\/td><td>96<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>A m\u00f3dos\u00edtott MPS az A term\u00e9kre: 170, 130, 100; a B term\u00e9k mennyis\u00e9gei v\u00e1ltozatlanul 80, 100, 80. A h\u00e1rom h\u00e9t teljes gy\u00e1rt\u00e1si mennyis\u00e9ge nem v\u00e1ltozik. Ebben a modellben megsz\u0171nik a t\u00falterhel\u00e9s, de az 1. heti megmunk\u00e1l\u00e1sn\u00e1l nincs tov\u00e1bbi tartal\u00e9k a kapacit\u00e1sba m\u00e1r besz\u00e1m\u00edtott vesztes\u00e9geken fel\u00fcl.<\/p>\n\n\n<p>Az el\u0151rehozott gy\u00e1rt\u00e1s teh\u00e1t \u00fczleti d\u00f6nt\u00e9s, nem k\u00f6lts\u00e9gmentes megold\u00e1s. Kor\u00e1bban van sz\u00fcks\u00e9g az anyagokra, helyet kell biztos\u00edtani a szerelt egys\u00e9gek t\u00e1rol\u00e1s\u00e1hoz, \u00e9s csak olyan term\u00e9kn\u00e9l indokolt el\u0151re gy\u00e1rtani, amelynek kereslete \u00e9s m\u0171szaki specifik\u00e1ci\u00f3ja ezt lehet\u0151v\u00e9 teszi. Vesse \u00f6ssze ezeket a k\u00f6lts\u00e9geket a t\u00fal\u00f3ra, az alv\u00e1llalkoz\u00f3i gy\u00e1rt\u00e1s vagy a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151 egyeztetett m\u00f3dos\u00edt\u00e1s\u00e1nak k\u00f6lts\u00e9geivel.<\/p>\n\n\n<p>Az RCCP k\u00e9zzelfoghat\u00f3v\u00e1 teszi a lehet\u0151s\u00e9geket. Azt azonban nem d\u00f6nti el, melyik v\u00e1llal\u00e1s a leg\u00e9rt\u00e9kesebb az \u00d6n v\u00e1llalkoz\u00e1s\u00e1nak.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mi\u00e9rt nem garant\u00e1lja a hat\u00e1rid\u0151re t\u00f6rt\u00e9n\u0151 sz\u00e1ll\u00edt\u00e1st a sikeres RCCP-ellen\u0151rz\u00e9s?<\/h2>\n\n\n<p>A m\u00f3dos\u00edtott p\u00e9ld\u00e1ban mindk\u00e9t er\u0151forr\u00e1s terhel\u00e9se belef\u00e9r a heti kapacit\u00e1sba. Most k\u00e9pzelje el, hogy az 1. h\u00e9t egyik rendel\u00e9s\u00e9hez sz\u00fcks\u00e9ges anyag csak cs\u00fct\u00f6rt\u00f6k\u00f6n \u00e9rkezik meg, mik\u00f6zben t\u00f6bb m\u00e1sik rendel\u00e9shez is ugyanerre a megmunk\u00e1l\u00f3 g\u00e9pcsoportra van sz\u00fcks\u00e9g a p\u00e9nteki szerel\u00e9s el\u0151tt.<\/p>\n\n\n<p>A h\u00e9t teljes 128 \u00f3r\u00e1ja nem egyen\u00e9rt\u00e9k\u0171 az anyag be\u00e9rkez\u00e9se ut\u00e1n m\u00e9g rendelkez\u00e9sre \u00e1ll\u00f3 \u00f3r\u00e1kkal. Ekkor m\u00e1r sz\u00e1m\u00edt a gy\u00e1rt\u00e1si feladatok sorrendje, a m\u0171szakok kezdete \u00e9s v\u00e9ge, valamint az alkatr\u00e9szek \u00e1tad\u00e1sa a szerel\u00e9snek. A durva kapacit\u00e1sellen\u0151rz\u00e9s puszt\u00e1n az \u00f6sszes\u00edtett \u00e9rt\u00e9kekb\u0151l nem tudja meg\u00e1llap\u00edtani ezt az id\u0151z\u00edt\u00e9st.<\/p>\n\n\n<p>N\u00e9gy okra \u00e9rdemes figyelni, amelyek miatt egy kiegyens\u00falyozott kapacit\u00e1sterv is meghi\u00fasulhat a v\u00e9grehajt\u00e1s sor\u00e1n:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Id\u0151szakon bel\u00fcli id\u0151z\u00edt\u00e9s:<\/strong> t\u00f6bb gy\u00e1rt\u00e1si feladatnak ugyanazon a napon van sz\u00fcks\u00e9ge ugyanarra az er\u0151forr\u00e1sra.<\/li><li><strong>M\u0171veletek k\u00f6z\u00f6tti f\u00fcgg\u0151s\u00e9gek:<\/strong> a szerel\u00e9s nem haszn\u00e1lhatja ki a szabad kapacit\u00e1s\u00e1t, am\u00edg a megmunk\u00e1l\u00e1s sor\u00e1n el nem k\u00e9sz\u00fclnek a sz\u00fcks\u00e9ges alkatr\u00e9szek.<\/li><li><strong>Az er\u0151forr\u00e1s alkalmass\u00e1ga:<\/strong> egy m\u00e1sik g\u00e9pnek ugyan van szabad kapacit\u00e1sa, de a sz\u00fcks\u00e9ges m\u0171veletet nem tudja elv\u00e9gezni.<\/li><li><strong>V\u00e1ltoz\u00f3 k\u00f6r\u00fclm\u00e9nyek:<\/strong> egy k\u00e9s\u0151 anyagsz\u00e1ll\u00edt\u00e1s, g\u00e9phiba vagy s\u00fcrg\u0151s rendel\u00e9s az ellen\u0151rz\u00e9s ut\u00e1n m\u00f3dos\u00edtja a tervet.<\/li><\/ul>\n\n\n<p>Ezen a ponton kell \u00e1tt\u00e9rni az <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/veges-kapacitasu-utemezes\/\">\u00f6sszes\u00edtett ellen\u0151rz\u00e9sr\u0151l a v\u00e9ges kapacit\u00e1s\u00fa \u00fctemez\u00e9sre<\/a>. A v\u00e1llal\u00e1sokr\u00f3l sz\u00f3l\u00f3 el\u0151zetes d\u00f6nt\u00e9shez tov\u00e1bbra is haszn\u00e1lja az RCCP-t; azt pedig r\u00e9szletes \u00fctemtervvel ellen\u0151rizze, hogyan illeszkednek egym\u00e1shoz a gy\u00e1rt\u00e1si feladatok a gyakorlatban.<\/p>\n\n\n<h2 class=\"wp-block-heading\">A kapacit\u00e1sr\u00f3l hozott d\u00f6nt\u00e9st\u0151l a SkyPlanner \u00fctemterv\u00e9ig<\/h2>\n\n\n<p>A SkyPlanner APS az aj\u00e1nlott k\u00f6vetkez\u0151 l\u00e9p\u00e9s, ha tervez\u0151i azzal t\u00f6ltik az idej\u00fcket, hogy ezekb\u0151l a d\u00f6nt\u00e9sekb\u0151l g\u00e9penk\u00e9nti feladatsorokat \u00e1ll\u00edtanak \u00f6ssze, majd a gy\u00e1rt\u00e1s minden v\u00e1ltoz\u00e1sakor \u00fajra\u00e9p\u00edtik \u0151ket. Tartsa meg az RCCP-t a f\u0151termel\u00e9si terv k\u00e9sz\u00edt\u00e9s\u00e9nek folyamat\u00e1ban, az ezt k\u00f6vet\u0151 r\u00e9szletes \u00fctemez\u00e9shez pedig haszn\u00e1lja a SkyPlanner megold\u00e1s\u00e1t.<\/p>\n\n\n<p>Az \u00fczleti \u00e9s gy\u00e1rt\u00e1si adatok forr\u00e1sa tov\u00e1bbra is az ERP legyen. A SkyPlanner <a href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/\">ny\u00edlt REST API fel\u00fclet\u00e9n kereszt\u00fcl b\u00e1rmely ERP- vagy MES-rendszerrel integr\u00e1lhat\u00f3<\/a>, \u00edgy ezek az adatok k\u00f6zvetlen\u00fcl felhaszn\u00e1lhat\u00f3k a gy\u00e1rt\u00e1s\u00fctemez\u00e9sben, ahelyett, hogy a tervez\u0151nek \u00fajra \u00e9s \u00fajra k\u00e9zzel kellene \u00f6ssze\u00e1ll\u00edtania a tervet.<\/p>\n\n\n<p>Modellezze a munka\u00e1llom\u00e1sokat, a m\u0171veleteket, a m\u0171szakokat, a g\u00e9pkezel\u0151ket \u00e9s a priorit\u00e1sokat. Az Arcturus a be\u00e1ll\u00edtott kapacit\u00e1sok, f\u00fcgg\u0151s\u00e9gek \u00e9s szab\u00e1lyok alapj\u00e1n sz\u00e1m\u00edtja ki az \u00fctemtervet. Ha enged\u00e9lyezi az anyagell\u00e1t\u00e1st figyelembe vev\u0151 \u00fctemez\u00e9st, az anyagok rendelkez\u00e9sre \u00e1ll\u00e1sa \u00e9s a be\u00e9rkez\u0151 sz\u00e1ll\u00edtm\u00e1nyok is befoly\u00e1solj\u00e1k az id\u0151z\u00edt\u00e9st. Az \u00edgy \u00fctemezett gy\u00e1rt\u00e1si feladatokat \u00e9s kapcsolataikat a Gantt-id\u0151vonalon tekintheti \u00e1t.<\/p>\n\n\n<p>A szivatty\u00fas p\u00e9ld\u00e1ban a k\u00f6vetkez\u0151 gyakorlati l\u00e9p\u00e9s a m\u00f3dos\u00edtott gy\u00e1rt\u00e1si mennyis\u00e9gek \u00fctemez\u00e9se, majd annak ellen\u0151rz\u00e9se, hogy mikor fejez\u0151dik be a megmunk\u00e1l\u00e1s \u00e9s a szerel\u00e9s. Ha megv\u00e1ltozik egy anyag be\u00e9rkez\u00e9si id\u0151pontja, friss\u00edtse az ell\u00e1t\u00e1si adatokat, \u00e9s sz\u00e1m\u00edttassa \u00fajra az \u00fctemtervet. A Gantt-n\u00e9zet konkr\u00e9t alapot ad annak eld\u00f6nt\u00e9s\u00e9hez, hogy tarthat\u00f3-e a v\u00e1llal\u00e1s, m\u00f3dos\u00edtani kell-e a priorit\u00e1sokat, vagy tov\u00e1bbi kapacit\u00e1st kell biztos\u00edtani.<\/p>\n\n\n<p>Ez ott takar\u00edt meg tervez\u00e9si munk\u00e1t, ahol a durva kapacit\u00e1ssz\u00e1m\u00edt\u00e1s v\u00e9get \u00e9r: \u00f6sszehangolja a k\u00fcl\u00f6nb\u00f6z\u0151 er\u0151forr\u00e1sokon v\u00e9gzett munk\u00e1t, \u00e9s a k\u00f6r\u00fclm\u00e9nyek v\u00e1ltoz\u00e1sakor is fenntartja ezt az \u00f6sszhangot. A priorit\u00e1sokat a tervez\u0151 hat\u00e1rozza meg; az \u00fctemez\u00e9si sz\u00e1m\u00edt\u00e1sokat az Arcturus v\u00e9gzi. Ha a sz\u00fcks\u00e9ges munka \u00edgy sem f\u00e9r bele a hat\u00e1rid\u0151kig rendelkez\u00e9sre \u00e1ll\u00f3 id\u0151be, az \u00fczleti d\u00f6nt\u00e9s sz\u00fcks\u00e9gess\u00e9ge l\u00e1that\u00f3 marad, nem fedi el egy kiegyens\u00falyozott heti \u00f6sszes\u00edt\u00e9s.<\/p>\n\n\n<h3 class=\"wp-block-heading\">KJH-Comp: az \u00f6sszes\u00edtett heti terhel\u00e9sen t\u00fal<\/h3>\n\n\n<p>A finn lemezmegmunk\u00e1l\u00f3 b\u00e9rgy\u00e1rt\u00f3, a KJH-Comp m\u00e1r kor\u00e1bban is tervezte a heti \u00f6sszes\u00edtett terhel\u00e9st a C9000 ERP-rendszer\u00e9ben \u00e9s t\u00e1bl\u00e1zatokban. A neh\u00e9zs\u00e9get a k\u00f6vetkez\u0151 l\u00e9p\u00e9s jelentette: a vev\u0151i rendel\u00e9sek konkr\u00e9t napokra sz\u00f3ltak, mik\u00f6zben a m\u0171vezet\u0151k m\u00e9g mindig k\u00e9zzel osztott\u00e1k ki a gy\u00e1rt\u00e1si feladatokat a g\u00e9pekre. K\u00e9t m\u0171vezet\u0151 k\u00fcl\u00f6n-k\u00fcl\u00f6n is a munkaideje legal\u00e1bb fel\u00e9t kapacit\u00e1s\u00fctemez\u00e9ssel t\u00f6lt\u00f6tte.<\/p>\n\n\n<p>A v\u00e1llalat megtartotta ERP-rendszer\u00e9t, a v\u00e9ges kapacit\u00e1s\u00fa \u00fctemez\u00e9shez pedig bevezette a SkyPlanner megold\u00e1s\u00e1t. A k\u00f6zz\u00e9tett \u00fcgyf\u00e9lt\u00f6rt\u00e9netben a KJH-Comp automatikus g\u00e9pkioszt\u00e1sr\u00f3l, a sz\u0171k keresztmetszetek kor\u00e1bbi felismer\u00e9s\u00e9r\u0151l \u00e9s kevesebb k\u00e9zi \u00fctemez\u00e9si munk\u00e1r\u00f3l sz\u00e1mol be. Az \u00fctemez\u00e9s\u00e9rt a kor\u00e1bbi k\u00e9t m\u0171vezet\u0151 helyett m\u00e1r csak egy felelt, a m\u00e1sik pedig m\u00e1s feladatokat kapott.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/hu\/ugyfeltortenetek\/kjh-comp\/\">A KJH-Comp besz\u00e1mol\u00f3ja szerint<\/a> a hat\u00e1rid\u0151re teljes\u00edtett sz\u00e1ll\u00edt\u00e1sok ar\u00e1nya a kor\u00e1bbi mintegy 50%-r\u00f3l 2026-ban ak\u00e1r 98%-ra emelkedett. Ez a v\u00e1llalat saj\u00e1t bevezet\u00e9se sor\u00e1n szerzett tapasztalata. Az RCCP-ellen\u0151rz\u00e9s szempontj\u00e1b\u00f3l az a tanuls\u00e1gos, milyen gyakorlati hi\u00e1nyoss\u00e1got sz\u00fcntettek meg: a heti terhel\u00e9s \u00e1ttekint\u00e9s\u00e9b\u0151l \u00f6sszehangolt napi munka lett, nem pedig \u00fajabb feladatsorok, amelyeket a m\u0171vezet\u0151knek k\u00e9zzel kellett \u00f6ssze\u00e1ll\u00edtaniuk.<\/p>\n\n\n<h2 class=\"wp-block-heading\">V\u00e1ltsa tettekre a k\u00f6vetkez\u0151 kapacit\u00e1sellen\u0151rz\u00e9s eredm\u00e9ny\u00e9t<\/h2>\n\n\n<p>Az MPS k\u00f6vetkez\u0151 fel\u00fclvizsg\u00e1latakor azonos\u00edtsa azt a kritikus er\u0151forr\u00e1st, amelyn\u00e9l a legnagyobb a kapacit\u00e1shi\u00e1ny. \u00c1llapodjanak meg arr\u00f3l, hogy \u00e1thelyezik a gy\u00e1rt\u00e1st, n\u00f6velik a felhaszn\u00e1lhat\u00f3 kapacit\u00e1st vagy m\u00f3dos\u00edtj\u00e1k a v\u00e1llal\u00e1st, majd sz\u00e1m\u00edts\u00e1k \u00fajra a durva kapacit\u00e1sterhel\u00e9st. Miel\u0151tt kiadn\u00e1 a m\u00f3dos\u00edtott gy\u00e1rt\u00e1si feladatokat, ellen\u0151rizze a r\u00e9szletes id\u0151z\u00edt\u00e9st a t\u00f6bbi feladat \u00e9s az anyagok rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1nak figyelembev\u00e9tel\u00e9vel.<\/p>\n\n\n<p>A SkyPlanner seg\u00edts\u00e9g\u00e9vel ezt az utols\u00f3 l\u00e9p\u00e9st gyorsabban \u00e9s hasznosabban v\u00e9gezheti el. <a href=\"https:\/\/skyplanner.ai\/hu\/proba\/\">Pr\u00f3b\u00e1lja ki dem\u00f3adatokkal<\/a> az \u00fctemez\u00e9si munkafolyamatot, vagy <a href=\"https:\/\/skyplanner.ai\/hu\/kapcsolat-ertekesites\/\">foglaljon bemutat\u00f3t<\/a> saj\u00e1t sz\u0171k keresztmetszetei, m\u0171szakjai \u00e9s v\u00e1llalt sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151i alapj\u00e1n. Hozza el a megval\u00f3s\u00edtani k\u00edv\u00e1nt gy\u00e1rt\u00e1si terv\u00e9t, \u00e9s n\u00e9zze meg, hogyan seg\u00edt az Arcturus \u00e9s a Gantt-id\u0151vonal olyan \u00fctemtervv\u00e9 alak\u00edtani, amelyet a csapata a gyakorlatban is haszn\u00e1lhat.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Durva kapacit\u00e1stervez\u00e9s: az MPS ellen\u0151rz\u00e9se RCCP-vel Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Durva kapacit\u00e1stervez\u00e9s: az MPS ellen\u0151rz\u00e9se RCCP-vel A gy\u00e1rt\u00e1si f\u0151terv r\u00f6gz\u00edti, hogy mit k\u00edv\u00e1nunk gy\u00e1rtani. A durva kapacit\u00e1stervez\u00e9s azt vizsg\u00e1lja, hogy a kritikus er\u0151forr\u00e1sok kapacit\u00e1sa elegend\u0151-e ehhez. Ezt m\u00e9g azel\u0151tt fontos ellen\u0151rizni, hogy a beszerz\u00e9s, a termel\u00e9s \u00e9s az \u00e9rt\u00e9kes\u00edt\u00e9s egy olyan terv alapj\u00e1n kezdene dolgozni, &#8230; <a title=\"Durva kapacit\u00e1stervez\u00e9s: az MPS ellen\u0151rz\u00e9se RCCP-vel\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/durva-kapacitastervezes\/\" aria-label=\"Read more about Durva kapacit\u00e1stervez\u00e9s: az MPS ellen\u0151rz\u00e9se RCCP-vel\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":99174,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2526,312],"tags":[],"class_list":["post-99145","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-es-utemezes","category-forrasok","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Durva kapacit\u00e1stervez\u00e9s: az MPS ellen\u0151rz\u00e9se RCCP-vel<\/title>\n<meta name=\"description\" content=\"El\u00e9g a kritikus er\u0151forr\u00e1sok kapacit\u00e1sa az MPS-hez? RCCP-p\u00e9ld\u00e1nkon azonos\u00edthatja a t\u00falterhel\u00e9seket, majd megval\u00f3s\u00edthat\u00f3 \u00fctemtervv\u00e9 alak\u00edthatja a tervet.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/durva-kapacitastervezes\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Durva kapacit\u00e1stervez\u00e9s: az MPS ellen\u0151rz\u00e9se RCCP-vel\" \/>\n<meta property=\"og:description\" content=\"El\u00e9g a kritikus er\u0151forr\u00e1sok kapacit\u00e1sa az MPS-hez? RCCP-p\u00e9ld\u00e1nkon azonos\u00edthatja a t\u00falterhel\u00e9seket, majd megval\u00f3s\u00edthat\u00f3 \u00fctemtervv\u00e9 alak\u00edthatja a tervet.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/forrasok\/durva-kapacitastervezes\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-15T15:53:51+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-15T15:54:47+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Szerz\u0151:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data2\" content=\"19 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/durva-kapacitastervezes\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/durva-kapacitastervezes\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Durva kapacit\u00e1stervez\u00e9s: az MPS ellen\u0151rz\u00e9se RCCP-vel\",\"datePublished\":\"2026-10-15T15:53:51+00:00\",\"dateModified\":\"2026-10-15T15:54:47+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/durva-kapacitastervezes\\\/\"},\"wordCount\":3769,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/durva-kapacitastervezes\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/rough-cut-capacity-planning-hero.png\",\"articleSection\":[\"APS \u00e9s \u00fctemez\u00e9s\",\"forr\u00e1sok\"],\"inLanguage\":\"hu-HU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/durva-kapacitastervezes\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/durva-kapacitastervezes\\\/\",\"name\":\"Durva kapacit\u00e1stervez\u00e9s: az MPS ellen\u0151rz\u00e9se RCCP-vel\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/durva-kapacitastervezes\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/durva-kapacitastervezes\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/rough-cut-capacity-planning-hero.png\",\"datePublished\":\"2026-10-15T15:53:51+00:00\",\"dateModified\":\"2026-10-15T15:54:47+00:00\",\"description\":\"El\u00e9g a kritikus er\u0151forr\u00e1sok kapacit\u00e1sa az MPS-hez? RCCP-p\u00e9ld\u00e1nkon azonos\u00edthatja a t\u00falterhel\u00e9seket, majd megval\u00f3s\u00edthat\u00f3 \u00fctemtervv\u00e9 alak\u00edthatja a tervet.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/durva-kapacitastervezes\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/durva-kapacitastervezes\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/durva-kapacitastervezes\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/rough-cut-capacity-planning-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/rough-cut-capacity-planning-hero.png\",\"width\":1672,\"height\":941},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/durva-kapacitastervezes\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Durva kapacit\u00e1stervez\u00e9s: az MPS ellen\u0151rz\u00e9se RCCP-vel\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Durva kapacit\u00e1stervez\u00e9s: az MPS ellen\u0151rz\u00e9se RCCP-vel","description":"El\u00e9g a kritikus er\u0151forr\u00e1sok kapacit\u00e1sa az MPS-hez? RCCP-p\u00e9ld\u00e1nkon azonos\u00edthatja a t\u00falterhel\u00e9seket, majd megval\u00f3s\u00edthat\u00f3 \u00fctemtervv\u00e9 alak\u00edthatja a tervet.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/forrasok\/durva-kapacitastervezes\/","og_locale":"hu_HU","og_type":"article","og_title":"Durva kapacit\u00e1stervez\u00e9s: az MPS ellen\u0151rz\u00e9se RCCP-vel","og_description":"El\u00e9g a kritikus er\u0151forr\u00e1sok kapacit\u00e1sa az MPS-hez? RCCP-p\u00e9ld\u00e1nkon azonos\u00edthatja a t\u00falterhel\u00e9seket, majd megval\u00f3s\u00edthat\u00f3 \u00fctemtervv\u00e9 alak\u00edthatja a tervet.","og_url":"https:\/\/skyplanner.ai\/hu\/forrasok\/durva-kapacitastervezes\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-15T15:53:51+00:00","article_modified_time":"2026-10-15T15:54:47+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Szerz\u0151:":"Jussi M\u00e4ntyl\u00e4","Becs\u00fclt olvas\u00e1si id\u0151":"19 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/durva-kapacitastervezes\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/durva-kapacitastervezes\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Durva kapacit\u00e1stervez\u00e9s: az MPS ellen\u0151rz\u00e9se RCCP-vel","datePublished":"2026-10-15T15:53:51+00:00","dateModified":"2026-10-15T15:54:47+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/durva-kapacitastervezes\/"},"wordCount":3769,"publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/durva-kapacitastervezes\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero.png","articleSection":["APS \u00e9s \u00fctemez\u00e9s","forr\u00e1sok"],"inLanguage":"hu-HU"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/durva-kapacitastervezes\/","url":"https:\/\/skyplanner.ai\/hu\/forrasok\/durva-kapacitastervezes\/","name":"Durva kapacit\u00e1stervez\u00e9s: az MPS ellen\u0151rz\u00e9se RCCP-vel","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/durva-kapacitastervezes\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/durva-kapacitastervezes\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero.png","datePublished":"2026-10-15T15:53:51+00:00","dateModified":"2026-10-15T15:54:47+00:00","description":"El\u00e9g a kritikus er\u0151forr\u00e1sok kapacit\u00e1sa az MPS-hez? RCCP-p\u00e9ld\u00e1nkon azonos\u00edthatja a t\u00falterhel\u00e9seket, majd megval\u00f3s\u00edthat\u00f3 \u00fctemtervv\u00e9 alak\u00edthatja a tervet.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/durva-kapacitastervezes\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/forrasok\/durva-kapacitastervezes\/"]}]},{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/durva-kapacitastervezes\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero.png","width":1672,"height":941},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/durva-kapacitastervezes\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"Durva kapacit\u00e1stervez\u00e9s: az MPS ellen\u0151rz\u00e9se RCCP-vel"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/rough-cut-capacity-planning-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Durva kapacit\u00e1stervez\u00e9s: az MPS ellen\u0151rz\u00e9se RCCP-vel Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Durva kapacit\u00e1stervez\u00e9s: az MPS ellen\u0151rz\u00e9se RCCP-vel A gy\u00e1rt\u00e1si f\u0151terv r\u00f6gz\u00edti, hogy mit k\u00edv\u00e1nunk gy\u00e1rtani. A durva kapacit\u00e1stervez\u00e9s azt vizsg\u00e1lja, hogy a kritikus er\u0151forr\u00e1sok kapacit\u00e1sa elegend\u0151-e ehhez. Ezt m\u00e9g azel\u0151tt fontos ellen\u0151rizni, hogy a beszerz\u00e9s, a termel\u00e9s \u00e9s az \u00e9rt\u00e9kes\u00edt\u00e9s egy olyan terv alapj\u00e1n kezdene dolgozni,&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/99145","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=99145"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/99145\/revisions"}],"predecessor-version":[{"id":99204,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/99145\/revisions\/99204"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media\/99174"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=99145"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/categories?post=99145"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/tags?post=99145"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}