{"id":97993,"date":"2026-10-14T22:50:56","date_gmt":"2026-10-14T22:50:56","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=97993"},"modified":"2026-10-14T22:51:48","modified_gmt":"2026-10-14T22:51:48","slug":"elore-es-visszafele-torteno-gyartasutemezes","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/hu\/forrasok\/elore-es-visszafele-torteno-gyartasutemezes\/","title":{"rendered":"El\u0151re \u00e9s visszafel\u00e9 t\u00f6rt\u00e9n\u0151 gy\u00e1rt\u00e1s\u00fctemez\u00e9s: v\u00e1lassza a megfelel\u0151 ir\u00e1nyt"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">El\u0151re \u00e9s visszafel\u00e9 t\u00f6rt\u00e9n\u0151 gy\u00e1rt\u00e1s\u00fctemez\u00e9s: v\u00e1lassza a megfelel\u0151 ir\u00e1nyt<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/hu\/\">Kezd\u0151lap<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/\">Er\u0151forr\u00e1sok<\/a> &raquo; El\u0151re \u00e9s visszafel\u00e9 t\u00f6rt\u00e9n\u0151 gy\u00e1rt\u00e1s\u00fctemez\u00e9s: v\u00e1lassza a megfelel\u0151 ir\u00e1nyt<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Becs\u00fclt olvas\u00e1si id\u0151: <\/span><span class=\"yoast-reading-time__reading-time\">8<\/span><span class=\"yoast-reading-time__time-unit\"> perc<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Egy rendel\u00e9s hat\u00e1rideje j\u00f6v\u0151 p\u00e9ntek. \u00c9rdemes elind\u00edtani a gy\u00e1rt\u00e1st, amint meg\u00e9rkezik az anyag, vagy ink\u00e1bb v\u00e1rni a kisz\u00e1ll\u00edt\u00e1shoz k\u00f6zelebbi id\u0151pontig? A korai ind\u00edt\u00e1s seg\u00edthet tartani a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151t, de anyagot \u00e9s \u00fczemi ter\u00fcletet is lek\u00f6t. A k\u00e9s\u0151bbi ind\u00edt\u00e1ssal a munka csak akkor ker\u00fcl az \u00fczembe, amikor sz\u00fcks\u00e9g van r\u00e1 \u2013 felt\u00e9ve, hogy a sz\u00fcks\u00e9ges kapacit\u00e1s akkor is rendelkez\u00e9sre \u00e1ll.<\/p>\n\n\n<p>Az el\u0151re \u00e9s visszafel\u00e9 t\u00f6rt\u00e9n\u0151 gy\u00e1rt\u00e1s\u00fctemez\u00e9s k\u00f6z\u00f6tti v\u00e1laszt\u00e1s err\u0151l az id\u0151z\u00edt\u00e9sr\u0151l sz\u00f3l. <strong>Az el\u0151re t\u00f6rt\u00e9n\u0151 \u00fctemez\u00e9s azt mutatja meg, mikor k\u00e9sz\u00fclhet el egy rendel\u00e9s, ha a legkor\u00e1bbi megengedett kezd\u00e9st\u0151l \u00fctemez\u00fcnk. A visszafel\u00e9 t\u00f6rt\u00e9n\u0151 \u00fctemez\u00e9s pedig azt, mikor kell elind\u00edtani ahhoz, hogy a kit\u0171z\u00f6tt id\u0151pontra elk\u00e9sz\u00fclj\u00f6n.<\/strong><\/p>\n\n\n<p>Egyik ir\u00e1ny sem teremt t\u00f6bb g\u00e9p\u00f3r\u00e1t. Haszn\u00e1lhat\u00f3 v\u00e1laszt akkor kapunk, ha a rendel\u00e9st az \u00fczem er\u0151forr\u00e1saihoz, anyagaihoz \u00e9s m\u00e1s v\u00e1llal\u00e1saihoz igaz\u00edtjuk. A SkyPlanner mindk\u00e9t ir\u00e1nyt t\u00e1mogatja, \u00e9s kisz\u00e1m\u00edtja a m\u0171veletek \u00fctemez\u00e9s\u00e9t. \u00cdgy eld\u00f6ntheti, mikor t\u00f6rt\u00e9njen a gy\u00e1rt\u00e1s, an\u00e9lk\u00fcl, hogy minden g\u00e9p feladatsor\u00e1t saj\u00e1t kez\u0171leg kellene \u00fajrarendeznie.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mi a k\u00fcl\u00f6nbs\u00e9g az el\u0151re \u00e9s a visszafel\u00e9 t\u00f6rt\u00e9n\u0151 \u00fctemez\u00e9s k\u00f6z\u00f6tt?<\/h2>\n\n\n<p>Az el\u0151re t\u00f6rt\u00e9n\u0151 \u00fctemez\u00e9s a kezd\u00e9si id\u0151pontb\u00f3l kiindulva halad a befejez\u00e9s fel\u00e9. Az els\u0151 m\u0171veletet az \u00fctemez\u00e9si korl\u00e1tok \u00e1ltal megengedett legkor\u00e1bbi id\u0151pontra helyezi, majd a gy\u00e1rt\u00e1si \u00fatvonal sorrendj\u00e9ben \u00fctemezi a tov\u00e1bbi m\u0171veleteket. Az eredm\u00e9ny az adott felt\u00e9telek mellett tervezhet\u0151 legkor\u00e1bbi befejez\u00e9si id\u0151pont.<\/p>\n\n\n<p>A visszafel\u00e9 t\u00f6rt\u00e9n\u0151 \u00fctemez\u00e9s az el\u0151\u00edrt befejez\u00e9si id\u0151pontb\u00f3l indul, \u00e9s a kezd\u00e9s fel\u00e9 halad. Az utols\u00f3 m\u0171veletet a legk\u00e9s\u0151bbi megfelel\u0151 id\u0151pontra helyezi, majd visszafel\u00e9 \u00fctemezi az azt megel\u0151z\u0151 m\u0171veleteket. Az eredm\u00e9ny megmutatja, hogy ugyanolyan jelleg\u0171 korl\u00e1tok mellett legk\u00e9s\u0151bb mikor ind\u00edthat\u00f3 el a rendel\u00e9s.<\/p>\n\n\n<p>A sz\u00e1m\u00edt\u00e1s ir\u00e1nya megv\u00e1ltozik, <strong>a gy\u00e1rt\u00e1si \u00fatvonal azonban nem<\/strong>. A v\u00e1g\u00e1s tov\u00e1bbra is megel\u0151zi a forg\u00e1csol\u00e1st, a forg\u00e1csol\u00e1s pedig a v\u00e9gellen\u0151rz\u00e9st.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>D\u00f6nt\u00e9si szempont<\/th><th>El\u0151re t\u00f6rt\u00e9n\u0151 \u00fctemez\u00e9s<\/th><th>Visszafel\u00e9 t\u00f6rt\u00e9n\u0151 \u00fctemez\u00e9s<\/th><\/tr><\/thead><tbody><tr><td>Kiindul\u00f3pont<\/td><td>Megengedett kezd\u00e9si id\u0151pont<\/td><td>El\u0151\u00edrt befejez\u00e9si id\u0151pont<\/td><\/tr><tr><td>F\u0151 k\u00e9rd\u00e9s<\/td><td>Legkor\u00e1bban mikor k\u00e9sz\u00fclhet el a rendel\u00e9s?<\/td><td>Legk\u00e9s\u0151bb mikor indulhat el a rendel\u00e9s?<\/td><\/tr><tr><td>Mikor hasznos?<\/td><td>A teljes\u00edthet\u0151 befejez\u00e9si id\u0151pont meghat\u00e1roz\u00e1s\u00e1hoz, illetve a miel\u0151bb elv\u00e9gzend\u0151 munka \u00fctemez\u00e9s\u00e9hez (ASAP)<\/td><td>Ha a visszaigazolt rendel\u00e9sek gy\u00e1rt\u00e1s\u00e1t arra az id\u0151re szeretn\u00e9 \u00fctemezni, amikor sz\u00fcks\u00e9g van r\u00e1juk<\/td><\/tr><tr><td>K\u00e9szletez\u00e9si kompromisszum<\/td><td>A sz\u00fcks\u00e9gesn\u00e9l kor\u00e1bban keletkezhet befejezetlen termel\u00e9s vagy k\u00e9szterm\u00e9kk\u00e9szlet<\/td><td>Cs\u00f6kkentheti a t\u00fal korai gy\u00e1rt\u00e1st \u00e9s a k\u00e9szlet v\u00e1rakoz\u00e1si idej\u00e9t<\/td><\/tr><tr><td>A sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151 v\u00e9delme<\/td><td>A korai befejez\u00e9s id\u0151t hagyhat a probl\u00e9m\u00e1k elh\u00e1r\u00edt\u00e1s\u00e1ra a kisz\u00e1ll\u00edt\u00e1s el\u0151tt<\/td><td>A biztons\u00e1gi id\u0151t tudatosan kell be\u00e9p\u00edteni a c\u00e9lid\u0151pontba \u00e9s az \u00fctemtervbe<\/td><\/tr><tr><td>Alapvet\u0151 ellen\u0151rz\u00e9s<\/td><td>A kisz\u00e1m\u00edtott befejez\u00e9ssel tarthat\u00f3 a v\u00e1llalt hat\u00e1rid\u0151?<\/td><td>A sz\u00fcks\u00e9ges kezd\u00e9skor rendelkez\u00e9sre \u00e1ll az anyag \u00e9s a kapacit\u00e1s?<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Az \u00fctemez\u00e9s ir\u00e1nya \u00e9s a kapacit\u00e1s kezel\u00e9se k\u00e9t k\u00fcl\u00f6n d\u00f6nt\u00e9s. Mindk\u00e9t ir\u00e1nyban sz\u00e1molhatunk <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/veges-kapacitasu-utemezes\/\">v\u00e9ges kapacit\u00e1ssal<\/a>, vagy felt\u00e9telezhet\u00fcnk korl\u00e1tlan kapacit\u00e1st. Ha egy visszafel\u00e9 sz\u00e1m\u00edtott terv t\u00f6bb rendel\u00e9st helyez ugyanarra a m\u00e1r foglalt g\u00e9pre, \u00e9pp\u00fagy nem v\u00e9grehajthat\u00f3, mint az ugyan\u00edgy elj\u00e1r\u00f3, el\u0151re sz\u00e1m\u00edtott terv.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Gy\u00e1rt\u00e1si p\u00e9lda: ugyanaz a rendel\u00e9s, k\u00e9t kezd\u00e9si id\u0151pont<\/h2>\n\n\n<p>Vegy\u00fcnk egy gy\u00e1rt\u00e1si t\u00e9telt, amely h\u00e1rom, k\u00fcl\u00f6n er\u0151forr\u00e1son v\u00e9gzett m\u0171veletet ig\u00e9nyel: v\u00e1g\u00e1st, forg\u00e1csol\u00e1st \u00e9s ellen\u0151rz\u00e9st. Az anyag h\u00e9tf\u0151 reggel rendelkez\u00e9sre \u00e1ll. Minden er\u0151forr\u00e1s h\u00e9tf\u0151t\u0151l p\u00e9ntekig, 08:00\u201316:00 k\u00f6z\u00f6tt dolgozik, \u00e9s egy m\u0171veletnek a teljes t\u00e9telen be kell fejez\u0151dnie, miel\u0151tt a k\u00f6vetkez\u0151 elkezd\u0151dhet. Az al\u00e1bbi id\u0151tartamok tartalmazz\u00e1k az egyes m\u0171veletekhez sz\u00fcks\u00e9ges id\u0151t; ebben az els\u0151 p\u00e9ld\u00e1ban nincs tov\u00e1bbi anyagmozgat\u00e1s vagy v\u00e1rakoz\u00e1s.<\/p>\n\n\n<p>A vev\u0151 p\u00e9nteki kisz\u00e1ll\u00edt\u00e1st k\u00e9r. A gy\u00e1rt\u00e1s befejez\u00e9s\u00e9nek bels\u0151 c\u00e9lid\u0151pontj\u00e1t cs\u00fct\u00f6rt\u00f6k 16:00-ra \u00e1ll\u00edtja, \u00edgy megmarad a csomagol\u00e1sra \u00e9s a kisz\u00e1ll\u00edt\u00e1sra egyeztetett id\u0151, amely nem r\u00e9sze ennek a gy\u00e1rt\u00e1si \u00fatvonalnak. Kezdetben az er\u0151forr\u00e1sokon minden sz\u00fcks\u00e9ges id\u0151s\u00e1v szabad.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>M\u0171velet<\/th><th>Id\u0151tartam<\/th><th>El\u0151re, h\u00e9tf\u0151 08:00-t\u00f3l<\/th><th>Visszafel\u00e9, cs\u00fct\u00f6rt\u00f6k 16:00-t\u00f3l<\/th><\/tr><\/thead><tbody><tr><td>V\u00e1g\u00e1s<\/td><td>2 \u00f3ra<\/td><td>H\u00e9tf\u0151 08:00\u201310:00<\/td><td>Cs\u00fct\u00f6rt\u00f6k 08:00\u201310:00<\/td><\/tr><tr><td>Forg\u00e1csol\u00e1s<\/td><td>4 \u00f3ra<\/td><td>H\u00e9tf\u0151 10:00\u201314:00<\/td><td>Cs\u00fct\u00f6rt\u00f6k 10:00\u201314:00<\/td><\/tr><tr><td>Ellen\u0151rz\u00e9s<\/td><td>2 \u00f3ra<\/td><td>H\u00e9tf\u0151 14:00\u201316:00<\/td><td>Cs\u00fct\u00f6rt\u00f6k 14:00\u201316:00<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Mindk\u00e9t \u00fctemterv teljes\u00edti a gy\u00e1rt\u00e1si c\u00e9lid\u0151pontot. El\u0151re \u00fctemezve a t\u00e9tel h\u00e9tf\u0151n elk\u00e9sz\u00fcl, majd v\u00e1rakozik. Visszafel\u00e9 \u00fctemezve a gy\u00e1rt\u00e1s csak cs\u00fct\u00f6rt\u00f6k\u00f6n indul el, \u00edgy nem keletkezik id\u0151 el\u0151tt k\u00e9szterm\u00e9kk\u00e9szlet. A rendel\u00e9st\u0151l \u00e9s a gy\u00e1rt\u00e1si k\u00f6r\u00fclm\u00e9nyekt\u0151l f\u00fcgg, hogy a hosszabb v\u00e1rakoz\u00e1s hasznos biztons\u00e1gi tartal\u00e9kot vagy felesleges k\u00e9szletet jelent.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Most \u00fctemezz\u00fcnk egy m\u00e1sik rendel\u00e9st is a g\u00e9pre<\/h3>\n\n\n<p>Tegy\u00fck fel, hogy a forg\u00e1csol\u00e1st v\u00e9gz\u0151 er\u0151forr\u00e1s cs\u00fct\u00f6rt\u00f6kre m\u00e1r teljesen le van foglalva. A c\u00e9lid\u0151pont el\u0151tti legk\u00e9s\u0151bbi szabad, n\u00e9gy\u00f3r\u00e1s id\u0151s\u00e1vja szerd\u00e1n 10:00\u201314:00 k\u00f6z\u00f6tt van.<\/p>\n\n\n<p>A kapacit\u00e1st figyelembe vev\u0151, visszafel\u00e9 t\u00f6rt\u00e9n\u0151 \u00fctemez\u00e9snek a t\u00e9tel forg\u00e1csol\u00e1s\u00e1t ebbe a szerdai id\u0151s\u00e1vba kell \u00e1thelyeznie, a v\u00e1g\u00e1st pedig az el\u00e9 kell \u00fctemeznie. Az ellen\u0151rz\u00e9s tov\u00e1bbra is t\u00f6rt\u00e9nhet cs\u00fct\u00f6rt\u00f6k\u00f6n 14:00\u201316:00 k\u00f6z\u00f6tt, ha ez az id\u0151s\u00e1v szabad marad. A rendel\u00e9s gy\u00e1rt\u00e1sa \u00edgy kor\u00e1bban indul, \u00e9s a t\u00e9tel a forg\u00e1csol\u00e1s \u00e9s az ellen\u0151rz\u00e9s k\u00f6z\u00f6tt v\u00e1rakozik.<\/p>\n\n\n<p>Ez\u00e9rt nem el\u00e9g nyolc megmunk\u00e1l\u00e1si \u00f3r\u00e1t levonni a hat\u00e1rid\u0151b\u0151l. A megl\u00e9v\u0151 feladatsorok \u00e9s a munkarendek hat\u00e1rozz\u00e1k meg, hogy ezek az \u00f3r\u00e1k t\u00e9nylegesen hov\u00e1 f\u00e9rnek be. Ha az anyag nem \u00e9rkezhet meg a v\u00e1g\u00e1shoz sz\u00fcks\u00e9ges id\u0151s\u00e1v el\u0151tt, akkor egy feloldand\u00f3 \u00fctk\u00f6z\u00e9st kapunk, nem pedig egy olyan kezd\u00e9si id\u0151pontot, amellyel a rendel\u00e9s gy\u00e1rt\u00e1sba adhat\u00f3.<\/p>\n\n\n<p>A SkyPlanner ezt az \u00fctemez\u00e9si munk\u00e1t egyetlen \u00f6sszef\u00fcgg\u0151 tervbe fogja \u00f6ssze. Az Arcturus, a rendszer \u00fctemez\u00e9st v\u00e9gz\u0151 mesters\u00e9ges intelligenci\u00e1ja a be\u00e1ll\u00edtott kapacit\u00e1sok, f\u00fcgg\u0151s\u00e9gek \u00e9s priorit\u00e1sok alapj\u00e1n sz\u00e1m\u00edtja ki a gy\u00e1rt\u00e1si feladatok elhelyez\u00e9s\u00e9t. <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/gantt-diagram-a-termeles-tervezesehez\/\">A Gantt-diagram<\/a> megjelen\u00edti az \u00edgy kapott id\u0151z\u00edt\u00e9st az er\u0151forr\u00e1sokon, \u00edgy k\u00f6nnyebb \u00e1tl\u00e1tni, hogy a tervezett gy\u00e1rt\u00e1sba ad\u00e1si id\u0151pont tov\u00e1bbra is megfelel\u0151-e.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mikor melyik m\u00f3dszert \u00e9rdemes haszn\u00e1lni?<\/h2>\n\n\n<p>Az alapj\u00e1n v\u00e1lasszon ir\u00e1nyt, hogy milyen k\u00e9rd\u00e9sre keres v\u00e1laszt, ne pedig egyetlen m\u00f3dszert alkalmazzon az eg\u00e9sz v\u00e1llalkoz\u00e1sra.<\/p>\n\n\n<p><strong>\u00dctemezzen el\u0151re, ha a kezd\u00e9s ismert, \u00e9s a befejez\u00e9s id\u0151pontja a k\u00e9rd\u00e9s.<\/strong> P\u00e9ld\u00e1ul a vev\u0151 a legkor\u00e1bbi v\u00e1llalhat\u00f3 sz\u00e1ll\u00edt\u00e1st k\u00e9ri, az anyag egy adott napon v\u00e1lik el\u00e9rhet\u0151v\u00e9, vagy egy k\u00e9s\u00e9sben l\u00e9v\u0151 munk\u00e1hoz \u00faj befejez\u00e9si becsl\u00e9s sz\u00fcks\u00e9ges. \u00dctemezzen a megengedett kezd\u00e9st\u0151l, vegye figyelembe a megl\u00e9v\u0151 terhel\u00e9st, \u00e9s ellen\u0151rizze a kisz\u00e1m\u00edtott befejez\u00e9st, miel\u0151tt hat\u00e1rid\u0151t \u00edg\u00e9r.<\/p>\n\n\n<p><strong>\u00dctemezzen visszafel\u00e9, ha a befejez\u00e9s ismert, \u00e9s a gy\u00e1rt\u00e1sba ad\u00e1s id\u0151pontja a k\u00e9rd\u00e9s.<\/strong> Van egy egyeztetett gy\u00e1rt\u00e1si c\u00e9lid\u0151pont, \u00e9s nem szeretn\u00e9 a sz\u00fcks\u00e9gesn\u00e9l j\u00f3val kor\u00e1bban elind\u00edtani a munk\u00e1t. Haladjon visszafel\u00e9 a gy\u00e1rt\u00e1si \u00fatvonalon, \u00e9s a sz\u00e1m\u00edt\u00e1sban vegye figyelembe az anyagok rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1t \u00e9s az er\u0151forr\u00e1sok kapacit\u00e1s\u00e1t is.<\/p>\n\n\n<p>Rendel\u00e9sre gy\u00e1rt\u00e1sn\u00e1l \u00e9s k\u00e9szletre gy\u00e1rt\u00e1sn\u00e1l egyar\u00e1nt sz\u00fcks\u00e9g lehet mindk\u00e9t megk\u00f6zel\u00edt\u00e9sre. Egy rendel\u00e9sre gy\u00e1rt\u00f3 \u00fczem el\u0151re sz\u00e1molva hat\u00e1rozhat meg re\u00e1lisan v\u00e1llalhat\u00f3 hat\u00e1rid\u0151t, majd visszafel\u00e9 \u00fctemezhet, hogy a visszaigazolt rendel\u00e9st ne adja t\u00fal kor\u00e1n gy\u00e1rt\u00e1sba. Egy k\u00e9szletfelt\u00f6lt\u0151 rendel\u00e9snek is lehet r\u00f6gz\u00edtett hat\u00e1rideje, amikorra a k\u00e9szletre sz\u00fcks\u00e9g van.<\/p>\n\n\n<p>Nem az a c\u00e9l, hogy minden gy\u00e1rt\u00e1si feladat az utols\u00f3 lehets\u00e9ges pillanatban k\u00e9sz\u00fclj\u00f6n el. Ha a csomagol\u00e1s, a sz\u00e1ll\u00edt\u00e1s vagy az esetleges probl\u00e9m\u00e1k elh\u00e1r\u00edt\u00e1sa id\u0151t ig\u00e9nyel, a gy\u00e1rt\u00e1si c\u00e9lid\u0151pontot a kisz\u00e1ll\u00edt\u00e1s el\u00e9 \u00e1ll\u00edtsa. A visszafel\u00e9 t\u00f6rt\u00e9n\u0151 \u00fctemez\u00e9s biztons\u00e1gi id\u0151vel v\u00e9dett c\u00e9lid\u0151ponttal is m\u0171k\u00f6dik; nem k\u00f6veteli meg minden id\u0151tartal\u00e9k elhagy\u00e1s\u00e1t.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Mi t\u00f6rt\u00e9nik, ha a sz\u00fcks\u00e9ges kezd\u00e9si id\u0151pont m\u00e1r elm\u00falt?<\/h3>\n\n\n<p>Ha a sz\u00fcks\u00e9ges kezd\u00e9si id\u0151pont m\u00e1r elm\u00falt, az arra figyelmeztet, hogy a jelenlegi felt\u00e9telekkel nem tarthat\u00f3 a c\u00e9lid\u0151pont. Ellen\u0151rizze, hogy a munka t\u00e9nylegesen elkezd\u0151d\u00f6tt-e, helyesek-e az id\u0151tartamok \u00e9s a munkarendek, illetve rendelkez\u00e9sre \u00e1ll-e az anyag. Ezut\u00e1n m\u00e9rlegeljen \u00e9rdemi v\u00e1ltoztat\u00e1st: megfelel\u0151 alternat\u00edv er\u0151forr\u00e1st, j\u00f3v\u00e1hagyott t\u00f6bbletkapacit\u00e1st, m\u00f3dos\u00edtott priorit\u00e1st vagy m\u00e1s v\u00e1llalt hat\u00e1rid\u0151t.<\/p>\n\n\n<p>A c\u00e9lid\u0151pont \u00e1t\u00e1ll\u00edt\u00e1sa a k\u00e9perny\u0151n \u00f6nmag\u00e1ban nem oldja meg a hi\u00e1nyt. A v\u00e1ltoztat\u00e1s ut\u00e1n sz\u00e1molja \u00fajra az \u00fctemtervet, \u00e9s ellen\u0151rizze a t\u00f6bbi rendel\u00e9sre gyakorolt hat\u00e1s\u00e1t, miel\u0151tt meger\u0151s\u00edti az \u00faj v\u00e1llal\u00e1st.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Alkalmazza a v\u00e1lasztott id\u0151z\u00edt\u00e9st a SkyPlanner seg\u00edts\u00e9g\u00e9vel<\/h2>\n\n\n<p>A SkyPlanner lehet\u0151v\u00e9 teszi, hogy a munk\u00e1t a lehet\u0151 leghamarabb vagy a hat\u00e1rid\u0151h\u00f6z k\u00f6zelebb \u00fctemezze. Az alap\u00e9rtelmezett, el\u0151re t\u00f6rt\u00e9n\u0151 \u00fctemez\u00e9si szab\u00e1ly hat\u00e1rozza meg az \u00e1ltal\u00e1nos ir\u00e1nyt; egy rendel\u00e9st\u00e9tel-szint\u0171 szab\u00e1ly pedig JIT-id\u0151z\u00edt\u00e9st is lehet\u0151v\u00e9 tesz a vegyes ASAP\/JIT munkafolyamatban.<\/p>\n\n\n<p>Gy\u00e1rt\u00e1stervez\u0151k\u00e9nt \u00edgy nem kell v\u00e1lasztania ak\u00f6z\u00f6tt, hogy mindent azonnal elind\u00edt, vagy mindent az utols\u00f3 pillanatra halaszt. Egy s\u00fcrg\u0151s rendel\u00e9s ASAP-\u00fctemez\u00e9st ig\u00e9nyelhet, m\u00edg egy m\u00e1sik, visszaigazolt rendel\u00e9st c\u00e9lszer\u0171bb a hat\u00e1ridej\u00e9hez k\u00f6zel id\u0151z\u00edteni. A priorit\u00e1s \u00e9s az \u00fctemez\u00e9s ir\u00e1nya elt\u00e9r\u0151 szerepet t\u00f6lt be: a priorit\u00e1s azt fejezi ki, melyik munka \u00e9lvez els\u0151bbs\u00e9get, az ir\u00e1ny pedig azt befoly\u00e1solja, hov\u00e1 ker\u00fcl id\u0151ben.<\/p>\n\n\n<p>A sz\u00e1m\u00edt\u00e1shoz a gy\u00e1rt\u00e1s adataira is sz\u00fcks\u00e9g van. \u00c1ll\u00edtsa be a munka\u00e1llom\u00e1sokat, a m\u0171szakokat, a g\u00e9pkezel\u0151ket, a m\u0171veletek k\u00f6z\u00f6tti f\u00fcgg\u0151s\u00e9geket \u00e9s a priorit\u00e1sokat. Ha az anyagok rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1t figyelembe vev\u0151 \u00fctemez\u00e9s be van kapcsolva, az Arcturus a kezd\u00e9si id\u0151pontok sz\u00e1m\u00edt\u00e1sakor sz\u00e1mol a rendelkez\u00e9sre \u00e1ll\u00f3 k\u00e9szlettel \u00e9s a be\u00e9rkez\u0151 sz\u00e1ll\u00edtm\u00e1nyokkal is. A beszerz\u00e9si rendel\u00e9s sz\u00e1ll\u00edt\u00e1si d\u00e1tuma a v\u00e1rhat\u00f3 rendelkez\u00e9sre \u00e1ll\u00e1st jelzi; a k\u00e9szlet akkor friss\u00fcl, amikor visszaigazolj\u00e1k a sz\u00e1ll\u00edtm\u00e1ny be\u00e9rkez\u00e9s\u00e9t.<\/p>\n\n\n<p>Ha v\u00e1ltozik a helyzet, friss\u00edtse ezeket az adatokat, \u00e9s sz\u00e1molja \u00fajra az \u00fctemtervet. Az \u00edgy kapott tervet \u00e1ttekintheti ahelyett, hogy minden \u00e9rintett m\u0171veletet k\u00e9zzel mozgatna \u00e1t. <strong>A priorit\u00e1sokr\u00f3l \u00d6n d\u00f6nt; az Arcturus az \u00d6n utas\u00edt\u00e1sai szerint sz\u00e1mol.<\/strong><\/p>\n\n\n<p>A SkyPlanner a ny\u00edlt REST API r\u00e9v\u00e9n b\u00e1rmely ERP vagy MES rendszerrel integr\u00e1lhat\u00f3. Megtarthatja a rendel\u00e9seit kezel\u0151 rendszert, \u00e9s annak gy\u00e1rt\u00e1si adatait olyan \u00fctemtervhez kapcsolhatja, amely a munka t\u00e9nyleges v\u00e9grehajt\u00e1s\u00e1hoz igazodik.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Megalapozottabb d\u00f6nt\u00e9sek a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151kr\u0151l a napi gy\u00e1rt\u00e1sban<\/h2>\n\n\n<p>A finn Eskomatic, amely b\u00e9rforg\u00e1csol\u00e1ssal foglalkozik, kor\u00e1bban nagyr\u00e9szt k\u00e9zzel rendezte a feladatsorokat egy el\u00f6reged\u0151 ERP- \u00e9s termel\u00e9sir\u00e1ny\u00edt\u00e1si rendszerben. Az anyagok \u00e1llapot\u00e1r\u00f3l rendelkez\u00e9sre \u00e1ll\u00f3 korl\u00e1tozott inform\u00e1ci\u00f3k miatt nehezebb volt el\u0151re l\u00e1tni a hi\u00e1nyokat.<\/p>\n\n\n<p>A SkyPlanner haszn\u00e1lat\u00e1val a csapat \u00e1ttekinthet\u0151bb, vizu\u00e1lis feladatsort \u00e9s automatikus terhel\u00e9s\u00fctemez\u00e9st kapott. <a href=\"https:\/\/skyplanner.ai\/hu\/ugyfeltortenetek\/eskomatic\/\">Az Eskomatic besz\u00e1mol\u00f3ja szerint<\/a> k\u00f6nnyebben \u00e1tl\u00e1that\u00f3v\u00e1 v\u00e1ltak a re\u00e1lis sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k, \u00edgy a v\u00e1llalat pontosabb sz\u00e1ll\u00edt\u00e1si d\u00e1tumokat tudott megadni vev\u0151inek. Az anyaghi\u00e1nyok k\u00f6nnyebb felismer\u00e9se az ezek miatt bek\u00f6vetkez\u0151 gy\u00e1rt\u00e1si le\u00e1ll\u00e1sokat is cs\u00f6kkentette.<\/p>\n\n\n<p>Ez a tapasztalat j\u00f3l mutatja, mit\u0151l hasznos egy id\u0151z\u00edt\u00e9si elv: a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151t nem \u00f6nmag\u00e1ban kezeli, hanem a kapacit\u00e1sterhel\u00e9ssel \u00e9s az anyagell\u00e1t\u00e1si helyzettel \u00f6sszef\u00fcgg\u00e9sben.<\/p>\n\n\n<h2 class=\"wp-block-heading\">V\u00e1lasszon \u00fctemez\u00e9si ir\u00e1nyt, majd t\u00e1maszkodjon a teljes gy\u00e1rt\u00e1st \u00f6sszehangol\u00f3 \u00fctemtervre<\/h2>\n\n\n<p>Az el\u0151re t\u00f6rt\u00e9n\u0151 \u00fctemez\u00e9ssel meghat\u00e1rozhatja, mikorra fejezhet\u0151 be legkor\u00e1bban a munka. A visszafel\u00e9 t\u00f6rt\u00e9n\u0151 \u00fctemez\u00e9ssel pedig azt, hogy egy ismert c\u00e9lid\u0151pont el\u00e9r\u00e9s\u00e9hez legk\u00e9s\u0151bb mikor kezd\u0151dhet el. Az eredm\u00e9nyt mindk\u00e9t esetben a teljes gy\u00e1rt\u00e1si helyzet alapj\u00e1n \u00e9rt\u00e9kelje, ne csak az adott rendel\u00e9s megmunk\u00e1l\u00e1si idej\u00e9t vegye figyelembe.<\/p>\n\n\n<p>Egy leterhelt \u00fczem sz\u00e1m\u00e1ra a SkyPlanner k\u00e9zenfekv\u0151 k\u00f6vetkez\u0151 l\u00e9p\u00e9s: mindk\u00e9t id\u0151z\u00edt\u00e9si megk\u00f6zel\u00edt\u00e9st \u00e9s <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/mi-a-termelesutemezes\/\">automatikus \u00fctemez\u00e9st<\/a> k\u00edn\u00e1l, a Gantt-n\u00e9zet pedig megmutatja, mit jelentenek a d\u00f6nt\u00e9sek a gy\u00e1rt\u00e1sban. K\u00e9zben tarthatja a v\u00e1llalt hat\u00e1rid\u0151ket an\u00e9lk\u00fcl, hogy minden feladatsort k\u00e9zzel kellene karbantartania.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/hu\/kapcsolat-ertekesites\/\">Foglaljon SkyPlanner-bemutat\u00f3t<\/a>, \u00e9s hozzon egy jellemz\u0151 rendel\u00e9st a gy\u00e1rt\u00e1si \u00fatvonal\u00e1val, a hat\u00e1ridej\u00e9vel \u00e9s a legnehezebben \u00fctemezhet\u0151 er\u0151forr\u00e1ssal egy\u00fctt. N\u00e9zze meg, hogyan illeszkedik az id\u0151z\u00edt\u00e9se a t\u00f6bbi munk\u00e1hoz. Ha el\u0151bb \u00f6n\u00e1ll\u00f3an ismerkedne a rendszerrel, <a href=\"https:\/\/skyplanner.ai\/hu\/proba\/\">pr\u00f3b\u00e1lja ki a SkyPlanner rendszert bemutat\u00f3adatokkal<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>El\u0151re \u00e9s visszafel\u00e9 t\u00f6rt\u00e9n\u0151 gy\u00e1rt\u00e1s\u00fctemez\u00e9s: v\u00e1lassza a megfelel\u0151 ir\u00e1nyt Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; El\u0151re \u00e9s visszafel\u00e9 t\u00f6rt\u00e9n\u0151 gy\u00e1rt\u00e1s\u00fctemez\u00e9s: v\u00e1lassza a megfelel\u0151 ir\u00e1nyt Egy rendel\u00e9s hat\u00e1rideje j\u00f6v\u0151 p\u00e9ntek. \u00c9rdemes elind\u00edtani a gy\u00e1rt\u00e1st, amint meg\u00e9rkezik az anyag, vagy ink\u00e1bb v\u00e1rni a kisz\u00e1ll\u00edt\u00e1shoz k\u00f6zelebbi id\u0151pontig? A korai ind\u00edt\u00e1s seg\u00edthet tartani a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151t, de anyagot \u00e9s \u00fczemi ter\u00fcletet &#8230; <a title=\"El\u0151re \u00e9s visszafel\u00e9 t\u00f6rt\u00e9n\u0151 gy\u00e1rt\u00e1s\u00fctemez\u00e9s: v\u00e1lassza a megfelel\u0151 ir\u00e1nyt\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/elore-es-visszafele-torteno-gyartasutemezes\/\" aria-label=\"Read more about El\u0151re \u00e9s visszafel\u00e9 t\u00f6rt\u00e9n\u0151 gy\u00e1rt\u00e1s\u00fctemez\u00e9s: v\u00e1lassza a megfelel\u0151 ir\u00e1nyt\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":98028,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2526,312],"tags":[],"class_list":["post-97993","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-es-utemezes","category-forrasok","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>El\u0151re \u00e9s visszafel\u00e9 t\u00f6rt\u00e9n\u0151 gy\u00e1rt\u00e1s\u00fctemez\u00e9s: mikor melyiket?<\/title>\n<meta name=\"description\" content=\"Ind\u00edt\u00e1s most vagy a hat\u00e1rid\u0151h\u00f6z k\u00f6zel? El\u0151re \u00e9s visszafel\u00e9 t\u00f6rt\u00e9n\u0151 gy\u00e1rt\u00e1s\u00fctemez\u00e9s: \u00f6sszehasonl\u00edt\u00e1s gy\u00e1rt\u00e1si p\u00e9ld\u00e1val \u00e9s a SkyPlanner megk\u00f6zel\u00edt\u00e9s\u00e9vel.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/elore-es-visszafele-torteno-gyartasutemezes\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"El\u0151re \u00e9s visszafel\u00e9 t\u00f6rt\u00e9n\u0151 gy\u00e1rt\u00e1s\u00fctemez\u00e9s: v\u00e1lassza a megfelel\u0151 ir\u00e1nyt\" \/>\n<meta property=\"og:description\" content=\"Ind\u00edt\u00e1s most vagy a hat\u00e1rid\u0151h\u00f6z k\u00f6zel? El\u0151re \u00e9s visszafel\u00e9 t\u00f6rt\u00e9n\u0151 gy\u00e1rt\u00e1s\u00fctemez\u00e9s: \u00f6sszehasonl\u00edt\u00e1s gy\u00e1rt\u00e1si p\u00e9ld\u00e1val \u00e9s a SkyPlanner megk\u00f6zel\u00edt\u00e9s\u00e9vel.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/forrasok\/elore-es-visszafele-torteno-gyartasutemezes\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-14T22:50:56+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-14T22:51:48+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/forward-backward-scheduling-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Szerz\u0151:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data2\" content=\"14 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/elore-es-visszafele-torteno-gyartasutemezes\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/elore-es-visszafele-torteno-gyartasutemezes\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"El\u0151re \u00e9s visszafel\u00e9 t\u00f6rt\u00e9n\u0151 gy\u00e1rt\u00e1s\u00fctemez\u00e9s: v\u00e1lassza a megfelel\u0151 ir\u00e1nyt\",\"datePublished\":\"2026-10-14T22:50:56+00:00\",\"dateModified\":\"2026-10-14T22:51:48+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/elore-es-visszafele-torteno-gyartasutemezes\\\/\"},\"wordCount\":2745,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/elore-es-visszafele-torteno-gyartasutemezes\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/forward-backward-scheduling-hero.png\",\"articleSection\":[\"APS \u00e9s \u00fctemez\u00e9s\",\"forr\u00e1sok\"],\"inLanguage\":\"hu-HU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/elore-es-visszafele-torteno-gyartasutemezes\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/elore-es-visszafele-torteno-gyartasutemezes\\\/\",\"name\":\"El\u0151re \u00e9s visszafel\u00e9 t\u00f6rt\u00e9n\u0151 gy\u00e1rt\u00e1s\u00fctemez\u00e9s: mikor melyiket?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/elore-es-visszafele-torteno-gyartasutemezes\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/elore-es-visszafele-torteno-gyartasutemezes\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/forward-backward-scheduling-hero.png\",\"datePublished\":\"2026-10-14T22:50:56+00:00\",\"dateModified\":\"2026-10-14T22:51:48+00:00\",\"description\":\"Ind\u00edt\u00e1s most vagy a hat\u00e1rid\u0151h\u00f6z k\u00f6zel? El\u0151re \u00e9s visszafel\u00e9 t\u00f6rt\u00e9n\u0151 gy\u00e1rt\u00e1s\u00fctemez\u00e9s: \u00f6sszehasonl\u00edt\u00e1s gy\u00e1rt\u00e1si p\u00e9ld\u00e1val \u00e9s a SkyPlanner megk\u00f6zel\u00edt\u00e9s\u00e9vel.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/elore-es-visszafele-torteno-gyartasutemezes\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/elore-es-visszafele-torteno-gyartasutemezes\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/elore-es-visszafele-torteno-gyartasutemezes\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/forward-backward-scheduling-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/forward-backward-scheduling-hero.png\",\"width\":1672,\"height\":941},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/elore-es-visszafele-torteno-gyartasutemezes\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"El\u0151re \u00e9s visszafel\u00e9 t\u00f6rt\u00e9n\u0151 gy\u00e1rt\u00e1s\u00fctemez\u00e9s: v\u00e1lassza a megfelel\u0151 ir\u00e1nyt\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"El\u0151re \u00e9s visszafel\u00e9 t\u00f6rt\u00e9n\u0151 gy\u00e1rt\u00e1s\u00fctemez\u00e9s: mikor melyiket?","description":"Ind\u00edt\u00e1s most vagy a hat\u00e1rid\u0151h\u00f6z k\u00f6zel? El\u0151re \u00e9s visszafel\u00e9 t\u00f6rt\u00e9n\u0151 gy\u00e1rt\u00e1s\u00fctemez\u00e9s: \u00f6sszehasonl\u00edt\u00e1s gy\u00e1rt\u00e1si p\u00e9ld\u00e1val \u00e9s a SkyPlanner megk\u00f6zel\u00edt\u00e9s\u00e9vel.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/forrasok\/elore-es-visszafele-torteno-gyartasutemezes\/","og_locale":"hu_HU","og_type":"article","og_title":"El\u0151re \u00e9s visszafel\u00e9 t\u00f6rt\u00e9n\u0151 gy\u00e1rt\u00e1s\u00fctemez\u00e9s: v\u00e1lassza a megfelel\u0151 ir\u00e1nyt","og_description":"Ind\u00edt\u00e1s most vagy a hat\u00e1rid\u0151h\u00f6z k\u00f6zel? El\u0151re \u00e9s visszafel\u00e9 t\u00f6rt\u00e9n\u0151 gy\u00e1rt\u00e1s\u00fctemez\u00e9s: \u00f6sszehasonl\u00edt\u00e1s gy\u00e1rt\u00e1si p\u00e9ld\u00e1val \u00e9s a SkyPlanner megk\u00f6zel\u00edt\u00e9s\u00e9vel.","og_url":"https:\/\/skyplanner.ai\/hu\/forrasok\/elore-es-visszafele-torteno-gyartasutemezes\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-14T22:50:56+00:00","article_modified_time":"2026-10-14T22:51:48+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/forward-backward-scheduling-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Szerz\u0151:":"Jussi M\u00e4ntyl\u00e4","Becs\u00fclt olvas\u00e1si id\u0151":"14 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/elore-es-visszafele-torteno-gyartasutemezes\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/elore-es-visszafele-torteno-gyartasutemezes\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"El\u0151re \u00e9s visszafel\u00e9 t\u00f6rt\u00e9n\u0151 gy\u00e1rt\u00e1s\u00fctemez\u00e9s: v\u00e1lassza a megfelel\u0151 ir\u00e1nyt","datePublished":"2026-10-14T22:50:56+00:00","dateModified":"2026-10-14T22:51:48+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/elore-es-visszafele-torteno-gyartasutemezes\/"},"wordCount":2745,"publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/elore-es-visszafele-torteno-gyartasutemezes\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/forward-backward-scheduling-hero.png","articleSection":["APS \u00e9s \u00fctemez\u00e9s","forr\u00e1sok"],"inLanguage":"hu-HU"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/elore-es-visszafele-torteno-gyartasutemezes\/","url":"https:\/\/skyplanner.ai\/hu\/forrasok\/elore-es-visszafele-torteno-gyartasutemezes\/","name":"El\u0151re \u00e9s visszafel\u00e9 t\u00f6rt\u00e9n\u0151 gy\u00e1rt\u00e1s\u00fctemez\u00e9s: mikor melyiket?","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/elore-es-visszafele-torteno-gyartasutemezes\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/elore-es-visszafele-torteno-gyartasutemezes\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/forward-backward-scheduling-hero.png","datePublished":"2026-10-14T22:50:56+00:00","dateModified":"2026-10-14T22:51:48+00:00","description":"Ind\u00edt\u00e1s most vagy a hat\u00e1rid\u0151h\u00f6z k\u00f6zel? El\u0151re \u00e9s visszafel\u00e9 t\u00f6rt\u00e9n\u0151 gy\u00e1rt\u00e1s\u00fctemez\u00e9s: \u00f6sszehasonl\u00edt\u00e1s gy\u00e1rt\u00e1si p\u00e9ld\u00e1val \u00e9s a SkyPlanner megk\u00f6zel\u00edt\u00e9s\u00e9vel.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/elore-es-visszafele-torteno-gyartasutemezes\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/forrasok\/elore-es-visszafele-torteno-gyartasutemezes\/"]}]},{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/elore-es-visszafele-torteno-gyartasutemezes\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/forward-backward-scheduling-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/forward-backward-scheduling-hero.png","width":1672,"height":941},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/elore-es-visszafele-torteno-gyartasutemezes\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"El\u0151re \u00e9s visszafel\u00e9 t\u00f6rt\u00e9n\u0151 gy\u00e1rt\u00e1s\u00fctemez\u00e9s: v\u00e1lassza a megfelel\u0151 ir\u00e1nyt"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/forward-backward-scheduling-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/forward-backward-scheduling-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/forward-backward-scheduling-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/forward-backward-scheduling-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/forward-backward-scheduling-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/forward-backward-scheduling-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/forward-backward-scheduling-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/forward-backward-scheduling-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"El\u0151re \u00e9s visszafel\u00e9 t\u00f6rt\u00e9n\u0151 gy\u00e1rt\u00e1s\u00fctemez\u00e9s: v\u00e1lassza a megfelel\u0151 ir\u00e1nyt Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; El\u0151re \u00e9s visszafel\u00e9 t\u00f6rt\u00e9n\u0151 gy\u00e1rt\u00e1s\u00fctemez\u00e9s: v\u00e1lassza a megfelel\u0151 ir\u00e1nyt Egy rendel\u00e9s hat\u00e1rideje j\u00f6v\u0151 p\u00e9ntek. \u00c9rdemes elind\u00edtani a gy\u00e1rt\u00e1st, amint meg\u00e9rkezik az anyag, vagy ink\u00e1bb v\u00e1rni a kisz\u00e1ll\u00edt\u00e1shoz k\u00f6zelebbi id\u0151pontig? A korai ind\u00edt\u00e1s seg\u00edthet tartani a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151t, de anyagot \u00e9s \u00fczemi ter\u00fcletet&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/97993","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=97993"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/97993\/revisions"}],"predecessor-version":[{"id":98056,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/97993\/revisions\/98056"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media\/98028"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=97993"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/categories?post=97993"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/tags?post=97993"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}