{"id":96592,"date":"2026-10-08T07:53:30","date_gmt":"2026-10-08T07:53:30","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=96592"},"modified":"2026-10-19T14:43:24","modified_gmt":"2026-10-19T14:43:24","slug":"rendelesre-gyartas","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesre-gyartas\/","title":{"rendered":"Rendel\u00e9sre gy\u00e1rt\u00e1s: kisebb k\u00e9szterm\u00e9kk\u00e9szlet, megalapozottabb sz\u00e1ll\u00edt\u00e1si \u00edg\u00e9retek"},"content":{"rendered":"<div class=\"gb-container gb-container-mto01 article-main-content-container\">\n<div class=\"gb-container gb-container-mto01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Rendel\u00e9sre gy\u00e1rt\u00e1s: kisebb k\u00e9szterm\u00e9kk\u00e9szlet, megalapozottabb sz\u00e1ll\u00edt\u00e1si \u00edg\u00e9retek<\/h1>\n\n<div class=\"gb-container gb-container-mto02\">\n<div class=\"gb-container gb-container-mto02\">\n\n<p><a href=\"\/hu\/\">Kezd\u0151lap<\/a> &raquo; <a href=\"\/hu\/forrasok\/\">Er\u0151forr\u00e1sok<\/a> &raquo; Rendel\u00e9sre gy\u00e1rt\u00e1s: kisebb k\u00e9szterm\u00e9kk\u00e9szlet, megalapozottabb sz\u00e1ll\u00edt\u00e1si \u00edg\u00e9retek<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__descriptive-text\">Becs\u00fclt olvas\u00e1si id\u0151: <\/span><span class=\"yoast-reading-time__reading-time\">8<\/span><span class=\"yoast-reading-time__time-unit\"> perc<\/span><\/p>\n\n<\/div>\n<\/div>\n<div class=\"gb-container gb-container-mto03\">\n<div class=\"gb-container gb-container-mto03\">\n\n<p>Egy vev\u0151 olyan m\u00e9ret\u0171 k\u00e9sz\u00fcl\u00e9kh\u00e1zat rendel, amelyb\u0151l ritk\u00e1n adnak el. \u00c9sszer\u0171 csak a rendel\u00e9s be\u00e9rkez\u00e9se ut\u00e1n legy\u00e1rtani: \u00edgy nem telik meg a rakt\u00e1r olyan v\u00e1ltozatokkal, amelyekre tal\u00e1n soha nem lesz vev\u0151. A vev\u0151 azonban sz\u00e1ll\u00edt\u00e1si d\u00e1tumot k\u00e9r, mik\u00f6zben a fel\u00fcletkezel\u00e9shez sz\u00fcks\u00e9ges er\u0151forr\u00e1s m\u00e1r foglalt.<\/p>\n\n\n<p>Ez a <strong>rendel\u00e9sre gy\u00e1rt\u00e1s<\/strong> alapvet\u0151 kompromisszuma. Kevesebb k\u00e9szterm\u00e9ket gy\u00e1rtanak el\u0151re, a vev\u0151knek viszont meg kell v\u00e1rniuk, am\u00edg a rendel\u00e9s\u00fck v\u00e9gighalad a gy\u00e1rt\u00e1son. A sikerhez nem el\u00e9g tudni, mit k\u00e9pesek legy\u00e1rtani: azt is l\u00e1tni kell, hogy a munka mikor f\u00e9r bele az \u00fczem kapacit\u00e1s\u00e1ba.<\/p>\n\n\n<p>A SkyPlanner gyakorlati seg\u00edts\u00e9get ny\u00fajt ennek a kompromisszumnak a kezel\u00e9s\u00e9hez. Az \u00fctemez\u00e9st v\u00e9gz\u0151 mesters\u00e9ges intelligenci\u00e1ja, az Arcturus a kapacit\u00e1s, az anyagok \u00e9s a priorit\u00e1sok alapj\u00e1n sz\u00e1m\u00edtja ki a gy\u00e1rt\u00e1si sorrendet. Az \u00edgy elk\u00e9sz\u00fclt terv Gantt-id\u0151vonalon l\u00e1that\u00f3, \u00edgy a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k v\u00e1llal\u00e1sakor pontosabb k\u00e9pet kaphat az \u00fczem el\u0151tt \u00e1ll\u00f3 munk\u00e1r\u00f3l.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mit jelent a rendel\u00e9sre gy\u00e1rt\u00e1s?<\/h2>\n\n\n<p>A rendel\u00e9sre gy\u00e1rt\u00e1s (MTO) olyan gy\u00e1rt\u00e1si strat\u00e9gia, amelyben a gy\u00e1rt\u00e1st a vev\u0151i megrendel\u00e9s ind\u00edtja el. Nem az el\u0151re jelzett keresletre k\u00e9sz\u00edtenek k\u00e9szterm\u00e9keket, hogy azut\u00e1n k\u00e9szletr\u0151l \u00e9rt\u00e9kes\u00edts\u00e9k \u0151ket, hanem a vev\u0151 \u00e1ltal megrendelt mennyis\u00e9get gy\u00e1rtj\u00e1k le, a k\u00e9rt specifik\u00e1ci\u00f3 szerint.<\/p>\n\n\n<p>A term\u00e9knek nem kell egyedi fejleszt\u00e9snek lennie. A gy\u00e1rt\u00f3 bev\u00e1lt konstrukci\u00f3t, anyagjegyz\u00e9ket \u00e9s technol\u00f3giai \u00fatvonalat is haszn\u00e1lhat, \u00e9s a term\u00e9ket a rendel\u00e9sben megadott m\u00e9retben, fel\u00fclettel vagy t\u00e9telmennyis\u00e9gben gy\u00e1rthatja le. A meghat\u00e1roz\u00f3 szempont az, hogy <strong>mi ind\u00edtja el a gy\u00e1rt\u00e1st<\/strong>, nem pedig az, hogy mennyire egyedi a term\u00e9k.<\/p>\n\n\n<p>K\u00e9pzelj\u00fcnk el egy lemezmegmunk\u00e1l\u00f3 v\u00e1llalatot, amely k\u00fcl\u00f6nb\u00f6z\u0151 m\u00e9ret\u0171 \u00e9s fel\u00fcletkezel\u00e9s\u0171 k\u00e9sz\u00fcl\u00e9kh\u00e1zakat k\u00edn\u00e1l. A gyakran haszn\u00e1lt lemezanyagokat k\u00e9szleten tartja, de egy k\u00e9sz\u00fcl\u00e9kh\u00e1z v\u00e1g\u00e1s\u00e1t, hajl\u00edt\u00e1s\u00e1t \u00e9s fel\u00fcletkezel\u00e9s\u00e9t csak a vev\u0151i megrendel\u00e9s be\u00e9rkez\u00e9se ut\u00e1n kezdi el. Ez az MTO: az alapanyag lehet k\u00e9szleten akkor is, ha a k\u00e9sz k\u00e9sz\u00fcl\u00e9kh\u00e1z nincs.<\/p>\n\n\n<p>A gy\u00e1rt\u00e1si strat\u00e9gi\u00e1k megk\u00fcl\u00f6nb\u00f6ztet\u00e9s\u00e9hez \u00e9rdemes azt megvizsg\u00e1lni, hogy mi van m\u00e9g h\u00e1tra a rendel\u00e9s be\u00e9rkez\u00e9sekor:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Strat\u00e9gia<\/th><th>A vev\u0151i megrendel\u00e9s \u00e1ltal elind\u00edtott munka<\/th><th>A tervez\u00e9s f\u0151 k\u00e9rd\u00e9se<\/th><\/tr><\/thead><tbody><tr><td>K\u00e9szletre gy\u00e1rt\u00e1s (MTS)<\/td><td>A v\u00e1rhat\u00f3 keresletre legy\u00e1rtott k\u00e9szterm\u00e9k kit\u00e1rol\u00e1sa \u00e9s kisz\u00e1ll\u00edt\u00e1sa<\/td><td>Mely k\u00e9szterm\u00e9kekb\u0151l mennyit tartsunk k\u00e9szleten?<\/td><\/tr><tr><td><a href=\"\/hu\/forrasok\/rendelesre-torteno-osszeszereles\/\">Rendel\u00e9sre t\u00f6rt\u00e9n\u0151 \u00f6sszeszerel\u00e9s (ATO)<\/a><\/td><td>A k\u00e9szterm\u00e9k \u00f6sszeszerel\u00e9se el\u0151k\u00e9sz\u00edtett alkatr\u00e9szekb\u0151l vagy r\u00e9szegys\u00e9gekb\u0151l<\/td><td>Rendelkez\u00e9sre \u00e1llnak a sz\u00fcks\u00e9ges alkatr\u00e9szek \u00e9s az \u00f6sszeszerel\u00e9si kapacit\u00e1s?<\/td><\/tr><tr><td>Rendel\u00e9sre gy\u00e1rt\u00e1s (MTO)<\/td><td>A megrendelt term\u00e9k legy\u00e1rt\u00e1sa megl\u00e9v\u0151 konstrukci\u00f3 \u00e9s technol\u00f3giai \u00fatvonal alapj\u00e1n<\/td><td>Mikor f\u00e9rnek bele a sz\u00fcks\u00e9ges m\u0171veletek a gy\u00e1rt\u00e1s \u00fctemterv\u00e9be?<\/td><\/tr><tr><td><a href=\"\/hu\/forrasok\/egyedi-tervezes-es-gyartas-rendelesre\/\">Egyedi tervez\u00e9s \u00e9s gy\u00e1rt\u00e1s rendel\u00e9sre (ETO)<\/a><\/td><td>A term\u00e9k megtervez\u00e9se vagy m\u0171szaki kidolgoz\u00e1sa, majd legy\u00e1rt\u00e1sa<\/td><td>Mikor k\u00e9sz\u00fclnek el a tervek, \u00e9s milyen munk\u00e1t ig\u00e9nyel majd a megval\u00f3s\u00edt\u00e1suk?<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Az MTO nem azonos a job shop gy\u00e1rt\u00e1ssal sem. Az MTO azt \u00edrja le, milyen szerepet j\u00e1tszik a rendel\u00e9s a gy\u00e1rt\u00e1s elind\u00edt\u00e1s\u00e1ban; a job shop pedig olyan gy\u00e1rt\u00e1si k\u00f6rnyezetet jelent, ahol a gy\u00e1rt\u00e1si feladatok elt\u00e9r\u0151 technol\u00f3giai \u00fatvonalakon haladhatnak, k\u00f6z\u00f6s er\u0151forr\u00e1sokat haszn\u00e1lva. Egy \u00fczemre mindkett\u0151 jellemz\u0151 lehet. A k\u00fcl\u00f6nb\u00f6z\u0151 \u00fatvonalak \u00fctemez\u00e9si neh\u00e9zs\u00e9geivel a <a href=\"\/hu\/forrasok\/muhelyrendszeru-gyartas\/\">job shop \u00fctemez\u00e9sr\u0151l sz\u00f3l\u00f3 \u00fatmutat\u00f3nk<\/a> foglalkozik.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mikor j\u00f3 v\u00e1laszt\u00e1s a rendel\u00e9sre gy\u00e1rt\u00e1s?<\/h2>\n\n\n<p>Az MTO akkor el\u0151ny\u00f6s, ha minden k\u00e9szterm\u00e9kv\u00e1ltozat k\u00e9szletez\u00e9se dr\u00e1ga lenne, az egyes v\u00e1ltozatok ir\u00e1nti kereslet ingadoz\u00f3, \u00e9s a vev\u0151k hajland\u00f3k megv\u00e1rni a gy\u00e1rt\u00e1st. \u00cdgy sz\u00e9lesebb k\u00edn\u00e1latot tarthat fenn an\u00e9lk\u00fcl, hogy minden lehets\u00e9ges term\u00e9ket el\u0151re legy\u00e1rtana.<\/p>\n\n\n<p>Az el\u0151ny legink\u00e1bb a k\u00e9szterm\u00e9kk\u00e9szletben mutatkozik meg: kevesebb term\u00e9k marad eladatlanul az\u00e9rt, mert rosszul becs\u00fclt\u00e9k meg a kereslet \u00f6sszet\u00e9tel\u00e9t. A munka t\u00e9nyleges vev\u0151i megrendel\u00e9shez k\u00f6t\u0151dik, amely meghat\u00e1rozhatja a sz\u00fcks\u00e9ges m\u00e9reteket, anyagot vagy fel\u00fcletkezel\u00e9st.<\/p>\n\n\n<p>Ennek az \u00e1ra a hosszabb \u00e1tfut\u00e1si id\u0151. MTS eset\u00e9n a term\u00e9k m\u00e1r kisz\u00e1ll\u00edt\u00e1sra k\u00e9szen \u00e1llhat. MTO eset\u00e9n a vev\u0151 v\u00e1rakoz\u00e1si idej\u00e9be a gy\u00e1rt\u00e1s \u00e9s a m\u0171veletek k\u00f6z\u00f6tti sorban \u00e1ll\u00e1s is belesz\u00e1m\u00edt. A rendel\u00e9sek be\u00e9rkez\u00e9se egyenetlen terhel\u00e9st is okozhat: egy csendes hetet t\u00f6bb olyan rendel\u00e9s k\u00f6vethet, amelyek ugyanaz\u00e9rt az er\u0151forr\u00e1s\u00e9rt versengenek.<\/p>\n\n\n<p><strong>A rendel\u00e9sre gy\u00e1rt\u00e1s nem jelent k\u00e9szlet n\u00e9lk\u00fcli m\u0171k\u00f6d\u00e9st, \u00e9s nem j\u00e1r automatikusan alacsonyabb \u00f6sszk\u00f6lts\u00e9ggel.<\/strong> Tov\u00e1bbra is sz\u00fcks\u00e9g lehet alapanyagokra, v\u00e1s\u00e1rolt alkatr\u00e9szekre \u00e9s befejezetlen termel\u00e9sre. Kis sorozatokn\u00e1l gyakori \u00e1t\u00e1ll\u00e1sokra lehet sz\u00fcks\u00e9g. Ha a vev\u0151k azonnali kisz\u00e1ll\u00edt\u00e1st v\u00e1rnak, \u00e9s rendszeresen ugyanazt a standard term\u00e9ket v\u00e1s\u00e1rolj\u00e1k, jobb v\u00e1laszt\u00e1s lehet <a href=\"\/hu\/forrasok\/keszletre-gyartas\/\">az adott term\u00e9k k\u00e9szletre gy\u00e1rt\u00e1sa<\/a>.<\/p>\n\n\n<p>Nem kell az eg\u00e9sz \u00fczemet egyetlen modellbe k\u00e9nyszer\u00edteni. A standard term\u00e9keket k\u00e9szleten tarthatja, m\u00edg a nehezebben el\u0151re jelezhet\u0151 kereslet\u0171 v\u00e1ltozatokat rendel\u00e9sre gy\u00e1rthatja. A <a href=\"\/hu\/forrasok\/master-production-schedule\/\">gy\u00e1rt\u00e1si f\u0151terv<\/a> seg\u00edt \u00f6sszekapcsolni ezt a v\u00e1ltozatosabb term\u00e9k\u00f6sszet\u00e9telt a gy\u00e1rt\u00e1sban elv\u00e9gzend\u0151 munk\u00e1val.<\/p>\n\n\n<h2 class=\"wp-block-heading\">A rendel\u00e9snek nemcsak hat\u00e1rid\u0151 kell, hanem hely is az \u00fctemtervben<\/h2>\n\n\n<p>T\u00e9rj\u00fcnk vissza a k\u00e9pzeletbeli k\u00e9sz\u00fcl\u00e9kh\u00e1zgy\u00e1rt\u00f3hoz. Egy \u00faj rendel\u00e9shez v\u00e1g\u00e1sra, hajl\u00edt\u00e1sra \u00e9s fel\u00fcletkezel\u00e9sre van sz\u00fcks\u00e9g. Az anyag rendelkez\u00e9sre \u00e1ll, \u00e9s a v\u00e1g\u00e1sn\u00e1l van szabad kapacit\u00e1s, ez\u00e9rt az \u00e9rt\u00e9kes\u00edt\u00e9s sz\u00edvesen \u00edg\u00e9rne gyors teljes\u00edt\u00e9st. A fel\u00fcletkezel\u00e9si kapacit\u00e1st azonban m\u00e1r m\u00e1s vev\u0151k rendel\u00e9sei foglalj\u00e1k le.<\/p>\n\n\n<p>A v\u00e1g\u00e1s azonnali elind\u00edt\u00e1sa nem oldja fel ezt az \u00fctk\u00f6z\u00e9st. Lehet, hogy csak egy \u00fajabb, fel\u00fcletkezel\u00e9sre v\u00e1r\u00f3 alkatr\u00e9szt eredm\u00e9nyez. A l\u00e9nyegi k\u00e9rd\u00e9s az, hogy a <strong>teljes technol\u00f3giai \u00fatvonal<\/strong> v\u00e9gigvihet\u0151-e id\u0151ben a m\u00e1r v\u00e1llalt rendel\u00e9sek mellett.<\/p>\n\n\n<p>Minden \u00faj rendel\u00e9sn\u00e9l tekintse \u00e1t egy\u00fctt az al\u00e1bbi adatokat:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Az elv\u00e9gzend\u0151 munka:<\/strong> a pontos specifik\u00e1ci\u00f3, a mennyis\u00e9g, a m\u0171veleti sorrend, valamint a megmunk\u00e1l\u00e1si \u00e9s \u00e1t\u00e1ll\u00e1si id\u0151k.<\/li><li><strong>A munk\u00e1ra alkalmas er\u0151forr\u00e1sok:<\/strong> a megfelel\u0151 munka\u00e1llom\u00e1sok, a m\u0171szakok, a g\u00e9pkezel\u0151k \u00e9s a sz\u00fcks\u00e9ges szersz\u00e1mok.<\/li><li><strong>Az anyagok rendelkez\u00e9sre \u00e1ll\u00e1sa:<\/strong> a megl\u00e9v\u0151 k\u00e9szlet, valamint a v\u00e1s\u00e1rolt anyagok \u00e9s alkatr\u00e9szek v\u00e1rhat\u00f3 el\u00e9rhet\u0151s\u00e9ge.<\/li><li><strong>A megl\u00e9v\u0151 v\u00e1llal\u00e1sok:<\/strong> az ugyanezek\u00e9rt az er\u0151forr\u00e1sok\u00e9rt m\u00e1r verseng\u0151 m\u0171veletek \u00e9s azok priorit\u00e1sai.<\/li><li><strong>A sz\u00e1ll\u00edt\u00e1sig sz\u00fcks\u00e9ges id\u0151:<\/strong> a h\u00e1tral\u00e9v\u0151 gy\u00e1rt\u00e1si l\u00e9p\u00e9sekre, ellen\u0151rz\u00e9sre, csomagol\u00e1sra \u00e9s sz\u00fcks\u00e9g eset\u00e9n a fuvaroz\u00e1sra ford\u00edtand\u00f3 id\u0151.<\/li><\/ul>\n\n\n<p>A <a href=\"\/hu\/forrasok\/gyartasi-munkalap\/\">gy\u00e1rt\u00e1si rendel\u00e9s<\/a> tartalmazza a gy\u00e1rt\u00e1si feladat v\u00e9grehajt\u00e1s\u00e1hoz sz\u00fcks\u00e9ges r\u00e9szleteket. A <a href=\"\/hu\/forrasok\/mi-a-termelesutemezes\/\">gy\u00e1rt\u00e1s\u00fctemez\u00e9s<\/a> a munk\u00e1t a rendelkez\u00e9sre \u00e1ll\u00f3 id\u0151h\u00f6z rendeli. Egy k\u00e9rt hat\u00e1rid\u0151 \u00f6nmag\u00e1ban egyiket sem biztos\u00edtja.<\/p>\n\n\n<p>Ha a k\u00e9rt d\u00e1tum nem tarthat\u00f3, d\u00f6nt\u00e9st kell hoznia. Seg\u00edthet egy m\u00e1sik, a m\u0171veletre alkalmas munka\u00e1llom\u00e1s, a m\u0171szak m\u00f3dos\u00edt\u00e1sa vagy a priorit\u00e1s megv\u00e1ltoztat\u00e1sa. Ha ezek nem jelentenek megold\u00e1st, egyeztessen k\u00e9s\u0151bbi d\u00e1tumot, miel\u0151tt a vev\u0151 egy teljes\u00edthetetlen \u00edg\u00e9retre alapozna. Ha egy k\u00f6z\u00f6s m\u0171velet rendszeresen k\u00e9slelteti a sz\u00e1ll\u00edt\u00e1sokat, vizsg\u00e1lja meg a <a href=\"\/hu\/forrasok\/szuk-keresztmetszet-a-gyartasban\/\">gy\u00e1rt\u00e1s sz\u0171k keresztmetszet\u00e9t<\/a> ahelyett, hogy \u00fajabb munk\u00e1k ind\u00edt\u00e1s\u00e1val tov\u00e1bb n\u00f6veln\u00e9 az el\u0151tte v\u00e1rakoz\u00f3 sort.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00d6n hat\u00e1rozza meg a priorit\u00e1sokat, a SkyPlanner kisz\u00e1m\u00edtja az \u00fctemtervet<\/h2>\n\n\n<p>Nem az adatok egyszeri ellen\u0151rz\u00e9se a neh\u00e9z feladat. Az a kih\u00edv\u00e1s, hogy az \u00f6sszef\u00fcgg\u00e9sek naprak\u00e9szek maradjanak akkor is, amikor \u00faj rendel\u00e9sek \u00e9rkeznek, v\u00e1ltoznak az anyagok be\u00e9rkez\u00e9si d\u00e1tumai, vagy a gy\u00e1rt\u00e1s a tervezettn\u00e9l tov\u00e1bb tart. Ha minden gy\u00e1rt\u00e1si feladatot k\u00e9zzel kell mozgatni a g\u00e9pek v\u00e1rakoz\u00e1si sorai k\u00f6z\u00f6tt, a tervez\u0151nek a d\u00f6nt\u00e9sek mellett a sz\u00e1m\u00edt\u00e1sok folyamatos friss\u00edt\u00e9s\u00e9r\u0151l is gondoskodnia kell.<\/p>\n\n\n<p>A <a href=\"\/hu\/\">SkyPlanner APS<\/a> elv\u00e9gzi \u00d6n helyett az \u00fctemez\u00e9shez sz\u00fcks\u00e9ges sz\u00e1m\u00edt\u00e1sokat. \u00d6n megadja a munka\u00e1llom\u00e1sokat, a m\u0171szakokat, a g\u00e9pkezel\u0151ket, az anyagokat \u00e9s a priorit\u00e1sokat, \u00e9s minden term\u00e9khez meghat\u00e1rozza a m\u0171veleti l\u00e9p\u00e9seket \u00e9s azok id\u0151tartam\u00e1t. Az Arcturus a be\u00e1ll\u00edtott kapacit\u00e1s \u00e9s a m\u0171veletek k\u00f6z\u00f6tti f\u00fcgg\u0151s\u00e9gek alapj\u00e1n \u00fctemezi a munk\u00e1t. A Gantt-n\u00e9zet megmutatja a m\u0171veletek sorrendj\u00e9t a k\u00fcl\u00f6nb\u00f6z\u0151 munka\u00e1llom\u00e1sokon, \u00edgy a k\u00fcl\u00f6n\u00e1ll\u00f3 v\u00e1rakoz\u00e1si sorok ellen\u0151rz\u00e9se helyett v\u00e9gigk\u00f6vetheti a k\u00e9sz\u00fcl\u00e9kh\u00e1zat a v\u00e1g\u00e1st\u00f3l a fel\u00fcletkezel\u00e9sig.<\/p>\n\n\n<p>A k\u00e9sz\u00fcl\u00e9kh\u00e1zas p\u00e9ld\u00e1ban ez azt jelenti, hogy a fel\u00fcletkezel\u00e9s terhel\u00e9se m\u00e1r a kezdetekt\u0151l r\u00e9sze a tervnek. Ha egy s\u00fcrg\u0151s rendel\u00e9s els\u0151bbs\u00e9get kap, m\u00f3dos\u00edtsa a priorit\u00e1st, \u00e9s sz\u00e1m\u00edttassa \u00fajra az \u00fctemtervet. Ezut\u00e1n az \u00faj v\u00e1llal\u00e1s meger\u0151s\u00edt\u00e9se el\u0151tt ellen\u0151rizze, hogy a t\u00f6bbi rendel\u00e9s mikor fejez\u0151dik be az \u00faj terv szerint. Az el\u0151ny nem csup\u00e1n az, hogy egy vev\u0151 gyorsabban kap v\u00e1laszt: azt is l\u00e1thatja, mit jelent ez a v\u00e1lasz a m\u00e1r v\u00e1rakoz\u00f3 vev\u0151k sz\u00e1m\u00e1ra.<\/p>\n\n\n<p>Az anyagok rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1t figyelembe vev\u0151 \u00fctemez\u00e9s egy m\u00e1sik gyakori MTO-probl\u00e9m\u00e1t is kezel ugyanebben a sz\u00e1m\u00edt\u00e1sban. Ha ez a szab\u00e1ly be van kapcsolva, az Arcturus figyelembe veszi az anyagok rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1t, ahelyett, hogy \u00fagy tervezne, mintha minden t\u00e9tel m\u00e1r rendelkez\u00e9sre \u00e1llna. A beszerz\u00e9si rendel\u00e9sek sz\u00e1ll\u00edt\u00e1si d\u00e1tumai azt jelzik, hogy az anyagok v\u00e1rhat\u00f3an mikor \u00e1llnak rendelkez\u00e9sre; a t\u00e9nyleges be\u00e9rkez\u00e9s visszaigazol\u00e1sakor friss\u00fcl a k\u00e9szlet. Fontos naprak\u00e9szen tartani ezeket a d\u00e1tumokat, amikor egy besz\u00e1ll\u00edt\u00f3i k\u00e9s\u00e9s megv\u00e1ltoztatja, hogy mely munk\u00e1k indulhatnak el legk\u00f6zelebb.<\/p>\n\n\n<p>A priorit\u00e1sokr\u00f3l tov\u00e1bbra is \u00d6n d\u00f6nt, \u00e9s z\u00e1rol\u00e1sokkal v\u00e9dheti meg az \u00fctemez\u00e9si d\u00f6nt\u00e9seit. Az Arcturus ezeknek a megk\u00f6t\u00e9seknek megfelel\u0151en sz\u00e1mol. Hi\u00e1nyz\u00f3 fizikai kapacit\u00e1st nem tud teremteni, de \u00e1tl\u00e1that\u00f3bb alapot adhat annak eld\u00f6nt\u00e9s\u00e9hez, hogy a tervet vagy a v\u00e1llalt hat\u00e1rid\u0151t kell m\u00f3dos\u00edtani.<\/p>\n\n\n<p>A SkyPlanner a ny\u00edlt REST API seg\u00edts\u00e9g\u00e9vel b\u00e1rmely ERP- vagy MES-rendszerrel integr\u00e1lhat\u00f3. A megl\u00e9v\u0151 rendel\u00e9si \u00e9s gy\u00e1rt\u00e1si adatokat \u00f6sszekapcsolhatja az \u00fctemtervvel, \u00edgy a jobb MTO-tervez\u00e9st nem kell az ERP lecser\u00e9l\u00e9s\u00e9vel kezdenie.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mit v\u00e1ltoztatott a kapacit\u00e1s \u00e1tl\u00e1that\u00f3s\u00e1ga a Fredman Operations m\u0171k\u00f6d\u00e9s\u00e9ben?<\/h2>\n\n\n<p>Az \u00e9lelmiszerrel val\u00f3 \u00e9rintkez\u00e9sre alkalmas konyhai \u00e9s csomagol\u00e1si megold\u00e1sokat gy\u00e1rt\u00f3 Fredman Operations v\u00e1llalatnak a rendel\u00e9si mennyis\u00e9gek n\u00f6veked\u00e9s\u00e9vel pontosabb k\u00e9pre volt sz\u00fcks\u00e9ge a kapacit\u00e1s\u00e1r\u00f3l. A munkalapokat k\u00e9zzel vitt\u00e9k \u00e1t az L7 ERP-b\u0151l az LTR termel\u00e9sir\u00e1ny\u00edt\u00e1si rendszerbe, a tervez\u0151 pedig \u00fagy rangsorolta a gy\u00e1rt\u00e1si feladatokat, hogy nem l\u00e1tta pontosan, mikor szabadulnak fel a g\u00e9pek, \u00e9s mennyi kapacit\u00e1s \u00e1ll rendelkez\u00e9sre a m\u0171szakokban. Egy s\u00fcrg\u0151s \u00fajra\u00fctemez\u00e9s ak\u00e1r egy \u00f3r\u00e1t vagy m\u00e9g t\u00f6bbet is ig\u00e9nybe vehetett.<\/p>\n\n\n<p>A v\u00e1llalat a mindenki sz\u00e1m\u00e1ra el\u00e9rhet\u0151 Gantt-n\u00e9zet \u00e1tl\u00e1that\u00f3s\u00e1ga miatt v\u00e1lasztotta a SkyPlanner megold\u00e1s\u00e1t, \u00e9s \u00f6sszekapcsolta vele az L7 \u00e9s LTR rendszereit. A g\u00e9pek, a szabad \u00e9s lek\u00f6t\u00f6tt kapacit\u00e1s, valamint a gy\u00e1rt\u00e1si feladatok el\u0151rehalad\u00e1sa egy\u00fcttesen v\u00e1lt l\u00e1that\u00f3v\u00e1. A gy\u00e1rt\u00e1sban dolgoz\u00f3k l\u00e1thatt\u00e1k a tervezett kezd\u00e9si \u00e9s befejez\u00e9si id\u0151pontokat, az \u00e9rt\u00e9kes\u00edt\u00e9s pedig megalapozottabban v\u00e1llalhatott sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket.<\/p>\n\n\n<p>A Fredman besz\u00e1mol\u00f3ja szerint cs\u00f6kkent a t\u00fal\u00f3ra, \u00e9s gyorsabban tudtak reag\u00e1lni az \u00fctemterv v\u00e1ltoz\u00e1saira. Egy rendel\u00e9sre gy\u00e1rt\u00f3 v\u00e1llalat sz\u00e1m\u00e1ra a gy\u00e1rt\u00e1s \u00e9s az \u00e9rt\u00e9kes\u00edt\u00e9s kapcsolata a fontos tanuls\u00e1g: a sz\u00e1ll\u00edt\u00e1si \u00edg\u00e9ret megalapozotts\u00e1ga k\u00f6nnyebben igazolhat\u00f3, ha mindenki l\u00e1tja a m\u00f6g\u00f6tte \u00e1ll\u00f3 kapacit\u00e1st. <a href=\"\/hu\/ugyfeltortenetek\/fredman-operations\/\">Olvassa el a Fredman Operations \u00fcgyf\u00e9lt\u00f6rt\u00e9net\u00e9t<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">N\u00e9zze meg, hogyan f\u00e9rne bele a k\u00f6vetkez\u0151 rendel\u00e9se az \u00fctemtervbe<\/h2>\n\n\n<p>A rendel\u00e9sre gy\u00e1rt\u00e1s seg\u00edt elker\u00fclni, hogy olyan k\u00e9szterm\u00e9kek halmoz\u00f3djanak fel, amelyekre nincs kereslet. A megval\u00f3s\u00edthat\u00f3 \u00fctemterv pedig abban seg\u00edt, hogy ezt a k\u00e9szletprobl\u00e9m\u00e1t ne v\u00e1ltsa fel a k\u00e9sedelmes vev\u0151i rendel\u00e9sek torl\u00f3d\u00e1sa.<\/p>\n\n\n<p>Ha szeretn\u00e9 l\u00e1tni, hogyan kezeln\u00e9 a SkyPlanner az \u00d6n gy\u00e1rt\u00e1s\u00e1t, <a href=\"\/hu\/kapcsolat-ertekesites\/\">foglaljon bemutat\u00f3t<\/a>. Hozzon p\u00e9ld\u00e1t egy jellemz\u0151 rendel\u00e9s technol\u00f3giai \u00fatvonal\u00e1ra, arra az er\u0151forr\u00e1sra, amely\u00e9rt a legt\u00f6bb rendel\u00e9s verseng, \u00e9s egy k\u00f6zelm\u00faltbeli v\u00e1ltoz\u00e1sra, amely felbor\u00edtotta a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket. Ezekb\u0151l kiindulva megmutathatjuk, hogyan k\u00f6nny\u00edthetn\u00e9 meg napi tervez\u00e9si munk\u00e1j\u00e1t az Arcturus \u00e9s a Gantt-\u00fctemterv.<\/p>\n\n\n<p>El\u0151bb ink\u00e1bb \u00f6n\u00e1ll\u00f3an ismerkedne a rendszerrel? <a href=\"\/hu\/proba\/\">Pr\u00f3b\u00e1lja ki a SkyPlanner rendszer\u00e9t dem\u00f3adatokkal<\/a>, \u00e9s n\u00e9zze meg, hogyan hangolja \u00f6ssze az \u00fctemterv a rendel\u00e9seket \u00e9s a kapacit\u00e1st.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Gyakran ism\u00e9telt k\u00e9rd\u00e9sek<\/h2>\n\n\n<h3 class=\"wp-block-heading\">A rendel\u00e9sre gy\u00e1rt\u00e1s azt jelenti, hogy minden term\u00e9ket egyedileg terveznek?<\/h3>\n\n\n<p>Nem. Az MTO-term\u00e9k k\u00e9sz\u00fclhet megl\u00e9v\u0151 terv \u00e9s bev\u00e1lt technol\u00f3giai \u00fatvonal alapj\u00e1n is, de a gy\u00e1rt\u00e1s csak a vev\u0151i rendel\u00e9s be\u00e9rkez\u00e9se ut\u00e1n indul el. Ha a rendel\u00e9s \u00faj term\u00e9ktervez\u00e9st is elind\u00edt, akkor a rendel\u00e9sre tervez\u00e9s pontosabban \u00edrja le a m\u0171k\u00f6d\u00e9st.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Tarthat anyagk\u00e9szletet egy rendel\u00e9sre gy\u00e1rt\u00f3 v\u00e1llalat?<\/h3>\n\n\n<p>Igen. Az MTO azt hat\u00e1rozza meg, hogy mi ind\u00edtja el a gy\u00e1rt\u00e1st, nem pedig a k\u00e9szletez\u00e9st tiltja. A gyakran haszn\u00e1lt alapanyagokat \u00e9s v\u00e1s\u00e1rolt alkatr\u00e9szeket lehet k\u00e9szleten tartani, hogy hamarabb elindulhasson a gy\u00e1rt\u00e1s. A k\u00e9szterm\u00e9k vev\u0151i rendel\u00e9sre k\u00e9sz\u00fcl, nem a k\u00e9szterm\u00e9kek ir\u00e1nti el\u0151re jelzett kereslet alapj\u00e1n.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Mi\u00e9rt v\u00e1ltozhatnak a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k rendel\u00e9sre gy\u00e1rt\u00e1s eset\u00e9n?<\/h3>\n\n\n<p>A rendel\u00e9sek ugyanazokat az er\u0151forr\u00e1sokat veszik ig\u00e9nybe. Az anyagok k\u00e9s\u00e9se, a kapacit\u00e1s kies\u00e9se vagy a priorit\u00e1sok v\u00e1ltoz\u00e1sa eltolhat egy m\u0171veletet, \u00e9s hat\u00e1ssal lehet az azt k\u00f6vet\u0151 munk\u00e1ra is. Az \u00fctemterv \u00fajrasz\u00e1m\u00edt\u00e1sa l\u00e1that\u00f3v\u00e1 teszi ezeket a k\u00f6vetkezm\u00e9nyeket, \u00edgy a gy\u00e1rt\u00e1stervez\u0151 reag\u00e1lhat, \u00e9s sz\u00fcks\u00e9g eset\u00e9n m\u00f3dos\u00edthatja a v\u00e1llalt hat\u00e1rid\u0151ket.<\/p>\n\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n\n<script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"Does make to order mean every product is custom-designed?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"No. An MTO product can use an established design and production route, with manufacturing starting only after the customer places an order. If that order also triggers new product engineering, engineer to order is the more appropriate description.\"}},{\"@type\":\"Question\",\"name\":\"Can a make-to-order manufacturer keep materials in stock?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Yes. MTO describes when manufacturing is triggered, not a ban on inventory. Common raw materials and purchased parts can be stocked so production can start sooner. The finished product is made for a customer order rather than for forecast finished-goods demand.\"}},{\"@type\":\"Question\",\"name\":\"Why can make-to-order delivery dates change?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Orders share resources. A material delay, lost capacity or priority change can move an operation and affect later work. Recalculating the schedule makes those consequences visible so the planner can respond and update commitments when needed.\"}}]}<\/script>\n\n","protected":false},"excerpt":{"rendered":"<p>Rendel\u00e9sre gy\u00e1rt\u00e1s: kisebb k\u00e9szterm\u00e9kk\u00e9szlet, megalapozottabb sz\u00e1ll\u00edt\u00e1si \u00edg\u00e9retek Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Rendel\u00e9sre gy\u00e1rt\u00e1s: kisebb k\u00e9szterm\u00e9kk\u00e9szlet, megalapozottabb sz\u00e1ll\u00edt\u00e1si \u00edg\u00e9retek Egy vev\u0151 olyan m\u00e9ret\u0171 k\u00e9sz\u00fcl\u00e9kh\u00e1zat rendel, amelyb\u0151l ritk\u00e1n adnak el. \u00c9sszer\u0171 csak a rendel\u00e9s be\u00e9rkez\u00e9se ut\u00e1n legy\u00e1rtani: \u00edgy nem telik meg a rakt\u00e1r olyan v\u00e1ltozatokkal, amelyekre tal\u00e1n soha nem lesz vev\u0151. A vev\u0151 azonban sz\u00e1ll\u00edt\u00e1si d\u00e1tumot k\u00e9r, &#8230; <a title=\"Rendel\u00e9sre gy\u00e1rt\u00e1s: kisebb k\u00e9szterm\u00e9kk\u00e9szlet, megalapozottabb sz\u00e1ll\u00edt\u00e1si \u00edg\u00e9retek\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesre-gyartas\/\" aria-label=\"Read more about Rendel\u00e9sre gy\u00e1rt\u00e1s: kisebb k\u00e9szterm\u00e9kk\u00e9szlet, megalapozottabb sz\u00e1ll\u00edt\u00e1si \u00edg\u00e9retek\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":97068,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2526,312],"tags":[],"class_list":["post-96592","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-es-utemezes","category-forrasok","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Rendel\u00e9sre gy\u00e1rt\u00e1s: kevesebb k\u00e9szlet, jobb \u00edg\u00e9retek &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"Rendel\u00e9sre gy\u00e1rt\u00e1s: kisebb k\u00e9szterm\u00e9kk\u00e9szlet, re\u00e1lis hat\u00e1rid\u0151 minden rendel\u00e9shez. N\u00e9zze meg, hogyan k\u00e9sz\u00edt a SkyPlanner m\u0171k\u00f6d\u0151 \u00fctemtervet a rendel\u00e9sekb\u0151l.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesre-gyartas\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Rendel\u00e9sre gy\u00e1rt\u00e1s: kisebb k\u00e9szterm\u00e9kk\u00e9szlet, megalapozottabb sz\u00e1ll\u00edt\u00e1si \u00edg\u00e9retek\" \/>\n<meta property=\"og:description\" content=\"Rendel\u00e9sre gy\u00e1rt\u00e1s: kisebb k\u00e9szterm\u00e9kk\u00e9szlet, re\u00e1lis hat\u00e1rid\u0151 minden rendel\u00e9shez. N\u00e9zze meg, hogyan k\u00e9sz\u00edt a SkyPlanner m\u0171k\u00f6d\u0151 \u00fctemtervet a rendel\u00e9sekb\u0151l.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesre-gyartas\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-08T07:53:30+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-19T14:43:24+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Szerz\u0151:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data2\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/rendelesre-gyartas\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/rendelesre-gyartas\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Rendel\u00e9sre gy\u00e1rt\u00e1s: kisebb k\u00e9szterm\u00e9kk\u00e9szlet, megalapozottabb sz\u00e1ll\u00edt\u00e1si \u00edg\u00e9retek\",\"datePublished\":\"2026-10-08T07:53:30+00:00\",\"dateModified\":\"2026-10-19T14:43:24+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/rendelesre-gyartas\\\/\"},\"wordCount\":2934,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/rendelesre-gyartas\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-make-to-order-hero.png\",\"articleSection\":[\"APS \u00e9s \u00fctemez\u00e9s\",\"forr\u00e1sok\"],\"inLanguage\":\"hu-HU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/rendelesre-gyartas\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/rendelesre-gyartas\\\/\",\"name\":\"Rendel\u00e9sre gy\u00e1rt\u00e1s: kevesebb k\u00e9szlet, jobb \u00edg\u00e9retek &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/rendelesre-gyartas\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/rendelesre-gyartas\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-make-to-order-hero.png\",\"datePublished\":\"2026-10-08T07:53:30+00:00\",\"dateModified\":\"2026-10-19T14:43:24+00:00\",\"description\":\"Rendel\u00e9sre gy\u00e1rt\u00e1s: kisebb k\u00e9szterm\u00e9kk\u00e9szlet, re\u00e1lis hat\u00e1rid\u0151 minden rendel\u00e9shez. N\u00e9zze meg, hogyan k\u00e9sz\u00edt a SkyPlanner m\u0171k\u00f6d\u0151 \u00fctemtervet a rendel\u00e9sekb\u0151l.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/rendelesre-gyartas\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/rendelesre-gyartas\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/rendelesre-gyartas\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-make-to-order-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-make-to-order-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"One custom housing waits while another occupies the finishing resource needed to complete both orders.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/rendelesre-gyartas\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Rendel\u00e9sre gy\u00e1rt\u00e1s: kisebb k\u00e9szterm\u00e9kk\u00e9szlet, megalapozottabb sz\u00e1ll\u00edt\u00e1si \u00edg\u00e9retek\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Rendel\u00e9sre gy\u00e1rt\u00e1s: kevesebb k\u00e9szlet, jobb \u00edg\u00e9retek &#8211; SkyPlanner","description":"Rendel\u00e9sre gy\u00e1rt\u00e1s: kisebb k\u00e9szterm\u00e9kk\u00e9szlet, re\u00e1lis hat\u00e1rid\u0151 minden rendel\u00e9shez. N\u00e9zze meg, hogyan k\u00e9sz\u00edt a SkyPlanner m\u0171k\u00f6d\u0151 \u00fctemtervet a rendel\u00e9sekb\u0151l.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesre-gyartas\/","og_locale":"hu_HU","og_type":"article","og_title":"Rendel\u00e9sre gy\u00e1rt\u00e1s: kisebb k\u00e9szterm\u00e9kk\u00e9szlet, megalapozottabb sz\u00e1ll\u00edt\u00e1si \u00edg\u00e9retek","og_description":"Rendel\u00e9sre gy\u00e1rt\u00e1s: kisebb k\u00e9szterm\u00e9kk\u00e9szlet, re\u00e1lis hat\u00e1rid\u0151 minden rendel\u00e9shez. N\u00e9zze meg, hogyan k\u00e9sz\u00edt a SkyPlanner m\u0171k\u00f6d\u0151 \u00fctemtervet a rendel\u00e9sekb\u0151l.","og_url":"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesre-gyartas\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-08T07:53:30+00:00","article_modified_time":"2026-10-19T14:43:24+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Szerz\u0151:":"Jussi M\u00e4ntyl\u00e4","Becs\u00fclt olvas\u00e1si id\u0151":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesre-gyartas\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesre-gyartas\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Rendel\u00e9sre gy\u00e1rt\u00e1s: kisebb k\u00e9szterm\u00e9kk\u00e9szlet, megalapozottabb sz\u00e1ll\u00edt\u00e1si \u00edg\u00e9retek","datePublished":"2026-10-08T07:53:30+00:00","dateModified":"2026-10-19T14:43:24+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesre-gyartas\/"},"wordCount":2934,"publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesre-gyartas\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","articleSection":["APS \u00e9s \u00fctemez\u00e9s","forr\u00e1sok"],"inLanguage":"hu-HU"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesre-gyartas\/","url":"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesre-gyartas\/","name":"Rendel\u00e9sre gy\u00e1rt\u00e1s: kevesebb k\u00e9szlet, jobb \u00edg\u00e9retek &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesre-gyartas\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesre-gyartas\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","datePublished":"2026-10-08T07:53:30+00:00","dateModified":"2026-10-19T14:43:24+00:00","description":"Rendel\u00e9sre gy\u00e1rt\u00e1s: kisebb k\u00e9szterm\u00e9kk\u00e9szlet, re\u00e1lis hat\u00e1rid\u0151 minden rendel\u00e9shez. N\u00e9zze meg, hogyan k\u00e9sz\u00edt a SkyPlanner m\u0171k\u00f6d\u0151 \u00fctemtervet a rendel\u00e9sekb\u0151l.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesre-gyartas\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesre-gyartas\/"]}]},{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesre-gyartas\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png","width":1672,"height":941,"caption":"One custom housing waits while another occupies the finishing resource needed to complete both orders."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/rendelesre-gyartas\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"Rendel\u00e9sre gy\u00e1rt\u00e1s: kisebb k\u00e9szterm\u00e9kk\u00e9szlet, megalapozottabb sz\u00e1ll\u00edt\u00e1si \u00edg\u00e9retek"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-make-to-order-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Rendel\u00e9sre gy\u00e1rt\u00e1s: kisebb k\u00e9szterm\u00e9kk\u00e9szlet, megalapozottabb sz\u00e1ll\u00edt\u00e1si \u00edg\u00e9retek Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Rendel\u00e9sre gy\u00e1rt\u00e1s: kisebb k\u00e9szterm\u00e9kk\u00e9szlet, megalapozottabb sz\u00e1ll\u00edt\u00e1si \u00edg\u00e9retek Egy vev\u0151 olyan m\u00e9ret\u0171 k\u00e9sz\u00fcl\u00e9kh\u00e1zat rendel, amelyb\u0151l ritk\u00e1n adnak el. \u00c9sszer\u0171 csak a rendel\u00e9s be\u00e9rkez\u00e9se ut\u00e1n legy\u00e1rtani: \u00edgy nem telik meg a rakt\u00e1r olyan v\u00e1ltozatokkal, amelyekre tal\u00e1n soha nem lesz vev\u0151. A vev\u0151 azonban sz\u00e1ll\u00edt\u00e1si d\u00e1tumot k\u00e9r,&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/96592","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=96592"}],"version-history":[{"count":2,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/96592\/revisions"}],"predecessor-version":[{"id":96897,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/96592\/revisions\/96897"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media\/97068"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=96592"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/categories?post=96592"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/tags?post=96592"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}