{"id":96011,"date":"2026-10-04T02:31:16","date_gmt":"2026-10-04T02:31:16","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=96011"},"modified":"2026-10-04T02:32:02","modified_gmt":"2026-10-04T02:32:02","slug":"mi-a-termelesutemezes","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/hu\/forrasok\/mi-a-termelesutemezes\/","title":{"rendered":"Mi a termel\u00e9s\u00fctemez\u00e9s? \u00datmutat\u00f3 gy\u00e1rt\u00f3knak"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Mi a termel\u00e9s\u00fctemez\u00e9s? \u00datmutat\u00f3 gy\u00e1rt\u00f3knak<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/hu\/\">Kezd\u0151lap<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/\">Er\u0151forr\u00e1sok<\/a> &raquo; Mi a termel\u00e9s\u00fctemez\u00e9s? \u00datmutat\u00f3 gy\u00e1rt\u00f3knak<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Becs\u00fclt olvas\u00e1si id\u0151: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> percek<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>A gy\u00e1rt\u00e1s\u00fctemez\u00e9s a gy\u00e1rt\u00e1si m\u0171veleteket er\u0151forr\u00e1sokhoz rendeli, \u00e9s meghat\u00e1rozza a sorrendj\u00fcket, a kezd\u00e9si \u00e9s a befejez\u00e9si id\u0151pontjukat. A gy\u00e1rt\u00e1si tervet v\u00e9grehajthat\u00f3 munk\u00e1v\u00e1 alak\u00edtja, figyelembe v\u00e9ve a kapacit\u00e1st, a folyamatf\u00fcgg\u0151s\u00e9geket, az anyagok el\u00e9rhet\u0151s\u00e9g\u00e9t \u00e9s a sz\u00e1ll\u00edt\u00e1si d\u00e1tumokat. Egy j\u00f3l haszn\u00e1lhat\u00f3 \u00fctemez\u00e9s azt is megmutatja, mi futhat legk\u00f6zelebb, \u00e9s minek kell v\u00e1rnia.<\/p>\n\n<div class=\"gb-container gb-container-article04\"><div class=\"gb-inside-container\">\n\n<p><strong>Legfontosabb tudnival\u00f3k<\/strong><\/p>\n\n\n<p>A gy\u00e1rt\u00e1stervez\u00e9s kijel\u00f6li a gy\u00e1rt\u00e1si c\u00e9lokat; az \u00fctemez\u00e9s a m\u0171veletek szintj\u00e9n hat\u00e1rozza meg a sorrendet \u00e9s az id\u0151z\u00edt\u00e9st.<\/p>\n\n\n<p>A hat\u00e1rid\u0151 vagy a magas priorit\u00e1s nem teremt hi\u00e1nyz\u00f3 g\u00e9pkapacit\u00e1st, munkaer\u0151t vagy anyagot.<\/p>\n\n\n<p>A haszn\u00e1lhat\u00f3 \u00fctemez\u00e9shez folyamatl\u00e9p\u00e9sek, id\u0151tartamok, munka\u00e1llom\u00e1s-hozz\u00e1rendel\u00e9s \u00e9s re\u00e1lis rendelkez\u00e9sre \u00e1ll\u00e1s sz\u00fcks\u00e9ges.<\/p>\n\n\n<p>A SkyPlanner rendszerben a tervez\u0151k be\u00e1ll\u00edtj\u00e1k a priorit\u00e1sokat, az Arcturus \u00fajrasz\u00e1molja az \u00fctemez\u00e9st, az eredm\u00e9nyt pedig a Gantt mutatja.<\/p>\n\n<\/div><\/div>\n\n<h2 class=\"wp-block-heading\">Mit d\u00f6nt el a gy\u00e1rt\u00e1s\u00fctemez\u00e9s?<\/h2>\n\n\n<p>Egy gy\u00e1rt\u00e1stervez\u0151 sz\u00e1m\u00e1ra a gyakorlati k\u00e9rd\u00e9s ez: melyik m\u0171velet fusson legk\u00f6zelebb melyik munka\u00e1llom\u00e1son? A v\u00e1lasznak \u00f6ssze kell k\u00f6tnie a rendel\u00e9st a gy\u00e1rt\u00e1si folyamat\u00e1val. A megmunk\u00e1l\u00e1snak be kell fejez\u0151dnie, miel\u0151tt az arra \u00e9p\u00fcl\u0151 \u00f6sszeszerel\u00e9si m\u0171velet elkezd\u0151dhetne. A kiv\u00e1lasztott g\u00e9pnek el\u00e9rhet\u0151nek kell lennie, \u00e9s a munk\u00e1nak bele kell f\u00e9rnie az adott m\u0171szakba \u00e9s az er\u0151forr\u00e1s rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1ba.<\/p>\n\n\n<p>Egy rendel\u00e9si lista mutathat mennyis\u00e9geket \u00e9s \u00edg\u00e9rt d\u00e1tumokat an\u00e9lk\u00fcl, hogy b\u00e1rmelyik k\u00e9rd\u00e9sre v\u00e1laszt adna. A gy\u00e1rt\u00e1si \u00fctemez\u00e9s hozz\u00e1adja azokat az er\u0151forr\u00e1s-hozz\u00e1rendel\u00e9seket \u00e9s id\u0151z\u00edt\u00e9st, amelyek ebb\u0151l a list\u00e1b\u00f3l \u00fczemi munk\u00e1t csin\u00e1lnak. Min\u0151s\u00e9g\u00e9t az hat\u00e1rozza meg, hogy a hozz\u00e1rendel\u00e9sek t\u00e9nylegesen v\u00e9grehajthat\u00f3k-e, nem az, hogy a d\u00e1tumok milyen sz\u00e9pen jelennek meg.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Gy\u00e1rt\u00e1stervez\u00e9s \u00e9s gy\u00e1rt\u00e1s\u00fctemez\u00e9s<\/h3>\n\n\n<p>A gy\u00e1rt\u00e1stervez\u00e9s \u00e9s az \u00fctemez\u00e9s ugyanannak a gy\u00e1rt\u00e1si probl\u00e9m\u00e1nak m\u00e1s-m\u00e1s szintj\u00e9vel foglalkozik. A tervez\u00e9s azt \u00e1llap\u00edtja meg, mit kell legy\u00e1rtani, \u00e9s ehhez milyen kapacit\u00e1s vagy anyag sz\u00fcks\u00e9ges. Az \u00fctemez\u00e9s azt dolgozza ki, hogyan illeszkednek az egyes m\u0171veletek a rendelkez\u00e9sre \u00e1ll\u00f3 er\u0151forr\u00e1sokhoz.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>D\u00f6nt\u00e9s<\/th><th>Gy\u00e1rt\u00e1stervez\u00e9s<\/th><th>Gy\u00e1rt\u00e1s\u00fctemez\u00e9s<\/th><\/tr><\/thead><tbody><tr><td>Legy\u00e1rtand\u00f3 munka<\/td><td>Term\u00e9kek \u00e9s sz\u00fcks\u00e9ges mennyis\u00e9gek<\/td><td>Konkr\u00e9t gy\u00e1rt\u00e1si feladatokhoz tartoz\u00f3 m\u0171veletek<\/td><\/tr><tr><td>Kapacit\u00e1s<\/td><td>A gy\u00e1rt\u00e1si c\u00e9l el\u00e9r\u00e9s\u00e9hez sz\u00fcks\u00e9ges kapacit\u00e1s<\/td><td>Az egyes m\u0171veletekhez el\u00e9rhet\u0151 munka\u00e1llom\u00e1s- \u00e9s m\u0171szakkapacit\u00e1s<\/td><\/tr><tr><td>Id\u0151z\u00edt\u00e9s<\/td><td>Gy\u00e1rt\u00e1si id\u0151szakok \u00e9s sz\u00e1ll\u00edt\u00e1si v\u00e1llal\u00e1sok<\/td><td>A m\u0171veletek sorrendje, kezd\u00e9si \u00e9s befejez\u00e9si ideje<\/td><\/tr><tr><td>Reakci\u00f3 egy zavarra<\/td><td>A gy\u00e1rt\u00e1si c\u00e9l vagy a rendelkez\u00e9sre \u00e1ll\u00f3 er\u0151forr\u00e1sok \u00fajragondol\u00e1sa<\/td><td>Annak \u00fajrasz\u00e1mol\u00e1sa, hogy mely \u00e9rintett m\u0171veletek futhatnak, \u00e9s mikor<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Ez fogalmi \u00f6sszehasonl\u00edt\u00e1s, nem term\u00e9kle\u00edr\u00e1s. A megk\u00fcl\u00f6nb\u00f6ztet\u00e9s akkor is hasznos, ha egy v\u00e1llalat mindk\u00e9t tev\u00e9kenys\u00e9get \u201etervez\u00e9snek\u201d nevezi: k\u00e9rdezze meg, megmondja-e a kimenet az oper\u00e1tornak, hogy melyik gy\u00e1rt\u00e1si feladat futhat legk\u00f6zelebb egy adott er\u0151forr\u00e1son.<\/p>\n\n\n<h2 class=\"wp-block-heading\">P\u00e9lda: az A \u00e9s a B rendel\u00e9s k\u00f6z\u00f6s munka\u00e1llom\u00e1son osztozik<\/h2>\n\n\n<p>Vegy\u00fcnk egy szeml\u00e9ltet\u0151 m\u0171helyt az A \u00e9s a B rendel\u00e9ssel. Mindkett\u0151nek ugyanarra a megmunk\u00e1l\u00f3 munka\u00e1llom\u00e1sra van sz\u00fcks\u00e9ge, miel\u0151tt a r\u00e1k\u00f6vetkez\u0151 \u00f6sszeszerel\u00e9si l\u00e9p\u00e9sekre sor ker\u00fclne. Mindk\u00e9t rendel\u00e9snek van sz\u00e1ll\u00edt\u00e1si d\u00e1tuma, \u00e9s a tervez\u0151 megadta a priorit\u00e1saikat. Az \u00fctk\u00f6z\u00e9s egyszer\u0171: A \u00e9s B nem foglalhatja el egyszerre a k\u00f6z\u00f6s megmunk\u00e1l\u00f3 munka\u00e1llom\u00e1st.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Gy\u00e1rt\u00e1si feladat<\/th><th>Gy\u00e1rt\u00e1si folyamat<\/th><th>Feloldand\u00f3 korl\u00e1t<\/th><\/tr><\/thead><tbody><tr><td>A<\/td><td>Megmunk\u00e1l\u00e1s, majd \u00f6sszeszerel\u00e9s<\/td><td>B-vel versenyez a k\u00f6z\u00f6s megmunk\u00e1l\u00f3 munka\u00e1llom\u00e1s\u00e9rt<\/td><\/tr><tr><td>B<\/td><td>Megmunk\u00e1l\u00e1s, majd \u00f6sszeszerel\u00e9s<\/td><td>Az \u00f6sszeszerel\u00e9si l\u00e9p\u00e9se megv\u00e1rja a saj\u00e1t megmunk\u00e1l\u00e1si l\u00e9p\u00e9s\u00e9nek befejez\u00e9s\u00e9t<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Az \u00fctemez\u00e9si d\u00f6nt\u00e9s az, hogy a k\u00f6z\u00f6s munka\u00e1llom\u00e1s v\u00e9grehajthat\u00f3 sorrendet kapjon, \u00e9s minden f\u00fcgg\u0151 \u00f6sszeszerel\u00e9si l\u00e9p\u00e9s a hozz\u00e1 tartoz\u00f3 megmunk\u00e1l\u00e1si l\u00e9p\u00e9s ut\u00e1n k\u00f6vetkezzen. Az eredm\u00e9ny feloldja az \u00e1tfed\u00e9st a sorban; ebb\u0151l nem k\u00f6vetkezik, hogy minden sz\u00e1ll\u00edt\u00e1si v\u00e1llal\u00e1s teljes\u00edthet\u0151. Ez a t\u00e9nyleges id\u0151tartamokt\u00f3l \u00e9s a rendelkez\u00e9sre \u00e1ll\u00f3 kapacit\u00e1st\u00f3l is f\u00fcgg.<\/p>\n\n\n<p>Tegy\u00fck fel most, hogy B anyaga nem \u00e1ll rendelkez\u00e9sre. A tervez\u0151nek ellen\u0151riznie kell, mikor indulhat el B gy\u00e1rt\u00e1sa, majd fel kell m\u00e9rnie a hat\u00e1st mindk\u00e9t rendel\u00e9sre. B priorit\u00e1s\u00e1nak n\u00f6vel\u00e9se kifejezi az \u00fczleti fontoss\u00e1g\u00e1t, de a hi\u00e1nyz\u00f3 anyagot nem p\u00f3tolja. Ha ehelyett egy megmunk\u00e1l\u00e1si m\u0171szak v\u00e1lik el\u00e9rhetetlenn\u00e9, A \u00e9s B kapacit\u00e1shelyzete egyar\u00e1nt megv\u00e1ltozik, m\u00e9g ha a rendel\u00e9si mennyis\u00e9gek v\u00e1ltozatlanok maradnak.<\/p>\n\n\n<p>Ez a kis eset l\u00e1that\u00f3v\u00e1 teszi az \u00fctemez\u00e9s c\u00e9lj\u00e1t: \u00f6sszhangban tartani az er\u0151forr\u00e1sok sorrendj\u00e9t, a f\u00fcgg\u0151s\u00e9geket \u00e9s a gy\u00e1rt\u00e1si felt\u00e9teleket. Itt nincs felt\u00e9telezett t\u00e9telnagys\u00e1g vagy kisz\u00e1m\u00edtott befejez\u00e9si id\u0151. Ezek a m\u0171hely saj\u00e1t m\u0171veleti adataihoz tartoznak.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Gy\u00e1rt\u00e1s\u00fctemez\u00e9s a SkyPlanner rendszerben<\/h2>\n\n\n<p>A <a href=\"\/hu\/\">SkyPlanner gy\u00e1rt\u00e1s\u00fctemez\u0151 szoftver\u00e9ben<\/a> a be\u00e1ll\u00edtott munka\u00e1llom\u00e1sok, m\u0171szakok, oper\u00e1torok, priorit\u00e1sok \u00e9s anyagok alkotj\u00e1k az \u00fctemez\u00e9s bemeneteit. Az A \u00e9s a B eset\u00e9ben a k\u00f6z\u00f6s munka\u00e1llom\u00e1s \u00e9s a gy\u00e1rt\u00e1si folyamataik \u00edrj\u00e1k le a kapacit\u00e1s\u00fctk\u00f6z\u00e9st \u00e9s a f\u00fcgg\u0151s\u00e9geket. A gy\u00e1rt\u00e1s\u00fctemez\u00e9si Gantt-n\u00e9zet als\u00f3 s\u00e1vj\u00e1ban tal\u00e1lhat\u00f3 <strong>Reschedule all<\/strong> gomb arra k\u00e9szteti az Arcturust, hogy a priorit\u00e1sok \u00e9s a rendelkez\u00e9sre \u00e1ll\u00f3 kapacit\u00e1s alapj\u00e1n \u2013 bele\u00e9rtve a munka\u00e1llom\u00e1sok el\u00e9rhet\u0151s\u00e9g\u00e9t, a f\u00fcgg\u0151s\u00e9geket \u00e9s a sz\u00e1ll\u00edt\u00e1si d\u00e1tumokat \u2013 \u00fajrasz\u00e1molja az \u00fctemez\u00e9st. A tervez\u0151 az el\u0151re be\u00e1ll\u00edtott priorit\u00e1sokkal d\u00f6nti el, mi sz\u00e1m\u00edt; a mesters\u00e9ges intelligencia ezeket k\u00f6veti.<\/p>\n\n\n<p>A Gantt a be\u00fctemezett munk\u00e1t munka\u00e1llom\u00e1s-s\u00e1vokban mutatja, a kapcsol\u00f3d\u00f3 folyamatl\u00e9p\u00e9seket f\u00e1zisvonalak k\u00f6tik \u00f6ssze. Az A-t vagy a B-t \u00e9rint\u0151 v\u00e1ltoz\u00e1s ut\u00e1n a tervez\u0151 egy\u00fctt vizsg\u00e1lhatja az \u00fajrasz\u00e1molt sort \u00e9s a r\u00e1k\u00f6vetkez\u0151 m\u0171veleteket. Ha az anyagtudatos \u00fctemez\u00e9s enged\u00e9lyezve van, a rendszer figyelembe veszi a rakt\u00e1r- \u00e9s k\u00e9szlet\u00e1llapotot, \u00edgy az anyaghi\u00e1ny hat\u00e1ssal van az \u00fctemez\u00e9sre. A hasznos eredm\u00e9ny egy \u00faj \u00fctemez\u00e9s, amelyet a friss\u00edtett gy\u00e1rt\u00e1si felt\u00e9telekhez k\u00e9pest lehet megvizsg\u00e1lni \u2013 nem az A-t a B el\u00e9 helyez\u0151 sorrend \u00edg\u00e9rete a bemenetekt\u0151l f\u00fcggetlen\u00fcl.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Ellen\u0151rizend\u0151 bemenet A \u00e9s B eset\u00e9ben<\/th><th>\u00dctemez\u00e9si k\u00f6vetkezm\u00e9ny<\/th><th>Dokument\u00e1lt SkyPlanner-megfelel\u0151<\/th><\/tr><\/thead><tbody><tr><td>K\u00f6z\u00f6s munka\u00e1llom\u00e1s \u00e9s el\u00e9rhet\u0151 m\u0171szakok<\/td><td>A megmunk\u00e1l\u00e1si m\u0171veleteknek bele kell f\u00e9rni\u00fck a rendelkez\u00e9sre \u00e1ll\u00f3 kapacit\u00e1sba<\/td><td>A munka\u00e1llom\u00e1sok \u00e9s a m\u0171szakok \u00fctemez\u00e9si bemenetek; az Arcturus figyelembe veszi a rendelkez\u00e9sre \u00e1ll\u00f3 kapacit\u00e1st<\/td><\/tr><tr><td>Sorrendbe \u00e1ll\u00edtott folyamatl\u00e9p\u00e9sek \u00e9s id\u0151tartamok<\/td><td>Az \u00f6sszeszerel\u00e9snek k\u00f6vetnie kell azt a megmunk\u00e1l\u00e1st, amelyt\u0151l f\u00fcgg<\/td><td>Folyamatl\u00e9p\u00e9sek be\u00e1ll\u00edt\u00e1sa \u00e9s a f\u00fcgg\u0151s\u00e9geket figyelembe vev\u0151 \u00fajrasz\u00e1mol\u00e1s<\/td><\/tr><tr><td>Sz\u00e1ll\u00edt\u00e1si d\u00e1tumok \u00e9s kiv\u00e1lasztott priorit\u00e1sok<\/td><td>A futtathat\u00f3 gy\u00e1rt\u00e1si feladatok a tervez\u0151 c\u00e9ljai szerint versengenek<\/td><td>A Reschedule all a sz\u00e1ll\u00edt\u00e1si d\u00e1tumokat \u00e9s a priorit\u00e1sokat haszn\u00e1lja<\/td><\/tr><tr><td>B anyag\u00e1nak el\u00e9rhet\u0151s\u00e9ge<\/td><td>A hi\u00e1ny megv\u00e1ltoztatja B futtathat\u00f3s\u00e1g\u00e1t \u00e9s id\u0151z\u00edt\u00e9s\u00e9t<\/td><td>Az anyagtudatos \u00fctemez\u00e9s enged\u00e9lyez\u00e9s eset\u00e9n figyelembe veszi a k\u00e9szlet\u00e1llapotot<\/td><\/tr><tr><td>\u00dajrasz\u00e1molt m\u0171veleti sorrend<\/td><td>A megmunk\u00e1l\u00e1st \u00e9s a r\u00e1k\u00f6vetkez\u0151 \u00f6sszeszerel\u00e9st egy\u00fctt kell ellen\u0151rizni<\/td><td>Munka\u00e1llom\u00e1s-s\u00e1vok \u00e9s f\u00e1zisvonalak a Gantt-ban<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Term\u00e9kalap: a SkyPlanner dokument\u00e1ci\u00f3ja \u2013 \u201eHol van a King Button?\u201d (KB 892) \u00e9s \u201eSkyPlanner: Az alapok\u201d (KB 775) \u2013, valamint az Arcturus dokument\u00e1lt k\u00e9pess\u00e9gei; ellen\u0151rizve: 2026. okt\u00f3ber 4. A t\u00e1bl\u00e1zat dokument\u00e1lt funkci\u00f3kat rendel egy szeml\u00e9ltet\u0151 esethez, nem egy m\u00e9rt szoftverfuttat\u00e1shoz.<\/p>\n\n\n<p>A sorrend megismer\u00e9s\u00e9hez <a href=\"https:\/\/skyplanner.ai\/hu\/proba\/\">pr\u00f3b\u00e1lja ki a SkyPlanner rendszert dem\u00f3adatokkal<\/a>. Ha saj\u00e1t munka\u00e1llom\u00e1sair\u00f3l, m\u0171szakjair\u00f3l \u00e9s gy\u00e1rt\u00e1si folyamatair\u00f3l szeretne egyeztetni, <a href=\"https:\/\/skyplanner.ai\/hu\/kapcsolat-ertekesites\/\">foglaljon dem\u00f3t<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Bemenetek, amelyekt\u0151l haszn\u00e1lhat\u00f3 lesz a gy\u00e1rt\u00e1si \u00fctemez\u00e9s<\/h2>\n\n\n<p>Miel\u0151tt meg\u00edt\u00e9ln\u00e9 az A \u00e9s a B \u00fctemez\u00e9s\u00e9t, ellen\u0151rizze a m\u00f6g\u00f6tte \u00e1ll\u00f3 modellt. Egy term\u00e9krekord azt azonos\u00edtja, mit gy\u00e1rt; \u00f6nmag\u00e1ban nem \u00edr le v\u00e9grehajthat\u00f3 munk\u00e1t. A SkyPlanner Getting Started dokument\u00e1ci\u00f3ja egy minim\u00e1lis modellt \u00e9p\u00edt fel munka\u00e1llom\u00e1sokb\u00f3l, term\u00e9kekb\u0151l \u00e9s gy\u00e1rt\u00e1si folyamatokb\u00f3l. Egy folyamatk\u00e9sz gy\u00e1rtott term\u00e9knek sorrendbe \u00e1ll\u00edtott folyamatl\u00e9p\u00e9sekre, pozit\u00edv id\u0151tartamokra \u00e9s munka\u00e1llom\u00e1s-hozz\u00e1rendel\u00e9sre van sz\u00fcks\u00e9ge.<\/p>\n\n\n<p>Az al\u00e1bbi ellen\u0151rz\u0151list\u00e1t haszn\u00e1lja egy els\u0151 modell el\u0151k\u00e9sz\u00edt\u00e9sekor vagy egy v\u00e1ratlan sorrend kivizsg\u00e1l\u00e1sakor:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>Gy\u00e1rt\u00e1si folyamat:<\/strong> Megvannak-e minden gy\u00e1rt\u00e1si feladatn\u00e1l a sz\u00fcks\u00e9ges m\u0171veletek, a helyes sorrendben? B eset\u00e9ben az \u00f6sszeszerel\u00e9snek B megmunk\u00e1l\u00e1s\u00e1t\u00f3l kell f\u00fcggnie, nem A-\u00e9t\u00f3l.<\/li><li><strong>Id\u0151tartam alapja:<\/strong> T\u00fckr\u00f6zik-e a m\u0171veletek id\u0151tartamai a gy\u00e1rt\u00e1si feladatot \u00e9s annak mennyis\u00e9g\u00e9t? A SkyPlanner t\u00e1mogatja a Time\/Piece, a Pieces\/Time \u00e9s a Fixed Time folyamatl\u00e9p\u00e9s-sz\u00e1m\u00edt\u00e1sokat, az el\u0151k\u00e9sz\u00edt\u00e9shez pedig \u00e1t\u00e1ll\u00e1si id\u0151t.<\/li><li><strong>Munka\u00e1llom\u00e1s-hozz\u00e1rendel\u00e9s:<\/strong> Minden m\u0171velet megfelel\u0151 munka\u00e1llom\u00e1shoz van rendelve? Egy m\u00e1sodik g\u00e9p az \u00fczemben csak akkor seg\u00edt, ha az adott m\u0171velet haszn\u00e1lhatja.<\/li><li><strong>M\u0171szakok \u00e9s oper\u00e1torok:<\/strong> Egyezik-e a r\u00f6gz\u00edtett rendelkez\u00e9sre \u00e1ll\u00e1s azzal a kapacit\u00e1ssal, amely t\u00e9nylegesen el tudja v\u00e9gezni a munk\u00e1t? Egy szabad g\u00e9pid\u0151s\u00e1v kev\u00e9s, ha a sz\u00fcks\u00e9ges oper\u00e1tor nem el\u00e9rhet\u0151.<\/li><li><strong>Anyagok:<\/strong> Naprak\u00e9sz-e az anyag\u00e1llapot, k\u00fcl\u00f6n\u00f6sen B k\u00e9sedelmes alapanyaga eset\u00e9n? Ellen\u0151rizze ezt az anyagtudatos \u00fctemez\u00e9s be\u00e1ll\u00edt\u00e1s\u00e1val egy\u00fctt, ha haszn\u00e1lja ezt a k\u00e9pess\u00e9get.<\/li><li><strong>Sz\u00e1ll\u00edt\u00e1si d\u00e1tumok \u00e9s priorit\u00e1sok:<\/strong> Kifejezik-e a d\u00e1tumok \u00e9s a preferenci\u00e1k azokat a d\u00f6nt\u00e9seket, amelyeket a tervez\u0151 meg akar hozni?<\/li><\/ul>\n\n\n<p>Hasznos be\u00e1ll\u00edt\u00e1si ellen\u0151rz\u00e9s, ha m\u00e9g azel\u0151tt megvizsg\u00e1ljuk a folyamatot, hogy a priorit\u00e1sokkal pr\u00f3b\u00e1ln\u00e1nk jav\u00edtani az eredm\u00e9nyen. A hi\u00e1nyz\u00f3 technol\u00f3giai \u00fatvonal vagy a haszn\u00e1lhatatlan id\u0151tartamok bemeneti adatprobl\u00e9m\u00e1k. A SkyPlanner Dynamic Priorities \u00fatmutat\u00f3ja is szelekt\u00edv priorit\u00e1sbe\u00e1ll\u00edt\u00e1st javasol ahelyett, hogy minden priorit\u00e1ss\u00e1vot maximumra \u00e1ll\u00edtan\u00e1nk: a preferenci\u00e1knak \u00e9rdemi v\u00e1laszt\u00e1st kell kifejezni\u00fck az egym\u00e1ssal verseng\u0151 c\u00e9lok k\u00f6z\u00f6tt.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00dctemez\u00e9si m\u00f3dszerek \u00e9s korl\u00e1taik<\/h2>\n\n\n<p>T\u00f6bb \u00e1ltal\u00e1nos \u00fctemez\u00e9si fogalom seg\u00edt meg\u00e9rteni, hogyan \u00e9p\u00fcl fel egy sor. Ezek \u00fctemez\u00e9si megk\u00f6zel\u00edt\u00e9seket \u00edrnak le, nem a SkyPlanner kiv\u00e1laszthat\u00f3 m\u00f3djainak list\u00e1j\u00e1t.<\/p>\n\n\n<p>Az <strong>el\u0151re \u00fctemez\u00e9s<\/strong> att\u00f3l a pontt\u00f3l indul, amikor a munka megkezdhet\u0151, \u00e9s az ezt k\u00f6vet\u0151 m\u0171veleteket m\u00f6g\u00e9 helyezi. A eset\u00e9ben ez azt jelenti, hogy a megmunk\u00e1l\u00e1si \u00e9s szerel\u00e9si sorrendj\u00e9t egy rendelkez\u00e9sre \u00e1ll\u00f3 kezd\u00e9si id\u0151pontt\u00f3l k\u00f6vetj\u00fck. Seg\u00edt l\u00e1that\u00f3v\u00e1 tenni azt a befejez\u00e9si d\u00e1tumot, amelyet a felt\u00e9telezett rendelkez\u00e9sre \u00e1ll\u00e1s lehet\u0151v\u00e9 tesz.<\/p>\n\n\n<p>A <strong>visszafel\u00e9 \u00fctemez\u00e9s<\/strong> a megk\u00f6vetelt befejez\u00e9si d\u00e1tumb\u00f3l indul ki, \u00e9s a m\u0171veleteken visszafel\u00e9 haladva hat\u00e1rozza meg, mikor kellene elkezdeni \u0151ket. B eset\u00e9ben olyan kezd\u00e9si k\u00f6vetelm\u00e9nyt t\u00e1rhat fel, amelyet a k\u00e9sedelmes anyaga nem tud teljes\u00edteni. A megk\u00f6vetelt kezd\u00e9s vizsg\u00e1land\u00f3 korl\u00e1t, nem bizony\u00edt\u00e9k arra, hogy a munka megval\u00f3s\u00edthat\u00f3.<\/p>\n\n\n<p>A <strong>v\u00e9ges kapacit\u00e1s\u00fa \u00fctemez\u00e9s<\/strong> a munka elhelyez\u00e9sekor figyelembe veszi a rendelkez\u00e9sre \u00e1ll\u00f3 er\u0151forr\u00e1s-kapacit\u00e1st. A k\u00f6z\u00f6s munka\u00e1llom\u00e1sos esetben az A \u00e9s B k\u00f6z\u00f6tti verseng\u00e9st kell feloldania. Korl\u00e1tlan kapacit\u00e1st felt\u00e9telezve mindk\u00e9t gy\u00e1rt\u00e1si feladat ugyanarra a rendelkez\u00e9sre \u00e1ll\u00f3 id\u0151szakra ker\u00fclhet, a konfliktus megold\u00e1s\u00e1t pedig valakinek k\u00e9s\u0151bbre hagyja.<\/p>\n\n\n<p>A t\u00e1bl\u00e1zatkezel\u0151 seg\u00edthet a tervez\u0151nek meg\u00e9rteni egy kis sort, \u00e9s dokument\u00e1lni a javasolt sorrendet. Ahogy szaporodnak a k\u00f6z\u00f6s er\u0151forr\u00e1sok \u00e9s az egym\u00e1st\u00f3l f\u00fcgg\u0151 m\u0171veletek, \u00fagy ig\u00e9nyel minden m\u00f3dos\u00edt\u00e1s egyre t\u00f6bb egyeztet\u00e9st: ha \u00e1thelyezz\u00fck B megmunk\u00e1l\u00e1s\u00e1t, \u00e1t kell gondolni a szerel\u00e9s\u00e9t, az A k\u00f6r\u00fcli sort \u00e9s minden m\u00e1s \u00e9rintett munk\u00e1t. Az <a href=\"\/hu\/forrasok\/excel-gyartastervezes-kihivasai-es-skyplanner-aps-megoldas\/\">Excelben v\u00e9gzett gy\u00e1rt\u00e1stervez\u00e9sr\u0151l sz\u00f3l\u00f3 anyag<\/a> r\u00e9szletesebben bemutatja ezt a karbantart\u00e1si probl\u00e9m\u00e1t.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mit tegy\u00fcnk, ha nincs el\u00e9g kapacit\u00e1s?<\/h2>\n\n\n<p>A megval\u00f3s\u00edthat\u00f3 sorrend \u00e9s a kiel\u00e9g\u00edt\u0151 sz\u00e1ll\u00edt\u00e1si eredm\u00e9ny k\u00e9t k\u00fcl\u00f6n pr\u00f3ba. Ha A \u00e9s B nem tud egyar\u00e1nt elk\u00e9sz\u00fclni a rendelkez\u00e9sre \u00e1ll\u00f3 kapacit\u00e1son bel\u00fcl, att\u00f3l, hogy \u00e9rv\u00e9nyes sorrendbe \u00e1ll\u00edtjuk \u0151ket, a hi\u00e1ny nem sz\u0171nik meg. A tervez\u0151nek kell eld\u00f6ntenie, hogy m\u00f3dos\u00edtja-e az \u00edg\u00e9rt id\u0151z\u00edt\u00e9st, biztos\u00edt-e tov\u00e1bbi kapacit\u00e1st, vagy kiv\u00e1lasztja, melyik munka \u00e9lvez els\u0151bbs\u00e9get.<\/p>\n\n\n<p>Kezdj\u00fck a t\u00e9nylegesen megk\u00f6t\u0151 korl\u00e1ttal. Ha B anyagra v\u00e1r, a t\u00f6bblet megmunk\u00e1l\u00e1si kapacit\u00e1s \u00f6nmag\u00e1ban nem teszi elk\u00e9sz\u00edthet\u0151v\u00e9. Ha a k\u00f6z\u00f6s munka\u00e1llom\u00e1s t\u00falterhelt, a szerel\u00e9si d\u00e1tumok pontoss\u00e1g\u00e1nak jav\u00edt\u00e1sa nem szabad\u00edt fel megmunk\u00e1l\u00e1si id\u0151ablakot. Ha a korl\u00e1t egy g\u00e9pkezel\u0151, a g\u00e9p napt\u00e1r\u00e1t a g\u00e9pkezel\u0151 rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1val egy\u00fctt kell \u00e9rt\u00e9kelni.<\/p>\n\n\n<p>Az \u00faj \u00fctemez\u00e9s ki\u00e9rt\u00e9kel\u00e9se el\u0151tt r\u00f6gz\u00edts\u00fck a v\u00e1lasztott v\u00e1ltoztat\u00e1st a bemeneti adatokban. Ezut\u00e1n vizsg\u00e1ljuk meg az \u00e9rintett, azt k\u00f6vet\u0151 munk\u00e1kat, ne csak az \u00e1thelyezett m\u0171veletet. A \u00e9s B eset\u00e9ben ez azt jelenti, hogy a szerel\u00e9si l\u00e9p\u00e9seiket \u00e9s a k\u00f6z\u00f6s megmunk\u00e1l\u00e1si sort is ellen\u0151rizni kell. \u00cdgy k\u00fcl\u00f6nb\u00f6ztethet\u0151 meg a val\u00f3di javul\u00e1s att\u00f3l a konfliktust\u00f3l, amely csak m\u00e1shov\u00e1 tol\u00f3dott.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Az \u00fctemez\u00e9s \u00f6sszhangban tart\u00e1sa a gy\u00e1rt\u00e1si adatokkal<\/h2>\n\n\n<p>Az \u00fctemez\u00e9s csak annyira naprak\u00e9sz, amennyire a benne \u00e1br\u00e1zolt felt\u00e9telek. Miut\u00e1n B anyaga el\u00e9rhet\u0151v\u00e9 v\u00e1lik, vagy egy m\u0171szakv\u00e1lt\u00e1s hat\u00e1ssal van A-ra, az \u00fajrasz\u00e1m\u00edt\u00e1s \u00e1ttekint\u00e9se el\u0151tt ellen\u0151rizz\u00fck, hogy a vonatkoz\u00f3 adatok t\u00fckr\u00f6zik-e a v\u00e1ltoz\u00e1st. M\u00e1sk\u00fcl\u00f6nben a tervez\u0151 az \u00fczem aktu\u00e1lis helyzet\u00e9t egy elavult modellel hasonl\u00edthatja \u00f6ssze.<\/p>\n\n\n<p>A SkyPlanner ny\u00edlt REST API-n kereszt\u00fcl integr\u00e1l\u00f3dik b\u00e1rmely ERP- vagy MES-rendszerrel. Ez lehet\u0151s\u00e9get ad arra, hogy az \u00fctemez\u00e9si modellt \u00f6sszekapcsoljuk a rendel\u00e9si \u00e9s gy\u00e1rt\u00e1si adatokat t\u00e1rol\u00f3 rendszerekkel. Az <a href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/\">ERP- \u00e9s MES-integr\u00e1ci\u00f3r\u00f3l sz\u00f3l\u00f3 inform\u00e1ci\u00f3<\/a> a k\u00f6vetkez\u0151 l\u00e9p\u00e9s annak azonos\u00edt\u00e1s\u00e1hoz, hogyan t\u00e1mogathatj\u00e1k a megl\u00e9v\u0151 adatok az \u00fctemez\u00e9st.<\/p>\n\n\n<p>Integr\u00e1ci\u00f3s egyeztet\u00e9shez haszn\u00e1ljuk A-t \u00e9s B-t adatk\u00f6vet\u00e9si p\u00e9ldak\u00e9nt: honnan sz\u00e1rmaznak a rendel\u00e9seik, a gy\u00e1rt\u00e1si l\u00e9p\u00e9seik \u00e9s a rendelkez\u00e9sre \u00e1ll\u00e1si inform\u00e1ci\u00f3ik, \u00e9s hogyan jutnak el a v\u00e1ltoz\u00e1sok a modellhez? E bemenetek egyeztet\u00e9se megk\u00f6nny\u00edti az \u00fctemez\u00e9si eredm\u00e9ny \u00e9rt\u00e9kel\u00e9s\u00e9t. Az integr\u00e1ci\u00f3s m\u00f3dszert \u00e9s az adatlek\u00e9pez\u00e9st az \u00e9rintett t\u00e9nyleges rendszerek alapj\u00e1n kell megfontolni.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Gyakran ism\u00e9telt k\u00e9rd\u00e9sek<\/h2>\n\n\n<h3 class=\"wp-block-heading\">Mi a gy\u00e1rt\u00e1s\u00fctemez\u00e9s a gy\u00e1rt\u00e1s ter\u00fclet\u00e9n?<\/h3>\n\n\n<p>A gy\u00e1rt\u00e1si m\u0171veletek termel\u00e9si er\u0151forr\u00e1sokhoz rendel\u00e9se, sorba \u00e1ll\u00edt\u00e1sa \u00e9s id\u0151z\u00edt\u00e9se. Az eredm\u00e9ny\u00e9nek meg kell mondania az \u00fczemnek, melyik munka futhat k\u00f6vetkez\u0151k\u00e9nt, \u00e9s melyiknek kell v\u00e1rnia. Az A\/B p\u00e9ld\u00e1ban a k\u00f6z\u00f6s megmunk\u00e1l\u00e1si sor \u00e9s az att\u00f3l f\u00fcgg\u0151 szerel\u00e9si l\u00e9p\u00e9sek ugyanahhoz az \u00fctemez\u00e9si d\u00f6nt\u00e9shez tartoznak.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Mi a k\u00fcl\u00f6nbs\u00e9g a gy\u00e1rt\u00e1stervez\u00e9s \u00e9s a gy\u00e1rt\u00e1s\u00fctemez\u00e9s k\u00f6z\u00f6tt?<\/h3>\n\n\n<p>A \u00e9s B eset\u00e9ben a k\u00fcl\u00f6nbs\u00e9g akkor v\u00e1lik gyakorlati k\u00e9rd\u00e9ss\u00e9, amikor a k\u00f6z\u00f6s munka\u00e1llom\u00e1suk nem tudja teljes\u00edteni mindk\u00e9t v\u00e1llal\u00e1st. A megmunk\u00e1l\u00e1si sorrend m\u00f3dos\u00edt\u00e1sa \u00fctemez\u00e9si d\u00f6nt\u00e9s; a gy\u00e1rt\u00e1si c\u00e9l vagy a rendelkez\u00e9sre \u00e1ll\u00f3 er\u0151forr\u00e1sok \u00fajragondol\u00e1sa a tervez\u00e9shez tartozik. A fenti \u00f6sszehasonl\u00edt\u00f3 t\u00e1bl\u00e1zat seg\u00edts\u00e9g\u00e9vel azonos\u00edtsuk, melyik d\u00f6nt\u00e9sre kell figyelni, miel\u0151tt m\u00f3dos\u00edtjuk a m\u0171veletek d\u00e1tumait.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Milyen inform\u00e1ci\u00f3kra van sz\u00fcks\u00e9g a gy\u00e1rt\u00e1si \u00fctemez\u00e9s elk\u00e9sz\u00edt\u00e9s\u00e9hez?<\/h3>\n\n\n<p>Kezdj\u00fck a gy\u00e1rt\u00e1si feladatokkal, a sorba rendezett folyamatl\u00e9p\u00e9sekkel, az id\u0151tartamokkal, a megfelel\u0151 munka\u00e1llom\u00e1sokkal, az el\u00e9rhet\u0151 m\u0171szakokkal \u00e9s g\u00e9pkezel\u0151kkel, az anyagokkal, a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151kkel \u00e9s a priorit\u00e1sokkal. A SkyPlanner els\u0151 modellj\u00e9ben a sorrend ki\u00e9rt\u00e9kel\u00e9se el\u0151tt ellen\u0151rizz\u00fck a gy\u00e1rtott term\u00e9k folyamat\u00e1t. A term\u00e9keket tartalmaz\u00f3 sorok \u00f6nmagukban nem hat\u00e1rozz\u00e1k meg, hol fut egy m\u0171velet, \u00e9s mennyi ideig foglal le egy er\u0151forr\u00e1st.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Mit tegyen a tervez\u0151, ha a v\u00e9ges kapacit\u00e1s miatt nem teljes\u00edthet\u0151 a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151?<\/h3>\n\n\n<p>A tervez\u0151 sz\u00e1m\u00e1ra a tanuls\u00e1g egy konkr\u00e9t, a megk\u00f6vetelt d\u00e1tumhoz viszony\u00edtott hi\u00e1ny. Ha B a rendelkez\u00e9sre \u00e1ll\u00f3 megmunk\u00e1l\u00e1si kapacit\u00e1ssal nem tud id\u0151ben elk\u00e9sz\u00fclni, vizsg\u00e1ljuk meg a korl\u00e1tot, \u00e9s d\u00f6nts\u00fck el, hogy a kapacit\u00e1st, a priorit\u00e1st vagy a v\u00e1llal\u00e1st m\u00f3dos\u00edtjuk. Ellen\u0151rizz\u00fck \u00fajra A k\u00f6vetkez\u0151 munk\u00e1it is, hogy B probl\u00e9m\u00e1j\u00e1nak megold\u00e1sa ne csak tov\u00e1bbtolja a hi\u00e1nyt.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Hogyan hat az anyaghi\u00e1ny vagy a g\u00e9p el\u00e9rhetetlens\u00e9ge az \u00fctemez\u00e9sre?<\/h3>\n\n\n<p>Az anyaghi\u00e1ny k\u00e9sleltetheti, hogy egy m\u0171velet mikor v\u00e1lik ind\u00edthat\u00f3v\u00e1; a g\u00e9p el\u00e9rhetetlens\u00e9ge pedig elvonja a kapacit\u00e1st ott, ahol a munk\u00e1nak futnia kellett volna. Mindkett\u0151 hat\u00e1ssal lehet a k\u00f6vetkez\u0151 l\u00e9p\u00e9sekre \u00e9s a verseng\u0151 gy\u00e1rt\u00e1si feladatokra. B anyaghi\u00e1nya eset\u00e9n az \u00fajrasz\u00e1molt sor megvizsg\u00e1l\u00e1sa el\u0151tt ellen\u0151rizz\u00fck a k\u00e9szlet\u00e1llapotot, \u00e9s a SkyPlannerben az enged\u00e9lyezett anyagtudatos \u00fctemez\u00e9si funkci\u00f3t.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Egy\u00fctt tud m\u0171k\u00f6dni a gy\u00e1rt\u00e1s\u00fctemez\u0151 szoftver egy megl\u00e9v\u0151 ERP- vagy MES-rendszerrel?<\/h3>\n\n\n<p>Igen. A SkyPlanner ny\u00edlt REST API-n kereszt\u00fcl integr\u00e1l\u00f3dik b\u00e1rmely ERP- vagy MES-rendszerrel. A gyakorlati k\u00e9rd\u00e9s az, hogyan lesznek lek\u00e9pezve \u00e9s naprak\u00e9szen tartva a vonatkoz\u00f3 rendel\u00e9si \u00e9s gy\u00e1rt\u00e1si adatok. A \u00e9s B eset\u00e9ben az integr\u00e1ci\u00f3 megval\u00f3s\u00edt\u00e1s\u00e1nak megbesz\u00e9l\u00e9se el\u0151tt der\u00edts\u00fck ki, honnan sz\u00e1rmaznak a m\u0171veleteik \u00e9s a rendelkez\u00e9sre \u00e1ll\u00e1si inform\u00e1ci\u00f3ik.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Mikor el\u00e9g egy t\u00e1bl\u00e1zat, \u00e9s mikor hasznos az automatikus \u00fajra\u00fctemez\u00e9s?<\/h3>\n\n\n<p>A t\u00e1bl\u00e1zat akkor lehet hasznos, ha a tervez\u0151 megb\u00edzhat\u00f3an k\u00e9pes karbantartani a sort \u00e9s egyeztetni a f\u00fcgg\u0151s\u00e9geit. Az automatikus \u00fajra\u00fctemez\u00e9s akkor v\u00e1lik hasznoss\u00e1, ha a v\u00e1ltoz\u00e1sok sok \u00f6sszekapcsolt m\u0171veletet vagy k\u00f6z\u00f6s er\u0151forr\u00e1st \u00e9rintenek. A \u00e9s B eset\u00e9ben m\u00e9rj\u00fck fel, mennyi munka k\u00f6vetkezik egyetlen megmunk\u00e1l\u00e1si v\u00e1ltoztat\u00e1sb\u00f3l, bele\u00e9rtve a k\u00f6vetkez\u0151 szerel\u00e9st \u00e9s a sorban l\u00e9v\u0151 t\u00f6bbi gy\u00e1rt\u00e1si feladatot.<\/p>\n\n<\/div>\n<\/div>\n\n<script type=\"application\/ld+json\">{\"@context\":\"https:\/\/schema.org\",\"@type\":\"FAQPage\",\"mainEntity\":[{\"@type\":\"Question\",\"name\":\"What is production scheduling in manufacturing?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"It is the assignment, sequencing and timing of manufacturing operations on production resources. Its output should tell the shop floor which work can run next and which work must wait. In the A\/B example, the shared machining queue and the dependent assembly steps belong to the same scheduling decision.\"}},{\"@type\":\"Question\",\"name\":\"What is the difference between production planning and production scheduling?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"For A and B, the distinction becomes practical when their shared workstation cannot support both commitments. Changing the machining sequence is a scheduling decision; reconsidering the production objective or available resources belongs to planning. Use the comparison table above to identify which decision needs attention before changing operation dates.\"}},{\"@type\":\"Question\",\"name\":\"What information do you need to create a production schedule?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Start with jobs, ordered process steps, durations, eligible workstations, available shifts and operators, materials, delivery dates and priorities. In SkyPlanner's first model, verify the manufactured product's flow before evaluating its sequence. Product rows alone do not establish where an operation runs or how long it occupies a resource.\"}},{\"@type\":\"Question\",\"name\":\"What should a planner do when finite capacity causes a delivery shortfall?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"The planner takeaway is a concrete shortfall against a required date. If B cannot finish on time with the available machining capacity, inspect the constraint and decide whether to change capacity, priority or the commitment. Recheck A's downstream work as well, so solving B's problem does not simply move the shortfall.\"}},{\"@type\":\"Question\",\"name\":\"How do material shortages or machine unavailability affect a schedule?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"A material shortage can delay when an operation becomes eligible; machine unavailability removes capacity where work was expected to run. Both can affect downstream steps and competing jobs. For B's material shortage, verify the inventory state and, in SkyPlanner, the enabled material-aware scheduling capability before inspecting the recalculated queue.\"}},{\"@type\":\"Question\",\"name\":\"Can production scheduling software work with an existing ERP or MES?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Yes. SkyPlanner integrates with any ERP or MES through its open REST API. The practical question is how the relevant order and production data will be mapped and kept current. For A and B, trace the source of their operations and availability information before discussing the integration implementation.\"}},{\"@type\":\"Question\",\"name\":\"When is a spreadsheet enough, and when is automatic rescheduling useful?\",\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"A spreadsheet can be useful when a planner can maintain the queue and reconcile its dependencies reliably. Automatic rescheduling becomes useful when changes affect many linked operations or shared resources. With A and B, assess how much work follows a single machining change, including downstream assembly and other jobs in the queue.\"}}]}<\/script>\n\n","protected":false},"excerpt":{"rendered":"<p>Mi a termel\u00e9s\u00fctemez\u00e9s? \u00datmutat\u00f3 gy\u00e1rt\u00f3knak Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Mi a termel\u00e9s\u00fctemez\u00e9s? \u00datmutat\u00f3 gy\u00e1rt\u00f3knak A gy\u00e1rt\u00e1s\u00fctemez\u00e9s a gy\u00e1rt\u00e1si m\u0171veleteket er\u0151forr\u00e1sokhoz rendeli, \u00e9s meghat\u00e1rozza a sorrendj\u00fcket, a kezd\u00e9si \u00e9s a befejez\u00e9si id\u0151pontjukat. A gy\u00e1rt\u00e1si tervet v\u00e9grehajthat\u00f3 munk\u00e1v\u00e1 alak\u00edtja, figyelembe v\u00e9ve a kapacit\u00e1st, a folyamatf\u00fcgg\u0151s\u00e9geket, az anyagok el\u00e9rhet\u0151s\u00e9g\u00e9t \u00e9s a sz\u00e1ll\u00edt\u00e1si d\u00e1tumokat. Egy j\u00f3l haszn\u00e1lhat\u00f3 \u00fctemez\u00e9s azt &#8230; <a title=\"Mi a termel\u00e9s\u00fctemez\u00e9s? \u00datmutat\u00f3 gy\u00e1rt\u00f3knak\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/mi-a-termelesutemezes\/\" aria-label=\"Read more about Mi a termel\u00e9s\u00fctemez\u00e9s? \u00datmutat\u00f3 gy\u00e1rt\u00f3knak\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":96058,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2526,312],"tags":[],"class_list":["post-96011","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-scheduling","category-forrasok","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Mi a termel\u00e9s\u00fctemez\u00e9s? \u00datmutat\u00f3 gy\u00e1rt\u00f3knak<\/title>\n<meta name=\"description\" content=\"\u00c9p\u00edtsen megval\u00f3s\u00edthat\u00f3 termel\u00e9s\u00fctemez\u00e9st: feladatsorrend, kapacit\u00e1s, anyagok \u2013 \u00e9s n\u00e9zze meg, hogyan sz\u00e1mol \u00fajra a SkyPlanner, ha v\u00e1ltoznak a priorit\u00e1sok.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/mi-a-termelesutemezes\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Mi a termel\u00e9s\u00fctemez\u00e9s? \u00datmutat\u00f3 gy\u00e1rt\u00f3knak\" \/>\n<meta property=\"og:description\" content=\"\u00c9p\u00edtsen megval\u00f3s\u00edthat\u00f3 termel\u00e9s\u00fctemez\u00e9st: feladatsorrend, kapacit\u00e1s, anyagok \u2013 \u00e9s n\u00e9zze meg, hogyan sz\u00e1mol \u00fajra a SkyPlanner, ha v\u00e1ltoznak a priorit\u00e1sok.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/forrasok\/mi-a-termelesutemezes\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-04T02:31:16+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-04T02:32:02+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"2172\" \/>\n\t<meta property=\"og:image:height\" content=\"724\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Szerz\u0151:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data2\" content=\"18 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/mi-a-termelesutemezes\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/mi-a-termelesutemezes\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Mi a termel\u00e9s\u00fctemez\u00e9s? \u00datmutat\u00f3 gy\u00e1rt\u00f3knak\",\"datePublished\":\"2026-10-04T02:31:16+00:00\",\"dateModified\":\"2026-10-04T02:32:02+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/mi-a-termelesutemezes\\\/\"},\"wordCount\":3696,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/mi-a-termelesutemezes\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-scheduling-hero.png\",\"articleSection\":[\"APS &amp; Scheduling\",\"forr\u00e1sok\"],\"inLanguage\":\"hu-HU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/mi-a-termelesutemezes\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/mi-a-termelesutemezes\\\/\",\"name\":\"Mi a termel\u00e9s\u00fctemez\u00e9s? \u00datmutat\u00f3 gy\u00e1rt\u00f3knak\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/mi-a-termelesutemezes\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/mi-a-termelesutemezes\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-scheduling-hero.png\",\"datePublished\":\"2026-10-04T02:31:16+00:00\",\"dateModified\":\"2026-10-04T02:32:02+00:00\",\"description\":\"\u00c9p\u00edtsen megval\u00f3s\u00edthat\u00f3 termel\u00e9s\u00fctemez\u00e9st: feladatsorrend, kapacit\u00e1s, anyagok \u2013 \u00e9s n\u00e9zze meg, hogyan sz\u00e1mol \u00fajra a SkyPlanner, ha v\u00e1ltoznak a priorit\u00e1sok.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/mi-a-termelesutemezes\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/mi-a-termelesutemezes\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/mi-a-termelesutemezes\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-scheduling-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/production-scheduling-hero.png\",\"width\":2172,\"height\":724,\"caption\":\"Two component batches queue for a shared machining workstation before moving to assembly\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/mi-a-termelesutemezes\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Mi a termel\u00e9s\u00fctemez\u00e9s? \u00datmutat\u00f3 gy\u00e1rt\u00f3knak\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@SkyPlannerAPS\",\"https:\\\/\\\/www.capterra.com\\\/p\\\/265911\\\/SkyPlanner-APS\\\/\",\"https:\\\/\\\/www.trustradius.com\\\/products\\\/skyplanner-aps\\\/reviews\",\"https:\\\/\\\/www.saasworthy.com\\\/product\\\/skyplanner-aps\",\"https:\\\/\\\/sourceforge.net\\\/software\\\/product\\\/SkyPlanner-APS\\\/\",\"https:\\\/\\\/www.g2.com\\\/products\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.getapp.com\\\/project-management-planning-software\\\/a\\\/skyplanner-aps\\\/\",\"https:\\\/\\\/www.softwareadvice.com\\\/cmms\\\/skyplanner-aps-profile\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Mi a termel\u00e9s\u00fctemez\u00e9s? \u00datmutat\u00f3 gy\u00e1rt\u00f3knak","description":"\u00c9p\u00edtsen megval\u00f3s\u00edthat\u00f3 termel\u00e9s\u00fctemez\u00e9st: feladatsorrend, kapacit\u00e1s, anyagok \u2013 \u00e9s n\u00e9zze meg, hogyan sz\u00e1mol \u00fajra a SkyPlanner, ha v\u00e1ltoznak a priorit\u00e1sok.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/forrasok\/mi-a-termelesutemezes\/","og_locale":"hu_HU","og_type":"article","og_title":"Mi a termel\u00e9s\u00fctemez\u00e9s? \u00datmutat\u00f3 gy\u00e1rt\u00f3knak","og_description":"\u00c9p\u00edtsen megval\u00f3s\u00edthat\u00f3 termel\u00e9s\u00fctemez\u00e9st: feladatsorrend, kapacit\u00e1s, anyagok \u2013 \u00e9s n\u00e9zze meg, hogyan sz\u00e1mol \u00fajra a SkyPlanner, ha v\u00e1ltoznak a priorit\u00e1sok.","og_url":"https:\/\/skyplanner.ai\/hu\/forrasok\/mi-a-termelesutemezes\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-04T02:31:16+00:00","article_modified_time":"2026-10-04T02:32:02+00:00","og_image":[{"width":2172,"height":724,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Szerz\u0151:":"Jussi M\u00e4ntyl\u00e4","Becs\u00fclt olvas\u00e1si id\u0151":"18 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/mi-a-termelesutemezes\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/mi-a-termelesutemezes\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Mi a termel\u00e9s\u00fctemez\u00e9s? \u00datmutat\u00f3 gy\u00e1rt\u00f3knak","datePublished":"2026-10-04T02:31:16+00:00","dateModified":"2026-10-04T02:32:02+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/mi-a-termelesutemezes\/"},"wordCount":3696,"publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/mi-a-termelesutemezes\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-hero.png","articleSection":["APS &amp; Scheduling","forr\u00e1sok"],"inLanguage":"hu-HU"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/mi-a-termelesutemezes\/","url":"https:\/\/skyplanner.ai\/hu\/forrasok\/mi-a-termelesutemezes\/","name":"Mi a termel\u00e9s\u00fctemez\u00e9s? \u00datmutat\u00f3 gy\u00e1rt\u00f3knak","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/mi-a-termelesutemezes\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/mi-a-termelesutemezes\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-hero.png","datePublished":"2026-10-04T02:31:16+00:00","dateModified":"2026-10-04T02:32:02+00:00","description":"\u00c9p\u00edtsen megval\u00f3s\u00edthat\u00f3 termel\u00e9s\u00fctemez\u00e9st: feladatsorrend, kapacit\u00e1s, anyagok \u2013 \u00e9s n\u00e9zze meg, hogyan sz\u00e1mol \u00fajra a SkyPlanner, ha v\u00e1ltoznak a priorit\u00e1sok.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/mi-a-termelesutemezes\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/forrasok\/mi-a-termelesutemezes\/"]}]},{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/mi-a-termelesutemezes\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-hero.png","width":2172,"height":724,"caption":"Two component batches queue for a shared machining workstation before moving to assembly"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/mi-a-termelesutemezes\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"Mi a termel\u00e9s\u00fctemez\u00e9s? \u00datmutat\u00f3 gy\u00e1rt\u00f3knak"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882","https:\/\/www.linkedin.com\/company\/skyplanner-aps\/","https:\/\/www.youtube.com\/@SkyPlannerAPS","https:\/\/www.capterra.com\/p\/265911\/SkyPlanner-APS\/","https:\/\/www.trustradius.com\/products\/skyplanner-aps\/reviews","https:\/\/www.saasworthy.com\/product\/skyplanner-aps","https:\/\/sourceforge.net\/software\/product\/SkyPlanner-APS\/","https:\/\/www.g2.com\/products\/skyplanner-aps\/","https:\/\/www.getapp.com\/project-management-planning-software\/a\/skyplanner-aps\/","https:\/\/www.softwareadvice.com\/cmms\/skyplanner-aps-profile\/"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-hero.png",2172,724,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-hero-300x100.png",300,100,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-hero-768x256.png",768,256,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-hero-1024x341.png",1024,341,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-hero-1536x512.png",1536,512,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-hero-2048x683.png",2048,683,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/production-scheduling-hero-360x120.png",360,120,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Mi a termel\u00e9s\u00fctemez\u00e9s? \u00datmutat\u00f3 gy\u00e1rt\u00f3knak Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Mi a termel\u00e9s\u00fctemez\u00e9s? \u00datmutat\u00f3 gy\u00e1rt\u00f3knak A gy\u00e1rt\u00e1s\u00fctemez\u00e9s a gy\u00e1rt\u00e1si m\u0171veleteket er\u0151forr\u00e1sokhoz rendeli, \u00e9s meghat\u00e1rozza a sorrendj\u00fcket, a kezd\u00e9si \u00e9s a befejez\u00e9si id\u0151pontjukat. A gy\u00e1rt\u00e1si tervet v\u00e9grehajthat\u00f3 munk\u00e1v\u00e1 alak\u00edtja, figyelembe v\u00e9ve a kapacit\u00e1st, a folyamatf\u00fcgg\u0151s\u00e9geket, az anyagok el\u00e9rhet\u0151s\u00e9g\u00e9t \u00e9s a sz\u00e1ll\u00edt\u00e1si d\u00e1tumokat. Egy j\u00f3l haszn\u00e1lhat\u00f3 \u00fctemez\u00e9s azt&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/96011","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=96011"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/96011\/revisions"}],"predecessor-version":[{"id":96040,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/96011\/revisions\/96040"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media\/96058"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=96011"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/categories?post=96011"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/tags?post=96011"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}