{"id":8280,"date":"2022-10-28T07:54:22","date_gmt":"2022-10-28T07:54:22","guid":{"rendered":"https:\/\/skyplanner.ai\/forrasok\/hogyan-optimalizalhato-az-atfutasi-ido-a-gyartasban\/"},"modified":"2026-10-19T14:41:33","modified_gmt":"2026-10-19T14:41:33","slug":"hogyan-optimalizalhato-az-atfutasi-ido-a-gyartasban","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/hu\/forrasok\/hogyan-optimalizalhato-az-atfutasi-ido-a-gyartasban\/","title":{"rendered":"\u00c1tfut\u00e1si id\u0151 a gy\u00e1rt\u00e1sban: l\u00e1ssa a m\u0171veletek k\u00f6z\u00f6tti v\u00e1rakoz\u00e1st"},"content":{"rendered":"<div class=\"gb-container gb-container-leadtime01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">\u00c1tfut\u00e1si id\u0151 a gy\u00e1rt\u00e1sban: l\u00e1ssa a m\u0171veletek k\u00f6z\u00f6tti v\u00e1rakoz\u00e1st<\/h1>\n\n\n<p>A technol\u00f3giai \u00fatvonal szerint tizenk\u00e9t \u00f3ra. A vev\u0151nek nyolc napot \u00edg\u00e9rtek. Az els\u0151 m\u0171velett\u0151l a rendel\u00e9s elk\u00e9sz\u00fclt\u00e9ig a munkadarabok j\u00f3val t\u00f6bb id\u0151t t\u00f6ltenek v\u00e1rakoz\u00e1ssal, mint t\u00e9nyleges megmunk\u00e1l\u00e1ssal.<\/p>\n\n\n<p>A gy\u00e1rt\u00e1stervez\u0151 sz\u00e1m\u00e1ra ennek a k\u00fcl\u00f6nbs\u00e9gnek a meg\u00e9rt\u00e9se az els\u0151 l\u00e9p\u00e9s a gy\u00e1rt\u00e1si \u00e1tfut\u00e1si id\u0151 jav\u00edt\u00e1s\u00e1hoz. A gyorsabb megmunk\u00e1l\u00e1s seg\u00edthet, de nem oldja meg, ha egy gy\u00e1rt\u00e1si feladat k\u00e9t napot v\u00e1r a k\u00f6vetkez\u0151 szabad id\u0151ablakra.<\/p>\n\n\n<p>\u00c9rdemes ink\u00e1bb ezt k\u00e9rdezni: <strong>minek \u00e9s milyen sorrendben kell megt\u00f6rt\u00e9nnie ahhoz, hogy ez a rendel\u00e9s elk\u00e9sz\u00fclj\u00f6n?<\/strong> A SkyPlanner \u00f6sszekapcsolja ezeket a m\u0171veleteket a v\u00e9grehajt\u00e1sukat meghat\u00e1roz\u00f3 kapacit\u00e1ssal \u00e9s priorit\u00e1sokkal. Az \u00edgy kapott \u00fctemterv seg\u00edt ler\u00f6vid\u00edteni az elker\u00fclhet\u0151 v\u00e1rakoz\u00e1sokat, \u00e9s olyan hat\u00e1rid\u0151ket adni a vev\u0151knek, amelyek az el\u0151tt\u00fcnk \u00e1ll\u00f3 munk\u00e1n alapulnak.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mi a gy\u00e1rt\u00e1si \u00e1tfut\u00e1si id\u0151?<\/h2>\n\n\n<p>A gy\u00e1rt\u00e1si \u00e1tfut\u00e1si id\u0151 az az eltelt id\u0151, amely alatt egy term\u00e9k vagy rendel\u00e9s v\u00e9gighalad egy meghat\u00e1rozott gy\u00e1rt\u00e1si folyamaton. Nemcsak a megmunk\u00e1l\u00e1st \u00e9s az \u00e1t\u00e1ll\u00e1st foglalja mag\u00e1ban, hanem a sorban \u00e1ll\u00e1st, az anyagmozgat\u00e1st, az ellen\u0151rz\u00e9st \u00e9s a folyamaton bel\u00fcli egy\u00e9b v\u00e1rakoz\u00e1sokat is.<\/p>\n\n\n<p>Ebben a cikkben <strong>a gy\u00e1rt\u00e1sba ad\u00e1st\u00f3l addig m\u00e9rj\u00fck, am\u00edg a rendel\u00e9s elk\u00e9sz\u00fcl \u00e9s kisz\u00e1ll\u00edt\u00e1sra k\u00e9sz<\/strong>. Ebbe a gy\u00e1rt\u00e1sba ad\u00e1s ut\u00e1n, az els\u0151 m\u0171velet el\u0151tt eltelt v\u00e1rakoz\u00e1s is belesz\u00e1m\u00edt. A gy\u00e1rt\u00e1sba ad\u00e1st megel\u0151z\u0151 anyagbeszerz\u00e9s \u00e9s a k\u00e9szterm\u00e9k vev\u0151h\u00f6z sz\u00e1ll\u00edt\u00e1sa viszont nem tartozik bele automatikusan.<\/p>\n\n\n<p>Az \u00e1tfut\u00e1si id\u0151 meghat\u00e1roz\u00e1sa v\u00e1llalatonk\u00e9nt \u00e9s tervez\u00e9si rendszerenk\u00e9nt elt\u00e9rhet. A sz\u00e1mok \u00f6sszehasonl\u00edt\u00e1sa el\u0151tt r\u00f6gz\u00edtse, melyik esem\u00e9nyt\u0151l melyikig m\u00e9r:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Mutat\u00f3<\/th><th>Kezd\u0151- \u00e9s v\u00e9gpont<\/th><th>Milyen k\u00e9rd\u00e9sre ad v\u00e1laszt?<\/th><\/tr><\/thead><tbody><tr><td>Gy\u00e1rt\u00e1si \u00e1tfut\u00e1si id\u0151 a cikkben haszn\u00e1lt \u00e9rtelemben<\/td><td>A gy\u00e1rt\u00e1sba ad\u00e1st\u00f3l a kisz\u00e1ll\u00edt\u00e1sra k\u00e9sz \u00e1llapotig<\/td><td>Mennyi id\u0151t t\u00f6lt egy rendel\u00e9s a gy\u00e1rt\u00e1si folyamatunkban?<\/td><\/tr><tr><td>Vev\u0151i megrendel\u00e9s \u00e1tfut\u00e1si ideje<\/td><td>A megrendel\u00e9s elfogad\u00e1s\u00e1t\u00f3l a vev\u0151i \u00e1tv\u00e9telig<\/td><td>Mennyit kell v\u00e1rnia a vev\u0151nek?<\/td><\/tr><tr><td>Besz\u00e1ll\u00edt\u00f3i \u00e1tfut\u00e1si id\u0151<\/td><td>A beszerz\u00e9si megrendel\u00e9s lead\u00e1s\u00e1t\u00f3l az anyag be\u00e9rkez\u00e9s\u00e9ig<\/td><td>Mikorra v\u00e1rhat\u00f3 a beszerzett anyag?<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Ezek az id\u0151szakok \u00e1tfedhetik egym\u00e1st. Ha az anyagot m\u00e1r akkor megrendelik, amikor a m\u0171szaki el\u0151k\u00e9sz\u00edt\u00e9s m\u00e9g folyamatban van, a k\u00e9t id\u0151tartam teljes \u00f6sszead\u00e1s\u00e1val a v\u00e1rakoz\u00e1s egy r\u00e9sz\u00e9t k\u00e9tszer sz\u00e1moln\u00e1nk. Az egyes r\u00e9szlegek \u00e1tfut\u00e1siid\u0151-becsl\u00e9seinek \u00f6sszead\u00e1sa helyett a t\u00e9nyleges id\u0151beli lefoly\u00e1st k\u00f6vesse.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Az \u00e1tfut\u00e1si id\u0151 nem ciklusid\u0151 \u00e9s nem termel\u00e9si r\u00e1ta<\/h3>\n\n\n<p>A <a href=\"\/hu\/forrasok\/gyartasi-ciklusido\/\">gy\u00e1rt\u00e1si ciklusid\u0151<\/a> egy darab el\u0151\u00e1ll\u00edt\u00e1s\u00e1nak vagy egy meghat\u00e1rozott m\u0171velet elv\u00e9gz\u00e9s\u00e9nek idej\u00e9t m\u00e9ri. A gy\u00e1rt\u00e1si \u00e1tfut\u00e1si id\u0151 enn\u00e9l t\u00e1gabb folyamaton k\u00f6veti v\u00e9gig a term\u00e9ket, a m\u0171veletek k\u00f6z\u00f6tti v\u00e1rakoz\u00e1sokat is bele\u00e9rtve.<\/p>\n\n\n<p>A <a href=\"\/hu\/forrasok\/termelesi-rata\/\">termel\u00e9si r\u00e1ta<\/a> az id\u0151egys\u00e9gre jut\u00f3 kibocs\u00e1t\u00e1st m\u00e9ri, p\u00e9ld\u00e1ul a m\u0171szakonk\u00e9nt elk\u00e9sz\u00fclt, megfelel\u0151 min\u0151s\u00e9g\u0171 szerelv\u00e9nyek sz\u00e1m\u00e1t. Ez r\u00e1ta, nem id\u0151tartam. Egy g\u00e9p ciklusideje lehet r\u00f6vid, mik\u00f6zben az ott k\u00e9sz\u00fcl\u0151 alkatr\u00e9szeket tartalmaz\u00f3 rendel\u00e9s \u00e1tfut\u00e1si ideje tov\u00e1bbra is hossz\u00fa.<\/p>\n\n\n<h2 class=\"wp-block-heading\">A gy\u00e1rt\u00e1si \u00e1tfut\u00e1si id\u0151 kisz\u00e1m\u00edt\u00e1sa<\/h2>\n\n\n<p>Elk\u00e9sz\u00fclt rendel\u00e9sn\u00e9l a r\u00f6gz\u00edtett esem\u00e9nyek id\u0151pontjaib\u00f3l induljon ki:<\/p>\n\n\n<p><strong>Gy\u00e1rt\u00e1si \u00e1tfut\u00e1si id\u0151 = A kisz\u00e1ll\u00edt\u00e1sra k\u00e9sz \u00e1llapot id\u0151pontja \u2212 A gy\u00e1rt\u00e1sba ad\u00e1s id\u0151pontja<\/strong><\/p>\n\n\n<p>Tegy\u00fck fel, hogy egy rendel\u00e9st h\u00e9tf\u0151n 08:00-kor adnak gy\u00e1rt\u00e1sba, \u00e9s cs\u00fct\u00f6rt\u00f6k\u00f6n 08:00-kor \u00e1ll k\u00e9szen a kisz\u00e1ll\u00edt\u00e1sra. A gy\u00e1rt\u00e1si \u00e1tfut\u00e1si ideje <strong>72 napt\u00e1ri \u00f3ra<\/strong>, akkor is, ha az \u00e1t\u00e1ll\u00e1s \u00e9s a megmunk\u00e1l\u00e1s \u00f6sszesen csak tizenk\u00e9t \u00f3r\u00e1t ig\u00e9nyel.<\/p>\n\n\n<p>A fennmarad\u00f3 <strong>60 \u00f3ra<\/strong> az \u00e1t\u00e1ll\u00e1son \u00e9s a megmunk\u00e1l\u00e1son k\u00edv\u00fcl telik el. Beletartozhat a sorban \u00e1ll\u00e1s, az anyagmozgat\u00e1s, az ellen\u0151rz\u00e9s, az \u00e9jszakai \u00fczemsz\u00fcnet \u00e9s a sz\u00fcks\u00e9ges h\u0171l\u00e9si id\u0151. Ne tekintse mind a hatvan \u00f3r\u00e1t elker\u00fclhet\u0151 vesztes\u00e9gnek: el\u0151bb der\u00edtse ki, mi t\u00f6rt\u00e9nik az egyes k\u00f6ztes id\u0151szakokban.<\/p>\n\n\n<p>A teljes id\u0151 meg\u00e9rt\u00e9s\u00e9hez bontsa az id\u0151vonalat egym\u00e1st \u00e1t nem fed\u0151 kateg\u00f3ri\u00e1kra:<\/p>\n\n\n<ul class=\"wp-block-list\">\n<li><strong>\u00c1t\u00e1ll\u00e1s \u00e9s megmunk\u00e1l\u00e1s:<\/strong> a berendez\u00e9sek el\u0151k\u00e9sz\u00edt\u00e9se \u00e9s a m\u0171veletek v\u00e9grehajt\u00e1sa.<\/li>\n\n<li><strong>Sorban \u00e1ll\u00e1s:<\/strong> v\u00e1rakoz\u00e1s szabad g\u00e9pre, g\u00e9pkezel\u0151re vagy ellen\u0151rz\u00e9si id\u0151ablakra.<\/li>\n\n<li><strong>Anyagmozgat\u00e1s \u00e9s ellen\u0151rz\u00e9sek:<\/strong> tov\u00e1bb\u00edt\u00e1s \u00e9s min\u0151s\u00e9gellen\u0151rz\u00e9si tev\u00e9kenys\u00e9gek a kijel\u00f6lt m\u00e9r\u00e9si hat\u00e1rokon bel\u00fcl.<\/li>\n\n<li><strong>Egy\u00e9b eltelt id\u0151:<\/strong> sz\u00fcks\u00e9ges v\u00e1rakoz\u00e1si id\u0151k, munkav\u00e9gz\u00e9s n\u00e9lk\u00fcli m\u0171szakok \u00e9s m\u00e1shol m\u00e9g el nem sz\u00e1molt megszak\u00edt\u00e1sok.<\/li>\n<\/ul>\n\n\n<p>A teljes id\u0151t az esem\u00e9nyek id\u0151pontjaib\u00f3l sz\u00e1m\u00edtsa ki, az okait pedig a kateg\u00f3ri\u00e1k seg\u00edts\u00e9g\u00e9vel t\u00e1rja fel. Ha k\u00e9t m\u0171velet p\u00e1rhuzamosan fut, az id\u0151tartamuk egyszer\u0171 \u00f6sszead\u00e1s\u00e1val nem kapjuk meg az eltelt \u00e1tfut\u00e1si id\u0151t.<\/p>\n\n\n<p>Az id\u0151alapot is haszn\u00e1lja k\u00f6vetkezetesen. A napt\u00e1ri \u00f3r\u00e1k a teljes eltelt id\u0151t, a munka\u00f3r\u00e1k pedig egy megadott m\u0171szaknapt\u00e1r szerinti munkaid\u0151t jelentik. Mindkett\u0151 hasznos lehet, de tizenk\u00e9t munka\u00f3ra \u00e9s hetvenk\u00e9t napt\u00e1ri \u00f3ra nem cser\u00e9lhet\u0151 fel. Az \u00e9rt\u00e9kes\u00edt\u00e9snek is jelezze, melyik id\u0151alapra \u00e9p\u00fcl a megadott hat\u00e1rid\u0151.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mi\u00e9rt lehet hossz\u00fa az \u00e1tfut\u00e1si id\u0151 r\u00f6vid technol\u00f3giai \u00fatvonal mellett is?<\/h2>\n\n\n<p>A technol\u00f3giai \u00fatvonal megmutatja, milyen m\u0171veleteket ig\u00e9nyel a rendel\u00e9s. A v\u00e1rakoz\u00e1si sor d\u00f6nti el, mikor ker\u00fclhet r\u00e1juk sor.<\/p>\n\n\n<p>Tegy\u00fck fel, hogy a forg\u00e1csol\u00e1s kedd reggelre befejez\u0151dik, de a befejez\u0151 m\u0171velet munka\u00e1llom\u00e1s\u00e1n cs\u00fct\u00f6rt\u00f6kig nincs a feladatra alkalmas szabad kapacit\u00e1s. A forg\u00e1csol\u00e1s egy\u00f3r\u00e1s gyors\u00edt\u00e1sa nem hozza el\u0151r\u00e9bb az elk\u00e9sz\u00fcl\u00e9st, ha a befejez\u0151 m\u0171velet id\u0151pontja v\u00e1ltozatlan marad. Az \u00fctemez\u00e9sben rejl\u0151 lehet\u0151s\u00e9g a k\u00e9t m\u0171velet \u00f6sszehangol\u00e1sa, nem puszt\u00e1n az els\u0151 kor\u00e1bbi ind\u00edt\u00e1sa.<\/p>\n\n\n<p>Sz\u00e1mos mindennapi d\u00f6nt\u00e9s vezet ilyen v\u00e1rakoz\u00e1sokhoz:<\/p>\n\n\n<p><strong>A munka elind\u00edt\u00e1sa, miel\u0151tt az \u00fatvonal tov\u00e1bbi szakaszain biztos\u00edtottak lenn\u00e9nek a felt\u00e9telek.<\/strong> Az els\u0151 munka\u00e1llom\u00e1s folyamatosan dolgozik, de a k\u00e9s\u0151bbi m\u0171veletekn\u00e9l felhalmoz\u00f3dnak a f\u00e9lk\u00e9sz munk\u00e1k. A gy\u00e1rt\u00e1sba ad\u00e1skor vegye figyelembe a teljes h\u00e1tral\u00e9v\u0151 \u00fatvonalat. Ez az elv a <a href=\"\/hu\/forrasok\/just-in-time-gyartas\/\">just-in-time gy\u00e1rt\u00e1st<\/a> is t\u00e1mogatja: att\u00f3l, hogy folyik a munka, m\u00e9g nem biztos, hogy a term\u00e9kek megfelel\u0151en haladnak.<\/p>\n\n\n<p><strong>Tervez\u00e9s olyan kapacit\u00e1sra, amely val\u00f3j\u00e1ban nem \u00e1ll rendelkez\u00e9sre.<\/strong> A l\u00e1tsz\u00f3lag szabad g\u00e9phez olyan g\u00e9pkezel\u0151re lehet sz\u00fcks\u00e9g, aki \u00e9ppen m\u00e1shol dolgozik. Hi\u00e1nyozhat egy sz\u00fcks\u00e9ges szersz\u00e1m vagy anyag is. A tervezett kezd\u00e9snek a m\u0171velet t\u00e9nyleges er\u0151forr\u00e1sig\u00e9ny\u00e9hez kell igazodnia.<\/p>\n\n\n<p><strong>A priorit\u00e1sok m\u00f3dos\u00edt\u00e1sa csak egy-egy v\u00e1rakoz\u00e1si soron bel\u00fcl.<\/strong> A s\u00fcrg\u0151s feladat el\u0151r\u00e9bb ker\u00fcl, de a k\u00f6vetkez\u0151 m\u0171velete nem. Egy m\u00e1sik rendel\u00e9s elvesz\u00edti az id\u0151ablak\u00e1t an\u00e9lk\u00fcl, hogy b\u00e1rki ellen\u0151rizn\u00e9, ez hogyan hat az elk\u00e9sz\u00fcl\u00e9s\u00e9re.<\/p>\n\n\n<p><strong>A sz\u00fcks\u00e9ges v\u00e1rakoz\u00e1si id\u0151 szabadon felhaszn\u00e1lhat\u00f3 id\u0151k\u00e9nt kezel\u00e9se.<\/strong> Sz\u00e1rad\u00e1sra, h\u0171l\u00e9sre vagy min\u0151s\u00e9g\u00fcgyi felszabad\u00edt\u00e1sra is sz\u00fcks\u00e9g lehet. R\u00f6gz\u00edtse ezeket a technol\u00f3giai \u00fatvonalban, hogy a k\u00f6vetkez\u0151 m\u0171veletet ne \u00fctemezz\u00e9k olyan id\u0151pontra, amikor a term\u00e9k m\u00e9g nem \u00e1ll k\u00e9szen r\u00e1.<\/p>\n\n\n<p>A <a href=\"\/hu\/forrasok\/lean-manufacturing-lean-manufacturing-hatekonysag-felszabaditva\/\">lean gy\u00e1rt\u00e1s<\/a> seg\u00edt felt\u00e1rni a sz\u00fcks\u00e9gtelen v\u00e1rakoz\u00e1st \u00e9s anyagmozgat\u00e1st. Az \u00f6sszehangolt \u00fctemtervvel ezek a fejleszt\u00e9sek a napi rendel\u00e9s\u00e1llom\u00e1ny kezel\u00e9s\u00e9ben is hasznos\u00edthat\u00f3k. Tov\u00e1bbi fejleszt\u00e9si m\u00f3dszereket az <a href=\"\/hu\/forrasok\/az-atfutasi-ido-csokkentese-az-okosabb-uzlet-titka\/\">\u00e1tfut\u00e1si id\u0151 cs\u00f6kkent\u00e9s\u00e9r\u0151l<\/a> sz\u00f3l\u00f3 \u00fatmutat\u00f3nkban tal\u00e1l.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Cs\u00f6kkentse a m\u0171veletek k\u00f6z\u00f6tti v\u00e1rakoz\u00e1st a SkyPlannerrel<\/h2>\n\n\n<p>A SkyPlanner APS v\u00e9ges kapacit\u00e1s\u00fa gy\u00e1rt\u00e1si \u00fctemtervbe rendezi a rendel\u00e9sek m\u0171veleteit. Mesters\u00e9ges intelligenci\u00e1n alapul\u00f3 \u00fctemez\u0151je, az Arcturus figyelembe veszi a munka\u00e1llom\u00e1sok be\u00e1ll\u00edtott kapacit\u00e1s\u00e1t, a m\u0171szakokat, a f\u00fcgg\u0151s\u00e9geket \u00e9s a priorit\u00e1sokat. Ha az anyagok rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1t figyelembe vev\u0151 \u00fctemez\u00e9s enged\u00e9lyezve van, az anyagell\u00e1t\u00e1s is befoly\u00e1solja, mikor v\u00e9gezhet\u0151 el a munka.<\/p>\n\n\n<p>Ez hasznosabb kiindul\u00f3pontot ad a gy\u00e1rt\u00e1stervez\u0151nek, mint egy olyan r\u00f6gz\u00edtett \u00edg\u00e9ret, hogy \u201eminden nyolc nap alatt k\u00e9sz\u00fcl el\u201d. A Gantt-id\u0151vonal megmutatja a k\u00fcl\u00f6nb\u00f6z\u0151 munka\u00e1llom\u00e1sokra \u00fctemezett m\u0171veletek sorrendj\u00e9t, \u00edgy \u00e1ttekintheti, mikor kezd\u0151dik a rendel\u00e9s gy\u00e1rt\u00e1sa a terv szerint, hol maradnak v\u00e1rakoz\u00e1sok, \u00e9s mikorra v\u00e1rhat\u00f3 az utols\u00f3 m\u0171velet befejez\u00e9se.<\/p>\n\n\n<h3 class=\"wp-block-heading\">A r\u00f6videbb \u00e1tfut\u00e1si id\u0151 is legyen szempont a priorit\u00e1sok k\u00f6z\u00f6tt<\/h3>\n\n\n<p>A SkyPlannerben k\u00fcl\u00f6n be\u00e1ll\u00edthat\u00f3 az <strong>\u00e1tfut\u00e1si id\u0151 priorit\u00e1sa<\/strong>: az Arcturus arra t\u00f6rekszik, hogy minden rendel\u00e9si t\u00e9teln\u00e9l a lehet\u0151 legr\u00f6videbb legyen az els\u0151 \u00e9s az utols\u00f3 m\u0171velet k\u00f6z\u00f6tt eltelt id\u0151. Ez akkor k\u00fcl\u00f6n\u00f6sen \u00e9rt\u00e9kes, ha maga a munka viszonylag r\u00f6vid, de a m\u0171veletek id\u0151ben messze ker\u00fclnek egym\u00e1st\u00f3l.<\/p>\n\n\n<p>Ez az optimaliz\u00e1l\u00e1si id\u0151szak sz\u0171kebb, mint a fent meghat\u00e1rozott, gy\u00e1rt\u00e1sba ad\u00e1st\u00f3l a kisz\u00e1ll\u00edt\u00e1sra k\u00e9sz \u00e1llapotig m\u00e9rt id\u0151. Nem foglal mag\u00e1ban minden, els\u0151 m\u0171velet el\u0151tti v\u00e1rakoz\u00e1st, \u00e9s nem jelent \u00edg\u00e9retet a beszerz\u00e9s vagy a vev\u0151h\u00f6z t\u00f6rt\u00e9n\u0151 sz\u00e1ll\u00edt\u00e1s ler\u00f6vid\u00edt\u00e9s\u00e9re.<\/p>\n\n\n<p>Ezt a szempontot az elk\u00e9sz\u00fcl\u00e9si hat\u00e1rid\u0151re, a vev\u0151kre \u00e9s a gy\u00e1rt\u00e1si feladatokra vonatkoz\u00f3 priorit\u00e1sokkal egy\u00fctt szab\u00e1lyozhatja. Egy t\u00e9tel gy\u00e1rt\u00e1si id\u0151szak\u00e1nak r\u00f6vid\u00edt\u00e9s\u00e9t \u00f6ssze kell hangolni a t\u00f6bbi rendel\u00e9s v\u00e1llalt sz\u00e1ll\u00edt\u00e1si hat\u00e1ridej\u00e9vel. Ahelyett, hogy mindent egyform\u00e1n s\u00fcrg\u0151snek jel\u00f6lne, azokat a priorit\u00e1sokat adja meg az \u00fctemez\u0151nek, amelyeket a v\u00e1llalkoz\u00e1snak val\u00f3ban k\u00f6vetnie kell.<\/p>\n\n\n<p>Err\u0151l az \u00fctemez\u00e9si lehet\u0151s\u00e9gr\u0151l a <a href=\"\/hu\/forrasok\/atfutasi-ido-menedzsment-funkcio-optimalizaljon-minden-percet\/\">SkyPlanner \u00e1tfut\u00e1siid\u0151-kezel\u00e9si funkci\u00f3j\u00e1t bemutat\u00f3 oldalon<\/a> olvashat b\u0151vebben.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Sz\u00e1m\u00edttassa \u00fajra az \u00fctemtervet, ha v\u00e1ltoznak a k\u00f6r\u00fclm\u00e9nyek<\/h3>\n\n\n<p>Ha s\u00fcrg\u0151s rendel\u00e9s \u00e9rkezik vagy v\u00e1ltozik egy m\u0171szak, az Arcturus az \u00faj helyzetnek megfelel\u0151en \u00fajrasz\u00e1m\u00edthatja az \u00fctemtervet. Ne csak az \u00e1thelyezett m\u0171veletet ellen\u0151rizze, hanem az \u00edgy kialakul\u00f3 elk\u00e9sz\u00fcl\u00e9si id\u0151pontokat is. A z\u00e1rol\u00e1sokkal meg\u0151rizheti azokat az \u00fctemez\u00e9si d\u00f6nt\u00e9seket, amelyeknek v\u00e1ltozatlanul kell maradniuk.<\/p>\n\n\n<p>\u00cdgy kevesebb id\u0151t kell az egyes v\u00e1rakoz\u00e1si sorok \u00fajrarendez\u00e9s\u00e9re ford\u00edtani, \u00e9s vil\u00e1gosabban l\u00e1tszanak a v\u00e1ltoztat\u00e1s k\u00f6vetkezm\u00e9nyei. M\u00e9g a rendel\u00e9s tervezett kisz\u00e1ll\u00edt\u00e1sa el\u0151tt eld\u00f6ntheti, hogy m\u00f3dos\u00edtja-e a kapacit\u00e1st, megv\u00e1ltoztat-e egy priorit\u00e1st, vagy egyeztet egy \u00faj hat\u00e1rid\u0151r\u0151l.<\/p>\n\n\n<p>Megl\u00e9v\u0151 rendszerei tov\u00e1bbra is hasznosak maradnak. Az <a href=\"\/hu\/forrasok\/gyartasi-erp-atfogo-utmutato\/\">ERP rendszer<\/a> biztos\u00edtja a rendel\u00e9sek h\u00e1tt\u00e9radatait, m\u00edg a <a href=\"\/hu\/forrasok\/mes-rendszer-mi-az-es-hogyan-mukodik\/\">MES<\/a> a gy\u00e1rt\u00e1s v\u00e9grehajt\u00e1s\u00e1r\u00f3l szolg\u00e1ltathat inform\u00e1ci\u00f3t. <strong>A SkyPlanner ny\u00edlt REST API fel\u00fclet\u00e9n kereszt\u00fcl b\u00e1rmely ERP vagy MES rendszerrel integr\u00e1lhat\u00f3<\/strong>, \u00edgy ezek az inform\u00e1ci\u00f3k \u00f6sszekapcsolhat\u00f3k a gy\u00e1rt\u00e1s\u00fctemez\u00e9ssel.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mit v\u00e1ltoztatott a jobb \u00e1tl\u00e1that\u00f3s\u00e1g az Eskomaticn\u00e1l?<\/h2>\n\n\n<p>A finn Eskomatic b\u00e9rforg\u00e1csol\u00f3 v\u00e1llalat kor\u00e1bban nagyr\u00e9szt k\u00e9zzel \u00e1ll\u00edtotta \u00f6ssze a feladatok sorrendj\u00e9t egy r\u00e9gebbi ERP \u00e9s termel\u00e9sir\u00e1ny\u00edt\u00e1si rendszerben. Az \u00e1tfog\u00f3 k\u00e9p kialak\u00edt\u00e1sa sok munk\u00e1t ig\u00e9nyelt, \u00e9s az anyaghi\u00e1nyok olykor csak r\u00f6viddel a feladat tervezett kezd\u00e9se el\u0151tt der\u00fcltek ki.<\/p>\n\n\n<p>A SkyPlannerrel a tervez\u0151k \u00e1ttekinthet\u0151bb, vizu\u00e1lis feladatsort kaptak, \u00e9s a mesters\u00e9ges intelligencia \u00e1ltal \u00fctemezett munk\u00e1k alapj\u00e1n el\u0151re l\u00e1thatt\u00e1k a v\u00e1rhat\u00f3 terhel\u00e9st. Az Eskomaticn\u00e1l bevezetett megold\u00e1s m\u00e1r a gy\u00e1rt\u00e1stervez\u00e9s sor\u00e1n jelzi a hi\u00e1nyz\u00f3 anyagokat, \u00edgy seg\u00edt a csapatnak elker\u00fclni az anyaghi\u00e1ny miatti le\u00e1ll\u00e1sokat.<\/p>\n\n\n<p>A terhel\u00e9s automatikus \u00fctemez\u00e9se abban is seg\u00edti az Eskomaticot, hogy re\u00e1lisabban l\u00e1ssa az elk\u00e9sz\u00fcl\u00e9s v\u00e1rhat\u00f3 idej\u00e9t, \u00e9s pontosabb sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket adjon a vev\u0151knek. Ez az \u00e1tfut\u00e1si id\u0151 \u00e9s az \u00fctemez\u00e9s gyakorlati kapcsolata: a d\u00e1tum a munka \u00e9s a korl\u00e1tok \u00e1ttekint\u00e9s\u00e9b\u0151l ad\u00f3dik, nem pedig egy minden rendel\u00e9shez hozz\u00e1sz\u00e1m\u00edtott, egys\u00e9ges id\u0151keretb\u0151l.<\/p>\n\n\n<p><a href=\"\/hu\/ugyfeltortenetek\/eskomatic\/\">Olvassa el az Eskomatic SkyPlannerrel szerzett tapasztalatair\u00f3l sz\u00f3l\u00f3 teljes \u00fcgyf\u00e9lt\u00f6rt\u00e9netet<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Az \u00e1tfut\u00e1si id\u0151t cs\u00f6kkentse, ne csak a mutat\u00f3t jav\u00edtsa<\/h2>\n\n\n<p>Kezdje egy olyan term\u00e9kcsal\u00e1ddal, amelynek rendel\u00e9sei rendszeresen a v\u00e1rtn\u00e1l hosszabb id\u0151 alatt k\u00e9sz\u00fclnek el. Vesse \u00f6ssze a gy\u00e1rt\u00e1sba ad\u00e1s, a m\u0171veletek \u00e9s a kisz\u00e1ll\u00edt\u00e1sra k\u00e9sz \u00e1llapot id\u0151b\u00e9lyegeit. Keresse meg azt a visszat\u00e9r\u0151 v\u00e1rakoz\u00e1si szakaszt, amely a leggyakrabban k\u00e9slelteti a befejez\u00e9st, majd pr\u00f3b\u00e1lja ki, hogy egy \u00fctemez\u00e9si vagy folyamatbeli v\u00e1ltoztat\u00e1s hogyan hat r\u00e1.<\/p>\n\n\n<p>Az \u00e1tfut\u00e1si id\u0151 mellett a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k betart\u00e1s\u00e1t is k\u00f6vesse. A r\u00f6videbb gy\u00e1rt\u00e1si id\u0151tartam nem jelent el\u0151rel\u00e9p\u00e9st, ha miatta m\u00e1s rendel\u00e9sek k\u00e9sve teljes\u00fclnek a v\u00e1llalt hat\u00e1rid\u0151h\u00f6z k\u00e9pest. Hasonl\u00f3k\u00e9ppen, a gy\u00e1rt\u00e1sba ad\u00e1s id\u0151pontj\u00e1nak k\u00e9s\u0151bbre tol\u00e1s\u00e1val r\u00f6videbbnek t\u0171nhet a gy\u00e1rt\u00e1sba ad\u00e1st\u00f3l a kisz\u00e1ll\u00edt\u00e1sra k\u00e9sz \u00e1llapotig m\u00e9rt \u00e1tfut\u00e1si id\u0151, mik\u00f6zben a vev\u0151 teljes v\u00e1rakoz\u00e1si ideje pontosan ugyanannyi marad. Ezt a kor\u00e1bbi v\u00e1rakoz\u00e1st k\u00fcl\u00f6n k\u00f6vesse nyomon, ne t\u00fcntesse el a m\u00e9r\u00e9sb\u0151l.<\/p>\n\n\n<p>A SkyPlanner k\u00fcl\u00f6n\u00f6sen j\u00f3 v\u00e1laszt\u00e1s, ha sok rendel\u00e9s gy\u00e1rt\u00e1s\u00e1t kell \u00f6sszehangolni k\u00f6z\u00f6s er\u0151forr\u00e1sokon: az Arcturus elv\u00e9gzi az \u00fctemez\u00e9si sz\u00e1m\u00edt\u00e1sokat, mik\u00f6zben a priorit\u00e1sok \u00e9s a m\u00f3dos\u00edt\u00e1s ellen z\u00e1rolt d\u00f6nt\u00e9sek tov\u00e1bbra is az \u00d6n kez\u00e9ben maradnak. \u00cdgy an\u00e9lk\u00fcl dolgozhat a v\u00e1rakoz\u00e1si szakaszok r\u00f6vid\u00edt\u00e9s\u00e9n \u00e9s a megb\u00edzhat\u00f3bb befejez\u00e9si id\u0151pontokon, hogy minden v\u00e1rakoz\u00e1si sort k\u00e9zzel kellene karbantartania.<\/p>\n\n\n<p><a href=\"\/hu\/kapcsolat-ertekesites\/\">Foglaljon SkyPlanner-bemutat\u00f3t<\/a>, \u00e9s hozzon p\u00e9ldak\u00e9nt egy olyan rendel\u00e9st, amely mind\u00f6ssze n\u00e9h\u00e1ny \u00f3r\u00e1nyi munk\u00e1t ig\u00e9nyelt, m\u00e9gis napok alatt k\u00e9sz\u00fclt el. A technol\u00f3giai \u00fatvonal, a v\u00e1rakoz\u00e1sok \u00e9s a legterheltebb er\u0151forr\u00e1s j\u00f3 kiindul\u00f3pontot adnak annak felt\u00e1r\u00e1s\u00e1hoz, hogy min v\u00e1ltoztathatna egy \u00f6sszehangolt \u00fctemterv. Ha el\u0151bb \u00f6n\u00e1ll\u00f3an ismerkedne meg a rendszerrel, <a href=\"\/hu\/proba\/\">pr\u00f3b\u00e1lja ki a SkyPlannert dem\u00f3adatokkal<\/a>.<\/p>\n\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>\u00c1tfut\u00e1si id\u0151 a gy\u00e1rt\u00e1sban: l\u00e1ssa a m\u0171veletek k\u00f6z\u00f6tti v\u00e1rakoz\u00e1st A technol\u00f3giai \u00fatvonal szerint tizenk\u00e9t \u00f3ra. A vev\u0151nek nyolc napot \u00edg\u00e9rtek. Az els\u0151 m\u0171velett\u0151l a rendel\u00e9s elk\u00e9sz\u00fclt\u00e9ig a munkadarabok j\u00f3val t\u00f6bb id\u0151t t\u00f6ltenek v\u00e1rakoz\u00e1ssal, mint t\u00e9nyleges megmunk\u00e1l\u00e1ssal. A gy\u00e1rt\u00e1stervez\u0151 sz\u00e1m\u00e1ra ennek a k\u00fcl\u00f6nbs\u00e9gnek a meg\u00e9rt\u00e9se az els\u0151 l\u00e9p\u00e9s a gy\u00e1rt\u00e1si \u00e1tfut\u00e1si id\u0151 jav\u00edt\u00e1s\u00e1hoz. A gyorsabb megmunk\u00e1l\u00e1s &#8230; <a title=\"\u00c1tfut\u00e1si id\u0151 a gy\u00e1rt\u00e1sban: l\u00e1ssa a m\u0171veletek k\u00f6z\u00f6tti v\u00e1rakoz\u00e1st\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/hogyan-optimalizalhato-az-atfutasi-ido-a-gyartasban\/\" aria-label=\"Read more about \u00c1tfut\u00e1si id\u0151 a gy\u00e1rt\u00e1sban: l\u00e1ssa a m\u0171veletek k\u00f6z\u00f6tti v\u00e1rakoz\u00e1st\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":2,"featured_media":98259,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2526,312],"tags":[],"class_list":["post-8280","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-es-utemezes","category-forrasok","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>\u00c1tfut\u00e1si id\u0151 a gy\u00e1rt\u00e1sban: t\u00e1rja fel a v\u00e1rakoz\u00e1sokat<\/title>\n<meta name=\"description\" content=\"\u00d3r\u00e1nyi munka is tarthat napokig. Gy\u00e1rt\u00e1si \u00e1tfut\u00e1si id\u0151: t\u00e1rja fel a m\u0171veletek k\u00f6zti v\u00e1rakoz\u00e1st, tervezzen megb\u00edzhat\u00f3bb hat\u00e1rid\u0151ket a SkyPlannerrel.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/hogyan-optimalizalhato-az-atfutasi-ido-a-gyartasban\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u00c1tfut\u00e1si id\u0151 a gy\u00e1rt\u00e1sban: l\u00e1ssa a m\u0171veletek k\u00f6z\u00f6tti v\u00e1rakoz\u00e1st\" \/>\n<meta property=\"og:description\" content=\"\u00d3r\u00e1nyi munka is tarthat napokig. Gy\u00e1rt\u00e1si \u00e1tfut\u00e1si id\u0151: t\u00e1rja fel a m\u0171veletek k\u00f6zti v\u00e1rakoz\u00e1st, tervezzen megb\u00edzhat\u00f3bb hat\u00e1rid\u0151ket a SkyPlannerrel.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/forrasok\/hogyan-optimalizalhato-az-atfutasi-ido-a-gyartasban\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2022-10-28T07:54:22+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-19T14:41:33+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t<meta property=\"og:image:height\" content=\"720\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jesse Sinisalo\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Szerz\u0151:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jesse Sinisalo\" \/>\n\t<meta name=\"twitter:label2\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data2\" content=\"14 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/hogyan-optimalizalhato-az-atfutasi-ido-a-gyartasban\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/hogyan-optimalizalhato-az-atfutasi-ido-a-gyartasban\\\/\"},\"author\":{\"name\":\"Jesse Sinisalo\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/eb1bfd6abe95a50b4a9ba1a081cce2dd\"},\"headline\":\"\u00c1tfut\u00e1si id\u0151 a gy\u00e1rt\u00e1sban: l\u00e1ssa a m\u0171veletek k\u00f6z\u00f6tti v\u00e1rakoz\u00e1st\",\"datePublished\":\"2022-10-28T07:54:22+00:00\",\"dateModified\":\"2026-10-19T14:41:33+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/hogyan-optimalizalhato-az-atfutasi-ido-a-gyartasban\\\/\"},\"wordCount\":2869,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/hogyan-optimalizalhato-az-atfutasi-ido-a-gyartasban\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-lead-time-hero.png\",\"articleSection\":[\"APS \u00e9s \u00fctemez\u00e9s\",\"forr\u00e1sok\"],\"inLanguage\":\"hu-HU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/hogyan-optimalizalhato-az-atfutasi-ido-a-gyartasban\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/hogyan-optimalizalhato-az-atfutasi-ido-a-gyartasban\\\/\",\"name\":\"\u00c1tfut\u00e1si id\u0151 a gy\u00e1rt\u00e1sban: t\u00e1rja fel a v\u00e1rakoz\u00e1sokat\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/hogyan-optimalizalhato-az-atfutasi-ido-a-gyartasban\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/hogyan-optimalizalhato-az-atfutasi-ido-a-gyartasban\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-lead-time-hero.png\",\"datePublished\":\"2022-10-28T07:54:22+00:00\",\"dateModified\":\"2026-10-19T14:41:33+00:00\",\"description\":\"\u00d3r\u00e1nyi munka is tarthat napokig. Gy\u00e1rt\u00e1si \u00e1tfut\u00e1si id\u0151: t\u00e1rja fel a m\u0171veletek k\u00f6zti v\u00e1rakoz\u00e1st, tervezzen megb\u00edzhat\u00f3bb hat\u00e1rid\u0151ket a SkyPlannerrel.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/hogyan-optimalizalhato-az-atfutasi-ido-a-gyartasban\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/hogyan-optimalizalhato-az-atfutasi-ido-a-gyartasban\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/hogyan-optimalizalhato-az-atfutasi-ido-a-gyartasban\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-lead-time-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/manufacturing-lead-time-hero.png\",\"width\":1280,\"height\":720,\"caption\":\"Parts waiting between manufacturing stations illustrate the gaps within manufacturing lead time\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/hogyan-optimalizalhato-az-atfutasi-ido-a-gyartasban\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Cikkek\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"\u00c1tfut\u00e1si id\u0151 a gy\u00e1rt\u00e1sban: l\u00e1ssa a m\u0171veletek k\u00f6z\u00f6tti v\u00e1rakoz\u00e1st\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/eb1bfd6abe95a50b4a9ba1a081cce2dd\",\"name\":\"Jesse Sinisalo\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g\",\"caption\":\"Jesse Sinisalo\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u00c1tfut\u00e1si id\u0151 a gy\u00e1rt\u00e1sban: t\u00e1rja fel a v\u00e1rakoz\u00e1sokat","description":"\u00d3r\u00e1nyi munka is tarthat napokig. Gy\u00e1rt\u00e1si \u00e1tfut\u00e1si id\u0151: t\u00e1rja fel a m\u0171veletek k\u00f6zti v\u00e1rakoz\u00e1st, tervezzen megb\u00edzhat\u00f3bb hat\u00e1rid\u0151ket a SkyPlannerrel.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/forrasok\/hogyan-optimalizalhato-az-atfutasi-ido-a-gyartasban\/","og_locale":"hu_HU","og_type":"article","og_title":"\u00c1tfut\u00e1si id\u0151 a gy\u00e1rt\u00e1sban: l\u00e1ssa a m\u0171veletek k\u00f6z\u00f6tti v\u00e1rakoz\u00e1st","og_description":"\u00d3r\u00e1nyi munka is tarthat napokig. Gy\u00e1rt\u00e1si \u00e1tfut\u00e1si id\u0151: t\u00e1rja fel a m\u0171veletek k\u00f6zti v\u00e1rakoz\u00e1st, tervezzen megb\u00edzhat\u00f3bb hat\u00e1rid\u0151ket a SkyPlannerrel.","og_url":"https:\/\/skyplanner.ai\/hu\/forrasok\/hogyan-optimalizalhato-az-atfutasi-ido-a-gyartasban\/","og_site_name":"SkyPlanner","article_published_time":"2022-10-28T07:54:22+00:00","article_modified_time":"2026-10-19T14:41:33+00:00","og_image":[{"width":1280,"height":720,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png","type":"image\/png"}],"author":"Jesse Sinisalo","twitter_card":"summary_large_image","twitter_misc":{"Szerz\u0151:":"Jesse Sinisalo","Becs\u00fclt olvas\u00e1si id\u0151":"14 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/hogyan-optimalizalhato-az-atfutasi-ido-a-gyartasban\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/hogyan-optimalizalhato-az-atfutasi-ido-a-gyartasban\/"},"author":{"name":"Jesse Sinisalo","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/eb1bfd6abe95a50b4a9ba1a081cce2dd"},"headline":"\u00c1tfut\u00e1si id\u0151 a gy\u00e1rt\u00e1sban: l\u00e1ssa a m\u0171veletek k\u00f6z\u00f6tti v\u00e1rakoz\u00e1st","datePublished":"2022-10-28T07:54:22+00:00","dateModified":"2026-10-19T14:41:33+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/hogyan-optimalizalhato-az-atfutasi-ido-a-gyartasban\/"},"wordCount":2869,"publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/hogyan-optimalizalhato-az-atfutasi-ido-a-gyartasban\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png","articleSection":["APS \u00e9s \u00fctemez\u00e9s","forr\u00e1sok"],"inLanguage":"hu-HU"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/hogyan-optimalizalhato-az-atfutasi-ido-a-gyartasban\/","url":"https:\/\/skyplanner.ai\/hu\/forrasok\/hogyan-optimalizalhato-az-atfutasi-ido-a-gyartasban\/","name":"\u00c1tfut\u00e1si id\u0151 a gy\u00e1rt\u00e1sban: t\u00e1rja fel a v\u00e1rakoz\u00e1sokat","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/hogyan-optimalizalhato-az-atfutasi-ido-a-gyartasban\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/hogyan-optimalizalhato-az-atfutasi-ido-a-gyartasban\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png","datePublished":"2022-10-28T07:54:22+00:00","dateModified":"2026-10-19T14:41:33+00:00","description":"\u00d3r\u00e1nyi munka is tarthat napokig. Gy\u00e1rt\u00e1si \u00e1tfut\u00e1si id\u0151: t\u00e1rja fel a m\u0171veletek k\u00f6zti v\u00e1rakoz\u00e1st, tervezzen megb\u00edzhat\u00f3bb hat\u00e1rid\u0151ket a SkyPlannerrel.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/hogyan-optimalizalhato-az-atfutasi-ido-a-gyartasban\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/forrasok\/hogyan-optimalizalhato-az-atfutasi-ido-a-gyartasban\/"]}]},{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/hogyan-optimalizalhato-az-atfutasi-ido-a-gyartasban\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png","width":1280,"height":720,"caption":"Parts waiting between manufacturing stations illustrate the gaps within manufacturing lead time"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/hogyan-optimalizalhato-az-atfutasi-ido-a-gyartasban\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"Cikkek","item":"https:\/\/skyplanner.ai\/hu\/forrasok\/"},{"@type":"ListItem","position":3,"name":"\u00c1tfut\u00e1si id\u0151 a gy\u00e1rt\u00e1sban: l\u00e1ssa a m\u0171veletek k\u00f6z\u00f6tti v\u00e1rakoz\u00e1st"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/eb1bfd6abe95a50b4a9ba1a081cce2dd","name":"Jesse Sinisalo","image":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/secure.gravatar.com\/avatar\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g","caption":"Jesse Sinisalo"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png",1280,720,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png",1280,720,false],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero.png",1280,720,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/manufacturing-lead-time-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jesse Sinisalo","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jesse\/"},"uagb_comment_info":0,"uagb_excerpt":"\u00c1tfut\u00e1si id\u0151 a gy\u00e1rt\u00e1sban: l\u00e1ssa a m\u0171veletek k\u00f6z\u00f6tti v\u00e1rakoz\u00e1st A technol\u00f3giai \u00fatvonal szerint tizenk\u00e9t \u00f3ra. A vev\u0151nek nyolc napot \u00edg\u00e9rtek. Az els\u0151 m\u0171velett\u0151l a rendel\u00e9s elk\u00e9sz\u00fclt\u00e9ig a munkadarabok j\u00f3val t\u00f6bb id\u0151t t\u00f6ltenek v\u00e1rakoz\u00e1ssal, mint t\u00e9nyleges megmunk\u00e1l\u00e1ssal. A gy\u00e1rt\u00e1stervez\u0151 sz\u00e1m\u00e1ra ennek a k\u00fcl\u00f6nbs\u00e9gnek a meg\u00e9rt\u00e9se az els\u0151 l\u00e9p\u00e9s a gy\u00e1rt\u00e1si \u00e1tfut\u00e1si id\u0151 jav\u00edt\u00e1s\u00e1hoz. A gyorsabb megmunk\u00e1l\u00e1s&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/8280","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=8280"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/8280\/revisions"}],"predecessor-version":[{"id":93104,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/8280\/revisions\/93104"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media\/98259"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=8280"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/categories?post=8280"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/tags?post=8280"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}