{"id":7106,"date":"2022-09-01T11:45:00","date_gmt":"2022-09-01T11:45:00","guid":{"rendered":"https:\/\/skyplanner.ai\/?page_id=7106"},"modified":"2026-10-10T14:05:53","modified_gmt":"2026-10-10T14:05:53","slug":"mes-rendszer-mi-az-es-hogyan-mukodik","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/hu\/forrasok\/mes-rendszer-mi-az-es-hogyan-mukodik\/","title":{"rendered":"MES rendszer \u2013 Mi az, \u00e9s mit csin\u00e1l"},"content":{"rendered":"<div class=\"gb-container gb-container-3df1db73 no-overflow\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-d55bc3f3\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-8557534f special-color\">\n<div class=\"gb-grid-column gb-grid-column-fb47f507\"><div class=\"gb-container gb-container-fb47f507 special-color\">\n\n<p class=\"special-color\"><\/p>\n\n\n\n<p class=\"special-color\"><\/p>\n\n\n\n<p class=\"special-color\"><\/p>\n\n\n\n<p class=\"special-color\"><\/p>\n\n\n\n<p class=\"special-color\"><\/p>\n\n\n\n<p class=\"special-color\"><\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-fc5995b1 gb-headline-text\"><strong>MES rendszer<\/strong><\/h4>\n\n\n\n<p class=\"special-color has-contrast-color has-base-3-background-color has-text-color has-background\"><strong><a href=\"\/hu\/forrasok\/mes-vs-erp-mi-a-kulonbseg\/\">MES vs ERP<\/a><\/strong><br><br><strong><a href=\"\/hu\/forrasok\/a-mes-erp-integracio-ereje\/\">MES ERP integr\u00e1ci\u00f3<\/a><\/strong><br><br><a href=\"\/hu\/forrasok\/a-mes-funkciok-elonyei\/\"><strong>MES funkci\u00f3k<\/strong><\/a><br>\u00b7 <a href=\"\/hu\/forrasok\/mes-gyartasfelugyelet\/\">Gy\u00e1rt\u00e1sfel\u00fcgyelet<\/a><br>\u00b7 <a href=\"\/hu\/forrasok\/mes-minosegellenorzes-a-gyartasban\/\">Min\u0151s\u00e9gellen\u0151rz\u00e9s<\/a><br>\u00b7 <a href=\"\/hu\/forrasok\/mes-keszlet-optimalizalas\/\">K\u00e9szletoptimaliz\u00e1l\u00e1s<\/a><br>\u00b7 <a href=\"\/hu\/forrasok\/mes-adataramlas-kezeles\/\">Adat\u00e1raml\u00e1s-kezel\u00e9s<\/a><br>\u00b7<a href=\"\/hu\/forrasok\/mes-gyartasi-analitika\/\"> Gy\u00e1rt\u00e1si analitika<\/a><br>\u00b7<a href=\"\/hu\/forrasok\/mes-gyartaskovetes\/\"> Gy\u00e1rt\u00e1sk\u00f6vet\u00e9s<\/a><br><br><strong><a href=\"\/hu\/forrasok\/mes-megoldasok-hogyan-valasszuk-ki-a-megfelelot\/\">MES megold\u00e1sok<\/a><\/strong><br>\u00b7<a href=\"\/hu\/forrasok\/felhoalapu-mes\/\"> Felh\u0151alap\u00fa MES<\/a><br>\u00b7 <a href=\"\/hu\/forrasok\/helyszini-mes\/\">Helyi telep\u00edt\u00e9s\u0171 MES<\/a><br>\u00b7 <a href=\"\/hu\/forrasok\/mes-kisvallalkozasok-szamara\/\">MES kisv\u00e1llalkoz\u00e1soknak<\/a><br>\u00b7 <a href=\"\/hu\/forrasok\/ai-vezerelt-mes\/\">AI vez\u00e9relt MES<\/a><br>\u00b7 <a href=\"\/hu\/forrasok\/vallalati-mes\/\">V\u00e1llalati MES<\/a><br>\u00b7<a href=\"\/hu\/forrasok\/iparag-specifikus-mes\/\"> Ipar\u00e1g-specifikus MES<\/a><\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-8526f60b\"><div class=\"gb-container gb-container-8526f60b front-head\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-93641464\"><div class=\"gb-inside-container\">\n<div class=\"yoast-breadcrumbs\"><span><span><a href=\"https:\/\/skyplanner.ai\/hu\/\">Home<\/a><\/span> \u00bb <span><a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/\">Cikkek<\/a><\/span> \u00bb <span class=\"breadcrumb_last\" aria-current=\"page\">MES rendszer \u2013 Mi az, \u00e9s mit csin\u00e1l<\/span><\/span><\/div>\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-26760224\"><div class=\"gb-inside-container\">\n\n<h1 class=\"wp-block-heading has-text-align-left has-text-color\" id=\"h-mes-system-what-it-is-and-what-it-does\" style=\"color:#1f1f33\">MES rendszer \u2013 Mi az, \u00e9s mit csin\u00e1l<\/h1>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-3112db8f\"><div class=\"gb-inside-container\">\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Becs\u00fclt olvas\u00e1si id\u0151: <\/span><span class=\"yoast-reading-time__reading-time\">13<\/span><span class=\"yoast-reading-time__time-unit\"> perc<\/span><\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-6986ace5\"><div class=\"gb-inside-container\">\n\n<p class=\"has-text-align-left\">Amikor az automatiz\u00e1l\u00e1s el\u0151sz\u00f6r kezdett be\u00e9p\u00fclni a gy\u00e1rt\u00e1sba, megsz\u00fcletett a Manufacturing Execution System (MES) kifejez\u00e9s. A MES az automatiz\u00e1lt rendszerek kezel\u00e9s\u00e9nek eszk\u00f6ze volt oly m\u00f3don, amely lehet\u0151v\u00e9 tette a gy\u00e1rt\u00f3\u00fczemek z\u00f6kken\u0151mentes m\u0171k\u00f6d\u00e9s\u00e9t. Ezt a folyamatok \u00e9szszer\u0171s\u00edt\u00e9s\u00e9vel, a gy\u00e1rt\u00e1s sor\u00e1n t\u00f6rt\u00e9n\u0151 nyomon k\u00f6vet\u00e9s\u00fckkel \u00e9s az esem\u00e9nyek automatikus dokument\u00e1l\u00e1s\u00e1val \u00e9rte el.<\/p>\n\n\n\n<p>Az id\u0151 m\u00fal\u00e1s\u00e1val a v\u00e1llalatok \u00faj m\u00f3dszereket tal\u00e1ltak ezen \u00faj eszk\u00f6z kihaszn\u00e1l\u00e1s\u00e1ra. A testreszabott term\u00e9kek ir\u00e1nti n\u00f6vekv\u0151 ig\u00e9nnyel a folyamatokat \u00e9szszer\u0171s\u00edteni kellett a nagyobb hat\u00e9konys\u00e1g \u00e9rdek\u00e9ben, a&nbsp;<a href=\"\/hu\/\" target=\"_blank\" rel=\"noreferrer noopener\">termel\u00e9stervez\u00e9s<\/a>&nbsp;pedig optimaliz\u00e1l\u00e1st ig\u00e9nyelt. Erre a MES fantasztikus eszk\u00f6znek bizonyult.<\/p>\n\n\n\t\t\t\t<div class=\"wp-block-uagb-table-of-contents uagb-toc__align-left uagb-toc__columns-1  uagb-block-613f9f62      \"\n\t\t\t\t\tdata-scroll= \"1\"\n\t\t\t\t\tdata-offset= \"30\"\n\t\t\t\t\tstyle=\"\"\n\t\t\t\t>\n\t\t\t\t<div class=\"uagb-toc__wrap\">\n\t\t\t\t\t\t<div class=\"uagb-toc__title\">\n\t\t\t\t\t\t\tTable Of Contents\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"uagb-toc__list-wrap \">\n\t\t\t\t\t\t<ol class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#tldr\" class=\"uagb-toc-link__trigger\">TL;DR<\/a><li class=\"uagb-toc__list\"><a href=\"#mi-az-a-mes\" class=\"uagb-toc-link__trigger\">Mi az a MES?<\/a><li class=\"uagb-toc__list\"><a href=\"#mes-funkci\u00f3k\" class=\"uagb-toc-link__trigger\">MES funkci\u00f3k<\/a><li class=\"uagb-toc__list\"><a href=\"#mes-jellemz\u0151k\" class=\"uagb-toc-link__trigger\">MES jellemz\u0151k<\/a><li class=\"uagb-toc__list\"><a href=\"#mes-megold\u00e1sok\" class=\"uagb-toc-link__trigger\">MES megold\u00e1sok<\/a><li class=\"uagb-toc__list\"><a href=\"#tan\u00e1csok-a-megfelel\u0151-megold\u00e1s-kiv\u00e1laszt\u00e1s\u00e1hoz\" class=\"uagb-toc-link__trigger\">Tan\u00e1csok a megfelel\u0151 megold\u00e1s kiv\u00e1laszt\u00e1s\u00e1hoz<\/a><li class=\"uagb-toc__list\"><a href=\"#mes-\u00e9s-erp\" class=\"uagb-toc-link__trigger\">MES \u00e9s ERP<\/a><li class=\"uagb-toc__list\"><a href=\"#a-mes-haszn\u00e1lat\u00e1nak-el\u0151nyei\" class=\"uagb-toc-link__trigger\">A MES haszn\u00e1lat\u00e1nak el\u0151nyei<\/a><li class=\"uagb-toc__list\"><a href=\"#a-manufacturing-execution-system-j\u00f6v\u0151beli-alkalmaz\u00e1sai\" class=\"uagb-toc-link__trigger\">A Manufacturing Execution System j\u00f6v\u0151beli alkalmaz\u00e1sai<\/a><li class=\"uagb-toc__list\"><a href=\"#emelje-v\u00e1llalata-folyamatmenedzsmentj\u00e9t-a-k\u00f6vetkez\u0151-szintre\" class=\"uagb-toc-link__trigger\">Emelje v\u00e1llalata folyamatmenedzsmentj\u00e9t a k\u00f6vetkez\u0151 szintre!<\/a><li class=\"uagb-toc__list\"><a href=\"#gyakran-ism\u00e9telt-k\u00e9rd\u00e9sek\" class=\"uagb-toc-link__trigger\">Gyakran Ism\u00e9telt K\u00e9rd\u00e9sek<\/a><\/ol>\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-b0f6164d\"><div class=\"gb-inside-container\">\n\n<h2 class=\"gb-headline gb-headline-a28df297 gb-headline-text\">TL;DR<\/h2>\n\n\n\n<p>A gy\u00e1rt\u00e1sir\u00e1ny\u00edt\u00e1si rendszer (MES) k\u00f6veti \u00e9s dokument\u00e1lja az \u00fczemi szint\u0171 termel\u00e9st, \u00edgy a csapat naprak\u00e9sz inform\u00e1ci\u00f3kat kap a gy\u00e1rt\u00e1si feladatokr\u00f3l, az anyagokr\u00f3l \u00e9s a min\u0151s\u00e9gr\u0151l. Az ERP az \u00fczleti tervez\u00e9st szolg\u00e1lja, a MES pedig a gy\u00e1rt\u00e1s v\u00e9grehajt\u00e1s\u00e1t t\u00e1mogatja. Az ISA-95 modelleket \u00e9s egys\u00e9ges terminol\u00f3gi\u00e1t ad a gy\u00e1rt\u00e1svez\u00e9rl\u00e9s \u00e9s a v\u00e1llalati funkci\u00f3k k\u00f6z\u00f6tti inform\u00e1ci\u00f3cser\u00e9hez; nem a MES k\u00f6telez\u0151 funkci\u00f3inak ellen\u0151rz\u0151list\u00e1ja. A korszer\u0171 MES rendszerek t\u00f6bbek k\u00f6z\u00f6tt gy\u00e1rt\u00e1sfel\u00fcgyeletet, k\u00e9szletk\u00f6vet\u00e9st \u00e9s termel\u00e9si elemz\u00e9seket k\u00edn\u00e1lnak. A MES \u00e9s a SkyPlanner APS \u00f6sszekapcsol\u00e1s\u00e1val a gy\u00e1rt\u00e1si adatokra \u00e9s a gy\u00e1rt\u00e1stervez\u0151 \u00e1ltal meghat\u00e1rozott priorit\u00e1sokra \u00e9p\u00fcl\u0151 \u00fctemez\u00e9s is el\u00e9rhet\u0151v\u00e9 v\u00e1lik.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-what-is-mes\">Mi az a MES?<\/h2>\n\n\n<div class=\"gb-container gb-container-ce737323\"><div class=\"gb-inside-container\">\n\n<p><strong>A gy\u00e1rt\u00e1sir\u00e1ny\u00edt\u00e1si rendszer (MES) olyan szoftver, amely k\u00f6veti, dokument\u00e1lja \u00e9s t\u00e1mogatja a gy\u00e1rt\u00e1s v\u00e9grehajt\u00e1s\u00e1t az \u00fczemben. Adatokat gy\u0171jt a g\u00e9pkezel\u0151kt\u0151l, a berendez\u00e9sekt\u0151l \u00e9s a csatlakoztatott rendszerekt\u0151l, \u00edgy a csapat nyomon k\u00f6vetheti a gy\u00e1rt\u00e1si feladatok el\u0151rehalad\u00e1s\u00e1t, az anyagfelhaszn\u00e1l\u00e1st \u00e9s a min\u0151s\u00e9get.<\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p class=\"has-text-align-left\">A MES \u00e9s az ERP egym\u00e1st kieg\u00e9sz\u00edt\u0151 szerepet t\u00f6lt be. Az ERP az \u00fczleti folyamatokat t\u00e1mogatja, p\u00e9ld\u00e1ul a rendel\u00e9sek kezel\u00e9s\u00e9t, a beszerz\u00e9st \u00e9s a p\u00e9nz\u00fcgyeket, m\u00edg a MES r\u00e9szletesebb inform\u00e1ci\u00f3kat ny\u00fajt a gy\u00e1rt\u00e1s v\u00e9grehajt\u00e1s\u00e1r\u00f3l. Az integr\u00e1ci\u00f3 lehet\u0151v\u00e9 teszi, hogy a k\u00e9t rendszer megossza egym\u00e1ssal a gy\u00e1rt\u00e1si k\u00f6vetelm\u00e9nyeket \u00e9s eredm\u00e9nyeket.<\/p>\n\n\n\n<p>A MES \u00e9rz\u00e9kel\u0151k \u00e9s szoftverek integr\u00e1lt rendszere, amely nyomon k\u00f6veti a berendez\u00e9seket, az anyagokat \u00e9s a dolgoz\u00f3kat. R\u00e1mutat a folyamatok sz\u0171k keresztmetszeteire, seg\u00edt a berendez\u00e9sek karbantart\u00e1s\u00e1nak el\u0151zetes \u00fctemez\u00e9s\u00e9ben, valamint testreszabott utas\u00edt\u00e1sok ad\u00e1s\u00e1ra is haszn\u00e1lhat\u00f3 a dolgoz\u00f3k \u00e9s a berendez\u00e9sek sz\u00e1m\u00e1ra a megrendel\u00e9s alapj\u00e1n. Ez seg\u00edt a folyamatok \u00e9szszer\u0171s\u00edt\u00e9s\u00e9ben, \u00e9s megb\u00edzhat\u00f3bb \u00fctemez\u00e9st tesz lehet\u0151v\u00e9.<\/p>\n\n\n\n<p>Amikor a MES m\u00e9g gyerekcip\u0151ben j\u00e1rt, meglehet\u0151sen laz\u00e1n hat\u00e1rozt\u00e1k meg. Szinte b\u00e1rmilyen folyamatk\u00f6vet\u00e9si, dokument\u00e1l\u00e1si vagy kezel\u00e9si m\u00f3dszert MES-nek nevezhettek. Ez probl\u00e9m\u00e1kat okozott a MES \u00e9s m\u00e1s rendszerek k\u00f6z\u00f6tti interf\u00e9szek m\u0171k\u00f6dtet\u00e9sekor.<\/p>\n\n\n\n<p>Az <a href=\"https:\/\/www.isa.org\/standards-and-publications\/isa-standards\/isa-standards-committees\/isa95\">ISA-95<\/a> modelleket, terminol\u00f3gi\u00e1t \u00e9s inform\u00e1ci\u00f3cser\u00e9t hat\u00e1roz meg a gy\u00e1rt\u00e1svez\u00e9rl\u00e9s \u00e9s a v\u00e1llalati funkci\u00f3k integr\u00e1ci\u00f3j\u00e1hoz. Az \u00e1ltala t\u00e1rgyalt integr\u00e1ci\u00f3s ter\u00fclet elt\u00e9r a <a href=\"https:\/\/mesa.org\/topics-resources\/mesa-model\/\">MESA<\/a> \u00e1ltal kor\u00e1bban kidolgozott MES-funkci\u00f3modellek t\u00e1rgyk\u00f6r\u00e9t\u0151l. Az al\u00e1bbi lista a gyakori MES-funkci\u00f3kat tekinti \u00e1t, nem az ISA-95 k\u00f6telez\u0151 k\u00f6vetelm\u00e9nyeit sorolja fel:<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-mes-functions\">MES funkci\u00f3k<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Adatgy\u0171jt\u00e9s<\/li>\n\n\n\n<li>Min\u0151s\u00e9gellen\u0151rz\u00e9s<\/li>\n\n\n\n<li>Gy\u00e1rt\u00e1s\u00fctemez\u00e9s<\/li>\n\n\n\n<li>Teljes\u00edtm\u00e9nyelemz\u00e9s<\/li>\n\n\n\n<li>Term\u00e9kek \u00e1raml\u00e1sa<\/li>\n\n\n\n<li>Sz\u00e1rmaz\u00e1s \u00e9s nyomon k\u00f6vethet\u0151s\u00e9g<\/li>\n\n\n\n<li>Folyamatir\u00e1ny\u00edt\u00e1s<\/li>\n\n\n\n<li>Er\u0151forr\u00e1s-kezel\u00e9s<\/li>\n\n\n\n<li>Szem\u00e9lyzetkezel\u00e9s<\/li>\n\n\n\n<li>Karbantart\u00e1s-kezel\u00e9s<\/li>\n\n\n\n<li>Dokumentumkezel\u00e9s<\/li>\n<\/ol>\n\n\n\n<p>Az adott MES funkci\u00f3i a term\u00e9kt\u0151l \u00e9s annak megval\u00f3s\u00edt\u00e1s\u00e1t\u00f3l f\u00fcggnek. Hat\u00e1rozza meg, melyik feladat\u00e9rt melyik rendszer felel, \u00e9s hogyan \u00e1ramlanak az adatok a MES, az ERP \u00e9s az \u00fctemez\u0151 szoftverek, p\u00e9ld\u00e1ul az APS k\u00f6z\u00f6tt.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-ca25f6c8 gb-headline-text\">MES jellemz\u0151k<\/h2>\n\n\n\n<p>M\u00e9lyebbre mer\u00fclve e rendszer birodalm\u00e1ban, egy \u00fajabb, izgalmas aspektussal tal\u00e1lkozunk:&nbsp;<a href=\"\/hu\/forrasok\/a-mes-funkciok-elonyei\/\">MES jellemz\u0151k<\/a>. Am\u00edg meg\u00e9rtj\u00fck ezen eszk\u00f6z \u00e1rnyalatait, a MES funkci\u00f3 \u00e9s a MES jellemz\u0151 k\u00f6z\u00f6tti k\u00fcl\u00f6nbs\u00e9gt\u00e9tel tov\u00e1bbra is kulcsfontoss\u00e1g\u00fa marad.<\/p>\n\n\n\n<p>Egyszer\u0171en fogalmazva, a MES funkci\u00f3 azokra az alapvet\u0151 m\u0171veletekre vagy feladatokra utal, amelyeket a rendszer el tud v\u00e9gezni. Ezek a funkci\u00f3k alkotj\u00e1k a MES rendszer gerinc\u00e9t. Ek\u00f6zben a jellemz\u0151i a rendszer specifikus eszk\u00f6zeit vagy k\u00e9pess\u00e9geit emelik ki, n\u00f6velve annak funkcion\u00e1lis potenci\u00e1lj\u00e1t. A MES rendszerek felt\u00e9rk\u00e9pez\u00e9se sor\u00e1n hat innovat\u00edv jellemz\u0151t azonos\u00edtottunk, amelyek kiemelkednek:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong><a href=\"\/hu\/forrasok\/mes-gyartasfelugyelet\/\">Gy\u00e1rt\u00e1sfel\u00fcgyelet<\/a><\/strong>: Ez a funkci\u00f3 val\u00f3s idej\u0171 r\u00e1l\u00e1t\u00e1st biztos\u00edt a gy\u00e1rt\u00e1si folyamatra, \u00edgy minden z\u00f6kken\u0151mentesen \u00e9s hat\u00e9konyan m\u0171k\u00f6dik. A fel\u00fcgyelet r\u00e9v\u00e9n a termel\u00e9stervez\u0151k \u00e9rt\u00e9kes inform\u00e1ci\u00f3khoz jutnak, \u00e9s sz\u00fcks\u00e9g szerint elv\u00e9gezhetik a kiigaz\u00edt\u00e1sokat.<\/li>\n\n\n\n<li><a href=\"\/hu\/forrasok\/mes-minosegellenorzes-a-gyartasban\/\"><strong>Min\u0151s\u00e9gellen\u0151rz\u00e9s a gy\u00e1rt\u00e1sban<\/strong>:<\/a> Egy j\u00f3l fel\u00e9p\u00edtett MES rendszer nem csup\u00e1n a termel\u00e9st fel\u00fcgyeli, hanem a k\u00e9sz\u00fcl\u0151 term\u00e9kek min\u0151s\u00e9g\u00e9t is r\u00e9szletesen k\u00f6veti. R\u00f6gz\u00edti a min\u0151s\u00e9gellen\u0151rz\u00e9seket \u00e9s jelzi az elt\u00e9r\u00e9seket, hogy a csapat az el\u0151\u00edrt szabv\u00e1nyoknak megfelel\u0151en int\u00e9zkedhessen.<\/li>\n\n\n\n<li><strong><a href=\"\/hu\/forrasok\/mes-keszlet-optimalizalas\/\">K\u00e9szletoptimaliz\u00e1l\u00e1s<\/a><\/strong>: A gy\u00e1rt\u00e1s mellett a k\u00e9szletgazd\u00e1lkod\u00e1s is kiemelt fontoss\u00e1g\u00fa. A MES rendszerek k\u00f6vetik az anyagmozg\u00e1sokat \u00e9s az anyagfelhaszn\u00e1l\u00e1st, \u00edgy seg\u00edtenek a csapatnak felismerni az anyaghi\u00e1nyt \u00e9s a k\u00e9szletfelesleget.<\/li>\n\n\n\n<li><strong><a href=\"\/hu\/forrasok\/mes-adataramlas-kezeles\/\">Adat\u00e1raml\u00e1s-kezel\u00e9s<\/a><\/strong>: Digitaliz\u00e1lt korunkban az adat az \u00far. Ez\u00e9rt az adat\u00e1raml\u00e1s kezel\u00e9se kiemelt jelent\u0151s\u00e9g\u0171v\u00e9 v\u00e1lik. Az ezzel a funkci\u00f3val felszerelt MES rendszer z\u00f6kken\u0151mentes adatmozg\u00e1st, -t\u00e1rol\u00e1st \u00e9s -hozz\u00e1f\u00e9r\u00e9st biztos\u00edt, g\u00f6rd\u00fcl\u00e9kenyebb\u00e9 t\u00e9ve a d\u00f6nt\u00e9shozatalt.<\/li>\n\n\n\n<li><strong><a href=\"\/hu\/forrasok\/mes-gyartasi-analitika\/\">Gy\u00e1rt\u00e1si analitika<\/a><\/strong>: Az adatok m\u00e9ly\u00e9re hatolva az MES rendszerek kulcsfontoss\u00e1g\u00fa elemz\u00e9seket nyerhetnek ki. Ezek az elemz\u00e9sek seg\u00edts\u00e9g\u00e9vel a termel\u00e9stervez\u0151k felismerhetik a mint\u00e1zatokat, el\u0151re jelezhetik a trendeket, \u00e9s megalapozott d\u00f6nt\u00e9seket hozhatnak.<\/li>\n\n\n\n<li><strong><a href=\"\/hu\/forrasok\/mes-gyartaskovetes\/\">Termel\u00e9sk\u00f6vet\u00e9s<\/a><\/strong>: V\u00e9g\u00fcl, de kor\u00e1ntsem utols\u00f3sorban, a termel\u00e9sk\u00f6vet\u00e9s igazi gy\u00f6ngyszem marad. Vil\u00e1gos k\u00e9pet ad arr\u00f3l, hogy az egyes term\u00e9kek hol tartanak a gy\u00e1rt\u00f3soron, megnyitva az utat a jobb er\u0151forr\u00e1s-eloszt\u00e1s \u00e9s hat\u00e9konys\u00e1g el\u0151tt.<\/li>\n<\/ol>\n\n\n\n<p>N\u00e9zz\u00fck meg az egyik ilyen jellemz\u0151t a tiszt\u00e1bb meg\u00e9rt\u00e9s \u00e9rdek\u00e9ben. Gy\u00e1rt\u00e1sfel\u00fcgyelet \u2013 Ez a funkci\u00f3 \u00e1tfog\u00f3 \u00e1ttekint\u00e9st ny\u00fajt a gy\u00e1rt\u00e1si folyamatr\u00f3l. Gondoljon r\u00e1 \u00fagy, mint egy \u00e9ber \u0151rre. Ez a funkci\u00f3 akt\u00edvan \u00e9szleli a szab\u00e1lytalans\u00e1gokat, a potenci\u00e1lis hat\u00e9konys\u00e1gcs\u00f6kken\u00e9st \u00e9s a rendszerhib\u00e1k jeleit. <\/p>\n\n\n\n<p>A percrek\u00e9sz adatok biztos\u00edt\u00e1s\u00e1val a gy\u00e1rt\u00e1sfel\u00fcgyelet biztos\u00edtja, hogy a termel\u00e9stervez\u0151k mindig t\u00e1j\u00e9kozottak legyenek, lehet\u0151v\u00e9 t\u00e9ve sz\u00e1mukra az azonnali cselekv\u00e9st \u00e9s a folyamatok sz\u00fcks\u00e9g szerinti jav\u00edt\u00e1s\u00e1t.<br><br>A MES rendszerek vil\u00e1ga folyamatosan fejl\u0151dik, egyre kifinomultabb eszk\u00f6z\u00f6ket \u00e9s funkci\u00f3kat k\u00edn\u00e1lva. A naprak\u00e9sz t\u00e1j\u00e9kozotts\u00e1g r\u00e9v\u00e9n a termel\u00e9stervez\u0151k teljes m\u00e9rt\u00e9kben kihaszn\u00e1lhatj\u00e1k e rendszerek lehet\u0151s\u00e9geit, egy f\u00e9nyesebb j\u00f6v\u0151 fel\u00e9 lend\u00edtve m\u0171veleteiket.<\/p>\n\n\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS \u2013 Termel\u00e9stervez\u00e9s \u00e9s -\u00fctemez\u00e9s term\u00e9kk\u00e9p, szemb\u0151l n\u00e9zve\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Fejlett termel\u00e9stervez\u00e9s AI-val &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Olvasson t\u00f6bbet a termel\u00e9stervez\u00e9si \u00e9s optimaliz\u00e1l\u00e1si megk\u00f6zel\u00edt\u00e9s\u00fcnkr\u0151l, amely az AI erej\u00e9t haszn\u00e1lja fel.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"\/hu\/\" aria-label=\"Foglaljon dem\u00f3t\">Termel\u00e9stervez\u00e9s AI-val<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-1794ec07\"><div class=\"gb-inside-container\">\n\n<h2 class=\"gb-headline gb-headline-3a1286ae gb-headline-text\">MES megold\u00e1sok<\/h2>\n\n\n\n<p>K\u00fcl\u00f6nb\u00f6z\u0151 <a href=\"\/hu\/forrasok\/mes-megoldasok-hogyan-valasszuk-ki-a-megfelelot\/\">MES megold\u00e1sok <\/a>\u00e1llnak k\u00e9szen arra, hogy kezelj\u00e9k a k\u00fcl\u00f6nf\u00e9le m\u0171k\u00f6d\u00e9si kih\u00edv\u00e1sokat a MES rendszerek kiterjedt ter\u00fclet\u00e9n. Mindegyik egyedi \u00e9rt\u00e9ket k\u00e9pvisel, a felh\u0151alap\u00fa rendszerek \u00e9szszer\u0171s\u00edtett k\u00e9pess\u00e9geit\u0151l az ipar\u00e1g-specifikus MES speci\u00e1lis k\u00edn\u00e1lat\u00e1ig. Utazzunk egy\u00fctt v\u00e9gig ezeken a lehet\u0151s\u00e9geken, azonos\u00edtva, hogyan tudja mindegyik optim\u00e1lisan t\u00e1mogatni \u00e9s jav\u00edtani v\u00e1llalata specifikus gy\u00e1rt\u00e1si ig\u00e9nyeit.<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong><a href=\"\/hu\/forrasok\/felhoalapu-mes\/\">Felh\u0151alap\u00fa MES<\/a><\/strong>: A felh\u0151b\u0151l m\u0171k\u00f6dik, ami azt jelenti, hogy b\u00e1rhonnan hozz\u00e1f\u00e9rhet, ahol van internetkapcsolat. Rugalmass\u00e1got k\u00edn\u00e1l, \u00e9s gyakran alacsonyabbak a kezdeti k\u00f6lts\u00e9gei. Ugyanakkor stabil internetkapcsolatot ig\u00e9nyel.<\/li>\n\n\n\n<li><strong><a href=\"\/hu\/forrasok\/helyszini-mes\/\">Helyben telep\u00edtett MES<\/a><\/strong>: Ez a rendszer a v\u00e1llalat saj\u00e1t hardver\u00e9re \u00e9s szervereire telep\u00fcl. B\u00e1r nagyobb kezdeti beruh\u00e1z\u00e1st ig\u00e9nyelhet, nagyobb kontrollt biztos\u00edthat az adatok felett, \u00e9s testreszabhat\u00f3 a v\u00e1llalat ig\u00e9nyeihez.<\/li>\n\n\n\n<li><strong><a href=\"\/hu\/forrasok\/mes-kisvallalkozasok-szamara\/\">MES kisv\u00e1llalkoz\u00e1soknak<\/a><\/strong>: Kifejezetten a kisebb m\u0171k\u00f6d\u00e9sre szabva ezek a rendszerek \u00e1ltal\u00e1ban egyszer\u0171bbek \u00e9s k\u00f6lts\u00e9ghat\u00e9konyabbak. Azokra az alapvet\u0151 funkci\u00f3kra \u00f6sszpontos\u00edtanak, amelyekre egy kisv\u00e1llalkoz\u00e1snak sz\u00fcks\u00e9ge van, an\u00e9lk\u00fcl hogy \u00f6sszetett funkci\u00f3kkal terheln\u00e9k t\u00fal.<\/li>\n\n\n\n<li><strong><a href=\"\/hu\/forrasok\/ai-vezerelt-mes\/\">AI-vez\u00e9relt MES<\/a><\/strong>: A mesters\u00e9ges intelligencia be\u00e9p\u00edt\u00e9s\u00e9vel ezek a rendszerek k\u00e9pesek trendeket el\u0151re jelezni, feladatokat automatiz\u00e1lni \u00e9s folyamatokat optimaliz\u00e1lni. Kiv\u00e1l\u00f3 v\u00e1laszt\u00e1s azoknak a v\u00e1llalkoz\u00e1soknak, amelyek az innov\u00e1ci\u00f3 \u00e9lvonal\u00e1ban szeretn\u00e9nek maradni.<\/li>\n\n\n\n<li><strong><a href=\"\/hu\/forrasok\/vallalati-mes\/\">V\u00e1llalati (enterprise) MES<\/a><\/strong>: A nagy, \u00f6sszetett ig\u00e9ny\u0171 v\u00e1llalatok sz\u00e1m\u00e1ra tervezett megold\u00e1s kiterjedt funkci\u00f3kat k\u00edn\u00e1l, nagy adatmennyis\u00e9get k\u00e9pes kezelni, \u00e9s z\u00f6kken\u0151mentesen integr\u00e1lhat\u00f3 m\u00e1s v\u00e1llalati rendszerekkel.<\/li>\n\n\n\n<li><strong><a href=\"\/hu\/forrasok\/iparag-specifikus-mes\/\">Ipar\u00e1g-specifikus MES<\/a><\/strong>: Ezeket konkr\u00e9t ipar\u00e1gakra, p\u00e9ld\u00e1ul a gy\u00f3gyszeriparra vagy az aut\u00f3iparra szabj\u00e1k. Eleve olyan eszk\u00f6z\u00f6kkel \u00e9s funkci\u00f3kkal vannak felszerelve, amelyek az adott \u00e1gazatra jellemz\u0151ek.<\/li>\n<\/ol>\n\n\n\n<p>A v\u00e1llalkoz\u00e1sa sz\u00e1m\u00e1ra megfelel\u0151 MES megold\u00e1s kiv\u00e1laszt\u00e1sa d\u00f6nt\u0151 fontoss\u00e1g\u00fa lehet a gy\u00e1rt\u00e1si folyamat hat\u00e9konys\u00e1ga \u00e9s sikere szempontj\u00e1b\u00f3l.<\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-3cf0e0d5 gb-headline-text\">Tan\u00e1csok a megfelel\u0151 megold\u00e1s kiv\u00e1laszt\u00e1s\u00e1hoz<\/h2>\n\n\n\n<p>A MES rendszerek ezen v\u00e1ltozatos k\u00edn\u00e1lat\u00e1b\u00f3l a legjobb v\u00e1laszt\u00e1s meghozatala els\u0151re ijeszt\u0151nek t\u0171nhet. Alapvet\u0151 fontoss\u00e1g\u00fa, hogy a kiv\u00e1lasztott rendszert \u00f6sszhangba hozza v\u00e1llalata saj\u00e1tos m\u0171k\u00f6d\u00e9si ig\u00e9nyeivel \u00e9s j\u00f6v\u0151beli c\u00e9ljaival. Hogy seg\u00edts\u00fcnk ebben a kritikus d\u00f6nt\u00e9sben, \u00edme n\u00e9h\u00e1ny felbecs\u00fclhetetlen \u00e9rt\u00e9k\u0171 tipp, amit \u00e9rdemes megfontolni:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Ismerje meg az ig\u00e9nyeit<\/strong>: A d\u00f6nt\u00e9s el\u0151tt m\u00e9rje fel v\u00e1llalata egyedi k\u00f6vetelm\u00e9nyeit. \u00d6sszetett funkci\u00f3kra van sz\u00fcks\u00e9ge, vagy csak az alapokra?<\/li>\n\n\n\n<li><strong>K\u00f6lts\u00e9gvet\u00e9si szempontok<\/strong>: B\u00e1r alapvet\u0151 fontoss\u00e1g\u00fa olyan rendszert v\u00e1lasztani, amely megfelel az ig\u00e9nyeinek, ugyanilyen fontos megfontolni, mennyit hajland\u00f3 befektetni.<\/li>\n\n\n\n<li><strong>Sk\u00e1l\u00e1zhat\u00f3s\u00e1g<\/strong>: Gondolkodjon hossz\u00fa t\u00e1von. Olyan MES rendszert v\u00e1lasszon, amely k\u00e9pes egy\u00fctt n\u00f6vekedni a v\u00e1llalat\u00e1val.<\/li>\n\n\n\n<li><strong>Integr\u00e1ci\u00f3<\/strong>: Gy\u0151z\u0151dj\u00f6n meg r\u00f3la, hogy a Manufacturing Execution System j\u00f3l integr\u00e1lhat\u00f3 a t\u00f6bbi haszn\u00e1lt szoftverrel.<\/li>\n\n\n\n<li><strong>Felhaszn\u00e1l\u00f3bar\u00e1ts\u00e1g<\/strong>: Egy nehezen kezelhet\u0151 rendszer h\u00e1tr\u00e1ltathatja a termel\u00e9kenys\u00e9get. Olyat v\u00e1lasszon, amely intuit\u00edv \u00e9s felhaszn\u00e1l\u00f3bar\u00e1t.<\/li>\n\n\n\n<li><strong>T\u00e1mogat\u00e1s \u00e9s k\u00e9pz\u00e9s<\/strong>: Ellen\u0151rizze, hogy a szolg\u00e1ltat\u00f3 k\u00edn\u00e1l-e elegend\u0151 t\u00e1mogat\u00e1st \u00e9s k\u00e9pz\u00e9seket, amelyek seg\u00edtenek a csapat\u00e1nak megismerkedni a rendszerrel.<\/li>\n<\/ul>\n\n\n\n<p>B\u00e1r sz\u00e1mos MES rendszer opci\u00f3 \u00e1ll rendelkez\u00e9sre, a helyes v\u00e1laszt\u00e1s mindig az lesz, amelyik a legjobban illeszkedik v\u00e1llalata egyedi ig\u00e9nyeihez \u00e9s n\u00f6veked\u00e9si terveihez.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"h-mes-and-erp\">MES \u00e9s ERP<\/h2>\n\n\n\n<p>Amikor elmer\u00fcl\u00fcnk az ipari szoftverek bonyolults\u00e1g\u00e1ban, gyakran felmer\u00fcl a \u201e<a href=\"\/hu\/forrasok\/mes-vs-erp-mi-a-kulonbseg\/\">MES vs ERP<\/a>\u201d vita, \u00e9s k\u00f6nny\u0171 meg\u00e9rteni, mi\u00e9rt.<\/p>\n\n\n\n<p class=\"has-text-align-left\">A MES \u00e9s az&nbsp;<a href=\"\/hu\/forrasok\/gyartasi-erp-atfogo-utmutato\/\" target=\"_blank\" rel=\"noreferrer noopener\">ERP<\/a>&nbsp;gyakran pontos\u00edt\u00e1st ig\u00e9nyel, mivel neh\u00e9z megmondani, hol \u00e9r v\u00e9get az egyik \u00e9s hol kezd\u0151dik a m\u00e1sik. Mindk\u00e9t rendszernek vannak \u00e1tfed\u0151 funkci\u00f3i, \u00e9s n\u00e9h\u00e1ny kezdetleges esetben a MES-re nincs is sz\u00fcks\u00e9g. Mindazon\u00e1ltal egy \u00fczem m\u0171k\u00f6d\u00e9s\u00e9nek optimaliz\u00e1l\u00e1sa neh\u00e9znek bizonyulhat puszt\u00e1n az ERP seg\u00edts\u00e9g\u00e9vel.<\/p>\n\n\n\n<p>Az ERP (Enterprise Resource Planning) egy teljes \u00fczletmenet ir\u00e1ny\u00edt\u00e1s\u00e1ra tervezett szoftverrendszer. Megk\u00eds\u00e9rli integr\u00e1lni \u00e9s kezelni a v\u00e1llalat \u00fczleti tev\u00e9kenys\u00e9g\u00e9nek minden aspektus\u00e1t. Az ERP az esem\u00e9nyek folyamatosan friss\u00fcl\u0151 adatb\u00e1zisak\u00e9nt funkcion\u00e1l minden szinten. Ez az inform\u00e1ci\u00f3 manu\u00e1lisan vagy automatikusan felhaszn\u00e1lhat\u00f3 az optim\u00e1lis m\u0171k\u00f6d\u00e9shez sz\u00fcks\u00e9ges er\u0151forr\u00e1sok kezel\u00e9s\u00e9re.<\/p>\n\n\n\n<p>A MES ezzel szemben nem l\u00e9p ki az \u00fczem falain k\u00edv\u00fclre. F\u0151 feladata annak felm\u00e9r\u00e9se, hogy milyen er\u0151forr\u00e1sok (alapanyag, szem\u00e9lyzet, g\u00e9pek \u00e9s berendez\u00e9sek) \u00e1llnak rendelkez\u00e9sre, \u00e9s ezeket hogyan lehet a legjobban felhaszn\u00e1lni a megrendelt term\u00e9kek legy\u00e1rt\u00e1s\u00e1hoz. Ide tartozik t\u00f6bbek k\u00f6z\u00f6tt az <a href=\"\/hu\/forrasok\/mi-a-termelesutemezes\/\">\u00fctemez\u00e9s<\/a>, a berendez\u00e9sek karbantart\u00e1sa, a k\u00e9szletkezel\u00e9s, a min\u0151s\u00e9gellen\u0151rz\u00e9s \u00e9s a dokument\u00e1l\u00e1s.<\/p>\n\n\n\n<p>Optim\u00e1lis helyzetben az ERP-k a piaci el\u0151rejelz\u00e9sek alapj\u00e1n j\u00f3slatokat k\u00e9sz\u00edthetnek bizonyos term\u00e9kek j\u00f6v\u0151beli kereslet\u00e9re vonatkoz\u00f3an, \u00e9s tov\u00e1bb\u00edthatj\u00e1k ezt az inform\u00e1ci\u00f3t a MES fel\u00e9. A MES ezut\u00e1n az ERP ig\u00e9nyeihez igaz\u00edthatja a termel\u00e9st. A Manufacturing Execution System t\u00f6bb er\u0151forr\u00e1st tud allok\u00e1lni a nagy kereslet\u0171 term\u00e9kek optim\u00e1lis \u00e9s automatikus gy\u00e1rt\u00e1s\u00e1hoz. Ily m\u00f3don az ERP \u00e9s a MES z\u00f6kken\u0151mentesen tud egy\u00fcttm\u0171k\u00f6dni.<\/p>\n\n\n\n<p>B\u00e1r egy ERP&nbsp;<em>haszn\u00e1lhat\u00f3<\/em>&nbsp;ak\u00e1r a gy\u00e1rt\u00e1si folyamat legapr\u00f3bb r\u00e9szleteinek kezel\u00e9s\u00e9re is, ezt a feladatot gyakran a legjobb a Manufacturing Execution Systemre b\u00edzni. Az ERP szoftver ide\u00e1lis esetben azt kezeli, ami beker\u00fcl az \u00fczembe \u00e9s ami kij\u00f6n onnan, m\u00edg a MES mindent kezel, ami az \u00fczem \u00e9p\u00fclet\u00e9n bel\u00fcl t\u00f6rt\u00e9nik.<\/p>\n\n\n\n<p>A MES \u00e9s ERP rendszerek integr\u00e1l\u00e1sa nem csup\u00e1n k\u00e9nyelmi k\u00e9rd\u00e9s \u2013 ez egy strat\u00e9giai l\u00e9p\u00e9s, amely forradalmas\u00edthatja egy v\u00e1llalat m\u0171k\u00f6d\u00e9s\u00e9t. Amikor ez a k\u00e9t nagy teljes\u00edtm\u00e9ny\u0171 rendszer szinkroniz\u00e1l\u00f3dik, harmoniz\u00e1lt k\u00e9pet ny\u00fajtanak a gy\u00e1rt\u00e1si m\u0171veletekr\u0151l \u00e9s az \u00fczleti folyamatokr\u00f3l, biztos\u00edtva, hogy a d\u00f6nt\u00e9sek \u00e1tfog\u00f3, val\u00f3s idej\u0171 adatokon alapuljanak. Az ilyen integr\u00e1ci\u00f3 kik\u00fcsz\u00f6b\u00f6li a felesleges feladatokat, \u00e1thidalja az inform\u00e1ci\u00f3s r\u00e9seket \u00e9s n\u00f6veli az \u00e1ltal\u00e1nos hat\u00e9konys\u00e1got.<\/p>\n\n\n\n<p>A <a href=\"\/hu\/forrasok\/a-mes-erp-integracio-ereje\/\" target=\"_blank\" rel=\"noreferrer noopener\">MES ERP integr\u00e1ci\u00f3<\/a>&nbsp;egys\u00e9ges, koherens perspekt\u00edv\u00e1t hoz, agilisabb\u00e1, reag\u00e1l\u00f3k\u00e9pesebb\u00e9 \u00e9s versenyk\u00e9pesebb\u00e9 t\u00e9ve a v\u00e1llalkoz\u00e1sokat.&nbsp;<\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-68ae52c7\"><div class=\"gb-inside-container\">\n\n<h2 class=\"wp-block-heading\" id=\"h-benefits-of-using-mes\">A MES haszn\u00e1lat\u00e1nak el\u0151nyei<\/h2>\n\n\n\n<p class=\"has-text-align-left\">A gy\u00e1rt\u00e1sir\u00e1ny\u00edt\u00e1si rendszer termel\u00e9si adatokat gy\u0171jt a csatlakoztatott berendez\u00e9sekt\u0151l, a g\u00e9pkezel\u0151kt\u0151l \u00e9s m\u00e1s rendszerekt\u0151l, majd ezeket el\u00e9rhet\u0151v\u00e9 teszi a csapat sz\u00e1m\u00e1ra. A vezet\u0151k ezen inform\u00e1ci\u00f3k alapj\u00e1n azonos\u00edthatj\u00e1k a k\u00e9s\u00e9seket, \u00e9s eld\u00f6nthetik, min kell v\u00e1ltoztatni. A gy\u00e1rt\u00e1si tev\u00e9kenys\u00e9gek, az anyagfelhaszn\u00e1l\u00e1s \u00e9s a min\u0151s\u00e9gellen\u0151rz\u00e9sek nyilv\u00e1ntart\u00e1sa t\u00e1mogatja a min\u0151s\u00e9g- \u00e9s k\u00e9szletellen\u0151rz\u00e9st.<\/p>\n\n\n<div class=\"gb-container gb-container-7f408084\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"720\" height=\"560\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Shapes-old-production-planning-1.png\" alt=\"SkyPlanner fejlett tervez\u00e9s \u00e9s \u00fctemez\u00e9s termel\u00e9stervez\u00e9s\" class=\"wp-image-2061\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Shapes-old-production-planning-1.png 720w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Shapes-old-production-planning-1-300x233.png 300w\" sizes=\"(max-width: 720px) 100vw, 720px\" \/><\/figure>\n\n<\/div><\/div>\n\n\n<p><a href=\"\/hu\/forrasok\/hogyan-optimalizalhato-az-atfutasi-ido-a-gyartasban\/\" target=\"_blank\" rel=\"noreferrer noopener\">Az \u00e1tfut\u00e1si id\u0151 optimaliz\u00e1l\u00e1sa elengedhetetlen a sikerhez<\/a>, \u00e9s ebben a MES rendszer azzal seg\u00edt, hogy l\u00e1that\u00f3v\u00e1 teszi a gy\u00e1rt\u00e1si feladatok el\u0151rehalad\u00e1s\u00e1t \u00e9s a k\u00e9s\u00e9seket. Ha egy rendel\u00e9s m\u00f3dosul, a naprak\u00e9sz termel\u00e9si nyilv\u00e1ntart\u00e1s alapj\u00e1n a csapat felm\u00e9rheti, mely m\u0171veletek vannak m\u00e9g h\u00e1tra, \u00e9s megval\u00f3s\u00edthat\u00f3-e a v\u00e1ltoztat\u00e1s. Az \u00e1tfut\u00e1si id\u0151re gyakorolt hat\u00e1s a rendelkez\u00e9sre \u00e1ll\u00f3 kapacit\u00e1st\u00f3l, az anyagokt\u00f3l \u00e9s a m\u00e1r elv\u00e9gzett munk\u00e1t\u00f3l f\u00fcgg; az egyedi ig\u00e9nyekhez val\u00f3 igazod\u00e1s nem j\u00e1r fennakad\u00e1s n\u00e9lk\u00fcl.<\/p>\n\n\n\n<p>A MES tov\u00e1bb\u00edthatja a gy\u00e1rt\u00e1si eredm\u00e9nyeket az ERP fel\u00e9, \u00edgy a v\u00e1llalati nyilv\u00e1ntart\u00e1sok \u00f6sszhangban maradnak az \u00fczemi tev\u00e9kenys\u00e9ggel. Az ERP a v\u00e1llalati szint\u0171 folyamatokat kezeli, a MES pedig a v\u00e9grehajt\u00e1s r\u00e9szleteit szolg\u00e1ltatja. Egym\u00e1st kieg\u00e9sz\u00edt\u0151 rendszerek, amelyeket integr\u00e1ci\u00f3 kapcsol \u00f6ssze.<\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-87005d77\"><div class=\"gb-inside-container\">\n\n<h2 class=\"wp-block-heading\" id=\"h-future-applications-of-manufacturing-execution-system\">A Manufacturing Execution System j\u00f6v\u0151beli alkalmaz\u00e1sai<\/h2>\n\n\n\n<p class=\"has-text-align-left\">A j\u00f6v\u0151beli MES-alkalmaz\u00e1sok a termel\u00e9si nyilv\u00e1ntart\u00e1sokat elemz\u00e9sekkel \u00e9s mesters\u00e9ges intelligenci\u00e1val kapcsolhatj\u00e1k \u00f6ssze, hogy seg\u00edts\u00e9k a csapatot a mint\u00e1zatok felismer\u00e9s\u00e9ben \u00e9s a v\u00e1ltoz\u00e1sokra val\u00f3 reag\u00e1l\u00e1sban. Az el\u0151rejelz\u0151 eszk\u00f6z\u00f6ket a t\u00e9nyleges termel\u00e9si adatok \u00e9s a t\u00e1mogatni k\u00edv\u00e1nt d\u00f6nt\u00e9sek alapj\u00e1n kell \u00e9rt\u00e9kelni.<\/p>\n\n\n\n<p>A mesters\u00e9ges intelligenci\u00e1ra \u00e9p\u00fcl\u0151 \u00fctemez\u00e9snek m\u00e1r ma is gyakorlati szerepe van a MES mellett. A SkyPlanner APS rendszerben a gy\u00e1rt\u00e1stervez\u0151k hat\u00e1rozz\u00e1k meg a priorit\u00e1sokat \u00e9s a korl\u00e1tokat, az Arcturus pedig a gy\u00e1rt\u00e1si adatok, a kapacit\u00e1s \u00e9s az anyagok alapj\u00e1n sz\u00e1m\u00edtja ki az \u00fctemtervet. Ezekkel a szab\u00e1lyokkal \u00e9s z\u00e1rol\u00e1sokkal az ir\u00e1ny\u00edt\u00e1s a gy\u00e1rt\u00e1stervez\u0151k kez\u00e9ben marad. Ez az \u00fctemez\u00e9s automatiz\u00e1l\u00e1sa, nem az eg\u00e9sz v\u00e1llalat \u00f6n\u00e1ll\u00f3 ir\u00e1ny\u00edt\u00e1sa.<\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-c6c85bb5\"><div class=\"gb-inside-container\">\n\n<h2 class=\"wp-block-heading\" id=\"h-take-your-company-s-process-management-to-the-next-level\">Emelje v\u00e1llalata folyamatmenedzsmentj\u00e9t a k\u00f6vetkez\u0151 szintre!<\/h2>\n\n\n\n<p class=\"has-text-align-left\">A MES rendszer integr\u00e1l\u00e1sa egy <a href=\"\/hu\/\">APS rendszerrel, p\u00e9ld\u00e1ul a SkyPlannerrel<\/a> \u00f6sszekapcsolja a gy\u00e1rt\u00e1s v\u00e9grehajt\u00e1s\u00e1ra vonatkoz\u00f3 adatokat az \u00fctemez\u00e9ssel. A <a href=\"\/hu\/funkciok\/\">SkyPlanner APS<\/a> ny\u00edlt REST API fel\u00fclet\u00e9n kereszt\u00fcl b\u00e1rmely ERP vagy MES rendszerrel integr\u00e1lhat\u00f3, \u00edgy ezek az adatok be\u00e9p\u00fclnek a gy\u00e1rt\u00e1stervez\u0151k \u00e1ltal meghat\u00e1rozott priorit\u00e1sokra \u00e9p\u00fcl\u0151 tervez\u00e9sbe.<\/p>\n\n\n\n<p>Ha a rendel\u00e9sek, a kapacit\u00e1s vagy a gy\u00e1rt\u00e1s el\u0151rehalad\u00e1sa v\u00e1ltozik, a SkyPlanner APS az Arcturus seg\u00edts\u00e9g\u00e9vel \u00fajrasz\u00e1m\u00edtja az \u00fctemtervet a gy\u00e1rt\u00e1stervez\u0151 szab\u00e1lyai \u00e9s priorit\u00e1sai szerint. Bekapcsolt Autopilot mellett a v\u00e1ltoz\u00e1sok automatikus \u00fajra\u00fctemez\u00e9st ind\u00edthatnak el, mik\u00f6zben a szab\u00e1lyok \u00e9s z\u00e1rol\u00e1sok tov\u00e1bbra is \u00e9rv\u00e9nyben maradnak. A Gantt-id\u0151vonal munka\u00e1llom\u00e1sonk\u00e9nt mutatja az \u00fctemezett feladatokat, \u00edgy a csapat l\u00e1thatja a friss\u00edtett tervet.<\/p>\n\n\n\n<p>Szeretn\u00e9 a m\u0171k\u00f6d\u00e9s\u00e9ben kihaszn\u00e1lni a <a href=\"\/hu\/forrasok\/fejlett-tervezes-es-utemezes-aps\/\">MES \u00e9s az APS<\/a> egy\u00fcttes erej\u00e9t? <a href=\"\/hu\/kapcsolat-ertekesites\/\">L\u00e9pjen kapcsolatba vel\u00fcnk, \u00e9s tudjon meg t\u00f6bbet!<\/a><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"302\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1024x302.png\" alt=\"SkyPlanner fejlett tervez\u00e9s \u00e9s \u00fctemez\u00e9s Solutions to production problems\" class=\"wp-image-4232\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1024x302.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-300x88.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-768x226.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1536x452.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-2048x603.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"gb-headline gb-headline-907bb0ac gb-headline-text\">Gyakran Ism\u00e9telt K\u00e9rd\u00e9sek<\/h2>\n\n\n\n<p>\u00cdme n\u00e9h\u00e1ny gyakran ism\u00e9telt k\u00e9rd\u00e9s a Manufacturing Execution Systems (MES) rendszerekkel kapcsolatban, hogy seg\u00edtsen m\u00e9lyebben elmer\u00fclni a modern gy\u00e1rt\u00e1si folyamatok ezen l\u00e9tfontoss\u00e1g\u00fa aspektus\u00e1ban. Ezek a FAQ-k \u00e1tfog\u00f3 betekint\u00e9st ny\u00fajtanak a Manufacturing Execution System vil\u00e1g\u00e1ba, az alapvet\u0151 defin\u00edci\u00f3t\u00f3l kezdve eg\u00e9szen addig, miben k\u00fcl\u00f6nb\u00f6zik m\u00e1s rendszerekt\u0151l, p\u00e9ld\u00e1ul az ERP-t\u0151l. Ak\u00e1r a funkci\u00f3in t\u00f6preng, ak\u00e1r a kort\u00e1rs MES rendszerek jellemz\u0151it szeretn\u00e9 meg\u00e9rteni, vagy fejl\u0151d\u00e9s\u00e9nek bonyolults\u00e1gait k\u00edv\u00e1nja felt\u00e1rni, ez a FAQ r\u00e9sz minden v\u00e1laszt tartalmaz. <\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-6030632f gb-headline-text\">Mi az a Manufacturing Execution System (MES)?<\/h4>\n\n\n\n<p>A gy\u00e1rt\u00e1sir\u00e1ny\u00edt\u00e1si rendszer olyan szoftver, amely k\u00f6veti, dokument\u00e1lja \u00e9s t\u00e1mogatja a gy\u00e1rt\u00e1s v\u00e9grehajt\u00e1s\u00e1t az \u00fczemben. Adatokat gy\u0171jt a g\u00e9pkezel\u0151kt\u0151l, a berendez\u00e9sekt\u0151l \u00e9s a csatlakoztatott rendszerekt\u0151l, hogy l\u00e1that\u00f3v\u00e1 tegye a gy\u00e1rt\u00e1si feladatok el\u0151rehalad\u00e1s\u00e1t, az anyagfelhaszn\u00e1l\u00e1st \u00e9s a min\u0151s\u00e9get.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-60855819 gb-headline-text\">Miben k\u00fcl\u00f6nb\u00f6zik a MES az ERP-t\u0151l?<\/h4>\n\n\n\n<p>M\u00edg az Enterprise Resource Planning (ERP) a teljes \u00fczletmenet ir\u00e1ny\u00edt\u00e1s\u00e1ra szolg\u00e1l minden aspektus integr\u00e1l\u00e1s\u00e1val \u00e9s kezel\u00e9s\u00e9vel, a MES kifejezetten a gy\u00e1rt\u00f3\u00fczemi k\u00f6rnyezeten bel\u00fcli tev\u00e9kenys\u00e9gekre \u00f6sszpontos\u00edt, optimaliz\u00e1lva az er\u0151forr\u00e1sokat \u00e9s a folyamatokat.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-357c70af gb-headline-text\">Melyek a Manufacturing Execution System els\u0151dleges funkci\u00f3i?<\/h4>\n\n\n\n<p>Ezen eszk\u00f6z n\u00e9h\u00e1ny alapvet\u0151 funkci\u00f3ja k\u00f6z\u00e9 tartozik t\u00f6bbek k\u00f6z\u00f6tt az adatgy\u0171jt\u00e9s, a min\u0151s\u00e9gellen\u0151rz\u00e9s, az \u00fctemez\u00e9s, a teljes\u00edtm\u00e9nyelemz\u00e9s, a term\u00e9k\u00e1raml\u00e1s \u00e9s az er\u0151forr\u00e1s-kezel\u00e9s.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-33cf3c20 gb-headline-text\">Milyen jellemz\u0151ket k\u00edn\u00e1lnak a modern MES rendszerek?<\/h4>\n\n\n\n<p>A modern MES rendszerek olyan funkci\u00f3kkal b\u00fcszk\u00e9lkedhetnek, mint a val\u00f3s idej\u0171 gy\u00e1rt\u00e1sfel\u00fcgyelet, a gy\u00e1rt\u00e1si min\u0151s\u00e9gellen\u0151rz\u00e9s, a k\u00e9szletoptimaliz\u00e1l\u00e1s, az adat\u00e1raml\u00e1s-kezel\u00e9s, a gy\u00e1rt\u00e1si analitika \u00e9s a gy\u00e1rt\u00e1sk\u00f6vet\u00e9s.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-68c7368f gb-headline-text\">Hogyan v\u00e1ltozott a MES defin\u00edci\u00f3ja az id\u0151k folyam\u00e1n?<\/h4>\n\n\n\n<p>A MES-funkci\u00f3modellek az id\u0151k sor\u00e1n seg\u00edtettek le\u00edrni a gy\u00e1rt\u00e1s v\u00e9grehajt\u00e1s\u00e1hoz kapcsol\u00f3d\u00f3 tev\u00e9kenys\u00e9geket. A MESA t\u00f6bb modellt is k\u00f6zz\u00e9tett a gy\u00e1rt\u00f3v\u00e1llalatok sz\u00e1m\u00e1ra. Az ISA-95 k\u00f6z\u00f6s modellekkel, terminol\u00f3gi\u00e1val \u00e9s inform\u00e1ci\u00f3cser\u00e9vel t\u00e1mogatja a gy\u00e1rt\u00e1svez\u00e9rl\u00e9s \u00e9s a v\u00e1llalati funkci\u00f3k integr\u00e1ci\u00f3j\u00e1t; nem a k\u00f6telez\u0151 MES-funkci\u00f3k r\u00f6gz\u00edtett ellen\u0151rz\u0151list\u00e1ja.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-457889a7 gb-headline-text\">Milyen t\u00edpus\u00fa MES megold\u00e1sok \u00e9rhet\u0151k el?<\/h4>\n\n\n\n<p>A Manufacturing Execution System megold\u00e1sok lehetnek felh\u0151alap\u00faak, helyi telep\u00edt\u00e9s\u0171ek, kisv\u00e1llalkoz\u00e1sokra szabottak, AI-vez\u00e9reltek, nagyv\u00e1llalatok sz\u00e1m\u00e1ra tervezettek, vagy specifikusak bizonyos ipar\u00e1gakra, p\u00e9ld\u00e1ul a gy\u00f3gyszeriparra.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-834d5e64 gb-headline-text\">Hogyan v\u00e1lhat egy v\u00e1llalkoz\u00e1s el\u0151ny\u00e9re a MES integr\u00e1l\u00e1sa m\u00e1s rendszerekkel?<\/h4>\n\n\n\n<p>A MES a gy\u00e1rt\u00e1s v\u00e9grehajt\u00e1s\u00e1ra vonatkoz\u00f3 adatokat szolg\u00e1ltatja, m\u00edg az APS kisz\u00e1m\u00edtja az \u00fctemtervet. A SkyPlanner APS ny\u00edlt REST API fel\u00fclet\u00e9n kereszt\u00fcl b\u00e1rmely ERP vagy MES rendszerhez csatlakoztathat\u00f3. Az Arcturus a gy\u00e1rt\u00e1si adatok \u00e9s a gy\u00e1rt\u00e1stervez\u0151 \u00e1ltal meghat\u00e1rozott priorit\u00e1sok alapj\u00e1n \u00fctemezi a munk\u00e1t, az \u00edgy elk\u00e9sz\u00fclt tervet pedig a Gantt-id\u0151vonal jelen\u00edti meg.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-4e467a7a gb-headline-text\">Hogyan fog alkalmazkodni a MES a j\u00f6v\u0151ben?<\/h4>\n\n\n\n<p>A MES egyre ink\u00e1bb \u00f6sszekapcsolhatja a termel\u00e9si nyilv\u00e1ntart\u00e1sokat az elemz\u00e9sekkel \u00e9s a mesters\u00e9ges intelligenci\u00e1val t\u00e1mogatott eszk\u00f6z\u00f6kkel. Ennek egy ma is m\u0171k\u00f6d\u0151 gyakorlati alkalmaz\u00e1sa a MES mellett haszn\u00e1lt APS-\u00fctemez\u00e9s: a gy\u00e1rt\u00e1stervez\u0151k meghat\u00e1rozz\u00e1k a priorit\u00e1sokat, az \u00fctemez\u0151motor pedig a gy\u00e1rt\u00e1s v\u00e1ltoz\u00e1saihoz igazodva \u00fajrasz\u00e1m\u00edtja a tervet. Az automatiz\u00e1lt \u00fctemez\u00e9st tov\u00e1bbra is a gy\u00e1rt\u00e1stervez\u0151 szab\u00e1lyai \u00e9s korl\u00e1tai vez\u00e9rlik.<\/p>\n\n<\/div><\/div>\n\n<div class=\"gb-container gb-container-fb4bc7a3 sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-f791a09c\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-ff11cdab\">\n<div class=\"gb-grid-column gb-grid-column-525e141f\"><div class=\"gb-container gb-container-525e141f\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"588\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-1024x588.png\" alt=\"SkyPlanner APS \u2013 Termel\u00e9stervez\u00e9s \u00e9s -\u00fctemez\u00e9s n\u00e9zet\" class=\"wp-image-4273\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-1024x588.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-300x172.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-768x441.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-1536x882.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Tilted-PNG-2048x1175.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-279cad58\"><div class=\"gb-container gb-container-279cad58\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-skyrocket-your-production-with-skyplanner-aps\" style=\"font-size:24px\">Rep\u00edtse a magasba termel\u00e9s\u00e9t a SkyPlanner APS seg\u00edts\u00e9g\u00e9vel<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Foglaljon dem\u00f3t technikai csapatunkn\u00e1l, hogy l\u00e1ssa, hogyan m\u0171k\u00f6dik a SkyPlanner APS a gyakorlatban.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-4efb82ec\">\n\n<a class=\"gb-button gb-button-89b98570 gb-button-text\" href=\"\/hu\/kapcsolat-ertekesites\/\" aria-label=\"Foglaljon dem\u00f3t\">Foglaljon dem\u00f3t<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n\n\n<hr class=\"wp-block-separator has-text-color has-base-color has-css-opacity has-base-background-color has-background\"\/>\n\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>","protected":false},"excerpt":{"rendered":"","protected":false},"author":2,"featured_media":7049,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[312,2691],"tags":[],"class_list":["post-7106","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-forrasok","category-mes-rendszerek","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>MES rendszer: jelent\u00e9se, funkci\u00f3i \u00e9s m\u0171k\u00f6d\u00e9se &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"Mit jelent a MES, \u00e9s hogyan k\u00f6veti a gy\u00e1rt\u00e1st? Ismerje meg a f\u0151 funkci\u00f3kat, az ERP \u00fczleti szerep\u00e9t \u00e9s az APS feladat\u00e1t a gy\u00e1rt\u00e1s\u00fctemez\u00e9sben.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/mes-rendszer-mi-az-es-hogyan-mukodik\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"MES rendszer \u2013 Mi az, \u00e9s mit csin\u00e1l\" \/>\n<meta property=\"og:description\" content=\"Mit jelent a MES, \u00e9s hogyan k\u00f6veti a gy\u00e1rt\u00e1st? Ismerje meg a f\u0151 funkci\u00f3kat, az ERP \u00fczleti szerep\u00e9t \u00e9s az APS feladat\u00e1t a gy\u00e1rt\u00e1s\u00fctemez\u00e9sben.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/forrasok\/mes-rendszer-mi-az-es-hogyan-mukodik\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2022-09-01T11:45:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-10T14:05:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1280\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Jesse Sinisalo\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Szerz\u0151:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jesse Sinisalo\" \/>\n\t<meta name=\"twitter:label2\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data2\" content=\"21 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/mes-rendszer-mi-az-es-hogyan-mukodik\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/mes-rendszer-mi-az-es-hogyan-mukodik\\\/\"},\"author\":{\"name\":\"Jesse Sinisalo\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/eb1bfd6abe95a50b4a9ba1a081cce2dd\"},\"headline\":\"MES rendszer \u2013 Mi az, \u00e9s mit csin\u00e1l\",\"datePublished\":\"2022-09-01T11:45:00+00:00\",\"dateModified\":\"2026-10-10T14:05:53+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/mes-rendszer-mi-az-es-hogyan-mukodik\\\/\"},\"wordCount\":4147,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/mes-rendszer-mi-az-es-hogyan-mukodik\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/09\\\/MES-What-it-is-and-what-it-does-header-image.jpg\",\"articleSection\":[\"forr\u00e1sok\",\"MES rendszerek\"],\"inLanguage\":\"hu-HU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/mes-rendszer-mi-az-es-hogyan-mukodik\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/mes-rendszer-mi-az-es-hogyan-mukodik\\\/\",\"name\":\"MES rendszer: jelent\u00e9se, funkci\u00f3i \u00e9s m\u0171k\u00f6d\u00e9se &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/mes-rendszer-mi-az-es-hogyan-mukodik\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/mes-rendszer-mi-az-es-hogyan-mukodik\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/09\\\/MES-What-it-is-and-what-it-does-header-image.jpg\",\"datePublished\":\"2022-09-01T11:45:00+00:00\",\"dateModified\":\"2026-10-10T14:05:53+00:00\",\"description\":\"Mit jelent a MES, \u00e9s hogyan k\u00f6veti a gy\u00e1rt\u00e1st? Ismerje meg a f\u0151 funkci\u00f3kat, az ERP \u00fczleti szerep\u00e9t \u00e9s az APS feladat\u00e1t a gy\u00e1rt\u00e1s\u00fctemez\u00e9sben.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/mes-rendszer-mi-az-es-hogyan-mukodik\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/mes-rendszer-mi-az-es-hogyan-mukodik\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/mes-rendszer-mi-az-es-hogyan-mukodik\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/09\\\/MES-What-it-is-and-what-it-does-header-image.jpg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/09\\\/MES-What-it-is-and-what-it-does-header-image.jpg\",\"width\":1920,\"height\":1280,\"caption\":\"MES - What it is and what it does header image\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/mes-rendszer-mi-az-es-hogyan-mukodik\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Cikkek\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"MES rendszer \u2013 Mi az, \u00e9s mit csin\u00e1l\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/eb1bfd6abe95a50b4a9ba1a081cce2dd\",\"name\":\"Jesse Sinisalo\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g\",\"caption\":\"Jesse Sinisalo\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"MES rendszer: jelent\u00e9se, funkci\u00f3i \u00e9s m\u0171k\u00f6d\u00e9se &#8211; SkyPlanner","description":"Mit jelent a MES, \u00e9s hogyan k\u00f6veti a gy\u00e1rt\u00e1st? Ismerje meg a f\u0151 funkci\u00f3kat, az ERP \u00fczleti szerep\u00e9t \u00e9s az APS feladat\u00e1t a gy\u00e1rt\u00e1s\u00fctemez\u00e9sben.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/forrasok\/mes-rendszer-mi-az-es-hogyan-mukodik\/","og_locale":"hu_HU","og_type":"article","og_title":"MES rendszer \u2013 Mi az, \u00e9s mit csin\u00e1l","og_description":"Mit jelent a MES, \u00e9s hogyan k\u00f6veti a gy\u00e1rt\u00e1st? Ismerje meg a f\u0151 funkci\u00f3kat, az ERP \u00fczleti szerep\u00e9t \u00e9s az APS feladat\u00e1t a gy\u00e1rt\u00e1s\u00fctemez\u00e9sben.","og_url":"https:\/\/skyplanner.ai\/hu\/forrasok\/mes-rendszer-mi-az-es-hogyan-mukodik\/","og_site_name":"SkyPlanner","article_published_time":"2022-09-01T11:45:00+00:00","article_modified_time":"2026-10-10T14:05:53+00:00","og_image":[{"width":1920,"height":1280,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg","type":"image\/jpeg"}],"author":"Jesse Sinisalo","twitter_card":"summary_large_image","twitter_misc":{"Szerz\u0151:":"Jesse Sinisalo","Becs\u00fclt olvas\u00e1si id\u0151":"21 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/mes-rendszer-mi-az-es-hogyan-mukodik\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/mes-rendszer-mi-az-es-hogyan-mukodik\/"},"author":{"name":"Jesse Sinisalo","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/eb1bfd6abe95a50b4a9ba1a081cce2dd"},"headline":"MES rendszer \u2013 Mi az, \u00e9s mit csin\u00e1l","datePublished":"2022-09-01T11:45:00+00:00","dateModified":"2026-10-10T14:05:53+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/mes-rendszer-mi-az-es-hogyan-mukodik\/"},"wordCount":4147,"publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/mes-rendszer-mi-az-es-hogyan-mukodik\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg","articleSection":["forr\u00e1sok","MES rendszerek"],"inLanguage":"hu-HU"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/mes-rendszer-mi-az-es-hogyan-mukodik\/","url":"https:\/\/skyplanner.ai\/hu\/forrasok\/mes-rendszer-mi-az-es-hogyan-mukodik\/","name":"MES rendszer: jelent\u00e9se, funkci\u00f3i \u00e9s m\u0171k\u00f6d\u00e9se &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/mes-rendszer-mi-az-es-hogyan-mukodik\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/mes-rendszer-mi-az-es-hogyan-mukodik\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg","datePublished":"2022-09-01T11:45:00+00:00","dateModified":"2026-10-10T14:05:53+00:00","description":"Mit jelent a MES, \u00e9s hogyan k\u00f6veti a gy\u00e1rt\u00e1st? Ismerje meg a f\u0151 funkci\u00f3kat, az ERP \u00fczleti szerep\u00e9t \u00e9s az APS feladat\u00e1t a gy\u00e1rt\u00e1s\u00fctemez\u00e9sben.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/mes-rendszer-mi-az-es-hogyan-mukodik\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/forrasok\/mes-rendszer-mi-az-es-hogyan-mukodik\/"]}]},{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/mes-rendszer-mi-az-es-hogyan-mukodik\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg","width":1920,"height":1280,"caption":"MES - What it is and what it does header image"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/mes-rendszer-mi-az-es-hogyan-mukodik\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"Cikkek","item":"https:\/\/skyplanner.ai\/hu\/forrasok\/"},{"@type":"ListItem","position":3,"name":"MES rendszer \u2013 Mi az, \u00e9s mit csin\u00e1l"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/eb1bfd6abe95a50b4a9ba1a081cce2dd","name":"Jesse Sinisalo","image":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/secure.gravatar.com\/avatar\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/f7fad7e89e1bc7e7f7a68406782bb2f01302bf59af6e67593343971c8f70786a?s=96&d=mm&r=g","caption":"Jesse Sinisalo"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg",1920,1280,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image-150x150.jpg",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image-300x200.jpg",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image-768x512.jpg",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image-1024x683.jpg",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image-1536x1024.jpg",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg",1920,1280,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/09\/MES-What-it-is-and-what-it-does-header-image.jpg",360,240,false]},"uagb_author_info":{"display_name":"Jesse Sinisalo","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jesse\/"},"uagb_comment_info":0,"uagb_excerpt":null,"_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/7106","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=7106"}],"version-history":[{"count":4,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/7106\/revisions"}],"predecessor-version":[{"id":95246,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/7106\/revisions\/95246"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media\/7049"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=7106"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/categories?post=7106"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/tags?post=7106"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}