{"id":41390,"date":"2024-08-21T09:09:48","date_gmt":"2024-08-21T09:09:48","guid":{"rendered":"https:\/\/skyplanner.ai\/forrasok\/eroforras-elosztas-optimalizalasa-a-termeles-hatekonysaganak-novelese\/"},"modified":"2026-10-19T17:57:05","modified_gmt":"2026-10-19T17:57:05","slug":"eroforras-elosztas-optimalizalasa-a-termeles-hatekonysaganak-novelese","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/hu\/forrasok\/eroforras-elosztas-optimalizalasa-a-termeles-hatekonysaganak-novelese\/","title":{"rendered":"Er\u0151forr\u00e1s-allok\u00e1ci\u00f3 a gy\u00e1rt\u00e1sban: a feladat\u00fctk\u00f6z\u00e9sek felold\u00e1sa"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\" id=\"h-resource-allocation-in-manufacturing-resolve-job-conflicts\">Er\u0151forr\u00e1s-allok\u00e1ci\u00f3 a gy\u00e1rt\u00e1sban: a feladat\u00fctk\u00f6z\u00e9sek felold\u00e1sa<\/h1>\n\n\n<div class=\"gb-container gb-container-e8026af9\">\n\n<p><a href=\"\/hu\/\">Kezd\u0151lap<\/a>&nbsp;\u00bb&nbsp;<a href=\"\/hu\/forrasok\/\">Tud\u00e1st\u00e1r<\/a>&nbsp;\u00bb&nbsp;Er\u0151forr\u00e1s-allok\u00e1ci\u00f3 a gy\u00e1rt\u00e1sban: a feladat\u00fctk\u00f6z\u00e9sek felold\u00e1sa<\/p>\n\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Becs\u00fclt olvas\u00e1si id\u0151: <\/span><span class=\"yoast-reading-time__reading-time\">8<\/span><span class=\"yoast-reading-time__time-unit\"> perc<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-f0fd57d0\">\n\n<p>A k\u00f6vetkez\u0151 gy\u00e1rt\u00e1si feladat ind\u00edt\u00e1sra k\u00e9sz, a g\u00e9p szabad, \u00edgy k\u00e9zenfekv\u0151nek t\u0171nik elind\u00edtani a munk\u00e1t. Csakhogy egy s\u00fcrg\u0151s rendel\u00e9shez is erre a g\u00e9pre van sz\u00fcks\u00e9g, \u00e9s az m\u00e1shol nem gy\u00e1rthat\u00f3 le, m\u00edg az ind\u00edt\u00e1s el\u0151tt \u00e1ll\u00f3 feladat m\u00e1sik g\u00e9pen is elv\u00e9gezhet\u0151.<\/p>\n\n\n\n<p>Ez az er\u0151forr\u00e1s-allok\u00e1ci\u00f3 mindennapos kih\u00edv\u00e1sa a gy\u00e1rt\u00e1sban: eld\u00f6nteni, melyik feladat melyik er\u0151forr\u00e1st kapja meg \u00fagy, hogy k\u00f6zben ne nehez\u00edts\u00fck meg egy m\u00e1sik rendel\u00e9s teljes\u00edt\u00e9s\u00e9t. A j\u00f3 d\u00f6nt\u00e9shez nem el\u00e9g a g\u00e9p el\u0151tt v\u00e1rakoz\u00f3 feladatokat n\u00e9zni. Egy\u00fctt kell figyelembe venni a berendez\u00e9seket, a dolgoz\u00f3k rendelkez\u00e9sre \u00e1ll\u00f3 munkaidej\u00e9t, az anyagok el\u00e9rhet\u0151s\u00e9g\u00e9t \u00e9s a rendel\u00e9s befejez\u00e9s\u00e9hez m\u00e9g sz\u00fcks\u00e9ges m\u0171veleteket.<\/p>\n\n\n\n<p>A SkyPlanner ezeket az \u00f6sszef\u00fcgg\u00e9seket figyelembe v\u00e9ve sz\u00e1m\u00edtja ki az \u00fctemtervet. \u00d6n hat\u00e1rozza meg, hol v\u00e9gezhet\u0151k el a feladatok, \u00e9s mely priorit\u00e1sok sz\u00e1m\u00edtanak; az Arcturus, a rendszer \u00fctemez\u00e9sre szolg\u00e1l\u00f3 mesters\u00e9ges intelligenci\u00e1ja pedig kisz\u00e1m\u00edtja az er\u0151forr\u00e1s-hozz\u00e1rendel\u00e9seket \u00e9s az id\u0151z\u00edt\u00e9st. \u00cdgy ahelyett, hogy \u00fajra \u00e9s \u00fajra az egyes g\u00e9pek v\u00e1r\u00f3list\u00e1i k\u00f6z\u00f6tt mozgatn\u00e1 a feladatokat, a tervet meghat\u00e1roz\u00f3 termel\u00e9si d\u00f6nt\u00e9sekre \u00f6sszpontos\u00edthat.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Mit jelent az er\u0151forr\u00e1s-allok\u00e1ci\u00f3 a gy\u00e1rt\u00e1sban?<\/h2>\n\n\n\n<p>Az er\u0151forr\u00e1s-allok\u00e1ci\u00f3 a gy\u00e1rt\u00e1sban azt jelenti, hogy a rendelkez\u00e9sre \u00e1ll\u00f3 termel\u00e9si er\u0151forr\u00e1sokat hozz\u00e1rendelj\u00fck az azokat ig\u00e9nyl\u0151 feladatokhoz. A gyakorlatban ehhez olyan alkalmas munka\u00e1llom\u00e1st \u00e9s megfelel\u0151 id\u0151pontot kell v\u00e1lasztani, ahol \u00e9s amikor a sz\u00fcks\u00e9ges dolgoz\u00f3k \u00e9s anyagok rendelkez\u00e9sre \u00e1llnak, az el\u0151z\u0151 m\u0171veletek pedig m\u00e1r befejez\u0151dtek.<\/p>\n\n\n\n<p>Az er\u0151forr\u00e1s-allok\u00e1ci\u00f3 optimaliz\u00e1l\u00e1sa ezeket a d\u00f6nt\u00e9seket jav\u00edtja az azonos er\u0151forr\u00e1sok\u00e9rt verseng\u0151 feladatok k\u00f6r\u00e9ben. A c\u00e9l nem egyszer\u0171en az, hogy minden g\u00e9p folyamatosan dolgozzon. A megl\u00e9v\u0151 er\u0151forr\u00e1sokat \u00fagy kell felhaszn\u00e1lni, hogy az seg\u00edtse a v\u00e1llalt sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k betart\u00e1s\u00e1t \u00e9s a rendel\u00e9sek el\u0151rehalad\u00e1s\u00e1t a gy\u00e1rt\u00e1sban.<\/p>\n\n\n\n<p>Ez a k\u00fcl\u00f6nbs\u00e9g akkor v\u00e1lik fontoss\u00e1, ha az egyik feladat t\u00f6bb g\u00e9pen is elv\u00e9gezhet\u0151, a m\u00e1sik viszont csak egyen. Ha a t\u00f6bb g\u00e9pen is elv\u00e9gezhet\u0151 feladat kapja meg el\u0151sz\u00f6r a sz\u0171k\u00f6sen rendelkez\u00e9sre \u00e1ll\u00f3 g\u00e9pet, az helyben hat\u00e9konynak t\u0171nhet, m\u00e1shol viszont k\u00e9s\u00e9st okozhat.<\/p>\n\n\n\n<p>A kapacit\u00e1stervez\u00e9s arra keresi a v\u00e1laszt, hogy elegend\u0151 felhaszn\u00e1lhat\u00f3 kapacit\u00e1s \u00e1ll-e rendelkez\u00e9sre a munkamennyis\u00e9ghez. Az allok\u00e1ci\u00f3 d\u00f6nti el, hogy melyik feladat kapja meg ezt a kapacit\u00e1st. A <a href=\"\/hu\/forrasok\/mi-a-termelesutemezes\/\">gy\u00e1rt\u00e1s\u00fctemez\u00e9s<\/a> ezeket a hozz\u00e1rendel\u00e9seket kezd\u00e9si \u00e9s befejez\u00e9si id\u0151pontokkal ell\u00e1tott sorrendbe rendezi. A kihaszn\u00e1lts\u00e1g pedig megmutatja, hogy az er\u0151forr\u00e1s rendelkez\u00e9sre \u00e1ll\u00f3 idej\u00e9b\u0151l mennyit haszn\u00e1ltak fel; \u00f6nmag\u00e1ban azonban nem \u00e1rulja el, hogy a megfelel\u0151 feladatra ford\u00edtott\u00e1k-e ezt az id\u0151t.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Allok\u00e1ci\u00f3s p\u00e9lda: hagyjuk szabadon a g\u00e9pet annak a feladatnak, amely m\u00e1shol nem v\u00e9gezhet\u0151 el<\/h2>\n\n\n\n<p>K\u00e9pzelj\u00fcnk el egy lemezmegmunk\u00e1l\u00f3 \u00fczemet egy nagy \u00e9s egy kisebb \u00e9lhajl\u00edt\u00f3 g\u00e9ppel. Mindkett\u0151 szabad, \u00e9s mindkett\u0151h\u00f6z rendelkez\u00e9sre \u00e1ll kezel\u0151. Egy sorozat kism\u00e9ret\u0171 konzol hajl\u00edt\u00e1sra v\u00e1r, a tervez\u0151 pedig a nagy g\u00e9pre osztja be, mert azon \u00e9ppen befejez\u0151d\u00f6tt az el\u0151z\u0151 feladat.<\/p>\n\n\n\n<p>Egy s\u00fcrg\u0151s panelrendel\u00e9shez is hajl\u00edt\u00e1sra van sz\u00fcks\u00e9g. Az alkatr\u00e9szek t\u00fal sz\u00e9lesek a kisebb \u00e9lhajl\u00edt\u00f3hoz, ez\u00e9rt meg kell v\u00e1rniuk a nagy g\u00e9pet. K\u00f6zben a kisebb g\u00e9pen lenne kapacit\u00e1s a konzolok hajl\u00edt\u00e1s\u00e1ra.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Hajl\u00edt\u00e1sra v\u00e1r\u00f3 feladat<\/th><th>A feladatra alkalmas g\u00e9pek<\/th><th>Mit kell biztos\u00edtani az allok\u00e1ci\u00f3val?<\/th><\/tr><\/thead><tbody><tr><td>Kism\u00e9ret\u0171 konzolok<\/td><td>Nagy vagy kis \u00e9lhajl\u00edt\u00f3<\/td><td>A rendel\u00e9s tov\u00e1bbi m\u0171veleteinek megval\u00f3s\u00edthat\u00f3 \u00fctemez\u00e9s\u00e9t<\/td><\/tr><tr><td>Sz\u00e9les panelek<\/td><td>Csak a nagy \u00e9lhajl\u00edt\u00f3<\/td><td>Hozz\u00e1f\u00e9r\u00e9st az egyetlen alkalmas g\u00e9phez, m\u00e9g a k\u00f6vetkez\u0151 m\u0171veletre val\u00f3 \u00e1tad\u00e1s el\u0151\u00edrt id\u0151pontja el\u0151tt<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>Ha a munka m\u00e9g nem kezd\u0151d\u00f6tt el, a konzolokat a kisebb \u00e9lhajl\u00edt\u00f3ra \u00e1thelyezve a nagy g\u00e9p szabadon maradhat a panelek sz\u00e1m\u00e1ra. Az \u00fczem nem v\u00e1s\u00e1rolt t\u00f6bbletkapacit\u00e1st, csup\u00e1n okosabban haszn\u00e1lta ki a megl\u00e9v\u0151 lehet\u0151s\u00e9geket.<\/p>\n\n\n\n<p>Ez hasznos lehet\u0151s\u00e9g, de nem jelenti azt, hogy minden m\u00e1s g\u00e9pen is elv\u00e9gezhet\u0151 feladatot \u00e1t kell helyezni. A kisebb \u00e9lhajl\u00edt\u00f3n tov\u00e1bb tarthat a munka, \u00fajabb \u00e1t\u00e1ll\u00e1sra lehet sz\u00fcks\u00e9g, vagy a g\u00e9pet egy m\u00e1sik v\u00e1llal\u00e1s teljes\u00edt\u00e9s\u00e9hez kell fenntartani. Ha mindk\u00e9t \u00e9lhajl\u00edt\u00f3hoz ugyanaz a g\u00e9pkezel\u0151 sz\u00fcks\u00e9ges, a g\u00e9pnapt\u00e1rak \u00f6nmagukban m\u00e9g nem igazolj\u00e1k, hogy a k\u00e9t feladat p\u00e1rhuzamosan v\u00e9gezhet\u0151. A panelek hajl\u00edt\u00e1s\u00e1nak befejez\u00e9sekor a rendel\u00e9s k\u00f6vetkez\u0151 m\u0171velet\u00e9hez is rendelkez\u00e9sre kell \u00e1llnia a sz\u00fcks\u00e9ges kapacit\u00e1snak.<\/p>\n\n\n\n<p>Az a j\u00f3 er\u0151forr\u00e1s-eloszt\u00e1s, amely az \u00f6sszef\u00fcgg\u0151 rendel\u00e9sek szempontj\u00e1b\u00f3l is m\u0171k\u00f6dik, nem csup\u00e1n az \u00e9ppen vizsg\u00e1lt munka\u00e1llom\u00e1son.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Hogyan osszuk el az er\u0151forr\u00e1sokat az egym\u00e1ssal verseng\u0151 rendel\u00e9sek k\u00f6z\u00f6tt?<\/h2>\n\n\n\n<p>Az er\u0151forr\u00e1sok eloszt\u00e1sakor el\u0151sz\u00f6r a megval\u00f3s\u00edthat\u00f3 lehet\u0151s\u00e9geket kell tiszt\u00e1zni, majd azt, hogy mi \u00e9lvezzen els\u0151bbs\u00e9get. A SkyPlanner ezt a k\u00e9t szempontot ugyanabban a gy\u00e1rt\u00e1si \u00fctemtervben kezeli, \u00edgy ha az egyik feladatsor v\u00e1ltozik, nem kell az \u00f6sszes t\u00f6bbit k\u00e9zzel helyreigaz\u00edtania.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Tiszt\u00e1zza, hol v\u00e9gezhet\u0151 el t\u00e9nylegesen a munka<\/h3>\n\n\n\n<p>A feladatra alkalmas munka\u00e1llom\u00e1sokb\u00f3l induljon ki, ne az \u00f6sszes olyan g\u00e9pb\u0151l, amelyen van szabad id\u0151. Az alkatr\u00e9sz m\u00e9rete, a g\u00e9pen elv\u00e9gezhet\u0151 technol\u00f3giai m\u0171veletek, a szersz\u00e1moz\u00e1s \u00e9s a min\u0151s\u00e9gi k\u00f6vetelm\u00e9nyek d\u00f6ntik el, hogy egy m\u00e1sik g\u00e9p val\u00f3ban sz\u00f3ba j\u00f6het-e. Sz\u00e1moljon az adott alternat\u00edva \u00e1t\u00e1ll\u00e1si \u00e9s megmunk\u00e1l\u00e1si idej\u00e9vel is: att\u00f3l, hogy k\u00e9t g\u00e9p ugyanazt az alkatr\u00e9szt el tudja k\u00e9sz\u00edteni, m\u00e9g nem felt\u00e9tlen\u00fcl dolgoznak azonos sebess\u00e9ggel.<\/p>\n\n\n\n<p>A SkyPlannerben megadhatja, mely munka\u00e1llom\u00e1sok alkalmasak egy gy\u00e1rt\u00e1si feladatra. Ha enged\u00e9lyezi az alternat\u00edv munka\u00e1llom\u00e1sok k\u00f6z\u00f6tti \u00e1thelyez\u00e9st, az Arcturus az \u00fctemez\u00e9s kisz\u00e1m\u00edt\u00e1sakor v\u00e1laszthat k\u00f6z\u00fcl\u00fck, a munka\u00e1llom\u00e1sok hat\u00e9konys\u00e1gi \u00e9rt\u00e9keit is figyelembe v\u00e9ve. \u00cdgy a t\u00f6bb helyen is elv\u00e9gezhet\u0151 munka m\u00e1sik \u00e1llom\u00e1sra ker\u00fclhet, ha a k\u00f6z\u00f6s er\u0151forr\u00e1sra egy k\u00f6t\u00f6ttebb feladatnak van sz\u00fcks\u00e9ge.<\/p>\n\n\n\n<p>A sz\u00fcks\u00e9ges gy\u00e1rt\u00e1si ismereteket a tervez\u0151 viszi be a rendszerbe. A SkyPlanner ezeket a teljes feladat\u00e1llom\u00e1ny \u00fctemez\u00e9s\u00e9ben alkalmazza, \u00edgy nem kell minden egyes feladatn\u00e1l k\u00fcl\u00f6n eld\u00f6ntenie, melyik g\u00e9pre ker\u00fclj\u00f6n.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Miel\u0151tt lek\u00f6ti a sz\u0171k\u00f6s g\u00e9pid\u0151t, ellen\u0151rizze az ind\u00edt\u00e1s felt\u00e9teleit<\/h3>\n\n\n\n<p>A szabad g\u00e9pid\u0151 nem seg\u00edt azon a m\u0171veleten, amelyet m\u00e9g nem lehet elind\u00edtani. Ellen\u0151rizze az anyagell\u00e1t\u00e1st, az el\u0151z\u0151 m\u0171velet \u00e1llapot\u00e1t \u00e9s a munk\u00e1hoz sz\u00fcks\u00e9ges l\u00e9tsz\u00e1mot. K\u00fcl\u00f6nben egy s\u00fcrg\u0151snek tekintett feladat foglalhatja a helyet a tervben, mik\u00f6zben a m\u00e1r ind\u00edthat\u00f3 munk\u00e1k m\u00f6g\u00f6tte v\u00e1rakoznak.<\/p>\n\n\n\n<p>A SkyPlanner a munka\u00e1llom\u00e1sokat, a m\u0171szakokat \u00e9s a g\u00e9pkezel\u0151ket is megjelen\u00edti a gy\u00e1rt\u00e1si tervben. Ha enged\u00e9lyezi az anyagell\u00e1t\u00e1st figyelembe vev\u0151 \u00fctemez\u00e9st, az Arcturus a nyilv\u00e1ntartott k\u00e9szletekkel \u00e9s a be\u00e9rkez\u0151 anyagokkal is sz\u00e1mol. A m\u0171veletek k\u00f6z\u00f6tt be\u00e1ll\u00edtott f\u00fcgg\u0151s\u00e9gek \u00f6sszekapcsolj\u00e1k a feladatokat, \u00edgy a terv figyelembe tudja venni, minek kell megt\u00f6rt\u00e9nnie a k\u00f6vetkez\u0151 m\u0171velet megkezd\u00e9se el\u0151tt.<\/p>\n\n\n\n<p>Az er\u0151forr\u00e1sok ilyen eloszt\u00e1sa az \u00fczemben is jobban haszn\u00e1lhat\u00f3: a feladatsor nemcsak a k\u00e9rt hat\u00e1rid\u0151t t\u00fckr\u00f6zi, hanem az er\u0151forr\u00e1sokat \u00e9s az ind\u00edthat\u00f3s\u00e1g felt\u00e9teleit is. Ha k\u00e9sik egy sz\u00e1ll\u00edtm\u00e1ny vagy v\u00e1ltozik a l\u00e9tsz\u00e1m, friss\u00edtse ezeket az adatokat, hogy a k\u00f6vetkez\u0151 \u00fctemez\u00e9s m\u00e1r az aktu\u00e1lis helyzettel sz\u00e1moljon.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Ne csak a g\u00e9pet ossza be, hanem a k\u00f6z\u00f6sen haszn\u00e1lt szersz\u00e1mot is<\/h3>\n\n\n\n<p>K\u00e9t m\u0171szakilag alkalmas g\u00e9p m\u00e9g nem jelenti azt, hogy a munka k\u00e9t helyen is v\u00e9gezhet\u0151. Ha mindk\u00e9t gy\u00e1rt\u00e1si feladathoz ugyanaz a fizikai \u00f6nt\u0151forma vagy befog\u00f3k\u00e9sz\u00fcl\u00e9k kell, \u00e9s abb\u00f3l csak egy van, a feladat m\u00e1sik g\u00e9pre helyez\u00e9se nem oldja fel az \u00fctk\u00f6z\u00e9st. A g\u00e9pnek \u00e9s a sz\u00fcks\u00e9ges szersz\u00e1mnak egyszerre kell rendelkez\u00e9sre \u00e1llnia.<\/p>\n\n\n\n<p>Tegy\u00fck fel, hogy 08:00-kor k\u00e9t g\u00e9p is munk\u00e1ra k\u00e9sz, a kezel\u0151k \u00e9s az anyagok rendelkez\u00e9sre \u00e1llnak, de a k\u00e9t g\u00e9phez csak egy k\u00f6z\u00f6s befog\u00f3k\u00e9sz\u00fcl\u00e9k van. Az A rendel\u00e9shez az egyik g\u00e9pen k\u00e9t \u00f3ra megmunk\u00e1l\u00e1s, majd egy \u00f3ra ellen\u0151rz\u00e9s sz\u00fcks\u00e9ges, \u00e9s 11:00-ig el kell k\u00e9sz\u00fclnie. A B rendel\u00e9shez a m\u00e1sik g\u00e9pen h\u00e1rom \u00f3ra megmunk\u00e1l\u00e1s, majd egy \u00f3ra ellen\u0151rz\u00e9s kell, a befejez\u00e9si hat\u00e1rideje pedig 14:00. Mindk\u00e9t megmunk\u00e1l\u00e1si m\u0171velet teljes id\u0151tartama alatt sz\u00fcks\u00e9g van a befog\u00f3k\u00e9sz\u00fcl\u00e9kre. A p\u00e9ld\u00e1ban szerepl\u0151 id\u0151k az \u00e1t\u00e1ll\u00e1st is tartalmazz\u00e1k; felt\u00e9telezz\u00fck, hogy a befog\u00f3k\u00e9sz\u00fcl\u00e9k \u00e1thelyez\u00e9se nem okoz tov\u00e1bbi k\u00e9sedelmet, \u00e9s az ellen\u0151rz\u00e9shez rendelkez\u00e9sre \u00e1ll a sz\u00fcks\u00e9ges kapacit\u00e1s.<\/p>\n\n\n\n<p>Ha el\u0151sz\u00f6r az A rendel\u00e9s kapja meg a befog\u00f3k\u00e9sz\u00fcl\u00e9ket, a megmunk\u00e1l\u00e1s 08:00-t\u00f3l 10:00-ig tart, az ellen\u0151rz\u00e9s pedig 11:00-kor fejez\u0151dik be. Ezut\u00e1n a B rendel\u00e9s a saj\u00e1t g\u00e9p\u00e9n 10:00-t\u00f3l 13:00-ig haszn\u00e1lhatja a befog\u00f3k\u00e9sz\u00fcl\u00e9ket, \u00e9s az ellen\u0151rz\u00e9se 14:00-kor z\u00e1rulhat. \u00cdgy mindk\u00e9t v\u00e1llalt hat\u00e1rid\u0151 tarthat\u00f3. Ford\u00edtott sorrendben a B rendel\u00e9s 12:00-kor elk\u00e9sz\u00fcl, az A viszont csak 14:00-kor fejezhet\u0151 be. A k\u00e9t g\u00e9p egyidej\u0171, 08:00-kor t\u00f6rt\u00e9n\u0151 ind\u00edt\u00e1sa nem megold\u00e1s: ehhez az egyetlen befog\u00f3k\u00e9sz\u00fcl\u00e9ket egyszerre k\u00e9t feladathoz kellene lefoglalni.<\/p>\n\n\n\n<p>A SkyPlanner megakad\u00e1lyozza, hogy ugyanazt a szersz\u00e1mot egy id\u0151ben t\u00f6bb feladathoz is lefoglalj\u00e1k. R\u00f6gz\u00edtse egyszer a k\u00f6z\u00f6sen haszn\u00e1lt befog\u00f3k\u00e9sz\u00fcl\u00e9ket, kapcsolja a megfelel\u0151 munka\u00e1llom\u00e1sokhoz, \u00e9s rendelje hozz\u00e1 azokhoz a term\u00e9kekhez, amelyekhez sz\u00fcks\u00e9g van r\u00e1. Az Arcturus az \u00fctemterv kisz\u00e1m\u00edt\u00e1sakor a g\u00e9pkapacit\u00e1ssal \u00e9s az \u00d6n \u00e1ltal megadott priorit\u00e1sokkal egy\u00fctt veszi figyelembe a szersz\u00e1mok rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1t. A Gantt-diagramon az \u00e9rintett rendel\u00e9sek \u00f6sszes h\u00e1tral\u00e9v\u0151 m\u0171velet\u00e9t tekintse \u00e1t, ne csak azt n\u00e9zze, mikor szabadul fel a befog\u00f3k\u00e9sz\u00fcl\u00e9k.<\/p>\n\n\n\n<p>\u00cdgy kevesebbszer kell k\u00e9zzel \u00f6sszehangolnia az egyes g\u00e9pek feladatsorait, \u00e9s megval\u00f3s\u00edthat\u00f3 \u00fctemtervre alapozhatja a v\u00e1llalt sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket. Am\u00edg egy gy\u00e1rt\u00e1si feladat a befog\u00f3k\u00e9sz\u00fcl\u00e9kre v\u00e1r, a szabad g\u00e9pid\u0151ben m\u00e1s, ind\u00edt\u00e1sra k\u00e9sz munk\u00e1k v\u00e9gezhet\u0151k, amelyekhez nincs sz\u00fcks\u00e9g erre a k\u00e9sz\u00fcl\u00e9kre. Az er\u0151forr\u00e1sok megfelel\u0151 beoszt\u00e1sa lehet\u0151v\u00e9 teszi a rendel\u00e9sek el\u0151rehalad\u00e1s\u00e1t. \u00d6nmag\u00e1ban nem el\u00e9g, ha k\u00e9t g\u00e9p feladatsora is tel\u00edtettnek l\u00e1tszik, mik\u00f6zben mindkett\u0151 ugyanaz\u00e9rt az egy szersz\u00e1m\u00e9rt verseng.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">D\u00f6ntse el, melyik v\u00e1llal\u00e1s \u00e9lvezzen els\u0151bbs\u00e9get<\/h3>\n\n\n\n<p>Ha k\u00e9t ind\u00edthat\u00f3 feladathoz ugyanaz az er\u0151forr\u00e1s kell, el\u0151fordulhat, hogy nincs olyan megold\u00e1s, amellyel mindk\u00e9t eredeti v\u00e1llal\u00e1s tarthat\u00f3. Ilyenkor termel\u00e9si d\u00f6nt\u00e9sre van sz\u00fcks\u00e9g; ezt nem oldja meg, ha m\u00e9g t\u00f6bb feladatot \u00e1ll\u00edtanak sorba a g\u00e9pn\u00e9l.<\/p>\n\n\n\n<p>Vizsg\u00e1lja meg a rendel\u00e9s h\u00e1tral\u00e9v\u0151 m\u0171veleteit, a v\u00e1llalt sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151t \u00e9s a k\u00e9s\u00e9s k\u00f6vetkezm\u00e9nyeit. Egy k\u00e9s\u0151bb esed\u00e9kes feladat is ig\u00e9nyelhet els\u0151bbs\u00e9get, ha t\u00f6bb munka van m\u00e9g h\u00e1tra bel\u0151le. Ugyanakkor egy fontos rendel\u00e9s el\u0151resorol\u00e1sa egy m\u00e1sikat h\u00e1tr\u00e9bb tolhat. Tudatosan m\u00e9rlegelje ezt a kompromisszumot, ahelyett hogy a leghangosabb s\u00fcrget\u00e9s hat\u00e1rozn\u00e1 meg a sorrendet.<\/p>\n\n\n\n<p>A SkyPlanner dinamikus priorit\u00e1saival az \u00fcgyfelek \u00e9s a gy\u00e1rt\u00e1si feladatok fontoss\u00e1ga, a hat\u00e1rid\u0151k \u00e9s m\u00e1s \u00fctemez\u00e9si be\u00e1ll\u00edt\u00e1sok alapj\u00e1n ir\u00e1ny\u00edthatja a sz\u00e1m\u00edt\u00e1st. A szigor\u00faan hat\u00e1rid\u0151 szerinti \u00fctemez\u00e9s m\u00e1s c\u00e9l, mint az, hogy min\u00e9l t\u00f6bb feladat k\u00e9sz\u00fclj\u00f6n el id\u0151ben. A SkyPlannerben megadhatja ezeket a szempontokat, ahelyett hogy minden \u00fctk\u00f6z\u00e9sre ugyanazt a r\u00f6gz\u00edtett szab\u00e1lyt alkalmazn\u00e1.<\/p>\n\n\n\n<p>\u00d6n d\u00f6nti el, mely v\u00e1llal\u00e1sokat kell a tervnek meg\u0151riznie. Az Arcturus e priorit\u00e1sok ment\u00e9n sz\u00e1m\u00edtja ki az \u00fctemez\u00e9st, a szab\u00e1lyokkal \u00e9s z\u00e1rol\u00e1sokkal pedig megtarthatja az ir\u00e1ny\u00edt\u00e1st a r\u00f6gz\u00edteni k\u00edv\u00e1nt d\u00f6nt\u00e9sek felett. \u00cdgy a termel\u00e9si szempontokat k\u00f6vetkezetesen \u00e9rv\u00e9nyes\u00edtheti a teljes rendel\u00e9s\u00e1llom\u00e1nyon, nem kell \u00fajra \u00e9s \u00fajra fel\u00fcl\u00edrnia az egyes feladatsorokat.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Az \u00e1thelyezett feladaton t\u00fal a t\u00f6bbi munk\u00e1ra gyakorolt hat\u00e1st is vizsg\u00e1lja meg<\/h3>\n\n\n\n<p>Egy m\u0171velet \u00e1thelyez\u00e9s\u00e9vel m\u00e9g nem z\u00e1rul le a d\u00f6nt\u00e9s. Ellen\u0151rizze, mikor juthat el a rendel\u00e9s a k\u00f6vetkez\u0151 m\u0171velethez, \u00e9s mely m\u00e1s feladatok helye v\u00e1ltozott meg az \u00fctemtervben.<\/p>\n\n\n\n<p>Az \u00e9lhajl\u00edt\u00f3s p\u00e9ld\u00e1ban a nagy g\u00e9p felszabad\u00edt\u00e1sa csak akkor seg\u00edt, ha a panelek a h\u00e1tral\u00e9v\u0151 m\u0171veleteken is id\u0151ben v\u00e9gighaladhatnak. A konzolok \u00e1thelyez\u00e9se sem j\u00f3 csere, ha emiatt a szerel\u00e9s\u00fckben s\u00falyosabb k\u00e9s\u00e9s keletkezik.<\/p>\n\n\n\n<p>A SkyPlanner Gantt-diagramon jelen\u00edti meg a kisz\u00e1m\u00edtott tervet. Az \u00e9rintett m\u0171veleteket itt \u00f6sszef\u00fcgg\u0151 \u00fctemtervk\u00e9nt tekintse \u00e1t, \u00e9s ne felt\u00e9telezze, hogy egy helyileg kedvez\u0151bb g\u00e9phozz\u00e1rendel\u00e9s minden rendel\u00e9s kisz\u00e1ll\u00edt\u00e1s\u00e1t el\u0151seg\u00edtette. A <a href=\"\/hu\/forrasok\/veges-kapacitasu-utemezes\/\">termel\u00e9s\u00fctemez\u00e9s<\/a> adja az alapot ahhoz, hogy a munka a tervben megadott t\u00e9nyleges g\u00e9p- \u00e9s szem\u00e9lyzeti kapacit\u00e1son bel\u00fcl kapjon helyet.<\/p>\n\n\n\n<p>El\u0151fordul, hogy az eredm\u00e9ny val\u00f3di er\u0151forr\u00e1shi\u00e1nyt t\u00e1r fel. Ilyenkor egy megfelel\u0151 l\u00e9tsz\u00e1mmal biztos\u00edtott pluszm\u0171szak, egy j\u00f3v\u00e1hagyott alternat\u00edv gy\u00e1rt\u00e1si \u00fatvonal vagy a vev\u0151nek tett v\u00e1llal\u00e1s m\u00f3dos\u00edt\u00e1sa jelenthet megold\u00e1st. A jobb er\u0151forr\u00e1s-eloszt\u00e1s seg\u00edt kihaszn\u00e1lni a megl\u00e9v\u0151 lehet\u0151s\u00e9geket, de nem teremt el\u0151 olyan er\u0151forr\u00e1st, amely nem \u00e1ll rendelkez\u00e9sre.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Ha v\u00e1ltozik a helyzet, sz\u00e1m\u00edtsa \u00fajra az \u00fctemtervet<\/h3>\n\n\n\n<p>Egy \u00e9szszer\u0171 er\u0151forr\u00e1s-eloszt\u00e1s is elavulhat, ha k\u00e9sik az anyag, cs\u00f6kken egy munka\u00e1llom\u00e1s kapacit\u00e1sa vagy megv\u00e1ltozik egy rendel\u00e9s priorit\u00e1sa. Ha csak az \u00e9rintett g\u00e9p feladatsor\u00e1t friss\u00edti, figyelmen k\u00edv\u00fcl maradhatnak az att\u00f3l f\u00fcgg\u0151 munk\u00e1k.<\/p>\n\n\n\n<p>A SkyPlannerben friss\u00edtse az \u00e9rintett rendelkez\u00e9sre \u00e1ll\u00e1si adatokat vagy priorit\u00e1sokat, majd b\u00edzza az \u00fctemterv \u00fajrasz\u00e1m\u00edt\u00e1s\u00e1t az Arcturusra. Az automatikus \u00e1t\u00fctemez\u00e9s bekapcsol\u00e1s\u00e1val is seg\u00edthet naprak\u00e9szen tartani a tervet, an\u00e9lk\u00fcl hogy a tervez\u0151nek minden \u00fajrasz\u00e1m\u00edt\u00e1st k\u00fcl\u00f6n el kellene ind\u00edtania.<\/p>\n\n\n\n<p>Ilyenkor v\u00e1lik k\u00fcl\u00f6n\u00f6sen \u00e9rt\u00e9kess\u00e9, hogy kevesebb a k\u00e9zi munka. Az \u00d6n feladata a rendk\u00edv\u00fcli helyzet megold\u00e1sa \u00e9s a k\u00f6vetkezm\u00e9nyek \u00e1ttekint\u00e9se, nem pedig annak egyenk\u00e9nti \u00fajratervez\u00e9se, hogy az \u00e9rintett feladatok melyik er\u0151forr\u00e1shoz ker\u00fcljenek.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Mi v\u00e1ltozott a KJH-Comp v\u00e1llalatn\u00e1l?<\/h2>\n\n\n\n<p>A finn KJH-Comp lemezipari b\u00e9rgy\u00e1rt\u00f3 is az \u00f6sszes\u00edtett terhel\u00e9s tervez\u00e9se \u00e9s a napi er\u0151forr\u00e1s-eloszt\u00e1s k\u00f6z\u00f6tti szakad\u00e9kkal szembes\u00fclt. A C9000 ERP \u00e9s a t\u00e1bl\u00e1zatok a hozz\u00e1vet\u0151leges heti terhel\u00e9st mutatt\u00e1k, de a feladatokat napi szinten tov\u00e1bbra is k\u00e9zzel kellett a g\u00e9pekhez rendelni. K\u00e9t m\u0171vezet\u0151 k\u00fcl\u00f6n-k\u00fcl\u00f6n is a munkaideje legal\u00e1bb fel\u00e9t a kapacit\u00e1sok \u00fctemez\u00e9s\u00e9re ford\u00edtotta.<\/p>\n\n\n\n<p>A SkyPlanner haszn\u00e1lata mellett a rendel\u00e9seket tov\u00e1bbra is a megl\u00e9v\u0151 ERP-rendszerben r\u00f6gz\u00edtik, a mesters\u00e9ges intelligencia pedig automatikusan v\u00e9gzi a t\u00e9nyleges kapacit\u00e1st figyelembe vev\u0151 termel\u00e9s\u00fctemez\u00e9st \u00e9s a feladatok g\u00e9pekhez rendel\u00e9s\u00e9t. A KJH-Compn\u00e1l bevezetett megold\u00e1sban a gy\u00e1rt\u00e1sba ad\u00e1st az is seg\u00edti, hogy hegeszt\u00e9s el\u0151tt ellen\u0151rzik az alkatr\u00e9szek rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1t, a hegeszt\u00e9si feladatokat pedig a megfelel\u0151 szaktud\u00e1s\u00fa munkat\u00e1rsakhoz rendelik.<\/p>\n\n\n\n<p>A v\u00e1llalat besz\u00e1mol\u00f3ja szerint a k\u00e9t h\u00e9t m\u00falva esed\u00e9kes feladatok m\u00e1r nem szor\u00edtj\u00e1k ki azokat, amelyeket m\u00e1snap kell kisz\u00e1ll\u00edtani. Az \u00fctemez\u00e9s\u00e9rt a kor\u00e1bbi k\u00e9t m\u0171vezet\u0151 helyett m\u00e1r csak egy felel, a m\u00e1sikuk m\u00e1s feladatokat kapott. A KJH-Comp szerint a hat\u00e1rid\u0151re teljes\u00edtett sz\u00e1ll\u00edt\u00e1sok ar\u00e1nya 2026-ban a kor\u00e1bbi mintegy 50%-r\u00f3l ak\u00e1r 98%-ra emelkedett, mik\u00f6zben a term\u00e9kk\u00edn\u00e1lat b\u0151v\u00fcl\u00e9s\u00e9t nem k\u00eds\u00e9rte ar\u00e1nyos l\u00e9tsz\u00e1mn\u00f6veked\u00e9s.<\/p>\n\n\n\n<p>Az eset j\u00f3l mutatja, mit jelent a gyakorlatban \u00e1tt\u00e9rni a heti \u00f6sszterhel\u00e9s kezel\u00e9s\u00e9r\u0151l a napi munka \u00f6sszehangol\u00e1s\u00e1ra: kevesebb munk\u00e1t ig\u00e9nyel a feladatok g\u00e9pekhez rendel\u00e9se, \u00e9s jobban k\u00e9zben tarthat\u00f3, hogy mely rendel\u00e9sek kapj\u00e1k meg a sz\u00fcks\u00e9ges er\u0151forr\u00e1sokat.<\/p>\n\n\n\n<p><a href=\"\/hu\/ugyfeltortenetek\/kjh-comp\/\">Olvassa el a KJH-Comp tapasztalatait a SkyPlanner haszn\u00e1lat\u00e1r\u00f3l<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Tervezze \u00f6ssze az azonos er\u0151forr\u00e1sok\u00e9rt verseng\u0151 rendel\u00e9seket<\/h2>\n\n\n\n<p>Ha tervez\u0151i eg\u00e9sz nap azt m\u00e9rlegelik, hov\u00e1 f\u00e9rhet be egy-egy gy\u00e1rt\u00e1si feladat, a SkyPlanner bevezet\u00e9se \u00e9szszer\u0171 k\u00f6vetkez\u0151 l\u00e9p\u00e9s. Az \u00fctemez\u00e9s kisz\u00e1m\u00edt\u00e1sakor egy\u00fctt veszi figyelembe a m\u0171velet elv\u00e9gz\u00e9s\u00e9re alkalmas munka\u00e1llom\u00e1sokat, a rendelkez\u00e9sre \u00e1ll\u00f3 m\u0171szakokat, az anyagokat \u00e9s a priorit\u00e1sokat, az eredm\u00e9nyt pedig a Gantt-diagramon jelen\u00edti meg. A gy\u00e1rt\u00e1si d\u00f6nt\u00e9sek tov\u00e1bbra is az \u00d6n kez\u00e9ben maradnak, mik\u00f6zben kevesebb id\u0151t kell ford\u00edtania az ezekb\u0151l ad\u00f3d\u00f3 v\u00e1ltoz\u00e1sok k\u00e9zi \u00e1tvezet\u00e9s\u00e9re.<\/p>\n\n\n\n<p>A rendel\u00e9sek kezel\u00e9s\u00e9re m\u00e1r haszn\u00e1lt rendszer\u00e9t is megtarthatja: a SkyPlanner ny\u00edlt REST API fel\u00fclet\u00e9n kereszt\u00fcl b\u00e1rmely ERP- vagy MES-rendszerrel integr\u00e1lhat\u00f3.<\/p>\n\n\n\n<p><a href=\"\/hu\/kapcsolat-ertekesites\/\">Foglaljon SkyPlanner-bemutat\u00f3t<\/a>, amelyen a saj\u00e1t gy\u00e1rt\u00e1s\u00e1b\u00f3l hozott er\u0151forr\u00e1s\u00fctk\u00f6z\u00e9st j\u00e1rhatj\u00e1k k\u00f6r\u00fcl. Hozza el az azonos er\u0151forr\u00e1sok\u00e9rt verseng\u0151 rendel\u00e9sek adatait, az azokhoz haszn\u00e1lhat\u00f3 g\u00e9pek list\u00e1j\u00e1t, azt, hogy mikor \u00e9s mennyi id\u0151re \u00e1ll rendelkez\u00e9sre a sz\u00fcks\u00e9ges szem\u00e9lyzet, valamint azt a v\u00e1llal\u00e1st, amelyet tartania kell. \u00cdgy a megbesz\u00e9l\u00e9snek konkr\u00e9t c\u00e9lja lesz: megvizsg\u00e1lhatj\u00e1k, hogyan k\u00e9sz\u00edthet a SkyPlanner e korl\u00e1tok figyelembev\u00e9tel\u00e9vel megval\u00f3s\u00edthat\u00f3 gy\u00e1rt\u00e1si \u00fctemtervet. Ha el\u0151bb a tervez\u00e9si megk\u00f6zel\u00edt\u00e9st szeretn\u00e9 megismerni, <a href=\"\/hu\/proba\/\">pr\u00f3b\u00e1lja ki a SkyPlanner rendszer\u00e9t dem\u00f3adatokkal<\/a>.<\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-92545123\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-0a61546f\">\n<div class=\"gb-grid-column gb-grid-column-e4183086\"><div class=\"gb-container gb-container-e4183086\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-84ccbb5d\"><div class=\"gb-container gb-container-84ccbb5d\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Er\u0151forr\u00e1s-allok\u00e1ci\u00f3 a gy\u00e1rt\u00e1sban: a feladat\u00fctk\u00f6z\u00e9sek felold\u00e1sa Kezd\u0151lap&nbsp;\u00bb&nbsp;Tud\u00e1st\u00e1r&nbsp;\u00bb&nbsp;Er\u0151forr\u00e1s-allok\u00e1ci\u00f3 a gy\u00e1rt\u00e1sban: a feladat\u00fctk\u00f6z\u00e9sek felold\u00e1sa A k\u00f6vetkez\u0151 gy\u00e1rt\u00e1si feladat ind\u00edt\u00e1sra k\u00e9sz, a g\u00e9p szabad, \u00edgy k\u00e9zenfekv\u0151nek t\u0171nik elind\u00edtani a munk\u00e1t. Csakhogy egy s\u00fcrg\u0151s rendel\u00e9shez is erre a g\u00e9pre van sz\u00fcks\u00e9g, \u00e9s az m\u00e1shol nem gy\u00e1rthat\u00f3 le, m\u00edg az ind\u00edt\u00e1s el\u0151tt \u00e1ll\u00f3 feladat m\u00e1sik g\u00e9pen is elv\u00e9gezhet\u0151. Ez az &#8230; <a title=\"Er\u0151forr\u00e1s-allok\u00e1ci\u00f3 a gy\u00e1rt\u00e1sban: a feladat\u00fctk\u00f6z\u00e9sek felold\u00e1sa\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/eroforras-elosztas-optimalizalasa-a-termeles-hatekonysaganak-novelese\/\" aria-label=\"Read more about Er\u0151forr\u00e1s-allok\u00e1ci\u00f3 a gy\u00e1rt\u00e1sban: a feladat\u00fctk\u00f6z\u00e9sek felold\u00e1sa\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":6,"featured_media":101605,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2526,312],"tags":[],"class_list":["post-41390","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-es-utemezes","category-forrasok","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Er\u0151forr\u00e1s-allok\u00e1ci\u00f3 a gy\u00e1rt\u00e1sban: \u00fctk\u00f6z\u00e9sek &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"K\u00e9t feladat, egy g\u00e9p. Ismerje meg az er\u0151forr\u00e1sok eloszt\u00e1s\u00e1t: a SkyPlannerrel kevesebb k\u00e9zi tervez\u00e9ssel haladhatnak az azonos g\u00e9pet ig\u00e9nyl\u0151 rendel\u00e9sek.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/eroforras-elosztas-optimalizalasa-a-termeles-hatekonysaganak-novelese\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Er\u0151forr\u00e1s-allok\u00e1ci\u00f3 a gy\u00e1rt\u00e1sban: a feladat\u00fctk\u00f6z\u00e9sek felold\u00e1sa\" \/>\n<meta property=\"og:description\" content=\"K\u00e9t feladat, egy g\u00e9p. Ismerje meg az er\u0151forr\u00e1sok eloszt\u00e1s\u00e1t: a SkyPlannerrel kevesebb k\u00e9zi tervez\u00e9ssel haladhatnak az azonos g\u00e9pet ig\u00e9nyl\u0151 rendel\u00e9sek.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/forrasok\/eroforras-elosztas-optimalizalasa-a-termeles-hatekonysaganak-novelese\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2024-08-21T09:09:48+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-19T17:57:05+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/resource-allocation-optimization-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1774\" \/>\n\t<meta property=\"og:image:height\" content=\"887\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Szerz\u0151:\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n\t<meta name=\"twitter:label2\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data2\" content=\"18 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/eroforras-elosztas-optimalizalasa-a-termeles-hatekonysaganak-novelese\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/eroforras-elosztas-optimalizalasa-a-termeles-hatekonysaganak-novelese\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"Er\u0151forr\u00e1s-allok\u00e1ci\u00f3 a gy\u00e1rt\u00e1sban: a feladat\u00fctk\u00f6z\u00e9sek felold\u00e1sa\",\"datePublished\":\"2024-08-21T09:09:48+00:00\",\"dateModified\":\"2026-10-19T17:57:05+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/eroforras-elosztas-optimalizalasa-a-termeles-hatekonysaganak-novelese\\\/\"},\"wordCount\":3573,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/eroforras-elosztas-optimalizalasa-a-termeles-hatekonysaganak-novelese\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/resource-allocation-optimization-hero.png\",\"articleSection\":[\"APS \u00e9s \u00fctemez\u00e9s\",\"forr\u00e1sok\"],\"inLanguage\":\"hu-HU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/eroforras-elosztas-optimalizalasa-a-termeles-hatekonysaganak-novelese\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/eroforras-elosztas-optimalizalasa-a-termeles-hatekonysaganak-novelese\\\/\",\"name\":\"Er\u0151forr\u00e1s-allok\u00e1ci\u00f3 a gy\u00e1rt\u00e1sban: \u00fctk\u00f6z\u00e9sek &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/eroforras-elosztas-optimalizalasa-a-termeles-hatekonysaganak-novelese\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/eroforras-elosztas-optimalizalasa-a-termeles-hatekonysaganak-novelese\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/resource-allocation-optimization-hero.png\",\"datePublished\":\"2024-08-21T09:09:48+00:00\",\"dateModified\":\"2026-10-19T17:57:05+00:00\",\"description\":\"K\u00e9t feladat, egy g\u00e9p. Ismerje meg az er\u0151forr\u00e1sok eloszt\u00e1s\u00e1t: a SkyPlannerrel kevesebb k\u00e9zi tervez\u00e9ssel haladhatnak az azonos g\u00e9pet ig\u00e9nyl\u0151 rendel\u00e9sek.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/eroforras-elosztas-optimalizalasa-a-termeles-hatekonysaganak-novelese\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/eroforras-elosztas-optimalizalasa-a-termeles-hatekonysaganak-novelese\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/eroforras-elosztas-optimalizalasa-a-termeles-hatekonysaganak-novelese\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/resource-allocation-optimization-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/resource-allocation-optimization-hero.png\",\"width\":1774,\"height\":887,\"caption\":\"Large and small blue press brakes beside stacked sheet panels and trays of metal brackets.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/eroforras-elosztas-optimalizalasa-a-termeles-hatekonysaganak-novelese\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Er\u0151forr\u00e1s-allok\u00e1ci\u00f3 a gy\u00e1rt\u00e1sban: a feladat\u00fctk\u00f6z\u00e9sek felold\u00e1sa\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Er\u0151forr\u00e1s-allok\u00e1ci\u00f3 a gy\u00e1rt\u00e1sban: \u00fctk\u00f6z\u00e9sek &#8211; SkyPlanner","description":"K\u00e9t feladat, egy g\u00e9p. Ismerje meg az er\u0151forr\u00e1sok eloszt\u00e1s\u00e1t: a SkyPlannerrel kevesebb k\u00e9zi tervez\u00e9ssel haladhatnak az azonos g\u00e9pet ig\u00e9nyl\u0151 rendel\u00e9sek.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/forrasok\/eroforras-elosztas-optimalizalasa-a-termeles-hatekonysaganak-novelese\/","og_locale":"hu_HU","og_type":"article","og_title":"Er\u0151forr\u00e1s-allok\u00e1ci\u00f3 a gy\u00e1rt\u00e1sban: a feladat\u00fctk\u00f6z\u00e9sek felold\u00e1sa","og_description":"K\u00e9t feladat, egy g\u00e9p. Ismerje meg az er\u0151forr\u00e1sok eloszt\u00e1s\u00e1t: a SkyPlannerrel kevesebb k\u00e9zi tervez\u00e9ssel haladhatnak az azonos g\u00e9pet ig\u00e9nyl\u0151 rendel\u00e9sek.","og_url":"https:\/\/skyplanner.ai\/hu\/forrasok\/eroforras-elosztas-optimalizalasa-a-termeles-hatekonysaganak-novelese\/","og_site_name":"SkyPlanner","article_published_time":"2024-08-21T09:09:48+00:00","article_modified_time":"2026-10-19T17:57:05+00:00","og_image":[{"width":1774,"height":887,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/resource-allocation-optimization-hero.png","type":"image\/png"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Szerz\u0151:":"SkyPlanner","Becs\u00fclt olvas\u00e1si id\u0151":"18 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/eroforras-elosztas-optimalizalasa-a-termeles-hatekonysaganak-novelese\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/eroforras-elosztas-optimalizalasa-a-termeles-hatekonysaganak-novelese\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"Er\u0151forr\u00e1s-allok\u00e1ci\u00f3 a gy\u00e1rt\u00e1sban: a feladat\u00fctk\u00f6z\u00e9sek felold\u00e1sa","datePublished":"2024-08-21T09:09:48+00:00","dateModified":"2026-10-19T17:57:05+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/eroforras-elosztas-optimalizalasa-a-termeles-hatekonysaganak-novelese\/"},"wordCount":3573,"publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/eroforras-elosztas-optimalizalasa-a-termeles-hatekonysaganak-novelese\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/resource-allocation-optimization-hero.png","articleSection":["APS \u00e9s \u00fctemez\u00e9s","forr\u00e1sok"],"inLanguage":"hu-HU"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/eroforras-elosztas-optimalizalasa-a-termeles-hatekonysaganak-novelese\/","url":"https:\/\/skyplanner.ai\/hu\/forrasok\/eroforras-elosztas-optimalizalasa-a-termeles-hatekonysaganak-novelese\/","name":"Er\u0151forr\u00e1s-allok\u00e1ci\u00f3 a gy\u00e1rt\u00e1sban: \u00fctk\u00f6z\u00e9sek &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/eroforras-elosztas-optimalizalasa-a-termeles-hatekonysaganak-novelese\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/eroforras-elosztas-optimalizalasa-a-termeles-hatekonysaganak-novelese\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/resource-allocation-optimization-hero.png","datePublished":"2024-08-21T09:09:48+00:00","dateModified":"2026-10-19T17:57:05+00:00","description":"K\u00e9t feladat, egy g\u00e9p. Ismerje meg az er\u0151forr\u00e1sok eloszt\u00e1s\u00e1t: a SkyPlannerrel kevesebb k\u00e9zi tervez\u00e9ssel haladhatnak az azonos g\u00e9pet ig\u00e9nyl\u0151 rendel\u00e9sek.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/eroforras-elosztas-optimalizalasa-a-termeles-hatekonysaganak-novelese\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/forrasok\/eroforras-elosztas-optimalizalasa-a-termeles-hatekonysaganak-novelese\/"]}]},{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/eroforras-elosztas-optimalizalasa-a-termeles-hatekonysaganak-novelese\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/resource-allocation-optimization-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/resource-allocation-optimization-hero.png","width":1774,"height":887,"caption":"Large and small blue press brakes beside stacked sheet panels and trays of metal brackets."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/eroforras-elosztas-optimalizalasa-a-termeles-hatekonysaganak-novelese\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"Er\u0151forr\u00e1s-allok\u00e1ci\u00f3 a gy\u00e1rt\u00e1sban: a feladat\u00fctk\u00f6z\u00e9sek felold\u00e1sa"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/resource-allocation-optimization-hero.png",1774,887,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/resource-allocation-optimization-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/resource-allocation-optimization-hero-300x150.png",300,150,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/resource-allocation-optimization-hero-768x384.png",768,384,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/resource-allocation-optimization-hero-1024x512.png",1024,512,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/resource-allocation-optimization-hero-1536x768.png",1536,768,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/resource-allocation-optimization-hero.png",1774,887,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/resource-allocation-optimization-hero-360x180.png",360,180,true]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/hu\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"Er\u0151forr\u00e1s-allok\u00e1ci\u00f3 a gy\u00e1rt\u00e1sban: a feladat\u00fctk\u00f6z\u00e9sek felold\u00e1sa Kezd\u0151lap&nbsp;\u00bb&nbsp;Tud\u00e1st\u00e1r&nbsp;\u00bb&nbsp;Er\u0151forr\u00e1s-allok\u00e1ci\u00f3 a gy\u00e1rt\u00e1sban: a feladat\u00fctk\u00f6z\u00e9sek felold\u00e1sa A k\u00f6vetkez\u0151 gy\u00e1rt\u00e1si feladat ind\u00edt\u00e1sra k\u00e9sz, a g\u00e9p szabad, \u00edgy k\u00e9zenfekv\u0151nek t\u0171nik elind\u00edtani a munk\u00e1t. Csakhogy egy s\u00fcrg\u0151s rendel\u00e9shez is erre a g\u00e9pre van sz\u00fcks\u00e9g, \u00e9s az m\u00e1shol nem gy\u00e1rthat\u00f3 le, m\u00edg az ind\u00edt\u00e1s el\u0151tt \u00e1ll\u00f3 feladat m\u00e1sik g\u00e9pen is elv\u00e9gezhet\u0151. Ez az&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/41390","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=41390"}],"version-history":[{"count":0,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/41390\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media\/101605"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=41390"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/categories?post=41390"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/tags?post=41390"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}