{"id":23048,"date":"2023-09-29T08:03:57","date_gmt":"2023-09-29T08:03:57","guid":{"rendered":"https:\/\/skyplanner.ai\/forrasok\/gyartasvezeto-fizetese-litvaniaban-2023\/"},"modified":"2026-06-19T20:49:19","modified_gmt":"2026-06-19T20:49:19","slug":"gyartasvezeto-fizetese-litvaniaban-2026","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/hu\/forrasok\/gyartasvezeto-fizetese-litvaniaban-2026\/","title":{"rendered":"Termel\u00e9si menedzser fizet\u00e9se Litv\u00e1ni\u00e1ban 2026"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\" id=\"h-production-manager-salary-in-lithuania-2026\">Termel\u00e9si menedzser fizet\u00e9se Litv\u00e1ni\u00e1ban 2026<\/h1>\n\n\n<div class=\"gb-container gb-container-e8026af9\">\n\n<p><a href=\"\/hu\/\">Kezd\u0151lap<\/a> \u00bb <a href=\"\/hu\/forrasok\/\">Forr\u00e1sok<\/a> \u00bb Gy\u00e1rt\u00e1svezet\u0151 fizet\u00e9se Litv\u00e1ni\u00e1ban 2026<\/p>\n\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" viewbox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Becs\u00fclt olvas\u00e1si id\u0151: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> perc<\/span><\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f0fd57d0\">\n<div class=\"gb-container gb-container-31dfeab3\"><div class=\"gb-inside-container\">\n\n<p><strong>Litv\u00e1ni\u00e1ban 2026-ben az \u00e1tlagos termel\u00e9si menedzser fizet\u00e9s \u00e9ves szinten 35<strong>499<\/strong> eur\u00f3 k\u00f6r\u00fcl van, ami nagyj\u00e1b\u00f3l havi 2958 eur\u00f3nak felel meg.  <\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p>A litv\u00e1n feldolgoz\u00f3ipar robusztuss\u00e1g\u00e1t mutatja a sokf\u00e9le ter\u00fclet, t\u00f6bbek k\u00f6z\u00f6tt az elektronika, a g\u00e9pipar, a textilipar \u00e9s az \u00e9lelmiszer-feldolgoz\u00e1s r\u00e9v\u00e9n. A technol\u00f3giai integr\u00e1ci\u00f3 \u00e9s a m\u0171k\u00f6d\u00e9si kiv\u00e1l\u00f3s\u00e1g fel\u00e9 mutat\u00f3 n\u00f6vekv\u0151 tendenci\u00e1val a hozz\u00e1\u00e9rt\u0151 <a href=\"\/hu\/forrasok\/gyartasvezeto-munkakori-leiras\/\">termel\u00e9sir\u00e1ny\u00edt\u00f3k<\/a> ir\u00e1nti kereslet egyre nagyobb. Ezek a szakemberek kulcsfontoss\u00e1g\u00faak a z\u00f6kken\u0151mentes termel\u00e9si folyamatok szervez\u00e9s\u00e9ben, a biztons\u00e1g garant\u00e1l\u00e1s\u00e1ban \u00e9s az \u00e1ltal\u00e1nos hat\u00e9konys\u00e1g n\u00f6vel\u00e9s\u00e9ben.    <\/p>\n\n\n\n<p>Most, hogy belemer\u00fclj\u00fcnk a szakma p\u00e9nz\u00fcgyi t\u00fckr\u00e9be, milyenek lesznek a termel\u00e9si menedzserek fizet\u00e9si kil\u00e1t\u00e1sai Litv\u00e1ni\u00e1ban 2026-ben?<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Gy\u00e1rt\u00e1si menedzser fizet\u00e9se Insight<\/h2>\n\n\n\n<p>A tipikus litv\u00e1niai javadalmaz\u00e1si helyzet szer\u00e9ny k\u00e9pet mutat. A <strong>havi 1 651 eur\u00f3<\/strong> k\u00f6r\u00fcli \u00e1tlagfizet\u00e9ssel Litv\u00e1nia m\u00e9rs\u00e9kelt meg\u00e9lhet\u00e9si k\u00f6lts\u00e9geket \u00e9s n\u00f6vekv\u0151 ipari \u00e1gazatokat k\u00edn\u00e1l, k\u00fcl\u00f6n\u00f6sen a feldolgoz\u00f3iparban. <\/p>\n\n\n\n<p>Litv\u00e1ni\u00e1ban az \u00e1tlagos termel\u00e9svezet\u0151 fizet\u00e9s 2026-ben <strong>35 499 eur\u00f3<\/strong> k\u00f6r\u00fcl mozog <strong>\u00e9vente<\/strong>, ami k\u00f6r\u00fclbel\u00fcl <strong>havi 2 958 eur\u00f3nak<\/strong> felel meg. Ez a sz\u00e1m jelent\u0151sen meghaladja az orsz\u00e1g \u00e1tlagb\u00e9r\u00e9t, ami t\u00fckr\u00f6zi azt a kritikus szerepet \u00e9s szak\u00e9rtelmet, amelyet ezek a szakemberek a feldolgoz\u00f3iparban ny\u00fajtanak. Ugyanakkor az olyan t\u00e9nyez\u0151k, mint az iskolai v\u00e9gzetts\u00e9g, a munkav\u00e9gz\u00e9s helye \u00e9s egy\u00e9b elemek kulcsfontoss\u00e1g\u00faak a Litv\u00e1ni\u00e1ban dolgoz\u00f3 termel\u00e9si vezet\u0151k fizet\u00e9s\u00e9nek meghat\u00e1roz\u00e1s\u00e1ban.  <\/p>\n\n\n\n<h2 class=\"wp-block-heading\">\u00d6sszehasonl\u00edt\u00f3 p\u00e9nz\u00fcgyi elemz\u00e9s hat\u00e1rokon \u00e1tny\u00fal\u00f3an<\/h2>\n\n\n\n<p>Az eur\u00f3pai termel\u00e9si vezet\u0151k b\u00e9rszerkezet\u00e9nek vizsg\u00e1lata \u00e9rdekes perspekt\u00edv\u00e1t k\u00edn\u00e1l. P\u00e9ld\u00e1ul <a href=\"\/hu\/forrasok\/gyartasvezeto-fizetese-daniaban-2026\/\">D\u00e1nia termel\u00e9si menedzser fizet\u00e9se<\/a> a megemelkedett meg\u00e9lhet\u00e9si k\u00f6lts\u00e9gek miatt magasabb b\u00e9rspektrumot mutat, m\u00edg <a href=\"\/hu\/forrasok\/gyartasvezeto-fizetes-lettorszagban-2026\/\">Lettorsz\u00e1g termel\u00e9si menedzser fizet\u00e9se<\/a> alacsonyabb fizet\u00e9st mutat. Ezek az \u00f6sszehasonl\u00edt\u00e1sok Litv\u00e1ni\u00e1t viszonylag kiegyens\u00falyozott terepnek tekintik a termel\u00e9sir\u00e1ny\u00edt\u00e1si ter\u00fcleten el\u0151rehalad\u00f3 egy\u00e9nek sz\u00e1m\u00e1ra.  <\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f7e777f3\">\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Production planning and scheduling product image straight view\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Advanced production planning with AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Read more about our approach to production planning and optimization leveraging the power of AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"https:\/\/skyplanner.ai\/\" aria-label=\"Book a demo\">Production planning with AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div>\n\n<div class=\"gb-container gb-container-33d6b196\">\n\n<h2 class=\"wp-block-heading\">A termel\u00e9si menedzser fizet\u00e9s\u00e9t befoly\u00e1sol\u00f3 t\u00e9nyez\u0151k Litv\u00e1ni\u00e1ban<\/h2>\n\n\n\n<p>A litv\u00e1niai termel\u00e9si menedzserek fizet\u00e9s\u00e9t t\u00f6bb t\u00e9nyez\u0151 is befoly\u00e1solja:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>V\u00e9gzetts\u00e9g \u00e9s tapasztalat: <\/strong>A magasabb iskolai v\u00e9gzetts\u00e9g \u00e9s a ter\u00fcleten szerzett sz\u00e9les k\u00f6r\u0171 tapasztalat gyakran jobb fizet\u00e9si kil\u00e1t\u00e1sokat eredm\u00e9nyez. A vezet\u00e9si alapelvekb\u0151l \u00e9s t\u00f6bb\u00e9ves gyakorlati tapasztalattal rendelkez\u0151 termel\u00e9si vezet\u0151k jobb helyzetben vannak ahhoz, hogy magasabb fizet\u00e9st kapjanak. <\/li>\n\n\n\n<li><strong>K\u00e9pess\u00e9gek: <\/strong>Az olyan relev\u00e1ns k\u00e9szs\u00e9gek elsaj\u00e1t\u00edt\u00e1sa \u00e9s bemutat\u00e1sa, mint a probl\u00e9mamegold\u00e1s, a k\u00f6lts\u00e9gvet\u00e9s kezel\u00e9se \u00e9s a termel\u00e9si folyamatok ismerete jelent\u0151sen n\u00f6veli a kereseti lehet\u0151s\u00e9geket. A munk\u00e1ltat\u00f3k nagyra \u00e9rt\u00e9kelik azokat a k\u00e9szs\u00e9geket, amelyek k\u00e9pesek a m\u0171k\u00f6d\u00e9si hat\u00e9konys\u00e1got n\u00f6velni \u00e9s a termel\u00e9si strat\u00e9gi\u00e1k sikeres v\u00e9grehajt\u00e1s\u00e1t biztos\u00edtani. <\/li>\n\n\n\n<li><strong>Helysz\u00edn: <\/strong>A litv\u00e1niai termel\u00e9si vezet\u0151k fizet\u00e9se jelent\u0151sen elt\u00e9r a munkav\u00e9gz\u00e9s hely\u00e9t\u0151l f\u00fcgg\u0151en. Az olyan ipari k\u00f6zpontok, mint Vilnius, Kaunas \u00e9s Klaip\u0117da gyakran magasabb b\u00e9reket k\u00edn\u00e1lnak a feldolgoz\u00f3ipari c\u00e9gek nagyobb koncentr\u00e1ci\u00f3ja \u00e9s a magasabb meg\u00e9lhet\u00e9si k\u00f6lts\u00e9gek miatt. Ezzel szemben a kisebb v\u00e1rosokban a kisebb ipari tev\u00e9kenys\u00e9g \u00e9s az alacsonyabb meg\u00e9lhet\u00e9si k\u00f6lts\u00e9gek miatt alacsonyabbak lehetnek a fizet\u00e9sek, ami a Litv\u00e1ni\u00e1n bel\u00fcli sz\u00e9lesebb k\u00f6r\u0171 gazdas\u00e1gi egyenl\u0151tlens\u00e9geket t\u00fckr\u00f6zi.  <\/li>\n\n\n\n<li><strong>A v\u00e1llalat m\u00e9rete: <\/strong>A nagyobb, kiterjedt gy\u00e1rt\u00f3sorokkal rendelkez\u0151 v\u00e1llalatok jobb kompenz\u00e1ci\u00f3t k\u00edn\u00e1lnak, mint a kisebb v\u00e1llalkoz\u00e1sok. A nagyobb v\u00e1llalatokn\u00e1l a felel\u0151ss\u00e9gi k\u00f6r\u00f6k sz\u00e9les sk\u00e1l\u00e1ja \u00e9s a sz\u00fcks\u00e9ges fel\u00fcgyelet m\u00e9rt\u00e9ke gyakran indokolja a magasabb javadalmaz\u00e1si csomagokat. <\/li>\n\n\n\n<li><strong>A v\u00e1llalat t\u00edpusa: <\/strong>Az ipar\u00e1gi szegmens, amelyhez egy v\u00e1llalat tartozik, szint\u00e9n befoly\u00e1solja a b\u00e9rstrukt\u00far\u00e1t. P\u00e9ld\u00e1ul a technol\u00f3giai, a gy\u00f3gyszeripari vagy a textilipari termel\u00e9s\u00e9rt felel\u0151s vezet\u0151k eset\u00e9ben elt\u00e9r\u0151 b\u00e9rt\u00e1bl\u00e1k alakulhatnak ki az ezekben az \u00e1gazatokban sz\u00fcks\u00e9ges elt\u00e9r\u0151 ig\u00e9nyek \u00e9s szak\u00e9rtelem miatt. A moderniz\u00e1lt m\u0171k\u00f6d\u00e9ssel \u00e9s nemzetk\u00f6zi kitekint\u00e9ssel rendelkez\u0151 v\u00e1llalatok gyakran versenyk\u00e9pesebb fizet\u00e9seket k\u00edn\u00e1lnak, ami t\u00fckr\u00f6zi, hogy olyan menedzsereket keresnek, akik k\u00e9pesek eligazodni a modern, glob\u00e1lisan integr\u00e1lt termel\u00e9si \u00f6kosziszt\u00e9m\u00e1k bonyolults\u00e1g\u00e1ban.  <\/li>\n<\/ol>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"302\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1024x302.png\" alt=\"SkyPlanner fejlett tervez\u00e9s \u00e9s \u00fctemez\u00e9s Megold&#xE1;sok termel&#xE9;si probl&#xE9;m&#xE1;kra\" class=\"wp-image-4232\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1024x302.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-300x88.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-768x226.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1536x452.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-2048x603.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">A termel\u00e9si vezet\u0151 szerep\u00e9nek meghat\u00e1roz\u00e1sa<\/h2>\n\n\n\n<p>A termel\u00e9si vezet\u0151 biztos\u00edtja a gy\u00e1rt\u00e1si folyamatok z\u00f6kken\u0151mentes m\u0171k\u00f6d\u00e9s\u00e9t \u00e9s a k\u00edv\u00e1nt c\u00e9lok el\u00e9r\u00e9s\u00e9t. Tervezik, koordin\u00e1lj\u00e1k \u00e9s fel\u00fcgyelik a termel\u00e9si tev\u00e9kenys\u00e9geket, a k\u00f6lts\u00e9gek ellen\u0151rz\u00e9se \u00e9rdek\u00e9ben kezelik a k\u00f6lts\u00e9gvet\u00e9st, \u00e9s biztos\u00edtj\u00e1k a biztons\u00e1gi el\u0151\u00edr\u00e1sok betart\u00e1s\u00e1t a balesetek megel\u0151z\u00e9se \u00e9rdek\u00e9ben. Egy\u00fcttm\u0171k\u00f6dnek a k\u00fcl\u00f6nb\u00f6z\u0151 r\u00e9szlegekkel, p\u00e9ld\u00e1ul a beszerz\u00e9ssel, a logisztik\u00e1val \u00e9s az \u00e9rt\u00e9kes\u00edt\u00e9ssel, hogy a termel\u00e9si terv \u00f6sszhangban legyen m\u00e1s m\u0171k\u00f6d\u00e9si c\u00e9lokkal. Az\u00e1ltal, hogy naprak\u00e9szek az \u00faj technol\u00f3gi\u00e1kkal kapcsolatban, seg\u00edtenek jav\u00edtani a termel\u00e9s hat\u00e9konys\u00e1g\u00e1t, biztos\u00edtva, hogy a term\u00e9kek id\u0151ben \u00e9s a k\u00f6lts\u00e9gvet\u00e9sen bel\u00fcl k\u00e9sz\u00fcljenek el. Szerep\u00fck kiterjed:    <\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>K\u00f6lts\u00e9ghat\u00e9konys\u00e1g: <\/strong>A termel\u00e9si vezet\u0151k d\u00f6nt\u0151 szerepet j\u00e1tszanak annak biztos\u00edt\u00e1s\u00e1ban, hogy a gy\u00e1rt\u00e1si m\u0171veletek betarts\u00e1k a meghat\u00e1rozott k\u00f6lts\u00e9gvet\u00e9st. A k\u00f6lts\u00e9gt\u00fall\u00e9p\u00e9sek elker\u00fcl\u00e9se \u00e9rdek\u00e9ben apr\u00f3l\u00e9kosan ellen\u0151rzik az er\u0151forr\u00e1sok eloszt\u00e1s\u00e1t \u00e9s elk\u00f6lt\u00e9s\u00e9t. A k\u00f6lts\u00e9gvet\u00e9si korl\u00e1tok betart\u00e1sa mellett folyamatosan keresik a m\u0171k\u00f6d\u00e9si hat\u00e9konys\u00e1g \u00e9s j\u00f6vedelmez\u0151s\u00e9g n\u00f6vel\u00e9s\u00e9nek lehet\u0151s\u00e9geit. A termel\u00e9si folyamatok elemz\u00e9s\u00e9vel azonos\u00edtani tudj\u00e1k a jav\u00edt\u00e1sra szorul\u00f3 ter\u00fcleteket, \u00e9s k\u00f6lts\u00e9gcs\u00f6kkent\u0151 int\u00e9zked\u00e9seket tudnak v\u00e9grehajtani, biztos\u00edtva az er\u0151forr\u00e1sok optim\u00e1lis felhaszn\u00e1l\u00e1s\u00e1t a termel\u00e9si c\u00e9lok el\u00e9r\u00e9se \u00e9rdek\u00e9ben.   <\/li>\n\n\n\n<li><strong>Biztons\u00e1gi protokoll v\u00e9grehajt\u00e1sa: <\/strong>A termel\u00e9si vezet\u0151k sz\u00e1m\u00e1ra kiemelt fontoss\u00e1g\u00fa a biztons\u00e1gos munkak\u00f6rnyezet fenntart\u00e1sa. Felel\u0151sek a gy\u00e1rt\u00e1si l\u00e9tes\u00edtm\u00e9nyen bel\u00fcl a meghat\u00e1rozott biztons\u00e1gi ir\u00e1nyelvek betart\u00e1s\u00e1nak biztos\u00edt\u00e1s\u00e1\u00e9rt. Ez mag\u00e1ban foglalja a rendszeres biztons\u00e1gi gyakorlatok megtart\u00e1s\u00e1t, a berendez\u00e9sek karbantart\u00e1s\u00e1nak fel\u00fcgyelet\u00e9t \u00e9s a szem\u00e9lyzet biztons\u00e1gi k\u00e9pz\u00e9s\u00e9t. A biztons\u00e1gi protokollok \u00e9rv\u00e9nyes\u00edt\u00e9s\u00e9re ir\u00e1nyul\u00f3 proakt\u00edv megk\u00f6zel\u00edt\u00e9s\u00fck cs\u00f6kkenti a balesetek kock\u00e1zat\u00e1t, \u00e9s el\u0151seg\u00edti a szervezeten bel\u00fcli biztons\u00e1gi \u00e9s megfelel\u0151s\u00e9gi kult\u00fara kialakul\u00e1s\u00e1t.   <\/li>\n\n\n\n<li><strong>Egy\u00fcttm\u0171k\u00f6d\u00e9s \u00e9s koordin\u00e1ci\u00f3: <\/strong>A termel\u00e9si vezet\u0151k h\u00eddk\u00e9nt szolg\u00e1lnak a k\u00fcl\u00f6nb\u00f6z\u0151 r\u00e9szlegek, p\u00e9ld\u00e1ul a beszerz\u00e9s, a logisztika \u00e9s az \u00e9rt\u00e9kes\u00edt\u00e9s k\u00f6z\u00f6tt. Az \u0151 szerep\u00fckh\u00f6z tartozik, hogy egy\u00fcttm\u0171k\u00f6dnek ezekkel az oszt\u00e1lyokkal, hogy biztos\u00edts\u00e1k a term\u00e9kek z\u00f6kken\u0151mentes \u00e1tmenet\u00e9t a gy\u00e1rt\u00e1st\u00f3l a piacra. A ny\u00edlt kommunik\u00e1ci\u00f3 \u00e9s koordin\u00e1ci\u00f3 el\u0151seg\u00edt\u00e9s\u00e9vel seg\u00edtenek \u00f6sszehangolni a k\u00fcl\u00f6nb\u00f6z\u0151 r\u00e9szlegek c\u00e9lkit\u0171z\u00e9seit az \u00e1ltal\u00e1nos termel\u00e9si c\u00e9lokkal. Ez az egy\u00fcttm\u0171k\u00f6d\u00e9sen alapul\u00f3 megk\u00f6zel\u00edt\u00e9s biztos\u00edtja az anyagok id\u0151ben t\u00f6rt\u00e9n\u0151 beszerz\u00e9s\u00e9t, a hat\u00e9kony gy\u00e1rt\u00e1si \u00fctemtervet \u00e9s a k\u00e9szterm\u00e9kek z\u00f6kken\u0151mentes piacra jut\u00e1s\u00e1t.   <\/li>\n\n\n\n<li><strong>Modern eszk\u00f6z\u00f6k integr\u00e1l\u00e1sa: <\/strong>A technol\u00f3gia gyors fejl\u0151d\u00e9s\u00e9vel a modern eszk\u00f6z\u00f6k integr\u00e1l\u00e1sa a termel\u00e9si folyamatba a termel\u00e9sir\u00e1ny\u00edt\u00f3 szerep\u00e9nek l\u00e9tfontoss\u00e1g\u00fa aspektus\u00e1v\u00e1 v\u00e1lt. \u0150k fel\u00fcgyelik a m\u0171veletek racionaliz\u00e1l\u00e1s\u00e1t \u00e9s a gy\u00e1rt\u00e1stervez\u00e9s jav\u00edt\u00e1s\u00e1t seg\u00edt\u0151 korszer\u0171 eszk\u00f6z\u00f6k bevezet\u00e9s\u00e9t. <a href=\"\/hu\/\">Az olyan eszk\u00f6z\u00f6k, mint az APS (fejlett tervez\u00e9s \u00e9s \u00fctemez\u00e9s) rendszerek<\/a> jelent\u0151sen n\u00f6velhetik a gy\u00e1rt\u00e1si folyamat hat\u00e9konys\u00e1g\u00e1t \u00e9s termel\u00e9kenys\u00e9g\u00e9t, lehet\u0151v\u00e9 t\u00e9ve a jobb tervez\u00e9st, \u00fctemez\u00e9st \u00e9s a gy\u00e1rt\u00e1si tev\u00e9kenys\u00e9gek val\u00f3s idej\u0171 nyomon k\u00f6vet\u00e9s\u00e9t. <\/li>\n<\/ul>\n\n\n\n<h4 class=\"wp-block-heading\">Alapvet\u0151 k\u00e9szs\u00e9gek a termel\u00e9si vezet\u0151k sz\u00e1m\u00e1ra<\/h4>\n\n\n\n<p>A termel\u00e9sir\u00e1ny\u00edt\u00e1sban val\u00f3 j\u00e1rtass\u00e1g a m\u0171szaki \u00e9s a vezet\u0151i k\u00e9szs\u00e9gek kever\u00e9k\u00e9t ig\u00e9nyli. N\u00e9h\u00e1ny a legfontosabb k\u00e9pess\u00e9gek k\u00f6z\u00fcl: <\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Er\u0151s vezet\u00e9s<\/li>\n\n\n\n<li>Hat\u00e9kony probl\u00e9mamegold\u00e1s<\/li>\n\n\n\n<li>A gy\u00e1rt\u00e1si folyamatok alapos ismerete<\/li>\n\n\n\n<li>K\u00f6lts\u00e9gvet\u00e9si gazd\u00e1lkod\u00e1s<\/li>\n\n\n\n<li>Id\u0151gazd\u00e1lkod\u00e1s<\/li>\n\n\n\n<li>Az eg\u00e9szs\u00e9g\u00fcgyi \u00e9s biztons\u00e1gi el\u0151\u00edr\u00e1sok betart\u00e1sa<\/li>\n\n\n\n<li>Technikai szak\u00e9rtelem<\/li>\n\n\n\n<li>Hat\u00e9kony kommunik\u00e1ci\u00f3<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">A fizet\u00e9sen t\u00fal: Litv\u00e1ni\u00e1ban a termel\u00e9si menedzserek tov\u00e1bbi juttat\u00e1sai<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Karrierfejleszt\u00e9si lehet\u0151s\u00e9gek: <\/strong>A litv\u00e1niai termel\u00e9si menedzserek szerepe utat nyit a karrier\u00e9p\u00edt\u00e9shez a feldolgoz\u00f3iparban bet\u00f6lt\u00f6tt magasabb vezet\u0151i vagy vezet\u0151i poz\u00edci\u00f3k fel\u00e9.<\/li>\n\n\n\n<li><strong>H\u00e1l\u00f3zati kil\u00e1t\u00e1sok: <\/strong>A poz\u00edci\u00f3 platformot biztos\u00edt a k\u00fcl\u00f6nb\u00f6z\u0151 \u00e1gazatokban dolgoz\u00f3 szakemberekkel val\u00f3 kapcsolat\u00e9p\u00edt\u00e9sre, ami el\u0151seg\u00edti a karrier\u00e9p\u00edt\u00e9st \u00e9s a tanul\u00e1si lehet\u0151s\u00e9geket.<\/li>\n\n\n\n<li><strong>Munkahelyi stabilit\u00e1s: <\/strong>A termel\u00e9si vezet\u0151k sz\u00e1m\u00edthatnak munkahely\u00fck stabilit\u00e1s\u00e1ra, mivel szak\u00e9rtelm\u00fck tov\u00e1bbra is kulcsfontoss\u00e1g\u00fa az operat\u00edv sikerhez.<\/li>\n\n\n\n<li><strong>Soksz\u00edn\u0171 munkak\u00f6rnyezet: <\/strong>A soksz\u00edn\u0171 litv\u00e1niai gy\u00e1rt\u00e1si t\u00e1j lehet\u0151v\u00e9 teszi a termel\u00e9sir\u00e1ny\u00edt\u00f3k sz\u00e1m\u00e1ra, hogy k\u00fcl\u00f6nb\u00f6z\u0151 ipari l\u00e9tes\u00edtm\u00e9nyekben navig\u00e1ljanak, gazdag\u00edtva ezzel szakmai tapasztalataikat.<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">A litv\u00e1niai termel\u00e9si menedzserek j\u00f6v\u0151beli kil\u00e1t\u00e1sai<\/h2>\n\n\n\n<p>A litv\u00e1n feldolgoz\u00f3ipar folyamatos innov\u00e1ci\u00f3j\u00e1val a tapasztalt termel\u00e9si vezet\u0151k ir\u00e1nti ig\u00e9ny tov\u00e1bbra is folyamatos. Az olyan modern eszk\u00f6z\u00f6k, mint az APS-rendszer, k\u00fcl\u00f6n\u00f6sen az olyan mesters\u00e9ges intelligencia platformokkal, mint a Skyplanner, val\u00f3 integr\u00e1l\u00e1s\u00e1val a hat\u00e9konys\u00e1g \u00e9s a termel\u00e9kenys\u00e9g fokoz\u00f3d\u00e1s\u00e1nak \u00fatja ny\u00edlik meg, \u00edgy ez az eszk\u00f6z a termel\u00e9sir\u00e1ny\u00edt\u00f3k legjobb bar\u00e1tj\u00e1v\u00e1 v\u00e1lik. <\/p>\n\n\n\n<p>Az\u00e1ltal, hogy a termel\u00e9si menedzser fizet\u00e9s\u00e9t Litv\u00e1ni\u00e1ban 2026-ben befoly\u00e1sol\u00f3 k\u00fcl\u00f6nb\u00f6z\u0151 aspektusokat, valamint e szakma alapvet\u0151 szerep\u00e9t \u00e9s j\u00f6v\u0151beli kil\u00e1t\u00e1sait vizsg\u00e1ljuk, a potenci\u00e1lis p\u00e1ly\u00e1z\u00f3k \u00e9s az ipar\u00e1gi szerepl\u0151k tiszt\u00e1bb k\u00e9pet kapnak a litv\u00e1n feldolgoz\u00f3ipari \u00e1gazat \u00edg\u00e9retes kil\u00e1t\u00e1sair\u00f3l.<\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-92545123\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-0a61546f\">\n<div class=\"gb-grid-column gb-grid-column-e4183086\"><div class=\"gb-container gb-container-e4183086\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-84ccbb5d\"><div class=\"gb-container gb-container-84ccbb5d\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Termel\u00e9si menedzser fizet\u00e9se Litv\u00e1ni\u00e1ban 2026 Kezd\u0151lap \u00bb Forr\u00e1sok \u00bb Gy\u00e1rt\u00e1svezet\u0151 fizet\u00e9se Litv\u00e1ni\u00e1ban 2026 Litv\u00e1ni\u00e1ban 2026-ben az \u00e1tlagos termel\u00e9si menedzser fizet\u00e9s \u00e9ves szinten 35499 eur\u00f3 k\u00f6r\u00fcl van, ami nagyj\u00e1b\u00f3l havi 2958 eur\u00f3nak felel meg. A litv\u00e1n feldolgoz\u00f3ipar robusztuss\u00e1g\u00e1t mutatja a sokf\u00e9le ter\u00fclet, t\u00f6bbek k\u00f6z\u00f6tt az elektronika, a g\u00e9pipar, a textilipar \u00e9s az \u00e9lelmiszer-feldolgoz\u00e1s r\u00e9v\u00e9n. A technol\u00f3giai &#8230; <a title=\"Termel\u00e9si menedzser fizet\u00e9se Litv\u00e1ni\u00e1ban 2026\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/gyartasvezeto-fizetese-litvaniaban-2026\/\" aria-label=\"Read more about Termel\u00e9si menedzser fizet\u00e9se Litv\u00e1ni\u00e1ban 2026\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":6,"featured_media":23017,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[312,2693],"tags":[],"class_list":["post-23048","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-forrasok","category-karrier-es-fizetesek","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Termel\u00e9si menedzser fizet\u00e9se Litv\u00e1ni\u00e1ban 2026 \u2013 SkyPlanner<\/title>\n<meta name=\"description\" content=\"Litv\u00e1ni\u00e1ban 2026-ben az \u00e1tlagos termel\u00e9si menedzser fizet\u00e9s \u00e9ves szinten 35 499 eur\u00f3 k\u00f6r\u00fcl van, ami nagyj\u00e1b\u00f3l havi 2958 eur\u00f3nak felel meg.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/gyartasvezeto-fizetese-litvaniaban-2026\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Termel\u00e9si menedzser fizet\u00e9se Litv\u00e1ni\u00e1ban 2026\" \/>\n<meta property=\"og:description\" content=\"Litv\u00e1ni\u00e1ban 2026-ben az \u00e1tlagos termel\u00e9si menedzser fizet\u00e9s \u00e9ves szinten 35 499 eur\u00f3 k\u00f6r\u00fcl van, ami nagyj\u00e1b\u00f3l havi 2958 eur\u00f3nak felel meg.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/forrasok\/gyartasvezeto-fizetese-litvaniaban-2026\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2023-09-29T08:03:57+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-19T20:49:19+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Lithuania-1024x683.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Szerz\u0151:\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n\t<meta name=\"twitter:label2\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/gyartasvezeto-fizetese-litvaniaban-2026\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/gyartasvezeto-fizetese-litvaniaban-2026\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"Termel\u00e9si menedzser fizet\u00e9se Litv\u00e1ni\u00e1ban 2026\",\"datePublished\":\"2023-09-29T08:03:57+00:00\",\"dateModified\":\"2026-06-19T20:49:19+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/gyartasvezeto-fizetese-litvaniaban-2026\\\/\"},\"wordCount\":2040,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/gyartasvezeto-fizetese-litvaniaban-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Production-Manager-Salary-in-Lithuania.png\",\"articleSection\":[\"forr\u00e1sok\",\"Karrier \u00e9s fizet\u00e9sek\"],\"inLanguage\":\"hu-HU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/gyartasvezeto-fizetese-litvaniaban-2026\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/gyartasvezeto-fizetese-litvaniaban-2026\\\/\",\"name\":\"Termel\u00e9si menedzser fizet\u00e9se Litv\u00e1ni\u00e1ban 2026 \u2013 SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/gyartasvezeto-fizetese-litvaniaban-2026\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/gyartasvezeto-fizetese-litvaniaban-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Production-Manager-Salary-in-Lithuania.png\",\"datePublished\":\"2023-09-29T08:03:57+00:00\",\"dateModified\":\"2026-06-19T20:49:19+00:00\",\"description\":\"Litv\u00e1ni\u00e1ban 2026-ben az \u00e1tlagos termel\u00e9si menedzser fizet\u00e9s \u00e9ves szinten 35 499 eur\u00f3 k\u00f6r\u00fcl van, ami nagyj\u00e1b\u00f3l havi 2958 eur\u00f3nak felel meg.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/gyartasvezeto-fizetese-litvaniaban-2026\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/gyartasvezeto-fizetese-litvaniaban-2026\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/gyartasvezeto-fizetese-litvaniaban-2026\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Production-Manager-Salary-in-Lithuania.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/Production-Manager-Salary-in-Lithuania.png\",\"width\":4990,\"height\":3327,\"caption\":\"Production Manager Salary in Lithuania\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/gyartasvezeto-fizetese-litvaniaban-2026\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Termel\u00e9si menedzser fizet\u00e9se Litv\u00e1ni\u00e1ban 2026\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Termel\u00e9si menedzser fizet\u00e9se Litv\u00e1ni\u00e1ban 2026 \u2013 SkyPlanner","description":"Litv\u00e1ni\u00e1ban 2026-ben az \u00e1tlagos termel\u00e9si menedzser fizet\u00e9s \u00e9ves szinten 35 499 eur\u00f3 k\u00f6r\u00fcl van, ami nagyj\u00e1b\u00f3l havi 2958 eur\u00f3nak felel meg.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/forrasok\/gyartasvezeto-fizetese-litvaniaban-2026\/","og_locale":"hu_HU","og_type":"article","og_title":"Termel\u00e9si menedzser fizet\u00e9se Litv\u00e1ni\u00e1ban 2026","og_description":"Litv\u00e1ni\u00e1ban 2026-ben az \u00e1tlagos termel\u00e9si menedzser fizet\u00e9s \u00e9ves szinten 35 499 eur\u00f3 k\u00f6r\u00fcl van, ami nagyj\u00e1b\u00f3l havi 2958 eur\u00f3nak felel meg.","og_url":"https:\/\/skyplanner.ai\/hu\/forrasok\/gyartasvezeto-fizetese-litvaniaban-2026\/","og_site_name":"SkyPlanner","article_published_time":"2023-09-29T08:03:57+00:00","article_modified_time":"2026-06-19T20:49:19+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Lithuania-1024x683.png","type":"image\/png"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Szerz\u0151:":"SkyPlanner","Becs\u00fclt olvas\u00e1si id\u0151":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/gyartasvezeto-fizetese-litvaniaban-2026\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/gyartasvezeto-fizetese-litvaniaban-2026\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"Termel\u00e9si menedzser fizet\u00e9se Litv\u00e1ni\u00e1ban 2026","datePublished":"2023-09-29T08:03:57+00:00","dateModified":"2026-06-19T20:49:19+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/gyartasvezeto-fizetese-litvaniaban-2026\/"},"wordCount":2040,"publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/gyartasvezeto-fizetese-litvaniaban-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Lithuania.png","articleSection":["forr\u00e1sok","Karrier \u00e9s fizet\u00e9sek"],"inLanguage":"hu-HU"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/gyartasvezeto-fizetese-litvaniaban-2026\/","url":"https:\/\/skyplanner.ai\/hu\/forrasok\/gyartasvezeto-fizetese-litvaniaban-2026\/","name":"Termel\u00e9si menedzser fizet\u00e9se Litv\u00e1ni\u00e1ban 2026 \u2013 SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/gyartasvezeto-fizetese-litvaniaban-2026\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/gyartasvezeto-fizetese-litvaniaban-2026\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Lithuania.png","datePublished":"2023-09-29T08:03:57+00:00","dateModified":"2026-06-19T20:49:19+00:00","description":"Litv\u00e1ni\u00e1ban 2026-ben az \u00e1tlagos termel\u00e9si menedzser fizet\u00e9s \u00e9ves szinten 35 499 eur\u00f3 k\u00f6r\u00fcl van, ami nagyj\u00e1b\u00f3l havi 2958 eur\u00f3nak felel meg.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/gyartasvezeto-fizetese-litvaniaban-2026\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/forrasok\/gyartasvezeto-fizetese-litvaniaban-2026\/"]}]},{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/gyartasvezeto-fizetese-litvaniaban-2026\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Lithuania.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Lithuania.png","width":4990,"height":3327,"caption":"Production Manager Salary in Lithuania"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/gyartasvezeto-fizetese-litvaniaban-2026\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"Termel\u00e9si menedzser fizet\u00e9se Litv\u00e1ni\u00e1ban 2026"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Lithuania.png",4990,3327,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Lithuania-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Lithuania-300x200.png",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Lithuania-768x512.png",768,512,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Lithuania-1024x683.png",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Lithuania-1536x1024.png",1536,1024,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Lithuania-2048x1365.png",2048,1365,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/09\/Production-Manager-Salary-in-Lithuania.png",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/hu\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"Termel\u00e9si menedzser fizet\u00e9se Litv\u00e1ni\u00e1ban 2026 Kezd\u0151lap \u00bb Forr\u00e1sok \u00bb Gy\u00e1rt\u00e1svezet\u0151 fizet\u00e9se Litv\u00e1ni\u00e1ban 2026 Litv\u00e1ni\u00e1ban 2026-ben az \u00e1tlagos termel\u00e9si menedzser fizet\u00e9s \u00e9ves szinten 35499 eur\u00f3 k\u00f6r\u00fcl van, ami nagyj\u00e1b\u00f3l havi 2958 eur\u00f3nak felel meg. A litv\u00e1n feldolgoz\u00f3ipar robusztuss\u00e1g\u00e1t mutatja a sokf\u00e9le ter\u00fclet, t\u00f6bbek k\u00f6z\u00f6tt az elektronika, a g\u00e9pipar, a textilipar \u00e9s az \u00e9lelmiszer-feldolgoz\u00e1s r\u00e9v\u00e9n. A technol\u00f3giai&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/23048","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=23048"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/23048\/revisions"}],"predecessor-version":[{"id":94084,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/23048\/revisions\/94084"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media\/23017"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=23048"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/categories?post=23048"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/tags?post=23048"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}