{"id":16155,"date":"2023-08-24T09:05:50","date_gmt":"2023-08-24T09:05:50","guid":{"rendered":"https:\/\/skyplanner.ai\/forrasok\/erp-szolgaltatasmenedzsment\/"},"modified":"2026-06-19T20:27:10","modified_gmt":"2026-06-19T20:27:10","slug":"erp-szolgaltatasmenedzsment","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/hu\/forrasok\/erp-szolgaltatasmenedzsment\/","title":{"rendered":"ERP szolg\u00e1ltat\u00e1smenedzsment"},"content":{"rendered":"<div class=\"gb-container gb-container-bf558a89\">\n\n<h1 class=\"wp-block-heading\" id=\"h-erp-service-management\">ERP szolg\u00e1ltat\u00e1smenedzsment<\/h1>\n\n\n<div class=\"gb-container gb-container-e8026af9\">\n\n<p><a href=\"https:\/\/skyplanner.ai\/hu\/\">Kezd\u0151lap<\/a> \u00bb <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/\">Forr\u00e1sok<\/a> \u00bb ERP Service Management<\/p>\n\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" viewbox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Becs\u00fclt olvas\u00e1si id\u0151: <\/span><span class=\"yoast-reading-time__reading-time\">14<\/span><span class=\"yoast-reading-time__time-unit\"> perc<\/span><\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f0fd57d0\">\n\n<p>A gy\u00e1rt\u00e1stervez\u00e9s \u00f6sszetett ter\u00fclet\u00e9n az okosabb munkav\u00e9gz\u00e9s gyakran a megfelel\u0151 eszk\u00f6z\u00f6k \u00e9s strat\u00e9gi\u00e1k kihaszn\u00e1l\u00e1s\u00e1t jelenti. Az ERP Service Management, egy kiemelked\u0151 <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/erp-modulok\/\">ERP modul<\/a>, megtestes\u00edti ezt a b\u00f6lcsess\u00e9get. Az\u00e1ltal, hogy a m\u0171veletek ir\u00e1ny\u00edt\u00e1s\u00e1hoz \u00e9sszer\u0171s\u00edtett megk\u00f6zel\u00edt\u00e9st biztos\u00edt, lehet\u0151v\u00e9 teszi a gy\u00e1rt\u00e1stervez\u0151k sz\u00e1m\u00e1ra, hogy ne csak gyorsabban, hanem &#8211; ami m\u00e9g fontosabb &#8211; okosabban dolgozzanak. Ez az \u00fatmutat\u00f3 \u00e1tfog\u00f3an bemutatja az ERP Service Management k\u00e9pess\u00e9geit \u00e9s el\u0151nyeit, bemutatva, hogyan k\u00e9pes \u00fajrafogalmazni \u00e9s emelni a gy\u00e1rt\u00e1stervez\u00e9si szabv\u00e1nyokat. Fedezze fel, hogyan lehet a gyorsabb helyett okosabban dolgozni, \u00e9s hogyan lehet a p\u00e1ratlan sikerhez vezet\u0151 utat kik\u00f6vezni.<\/p>\n\n\n\t\t\t\t<div class=\"wp-block-uagb-table-of-contents uagb-toc__align-left uagb-toc__columns-1  uagb-block-f6df4f73      \"\n\t\t\t\t\tdata-scroll= \"1\"\n\t\t\t\t\tdata-offset= \"30\"\n\t\t\t\t\tstyle=\"\"\n\t\t\t\t>\n\t\t\t\t<div class=\"uagb-toc__wrap\">\n\t\t\t\t\t\t<div class=\"uagb-toc__title\">\n\t\t\t\t\t\t\tTable Of Contents\t\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"uagb-toc__list-wrap \">\n\t\t\t\t\t\t<ol class=\"uagb-toc__list\"><li class=\"uagb-toc__list\"><a href=\"#tldr\" class=\"uagb-toc-link__trigger\">TL;DR<\/a><li class=\"uagb-toc__list\"><a href=\"#az-erp-szolg\u00e1ltat\u00e1smenedzsment-meg\u00e9rt\u00e9se\" class=\"uagb-toc-link__trigger\">Az ERP szolg\u00e1ltat\u00e1smenedzsment meg\u00e9rt\u00e9se<\/a><li class=\"uagb-toc__list\"><a href=\"#az-erp-szolg\u00e1ltat\u00e1smenedzsment-fontoss\u00e1ga\" class=\"uagb-toc-link__trigger\">Az ERP szolg\u00e1ltat\u00e1smenedzsment fontoss\u00e1ga<\/a><li class=\"uagb-toc__list\"><a href=\"#az-erp-szolg\u00e1ltat\u00e1smenedzsment-el\u0151nyei\" class=\"uagb-toc-link__trigger\">Az ERP szolg\u00e1ltat\u00e1smenedzsment el\u0151nyei<\/a><li class=\"uagb-toc__list\"><a href=\"#az-erp-szolg\u00e1ltat\u00e1smenedzsment-f\u0151-\u00f6sszetev\u0151i\" class=\"uagb-toc-link__trigger\">Az ERP szolg\u00e1ltat\u00e1smenedzsment f\u0151 \u00f6sszetev\u0151i<\/a><li class=\"uagb-toc__list\"><a href=\"#az-erp-szolg\u00e1ltat\u00e1smenedzsment-j\u00f6v\u0151beli-trendjei\" class=\"uagb-toc-link__trigger\">Az ERP szolg\u00e1ltat\u00e1smenedzsment j\u00f6v\u0151beli trendjei<\/a><li class=\"uagb-toc__list\"><a href=\"#\u00f6t-ipar\u00e1g-profit\u00e1l-ebb\u0151l-az-eszk\u00f6zb\u0151l\" class=\"uagb-toc-link__trigger\">\u00d6t ipar\u00e1g profit\u00e1l ebb\u0151l az eszk\u00f6zb\u0151l<\/a><li class=\"uagb-toc__list\"><a href=\"#aps-rendszerek-\u00e9s-erp-szolg\u00e1ltat\u00e1smenedzsment\" class=\"uagb-toc-link__trigger\">APS rendszerek \u00e9s ERP szolg\u00e1ltat\u00e1smenedzsment<\/a><\/ol>\t\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\n\n\n<h2 class=\"gb-headline gb-headline-9d0d442b gb-headline-text\">TL;DR<\/h2>\n\n\n\n<p>Az ERP Service Management a v\u00e1llalati er\u0151forr\u00e1s-tervez\u00e9si keretrendszer egyik alapvet\u0151 modulja, amelynek c\u00e9lja, hogy az adatok k\u00f6zpontos\u00edt\u00e1s\u00e1val \u00e9s a m\u0171veletek racionaliz\u00e1l\u00e1s\u00e1val n\u00f6velje a szolg\u00e1ltat\u00e1si feladatok hat\u00e9konys\u00e1g\u00e1t. El\u0151nyei k\u00f6z\u00e9 tartozik t\u00f6bbek k\u00f6z\u00f6tt a k\u00f6zpontos\u00edtott adatkezel\u00e9s, a jobb \u00fcgyf\u00e9lszolg\u00e1lat \u00e9s a m\u00e1s modulokkal val\u00f3 z\u00f6kken\u0151mentes integr\u00e1ci\u00f3. Az olyan kulcsfontoss\u00e1g\u00fa \u00f6sszetev\u0151kkel, mint a szolg\u00e1ltat\u00e1si megrendel\u00e9sek kezel\u00e9se \u00e9s az analitika, ez az eszk\u00f6z l\u00e9tfontoss\u00e1g\u00fa az olyan ipar\u00e1gak sz\u00e1m\u00e1ra, mint a gy\u00e1rt\u00e1s \u00e9s az eg\u00e9szs\u00e9g\u00fcgy. A technol\u00f3giai trendek fejl\u0151d\u00e9s\u00e9vel a modul a j\u00f6v\u0151ben az AI, az IoT \u00e9s az AR elemeket is mag\u00e1ban foglalja. A Skyplanner fejlett tervez\u00e9s \u00e9s \u00fctemez\u00e9s rendszere kieg\u00e9sz\u00edti ezt az ERP-modult, \u00edgy biztos\u00edtva a v\u00e1llalkoz\u00e1sok sz\u00e1m\u00e1ra az \u00e1tfog\u00f3 \u00e9s moderniz\u00e1lt szolg\u00e1ltat\u00e1smenedzsmentet.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Az ERP szolg\u00e1ltat\u00e1smenedzsment meg\u00e9rt\u00e9se<\/h2>\n\n\n\n<p><strong>Az ERP szolg\u00e1ltat\u00e1smenedzsment egy speci\u00e1lis modul a t\u00e1gabb <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/mi-az-az-erp\/\">v\u00e1llalati er\u0151forr\u00e1s-tervez\u00e9si (ERP)<\/a> keretrendszerben.<\/strong> A szolg\u00e1ltat\u00e1sorient\u00e1lt feladatok \u00e9s funkci\u00f3k integr\u00e1l\u00e1s\u00e1ra \u00e9s kezel\u00e9s\u00e9re tervezett ERP Service Management z\u00f6kken\u0151mentesen illeszkedik m\u00e1s ERP-funkci\u00f3khoz, hogy koherenci\u00e1t teremtsen a szolg\u00e1ltat\u00e1si m\u0171veletekben, az \u00fcgyf\u00e9lkapcsolatokt\u00f3l kezdve a bels\u0151 szolg\u00e1ltat\u00e1si folyamatokig.<\/p>\n\n\n<div class=\"gb-container gb-container-ce737323\"><div class=\"gb-inside-container\">\n\n<p><strong>\u00d6sszess\u00e9g\u00e9ben az ERP Service Management olyan megold\u00e1s, amely n\u00f6veli a szervezeten bel\u00fcli szolg\u00e1ltat\u00e1si funkci\u00f3k hat\u00e9konys\u00e1g\u00e1t \u00e9s termel\u00e9kenys\u00e9g\u00e9t.<\/strong><\/p>\n\n<\/div><\/div>\n\n\n<p>Figyelembe veszi a szolg\u00e1ltat\u00e1si m\u0171veletek bonyolult kih\u00edv\u00e1sait, \u00e9s olyan szem\u00e9lyre szabott megold\u00e1sokat k\u00edn\u00e1l, amelyek z\u00f6kken\u0151mentesen illeszkednek az operat\u00edv ir\u00e1ny\u00edt\u00e1s \u00e1tfog\u00f3 k\u00e9p\u00e9be. A szolg\u00e1ltat\u00e1ssal kapcsolatos adatok, feladatok \u00e9s folyamatok k\u00f6zpontos\u00edt\u00e1s\u00e1val egys\u00e9ges megk\u00f6zel\u00edt\u00e9st biztos\u00edt, seg\u00edtve a v\u00e1llalkoz\u00e1sokat abban, hogy a m\u0171k\u00f6d\u00e9si hat\u00e9konys\u00e1g fenntart\u00e1sa mellett kiv\u00e1l\u00f3 min\u0151s\u00e9g\u0171 szolg\u00e1ltat\u00e1sokat ny\u00fajtsanak.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Az ERP szolg\u00e1ltat\u00e1smenedzsment fontoss\u00e1ga<\/h2>\n\n\n\n<p>Az egyre \u00f6sszetettebb \u00fczleti k\u00f6rnyezetben a szolg\u00e1ltat\u00e1si m\u0171veletek hat\u00e9kony ir\u00e1ny\u00edt\u00e1sa kiemelked\u0151 fontoss\u00e1g\u00fa.  <strong>Az ERP szolg\u00e1ltat\u00e1smenedzsment f\u0151 c\u00e9lja a szervezeten bel\u00fcli szolg\u00e1ltat\u00e1ssal kapcsolatos funkci\u00f3k racionaliz\u00e1l\u00e1sa \u00e9s optimaliz\u00e1l\u00e1sa.<\/strong>  Ez biztos\u00edtja, hogy a folyamatok ne csak \u00f6sszhangban legyenek a v\u00e1llalat c\u00e9lkit\u0171z\u00e9seivel, hanem versenyel\u0151nyt is jelentsenek a piacon. ERP-modulk\u00e9nt az ERP Service Management a szolg\u00e1ltat\u00e1si m\u0171veleteket er\u0151s\u00edt\u0151 gerinck\u00e9nt m\u0171k\u00f6dik, lehet\u0151v\u00e9 t\u00e9ve a bels\u0151 \u00e9s k\u00fcls\u0151 szolg\u00e1ltat\u00e1si ig\u00e9nyeknek megfelel\u0151 egys\u00e9ges megk\u00f6zel\u00edt\u00e9st.<\/p>\n\n\n\n<div class=\"wp-block-uagb-image uagb-block-a4bcbb88 wp-block-uagb-image--layout-default wp-block-uagb-image--effect-static wp-block-uagb-image--align-none\"><figure class=\"wp-block-uagb-image__figure\"><img decoding=\"async\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/08\/Display-wide-5-1024x536.png\" alt=\"\" class=\"uag-image-6463\" width=\"1024\" height=\"536\" title=\"\" loading=\"lazy\" role=\"img\"><\/figure><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Az ERP szolg\u00e1ltat\u00e1smenedzsment el\u0151nyei  <\/h2>\n\n\n\n<h4 class=\"gb-headline gb-headline-98d9de82 gb-headline-text\">K\u00f6zpontos\u00edtott adatkezel\u00e9s<\/h4>\n\n\n\n<p>Az egyik kiemelked\u0151 funkci\u00f3 a szolg\u00e1ltat\u00e1ssal kapcsolatos adatok k\u00f6zpontos\u00edt\u00e1sa. Ez biztos\u00edtja a k\u00f6nny\u0171 hozz\u00e1f\u00e9r\u00e9st, a gyors lek\u00e9rdez\u00e9st \u00e9s a pontos adatelemz\u00e9st, ami megalapozott d\u00f6nt\u00e9shozatalt eredm\u00e9nyez.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-496a7c64 gb-headline-text\">Tov\u00e1bbfejlesztett \u00fcgyf\u00e9lszolg\u00e1lat<\/h4>\n\n\n\n<p>A szervizk\u00e9relmek, panaszok \u00e9s visszajelz\u00e9sek racionaliz\u00e1l\u00e1s\u00e1val az ERP Service Management biztos\u00edtja az id\u0151ben t\u00f6rt\u00e9n\u0151 \u00e9s hat\u00e9kony \u00fcgyf\u00e9lkiszolg\u00e1l\u00e1st, ami az \u00fcgyfelek nagyobb el\u00e9gedetts\u00e9g\u00e9hez vezet.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-2f9d06b7 gb-headline-text\">Hat\u00e9kony munkamegrendel\u00e9s-kezel\u00e9s<\/h4>\n\n\n\n<p>A modul leegyszer\u0171s\u00edti a teljes munkamegrendel\u00e9si folyamatot &#8211; a kezdem\u00e9nyez\u00e9st\u0151l a befejez\u00e9sig. Ez gyorsabb \u00e1tfut\u00e1si id\u0151t \u00e9s magasabb szolg\u00e1ltat\u00e1si min\u0151s\u00e9get eredm\u00e9nyez.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-e1dd7107 gb-headline-text\">Z\u00f6kken\u0151mentes integr\u00e1ci\u00f3 m\u00e1s modulokkal<\/h4>\n\n\n\n<p>Az ERP Service Management harmonikusan integr\u00e1l\u00f3dik m\u00e1s ERP modulokkal, mint p\u00e9ld\u00e1ul a p\u00e9nz\u00fcgy, a HR \u00e9s a beszerz\u00e9s, biztos\u00edtva az \u00fczleti m\u0171veletek egys\u00e9ges megk\u00f6zel\u00edt\u00e9s\u00e9t.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-720fbf3a gb-headline-text\">Cs\u00f6kkentett m\u0171k\u00f6d\u00e9si k\u00f6lts\u00e9gek<\/h4>\n\n\n\n<p>A v\u00e1llalkoz\u00e1sok hossz\u00fa t\u00e1von jelent\u0151s k\u00f6lts\u00e9gmegtakar\u00edt\u00e1st \u00e9rhetnek el a szolg\u00e1ltat\u00e1si folyamatok optimaliz\u00e1l\u00e1s\u00e1val \u00e9s a redundanci\u00e1k megsz\u00fcntet\u00e9s\u00e9vel.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-3c32515d gb-headline-text\">Sk\u00e1l\u00e1zhat\u00f3s\u00e1g a n\u00f6veked\u00e9shez<\/h4>\n\n\n\n<p>A v\u00e1llalkoz\u00e1sok b\u0151v\u00fcl\u00e9s\u00e9vel a szolg\u00e1ltat\u00e1si k\u00e9relmek mennyis\u00e9ge is n\u00f6vekedhet. Ez az ERP-eszk\u00f6z lehet\u0151v\u00e9 teszi a k\u00f6nny\u0171 sk\u00e1l\u00e1zhat\u00f3s\u00e1got, biztos\u00edtva a n\u00f6vekv\u0151 ig\u00e9nyek megfelel\u0151 kiel\u00e9g\u00edt\u00e9s\u00e9t an\u00e9lk\u00fcl, hogy a hat\u00e9konys\u00e1g cs\u00f6kkenne.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-c38c69db gb-headline-text\">Jav\u00edtott er\u0151forr\u00e1s-eloszt\u00e1s<\/h4>\n\n\n\n<p>A modul fejlett analitik\u00e1j\u00e1val betekint\u00e9st ny\u00fajt az er\u0151forr\u00e1sok kihaszn\u00e1lts\u00e1g\u00e1ba, biztos\u00edtva az er\u0151forr\u00e1sok b\u00f6lcs eloszt\u00e1s\u00e1t, elker\u00fclve a t\u00fal- vagy alulhaszn\u00e1latot.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-ec72cd4f gb-headline-text\">Val\u00f3s idej\u0171 jelent\u00e9sk\u00e9sz\u00edt\u00e9s \u00e9s elemz\u00e9s<\/h4>\n\n\n\n<p><strong><\/strong>A d\u00f6nt\u00e9shoz\u00f3k sz\u00e1m\u00e1ra el\u0151ny\u00f6sek a val\u00f3s idej\u0171 jelent\u00e9sek \u00e9s elemz\u00e9sek, amelyek b\u00e1rmely adott pillanatban vil\u00e1gos k\u00e9pet ny\u00fajtanak a szolg\u00e1ltat\u00e1si m\u0171veletekr\u0151l. Ez lehet\u0151v\u00e9 teszi az id\u0151ben t\u00f6rt\u00e9n\u0151 beavatkoz\u00e1st \u00e9s a strat\u00e9giai tervez\u00e9st.<\/p>\n\n\n\n<p>Az ERP szolg\u00e1ltat\u00e1smenedzsment bevezet\u00e9se m\u0171k\u00f6d\u00e9si hat\u00e9konys\u00e1got k\u00edn\u00e1l, \u00e9s a v\u00e1llalkoz\u00e1sok jobban megfelelnek a dinamikus piaci k\u00f6rnyezet k\u00f6vetelm\u00e9nyeinek. Mivel a termel\u00e9s tervez\u0151i \u00e9s az \u00fczleti vezet\u0151k a siker \u00e9rdek\u00e9ben keresik a lehet\u0151s\u00e9get, e modul integr\u00e1l\u00e1sa nem csak el\u0151ny\u00f6s, hanem n\u00e9lk\u00fcl\u00f6zhetetlen is.<\/p>\n\n\n\n<p><\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-f7e777f3\">\n<div class=\"gb-container gb-container-0a56c9fa sticky\"><div class=\"gb-inside-container\">\n<div class=\"gb-container gb-container-eed176fc\"><div class=\"gb-inside-container\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-1b2f16ae\">\n<div class=\"gb-grid-column gb-grid-column-be655727\"><div class=\"gb-container gb-container-be655727\"><div class=\"gb-inside-container\">\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"685\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png\" alt=\"SkyPlanner APS - Production planning and scheduling product image straight view\" class=\"wp-image-4339\" srcset=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1024x685.png 1024w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-300x201.png 300w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-768x514.png 768w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-1536x1027.png 1536w, https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Production-planning-Straight-PNG-1-2048x1370.png 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n<\/div><\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-0821f9a0\"><div class=\"gb-container gb-container-0821f9a0\"><div class=\"gb-inside-container\">\n\n<h4 class=\"wp-block-heading mobile-text-center\" id=\"h-advanced-production-planning-with-ai-skyplanner-aps\" style=\"font-size:24px\">Advanced production planning with AI &#8211; SkyPlanner APS<\/h4>\n\n\n\n<p class=\"mobile-text-center\">Read more about our approach to production planning and optimization leveraging the power of AI.<\/p>\n\n\n<div class=\"gb-button-wrapper gb-button-wrapper-690cb95e\">\n\n<a class=\"gb-button gb-button-7b87a903 gb-button-text\" href=\"https:\/\/skyplanner.ai\/\" aria-label=\"Book a demo\">Production planning with AI<\/a>\n\n<\/div>\n<\/div><\/div><\/div>\n<\/div>\n<\/div><\/div>\n<\/div><\/div>\n<\/div>\n\n<div class=\"gb-container gb-container-33d6b196\">\n\n<h2 class=\"wp-block-heading\">Az ERP szolg\u00e1ltat\u00e1smenedzsment f\u0151 \u00f6sszetev\u0151i  <\/h2>\n\n\n\n<p>Az ERP szolg\u00e1ltat\u00e1smenedzsment sokr\u00e9t\u0171 birodalm\u00e1ban sz\u00e1mos komponens m\u0171k\u00f6dik egy\u00fctt, hogy egys\u00e9ges szolg\u00e1ltat\u00e1smenedzsment-megold\u00e1st ny\u00fajtson. B\u00e1r a modul sz\u00e1mos elemet tartalmaz, az al\u00e1bbiakban bemutatunk n\u00e9h\u00e1nyat a legfontosabb \u00f6sszetev\u0151k k\u00f6z\u00fcl, amelyek jelent\u0151s szerepet j\u00e1tszanak a szolg\u00e1ltat\u00e1si m\u0171veletek optimaliz\u00e1l\u00e1s\u00e1ban:<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-32c8aea5 gb-headline-text\">Szolg\u00e1ltat\u00e1si megrendel\u00e9s kezel\u00e9se<\/h4>\n\n\n\n<p>Ez a komponens lehet\u0151v\u00e9 teszi a v\u00e1llalkoz\u00e1sok sz\u00e1m\u00e1ra, hogy a szolg\u00e1ltat\u00e1si megrendel\u00e9seket a kezdem\u00e9nyez\u00e9st\u0151l a befejez\u00e9sig hat\u00e9konyan nyomon k\u00f6vess\u00e9k \u00e9s kezelj\u00e9k. Biztos\u00edtja, hogy minden szolg\u00e1ltat\u00e1si ig\u00e9nyt szisztematikusan napl\u00f3zzanak, kiutaljanak \u00e9s teljes\u00edtsenek.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-c946a3a4 gb-headline-text\">Szolg\u00e1ltat\u00e1s-diszp\u00e9cser \u00e9s \u00fctemez\u00e9s<\/h4>\n\n\n\n<p>Az er\u0151forr\u00e1s-kihaszn\u00e1l\u00e1s optimaliz\u00e1l\u00e1s\u00e1hoz elengedhetetlen\u00fcl fontos funkci\u00f3 biztos\u00edtja, hogy a szervizcsapatokat a megfelel\u0151 id\u0151ben a megfelel\u0151 helyekre k\u00fcldj\u00e9k. Az \u00fctemez\u00e9s automatiz\u00e1l\u00e1s\u00e1val cs\u00f6kkenti az emberi hib\u00e1kat \u00e9s n\u00f6veli a szolg\u00e1ltat\u00e1sny\u00fajt\u00e1s sebess\u00e9g\u00e9t.<\/p>\n\n\n\n<p><strong>Field Service Management<\/strong><\/p>\n\n\n\n<p>A helysz\u00edni szervizcsapatokkal rendelkez\u0151 v\u00e1llalkoz\u00e1sok sz\u00e1m\u00e1ra kifejlesztett komponens biztos\u00edtja, hogy a helysz\u00edni szervizek munkat\u00e1rsai val\u00f3s id\u0151ben hozz\u00e1f\u00e9rjenek a sz\u00fcks\u00e9ges inform\u00e1ci\u00f3khoz, eszk\u00f6z\u00f6kh\u00f6z \u00e9s t\u00e1mogat\u00e1shoz, lehet\u0151v\u00e9 t\u00e9ve sz\u00e1mukra a feladatok hat\u00e9kony v\u00e9grehajt\u00e1s\u00e1t.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-c304903d gb-headline-text\">Vagyonkezel\u00e9s<\/h4>\n\n\n\n<p>Az \u00f6sszes eszk\u00f6z, a g\u00e9pekt\u0151l kezdve a szersz\u00e1mokig \u00e9s berendez\u00e9sekig, nyomon k\u00f6vet\u00e9se kulcsfontoss\u00e1g\u00fa. Az eszk\u00f6zgazd\u00e1lkod\u00e1s biztos\u00edtja, hogy minden eszk\u00f6zzel elsz\u00e1moljanak, karbantartj\u00e1k \u00e9s optim\u00e1lisan haszn\u00e1lj\u00e1k.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-f9e86246 gb-headline-text\">Szerz\u0151d\u00e9skezel\u00e9s<\/h4>\n\n\n\n<p>Ez az elem racionaliz\u00e1lja az \u00fcgyfelekkel vagy sz\u00e1ll\u00edt\u00f3kkal k\u00f6t\u00f6tt szolg\u00e1ltat\u00e1si szerz\u0151d\u00e9sek kezel\u00e9s\u00e9t. Nyomon k\u00f6veti a szerz\u0151d\u00e9si felt\u00e9teleket, a meg\u00faj\u00edt\u00e1si d\u00e1tumokat \u00e9s m\u00e1s kritikus inform\u00e1ci\u00f3kat, biztos\u00edtva, hogy a v\u00e1llalkoz\u00e1sok tov\u00e1bbra is megfeleljenek a k\u00f6vetelm\u00e9nyeknek \u00e9s proakt\u00edvak maradjanak.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-85b73baf gb-headline-text\">Szolg\u00e1ltat\u00e1s sz\u00e1ml\u00e1z\u00e1s \u00e9s sz\u00e1ml\u00e1z\u00e1s<\/h4>\n\n\n\n<p>A sz\u00e1ml\u00e1z\u00e1s \u00e9s a sz\u00e1ml\u00e1z\u00e1s automatiz\u00e1l\u00e1sa cs\u00f6kkenti a hib\u00e1kat \u00e9s felgyors\u00edtja a p\u00e9nz\u00fcgyi folyamatot. Ez a komponens biztos\u00edtja az elv\u00e9gzett szolg\u00e1ltat\u00e1sok alapj\u00e1n t\u00f6rt\u00e9n\u0151 pontos sz\u00e1ml\u00e1z\u00e1st, ami el\u0151seg\u00edti az \u00fcgyfelek bizalm\u00e1t.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-3f62251f gb-headline-text\">Szolg\u00e1ltat\u00e1si szint\u0171 meg\u00e1llapod\u00e1s (SLA) kezel\u00e9se<\/h4>\n\n\n\n<p>Az \u00fcgyfelek el\u00e9gedetts\u00e9ge szempontj\u00e1b\u00f3l kulcsfontoss\u00e1g\u00fa a meg\u00e1llapod\u00e1s szerinti szolg\u00e1ltat\u00e1si szintek betart\u00e1sa vagy t\u00falteljes\u00edt\u00e9se. Ez a funkci\u00f3 figyeli az SLA-k betart\u00e1s\u00e1t, \u00e9s figyelmezteti a v\u00e1llalkoz\u00e1sokat, ha a szolg\u00e1ltat\u00e1si k\u00f6telezetts\u00e9gv\u00e1llal\u00e1sok megszeg\u00e9s\u00e9nek vesz\u00e9lye fenn\u00e1ll.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-c11c2dfc gb-headline-text\">Szolg\u00e1ltat\u00e1si analitika \u00e9s jelent\u00e9sk\u00e9sz\u00edt\u00e9s<\/h4>\n\n\n\n<p>A megalapozott d\u00f6nt\u00e9shozatalt \u00e1tfog\u00f3 elemz\u00e9sek \u00e9s jelent\u00e9sek t\u00e1mogatj\u00e1k. Ez a komponens betekint\u00e9st ny\u00fajt a szolg\u00e1ltat\u00e1si m\u0171veletekbe, kiemelve a hat\u00e9konys\u00e1got \u00e9s a fejleszt\u00e9sre szorul\u00f3 ter\u00fcleteket.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-6e60efbd gb-headline-text\">Megel\u0151z\u0151 karbantart\u00e1s<\/h4>\n\n\n\n<p>Ahelyett, hogy megv\u00e1rn\u00e1, am\u00edg a g\u00e9pek vagy berendez\u00e9sek meghib\u00e1sodnak, ez a komponens rendszeres karbantart\u00e1si ellen\u0151rz\u00e9seket tervez, biztos\u00edtva, hogy az eszk\u00f6z\u00f6k optim\u00e1lis \u00e1llapotban maradjanak, \u00e9s cs\u00f6kkentve az \u00e1ll\u00e1sid\u0151t.<\/p>\n\n\n\n<h4 class=\"gb-headline gb-headline-c2d2726a gb-headline-text\">\u00dcgyf\u00e9lszolg\u00e1lat \u00e9s \u00fcgyf\u00e9lszolg\u00e1lat<\/h4>\n\n\n\n<p>Ez a funkci\u00f3 a v\u00e1llalkoz\u00e1sok \u00e9s az \u00fcgyfelek k\u00f6z\u00f6tti els\u0151 vonalbeli kapcsol\u00f3d\u00e1si pontk\u00e9nt szolg\u00e1l, \u00e9s kezeli az \u00fcgyf\u00e9lk\u00e9rd\u00e9seket, panaszokat \u00e9s visszajelz\u00e9seket, biztos\u00edtva a gyors megold\u00e1st \u00e9s a pozit\u00edv m\u00e1rkaim\u00e1zs fenntart\u00e1s\u00e1t.<\/p>\n\n\n\n<p>B\u00e1r ez az ERP Service Management n\u00e9h\u00e1ny kiemelked\u0151 \u00f6sszetev\u0151je, fontos megjegyezni, hogy a modul m\u00e9g t\u00f6bb, az egyedi \u00fczleti ig\u00e9nyekre szabott funkci\u00f3t k\u00edn\u00e1l. Ezek a kiemelt \u00f6sszetev\u0151k a legjobb \u00e9s leggyakrabban keresett funkci\u00f3kat k\u00e9pviselik, amelyek megalapozz\u00e1k a hat\u00e9kony \u00e9s eredm\u00e9nyes szolg\u00e1ltat\u00e1smenedzsmentet.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<div class=\"wp-block-uagb-image uagb-block-bfa107b0 wp-block-uagb-image--layout-default wp-block-uagb-image--effect-static wp-block-uagb-image--align-none\"><figure class=\"wp-block-uagb-image__figure\"><img decoding=\"async\" src=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/06\/Solutions-header-Flat-PNG-1024x302.png\" alt=\"SkyPlanner fejlett tervez\u00e9s \u00e9s \u00fctemez\u00e9s Megold\u00e1sok termel\u00e9si probl\u00e9m\u00e1kra\" class=\"uag-image-4232\" width=\"1024\" height=\"302\" title=\"\" loading=\"lazy\" role=\"img\"><\/figure><\/div>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Az ERP szolg\u00e1ltat\u00e1smenedzsment j\u00f6v\u0151beli trendjei  <\/h2>\n\n\n\n<p>Ahogy a technol\u00f3giai fejl\u0151d\u00e9s folyamatosan alak\u00edtja az \u00fczleti \u00e9letet, az ERP szolg\u00e1ltat\u00e1smenedzsment is fejl\u0151dik, \u00e9s \u00faj trendeket vesz \u00e1t a k\u00e9pess\u00e9geinek b\u0151v\u00edt\u00e9se \u00e9rdek\u00e9ben. A kialakul\u00f3ban l\u00e9v\u0151 trendek k\u00f6z\u00fcl a k\u00f6vetkez\u0151k figyelemre m\u00e9lt\u00f3ak:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Mesters\u00e9ges intelligencia (AI) \u00e9s g\u00e9pi tanul\u00e1s:<\/strong> A mesters\u00e9ges intelligencia \u00e9s a g\u00e9pi tanul\u00e1s be\u00e9p\u00edt\u00e9se az ERP szolg\u00e1ltat\u00e1smenedzsmentbe jobb el\u0151rejelz\u0151 elemz\u00e9st, intelligens er\u0151forr\u00e1s-eloszt\u00e1st \u00e9s automatiz\u00e1lt szolg\u00e1ltat\u00e1si folyamatokat eredm\u00e9nyezhet.<\/li>\n\n\n\n<li><strong>IoT-integr\u00e1ci\u00f3:<\/strong> Az <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/a-dolgok-internete-a-gyartas-megerositese\/\">IoT-eszk\u00f6z\u00f6k <\/a>val\u00f3s idej\u0171 adatokat szolg\u00e1ltathatnak a berendez\u00e9sekr\u0151l \u00e9s g\u00e9pekr\u0151l, lehet\u0151v\u00e9 t\u00e9ve a proakt\u00edv karbantart\u00e1st \u00e9s az id\u0151ben t\u00f6rt\u00e9n\u0151 szervizbeavatkoz\u00e1st.<\/li>\n\n\n\n<li><strong>Felh\u0151alap\u00fa rendszerek:<\/strong> A felh\u0151alap\u00fa ERP Service Management megold\u00e1sok sk\u00e1l\u00e1zhat\u00f3s\u00e1got, t\u00e1voli hozz\u00e1f\u00e9r\u00e9st \u00e9s cs\u00f6kkentett infrastruktur\u00e1lis k\u00f6lts\u00e9geket k\u00edn\u00e1lnak.<\/li>\n\n\n\n<li><strong>Tov\u00e1bbfejlesztett \u00fcgyf\u00e9l\u00e9lm\u00e9nyek:<\/strong> Az \u00fcgyf\u00e9lkapcsolat-kezel\u0151 (CRM) rendszerek integr\u00e1l\u00e1s\u00e1val a v\u00e1llalkoz\u00e1sok szem\u00e9lyre szabott szolg\u00e1ltat\u00e1si \u00e9lm\u00e9nyt ny\u00fajthatnak.<\/li>\n\n\n\n<li><strong>A kiterjesztett val\u00f3s\u00e1g (AR) t\u00e1mogat\u00e1sa:<\/strong> A helysz\u00edni szervizcsapatok sz\u00e1m\u00e1ra az AR virtu\u00e1lis seg\u00edts\u00e9get ny\u00fajthat, jav\u00edtva a szolg\u00e1ltat\u00e1sny\u00fajt\u00e1s min\u0151s\u00e9g\u00e9t \u00e9s sebess\u00e9g\u00e9t.<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">\u00d6t ipar\u00e1g profit\u00e1l ebb\u0151l az eszk\u00f6zb\u0151l<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Gy\u00e1rt\u00e1s:<\/strong> A gy\u00e1rt\u00f3k a hat\u00e9kony szervizmenedzsmentre t\u00e1maszkodnak a g\u00e9pek \u00e9s berendez\u00e9sek karbantart\u00e1s\u00e1nak biztos\u00edt\u00e1sa \u00e9rdek\u00e9ben, ami cs\u00f6kkenti az \u00e1ll\u00e1sid\u0151t \u00e9s n\u00f6veli a termel\u00e9kenys\u00e9get.<\/li>\n\n\n\n<li><strong>Eg\u00e9szs\u00e9g\u00fcgy:<\/strong> Az eg\u00e9szs\u00e9g\u00fcgyben az ERP Service Management racionaliz\u00e1lhatja az orvosi berendez\u00e9sek karbantart\u00e1s\u00e1t, biztos\u00edtva a biztons\u00e1gi el\u0151\u00edr\u00e1sok betart\u00e1s\u00e1t \u00e9s a betegek id\u0151ben t\u00f6rt\u00e9n\u0151 ell\u00e1t\u00e1s\u00e1t.<\/li>\n\n\n\n<li><strong>K\u00f6zm\u0171vek:<\/strong> A k\u00f6z\u00fczemi v\u00e1llalatok sz\u00e1m\u00e1ra el\u0151ny\u00f6s az optimaliz\u00e1lt helysz\u00edni szervizmenedzsment, amely biztos\u00edtja az infrastrukt\u00fara karbantart\u00e1s\u00e1t \u00e9s a szolg\u00e1ltat\u00e1si zavarok minimaliz\u00e1l\u00e1s\u00e1t.<\/li>\n\n\n\n<li><strong>Kiskereskedelem:<\/strong> A kiskeresked\u0151k sz\u00e1m\u00e1ra a hat\u00e9kony \u00fcgyf\u00e9lszolg\u00e1lat \u00e9s t\u00e1mogat\u00e1s l\u00e9tfontoss\u00e1g\u00fa. Ez az ERP modul biztos\u00edtja az \u00fcgyf\u00e9lk\u00e9rd\u00e9sek \u00e9s panaszok gyors kezel\u00e9s\u00e9t.<\/li>\n\n\n\n<li><strong>T\u00e1vk\u00f6zl\u00e9s:<\/strong> A t\u00e1vk\u00f6zl\u00e9si ipar\u00e1gban a h\u00e1l\u00f3zati infrastrukt\u00fara fenntart\u00e1sa \u00e9s a folyamatos szolg\u00e1ltat\u00e1sny\u00fajt\u00e1s szempontj\u00e1b\u00f3l kulcsfontoss\u00e1g\u00fa a hat\u00e9kony szervizmegrendel\u00e9s-kezel\u00e9s, a helysz\u00edni szerviz \u00e9s az eszk\u00f6zgazd\u00e1lkod\u00e1s.<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">APS rendszerek \u00e9s ERP szolg\u00e1ltat\u00e1smenedzsment<\/h2>\n\n\n\n<p>A <a href=\"https:\/\/skyplanner.ai\/hu\/\">Skyplanner fejlett tervez\u00e9si \u00e9s \u00fctemez\u00e9si (APS <\/a>) rendszere jelent\u0151sen jav\u00edthatja az ERP szolg\u00e1ltat\u00e1smenedzsmentet. A Skyplanner \u00e1tfog\u00f3 funkci\u00f3csomagot k\u00edn\u00e1l, amely kieg\u00e9sz\u00edti ezt az ERP-eszk\u00f6zt, \u00e9s biztos\u00edtja a hat\u00e9kony \u00fctemez\u00e9st, er\u0151forr\u00e1s-eloszt\u00e1st \u00e9s gy\u00e1rt\u00e1stervez\u00e9st. A Skyplanner er\u0151teljes analitik\u00e1j\u00e1val olyan betekint\u00e9st ny\u00fajt, amely tov\u00e1bb optimaliz\u00e1lhatja a szolg\u00e1ltat\u00e1skezel\u00e9si folyamatokat.<\/p>\n\n\n\n<p>Ha az ERP szolg\u00e1ltat\u00e1smenedzsmentet szeretn\u00e9 integr\u00e1lni \u00fczleti tev\u00e9kenys\u00e9g\u00e9be, a <a href=\"https:\/\/skyplanner.ai\/hu\/funkciok\/\">Skyplanner kiv\u00e1l\u00f3 v\u00e1laszt\u00e1s<\/a>.  <\/p>\n\n\n\n<p>A Skyplanner szakk\u00e9pzett csapata v\u00e9gigvezeti \u00d6nt a bevezet\u00e9si folyamaton, biztos\u00edtva, hogy a megold\u00e1s az \u00d6n egyedi ig\u00e9nyeihez igazodjon. T\u00e1mogat\u00e1sunkkal az \u00d6n v\u00e1llalkoz\u00e1sa kihaszn\u00e1lhatja az ERP szolg\u00e1ltat\u00e1smenedzsment erej\u00e9t, hogy n\u00f6veked\u00e9st \u00e9rjen el, \u00e9s a modern id\u0151kben is a versenyt\u00e1rsak el\u0151tt maradjon.<\/p>\n\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/hu\/kapcsolat-ertekesites\/\">L\u00e9pjen kapcsolatba vel\u00fcnk m\u00e9g ma, hogy t\u00f6bbet tudjon meg<\/a> arr\u00f3l, hogyan seg\u00edthet a Skyplanner abban, hogy v\u00e1llalkoz\u00e1sa a hat\u00e9konys\u00e1g \u00e9s a siker \u00faj magass\u00e1gokba emelkedjen.<\/p>\n\n\n\n<p><\/p>\n\n<\/div>\n\n<div class=\"gb-container gb-container-92545123\">\n<div class=\"gb-grid-wrapper gb-grid-wrapper-0a61546f\">\n<div class=\"gb-grid-column gb-grid-column-e4183086\"><div class=\"gb-container gb-container-e4183086\">\n\n<\/div><\/div>\n\n<div class=\"gb-grid-column gb-grid-column-84ccbb5d\"><div class=\"gb-container gb-container-84ccbb5d\">\n\n<\/div><\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>ERP szolg\u00e1ltat\u00e1smenedzsment Kezd\u0151lap \u00bb Forr\u00e1sok \u00bb ERP Service Management A gy\u00e1rt\u00e1stervez\u00e9s \u00f6sszetett ter\u00fclet\u00e9n az okosabb munkav\u00e9gz\u00e9s gyakran a megfelel\u0151 eszk\u00f6z\u00f6k \u00e9s strat\u00e9gi\u00e1k kihaszn\u00e1l\u00e1s\u00e1t jelenti. Az ERP Service Management, egy kiemelked\u0151 ERP modul, megtestes\u00edti ezt a b\u00f6lcsess\u00e9get. Az\u00e1ltal, hogy a m\u0171veletek ir\u00e1ny\u00edt\u00e1s\u00e1hoz \u00e9sszer\u0171s\u00edtett megk\u00f6zel\u00edt\u00e9st biztos\u00edt, lehet\u0151v\u00e9 teszi a gy\u00e1rt\u00e1stervez\u0151k sz\u00e1m\u00e1ra, hogy ne csak gyorsabban, hanem &#8211; &#8230; <a title=\"ERP szolg\u00e1ltat\u00e1smenedzsment\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/erp-szolgaltatasmenedzsment\/\" aria-label=\"Read more about ERP szolg\u00e1ltat\u00e1smenedzsment\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":6,"featured_media":15582,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2692,312],"tags":[],"class_list":["post-16155","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-erp-hu","category-forrasok","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>ERP szolg\u00e1ltat\u00e1smenedzsment &#8211; SkyPlanner<\/title>\n<meta name=\"description\" content=\"\u00d6sszess\u00e9g\u00e9ben az ERP Service Management olyan megold\u00e1s, amely n\u00f6veli a szervezeten bel\u00fcli szolg\u00e1ltat\u00e1si funkci\u00f3k hat\u00e9konys\u00e1g\u00e1t \u00e9s termel\u00e9kenys\u00e9g\u00e9t.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/erp-szolgaltatasmenedzsment\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ERP szolg\u00e1ltat\u00e1smenedzsment\" \/>\n<meta property=\"og:description\" content=\"\u00d6sszess\u00e9g\u00e9ben az ERP Service Management olyan megold\u00e1s, amely n\u00f6veli a szervezeten bel\u00fcli szolg\u00e1ltat\u00e1si funkci\u00f3k hat\u00e9konys\u00e1g\u00e1t \u00e9s termel\u00e9kenys\u00e9g\u00e9t.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/forrasok\/erp-szolgaltatasmenedzsment\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2023-08-24T09:05:50+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-19T20:27:10+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/08\/ERP-Service-Management--scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1709\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"SkyPlanner\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Szerz\u0151:\" \/>\n\t<meta name=\"twitter:data1\" content=\"SkyPlanner\" \/>\n\t<meta name=\"twitter:label2\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/erp-szolgaltatasmenedzsment\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/erp-szolgaltatasmenedzsment\\\/\"},\"author\":{\"name\":\"SkyPlanner\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\"},\"headline\":\"ERP szolg\u00e1ltat\u00e1smenedzsment\",\"datePublished\":\"2023-08-24T09:05:50+00:00\",\"dateModified\":\"2026-06-19T20:27:10+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/erp-szolgaltatasmenedzsment\\\/\"},\"wordCount\":2511,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/erp-szolgaltatasmenedzsment\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/08\\\/ERP-Service-Management--scaled.jpg\",\"articleSection\":[\"ERP\",\"forr\u00e1sok\"],\"inLanguage\":\"hu-HU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/erp-szolgaltatasmenedzsment\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/erp-szolgaltatasmenedzsment\\\/\",\"name\":\"ERP szolg\u00e1ltat\u00e1smenedzsment &#8211; SkyPlanner\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/erp-szolgaltatasmenedzsment\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/erp-szolgaltatasmenedzsment\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/08\\\/ERP-Service-Management--scaled.jpg\",\"datePublished\":\"2023-08-24T09:05:50+00:00\",\"dateModified\":\"2026-06-19T20:27:10+00:00\",\"description\":\"\u00d6sszess\u00e9g\u00e9ben az ERP Service Management olyan megold\u00e1s, amely n\u00f6veli a szervezeten bel\u00fcli szolg\u00e1ltat\u00e1si funkci\u00f3k hat\u00e9konys\u00e1g\u00e1t \u00e9s termel\u00e9kenys\u00e9g\u00e9t.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/erp-szolgaltatasmenedzsment\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/erp-szolgaltatasmenedzsment\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/erp-szolgaltatasmenedzsment\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/08\\\/ERP-Service-Management--scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2023\\\/08\\\/ERP-Service-Management--scaled.jpg\",\"width\":2560,\"height\":1709,\"caption\":\"ERP Service Management\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/erp-szolgaltatasmenedzsment\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ERP szolg\u00e1ltat\u00e1smenedzsment\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/9122a7382a3a91f77e5ed0207811724a\",\"name\":\"SkyPlanner\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g\",\"caption\":\"SkyPlanner\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"ERP szolg\u00e1ltat\u00e1smenedzsment &#8211; SkyPlanner","description":"\u00d6sszess\u00e9g\u00e9ben az ERP Service Management olyan megold\u00e1s, amely n\u00f6veli a szervezeten bel\u00fcli szolg\u00e1ltat\u00e1si funkci\u00f3k hat\u00e9konys\u00e1g\u00e1t \u00e9s termel\u00e9kenys\u00e9g\u00e9t.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/forrasok\/erp-szolgaltatasmenedzsment\/","og_locale":"hu_HU","og_type":"article","og_title":"ERP szolg\u00e1ltat\u00e1smenedzsment","og_description":"\u00d6sszess\u00e9g\u00e9ben az ERP Service Management olyan megold\u00e1s, amely n\u00f6veli a szervezeten bel\u00fcli szolg\u00e1ltat\u00e1si funkci\u00f3k hat\u00e9konys\u00e1g\u00e1t \u00e9s termel\u00e9kenys\u00e9g\u00e9t.","og_url":"https:\/\/skyplanner.ai\/hu\/forrasok\/erp-szolgaltatasmenedzsment\/","og_site_name":"SkyPlanner","article_published_time":"2023-08-24T09:05:50+00:00","article_modified_time":"2026-06-19T20:27:10+00:00","og_image":[{"width":2560,"height":1709,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/08\/ERP-Service-Management--scaled.jpg","type":"image\/jpeg"}],"author":"SkyPlanner","twitter_card":"summary_large_image","twitter_misc":{"Szerz\u0151:":"SkyPlanner","Becs\u00fclt olvas\u00e1si id\u0151":"7 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/erp-szolgaltatasmenedzsment\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/erp-szolgaltatasmenedzsment\/"},"author":{"name":"SkyPlanner","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a"},"headline":"ERP szolg\u00e1ltat\u00e1smenedzsment","datePublished":"2023-08-24T09:05:50+00:00","dateModified":"2026-06-19T20:27:10+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/erp-szolgaltatasmenedzsment\/"},"wordCount":2511,"publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/erp-szolgaltatasmenedzsment\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/08\/ERP-Service-Management--scaled.jpg","articleSection":["ERP","forr\u00e1sok"],"inLanguage":"hu-HU"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/erp-szolgaltatasmenedzsment\/","url":"https:\/\/skyplanner.ai\/hu\/forrasok\/erp-szolgaltatasmenedzsment\/","name":"ERP szolg\u00e1ltat\u00e1smenedzsment &#8211; SkyPlanner","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/erp-szolgaltatasmenedzsment\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/erp-szolgaltatasmenedzsment\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/08\/ERP-Service-Management--scaled.jpg","datePublished":"2023-08-24T09:05:50+00:00","dateModified":"2026-06-19T20:27:10+00:00","description":"\u00d6sszess\u00e9g\u00e9ben az ERP Service Management olyan megold\u00e1s, amely n\u00f6veli a szervezeten bel\u00fcli szolg\u00e1ltat\u00e1si funkci\u00f3k hat\u00e9konys\u00e1g\u00e1t \u00e9s termel\u00e9kenys\u00e9g\u00e9t.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/erp-szolgaltatasmenedzsment\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/forrasok\/erp-szolgaltatasmenedzsment\/"]}]},{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/erp-szolgaltatasmenedzsment\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/08\/ERP-Service-Management--scaled.jpg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/08\/ERP-Service-Management--scaled.jpg","width":2560,"height":1709,"caption":"ERP Service Management"},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/erp-szolgaltatasmenedzsment\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"ERP szolg\u00e1ltat\u00e1smenedzsment"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/9122a7382a3a91f77e5ed0207811724a","name":"SkyPlanner","image":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b7d00e63bfb49c23e740cab317acbfb7287b7fa23d51b75e89a6659494daa9dd?s=96&d=mm&r=g","caption":"SkyPlanner"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/08\/ERP-Service-Management--scaled.jpg",2560,1709,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/08\/ERP-Service-Management--150x150.jpg",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/08\/ERP-Service-Management--300x200.jpg",300,200,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/08\/ERP-Service-Management--768x513.jpg",768,513,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/08\/ERP-Service-Management--1024x683.jpg",1024,683,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/08\/ERP-Service-Management--1536x1025.jpg",1536,1025,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/08\/ERP-Service-Management--2048x1367.jpg",2048,1367,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2023\/08\/ERP-Service-Management--scaled.jpg",360,240,false]},"uagb_author_info":{"display_name":"SkyPlanner","author_link":"https:\/\/skyplanner.ai\/hu\/author\/bettina\/"},"uagb_comment_info":0,"uagb_excerpt":"ERP szolg\u00e1ltat\u00e1smenedzsment Kezd\u0151lap \u00bb Forr\u00e1sok \u00bb ERP Service Management A gy\u00e1rt\u00e1stervez\u00e9s \u00f6sszetett ter\u00fclet\u00e9n az okosabb munkav\u00e9gz\u00e9s gyakran a megfelel\u0151 eszk\u00f6z\u00f6k \u00e9s strat\u00e9gi\u00e1k kihaszn\u00e1l\u00e1s\u00e1t jelenti. Az ERP Service Management, egy kiemelked\u0151 ERP modul, megtestes\u00edti ezt a b\u00f6lcsess\u00e9get. Az\u00e1ltal, hogy a m\u0171veletek ir\u00e1ny\u00edt\u00e1s\u00e1hoz \u00e9sszer\u0171s\u00edtett megk\u00f6zel\u00edt\u00e9st biztos\u00edt, lehet\u0151v\u00e9 teszi a gy\u00e1rt\u00e1stervez\u0151k sz\u00e1m\u00e1ra, hogy ne csak gyorsabban, hanem &#8211;&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/16155","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=16155"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/16155\/revisions"}],"predecessor-version":[{"id":93617,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/16155\/revisions\/93617"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media\/15582"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=16155"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/categories?post=16155"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/tags?post=16155"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}