{"id":112800,"date":"2026-10-29T17:46:53","date_gmt":"2026-10-29T17:46:53","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=112800"},"modified":"2026-10-29T17:47:55","modified_gmt":"2026-10-29T17:47:55","slug":"muszaki-modositasi-utasitas","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/hu\/forrasok\/muszaki-modositasi-utasitas\/","title":{"rendered":"M\u0171szaki m\u00f3dos\u00edt\u00e1si utas\u00edt\u00e1s: j\u00f3v\u00e1hagy\u00e1st\u00f3l a gy\u00e1rt\u00e1sig"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">M\u0171szaki m\u00f3dos\u00edt\u00e1si utas\u00edt\u00e1s: j\u00f3v\u00e1hagy\u00e1st\u00f3l a gy\u00e1rt\u00e1sig<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/hu\/\">Kezd\u0151lap<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/\">Er\u0151forr\u00e1sok<\/a> &raquo; M\u0171szaki m\u00f3dos\u00edt\u00e1si utas\u00edt\u00e1s: j\u00f3v\u00e1hagy\u00e1st\u00f3l a gy\u00e1rt\u00e1sig<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Becs\u00fclt olvas\u00e1si id\u0151: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> perc<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>A m\u0171szaki ter\u00fclet j\u00f3v\u00e1hagyta az \u00faj rev\u00edzi\u00f3t. A beszerz\u00e9s m\u00e1r megkapta a friss\u00edtett alkatr\u00e9sz-specifik\u00e1ci\u00f3t. Egy nyitott gy\u00e1rt\u00e1si rendel\u00e9shez azonban m\u00e9g mindig a r\u00e9gi rajz van csatolva, egy m\u00e1sik t\u00e9tel pedig m\u00e1r t\u00fal van azon a m\u0171veleten, amelyet m\u00f3dos\u00edtani kell. Pontosan mit tegyen most a termel\u00e9s?<\/p>\n\n\n<p>A <strong>m\u0171szaki m\u00f3dos\u00edt\u00e1si utas\u00edt\u00e1s (ECO)<\/strong> szab\u00e1lyozott dokumentum, amely a term\u00e9k vagy a hozz\u00e1 tartoz\u00f3 gy\u00e1rt\u00e1si inform\u00e1ci\u00f3k m\u00f3dos\u00edt\u00e1s\u00e1nak meghat\u00e1roz\u00e1s\u00e1t, fel\u00fclvizsg\u00e1lat\u00e1t, enged\u00e9lyez\u00e9s\u00e9t \u00e9s v\u00e9grehajt\u00e1s\u00e1t szolg\u00e1lja. R\u00f6gz\u00edti, hogy mi v\u00e1ltozik, mely cikkek \u00e9s dokumentumok \u00e9rintettek, ki hagyja j\u00f3v\u00e1 a m\u00f3dos\u00edt\u00e1st, \u00e9s hogyan vezetik be azt. J\u00f3v\u00e1hagy\u00e1s ut\u00e1n a szervezet sz\u00e1m\u00e1ra egyeztetett alapot ad a v\u00e9grehajt\u00e1shoz.<\/p>\n\n\n<p>A j\u00f3v\u00e1hagy\u00e1s nem azonos a v\u00e9grehajt\u00e1ssal. A megfelel\u0151 m\u00f3dos\u00edt\u00e1st a megfelel\u0151 gy\u00e1rt\u00e1si munk\u00e1kban kell \u00e9rv\u00e9nyes\u00edteni, \u00e9s az \u00edgy sz\u00fcks\u00e9gess\u00e9 v\u00e1l\u00f3 munk\u00e1nak is bele kell f\u00e9rnie az \u00fczem kapacit\u00e1s\u00e1ba. A SkyPlanner APS az \u00fctemez\u00e9sben seg\u00edt: miut\u00e1n a j\u00f3v\u00e1hagyott m\u00f3dos\u00edt\u00e1sokat \u00e1tvezett\u00e9k az \u00e9rintett gy\u00e1rt\u00e1si feladatokon, meghat\u00e1rozza a hely\u00fcket az \u00fctemtervben a t\u00f6bbi rendel\u00e9s mellett, \u00e9s l\u00e1that\u00f3v\u00e1 teszi a befejez\u00e9si id\u0151pontokra gyakorolt hat\u00e1st.<\/p>\n\n\n<h2 class=\"wp-block-heading\">ECR, ECO \u00e9s ECN: mi a k\u00fcl\u00f6nbs\u00e9g?<\/h2>\n\n\n<p>\u00c9rdemes k\u00fcl\u00f6nv\u00e1lasztani a m\u00f3dos\u00edt\u00e1s kezdem\u00e9nyez\u00e9s\u00e9t, a v\u00e9grehajt\u00e1s meghat\u00e1roz\u00e1s\u00e1t \u00e9s enged\u00e9lyez\u00e9s\u00e9t, valamint a kiad\u00e1sr\u00f3l sz\u00f3l\u00f3 \u00e9rtes\u00edt\u00e9st:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>M\u0171szaki m\u00f3dos\u00edt\u00e1si k\u00e9relem (ECR):<\/strong> bemutatja a javasolt m\u00f3dos\u00edt\u00e1st \u00e9s annak indok\u00e1t, hogy a csapat m\u00e9rlegelhesse, \u00e9rdemes-e tov\u00e1bbl\u00e9pni.<\/li><li><strong>M\u0171szaki m\u00f3dos\u00edt\u00e1si utas\u00edt\u00e1s (ECO):<\/strong> meghat\u00e1rozza a m\u00f3dos\u00edt\u00e1st, \u00f6sszefogja az \u00e9rintett inform\u00e1ci\u00f3kat \u00e9s a v\u00e9grehajt\u00e1shoz sz\u00fcks\u00e9ges d\u00f6nt\u00e9seket, \u00e9s v\u00e9gigmegy az el\u0151\u00edrt fel\u00fclvizsg\u00e1lati \u00e9s j\u00f3v\u00e1hagy\u00e1si folyamaton.<\/li><li><strong>M\u0171szaki m\u00f3dos\u00edt\u00e1si \u00e9rtes\u00edt\u00e9s (ECN):<\/strong> k\u00f6zli a j\u00f3v\u00e1hagyott m\u00f3dos\u00edt\u00e1st \u00e9s a v\u00e9grehajt\u00e1shoz sz\u00fcks\u00e9ges tudnival\u00f3kat.<\/li><\/ul>\n\n\n<p>Az elnevez\u00e9sek \u00e9s a folyamat egyes szakaszainak hat\u00e1rai v\u00e1llalatonk\u00e9nt elt\u00e9rnek. Egyes gy\u00e1rt\u00f3k m\u00e1s \u00e9rtelemben haszn\u00e1lj\u00e1k az ECO \u00e9s az ECN kifejez\u00e9st, vagy \u00f6sszevonj\u00e1k a funkci\u00f3ikat. A v\u00e1llalat szab\u00e1lyozott folyamat\u00e1t k\u00f6vesse: \u00f6nmag\u00e1ban a r\u00f6vid\u00edt\u00e9sb\u0151l nem \u00e1llap\u00edthat\u00f3 meg, hogy enged\u00e9lyezt\u00e9k-e a munk\u00e1t.<\/p>\n\n\n<p>Az ECO vonatkozhat konstrukci\u00f3s hiba jav\u00edt\u00e1s\u00e1ra, egy alkatr\u00e9sz kiv\u00e1lt\u00e1s\u00e1ra, a gy\u00e1rt\u00e1s fejleszt\u00e9s\u00e9re vagy vev\u0151i k\u00f6vetelm\u00e9nyre. A fel\u00fclvizsg\u00e1lat m\u00e9lys\u00e9g\u00e9t a k\u00f6vetkezm\u00e9nyekhez kell igaz\u00edtani. Egy furat hely\u00e9nek m\u00f3dos\u00edt\u00e1sa \u00e9s egy rajzi megjegyz\u00e9s pontos\u00edt\u00e1sa nem felt\u00e9tlen\u00fcl ig\u00e9nyel azonos r\u00e1ford\u00edt\u00e1st a bevezet\u00e9s sor\u00e1n.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Mit tartalmazzon a m\u0171szaki m\u00f3dos\u00edt\u00e1si utas\u00edt\u00e1s?<\/h3>\n\n\n<p>A dokumentum legyen el\u00e9g r\u00e9szletes ahhoz, hogy minden felel\u0151s csapat v\u00e9gre tudja hajtani a feladat\u00e1t an\u00e9lk\u00fcl, hogy saj\u00e1t \u00e9rtelmez\u00e9s\u00e9re kellene hagyatkoznia. Tartalmazza az al\u00e1bbiakat:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>A m\u00f3dos\u00edt\u00e1s egyedi azonos\u00edt\u00f3ja, indoka, felel\u0151se \u00e9s aktu\u00e1lis \u00e1llapota.<\/li><li>Az \u00e9rintett cikksz\u00e1mok, szerelv\u00e9nyek \u00e9s dokumentumok, valamint a jelenlegi \u00e9s a javasolt rev\u00edzi\u00f3k.<\/li><li>A v\u00e1ltoz\u00e1s egy\u00e9rtelm\u0171 le\u00edr\u00e1sa, sz\u00fcks\u00e9g szerint a rajzokra, anyagjegyz\u00e9kekre, gy\u00e1rt\u00e1si \u00fatvonalakra, utas\u00edt\u00e1sokra \u00e9s ellen\u0151rz\u00e9si k\u00f6vetelm\u00e9nyekre is kiterjed\u0151en.<\/li><li>A beszerzett anyagokra, a k\u00e9szletre, a nyitott gy\u00e1rt\u00e1si munk\u00e1kra \u00e9s a k\u00e9szterm\u00e9kekre gyakorolt hat\u00e1s.<\/li><li>Az alkalmaz\u00e1si hat\u00e1r szab\u00e1lya: pontosan mely pontt\u00f3l kell az \u00faj k\u00f6vetelm\u00e9nyt alkalmazni.<\/li><li>A megl\u00e9v\u0151 anyagok \u00e9s gy\u00e1rt\u00e1si munk\u00e1k tov\u00e1bbi kezel\u00e9s\u00e9r\u0151l hozott d\u00f6nt\u00e9s, bele\u00e9rtve a kiv\u00e9teleket \u00e9s azok j\u00f3v\u00e1hagy\u00f3j\u00e1t.<\/li><li>A sz\u00fcks\u00e9ges j\u00f3v\u00e1hagy\u00e1sok, a v\u00e9grehajt\u00e1si felel\u0151ss\u00e9gek, az id\u0151z\u00edt\u00e9s \u00e9s a v\u00e9grehajt\u00e1st igazol\u00f3 dokumentumok.<\/li><\/ul>\n\n\n<p>A <a href=\"\/hu\/forrasok\/termekadat-kezeles-pdm\/\">term\u00e9kadat-kezel\u00e9s<\/a> seg\u00edt szab\u00e1lyozottan kezelni a term\u00e9k m\u0171szaki meghat\u00e1roz\u00e1s\u00e1t \u00e9s annak rev\u00edzi\u00f3it. Az ECO ezt kapcsolja \u00f6ssze egy adott m\u00f3dos\u00edt\u00e1ssal. A termel\u00e9snek azt is tudnia kell, hogy ezent\u00fal mely rendel\u00e9seket \u00e9s m\u0171veleteket kell m\u00e1sk\u00e9pp v\u00e9grehajtania.<\/p>\n\n\n<h2 class=\"wp-block-heading\">A bevezet\u00e9s megtervez\u00e9se el\u0151tt hat\u00e1rozza meg az \u00e9rintett munk\u00e1k k\u00f6r\u00e9t<\/h2>\n\n\n<p>Induljon ki a m\u00f3dos\u00edtott cikkb\u0151l, \u00e9s k\u00f6vesse v\u00e9gig, hol haszn\u00e1lj\u00e1k fel. Egy alkatr\u00e9sz t\u00f6bb szerelv\u00e9nyben, v\u00e1ltozatban vagy vev\u0151i megrendel\u00e9sben is szerepelhet. Egy rajzrev\u00edzi\u00f3 \u00e9rintheti a szersz\u00e1mokat, az ellen\u0151rz\u00e9si utas\u00edt\u00e1sokat \u00e9s a besz\u00e1ll\u00edt\u00f3n\u00e1l folyamatban l\u00e9v\u0151 munk\u00e1t is, nem csup\u00e1n a saj\u00e1t \u00fczemben megmunk\u00e1l\u00e1sra v\u00e1r\u00f3 t\u00e9teleket.<\/p>\n\n\n<p>Az \u00e9rintett t\u00e9telek k\u00f6r\u00e9t a t\u00e9nyleges nyilv\u00e1ntart\u00e1sok alapj\u00e1n \u00e1ll\u00edtsa \u00f6ssze, ne csak a legfrissebb term\u00e9kstrukt\u00far\u00e1b\u00f3l induljon ki. Ellen\u0151rizze a nyitott beszerz\u00e9si rendel\u00e9seket, a m\u00e1r bev\u00e9telezett vagy kiadott anyagokat, a gy\u00e1rt\u00e1si rendel\u00e9seket \u00e9s azok el\u0151rehalad\u00e1s\u00e1t, valamint a k\u00e9szterm\u00e9kk\u00e9szletet. A m\u00e1r kisz\u00e1ll\u00edtott darabokat is vizsg\u00e1lja meg, ha a m\u00f3dos\u00edt\u00e1s helysz\u00edni vagy vev\u0151i int\u00e9zked\u00e9st ig\u00e9nyel. Azt is r\u00f6gz\u00edtse, mi nem \u00e9rintett: \u00edgy egy sz\u0171k k\u00f6r\u0171 m\u00f3dos\u00edt\u00e1s nem okoz sz\u00fcks\u00e9gtelen fennakad\u00e1st az eg\u00e9sz \u00fczemben.<\/p>\n\n\n<p>Minden \u00e9rintett gy\u00e1rt\u00e1si rendel\u00e9sn\u00e9l azonos\u00edtsa az alkalmazand\u00f3 rev\u00edzi\u00f3t, a mennyis\u00e9get \u00e9s az aktu\u00e1lis m\u0171veletet. Tiszt\u00e1zza, mi t\u00f6rt\u00e9nt meg t\u00e9nylegesen a darabokkal. A \u201enyitott\u201d \u00e1llapot jelenthet m\u00e9g el sem kezdett gy\u00e1rt\u00e1si feladatot, m\u00e1r be\u00e9p\u00edtett alkatr\u00e9szeket tartalmaz\u00f3 szerelv\u00e9nyt vagy ellen\u0151rz\u00e9sre v\u00e1r\u00f3, majdnem k\u00e9sz term\u00e9ket is. Ezek a helyzetek elt\u00e9r\u0151 d\u00f6nt\u00e9seket ig\u00e9nyelnek.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Tegye egy\u00e9rtelm\u0171v\u00e9 az alkalmaz\u00e1si hat\u00e1rt<\/h3>\n\n\n<p>Az <strong>alkalmaz\u00e1si hat\u00e1r<\/strong> azt hat\u00e1rozza meg, hogy mely term\u00e9kekn\u00e9l vagy gy\u00e1rt\u00e1si munk\u00e1kn\u00e1l kell \u00e9rv\u00e9nyes\u00edteni a m\u00f3dos\u00edt\u00e1st. Megadhat\u00f3 d\u00e1tummal, sorozatsz\u00e1mmal, t\u00e9tellel, gy\u00e1rt\u00e1si rendel\u00e9ssel vagy m\u00e1s, szab\u00e1lyozottan kezelt azonos\u00edt\u00f3val. Olyan hat\u00e1rt v\u00e1lasszon, amelyet a csapatok \u00e9s a rendszerek k\u00f6vetkezetesen tudnak alkalmazni.<\/p>\n\n\n<p>A \u201eh\u00e9tf\u0151t\u0151l az \u00faj rev\u00edzi\u00f3t kell haszn\u00e1lni\u201d megfogalmaz\u00e1s fontos k\u00e9rd\u00e9seket hagy nyitva. A h\u00e9tf\u0151n l\u00e9trehozott rendel\u00e9sekre, a h\u00e9tf\u0151n indul\u00f3 m\u0171veletekre vagy a h\u00e9tf\u0151 ut\u00e1n kisz\u00e1ll\u00edtott term\u00e9kekre vonatkozik? Mi t\u00f6rt\u00e9nik azzal a t\u00e9tellel, amelynek gy\u00e1rt\u00e1sa \u00e1tny\u00falik ezen a hat\u00e1ron?<\/p>\n\n\n<p>Fogalmazza meg egy\u00e9rtelm\u0171en a k\u00edv\u00e1nt szab\u00e1lyt, sorolja fel az \u00e9rintett nyitott munk\u00e1kat, \u00e9s dokument\u00e1lja az enged\u00e9lyezett kiv\u00e9teleket. Ha a m\u00f3dos\u00edt\u00e1st a m\u00e1r megkezdett munk\u00e1kra is alkalmazni kell, egy k\u00e9s\u0151bbi \u00e9rv\u00e9nybel\u00e9p\u00e9si d\u00e1tum megad\u00e1sa nem helyettes\u00edti ezek azonnali azonos\u00edt\u00e1s\u00e1t \u00e9s szab\u00e1lyozott kezel\u00e9s\u00e9t.<\/p>\n\n\n<p>Miel\u0151tt v\u00e9gleges\u00edti az alkalmaz\u00e1si hat\u00e1rt, ellen\u0151rizze, hogy tarthat\u00f3-e. El\u0151fordulhat, hogy az \u00faj alkatr\u00e9sz csak a tervezett bevezet\u00e9s ut\u00e1n \u00e9rkezik meg, vagy a kieg\u00e9sz\u00edt\u0151 ellen\u0151rz\u00e9shez olyan er\u0151forr\u00e1sra van sz\u00fcks\u00e9g, amelyet m\u00e1r egy m\u00e1sik sz\u00e1ll\u00edt\u00e1shoz k\u00f6t\u00f6ttek le. Ezt az \u00fctk\u00f6z\u00e9st a m\u0171szaki ter\u00fcletnek, a min\u0151s\u00e9g\u00fcgynek, a beszerz\u00e9snek \u00e9s a termel\u00e9snek k\u00f6z\u00f6sen kell feloldania. A sz\u00e1ll\u00edt\u00e1si neh\u00e9zs\u00e9g nem jogos\u00edt fel egy nem j\u00f3v\u00e1hagyott r\u00e9gi rev\u00edzi\u00f3 haszn\u00e1lat\u00e1ra; ugyan\u00edgy egy rev\u00edzi\u00f3 j\u00f3v\u00e1hagy\u00e1sa sem teremti meg a gy\u00e1rt\u00e1s\u00e1hoz sz\u00fcks\u00e9ges kapacit\u00e1st.<\/p>\n\n\n<h2 class=\"wp-block-heading\">D\u00f6ntse el, mi t\u00f6rt\u00e9njen a m\u00e1r megkezdett munk\u00e1kkal<\/h2>\n\n\n<p>Tegy\u00fck fel, hogy j\u00f3v\u00e1hagyt\u00e1k egy tart\u00f3konzol furatkioszt\u00e1s\u00e1nak m\u00f3dos\u00edt\u00e1s\u00e1t, \u00e9s az \u00f6sszeszerel\u00e9s el\u0151tt egy tov\u00e1bbi ellen\u0151rz\u00e9st is el\u0151\u00edrtak. Egyes gy\u00e1rt\u00e1si rendel\u00e9seken m\u00e9g nem kezd\u0151d\u00f6tt el a munka. M\u00e1s konzolokat m\u00e1r megmunk\u00e1ltak, a k\u00e9sz szerelv\u00e9nyek pedig kisz\u00e1ll\u00edt\u00e1sra v\u00e1rnak.<\/p>\n\n\n<p>A konzol term\u00e9kt\u00f6rzs\u00e9nek friss\u00edt\u00e9se nem d\u00f6nti el, mi legyen az \u00e9rintett darabokkal. Minden \u00e9rintett csoportra vonatkoz\u00f3an egy\u00e9rtelm\u0171en rendelkezni kell a tov\u00e1bbi kezel\u00e9sr\u0151l: mi t\u00f6rt\u00e9nhet vel\u00fck ezut\u00e1n, \u00e9s kinek az enged\u00e9ly\u00e9vel.<\/p>\n\n\n<h3 class=\"wp-block-heading\">M\u00e9g meg nem kezdett munk\u00e1k<\/h3>\n\n\n<p>Az \u00e9rintett rendel\u00e9seken m\u00e9g a gy\u00e1rt\u00e1sba ad\u00e1s el\u0151tt vezesse \u00e1t a j\u00f3v\u00e1hagyott rev\u00edzi\u00f3t. Ellen\u0151rizze az anyagsz\u00fcks\u00e9gletet, a m\u0171veleti sorrendet, a be\u00e1ll\u00edt\u00e1si \u00e9s megmunk\u00e1l\u00e1si id\u0151ket, a szersz\u00e1mokat, az utas\u00edt\u00e1sokat \u00e9s az ellen\u0151rz\u00e9si feladatokat. Az \u00e9rv\u00e9ny\u00fcket vesztett utas\u00edt\u00e1sokat vonja vissza a felhaszn\u00e1l\u00e1s hely\u00e9r\u0151l.<\/p>\n\n\n<p>Ne felt\u00e9telezze, hogy egy megl\u00e9v\u0151 rendel\u00e9s automatikusan \u00e1tveszi a t\u00f6rzsadatok k\u00e9s\u0151bbi m\u00f3dos\u00edt\u00e1sait. Ellen\u0151rizze a rendel\u00e9s saj\u00e1t gy\u00e1rt\u00e1si adatait \u00e9s az \u00fctemez\u0151rendszerben haszn\u00e1lt gy\u00e1rt\u00e1si feladatokat. A term\u00e9kadatok m\u00e1r tartalmazhatj\u00e1k az \u00faj rev\u00edzi\u00f3t, mik\u00f6zben a rendel\u00e9s gy\u00e1rt\u00e1si \u00fatvonala v\u00e1ltozatlan marad.<\/p>\n\n\n<h3 class=\"wp-block-heading\">M\u00e1r megkezdett munk\u00e1k<\/h3>\n\n\n<p>A h\u00e1tral\u00e9v\u0151 munka terv\u00e9nek m\u00f3dos\u00edt\u00e1sa el\u0151tt \u00e1llap\u00edtsa meg a darabok t\u00e9nyleges \u00e1llapot\u00e1t. A konzolos p\u00e9ld\u00e1ban a m\u0171szaki ter\u00fcletnek \u00e9s a min\u0151s\u00e9g\u00fcgynek kell eld\u00f6ntenie, hogy a m\u00e1r megmunk\u00e1lt alkatr\u00e9szek ut\u00f3munk\u00e1lhat\u00f3k-e, ki kell-e \u0151ket cser\u00e9lni, vagy kifejezetten enged\u00e9lyezett kiv\u00e9tel alapj\u00e1n tov\u00e1bbengedhet\u0151k. A gy\u00e1rt\u00e1stervez\u0151 ezut\u00e1n \u00fctemezi a j\u00f3v\u00e1hagyott d\u00f6nt\u00e9sb\u0151l ad\u00f3d\u00f3 munk\u00e1t.<\/p>\n\n\n<p>Ha a folytat\u00e1s haszn\u00e1lhatatlan vagy nem elfogadhat\u00f3 darabokat eredm\u00e9nyezhet, a d\u00f6nt\u00e9s megsz\u00fclet\u00e9s\u00e9ig k\u00f6vesse az elfogadott z\u00e1rol\u00e1si elj\u00e1r\u00e1st. Azonos\u00edtsa a z\u00e1rolt mennyis\u00e9get \u00e9s m\u0171veleteket, hogy m\u0171szakv\u00e1lt\u00e1skor ne indulhasson \u00fajra \u00e9szrev\u00e9tlen\u00fcl a munka.<\/p>\n\n\n<p>\u0150rizze meg az elv\u00e9gzett munka \u00e9s a t\u00e9nyleges el\u0151rehalad\u00e1s adatait. Ha ut\u00f3munka sz\u00fcks\u00e9ges, hat\u00e1rozza meg a kieg\u00e9sz\u00edt\u0151 m\u0171veleteket \u00e9s az esetleges ism\u00e9telt ellen\u0151rz\u00e9st, ahelyett hogy a nyilv\u00e1ntart\u00e1sb\u00f3l \u00fagy t\u0171nne, mintha az eredeti m\u0171velet meg sem t\u00f6rt\u00e9nt volna. Ha a t\u00e9tel egy r\u00e9sze m\u00e1s gy\u00e1rt\u00e1si \u00fatvonalon halad tov\u00e1bb, egyeztesse a mennyis\u00e9geket, hogy minden darabbal el lehessen sz\u00e1molni.<\/p>\n\n\n<h3 class=\"wp-block-heading\">K\u00e9szterm\u00e9kk\u00e9szlet \u00e9s kisz\u00e1ll\u00edtott term\u00e9kek<\/h3>\n\n\n<p>K\u00fcl\u00f6n d\u00f6ntse el, hogy a k\u00e9szterm\u00e9kek tov\u00e1bbra is elfogadhat\u00f3k-e, ellen\u0151rz\u00e9sre vagy m\u00f3dos\u00edt\u00e1sra szorulnak-e, illetve meg kell-e tiltani a kisz\u00e1ll\u00edt\u00e1sukat. A j\u00f6v\u0151beni gy\u00e1rt\u00e1sra vonatkoz\u00f3 m\u0171szaki m\u00f3dos\u00edt\u00e1si utas\u00edt\u00e1s (ECO) nem jelenti automatikusan azt, hogy minden kor\u00e1bbi darabot m\u00f3dos\u00edtani kell, de a k\u00e9szterm\u00e9kk\u00e9szletet sem mentes\u00edti automatikusan a m\u00f3dos\u00edt\u00e1s al\u00f3l.<\/p>\n\n\n<p>A m\u00f3dos\u00edt\u00e1sra vonatkoz\u00f3 m\u0171szaki, min\u0151s\u00e9gi, vev\u0151i \u00e9s biztons\u00e1gi k\u00f6vetelm\u00e9nyekb\u0151l induljon ki. Az ut\u00f3lagos \u00e1talak\u00edt\u00e1sokat, a kisz\u00e1ll\u00edtott term\u00e9keken sz\u00fcks\u00e9ges beavatkoz\u00e1sokat \u00e9s a vev\u0151i j\u00f3v\u00e1hagy\u00e1ssal kapcsolatos teend\u0151ket ehhez a d\u00f6nt\u00e9shez kapcsol\u00f3d\u00f3an kezelje. E feladatok k\u00f6re nem vezethet\u0151 le abb\u00f3l, hogy a gy\u00e1rt\u00e1si megrendel\u00e9s lez\u00e1rt st\u00e1tusz\u00fa.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vezesse \u00e1t a j\u00f3v\u00e1hagyott m\u00f3dos\u00edt\u00e1st a folyamatban l\u00e9v\u0151 gy\u00e1rt\u00e1sba<\/h2>\n\n\n<p>Miut\u00e1n meg\u00e1llapodtak az \u00e9rintett t\u00e9telek k\u00f6r\u00e9r\u0151l \u00e9s azok kezel\u00e9s\u00e9r\u0151l, szervezze meg a v\u00e9grehajt\u00e1st szab\u00e1lyozott feladatk\u00e9nt. Nevezze meg a term\u00e9kadatok, a beszerz\u00e9si k\u00f6vetelm\u00e9nyek, a rendel\u00e9senk\u00e9nti adatok, a gy\u00e1rt\u00e1si feladatok \u00e9s az \u00fczemi munkautas\u00edt\u00e1sok friss\u00edt\u00e9s\u00e9\u00e9rt felel\u0151s szem\u00e9lyeket. A v\u00e9grehajt\u00e1snak legyen egy \u00e1tfog\u00f3 felel\u0151se, aki \u00f6sszehangolja \u00e9s ellen\u0151rzi a r\u00e9szfeladatok \u00e1tad\u00e1s\u00e1t.<\/p>\n\n\n<p>A konzol m\u00f3dos\u00edt\u00e1s\u00e1n\u00e1l ez t\u00f6bbet jelent egy \u00faj rajz csatol\u00e1s\u00e1n\u00e1l. Az \u00e9rintett gy\u00e1rt\u00e1si feladatokban szerepelni\u00fck kell a m\u00f3dos\u00edtott gy\u00e1rt\u00e1si m\u0171veleteknek, az esetlegesen j\u00f3v\u00e1hagyott ut\u00f3munk\u00e1nak \u00e9s a kieg\u00e9sz\u00edt\u0151 ellen\u0151rz\u00e9snek, az \u00f6sszeszerel\u00e9s el\u0151tti m\u0171veleti f\u00fcgg\u0151s\u00e9geket pedig helyesen kell megadni. Az anyagok rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1nak \u00e9s a legkor\u00e1bbi megengedett kezd\u00e9si id\u0151pontnak \u00f6sszhangban kell lennie az \u00faj verzi\u00f3 bevezet\u00e9s\u00e9r\u0151l hozott d\u00f6nt\u00e9ssel.<\/p>\n\n\n<p>Miel\u0151tt a t\u00f6meges friss\u00edt\u00e9sre hagyatkozna, ellen\u0151rizzen elej\u00e9t\u0151l a v\u00e9g\u00e9ig egy jellemz\u0151 \u00e9rintett rendel\u00e9st. A rendel\u00e9s a k\u00edv\u00e1nt verzi\u00f3ra hivatkozik? Helyesek a m\u00e9g h\u00e1tral\u00e9v\u0151 m\u0171veletei? A gy\u00e1rt\u00e1sban a megfelel\u0151 utas\u00edt\u00e1sokat l\u00e1tj\u00e1k? Ugyanazok a feladatok ker\u00fcltek be az \u00fctemez\u00e9si rendszerbe, amelyeket az \u00fczemben v\u00e9gre kell hajtani? Ezut\u00e1n ellen\u0151rizze \u00e9s egyeztesse a teljes \u00e9rintett list\u00e1t, a kiv\u00e9teleket \u00e9s a sikertelen friss\u00edt\u00e9seket is bele\u00e9rtve.<\/p>\n\n\n<p>Ez k\u00fcl\u00f6n\u00f6sen fontos, ha az adatok t\u00f6bb rendszer k\u00f6z\u00f6tt \u00e1ramlanak. Att\u00f3l, hogy a m\u0171szaki tervez\u0151rendszerben vagy a rendel\u00e9sr\u00f6gz\u00edt\u0151 rendszerben siker\u00fclt egy adatot m\u00f3dos\u00edtani, m\u00e9g nem bizony\u00edtott, hogy a m\u00e1r be\u00fctemezett gy\u00e1rt\u00e1si feladat is megv\u00e1ltozott. \u00c1llapodjanak meg arr\u00f3l, hogy az egyes mez\u0151knek melyik rendszer a gazd\u00e1ja, hogyan azonos\u00edtj\u00e1k a megl\u00e9v\u0151 gy\u00e1rt\u00e1si feladatokat, \u00e9s hogyan ellen\u0151rzik a friss\u00edt\u00e9st. A <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/egyedi-tervezes-es-gyartas-rendelesre\/\">rendel\u00e9sre tervez\u00e9s \u00e9s gy\u00e1rt\u00e1s<\/a> sor\u00e1n ugyanez a fegyelem sz\u00fcks\u00e9ges, ha a vev\u0151specifikus tervek egy r\u00e9sz\u00fck gy\u00e1rt\u00e1sba ad\u00e1sa ut\u00e1n tov\u00e1bb v\u00e1ltoznak.<\/p>\n\n\n<p>Csak ezut\u00e1n van \u00e9rtelme \u00fajrasz\u00e1m\u00edtani az \u00fctemtervet. Ellenkez\u0151 esetben a meggy\u0151z\u0151nek t\u0171n\u0151 befejez\u00e9si d\u00e1tum m\u00e9g mindig a r\u00e9gi m\u0171veletsorra vonatkozhat.<\/p>\n\n\n<h2 class=\"wp-block-heading\">N\u00e9zze meg a SkyPlanner seg\u00edts\u00e9g\u00e9vel, hogyan hat a m\u00f3dos\u00edt\u00e1s a sz\u00e1ll\u00edt\u00e1sra<\/h2>\n\n\n<p>A kieg\u00e9sz\u00edt\u0151 ellen\u0151rz\u00e9snek t\u00e9nyleges helyet kell biztos\u00edtani a v\u00e1rakoz\u00f3 feladatok k\u00f6z\u00f6tt. Az ut\u00f3munka ugyanaz\u00e9rt a megmunk\u00e1l\u00f3k\u00f6zpont\u00e9rt versenyezhet, mint a norm\u00e1l gy\u00e1rt\u00e1s. Egy m\u00e1sik alkatr\u00e9sz alkalmaz\u00e1sa megv\u00e1ltoztathatja, hogy mikor \u00e1llnak rendelkez\u00e9sre az \u00f6sszeszerel\u00e9s felt\u00e9telei. Ha csak az \u00e9rintett rendel\u00e9st mozgatja az \u00fctemtervben, a probl\u00e9ma egy m\u00e1sik vev\u0151 sz\u00e1ll\u00edt\u00e1s\u00e1n\u00e1l jelentkezhet.<\/p>\n\n\n<p>A SkyPlanner a munka\u00e1llom\u00e1sokat, a m\u0171szakokat, a g\u00e9pkezel\u0151ket, a priorit\u00e1sokat \u00e9s az anyagokat <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/mi-a-termelesutemezes\/\">egyetlen gy\u00e1rt\u00e1si tervben<\/a> fogja \u00f6ssze. Mesters\u00e9ges intelligenci\u00e1n alapul\u00f3 \u00fctemez\u0151je, az <strong>Arcturus<\/strong> a be\u00e1ll\u00edtott kapacit\u00e1s, az alkalmas er\u0151forr\u00e1sok \u00e9s a f\u00fcgg\u0151s\u00e9gek figyelembev\u00e9tel\u00e9vel \u00fctemezi a meghat\u00e1rozott m\u0171veleteket. A Gantt-id\u0151vonal megmutatja, hol zajlanak ezek a m\u0171veletek, \u00e9s mikorra v\u00e1rhat\u00f3 a munka befejez\u00e9se.<\/p>\n\n\n<p>Miut\u00e1n a konzol m\u00f3dos\u00edt\u00e1s\u00e1t \u00e1tvezett\u00e9k a megfelel\u0151 gy\u00e1rt\u00e1si feladatokba, a hozz\u00e1 tartoz\u00f3 megmunk\u00e1l\u00e1st, ellen\u0151rz\u00e9st \u00e9s \u00f6sszeszerel\u00e9st az ugyanazokat az er\u0151forr\u00e1sokat haszn\u00e1l\u00f3 t\u00f6bbi rendel\u00e9ssel egy\u00fctt l\u00e1thatja. Kevesebb id\u0151t kell a k\u00fcl\u00f6n\u00e1ll\u00f3 feladatsorok \u00fajra\u00e9p\u00edt\u00e9s\u00e9re \u00e9s a sz\u00e1ll\u00edt\u00e1si d\u00e1tumok k\u00e9zi egyeztet\u00e9s\u00e9re ford\u00edtania. A k\u00f6z\u00f6s \u00fctemterv \u00e1tl\u00e1that\u00f3bb alapot ad annak eld\u00f6nt\u00e9s\u00e9hez, hogy m\u00f3dos\u00edtsa-e a priorit\u00e1sokat, bevonjon-e tov\u00e1bbi rendelkez\u00e9sre \u00e1ll\u00f3 kapacit\u00e1st, vagy egyeztessen-e egy \u00faj v\u00e1llalt hat\u00e1rid\u0151r\u0151l.<\/p>\n\n\n<p>Ha az anyagell\u00e1t\u00e1st is figyelembe vev\u0151 \u00fctemez\u00e9s enged\u00e9lyezve van, az Arcturus az anyagok rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1val is sz\u00e1mol. Tartsa naprak\u00e9szen a j\u00f3v\u00e1hagyott alkatr\u00e9szekre \u00e9s azok el\u00e9rhet\u0151s\u00e9g\u00e9re vonatkoz\u00f3 adatokat: a k\u00e9szleten l\u00e9v\u0151 mennyis\u00e9g \u00f6nmag\u00e1ban nem igazolja, hogy egy alkatr\u00e9sz a megfelel\u0151 verzi\u00f3j\u00fa, vagy hogy felhaszn\u00e1l\u00e1sra enged\u00e9lyezt\u00e9k.<\/p>\n\n\n<p><strong>A SkyPlanner a ny\u00edlt REST API-j\u00e1n kereszt\u00fcl b\u00e1rmely ERP- vagy MES-rendszerrel integr\u00e1lhat\u00f3.<\/strong> A megl\u00e9v\u0151 gy\u00e1rt\u00e1si feladatok friss\u00edthet\u0151k a m\u00f3dos\u00edtott m\u0171veleti adatokkal, bele\u00e9rtve az id\u0151tartamokat, az utas\u00edt\u00e1sokat \u00e9s a rajzokra mutat\u00f3 hivatkoz\u00e1sokat. Az integr\u00e1ci\u00f3nak a t\u00e9nyleges gy\u00e1rt\u00e1si feladatokat kell c\u00e9loznia: a SkyPlanner a rendel\u00e9sr\u00f6gz\u00edt\u00e9s sor\u00e1n felvitt adatokat export\u00e1lja az \u00fctemez\u00e9sbe, de ha az export ut\u00e1n m\u00f3dos\u00edtj\u00e1k a rendel\u00e9sr\u00f6gz\u00edt\u00e9si adatokat, att\u00f3l az \u00fctemez\u00e9sben szerepl\u0151 gy\u00e1rt\u00e1si feladatok nem friss\u00fclnek.<\/p>\n\n\n<p>Ez a k\u00fcl\u00f6nbs\u00e9gt\u00e9tel fontos ahhoz, hogy a sz\u00e1m\u00edt\u00e1s eredm\u00e9nye haszn\u00e1lhat\u00f3 legyen. A m\u0171szaki j\u00f3v\u00e1hagy\u00e1st \u00e9s az \u00faj verzi\u00f3 alkalmaz\u00e1si hat\u00e1r\u00e1nak meghat\u00e1roz\u00e1s\u00e1t az egyeztetett m\u00f3dos\u00edt\u00e1si folyamatban kezelje, a d\u00f6nt\u00e9sek k\u00f6vetkezm\u00e9nyeit vezesse \u00e1t a megfelel\u0151 gy\u00e1rt\u00e1si feladatokba, az \u00fctemez\u00e9s kisz\u00e1m\u00edt\u00e1s\u00e1t pedig b\u00edzza a SkyPlanner rendszerre. A priorit\u00e1sokr\u00f3l \u00e9s arr\u00f3l, hogy mely \u00fctemez\u00e9si d\u00f6nt\u00e9seket kell v\u00e1ltozatlanul hagyni, \u00d6n hat\u00e1roz; az Arcturus ezek keretein bel\u00fcl dolgozik.<\/p>\n\n\n<h3 class=\"wp-block-heading\">K\u00e9rdezze saj\u00e1t MI-asszisztens\u00e9t az \u00e9rintett gy\u00e1rt\u00e1si feladatokr\u00f3l<\/h3>\n\n\n<p>Saj\u00e1t MI-asszisztens\u00e9vel, p\u00e9ld\u00e1ul a <strong>Claude, ChatGPT vagy Microsoft Copilot<\/strong> haszn\u00e1lat\u00e1val, MCP-kapcsolaton kereszt\u00fcl besz\u00e9lget\u00e9ses form\u00e1ban dolgozhat a SkyPlanner rendszerrel. Az MCP az asszisztenst a SkyPlanner adataival \u00e9s funkci\u00f3ival \u00f6sszek\u00f6t\u0151 kapcsolat. Az asszisztens a term\u00e9kismeretek mellett azokat a gy\u00e1rt\u00e1si adatokat is felhaszn\u00e1lhatja, amelyekhez hozz\u00e1f\u00e9r\u00e9si jogosults\u00e1ga van.<\/p>\n\n\n<p>Ehhez a feladathoz j\u00f3 kiindul\u00f3pont lehet a k\u00f6vetkez\u0151 k\u00e9r\u00e9s: \u201eMutasd meg ezeknek az \u00e9rintett gy\u00e1rt\u00e1si rendel\u00e9seknek a h\u00e1tral\u00e9v\u0151 m\u0171veleteit \u00e9s a tervezett befejez\u00e9si d\u00e1tumait.\u201d \u00cdgy a besz\u00e9lget\u00e9s a t\u00e9nyleges gy\u00e1rt\u00e1si feladatokra \u00f6sszpontosul, \u00e9s nem kell t\u00f6bb feladatsorb\u00f3l \u00f6sszegy\u0171jtenie a d\u00e1tumokat. Az enged\u00e9lyezett m\u00f3dos\u00edt\u00e1sokhoz is ig\u00e9nybe vehet\u0151k a SkyPlanner funkci\u00f3i; tov\u00e1bbra is a j\u00f3v\u00e1hagyott ECO \u00e9s az abban szerepl\u0151 \u00e9rintett rendel\u00e9sek list\u00e1ja hat\u00e1rozza meg, hogy min kell v\u00e1ltoztatni.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Mamec: az ism\u00e9tl\u0151d\u0151 gy\u00e1rt\u00e1si m\u00f3dos\u00edt\u00e1sok hat\u00e1sainak egyszer\u0171bb felm\u00e9r\u00e9se<\/h3>\n\n\n<p>A Mamec ipari kever\u0151berendez\u00e9seket \u00e9s b\u00e9rgy\u00e1rt\u00e1sban cs\u00facstechnol\u00f3gi\u00e1s term\u00e9keket gy\u00e1rt. A SkyPlanner bevezet\u00e9se el\u0151tt a t\u00f6bb ezer gy\u00e1rt\u00e1si rendel\u00e9s k\u00f6z\u00f6tti f\u00fcgg\u0151s\u00e9geket neh\u00e9z volt k\u00e9zzel kezelni, az \u00fczemi priorit\u00e1sokat pedig a pap\u00edralap\u00fa gy\u00e1rt\u00e1si rendel\u00e9seken szerepl\u0151 sz\u00e1ll\u00edt\u00e1si d\u00e1tumok hat\u00e1rozt\u00e1k meg. A teljes terhel\u00e9st neh\u00e9z volt \u00e1tl\u00e1tni.<\/p>\n\n\n<p>A Mamec integr\u00e1lta a SkyPlanner rendszer\u00e9t az Oscar ERP rendszerrel, \u00e9s a gy\u00e1rt\u00e1stervez\u00e9s els\u0151dleges platformjak\u00e9nt haszn\u00e1lja. Besz\u00e1mol\u00f3juk szerint cs\u00f6kkent a tervez\u00e9s munkaterhe, \u00e9s k\u00f6nnyebb\u00e9 v\u00e1lt a m\u00f3dos\u00edt\u00e1sok kezel\u00e9se a nagy k\u00f6vetelm\u00e9nyeket t\u00e1maszt\u00f3, vev\u0151vez\u00e9relt term\u00e9kfejleszt\u00e9sben. Amikor a gy\u00e1rt\u00e1si m\u0171veletsorok \u00fajra \u00e9s \u00fajra v\u00e1ltoznak, a hat\u00e1sok kevesebb munk\u00e1val felm\u00e9rhet\u0151k, \u00e9s a vev\u0151k t\u00e1j\u00e9koztathat\u00f3k arr\u00f3l, hogy mi v\u00e1llalhat\u00f3.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/hu\/ugyfeltortenetek\/mamec\/\">A Mamec SkyPlanner-tapasztalatai<\/a> j\u00f3l szeml\u00e9ltetik a k\u00f6z\u00f6s gy\u00e1rt\u00e1si terv el\u0151nyeit, amikor v\u00e1ltoznak a gy\u00e1rt\u00e1si feladatok. Itt az \u00e1tl\u00e1that\u00f3s\u00e1g \u00e9s az \u00fajratervez\u00e9s kisebb munkaterhe a l\u00e9nyeg, nem pedig az, hogy egy ECO j\u00f3v\u00e1hagy\u00e1s\u00e1t a gy\u00e1rt\u00e1sban m\u00e1r v\u00e9grehajtott m\u00f3dos\u00edt\u00e1snak tekints\u00fck.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ellen\u0151rizze a v\u00e9grehajt\u00e1st, \u00e9s csak ut\u00e1na v\u00e1llaljon \u00faj sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151t<\/h2>\n\n\n<p>A v\u00e9grehajt\u00e1s lez\u00e1r\u00e1sakor ellen\u0151rizze az \u00e9rintett t\u00e9telek teljes k\u00f6r\u00e9t. Gy\u0151z\u0151dj\u00f6n meg arr\u00f3l, hogy a kijel\u00f6lt rendel\u00e9sek \u00e9s a fizikai darabok a j\u00f3v\u00e1hagyott verzi\u00f3nak vagy a dokument\u00e1lt kiv\u00e9telnek megfelel\u0151en k\u00e9sz\u00fcltek, az el\u0151\u00edrt ellen\u0151rz\u00e9sek megt\u00f6rt\u00e9ntek, a felv\u00e1ltott utas\u00edt\u00e1sokat szab\u00e1lyozottan kezelt\u00e9k, \u00e9s a h\u00e1tral\u00e9v\u0151 teend\u0151knek van felel\u0151s\u00fck. R\u00f6gz\u00edtse a m\u00f3dos\u00edt\u00e1si folyamatban el\u0151\u00edrt igazol\u00f3 adatokat \u00e9s dokumentumokat; a j\u00f3v\u00e1hagy\u00e1s \u00e9s az \u00fajra\u00fctemezett Gantt-diagram \u00f6nmag\u00e1ban nem bizony\u00edtja a fizikai v\u00e9grehajt\u00e1st.<\/p>\n\n\n<p>Az \u00fctemez\u00e9si d\u00f6nt\u00e9snek ekkor m\u00e1r a t\u00e9nylegesen h\u00e1tral\u00e9v\u0151 munk\u00e1n kell alapulnia. Ha a m\u00f3dos\u00edtott m\u0171veletsor miatt v\u00e1ltozik a sz\u00e1ll\u00edt\u00e1s id\u0151pontja, k\u00f6z\u00f6lje az \u00faj v\u00e1llalt hat\u00e1rid\u0151t \u00e9s annak alapj\u00e1t. Ne hagyja, hogy az \u00e9rt\u00e9kes\u00edt\u00e9s, a gy\u00e1rt\u00e1s \u00e9s a vev\u0151 elt\u00e9r\u0151 d\u00e1tumokkal sz\u00e1moljon.<\/p>\n\n\n<p><strong>V\u00e1lassza a SkyPlanner rendszer\u00e9t, ha a j\u00f3v\u00e1hagyott m\u00f3dos\u00edt\u00e1sok miatt csapat\u00e1nak \u00fajra \u00e9s \u00fajra \u00e1t kell alak\u00edtania a gy\u00e1rt\u00e1si feladatsorokat \u00e9s a v\u00e1llalt sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket.<\/strong> A m\u00f3dos\u00edtott feladatok \u00edgy ugyanabban a kapacit\u00e1stervben kapnak helyet, mint minden m\u00e1s, aminek a legy\u00e1rt\u00e1s\u00e1t m\u00e1r elv\u00e1llalt\u00e1k.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/hu\/kapcsolat-ertekesites\/\">Foglaljon SkyPlanner-bemutat\u00f3t<\/a>, \u00e9s hozzon egy j\u00f3v\u00e1hagyott m\u00f3dos\u00edt\u00e1st, az \u00e9rintett nyitott rendel\u00e9sek list\u00e1j\u00e1t, azok aktu\u00e1lis gy\u00e1rt\u00e1si \u00e1llapot\u00e1t, valamint az \u00faj verzi\u00f3 alkalmaz\u00e1si hat\u00e1r\u00e1t meghat\u00e1roz\u00f3 tervezett szab\u00e1lyt. Az \u00edgy \u00e1tadott konkr\u00e9t adatok alapj\u00e1n megvizsg\u00e1lhatjuk, hogyan hatnak a friss\u00edtett m\u0171veletek a kapacit\u00e1sra \u00e9s a befejez\u00e9si d\u00e1tumokra. El\u0151bb ink\u00e1bb az \u00fctemez\u00e9st ismern\u00e9 meg? <a href=\"https:\/\/skyplanner.ai\/hu\/proba\/\">Pr\u00f3b\u00e1lja ki a SkyPlanner rendszer\u00e9t mintaadatokkal<\/a>, vagy haszn\u00e1lja a SkyPlanner Assistant MI-t\u00e1mogat\u00e1s\u00fa Els\u0151 l\u00e9p\u00e9sek funkci\u00f3j\u00e1t.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>M\u0171szaki m\u00f3dos\u00edt\u00e1si utas\u00edt\u00e1s: j\u00f3v\u00e1hagy\u00e1st\u00f3l a gy\u00e1rt\u00e1sig Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; M\u0171szaki m\u00f3dos\u00edt\u00e1si utas\u00edt\u00e1s: j\u00f3v\u00e1hagy\u00e1st\u00f3l a gy\u00e1rt\u00e1sig A m\u0171szaki ter\u00fclet j\u00f3v\u00e1hagyta az \u00faj rev\u00edzi\u00f3t. A beszerz\u00e9s m\u00e1r megkapta a friss\u00edtett alkatr\u00e9sz-specifik\u00e1ci\u00f3t. Egy nyitott gy\u00e1rt\u00e1si rendel\u00e9shez azonban m\u00e9g mindig a r\u00e9gi rajz van csatolva, egy m\u00e1sik t\u00e9tel pedig m\u00e1r t\u00fal van azon a m\u0171veleten, amelyet m\u00f3dos\u00edtani kell. &#8230; <a title=\"M\u0171szaki m\u00f3dos\u00edt\u00e1si utas\u00edt\u00e1s: j\u00f3v\u00e1hagy\u00e1st\u00f3l a gy\u00e1rt\u00e1sig\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/muszaki-modositasi-utasitas\/\" aria-label=\"Read more about M\u0171szaki m\u00f3dos\u00edt\u00e1si utas\u00edt\u00e1s: j\u00f3v\u00e1hagy\u00e1st\u00f3l a gy\u00e1rt\u00e1sig\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":112824,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2526,312],"tags":[],"class_list":["post-112800","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-es-utemezes","category-forrasok","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>M\u0171szaki m\u00f3dos\u00edt\u00e1si utas\u00edt\u00e1s: j\u00f3v\u00e1hagy\u00e1st\u00f3l a gy\u00e1rt\u00e1sig<\/title>\n<meta name=\"description\" content=\"A j\u00f3v\u00e1hagyott ECO-hoz is kell gy\u00e1rt\u00e1si terv: \u00e9rintett munk\u00e1k, rev\u00edzi\u00f3hat\u00e1rok, WIP-d\u00f6nt\u00e9sek, majd a kapacit\u00e1s \u00e9s a sz\u00e1ll\u00edt\u00e1s felm\u00e9r\u00e9se.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/muszaki-modositasi-utasitas\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"M\u0171szaki m\u00f3dos\u00edt\u00e1si utas\u00edt\u00e1s: j\u00f3v\u00e1hagy\u00e1st\u00f3l a gy\u00e1rt\u00e1sig\" \/>\n<meta property=\"og:description\" content=\"A j\u00f3v\u00e1hagyott ECO-hoz is kell gy\u00e1rt\u00e1si terv: \u00e9rintett munk\u00e1k, rev\u00edzi\u00f3hat\u00e1rok, WIP-d\u00f6nt\u00e9sek, majd a kapacit\u00e1s \u00e9s a sz\u00e1ll\u00edt\u00e1s felm\u00e9r\u00e9se.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/forrasok\/muszaki-modositasi-utasitas\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-29T17:46:53+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-29T17:47:55+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/engineering-change-order-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Szerz\u0151:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data2\" content=\"20 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/muszaki-modositasi-utasitas\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/muszaki-modositasi-utasitas\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"M\u0171szaki m\u00f3dos\u00edt\u00e1si utas\u00edt\u00e1s: j\u00f3v\u00e1hagy\u00e1st\u00f3l a gy\u00e1rt\u00e1sig\",\"datePublished\":\"2026-10-29T17:46:53+00:00\",\"dateModified\":\"2026-10-29T17:47:55+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/muszaki-modositasi-utasitas\\\/\"},\"wordCount\":4056,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/muszaki-modositasi-utasitas\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/engineering-change-order-hero.png\",\"articleSection\":[\"APS \u00e9s \u00fctemez\u00e9s\",\"forr\u00e1sok\"],\"inLanguage\":\"hu-HU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/muszaki-modositasi-utasitas\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/muszaki-modositasi-utasitas\\\/\",\"name\":\"M\u0171szaki m\u00f3dos\u00edt\u00e1si utas\u00edt\u00e1s: j\u00f3v\u00e1hagy\u00e1st\u00f3l a gy\u00e1rt\u00e1sig\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/muszaki-modositasi-utasitas\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/muszaki-modositasi-utasitas\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/engineering-change-order-hero.png\",\"datePublished\":\"2026-10-29T17:46:53+00:00\",\"dateModified\":\"2026-10-29T17:47:55+00:00\",\"description\":\"A j\u00f3v\u00e1hagyott ECO-hoz is kell gy\u00e1rt\u00e1si terv: \u00e9rintett munk\u00e1k, rev\u00edzi\u00f3hat\u00e1rok, WIP-d\u00f6nt\u00e9sek, majd a kapacit\u00e1s \u00e9s a sz\u00e1ll\u00edt\u00e1s felm\u00e9r\u00e9se.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/muszaki-modositasi-utasitas\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/muszaki-modositasi-utasitas\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/muszaki-modositasi-utasitas\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/engineering-change-order-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/engineering-change-order-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Bracket drawing points to a bin of L-brackets beside a parts tray and probe-and-magnifier inspection station.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/muszaki-modositasi-utasitas\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"M\u0171szaki m\u00f3dos\u00edt\u00e1si utas\u00edt\u00e1s: j\u00f3v\u00e1hagy\u00e1st\u00f3l a gy\u00e1rt\u00e1sig\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"M\u0171szaki m\u00f3dos\u00edt\u00e1si utas\u00edt\u00e1s: j\u00f3v\u00e1hagy\u00e1st\u00f3l a gy\u00e1rt\u00e1sig","description":"A j\u00f3v\u00e1hagyott ECO-hoz is kell gy\u00e1rt\u00e1si terv: \u00e9rintett munk\u00e1k, rev\u00edzi\u00f3hat\u00e1rok, WIP-d\u00f6nt\u00e9sek, majd a kapacit\u00e1s \u00e9s a sz\u00e1ll\u00edt\u00e1s felm\u00e9r\u00e9se.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/forrasok\/muszaki-modositasi-utasitas\/","og_locale":"hu_HU","og_type":"article","og_title":"M\u0171szaki m\u00f3dos\u00edt\u00e1si utas\u00edt\u00e1s: j\u00f3v\u00e1hagy\u00e1st\u00f3l a gy\u00e1rt\u00e1sig","og_description":"A j\u00f3v\u00e1hagyott ECO-hoz is kell gy\u00e1rt\u00e1si terv: \u00e9rintett munk\u00e1k, rev\u00edzi\u00f3hat\u00e1rok, WIP-d\u00f6nt\u00e9sek, majd a kapacit\u00e1s \u00e9s a sz\u00e1ll\u00edt\u00e1s felm\u00e9r\u00e9se.","og_url":"https:\/\/skyplanner.ai\/hu\/forrasok\/muszaki-modositasi-utasitas\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-29T17:46:53+00:00","article_modified_time":"2026-10-29T17:47:55+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/engineering-change-order-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Szerz\u0151:":"Jussi M\u00e4ntyl\u00e4","Becs\u00fclt olvas\u00e1si id\u0151":"20 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/muszaki-modositasi-utasitas\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/muszaki-modositasi-utasitas\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"M\u0171szaki m\u00f3dos\u00edt\u00e1si utas\u00edt\u00e1s: j\u00f3v\u00e1hagy\u00e1st\u00f3l a gy\u00e1rt\u00e1sig","datePublished":"2026-10-29T17:46:53+00:00","dateModified":"2026-10-29T17:47:55+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/muszaki-modositasi-utasitas\/"},"wordCount":4056,"publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/muszaki-modositasi-utasitas\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/engineering-change-order-hero.png","articleSection":["APS \u00e9s \u00fctemez\u00e9s","forr\u00e1sok"],"inLanguage":"hu-HU"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/muszaki-modositasi-utasitas\/","url":"https:\/\/skyplanner.ai\/hu\/forrasok\/muszaki-modositasi-utasitas\/","name":"M\u0171szaki m\u00f3dos\u00edt\u00e1si utas\u00edt\u00e1s: j\u00f3v\u00e1hagy\u00e1st\u00f3l a gy\u00e1rt\u00e1sig","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/muszaki-modositasi-utasitas\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/muszaki-modositasi-utasitas\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/engineering-change-order-hero.png","datePublished":"2026-10-29T17:46:53+00:00","dateModified":"2026-10-29T17:47:55+00:00","description":"A j\u00f3v\u00e1hagyott ECO-hoz is kell gy\u00e1rt\u00e1si terv: \u00e9rintett munk\u00e1k, rev\u00edzi\u00f3hat\u00e1rok, WIP-d\u00f6nt\u00e9sek, majd a kapacit\u00e1s \u00e9s a sz\u00e1ll\u00edt\u00e1s felm\u00e9r\u00e9se.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/muszaki-modositasi-utasitas\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/forrasok\/muszaki-modositasi-utasitas\/"]}]},{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/muszaki-modositasi-utasitas\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/engineering-change-order-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/engineering-change-order-hero.png","width":1672,"height":941,"caption":"Bracket drawing points to a bin of L-brackets beside a parts tray and probe-and-magnifier inspection station."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/muszaki-modositasi-utasitas\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"M\u0171szaki m\u00f3dos\u00edt\u00e1si utas\u00edt\u00e1s: j\u00f3v\u00e1hagy\u00e1st\u00f3l a gy\u00e1rt\u00e1sig"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/engineering-change-order-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/engineering-change-order-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/engineering-change-order-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/engineering-change-order-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/engineering-change-order-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/engineering-change-order-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/engineering-change-order-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/engineering-change-order-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"M\u0171szaki m\u00f3dos\u00edt\u00e1si utas\u00edt\u00e1s: j\u00f3v\u00e1hagy\u00e1st\u00f3l a gy\u00e1rt\u00e1sig Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; M\u0171szaki m\u00f3dos\u00edt\u00e1si utas\u00edt\u00e1s: j\u00f3v\u00e1hagy\u00e1st\u00f3l a gy\u00e1rt\u00e1sig A m\u0171szaki ter\u00fclet j\u00f3v\u00e1hagyta az \u00faj rev\u00edzi\u00f3t. A beszerz\u00e9s m\u00e1r megkapta a friss\u00edtett alkatr\u00e9sz-specifik\u00e1ci\u00f3t. Egy nyitott gy\u00e1rt\u00e1si rendel\u00e9shez azonban m\u00e9g mindig a r\u00e9gi rajz van csatolva, egy m\u00e1sik t\u00e9tel pedig m\u00e1r t\u00fal van azon a m\u0171veleten, amelyet m\u00f3dos\u00edtani kell.&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/112800","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=112800"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/112800\/revisions"}],"predecessor-version":[{"id":112863,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/112800\/revisions\/112863"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media\/112824"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=112800"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/categories?post=112800"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/tags?post=112800"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}