{"id":112193,"date":"2026-10-29T02:13:53","date_gmt":"2026-10-29T02:13:53","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=112193"},"modified":"2026-10-29T02:14:43","modified_gmt":"2026-10-29T02:14:43","slug":"polca","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/hu\/forrasok\/polca\/","title":{"rendered":"POLCA a gy\u00e1rt\u00e1sban: a cell\u00e1k k\u00f6z\u00f6tti \u00e1raml\u00e1s szab\u00e1lyoz\u00e1sa"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">POLCA a gy\u00e1rt\u00e1sban: a cell\u00e1k k\u00f6z\u00f6tti \u00e1raml\u00e1s szab\u00e1lyoz\u00e1sa<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/hu\/\">Kezd\u0151lap<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/\">Er\u0151forr\u00e1sok<\/a> &raquo; POLCA a gy\u00e1rt\u00e1sban: a cell\u00e1k k\u00f6z\u00f6tti \u00e1raml\u00e1s szab\u00e1lyoz\u00e1sa<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Becs\u00fclt olvas\u00e1si id\u0151: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> perc<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Egy gy\u00e1rt\u00f3cella \u00fajabb feladattal v\u00e9gez, de a k\u00f6vetkez\u0151 cella nem tudja folytatni a munk\u00e1t. Az els\u0151 csapat folyamatosan dolgozott. A rendel\u00e9s azonban csak a v\u00e1rakoz\u00e1si sorban kapott helyet, a hat\u00e1rid\u0151re t\u00f6rt\u00e9n\u0151 sz\u00e1ll\u00edt\u00e1s es\u00e9lye nem javult.<\/p>\n\n\n<p>Sokf\u00e9le term\u00e9k kis sorozat\u00fa gy\u00e1rt\u00e1s\u00e1n\u00e1l ezt nehezebb k\u00e9zben tartani, mert a gy\u00e1rt\u00e1si feladatok nem mind ugyanazt az \u00fatvonalat k\u00f6vetik. Az egyikhez forg\u00e1csol\u00e1s \u00e9s \u00f6sszeszerel\u00e9s kell, a m\u00e1sikhoz hegeszt\u00e9s \u00e9s fel\u00fcletkezel\u00e9s. Ilyen v\u00e1ltozatoss\u00e1g mellett nem \u00e9letszer\u0171 megold\u00e1s minden lehets\u00e9ges alkatr\u00e9szb\u0151l egy-egy szabv\u00e1nyos t\u00e1rol\u00f3nyi k\u00e9szletet tartani \u00e9s ut\u00e1np\u00f3tolni.<\/p>\n\n\n<p>A POLCA kapacit\u00e1sjelz\u00e9sekkel szab\u00e1lyozza a gy\u00e1rt\u00f3cell\u00e1k k\u00f6z\u00f6tti \u00e1raml\u00e1st. Seg\u00edt elker\u00fclni olyan feladatok elind\u00edt\u00e1s\u00e1t, amelyek csak tov\u00e1bb n\u00f6veln\u00e9k a torl\u00f3d\u00e1st a k\u00e9s\u0151bbi m\u0171veletekn\u00e9l. A k\u00f6vetkez\u0151 tervez\u00e9si k\u00e9rd\u00e9s ugyanilyen fontos: hogyan illeszthet\u0151k be az enged\u00e9lyezett feladatok a t\u00f6bbi rendel\u00e9s \u00e9s a k\u00f6z\u00f6sen haszn\u00e1lt g\u00e9pek munkarendj\u00e9be? A SkyPlanner APS egyetlen gy\u00e1rt\u00e1si \u00fctemtervben fogja \u00f6ssze ezeket a munk\u00e1kat, \u00edgy kevesebb k\u00e9zi egyeztet\u00e9sre van sz\u00fcks\u00e9g a cell\u00e1k k\u00fcl\u00f6n feladatlist\u00e1i \u00e9s az er\u0151forr\u00e1sok v\u00e1rakoz\u00e1si sorai k\u00f6z\u00f6tt.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mi a POLCA szerepe a gy\u00e1rt\u00e1sban?<\/h2>\n\n\n<p><strong>A POLCA a Paired-cell Overlapping Loops of Cards with Authorization r\u00f6vid\u00edt\u00e9se. Ez a termel\u00e9sir\u00e1ny\u00edt\u00e1si m\u00f3dszer cellap\u00e1rokhoz rendelt, korl\u00e1tozott sz\u00e1m\u00fa k\u00e1rty\u00e1val \u00e9s a gy\u00e1rt\u00e1si feladatok enged\u00e9lyez\u00e9si d\u00e1tum\u00e1val szab\u00e1lyozza, hogy mikor indulhat el a munka.<\/strong> Rajan Suri dolgozta ki a Quick Response Manufacturing r\u00e9szek\u00e9nt, sokf\u00e9le term\u00e9k kis sorozat\u00fa \u00e9s egyedi gy\u00e1rt\u00e1s\u00e1hoz.<\/p>\n\n\n<p>A l\u00e9nyegi k\u00fcl\u00f6nbs\u00e9g abban rejlik, hogy mit jelent a k\u00e1rtya. A POLCA-k\u00e1rtya egy adott cellap\u00e1rra vonatkoz\u00f3 kapacit\u00e1sjelz\u00e9s, nem pedig utas\u00edt\u00e1s egy meghat\u00e1rozott cikksz\u00e1m\u00fa alkatr\u00e9sz ut\u00e1np\u00f3tl\u00e1s\u00e1ra. A k\u00e1rty\u00e1k sz\u00e1m\u00e1nak korl\u00e1toz\u00e1sa szab hat\u00e1rt az adott k\u00e1rtyak\u00f6rben lek\u00f6t\u00f6tt befejezetlen termel\u00e9snek (WIP). K\u00fcl\u00f6nb\u00f6z\u0151 term\u00e9kek is haszn\u00e1lhatj\u00e1k ugyanazt a k\u00e1rtyak\u00f6rt, ha gy\u00e1rt\u00e1si \u00fatvonaluk \u00e1thalad az adott cellap\u00e1ron.<\/p>\n\n\n<p>K\u00e9t felt\u00e9telnek kell egy\u00fcttesen teljes\u00fclnie:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>A gy\u00e1rt\u00e1si feladat enged\u00e9lyezett.<\/strong> El\u00e9rkezett az adott cell\u00e1ra \u00e9rv\u00e9nyes enged\u00e9lyez\u00e9si d\u00e1tuma, \u00edgy nem indul el a tervben megengedettn\u00e9l kor\u00e1bban.<\/li><li><strong>A megfelel\u0151 k\u00e1rtyak\u00f6rben van szabad k\u00e1rtya.<\/strong> Ez enged\u00e9lyt ad arra, hogy tov\u00e1bbi munka ker\u00fclj\u00f6n a k\u00e9t cella k\u00f6z\u00f6tti \u00e1raml\u00e1sba.<\/li><\/ul>\n\n\n<p>A feladatnak emellett v\u00e9grehajt\u00e1sra k\u00e9sznek kell lennie, \u00e9s a sz\u00fcks\u00e9ges anyagnak is rendelkez\u00e9sre kell \u00e1llnia. Egy szabad k\u00e1rtya nem teremt vev\u0151i ig\u00e9nyt, nem p\u00f3tolja a hi\u00e1nyz\u00f3 alkatr\u00e9szt, \u00e9s nem tesz s\u00fcrg\u0151ss\u00e9 egy m\u00e9g nem enged\u00e9lyezett feladatot. Ugyan\u00edgy a tervezett kezd\u00e9si d\u00e1tum sem jogos\u00edt fel a megtelt k\u00e1rtyak\u00f6r korl\u00e1tj\u00e1nak figyelmen k\u00edv\u00fcl hagy\u00e1s\u00e1ra.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hogyan m\u0171k\u00f6dnek az \u00e1tfed\u0151 k\u00e1rtyak\u00f6r\u00f6k?<\/h2>\n\n\n<p>K\u00e9pzelj\u00fcnk el egy rendel\u00e9st, amely az A gy\u00e1rt\u00f3cell\u00e1n, a B forg\u00e1csol\u00f3cell\u00e1n \u00e9s a C \u00f6sszeszerel\u0151 cell\u00e1n halad \u00e1t. Az \u00fatvonala egy A\/B \u00e9s egy B\/C k\u00e1rtyak\u00f6rt haszn\u00e1l. Mindk\u00e9t k\u00f6rnek saj\u00e1t k\u00e1rty\u00e1i vannak: egy A\/B k\u00e1rtya nem helyettes\u00edthet B\/C k\u00e1rty\u00e1t.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ind\u00edt\u00e1s az A cell\u00e1ban, A\/B k\u00e1rty\u00e1val<\/h3>\n\n\n<p>Amikor a gy\u00e1rt\u00e1si feladat enged\u00e9lyezett\u00e9 v\u00e1lik az A cell\u00e1ban, a csapat ellen\u0151rzi, hogy van-e szabad A\/B k\u00e1rtya, \u00e9s rendelkez\u00e9sre \u00e1ll-e a munk\u00e1hoz sz\u00fcks\u00e9ges anyag. Ha a felt\u00e9telek teljes\u00fclnek, a k\u00e1rty\u00e1t a feladathoz csatolj\u00e1k, \u00e9s megkezd\u0151dik a megmunk\u00e1l\u00e1s.<\/p>\n\n\n<p>Az A\/B k\u00e1rtya a feladattal marad, amikor az A cella v\u00e9gez, \u00e9s \u00e1tadja a munk\u00e1t a B cell\u00e1nak. <strong>Att\u00f3l m\u00e9g nem ker\u00fcl vissza az A cell\u00e1ba, hogy az ottani gy\u00e1rt\u00e1s befejez\u0151d\u00f6tt.<\/strong> A k\u00e1rtya mindaddig foglalt marad, am\u00edg a feladat a B cell\u00e1n\u00e1l v\u00e1rakozik, illetve am\u00edg ott dolgoznak rajta.<\/p>\n\n\n<h3 class=\"wp-block-heading\">B\/C k\u00e1rtya csatol\u00e1sa a B cell\u00e1ban v\u00e9gzett munka kezdete el\u0151tt<\/h3>\n\n\n<p>Miel\u0151tt a B cell\u00e1ban megkezd\u0151dne a forg\u00e1csol\u00e1s, a feladatnak ott is enged\u00e9lyezettnek kell lennie, \u00e9s szabad B\/C k\u00e1rty\u00e1ra is sz\u00fcks\u00e9g van. A B cell\u00e1ban v\u00e9gzett megmunk\u00e1l\u00e1s alatt ez\u00e9rt a feladathoz a bej\u00f6v\u0151 A\/B \u00e9s a kimen\u0151 B\/C k\u00e1rtya egyar\u00e1nt hozz\u00e1 van rendelve. Ezt jelenti az \u00e1tfed\u00e9s: a B cella mindk\u00e9t k\u00e1rtyak\u00f6rh\u00f6z tartozik.<\/p>\n\n\n<p>Ha nincs szabad B\/C k\u00e1rtya, a forg\u00e1csol\u00e1s elind\u00edt\u00e1sa olyan \u00fatvonalra terhelne tov\u00e1bbi munk\u00e1t, amelyen az enged\u00e9lyezett munkamennyis\u00e9g m\u00e1r le van k\u00f6tve. A B cell\u00e1ban ehelyett egy m\u00e1sik, v\u00e9grehajt\u00e1sra k\u00e9sz \u00e9s enged\u00e9lyezett feladatot \u00e9rdemes v\u00e1lasztani, amelyhez rendelkez\u00e9sre \u00e1ll a sz\u00fcks\u00e9ges k\u00e1rtya. Ha nincs ilyen feladat, a m\u0171szakvezet\u0151 az akad\u00e1ly elh\u00e1r\u00edt\u00e1s\u00e1ra vagy m\u00e1s hasznos munk\u00e1ra ir\u00e1ny\u00edthatja \u00e1t a csapatot, ahelyett, hogy puszt\u00e1n a B cella foglalkoztat\u00e1sa \u00e9rdek\u00e9ben ind\u00edtana el \u00fajabb munk\u00e1t.<\/p>\n\n\n<h3 class=\"wp-block-heading\">A k\u00e1rtya visszak\u00fcld\u00e9se a m\u00e1sodik cella munk\u00e1j\u00e1nak befejez\u00e9se ut\u00e1n<\/h3>\n\n\n<p>Amint a B cella v\u00e9gez a feladattal, \u00e9s az tov\u00e1bbhalad a C cell\u00e1ba, az A\/B k\u00e1rtya visszaker\u00fcl az A cell\u00e1ba. Ott egy \u00fajabb, a felt\u00e9teleknek megfelel\u0151, B fel\u00e9 tart\u00f3 feladathoz haszn\u00e1lhat\u00f3 fel.<\/p>\n\n\n<p>A B\/C k\u00e1rtya a rendel\u00e9ssel marad a C cell\u00e1ban is. Amikor a C cella befejezi a munk\u00e1t, ez a k\u00e1rtya visszaker\u00fcl a B cell\u00e1ba. Ha a C a szab\u00e1lyozott gy\u00e1rt\u00e1si folyamat utols\u00f3 cell\u00e1ja, az ottani munkakezd\u00e9shez m\u00e1r nincs sz\u00fcks\u00e9g tov\u00e1bbi, kimen\u0151 k\u00e1rtyak\u00f6rh\u00f6z tartoz\u00f3 k\u00e1rty\u00e1ra.<\/p>\n\n\n<p>Ez a visszak\u00fcld\u00e9si szab\u00e1ly teszi hasznoss\u00e1 a jelz\u00e9st. Az A\/B k\u00e1rtya id\u0151 el\u0151tti visszak\u00fcld\u00e9se \u00fajabb munk\u00e1t engedne a k\u00f6rbe, miel\u0151tt a m\u00e1r benne l\u00e9v\u0151 feladat befejez\u0151dne a B cell\u00e1ban. Egy befejezett feladat k\u00e1rty\u00e1j\u00e1nak indokolatlan visszatart\u00e1sa viszont olyan enged\u00e9lyt k\u00f6tne le, amelyet m\u00e1r \u00fajra fel lehetne haszn\u00e1lni.<\/p>\n\n\n<p>A k\u00e1rtya ugyanakkor nem jelent foglal\u00e1st egy azonnal rendelkez\u00e9sre \u00e1ll\u00f3 g\u00e9pre. A k\u00e1rtyak\u00f6rben lek\u00f6t\u00f6tt munkamennyis\u00e9get szab\u00e1lyozza, nem pedig a cell\u00e1kon bel\u00fcli \u00f6sszes m\u0171velet pontos v\u00e9grehajt\u00e1si id\u0151pontj\u00e1t hat\u00e1rozza meg.<\/p>\n\n\n<h2 class=\"wp-block-heading\">A POLCA, a kanban \u00e9s a CONWIP m\u00e1st-m\u00e1st szab\u00e1lyoz<\/h2>\n\n\n<p>Mindh\u00e1rom m\u00f3dszer enged\u00e9lyez\u0151 jelz\u00e9seket haszn\u00e1l, de m\u00e1s-m\u00e1s k\u00e9rd\u00e9sre ad v\u00e1laszt.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>M\u00f3dszer<\/th><th>Mit enged\u00e9lyez jellemz\u0151en a jelz\u00e9s?<\/th><th>Mikor alkalmazhat\u00f3?<\/th><\/tr><\/thead><tbody><tr><td>Alkatr\u00e9szhez k\u00f6t\u00f6tt termel\u00e9si kanban<\/td><td>Meghat\u00e1rozott alkatr\u00e9sz adott mennyis\u00e9g\u00e9nek ut\u00e1np\u00f3tl\u00e1s\u00e1t a felhaszn\u00e1l\u00e1s ut\u00e1n<\/td><td>Ism\u00e9tl\u0151d\u0151en gy\u00e1rtott alkatr\u00e9szekn\u00e9l, ha kialak\u00edthat\u00f3 m\u0171k\u00f6d\u0151k\u00e9pes ut\u00e1np\u00f3tl\u00e1si k\u00f6r<\/td><\/tr><tr><td>CONWIP<\/td><td>\u00dajabb feladat bel\u00e9p\u00e9s\u00e9t egy meghat\u00e1rozott folyamatba, amikor felszabadul az \u00f6sszes befejezetlen termel\u00e9st korl\u00e1toz\u00f3 enged\u00e9ly<\/td><td>Egy kijel\u00f6lt rendszerhat\u00e1ron bel\u00fcli munkamennyis\u00e9g szab\u00e1lyoz\u00e1s\u00e1ra<\/td><\/tr><tr><td>POLCA<\/td><td>Munka bel\u00e9p\u00e9s\u00e9t egy adott cellap\u00e1r k\u00e1rtyak\u00f6r\u00e9be, ha a feladat enged\u00e9lyezett<\/td><td>Ha a k\u00fcl\u00f6nb\u00f6z\u0151 term\u00e9kek elt\u00e9r\u0151 \u00fatvonalakon haladnak a cell\u00e1k k\u00f6z\u00f6tt<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>A <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/kanban-a-gyartasban\/\">kanban a gy\u00e1rt\u00e1sban<\/a> akkor hasznos, ha az ut\u00e1np\u00f3toland\u00f3 cikk \u00e9s az ut\u00e1np\u00f3tl\u00e1s menete ism\u00e9tl\u0151d\u0151. Egy m\u00e9g meg sem tervezett vagy meg sem rendelt egyedi alkatr\u00e9szt nem lehet \u00fagy kezelni, mintha szabv\u00e1nyos, rakt\u00e1ron tartott alkatr\u00e9sz lenne.<\/p>\n\n\n<p>A <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/conwip\/\">CONWIP k\u00fcl\u00f6nb\u00f6z\u0151 term\u00e9keket is k\u00e9pes kezelni<\/a> an\u00e9lk\u00fcl, hogy minden alkatr\u00e9szhez k\u00fcl\u00f6n ut\u00e1np\u00f3tl\u00e1si k\u00e1rty\u00e1ra lenne sz\u00fcks\u00e9g. Meghat\u00e1roz\u00f3 szab\u00e1lyoz\u00e1si eszk\u00f6ze a kijel\u00f6lt folyamat eg\u00e9sz\u00e9re \u00e9rv\u00e9nyes WIP-korl\u00e1t. A POLCA ezzel szemben helyi jelz\u00e9seket ad a feladat \u00fatvonal\u00e1n szerepl\u0151 cellap\u00e1rok k\u00f6z\u00f6tti kapcsolatokhoz, nem csup\u00e1n egyetlen, a teljes folyamatra vonatkoz\u00f3 korl\u00e1tra t\u00e1maszkodik.<\/p>\n\n\n<p>A gyakorlatban nem az alapj\u00e1n \u00e9rdemes v\u00e1lasztani, hogy melyik r\u00f6vid\u00edt\u00e9s hangzik korszer\u0171bbnek. Azt kell tiszt\u00e1zni, mit szeretn\u00e9nk szab\u00e1lyozni: ismert cikkek ut\u00e1np\u00f3tl\u00e1s\u00e1t, egy k\u00f6r\u00fclhat\u00e1rolt rendszer teljes munkamennyis\u00e9g\u00e9t, vagy a v\u00e1ltoz\u00f3 \u00fatvonalakon, cell\u00e1k k\u00f6z\u00f6tt lek\u00f6t\u00f6tt munk\u00e1t. Az \u00fczem k\u00fcl\u00f6nb\u00f6z\u0151 ter\u00fcletein elt\u00e9r\u0151 v\u00e1laszok sz\u00fclethetnek.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Megfelel\u0151 v\u00e1laszt\u00e1s a POLCA az \u00d6n \u00fczem\u00e9ben?<\/h2>\n\n\n<p>A POLCA alkalmaz\u00e1s\u00e1t akkor \u00e9rdemes megvizsg\u00e1lni, ha a term\u00e9kek sokf\u00e9les\u00e9ge neh\u00e9zkess\u00e9 teszi az alkatr\u00e9szenk\u00e9nti ut\u00e1np\u00f3tl\u00e1st, de a gy\u00e1rt\u00e1si \u00fatvonalak tov\u00e1bbra is j\u00f3l azonos\u00edthat\u00f3 cell\u00e1kon haladnak \u00e1t. Minden feladatn\u00e1l tudni kell, melyik cella k\u00f6vetkezik, \u00e9s biztos\u00edtani kell a hozz\u00e1 tartoz\u00f3 k\u00e1rtyak\u00f6r\u00f6k m\u0171k\u00f6dtet\u00e9s\u00e9t.<\/p>\n\n\n<p>K\u00fcl\u00f6n\u00f6sen akkor lehet hasznos, ha a helyi d\u00f6nt\u00e9sek rendre torl\u00f3d\u00e1st okoznak a folyamat k\u00e9s\u0151bbi pontjain: egy megel\u0151z\u0151 m\u0171veletet v\u00e9gz\u0151 csapat a saj\u00e1t kihaszn\u00e1lts\u00e1ga \u00e9rdek\u00e9ben \u00faj munk\u00e1t ind\u00edt, mik\u00f6zben a fogad\u00f3 cella m\u00e1r \u00edgy is nehezen birk\u00f3zik meg a feladataival. A m\u00f3dszer t\u00e1mpontot ad a csapatnak ahhoz, hogy a torl\u00f3d\u00e1s n\u00f6vel\u00e9se helyett m\u00e1sik enged\u00e9lyezett feladatot v\u00e1lasszon.<\/p>\n\n\n<p>El\u0151fordulhat azonban, hogy el\u0151bb az alapokat kell rendbe tenni. A megb\u00edzhatatlan gy\u00e1rt\u00e1si \u00fatvonalak megnehez\u00edtik a megfelel\u0151 k\u00e1rtya kiv\u00e1laszt\u00e1s\u00e1t. Az anyaghi\u00e1ny \u00fagy k\u00f6theti le a feladatokat \u00e9s a k\u00e1rty\u00e1kat, hogy k\u00f6zben nem halad a munka. Ha egy cella kapacit\u00e1sa tart\u00f3san nem elegend\u0151 a v\u00e1llalt ig\u00e9nyek teljes\u00edt\u00e9s\u00e9hez, kapacit\u00e1sr\u00f3l sz\u00f3l\u00f3 d\u00f6nt\u00e9sre van sz\u00fcks\u00e9g, nem puszt\u00e1n a k\u00e1rty\u00e1k sz\u00e1m\u00e1nak m\u00f3dos\u00edt\u00e1s\u00e1ra.<\/p>\n\n\n<p>A k\u00e1rtyak\u00f6r\u00f6k sz\u00e1ma \u00e9s szerepe \u00e9ppolyan fontos, mint a term\u00e9kek v\u00e1ltozatoss\u00e1ga. Ha nagyon sok, ritk\u00e1n haszn\u00e1lt kapcsolat van a cellap\u00e1rok k\u00f6z\u00f6tt, neh\u00e9zkess\u00e9 v\u00e1lhat a nyilv\u00e1ntart\u00e1suk. \u00c9rdemes egy \u00f6sszetartoz\u00f3 term\u00e9kcsal\u00e1ddal kezdeni, amelynek \u00fatvonalai \u00e9s a cell\u00e1k k\u00f6z\u00f6tti \u00e1tad\u00e1sai vil\u00e1gosan le\u00edrhat\u00f3k, ahelyett, hogy minden elk\u00e9pzelhet\u0151 r\u00e9szlegp\u00e1r k\u00f6z\u00e9 k\u00e1rty\u00e1t rendeln\u00e9nk.<\/p>\n\n\n<p>Mindenekel\u0151tt a vezet\u00e9snek is t\u00e1mogatnia kell az elv\u00e1rt m\u0171k\u00f6d\u00e9st. Ha a g\u00e9pkezel\u0151ket kiz\u00e1r\u00f3lag az\u00e9rt jutalmazz\u00e1k, hogy saj\u00e1t g\u00e9p\u00fcket folyamatosan foglalkoztass\u00e1k, er\u0151s \u00f6szt\u00f6nz\u00e9st kapnak egy olyan szab\u00e1ly megker\u00fcl\u00e9s\u00e9re, amely id\u0151nk\u00e9nt \u00e9ppen a munkakezd\u00e9st tiltja meg. A k\u00eds\u00e9rleti bevezet\u00e9st a rendel\u00e9sek \u00e1raml\u00e1sa \u00e9s a sz\u00e1ll\u00edt\u00e1si teljes\u00edtm\u00e9ny alapj\u00e1n \u00e9rt\u00e9kelje, ne csup\u00e1n a kihaszn\u00e1lts\u00e1g szerint.<\/p>\n\n\n<h2 class=\"wp-block-heading\">A pr\u00f3ba\u00fczem a termel\u00e9s \u00e1raml\u00e1s\u00e1t tesztelje, ne csak a k\u00e1rty\u00e1k kezel\u00e9s\u00e9t<\/h2>\n\n\n<p>V\u00e1lasszon ki a t\u00e9nyleges rendel\u00e9sekb\u0151l egy j\u00f3l kezelhet\u0151 csoportot, \u00e9s t\u00e9rk\u00e9pezze fel, mely cell\u00e1kon haladnak kereszt\u00fcl. Vonja be azokat is, akik a munk\u00e1t \u00fctemezik, v\u00e9gzik, illetve a munkadarabokat mozgatj\u00e1k. Az indul\u00e1s el\u0151tt k\u00f6z\u00f6sen kell tiszt\u00e1zniuk n\u00e9gy gyakorlati k\u00e9rd\u00e9st.<\/p>\n\n\n<p><strong>Mennyi munk\u00e1t k\u00e9pvisel egy k\u00e1rtya?<\/strong> Egy\u00e9rtelm\u0171en meg kell \u00e1llapodni abban, mit jelent a gy\u00e1rt\u00e1si feladat, a tov\u00e1bb\u00edt\u00e1si t\u00e9tel vagy a meghat\u00e1rozott terhel\u00e9si egys\u00e9g. Egy r\u00f6vid \u00e9s egy hossz\u00fa m\u0171velet kapacit\u00e1sig\u00e9nye nem lesz azonos att\u00f3l, hogy mindkett\u0151h\u00f6z egy-egy feladatazonos\u00edt\u00f3 tartozik. Ha az \u00f6sszet\u00e9tel er\u0151sen v\u00e1ltozik, vizsg\u00e1lj\u00e1k meg a k\u00e1rty\u00e1k \u00e1ltal k\u00e9pviselt terhel\u00e9st, ne felt\u00e9telezz\u00e9k, hogy a rendel\u00e9sek sz\u00e1ma \u00f6nmag\u00e1ban teljes k\u00e9pet ad.<\/p>\n\n\n<p><strong>Mennyi munk\u00e1t engedjenek meg az egyes k\u00e1rtyak\u00f6r\u00f6k?<\/strong> A kezdeti k\u00e1rtyasz\u00e1mot a v\u00e1rhat\u00f3 termel\u00e9si \u00e1raml\u00e1s, a munka k\u00e9t cell\u00e1n val\u00f3 \u00e1thalad\u00e1s\u00e1nak ideje \u00e9s a v\u00e1lasztott terhel\u00e9si egys\u00e9g alapj\u00e1n hat\u00e1rozz\u00e1k meg. T\u00fal sok k\u00e1rty\u00e1val kev\u00e9sb\u00e9 lehet korl\u00e1tozni a torl\u00f3d\u00e1st; t\u00fal kev\u00e9s k\u00e1rtya viszont olyan munk\u00e1t is feltarthat, amely egy\u00e9bk\u00e9nt haladhatna. Nincs olyan k\u00e1rtyasz\u00e1m, amely minden k\u00e1rtyak\u00f6rh\u00f6z vagy \u00fczemhez megfelel\u0151.<\/p>\n\n\n<p><strong>Ki ellen\u0151rzi, tov\u00e1bb\u00edtja \u00e9s juttatja vissza a k\u00e1rty\u00e1kat?<\/strong> Legyen egy\u00e9rtelm\u0171, hol t\u00f6rt\u00e9nik az enged\u00e9lyez\u00e9s ellen\u0151rz\u00e9se \u00e9s hol kell visszaadni a k\u00e1rty\u00e1kat. Az oktat\u00e1son k\u00f6vess\u00e9k v\u00e9gig egy gy\u00e1rt\u00e1si feladat teljes \u00fatj\u00e1t, bele\u00e9rtve azt is, ha hi\u00e1nyzik a k\u00f6vetkez\u0151 cell\u00e1ba vezet\u0151 k\u00f6r k\u00e1rty\u00e1ja, nincs meg az anyag, vagy elakad a feladat. A szab\u00e1lyozott kiv\u00e9telhez felel\u0151s \u00e9s r\u00f6gz\u00edtett indok sz\u00fcks\u00e9ges; ha rendszeresen a sz\u00fcks\u00e9ges enged\u00e9ly n\u00e9lk\u00fcl kezdik el a munk\u00e1t, a szab\u00e1lyoz\u00e1s \u00e9rtelm\u00e9t veszti.<\/p>\n\n\n<p><strong>Mib\u0151l der\u00fcl ki, hogy m\u0171k\u00f6dik a rendszer?<\/strong> R\u00f6gz\u00edts\u00e9k a kiindul\u00f3 \u00e9rt\u00e9keket: a befejezetlen termel\u00e9s (WIP) mennyis\u00e9g\u00e9t, a szab\u00e1lyozott szakasz \u00e1tfut\u00e1si idej\u00e9t, a termel\u00e9si r\u00e1t\u00e1t \u00e9s a sz\u00e1ll\u00edt\u00e1si teljes\u00edtm\u00e9nyt. A pr\u00f3ba\u00fczem sor\u00e1n ellen\u0151rizz\u00e9k, hol v\u00e1rakoznak a k\u00e1rty\u00e1k \u00e9s a gy\u00e1rt\u00e1si feladatok. A korl\u00e1tok m\u00f3dos\u00edt\u00e1sa el\u0151tt vizsg\u00e1lj\u00e1k meg, hogy a t\u00e9nyleges terhel\u00e9s, egy elmaradt k\u00e1rtyavisszaad\u00e1s, megb\u00edzhatatlan adatok vagy visszat\u00e9r\u0151 termel\u00e9si probl\u00e9ma okozza-e a v\u00e1rakoz\u00e1st.<\/p>\n\n\n<p>\u00cdgy a pr\u00f3ba\u00fczem hasznos tanul\u00e1si folyamatt\u00e1 v\u00e1lik. Azt vizsg\u00e1lj\u00e1k, hogy kisz\u00e1m\u00edthat\u00f3bban halad-e a munka a kiv\u00e1lasztott cell\u00e1kon kereszt\u00fcl, nem azt bizony\u00edtj\u00e1k, hogy a csapat meg tud t\u00f6lteni egy t\u00e1bl\u00e1t sz\u00ednes k\u00e1rty\u00e1kkal.<\/p>\n\n\n<h2 class=\"wp-block-heading\">A k\u00e1rtyak\u00f6rben felszabadul\u00f3 hely m\u00e9g nem oldja meg a sz\u00e1ll\u00edt\u00e1sok tervez\u00e9s\u00e9t<\/h2>\n\n\n<p>T\u00e9rj\u00fcnk vissza az A\u2013B\u2013C \u00fatvonalhoz. Tegy\u00fck fel, hogy egy m\u00e1sik rendel\u00e9s az A cell\u00e1b\u00f3l a D hegeszt\u0151cell\u00e1ba halad. Az els\u0151 rendel\u00e9shez rendelkez\u00e9sre \u00e1ll egy szabad A\/B k\u00e1rtya, a m\u00e1sodikhoz pedig egy szabad A\/D k\u00e1rtya. Mindkett\u0151 enged\u00e9lyezett \u00e9s ind\u00edt\u00e1sra k\u00e9sz.<\/p>\n\n\n<p>K\u00e9s\u0151bb mindk\u00e9t rendel\u00e9shez ugyanarra a befejez\u0151 megmunk\u00e1l\u00e1st v\u00e9gz\u0151 er\u0151forr\u00e1sra van sz\u00fcks\u00e9g, amely m\u00e1s term\u00e9kcsal\u00e1dokat is kiszolg\u00e1l. A helyi enged\u00e9lyekb\u0151l a tervez\u0151 nem tudja meg, melyik rendel\u00e9s k\u00e9sz\u00fclhet el el\u0151bb, belef\u00e9r-e a v\u00e1rakoz\u00f3 befejez\u0151 munk\u00e1k elv\u00e9gz\u00e9se a kisz\u00e1ll\u00edt\u00e1sig h\u00e1tral\u00e9v\u0151 id\u0151be, vagy mi t\u00f6rt\u00e9nik, ha egy s\u00fcrg\u0151s vev\u0151i rendel\u00e9s is beker\u00fcl a sorba.<\/p>\n\n\n<p>Ilyenkor a <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/mi-a-termelesutemezes\/\">gy\u00e1rt\u00e1s\u00fctemez\u00e9shez<\/a> a teljes \u00fatvonalat figyelembe kell venni. A cellap\u00e1rok jelz\u00e9sei seg\u00edtenek szab\u00e1lyozni, mely munk\u00e1k indulhatnak el. Az \u00f6sszef\u00fcgg\u0151 \u00fctemterv pedig megmutatja, hogyan versengenek a m\u0171veletek a k\u00f6z\u00f6s er\u0151forr\u00e1sokon rendelkez\u00e9sre \u00e1ll\u00f3 t\u00e9nyleges id\u0151\u00e9rt, \u00e9s ez hogyan befoly\u00e1solja a befejez\u00e9st.<\/p>\n\n\n<p>T\u00f6bblet k\u00e9zi munk\u00e1t okoz, ha mindk\u00e9t k\u00e9rd\u00e9sre az egyes cell\u00e1k k\u00e1rtyalist\u00e1ib\u00f3l pr\u00f3b\u00e1lnak v\u00e1laszt kapni. A tervez\u0151nek v\u00e9g\u00fcl list\u00e1kat kell \u00f6sszevetnie, feladatokat kell \u00e1thelyeznie az er\u0151forr\u00e1sok v\u00e1rakoz\u00e1si sorai k\u00f6z\u00f6tt, \u00e9s minden priorit\u00e1sv\u00e1ltoz\u00e1skor \u00fajra ellen\u0151riznie kell ugyanazokat a k\u00e9s\u0151bbi \u00fctk\u00f6z\u00e9seket.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00dctemezze a teljes \u00fczem munk\u00e1j\u00e1t a SkyPlanner seg\u00edts\u00e9g\u00e9vel<\/h2>\n\n\n<p>A SkyPlanner APS k\u00f6z\u00f6s er\u0151forr\u00e1s-\u00fctemtervbe rendezi a v\u00e1llalt gy\u00e1rt\u00e1si feladatokat. Adja meg a folyamat l\u00e9p\u00e9seit, az azok elv\u00e9gz\u00e9s\u00e9re alkalmas munka\u00e1llom\u00e1sokat, az id\u0151tartamokat, a m\u0171szakokat \u00e9s a f\u00fcgg\u0151s\u00e9geket. Az Arcturus, a SkyPlanner mesters\u00e9ges intelligenci\u00e1ra \u00e9p\u00fcl\u0151 \u00fctemez\u0151motorja kisz\u00e1m\u00edtja, hov\u00e1 illeszthet\u0151k be a m\u0171veletek a be\u00e1ll\u00edtott kapacit\u00e1s \u00e9s priorit\u00e1sok figyelembev\u00e9tel\u00e9vel. A Gantt-n\u00e9zetben l\u00e1that\u00f3v\u00e1 v\u00e1lik a sorrend \u00e9s a befejez\u00e9s id\u0151pontja.<\/p>\n\n\n<p>A befejez\u0151 megmunk\u00e1l\u00e1s kapacit\u00e1s\u00e1n osztoz\u00f3 k\u00e9t rendel\u00e9s eset\u00e9ben ez azt jelenti, hogy a k\u00e9s\u0151bbi kapacit\u00e1s\u00fctk\u00f6z\u00e9sek ugyanabban a tervben l\u00e1that\u00f3k, mint a gy\u00e1rt\u00e1s, a forg\u00e1csol\u00e1s \u00e9s a hegeszt\u00e9s. Kevesebb id\u0151t kell az elk\u00fcl\u00f6n\u00fclt v\u00e1rakoz\u00e1si sorok k\u00e9zi \u00f6sszehangol\u00e1s\u00e1ra ford\u00edtania, \u00e9s vil\u00e1gosabb alapokon d\u00f6ntheti el, melyik v\u00e1llalt teljes\u00edt\u00e9s ig\u00e9nyel figyelmet.<\/p>\n\n\n<p>A meg\u00e1llapod\u00e1s szerinti legkor\u00e1bbi kezd\u00e9sek kezd\u00e9si jogosults\u00e1gi d\u00e1tumokkal adhat\u00f3k meg, ha az erre vonatkoz\u00f3 szab\u00e1ly be van kapcsolva. Ez a d\u00e1tum \u00fctemez\u00e9si korl\u00e1t, nem pedig annak visszaigazol\u00e1sa, hogy rendelkez\u00e9sre \u00e1ll egy szabad POLCA-k\u00e1rtya. A k\u00e1rtyak\u00f6r t\u00e9nyleges ind\u00edt\u00e1si enged\u00e9ly\u00e9r\u0151l tov\u00e1bbra is a termel\u00e9sir\u00e1ny\u00edt\u00e1si folyamatban d\u00f6ntsenek, \u00e9s az \u00fctemezett munk\u00e1t igaz\u00edts\u00e1k a meg\u00e1llapod\u00e1s szerinti enged\u00e9lyekhez \u00e9s kezd\u00e9si korl\u00e1toz\u00e1sokhoz.<\/p>\n\n\n<p>A priorit\u00e1sokr\u00f3l tov\u00e1bbra is \u00d6n d\u00f6nt. A SkyPlanner dinamikus priorit\u00e1saival \u00fagy ir\u00e1ny\u00edthatja a sz\u00e1m\u00edt\u00e1st, hogy az a hat\u00e1rid\u0151ket, a vev\u0151k \u00e9s gy\u00e1rt\u00e1si feladatok fontoss\u00e1g\u00e1t, valamint az egy\u00e9b \u00fctemez\u00e9si c\u00e9lokat helyezze el\u0151t\u00e9rbe. Egy frissen felszabadult k\u00e1rtya nem jelent automatikusan \u00fczemi szinten legmagasabb priorit\u00e1st. Ha az anyagok rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1t figyelembe vev\u0151 \u00fctemez\u00e9s be van kapcsolva, a rendszer az anyagot felhaszn\u00e1l\u00f3 m\u0171velet \u00fctemez\u00e9sekor az anyagell\u00e1totts\u00e1ggal is sz\u00e1mol.<\/p>\n\n\n<p>Ha v\u00e1ltozik a r\u00f6gz\u00edtett kapacit\u00e1s vagy a priorit\u00e1s, az Arcturus \u00fajrasz\u00e1m\u00edthatja az \u00f6sszef\u00fcgg\u0151 \u00fctemtervet. Ahelyett, hogy minden \u00e9rintett v\u00e1rakoz\u00e1si sort k\u00e9zzel \u00edrna \u00e1t, \u00e1ttekintheti a fontos rendel\u00e9sekre gyakorolt hat\u00e1st. <strong>A SkyPlanner ny\u00edlt REST API-j\u00e1n kereszt\u00fcl b\u00e1rmely ERP- vagy MES-rendszerrel integr\u00e1lhat\u00f3<\/strong>, \u00edgy a hat\u00e9konyabb \u00fctemez\u00e9s a megl\u00e9v\u0151 rendel\u00e9skezel\u00e9si \u00e9s termel\u00e9si rendszerek mellett is haszn\u00e1lhat\u00f3.<\/p>\n\n\n<p>A kever\u00e9stechnol\u00f3gi\u00e1val \u00e9s cs\u00facstechnol\u00f3gi\u00e1s b\u00e9rgy\u00e1rt\u00e1ssal foglalkoz\u00f3 Mamec sz\u00e1m\u00e1ra is ismer\u0151s a k\u00e9zi tervez\u00e9s probl\u00e9m\u00e1ja. Besz\u00e1mol\u00f3juk szerint kor\u00e1bban t\u00f6bb ezer, egym\u00e1st\u00f3l f\u00fcgg\u0151 munkalap sorrendj\u00e9t hat\u00e1rozt\u00e1k meg a pap\u00edralap\u00fa munkalapokon szerepl\u0151 hat\u00e1rid\u0151k alapj\u00e1n, megb\u00edzhat\u00f3 \u00f6sszk\u00e9p n\u00e9lk\u00fcl. Miut\u00e1n integr\u00e1lt\u00e1k a SkyPlanner rendszert az Oscar ERP rendszerrel, mesters\u00e9ges intelligenci\u00e1n alapul\u00f3, v\u00e9ges kapacit\u00e1s\u00fa \u00fctemez\u00e9st \u00e9s k\u00f6z\u00f6s termel\u00e9si n\u00e9zetet haszn\u00e1lnak, \u00e9s arr\u00f3l sz\u00e1molnak be, hogy a tervez\u00e9si munkaterhel\u00e9s \u00e9rezhet\u0151en cs\u00f6kkent. Tapasztalatuk az \u00f6sszef\u00fcgg\u0151 \u00fctemez\u00e9s \u00e9rt\u00e9k\u00e9t szeml\u00e9lteti, nem pedig egy POLCA-bevezet\u00e9st. A teljes t\u00f6rt\u00e9net\u00e9rt olvassa el a <a href=\"https:\/\/skyplanner.ai\/hu\/ugyfeltortenetek\/mamec\/\">Mamec SkyPlanner-tapasztalatait<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Vizsg\u00e1lja egy\u00fctt a cell\u00e1k jelz\u00e9seit \u00e9s a k\u00f6z\u00f6s kapacit\u00e1st<\/h2>\n\n\n<p>Ha a POLCA illik az \u00d6n termel\u00e9s\u00e9hez, a pr\u00f3ba\u00fczem sor\u00e1n alak\u00edtsanak ki egy\u00e9rtelm\u0171 enged\u00e9lyez\u00e9si szab\u00e1lyokat a k\u00e1rtyak\u00f6r\u00f6kh\u00f6z \u00e9s megb\u00edzhat\u00f3 k\u00e1rtyavisszaad\u00e1si folyamatot. A SkyPlanner seg\u00edts\u00e9g\u00e9vel tegye l\u00e1that\u00f3v\u00e1 az eg\u00e9sz \u00fczemben, milyen sorrendben haszn\u00e1lj\u00e1k a v\u00e1llalt gy\u00e1rt\u00e1si feladatok az er\u0151forr\u00e1sokat, \u00e9s ez hogyan hat a sz\u00e1ll\u00edt\u00e1sokra. Ezek a d\u00f6nt\u00e9sek egy\u00fctt a val\u00f3di probl\u00e9m\u00e1t kezelik: a megfelel\u0151 munka induljon el, mik\u00f6zben az sem v\u00e9sz szem el\u0151l, mire lesz sz\u00fcks\u00e9g a befejez\u00e9s\u00e9hez.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/hu\/kapcsolat-ertekesites\/\">Foglaljon SkyPlanner-bemutat\u00f3t<\/a>, amelyhez hozzon p\u00e9ldak\u00e9nt egy jellemz\u0151 cellacsoportot, k\u00e9t elt\u00e9r\u0151 \u00fatvonal\u00fa rendel\u00e9st \u00e9s egy k\u00f6z\u00f6sen haszn\u00e1lt er\u0151forr\u00e1st. K\u00e9sz\u00fclj\u00f6n a meg\u00e1llapod\u00e1s szerinti kezd\u00e9si korl\u00e1toz\u00e1sokkal \u00e9s priorit\u00e1sokkal is. \u00cdgy a gyakorlatban vizsg\u00e1lhatja meg, hogyan cs\u00f6kkentheti a SkyPlanner a k\u00e9zi \u00fctemez\u00e9si munk\u00e1t, \u00e9s hogyan teheti vil\u00e1gosabb\u00e1 a sz\u00e1ll\u00edt\u00e1sokra gyakorolt hat\u00e1st.<\/p>\n\n\n<p>Ha el\u0151bb \u00f6n\u00e1ll\u00f3an ismerkedne a rendszerrel, <a href=\"https:\/\/skyplanner.ai\/hu\/proba\/\">pr\u00f3b\u00e1lja ki a SkyPlannert dem\u00f3adatokkal<\/a>, vagy haszn\u00e1lja a SkyPlanner Assistant mesters\u00e9ges intelligenci\u00e1val t\u00e1mogatott bevezet\u0151 folyamat\u00e1t.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>POLCA a gy\u00e1rt\u00e1sban: a cell\u00e1k k\u00f6z\u00f6tti \u00e1raml\u00e1s szab\u00e1lyoz\u00e1sa Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; POLCA a gy\u00e1rt\u00e1sban: a cell\u00e1k k\u00f6z\u00f6tti \u00e1raml\u00e1s szab\u00e1lyoz\u00e1sa Egy gy\u00e1rt\u00f3cella \u00fajabb feladattal v\u00e9gez, de a k\u00f6vetkez\u0151 cella nem tudja folytatni a munk\u00e1t. Az els\u0151 csapat folyamatosan dolgozott. A rendel\u00e9s azonban csak a v\u00e1rakoz\u00e1si sorban kapott helyet, a hat\u00e1rid\u0151re t\u00f6rt\u00e9n\u0151 sz\u00e1ll\u00edt\u00e1s es\u00e9lye nem javult. &#8230; <a title=\"POLCA a gy\u00e1rt\u00e1sban: a cell\u00e1k k\u00f6z\u00f6tti \u00e1raml\u00e1s szab\u00e1lyoz\u00e1sa\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/polca\/\" aria-label=\"Read more about POLCA a gy\u00e1rt\u00e1sban: a cell\u00e1k k\u00f6z\u00f6tti \u00e1raml\u00e1s szab\u00e1lyoz\u00e1sa\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":112211,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2526,312],"tags":[],"class_list":["post-112193","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-es-utemezes","category-forrasok","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>POLCA a gy\u00e1rt\u00e1sban: a cell\u00e1k k\u00f6z\u00f6tti \u00e1raml\u00e1s szab\u00e1lyoz\u00e1sa<\/title>\n<meta name=\"description\" content=\"Elt\u00e9r\u0151 feladatok, elt\u00e9r\u0151 \u00fatvonalak. A POLCA a cell\u00e1k k\u00f6zti \u00e1raml\u00e1st szab\u00e1lyozza; a kapcsol\u00f3d\u00f3 \u00fctemez\u00e9s az enged\u00e9lyezett munk\u00e1b\u00f3l sz\u00e1ll\u00edt\u00e1si tervet k\u00e9sz\u00edt.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/polca\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"POLCA a gy\u00e1rt\u00e1sban: a cell\u00e1k k\u00f6z\u00f6tti \u00e1raml\u00e1s szab\u00e1lyoz\u00e1sa\" \/>\n<meta property=\"og:description\" content=\"Elt\u00e9r\u0151 feladatok, elt\u00e9r\u0151 \u00fatvonalak. A POLCA a cell\u00e1k k\u00f6zti \u00e1raml\u00e1st szab\u00e1lyozza; a kapcsol\u00f3d\u00f3 \u00fctemez\u00e9s az enged\u00e9lyezett munk\u00e1b\u00f3l sz\u00e1ll\u00edt\u00e1si tervet k\u00e9sz\u00edt.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/forrasok\/polca\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-29T02:13:53+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-29T02:14:43+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/polca-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Szerz\u0151:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data2\" content=\"19 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/polca\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/polca\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"POLCA a gy\u00e1rt\u00e1sban: a cell\u00e1k k\u00f6z\u00f6tti \u00e1raml\u00e1s szab\u00e1lyoz\u00e1sa\",\"datePublished\":\"2026-10-29T02:13:53+00:00\",\"dateModified\":\"2026-10-29T02:14:43+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/polca\\\/\"},\"wordCount\":3780,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/polca\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/polca-manufacturing-hero.png\",\"articleSection\":[\"APS \u00e9s \u00fctemez\u00e9s\",\"forr\u00e1sok\"],\"inLanguage\":\"hu-HU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/polca\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/polca\\\/\",\"name\":\"POLCA a gy\u00e1rt\u00e1sban: a cell\u00e1k k\u00f6z\u00f6tti \u00e1raml\u00e1s szab\u00e1lyoz\u00e1sa\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/polca\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/polca\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/polca-manufacturing-hero.png\",\"datePublished\":\"2026-10-29T02:13:53+00:00\",\"dateModified\":\"2026-10-29T02:14:43+00:00\",\"description\":\"Elt\u00e9r\u0151 feladatok, elt\u00e9r\u0151 \u00fatvonalak. A POLCA a cell\u00e1k k\u00f6zti \u00e1raml\u00e1st szab\u00e1lyozza; a kapcsol\u00f3d\u00f3 \u00fctemez\u00e9s az enged\u00e9lyezett munk\u00e1b\u00f3l sz\u00e1ll\u00edt\u00e1si tervet k\u00e9sz\u00edt.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/polca\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/polca\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/polca\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/polca-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/polca-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"Three manufacturing cells linked by two overlapping blue loops, each with a capacity card.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/polca\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"POLCA a gy\u00e1rt\u00e1sban: a cell\u00e1k k\u00f6z\u00f6tti \u00e1raml\u00e1s szab\u00e1lyoz\u00e1sa\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"POLCA a gy\u00e1rt\u00e1sban: a cell\u00e1k k\u00f6z\u00f6tti \u00e1raml\u00e1s szab\u00e1lyoz\u00e1sa","description":"Elt\u00e9r\u0151 feladatok, elt\u00e9r\u0151 \u00fatvonalak. A POLCA a cell\u00e1k k\u00f6zti \u00e1raml\u00e1st szab\u00e1lyozza; a kapcsol\u00f3d\u00f3 \u00fctemez\u00e9s az enged\u00e9lyezett munk\u00e1b\u00f3l sz\u00e1ll\u00edt\u00e1si tervet k\u00e9sz\u00edt.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/forrasok\/polca\/","og_locale":"hu_HU","og_type":"article","og_title":"POLCA a gy\u00e1rt\u00e1sban: a cell\u00e1k k\u00f6z\u00f6tti \u00e1raml\u00e1s szab\u00e1lyoz\u00e1sa","og_description":"Elt\u00e9r\u0151 feladatok, elt\u00e9r\u0151 \u00fatvonalak. A POLCA a cell\u00e1k k\u00f6zti \u00e1raml\u00e1st szab\u00e1lyozza; a kapcsol\u00f3d\u00f3 \u00fctemez\u00e9s az enged\u00e9lyezett munk\u00e1b\u00f3l sz\u00e1ll\u00edt\u00e1si tervet k\u00e9sz\u00edt.","og_url":"https:\/\/skyplanner.ai\/hu\/forrasok\/polca\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-29T02:13:53+00:00","article_modified_time":"2026-10-29T02:14:43+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/polca-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Szerz\u0151:":"Jussi M\u00e4ntyl\u00e4","Becs\u00fclt olvas\u00e1si id\u0151":"19 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/polca\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/polca\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"POLCA a gy\u00e1rt\u00e1sban: a cell\u00e1k k\u00f6z\u00f6tti \u00e1raml\u00e1s szab\u00e1lyoz\u00e1sa","datePublished":"2026-10-29T02:13:53+00:00","dateModified":"2026-10-29T02:14:43+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/polca\/"},"wordCount":3780,"publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/polca\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/polca-manufacturing-hero.png","articleSection":["APS \u00e9s \u00fctemez\u00e9s","forr\u00e1sok"],"inLanguage":"hu-HU"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/polca\/","url":"https:\/\/skyplanner.ai\/hu\/forrasok\/polca\/","name":"POLCA a gy\u00e1rt\u00e1sban: a cell\u00e1k k\u00f6z\u00f6tti \u00e1raml\u00e1s szab\u00e1lyoz\u00e1sa","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/polca\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/polca\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/polca-manufacturing-hero.png","datePublished":"2026-10-29T02:13:53+00:00","dateModified":"2026-10-29T02:14:43+00:00","description":"Elt\u00e9r\u0151 feladatok, elt\u00e9r\u0151 \u00fatvonalak. A POLCA a cell\u00e1k k\u00f6zti \u00e1raml\u00e1st szab\u00e1lyozza; a kapcsol\u00f3d\u00f3 \u00fctemez\u00e9s az enged\u00e9lyezett munk\u00e1b\u00f3l sz\u00e1ll\u00edt\u00e1si tervet k\u00e9sz\u00edt.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/polca\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/forrasok\/polca\/"]}]},{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/polca\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/polca-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/polca-manufacturing-hero.png","width":1672,"height":941,"caption":"Three manufacturing cells linked by two overlapping blue loops, each with a capacity card."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/polca\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"POLCA a gy\u00e1rt\u00e1sban: a cell\u00e1k k\u00f6z\u00f6tti \u00e1raml\u00e1s szab\u00e1lyoz\u00e1sa"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/polca-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/polca-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/polca-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/polca-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/polca-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/polca-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/polca-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/polca-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"POLCA a gy\u00e1rt\u00e1sban: a cell\u00e1k k\u00f6z\u00f6tti \u00e1raml\u00e1s szab\u00e1lyoz\u00e1sa Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; POLCA a gy\u00e1rt\u00e1sban: a cell\u00e1k k\u00f6z\u00f6tti \u00e1raml\u00e1s szab\u00e1lyoz\u00e1sa Egy gy\u00e1rt\u00f3cella \u00fajabb feladattal v\u00e9gez, de a k\u00f6vetkez\u0151 cella nem tudja folytatni a munk\u00e1t. Az els\u0151 csapat folyamatosan dolgozott. A rendel\u00e9s azonban csak a v\u00e1rakoz\u00e1si sorban kapott helyet, a hat\u00e1rid\u0151re t\u00f6rt\u00e9n\u0151 sz\u00e1ll\u00edt\u00e1s es\u00e9lye nem javult.&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/112193","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=112193"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/112193\/revisions"}],"predecessor-version":[{"id":112256,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/112193\/revisions\/112256"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media\/112211"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=112193"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/categories?post=112193"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/tags?post=112193"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}