{"id":111916,"date":"2026-10-28T19:23:39","date_gmt":"2026-10-28T19:23:39","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=111916"},"modified":"2026-10-28T19:24:29","modified_gmt":"2026-10-28T19:24:29","slug":"epei","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/hu\/forrasok\/epei\/","title":{"rendered":"EPEI: re\u00e1lis gy\u00e1rt\u00e1si ism\u00e9tl\u0151d\u00e9si id\u0151k\u00f6z sz\u00e1m\u00edt\u00e1sa"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">EPEI: re\u00e1lis gy\u00e1rt\u00e1si ism\u00e9tl\u0151d\u00e9si id\u0151k\u00f6z sz\u00e1m\u00edt\u00e1sa<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/hu\/\">Kezd\u0151lap<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/\">Er\u0151forr\u00e1sok<\/a> &raquo; EPEI: re\u00e1lis gy\u00e1rt\u00e1si ism\u00e9tl\u0151d\u00e9si id\u0151k\u00f6z sz\u00e1m\u00edt\u00e1sa<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Becs\u00fclt olvas\u00e1si id\u0151: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> perc<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Egy term\u00e9kcsal\u00e1d minden alkatr\u00e9sz\u00e9t gyakrabban, kisebb sorozatokban szeretn\u00e9 gy\u00e1rtani. Az ism\u00e9tl\u0151d\u0151 gy\u00e1rt\u00e1si sorrend rendezettnek t\u0171nik: A, majd B, azt\u00e1n C, v\u00e9g\u00fcl vissza A-ra. A g\u00e9pen azonban vev\u0151i megrendel\u00e9seket is teljes\u00edteni kell, \u00e9s minden \u00fajabb k\u00f6r \u00fajabb \u00e1t\u00e1ll\u00e1sokkal j\u00e1r.<\/p>\n\n\n<p>Az EPEI seg\u00edt felm\u00e9rni, milyen gyakran ism\u00e9tl\u0151dhet a term\u00e9kcsal\u00e1d gy\u00e1rt\u00e1sa. Nem csup\u00e1n az a k\u00e9rd\u00e9s, milyen r\u00f6vid id\u0151k\u00f6zt szeretne el\u00e9rni, hanem az is, hogy belef\u00e9r-e a gy\u00e1rt\u00e1s, az \u00e1t\u00e1ll\u00e1s \u00e9s a t\u00f6bbi munka.<\/p>\n\n\n<p>El\u0151sz\u00f6r ezt a kapacit\u00e1sellen\u0151rz\u00e9st v\u00e9gezze el. Ezut\u00e1n illessze az ism\u00e9tl\u0151d\u0151 rendel\u00e9seket a termel\u00e9s t\u00f6bbi r\u00e9sz\u00e9vel k\u00f6z\u00f6s \u00fctemtervbe. A SkyPlanner APS ebben seg\u00edt: nem kell folyton g\u00e9penk\u00e9nt k\u00fcl\u00f6n-k\u00fcl\u00f6n \u00e1trendeznie a munk\u00e1k sorrendj\u00e9t, hogy tarthat\u00f3 legyen a v\u00e1lasztott ritmus.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mit jelent az EPEI?<\/h2>\n\n\n<p><strong>Az Every Part Every Interval (EPEI) azt az id\u0151k\u00f6zt jelenti, amely egy meghat\u00e1rozott term\u00e9kcsal\u00e1d egyes alkatr\u00e9szeinek k\u00e9t egym\u00e1st k\u00f6vet\u0151 gy\u00e1rt\u00e1sa k\u00f6z\u00f6tt eltelik egy adott folyamatn\u00e1l.<\/strong> A k\u00e9t munkanapos EPEI-c\u00e9l azt jelenti, hogy a csal\u00e1d minden alkatr\u00e9sze k\u00e9t munkanaponk\u00e9nt \u00fajra sorra ker\u00fcl, \u00e9s ekkor az ehhez az ut\u00e1np\u00f3tl\u00e1si ritmushoz sz\u00fcks\u00e9ges mennyis\u00e9g k\u00e9sz\u00fcl bel\u0151le.<\/p>\n\n\n<p>Tal\u00e1lkozhat az \u201eevery product every interval\u201d angol elnevez\u00e9ssel vagy az EPEx jel\u00f6l\u00e9ssel is, ahol az x a v\u00e1lasztott id\u0151k\u00f6zt jel\u00f6li. A l\u00e9nyeg az ism\u00e9tl\u0151d\u00e9s gyakoris\u00e1ga, nem az, hogy az adott \u00fczemben melyik r\u00f6vid\u00edt\u00e9st haszn\u00e1lj\u00e1k.<\/p>\n\n\n<p>Miel\u0151tt megadn\u00e1 az \u00e9rt\u00e9ket, hat\u00e1rozza meg, mire vonatkozik. A \u201ek\u00e9t nap\u201d csak akkor hasznos inform\u00e1ci\u00f3, ha mindenki tudja, mely alkatr\u00e9szekre, melyik er\u0151forr\u00e1sra \u00e9s milyen munkanapt\u00e1rra \u00e9rtend\u0151. Egy k\u00e9tnaponta megmunk\u00e1lt term\u00e9kcsal\u00e1d darabjai k\u00e9s\u0151bb m\u00e9g v\u00e1rakozhatnak egy olyan k\u00f6vetkez\u0151 folyamatra, amelyre csak hetente ker\u00fcl sor.<\/p>\n\n\n<p>H\u00e1rom dolgot is k\u00fcl\u00f6n kell v\u00e1lasztani:<\/p>\n\n\n<ul class=\"wp-block-list\"><li><strong>A sz\u00e1m\u00edtott als\u00f3 hat\u00e1r:<\/strong> a legr\u00f6videbb id\u0151k\u00f6z, amely a megadott kapacit\u00e1ssz\u00e1m\u00edt\u00e1s alapj\u00e1n m\u00e9g megval\u00f3s\u00edthat\u00f3.<\/li><li><strong>A tervez\u00e9si c\u00e9l:<\/strong> a gyakorlati megval\u00f3s\u00edthat\u00f3s\u00e1g, az ig\u00e9ny \u00e9s az \u00fczemi k\u00f6r\u00fclm\u00e9nyek m\u00e9rlegel\u00e9s\u00e9vel v\u00e1lasztott ritmus.<\/li><li><strong>A t\u00e9nyleges id\u0151k\u00f6z:<\/strong> az egyes alkatr\u00e9szek k\u00e9t egym\u00e1st k\u00f6vet\u0151 gy\u00e1rt\u00e1sa k\u00f6z\u00f6tt val\u00f3ban eltelt id\u0151.<\/li><\/ul>\n\n\n<p>Az ism\u00e9tl\u0151d\u0151 gy\u00e1rt\u00e1si sorrendhez kit\u0171z\u00f6tt c\u00e9l m\u00e9g nem bizony\u00edtja, hogy az \u00fczem el is \u00e9rte azt. Az EPEI nem az egy darab elk\u00e9sz\u00edt\u00e9s\u00e9hez sz\u00fcks\u00e9ges ciklusid\u0151, nem az ig\u00e9ny \u00e1ltal meghat\u00e1rozott \u00fctemid\u0151, \u00e9s nem is egy rendel\u00e9s teljes gy\u00e1rt\u00e1si \u00e1tfut\u00e1si ideje.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Az EPEI kapacit\u00e1sb\u00f3l ad\u00f3d\u00f3 als\u00f3 hat\u00e1r\u00e1nak kisz\u00e1m\u00edt\u00e1sa<\/h2>\n\n\n<p>Ha egy egyszer\u0171 term\u00e9kcsal\u00e1d alkatr\u00e9szei egyetlen er\u0151forr\u00e1son, egym\u00e1s ut\u00e1n k\u00e9sz\u00fclnek, h\u00e1rom kiindul\u00f3 adatra van sz\u00fcks\u00e9g:<\/p>\n\n\n<p>1. <strong>A term\u00e9kcsal\u00e1d sz\u00e1m\u00e1ra munkanaponk\u00e9nt rendelkez\u00e9sre \u00e1ll\u00f3 id\u0151.<\/strong> Vonja le a tervezett, nem termel\u00e9sre ford\u00edtott id\u0151t, valamint az er\u0151forr\u00e1s m\u00e1s munk\u00e1kra m\u00e1r lek\u00f6t\u00f6tt kapacit\u00e1s\u00e1t.<\/p>\n\n\n<p>2. <strong>Az ig\u00e9ny kiel\u00e9g\u00edt\u00e9s\u00e9hez sz\u00fcks\u00e9ges napi megmunk\u00e1l\u00e1si id\u0151.<\/strong> Minden alkatr\u00e9szn\u00e9l szorozza meg az \u00e1tlagos napi ig\u00e9nyt a darabonk\u00e9nti megmunk\u00e1l\u00e1si id\u0151vel, majd adja \u00f6ssze az eredm\u00e9nyeket.<\/p>\n\n\n<p>3. <strong>Egy teljes ism\u00e9tl\u0151d\u0151 gy\u00e1rt\u00e1si k\u00f6r \u00e1t\u00e1ll\u00e1si ideje.<\/strong> Minden \u00e1t\u00e1ll\u00e1st sz\u00e1m\u00edtson bele, az utols\u00f3 alkatr\u00e9szr\u0151l az els\u0151re val\u00f3 vissza\u00e1ll\u00e1st is.<\/p>\n\n\n<p>A rendelkez\u00e9sre \u00e1ll\u00f3 id\u0151 \u00e9s a napi megmunk\u00e1l\u00e1si id\u0151 k\u00fcl\u00f6nbs\u00e9ge adja az \u00e1t\u00e1ll\u00e1sokra fennmarad\u00f3 kapacit\u00e1st. Az alapsz\u00e1m\u00edt\u00e1s:<\/p>\n\n\n<p><strong>Minim\u00e1lis id\u0151k\u00f6z munkanapban = egy teljes ism\u00e9tl\u0151d\u0151 gy\u00e1rt\u00e1si k\u00f6r \u00f6sszes \u00e1t\u00e1ll\u00e1si ideje \u00f7 az \u00e1t\u00e1ll\u00e1sokra naponta fennmarad\u00f3 kapacit\u00e1s<\/strong><\/p>\n\n\n<p>Jel\u00f6lje A a naponta rendelkez\u00e9sre \u00e1ll\u00f3 id\u0151t, R a naponta sz\u00fcks\u00e9ges megmunk\u00e1l\u00e1si id\u0151t, S pedig egy teljes k\u00f6r \u00e1t\u00e1ll\u00e1si idej\u00e9t, mindegyiket percben megadva:<\/p>\n\n\n<p><strong>T \u2265 S \u00f7 (A \u2212 R)<\/strong><\/p>\n\n\n<p>A levezet\u00e9s egyszer\u0171. T munkanap alatt R \u00d7 T perc megmunk\u00e1l\u00e1sra \u00e9s S perc \u00e1t\u00e1ll\u00e1sra van sz\u00fcks\u00e9g. Ezeknek bele kell f\u00e9rni\u00fck az A \u00d7 T perc rendelkez\u00e9sre \u00e1ll\u00f3 id\u0151be. A felt\u00e9telt \u00e1trendezve megkapjuk a fenti id\u0151k\u00f6zt.<\/p>\n\n\n<p>Haszn\u00e1ljon egys\u00e9ges m\u00e9rt\u00e9kegys\u00e9geket. Ha az ig\u00e9nyt darab\/nap, a megmunk\u00e1l\u00e1si id\u0151t pedig m\u00e1sodperc\/darab egys\u00e9gben adja meg, az eredm\u00e9ny\u00fcl kapott m\u00e1sodperceket v\u00e1ltsa percre, miel\u0151tt levonn\u00e1 \u0151ket a naponta rendelkez\u00e9sre \u00e1ll\u00f3 percekb\u0151l.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Tudatosan hagyjon tartal\u00e9kot az ingadoz\u00e1sokra<\/h3>\n\n\n<p>Az alapk\u00e9plettel sz\u00e1m\u00edtott als\u00f3 hat\u00e1rn\u00e1l az \u00e1t\u00e1ll\u00e1sok minden fennmarad\u00f3 kapacit\u00e1st kit\u00f6ltenek. Az ilyen \u00fczemi c\u00e9l k\u00f6nnyen tarthatatlann\u00e1 v\u00e1lhat, ha a mindennapos ingadoz\u00e1sok kezel\u00e9s\u00e9re m\u00e1r nem marad mozg\u00e1st\u00e9r.<\/p>\n\n\n<p>Az id\u0151k\u00f6z kisz\u00e1m\u00edt\u00e1sa el\u0151tt naponta meghat\u00e1rozott sz\u00e1m\u00fa percet tartal\u00e9kolhat a kies\u00e9sek behoz\u00e1s\u00e1ra vagy az ig\u00e9ny ingadoz\u00e1s\u00e1ra. Ezt a tartal\u00e9kot vonja le A-b\u00f3l. Ugyanazt az id\u0151keretet ne vonja le k\u00e9tszer: a sz\u00fcneteket, az ismert \u00e1ll\u00e1sid\u0151ket, az egy\u00e9b munk\u00e1kat \u00e9s a kies\u00e9sek behoz\u00e1s\u00e1ra sz\u00e1nt id\u0151t egy\u00e9rtelm\u0171en, k\u00fcl\u00f6n kell kezelni.<\/p>\n\n\n<p>Ha A \u2212 R nulla vagy negat\u00edv, nem marad pozit\u00edv id\u0151keret az \u00e1t\u00e1ll\u00e1sokra. Az id\u0151k\u00f6z n\u00f6vel\u00e9se nem oldja meg azt a tart\u00f3s helyzetet, amikor a megmunk\u00e1l\u00e1s m\u00e1r \u00f6nmag\u00e1ban lek\u00f6ti az \u00f6sszes rendelkez\u00e9sre \u00e1ll\u00f3 kapacit\u00e1st. A terhel\u00e9sen, a sz\u00fcks\u00e9ges megmunk\u00e1l\u00e1si id\u0151n vagy a kapacit\u00e1son kell v\u00e1ltoztatni.<\/p>\n\n\n<p>Ez kapacit\u00e1sb\u00f3l ad\u00f3d\u00f3 als\u00f3 hat\u00e1r, nem gazdas\u00e1gi optimum. A sz\u00e1m\u00edt\u00e1s \u00e1lland\u00f3, jellemz\u0151 ig\u00e9ny\u00f6sszet\u00e9telt, k\u00f6r\u00f6nk\u00e9nt minden alkatr\u00e9sz egyszeri gy\u00e1rt\u00e1s\u00e1t \u00e9s a megadott sorrendet felt\u00e9telezi. A minim\u00e1lis sorozatnagys\u00e1gok, a k\u00f6t\u00f6tt id\u0151tartam\u00fa folyamatok, az anyagok rendelkez\u00e9sre \u00e1ll\u00e1sa \u00e9s az egy\u00e9b m\u0171veletek hosszabb id\u0151k\u00f6zt tehetnek sz\u00fcks\u00e9gess\u00e9.<\/p>\n\n\n<h2 class=\"wp-block-heading\">EPEI-sz\u00e1m\u00edt\u00e1si p\u00e9lda: h\u00e1rom alkatr\u00e9sz egy g\u00e9pen<\/h2>\n\n\n<p>K\u00e9pzelj\u00fcnk el egy megmunk\u00e1l\u00f3cell\u00e1t, ahol h\u00e1rom alkatr\u00e9szt gy\u00e1rtanak rendszeresen. A tervezett, nem termel\u00e9sre ford\u00edtott id\u0151 \u00e9s a m\u00e1r lek\u00f6t\u00f6tt egy\u00e9b munk\u00e1k levon\u00e1sa ut\u00e1n ennek a term\u00e9kcsal\u00e1dnak <strong>munkanaponk\u00e9nt 420 perc<\/strong> \u00e1ll rendelkez\u00e9s\u00e9re.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Alkatr\u00e9sz<\/th><th>Munkanaponk\u00e9nti ig\u00e9ny<\/th><th>Darabonk\u00e9nti megmunk\u00e1l\u00e1si id\u0151<\/th><th>Munkanaponk\u00e9nt sz\u00fcks\u00e9ges megmunk\u00e1l\u00e1si id\u0151<\/th><\/tr><\/thead><tbody><tr><td>A<\/td><td>100 darab<\/td><td>2 perc<\/td><td>200 perc<\/td><\/tr><tr><td>B<\/td><td>60 darab<\/td><td>1,5 perc<\/td><td>90 perc<\/td><\/tr><tr><td>C<\/td><td>40 darab<\/td><td>1 perc<\/td><td>40 perc<\/td><\/tr><tr><td>\u00d6sszesen<\/td><td>200 darab<\/td><td>\u2014<\/td><td>330 perc<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>A teljes A\u2013B\u2013C\u2013A sorrendben az \u00e1t\u00e1ll\u00e1sok 90 percet ig\u00e9nyelnek. Ebben a C-r\u0151l A-ra val\u00f3 vissza\u00e1ll\u00e1s is benne van; k\u00fcl\u00f6nben a k\u00f6vetkez\u0151 k\u00f6r egy olyan \u00e1t\u00e1ll\u00e1ssal kezd\u0151dne, amellyel a sz\u00e1m\u00edt\u00e1s nem sz\u00e1molt.<\/p>\n\n\n<p>Tartal\u00e9k n\u00e9lk\u00fcl az \u00e1t\u00e1ll\u00e1sokra naponta 420 \u2212 330 = 90 perc marad. A sz\u00e1m\u00edtott minim\u00e1lis id\u0151k\u00f6z teh\u00e1t <strong>90 \u00f7 90 = egy munkanap<\/strong>. A napi gy\u00e1rt\u00e1s \u00e9ppen belef\u00e9rne, de a kies\u00e9sek behoz\u00e1s\u00e1ra nem maradna id\u0151.<\/p>\n\n\n<p>Most tartal\u00e9koljunk naponta 45 percet. Az \u00e1t\u00e1ll\u00e1sokra \u00edgy naponta 420 \u2212 45 \u2212 330 = 45 perc marad. Ebb\u0151l az id\u0151k\u00f6z als\u00f3 hat\u00e1ra:<\/p>\n\n\n<p><strong>Az EPEI kapacit\u00e1sb\u00f3l ad\u00f3d\u00f3 als\u00f3 hat\u00e1ra = 90 \u00f7 45 = k\u00e9t munkanap<\/strong><\/p>\n\n\n<p>Ebben a ritmusban egy k\u00f6r alatt A-b\u00f3l 200, B-b\u0151l 120, C-b\u0151l pedig 80 darab k\u00e9sz\u00fcl. A megmunk\u00e1l\u00e1s 660 percet, az \u00e1t\u00e1ll\u00e1sok tov\u00e1bbi 90 percet vesznek ig\u00e9nybe. Ez \u00f6sszesen 750 perc a k\u00e9t napra rendelkez\u00e9sre \u00e1ll\u00f3 840 percb\u0151l, \u00edgy megmarad a tervezett 90 perces tartal\u00e9k.<\/p>\n\n\n<p>A k\u00e9t munkanap teh\u00e1t re\u00e1lis lehet\u0151s\u00e9g, de m\u00e9g nem igazoltan megval\u00f3s\u00edthat\u00f3 \u00fctemterv. Ellen\u0151rizze, hogy a sorrend belef\u00e9r-e a t\u00e9nyleges m\u0171szakok id\u0151keret\u00e9be, az alkatr\u00e9szek \u00e9s a szersz\u00e1mok k\u00e9szen \u00e1llnak-e, \u00e9s a k\u00f6vetkez\u0151 m\u0171veletek \u00e1t tudj\u00e1k-e venni a munk\u00e1t. Egy h\u00e9tv\u00e9ge miatt k\u00e9t munkanap t\u00f6bb mint k\u00e9t napt\u00e1ri napot is \u00e1tfoghat.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Mit\u0151l lehet r\u00f6videbb vagy hosszabb az id\u0151k\u00f6z?<\/h3>\n\n\n<p>Ha a teljes k\u00f6r \u00e1t\u00e1ll\u00e1si ideje 90 percr\u0151l 45 percre cs\u00f6kken, mik\u00f6zben minden m\u00e1s v\u00e1ltozatlan marad, a tartal\u00e9kot is figyelembe vev\u0151 als\u00f3 korl\u00e1t <strong>45 \u00f7 45 = egy munkanap<\/strong> lesz. Az \u00e1t\u00e1ll\u00e1si id\u0151 cs\u00f6kkent\u00e9se teh\u00e1t nemcsak gyorsabb \u00e1t\u00e1ll\u00e1st jelent: minden alkatr\u00e9sz gy\u00e1rt\u00e1s\u00e1ra gyakrabban ker\u00fclhet sor.<\/p>\n\n\n<p>A ford\u00edtott hat\u00e1sr\u00f3l k\u00f6nny\u0171 megfeledkezni. Ha a napi megmunk\u00e1l\u00e1si id\u0151ig\u00e9ny 330 percr\u0151l 360 percre n\u0151, ugyanakkora tartal\u00e9k mellett mind\u00f6ssze 420 \u2212 45 \u2212 360 = 15 perc marad naponta az \u00e1t\u00e1ll\u00e1sokra. Az eredeti, k\u00f6r\u00f6nk\u00e9nt \u00f6sszesen 90 perces \u00e1t\u00e1ll\u00e1si id\u0151vel az als\u00f3 korl\u00e1t <strong>hat munkanapra<\/strong> n\u0151.<\/p>\n\n\n<p>Ha kev\u00e9s kapacit\u00e1s marad az \u00e1t\u00e1ll\u00e1sokra, a megmunk\u00e1l\u00e1si terhel\u00e9s m\u00e9rs\u00e9kelt n\u00f6veked\u00e9se is jelent\u0151sen meghosszabb\u00edthatja az ism\u00e9tl\u0151d\u00e9si id\u0151k\u00f6zt. Ne csak az \u00e1t\u00e1ll\u00e1sok fejleszt\u00e9se ut\u00e1n ellen\u0151rizze \u00fajra az EPEI-t, hanem akkor is, ha v\u00e1ltozik a term\u00e9k\u00f6sszet\u00e9tel vagy a k\u00f6z\u00f6s er\u0151forr\u00e1s terhel\u00e9se.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Olyan ritmust v\u00e1lasszon, amely a keresletet szolg\u00e1lja, nem csup\u00e1n a gy\u00e1rt\u00e1si k\u00f6rt k\u00f6veti<\/h2>\n\n\n<p>R\u00f6videbb ism\u00e9tl\u0151d\u00e9si id\u0151k\u00f6zzel hamarabb p\u00f3tolhat\u00f3 egy alkatr\u00e9sz k\u00e9szlete, \u00e9s r\u00f6videbb id\u0151szak fogyaszt\u00e1s\u00e1t kell fedezni k\u00e9t gy\u00e1rt\u00e1s k\u00f6z\u00f6tt. Ez kisebb ut\u00e1np\u00f3tl\u00e1si t\u00e9teleket \u00e9s kevesebb lek\u00f6t\u00f6tt k\u00e9szletet tesz lehet\u0151v\u00e9. Az id\u0151k\u00f6z r\u00f6vid\u00edt\u00e9se ugyanakkor gyakoribb \u00e1t\u00e1ll\u00e1ssal is j\u00e1r.<\/p>\n\n\n<p>\u00c1lland\u00f3 kereslet mellett az alkalmank\u00e9nt gy\u00e1rtand\u00f3 mennyis\u00e9g kiindul\u00f3 \u00e9rt\u00e9ke a munkanaponk\u00e9nti ig\u00e9ny \u00e9s a v\u00e1lasztott id\u0151k\u00f6z szorzata. A p\u00e9ld\u00e1ban az A alkatr\u00e9szb\u0151l alkalmank\u00e9nt 100 \u00d7 2 = 200 darabra van sz\u00fcks\u00e9g. Ez a k\u00f6r alatti keresletet fedez\u0151 mennyis\u00e9g, nem pedig teljes k\u00f6r\u0171 szab\u00e1ly a biztons\u00e1gi k\u00e9szletre vagy az ut\u00e1np\u00f3tl\u00e1sra. A megl\u00e9v\u0151 k\u00e9szletet, a hi\u00e1nyokat, a minim\u00e1lis t\u00e9telnagys\u00e1gokat \u00e9s a kereslet v\u00e1ltoz\u00e1sait tov\u00e1bbra is figyelembe kell venni.<\/p>\n\n\n<p>A ritmus kiv\u00e1laszt\u00e1sakor ker\u00fclje el ezt a h\u00e1rom gyakori hib\u00e1t.<\/p>\n\n\n<p><strong>Ne keverje \u00f6ssze a k\u00e9szletfedezetet a gy\u00e1rt\u00e1si k\u00e9pess\u00e9ggel.<\/strong> A k\u00e9szlet \u00e9s a napi ig\u00e9ny h\u00e1nyadosa azt mutatja meg, hogy a k\u00e9szlet mennyi ideig fedezhetn\u00e9 a fogyaszt\u00e1st. Arr\u00f3l viszont nem ad inform\u00e1ci\u00f3t, hogy az er\u0151forr\u00e1s k\u00e9pes-e el\u00e9g gyakran legy\u00e1rtani a teljes term\u00e9kcsal\u00e1dot, az \u00e1t\u00e1ll\u00e1sokkal egy\u00fctt, a k\u00e9szlet p\u00f3tl\u00e1s\u00e1hoz.<\/p>\n\n\n<p><strong>Ne gy\u00e1rtson minden k\u00f6rben minden kis fogy\u00e1s\u00fa cikket.<\/strong> A rendszeresen gy\u00e1rtott cikkek ism\u00e9tl\u0151d\u0151 csoportja indokolhat r\u00f6vid id\u0151k\u00f6zt, mik\u00f6zben az id\u0151szakosan keresett cikkek ritk\u00e1bban, t\u00e9nyleges ig\u00e9ny alapj\u00e1n k\u00e9sz\u00fclnek. Egy\u00e9rtelm\u0171en hat\u00e1rozza meg, mely cikkek tartoznak az egyes csoportokba. Ha egy cikk csak minden harmadik k\u00f6rben ker\u00fcl gy\u00e1rt\u00e1sba, annak EPEI-je nem azonos a minden k\u00f6rben gy\u00e1rtott cikkek egyk\u00f6r\u00f6s EPEI-j\u00e9vel.<\/p>\n\n\n<p><strong>Ne optimaliz\u00e1lja az \u00e1t\u00e1ll\u00e1sokat a t\u00f6bbi szempontt\u00f3l elszigetelten.<\/strong> Ha sz\u00e1m\u00edt az \u00e1t\u00e1ll\u00e1s ir\u00e1nya, a kiv\u00e1lasztott sorrend t\u00e9nyleges \u00e1tmeneteivel sz\u00e1moljon. Egy <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/atallasi-matrix\/\">\u00e1t\u00e1ll\u00e1si m\u00e1trix<\/a> seg\u00edthet hat\u00e9konyabb sorrendet tal\u00e1lni. Ha azonban az \u00e1t\u00e1ll\u00e1sok megtakar\u00edt\u00e1sa \u00e9rdek\u00e9ben t\u00fal hossz\u00fa gy\u00e1rt\u00e1si kamp\u00e1nyt alak\u00edt ki, egy m\u00e1sik alkatr\u00e9sz k\u00f6vetkez\u0151 gy\u00e1rt\u00e1sa t\u00fal sok\u00e1ig v\u00e1rathat mag\u00e1ra.<\/p>\n\n\n<p>A <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/heijunka\/\">termel\u00e9skiegyenl\u00edt\u00e9s<\/a> t\u00e1gabb feladata a mennyis\u00e9g \u00e9s a term\u00e9k\u00f6sszet\u00e9tel id\u0151beli eloszt\u00e1sa. Ezen bel\u00fcl az EPEI egy konkr\u00e9t k\u00e9rd\u00e9st vet fel: milyen gyakran t\u00e9rhet\u00fcnk vissza ezeknek az alkatr\u00e9szeknek a gy\u00e1rt\u00e1s\u00e1hoz? Erre \u00fagy adjon v\u00e1laszt, hogy k\u00f6zben ne k\u00e9nyszer\u00edtse merev mint\u00e1ba a teljes term\u00e9kv\u00e1laszt\u00e9kot.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Illessze az ism\u00e9tl\u0151d\u0151 munk\u00e1kat a t\u00e9nyleges gy\u00e1rt\u00e1si \u00fctemtervbe<\/h2>\n\n\n<p>A kapacit\u00e1ssz\u00e1m\u00edt\u00e1s sz\u00e1nd\u00e9kosan egyszer\u0171. Az \u00fczem gy\u00e1rt\u00e1si \u00fctemterve viszont nem az. Ugyanazokat a g\u00e9peket m\u00e1s rendel\u00e9sek is terhelik, a g\u00e9pkezel\u0151k meghat\u00e1rozott m\u0171szakokban dolgoznak, \u00e9s egy hi\u00e1nyz\u00f3 anyag megakaszthatja a k\u00f6vetkez\u0151 tervezett gy\u00e1rt\u00e1st.<\/p>\n\n\n<p>Itt v\u00e1lik igaz\u00e1n hasznoss\u00e1 a SkyPlanner APS. Ahelyett, hogy k\u00fcl\u00f6n gy\u00e1rt\u00e1si k\u00f6rt tartana fenn, \u00e9s minden m\u00e1s munk\u00e1t k\u00e9zzel illesztene k\u00f6r\u00e9, <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/mi-a-termelesutemezes\/\">\u00fctemezze a kiv\u00e1lasztott ut\u00e1np\u00f3tl\u00e1si rendel\u00e9seket a teljes rendel\u00e9s\u00e1llom\u00e1nnyal egy\u00fctt<\/a>. \u00cdgy tiszt\u00e1bban l\u00e1thatja, hogy az ism\u00e9tl\u0151d\u0151 munk\u00e1k \u00f6sszeegyeztethet\u0151k-e a vev\u0151knek tett v\u00e1llal\u00e1sokkal, \u00e9s kevesebb napi munk\u00e1t ig\u00e9nyel a g\u00e9pekre v\u00e1r\u00f3 feladatok sorrendj\u00e9nek \u00f6sszehangol\u00e1sa.<\/p>\n\n\n<h3 class=\"wp-block-heading\">A term\u00e9kcsal\u00e1d val\u00f3s id\u0151ig\u00e9ny\u00e9t modellezze<\/h3>\n\n\n<p>A SkyPlannerben m\u0171veletenk\u00e9nt megadhat\u00f3 a darabonk\u00e9nti megmunk\u00e1l\u00e1si id\u0151, a termel\u00e9si r\u00e1ta vagy a r\u00f6gz\u00edtett id\u0151tartam, valamint az \u00e1t\u00e1ll\u00e1si id\u0151 \u00e9s az alkalmas munka\u00e1llom\u00e1sok. Minden m\u0171veletn\u00e9l a megfelel\u0151 m\u00f3dszert alkalmazza, ahelyett, hogy minden t\u00e9tel id\u0151ig\u00e9ny\u00e9t egyszer\u0171en a darabsz\u00e1m \u00e9s a darabonk\u00e9nti ciklusid\u0151 szorzatak\u00e9nt sz\u00e1moln\u00e1 ki.<\/p>\n\n\n<p>Vigye be az \u00fctemtervbe a kiv\u00e1lasztott mennyis\u00e9geket, gy\u00e1rt\u00e1si \u00fatvonalakat \u00e9s hat\u00e1rid\u0151ket, a megfelel\u0151 m\u0171szakokkal \u00e9s er\u0151forr\u00e1s-kapacit\u00e1ssal egy\u00fctt. Az Arcturus, a SkyPlanner \u00fctemez\u0151motorja a be\u00e1ll\u00edtott priorit\u00e1sok \u00e9s a m\u0171veletek k\u00f6z\u00f6tti f\u00fcgg\u0151s\u00e9gek alapj\u00e1n sz\u00e1m\u00edtja ki a feladatok hely\u00e9t az \u00fctemtervben. Ha az anyagell\u00e1t\u00e1st figyelembe vev\u0151 \u00fctemez\u00e9s enged\u00e9lyezve van, az anyagok rendelkez\u00e9sre \u00e1ll\u00e1sa is befoly\u00e1solja a sz\u00e1m\u00edt\u00e1st. A kapott munkasorrend a Gantt-diagramon l\u00e1that\u00f3.<\/p>\n\n\n<p>A tervez\u00e9si d\u00f6nt\u00e9sek tov\u00e1bbra is az \u00d6n kez\u00e9ben maradnak: melyik term\u00e9kcsal\u00e1d gy\u00e1rt\u00e1sa ism\u00e9tl\u0151dj\u00f6n, milyen c\u00e9l\u00e9rt\u00e9k \u00e9szszer\u0171, \u00e9s milyen priorit\u00e1st kapjanak a kiv\u00e9telek. Ha egy rendel\u00e9st nem szabad t\u00fal kor\u00e1n legy\u00e1rtani, a legkor\u00e1bbi megengedett kezd\u00e9si d\u00e1tummal megakad\u00e1lyozhat\u00f3, hogy a rendszer enn\u00e9l kor\u00e1bbra \u00fctemezze. Ez a kezd\u00e9s legkor\u00e1bbi id\u0151pontj\u00e1t korl\u00e1tozza, nem garant\u00e1lja a k\u00f6vetkez\u0151 gy\u00e1rt\u00e1s id\u0151pontj\u00e1t.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Cs\u00f6kkentse az \u00e1t\u00e1ll\u00e1si id\u0151t, de tartsa szem el\u0151tt a k\u00f6vetkez\u0151 sz\u00fcks\u00e9ges gy\u00e1rt\u00e1st is<\/h3>\n\n\n<p>A SkyPlanner k\u00f6z\u00f6s tulajdons\u00e1gok, p\u00e9ld\u00e1ul szersz\u00e1moz\u00e1s, anyag vagy sz\u00edn alapj\u00e1n k\u00e9pes csoportos\u00edtani a munk\u00e1kat. A munka\u00e1llom\u00e1sok hasonl\u00f3s\u00e1gi szab\u00e1lyai figyelembe veszik a kiv\u00e1lasztott tulajdons\u00e1got \u00e9s az elt\u00e9r\u0151 munk\u00e1k k\u00f6z\u00f6tti \u00e1t\u00e1ll\u00e1si id\u0151t. A csoportos\u00edt\u00e1s fontoss\u00e1ga a dinamikus priorit\u00e1sokkal szab\u00e1lyozhat\u00f3.<\/p>\n\n\n<p>\u00cdgy visszanyerhet\u0151 az elker\u00fclhet\u0151 \u00e1t\u00e1ll\u00e1sokkal egy\u00e9bk\u00e9nt elvesz\u0151 id\u0151. Az \u00e1t\u00e1ll\u00e1si id\u0151 megtakar\u00edt\u00e1sa \u00e9s a r\u00f6vid ism\u00e9tl\u0151d\u00e9si id\u0151k\u00f6z azonban nem mindig ugyanazt a c\u00e9lt szolg\u00e1lja. Ha t\u00fal sok\u00e1ig tartja egy csoportban a hasonl\u00f3 munk\u00e1kat, az k\u00e9sleltetheti egy m\u00e1sik alkatr\u00e9sz k\u00f6vetkez\u0151 gy\u00e1rt\u00e1s\u00e1t. A csoportos\u00edt\u00e1s s\u00faly\u00e1t a sz\u00e1ll\u00edt\u00e1si priorit\u00e1sokkal egy\u00fctt \u00e1ll\u00edtsa be, majd ellen\u0151rizze, hogy a kapott sorrend megfelel-e a v\u00e1lasztott id\u0151k\u00f6znek.<\/p>\n\n\n<p>A <a href=\"https:\/\/skyplanner.ai\/hu\/ugyfeltortenetek\/kjh-comp\/\">KJH-Comp<\/a> kor\u00e1bban az ERP-ben tervezett heti terhel\u00e9sre \u00e9s t\u00e1bl\u00e1zatokra t\u00e1maszkodott, a munk\u00e1k napi szint\u0171 g\u00e9phez rendel\u00e9se pedig a m\u0171vezet\u0151kre maradt. A SkyPlannerrel a v\u00e9ges kapacit\u00e1s\u00fa \u00fctemez\u00e9s \u00e9s a g\u00e9phez rendel\u00e9s automatikuss\u00e1 v\u00e1lt. A v\u00e1llalat besz\u00e1mol\u00f3ja szerint a hajl\u00edt\u00e1sn\u00e1l az azonos szersz\u00e1moz\u00e1st \u00e9s anyagvastags\u00e1got ig\u00e9nyl\u0151 munk\u00e1kat csoportos\u00edtj\u00e1k, \u00edgy r\u00f6vid\u00fclnek az \u00e1t\u00e1ll\u00e1sok \u00e9s cs\u00f6kken az \u00fcresj\u00e1rati id\u0151.<\/p>\n\n\n<p>Rendszeresen visszat\u00e9r\u0151 term\u00e9kcsal\u00e1d eset\u00e9n ugyanezek az el\u0151ny\u00f6k sz\u00e1m\u00edtanak: kevesebb elker\u00fclhet\u0151 \u00e1t\u00e1ll\u00e1s \u00e9s kevesebb id\u0151 a napi terv \u00fajra\u00e9p\u00edt\u00e9s\u00e9re. A k\u00f6vetkez\u0151 l\u00e9p\u00e9s annak ellen\u0151rz\u00e9se, hogy a v\u00e1lasztott ism\u00e9tl\u0151d\u00e9si id\u0151k\u00f6z a teljes terhel\u00e9s mellett is tarthat\u00f3-e.<\/p>\n\n\n<h2 class=\"wp-block-heading\">A termel\u00e9s v\u00e1ltoz\u00e1s\u00e1val ellen\u0151rizze \u00fajra az ism\u00e9tl\u0151d\u00e9si id\u0151k\u00f6zt<\/h2>\n\n\n<p>A c\u00e9l\u00e9rt\u00e9k meghat\u00e1roz\u00e1sa ut\u00e1n minden alkatr\u00e9szn\u00e9l k\u00f6vetkezetesen r\u00f6gz\u00edtse az egym\u00e1st k\u00f6vet\u0151 gy\u00e1rt\u00e1sok id\u0151pontj\u00e1t a meghat\u00e1rozott gy\u00e1rt\u00e1si folyamatban. Mindig ugyanazt az esem\u00e9nyt \u2013 p\u00e9ld\u00e1ul a gy\u00e1rt\u00e1s kezdet\u00e9t \u2013 \u00e9s ugyanazt a munkanapt\u00e1rt vegye alapul. Vizsg\u00e1lja meg a gy\u00e1rt\u00e1sok k\u00f6z\u00f6tti id\u0151k\u00f6z\u00f6ket, k\u00fcl\u00f6n\u00f6sen azokat az eseteket, amikor a k\u00f6vetkez\u0151 gy\u00e1rt\u00e1sra nem ker\u00fclt sor a tervezett id\u0151ben: az \u00e1tlag \u00f6nmag\u00e1ban elfedheti, ha egy alkatr\u00e9sz gy\u00e1rt\u00e1s\u00e1ra rendszeresen t\u00fal sokat kell v\u00e1rni.<\/p>\n\n\n<p>Ha cs\u00faszik a k\u00f6vetkez\u0151 gy\u00e1rt\u00e1s, a c\u00e9l\u00e9rt\u00e9k m\u00f3dos\u00edt\u00e1sa el\u0151tt t\u00e1rja fel az ok\u00e1t. T\u00fal der\u0171l\u00e1t\u00f3 volt az \u00e1t\u00e1ll\u00e1sokra eredetileg tervezett id\u0151keret? M\u00e1sik rendel\u00e9s k\u00f6t\u00f6tte le a kapacit\u00e1st? Nem \u00e1llt rendelkez\u00e9sre az anyag, vagy egy k\u00e9s\u0151bbi folyamatl\u00e9p\u00e9s korl\u00e1tja akad\u00e1lyozta a tervezett anyag\u00e1raml\u00e1st?<\/p>\n\n\n<p>Friss\u00edtse az \u00e9rintett kapacit\u00e1s-, anyag- vagy priorit\u00e1sadatokat, \u00e9s sz\u00e1m\u00edttassa \u00fajra az \u00fctemtervet a SkyPlannerben. Ezut\u00e1n egy\u00fctt tekintse \u00e1t a k\u00f6vetkez\u0151 ut\u00e1np\u00f3tl\u00e1si gy\u00e1rt\u00e1sokat \u00e9s az \u00e9rintett vev\u0151i munk\u00e1kat. A c\u00e9l a h\u00e1tt\u00e9rben h\u00faz\u00f3d\u00f3 \u00fctk\u00f6z\u00e9s felold\u00e1sa, nem pedig a tegnapi gy\u00e1rt\u00e1si k\u00f6r l\u00e1tsz\u00f3lagos meg\u0151rz\u00e9se, mik\u00f6zben a t\u00e9nyleges munkasorrend egyre jobban elt\u00e9r t\u0151le.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Tesztelje egy rendszeresen gy\u00e1rtott term\u00e9kcsal\u00e1d \u00fctemez\u00e9s\u00e9t a SkyPlannerrel<\/h2>\n\n\n<p>A gyakorlatban haszn\u00e1lhat\u00f3 EPEI h\u00e1rom d\u00f6nt\u00e9st kapcsol \u00f6ssze: milyen id\u0151k\u00f6zt tesz lehet\u0151v\u00e9 a kapacit\u00e1s, milyen ut\u00e1np\u00f3tl\u00e1si ritmust ig\u00e9nyel a kereslet, \u00e9s milyen \u00fctemterv tudja mindkett\u0151t megval\u00f3s\u00edtani a t\u00f6bbi rendel\u00e9s mellett.<\/p>\n\n\n<p>A harmadik d\u00f6nt\u00e9shez a SkyPlanner biztos\u00edtja az \u00fctemez\u00e9si alapot. Ny\u00edlt REST API-j\u00e1n kereszt\u00fcl b\u00e1rmely ERP- vagy MES-rendszerrel integr\u00e1lhat\u00f3, \u00edgy megtarthatja megl\u00e9v\u0151 v\u00e1llalatir\u00e1ny\u00edt\u00e1si rendszer\u00e9t, \u00e9s az ism\u00e9tl\u0151d\u0151 gy\u00e1rt\u00e1st az \u00fczem t\u00f6bbi munk\u00e1j\u00e1val k\u00f6z\u00f6s, v\u00e9ges kapacit\u00e1s\u00fa \u00fctemtervbe illesztheti.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/hu\/kapcsolat-ertekesites\/\">Foglaljon SkyPlanner-bemutat\u00f3t<\/a>, \u00e9s hozzon p\u00e9ldak\u00e9nt egy term\u00e9kcsal\u00e1dot a megmunk\u00e1l\u00e1si \u00e9s \u00e1t\u00e1ll\u00e1si id\u0151kkel, a m\u0171szaknapt\u00e1rral \u00e9s az ugyanazt az er\u0151forr\u00e1st terhel\u0151 egy\u00e9b rendel\u00e9sekkel egy\u00fctt. A megbesz\u00e9l\u00e9sen \u00e1ttekintheti, hogyan illeszkedne az elk\u00e9pzelt ritmus a t\u00e9nyleges terhel\u00e9shez. Ha el\u0151bb ink\u00e1bb a k\u00f6rnyezetet ismern\u00e9 meg, <a href=\"https:\/\/skyplanner.ai\/hu\/proba\/\">pr\u00f3b\u00e1lja ki a SkyPlannert dem\u00f3adatokkal<\/a>, vagy haszn\u00e1lja az Asszisztens mesters\u00e9ges intelligenci\u00e1val t\u00e1mogatott kezdeti be\u00e1ll\u00edt\u00e1si folyamat\u00e1t.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>EPEI: re\u00e1lis gy\u00e1rt\u00e1si ism\u00e9tl\u0151d\u00e9si id\u0151k\u00f6z sz\u00e1m\u00edt\u00e1sa Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; EPEI: re\u00e1lis gy\u00e1rt\u00e1si ism\u00e9tl\u0151d\u00e9si id\u0151k\u00f6z sz\u00e1m\u00edt\u00e1sa Egy term\u00e9kcsal\u00e1d minden alkatr\u00e9sz\u00e9t gyakrabban, kisebb sorozatokban szeretn\u00e9 gy\u00e1rtani. Az ism\u00e9tl\u0151d\u0151 gy\u00e1rt\u00e1si sorrend rendezettnek t\u0171nik: A, majd B, azt\u00e1n C, v\u00e9g\u00fcl vissza A-ra. A g\u00e9pen azonban vev\u0151i megrendel\u00e9seket is teljes\u00edteni kell, \u00e9s minden \u00fajabb k\u00f6r \u00fajabb \u00e1t\u00e1ll\u00e1sokkal j\u00e1r. Az &#8230; <a title=\"EPEI: re\u00e1lis gy\u00e1rt\u00e1si ism\u00e9tl\u0151d\u00e9si id\u0151k\u00f6z sz\u00e1m\u00edt\u00e1sa\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/epei\/\" aria-label=\"Read more about EPEI: re\u00e1lis gy\u00e1rt\u00e1si ism\u00e9tl\u0151d\u00e9si id\u0151k\u00f6z sz\u00e1m\u00edt\u00e1sa\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":111941,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2526,312],"tags":[],"class_list":["post-111916","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-es-utemezes","category-forrasok","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>EPEI: re\u00e1lis gy\u00e1rt\u00e1si ism\u00e9tl\u0151d\u00e9si id\u0151k\u00f6z sz\u00e1m\u00edt\u00e1sa<\/title>\n<meta name=\"description\" content=\"Id\u0151ben \u00fajra sorra ker\u00fcl minden alkatr\u00e9sz? Sz\u00e1m\u00edtson kapacit\u00e1shoz igazod\u00f3 EPEI-t az \u00e1t\u00e1ll\u00e1sokkal egy\u00fctt, \u00e9s vigye az ism\u00e9tl\u0151d\u0151 munk\u00e1kat a SkyPlannerbe.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/epei\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"EPEI: re\u00e1lis gy\u00e1rt\u00e1si ism\u00e9tl\u0151d\u00e9si id\u0151k\u00f6z sz\u00e1m\u00edt\u00e1sa\" \/>\n<meta property=\"og:description\" content=\"Id\u0151ben \u00fajra sorra ker\u00fcl minden alkatr\u00e9sz? Sz\u00e1m\u00edtson kapacit\u00e1shoz igazod\u00f3 EPEI-t az \u00e1t\u00e1ll\u00e1sokkal egy\u00fctt, \u00e9s vigye az ism\u00e9tl\u0151d\u0151 munk\u00e1kat a SkyPlannerbe.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/forrasok\/epei\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-28T19:23:39+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-28T19:24:29+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/every-part-every-interval-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1774\" \/>\n\t<meta property=\"og:image:height\" content=\"887\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Szerz\u0151:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data2\" content=\"18 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/epei\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/epei\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"EPEI: re\u00e1lis gy\u00e1rt\u00e1si ism\u00e9tl\u0151d\u00e9si id\u0151k\u00f6z sz\u00e1m\u00edt\u00e1sa\",\"datePublished\":\"2026-10-28T19:23:39+00:00\",\"dateModified\":\"2026-10-28T19:24:29+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/epei\\\/\"},\"wordCount\":3560,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/epei\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/every-part-every-interval-hero.png\",\"articleSection\":[\"APS \u00e9s \u00fctemez\u00e9s\",\"forr\u00e1sok\"],\"inLanguage\":\"hu-HU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/epei\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/epei\\\/\",\"name\":\"EPEI: re\u00e1lis gy\u00e1rt\u00e1si ism\u00e9tl\u0151d\u00e9si id\u0151k\u00f6z sz\u00e1m\u00edt\u00e1sa\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/epei\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/epei\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/every-part-every-interval-hero.png\",\"datePublished\":\"2026-10-28T19:23:39+00:00\",\"dateModified\":\"2026-10-28T19:24:29+00:00\",\"description\":\"Id\u0151ben \u00fajra sorra ker\u00fcl minden alkatr\u00e9sz? Sz\u00e1m\u00edtson kapacit\u00e1shoz igazod\u00f3 EPEI-t az \u00e1t\u00e1ll\u00e1sokkal egy\u00fctt, \u00e9s vigye az ism\u00e9tl\u0151d\u0151 munk\u00e1kat a SkyPlannerbe.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/epei\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/epei\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/epei\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/every-part-every-interval-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/every-part-every-interval-hero.png\",\"width\":1774,\"height\":887,\"caption\":\"Three different part shapes repeat around a machining station, illustrating a product family\u2019s return interval.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/epei\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"EPEI: re\u00e1lis gy\u00e1rt\u00e1si ism\u00e9tl\u0151d\u00e9si id\u0151k\u00f6z sz\u00e1m\u00edt\u00e1sa\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"EPEI: re\u00e1lis gy\u00e1rt\u00e1si ism\u00e9tl\u0151d\u00e9si id\u0151k\u00f6z sz\u00e1m\u00edt\u00e1sa","description":"Id\u0151ben \u00fajra sorra ker\u00fcl minden alkatr\u00e9sz? Sz\u00e1m\u00edtson kapacit\u00e1shoz igazod\u00f3 EPEI-t az \u00e1t\u00e1ll\u00e1sokkal egy\u00fctt, \u00e9s vigye az ism\u00e9tl\u0151d\u0151 munk\u00e1kat a SkyPlannerbe.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/forrasok\/epei\/","og_locale":"hu_HU","og_type":"article","og_title":"EPEI: re\u00e1lis gy\u00e1rt\u00e1si ism\u00e9tl\u0151d\u00e9si id\u0151k\u00f6z sz\u00e1m\u00edt\u00e1sa","og_description":"Id\u0151ben \u00fajra sorra ker\u00fcl minden alkatr\u00e9sz? Sz\u00e1m\u00edtson kapacit\u00e1shoz igazod\u00f3 EPEI-t az \u00e1t\u00e1ll\u00e1sokkal egy\u00fctt, \u00e9s vigye az ism\u00e9tl\u0151d\u0151 munk\u00e1kat a SkyPlannerbe.","og_url":"https:\/\/skyplanner.ai\/hu\/forrasok\/epei\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-28T19:23:39+00:00","article_modified_time":"2026-10-28T19:24:29+00:00","og_image":[{"width":1774,"height":887,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/every-part-every-interval-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Szerz\u0151:":"Jussi M\u00e4ntyl\u00e4","Becs\u00fclt olvas\u00e1si id\u0151":"18 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/epei\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/epei\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"EPEI: re\u00e1lis gy\u00e1rt\u00e1si ism\u00e9tl\u0151d\u00e9si id\u0151k\u00f6z sz\u00e1m\u00edt\u00e1sa","datePublished":"2026-10-28T19:23:39+00:00","dateModified":"2026-10-28T19:24:29+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/epei\/"},"wordCount":3560,"publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/epei\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/every-part-every-interval-hero.png","articleSection":["APS \u00e9s \u00fctemez\u00e9s","forr\u00e1sok"],"inLanguage":"hu-HU"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/epei\/","url":"https:\/\/skyplanner.ai\/hu\/forrasok\/epei\/","name":"EPEI: re\u00e1lis gy\u00e1rt\u00e1si ism\u00e9tl\u0151d\u00e9si id\u0151k\u00f6z sz\u00e1m\u00edt\u00e1sa","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/epei\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/epei\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/every-part-every-interval-hero.png","datePublished":"2026-10-28T19:23:39+00:00","dateModified":"2026-10-28T19:24:29+00:00","description":"Id\u0151ben \u00fajra sorra ker\u00fcl minden alkatr\u00e9sz? Sz\u00e1m\u00edtson kapacit\u00e1shoz igazod\u00f3 EPEI-t az \u00e1t\u00e1ll\u00e1sokkal egy\u00fctt, \u00e9s vigye az ism\u00e9tl\u0151d\u0151 munk\u00e1kat a SkyPlannerbe.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/epei\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/forrasok\/epei\/"]}]},{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/epei\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/every-part-every-interval-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/every-part-every-interval-hero.png","width":1774,"height":887,"caption":"Three different part shapes repeat around a machining station, illustrating a product family\u2019s return interval."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/epei\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"EPEI: re\u00e1lis gy\u00e1rt\u00e1si ism\u00e9tl\u0151d\u00e9si id\u0151k\u00f6z sz\u00e1m\u00edt\u00e1sa"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/every-part-every-interval-hero.png",1774,887,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/every-part-every-interval-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/every-part-every-interval-hero-300x150.png",300,150,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/every-part-every-interval-hero-768x384.png",768,384,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/every-part-every-interval-hero-1024x512.png",1024,512,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/every-part-every-interval-hero-1536x768.png",1536,768,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/every-part-every-interval-hero.png",1774,887,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/every-part-every-interval-hero-360x180.png",360,180,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"EPEI: re\u00e1lis gy\u00e1rt\u00e1si ism\u00e9tl\u0151d\u00e9si id\u0151k\u00f6z sz\u00e1m\u00edt\u00e1sa Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; EPEI: re\u00e1lis gy\u00e1rt\u00e1si ism\u00e9tl\u0151d\u00e9si id\u0151k\u00f6z sz\u00e1m\u00edt\u00e1sa Egy term\u00e9kcsal\u00e1d minden alkatr\u00e9sz\u00e9t gyakrabban, kisebb sorozatokban szeretn\u00e9 gy\u00e1rtani. Az ism\u00e9tl\u0151d\u0151 gy\u00e1rt\u00e1si sorrend rendezettnek t\u0171nik: A, majd B, azt\u00e1n C, v\u00e9g\u00fcl vissza A-ra. A g\u00e9pen azonban vev\u0151i megrendel\u00e9seket is teljes\u00edteni kell, \u00e9s minden \u00fajabb k\u00f6r \u00fajabb \u00e1t\u00e1ll\u00e1sokkal j\u00e1r. Az&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/111916","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=111916"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/111916\/revisions"}],"predecessor-version":[{"id":111980,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/111916\/revisions\/111980"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media\/111941"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=111916"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/categories?post=111916"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/tags?post=111916"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}