{"id":111512,"date":"2026-10-27T22:44:45","date_gmt":"2026-10-27T22:44:45","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=111512"},"modified":"2026-10-27T22:45:43","modified_gmt":"2026-10-27T22:45:43","slug":"anyaghiany-kezeles","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/hu\/forrasok\/anyaghiany-kezeles\/","title":{"rendered":"Anyaghi\u00e1ny-kezel\u00e9s: ne akadjanak el a rendel\u00e9sek"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Anyaghi\u00e1ny-kezel\u00e9s: ne akadjanak el a rendel\u00e9sek<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/hu\/\">Kezd\u0151lap<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/\">Er\u0151forr\u00e1sok<\/a> &raquo; Anyaghi\u00e1ny-kezel\u00e9s: ne akadjanak el a rendel\u00e9sek<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Becs\u00fclt olvas\u00e1si id\u0151: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> perc<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Egy besz\u00e1ll\u00edt\u00f3 meg\u00edg\u00e9ri, hogy soron k\u00edv\u00fcl sz\u00e1ll\u00edtja a hi\u00e1nyz\u00f3 alkatr\u00e9szt. A beszerz\u00e9snek m\u00e1r van terve a helyzet rendez\u00e9s\u00e9re. A termel\u00e9snek viszont m\u00e9g tudnia kell, hogy az alkatr\u00e9sz el\u00e9g kor\u00e1n \u00e9rkezik-e a rendel\u00e9s hat\u00e1ridej\u00e9nek tart\u00e1s\u00e1hoz, \u00e9s mit gy\u00e1rtson addig.<\/p>\n\n\n<p>Ez az anyaghi\u00e1ny-kezel\u00e9s val\u00f3di feladata. Ha minden hi\u00e1nyz\u00f3 alkatr\u00e9sz beszerz\u00e9s\u00e9t egyform\u00e1n s\u00fcrgetj\u00fck, a figyelm\u00fcnk nagyon elt\u00e9r\u0151 k\u00f6vetkezm\u00e9nyekkel j\u00e1r\u00f3 probl\u00e9m\u00e1k k\u00f6z\u00f6tt oszlik meg. Az az int\u00e9zked\u00e9s a leghasznosabb, amely biztos\u00edtja a v\u00e1llalt sz\u00e1ll\u00edt\u00e1st, vagy megel\u0151z egy m\u00e9g elker\u00fclhet\u0151 le\u00e1ll\u00e1st.<\/p>\n\n\n<p>A SkyPlanner APS \u00f6sszekapcsolja az anyagok rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1t a gy\u00e1rt\u00e1si kapacit\u00e1ssal \u00e9s a priorit\u00e1sokkal. Miut\u00e1n ellen\u0151rizte a hi\u00e1nyt \u00e9s d\u00f6nt\u00f6tt a sz\u00fcks\u00e9ges int\u00e9zked\u00e9sekr\u0151l, a rendszer ezekb\u0151l az adatokb\u00f3l minden \u00e9rintett sz\u00e1m\u00e1ra k\u00f6z\u00f6s gy\u00e1rt\u00e1si \u00fctemtervet k\u00e9sz\u00edt. \u00cdgy kevesebb id\u0151t kell a g\u00e9pekre v\u00e1r\u00f3 feladatok sorrendj\u00e9nek \u00fajratervez\u00e9s\u00e9re ford\u00edtania, \u00e9s t\u00f6bb ideje marad a val\u00f3ban fontos elt\u00e9r\u00e9sek kezel\u00e9s\u00e9re.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mit jelent az anyaghi\u00e1ny-kezel\u00e9s a gy\u00e1rt\u00e1sban?<\/h2>\n\n\n<p>Az anyaghi\u00e1ny-kezel\u00e9s sor\u00e1n azonos\u00edtjuk, ellen\u0151rizz\u00fck, fontoss\u00e1gi sorrendbe \u00e1ll\u00edtjuk \u00e9s megsz\u00fcntetj\u00fck a gy\u00e1rt\u00e1st vesz\u00e9lyeztet\u0151 anyag- vagy alkatr\u00e9szhi\u00e1nyokat. Az ell\u00e1t\u00e1si probl\u00e9m\u00e1t az \u00e9rintett gy\u00e1rt\u00e1si feladatokkal, a vev\u0151nek tett v\u00e1llal\u00e1ssal \u00e9s a helyzet rendez\u00e9s\u00e9t szolg\u00e1l\u00f3 konkr\u00e9t int\u00e9zked\u00e9ssel egy\u00fctt kezelj\u00fck.<\/p>\n\n\n<p>A hi\u00e1ny nem felt\u00e9tlen\u00fcl jelent nulla k\u00e9szletet. Lehet anyag a polcon, de nem biztos, hogy elegend\u0151 minden olyan rendel\u00e9shez, amelyhez a k\u00f6vetkez\u0151 be\u00e9rkez\u00e9s el\u0151tt sz\u00fcks\u00e9g van r\u00e1. A k\u00e9szlet az\u00e9rt is lehet el\u00e9rhetetlen, mert m\u00e1s feladatra foglalt\u00e1k le, ellen\u0151rz\u00e9sre v\u00e1r, vagy nincs a tervezett ind\u00edt\u00e1shoz sz\u00fcks\u00e9ges helyen.<\/p>\n\n\n<p>A hi\u00e1ny nem is mindig a besz\u00e1ll\u00edt\u00f3 hib\u00e1j\u00e1b\u00f3l keletkezik. K\u00e9sedelmes be\u00e9rkez\u00e9s, pontatlan k\u00e9szletnyilv\u00e1ntart\u00e1s, nem r\u00f6gz\u00edtett felhaszn\u00e1l\u00e1s, selejt, komissi\u00f3z\u00e1si hiba vagy a rendel\u00e9sek anyagig\u00e9ny\u00e9nek v\u00e1ltoz\u00e1sa miatt is hi\u00e1nyozhat egy gy\u00e1rt\u00e1si feladathoz sz\u00fcks\u00e9ges anyag. Az ell\u00e1t\u00e1si l\u00e1nc sz\u00e9lesebb k\u00f6r\u0171 zavara is okozhat hi\u00e1nyt, de az \u00fczemben ett\u0151l m\u00e9g konkr\u00e9t k\u00e9rd\u00e9sben kell d\u00f6nteni: mely feladatokat \u00e9rinti a hi\u00e1ny, \u00e9s mit tehet\u00fcnk ellene?<\/p>\n\n\n<p>Az <a href=\"\/hu\/forrasok\/mrp-rovid-utmutato\/\">MRP<\/a> azonos\u00edtja az anyagsz\u00fcks\u00e9gletet \u00e9s az ell\u00e1t\u00e1s hi\u00e1nyoss\u00e1gait. A <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/keszletfedezet\/\">k\u00e9szletfedezet<\/a> seg\u00edt felm\u00e9rni, meddig elegend\u0151 a rendelkez\u00e9sre \u00e1ll\u00f3 mennyis\u00e9g. Az anyaghi\u00e1ny-kezel\u00e9s a k\u00f6vetkez\u0151 l\u00e9p\u00e9s: eld\u00f6ntj\u00fck, melyik igazolt hi\u00e1nnyal kell el\u0151sz\u00f6r foglalkozni, majd a v\u00e1lasztott int\u00e9zked\u00e9st a termel\u00e9sben v\u00e9grehajthat\u00f3 feladatokk\u00e1 alak\u00edtjuk.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Ellen\u0151rizze a hi\u00e1nyt, miel\u0151tt magasabb szintre emeli az \u00fcgyet<\/h2>\n\n\n<p>Ne csup\u00e1n a cikksz\u00e1mb\u00f3l induljon ki, hanem az \u00e9rintett m\u0171veletb\u0151l. A hi\u00e1nyr\u00f3l vezetett nyilv\u00e1ntart\u00e1s akkor hasznos, ha megmutatja, mi hi\u00e1nyzik, hol van r\u00e1 sz\u00fcks\u00e9g, \u00e9s mikorra kell felhaszn\u00e1lhat\u00f3nak lennie.<\/p>\n\n\n<p>Gy\u0171jtse \u00f6ssze a k\u00f6vetkez\u0151 adatokat:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>A sz\u00fcks\u00e9ges anyag m\u0171szaki k\u00f6vetelm\u00e9nyei \u00e9s mennyis\u00e9ge, a m\u00e9rt\u00e9kegys\u00e9ggel egy\u00fctt.<\/li><li>A fizikailag rendelkez\u00e9sre \u00e1ll\u00f3, felhaszn\u00e1lhat\u00f3 mennyis\u00e9g \u00e9s az abb\u00f3l m\u00e1r lek\u00f6t\u00f6tt k\u00e9szlet.<\/li><li>Az \u00e9rintett rendel\u00e9sek \u00e9s m\u0171veletek, a v\u00e1llalt sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151kkel egy\u00fctt.<\/li><li>A be\u00e9rkez\u0151 mennyis\u00e9g \u00e9s a felhaszn\u00e1lhat\u00f3s\u00e1g megb\u00edzhat\u00f3 id\u0151pontja, sz\u00fcks\u00e9g szerint az \u00e1ru\u00e1tv\u00e9tel, az ellen\u0151rz\u00e9s \u00e9s a bels\u0151 anyagmozgat\u00e1s idej\u00e9vel egy\u00fctt.<\/li><li>Minden tov\u00e1bbi anyaghi\u00e1ny vagy kapacit\u00e1skorl\u00e1t, amely tov\u00e1bbra is akad\u00e1lyozn\u00e1 a befejez\u00e9st.<\/li><li>A k\u00f6vetkez\u0151 int\u00e9zked\u00e9s felel\u0151se \u00e9s a helyzet \u00fajb\u00f3li ellen\u0151rz\u00e9s\u00e9nek id\u0151pontja.<\/li><\/ul>\n\n\n<p>\u00cdgy elker\u00fclhet\u0151, hogy k\u00f6lts\u00e9ges int\u00e9zked\u00e9sekkel pr\u00f3b\u00e1ljunk rosszul azonos\u00edtott probl\u00e9m\u00e1t megoldani. Ha a megfelel\u0151 alkatr\u00e9sz m\u00e1r az \u00fczemben van, de m\u00e9g nem jutott el a munka\u00e1llom\u00e1sra, egy \u00fajabb beszerz\u00e9s nem oldja meg a mai ind\u00edt\u00e1st. Ha a be\u00e9rkezett \u00e1ru z\u00e1rol\u00e1s alatt \u00e1ll, att\u00f3l m\u00e9g nem v\u00e1lik a gy\u00e1rt\u00e1sban felhaszn\u00e1lhat\u00f3 k\u00e9szlett\u00e9, hogy m\u00e1r a rakt\u00e1rban van.<\/p>\n\n\n<p>K\u00fcl\u00f6nb\u00f6ztesse meg a v\u00e1rhat\u00f3 be\u00e9rkez\u00e9st a visszaigazoltt\u00f3l. K\u00e9rdezze meg a besz\u00e1ll\u00edt\u00f3t, hogy mi k\u00e9sz\u00fclt el t\u00e9nylegesen, illetve mit adtak m\u00e1r fel, ne csup\u00e1n azt, hogy tov\u00e1bbra is \u00e9rv\u00e9nyes-e az eredeti \u00edg\u00e9ret. A termel\u00e9snek megb\u00edzhat\u00f3 tervez\u00e9si d\u00e1tumra van sz\u00fcks\u00e9ge. A m\u00falt heti beszerz\u00e9si rendel\u00e9sb\u0151l \u00e1tm\u00e1solt, t\u00fal optimista d\u00e1tum eg\u00e9szen a k\u00f6vetkez\u0151 meghi\u00fasult ind\u00edt\u00e1sig elfedheti, hogy a helyzetet m\u00e9g nem siker\u00fclt rendezni.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Annak a sz\u00e1ll\u00edt\u00e1snak adjon els\u0151bbs\u00e9get, amelynek hat\u00e1rideje m\u00e9g tarthat\u00f3<\/h2>\n\n\n<p>Nem automatikusan a legnagyobb hi\u00e1nyz\u00f3 mennyis\u00e9g jelenti a legfontosabb probl\u00e9m\u00e1t. Ahogyan a legdr\u00e1g\u00e1bb alkatr\u00e9sz vagy a legt\u00f6bb s\u00fcrget\u0151 telefonh\u00edv\u00e1st kiv\u00e1lt\u00f3 rendel\u00e9s sem.<\/p>\n\n\n<p>Minden igazolt hi\u00e1nyn\u00e1l tegye fel a k\u00e9rd\u00e9st: <strong>mit v\u00e1ltoztatna a sz\u00e1ll\u00edt\u00e1son, ha megsz\u00fcntetn\u00e9nk ezt a hi\u00e1nyt?<\/strong> Tekintse \u00e1t az \u00e9rintett rendel\u00e9s \u00f6sszes h\u00e1tral\u00e9v\u0151 m\u0171velet\u00e9t. Az anyag kor\u00e1bbi be\u00e9rkez\u00e9se csak akkor seg\u00edt, ha m\u00e9g marad id\u0151 a sz\u00fcks\u00e9ges megmunk\u00e1l\u00e1sra, fel\u00fcletkezel\u00e9sre, \u00f6sszeszerel\u00e9sre, ellen\u0151rz\u00e9sre \u00e9s kisz\u00e1ll\u00edt\u00e1sra.<\/p>\n\n\n<p>Ez\u00e9rt nem csak a vev\u0151 sz\u00e1ll\u00edt\u00e1si hat\u00e1rideje sz\u00e1m\u00edt. A d\u00f6nt\u0151 id\u0151pont az, amikor az anyagnak legk\u00e9s\u0151bb felhaszn\u00e1lhat\u00f3v\u00e1 kell v\u00e1lnia ahhoz, hogy a h\u00e1tral\u00e9v\u0151 gy\u00e1rt\u00e1si m\u0171veletek m\u00e9g belef\u00e9rjenek az id\u0151be. Egy szerd\u00e1n \u00e9rkez\u0151 alkatr\u00e9sz lehet\u0151v\u00e9 teheti az egyik cs\u00fct\u00f6rt\u00f6ki kisz\u00e1ll\u00edt\u00e1st, egy m\u00e1sikhoz viszont m\u00e1r k\u00e9s\u0151n \u00e9rkezhet, ha ann\u00e1l m\u00e9g k\u00fcls\u0151 fel\u00fcletkezel\u00e9sre is sz\u00fcks\u00e9g van.<\/p>\n\n\n<p>H\u00e1rom gyakorlati k\u00e9rd\u00e9s alapj\u00e1n hasonl\u00edtsa \u00f6ssze a hi\u00e1nyokat:<\/p>\n\n\n<p>1. <strong>Mi ker\u00fcl vesz\u00e9lybe?<\/strong> Hat\u00e1rozza meg, melyik vev\u0151i v\u00e1llal\u00e1st vagy rendel\u00e9scsoportot \u00e9rinti a hi\u00e1ny, illetve milyen termel\u00e9sle\u00e1ll\u00e1st okozhat. A csapat \u00e1ltal elfogadott \u00fczleti priorit\u00e1sokb\u00f3l induljon ki.<\/p>\n\n\n<p>2. <strong>A javasolt int\u00e9zked\u00e9ssel m\u00e9g tarthat\u00f3 a v\u00e1llal\u00e1s?<\/strong> Ellen\u0151rizze a t\u00f6bbi anyagot, a h\u00e1tral\u00e9v\u0151 m\u0171veleteket \u00e9s a rendelkez\u00e9sre \u00e1ll\u00f3 kapacit\u00e1st. Ne fizessen az egyik alkatr\u00e9sz gyorsabb sz\u00e1ll\u00edt\u00e1s\u00e1\u00e9rt, ha egy m\u00e1sik alkatr\u00e9sz miatt ugyanaz a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151 mindenk\u00e9ppen tarthatatlan.<\/p>\n\n\n<p>3. <strong>Mennyi id\u0151 maradt a cselekv\u00e9sre?<\/strong> Egy m\u00e9g tarthat\u00f3 rendel\u00e9si hat\u00e1rid\u0151 is tarthatatlann\u00e1 v\u00e1lhat, mik\u00f6zben mindenki egy kev\u00e9sb\u00e9 s\u00fcrg\u0151s elt\u00e9r\u00e9ssel foglalkozik.<\/p>\n\n\n<p>Egyes hi\u00e1nyokat azonnal magasabb d\u00f6nt\u00e9si szintre kell emelni, mert t\u00f6bb rendel\u00e9st vagy egy kritikus gy\u00e1rt\u00e1si id\u0151ablakot vesz\u00e9lyeztetnek. M\u00e1s esetekben a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151 m\u00f3dos\u00edt\u00e1sa n\u00e9lk\u00fcl is megv\u00e1rhat\u00f3 a szok\u00e1sos, visszaigazolt be\u00e9rkez\u00e9s. Tegye l\u00e1that\u00f3v\u00e1 ezt a k\u00fcl\u00f6nbs\u00e9get, hogy a beszerz\u00e9s, a termel\u00e9s \u00e9s az \u00e9rt\u00e9kes\u00edt\u00e9s azonos priorit\u00e1sok szerint dolgozzon.<\/p>\n\n\n<p>Ha nincs megval\u00f3s\u00edthat\u00f3 m\u00f3d az eredeti hat\u00e1rid\u0151 tart\u00e1s\u00e1ra, id\u0151ben t\u00e1j\u00e9koztassa a vev\u0151t, \u00e9s \u00e1llapodjanak meg egy \u00faj v\u00e1llal\u00e1sban. Att\u00f3l, hogy egy tarthatatlan hat\u00e1rid\u0151 tov\u00e1bbra is \u201es\u00fcrg\u0151s\u201d jel\u00f6l\u00e9st kap, m\u00e9g nem lesz t\u00f6bb id\u0151 a gy\u00e1rt\u00e1sra.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Olyan int\u00e9zked\u00e9st v\u00e1lasszon, amely \u00e9rdemben v\u00e1ltoztat az eredm\u00e9nyen<\/h2>\n\n\n<p>A sz\u00e1ll\u00edt\u00e1s s\u00fcrget\u00e9se akkor hasznos, ha az anyag kor\u00e1bbi felhaszn\u00e1lhat\u00f3s\u00e1ga megv\u00e1ltoztatja, mely feladatokat tudjuk befejezni. Azt a mennyis\u00e9get \u00e9s \u00e9rkez\u00e9si id\u0151pontot k\u00e9rje, amely ehhez sz\u00fcks\u00e9ges. Egy visszaigazolt r\u00e9szsz\u00e1ll\u00edt\u00e1s t\u00f6bbet \u00e9rhet, mint egy meg nem er\u0151s\u00edtett \u00edg\u00e9ret a teljes beszerz\u00e9si rendel\u00e9s teljes\u00edt\u00e9s\u00e9re.<\/p>\n\n\n<p>Miel\u0151tt fel\u00e1ras fuvaroz\u00e1st rendelne, ellen\u0151rizze, hogy az \u00e1ru\u00e1tv\u00e9tel \u00e9s az ellen\u0151rz\u00e9s fel tudja-e dolgozni a be\u00e9rkez\u0151 t\u00e9telt, \u00e9s ut\u00e1na rendelkez\u00e9sre \u00e1llnak-e a sz\u00fcks\u00e9ges gy\u00e1rt\u00e1si er\u0151forr\u00e1sok. A sz\u00e1ll\u00edt\u00e1si id\u0151 megtakar\u00edt\u00e1sa keveset \u00e9r, ha az anyag ezut\u00e1n a kisz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151n t\u00fal is egy g\u00e9pre v\u00e1r.<\/p>\n\n\n<p>A m\u00e1shol el\u00e9rhet\u0151 k\u00e9szlet is megold\u00e1st k\u00edn\u00e1lhat. Felhaszn\u00e1l\u00e1s\u00e1nak enged\u00e9lyez\u00e9se el\u0151tt ellen\u0151rizze a m\u0171szaki megfelel\u0151s\u00e9get, az \u00e1llapotot, az \u00e1tsz\u00e1ll\u00edt\u00e1s idej\u00e9t \u00e9s a megl\u00e9v\u0151 lek\u00f6t\u00e9seket. A hi\u00e1ny \u00e1thelyez\u00e9se egyik vev\u0151r\u0151l a m\u00e1sikra \u00fczleti d\u00f6nt\u00e9s, nem k\u00e9szletkorrekci\u00f3.<\/p>\n\n\n<p>Helyettes\u00edt\u0151 anyag vagy alkatr\u00e9sz haszn\u00e1lat\u00e1hoz a megfelel\u0151 m\u0171szaki \u00e9s min\u0151s\u00e9g\u00fcgyi j\u00f3v\u00e1hagy\u00e1s sz\u00fcks\u00e9ges, valamint a vev\u0151 j\u00f3v\u00e1hagy\u00e1sa is, ha a v\u00e1ltoztat\u00e1s ezt megk\u00f6veteli. A hasonl\u00f3 le\u00edr\u00e1s vagy m\u00e9ret \u00f6nmag\u00e1ban nem jogos\u00edt fel a felhaszn\u00e1l\u00e1sra. A helyzet rendez\u00e9s\u00e9r\u0151l sz\u00f3l\u00f3 d\u00f6nt\u00e9sn\u00e9l a j\u00f3v\u00e1hagy\u00e1shoz sz\u00fcks\u00e9ges id\u0151vel is sz\u00e1moljon.<\/p>\n\n\n<p>A feladatok sorrendj\u00e9nek m\u00f3dos\u00edt\u00e1s\u00e1val a termel\u00e9s akkor is haladhat, amikor egy elakadt gy\u00e1rt\u00e1si feladat v\u00e1rakozik. Olyan munk\u00e1t v\u00e1lasszon, amelyhez minden anyag \u00e9s el\u0151felt\u00e9tel adott, majd ellen\u0151rizze, milyen k\u00f6z\u00f6sen haszn\u00e1lt er\u0151forr\u00e1sokat foglal majd le. Hiba lehet most munk\u00e1t adni egy szabad g\u00e9pnek, ha ezzel elvessz\u00fck azt a fel\u00fcletkezel\u00e9si id\u0151s\u00e1vot, amelyre az els\u0151bbs\u00e9get \u00e9lvez\u0151 rendel\u00e9snek lesz sz\u00fcks\u00e9ge az anyag meg\u00e9rkez\u00e9se ut\u00e1n.<\/p>\n\n\n<p>A r\u00e9szleges gy\u00e1rt\u00e1s vagy r\u00e9szsz\u00e1ll\u00edt\u00e1s is seg\u00edthet, ha a folyamat \u00e9s a vev\u0151vel k\u00f6t\u00f6tt meg\u00e1llapod\u00e1s ezt lehet\u0151v\u00e9 teszi. Egy\u00e9rtelm\u0171en r\u00f6gz\u00edtse a mennyis\u00e9geket \u00e9s a m\u00e9g fennmarad\u00f3 k\u00f6telezetts\u00e9get. Ellenkez\u0151 esetben t\u00f6bb, r\u00e9szben elk\u00e9sz\u00fclt rendel\u00e9s is felem\u00e9sztheti a sz\u0171k\u00f6sen rendelkez\u00e9sre \u00e1ll\u00f3 anyagot an\u00e9lk\u00fcl, hogy ak\u00e1r egyetlen kisz\u00e1ll\u00edthat\u00f3 t\u00e9tel elk\u00e9sz\u00fclne.<\/p>\n\n\n<h2 class=\"wp-block-heading\">P\u00e9lda: ugyanaz az alkatr\u00e9sz, elt\u00e9r\u0151 megold\u00e1sok<\/h2>\n\n\n<p>Tegy\u00fck fel, hogy k\u00e9t rendel\u00e9shez egyenk\u00e9nt 40 darab sz\u00fcks\u00e9ges ugyanabb\u00f3l az alkatr\u00e9szb\u0151l. Csak 40 felhaszn\u00e1lhat\u00f3 darab \u00e1ll rendelkez\u00e9sre. Tov\u00e1bbi 40 darab \u00e9rkez\u00e9s\u00e9t p\u00e9ntekre igazolt\u00e1k vissza.<\/p>\n\n\n<p>Az A rendel\u00e9st cs\u00fct\u00f6rt\u00f6k\u00f6n kell kisz\u00e1ll\u00edtani. A t\u00f6bbi anyag rendelkez\u00e9sre \u00e1ll, \u00e9s a h\u00e1tral\u00e9v\u0151 m\u0171veletek elv\u00e9gezhet\u0151k a kisz\u00e1ll\u00edt\u00e1sig, ha ez a rendel\u00e9s kapja meg az el\u00e9rhet\u0151 alkatr\u00e9szeket. A B rendel\u00e9s hat\u00e1rideje a k\u00f6vetkez\u0151 kedd, de egy m\u00e1sik, hozz\u00e1 sz\u00fcks\u00e9ges alkatr\u00e9sz csak h\u00e9tf\u0151n v\u00e1lik felhaszn\u00e1lhat\u00f3v\u00e1.<\/p>\n\n\n<p><strong>Az A rendel\u00e9s.<\/strong> 40 alkatr\u00e9szre van sz\u00fcks\u00e9ge; a t\u00f6bbi anyag rendelkez\u00e9sre \u00e1ll, \u00e9s a cs\u00fct\u00f6rt\u00f6ki befejez\u00e9s megval\u00f3s\u00edthat\u00f3, ha biztos\u00edtjuk a h\u00e1tral\u00e9v\u0151 m\u0171veletekhez sz\u00fcks\u00e9ges kapacit\u00e1st. Enged\u00e9lyezze az el\u00e9rhet\u0151 mennyis\u00e9g felhaszn\u00e1l\u00e1s\u00e1t az A rendel\u00e9shez, \u00e9s biztos\u00edtsa a h\u00e1tral\u00e9v\u0151 gy\u00e1rt\u00e1si m\u0171veletek elv\u00e9gz\u00e9s\u00e9t.<\/p>\n\n\n<p><strong>B rendel\u00e9s.<\/strong> 40 alkatr\u00e9szre van sz\u00fcks\u00e9ge, de egy m\u00e1sik anyag hi\u00e1nya h\u00e9tf\u0151ig akad\u00e1lyozza az el\u0151rehalad\u00e1st. Ellen\u0151rizze, hogy a p\u00e9nteki be\u00e9rkez\u00e9ssel \u00e9s a h\u00e9tf\u0151n rendelkez\u00e9sre \u00e1ll\u00f3 m\u00e1sik anyaggal elv\u00e9gezhet\u0151k-e a h\u00e1tral\u00e9v\u0151 m\u0171veletek a keddi sz\u00e1ll\u00edt\u00e1sig.<\/p>\n\n\n<p><strong>Az ind\u00edt\u00e1sra k\u00e9sz C rendel\u00e9s.<\/strong> Nincs sz\u00fcks\u00e9ge a hi\u00e1nyz\u00f3 alkatr\u00e9szre, de ugyanazt a fel\u00fcletkezel\u00e9si er\u0151forr\u00e1st ig\u00e9nyli. Csak olyan helyre \u00fctemezze, ahol nem foglalja el az A rendel\u00e9shez sz\u00fcks\u00e9ges fel\u00fcletkezel\u00e9si kapacit\u00e1st.<\/p>\n\n\n<p>A rendelkez\u00e9sre \u00e1ll\u00f3 mennyis\u00e9get itt az \u00f6sszes gy\u00e1rt\u00e1si felt\u00e9tel \u00e9s a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k egy\u00fcttes m\u00e9rlegel\u00e9se alapj\u00e1n indokolt az A rendel\u00e9shez felhaszn\u00e1lni, nem puszt\u00e1n az\u00e9rt, mert az A hat\u00e1rideje kor\u00e1bbi. Ha a B sz\u00e1m\u00e1ra s\u00fcrg\u0151ss\u00e9ggel tov\u00e1bbi darabokat szerezn\u00e9nek be a k\u00f6z\u00f6s alkatr\u00e9szb\u0151l, azzal m\u00e9g nem h\u00e1rulna el a m\u00e1sik, h\u00e9tf\u0151ig fenn\u00e1ll\u00f3 akad\u00e1ly.<\/p>\n\n\n<p>Ugyanez a gondolatmenet mutatja meg azt is, mi\u00e9rt nem el\u00e9g az a tan\u00e1cs, hogy \u201egy\u00e1rtsunk b\u00e1rmit, ami ind\u00edt\u00e1sra k\u00e9sz\u201d. A C rendel\u00e9s gy\u00e1rt\u00e1sa hasznos lehet, de nem k\u00f6theti le azt a kapacit\u00e1st, amely lehet\u0151v\u00e9 teszi az A hat\u00e1ridej\u00e9nek tart\u00e1s\u00e1t.<\/p>\n\n\n<p>Ha a h\u00e9tf\u0151re v\u00e1rt m\u00e1sodik alkatr\u00e9sz k\u00e9sik, a B rendel\u00e9sr\u0151l \u00faj d\u00f6nt\u00e9st kell hozni. A hi\u00e1nylist\u00e1t, az anyagfoglal\u00e1sokat \u00e9s a gy\u00e1rt\u00e1si \u00fctemtervet egyar\u00e1nt ehhez a v\u00e1ltoz\u00e1shoz kell igaz\u00edtani.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00c9p\u00edtse be a v\u00e1lasztott int\u00e9zked\u00e9st a SkyPlanner \u00fctemterv\u00e9be<\/h2>\n\n\n<p>A hi\u00e1nylista megmutathatja, mivel kell foglalkozni. \u00d6nmag\u00e1ban azonban nem tudja a h\u00e1tral\u00e9v\u0151 munk\u00e1t \u00f6sszehangolni az \u00fczem \u00f6sszes t\u00f6bbi rendel\u00e9s\u00e9vel. Ebben ny\u00fajt gyakorlati el\u0151nyt a SkyPlanner.<\/p>\n\n\n<p>Ha az anyagell\u00e1totts\u00e1got figyelembe vev\u0151 \u00fctemez\u00e9s enged\u00e9lyezve van, a SkyPlanner az \u00fctemterv kisz\u00e1m\u00edt\u00e1sakor a gy\u00e1rt\u00e1shoz rendelt anyagokkal \u00e9s azok karbantartott rendelkez\u00e9sre \u00e1ll\u00e1si adataival sz\u00e1mol. A beszerz\u00e9si rendel\u00e9sek v\u00e1rhat\u00f3 be\u00e9rkez\u00e9si d\u00e1tumai alapj\u00e1n a be\u00e9rkez\u0151 k\u00e9szlet is befoly\u00e1solja az azt ig\u00e9nyl\u0151 munka id\u0151z\u00edt\u00e9s\u00e9t. Ha friss\u00edti egy k\u00e9s\u0151 sz\u00e1ll\u00edtm\u00e1ny be\u00e9rkez\u00e9si d\u00e1tum\u00e1t, majd \u00fajrasz\u00e1m\u00edtja az \u00fctemtervet, a v\u00e1ltoz\u00e1s a gy\u00e1rt\u00e1stervez\u00e9sben is megjelenik, nem csup\u00e1n egy beszerz\u00e9si megjegyz\u00e9sben marad.<\/p>\n\n\n<p>Az Arcturus, a SkyPlanner \u00fctemez\u00e9st v\u00e9gz\u0151 mesters\u00e9ges intelligenci\u00e1ja a be\u00e1ll\u00edtott kapacit\u00e1s, m\u0171szakok, m\u0171veleti f\u00fcgg\u0151s\u00e9gek \u00e9s priorit\u00e1sok alapj\u00e1n \u00fctemezi a munk\u00e1t. Az eredm\u00e9ny a <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/mi-a-termelesutemezes\/\">Gantt-\u00fctemtervben<\/a> l\u00e1that\u00f3. \u00c1ttekintheti, mikorra ker\u00fcltek az \u00e9rintett munk\u00e1k, hogyan illeszkednek a h\u00e1tral\u00e9v\u0151 m\u0171veletek az \u00fctemtervbe, \u00e9s mi v\u00e1ltozott a t\u00f6bbi rendel\u00e9sn\u00e9l.<\/p>\n\n\n<p>A fenti p\u00e9ld\u00e1ban a tervez\u0151 el\u0151sz\u00f6r ellen\u0151rzi a felhaszn\u00e1lhat\u00f3 mennyis\u00e9get, \u00e9s j\u00f3v\u00e1hagyja az anyag felhaszn\u00e1l\u00e1s\u00e1r\u00f3l sz\u00f3l\u00f3 d\u00f6nt\u00e9st. Ezut\u00e1n a karbantartott anyagadatok \u00e9s a kiv\u00e1lasztott priorit\u00e1sok k\u00e9pezik a gy\u00e1rt\u00e1si \u00fctemterv \u00fajrasz\u00e1m\u00edt\u00e1s\u00e1nak alapj\u00e1t. A tervez\u0151 \u00e1ttekinti az A gy\u00e1rt\u00e1si \u00fatvonal\u00e1t, a B k\u00e9s\u0151bbi ind\u00edthat\u00f3s\u00e1g\u00e1t, valamint a C hely\u00e9t a k\u00f6z\u00f6s er\u0151forr\u00e1s \u00fctemterv\u00e9ben. Az \u00f6sszes\u00edtett gy\u00e1rt\u00e1si hat\u00e1s meg\u00e9rt\u00e9s\u00e9hez nem kell k\u00fcl\u00f6n-k\u00fcl\u00f6n \u00fajra \u00f6ssze\u00e1ll\u00edtania az egyes g\u00e9pek munkasorrendj\u00e9t.<\/p>\n\n\n<p><strong>\u00d6n d\u00f6nti el, mely v\u00e1llal\u00e1sok teljes\u00edt\u00e9s\u00e9t kell biztos\u00edtani; a SkyPlanner ezekhez a d\u00f6nt\u00e9sekhez igaz\u00edtva v\u00e9gzi el az \u00fctemez\u00e9si sz\u00e1m\u00edt\u00e1sokat.<\/strong> Korl\u00e1tozott er\u0151forr\u00e1sok eset\u00e9n az \u00fcgyfelekhez rendelt priorit\u00e1sok befoly\u00e1solhatj\u00e1k az \u00fctemez\u00e9si sorrendet. Ezzel tervez\u00e9si munk\u00e1t takar\u00edt meg, mik\u00f6zben az \u00fczleti m\u00e9rlegel\u00e9s az \u00fcgyf\u00e9lkapcsolat\u00e9rt felel\u0151s munkat\u00e1rsak kez\u00e9ben marad.<\/p>\n\n\n<p>A SkyPlanner a ny\u00edlt REST API-j\u00e1n kereszt\u00fcl b\u00e1rmely ERP- vagy MES-rendszerrel integr\u00e1lhat\u00f3. A megl\u00e9v\u0151 rendel\u00e9si \u00e9s anyagadatokat \u00f6sszekapcsolhatja a v\u00e9ges kapacit\u00e1s\u00fa gy\u00e1rt\u00e1s\u00fctemez\u00e9ssel, \u00edgy nem kell lecser\u00e9lnie egy j\u00f3l m\u0171k\u00f6d\u0151 ERP-rendszert puszt\u00e1n a helyre\u00e1ll\u00edt\u00e1si terv \u00f6sszehangol\u00e1sa miatt.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mit hozott az Eskomatic sz\u00e1m\u00e1ra az anyagell\u00e1totts\u00e1g jobb \u00e1tl\u00e1that\u00f3s\u00e1ga?<\/h2>\n\n\n<p>A <a href=\"https:\/\/skyplanner.ai\/hu\/ugyfeltortenetek\/eskomatic\/\">b\u00e9rforg\u00e1csol\u00e1ssal foglalkoz\u00f3 Eskomatic<\/a> kor\u00e1bban j\u00f3r\u00e9szt k\u00e9zzel \u00e1ll\u00edtotta \u00f6ssze a munkasorrendet egy r\u00e9gebbi ERP- \u00e9s termel\u00e9sir\u00e1ny\u00edt\u00e1si rendszerben. Mivel az anyagok rendelkez\u00e9sre \u00e1ll\u00e1sa nem volt kell\u0151en \u00e1tl\u00e1that\u00f3, a hi\u00e1nyokra olykor csak r\u00f6viddel a gy\u00e1rt\u00e1si feladat tervezett kezd\u00e9se el\u0151tt der\u00fclt f\u00e9ny.<\/p>\n\n\n<p>A SkyPlanner seg\u00edts\u00e9g\u00e9vel az Eskomatic \u00e1tl\u00e1that\u00f3bb, Gantt-diagramon megjelen\u00edtett munkasorrendet kapott, \u00e9s a v\u00e1rhat\u00f3 gy\u00e1rt\u00e1si terhel\u00e9s mellett az anyaghi\u00e1nyok is l\u00e1that\u00f3v\u00e1 v\u00e1ltak. A v\u00e1llalat besz\u00e1mol\u00f3ja szerint kevesebb az anyaghi\u00e1ny miatti termel\u00e9sle\u00e1ll\u00e1s, az automatikus kapacit\u00e1s\u00fctemez\u00e9snek k\u00f6sz\u00f6nhet\u0151en pedig pontosabban hat\u00e1rozz\u00e1k meg a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket.<\/p>\n\n\n<p>Az anyaghi\u00e1nyt kezel\u0151 tervez\u0151 sz\u00e1m\u00e1ra ez a l\u00e9nyegi v\u00e1ltoz\u00e1s: kevesebb id\u0151 megy el annak kider\u00edt\u00e9s\u00e9re, mi\u00e9rt nem indulhat el a munka, \u00e9s biztosabb alapokon d\u00f6nthet arr\u00f3l, mi sz\u00e1ll\u00edthat\u00f3 m\u00e9g le.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Az int\u00e9zked\u00e9st z\u00e1rja le, ne csak a hi\u00e1nylista sor\u00e1t<\/h2>\n\n\n<p>Minden helyre\u00e1ll\u00edt\u00e1si int\u00e9zked\u00e9shez rendeljen felel\u0151st, \u00e9s hat\u00e1rozza meg a k\u00f6vetkez\u0151 ellen\u0151rz\u00e9s id\u0151pontj\u00e1t. A beszerz\u00e9s meger\u0151s\u00edti, hogyan biztos\u00edthat\u00f3 az ell\u00e1t\u00e1s; a rakt\u00e1r \u00e9s a min\u0151s\u00e9g\u00fcgy ellen\u0151rzi a felhaszn\u00e1lhat\u00f3 k\u00e9szlet rendelkez\u00e9sre \u00e1ll\u00e1s\u00e1t; a gy\u00e1rt\u00e1stervez\u00e9s friss\u00edti a sorrendet; az \u00e9rt\u00e9kes\u00edt\u00e9s pedig k\u00f6zli a sz\u00e1ll\u00edt\u00e1si v\u00e1llal\u00e1s esetleges v\u00e1ltoz\u00e1s\u00e1t. Egy kisebb \u00fczemben t\u00f6bb szerepk\u00f6rt is ell\u00e1that ugyanaz a szem\u00e9ly, de az inform\u00e1ci\u00f3kat akkor is \u00e1t kell adni.<\/p>\n\n\n<p>Ne z\u00e1rjon le egy elt\u00e9r\u00e9st puszt\u00e1n az\u00e9rt, mert a besz\u00e1ll\u00edt\u00f3 szerint az \u00e1rut feladt\u00e1k. Ellen\u0151rizze, hogy a sz\u00fcks\u00e9ges mennyis\u00e9g felhaszn\u00e1lhat\u00f3-e, az \u00e9rintett munka az \u00fctemterv szerint val\u00f3ban elv\u00e9gezhet\u0151-e, \u00e9s a v\u00e9grehajt\u00f3k rendelkeznek-e az aktu\u00e1lis tervvel.<\/p>\n\n\n<p>Ezut\u00e1n vonja le a tanuls\u00e1gokat az ism\u00e9tl\u0151d\u0151 probl\u00e9m\u00e1kb\u00f3l. K\u00f6vesse nyomon az anyaghi\u00e1ny miatti \u00e1ll\u00e1sid\u0151t, a helyre\u00e1ll\u00edt\u00e1sra tett \u00edg\u00e9retek megb\u00edzhat\u00f3s\u00e1g\u00e1t, \u00e9s azt, hogy az int\u00e9zked\u00e9sekkel t\u00e9nylegesen mely sz\u00e1ll\u00edt\u00e1si v\u00e1llal\u00e1sokat siker\u00fclt tartani. T\u00e1rja fel a visszat\u00e9r\u0151 nyilv\u00e1ntart\u00e1si hib\u00e1k, a nem tervezett anyagfelhaszn\u00e1l\u00e1s \u00e9s a bizonytalan be\u00e9rkez\u00e9sek kiv\u00e1lt\u00f3 okait. A nyitott hi\u00e1nyt\u00e9telek sz\u00e1m\u00e1nak cs\u00f6kken\u00e9se nem siker, ha a befejezetlen rendel\u00e9sek csup\u00e1n m\u00e1shol v\u00e1rakoznak.<\/p>\n\n\n<p>Azoknak az \u00fczemeknek, ahol rendszeresen kell k\u00e9sve \u00e9rkez\u0151 anyagokkal \u00e9s t\u00f6bb rendel\u00e9shez is haszn\u00e1lt g\u00e9pekkel tervezni, a SkyPlanner APS gyakorlati megold\u00e1st k\u00edn\u00e1l arra, hogy a helyre\u00e1ll\u00edt\u00e1si d\u00f6nt\u00e9sb\u0151l v\u00e9grehajthat\u00f3 gy\u00e1rt\u00e1si terv legyen. Cs\u00f6kkenti az anyaglist\u00e1k \u00e9s a g\u00e9pek munkasorrendje k\u00f6z\u00f6tti k\u00e9zi egyeztet\u00e9st, \u00edgy a csapat a sz\u00e1ll\u00edt\u00e1si v\u00e1llal\u00e1sok teljes\u00edt\u00e9s\u00e9re \u00f6sszpontos\u00edthat.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/hu\/kapcsolat-ertekesites\/\">Foglaljon SkyPlanner-bemutat\u00f3t<\/a>, \u00e9s hozzon egy val\u00f3s anyaghi\u00e1nyos esetet az \u00e9rintett anyagot felhaszn\u00e1l\u00f3 rendel\u00e9sekkel \u00e9s egy meger\u0151s\u00edtett be\u00e9rkez\u00e9si d\u00e1tummal. Ennek alapj\u00e1n \u00e1tbesz\u00e9lhetj\u00fck, mi ind\u00edthat\u00f3 most, minek kell v\u00e1rnia, \u00e9s hogyan hat a d\u00f6nt\u00e9s a gy\u00e1rt\u00e1s t\u00f6bbi r\u00e9sz\u00e9re. Ha el\u0151bb \u00f6n\u00e1ll\u00f3an ismerkedne a rendszerrel, <a href=\"https:\/\/skyplanner.ai\/hu\/proba\/\">pr\u00f3b\u00e1lja ki a SkyPlanner rendszert bemutat\u00f3adatokkal<\/a>, vagy haszn\u00e1lja a SkyPlanner Assistant mesters\u00e9ges intelligenci\u00e1val t\u00e1mogatott Els\u0151 l\u00e9p\u00e9sek folyamat\u00e1t.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Anyaghi\u00e1ny-kezel\u00e9s: ne akadjanak el a rendel\u00e9sek Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Anyaghi\u00e1ny-kezel\u00e9s: ne akadjanak el a rendel\u00e9sek Egy besz\u00e1ll\u00edt\u00f3 meg\u00edg\u00e9ri, hogy soron k\u00edv\u00fcl sz\u00e1ll\u00edtja a hi\u00e1nyz\u00f3 alkatr\u00e9szt. A beszerz\u00e9snek m\u00e1r van terve a helyzet rendez\u00e9s\u00e9re. A termel\u00e9snek viszont m\u00e9g tudnia kell, hogy az alkatr\u00e9sz el\u00e9g kor\u00e1n \u00e9rkezik-e a rendel\u00e9s hat\u00e1ridej\u00e9nek tart\u00e1s\u00e1hoz, \u00e9s mit gy\u00e1rtson addig. Ez &#8230; <a title=\"Anyaghi\u00e1ny-kezel\u00e9s: ne akadjanak el a rendel\u00e9sek\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/anyaghiany-kezeles\/\" aria-label=\"Read more about Anyaghi\u00e1ny-kezel\u00e9s: ne akadjanak el a rendel\u00e9sek\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":111530,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2526,312],"tags":[],"class_list":["post-111512","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-es-utemezes","category-forrasok","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Anyaghi\u00e1ny-kezel\u00e9s: ne akadjanak el a rendel\u00e9sek<\/title>\n<meta name=\"description\" content=\"Rangsorolja az anyaghi\u00e1nyokat, tartsa a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket, \u00e9s k\u00e9sz\u00edtsen a rendelkez\u00e9sre \u00e1ll\u00f3 anyagokhoz igazod\u00f3, megval\u00f3s\u00edthat\u00f3 gy\u00e1rt\u00e1si \u00fctemtervet a SkyPlannerrel.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/anyaghiany-kezeles\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Anyaghi\u00e1ny-kezel\u00e9s: ne akadjanak el a rendel\u00e9sek\" \/>\n<meta property=\"og:description\" content=\"Rangsorolja az anyaghi\u00e1nyokat, tartsa a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket, \u00e9s k\u00e9sz\u00edtsen a rendelkez\u00e9sre \u00e1ll\u00f3 anyagokhoz igazod\u00f3, megval\u00f3s\u00edthat\u00f3 gy\u00e1rt\u00e1si \u00fctemtervet a SkyPlannerrel.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/forrasok\/anyaghiany-kezeles\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-27T22:44:45+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-27T22:45:43+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1774\" \/>\n\t<meta property=\"og:image:height\" content=\"887\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Szerz\u0151:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data2\" content=\"18 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/anyaghiany-kezeles\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/anyaghiany-kezeles\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Anyaghi\u00e1ny-kezel\u00e9s: ne akadjanak el a rendel\u00e9sek\",\"datePublished\":\"2026-10-27T22:44:45+00:00\",\"dateModified\":\"2026-10-27T22:45:43+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/anyaghiany-kezeles\\\/\"},\"wordCount\":3603,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/anyaghiany-kezeles\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/material-shortages-manufacturing-hero.png\",\"articleSection\":[\"APS \u00e9s \u00fctemez\u00e9s\",\"forr\u00e1sok\"],\"inLanguage\":\"hu-HU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/anyaghiany-kezeles\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/anyaghiany-kezeles\\\/\",\"name\":\"Anyaghi\u00e1ny-kezel\u00e9s: ne akadjanak el a rendel\u00e9sek\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/anyaghiany-kezeles\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/anyaghiany-kezeles\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/material-shortages-manufacturing-hero.png\",\"datePublished\":\"2026-10-27T22:44:45+00:00\",\"dateModified\":\"2026-10-27T22:45:43+00:00\",\"description\":\"Rangsorolja az anyaghi\u00e1nyokat, tartsa a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket, \u00e9s k\u00e9sz\u00edtsen a rendelkez\u00e9sre \u00e1ll\u00f3 anyagokhoz igazod\u00f3, megval\u00f3s\u00edthat\u00f3 gy\u00e1rt\u00e1si \u00fctemtervet a SkyPlannerrel.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/anyaghiany-kezeles\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/anyaghiany-kezeles\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/anyaghiany-kezeles\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/material-shortages-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/material-shortages-manufacturing-hero.png\",\"width\":1774,\"height\":887,\"caption\":\"An assembly waits for a missing component while available parts keep another assembly moving.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/anyaghiany-kezeles\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Anyaghi\u00e1ny-kezel\u00e9s: ne akadjanak el a rendel\u00e9sek\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Anyaghi\u00e1ny-kezel\u00e9s: ne akadjanak el a rendel\u00e9sek","description":"Rangsorolja az anyaghi\u00e1nyokat, tartsa a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket, \u00e9s k\u00e9sz\u00edtsen a rendelkez\u00e9sre \u00e1ll\u00f3 anyagokhoz igazod\u00f3, megval\u00f3s\u00edthat\u00f3 gy\u00e1rt\u00e1si \u00fctemtervet a SkyPlannerrel.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/forrasok\/anyaghiany-kezeles\/","og_locale":"hu_HU","og_type":"article","og_title":"Anyaghi\u00e1ny-kezel\u00e9s: ne akadjanak el a rendel\u00e9sek","og_description":"Rangsorolja az anyaghi\u00e1nyokat, tartsa a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket, \u00e9s k\u00e9sz\u00edtsen a rendelkez\u00e9sre \u00e1ll\u00f3 anyagokhoz igazod\u00f3, megval\u00f3s\u00edthat\u00f3 gy\u00e1rt\u00e1si \u00fctemtervet a SkyPlannerrel.","og_url":"https:\/\/skyplanner.ai\/hu\/forrasok\/anyaghiany-kezeles\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-27T22:44:45+00:00","article_modified_time":"2026-10-27T22:45:43+00:00","og_image":[{"width":1774,"height":887,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Szerz\u0151:":"Jussi M\u00e4ntyl\u00e4","Becs\u00fclt olvas\u00e1si id\u0151":"18 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/anyaghiany-kezeles\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/anyaghiany-kezeles\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Anyaghi\u00e1ny-kezel\u00e9s: ne akadjanak el a rendel\u00e9sek","datePublished":"2026-10-27T22:44:45+00:00","dateModified":"2026-10-27T22:45:43+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/anyaghiany-kezeles\/"},"wordCount":3603,"publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/anyaghiany-kezeles\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero.png","articleSection":["APS \u00e9s \u00fctemez\u00e9s","forr\u00e1sok"],"inLanguage":"hu-HU"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/anyaghiany-kezeles\/","url":"https:\/\/skyplanner.ai\/hu\/forrasok\/anyaghiany-kezeles\/","name":"Anyaghi\u00e1ny-kezel\u00e9s: ne akadjanak el a rendel\u00e9sek","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/anyaghiany-kezeles\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/anyaghiany-kezeles\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero.png","datePublished":"2026-10-27T22:44:45+00:00","dateModified":"2026-10-27T22:45:43+00:00","description":"Rangsorolja az anyaghi\u00e1nyokat, tartsa a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket, \u00e9s k\u00e9sz\u00edtsen a rendelkez\u00e9sre \u00e1ll\u00f3 anyagokhoz igazod\u00f3, megval\u00f3s\u00edthat\u00f3 gy\u00e1rt\u00e1si \u00fctemtervet a SkyPlannerrel.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/anyaghiany-kezeles\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/forrasok\/anyaghiany-kezeles\/"]}]},{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/anyaghiany-kezeles\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero.png","width":1774,"height":887,"caption":"An assembly waits for a missing component while available parts keep another assembly moving."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/anyaghiany-kezeles\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"Anyaghi\u00e1ny-kezel\u00e9s: ne akadjanak el a rendel\u00e9sek"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero.png",1774,887,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero-300x150.png",300,150,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero-768x384.png",768,384,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero-1024x512.png",1024,512,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero-1536x768.png",1536,768,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero.png",1774,887,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/material-shortages-manufacturing-hero-360x180.png",360,180,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Anyaghi\u00e1ny-kezel\u00e9s: ne akadjanak el a rendel\u00e9sek Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Anyaghi\u00e1ny-kezel\u00e9s: ne akadjanak el a rendel\u00e9sek Egy besz\u00e1ll\u00edt\u00f3 meg\u00edg\u00e9ri, hogy soron k\u00edv\u00fcl sz\u00e1ll\u00edtja a hi\u00e1nyz\u00f3 alkatr\u00e9szt. A beszerz\u00e9snek m\u00e1r van terve a helyzet rendez\u00e9s\u00e9re. A termel\u00e9snek viszont m\u00e9g tudnia kell, hogy az alkatr\u00e9sz el\u00e9g kor\u00e1n \u00e9rkezik-e a rendel\u00e9s hat\u00e1ridej\u00e9nek tart\u00e1s\u00e1hoz, \u00e9s mit gy\u00e1rtson addig. Ez&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/111512","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=111512"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/111512\/revisions"}],"predecessor-version":[{"id":111576,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/111512\/revisions\/111576"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media\/111530"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=111512"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/categories?post=111512"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/tags?post=111512"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}