{"id":111141,"date":"2026-10-27T14:48:08","date_gmt":"2026-10-27T14:48:08","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=111141"},"modified":"2026-10-27T14:49:06","modified_gmt":"2026-10-27T14:49:06","slug":"poka-yoke","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/hu\/forrasok\/poka-yoke\/","title":{"rendered":"Poka-yoke a gy\u00e1rt\u00e1sban: v\u00e1lasszon hibakiv\u00e9d\u0151 megold\u00e1st"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Poka-yoke a gy\u00e1rt\u00e1sban: v\u00e1lasszon hibakiv\u00e9d\u0151 megold\u00e1st<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/hu\/\">Kezd\u0151lap<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/\">Er\u0151forr\u00e1sok<\/a> &raquo; Poka-yoke a gy\u00e1rt\u00e1sban: v\u00e1lasszon hibakiv\u00e9d\u0151 megold\u00e1st<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Becs\u00fclt olvas\u00e1si id\u0151: <\/span><span class=\"yoast-reading-time__reading-time\">10<\/span><span class=\"yoast-reading-time__time-unit\"> perc<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Megint csak a v\u00e9gellen\u0151rz\u00e9sn\u00e9l der\u00fcl ki, hogy hi\u00e1nyzik egy t\u00f6m\u00edt\u00e9s. A csapat ismeri a szerel\u00e9si utas\u00edt\u00e1st, a kezel\u0151 megkapta az oktat\u00e1st, \u00e9s a munkaasztal f\u00f6l\u00f6tt m\u00e9g mindig ott van az eml\u00e9keztet\u0151. Egy \u00fajabb eml\u00e9keztet\u0151 mellett tov\u00e1bbra is ugyan\u00fagy el\u0151fordulhat ugyanaz a hiba.<\/p>\n\n\n<p>A poka-yoke ezen a hibalehet\u0151s\u00e9gen v\u00e1ltoztat. Egy k\u00e9sz\u00fcl\u00e9k megakad\u00e1lyozhatja az alkatr\u00e9sz helytelen behelyez\u00e9s\u00e9t; egy szerel\u00e9s k\u00f6zbeni ellen\u0151rz\u00e9s m\u00e9g a h\u00e1z lez\u00e1r\u00e1sa el\u0151tt \u00e9szlelheti a kihagy\u00e1st. Nem az a l\u00e9nyeg, hogy melyik eszk\u00f6z t\u0171nik a legkorszer\u0171bbnek, hanem az, hogy melyik v\u00e1ltoztat\u00e1s kezeli megb\u00edzhat\u00f3an azt a hib\u00e1t, amelyet a folyamat jelenleg lehet\u0151v\u00e9 tesz.<\/p>\n\n\n<p>Ez az \u00fatmutat\u00f3 seg\u00edt a megfelel\u0151 megold\u00e1s kiv\u00e1laszt\u00e1s\u00e1ban, tesztel\u00e9s\u00e9ben \u00e9s \u00fczemi bevezet\u00e9s\u00e9ben. A v\u00e1ltoztat\u00e1s j\u00f3v\u00e1hagy\u00e1sa ut\u00e1n a SkyPlanner APS seg\u00edt a bevezet\u00e9st \u00e9s a m\u00f3dos\u00edtott m\u0171veleteket a vev\u0151i rendel\u00e9sekhez igaz\u00edtva \u00fctemezni. A sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151kre gyakorolt hat\u00e1s \u00edgy l\u00e1that\u00f3v\u00e1 v\u00e1lik a gy\u00e1rt\u00e1si \u00fctemtervben.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mit jelent a poka-yoke a gy\u00e1rt\u00e1sban?<\/h2>\n\n\n<p>A poka-yoke hibamegel\u0151z\u00e9st jelent. A gy\u00e1rt\u00e1sban a folyamat kialak\u00edt\u00e1s\u00e1val vagy valamilyen eszk\u00f6zzel megakad\u00e1lyozza a v\u00e9letlen hib\u00e1z\u00e1st, vagy azonnal l\u00e1that\u00f3v\u00e1 teszi a hib\u00e1t, hogy m\u00e9g a tov\u00e1bbhalad\u00e1s el\u0151tt jav\u00edthat\u00f3 legyen.<\/p>\n\n\n<p>A <strong>hib\u00e1z\u00e1s<\/strong> helytelen cselekv\u00e9s vagy mulaszt\u00e1s: p\u00e9ld\u00e1ul nem a megfelel\u0151 alkatr\u00e9sz kiv\u00e1laszt\u00e1sa, egy alkatr\u00e9sz ford\u00edtott behelyez\u00e9se vagy egy l\u00e9p\u00e9s kihagy\u00e1sa. Az ebb\u0151l ered\u0151 <strong>term\u00e9khiba<\/strong> azt jelenti, hogy a term\u00e9k nem felel meg valamely k\u00f6vetelm\u00e9nynek. M\u00e1s beavatkoz\u00e1s \u00e9szrevenni a kihagyott t\u00f6m\u00edt\u00e9st a h\u00e1z lez\u00e1r\u00e1sa el\u0151tt, mint a v\u00e9gellen\u0151rz\u00e9sn\u00e9l megtal\u00e1lni a sziv\u00e1rg\u00f3 k\u00e9sz szerelv\u00e9nyt.<\/p>\n\n\n<p>A j\u00f3 poka-yoke cs\u00f6kkenti a figyelemt\u0151l \u00e9s az eml\u00e9kezett\u0151l val\u00f3 f\u00fcgg\u00e9st. \u00c9pp\u00fagy seg\u00edti a tapasztalt kezel\u0151t egy zs\u00fafolt m\u0171szakban, mint azt, aki m\u00e9g tanulja a munk\u00e1t. Az utas\u00edt\u00e1sok \u00e9s az oktat\u00e1s tov\u00e1bbra is fontosak, de a folyamat nem \u00e9p\u00fclhet arra, hogy mindenki minden alkalommal mindenre eml\u00e9kszik.<\/p>\n\n\n<h3 class=\"wp-block-heading\">A megel\u0151z\u00e9s, az \u00e9szlel\u00e9s \u00e9s az ellen\u0151rz\u00e9s nem ugyanaz<\/h3>\n\n\n<p>A megel\u0151z\u00e9s kiz\u00e1rja egy adott hib\u00e1z\u00e1s lehet\u0151s\u00e9g\u00e9t. Egy aszimmetrikus pozicion\u00e1l\u00f3elem p\u00e9ld\u00e1ul csak az el\u0151\u00edrt helyzetben engedi a hely\u00e9re illeszkedni az alkatr\u00e9szt.<\/p>\n\n\n<p>Az \u00e9szlel\u00e9s felismeri a nem megfelel\u0151 \u00e1llapotot. Egy jelenl\u00e9t\u00e9rz\u00e9kel\u0151 kimutathatja, hogy hi\u00e1nyzik egy alkatr\u00e9sz, de a k\u00f6vetkez\u0151 l\u00e9p\u00e9st a hozz\u00e1 rendelt reakci\u00f3 hat\u00e1rozza meg. A <strong>figyelmeztet\u00e9s<\/strong> int\u00e9zked\u00e9sre sz\u00f3l\u00edt fel; a <strong>reteszel\u00e9s<\/strong> nem engedi a folytat\u00e1st, am\u00edg az el\u0151\u00edrt felt\u00e9tel nem teljes\u00fcl.<\/p>\n\n\n<p>Ezekr\u0151l k\u00fcl\u00f6n kell d\u00f6nteni a tervez\u00e9s sor\u00e1n. Egy \u00e9rz\u00e9kel\u0151 \u00f6nmag\u00e1ban m\u00e9g nem jelent reteszel\u00e9st, a reteszel\u00e9s pedig meg\u00e1ll\u00edthatja a hib\u00e1s term\u00e9k tov\u00e1bbhalad\u00e1s\u00e1t an\u00e9lk\u00fcl, hogy az eredeti hib\u00e1z\u00e1st megel\u0151zn\u00e9. A v\u00e9gellen\u0151rz\u00e9s tov\u00e1bbra is hasznos, ahol sz\u00fcks\u00e9g van r\u00e1, de a probl\u00e9ma felismer\u00e9se tov\u00e1bbi munkam\u0171veletek ut\u00e1n nem egyen\u00e9rt\u00e9k\u0171 a keletkez\u00e9s hely\u00e9n t\u00f6rt\u00e9n\u0151 megel\u0151z\u00e9ssel.<\/p>\n\n\n<h2 class=\"wp-block-heading\">A hib\u00e1hoz v\u00e1lasszon poka-yoke m\u00f3dszert<\/h2>\n\n\n<p>H\u00e1rom elterjedt m\u00f3dszercsal\u00e1d seg\u00edt eligazodni a v\u00e1laszt\u00e1sban. A <strong>kontaktm\u00f3dszer<\/strong> valamilyen fizikai jellemz\u0151t vagy illeszked\u00e9st ellen\u0151riz. A <strong>r\u00f6gz\u00edtett mennyis\u00e9g m\u00f3dszere<\/strong> az el\u0151\u00edrt darabsz\u00e1mot vagy mennyis\u00e9get vizsg\u00e1lja. A <strong>l\u00e9p\u00e9ssorrend-ellen\u0151rz\u00e9s m\u00f3dszere<\/strong> azt ellen\u0151rzi, hogy a sz\u00fcks\u00e9ges tev\u00e9kenys\u00e9gek az el\u0151\u00edrt sorrendben t\u00f6rt\u00e9nnek-e.<\/p>\n\n\n<p>Abb\u00f3l induljon ki, hogy mi k\u00fcl\u00f6nb\u00f6zteti meg a megfelel\u0151 \u00e1llapotot a nem megfelel\u0151t\u0151l:<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Jellemz\u0151 hib\u00e1z\u00e1s<\/th><th>Lehets\u00e9ges megold\u00e1s<\/th><th>Mit kell igazolni?<\/th><\/tr><\/thead><tbody><tr><td>Az alkatr\u00e9szt ford\u00edtva helyezik be<\/td><td>A helyes ir\u00e1nyt kik\u00e9nyszer\u00edt\u0151 k\u00e9sz\u00fcl\u00e9k vagy pozicion\u00e1l\u00f3elem; kontaktm\u00f3dszer<\/td><td>Helytelen ir\u00e1nyban az alkatr\u00e9sz nem illeszthet\u0151 a hely\u00e9re, mik\u00f6zben minden j\u00f3v\u00e1hagyott v\u00e1ltozat megfelel\u0151en illeszkedik<\/td><\/tr><tr><td>Kimarad egy alkatr\u00e9sz<\/td><td>Jelenl\u00e9tellen\u0151rz\u00e9s szerel\u00e9s k\u00f6zben; kontaktm\u00f3dszer<\/td><td>Az ellen\u0151rz\u00e9s megk\u00fcl\u00f6nb\u00f6zteti a t\u00e9nylegesen beszerelt alkatr\u00e9szt az \u00fcres vagy valami m\u00e1ssal eltakart be\u00e9p\u00edt\u00e9si helyt\u0151l<\/td><\/tr><tr><td>Az el\u0151\u00edrtn\u00e1l kevesebb alkatr\u00e9sz ker\u00fcl be<\/td><td>Darabsz\u00e1ml\u00e1l\u00e1s, t\u00f6megm\u00e9r\u00e9s vagy el\u0151re meghat\u00e1rozott mennyis\u00e9g\u0171 alkatr\u00e9sz bek\u00e9sz\u00edt\u00e9se; a r\u00f6gz\u00edtett mennyis\u00e9g m\u00f3dszere<\/td><td>A v\u00e1lasztott m\u00e9r\u00e9s az alkatr\u00e9szek megengedett elt\u00e9r\u00e9sei mellett is kimutatja a hi\u00e1nyt<\/td><\/tr><tr><td>Kimarad egy m\u0171velet<\/td><td>Az el\u0151\u00edrt sorrend ellen\u0151rz\u00e9se; a l\u00e9p\u00e9ssorrend-ellen\u0151rz\u00e9s m\u00f3dszere<\/td><td>A k\u00f6vetkez\u0151 m\u0171velet nem fogadhat\u00f3 el r\u00e9gi, megism\u00e9telt vagy oda nem tartoz\u00f3 befejez\u00e9si jel alapj\u00e1n<\/td><\/tr><tr><td>Hasonl\u00f3, de nem megfelel\u0151 alkatr\u00e9szt v\u00e1lasztanak<\/td><td>A v\u00e1ltozat azonos\u00edt\u00e1sa \u00e9s \u00f6sszevet\u00e9se az el\u0151\u00edrt alkatr\u00e9sszel<\/td><td>Az ellen\u0151rz\u00e9s a t\u00e9nylegesen felhaszn\u00e1lt alkatr\u00e9szt azonos\u00edtja, nem csup\u00e1n egy k\u00f6zelben l\u00e9v\u0151 c\u00edmk\u00e9t<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Ezek kiindul\u00f3pontok, nem telep\u00edt\u00e9sre k\u00e9sz m\u0171szaki tervek. Egy sz\u00e1ml\u00e1l\u00f3rendszer igazolhatja n\u00e9gy darab jelenl\u00e9t\u00e9t an\u00e9lk\u00fcl, hogy azt is igazoln\u00e1: val\u00f3ban a megfelel\u0151 n\u00e9gy darab van ott. A beolvas\u00e1s ellen\u0151rizhet egy k\u00f3dot, mik\u00f6zben a munkaasztalon tov\u00e1bbra is a nem megfelel\u0151 alkatr\u00e9sz van. Mindig tegye fel a k\u00e9rd\u00e9st: mit bizony\u00edt val\u00f3j\u00e1ban a v\u00e1lasztott jel?<\/p>\n\n\n<p>Gyakran a legegyszer\u0171bb hat\u00e1sos v\u00e1ltoztat\u00e1s a legjobb. Ha egy pozicion\u00e1l\u00f3elem teljesen kiz\u00e1rja a hib\u00e1z\u00e1st, lehet, hogy nincs sz\u00fcks\u00e9g kamer\u00e1ra, t\u00f6bbletkezel\u00e9sre \u00e9s minden ciklusban egy \u00fajabb d\u00f6nt\u00e9sre.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hogyan v\u00e1lasszon a gyakorlatban is m\u0171k\u00f6d\u0151 megold\u00e1st?<\/h2>\n\n\n<h3 class=\"wp-block-heading\">A hib\u00e1z\u00e1s pontos m\u00f3dj\u00e1t figyelje meg, ne csak a hib\u00e1s term\u00e9ket<\/h3>\n\n\n<p>A munk\u00e1t v\u00e9gz\u0151kkel egy\u00fctt figyelje meg a folyamatot ott, ahol a hib\u00e1z\u00e1s el\u0151fordulhat. R\u00f6gz\u00edtse az \u00e9rintett term\u00e9kv\u00e1ltozatot, az \u00e1t\u00e1ll\u00e1s k\u00f6r\u00fclm\u00e9nyeit \u00e9s azt a pontot, amely ut\u00e1n a hiba m\u00e1r nehezen \u00e9szrevehet\u0151 vagy k\u00f6lts\u00e9gesen jav\u00edthat\u00f3.<\/p>\n\n\n<p>A \u201eszerel\u00e9si hib\u00e1k\u201d t\u00fal t\u00e1g megfogalmaz\u00e1s ahhoz, hogy c\u00e9lzott megold\u00e1st lehessen tervezni. \u201eA t\u00f6m\u00edt\u00e9s kimaradhat, miel\u0151tt a fed\u00e9l eltakarja a horny\u00e1t\u201d m\u00e1r meghat\u00e1roz egy \u00e1llapotot \u00e9s egy beavatkoz\u00e1si pontot. A <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/gyokerok-elemzes\/\">gy\u00f6k\u00e9rok-elemz\u00e9s<\/a> seg\u00edthet meg\u00e9rteni, mi\u00e9rt \u00e1ll fenn ez a hibalehet\u0151s\u00e9g; a poka-yoke pedig az a megold\u00e1s, amelyet ennek kezel\u00e9s\u00e9re v\u00e1laszt ki \u00e9s valid\u00e1l.<\/p>\n\n\n<p>Miel\u0151tt \u00fajabb ellen\u0151rz\u00e9st vezetne be, vizsg\u00e1lja meg a kor\u00e1bbi l\u00e9p\u00e9seket. Kiv\u00e1lthat\u00f3 lenne a k\u00fcl\u00f6n\u00e1ll\u00f3 alkatr\u00e9sz egy j\u00f3v\u00e1hagyott term\u00e9km\u00f3dos\u00edt\u00e1ssal? Bek\u00e9sz\u00edthet\u0151 lenne az alkatr\u00e9sz a helyes ir\u00e1nyban? Lehetetlenn\u00e9 tehetn\u00e9 egy k\u00e9sz\u00fcl\u00e9k a helytelen \u00f6sszeszerel\u00e9st? Ne egy \u00fajabb ellen\u0151rz\u00e9s legyen az automatikus v\u00e1lasz minden term\u00e9khib\u00e1ra.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Hat\u00e1rozza meg, mi t\u00f6rt\u00e9njen nem megfelel\u0151 \u00e1llapot eset\u00e9n<\/h3>\n\n\n<p>\u00cdrja le k\u00f6z\u00e9rthet\u0151en az elv\u00e1rt reakci\u00f3t: minek kell le\u00e1llnia, ki int\u00e9zkedik, \u00e9s hogyan azonos\u00edtj\u00e1k, majd jav\u00edtj\u00e1k az \u00e9rintett darabot.<\/p>\n\n\n<p>A l\u00e1that\u00f3 figyelmeztet\u00e9s hasznos lehet, ha valaki m\u00e9g azel\u0151tt tud int\u00e9zkedni, hogy a hib\u00e1z\u00e1s tov\u00e1bbi k\u00e1rt okozna. Ha egy \u00e9szrev\u00e9tlen\u00fcl marad\u00f3 figyelmeztet\u00e9s lehet\u0151v\u00e9 tenn\u00e9 egy elfogadhatatlanul hib\u00e1s term\u00e9k tov\u00e1bbhalad\u00e1s\u00e1t, v\u00e1lasszon hat\u00e1rozottabb beavatkoz\u00e1st ahelyett, hogy arra \u00e9p\u00edtene: a kezel\u0151 mindig \u00e9szreveszi a jelz\u00e9st. A d\u00f6nt\u00e9st a min\u0151s\u00e9gi k\u00f6vetelm\u00e9nyek \u00e9s a kock\u00e1zat\u00e9rt\u00e9kel\u00e9s hat\u00e1rozza meg, ne kiz\u00e1r\u00f3lag a jelz\u0151eszk\u00f6z \u00e1ra.<\/p>\n\n\n<p>A min\u0151s\u00e9gi hib\u00e1k megel\u0151z\u00e9s\u00e9re szolg\u00e1l\u00f3 megold\u00e1sok nem helyettes\u00edtik a g\u00e9pek biztons\u00e1gi v\u00e9delmi rendszereit. Minden olyan v\u00e1ltoztat\u00e1s, amely a g\u00e9p m\u0171k\u00f6d\u00e9s\u00e9t vagy a szem\u00e9lyek v\u00e9delm\u00e9t \u00e9rinti, megfelel\u0151 m\u0171szaki \u00e9s biztons\u00e1gi fel\u00fclvizsg\u00e1latot ig\u00e9nyel.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Ellen\u0151rizze, hogy a megold\u00e1s meg\u00e1llja-e a hely\u00e9t a napi termel\u00e9sben<\/h3>\n\n\n<p>Az a megold\u00e1s, amely egy bemutat\u00f3darabon m\u0171k\u00f6dik, m\u00e1sik v\u00e1ltozatn\u00e1l, szennyezett k\u00e9sz\u00fcl\u00e9kn\u00e9l vagy az \u00e1t\u00e1ll\u00e1s ut\u00e1ni els\u0151 gy\u00e1rt\u00e1si feladatn\u00e1l m\u00e1r kudarcot vallhat. Ezeket a k\u00f6r\u00fclm\u00e9nyeket m\u00e1r a v\u00e1laszt\u00e1skor vegye figyelembe, ne csak ut\u00f3lag.<\/p>\n\n\n<p>A megold\u00e1ssal j\u00e1r\u00f3 munk\u00e1t is m\u00e9rlegelje. K\u00e9nyelmesen be tudj\u00e1k helyezni \u00e9s ki tudj\u00e1k venni a darabokat a kezel\u0151k? Elmozdulhat az \u00e9rz\u00e9kel\u0151 a szok\u00e1sos tiszt\u00edt\u00e1s sor\u00e1n? M\u00e1sik term\u00e9kre val\u00f3 \u00e1t\u00e1ll\u00e1skor sz\u00fcks\u00e9g van m\u00e1sik k\u00e9sz\u00fcl\u00e9kre vagy referencia\u00e9rt\u00e9kre? El\u00e9g egy\u00e9rtelm\u0171 a hiba\u00fczenet ahhoz, hogy a helyes helyre\u00e1ll\u00edt\u00e1st seg\u00edtse, ne pedig ism\u00e9telt vissza\u00e1ll\u00edt\u00e1sokra \u00f6szt\u00f6n\u00f6zz\u00f6n?<\/p>\n\n\n<p>A teljes \u00fczemeltet\u00e9si terhet vesse \u00f6ssze: a beszerz\u00e9st, a telep\u00edt\u00e9st, a ciklusid\u0151t, a karbantart\u00e1st \u00e9s a t\u00e9ves elutas\u00edt\u00e1sokat, valamint az elker\u00fclt ut\u00f3munk\u00e1t. A legolcs\u00f3bb eszk\u00f6z nem a legolcs\u00f3bb megold\u00e1s, ha rendszeresen meg\u00e1ll\u00edtja a megfelel\u0151 term\u00e9kek gy\u00e1rt\u00e1s\u00e1t. Egy lassabb m\u0171velet sem felt\u00e9tlen\u00fcl rosszabb \u00f6sszess\u00e9g\u00e9ben, ha jelent\u0151s jav\u00edt\u00e1si munk\u00e1t el\u0151z meg a k\u00e9s\u0151bbi l\u00e9p\u00e9sekben.<\/p>\n\n\n<h2 class=\"wp-block-heading\">P\u00e9lda: el\u0151zze meg a t\u00f6m\u00edt\u00e9s kimarad\u00e1s\u00e1t a h\u00e1z lez\u00e1r\u00e1sa el\u0151tt<\/h2>\n\n\n<p>K\u00e9pzelj\u00fcnk el egy gy\u00e1rt\u00f3t, amely olyan h\u00e1zat szerel \u00f6ssze, amelynek horny\u00e1ba a fed\u00e9l felszerel\u00e9se el\u0151tt t\u00f6m\u00edt\u00e9st kell helyezni. A t\u00f6m\u00edt\u00e9s hi\u00e1ny\u00e1ra csak a v\u00e9gs\u0151 sziv\u00e1rg\u00e1svizsg\u00e1laton der\u00fcl f\u00e9ny, addigra azonban m\u00e1r a r\u00f6gz\u00edt\u00e9sre \u00e9s a darab mozgat\u00e1s\u00e1ra is munk\u00e1t ford\u00edtottak.<\/p>\n\n\n<p>Egy jel\u00f6l\u00e9ssel ell\u00e1tott alkatr\u00e9szt\u00e1lca seg\u00edt \u00e9szben tartani a t\u00f6m\u00edt\u00e9st, de nem igazolja a beszerel\u00e9s\u00e9t. A t\u00e1lc\u00e1n az \u00fcres hely azt is jelentheti, hogy a t\u00f6m\u00edt\u00e9s a munkaasztalon maradt. A csapat ez\u00e9rt a fed\u00e9l felszerel\u00e9se el\u0151tt a horonyn\u00e1l v\u00e9gzett jelenl\u00e9tellen\u0151rz\u00e9st pr\u00f3b\u00e1l ki, amely blokkolja a folytat\u00e1st, ha az el\u0151\u00edrt \u00e1llapot nem igazolhat\u00f3.<\/p>\n\n\n<p>Az elfogad\u00e1s felt\u00e9tele egy konkr\u00e9t k\u00e9rd\u00e9sen m\u00falik: <strong>tov\u00e1bbjuthat-e ezen a ponton egy h\u00e1z, ha a t\u00f6m\u00edt\u00e9se nincs megfelel\u0151en a hely\u00e9n?<\/strong> Olyan eszk\u00f6zt kell v\u00e1lasztani, amely a t\u00e9nyleges alkatr\u00e9sz, horony \u00e9s gy\u00e1rt\u00e1si k\u00f6r\u00fclm\u00e9nyek mellett ad v\u00e1laszt erre a k\u00e9rd\u00e9sre.<\/p>\n\n\n<p>A j\u00f3v\u00e1hagy\u00e1s el\u0151tt a csapat ismert \u00e1llapotokkal teszi pr\u00f3b\u00e1ra a javasolt megold\u00e1st:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Megfelel\u0151en be\u00e9p\u00edtett t\u00f6m\u00edt\u00e9s minden j\u00f3v\u00e1hagyott h\u00e1zv\u00e1ltozatn\u00e1l.<\/li><li>Hi\u00e1nyz\u00f3 t\u00f6m\u00edt\u00e9s, valamint jelen l\u00e9v\u0151, de nem az el\u0151\u00edrt helyzetben l\u00e9v\u0151 t\u00f6m\u00edt\u00e9s.<\/li><li>Nem megfelel\u0151 t\u00edpus\u00fa t\u00f6m\u00edt\u00e9s, ha az egy\u00e9bk\u00e9nt elfogadhat\u00f3nak t\u0171n\u0151 jelz\u00e9st adhatna.<\/li><li>A v\u00e1lasztott ellen\u0151rz\u00e9s szempontj\u00e1b\u00f3l l\u00e9nyeges, v\u00e1rhat\u00f3 szennyez\u0151d\u00e9sek, valamint a megvil\u00e1g\u00edt\u00e1s \u00e9s a pozicion\u00e1l\u00e1s elt\u00e9r\u00e9sei.<\/li><li>\u00dajraind\u00edt\u00e1si \u00e9s \u00e1t\u00e1ll\u00e1si k\u00f6r\u00fclm\u00e9nyek, bele\u00e9rtve azt is, hogy t\u00e9vesen \u00fajra felhaszn\u00e1lhat\u00f3-e az el\u0151z\u0151 darab ellen\u0151rz\u00e9si eredm\u00e9nye.<\/li><\/ul>\n\n\n<p>A vizsg\u00e1latnak azt is igazolnia kell, hogy a megold\u00e1s felismeri a nem elfogadhat\u00f3 \u00e1llapotokat, \u00e9s azt is, hogy a megfelel\u0151 szerelv\u00e9nyeket megb\u00edzhat\u00f3an tov\u00e1bbengedi. Ha a hi\u00e1nyz\u00f3 t\u00f6m\u00edt\u00e9st \u00e9rz\u00e9keli, de a rossz helyre tett t\u00f6m\u00edt\u00e9st nem, a csapat megismerte a v\u00e9delem korl\u00e1tj\u00e1t. A m\u00f3dos\u00edt\u00e1s j\u00f3v\u00e1hagy\u00e1sa el\u0151tt tov\u00e1bb kell fejleszteni a m\u00f3dszert, vagy k\u00fcl\u00f6n ellen\u0151rz\u00e9st kell fenntartani a m\u00e9g nem kezelt hibam\u00f3dra.<\/p>\n\n\n<p>Ez\u00e9rt nem elegend\u0151 elfogad\u00e1si felt\u00e9tel az, hogy \u201eaz \u00e9rz\u00e9kel\u0151 z\u00f6ldre v\u00e1lt\u201d. A gy\u00e1rt\u00e1si eredm\u00e9ny megfelel\u0151s\u00e9g\u00e9t kell igazolni, nem a visszajelz\u0151 m\u0171k\u00f6d\u00e9s\u00e9t.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00c9p\u00edtse be a j\u00f3v\u00e1hagyott m\u00f3dos\u00edt\u00e1st a standardiz\u00e1lt munkav\u00e9gz\u00e9sbe<\/h2>\n\n\n<p>Ha a pr\u00f3ba\u00fczem sikeres, jel\u00f6lje ki, ki felel az eszk\u00f6z\u00e9rt, annak ellen\u0151rz\u00e9s\u00e9\u00e9rt \u00e9s a meghib\u00e1sod\u00e1s eset\u00e9n sz\u00fcks\u00e9ges int\u00e9zked\u00e9sek\u00e9rt. Eg\u00e9sz\u00edtse ki a munkautas\u00edt\u00e1st a munkadarab megfelel\u0151 behelyez\u00e9s\u00e9nek, az \u00e1t\u00e1ll\u00e1snak, a rendellenes \u00e1llapotok kezel\u00e9s\u00e9nek \u00e9s a helyre\u00e1ll\u00edt\u00e1snak a m\u00f3dj\u00e1val. Minden \u00e9rintett m\u0171szak dolgoz\u00f3it oktassa be, ne csak a pr\u00f3ba\u00fczemben r\u00e9szt vev\u0151 csapatot.<\/p>\n\n\n<p>Hat\u00e1rozzon meg a kock\u00e1zathoz \u00e9s a berendez\u00e9shez ill\u0151 ellen\u0151rz\u00e9si rendet. A csapatnak p\u00e9ld\u00e1ul sz\u00fcks\u00e9ge lehet egy j\u00f3v\u00e1hagyott, ismert hib\u00e1t tartalmaz\u00f3 tesztdarabra, vagy egy meghat\u00e1rozott m\u0171k\u00f6d\u00e9spr\u00f3b\u00e1ra a m\u0171k\u00f6d\u00e9st befoly\u00e1sol\u00f3 be\u00e1ll\u00edt\u00e1sm\u00f3dos\u00edt\u00e1s ut\u00e1n. A vizsg\u00e1latr\u00f3l \u00e9s annak gyakoris\u00e1g\u00e1r\u00f3l a min\u0151s\u00e9g\u00fcgyi \u00e9s a m\u0171szaki ter\u00fclet d\u00f6nts\u00f6n; nincs olyan \u00e1ltal\u00e1nos ellen\u0151rz\u00e9si id\u0151k\u00f6z, amely minden poka-yoke megold\u00e1shoz megfelel\u0151.<\/p>\n\n\n<p>Az ismerten nem megfelel\u0151 tesztdarabokat tartsa ellen\u0151rz\u00e9s alatt, hogy ne ker\u00fclhessenek a vev\u0151knek kisz\u00e1ll\u00edtott term\u00e9kek k\u00f6z\u00e9. Hat\u00e1rozza meg, hogyan \u00e1ll\u00edtj\u00e1k le a termel\u00e9st, vagy hogyan t\u00e9rnek \u00e1t egy j\u00f3v\u00e1hagyott alternat\u00edv elj\u00e1r\u00e1sra, ha a hibakiv\u00e9d\u0151 megold\u00e1s nem \u00e1ll rendelkez\u00e9sre. Ne az enged\u00e9ly n\u00e9lk\u00fcli megker\u00fcl\u00e9s legyen a termel\u00e9si c\u00e9l el\u00e9r\u00e9s\u00e9nek legegyszer\u0171bb m\u00f3dja.<\/p>\n\n\n<p>Ezut\u00e1n ellen\u0151rizze, hogy tart\u00f3s-e a javul\u00e1s. K\u00f6vesse a c\u00e9lzott term\u00e9khiba el\u0151fordul\u00e1s\u00e1t az \u00e9rintett gy\u00e1rt\u00e1si mennyis\u00e9ghez viszony\u00edtva, \u00e9s figyelje a t\u00e9ves elutas\u00edt\u00e1sokat, a megszak\u00edt\u00e1sokat \u00e9s a m\u0171veletenk\u00e9nti id\u0151t is. Gondoskodjon arr\u00f3l, hogy a term\u00e9k\u00f6sszet\u00e9tel \u00e9s a megfigyel\u00e9s alapja \u00f6sszehasonl\u00edthat\u00f3 maradjon. Ha egy h\u00e9ten j\u00f3val kevesebb szerelv\u00e9ny k\u00e9sz\u00fcl, a kevesebb hib\u00e1s darab \u00f6nmag\u00e1ban m\u00e9g nem bizony\u00edt javul\u00e1st.<\/p>\n\n\n<p>A munka\u00e1llom\u00e1s megv\u00e1ltozott m\u0171veleti ideje mellett a k\u00e9s\u0151bbi m\u0171veletekn\u00e9l sz\u00fcks\u00e9ges ut\u00f3munk\u00e1t is figyelje. Az el\u0151ny az, hogy t\u00f6bb megfelel\u0151 term\u00e9k k\u00e9sz\u00fcl kevesebb elker\u00fclhet\u0151 munk\u00e1val, nem puszt\u00e1n az, hogy egy munkaasztaln\u00e1l n\u00e9h\u00e1ny m\u00e1sodpercet nyernek.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00dctemezze a bevezet\u00e9st \u00fagy, hogy a sz\u00e1ll\u00edt\u00e1sokra gyakorolt hat\u00e1sa is l\u00e1that\u00f3 legyen<\/h2>\n\n\n<p>M\u00e9g egy kisebb k\u00e9sz\u00fcl\u00e9km\u00f3dos\u00edt\u00e1sn\u00e1l is id\u0151 kell a felszerel\u00e9shez, a tesztel\u00e9shez, a kezel\u0151k betan\u00edt\u00e1s\u00e1hoz \u00e9s a haszn\u00e1lat j\u00f3v\u00e1hagy\u00e1s\u00e1hoz. Ha ezek alatt a munka\u00e1llom\u00e1s nem \u00e1ll rendelkez\u00e9sre, ugyanezt a kapacit\u00e1st nem lehet a vev\u0151i megrendel\u00e9sekhez is oda\u00edg\u00e9rni.<\/p>\n\n\n<p>A t\u00f6m\u00edt\u00e9ses p\u00e9ld\u00e1ban a be\u00e9p\u00edt\u00e9s ut\u00e1ni munkav\u00e9gz\u00e9s is v\u00e1ltozik. Az \u00faj ellen\u0151rz\u00e9s n\u00f6velheti a kezel\u00e9si id\u0151t, mik\u00f6zben a t\u00f6m\u00edt\u00e9s kihagy\u00e1s\u00e1nak megel\u0151z\u00e9se cs\u00f6kkentheti a k\u00e9s\u0151bbi ut\u00f3munk\u00e1t. M\u00e9rje meg a m\u00f3dos\u00edtott m\u0171velet idej\u00e9t, \u00e9s vezesse \u00e1t az \u00faj adatokat a t\u00e9nylegesen tervezett munk\u00e1kon. Felt\u00e9telezett megtakar\u00edt\u00e1ssal ne sz\u00e1moljon addig, am\u00edg azt a folyamat nem igazolja.<\/p>\n\n\n<p>A SkyPlanner APS ezeket a v\u00e1ltoz\u00e1sokat <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/mi-a-termelesutemezes\/\">ugyanabba a kapacit\u00e1stervbe<\/a> illeszti be, amelyben a termel\u00e9s t\u00f6bbi r\u00e9sze is szerepel:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>R\u00f6gz\u00edtse a munka\u00e1llom\u00e1s kies\u00e9s\u00e9nek id\u0151szak\u00e1t rendelkez\u00e9sre \u00e1ll\u00e1si kiv\u00e9telk\u00e9nt, majd sz\u00e1m\u00edtsa \u00fajra az \u00fctemtervet.<\/li><li>Az \u00e9rintett munk\u00e1khoz a j\u00f3v\u00e1hagyott m\u0171veleti id\u0151ket, \u00e1t\u00e1ll\u00e1si k\u00f6vetelm\u00e9nyeket, alkalmas munka\u00e1llom\u00e1sokat \u00e9s a m\u0171veletek k\u00f6z\u00f6tti f\u00fcgg\u0151s\u00e9geket haszn\u00e1lja.<\/li><li>Tekintse \u00e1t a kapott sorrendet \u00e9s befejez\u00e9si d\u00e1tumokat a Gantt-diagramon, az ugyanaz\u00e9rt a kapacit\u00e1s\u00e9rt verseng\u0151 t\u00f6bbi rendel\u00e9ssel egy\u00fctt.<\/li><\/ul>\n\n\n<p>\u00cdgy a gy\u00e1rt\u00e1stervez\u0151 megalapozottabban d\u00f6nthet arr\u00f3l, mikor vezess\u00e9k be a m\u00f3dos\u00edt\u00e1st, \u00e9s mely v\u00e1llalt sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k ig\u00e9nyelnek figyelmet. Az Arcturus a be\u00e1ll\u00edtott korl\u00e1tok \u00e9s priorit\u00e1sok figyelembev\u00e9tel\u00e9vel sz\u00e1m\u00edtja ki az \u00fctemtervet, \u00edgy ritk\u00e1bban kell az egyes g\u00e9pek munkasor\u00e1t k\u00e9zzel \u00fajra \u00f6ssze\u00e1ll\u00edtani.<\/p>\n\n\n<p>A min\u0151s\u00e9gellen\u0151rz\u00e9snek \u00e9s az \u00fctemtervnek m\u00e1s a feladata. A fizikai ellen\u0151rz\u00e9snek kell igazolnia, hogy a t\u00f6m\u00edt\u00e9s megfelel\u0151en van be\u00e9p\u00edtve. A SkyPlanner rendszerben a m\u0171veletek k\u00f6z\u00f6tti f\u00fcgg\u0151s\u00e9g a tervezett munkasorrendet hat\u00e1rozza meg; nem igazolja, hogy egy fizikai alkatr\u00e9sz megfelelt az ellen\u0151rz\u00e9sen. A min\u0151s\u00e9g\u00fcgyi felszabad\u00edt\u00e1s tov\u00e1bbra is a csapat d\u00f6nt\u00e9se, \u00e9s a j\u00f3v\u00e1hagyott m\u00f3dos\u00edt\u00e1st az \u00e9rintett nyitott rendel\u00e9seken is \u00e1t kell vezetni.<\/p>\n\n\n<p>A SkyPlanner a ny\u00edlt REST API r\u00e9v\u00e9n <a href=\"https:\/\/skyplanner.ai\/hu\/integraciok\/\">b\u00e1rmely ERP- vagy MES-rendszerrel integr\u00e1lhat\u00f3<\/a>, \u00edgy az \u00fctemez\u00e9s \u00f6sszekapcsolhat\u00f3 a rendel\u00e9si \u00e9s gy\u00e1rt\u00e1si adatokat t\u00e1rol\u00f3 rendszerekkel.<\/p>\n\n\n<h3 class=\"wp-block-heading\">Juttassa el a m\u00f3dos\u00edtott tervet az \u00fczembe<\/h3>\n\n\n<p>A m\u00f3dos\u00edtott \u00fctemterv csak akkor seg\u00edt, ha az \u00fczemben is abb\u00f3l dolgoznak. A SkyPlanner bevezet\u00e9se el\u0151tt az <a href=\"https:\/\/skyplanner.ai\/hu\/ugyfeltortenetek\/utu\/\">eloszt\u00f3- \u00e9s kapcsol\u00f3berendez\u00e9seket gy\u00e1rt\u00f3 UTU<\/a> r\u00e9szlegenk\u00e9nt k\u00fcl\u00f6n t\u00e1bl\u00e1zatokat haszn\u00e1lt, \u00e9s az ERP-rendszerben v\u00e9grehajtott sorrendm\u00f3dos\u00edt\u00e1sok nem mindig jutottak el a termel\u00e9shez. Az Oracle NetSuite rendszerrel integr\u00e1lt SkyPlanner r\u00e9v\u00e9n az UTU egyetlen rendszerben fogja \u00f6ssze a gy\u00e1rt\u00f3sorait \u00e9s r\u00e9szlegeit. Besz\u00e1mol\u00f3ja szerint a friss\u00edtett munkasorok m\u00e1sodpercek alatt eljutnak a szerel\u0151kh\u00f6z.<\/p>\n\n\n<p>Ez a tapasztalat megmutatja, mennyit \u00e9r, ha a v\u00e1ltoz\u00f3 termel\u00e9si priorit\u00e1sok eljutnak az \u00e9rintettekhez. A bevezet\u00e9sn\u00e9l is hasonl\u00f3an gyakorlatias a c\u00e9l: a telep\u00edt\u00e9sre kijel\u00f6lt id\u0151szak \u00e9s a k\u00f6r\u00e9 \u00fctemezett gy\u00e1rt\u00e1si feladatok egyetlen naprak\u00e9sz terv r\u00e9szei legyenek, ne pedig k\u00fcl\u00f6n\u00e1ll\u00f3 utas\u00edt\u00e1sok versengjenek ugyanaz\u00e9rt a munka\u00e1llom\u00e1s\u00e9rt.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Az ism\u00e9tl\u0151d\u0151 t\u00e9veszt\u00e9st\u0151l a j\u00f3v\u00e1hagyott gy\u00e1rt\u00e1si m\u00f3dos\u00edt\u00e1sig<\/h2>\n\n\n<p>V\u00e1lasszon ki egy pontosan meghat\u00e1rozott t\u00e9veszt\u00e9st. Keresse meg a legkor\u00e1bbi pontot, ahol azt \u00e9rdemes megel\u0151zni vagy felismerni, v\u00e1lassza ki a kock\u00e1zatnak megfelel\u0151 reakci\u00f3t, majd tegye pr\u00f3b\u00e1ra a megold\u00e1st megfelel\u0151 \u00e9s nem megfelel\u0151 \u00e1llapotokkal is. Ezut\u00e1n jel\u00f6lje ki a j\u00f3v\u00e1hagyott m\u00f3dos\u00edt\u00e1s felel\u0151s\u00e9t, hat\u00e1rozza meg a karbantart\u00e1s rendj\u00e9t, \u00e9s biztos\u00edtson id\u0151t a bevezet\u00e9shez a termel\u00e9si tervben.<\/p>\n\n\n<p>Az utols\u00f3 l\u00e9p\u00e9shez a SkyPlanner APS seg\u00edts\u00e9g\u00e9vel k\u00e9sz\u00edthet megval\u00f3s\u00edthat\u00f3 \u00fctemtervet. <a href=\"https:\/\/skyplanner.ai\/hu\/kapcsolat-ertekesites\/\">Foglaljon id\u0151pontot egy bemutat\u00f3ra<\/a>, \u00e9s k\u00e9sz\u00edtse el\u0151 a bevezet\u00e9s tervezett id\u0151ablak\u00e1ra, az \u00e9rintett m\u0171veletekre \u00e9s az ugyanaz\u00e9rt a kapacit\u00e1s\u00e9rt verseng\u0151 rendel\u00e9sekre vonatkoz\u00f3 adatokat. N\u00e9zze meg, hogyan illeszkedik a m\u00f3dos\u00edt\u00e1s a rendelkez\u00e9sre \u00e1ll\u00f3 kapacit\u00e1shoz, \u00e9s hogyan hat a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151kre. Ha el\u0151bb az \u00fctemez\u00e9s menet\u00e9t szeretn\u00e9 megismerni, <a href=\"https:\/\/skyplanner.ai\/hu\/proba\/\">pr\u00f3b\u00e1lja ki a SkyPlanner rendszert dem\u00f3adatokkal<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Poka-yoke a gy\u00e1rt\u00e1sban: v\u00e1lasszon hibakiv\u00e9d\u0151 megold\u00e1st Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Poka-yoke a gy\u00e1rt\u00e1sban: v\u00e1lasszon hibakiv\u00e9d\u0151 megold\u00e1st Megint csak a v\u00e9gellen\u0151rz\u00e9sn\u00e9l der\u00fcl ki, hogy hi\u00e1nyzik egy t\u00f6m\u00edt\u00e9s. A csapat ismeri a szerel\u00e9si utas\u00edt\u00e1st, a kezel\u0151 megkapta az oktat\u00e1st, \u00e9s a munkaasztal f\u00f6l\u00f6tt m\u00e9g mindig ott van az eml\u00e9keztet\u0151. Egy \u00fajabb eml\u00e9keztet\u0151 mellett tov\u00e1bbra is ugyan\u00fagy el\u0151fordulhat &#8230; <a title=\"Poka-yoke a gy\u00e1rt\u00e1sban: v\u00e1lasszon hibakiv\u00e9d\u0151 megold\u00e1st\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/poka-yoke\/\" aria-label=\"Read more about Poka-yoke a gy\u00e1rt\u00e1sban: v\u00e1lasszon hibakiv\u00e9d\u0151 megold\u00e1st\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":111159,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[312,2554],"tags":[],"class_list":["post-111141","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-forrasok","category-gyartasi-hatekonysag","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Poka-yoke a gy\u00e1rt\u00e1sban: v\u00e1lasszon hibakiv\u00e9d\u0151 megold\u00e1st<\/title>\n<meta name=\"description\" content=\"El\u0151zze meg az ism\u00e9tl\u0151d\u0151 szerel\u00e9si hib\u00e1kat: v\u00e1lasszon \u00e9s teszteljen poka-yoke megold\u00e1st, majd a SkyPlannerrel \u00fctemezze bevezet\u00e9s\u00e9t a vev\u0151i rendel\u00e9sek mell\u00e9.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/poka-yoke\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Poka-yoke a gy\u00e1rt\u00e1sban: v\u00e1lasszon hibakiv\u00e9d\u0151 megold\u00e1st\" \/>\n<meta property=\"og:description\" content=\"El\u0151zze meg az ism\u00e9tl\u0151d\u0151 szerel\u00e9si hib\u00e1kat: v\u00e1lasszon \u00e9s teszteljen poka-yoke megold\u00e1st, majd a SkyPlannerrel \u00fctemezze bevezet\u00e9s\u00e9t a vev\u0151i rendel\u00e9sek mell\u00e9.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/forrasok\/poka-yoke\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-27T14:48:08+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-27T14:49:06+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/poka-yoke-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"941\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Szerz\u0151:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data2\" content=\"18 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/poka-yoke\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/poka-yoke\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Poka-yoke a gy\u00e1rt\u00e1sban: v\u00e1lasszon hibakiv\u00e9d\u0151 megold\u00e1st\",\"datePublished\":\"2026-10-27T14:48:08+00:00\",\"dateModified\":\"2026-10-27T14:49:06+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/poka-yoke\\\/\"},\"wordCount\":3621,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/poka-yoke\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/poka-yoke-manufacturing-hero.png\",\"articleSection\":[\"forr\u00e1sok\",\"Gy\u00e1rt\u00e1si hat\u00e9konys\u00e1g\"],\"inLanguage\":\"hu-HU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/poka-yoke\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/poka-yoke\\\/\",\"name\":\"Poka-yoke a gy\u00e1rt\u00e1sban: v\u00e1lasszon hibakiv\u00e9d\u0151 megold\u00e1st\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/poka-yoke\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/poka-yoke\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/poka-yoke-manufacturing-hero.png\",\"datePublished\":\"2026-10-27T14:48:08+00:00\",\"dateModified\":\"2026-10-27T14:49:06+00:00\",\"description\":\"El\u0151zze meg az ism\u00e9tl\u0151d\u0151 szerel\u00e9si hib\u00e1kat: v\u00e1lasszon \u00e9s teszteljen poka-yoke megold\u00e1st, majd a SkyPlannerrel \u00fctemezze bevezet\u00e9s\u00e9t a vev\u0151i rendel\u00e9sek mell\u00e9.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/poka-yoke\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/poka-yoke\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/poka-yoke\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/poka-yoke-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/poka-yoke-manufacturing-hero.png\",\"width\":1672,\"height\":941,\"caption\":\"An asymmetric component aligned with a matching keyed fixture illustrates mistake-proofing in manufacturing.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/poka-yoke\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Poka-yoke a gy\u00e1rt\u00e1sban: v\u00e1lasszon hibakiv\u00e9d\u0151 megold\u00e1st\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Poka-yoke a gy\u00e1rt\u00e1sban: v\u00e1lasszon hibakiv\u00e9d\u0151 megold\u00e1st","description":"El\u0151zze meg az ism\u00e9tl\u0151d\u0151 szerel\u00e9si hib\u00e1kat: v\u00e1lasszon \u00e9s teszteljen poka-yoke megold\u00e1st, majd a SkyPlannerrel \u00fctemezze bevezet\u00e9s\u00e9t a vev\u0151i rendel\u00e9sek mell\u00e9.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/forrasok\/poka-yoke\/","og_locale":"hu_HU","og_type":"article","og_title":"Poka-yoke a gy\u00e1rt\u00e1sban: v\u00e1lasszon hibakiv\u00e9d\u0151 megold\u00e1st","og_description":"El\u0151zze meg az ism\u00e9tl\u0151d\u0151 szerel\u00e9si hib\u00e1kat: v\u00e1lasszon \u00e9s teszteljen poka-yoke megold\u00e1st, majd a SkyPlannerrel \u00fctemezze bevezet\u00e9s\u00e9t a vev\u0151i rendel\u00e9sek mell\u00e9.","og_url":"https:\/\/skyplanner.ai\/hu\/forrasok\/poka-yoke\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-27T14:48:08+00:00","article_modified_time":"2026-10-27T14:49:06+00:00","og_image":[{"width":1672,"height":941,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/poka-yoke-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Szerz\u0151:":"Jussi M\u00e4ntyl\u00e4","Becs\u00fclt olvas\u00e1si id\u0151":"18 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/poka-yoke\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/poka-yoke\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Poka-yoke a gy\u00e1rt\u00e1sban: v\u00e1lasszon hibakiv\u00e9d\u0151 megold\u00e1st","datePublished":"2026-10-27T14:48:08+00:00","dateModified":"2026-10-27T14:49:06+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/poka-yoke\/"},"wordCount":3621,"publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/poka-yoke\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/poka-yoke-manufacturing-hero.png","articleSection":["forr\u00e1sok","Gy\u00e1rt\u00e1si hat\u00e9konys\u00e1g"],"inLanguage":"hu-HU"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/poka-yoke\/","url":"https:\/\/skyplanner.ai\/hu\/forrasok\/poka-yoke\/","name":"Poka-yoke a gy\u00e1rt\u00e1sban: v\u00e1lasszon hibakiv\u00e9d\u0151 megold\u00e1st","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/poka-yoke\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/poka-yoke\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/poka-yoke-manufacturing-hero.png","datePublished":"2026-10-27T14:48:08+00:00","dateModified":"2026-10-27T14:49:06+00:00","description":"El\u0151zze meg az ism\u00e9tl\u0151d\u0151 szerel\u00e9si hib\u00e1kat: v\u00e1lasszon \u00e9s teszteljen poka-yoke megold\u00e1st, majd a SkyPlannerrel \u00fctemezze bevezet\u00e9s\u00e9t a vev\u0151i rendel\u00e9sek mell\u00e9.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/poka-yoke\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/forrasok\/poka-yoke\/"]}]},{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/poka-yoke\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/poka-yoke-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/poka-yoke-manufacturing-hero.png","width":1672,"height":941,"caption":"An asymmetric component aligned with a matching keyed fixture illustrates mistake-proofing in manufacturing."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/poka-yoke\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"Poka-yoke a gy\u00e1rt\u00e1sban: v\u00e1lasszon hibakiv\u00e9d\u0151 megold\u00e1st"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/poka-yoke-manufacturing-hero.png",1672,941,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/poka-yoke-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/poka-yoke-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/poka-yoke-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/poka-yoke-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/poka-yoke-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/poka-yoke-manufacturing-hero.png",1672,941,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/poka-yoke-manufacturing-hero-360x203.png",360,203,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Poka-yoke a gy\u00e1rt\u00e1sban: v\u00e1lasszon hibakiv\u00e9d\u0151 megold\u00e1st Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Poka-yoke a gy\u00e1rt\u00e1sban: v\u00e1lasszon hibakiv\u00e9d\u0151 megold\u00e1st Megint csak a v\u00e9gellen\u0151rz\u00e9sn\u00e9l der\u00fcl ki, hogy hi\u00e1nyzik egy t\u00f6m\u00edt\u00e9s. A csapat ismeri a szerel\u00e9si utas\u00edt\u00e1st, a kezel\u0151 megkapta az oktat\u00e1st, \u00e9s a munkaasztal f\u00f6l\u00f6tt m\u00e9g mindig ott van az eml\u00e9keztet\u0151. Egy \u00fajabb eml\u00e9keztet\u0151 mellett tov\u00e1bbra is ugyan\u00fagy el\u0151fordulhat&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/111141","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=111141"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/111141\/revisions"}],"predecessor-version":[{"id":111204,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/111141\/revisions\/111204"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media\/111159"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=111141"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/categories?post=111141"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/tags?post=111141"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}