{"id":110865,"date":"2026-10-26T11:01:16","date_gmt":"2026-10-26T11:01:16","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=110865"},"modified":"2026-10-26T11:02:18","modified_gmt":"2026-10-26T11:02:18","slug":"fifo-sav","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/hu\/forrasok\/fifo-sav\/","title":{"rendered":"FIFO-s\u00e1vok a gy\u00e1rt\u00e1sban: tartsa k\u00e9zben a v\u00e1rakoz\u00f3 t\u00e9teleket"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">FIFO-s\u00e1vok a gy\u00e1rt\u00e1sban: tartsa k\u00e9zben a v\u00e1rakoz\u00f3 t\u00e9teleket<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/hu\/\">Kezd\u0151lap<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/\">Er\u0151forr\u00e1sok<\/a> &raquo; FIFO-s\u00e1vok a gy\u00e1rt\u00e1sban: tartsa k\u00e9zben a v\u00e1rakoz\u00f3 t\u00e9teleket<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Becs\u00fclt olvas\u00e1si id\u0151: <\/span><span class=\"yoast-reading-time__reading-time\">11<\/span><span class=\"yoast-reading-time__time-unit\"> perc<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>A legr\u00e9gebben be\u00e9rkezett kocsi m\u00e9g mindig v\u00e1rakozik, amikor \u00fajabb s\u00fcrg\u0151s gy\u00e1rt\u00e1si feladat \u00e9rkezik. Valaki a kijel\u00f6lt ter\u00fclet mell\u00e9 \u00e1ll\u00edtja az \u00faj t\u00e9telt, a k\u00f6vetkez\u0151 folyamat pedig azt veszi el\u0151re, amelyik \u00e9ppen a legs\u00fcrg\u0151sebbnek t\u0171nik. A tegnap \u00f3ta v\u00e1rakoz\u00f3 t\u00e9telek sors\u00e1ra \u00edgy egyre nehezebb magyar\u00e1zatot adni.<\/p>\n\n\n<p>A FIFO-s\u00e1v \u00e9ppen ezt a helyzetet hivatott megel\u0151zni. K\u00f6z\u00f6s sorrendi szab\u00e1lyt ad k\u00e9t folyamatnak, \u00e9s egy\u00e9rtelm\u0171en korl\u00e1tozza, mennyi anyag v\u00e1rakozhat k\u00f6z\u00f6tt\u00fck. Az el\u0151ny nem mag\u00e1b\u00f3l a padl\u00f3jel\u00f6l\u00e9sb\u0151l sz\u00e1rmazik, hanem a meg\u00e1llapod\u00e1s betart\u00e1s\u00e1b\u00f3l \u2014 k\u00fcl\u00f6n\u00f6sen akkor, amikor a s\u00e1v megtelik.<\/p>\n\n\n<p>A s\u00e1v k\u00e9t folyamat k\u00f6z\u00f6tt szab\u00e1lyozza az \u00e1tad\u00e1st. A SkyPlanner APS seg\u00edt \u00f6sszehangolni a kapcsol\u00f3d\u00f3 termel\u00e9st, \u00edgy a v\u00e1rakoz\u00e1si sort felt\u00f6lt\u0151 gy\u00e1rt\u00e1si feladatok \u00e9s az abb\u00f3l dolgoz\u00f3 er\u0151forr\u00e1sok a t\u00f6bbi rendel\u00e9ssel k\u00f6z\u00f6s \u00fctemtervbe illeszkednek. \u00cdgy kevesebb id\u0151t kell ford\u00edtani az egyes g\u00e9pek el\u0151tt v\u00e1rakoz\u00f3 feladatok \u00f6sszehangol\u00e1s\u00e1ra, \u00e9s vil\u00e1gosabban l\u00e1that\u00f3, hogyan hat egy k\u00e9s\u00e9s a sz\u00e1ll\u00edt\u00e1sokra.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mi a FIFO-s\u00e1v a gy\u00e1rt\u00e1sban?<\/h2>\n\n\n<p>A FIFO-s\u00e1v egy ell\u00e1t\u00f3 \u00e9s egy fogad\u00f3 folyamat k\u00f6z\u00f6tti, pontosan meghat\u00e1rozott, korl\u00e1tozott kapacit\u00e1s\u00fa \u00f6sszek\u00f6ttet\u00e9s. A FIFO jelent\u00e9se: els\u0151k\u00e9nt be, els\u0151k\u00e9nt ki. A t\u00e9telek az egyik v\u00e9g\u00e9n \u00e9rkeznek be, \u00e9s a m\u00e1sikon t\u00e1voznak, a be\u00e9rkez\u00e9s\u00fck sorrendj\u00e9ben. Amikor a s\u00e1v el\u00e9ri a meghat\u00e1rozott maxim\u00e1lis tel\u00edtetts\u00e9get, az ell\u00e1t\u00f3 folyamat nem gy\u00e1rt tov\u00e1bbi t\u00e9teleket ehhez az \u00f6sszek\u00f6ttet\u00e9shez, am\u00edg fel nem szabadul hely.<\/p>\n\n\n<p>A gyakorlatban ez lehet kijel\u00f6lt kocsi\u00e1ll\u00e1sok sora, g\u00f6rg\u0151s \u00e1tfut\u00f3 \u00e1llv\u00e1ny vagy megfelel\u0151 sz\u00e1ll\u00edt\u00f3p\u00e1lya. A haszn\u00e1lt eszk\u00f6zt\u0151l f\u00fcggetlen\u00fcl h\u00e1rom dolgot kell r\u00f6gz\u00edteni a m\u0171k\u00f6d\u00e9si szab\u00e1lyokban: az egy\u00e9rtelm\u0171 be- \u00e9s kil\u00e9p\u00e9si pontot, a maxim\u00e1lis mennyis\u00e9get, valamint azt, hogy a sorrendet alapesetben nem lehet felcser\u00e9lni.<\/p>\n\n\n<p>Ha egy korl\u00e1tlanul n\u00f6vekv\u0151 halomb\u00f3l mindig a legr\u00e9gebben be\u00e9rkezett t\u00e9telt v\u00e1lasztjuk, az FIFO-sorrendet jelent, de nem korl\u00e1tozza a befejezetlen termel\u00e9st. A korl\u00e1tozott kapacit\u00e1s\u00fa s\u00e1v ezt egy olyan utas\u00edt\u00e1ssal eg\u00e9sz\u00edti ki, amely \u00e9rv\u00e9nyt szerez a hat\u00e1rnak: <strong>a megtelt v\u00e1rakoz\u00e1si sorba ne gy\u00e1rtsunk tov\u00e1bbi t\u00e9teleket.<\/strong><\/p>\n\n\n<p>Itt a FIFO a t\u00e9telek fizikai mozg\u00e1s\u00e1t \u00edrja le a gy\u00e1rt\u00e1si szakaszok k\u00f6z\u00f6tt, nem k\u00e9szlet\u00e9rt\u00e9kel\u00e9si m\u00f3dszert jelent.<\/p>\n\n\n<h2 class=\"wp-block-heading\">A padl\u00f3jel\u00f6l\u00e9s el\u0151tt hat\u00e1rozza meg az \u00e1tad\u00e1s szab\u00e1lyait<\/h2>\n\n\n<p>El\u0151sz\u00f6r nevezze meg a k\u00e9t folyamatot, \u00e9s hat\u00e1rozza meg, milyen t\u00e9teleknek kell k\u00f6z\u00f6tt\u00fck \u00e1thaladniuk. A sorj\u00e1z\u00e1st\u00f3l az ellen\u0151rz\u00e9sig vezet\u0151 s\u00e1vot k\u00f6nnyebb kezelni, mint egy egyszer\u0171en \u201ek\u00e9sz alkatr\u00e9szek\u201d felirat\u00fa ter\u00fcletet, ahov\u00e1 k\u00fcl\u00f6nb\u00f6z\u0151 csapatok k\u00fcl\u00f6nb\u00f6z\u0151 helyekre sz\u00e1nt anyagokat tesznek le.<\/p>\n\n\n<p>\u00c1llapodjanak meg a beker\u00fcl\u00e9s felt\u00e9teleiben. A t\u00e9telen m\u00e1r el kell v\u00e9gezni az ell\u00e1t\u00f3 folyamat m\u0171velet\u00e9t, a t\u00e9telt egy\u00e9rtelm\u0171 azonos\u00edt\u00f3val kell ell\u00e1tni, \u00e9s meg kell felelnie a k\u00f6vetkez\u0151 folyamatnak t\u00f6rt\u00e9n\u0151 \u00e1tad\u00e1s k\u00f6vetelm\u00e9nyeinek. A hi\u00e1nyos alkatr\u00e9szk\u00e9szletnek vagy a m\u00e9g f\u00fcgg\u0151ben l\u00e9v\u0151 min\u0151s\u00e9g\u00fcgyi d\u00f6nt\u00e9sre v\u00e1r\u00f3 t\u00e9telnek egy\u00e9rtelm\u0171en megk\u00fcl\u00f6nb\u00f6ztethet\u0151nek kell lennie a feldolgoz\u00e1sra k\u00e9sz anyagt\u00f3l.<\/p>\n\n\n<p>Ezut\u00e1n hat\u00e1rozza meg, milyen egys\u00e9get k\u00edv\u00e1n szab\u00e1lyozni. Egy hely egy szabv\u00e1nyos \u00e1tad\u00e1si t\u00e9telt tartalmaz\u00f3 kocsit, egy raklapot vagy egyetlen nagy szerelv\u00e9nyt jelent? R\u00f6gz\u00edtse az egys\u00e9gen bel\u00fcli mennyis\u00e9gi korl\u00e1tot is. N\u00e9gy kocsi\u00e1ll\u00e1s nem jelent \u00e9rdemi darabsz\u00e1mkorl\u00e1tot, ha minden kocsira tetsz\u0151leges mennyis\u00e9g ker\u00fclhet.<\/p>\n\n\n<p>Tegye egy\u00e9rtelm\u0171v\u00e9 a halad\u00e1si ir\u00e1nyt mindk\u00e9t csapat sz\u00e1m\u00e1ra. Az \u00faj t\u00e9telek a m\u00e1r v\u00e1rakoz\u00f3k m\u00f6g\u00e9 ker\u00fclnek, a fogad\u00f3 folyamat pedig a kiv\u00e9teli v\u00e9gr\u0151l a legr\u00e9gebben be\u00e9rkezett, feldolgoz\u00e1sra alkalmas t\u00e9telt veszi el. A sorrendet az ebbe az \u00f6sszek\u00f6ttet\u00e9sbe val\u00f3 be\u00e9rkez\u00e9s hat\u00e1rozza meg, nem a vev\u0151i megrendel\u00e9s d\u00e1tuma vagy a k\u00eds\u00e9r\u0151lapon felt\u00fcntetett hat\u00e1rid\u0151.<\/p>\n\n\n<p>V\u00e9g\u00fcl jel\u00f6lje ki, ki felel a felt\u00f6lt\u00e9s\u00e9rt, az elv\u00e9tel\u00e9rt \u00e9s az elakadt \u00e1tad\u00e1s rendez\u00e9s\u00e9\u00e9rt. Minden m\u0171szaknak tudnia kell, ki enged\u00e9lyezhet kiv\u00e9telt, \u00e9s ki m\u00f3dos\u00edtja a gy\u00e1rt\u00e1si tervet. K\u00fcl\u00f6nben a megtelt s\u00e1v mindenki gondja lesz, de senki nem d\u00f6nt r\u00f3la.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00cdgy m\u0171k\u00f6dj\u00f6n a megtelt s\u00e1v szab\u00e1lya a gyakorlatban<\/h2>\n\n\n<p>K\u00e9pzelj\u00fcnk el egy sorj\u00e1z\u00e1si m\u0171veletet, ahonnan n\u00e9gy kijel\u00f6lt kocsi\u00e1ll\u00e1son kereszt\u00fcl jutnak el a t\u00e9telek az ellen\u0151rz\u00e9shez. Minden kocsi egy meghat\u00e1rozott \u00e1tad\u00e1si t\u00e9telt sz\u00e1ll\u00edt. Az ellen\u0151rz\u00e9s el\u00f6lr\u0151l veszi el a kocsikat, a sorj\u00e1z\u00e1s pedig h\u00e1tulra teszi az \u00faj t\u00e9teleket.<\/p>\n\n\n<p>Mind a n\u00e9gy hely foglalt. Ha ehhez az \u00f6sszek\u00f6ttet\u00e9shez egy \u00f6t\u00f6dik t\u00e9telt is elind\u00edtan\u00e1nak, annak nem lenne kijel\u00f6lt helye, m\u00e9g akkor sem, ha a sorj\u00e1z\u00f3g\u00e9p \u00e9ppen szabad. A g\u00e9pkezel\u0151 nem alak\u00edt ki egy nem hivatalos \u00f6t\u00f6dik helyet a s\u00e1v mellett. A csapat sz\u00fcnetelteti az ehhez az \u00e1tad\u00e1si ponthoz tartoz\u00f3 tov\u00e1bbi gy\u00e1rt\u00e1st, \u00e9s jelzi ennek ok\u00e1t a kijel\u00f6lt vezet\u0151nek.<\/p>\n\n\n<p>Amikor az ellen\u0151rz\u00e9s elveszi a legr\u00e9gebben be\u00e9rkezett kocsit, felszabadul egy hely. A meg\u00e1llapod\u00e1s szerinti ind\u00edt\u00e1si szab\u00e1ly alapj\u00e1n egyetlen p\u00f3tl\u00f3 t\u00e9tel ind\u00edthat\u00f3, felt\u00e9ve, hogy ezt a helyet m\u00e9g nem foglalt\u00e1k le egy m\u00e1sik, m\u00e1r \u00faton l\u00e9v\u0151 t\u00e9tel sz\u00e1m\u00e1ra.<\/p>\n\n\n<p>Ez az ut\u00f3bbi r\u00e9szlet l\u00e9nyeges: az \u00fcres hely nem felt\u00e9tlen\u00fcl szabad hely. Az ell\u00e1t\u00f3 m\u0171velet ind\u00edt\u00e1sa el\u0151tt sz\u00e1molni kell annak k\u00e9s\u0151bb elk\u00e9sz\u00fcl\u0151 mennyis\u00e9g\u00e9vel \u00e9s minden m\u00e1s, m\u00e1r a s\u00e1v fel\u00e9 tart\u00f3 t\u00e9tellel. K\u00fcl\u00f6nben k\u00e9t g\u00e9pkezel\u0151 is ugyanazt az \u00fcres helyet l\u00e1tja, mindketten elind\u00edtanak egy-egy t\u00e9telt, \u00e9s ism\u00e9t t\u00falt\u00f6lt\u00e9s alakul ki.<\/p>\n\n\n<p>M\u00e1r a pr\u00f3ba\u00fczem el\u0151tt hat\u00e1rozza meg, mennyi helyet kell fenntartani a m\u00e1r elind\u00edtott t\u00e9teleknek. Ne arra \u00e9p\u00edtsen, hogy az utols\u00f3 hely megtel\u00e9sekor majd f\u00e9lbeszak\u00edtanak egy m\u0171veletet, ha ez az adott ciklus k\u00f6zben nem biztons\u00e1gos vagy nem kivitelezhet\u0151. Ha egy m\u0171velet egyszerre t\u00f6bb \u00e1tad\u00e1si t\u00e9telt \u00e1ll\u00edt el\u0151, az ind\u00edt\u00e1sa el\u0151tt a teljes kimen\u0151 mennyis\u00e9ghez elegend\u0151, el\u0151re egyeztetett fogad\u00f3kapacit\u00e1snak kell rendelkez\u00e9sre \u00e1llnia.<\/p>\n\n\n<p>A megtelt s\u00e1v nem felt\u00e9tlen\u00fcl jelenti az \u00f6sszes gy\u00e1rt\u00e1si feladat le\u00e1ll\u00edt\u00e1s\u00e1t egy k\u00f6z\u00f6sen haszn\u00e1lt g\u00e9pen. A vezet\u0151 m\u00e1s enged\u00e9lyezett munk\u00e1t adhat ki, ha annak megvan a fogad\u00f3helye, vagy tervezett el\u0151k\u00e9sz\u00edt\u00e9sre haszn\u00e1lhatja ezt az id\u0151t. A c\u00e9l az, hogy ne n\u00f6velj\u00e9k tov\u00e1bb ezt a v\u00e1rakoz\u00e1si sort, nem pedig az, hogy a g\u00e9p kihaszn\u00e1lts\u00e1ga kedv\u00e9\u00e9rt m\u00e1shol rejtsenek el tov\u00e1bbi k\u00e9szletet.<\/p>\n\n\n<p>A le\u00e1ll\u00e1s egy probl\u00e9m\u00e1t is l\u00e1that\u00f3v\u00e1 tesz. Lehet, hogy az ellen\u0151rz\u00e9s kapacit\u00e1shi\u00e1nnyal k\u00fczd, ut\u00f3munk\u00e1val foglalkozik, vagy egy m\u00e1sik gy\u00e1rt\u00e1si \u00fatvonalat szolg\u00e1l ki. Ha a s\u00e1von fel\u00fcl felhalmoz\u00f3d\u00f3 anyagot m\u00e1shov\u00e1 viszik, azzal a jelz\u00e9st t\u00fcntetik el, nem az okot sz\u00fcntetik meg.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mekkora legyen a FIFO-s\u00e1v?<\/h2>\n\n\n<p>Olyan korl\u00e1tot v\u00e1lasszon, amely mellett az \u00e1tad\u00e1s a szok\u00e1sos ingadoz\u00e1sok ellen\u00e9re is m\u0171k\u00f6dik, de a s\u00e1v nem v\u00e1lik tart\u00f3s t\u00e1rol\u00f3helly\u00e9. A rendelkez\u00e9sre \u00e1ll\u00f3 alapter\u00fclet korl\u00e1t, nem pedig indok arra, hogy megt\u00f6lts\u00fck.<\/p>\n\n\n<p>A kezdeti d\u00f6nt\u00e9st a t\u00e9nyleges \u00fczemi k\u00f6r\u00fclm\u00e9nyekre alapozza:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>Milyen gyorsan dolgoz fel a fogad\u00f3 folyamat egy-egy \u00e1tad\u00e1si t\u00e9telt?<\/li><li>Mennyi id\u0151 alatt k\u00e9sz\u00fcl el \u00e9s \u00e9rkezik meg a p\u00f3tl\u00e1s, az \u00e1t\u00e1ll\u00e1sokat \u00e9s a sz\u00e1ll\u00edt\u00e1st is belesz\u00e1m\u00edtva?<\/li><li>Milyen fennakad\u00e1sokat kell \u00e9szszer\u0171en \u00e1thidalnia a k\u00e9t folyamat k\u00f6z\u00f6tti puffernek?<\/li><li>Mennyire v\u00e1ltoz\u00f3 a t\u00e9telek m\u00e9rete \u00e9s feldolgoz\u00e1si ideje?<\/li><li>Mennyi tov\u00e1bbi anyag \u00e9rkez\u00e9se elker\u00fclhetetlen a m\u00e1r elind\u00edtott gy\u00e1rt\u00e1sb\u00f3l, amikor az ell\u00e1t\u00f3 folyamat le\u00e1ll?<\/li><\/ul>\n\n\n<p>Egy kisebb puffer megakad\u00e1lyozhatja, hogy az ell\u00e1t\u00f3 folyamat r\u00f6vid kies\u00e9se miatt a k\u00f6vetkez\u0151 folyamat azonnal anyag n\u00e9lk\u00fcl maradjon. A korl\u00e1t n\u00f6vel\u00e9se azonban nem oldja meg a fogad\u00f3 folyamat tart\u00f3s kapacit\u00e1shi\u00e1ny\u00e1t. T\u00f6bbnyire csak nagyobb teret ad az emiatt felhalmoz\u00f3d\u00f3 t\u00e9teleknek.<\/p>\n\n\n<p>T\u00f6bbf\u00e9le term\u00e9k eset\u00e9n a foglalt helyek sz\u00e1ma mellett a feldolgoz\u00e1shoz sz\u00fcks\u00e9ges munkamennyis\u00e9get is vizsg\u00e1lja meg. Nem egyen\u00e9rt\u00e9k\u0171 egy hossz\u00fa ellen\u0151rz\u00e9st ig\u00e9nyl\u0151 kocsi \u00e9s egy olyan, amelynek tartalm\u00e1t gyorsan \u00e1t lehet vizsg\u00e1lni. A fizikai korl\u00e1tnak k\u00f6nnyen betarthat\u00f3nak kell maradnia, mik\u00f6zben a gy\u00e1rt\u00e1si \u00fctemterv sz\u00e1mol az elt\u00e9r\u0151 id\u0151ig\u00e9nyekkel.<\/p>\n\n\n<p>V\u00e9gezzen pr\u00f3ba\u00fczemet jellemz\u0151 m\u0171szakokkal \u00e9s term\u00e9k\u00f6sszet\u00e9tellel. Jegyezze fel, mikor telt meg a s\u00e1v, mikor nem volt feldolgoz\u00e1sra k\u00e9sz t\u00e9tele a k\u00f6vetkez\u0151 folyamatnak, mennyi ideig v\u00e1rt a legr\u00e9gebben be\u00e9rkezett t\u00e9tel, \u00e9s mi\u00e9rt k\u00e9rtek kiv\u00e9telt a dolgoz\u00f3k. A korl\u00e1t m\u00f3dos\u00edt\u00e1sa el\u0151tt keresse meg az okot. A megb\u00edzhatatlan ut\u00e1np\u00f3tl\u00e1s miatti ism\u00e9tl\u0151d\u0151 anyaghi\u00e1ny m\u00e1s beavatkoz\u00e1st ig\u00e9nyel, mint az a sor, amely a k\u00f6vetkez\u0151 folyamat t\u00falterhelts\u00e9ge miatt marad folyamatosan tele.<\/p>\n\n\n<p>Cs\u00f6kkentse a korl\u00e1tot, ahogy a fejleszt\u00e9sek ezt lehet\u0151v\u00e9 teszik, \u00e9s ellen\u0151rizze, hogy az \u00e1tad\u00e1s tov\u00e1bbra is m\u0171k\u00f6dik-e. Ne puszt\u00e1n az\u00e9rt hat\u00e1rozzon meg adott sz\u00e1m\u00fa helyet, mert egy m\u00e1sik gy\u00e1rban is annyit haszn\u00e1lnak. Az el\u0151\u00edrt sz\u00e1rad\u00e1si vagy kikem\u00e9nyed\u00e9si id\u0151 betart\u00e1s\u00e1t sem szabad a sorban \u00e1ll\u00e1s v\u00e9letlen id\u0151tartam\u00e1ra b\u00edzni: kifejezetten ellen\u0151rizni kell, hogy a t\u00e9tel k\u00e9szen \u00e1ll-e a k\u00f6vetkez\u0151 m\u0171veletre.<\/p>\n\n\n<h2 class=\"wp-block-heading\">D\u00f6ntse el el\u0151re, mi t\u00f6rt\u00e9njen, ha a legr\u00e9gebbi t\u00e9tel nem haladhat tov\u00e1bb<\/h2>\n\n\n<p>Az igazi pr\u00f3bat\u00e9tel nem egy szok\u00e1sos kocsi be\u00e9rkez\u00e9se. Hanem az, amikor a legr\u00e9gebben be\u00e9rkezett t\u00e9tel elakad, mik\u00f6zben egy \u00fajabb rendel\u00e9sre s\u00fcrg\u0151sen sz\u00fcks\u00e9g lenne.<\/p>\n\n\n<p>Ha a legr\u00e9gebben be\u00e9rkezett t\u00e9tellel min\u0151s\u00e9gi probl\u00e9ma van, jel\u00f6lje meg, \u00e9s kezelje a min\u0151s\u00e9g\u00fcgyi elj\u00e1r\u00e1s szerint. Ne vegye el sz\u00f3 n\u00e9lk\u00fcl a k\u00f6vetkez\u0151 kocsit \u00fagy, hogy a k\u00e9rd\u00e9ses anyag tov\u00e1bbra is norm\u00e1l gy\u00e1rt\u00e1si t\u00e9telnek l\u00e1tszik. Az illet\u00e9kes vezet\u0151nek \u00e9s a min\u0151s\u00e9g\u00fcgyi felel\u0151snek kell eld\u00f6ntenie, hogy sz\u00fcneteljen-e az \u00e1tad\u00e1s, vagy a t\u00e9tel ellen\u0151rz\u00f6tt z\u00e1rol\u00e1si ter\u00fcletre ker\u00fclj\u00f6n, illetve mi legyen a fennmarad\u00f3 t\u00e9telek sorrendj\u00e9vel.<\/p>\n\n\n<p>A z\u00e1rolt t\u00e9tel akkor is befejezetlen termel\u00e9s marad, ha m\u00e1r nem foglal helyet a s\u00e1vban. Maradjon l\u00e1that\u00f3 az \u00e9rintett termel\u00e9si nyilv\u00e1ntart\u00e1sokban, hogy a ter\u00fclet felszabad\u00edt\u00e1s\u00e1val ne t\u0171nj\u00f6n el a nyilv\u00e1ntart\u00e1sb\u00f3l a befejezetlen munka.<\/p>\n\n\n<p>A s\u00fcrg\u0151s rendel\u00e9sr\u0151l kifejezett priorit\u00e1si d\u00f6nt\u00e9st kell hozni; nem jelent \u00e1ltal\u00e1nos enged\u00e9lyt arra, hogy b\u00e1rki m\u00e1sik kocsit v\u00e1lasszon. A tervez\u0151nek \u00e1t kell tekintenie az \u00e9rintett v\u00e1llal\u00e1sokat, enged\u00e9lyeznie kell a FIFO-t\u00f3l val\u00f3 sz\u00fcks\u00e9ges elt\u00e9r\u00e9st, \u00e9s mindk\u00e9t csapat sz\u00e1m\u00e1ra egy\u00e9rtelm\u0171v\u00e9 kell tennie a m\u00f3dos\u00edtott sorrendet. R\u00f6gz\u00edts\u00e9k az okot, majd t\u00e9rjenek vissza a meg\u00e1llapod\u00e1s szerinti szab\u00e1lyhoz.<\/p>\n\n\n<p>Ha \u00e1lland\u00f3sulnak a kiv\u00e9telek, gondolja \u00fajra a kialak\u00edt\u00e1st. Azokhoz a t\u00e9telekhez, amelyek rendszeresen elt\u00e9r\u0151 k\u00f6vetkez\u0151 m\u0171veletet vagy speci\u00e1lis er\u0151forr\u00e1st ig\u00e9nyelnek, k\u00fcl\u00f6n, egy\u00e9rtelm\u0171en meghat\u00e1rozott \u00f6sszek\u00f6ttet\u00e9sekre lehet sz\u00fcks\u00e9g egyetlen olyan s\u00e1v helyett, amelyet mindenkinek meg kell ker\u00fclnie. Az \u00e1tad\u00e1s kialak\u00edt\u00e1sakor azt is figyelembe kell venni, ha a fogad\u00f3 folyamatn\u00e1l k\u00f6z\u00f6s feldolgoz\u00e1si t\u00e9telbe kell csoportos\u00edtani az anyagokat. Att\u00f3l, hogy FIFO-nak nevez\u00fcnk egy ter\u00fcletet, ahol a be\u00e9rkez\u00e9si sorrendt\u0151l f\u00fcggetlen\u00fcl v\u00e1lasztj\u00e1k ki a k\u00f6vetkez\u0151 t\u00e9telt, m\u00e9g nem v\u00e1lik azz\u00e1.<\/p>\n\n\n<p>A c\u00e9l egy val\u00f3ban haszn\u00e1lhat\u00f3 szab\u00e1ly, amelyn\u00e9l a kiv\u00e9teleknek is van felel\u0151se \u2013 nem pedig az, hogy egy szab\u00e1lyozatlan v\u00e1rakoz\u00e1si sort puszt\u00e1n merev szab\u00e1lyokkal c\u00edmk\u00e9zz\u00fcnk fel.<\/p>\n\n\n<h2 class=\"wp-block-heading\">A FIFO-s\u00e1v, a Kanban \u00e9s a CONWIP m\u00e1s-m\u00e1s szab\u00e1lyoz\u00e1si feladatot l\u00e1t el<\/h2>\n\n\n<p>Ezek a m\u00f3dszerek egym\u00e1s mellett is alkalmazhat\u00f3k, de az \u00e1ltaluk adott enged\u00e9lyek m\u00e1s-m\u00e1s k\u00f6rre vonatkoznak.<\/p>\n\n\n<p>A FIFO-s\u00e1v k\u00e9t adott folyamat k\u00f6z\u00f6tt szab\u00e1lyozza a sorrendet \u00e9s a v\u00e1rakoz\u00f3 mennyis\u00e9g fels\u0151 hat\u00e1r\u00e1t. Amikor egy t\u00e9telt kivesznek, hely szabadul fel az ut\u00e1np\u00f3tl\u00e1snak, az adott folyamatkapcsolat szab\u00e1lyai szerint.<\/p>\n\n\n<p>A <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/kanban-a-gyartasban\/\">Kanban-alap\u00fa ut\u00e1np\u00f3tl\u00e1si rendszer<\/a> jellemz\u0151en egy meghat\u00e1rozott cikk adott mennyis\u00e9g\u00e9nek p\u00f3tl\u00e1s\u00e1t enged\u00e9lyezi a felhaszn\u00e1l\u00e1s ut\u00e1n. A rendszeresen felhaszn\u00e1lt alkatr\u00e9szeket t\u00e1rol\u00f3 szupermarket m\u00e1s ig\u00e9nyt szolg\u00e1l ki, mint az a s\u00e1v, amely k\u00fcl\u00f6nb\u00f6z\u0151 gy\u00e1rt\u00e1si feladatok t\u00e9teleit \u00e9rkez\u00e9si sorrendben tov\u00e1bb\u00edtja.<\/p>\n\n\n<p>A <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/conwip\/\">CONWIP<\/a> egy meghat\u00e1rozott termel\u00e9si k\u00f6rbe ind\u00edthat\u00f3 munka mennyis\u00e9g\u00e9t korl\u00e1tozza. \u00daj munka ind\u00edt\u00e1s\u00e1ra akkor szabadul fel enged\u00e9ly, amikor egy t\u00e9tel elhagyja ezt a k\u00f6rt \u2013 nem puszt\u00e1n att\u00f3l, hogy egy kocsi a helyi s\u00e1vb\u00f3l a k\u00f6vetkez\u0151 m\u0171velethez ker\u00fcl.<\/p>\n\n\n<p>Tudatosan hat\u00e1rozza meg, mire terjed ki a szab\u00e1lyoz\u00e1s. Egy j\u00f3l m\u0171k\u00f6dtetett FIFO-s\u00e1v megakad\u00e1lyozhatja a t\u00faltermel\u00e9st az egyik \u00e1tad\u00e1si pontn\u00e1l, mik\u00f6zben a gy\u00e1rt\u00e1si \u00fatvonal m\u00e1s r\u00e9sz\u00e9n t\u00fal sok munka halmoz\u00f3dik fel. A helyi rend \u00e9s az eg\u00e9sz \u00fczem kapacit\u00e1saihoz igazod\u00f3 terhel\u00e9s \u00f6sszef\u00fcgg, de nem ugyanazzal a d\u00f6nt\u00e9ssel szab\u00e1lyozhat\u00f3.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hangolja \u00f6ssze a s\u00e1vhoz kapcsol\u00f3d\u00f3 munk\u00e1t a SkyPlanner seg\u00edts\u00e9g\u00e9vel<\/h2>\n\n\n<p>Ha a s\u00e1v m\u0171k\u00f6d\u00e9si szab\u00e1lyai m\u00e1r egy\u00e9rtelm\u0171ek, a k\u00f6vetkez\u0151 k\u00e9rd\u00e9s az, hogy a kapcsol\u00f3d\u00f3 munk\u00e1k elv\u00e9gezhet\u0151k-e a rendelkez\u00e9sre \u00e1ll\u00f3 er\u0151forr\u00e1sokkal. Egy k\u00f6z\u00f6sen haszn\u00e1lt ellen\u0151rz\u0151 \u00e1llom\u00e1s egy m\u00e1sik term\u00e9kcsal\u00e1dot is kiszolg\u00e1lhat. A sorj\u00e1z\u00f3g\u00e9p t\u00f6bb gy\u00e1rt\u00e1si \u00fatvonalra is tov\u00e1bb\u00edthat t\u00e9teleket. A vev\u0151i megrendel\u00e9sekn\u00e9l pedig tov\u00e1bbra is el kell v\u00e9gezni a k\u00e9s\u0151bbi m\u0171veleteket, \u00e9s be kell tartani a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket.<\/p>\n\n\n<p>A SkyPlanner APS ezeket az \u00f6sszef\u00fcgg\u00e9seket egyetlen <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/mi-a-termelesutemezes\/\">v\u00e9ges kapacit\u00e1s\u00fa gy\u00e1rt\u00e1si \u00fctemtervben<\/a> kezeli. Az \u00fctemez\u00e9st v\u00e9gz\u0151 mesters\u00e9ges intelligencia, az Arcturus a munka\u00e1llom\u00e1sok kapacit\u00e1sa, a m\u0171szakok, az adott feladatra alkalmas er\u0151forr\u00e1sok \u00e9s a m\u0171veletek k\u00f6z\u00f6tti f\u00fcgg\u0151s\u00e9gek alapj\u00e1n helyezi el a m\u0171veleteket. Ha az anyagell\u00e1t\u00e1st figyelembe vev\u0151 \u00fctemez\u00e9s be van kapcsolva, az anyagok rendelkez\u00e9sre \u00e1ll\u00e1sa is befoly\u00e1solja, mikorra \u00fctemezhet\u0151 a munka. A Gantt-diagram munka\u00e1llom\u00e1sonk\u00e9nt mutatja az \u00edgy elk\u00e9sz\u00fclt tervet.<\/p>\n\n\n<p>Nem kell minden g\u00e9p feladatsor\u00e1t k\u00fcl\u00f6n \u00fajra \u00f6ssze\u00e1ll\u00edtania: \u00d6n meghat\u00e1rozza a priorit\u00e1sokat, \u00e9s naprak\u00e9szen tartja a gy\u00e1rt\u00e1si alapadatokat, az Arcturus pedig elv\u00e9gzi az \u00fctemez\u00e9si sz\u00e1m\u00edt\u00e1sokat. Szab\u00e1lyokkal \u00e9s z\u00e1rol\u00e1sokkal meg\u0151rizheti a tervez\u00e9si d\u00f6nt\u00e9seit, mik\u00f6zben a rendszer a t\u00f6bbi munka \u00fctemez\u00e9s\u00e9t \u00fajrasz\u00e1m\u00edtja.<\/p>\n\n\n<p>Tartsa \u00f6sszhangban ezt a sz\u00e1m\u00edt\u00e1st a fizikai anyag\u00e1tad\u00e1ssal. <strong>A mesters\u00e9ges intelligencia \u00e1ltal meghat\u00e1rozott feladatsorrend nem egyezik meg automatikusan a FIFO-s\u00e1vba \u00e9rkez\u00e9s sorrendj\u00e9vel.<\/strong> \u00c1llapodjanak meg arr\u00f3l, hogyan jelen\u00edtik meg \u00e9s v\u00e9dik a tervben a m\u00e1r lek\u00f6t\u00f6tt munk\u00e1kat. A hat\u00e1rid\u0151k szerinti priorit\u00e1s m\u00f3dos\u00edt\u00e1sa nem v\u00e1lhat indokl\u00e1s n\u00e9lk\u00fcli utas\u00edt\u00e1ss\u00e1 arra, hogy valaki a fizikai v\u00e1rakoz\u00e1si sor k\u00f6zep\u00e9r\u0151l vegyen ki egy t\u00e9telt.<\/p>\n\n\n<p>Ha az ellen\u0151rz\u00e9sre rendelkez\u00e9sre \u00e1ll\u00f3 m\u0171szakid\u0151 cs\u00f6kken, r\u00f6gz\u00edtse a kapacit\u00e1sv\u00e1ltoz\u00e1st, \u00e9s sz\u00e1m\u00edtsa \u00fajra a kapcsol\u00f3d\u00f3 munk\u00e1k \u00fctemez\u00e9s\u00e9t. \u00cdgy egy\u00fctt tekintheti \u00e1t az \u00e9rintett m\u0171veleteket \u00e9s sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket, ahelyett, hogy a s\u00e1v pillanatnyi probl\u00e9m\u00e1j\u00e1t egy m\u00e1sik vev\u0151i megrendel\u00e9s h\u00e1tt\u00e9rbe szor\u00edt\u00e1s\u00e1val oldan\u00e1 meg. Azt, hogy fizikailag mi ker\u00fclhet a s\u00e1vba, tov\u00e1bbra is a s\u00e1v ind\u00edt\u00e1si szab\u00e1lya hat\u00e1rozza meg.<\/p>\n\n\n<p>Ez\u00e9rt \u00e9rdemes a FIFO-s\u00e1v mellett a SkyPlanner szoftvert is haszn\u00e1lni: az egy\u00e9rtelm\u0171 helyi anyag\u00e1tad\u00e1st az eg\u00e9sz \u00fczemet \u00f6sszehangol\u00f3 terv t\u00e1mogatja. Kevesebb k\u00e9zi \u00fctemez\u00e9si munk\u00e1ra van sz\u00fcks\u00e9g, a priorit\u00e1sokr\u00f3l, a kapacit\u00e1sr\u00f3l \u00e9s a vev\u0151knek tett v\u00e1llal\u00e1sokr\u00f3l pedig megalapozottabban d\u00f6nthet. A SkyPlanner ny\u00edlt REST API fel\u00fclet\u00e9n kereszt\u00fcl b\u00e1rmely ERP- vagy MES-rendszerrel integr\u00e1lhat\u00f3, \u00edgy a jobb \u00fctemez\u00e9shez nem kell lecser\u00e9lnie a megrendel\u00e9seit m\u00e1r nyilv\u00e1ntart\u00f3 rendszert.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mit mutatnak a Mamec tapasztalatai az \u00f6sszekapcsolt feladatsorokr\u00f3l?<\/h2>\n\n\n<p>A kever\u00e9stechnikai berendez\u00e9seket \u00e9s b\u00e9rgy\u00e1rt\u00e1sban cs\u00facstechnol\u00f3gi\u00e1s term\u00e9keket el\u0151\u00e1ll\u00edt\u00f3 finn Mamec kor\u00e1bban a pap\u00edralap\u00fa munkalapokon szerepl\u0151 sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k alapj\u00e1n hat\u00e1rozta meg az \u00fczemi munk\u00e1k priorit\u00e1s\u00e1t. A t\u00f6bb ezer gy\u00e1rt\u00e1si feladat k\u00f6z\u00f6tti f\u00fcgg\u0151s\u00e9geket t\u00fal neh\u00e9z volt k\u00e9zzel kezelni, \u00e9s a vezet\u00e9snek nem volt megb\u00edzhat\u00f3 \u00e1tfog\u00f3 k\u00e9pe a terhel\u00e9sr\u0151l.<\/p>\n\n\n<p>Az Oscar ERP rendszerrel integr\u00e1lt SkyPlannerben ma m\u00e1r a v\u00e9ges kapacit\u00e1s\u00fa \u00fctemez\u00e9s adja a tervez\u00e9s alapj\u00e1t. A Mamec egy-egy h\u00e9tre r\u00f6gz\u00edti a feladatsorokat, \u00edgy a g\u00e9pkezel\u0151k egy\u00e9rtelm\u0171en l\u00e1tj\u00e1k a k\u00f6vetkez\u0151 munk\u00e1kat. Besz\u00e1mol\u00f3juk szerint cs\u00f6kkent a tervez\u00e9ssel j\u00e1r\u00f3 munkateher, javult a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k betart\u00e1sa, \u00e9s kevesebb forg\u00f3t\u0151k\u00e9t k\u00f6t le sz\u00fcks\u00e9gtelen\u00fcl a befejezetlen termel\u00e9s, mert a gy\u00e1rt\u00e1si feladatok a megfelel\u0151 id\u0151ben indulnak.<\/p>\n\n\n<p>Egy t\u00f6bb gy\u00e1rt\u00e1si \u00fatvonalat kezel\u0151 \u00fczemben ezzel a k\u00f6z\u00f6s \u00e1ttekint\u00e9ssel a k\u00f6vetkez\u0151 feladat kiv\u00e1laszt\u00e1sa m\u00e1r nem csup\u00e1n helyi d\u00f6nt\u00e9s: a feladatnak az \u00e1tfog\u00f3 gy\u00e1rt\u00e1si tervben is egy\u00e9rtelm\u0171 helye van.<\/p>\n\n\n<p>A teljes t\u00f6rt\u00e9net\u00e9rt olvassa el a <a href=\"https:\/\/skyplanner.ai\/hu\/ugyfeltortenetek\/mamec\/\">Mamec besz\u00e1mol\u00f3j\u00e1t a SkyPlanner haszn\u00e1lat\u00e1r\u00f3l<\/a>.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Szab\u00e1lyozza a v\u00e1rakoz\u00e1si sort, \u00e9s tervezze \u00f6sszehangoltan az \u00fczem m\u0171k\u00f6d\u00e9s\u00e9t<\/h2>\n\n\n<p>Kezdje egy probl\u00e9m\u00e1s \u00e1tad\u00e1si ponttal. Hat\u00e1rozza meg, milyen t\u00e9telek ker\u00fclhetnek a s\u00e1vba, mekkora az \u00e1tad\u00e1si egys\u00e9g, hol t\u00f6rt\u00e9nik a bet\u00e1rol\u00e1s \u00e9s a kiv\u00e9tel, mennyi a megengedett legnagyobb mennyis\u00e9g, \u00e9s ki a felel\u0151s, ha meg\u00e1ll az anyag\u00e1raml\u00e1s. A szab\u00e1lyt akkor is tesztelje, amikor a s\u00e1v megtelik, ne csak akkor, amikor minden akad\u00e1lytalanul halad.<\/p>\n\n\n<p>Ezut\u00e1n tekintsen a kijel\u00f6lt helyeken t\u00falra is. Az \u00e1tad\u00f3 \u00e9s az \u00e1tvev\u0151 m\u0171velet k\u00e9pes teljes\u00edteni a v\u00e1llal\u00e1sait az ugyanazokat az er\u0151forr\u00e1sokat ig\u00e9nyl\u0151 \u00f6sszes t\u00f6bbi munka mellett? A SkyPlanner megalapozottabb\u00e1 teszi ezt a d\u00f6nt\u00e9st, mint a k\u00fcl\u00f6n-k\u00fcl\u00f6n, k\u00e9zzel karbantartott feladatsorok.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/hu\/kapcsolat-ertekesites\/\">Foglaljon SkyPlanner-bemutat\u00f3t<\/a>, \u00e9s hozza mag\u00e1val az aktu\u00e1lis v\u00e1rakoz\u00e1si sort, egy tipikus megrendel\u00e9s gy\u00e1rt\u00e1si \u00fatvonal\u00e1t, valamint az \u00e1tad\u00e1si pont mindk\u00e9t oldal\u00e1n ugyanazok\u00e9rt az er\u0151forr\u00e1sok\u00e9rt verseng\u0151 munk\u00e1k adatait. Ezek alapj\u00e1n megvizsg\u00e1lhatj\u00e1k, hogyan seg\u00edtene csapat\u00e1nak egy \u00f6sszehangolt, v\u00e9ges kapacit\u00e1s\u00fa \u00fctemterv a terhel\u00e9s k\u00e9zben tart\u00e1s\u00e1ban \u00e9s a k\u00e9s\u00e9sek kezel\u00e9s\u00e9ben. Ha el\u0151bb \u00f6n\u00e1ll\u00f3an ismerkedne a rendszerrel, <a href=\"https:\/\/skyplanner.ai\/hu\/proba\/\">pr\u00f3b\u00e1lja ki a SkyPlanner szoftvert bemutat\u00f3adatokkal<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>FIFO-s\u00e1vok a gy\u00e1rt\u00e1sban: tartsa k\u00e9zben a v\u00e1rakoz\u00f3 t\u00e9teleket Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; FIFO-s\u00e1vok a gy\u00e1rt\u00e1sban: tartsa k\u00e9zben a v\u00e1rakoz\u00f3 t\u00e9teleket A legr\u00e9gebben be\u00e9rkezett kocsi m\u00e9g mindig v\u00e1rakozik, amikor \u00fajabb s\u00fcrg\u0151s gy\u00e1rt\u00e1si feladat \u00e9rkezik. Valaki a kijel\u00f6lt ter\u00fclet mell\u00e9 \u00e1ll\u00edtja az \u00faj t\u00e9telt, a k\u00f6vetkez\u0151 folyamat pedig azt veszi el\u0151re, amelyik \u00e9ppen a legs\u00fcrg\u0151sebbnek t\u0171nik. A &#8230; <a title=\"FIFO-s\u00e1vok a gy\u00e1rt\u00e1sban: tartsa k\u00e9zben a v\u00e1rakoz\u00f3 t\u00e9teleket\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/fifo-sav\/\" aria-label=\"Read more about FIFO-s\u00e1vok a gy\u00e1rt\u00e1sban: tartsa k\u00e9zben a v\u00e1rakoz\u00f3 t\u00e9teleket\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":110883,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2526,312],"tags":[],"class_list":["post-110865","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-es-utemezes","category-forrasok","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>FIFO-s\u00e1vok a gy\u00e1rt\u00e1sban: tartsa k\u00e9zben a v\u00e1rakoz\u00f3 t\u00e9teleket<\/title>\n<meta name=\"description\" content=\"Ne legyen rakt\u00e1r a v\u00e1rakoz\u00e1si sorb\u00f3l. Szabjon FIFO-s\u00e1vkorl\u00e1tokat, jel\u00f6lj\u00f6n ki felel\u0151s\u00f6ket, \u00e9s hangolja \u00f6ssze a kapcsol\u00f3d\u00f3 gy\u00e1rt\u00e1st a SkyPlanner seg\u00edts\u00e9g\u00e9vel.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/fifo-sav\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"FIFO-s\u00e1vok a gy\u00e1rt\u00e1sban: tartsa k\u00e9zben a v\u00e1rakoz\u00f3 t\u00e9teleket\" \/>\n<meta property=\"og:description\" content=\"Ne legyen rakt\u00e1r a v\u00e1rakoz\u00e1si sorb\u00f3l. Szabjon FIFO-s\u00e1vkorl\u00e1tokat, jel\u00f6lj\u00f6n ki felel\u0151s\u00f6ket, \u00e9s hangolja \u00f6ssze a kapcsol\u00f3d\u00f3 gy\u00e1rt\u00e1st a SkyPlanner seg\u00edts\u00e9g\u00e9vel.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/forrasok\/fifo-sav\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-26T11:01:16+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-26T11:02:18+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/fifo-lanes-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"2073\" \/>\n\t<meta property=\"og:image:height\" content=\"758\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Szerz\u0151:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data2\" content=\"19 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/fifo-sav\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/fifo-sav\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"FIFO-s\u00e1vok a gy\u00e1rt\u00e1sban: tartsa k\u00e9zben a v\u00e1rakoz\u00f3 t\u00e9teleket\",\"datePublished\":\"2026-10-26T11:01:16+00:00\",\"dateModified\":\"2026-10-26T11:02:18+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/fifo-sav\\\/\"},\"wordCount\":3778,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/fifo-sav\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/fifo-lanes-manufacturing-hero.png\",\"articleSection\":[\"APS \u00e9s \u00fctemez\u00e9s\",\"forr\u00e1sok\"],\"inLanguage\":\"hu-HU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/fifo-sav\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/fifo-sav\\\/\",\"name\":\"FIFO-s\u00e1vok a gy\u00e1rt\u00e1sban: tartsa k\u00e9zben a v\u00e1rakoz\u00f3 t\u00e9teleket\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/fifo-sav\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/fifo-sav\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/fifo-lanes-manufacturing-hero.png\",\"datePublished\":\"2026-10-26T11:01:16+00:00\",\"dateModified\":\"2026-10-26T11:02:18+00:00\",\"description\":\"Ne legyen rakt\u00e1r a v\u00e1rakoz\u00e1si sorb\u00f3l. Szabjon FIFO-s\u00e1vkorl\u00e1tokat, jel\u00f6lj\u00f6n ki felel\u0151s\u00f6ket, \u00e9s hangolja \u00f6ssze a kapcsol\u00f3d\u00f3 gy\u00e1rt\u00e1st a SkyPlanner seg\u00edts\u00e9g\u00e9vel.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/fifo-sav\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/fifo-sav\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/fifo-sav\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/fifo-lanes-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/fifo-lanes-manufacturing-hero.png\",\"width\":2073,\"height\":758,\"caption\":\"Four trolleys fill a marked FIFO lane between two workbenches, with an arrow showing the direction of flow.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/fifo-sav\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"FIFO-s\u00e1vok a gy\u00e1rt\u00e1sban: tartsa k\u00e9zben a v\u00e1rakoz\u00f3 t\u00e9teleket\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"FIFO-s\u00e1vok a gy\u00e1rt\u00e1sban: tartsa k\u00e9zben a v\u00e1rakoz\u00f3 t\u00e9teleket","description":"Ne legyen rakt\u00e1r a v\u00e1rakoz\u00e1si sorb\u00f3l. Szabjon FIFO-s\u00e1vkorl\u00e1tokat, jel\u00f6lj\u00f6n ki felel\u0151s\u00f6ket, \u00e9s hangolja \u00f6ssze a kapcsol\u00f3d\u00f3 gy\u00e1rt\u00e1st a SkyPlanner seg\u00edts\u00e9g\u00e9vel.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/forrasok\/fifo-sav\/","og_locale":"hu_HU","og_type":"article","og_title":"FIFO-s\u00e1vok a gy\u00e1rt\u00e1sban: tartsa k\u00e9zben a v\u00e1rakoz\u00f3 t\u00e9teleket","og_description":"Ne legyen rakt\u00e1r a v\u00e1rakoz\u00e1si sorb\u00f3l. Szabjon FIFO-s\u00e1vkorl\u00e1tokat, jel\u00f6lj\u00f6n ki felel\u0151s\u00f6ket, \u00e9s hangolja \u00f6ssze a kapcsol\u00f3d\u00f3 gy\u00e1rt\u00e1st a SkyPlanner seg\u00edts\u00e9g\u00e9vel.","og_url":"https:\/\/skyplanner.ai\/hu\/forrasok\/fifo-sav\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-26T11:01:16+00:00","article_modified_time":"2026-10-26T11:02:18+00:00","og_image":[{"width":2073,"height":758,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/fifo-lanes-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Szerz\u0151:":"Jussi M\u00e4ntyl\u00e4","Becs\u00fclt olvas\u00e1si id\u0151":"19 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/fifo-sav\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/fifo-sav\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"FIFO-s\u00e1vok a gy\u00e1rt\u00e1sban: tartsa k\u00e9zben a v\u00e1rakoz\u00f3 t\u00e9teleket","datePublished":"2026-10-26T11:01:16+00:00","dateModified":"2026-10-26T11:02:18+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/fifo-sav\/"},"wordCount":3778,"publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/fifo-sav\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/fifo-lanes-manufacturing-hero.png","articleSection":["APS \u00e9s \u00fctemez\u00e9s","forr\u00e1sok"],"inLanguage":"hu-HU"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/fifo-sav\/","url":"https:\/\/skyplanner.ai\/hu\/forrasok\/fifo-sav\/","name":"FIFO-s\u00e1vok a gy\u00e1rt\u00e1sban: tartsa k\u00e9zben a v\u00e1rakoz\u00f3 t\u00e9teleket","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/fifo-sav\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/fifo-sav\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/fifo-lanes-manufacturing-hero.png","datePublished":"2026-10-26T11:01:16+00:00","dateModified":"2026-10-26T11:02:18+00:00","description":"Ne legyen rakt\u00e1r a v\u00e1rakoz\u00e1si sorb\u00f3l. Szabjon FIFO-s\u00e1vkorl\u00e1tokat, jel\u00f6lj\u00f6n ki felel\u0151s\u00f6ket, \u00e9s hangolja \u00f6ssze a kapcsol\u00f3d\u00f3 gy\u00e1rt\u00e1st a SkyPlanner seg\u00edts\u00e9g\u00e9vel.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/fifo-sav\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/forrasok\/fifo-sav\/"]}]},{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/fifo-sav\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/fifo-lanes-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/fifo-lanes-manufacturing-hero.png","width":2073,"height":758,"caption":"Four trolleys fill a marked FIFO lane between two workbenches, with an arrow showing the direction of flow."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/fifo-sav\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"FIFO-s\u00e1vok a gy\u00e1rt\u00e1sban: tartsa k\u00e9zben a v\u00e1rakoz\u00f3 t\u00e9teleket"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/fifo-lanes-manufacturing-hero.png",2073,758,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/fifo-lanes-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/fifo-lanes-manufacturing-hero-300x110.png",300,110,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/fifo-lanes-manufacturing-hero-768x281.png",768,281,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/fifo-lanes-manufacturing-hero-1024x374.png",1024,374,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/fifo-lanes-manufacturing-hero-1536x562.png",1536,562,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/fifo-lanes-manufacturing-hero-2048x749.png",2048,749,true],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/fifo-lanes-manufacturing-hero-360x132.png",360,132,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"FIFO-s\u00e1vok a gy\u00e1rt\u00e1sban: tartsa k\u00e9zben a v\u00e1rakoz\u00f3 t\u00e9teleket Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; FIFO-s\u00e1vok a gy\u00e1rt\u00e1sban: tartsa k\u00e9zben a v\u00e1rakoz\u00f3 t\u00e9teleket A legr\u00e9gebben be\u00e9rkezett kocsi m\u00e9g mindig v\u00e1rakozik, amikor \u00fajabb s\u00fcrg\u0151s gy\u00e1rt\u00e1si feladat \u00e9rkezik. Valaki a kijel\u00f6lt ter\u00fclet mell\u00e9 \u00e1ll\u00edtja az \u00faj t\u00e9telt, a k\u00f6vetkez\u0151 folyamat pedig azt veszi el\u0151re, amelyik \u00e9ppen a legs\u00fcrg\u0151sebbnek t\u0171nik. A&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/110865","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=110865"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/110865\/revisions"}],"predecessor-version":[{"id":110928,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/110865\/revisions\/110928"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media\/110883"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=110865"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/categories?post=110865"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/tags?post=110865"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}