{"id":110773,"date":"2026-10-26T08:47:49","date_gmt":"2026-10-26T08:47:49","guid":{"rendered":"https:\/\/skyplanner.ai\/?p=110773"},"modified":"2026-10-26T08:48:50","modified_gmt":"2026-10-26T08:48:50","slug":"multimoment-felvetel","status":"publish","type":"post","link":"https:\/\/skyplanner.ai\/hu\/forrasok\/multimoment-felvetel\/","title":{"rendered":"Multimoment felv\u00e9tel a gy\u00e1rt\u00e1sban: a rejtett fennakad\u00e1sok felt\u00e1r\u00e1sa"},"content":{"rendered":"<div class=\"gb-container gb-container-article01 article-main-content-container\">\n\n<h1 class=\"wp-block-heading\">Multimoment felv\u00e9tel a gy\u00e1rt\u00e1sban: a rejtett fennakad\u00e1sok felt\u00e1r\u00e1sa<\/h1>\n\n<div class=\"gb-container gb-container-article02\">\n\n<p><a href=\"\/hu\/\">Kezd\u0151lap<\/a> &raquo; <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/\">Er\u0151forr\u00e1sok<\/a> &raquo; Multimoment felv\u00e9tel a gy\u00e1rt\u00e1sban: a rejtett fennakad\u00e1sok felt\u00e1r\u00e1sa<\/p>\n\n\n<p class=\"yoast-reading-time__wrapper\"><span class=\"yoast-reading-time__icon\"><svg aria-hidden=\"true\" focusable=\"false\" data-icon=\"clock\" width=\"20\" height=\"20\" fill=\"none\" stroke=\"currentColor\" style=\"display:inline-block;vertical-align:-0.1em\" role=\"img\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 24 24\"><path stroke-linecap=\"round\" stroke-linejoin=\"round\" stroke-width=\"2\" d=\"M12 8v4l3 3m6-3a9 9 0 11-18 0 9 9 0 0118 0z\"><\/path><\/svg><\/span><span class=\"yoast-reading-time__spacer\" style=\"display:inline-block;width:1em\"><\/span><span class=\"yoast-reading-time__descriptive-text\">Becs\u00fclt olvas\u00e1si id\u0151: <\/span><span class=\"yoast-reading-time__reading-time\">12<\/span><span class=\"yoast-reading-time__time-unit\"> perc<\/span><\/p>\n\n<\/div>\n<div class=\"gb-container gb-container-article03\">\n\n<p>Egy \u00fczemi bej\u00e1r\u00e1son ugyanaz a m\u0171szak az egyik pillanatban leterheltnek, a m\u00e1sikban kihaszn\u00e1latlannak t\u0171nhet. Egyik l\u00e1togat\u00e1sb\u00f3l sem der\u00fcl ki, mennyi id\u0151 jut az alkatr\u00e9szek gy\u00e1rt\u00e1s\u00e1ra, a munka el\u0151k\u00e9sz\u00edt\u00e9s\u00e9re vagy arra, hogy meg\u00e9rkezzen valami, amire sz\u00fcks\u00e9g van.<\/p>\n\n\n<p>A multimoment felv\u00e9tel ezeket a benyom\u00e1sokat tervszer\u0171en v\u00e9gzett, v\u00e9letlenszer\u0171 megfigyel\u00e9sekkel v\u00e1ltja fel. Seg\u00edt felt\u00e1rni, milyen k\u00f6r\u00fclm\u00e9nyek szak\u00edtj\u00e1k meg a termel\u00e9st, \u00e9s kiv\u00e1lasztani egy olyan fejleszt\u00e9st, amelyet \u00e9rdemes kipr\u00f3b\u00e1lni. A hasznos eredm\u00e9ny nem az, hogy pontozzuk, ki mennyire t\u0171nik elfoglaltnak, hanem az, hogy vil\u00e1gosabban l\u00e1tjuk, mi akad\u00e1lyozza a munka halad\u00e1s\u00e1t.<\/p>\n\n\n<p>Miut\u00e1n ellen\u0151rizte, hogy a fejleszt\u00e9s t\u00e9nylegesen mit v\u00e1ltoztat meg, a SkyPlanner APS a jav\u00edtott m\u0171veleti id\u0151k \u00e9s az er\u0151forr\u00e1sok rendelkez\u00e9sre \u00e1ll\u00e1sa alapj\u00e1n \u00f6sszehangolt gy\u00e1rt\u00e1si \u00fctemtervet k\u00e9sz\u00edt. \u00cdgy kevesebb id\u0151t kell az egyes g\u00e9pek feladatsor\u00e1nak \u00fajratervez\u00e9s\u00e9re ford\u00edtania, \u00e9s l\u00e1thatja, hogyan hat a v\u00e1ltoz\u00e1s a teljes\u00edtend\u0151 rendel\u00e9sekre.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Mi a multimoment felv\u00e9tel?<\/h2>\n\n\n<p>A multimoment felv\u00e9tel olyan statisztikai m\u00f3dszer, amely v\u00e9letlenszer\u0171en kiv\u00e1lasztott pillanatokban figyeli meg az embereket vagy g\u00e9peket, \u00e9s ebb\u0151l becs\u00fcli meg a meghat\u00e1rozott tev\u00e9kenys\u00e9gekre ford\u00edtott id\u0151 ar\u00e1ny\u00e1t. Minden megfigyel\u00e9s az adott pillanatban zajl\u00f3 tev\u00e9kenys\u00e9get r\u00f6gz\u00edti. Az egy kateg\u00f3ri\u00e1ba tartoz\u00f3 megfigyel\u00e9sek ar\u00e1nya az adott tev\u00e9kenys\u00e9g id\u0151ar\u00e1ny\u00e1t becs\u00fcli a vizsg\u00e1lt id\u0151szakon bel\u00fcl, felt\u00e9ve, hogy a mintav\u00e9teli terv megfelel\u0151en reprezent\u00e1lja ezt az id\u0151szakot.<\/p>\n\n\n<p>Egy szerel\u00e9si ter\u00fclet vizsg\u00e1lata p\u00e9ld\u00e1ul megk\u00fcl\u00f6nb\u00f6ztetheti az \u00f6sszeszerel\u00e9st, az \u00e1t\u00e1ll\u00e1st, az ellen\u0151rz\u00e9st, az anyagra v\u00e1rakoz\u00e1st \u00e9s az egy\u00e9b megszak\u00edt\u00e1sokat. Ha ezeket a kateg\u00f3ri\u00e1kat reprezentat\u00edv m\u0171szakokban r\u00f6gz\u00edti, hasznosabb adatokhoz jut, mintha mindent csup\u00e1n munkav\u00e9gz\u00e9snek vagy t\u00e9tlens\u00e9gnek min\u0151s\u00edtene.<\/p>\n\n\n<p>A m\u00f3dszer k\u00fcl\u00f6n\u00f6sen akkor hasznos, ha a tev\u00e9kenys\u00e9gek v\u00e1ltozatosak, a megszak\u00edt\u00e1sok elsz\u00f3rtan jelentkeznek, a folyamatos megfigyel\u00e9s pedig jelent\u0151s r\u00e1ford\u00edt\u00e1st ig\u00e9nyelne. A tev\u00e9kenys\u00e9gek \u00e1tfog\u00f3 megoszl\u00e1s\u00e1nak meg\u00e9rt\u00e9s\u00e9hez nem kell minden m\u0171veletet az elej\u00e9t\u0151l a v\u00e9g\u00e9ig k\u00f6vetni.<\/p>\n\n\n<p>Ha m\u00e1s k\u00e9rd\u00e9sre keres v\u00e1laszt, v\u00e1lasszon m\u00e1s m\u00e9r\u00e9si m\u00f3dszert:<\/p>\n\n\n<ul class=\"wp-block-list\"><li>A <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/munkaido-normazas\/\">gy\u00e1rt\u00e1si munkaid\u0151-vizsg\u00e1lat<\/a> meghat\u00e1rozott munkaelemeket vizsg\u00e1l, \u00e9s megalapozott normaid\u0151 meg\u00e1llap\u00edt\u00e1s\u00e1ra is alkalmas. A tev\u00e9kenys\u00e9gek v\u00e9letlenszer\u0171 pillanatfelv\u00e9teleib\u0151l nem der\u00fcl ki, mennyi ideig tart egy-egy r\u00f6vid munkaelem.<\/li><li>A <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/gyartasi-idorogzites\/\">gy\u00e1rt\u00e1si id\u0151r\u00f6gz\u00edt\u00e9s<\/a> a gy\u00e1rt\u00e1si feladatokhoz vagy m\u0171veletekhez kapcsol\u00f3d\u00f3 esem\u00e9nyeket \u00e9s t\u00e9nyleges id\u0151ket r\u00f6gz\u00edti. Ezekb\u0151l a nyilv\u00e1ntart\u00e1sokb\u00f3l az der\u00fcl ki, mely munk\u00e1kra ford\u00edtott\u00e1k az elsz\u00e1molt \u00f3r\u00e1kat; nem az \u00f6sszes tev\u00e9kenys\u00e9g v\u00e9letlen mint\u00e1j\u00e1t adj\u00e1k.<\/li><\/ul>\n\n\n<p>Egy m\u00f3dszeres munkam\u00e9r\u00e9si vizsg\u00e1lat m\u00e1s adatok mellett mintav\u00e9telt is haszn\u00e1lhat a norm\u00e1k meg\u00e1llap\u00edt\u00e1s\u00e1hoz. Egy tev\u00e9kenys\u00e9g sz\u00e1zal\u00e9kos ar\u00e1nya \u00f6nmag\u00e1ban azonban sem normaid\u0151nek, sem az egy\u00e9ni munkatemp\u00f3 m\u00e9r\u0151sz\u00e1m\u00e1nak nem tekinthet\u0151.<\/p>\n\n\n<h2 class=\"wp-block-heading\">A megv\u00e1laszoland\u00f3 k\u00e9rd\u00e9sb\u0151l induljon ki, ne a dolgoz\u00f3k elfoglalts\u00e1g\u00e1t sz\u00e1molja<\/h2>\n\n\n<p>Olyan k\u00e9rd\u00e9st v\u00e1lasszon, amelynek megv\u00e1laszol\u00e1sa v\u00e1ltoztathat az \u00fczem m\u0171k\u00f6d\u00e9s\u00e9n. \u201eA szerel\u0151csapat idej\u00e9nek mekkora r\u00e9sze telik alkatr\u00e9szekre v\u00e1rakoz\u00e1ssal?\u201d Ez hasznos kiindul\u00f3pont, ha van lehet\u0151s\u00e9ge jav\u00edtani az anyag-el\u0151k\u00e9sz\u00edt\u00e9sen. A \u201eMennyire hat\u00e9kony mindenki?\u201d k\u00e9rd\u00e9s t\u00fal \u00e1ltal\u00e1nos ahhoz, hogy j\u00f3l megtervezhet\u0151 vizsg\u00e1lat \u00e9s \u00e9rtelmezhet\u0151 eredm\u00e9ny sz\u00fclessen bel\u0151le.<\/p>\n\n\n<p>A vizsg\u00e1lat c\u00e9lj\u00e1t egyeztesse a munk\u00e1t v\u00e9gz\u0151kkel. Mondja el, mit fognak megfigyelni, hogyan hat\u00e1rozz\u00e1k meg a kateg\u00f3ri\u00e1kat, ki l\u00e1thatja majd az eredm\u00e9nyeket, \u00e9s milyen d\u00f6nt\u00e9st t\u00e1mogatnak vel\u00fck. K\u00e9rdezze meg a dolgoz\u00f3kat, mely megszak\u00edt\u00e1sok maradnak ki a jelenlegi nyilv\u00e1ntart\u00e1sokb\u00f3l. A vizsg\u00e1lat hasznosabb, ha elmondhatj\u00e1k, mi\u00e9rt hi\u00e1nyzik egy alkatr\u00e9szk\u00e9szlet, mint ha \u00fagy \u00e9rzik, jobb eltitkolniuk a v\u00e1rakoz\u00e1st.<\/p>\n\n\n<p>Hat\u00e1rozza meg a vizsg\u00e1lt sokas\u00e1got: mely emberekre vagy g\u00e9pekre, m\u0171szakokra, napokra \u00e9s termel\u00e9si k\u00f6r\u00fclm\u00e9nyekre vonatkozzon az eredm\u00e9ny. Egy szerel\u00e9si ter\u00fclet nappali m\u0171szakj\u00e1nak vizsg\u00e1lata nem jellemzi automatikusan az \u00e9jszakai munk\u00e1t vagy az eg\u00e9sz \u00fczemet.<\/p>\n\n\n<p>Ezut\u00e1n v\u00e1lassza ki a megfigyel\u00e9si egys\u00e9get. Egy dolgoz\u00f3 egy adott pillanatban egy egys\u00e9g; egy g\u00e9p egy adott pillanatban egy m\u00e1sik. Az \u00e1llapotukat k\u00fcl\u00f6n kezelje. El\u0151fordulhat, hogy a g\u00e9p automatikusan forg\u00e1csol, mik\u00f6zben a kezel\u0151je egy m\u00e1sik alkatr\u00e9szt ellen\u0151riz. A g\u00e9p \u00fczemel, a dolgoz\u00f3 pedig ellen\u0151rz\u00e9st v\u00e9gez: egyik megfigyel\u00e9st sem kell t\u00e9tlens\u00e9gnek min\u0151s\u00edteni.<\/p>\n\n\n<p>A vizsg\u00e1lt id\u0151szak hat\u00e1rait is tegye egy\u00e9rtelm\u0171v\u00e9. Ha a vizsg\u00e1lat a teljes fizetett m\u0171szakot lefedi, a megfelel\u0151 sz\u00fcnetkateg\u00f3ri\u00e1t is vegye fel. Ha csak meghat\u00e1rozott \u00fczemi id\u0151szakokra terjed ki, k\u00f6z\u00f6lje, hogy ez az id\u0151alap k\u00e9pezi az ar\u00e1nysz\u00e1mok nevez\u0151j\u00e9t. A kett\u0151t ne hasonl\u00edtsa \u00f6ssze \u00fagy, mintha ugyanazt m\u00e9rn\u00e9k.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Hat\u00e1rozzon meg egy\u00e9rtelm\u0171en felismerhet\u0151 tev\u00e9kenys\u00e9geket<\/h2>\n\n\n<p>Kev\u00e9s kateg\u00f3ri\u00e1val dolgozzon, amelyek a v\u00e1lasztott megfigyel\u00e9si egys\u00e9gre n\u00e9zve k\u00f6lcs\u00f6n\u00f6sen kiz\u00e1rj\u00e1k egym\u00e1st, \u00e9s lefedik a v\u00e1rhat\u00f3 helyzeteket. Mindegyikhez \u00edrjon r\u00f6vid meghat\u00e1roz\u00e1st, a vizsg\u00e1lt ter\u00fcletr\u0151l vett p\u00e9ld\u00e1kkal.<\/p>\n\n\n<p>Az \u201eanyagra v\u00e1rakoz\u00e1s\u201d azt jelentse, hogy a kiv\u00e1lasztott munka a sz\u00fcks\u00e9ges anyag hi\u00e1nya miatt nem folytathat\u00f3, ne pedig azt, hogy a dolgoz\u00f3 \u00e9ppen az anyagt\u00e1rol\u00f3 \u00e1llv\u00e1ny mellett \u00e1ll. Az \u201e\u00e1t\u00e1ll\u00e1s\u201d kezdet\u00e9t \u00e9s v\u00e9g\u00e9t k\u00f6z\u00f6sen hat\u00e1rozz\u00e1k meg, az el\u0151k\u00e9sz\u00edt\u00e9st\u0151l a gy\u00e1rt\u00e1sra k\u00e9sz \u00e1llapotig. A sz\u00fcks\u00e9ges ellen\u0151rz\u00e9st k\u00fcl\u00f6n kateg\u00f3ri\u00e1ban tegye l\u00e1that\u00f3v\u00e1, ne rejtse el egy \u00e1ltal\u00e1nos, nem termel\u0151 tev\u00e9kenys\u00e9geket gy\u0171jt\u0151 kateg\u00f3ri\u00e1ban.<\/p>\n\n\n<p>Vegyen fel egy k\u00f3dot az ismeretlen vagy nem megfigyelhet\u0151 \u00e1llapotokra is. Ha nem \u00e1llap\u00edthat\u00f3 meg, mi t\u00f6rt\u00e9nik, tal\u00e1lgat\u00e1s helyett r\u00f6gz\u00edtse a bizonytalans\u00e1got. Ezeket az eseteket k\u00fcl\u00f6n tekintse \u00e1t; ne maradjanak ki \u00e9szrev\u00e9tlen\u00fcl a nevez\u0151b\u0151l.<\/p>\n\n\n<p>Egy r\u00f6vid pr\u00f3bafelv\u00e9tellel tesztelje a meghat\u00e1roz\u00e1sokat. A megfigyel\u0151k ugyanazokat a helyzeteket sorolj\u00e1k be, majd besz\u00e9lj\u00e9k meg az elt\u00e9r\u00e9seket. Ha egyik\u00fck a szersz\u00e1mkeres\u00e9st \u00e1t\u00e1ll\u00e1snak, m\u00e1sikuk v\u00e1rakoz\u00e1snak tekinti, a vizsg\u00e1lat r\u00e9szben a kateg\u00f3ri\u00e1k \u00e9rtelmez\u00e9s\u00e9t fogja m\u00e9rni a munka helyett. Ezt m\u00e9g a f\u0151 mintav\u00e9tel el\u0151tt rendezze.<\/p>\n\n\n<p>A pr\u00f3bafelv\u00e9tel gyakorlati probl\u00e9m\u00e1kra is f\u00e9nyt der\u00edt: megk\u00f6zel\u00edthetetlen megfigyel\u00e9si pontokra, t\u00fal hossz\u00fa bej\u00e1r\u00e1si \u00fatvonalra vagy olyan r\u00e9szletes kateg\u00f3ri\u00e1kra, amelyeket egy pillant\u00e1ssal nem lehet megk\u00fcl\u00f6nb\u00f6ztetni.<\/p>\n\n\n<h2 class=\"wp-block-heading\">V\u00e9letlenszer\u0171 megfigyel\u00e9sekkel fedje le a jellemz\u0151 termel\u00e9si k\u00f6r\u00fclm\u00e9nyeket<\/h2>\n\n\n<p>V\u00e9letlensz\u00e1m-gener\u00e1torral el\u0151re \u00e1ll\u00edtsa el\u0151 a megfigyel\u00e9si id\u0151pontokat, \u00e9s a mintav\u00e9teli tervet terjessze ki a d\u00f6nt\u00e9s szempontj\u00e1b\u00f3l \u00e9rintett m\u0171szakokra \u00e9s napokra. A megfigyelend\u0151 dolgoz\u00f3t vagy g\u00e9pet a terv szerint v\u00e1lassza ki, ne azt figyelje meg, aki vagy ami \u00e9rkez\u00e9skor a leg\u00e9rdekesebbnek t\u0171nik.<\/p>\n\n\n<p>A rendszeres, f\u00e9l\u00f3r\u00e1nk\u00e9nti l\u00e1togat\u00e1s \u00fajra \u00e9s \u00fajra egybeeshet az anyagut\u00e1np\u00f3tl\u00e1ssal, egy sz\u00fcnettel vagy egy g\u00e9pciklussal. M\u00e1sf\u00e9le torz\u00edt\u00e1st okoz, ha a m\u0171szakvezet\u0151 csak akkor v\u00e9gez megfigyel\u00e9st, amikor \u00e9ppen r\u00e1\u00e9r. A v\u00e9letlenszer\u0171 id\u0151z\u00edt\u00e9s seg\u00edt elker\u00fclni ezeket a mint\u00e1zatokat; a relev\u00e1ns \u00fczemi k\u00f6r\u00fclm\u00e9nyek lefed\u00e9se pedig biztos\u00edtja, hogy az eredm\u00e9ny ne csak egy k\u00e9nyelmesen kiv\u00e1lasztott d\u00e9lel\u0151ttre legyen haszn\u00e1lhat\u00f3.<\/p>\n\n\n<p>Minden kiv\u00e1lasztott pillanatban az \u00e9ppen zajl\u00f3 tev\u00e9kenys\u00e9get r\u00f6gz\u00edtse, ne v\u00e1rja meg a k\u00f6vetkez\u0151 kezdet\u00e9t. \u0150rizze meg az id\u0151b\u00e9lyeget, a megfigyel\u00e9si egys\u00e9g azonos\u00edt\u00f3j\u00e1t, a kateg\u00f3ri\u00e1t, valamint a m\u0171szakra vagy term\u00e9kre vonatkoz\u00f3 l\u00e9nyeges k\u00f6r\u00fclm\u00e9nyeket. Ha seg\u00edti egy fennakad\u00e1s kivizsg\u00e1l\u00e1s\u00e1t, k\u00e9sz\u00edtsen r\u00f6vid, t\u00e9nyszer\u0171 megjegyz\u00e9st is. Ne szak\u00edtsa meg a tev\u00e9kenys\u00e9get az\u00e9rt, hogy magyar\u00e1zatot k\u00e9rjen, majd az \u00edgy l\u00e9trehozott besz\u00e9lget\u00e9st sorolja be.<\/p>\n\n\n<p>R\u00f6gz\u00edtse az elmaradt megfigyel\u00e9seket \u00e9s az elmarad\u00e1s ok\u00e1t. Ha minden nehezen hozz\u00e1f\u00e9rhet\u0151 vagy k\u00f6r\u00fclm\u00e9nyes megfigyel\u00e9st egy k\u00f6nnyen elv\u00e9gezhet\u0151, k\u00f6zeli megfigyel\u00e9ssel helyettes\u00edt, megv\u00e1ltozhat, hogy mit reprezent\u00e1l a minta.<\/p>\n\n\n<p>Ha az egyik m\u0171szakban sz\u00e1nd\u00e9kosan s\u0171r\u0171bben vesz mint\u00e1t, a m\u0171szakok eredm\u00e9nyeit k\u00fcl\u00f6n k\u00f6z\u00f6lje, vagy a becs\u00fclni k\u00edv\u00e1nt id\u0151t, illetve sokas\u00e1got t\u00fckr\u00f6z\u0151 s\u00falyokkal vonja \u00f6ssze \u0151ket. Az elt\u00e9r\u0151 mintav\u00e9teli ar\u00e1nyokkal gy\u0171jt\u00f6tt adatok egyszer\u0171 \u00f6sszevon\u00e1sa miatt egy szokatlan m\u0171szak ar\u00e1nytalanul meghat\u00e1rozhatja az eredm\u00e9nyt.<\/p>\n\n\n<p>A megfigyel\u00e9sek sz\u00e1m\u00e1t is k\u00fcl\u00f6nb\u00f6ztesse meg a f\u00fcggetlen inform\u00e1ci\u00f3 mennyis\u00e9g\u00e9t\u0151l. Ha egy bej\u00e1r\u00e1s sor\u00e1n t\u00f6bb dolgoz\u00f3t figyel meg, t\u00f6bb adatot r\u00f6gz\u00edt, de egy k\u00f6z\u00f6s anyaghi\u00e1ny miatt az \u00e1llapotuk \u00f6sszef\u00fcgghet. Hasonl\u00f3 korl\u00e1tja van az ugyanazon le\u00e1ll\u00e1s alatt k\u00e9sz\u00edtett ism\u00e9telt pillanatfelv\u00e9teleknek. A bej\u00e1r\u00e1sok \u00e9s az id\u0151beli csoportok maradjanak azonos\u00edthat\u00f3k, hogy az elemz\u00e9sben figyelembe lehessen venni ezt a csoportosul\u00e1st.<\/p>\n\n\n<h2 class=\"wp-block-heading\">H\u00e1ny megfigyel\u00e9s sz\u00fcks\u00e9ges a multimoment felv\u00e9telhez?<\/h2>\n\n\n<p>A sz\u00fcks\u00e9ges mintanagys\u00e1g a d\u00f6nt\u00e9shez elv\u00e1rt pontoss\u00e1gt\u00f3l \u00e9s a tev\u00e9kenys\u00e9g v\u00e1rhat\u00f3 ar\u00e1ny\u00e1t\u00f3l f\u00fcgg. Nincs olyan megfigyel\u00e9ssz\u00e1m, amely minden vizsg\u00e1latot reprezentat\u00edvv\u00e1 tenne.<\/p>\n\n\n<p>F\u00fcggetlen megfigyel\u00e9sekb\u0151l \u00e1ll\u00f3 egyszer\u0171 v\u00e9letlen minta tervez\u00e9sekor egy tev\u00e9kenys\u00e9g ar\u00e1ny\u00e1nak becsl\u00e9s\u00e9hez gyakran a k\u00f6vetkez\u0151 k\u00f6zel\u00edt\u00e9st haszn\u00e1lj\u00e1k:<\/p>\n\n\n<p>n \u2248 z\u00b2 \u00d7 p \u00d7 (1 \u2212 p) \u00f7 e\u00b2<\/p>\n\n\n<p>Itt n a megfigyel\u00e9sek sz\u00e1ma, p a v\u00e1rhat\u00f3 ar\u00e1ny tizedes t\u00f6rt alakban, e a k\u00edv\u00e1nt abszol\u00fat hibahat\u00e1r, z pedig a norm\u00e1lis eloszl\u00e1snak a v\u00e1lasztott megb\u00edzhat\u00f3s\u00e1gi szinthez tartoz\u00f3 \u00e9rt\u00e9ke. K\u00f6zel\u00edt\u0151leg 95%-os megb\u00edzhat\u00f3s\u00e1gi szint eset\u00e9n z \u00e9rt\u00e9ke 1,96. A kapott megfigyel\u00e9ssz\u00e1mot felfel\u00e9 kerek\u00edtse.<\/p>\n\n\n<p>Ha m\u00e9g nincs megb\u00edzhat\u00f3 becsl\u00e9se p \u00e9rt\u00e9k\u00e9re, adott abszol\u00fat hibahat\u00e1r mellett a 0,50 haszn\u00e1lata adja a legnagyobb megfigyel\u00e9ssz\u00e1mot. \u00d6t sz\u00e1zal\u00e9kpontos hibahat\u00e1rral, azaz e = 0,05 eset\u00e9n a sz\u00e1m\u00edt\u00e1s eredm\u00e9nye 385 megfigyel\u00e9s. Ez az adott felt\u00e9telez\u00e9sekre \u00e9p\u00fcl\u0151 tervez\u00e9si p\u00e9lda, nem \u00e1ltal\u00e1nos minimum, \u00e9s nem jelent garanci\u00e1t minden alcsoportra.<\/p>\n\n\n<p>Pontosan fogalmazzon, amikor \u201e\u00f6t sz\u00e1zal\u00e9kr\u00f3l\u201d besz\u00e9l. A 20%-os v\u00e1rakoz\u00e1si ar\u00e1ny \u00f6t sz\u00e1zal\u00e9kpontos hibahat\u00e1rral nagyj\u00e1b\u00f3l 15% \u00e9s 25% k\u00f6z\u00f6tti tartom\u00e1nyt jelent. Ha viszont a relat\u00edv hibahat\u00e1r ennek az ar\u00e1nynak az 5%-a, az mindk\u00e9t ir\u00e1nyban mind\u00f6ssze egy sz\u00e1zal\u00e9kpontot jelent, amihez j\u00f3val nagyobb minta sz\u00fcks\u00e9ges.<\/p>\n\n\n<p>A sz\u00fcks\u00e9ges pontoss\u00e1got a d\u00f6nt\u00e9s szempontj\u00e1b\u00f3l fontos kateg\u00f3ri\u00e1hoz \u00e9s \u00f6sszehasonl\u00edt\u00e1shoz tervezze meg. Az \u00f6sszes\u00edtett v\u00e1rakoz\u00e1si ar\u00e1ny becsl\u00e9s\u00e9hez elegend\u0151 megfigyel\u00e9ssz\u00e1m kev\u00e9s lehet az egyes m\u0171szakok, ritka fennakad\u00e1sok vagy k\u00fcl\u00f6n\u00e1ll\u00f3 munka\u00e1llom\u00e1sok vizsg\u00e1lat\u00e1hoz. A bej\u00e1r\u00e1sonk\u00e9nt csoportosul\u00f3 megfigyel\u00e9seket is a mintav\u00e9teli tervnek megfelel\u0151en kell elemezni, nem pedig minden feljegyz\u00e9st f\u00fcggetlen adatk\u00e9nt kezelni. Ha a d\u00f6nt\u00e9s kis v\u00e1ltoz\u00e1s kimutat\u00e1s\u00e1n m\u00falik, vagy jelent\u0151s beruh\u00e1z\u00e1ssal j\u00e1r, a f\u0151 adatgy\u0171jt\u00e9s el\u0151tt ellen\u0151riztesse a tervet mintav\u00e9teli szak\u00e9rt\u0151vel.<\/p>\n\n\n<h2 class=\"wp-block-heading\">P\u00e9lda: hogyan lesz a megfigyel\u00e9sek sz\u00e1m\u00e1b\u00f3l fejleszt\u00e9si k\u00e9rd\u00e9s?<\/h2>\n\n\n<p>K\u00e9pzelj\u00fcnk el egy k\u00e9zi \u00f6sszeszerel\u0151 ter\u00fcletet, ahol a csapat arra gyanakszik, hogy a hi\u00e1nyos alkatr\u00e9szk\u00e9szletek miatt szakad meg a munka. A vizsg\u00e1lat sor\u00e1n a kijel\u00f6lt termel\u00e9si id\u0151szakokban 400, azonos kiv\u00e1laszt\u00e1si val\u00f3sz\u00edn\u0171s\u00e9g\u0171 megfigyel\u00e9st v\u00e9geznek, amelyek mindegyike egy dolgoz\u00f3 pillanatnyi tev\u00e9kenys\u00e9g\u00e9t r\u00f6gz\u00edti. Ebben az egyszer\u0171s\u00edtett p\u00e9ld\u00e1ban felt\u00e9telezz\u00fck, hogy a megfigyel\u00e9sek f\u00fcggetlenek, \u00e9s mindegyik besorolhat\u00f3 valamelyik kateg\u00f3ri\u00e1ba.<\/p>\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Megfigyelt tev\u00e9kenys\u00e9g<\/th><th>Megfigyel\u00e9sek sz\u00e1ma<\/th><th>Megfigyel\u00e9sek ar\u00e1nya<\/th><\/tr><\/thead><tbody><tr><td>\u00d6sszeszerel\u00e9s<\/td><td>200<\/td><td>50%<\/td><\/tr><tr><td>\u00c1t\u00e1ll\u00e1s \u00e9s el\u0151k\u00e9sz\u00edt\u00e9s<\/td><td>60<\/td><td>15%<\/td><\/tr><tr><td>Ellen\u0151rz\u00e9s<\/td><td>40<\/td><td>10%<\/td><\/tr><tr><td>Anyagra v\u00e1rakoz\u00e1s<\/td><td>80<\/td><td>20%<\/td><\/tr><tr><td>Egy\u00e9b azonos\u00edtott fennakad\u00e1sok<\/td><td>12<\/td><td>3%<\/td><\/tr><tr><td>Tervezett sz\u00fcnetek<\/td><td>8<\/td><td>2%<\/td><\/tr><tr><td>\u00d6sszesen<\/td><td>400<\/td><td>100%<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n<p>Az anyagra v\u00e1rakoz\u00e1s becs\u00fclt ar\u00e1nya 80 \u00f7 400 = 20%. Ez a vizsg\u00e1lat \u00e1ltal reprezent\u00e1lt, \u00f6sszes\u00edtett dolgoz\u00f3i id\u0151re vonatkozik. Nem jelenti azt, hogy minden dolgoz\u00f3 minden m\u0171szak pontosan egy\u00f6t\u00f6d\u00e9ben v\u00e1rakozik, vagy hogy minden megszak\u00edt\u00e1s ugyanannyi ideig tart.<\/p>\n\n\n<p>Erre az egy ar\u00e1nyra az egyszer\u0171 norm\u00e1lis k\u00f6zel\u00edt\u00e9s a k\u00f6vetkez\u0151t adja:<\/p>\n\n\n<p>K\u00f6zel\u00edt\u0151 hibahat\u00e1r 95%-os megb\u00edzhat\u00f3s\u00e1gi szinten = 1,96 \u00d7 \u221a[0.20 \u00d7 0.80 \u00f7 400] = 0,0392<\/p>\n\n\n<p>Ez k\u00f6r\u00fclbel\u00fcl 3,9 sz\u00e1zal\u00e9kpont, \u00edgy a k\u00f6zel\u00edt\u0151 intervallum 16,1%-t\u00f3l 23,9%-ig terjed. A megadott felt\u00e9telez\u00e9sek mellett a mintav\u00e9teli bizonytalans\u00e1got fejezi ki. Nem veszi figyelembe a megfigyel\u00e9si id\u0151pontok torz\u00edt\u00f3 megv\u00e1laszt\u00e1s\u00e1t, a tev\u00e9kenys\u00e9gek t\u00e9ves besorol\u00e1s\u00e1t vagy azt, ha a k\u00f6vetkez\u0151 h\u00f3napban m\u00e1s lesz a term\u00e9k\u00f6sszet\u00e9tel.<\/p>\n\n\n<p>Kis minta vagy null\u00e1hoz, illetve egyhez k\u00f6zeli tev\u00e9kenys\u00e9gi ar\u00e1ny eset\u00e9n e szimmetrikus k\u00f6zel\u00edt\u00e9s helyett haszn\u00e1ljon megfelel\u0151bb intervallumot, p\u00e9ld\u00e1ul Wilson-intervallumot vagy egzakt binomi\u00e1lis intervallumot. Ha a megfigyel\u00e9sek csoportosulnak vagy s\u00falyozottak, olyan m\u00f3dszert v\u00e1lasszon, amely a mintav\u00e9teli tervet is figyelembe veszi.<\/p>\n\n\n<p>A gyakorlati k\u00f6vetkeztet\u00e9s a tizedesjegyekt\u0151l f\u00fcggetlen\u00fcl egy\u00e9rtelm\u0171: az anyagra v\u00e1rakoz\u00e1s okait \u00e9rdemes kivizsg\u00e1lni. El\u0151sz\u00f6r n\u00e9zze meg, hol v\u00e1ltak hi\u00e1nyoss\u00e1 az \u00e9rintett alkatr\u00e9szk\u00e9szletek, mely alkatr\u00e9szek hi\u00e1nyoztak, \u00e9s el lehetett volna-e kezdeni k\u00f6zben a k\u00f6vetkez\u0151 \u00f6sszeszerel\u00e9si munk\u00e1t. A kateg\u00f3ria megmutatja, hol \u00e9rdemes keresni; az okokat a csapat \u00e9s a kapcsol\u00f3d\u00f3 nyilv\u00e1ntart\u00e1sok t\u00e1rj\u00e1k fel.<\/p>\n\n\n<h2 class=\"wp-block-heading\">Jav\u00edtson a k\u00f6r\u00fclm\u00e9nyeken, majd ellen\u0151rizze, mi v\u00e1ltozott<\/h2>\n\n\n<p>Tekintse \u00e1t az eredm\u00e9nyeket a dolgoz\u00f3kkal, az anyagmozgat\u00f3kkal \u00e9s az \u00e9rintett folyamat felel\u0151s\u00e9vel. V\u00e1lassza k\u00fcl\u00f6n a sz\u00fcks\u00e9ges munk\u00e1t az elker\u00fclhet\u0151 megszak\u00edt\u00e1sokt\u00f3l. Az ellen\u0151rz\u00e9s a min\u0151s\u00e9get v\u00e9dheti, az \u00e1t\u00e1ll\u00e1s a k\u00f6vetkez\u0151 sorozat gy\u00e1rt\u00e1s\u00e1t teszi lehet\u0151v\u00e9, a sz\u00fcnetek pedig seg\u00edtik a munkanap sor\u00e1n a regener\u00e1l\u00f3d\u00e1st. Egyik sem v\u00e1lik megsz\u00fcntethet\u0151 vesztes\u00e9gg\u00e9 puszt\u00e1n att\u00f3l, hogy nem \u00f6sszeszerel\u00e9s.<\/p>\n\n\n<p>V\u00e1lasszon egy c\u00e9lzott v\u00e1ltoztat\u00e1st, \u00e9s jel\u00f6lj\u00f6n ki hozz\u00e1 felel\u0151st. Az \u00f6sszeszerel\u00e9si p\u00e9ld\u00e1ban ez lehet az alkatr\u00e9szk\u00e9szlet hi\u00e1nytalans\u00e1g\u00e1nak ellen\u0151rz\u00e9se, miel\u0151tt a gy\u00e1rt\u00e1si feladatot kiadj\u00e1k a ter\u00fcletre. Ellen\u0151rizze, hogy cs\u00f6kken-e az alkatr\u00e9szhi\u00e1ny, \u00e9s val\u00f3ban hamarabb haladhat-e tov\u00e1bb a munka, nem pedig csak egy m\u00e1sik r\u00e9szlegre ker\u00fcl \u00e1t a v\u00e1rakoz\u00e1s.<\/p>\n\n\n<p>Ism\u00e9telje meg a megfigyel\u00e9seket \u00f6sszehasonl\u00edthat\u00f3 k\u00f6r\u00fclm\u00e9nyek k\u00f6z\u00f6tt, v\u00e1ltozatlan kateg\u00f3riameghat\u00e1roz\u00e1sokkal \u00e9s id\u0151beli lehat\u00e1rol\u00e1ssal. A f\u0151 sz\u00e1zal\u00e9kos eredm\u00e9nyek mellett hasonl\u00edtsa \u00f6ssze a term\u00e9k\u00f6sszet\u00e9telt, a l\u00e9tsz\u00e1mot \u00e9s a rendk\u00edv\u00fcli esem\u00e9nyeket is. A vizsg\u00e1lat bizonytalans\u00e1g\u00e1n bel\u00fcl marad\u00f3 kis ar\u00e1nyv\u00e1ltoz\u00e1s \u00f6nmag\u00e1ban nem meggy\u0151z\u0151 bizony\u00edt\u00e9k; a term\u00e9k\u00f6sszet\u00e9tel v\u00e1ltoz\u00e1sa is jav\u00edthatja a l\u00e1tsz\u00f3lagos eredm\u00e9nyt an\u00e9lk\u00fcl, hogy a munkam\u00f3dszer javult volna.<\/p>\n\n\n<p>A legfontosabb: az eredeti 20%-os v\u00e1rakoz\u00e1si ar\u00e1nyt ne sz\u00e1m\u00edtsa \u00e1t k\u00f6zvetlen\u00fcl 20% t\u00f6bbletkapacit\u00e1sra. A felszabadul\u00f3 id\u0151 elapr\u00f3z\u00f3dhat, kihaszn\u00e1l\u00e1s\u00e1hoz m\u00e1sik dolgoz\u00f3ra lehet sz\u00fcks\u00e9g, vagy olyan id\u0151szakra eshet, amikor a g\u00e9p m\u00e1r m\u0171k\u00f6dik. Az is lehet, hogy ebben az id\u0151ben m\u00e1s gy\u00e1rt\u00e1si feladat nem tudn\u00e1 ig\u00e9nybe venni a munka\u00e1llom\u00e1st.<\/p>\n\n\n<p>Ellen\u0151rizze a hat\u00e1st azon az er\u0151forr\u00e1son, amelyet \u00fctemezni k\u00edv\u00e1n. Ha a jobb el\u0151k\u00e9sz\u00edt\u00e9si m\u00f3dszer val\u00f3ban ler\u00f6vid\u00edti az \u00e1t\u00e1ll\u00e1st, m\u00e9rje meg \u00e9s hagyassa j\u00f3v\u00e1 az \u00faj \u00e1t\u00e1ll\u00e1si id\u0151t. Ha a munka\u00e1llom\u00e1s \u00edgy hosszabb id\u0151szakban \u00e1ll rendelkez\u00e9sre, gy\u0151z\u0151dj\u00f6n meg arr\u00f3l, hogy ezt a dolgoz\u00f3k \u00e9s a berendez\u00e9sek is lehet\u0151v\u00e9 teszik. Kezelje k\u00fcl\u00f6n az \u00e9l\u0151munka-r\u00e1ford\u00edt\u00e1st, a m\u0171velet eltelt idej\u00e9t \u00e9s a g\u00e9p foglalts\u00e1g\u00e1t.<\/p>\n\n\n<h2 class=\"wp-block-heading\">\u00c9p\u00edtse be az igazolt fejleszt\u00e9seket a gy\u00e1rt\u00e1si \u00fctemtervbe<\/h2>\n\n\n<p>Egy igazolt fejleszt\u00e9s hat\u00e1sa t\u00falmutat a vizsg\u00e1lt munka\u00e1llom\u00e1son. A r\u00f6videbb \u00e1t\u00e1ll\u00e1s lehet\u0151v\u00e9 teheti a k\u00f6vetkez\u0151 rendel\u00e9s kor\u00e1bbi ind\u00edt\u00e1s\u00e1t, de annak a k\u00f6vetkez\u0151 m\u0171veletn\u00e9l tov\u00e1bbra is anyagra \u00e9s szabad kapacit\u00e1sra lesz sz\u00fcks\u00e9ge. Ugyanazok\u00e9rt a g\u00e9pek\u00e9rt m\u00e1s rendel\u00e9sek is versenyezhetnek. Itt v\u00e1lik sz\u00fcks\u00e9gess\u00e9, hogy a helyi fejleszt\u00e9s egy <a href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/mi-a-termelesutemezes\/\">k\u00f6z\u00f6s gy\u00e1rt\u00e1si tervbe<\/a> illeszkedjen.<\/p>\n\n\n<p>A SkyPlanner rendszerben a m\u0171veletek id\u0151tartama darabonk\u00e9nti id\u0151vel, termel\u00e9si r\u00e1t\u00e1val vagy r\u00f6gz\u00edtett id\u0151tartammal adhat\u00f3 meg, az \u00e1t\u00e1ll\u00e1si \u00e9s a lez\u00e1r\u00e1si id\u0151 pedig k\u00fcl\u00f6n azonos\u00edthat\u00f3 marad. A munka\u00e1llom\u00e1sok m\u0171szakrendje hat\u00e1rozza meg a rendelkez\u00e9sre \u00e1ll\u00f3 id\u0151ablakokat. Az Arcturus, a SkyPlanner mesters\u00e9ges intelligenci\u00e1n alapul\u00f3 \u00fctemez\u0151je a be\u00e1ll\u00edtott kapacit\u00e1sok, f\u00fcgg\u0151s\u00e9gek \u00e9s priorit\u00e1sok alapj\u00e1n sz\u00e1m\u00edtja ki az \u00fctemtervet, az eredm\u00e9nyt pedig a Gantt-id\u0151vonal jelen\u00edti meg.<\/p>\n\n\n<p>Tegy\u00fck fel, hogy az ut\u00f3lagos m\u00e9r\u00e9s igazolja: a gy\u00e1rt\u00e1si feladatok egy meghat\u00e1rozott csoportj\u00e1n\u00e1l az \u00e1t\u00e1ll\u00e1si id\u0151 40 percr\u0151l 30 percre cs\u00f6kkent. Friss\u00edtse az \u00e9rintett tervez\u00e9si adatokat, hogy a megfelel\u0151 gy\u00e1rt\u00e1si feladatokn\u00e1l a j\u00f3v\u00e1hagyott \u00e1t\u00e1ll\u00e1si id\u0151 szerepeljen, majd \u00fctemezze \u00fajra ezeket a t\u00f6bbi gy\u00e1rt\u00e1si feladattal egy\u00fctt. Ne csak az els\u0151 \u00e1llom\u00e1son felszabadult id\u0151t vizsg\u00e1lja meg, hanem a k\u00f6vetkez\u0151 m\u0171veleteket \u00e9s a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151ket is.<\/p>\n\n\n<p>A SkyPlanner \u00f6sszehangoltan sz\u00e1m\u00edtja ki az \u00fctemez\u00e9st, \u00edgy nem kell minden m\u00f3dos\u00edtott gy\u00e1rt\u00e1si feladatot k\u00e9zzel beillesztenie az egyes g\u00e9pek v\u00e1rakoz\u00e1si sor\u00e1ba. \u00d6n d\u00f6nti el, melyik fejleszt\u00e9s igazolt, \u00e9s mely rendel\u00e9sek \u00e9lveznek els\u0151bbs\u00e9get; az Arcturus ezeket az utas\u00edt\u00e1sokat alkalmazza a tervben. A megalapozottabb adatok \u00edgy ott eredm\u00e9nyeznek hasznos gy\u00e1rt\u00e1si kapacit\u00e1st, ahol azt a gy\u00e1rt\u00e1si feladatokhoz val\u00f3ban fel lehet haszn\u00e1lni.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/hu\/ugyfeltortenetek\/fredman-operations\/\">A Fredman Operations SkyPlanner rendszerrel szerzett tapasztalatai<\/a> j\u00f3l szeml\u00e9ltetik az \u00fctemez\u00e9si el\u0151ny\u00f6ket. Az \u00e9lelmiszer-csomagol\u00f3anyagokat gy\u00e1rt\u00f3 v\u00e1llalat kor\u00e1bban nem l\u00e1tta \u00e1t egy\u00e9rtelm\u0171en a m\u0171szakonk\u00e9nti kapacit\u00e1st, egy s\u00fcrg\u0151s \u00e1t\u00fctemez\u00e9s pedig ak\u00e1r egy \u00f3r\u00e1t vagy ann\u00e1l is t\u00f6bbet vehetett ig\u00e9nybe. A bevezet\u00e9s r\u00e9v\u00e9n a g\u00e9pek \u00fctemtervei \u00e9s a m\u0171szakok kapacit\u00e1sa k\u00f6z\u00f6s Gantt-n\u00e9zetbe ker\u00fcltek. A v\u00e1llalat besz\u00e1mol\u00f3ja szerint gyorsabban reag\u00e1lnak a v\u00e1ltoz\u00e1sokra, \u00e9s egy\u00e9rtelm\u0171bb alapokra helyezhetik a sz\u00e1ll\u00edt\u00e1si hat\u00e1rid\u0151k v\u00e1llal\u00e1s\u00e1t. T\u00f6rt\u00e9net\u00fck megmutatja, mi\u00e9rt \u00e9rt\u00e9kes a terhel\u00e9s \u00f6sszehangol\u00e1sa a k\u00f6r\u00fclm\u00e9nyek v\u00e1ltoz\u00e1sa ut\u00e1n.<\/p>\n\n\n<p>V\u00e1lassza a SkyPlanner rendszert, ha az igazolt \u00fczemi fejleszt\u00e9seket a teljes rendel\u00e9s\u00e1llom\u00e1nyra kiterjed\u0151, megval\u00f3s\u00edthat\u00f3 tervv\u00e9 szeretn\u00e9 alak\u00edtani. Ny\u00edlt REST API-j\u00e1n kereszt\u00fcl b\u00e1rmely ERP- vagy MES-rendszerrel integr\u00e1lhat\u00f3, \u00edgy a gy\u00e1rt\u00e1s\u00fctemez\u00e9s fejleszt\u00e9se mellett megtarthatja a v\u00e1llalat m\u0171k\u00f6d\u00e9s\u00e9t ir\u00e1ny\u00edt\u00f3 rendszereit.<\/p>\n\n\n<p><a href=\"https:\/\/skyplanner.ai\/hu\/kapcsolat-ertekesites\/\">Foglaljon SkyPlanner-bemutat\u00f3t<\/a>, \u00e9s k\u00e9sz\u00fclj\u00f6n egy fejleszt\u00e9si p\u00e9ld\u00e1val: adja meg annak j\u00f3v\u00e1hagyott hat\u00e1s\u00e1t az id\u0151tartamra vagy a rendelkez\u00e9sre \u00e1ll\u00e1sra, valamint az ugyanazokat az er\u0151forr\u00e1sokat haszn\u00e1l\u00f3 t\u00f6bbi rendel\u00e9s adatait. \u00cdgy konkr\u00e9tan l\u00e1thatja, mit jelent a v\u00e1ltoz\u00e1s a m\u00e1r v\u00e1llalt gy\u00e1rt\u00e1si feladatok szempontj\u00e1b\u00f3l. Ha el\u0151bb \u00f6n\u00e1ll\u00f3an ismerkedne a rendszerrel, <a href=\"https:\/\/skyplanner.ai\/hu\/proba\/\">pr\u00f3b\u00e1lja ki a SkyPlanner rendszert bemutat\u00f3adatokkal<\/a>.<\/p>\n\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Multimoment felv\u00e9tel a gy\u00e1rt\u00e1sban: a rejtett fennakad\u00e1sok felt\u00e1r\u00e1sa Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Multimoment felv\u00e9tel a gy\u00e1rt\u00e1sban: a rejtett fennakad\u00e1sok felt\u00e1r\u00e1sa Egy \u00fczemi bej\u00e1r\u00e1son ugyanaz a m\u0171szak az egyik pillanatban leterheltnek, a m\u00e1sikban kihaszn\u00e1latlannak t\u0171nhet. Egyik l\u00e1togat\u00e1sb\u00f3l sem der\u00fcl ki, mennyi id\u0151 jut az alkatr\u00e9szek gy\u00e1rt\u00e1s\u00e1ra, a munka el\u0151k\u00e9sz\u00edt\u00e9s\u00e9re vagy arra, hogy meg\u00e9rkezzen valami, amire sz\u00fcks\u00e9g &#8230; <a title=\"Multimoment felv\u00e9tel a gy\u00e1rt\u00e1sban: a rejtett fennakad\u00e1sok felt\u00e1r\u00e1sa\" class=\"read-more\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/multimoment-felvetel\/\" aria-label=\"Read more about Multimoment felv\u00e9tel a gy\u00e1rt\u00e1sban: a rejtett fennakad\u00e1sok felt\u00e1r\u00e1sa\">Olvass tov\u00e1bb<\/a><\/p>\n","protected":false},"author":3,"featured_media":110797,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_uag_custom_page_level_css":"","footnotes":""},"categories":[2526,312],"tags":[],"class_list":["post-110773","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aps-es-utemezes","category-forrasok","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.3 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Multimoment felv\u00e9tel: rejtett fennakad\u00e1sok a gy\u00e1rt\u00e1sban<\/title>\n<meta name=\"description\" content=\"Multimoment felv\u00e9tel: v\u00e9letlen megfigyel\u00e9sekkel t\u00e1rja fel az id\u0151ar\u00e1nyokat, cs\u00f6kkentse a fennakad\u00e1sokat, \u00e9s \u00e9p\u00edtse be az igazolt v\u00e1ltoz\u00e1sokat az \u00fctemtervbe.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/skyplanner.ai\/hu\/forrasok\/multimoment-felvetel\/\" \/>\n<meta property=\"og:locale\" content=\"hu_HU\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Multimoment felv\u00e9tel a gy\u00e1rt\u00e1sban: a rejtett fennakad\u00e1sok felt\u00e1r\u00e1sa\" \/>\n<meta property=\"og:description\" content=\"Multimoment felv\u00e9tel: v\u00e9letlen megfigyel\u00e9sekkel t\u00e1rja fel az id\u0151ar\u00e1nyokat, cs\u00f6kkentse a fennakad\u00e1sokat, \u00e9s \u00e9p\u00edtse be az igazolt v\u00e1ltoz\u00e1sokat az \u00fctemtervbe.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/skyplanner.ai\/hu\/forrasok\/multimoment-felvetel\/\" \/>\n<meta property=\"og:site_name\" content=\"SkyPlanner\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-26T08:47:49+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-26T08:48:50+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-sampling-manufacturing-hero.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1672\" \/>\n\t<meta property=\"og:image:height\" content=\"940\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Szerz\u0151:\" \/>\n\t<meta name=\"twitter:data1\" content=\"Jussi M\u00e4ntyl\u00e4\" \/>\n\t<meta name=\"twitter:label2\" content=\"Becs\u00fclt olvas\u00e1si id\u0151\" \/>\n\t<meta name=\"twitter:data2\" content=\"19 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/multimoment-felvetel\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/multimoment-felvetel\\\/\"},\"author\":{\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\"},\"headline\":\"Multimoment felv\u00e9tel a gy\u00e1rt\u00e1sban: a rejtett fennakad\u00e1sok felt\u00e1r\u00e1sa\",\"datePublished\":\"2026-10-26T08:47:49+00:00\",\"dateModified\":\"2026-10-26T08:48:50+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/multimoment-felvetel\\\/\"},\"wordCount\":3822,\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/multimoment-felvetel\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-sampling-manufacturing-hero.png\",\"articleSection\":[\"APS \u00e9s \u00fctemez\u00e9s\",\"forr\u00e1sok\"],\"inLanguage\":\"hu-HU\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/multimoment-felvetel\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/multimoment-felvetel\\\/\",\"name\":\"Multimoment felv\u00e9tel: rejtett fennakad\u00e1sok a gy\u00e1rt\u00e1sban\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/multimoment-felvetel\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/multimoment-felvetel\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-sampling-manufacturing-hero.png\",\"datePublished\":\"2026-10-26T08:47:49+00:00\",\"dateModified\":\"2026-10-26T08:48:50+00:00\",\"description\":\"Multimoment felv\u00e9tel: v\u00e9letlen megfigyel\u00e9sekkel t\u00e1rja fel az id\u0151ar\u00e1nyokat, cs\u00f6kkentse a fennakad\u00e1sokat, \u00e9s \u00e9p\u00edtse be az igazolt v\u00e1ltoz\u00e1sokat az \u00fctemtervbe.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/multimoment-felvetel\\\/#breadcrumb\"},\"inLanguage\":\"hu-HU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/multimoment-felvetel\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/multimoment-felvetel\\\/#primaryimage\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-sampling-manufacturing-hero.png\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/work-sampling-manufacturing-hero.png\",\"width\":1672,\"height\":940,\"caption\":\"Assembly, fixture setup and waiting beside an empty component tray illustrate work-sampling activity snapshots.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/forrasok\\\/multimoment-felvetel\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Multimoment felv\u00e9tel a gy\u00e1rt\u00e1sban: a rejtett fennakad\u00e1sok felt\u00e1r\u00e1sa\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#website\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"name\":\"SkyPlanner\",\"description\":\"AI-powered production scheduling and planning software\",\"publisher\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"hu-HU\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#organization\",\"name\":\"Skycode Oy\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"contentUrl\":\"https:\\\/\\\/skyplanner.ai\\\/wp-content\\\/uploads\\\/2022\\\/05\\\/Skyplanner-logo-2.svg\",\"width\":223,\"height\":43,\"caption\":\"SkyPlanner APS\"},\"image\":{\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"legalName\":\"Skycode Oy\",\"alternateName\":[\"Skycode\",\"SkyPlanner\",\"SkyPlanner APS\"],\"description\":\"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.\",\"foundingDate\":\"1997\",\"taxID\":\"2204947-0\",\"vatID\":\"FI22049470\",\"telephone\":\"+358407000002\",\"email\":\"support@skyplanner.ai\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"Rantakatu 2 G 11\",\"postalCode\":\"65100\",\"addressLocality\":\"Vaasa\",\"addressCountry\":\"FI\"},\"brand\":{\"@type\":\"Brand\",\"name\":\"SkyPlanner\"},\"knowsAbout\":[\"Production Scheduling\",\"Advanced Planning and Scheduling\",\"Manufacturing AI\",\"Finite Capacity Scheduling\",\"ERP Integration\",\"MES Integration\"],\"areaServed\":\"Worldwide\",\"contactPoint\":[{\"@type\":\"ContactPoint\",\"contactType\":\"sales\",\"url\":\"https:\\\/\\\/skyplanner.ai\\\/contact-sales\\\/\",\"areaServed\":\"Worldwide\"},{\"@type\":\"ContactPoint\",\"contactType\":\"customer support\",\"email\":\"support@skyplanner.ai\",\"telephone\":\"+358407000002\",\"areaServed\":\"Worldwide\"}],\"sameAs\":[\"https:\\\/\\\/www.wikidata.org\\\/wiki\\\/Q141672132\",\"https:\\\/\\\/skycode.fi\\\/\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/skycodeoy\\\/\",\"https:\\\/\\\/www.finder.fi\\\/IT-konsultointi+IT-palvelut\\\/Skycode+Oy\\\/Vaasa\\\/yhteystiedot\\\/1934882\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/skyplanner.ai\\\/hu\\\/#\\\/schema\\\/person\\\/d90eac23cfbf5af3a2c4a38ff10376b5\",\"name\":\"Jussi M\u00e4ntyl\u00e4\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"hu-HU\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g\",\"caption\":\"Jussi M\u00e4ntyl\u00e4\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Multimoment felv\u00e9tel: rejtett fennakad\u00e1sok a gy\u00e1rt\u00e1sban","description":"Multimoment felv\u00e9tel: v\u00e9letlen megfigyel\u00e9sekkel t\u00e1rja fel az id\u0151ar\u00e1nyokat, cs\u00f6kkentse a fennakad\u00e1sokat, \u00e9s \u00e9p\u00edtse be az igazolt v\u00e1ltoz\u00e1sokat az \u00fctemtervbe.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/skyplanner.ai\/hu\/forrasok\/multimoment-felvetel\/","og_locale":"hu_HU","og_type":"article","og_title":"Multimoment felv\u00e9tel a gy\u00e1rt\u00e1sban: a rejtett fennakad\u00e1sok felt\u00e1r\u00e1sa","og_description":"Multimoment felv\u00e9tel: v\u00e9letlen megfigyel\u00e9sekkel t\u00e1rja fel az id\u0151ar\u00e1nyokat, cs\u00f6kkentse a fennakad\u00e1sokat, \u00e9s \u00e9p\u00edtse be az igazolt v\u00e1ltoz\u00e1sokat az \u00fctemtervbe.","og_url":"https:\/\/skyplanner.ai\/hu\/forrasok\/multimoment-felvetel\/","og_site_name":"SkyPlanner","article_published_time":"2026-10-26T08:47:49+00:00","article_modified_time":"2026-10-26T08:48:50+00:00","og_image":[{"width":1672,"height":940,"url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-sampling-manufacturing-hero.png","type":"image\/png"}],"author":"Jussi M\u00e4ntyl\u00e4","twitter_card":"summary_large_image","twitter_misc":{"Szerz\u0151:":"Jussi M\u00e4ntyl\u00e4","Becs\u00fclt olvas\u00e1si id\u0151":"19 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/multimoment-felvetel\/#article","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/multimoment-felvetel\/"},"author":{"name":"Jussi M\u00e4ntyl\u00e4","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5"},"headline":"Multimoment felv\u00e9tel a gy\u00e1rt\u00e1sban: a rejtett fennakad\u00e1sok felt\u00e1r\u00e1sa","datePublished":"2026-10-26T08:47:49+00:00","dateModified":"2026-10-26T08:48:50+00:00","mainEntityOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/multimoment-felvetel\/"},"wordCount":3822,"publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/multimoment-felvetel\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-sampling-manufacturing-hero.png","articleSection":["APS \u00e9s \u00fctemez\u00e9s","forr\u00e1sok"],"inLanguage":"hu-HU"},{"@type":"WebPage","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/multimoment-felvetel\/","url":"https:\/\/skyplanner.ai\/hu\/forrasok\/multimoment-felvetel\/","name":"Multimoment felv\u00e9tel: rejtett fennakad\u00e1sok a gy\u00e1rt\u00e1sban","isPartOf":{"@id":"https:\/\/skyplanner.ai\/hu\/#website"},"primaryImageOfPage":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/multimoment-felvetel\/#primaryimage"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/multimoment-felvetel\/#primaryimage"},"thumbnailUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-sampling-manufacturing-hero.png","datePublished":"2026-10-26T08:47:49+00:00","dateModified":"2026-10-26T08:48:50+00:00","description":"Multimoment felv\u00e9tel: v\u00e9letlen megfigyel\u00e9sekkel t\u00e1rja fel az id\u0151ar\u00e1nyokat, cs\u00f6kkentse a fennakad\u00e1sokat, \u00e9s \u00e9p\u00edtse be az igazolt v\u00e1ltoz\u00e1sokat az \u00fctemtervbe.","breadcrumb":{"@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/multimoment-felvetel\/#breadcrumb"},"inLanguage":"hu-HU","potentialAction":[{"@type":"ReadAction","target":["https:\/\/skyplanner.ai\/hu\/forrasok\/multimoment-felvetel\/"]}]},{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/multimoment-felvetel\/#primaryimage","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-sampling-manufacturing-hero.png","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-sampling-manufacturing-hero.png","width":1672,"height":940,"caption":"Assembly, fixture setup and waiting beside an empty component tray illustrate work-sampling activity snapshots."},{"@type":"BreadcrumbList","@id":"https:\/\/skyplanner.ai\/hu\/forrasok\/multimoment-felvetel\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/skyplanner.ai\/hu\/"},{"@type":"ListItem","position":2,"name":"Multimoment felv\u00e9tel a gy\u00e1rt\u00e1sban: a rejtett fennakad\u00e1sok felt\u00e1r\u00e1sa"}]},{"@type":"WebSite","@id":"https:\/\/skyplanner.ai\/hu\/#website","url":"https:\/\/skyplanner.ai\/hu\/","name":"SkyPlanner","description":"AI-powered production scheduling and planning software","publisher":{"@id":"https:\/\/skyplanner.ai\/hu\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/skyplanner.ai\/hu\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"hu-HU"},{"@type":"Organization","@id":"https:\/\/skyplanner.ai\/hu\/#organization","name":"Skycode Oy","url":"https:\/\/skyplanner.ai\/hu\/","logo":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/","url":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","contentUrl":"https:\/\/skyplanner.ai\/wp-content\/uploads\/2022\/05\/Skyplanner-logo-2.svg","width":223,"height":43,"caption":"SkyPlanner APS"},"image":{"@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/logo\/image\/"},"legalName":"Skycode Oy","alternateName":["Skycode","SkyPlanner","SkyPlanner APS"],"description":"Skycode Oy is the Finnish software company that develops and publishes SkyPlanner APS, AI production scheduling and advanced planning and scheduling (APS) software for manufacturers worldwide. Founded in 1997 as a sole proprietorship and incorporated as Skycode Oy in 2008.","foundingDate":"1997","taxID":"2204947-0","vatID":"FI22049470","telephone":"+358407000002","email":"support@skyplanner.ai","address":{"@type":"PostalAddress","streetAddress":"Rantakatu 2 G 11","postalCode":"65100","addressLocality":"Vaasa","addressCountry":"FI"},"brand":{"@type":"Brand","name":"SkyPlanner"},"knowsAbout":["Production Scheduling","Advanced Planning and Scheduling","Manufacturing AI","Finite Capacity Scheduling","ERP Integration","MES Integration"],"areaServed":"Worldwide","contactPoint":[{"@type":"ContactPoint","contactType":"sales","url":"https:\/\/skyplanner.ai\/contact-sales\/","areaServed":"Worldwide"},{"@type":"ContactPoint","contactType":"customer support","email":"support@skyplanner.ai","telephone":"+358407000002","areaServed":"Worldwide"}],"sameAs":["https:\/\/www.wikidata.org\/wiki\/Q141672132","https:\/\/skycode.fi\/","https:\/\/www.linkedin.com\/company\/skycodeoy\/","https:\/\/www.finder.fi\/IT-konsultointi+IT-palvelut\/Skycode+Oy\/Vaasa\/yhteystiedot\/1934882"]},{"@type":"Person","@id":"https:\/\/skyplanner.ai\/hu\/#\/schema\/person\/d90eac23cfbf5af3a2c4a38ff10376b5","name":"Jussi M\u00e4ntyl\u00e4","image":{"@type":"ImageObject","inLanguage":"hu-HU","@id":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d5cfcd5c06352082aff699784151984268501dafe5084791a9f280d4e3ec500f?s=96&d=mm&r=g","caption":"Jussi M\u00e4ntyl\u00e4"}}]}},"uagb_featured_image_src":{"full":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-sampling-manufacturing-hero.png",1672,940,false],"thumbnail":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-sampling-manufacturing-hero-150x150.png",150,150,true],"medium":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-sampling-manufacturing-hero-300x169.png",300,169,true],"medium_large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-sampling-manufacturing-hero-768x432.png",768,432,true],"large":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-sampling-manufacturing-hero-1024x576.png",1024,576,true],"1536x1536":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-sampling-manufacturing-hero-1536x864.png",1536,864,true],"2048x2048":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-sampling-manufacturing-hero.png",1672,940,false],"betterdocs-category-thumb":["https:\/\/skyplanner.ai\/wp-content\/uploads\/2026\/10\/work-sampling-manufacturing-hero-360x202.png",360,202,true]},"uagb_author_info":{"display_name":"Jussi M\u00e4ntyl\u00e4","author_link":"https:\/\/skyplanner.ai\/hu\/author\/jussi\/"},"uagb_comment_info":0,"uagb_excerpt":"Multimoment felv\u00e9tel a gy\u00e1rt\u00e1sban: a rejtett fennakad\u00e1sok felt\u00e1r\u00e1sa Kezd\u0151lap &raquo; Er\u0151forr\u00e1sok &raquo; Multimoment felv\u00e9tel a gy\u00e1rt\u00e1sban: a rejtett fennakad\u00e1sok felt\u00e1r\u00e1sa Egy \u00fczemi bej\u00e1r\u00e1son ugyanaz a m\u0171szak az egyik pillanatban leterheltnek, a m\u00e1sikban kihaszn\u00e1latlannak t\u0171nhet. Egyik l\u00e1togat\u00e1sb\u00f3l sem der\u00fcl ki, mennyi id\u0151 jut az alkatr\u00e9szek gy\u00e1rt\u00e1s\u00e1ra, a munka el\u0151k\u00e9sz\u00edt\u00e9s\u00e9re vagy arra, hogy meg\u00e9rkezzen valami, amire sz\u00fcks\u00e9g&hellip;","_links":{"self":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/110773","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/comments?post=110773"}],"version-history":[{"count":1,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/110773\/revisions"}],"predecessor-version":[{"id":110836,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/posts\/110773\/revisions\/110836"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media\/110797"}],"wp:attachment":[{"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/media?parent=110773"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/categories?post=110773"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/skyplanner.ai\/hu\/wp-json\/wp\/v2\/tags?post=110773"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}